R2020-161 2020-10-12RESOLUTION NO. R2020-161 A Resolution of the City Council of the City of Pearland, Texas, amending a Construction Manager at Risk contract with SpawGlass Corp, to include the Guaranteed Maximum Price (GMP) of $16,001,451.00 (inclusive of General Conditions and Pre -Construction Services), for construction phase services associated with Shadow Creek Library Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City Council hereby amends a Construction Manager at Risk contract with SpawGlass Corp, to include the Guaranteed Maximum Price (GMP) of $16,001,451.00, for construction phase services associated with Shadow Creek Library Project. Section 2. The City Manager or his designee is hereby authorized to execute an amended Construction Manager at Risk contract for the Shadow Creek Library Project. PASSED, APPROVED and ADOPTED this the 121h day of October, A.D., 2020. ATT TAL ROAN, TRMC, CMC CITY SECRETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR Date of Issuance: 09/30/2020 Contractor: SpawGlass Consultant: PGAL Explanation: This change order encompasses the following CHANGE ORDER Shadow Creek Library CMAR Shadow Creek Library - GMP CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpeariand.com/projects Change Order No.: 1 CoP Project No.: FA1805-CMAR P.O. No.: 2020-00000893 Description of Work Cost Time CHANGE ORDER Shadow Creek Library CMAR CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpeariand.com/projects Date of Issuance: 09/30/2020 Change Order No.: 1 Contractor: SpawGlass CoP Project No.: FA1805-CMAR Consultant: PGAL P.O. No.: 2020-00000893 1 Add Item No. 3.00, "General Conditions" $ - 0 Days 2 Add Item No. 4.00, "Builder's Risk" $ 56,213.00 0 Days 3 Add Item No. 5.00, "General Liability Insurance" $(8,912.00) 0 Days 4 Add Item No. 6.00, "Bonds" $(4,128.00) 0 Days 5 Add Item No. 7.00, "Subcontractor Default Ins" $ 208,384.00 0 Days 6 Add Item No. 8.00, "Warranty" $ 39,912.00 0 Days 7 Add Item No. 9.00, "Contractor's Contingency" $ 478,948.00 0 Days 8 Add Item No. 10.00, "Overhead & Profit" $ 478,948.00 0 Days 9 Add Item No. 11.00, "General Requirements" $ 387,625.00 0 Days 10 Add Item No. 12.00, "VDC & BIM" $ 23,040.00 0 Days 11 Add Item No. 13.00, "Site Utilities Consumption Allowance" $ 45,000.00 0 Days 12 Add Item No. 14.00, "Turnkey Concrete" $ 992,975.00 0 Days 13 Add Item No. 15.00, "Conrete Polishing" $ 34,775.00 0 Days 14 Add Item No. 16.00, "Masonry" $ 346,150.00 0 Days 15 Add Item No. 17.00, "Structural & Misc Steel" $ 1,294,950.00 0 Days 16 Add Item No. 18.00, "Ornamental Railings" $ 59,842.00 0 Days 17 Add Item No. 19.00, "Rough Carpentry" $ 58,280.00 0 Days 18 Add Item No. 20.00, "Millwork" $ 506,300.00 0 Days 19 Add Item No. 21.00, "Waterproofing" $ 230,062.00 0 Days 20 Add Item No. 22.00, "Roofing" $ 1,004,669.00 0 Days 21 Add Item No. 23.00, "Metal Wall Panels" $ 952,942.00 0 Days 22 Add Item No. 24.00, "Joint Sealants at Site" $ 18,037.00 0 Days CHANGE ORDER Shadow Creek Library CMAR CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpearland.com/projects