R2021-032 2021-02-22RESOLUTION NO. R2021-32 A Resolution of the City Council of the City of Pearland, Texas, amending a contract for design services with Dannenbaum Engineering Corporation, in the additional amount of $255,109.15 (total contract amount of $1,367,840.65), associated with the Smith Ranch Road Expansion Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That a contract for design services associated with the Smith Ranch Road Expansion Project was previously awarded to Dannenbaum Engineering Corporation. Section 2. The City Manager or his designee is hereby authorized to execute an amended contract for design services associated with the Smith Ranch Road Expansion Project. PASSED, APPROVED and ADOPTED this the 22nd day of February, A.D., 2021. VIN COLE AYOR ATTEST: /e_utie.e_ CRYSTAL ROAN, TRMC, CMC CITY SECRETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 pearlandtx.gov/projects Professional Services Contract Amendment Smith Ranch Road Expansion Date of Issuance: 03/03/2021 Consultant: Dannenbaum Amendment No.: CoP Project No.: P.O. No.: 2 TR1501 2017-00000547 Explanation: This change order encompasses the following: This contract amendment is to add additional services to redo expired appraisals and related work along with title searches for the preliminary right-of-way acquisition services resulting from delays due to required TxDOT funding corrections that resulted in a revised Advanced Funding Agreement and a delay in release of the Letter of Authority to proceed. Description of Work Cost Time 0 Days 1 Revise the quantity from 1 to 1.5299955535333899 on Item No. 3 3 Surveying, Parcel Acquisition, & ROW 2 Revise the quantity from 1 to 1.8192463087792745 on Item No. 4 4 Project Mgmt & Managing Contracted Services 3 Revise the quantity from 1 to 1.05856096314384689 on Item No. 8 8 Signing, Pavement Marking, TCP, Signals, & Illum. Please attach back-up documentation. $ 205,015.00 $ 47,567.71 $ 2,526.44 0 Days 0 Days Cost & Time Change Summary Cost Time Original Contract: $ 1,112,731.50 0 Days Previous Amendment(s): $ 0.00 0 Days Contract prior to this Amendment: $ 1,112,731.50 0 Days Net increase (decrease) from this Amendment: $ 255,109.15 0 Days Revised Contract: $ 1,367,840.65 0 Days Finance Approval: ACCEPTED*: By + `� —' Date 03/04/2021 Date 03/09/2021 APPROVED: By: Date 03/08/2021 Consultant Project Manager By: - Date 03/09/2021 Owner *Consultant agrees to perform change(s) included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes identifies for the contract value and/or contract time shown, are made part of the Design 1 of 1 D4. Revised 7/08 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2 11h 9F1186A0E6 Texas Department of Transportation P.O.BOX 1386, HOUSTON, TEXAS 77251-1386 1 713.802.5000 I WWW.TXDOT.GOV February 8, 2021 Mr. Skipper Jones Assistant Director City of Pearland 3519 Liberty Drive Pearland, Texas 77581 RE: Brazoria County CSJ: 0912-31-293 CS: Smith Ranch Road from Hughes Ranch to FM 518 Dear Mr. Jones: Thank you for sending us the attached consultant contract amendment between the City of Pearland and the Dannenbaum Engineering Corporation for the referenced project. The amendment has been reviewed by the Texas Department of Transportation(TXDOT) and our comments regarding the contract have been addressed. We have determined that the contract amendment adequately describes the work to be performed and that it for a fair and reasonable price. We request that you proceed to execute the contract amendment with Dannenbaum Engineering Corporation at your earliest convenience. When the contract amendment has been fully executed, we request that you send us a copy of the fully executed contract amendment and all subcontracts. Please contact me, at (713) 802-5501, should you have any questions or need additional information. Sincerely, L_H4 DocuSigned by: P t . F4BE6AED4B6740E... Mark D. Patterson, P.E. Director of Consultant Contracts Administration Houston District Attachment cc: Mohammed Zubair, P.E. w/attachment OUR VALUES: People • Accountability • Trust • Honesty OUR MISSION: Connecting You With Texas An Equal Opportunity Employer DocuSign Envelope ID: 89F8AE7C-0888-4A28-BBj�39F1186A0E6 WAs Used \\ Contracno.TR1501/CSJ 0912-31-293 ATTACHMENT D D-2 SUPPLEMENTAL WORK AUTHORIZATION NO. 2 WORK AUTHORIZATION NO. 2017-00000547 CONTRACT FOR ENGINEERING SERVICES THIS SUPPLEM ENTAL WORK AUTHORIZATION is made pursuant to the terms and conditions of Artide 5 Contract No. TR1501/CSJ0912-31-293 hereinafter identified as the ''Contract," entered into by and between the City of Pearland; and Dannenbaum Engineering Corporation (the Engineer). The following terms and conditions of Work Authorization No. 2017-00000547 are hereby amended as follows: 1. Attachment C, Services to be provided by the Engineer, is amended to add the following services at a cost of 255,109.15. • FC 130 i. Provide revised right-of-way maps/plats, property owner changes, revised metes and bounds descriptions and follow-up field work for 19 parcels; ii. Condemnation appraisal updates, preparation and testimony for 7 parcels; iii. Revised title reports, appraisal updates and reviews for 19 parcels; and iv. Additional Right of Way project administration including revised offer letters and owner coordination for 19 parcels. • FC 145 i. Project management including 6 additional meetings and a revised schedule. • FC 162 i. The addition of a fiber optic line for the project length. 2. The maximum amount payable under the Contract's increased by $255,109.15from 1,112,731.50 to $1,367,840,65, All other provisions are unchanged and remain in full force and effect. This Supplemental Work Authorization shall become effective on the date of final execution of the parties hereto. All other terms and conditions of Work Authorization No. 2017-00000547 not hereby amended are to remain in full force and effect. IN WITNESS WHEREOF, this Supplemental Work Authorization is executed in duplicate counterparts and hereby accepted and acknowledged below. DANNENBAUM ENGINEERING CORPORATION THE CITY OF PEARLAND (Signature) 3LA 12. C . 5V0 Gl4 Q � . (Printed Name) c7eito2 e(ec) MAA1. tNe (Title) 215/202.! (Date) (Signature) (Printed Name) (Title) (Date) Fnnineerinn—Fnnineerinn Sncr.DehnWA dnn Pane 1 of 1 Attachment 17-7 DocuSign Envelope ID: 89FSAE7C-0888-4A28-BB 74/1.