Date of Issuance: 09/30/2020 Change Order No.: 1 Contractor: SpawGlass CoP Project No.: FA1805-CMAR Consultant: PGAL P.O. No.: 2020-00000893 25 Add Item No. 27.00, "Overhead Coiling Doors" $ 10,932.00 0 Days 26 Add Item No. 28.00, "Turnkey Glass & Glazing" $ 902,160.00 0 Days 27 Add Item No. 29.00, "Drywall & Metal Studs" $ 857,446.00 0 Days 28 Add Item No. 30.00, "Tile" $ 83,177.00 0 Days 29 Add Item No. 31.00, "Acoustical Ceilings & Treatments" $ 412,193.00 0 Days 30 Add Item No. 32.00, "Carpet & Resilient Floors" $ 189,464.00 0 Days 31 Add Item No. 33.00, "Painting" $ 91,071.00 0 Days 32 Add Item No. 34.00, "RR Partitions, Access Mats & Lockers" $ 40,903.00 0 Days 33 Add Item No. 35.00, "Display Boards, Extinguishers and Wall $ 72,600.00 0 Days Protection" 34 Add Item No. 36.00, "Operable Partitions" $ 54,189.00 0 Days 35 Add Item No. 37.00, "Signage Allowance" $ 60,000.00 0 Days 36 Add Item No. 38.00, "Flagpoles" $ 9,543.00 0 Days 37 Add Item No. 39.00, "Library Equipment' $ 10,770.00 0 Days 38 Add Item No. 40.00, "Window Treatments" $ 25,441.00 0 Days 39 Add Item No. 41.00, "Elevators" $ 235,500.00 0 Days 40 Add Item No. 42.00, "Fire Suppression" $ 113,500.00 0 Days 41 Add Item No. 43.00, 'Turnkey Plumbing" $ 619,900.00 0 Days 42 Add Item No. 44.00, "Turnkey HVAC" $ 1,049,528.00 0 Days 43 Add Item No. 45.00, "Electrical' $ 1,304,622.00 0 Days 44 Add Item No. 46.00, "Structured Cabling" $ 195,741.00 0 Days 45 Add Item No. 47.00, "Audio -Video Systems" $ 34,799.00 0 Days 46 Add Item No. 48.00, "Security and Surveillance" $ 89,595.00 0 Days CHANGE ORDER Shadow Creek Library CMAR Date of Issuance: 09/30/2020 Contractor: SpawGlass Consultant: PGAL 49 Add Item No. 51.00, "Earthwork" 50 Add Item No. 52.00, "SWPPP" 51 Add Item No. 53.00, "Left Turn Lane" 52 Add Item No. 54.00, "Landscape & Irrigation System" 53 Add Item No. 55.00, "Site Furnishing" 54 Add Item No. 56.00, "Parking Specialties & Striping" 55 Add Item No. 57.00. "Site Utilities" Please attach back-uo documentation. Cost & Time Change Summary Original Contract: Previous Change Order(s): Contract prior to this Change Order: Net increase (decrease) from this Change Order Revised Contract: Finance Approval: ft., RECOMMENDED: By: Date Consultant ACCEPTED*: c By: - Date Contractor CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpearland.com/projects Change Order No.: 1 CoP Project No.: FA1805-CMAR P.O. No.: 2020-00000893 $ 254,256.00 0 Days $ 34,955.00 0 Days $ 164,660.00 0 Days $ 301,197.00 0 Days $ 131,912.00 0 Days $ 53,400.00 0 Days $ 265,872.00 0 Days Cost Time $ 859,833.00 0 Days $ - 0 Days $ 859,833.00 0 Days $ 15,141,618.00 0 Days $ 16,001,451.00 0 Days 9 nil ril)n)n Date RECOMMENDED: 10/01/2020 By: — -��- Date 10/01/2020 Construction Manager APPROVED: 10/01/2020 By:"�� ` - - Date 10/15/2020 Owner 'Contractor agrees to perform change(s) included in the Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed. No payment to the Contract (or Consultant) shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs. Upon