°39F1186A0E6 DANNENBAUM ENGINEERING CORPORATION 3100 WEST ALABAMA HOUSTON, TEXAS 77098 PO Box 22292 HOUSTON, TEXAS 77227 (713) 520-9570 December 29, 2020 City of Pearland Attn: Ms. Cara Davis Senior Project Manager 2559 Hillhouse, Pearland, TX 77584 Subject: Smith Ranch Road, Change Order No.1 Dear Ms. Davis: ENGINEERING EXCELLENCE SINCE 14345 As requested in your email dated 12/28/2020, please find attached the following documents: • Revised costs for Change Order 1 (Dannenbaum Cost Spreadsheet, CSJ 0912-31-293) • Revised Change Order 1 (covering only FC 130, 145, 162) • Amendment Cover Sheet (Form D-2) • Proposals from Abstract Services of Houston, PAS Property Acquisition Services, Sandy Rials, and IRR These documents are being transmitted to you for your review and concurrence in accordance with your email dated 12/28/2020 requesting resubmission of documents. The attached Change Order No.1 documents our additional costs for Right of Way services, meetings and a fiber optic line. These costs have been adjusted as per discussions with the City of Pearland on 11/17/2020. As directed, we have included only the revised sheets of the cost documents (Dannenbaum Cost Spreadsheet, CSJ 0912-31-293). It is our understanding the City of Pearland will use this information to gain TxDOT's approval for the Change Order to allow property acquisition to proceed to meet the January, 2022 letting. As a reminder, there are other additional costs for this project that are to be discussed later and were removed from this Change Order at the request of the City of Pearland. If you need anything else, please let us know. Thank you. Sincerely, Blair Blair C. Stocker, PE Senior Project Manager Dannenbaum Engineering Corporation (713) 527-6367 - Office (281) 731-4338 — Cell Xc: Skipper Jones (City of Pearland) Fatema Weekly (City of Pearland) Anthony Vu (City of Pearland) Nick Bokaie (Dannenbuam Engineering) DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2A-5B9F1186AOE6 DANNENBAUM ENGINEERING CORPORATION SMITIJ RANCH ROAD DESIGN CSJ 0912-3I-293 EAiScope Additions 1 TASK DESCRIPTION Principal Prolerl or Survey PM Senior Engineer Sen, Ilyd. Engineer or Sr. Surveyor . rims Design Engineer or2-Mon Crew Senior De0igeerl Engineer CARD Operator or Survey T'eebnlelan QAIQC Review Clorirni Tolnl tabor flours & Cos5 No, of Drooingo Labor Hours/ Sheet TOTAL COST/ TASK HOWLS SUB -TOTALS 0 0 8 4 80 8 24 4 4 132 10 LABOR 30'03i 5.E30810110 575.00 575.00 $55.00 555.00 $45,00 540.00 530.00 565.00 530.00 DIRECT LABOR COSTS 50.00 3000 $440.00 5220.00 53,600.00 5320.00 $720.00 5260.00 $120.00 5.680.00 $5,680.00 10B MULTIPLIER 2.6078 2.6078 2.6078 2.6078 2.6078 2.6078 2.6078 2,6078 2.6078 TOTAL LABOR COSTS 50.00 50.00 51.147.43 $573.72 59,38808 5814.50 $1.877.62 5678.03 '5312.91 514,812.30 FXED FEE (120) 51,777,48 r0'TAL(163H 516.5119,76 ENGINEERING/PROJECT MANUAL SUBMI"rFAL 160%, 90%, 95%, 100 %11FC I64( CONDUCT QC/QA ON SUBMITTALS 160%-90%, 100%1 12 12 $700.00 UPDATE DESIGN SCHEDULE 160%. 9096. 100%1 4 4 S I80.00 PREPARE AND SUOMTr PROJECT MANUAL 8 16 40 16 80 - 53.760.00 PREPARE AND SUBMIT 60%, 90°6, 9595, tom SUBMIIT'AL(Penrland,TxDOT) 3 6 6 6 21 5855.00 PREPARE PS&E SUBMISSION DATA SHEET AN17 CHECKLIST (District and Division Review) 4 -4 5160.00 ADDRESS AEI. COMMENTS (PearlaM,TxDOT30%.6os59o%, 05% Renew Comments on Drawinpa) 2 2 4 4 16 I8 31,040.00 SUBMIT 100%SUBMITTAI, 4 2 6 5240,00 HOURS SUB -TOTALS 0 11 18 2 62 4 22 12 24 155 0 0A006RATE PER Il000 575.00 $75.00 $55.00 S55.00 545.00 540.00 530.00 565.00 530.00 DIRECT LABOR COSTS 50.00 5825.00 5990.00 5110.00 52,790.00 5160.00 5660.00 5780.00 5720,00 57,035.00 57,035,00 10B MULTIPLIER 26078 2.6078 2.6078 2.6078 26078 2.6078 2.6078 2,6078 2.6078 TOTAL LABOR COSTS 50,00 $2,151.44 32,581.72 5286,86 57,275,76 5417.25 01.72115 52034.06 51,67762 518,145.87 FIXED FL•E (12%) $2,20I.50 TOTAL (1641) 520.547.38 PROJECT MANAGEMENT (68 % , MI% 95 % , IU0 % p FC 1451 PREPARE MONITILY INVOICES (8 MONTHS) 4 4 5220.00 PREPARE MONTHLY PROGRESS REPORTS (8 MONTHS) 4 4 5220.00 ATTEND MOOT PROTECT MEETINGS 12 MEETINGS) 6 6 4 16 5720,00 ATTEND PFARIAND PROTECT MEETINGS (4 hfEET1NGS) 16 16 4 36 $1,720,00 ATTEND SAFETY REVIEW TEAM MEETING (1 MEETINO9ToDOT) 4 4 1 9 5430,00 ATTEND 11ri1.0TY COORDINATION MEETING II MEETING) 4 4 I 9 5430.00 COORDINATE WITH PUBLIC UTILITIES 4 1 5 5210.00 COORDINATE WITH DRAZOIUA COUNTY 4 1 5 53100 COORDINATE WITH PRIVATE IIHLTIIES 8 1 9 53900.00 COORDINATE WITH PEAI(LAND 2 8 I I I 5300.00 COORDINATE 5VrO1 TxDOT 2 8 I 11 5300.00 COORDINATEWTOI FIERO OLIVER 4 8 24 12 48 52,180,00 COORDINATE WrIH IN EGRA 12 48 12 72 53,160,00 COORDINATE WiT1 RUHERFORD 3 6 6 15 5615,00 COORDINATE WITH ABSTRACTING SERVICES 6 6 12 24 596000 COORDINATE WBII104IIDSON 4 4 8 5300.00 COORDINATE WIHI ADS 0 50.00 COORDINATE WITH MS 0 $0.00 Change Ordrr 1 Pt9Jrs15.1 Additional McNingv(Novembet 2019 to September 2021)(6 Meetings) . ' 23' . , 20 _ $6,78028 TOTAL CHANGE OItUER I(FC 145) - - e:Yfiii! HOURS 5110-T07'A(S 0 4 71 ' 0 I50 0 0 0 61 286 0 LABOR RATE PER HOUR 573.00 575.00 055,00 555.00 545.00 540.00 530.00 565.00 $30.00 DIRECT LABOR COSTS 50.00 ' 0)00.00 53905.00 50.00 $6,730.00 $0.00 S0,00 $0.00 51,630.00 512,765.00 512,785.00 10B M1J,TIP1.3E8. 2.6078 2.6078 2.6078 3.6078 26078 26078 2.6078 2.6078 • 26078 0h11201468341 Smith Ranh Road PEAlt ANLYAdmin`Ciwnge Order llSRRScope&Budget 111220 with C041.8len 7 1229/2020 DocuSIgn Envelope ID: 89F8AE7C-0888-4A28-BB2A-5B9F1186A0E6 DANNENBAUM ENGINEERING CORPORATION SMITH RANCH ROAD DESIGN CSJ 0912-31-293 EA Scope Additions _ 1 TASK DESCRIPTION Principal Projeel or Survey PSI Senior Engineer Sen. Ilyd, Engineer or Sr. Surveyor PRPS Design Engineer or2•S1no Crew Senior Designer/ Engineer CAD» Opermnr or Survey Technielon QA/QC Review Clerical Total labor Hours di Costs No. of Drawings Labor Dom/ Shed TOTAL COST! TASK TOTAL LABOR COSTS $11.00 578134 510,183.46 50.00 517.602.65 Se00 50.00 50.00 54.772.27 533,340,72 FIXED FEE (12%3 54,000.80 TOTAL(1451) ,dl 0:1112MN883.01 Smith Ranch Road PEARLANDtAdmiteChanrc Order li.SRRScupe&Budget 111220 with CO0Tales 8 12R9/2020 DocuSlgn Envelope ID: 89F8AE7C-0888-4A28-BB2A-6BEF1186A0E6 DANNENBAUM ENGINEERING CORPORATION _ _ SMITH RANCH ROAD DESIGN CSJ 0912-31-293 _ _4 LA_;pc Addition •F a 71 TASK DESCRIPTION Principal Proleel or Surrey P31 ` Senior Engineer Sen. 11)11. Engineernr Sr, Surveyor PEPS Design Engineer or2-Sinn Cress Senior Designer/ Engineer CARD Opemlor or Surrey T.hnleinn QA/QC Review Clerical Told labor floors A Costs No. of II miring, labor Doors/ Sheet TOTAL COST/ TASK PS&E DIRECT EXPENSES . TRAVEL ($056 PER MILE0PEARfAN0550 Miles RT) VC 145 322100 TRAVEL (S0.36 PER MIIEt(I.DOTK10 MHO RT) PC 145 52800 TRAVEL (50.56 PER MIIE)(Sitex25 Mil. RT) FC 145 30.E MISCELLANEOUS FC 145 S9R00 12 60%, 90%, 95%DRAWING SETS PRINTING (51.00 PER SIIEE )(11 x 17 INCII)(250 Sheets) FC 164 12 100% DRAWING SETS PRINTING (SI.00 PER SIIEET9I I x 17MCI 8(250 Sheds) EC 164 03 00000 PLOTTING B&B MYLARS (S5 EACI1511 x 17 )NCII PLOTSX250 Sheets) FC 164 51,230.00 MISCELLANEOUS PHOTOGRAPHS, PUBLIC INVOLEMENT DISPLAY MATERIALS FC 164 S) 00000 Chinge Order 1 .. .. .. Mileage (6 Meetings)(Peorinnd) SI68.00 . . TOTAL CHANGE ORDER (FC 145) 11111111MM11111111- TOTAL DIRECT EXPENSES 511.76E00 TOTAL PLANS, SPECIFICATIONS, AND ESTIMATE BASIC FEE 0 13 151 18 396 236 513 36 89 5189,166.26 145 1.454 TOTAL PRELIMINARY ENGINEERING SERVICES BASIC FEE 0 23 80 16 273 68 216 12 31 S92,258.67 25 TOTAL ENGINEERING SERVICES BASIC FEE 0 38 231 34 669 304 729 48 140 170 'iR13091,41 UNIT RATES 5195.58 5195.58 $143,43 S143.43 S117.35 S10431 S78.23 S169.50 S78.23 0311204883-01 Smith Ranch Road PEARLAWUdmio'Chonge Order IISRRSo pe&Oodgel 111220 with C041.31. 9 12/292020 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2A-5B9F1186A0ER DANNENBAUM ENGINEERING CORPORATION SMITH RANCH ROAD DESIGN CSJ 0912-31-293 EA Scope Additions 1 TASK DESCRIPTION Principal Project or Survey rat Senior Engineer Sen. Iiyd. Eoglneeror Sr, Surveyor pars Design Engineer or 2-Man Crete Senior Designer/ Engineer CAD) Operator or Survey Techniclaa QNQC Reim Clerical Total Laboriloon &Cost, Pin. of Drawings labor hours/ Sheri TOTAL COST/ TASK AI)DITIONAI, SERVICES GEOTECIINICAL EXPLORATION (Terracon)IFC 1101 (Tememn) .. .. .. CONDUCT FIELD EXPLORATION [toad. Slormwnlcr]i10 borings to 20 feet( 59,10000 PERFORM LABORATORY TESTS CONDUCT ENGINEERING ANALYSES AND PREPARE REPORT 53.550.00 TRAFFIC CONTROL 57.500.00 Subtotal r_l,9so.00 TOTAL C.EOTCCIINICALEXPLORATION $21,950 _ CEOTECHNICAL EXPLORATION (Terrncon)(Offaile DctcnOGn)(FC 1101 NOT INCLUDED IN SCOPE- OF WORK - Subtotal TOTAL GF.OTECIINICAL EXPLORATION so BRIT RATES $180.00 5200.00 512.5.00 SI10.00 $80.00 5209.01 S50.00 SURVEYING WC 1301 (Damaenbaam) RIOI1T-0E-WAY MAPPING DC 130) RIGKT-OF-ENTRY LETTERS 6 Id 51.956 PREPARE ABSTRACT MAP 8 60 57.800 RECOVER AND TIE (Motmmenra.Comers, Boundaries) 34 140 60 $29,960 PREPARE ROW MAPS 17) 16 60 59,000 PREPARE PARCEL MAPS (24 Patrols) 40 150 $22.500 PREPARE PARCEL METES AND BOUNDS (24 parcels) 25 ' 50 59250 MONUMENT ROSY AND PARCELTAKINOS 5 50 57,2so QCJQA 20 54,E MENSES (57700.56800= 5900) 5900 SURTOTALFC 130 0 20 0 134 190 0 380 0 16 592,556 Choke Order 1 .) . Prepare Temporary construction Easements(TCEI forParcel 3 and Parcel 8 2 8 6 2 52,6d0 52,979 Parcel 3 E Metes and Bounds Document Revisal to Parcel (fee) - 1 ' 4 3 1 $1,330 . 51.490 Resubmit ReSiscd Righta4Way Documents due to changes ' " - .. 8'- 8. "32" " . 22. 10 • - $12,100 " - - - 513.552 Parcel 1.Drdicatlon• 2 5 - '8 1 $2230 52,498 Reeelv&JRevinv Patrol Mai:Metes and Bounds per Title company changes(Mn'.Ioe 2019) . - . . 8 6 58• '' - A7 8. 5I8250 520,440 Reeeive/Rovlew Pertti Mnp/Meies and Bounds per revised Title company changes (July 2019) . . 7 •2 32 •. 20 . 4 •.. . 59,520 ' - 510.062: Revlse ROW Set to match Title company chanF s .. 3 . ' . 20 13 .3 $5,630 56,306 Revise Parcel 16 includingfieldwork doe to Recent Comer Clip Changes .: 2 - .. 16 • - .. .. 10 ' . . , 1 .. $4,100 - . .. .. - $4.592 Parcels 5 ua112 Split outs ' ' '' ..' 6 :.' .24 .' :.' 16 ..' 4 :' 57,360' •. .--E8.243 'TOTAL CHANGE ORDER 1(EC 1501 - SURVEYING ITC 1501 SURVEYING (FC 150] ESTABLISII PRIMARY CONTROL NETWORK (Sunray Control,A(iprmtem, and Control Monuments Sheets) 2 23 65 24 $14,940 6 GA11204883.01 Smith Ranch Road PEARLAhTAAdminlChange Order IISRRScope&Budge) 111220 with CON Lidos 10 1229/2020 DocoSign Envelope ID: B9FBAE7C-0888-4A28-BB2A-5B9F1186A0E6 DANNENBAUM ENGINEERING CORPORATION SMITH RANCII ROAD DESIGN CSJ 0912-31-293 EA" Scopo Additions TASK DESCRIPTION PrInelpol Project or Survey P51 Senior Engineer Sen. 1lyd. Engineer or Sr. Surveyor PEPS Design Engineer or2-Mon Crew Senior Designer/ Engineer CA DR Opernier or Survey Terbnklom Q,VQC Review Clerical Total Labor Doom & Cosh No. of DrarIngs Labor (lours/ Sheel TOTAL COST/ TASK SURVEYING (Of/site Detention) Not included in Scope of Work 1FC 130/1501 r oEERIE PARCEL (One Parcel).; . . TOPOORAP1HC00UNDARY SURVEY rARCEf: (FC150) PARCEB. SURVEY )FC 130) R9OHI'OF.EYIRY FOR PARCEL TAKING FC 130) _ SUBTOTAL Offsite Detention 0 0 0 0 0 0 0 U 0 50 - HOURS SUBTOTALS 0 41 0 21) 390 0 502 0 16 6 LABOR RATE PER HOAR $0.00 5200.00 5160.00 $150.00 S130.00 S0.00 $110.00 5200.00 $66,00 DIRECT LABOR COSTS 10.00 $8.200.00 SD.00 131,650.00 550,700.00 50.00 155,210.00 50.00 51,056.00 3146,816,00 10.00 TOTAL LABOR COSTS $0,00 $8,200.00 S0.00 031,650.00 S50,700,00 50.00 155,22000 30.00 51,056.00 0217,587,60 TOTAL EXPENSES $900.00 TOTAL(I64H IMMIMTMIIMII UTILITY COORDINATION 130%, 60%, 90%, 95%, 100 % 11FC 1631 IDaonenbaom) OBTAIN UTILITY MAI'S 2 8 I 11 $540.09 COORDINATE WTI POWER COMPANY (Company Nome) I 1 2 575.00 COORDINATE WITH COMMUNICATION COMPANY (Camsan) I 1 2 $75.00 COORDINATE WITH OAS COMPANY (CenterPuint) I 1 2 S75.00 COORDINATE WITH WATER(Peadan(I) I 1 2 575.00 COORDINATE WITH SANITARY (Pcadaed) I 1 2 575.00 COORDINATE WITH PIPELINE COMPANIES (One Company) 2 I 3 5120.00 COORDINATE W171I SUP. COMPANY AND SURVEYOR (xx Pat Hales) - 0 $0.00 CONDUCT UTILITY COORDINATION MEI:TINES (Tam Meetings: 30% and Pre Lenln5) 8 8 2 18 51,020.00 PREPARE UTILITY LEGEND 2 8 IU I 10 $32000 PREPARE EXISTING UTILITY PLAN AND PROFILE. (1'=501(60%, 90%, 100%) 4 8 8 24 44 8 6 $1,620.00 PREPARE PROPOSEDVKII.TTY PLAN AND PROFILE(1,10)190S. 100%) 4 8 8 14 44 8 6. 51.620.00 PREPARE UTILITY STANDARDS 19055, 100%) 12 12 11 1 5360.00 CALCULATE UTILITY QUANT1TIBS (9055, I00%1 0 8 S360.00 PREPARE SUMMARY OF UTILITY QUANTITY SHEETS 190%. 100%) 4 4 8 16 I 16 S580.00 PREPARE UTILITY CONFLICTS LIST (30%, 60%, lo°A, 100%) 12 2 14 $600.00 PREPARE RI4QUIREO ACR00MIZNTS (Joint Uso, Advsncnl Finding) -NONE 0 30.00 PREPARE UTILITY EXHIBITS (Three Exhibits) 4 8 16 28 S980.00 HOURS SUBTOTALS 0 10 8 0 67 30 92 0 11 218 29 LABOR RATE PER IIOUR 75.00 75.00 55.00 55,00 45.00 40.00 30.00 65,00 30.00 DIRECT LABOR COSTS S0.00 $750.00 S440.00 00.00 $3,015.00 51,200,00 S2,760.00 $0,00 $330.00 55.495,02 58,495.00 100 MULTIPLIER 2.6078.. 