execution by all parties, the following changes identifies for the contract value and/or contract time shown, are made part of the contract. CHANGE ORDER NO. 1 ATTACHMENT "A" PROJECT: Shadow Creek Library CMAR September 30, 2020 PROJECT NO.: FA1805-CMAR ORIGINAL CONTRACT REVISED CONTRACT ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL QTY UNIT COST TOTAL NET CHANGE ADD ITEM(S) TO CONTRACT: Communications 46.00 Structured Cabling LS 1 195,741.00 $195,741.00 $195,741.00 47.00 Audio -Video Systems LS 1 $34,799.00 $34,799.00 $34,799.00 Concrete 14.00 Turnkey Concrete LS 1 992,975.00 $992,975.00 $992,975.00 15.00 Conrete Polishing LS 1 $34,775.00 $34,775.00 $34,775.00 Conveying Equipment 41.00 Elevators LS 1 235,500.00 $235,500.00 $235,500.00 Earthwork 51.00 Earthwork LS 1 254,256.00 $254,256.00 $254,256.00 52.00 SWPPP LS 1 $34,955.00 $34,955.00 $34,955.00 53.00 Left Turn Lane LS 1 164,660.00 $164,660.00 $164,660.00 Electrical 45.00 Electrical LS 1 304,622.00 $1,304,622.00 $1,304,622.00 Electronic Safety & Security 48.00 Security and Surveillance LS 1 $89,595.00 $89,595.00 $89,595.00 49.00 DAS / ERRCS Systems LS 1 $50,000.00 $50,000.00 $50,000.00 Allowance 50.00 Fire Alarm System LS 1 $54,900.00 $54,900.00 $54,900.00 Equipment 39.00 Library Equipment LS 1 $10,770.00 $10,770.00 $10,770.00 Exterior Improvements 54.00 Landscape & Irrigation LS 1 301,197.00 $301,197.00 $301,197.00 System 55.00 Site Furnishing LS 1 131,912.00 $131,912.00 $131,912.00 56.00 Parking Specialties & LS 1 $53,400.00 $53,400.00 $53,400.00 Striping Finishes 29.00 Drywall & Metal Studs LS 1 857,446.00 $857,446.00 $857,446.00 30.00 Tile LS 1 $83,177.00 $83,177.00 $83,177.00 31.00 Acoustical Ceilings & LS 1 412,193.00 $412,193.00 $412,193.00 Treatments 32.00 Carpet & Resilient Floors LS 1 189,464.00 $189,464.00 $189,464.00 33.00 Painting LS 1 $91,071.00 $91,071.00 $91,071.00 Fire Suppression 42.00 Fire Suppression LS 1 113,500.00 $113,500.00 $113,500.00 Furnishings 40.00 Window Treatments LS 1 $25,441.00 $25,441.00 $25,441.00 General Requirements 11.00 General Requirements LS 1 387,625.00 $387,625.00 $387,625.00 12.00 VDC & BIM LS 1 $23,040.00 $23,040.00 $23,040.00 13.00 Site Utilities Consumption LS 1 $45,000.00 $45,000.00 $45,000.00 Allowance Heating, Ventilating & Air Conditioning 44.00 Turnkey HVAC LS 1 049,528.00 $1,049,528.00 $1,049,528.00 Indirect Costs 3.00 General Conditions LS 0 554,163.00 $0.00 $0.00 4.00 Builders Risk LS 1 $56,213.00 $56,213.00 $56,213.00 5.00 General Liability Insurance LS 1 $-8,912.00 -$8,912.00 -$8,912.00 6.00 Bonds LS 1 $-4,128.00 -$4,128.00 -$4,128.00 CHANGE ORDER NO. 1 ATTACHMENT "A" PROJECT: Shadow Creek Library CMAR . Waterproofing 22.00 September 30, 2020 PROJECT NO.: FA1805-CMAR 23.00 Metal Wall Panels ORIGINAL CONTRACT Joint Sealants at Site REVISED CONTRACT Firestopping ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL QTY UNIT COST TOTAL NET CHANGE 16.00 Masonry LS 1 346,150.00 $346,150.00 $346,150.00 Metals 1 952,942.00 $952,942.00 $952,942.00 LS 1 17.00 Structural & Misc Steel LS 