2.6078 2,6078 2.6078 2.6078 2.6078 2,6078 2.6078 2.6078 TOTAL 1AOOR COSTS $0.00 11,935,85 S1,147.43 $0.00 $7,862,52 03.129,36 57.197,53 $0.00 $860.57 S22.153.26 FIXED FEE (12%). $2.658.39 'TOTAL URILIT' COORDINATION (1634) S24,811,65 05112014883-01 Smith Ranch RoodPEARLAND1AImin'1Change Order 11SRRSeope&budget 111220 with COW I.xls:c 12- 12J29/2020 DocuSign Envelope ID: BOFBAE7C-0688-4A28-BB2A-5B9F1186A0E6 DANNENBAUM ENGINEERING CORPORATION SMITH RANCH ROAD DESIGN CSJ 0912-31-293 .EA'Scope•Addition9, _ TASK DESCRIPTION Principal _ Project or Survey PM Senior Engineer Sen. llyd, Engineer or Sr. Surveyor PIs1'S Design Engineer or2-Men Crete Senior Designer/ Engineer CARD Operator or Survey Technician . QA/QC' Review Clerlenl Total Labor Hours 0 Costs No. of Drawings Labor Hours/ Sheet TOTAL ' COST! TASK :1'UGIIT=OP-WAY ACQUISITION (PC 130) 112•DMONT11Sj (Daoaeeb0um)` '. NEGOTIATION PROCESS (53.000 per parcel((24 Pascals) 380.640.00 RELOCATION SERVICES (54,000 perprreel)(l'Pateel) . . - E4,460.00 S16 128,00 TITLE.AND amnia SERVICE FEE15600 perFarcel)(24 Duals) - PROJECTADMINLSTRATION FEE (94,000 perMontE812 Months) , -._ ,.. --_.. ., 553,760.00 CONDP-MNAIION SUPPORT (If Requested by City of Pcadan488 Parcel at 34,500 per Parcel) 50,00 CONDEMNATION SUPPORT Of Requested by City of Peadand04 Months at S4,000 per Month) 50.00 Change Order l Negotiation Process (53,00D perparee1H19 Parcels) ' .. - S 57000.00 Relocation Soviets (34,000 per putce1)(1 Pare0O(Subcoosu(Imc PAS) .. . - S 3.501100 Title and Closing Service Pet(S600 per Parcel 1(19 Panels). S I140000 $; Pooled Administration Fee(S4A00 per Month)(24 Months)(April 2019 to Dee. 2021) .. .. 361 .. :. 155 31- S85.744:46 - .' SUBTOTAL CHANGE. ORDERI,FC 130 y 0) 96,0J3,80 . .- ,RIiMA1NING IN TASK .. £5 13:i353 ISI�t7A73e03 TOTAL CHANGE ORDER FC 130 - HOURS SUB -TOTALS 0 0 0 0 0 0 0 0 0 9 0 TABOR RATE PER DOUR 575,00 575,00 S55.00 S55.00 3)5.00 540.00 530,00 S65.00 530.00 DIRECT' LABOR COSTS 30.00 50.00 50.00 S0.00 513 OD 30.00 S0.0D 50.00 50.60 S0.00 $155.008.00 LOB MULTIPLIER 2.e078 2.6078 2.6078 2.6078 2.6078 2.6078 2.6078 2.6078 2.6078 TOTAL LABOR COSTS 30.00 S0.00 S0.00 S0.00 S0.00 S0.00 S0.00 S0.00 30.00 S155,008.00 FIXED FEE(1253) 50.00 TOTAL(1301) - - 1.1.1kTrOTatIME S000 -. „. .. .-PARCEL APPRAISAL':(FC1301 ....• ,.. .. (Integra Real Estate) APPRAISALS UP T022 PARCELS AT 5 3,750 EACH. S62,500.00 LS APPRALSALSUPTO 2PARCBAT 15,00D.EACH.- - ' S10,000.011 CONDEMNATION APPRAISAL UPDATES (Assume7 Parnls at 53,000 each) . $0,00 CONDEMNATION APPRAISAL UPDATES (Assume I Para( at 34.50) . . 9.0.00 CONDEMNATION PREPARATION AND TESTIMONY (Assume 8 Parcels at 8 hours at 5200 per lour) FA 00 Change Order 1 ' ' Appmisclo 6 Parcrlr 67 33,750 Each . •$22,50000 Approisels Update: 12 hinds of S3,000 each Condemnation Appraisal Updates (Assume 9 Parcels at S3.000 each) - - ' 27,000.U0 CondemnatlooPopo:ation and Testimony (Assume 9 Parcels it 25 hta4Jmrcel nl 5200 per hr.)T OU SURTOTALCIIANG0 ORDER I PC 130 .. ... t,,'r • S130.500.00 '. .' .'. '. RBIHAMNIN0 INTA0IC .- .'.' -. r�1�r1s,601 7�r t,� • TOTAL CHANGE ORDER" FCI]0 , � � .. .. ._ .. .. .. �• t,; ,:,) TOTAL PARCEL APPRAISAL REVIEW.(FC 1301 :' (Rutherford Roil Edala) 5. APPRAISAL REVIEWS UP TO 22PARCELS'AT 5800 EACH. -. 517,600.00 APPRAISAL REVIEWS UJPT02'PARCEL4 AT S900 BACK . _.... .. ." .. .. - 51.800.00 O:U12044883-01 Smith Ranch Road PFARLANDV.dminnCbonge Order 11SRl6Seope&Uudgct 111220 with CONI:eisx 14 12292020 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2A-5B9F1186A0E6 DANNUNI3AUM ENGINEERING CORPORATION SMITH RANCH ROAD DESIGN CSJ 0912-31-293 EA Scope Additions TASK DESCRIPTION Principal Project or Survey P31 Senior Engineer Sen. llyd. Engineer or Sr. Surveyor POPS Design Engineer or2-Mao Crew Senior Designed Engineer GWD Operator or Surrey Technician QAIQC Review Clerical Total Labor Hours &Corte No. of Drawings Lnbor (lours/ Sheet TOTAL COST! TASK CONDEMNATION APPRAISAL UPDATES (Assume 8 Parcels al MO each) E0.00 Change Order I .. .. • . • . , . Appraisal Review 19 Parcels at $1,500 each ' • $28,500 Appraisal Review Updates: 9 Parcels et S1,500 each. susop . .. S42,000,00 SUBTOTAL CHANGE ORDER 1 FC 130 IIIIMEMIR REALUNING IN TASK . . - . . 1111111EIDjDIET' TOTAL CHANGE ORDER 1 FC 130 - yt, TOTAL ;, t ' ' $0.00 0:1112014887-01 Smith Ranch Road PEARLA14DsAdminuAmnge Order 11SRRSeape&Oudgee 111220 with C0111 Atm 15 12292020 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2A-5B9F1186A0ES DANNENBAUM ENGINEERING CORPORATION SAMITII R 4NCII ROAD DESIGN CSJ 0912-31-293 EA Scope Additions. TASK DESCRIPTION Principal Protect or Surrey P31 Senior Engineer Sen. IIyd. Engineer or Sr.Suroeyor PUPS Design Engineer or 2-Mon Crew Senior Designer/ Engineer CARD Operator or Sun•cy Technician QA/QC Review Clerical Tnlal labor lloun &Casts No. or Drawings 'Lobo, Hours/ Sher) TOTAL COST( TASK ARTRACTING SERVICES'AND TITLE PREPARATION IFC 1301 - ' - (Abstracting Services of Houston)' TITLE REPORTS UP T024 PARCELS AT S400 EACH S9,600.00 TITLE REPORT UPDATES UP TO72 AT S500ACII S3,600.00 ESCROW FEES UP TO 24 PARCELS ATS500 EACH 512,000.00 TAX CERTIFICATES UP TO 24 PARCELS AT S90 EACH $2,160.00 POLICY FFPS ]TORE DETERMINED] 50,00 DOCUMENT RECORDATION COSTS ]TO REDETERMINED] .. S0.00 Change Order l Title Report Updates: 3 ,,19 at S50 each - ' S2,850 Tito Split Outs and New Tracts ( 3150/split oat & S400Mew cxoml:150 x2-0S4110 x2 - $1,100 Survey Review end Consultition(SS0/survey 19 a S50 (1st rourd)'19 x S50 (2nd round) • -' 37.900 Tax Certi0umcs: 19 Parcels Al S77.64 each . , S1,475 EurosvFees: 19 Piients of 5750 each .- 514,250 Tile Polley Fees .. .. .. .. .. .. .. S10.738 Document Preparation (Per Momey Pass Through) . .. . 'S7 000 Recording Fees (Per County Clerk Pass Through) .. $1500 ' SUBTOTAL CIIA74GE ORDER !Mlle _ 0 a`� • RESTAINING IN TASK ',aiT6 TOTAL CHANGE ORDER I PC 130 a i TOTAL . C44-rl ,ri I " - - . ENVIRONMENTAL (Berg-Oliver)(EAJIFC 1201 "- - (Berg Oliver) .. . _ . .. .. . EA nod NWP 1. Project Management .wJ QA/IC . 52.662.52 •.. 2. Emdrorunenul Setting and Evaluations - - S14.420.95 1. Hilton' Cultural..iul Archeological Survey - 58,438,33' 4. Traffic Noise end Air Duality An.lysl6 - • S11,734,76 S.,Indirccl and Cumulative Tingeds .. _ ,511,707.78 .. IOA'Document Prepautian &Comment Resolution' . - S11,057,45 S. FONSI S93LG7 9, Section 404 CWA'NWP - SI4.1129,16 - - ' Subtotal S76,002.62 TOTAL (DM (Scope dogs not lnclodo Public Meetlog and Public Dearing) . . 'S76,001,62,. 7. Public Imclvemenl ' 7a Public Meeting. .. .. .. .. S9,546.57 , 76. Natica Affording., Oppoitunity for Public Hearing(NAOPII) - - 6u59.27 Subtotal .. S10,9115.64 7e. Pak Hearing 'S11,498.06 Subtotal .. .. SI1.49S.06 Direct Expense. (included in abase items) TOTAL (1200)• .. ..562.970.77 0:71120'A633-0I Smith Ranch Rand PEARLANDlAJmin'Clunee Order IISRRSeepe&Budget 111220 with COP Luisa 16- 12,29/2020 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2A-5B9F1186A0E6 DANNENBAUM ENGINEERING CORPORATION SMITH RANCH ROAD DESIGN CSJ 0912-31-293 EA`Scope Additions. . i TASK DESCRIPTION Principal Project or Survey PM Senior Engineer Sea. Ilyd. Engineer or Sr.Sorveyor. rurs Design Engineer or2.31on Crew Senior Designer/ Engineer • CA1/D Operator or Surrey Teebnkion QA/QC Review Clerical Toloi Labor II ours 9 Costs No. of !Drawings tabor Boors/ Sheet TOTAL COST/ TASK ASBESTOS STUDY WC 1631 NOT IN SCOPE OF WORK Mark Up WOO TOTAL ALLOWANCE 00.00 LANDSCAPING AND DtRIGA'PION IFC.1631 (Knudson) PEASE 1- PROJECT INITIATION $300 RUSE 2 -CONSTRUCTION DOCUMENTS 510,000 PHASE) BIDDING AID CONSTRUCTION ADMINISTRATION S2.500 REIMBURSABLE EXPENSES S330 Subtotal S13230 TOTAL .SI3,170.00 SUBSURFACEUTILITYENGINEERING IFC 1631 (SAM Inc.) SUE 513.000.00 TOTAL ALLOWANCE SI5,ono.00 TRAFFIC SIGNAL DESIGN WC 1621 (TEDS! . f NOT IN SCOPE OF WORK TOTAL TRAFFIC SIGNAL DESIGN (1622) SO,dO 0 ILLUMINATION (FC 1621 (Damonbaumn) DESIGN AND PREPARE. coNcurr AND CABI.E BOX (Add to Proposed Utility Plan and Prafdt) - $2,500.00 Chance Omer l,. .. ., .. .. Fiber Optic Ceblo 1 ' .6 . . 7 .6 S2,255.73 . . S2,326:44 - SUBTOTAL CHANCE ORDER I FC 162 • • ' • S2,526.44 .' REMAINING INTASII .. - 50.00 • . TOTALGRANGE 0055,5]FC 162 TOTAL STREET LIGHTING (162J) 1.11M11110 0 15 PER TOTAL ADDITIONAL SERVICES(CE) $279,449.40 84 PSBE TOTAL ADDITIONAL SERVICES (EA](Scope does not includo Public Mooting and Public Hearing) $909,779.60 84 PSBE O:\I 120WSS3.01 Smilh Ranch Road PEAR1ANUlAdmin'Chnnge Order Il0000cnpe&Budget 111220 will) COO I.atix 19 11292020 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB 9F1186A0E6 Date: 11/17/2020 Smith Ranch Road Change Order No. 1 SJ3 0 urveying igh,t_of .Way Ma .py ng (kil dit oval Se,ruioe Proposed Scope and Budget Changes (includes 12% Fixed Fee) Prepare Temporary construction Easements (TCE) for Parcel 3 and Parcel 8 $2,979 Parcel 3 E Metes and Bounds Document Revised to Parcel 3 (fee) $1,490 Revise / Resubmit Revised Right -of -Way Documents due to changes $13,552 Parcel 1 Dedication $2,498 Receive/Review Parcel Map/Metes and Bounds per Title company changes (May -June 2019) $20,440 Receive/Review Parcel Map/Metes and Bounds per revised Title company changes (July 2019) $10,662 Revise ROW Set to match Title company changes $6,306 Revise Parcel 16 including fieldwork due to Recent Corner Clip Changes $4,592 Parcels 5 and 12 Split outs $8,243 Total $70,762 Order Re T70 Original Scope and Budget Appraisals up to 22 Parcels at $3,750 each Appraisals up to 2 Parcels at $5,000 each Proposed Scope and Budget Appraisals: 6 Parcels at $3,750 each $22,500 Appraisals Update: 12 Parcels at $3,000 each $36,000 Condemnation Appraisal Updates (Assume 9 Parcels at $3,000 each) ** $27,000 Condemnation Prep. and Testimony (Assume 9 Parcels at 25 Hrs./parcel at $200 per hr.) ' ** $45,000 Total $130,500 $82,500 $10,000 Total $92,500 Anticipated Condemnation Parcels 2, 4, 5, 5A, 8, 9, 10, 11 and 12A. ** As per direction at the 5-28-20 Negotiation Mtg. we were directed to add this work back in the proposal Note: All of the budget for this task was not expended. There is $47,500 remaining in this task. %,5{l gnan ge Order Reg es g 500 lirt[II n in . o a Re MC (`sl; 830.00 Pa c- I Aoe .1 .I ubeonsultan • Review (iFC 130) gbh replaces uthe fo d Original Scope and Budget Appraisal Review up to 22 Parcels at $800 each Appraisal Review up to 2 Parcels at $900 each $17,600 $1,800 Total $19,400 Pagel Change Order Costs based on 11-17 mtg bcs 11-17-20rev 1-26-21.xlsx 2/5/2021 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2 9F1186A0E6 Date: 11/17/2020 Smith Ranch Road Change Order No. 1 Note: All of the budget for this task was not expended Proposed Scope and Budget Appraisal Review: 19 Parcels at $1,500 each Appraisal Review Updates: 9 Parcels at $1,500 each $28,500 $13,500 Note: All of the budget for this task was not expended. There is $7,400 remaining in this task. Total $42,000 Anticipated Condemnation Parcels 2, 4, 5, 5A, 8, 9, 10, 11 and 12A. l3d(D'1rc dj@i ing. O oe e es 1111 $4�2 000 �' '3171 111 400 ret'C ''eq r $34,600 Original Scope and Budget Title Reports up to 24 Parcels at $400 each Title Report Updates up to 72 at $50 each Escrow Fees up to 24 Parcels at $500 each Tax Certificates up to 24 Parcels at $90 each Proposed Scope and Budget $9,600 $3,600 $12,000 $2,160 Total $27,360 Title Report Updates: 3 x 19 at $50 each $2,850 Title Split Outs and New Tracts ($150/split out & $400/new exam) $150 x 2+$400 x 2 $1,100 Survey Review and Consultation ($50/survey 19 x $50 (1st round)+19 x $50 (2nd round) $1,900 Tax Certificates: 19 Parcels at $77.64 each $1,475 Escrow Fees: 19 Parcels at $750 each $14,250 Title Policy Fees $10,738 Document Preparation (Per Attorney Pass Through) $3,000 Recording Fees (Per County Clerk Pass Through) $1,500 Note: All of the budget for this task was not expended. There is $20,160 remaining in this task. Total $36,813 1115b r aINlaanIG O'ri e Requ^ it s TI [ICTi :e o e Reque Original Scope and Budget (includes 12% Fixed Fee) Negotiation Process ($3,000 per parcel)(24 Parcels) Relocation Services ($4,000 per parcel)(1 Parcel) Title and Closing Service Fee ($600 per Parcel)(24 Parcels) Project Administration Fee ($4,000 per Month)(12 Months) *See Note Below. $80,640 $4,480 $16,128 * $53,760 Total $155,008 Page2 Change Order Costs based on 11-17 mtg bcs 11-17-20rev 1-26-21.xlsx 2/5/2021 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2�F1186A0E6 Date: 11/17/2020 Smith Ranch Road Change Order No. 1 Proposed Scope and Budget (includes 12% Fixed Fee) Negotiation Process ($3,000 per parcel)(19 Parcels) Relocation Services ($3,500 per parcel)(1 Parcel)(Subconsultant: PAS) Title and Closing Service Fee ($600 per Parcel )(19 Parcels) Project Administration Fee ($4,000 per Month)(24 Months)(April 2019 to Dec. 2021) Condemnation Support: ($4,500 per Parcel)(7 Parcels)* Condemnation Support: ($4,000 per Month)(4 Months)* $57,000.00 $3,500.00 $11,400.00 $96,033.80 $0.00 $0.00 Total $167,933.80 Note: Only $26,880 of the budget for Project Administration was expended. There is $128,128 remaining in this task. Anticipated Condemnation Parcels 2, 4, 5, 8, 9, 10, and 11. S f j- o i. E. nge O der Requ t: 12CIE ehFng 17010illC ode Rgoest E$ 6'7, 7-3,80 $ 28LI 8 0.0] S'3918C15.8(131 Prelmina y MEd Project Mana:eme Original Scope and Budget for Project Meetings (includes 12% Fixed Fee) Preliminary Engineering (2 meetings) Final Engineering (4 meetings) Mileage (6 Meetings)(Pearland) $2,103 $5,024 $168 Total $7,295 Proposed Scope and Budget Changes for Project Meetings(includes 12% Fixed Fee) Additional Meetings Conducted to Date (October 2019) Preliminary Engineering (6 meetings) $0 Final Engineering (7 meetings) $0 Mileage (13 Meetings)(Pearland) $0 Total $0 Projected