1 294,950.00 $1,294,950.00 $1,294,950.00 18.00 Ornamental Railings LS 1 $59,842.00 $59,842.00 $59,842.00 Openings 26.00 Doors, Frames & LS 1 140,400.00 $140,400.00 $140,400.00 Hardware 27.00 Overhead Coiling Doors LS 1 $10,932.00 $10,932.00 $10,932.00 28.00 Turnkey Glass & Glazing LS 1 902,160.00 $902,160.00 $902,160.00 Plumbing 43.00 Turnkey Plumbing LS 1 619,900.00 $619,900.00 $619,900.00 Specialties 34.00 RR Partitions, Access LS 1 $40,903.00 $40,903.00 $40,903.00 Mats & Lockers 35.00 Display Boards, LS 1 $72,600.00 $72,600.00 $72,600.00 Extinguishers and Wall Protection 36.00 Operable Partitions 37.00 Signage Allowance 38.00 Flagpoles Thermal and Moisture Protection 21.00 . Waterproofing 22.00 Roofing 23.00 Metal Wall Panels 24.00 Joint Sealants at Site 25.00 Firestopping Utilities $9,543.00 57.00 Site Utilities Wood. Plastics & Composites 19.00 Rough Carpentry 20,00 Millwork LS 1 $54,189.00 $54,189.00 $54,189.00 LS 1 $60,000.00 $60,000.00 $60,000.00 LS 1 $9,543.00 $9,543.00 $9,543.00 LS 1 230,062.00 $230,062.00 $230,062.00 LS 1 004,669.00 $1,004,669.00 $1,004,669.00 LS 1 952,942.00 $952,942.00 $952,942.00 LS 1 $18,037.00 $18,037.00 $16,037.00 LS 1 $22,980.00 $22,980.00 $22,980.00 LS 1 265,872.00 $265,872.00 $265,872.00 LS 1 $58,280.00 $58,280.00 $58,280.00 LS 1 506,300.00 $506,300.00 $506,300.00 NET TOTAL CHANGE ORDER #1: $15,141,618.00 ORIGINAL CONTRACT AMOUNT: $859,833.00 CHANGE ORDER #1: $15,141,618.00 REVISED CONTRACT AMOUNT: $16,001,451.00 October 6, 2020 Ms. Fatema Weekly City of Pearland - Engineering and Capital Projects 2559 Hillhouse Pearland, TX 77584 Re: Pearland Shadow Creek Library Project #FA1805-CMAR GMP Dear Ms. Weekly: Attached is our GMP for the above referenced project. Please note the following with this GMP: 1) The total amended contract price (GMP) is $16,001,451. This price includes the following items: a. The Pre -Construction Fee of $36,520 and the General Conditions of $823,313, totaling $859,833. b. Deducting previously contracted amounts ( line a above ) totaling $859,833, leaves the Total Amendment to the contract in the amount of $15,141,618. If you have any questions regarding this GMP, please do not hesitate to contact me. Yours very truly, Justin Nowak Project Manager 281-883-7938 Cc: Roger Berry - Vice President of Operations Aaron Bradford - Preconstruction Manager 0, r SpawGlass lawl�iAlpllsishaleft owl I Guaranteed Maximum Price (GMP) RFP No.: 0519-40 1 Project No. FA1805 40 M CHANGE ORDER Shadow Creek Library CMAR Date of Issuance: 09/30/2020 Contractor: SpawGlass Consultant: PGAL Explanation: This change order encompasses the following: Shadow Creek Library - GMP Description of Work CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpearland.com/projects Change Order No.: CoP Project No.: P.O. No.: Cost 1 FA1805-CMAR 2022-00000893 Time CHANGE ORDER Shadow Creek Library CMAR CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpearland.com/projects Date of Issuance: 09/30/2020 Change Order No.: 1 Contractor: SpawGlass CoP Project No.: FA1805-CMAR