Additional Meetings (November 2019 to September 2021)(6 Meetings) 7,593.91 Mileage (6 Meetings)(Pearland) ge 168.00 Total 7,761.91 UE030 IF 6�21 I lumination (AFddIt!.3717alLs Proposed Scope and Budget Changes to Drawings and Quantities(includes 12% Fixed Fee) Fiber Optic Cable 3 shts. 2,526.44 Qha Or equest 2,516 Page3 Change Order Costs based on 11-17 mtg bcs 11-17-20rev 1-26-21.xlsx 2/5/2021 DocuSign Envelope ID: 89FSAE7C-0888-4A28-BB22F1186A0E6 Date: 11/17/2020 Smith Ranch Road Change Order No. 1 Summary Total Change Order Request Task 3 Surveying and ROW Map Task 3 ROW Acquisition Task 3 Parcel Appraise) Review Task 3 Abstracting Serv. & Titles Task 3 Acquisition Proj. Admin. Task 4 Project Management Task 8 Illumination $70,762.00 $83,000.00 $34,600.00 $16, 653.00 $39,805.80 $7,761.91 $2,526.44 a 1_ ®'B er R q es $-2.5411O9 1L5j Page4 Change Order Costs based on 11-17 mtg bcs 11-17-20rev 1-26-21.xlsx 2/5/2021 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB241111h'i9F1186A0E6 Abstract Services of Houston 7500 San Felipe, Suite 1020 Houston, TX 77063 832-818-4445 PROPOSAL Date: June 3, 2020 Mr. David Bryant Dan nenhaurn Engineering Corporation 3 100 West Alabama Houston, Texas 77098 Re: Smith Ranch Road Dear Mr. Bryant, Pursuant to your request please find the following scope of service, price, not to exceed and time franc .for the above referenced project: 1. Scope of Service: a. 'Title Updates (2-3) (S50.00 per update). 3x50x19=$2850,00 b. 'Title split outs and new tracts ($150.00/split out. exam and $400.00/new exam). 150x2+400x2=$1100,00 c. Survey Review and consultation ($50.00 per survey). 9Y50(1" round) -- 19x50 (2' round)-- $1900.00 Reimbursable Expenses: d. Tax Certificates ($77.64). 7 7.64x 19=$1475.00 e. Escrow Fees S500.00 (If we are asked to provide title curative assistance this cost may rise to $750.00). 750x19—$14250.00 f. Title Policy Fees $10,738,00 g. Document Preparation (Per attorney cost -pass through). $3,000.00 h. Recording Fees (Per county clerk cost -pass through). S 1500.00 2. Price not to exceed: $37,000.00 3. Estimated Tirne Frame: Project will be completed within 10 working days from Notice to proceed. Note: Any additional items that may be requested during or after the initial research may he subject to additional charges. Items that are deemed necessary to the above detailed scope of service will not he subject to additional charges. DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB249F1186A0E6 (-ft) This proposal is good for 30 days from the date above. If you have any questions, please do not hesitate to contact me at the numbers listed above. Respectfully, James Fiendcrson DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB29F1186A0E6 RIGHT OF WAY SERVICE AGREEMENT This Right of Way Services Agreement ("Agreement") is entered into by and between Dannenbaum Engineering Corporation (Dannenbaum), and PAS Property Acquisition Services, LLC (PAS). Dannenbaum and PAS are hereinafter sometimes referred to individually as a "Party" and collectively as the "Parties". WITNESSETH In consideration of their mutual covenants hereunder, the Parties agree as follows: f. Scope of Services. Dannenbaum requests that PAS perform certain right of way and related technical services (the "Services") for the Smith Ranch Road Project. 2. Performance of Services. After accepting a request for Services, PAS will perform the Services as an independent contractor. Dannenbaumn agrees to provide PAS with such information, data and criteria as may be required from time to time by PAS to perform the Services efficiently and in accordance with this Agreement. 3. Compensation and Charges for Services, Charges for Services will be made in accordance with the Schedule of Rates and Expense Reimbursements attached hereto as Exhibit R. PAS shall invoice monthly for Services performed and payment shall be made by Danncnbaurn within thirty (30) days of receipt of invoice. PAS shall maintain such books and records as may be reasonably required to substantiate charges invoiced under this Agreement. 4. Confidential Information. Ail confidential data and information acquired by PAS from Dannenbaurn during the performance of Services shall be kept confidential and shall not be disclosed by PAS to third parties without the written consent of Dannenbaum, unless PAS is required by law or court order to make disclosure. .Data and information obtained by PAS in the ordinary course of its business, or which is in the public domain through no wrongful act of PAS shall not be considered confidential. 5. Ownership of Work Product, All reports, records, and other electronic files, sketches, working drawings and other tangible evidence of PAS' work product prepared hereunder for Dannenbaum shall be the property of Dannenbaum. PAS may retain a record of its work product. 6. Indemnification. PAS SHALL DEFEND, INDEMNIFY, AND HOLD HARMLESS DANNENBAUM, ITS DIRECTORS, OFFICERS, AGENTS, EMPLOYEE. AND AFFILIATES FROM AND AGAINST ANY AND ALL CLAIMS, DEMANDS, OR CAUSES OF ACTION (AND ALL LOSSES, LIAF31I.,I'I'ES, EXPENSES, AND JUDGEMENTS .INCURRED IN DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2 9F1186A0E6 CONNECTION THEREWITH , INCI;[JT)ING ATTO.RNEY'S FEES ANT) EXPENSES, COURT COSTS AND (YTI-i47,R. 'EXPENSES INCUR.RED IN ENFORCING THIS INDEMNITY PROVISION) BROLIGIIT BY PAS OR ANY OF PAS' EMPLOYEES, DIRECTORS, OFFICERS, AGENTS, OUTSIDE ADVISORY OR SUPIORT CONSULTANTS, OR REPRESENTATIVES, OR BY ANY THIRD PARTY, BASED UPON, OR IN C.ONNECI'ION WITH, RESULTING FROM., OR ARISING OUT OF, THE NEGLIGENCE OR MISCONDUCT OF PAS ARISING OUT OF. THE NEGLIGENCE OR MISCONDUCT OF PAS' EMPLOYEES DIRECTORS, OFFCIERS, AGENTS, OUTSIDE ADVISORY OR SUPPORT CONSULTANTS, OR REPRESENTATIVES. PAS shall promptly advise Dannenbaum in writing of any claims, which could give rise to a right of indemnification under this Paragraph 7, Insurance. PAS shall carry at its expense; the insurance cove►a.ge's set forth in "Insurance Coverage" attached hereto as Exhibit C. 8. Termination and Suspension, (a) Either party shall have the right to terminate this Agreement if the other Party materially defaults in the performance of its obligations hereunder and fails to commence steps to remedy such default within fifteen (15) days after written notice thereof. Dannenbaum shall also have the right to terminate this Agreement for any reason upon thirty (30) days written notice to PAS, In the event of termination., PAS shall be paid for all (i) Services rendered up to the termination date and (ii) in. cases where the termination is not due to the default of PAS, costs incurred by PAS for an orderly discontinuance of Scrvic.es. All partially completed•work product shall he delivered to Dannenbaum after termination and payment therefore. (b) Dannenbaumn may suspend for any reason performance of the Services provided that it issues to PAS a written suspension notice, which includes an undertaking by Dannenbaum to adjust the price and/or the performance schedule for the impact of the suspension. 9. Adjustments. In the Event of: (a) changes or additions to the scope of Services requested; or (b) delays in the performance of Services by reason of force majeure, charges and/or performance schedules shall, if appropriate, be adjusted. Upon the occurrence of any change, addition or delay, PAS shall, as soon as practicable, propose in writing to Dannenbaum for consideration and mutual agreement, an adjustment to charges and/or performance schedules. 10. Warranty. PAS warrants that the Services shall he performed with that degree of skill and judgment normally exercised by professional right of way firms performing services of a similar nature. The Parties agree that there are no standards of performance, guarantees or warranties extending beyond those expressed in this Paragraph. 11. Notices. Any notices or communications required or permitted to be given hereunder shall be given in writing by delivery in person or by first class mail addressed to the Party, postage prepaid, or by facsimile at the following addresses or such other address (es) as a Party may from tirne to time designate in writing DocuSign Envelope ID: 89FSAE7C-0888-4A28-BB 41" }9F1186A0E6 rat) If to Dannenbaumn: Danenbaum Engineering Corporation 3100 West Alabama Houston, TX 77498 Telephone (713) 520-9570. Facsimile (713) 533-4111 Attention: David A. Bryant If to PAS: PAS Property Acquisition Services, L.I.,C, 19855 Southwest Freeway, Suite 200 Sugar Land, Texas 77479 Telephone (281) 343-7171 Facsimile (281) 343-8181 Attention: Mark Heidaker Notices delivered in person shall be effective upon delivery. Notices sent by mail shall be effective on the third day after being -nailed. Notices sent by .facsimile shall be effective on the day following transmission, 12. Assignments and Subcontracts. This Agreement shall inure to the benefit of and are binding upon Parties and their successors and permitted assigns, Neither party shall assign all or any part of this Agreement without the prior written consent of the other Party. PAS shall obtain the consent of Dannenbaum before subcontracting any component of the Services, such consent not to be -unreasonably withheld by Dannenbaum. 13. Governing Law, This Agreement shall be governed and construed pursuant to the laws of the State of Texas and Harris County. 1.4. Seversability, Ia- the event any portion' of this Agreement is held to be unenforceable or invalid, the validity and enforceability of the remainder of the Agreement shall be unaffected. 15. Entire Agreement. This Agreement constitutes the entire agreement between .the Parties relating to the subject matter hereof, and supersedes all previous bids, proposals, contracts, understanding and other agreements between the Parties. This Agreement may not be amended except in writing signed by both Parties. In Witness Whereof, the Parties hereto have executed this Agreement effective as of the day and year last executed below. L)annenbaui Engineering C, By: Name: Way e G, Ahrens 'Title: Exec tiv Vi A President Date: 2,710 17 oration PAS Propert AcquiijSNot Services, LI,C. By: Name: Mark I leidaker Title: President Date: DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB29F1186A0E6 EXHIBIT A Services to be Provided The Services to be provided under. this Agreement shall be those requested by Dannenbaum and accepted by PAS in accordance with Paragraphs I and 2 of this Agreement. Those Services may include, among others, relocation assistance as stated below. Relocation A. Perform initial interview with owner/tenant to research the needs for each business and residence affected by the acquisition B. Explain Relocation Benefits Package/Advisory Services and Coordinate Move 1. Meet with the Displacee and discuss the advisory services & benefits they are eligible to receive C. 90-Day Notice to Displacee 1, Prepare 90 Day Notice and send to displacee affected by the acquisition along with the relocation booklet for Business Relocation 2. Find Comparables, Calculate Rent Supplement or Replacement Housing Payment, prepare 90 Day Notice and send to Displacee affected by the acquisition along with the relocation booklet for Residential Relocation. D. Issue 30-day notice 1. Once the property is acquired, it is the relocation agent's responsibility to notify the owner on the parcel 2. The agent will prepare and send a 30-day notice to vacate the displacement property to each of the displacees 3. The relocation agent will also confirm that the owner/business owner has also been issued a 30-day notice, through the acquisition department 4. Once the 30-day has been issued the displacees will start finalizing their .plans for moving and the agent will be responsible for monitoring each individual move E. Moving and Monitoring the Move 1, Obtain moving estimates on moving the personal property of each business or residence 2. Monitor each move and the circumstance under which the business chooses to move (actual cost move or negotiated self -move) or in the case of a residential relocation (actual cost move or room count move) 3. Receive and verify reestablishment expenses for each of the businesses 4. Submit the expenses for reimbursement F. Submit Vacate Form to the Client 1. Verify vacancy and send the proper form to the client on each of the displacees and the owner when they have each individually vacated the parcel DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB29F1186A0E6 1 . G. Process Moving Reimbursement 1, Agent will process the paperwork necessary to reirnbtlrse the displacee for any moving and reestablishment benefits to which they are entitled- 2. Once the checks are received from the client, the relocation agent will deliver the check to the displaces and obtain a signed receipt • 1-I. Searching Expense/Incidental Expense 1. Prepare & submit the Business Searching Expense, or prepare and ,submit the Incidental Expenses for the Residential. move. 2. Deliver chock to displacee and obtain a signed receipt 1. Deliver Check Receipt to the client 1. Clean and close the Relocation file. Submit closed file to the client DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2K9F1186A0E6 EXHIBIT B Schedule of rates