Consultant: PGAL P.O. No.: 2022-00000893 1 Add Item No. 3.00, "General Conditions" $ - 0 Days 2 Add Item No. 4.00, "Builder's Risk" $ 56,213.00 0 Days 3 Add Item No. 5.00, "General Liability Insurance" $(8,912.00) 0 Days 4 Add Item No. 6.00, "Bonds" $(4,128.00) 0 Days 5 Add Item No. 7.00, "Subcontractor Default Ins" $ 208,384.00 0 Days 6 Add Item No. 8.00, "Warranty" $ 39,912.00 0 Days 7 Add Item No. 9.00, "Contractor's Contingency" $ 478,948.00 0 Days 8 Add Item No. 10.00, "Overhead & Profit" $ 478,948.00 0 Days 9 Add Item No. 11.00, "General Requirements" $ 387,625.00 0 Days 10 Add Item No. 12.00, WDC & BIM" $ 23,040.00 0 Days 11 Add Item No. 13.00, "Site Utilities Consumption Allowance" $ 45,000.00 0 Days 12 Add Item No. 14.00, "Turnkey Concrete" $ 992,975.00 0 Days 13 Add Item No. 15.00, "Conrete Polishing" $ 34,775.00 0 Days 14 Add Item No. 16.00, "Masonry" $ 346,150.00 0 Days 15 Add Item No. 17.00, "Structural & Misc Steel" $ 1,294,950.00 0 Days 16 Add Item No. 18.00, "Ornamental Railings" $ 59,842.00 0 Days 17 Add Item No. 19.00, "Rough Carpentry" $ 58,280.00 0 Days 18 Add Item No. 20.00, "Millwork" $ 506,300.00 0 Days 19 Add Item No. 21.00, "Waterproofing" $ 230,062.00 0 Days 20 Add Item No. 22.00, "Roofing" $ 1,004,669.00 0 Days 21 Add Item No. 23.00, "Metal Wall Panels" $ 952,942.00 0 Days 22 Add Item No. 24.00, "Joint Sealants at Site" $ 18,037.00 0 Days CHANGE ORDER Shadow Creek Library CMAR CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpeariand.com/projects Date of Issuance: 09/30/2020 Change Order No.: Contractor: SpawGlass CoP Project No.: Consultant: PGAL P.O. No.: 25 Add Item No. 27.00, "Overhead Coiling Doors" $ 10,932.00 $ 902,160.00 $ 857,446.00 $ 83,177.00 $ 412,193.00 $ 189,464.00 $91,071.00 $ 40,903.00 $ 72,600.00 $ 54,189.00 $ 60,000.00 $ 9,543.00 $ 10,770.00 $ 25,441.00 $ 235,500.00 $ 113,500.00 $ 619,900.00 $ 1,049,528.00 $ 1,304,622.00 $ 195,741.00 $ 34,799.00 $ 89,595.00 1 FA1805-CMAR 26 Add Item No. 28.00, "Turnkey Glass & Glazing" 27 Add Item No. 29.00, "Drywall & Metal Studs" 28 Add Item No. 30.00, 'Tile" 29 Add Item No. 31.00, "Acoustical Ceilings & Treatments" 30 Add Item No. 32.00, "Carpet & Resilient Floors" 31 Add Item No. 33.00, "Painting" 32 Add Item No. 34.00, "RR Partitions, Access Mats & Lockers" 33 Add Item No. 35.00, "Display Boards, Extinguishers and Wall Days Protection" Days 34 Add Item No. 36.00, "Operable Partitions" 35 Add Item No. 37.00, "Signage Allowance" 36 Add Item No. 38.00, "Flagpoles" 37 Add Item No. 39.00, "Library Equipment" 38 Add Item No. 40.00, "Window Treatments" 39 Add Item No. 41.00, "Elevators" 40 Add Item No. 42.00, "Fire Suppression" 41 Add Item No. 43.00, 'Turnkey Plumbing" 42 Add Item No. 44.00, "Turnkey HVAC" 43 Add Item No. 45.00, "Electrical' 44 Add Item No. 46.00, "Structured Cabling" 45 Add Item No. 47.00, "Audio -Video Systems" 46 Add Item No. 48.00, "Security and Surveillance" $ 902,160.00 $ 857,446.00 $ 83,177.00 $ 412,193.00 $ 189,464.00 $91,071.00 $ 40,903.00 $ 72,600.00 $ 54,189.00 $ 60,000.00 $ 9,543.00 $ 10,770.00 $ 25,441.00 $ 235,500.00 $ 113,500.00 $ 619,900.00 $ 1,049,528.00 $ 1,304,622.00 $ 195,741.00 $ 34,799.00 $ 89,595.00 1 FA1805-CMAR 2022-00000893 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days CHANGE ORDER Shadow Creek Library CMAR CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpearland.com/projects Date of Issuance: 09/30/2020 Change Order No.: Contractor: SpawGlass CoP Project No.: Consultant: PGAL P.O. No.: 49 Add Item No. 51.00, "Earthwork" $ 254,256.00 50 Add Item No. 52.00, "SWPPP" 51 Add Item No. 53.00, "Left Turn Lane" 52 Add Item No. 54.00, "Landscape & Irrigation System" 53 Add Item No. 55.00, "Site Furnishing" 54 Add Item No. 56.00, "Parking Specialties & Striping" 55 Add Item No. 57.00, "Site Utilities" Please attach back-up documentation. Cost & Time Change Summary Original Contract: Previous Change Order(s): Contract prior to this Change Order: Net increase (decrease) from this Change Order: Revised Contract: Finance Approval: RECOMMENDED: By: Consultant ACCEPTED*: By: Contractor $ 34,955.00 $ 164,660.00 $ 301,197.00 $ 131,912.00 $ 53,400.00 $ 265,872.00 Cost $ 859,833.00 $ 859,833.00 $ 15,141,618.00 $ 16,001,451.00 1 FA1805-CMAR 2022-00000893 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days 0 Days Time 0 Days 0 Days 0 Days 0 Days 0 Days Date RECOMMENDED: Date 10/01/2020 By:Date 10/01/2020 Construction Manager APPROVED: Date 10/01/2020 By: Date Owner *Contractor agrees to perform change(s) included in the Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed. No payment to the Contract (or Consultant) shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs. Upon execution by all parties, the following changes identifies for the contract value and/or contract time shown, are made part of the contract. CHANGE ORDER NO. 1 ATTACHMENT"A" PROJECT: Shadow Creek Library CMAR September 30, 2020 PROJECT NO.: FA1805-CMAR ORIGINAL CONTRACT REVISED CONTRACT ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL QTY UNIT COST TOTAL NET CHANGE ADD ITEM(S) TO CONTRACT: Communications 46.00 Structured Cabling LS 1 195,741.00 $195,741.00 $195,741.00 47.00 Audio -Video Systems LS 1 $34,799.00 $34,799.00 $34,799.00 Concrete 14.00 Turnkey Concrete LS 1 992,975.00 $992,975.00 $992,975.00 15.00 Conrete Polishing LS 1 $34,775.00 $34,775.00 $34,775.00 Conveying Equipment 41.00 Elevators LS 1 235,500.00 $235,500.00 $235,500.00 Earthwork 51.00 Earthwork LS 1 254,256.00 $254,256.00 $254,256.00 52.00 SWPPP LS 1 $34,955.00 $34,955.00 $34,955.00 53.00 Left Turn Lane LS 1 164,660.00 $164,660.00 $164,660.00 Electrical 45.00 Electrical LS 1 304,622.00 $1,304,622.00 $1,304,622.00 Electronic Safety & Security 48.00 Security and Surveillance LS 1 $89,595.00 $89,595.00 $89,595.00 49.00 DAS / ERRCS Systems LS 1 $50,000.00 $50,000.00 $50,000.00 Allowance 50.00 Fire Alarm System LS 1 $54,900.00 $54,900.00 $54,900.00 Equipment 39.00 Library Equipment LS 1 $10,770.00 $10,770.00 $10,770.00 Exterior Improvements 54.00 Landscape & Irrigation LS 1 301,197.00 $301,197.00 $301,197.00 System 55.00 Site