and Expense Reimbursements The Rates and reimbursements set forth in this Exhibit B sire subject to annual adjustment by PAS, provided PAS gives Danncnbaum a minimum of sixty (60) days written notice of any such adj ustment. PAS will be paid at the rates per service shown below. I.n addition to that rate, Dannenbaurn will reimburse PAS for actual, project -related expenses at the rates set forth below. PAS will submit monthly invoices for services provided through the last day of each month to Danncnbaum, accompanied by an explanation of charges, professional fees, services, and expenses. Danncnbaum will pay such invoices according to its normal payment procedures, but in no event snail such payment be later than thirty days after Dannenbaum's receipt of the invoice. PER PARCEL Relocation Services: 1 @ $3,500 per parcel Total Cost of above mentioned services All parcels will be billed as follows: Relocation Fee Billing Delivery of 90 Day Notice Submission of First Payment Submission Closing of File MISCELLANEOUS PROJECT RELATED EXPENSES $ 3,500.00 $ 3,500.00 40% per parcel price 40% per parcel price 20% per parcel price a) Mileage at the current IRS rate. b) Other expenses authorized by Danncnbaum in the porformancc of the Scope of Services, DocuSign Envelope ID: 89FSAE7C-0888-4A28-BB2411.619F1186A0E6 Sandy Rials Appraisal, Review & Consulting 401 Polasek Road La Grange, Texas 78945 979-249-2081 Eici for Appraisal Review Services: Date Submitted: April 25, 2019 To: Dannenbaum Engineering Corporation 3100 Vilest Alabama Houston, Texas 77098 Attention: Mr. David A. Bryant Right of Way Assistant Manager Reference: Bid on Smith Ranch Road Project, Pearland, Texas Services Rendered: INITIAL REVIEW: The following review services will be furnished on each initial appraisal report: Inspection of each parcel, inspection of each comparable, review of initial appraisals per USPAP and TxDOT regulations, obtain corrections as needed, preparation review report and submission to indicated person for a fee of$1,500 each. UPDATES/JURY TRIAL REVIEWS: The following review services will be furnished on each appraisal report: Inspection of each parcel, inspection of each comparable, review of initial appraisals per USPAP and TxDOT regulations, obtain corrections as needed, preparation review report and submission to indicated person for a fee of $1,500 each. I hereby certify that the above services will he performed in accordance with agreement. Thank you for the opportunity to be of service. Sandy L. Rials Tx-11325392-G EIN #t 20-3177060 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB9F1186A0E6 Integra Realty Resources Houston October 28, 2020 9225 Katy Freeway Suite 206 Houston, Texas 77024 Dannenbaum Engineering Corporation 3100 W. Alabama Street Houston, TX 77098 Attn: Mr. David Bryant Re: Smith Ranch Road Dear Mr. Bryant, T 71.3••973-0212 F 713 973-2028 www.irr.com This letter is in response to your request for a fee quote for appraisal report(s) on the above referenced project. Integra Realty Resources — Houston, subject to your authorization, propose to provide these appraisal report(s) for the Subject Properties according to the following fee schedule: Parcei 2 Fee $3,006 3 & 3TCE 4 5 $3,750 $3,000 ' $3,000 5A $3,750 6 $3,000. . 7 8 g..TCE 9 $3,000' $3,000 • $3,750 $3,000 10 11 $3,000 $3,000 12 $3,000 12A $3,750 13 14 15 16 $3,750 $3,000 $3,000 $3,7.50 DocuSign Envelope ID: 89F8AE7C-0888-4A28-BB2(0649F1186A0E6 Dannenbaum Engineering Corporation Smith Ranch Road The purpose of the appraisal will be to determine the market value of the partial acquisition. Our opinions will be strictly expressed and reported in compliance with the Uniform Standards of Professional Appraisal Practice (USPAP), and the professional ethics and standards of professional appraisal practice of The Appraisal Institute. Our fee above specifically covers completion of the initial appraisal report. Updated appraisal reports for Special Commissioners Hearing will be killed at $3,000 per appraisal report. Additionally, expert testimony relating to this matter will be billed separately at the standard TxDOT rate of $200 per hour, not to exceed $5,000, without prior authorization from the client. In order to engage the appraisal services of Integra - Houston, based on the terms and conditions described above, we ask that you sign one copy of this letter and return it to our office. We look forward to working with you on this assignment. Should you have any questions regarding this matter, please feel free to contact me. Yours truly, Michael W. Welch, SR/WA, R/W-AC, MRICS AGREED AND ACCEPTED: By: Date: Page 2 of 2 Certificate Of Completion • Envelope Id: 89F8AE7C08884A28BB2A5B9F1186A0E6 Status: Completed Subject: Please DocuSign: Consultant Contract Amendment Approval_Dannenbaum and City of Pearland 0912-31... Source Envelope: Document Pages: 27 Certificate Pages: 2 AutoNav: Enabled Envelopeld Stamping: Enabled Time Zone: (UTC-06:00) Central Time (US & Canada) Record Tracking Status: Original 2/8/2021 6:08:19 AM Signer. Events Mark Patterson Mark.Patterson@txdot.gov Dir III TxDOT Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer. Events Editor Delivery Events.. Agent Delivery Events` Signatures: 1 Initials: 0 Envelope Originator: Heather M Town 125 E. llth Street Austin, TX 78701 Heather.Mitchell@txdot.gov IP Address: 204.64.21.251 Holder: Heather M Town HeatherMitchell@txdot.gov Location: DocuSign Signature Timestamp, Sent: 2/8/2021 6:09:24 AM Ex.44 1)44,44424. Viewed: 2/8/2021 9:11:44 AM F4eesaED4e8740e... Signed: 2/8/2021 9:12:07 AM Down; IY SECURED DocuSIgnod bY• Signature Adoption: Pre -selected Style Using IP Address: 204.64.21.251 Signature . Timestamp Status Timestamp: Status Intermediary Delivery Events Certified Delivery Events Carbon Copy Events. Heather M Town heather.mitchell@txdot.gov Texas Department of Transportation Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Mohammed Zubair Mohammed.Zubair@bcdot.gov Transportation Engineer TxDOT Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Status Status Status COPIED COPIED Witness.Events Signature; Timestamp :. Timestamp. Timestamp Sent: 2/8/2021 6:09:24 AM Resent: 2/8/2021 9:12:10 AM Sent: 2/8/2021 6:09:24 AM Viewed: 2/8/2021 6:55:44 AM Timestamp , . { ) . ---� / —1 —,_'_-- _�,_~—'~ � ...~..~.°' ._ Envelope Summary Events Stato's� � ' ' Tlmmestonnpa Envelope Sent 2/8/2026:09:24mw Certified Delivered Security Checked 20/20219:11:44AN Signing Complete Security Checked 20/20219:12:07AN Completed Security Checked 2/8/20219:12o7xw Payment Events ' Status �Timestamps — ------=-----�—�---