Furnishing LS 1 131,912.00 $131,912.00 $131,912.00 56.00 Parking Specialties & LS 1 $53,400.00 $53,400.00 $53,400.00 Striping Finishes 29.00 Drywall & Metal Studs LS 1 857,446.00 $857,446.00 $857,446.00 30.00 Tile LS 1 $83,177.00 $83,177.00 $83,177.00 31.00 Acoustical Ceilings & LS 1 412,193.00 $412,193.00 $412,193.00 Treatments 32.00 Carpet & Resilient Floors LS 1 189,464.00 $189,464.00 $189,464.00 33.00 Painting LS 1 $91,071.00 $91,071.00 $91,071.00 Fire Suppression 42.00 Fire Suppression LS 1 113,500.00 $113,500.00 $113,500.00 Furnishings 40.00 Window Treatments LS 1 $25,441.00 $25,441.00 $25,441.00 General Requirements 11.00 General Requirements LS 1 387,625.00 $387,625.00 $387,625.00 12.00 VDC & BIM LS 1 $23,040.00 $23,040.00 $23,040.00 13.00 Site Utilities Consumption LS 1 $45,000.00 $45,000.00 $45,000.00 Allowance Heating, Ventilating & Air Conditioning 44.00 Turnkey HVAC LS 1 049,528.00 $1,049,528.00 $1,049,528.00 Indirect Costs 3.00 General Conditions LS 0 554,163.00 $0.00 $0.00 4.00 Builder's Risk LS 1 $56,213.00 $56,213.00 $56,213.00 5.00 General Liability Insurance LS 1 $-8,912.00 -$8,912.00 -$8,912.00 6.00 Bonds LS 1 $-4,128.00 -$4,128.00 -$4,128.00 -, .,.. o..ti.............__ r,,.�..... .... 0 4 on❑ tan nn ¢'Nna qnn nn 29nA znd nn CHANGE ORDER NO. 1 ATTACHMENT "A" PROJECT: Shadow Creek Library CMAR September 30, 2020 PROJECT NO.: FA1805-CMAR ORIGINAL CONTRACT REVISED CONTRACT ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL QTY UNIT COST TOTAL NET CHANGE 16.00 Masonry LS 1 346,150.00 $346,150.00 $346,150.00 Metals 17.00 Structural & Misc Steel LS 1 294,950.00 $1,294,950.00 $1,294,950.00 18.00 Ornamental Railings LS 1 $59,842.00 $59,842.00 $59,842.00 Openings 26.00 Doors, Frames & LS 1 140,400.00 $140,400.00 $140,400.00 Hardware 27.00 Overhead Coiling Doors LS 1 $10,932.00 $10,932.00 $10,932.00 28.00 Turnkey Glass & Glazing LS 1 902,160.00 $902,160.00 $902,160.00 Plumbing 43.00 Turnkey Plumbing LS 1 619,900.00 $619,900.00 $619,900.00 Specialties 34.00 RR Partitions, Access LS 1 $40,903.00 $40,903.00 $40,903.00 Mats & Lockers 35.00 Display Boards, LS 1 $72,600.00 $72,600.00 $72,600.00 Extinguishers and Wall Protection 36.00 Operable Partitions LS 1 $54,189.00 $54,189.00 $54,189.00 37.00 Signage Allowance LS 1 $60,000.00 $60,000.00 $60,000.00 38.00 Flagpoles LS 1 $9,543.00 $9,543.00 $9,543.00 Thermal and Moisture Protection 21.00 Waterproofing LS 1 230,062.00 $230,062.00 $230,062.00 22.00 Roofing LS 1 004,669.00 $1,004,669.00 $1,004,669.00 23.00 Metal Wall Panels LS 1 952,942.00 $952,942.00 $952,942.00 24.00 Joint Sealants at Site LS 1 $18,037.00 $18,037.00 $18,037.00 25.00 Firestopping LS 1 $22,980.00 $22,980.00 $22,980.00 Utilities 57.00 Site Utilities LS 1 265,872.00 $265,872.00 $265,872.00 Wood. Plastics & Composites 19.00 Rough Carpentry LS 1 $58,280.00 $58,280.00 $58,280.00 20.00 Millwork LS 1 506,300.00 $506,300.00 $506,300.00 NET TOTAL CHANGE ORDER #1: $15,141,618.00 ORIGINAL CONTRACT AMOUNT: $859,833.00 CHANGE ORDER #11: $15,141,618.00 REVISED CONTRACT AMOUNT: $16,001,451.00