R2020-184 2020-09-28RESOLUTION NO. R2020-184 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City Manager or his designee to enter into an amended contract with CDM Smith, Inc., in the estimated amount of $1,919,101.00, to include construction phase services associated with Surface Plant Package No. 2. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract by and between the City of Pearland and CDM Smith, Inc., a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract with CDM Smith, Inc. for construction phase services associated with Surface Plant Package No. 2. PASSED, APPROVED and ADOPTED this the 28th day of September, A.D., 2020. TOM REID MAYOR A TAL ROAN, TRMC, CMC R LAN CITY SECRETARY ,•.•`•�Q sem• •Ns APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Date of Issuance: Consultant: CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 pearlandtx.gov/projects Professional Services Contract Amendment Surface Water Plant (Final Design - Package 2) 09/02/2020 Amendment No.: CDM Smith CoP Project No.: P.O. No.: Explanation: This change order encompasses the following: Amending contract to add construction phase services Description of Work Cost 1 Add Item No. 13 Construction Phase Services Basic Services $ 1,315,721.00 2 Add Item No. 14 Construction Phase Services Additional Services $ 603,380.00 Please attach back-up documentation. Cost & Time Change Summary Cost Original Contract: $ 5,202,432.00 Previous Amendment(s): $ 0.00 Contract prior to this Amendment: $ 5,202,432.00 Net increase (decrease) from this Amendment: $ 1,919,101.00 Revised Contract: $ 7,121,533.00 Finance Approval: 7q -a a ACCEPTED": By: 3 WA1605-Package2 2019-00001038 Time 810 Days 0 Days Time 0 Days 0 Days 0 Days 810 Days 810 Days Date 10/15/2020 APPROVED: Date 09/09/2020 By. -moi%-= Date 10/07/2020 Consultant Project Manager By. %z__ Date 10/15/2020 Owner 'Consultant agrees to perform change(s) included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by alt parties, the following changes identifies for the contract value and/or contract time shown, are made part of the Design 1 of 1 D4. Revised 7/08 AMENDMENT 3 - CONSTRUCTION PHASE SERVICES FOR PEARLAND SURFACE WATER TREATMENT PLANT PROJECT PROJECT#: WA1605 INTRODUCTION This scope of services for the Pearland Surface Water Plant (SWM) defines the construction service scope of work to be performed by the Engineer. This work will be completed as Amendment 1 under the City of Pearland SWTP Project # WA1605 Contract, executed on March 5, 2019. This overall project is broken into three design packages. This scope of work only addresses Package 2 - Surface Water Plant. Package 1 - Intake and Raw Water Pump Station Package 2 - Surface Water Treatment Plant Package 3 - Ground Storage Tank, High Service Pump Station, and Off-site Transmission System Improvements Stakeholders for this contract include: ■ CDM Smith Inc. and its teaming partners as "Engineer" ■ City of Pearland as "City" or "Owner" ■ Ardurra Group as "Owner's Representative" ■ Construction Manager -at -Risk (CMAR) is Pepper Lawson Waterworks (PLW) ■ Freese and Nichols as "Package 1 Consultant" ■ Stantec as "Package 3 Consultant" ■ Texas Water Development Board as "the funding agency" The work is separated into the following five phases: Phase 1- PROCESS EVALUATION AND DEVELOPMENT - Complete. Phase 2 - PRELIMINARY DESIGN - Complete. Phase 3 - FINAL DESIGN - In Process. Phase 4 - CONSTRUCTION SERVICES - Amendment 1. Phases 1 and 2 were completed under the original authorization. Amendment 1 was a no -cost reallocation of funds from the bench testing task to provide additional survey services. Phase 3 was authorized under a new Final Design Contract in the Pearland Manage -It system. Phase 4 services are described here as Amendment 1 to that Contract and will be an amendment in the Pearland Manage -It system to the Final Design contract. Pearland Surface Water Treatment Plant 1 Phase 4 and 5 Scope September 2020 SCOPE OF WORK The scope of work presented below describes the base level of services for Phases 4 of the SWTP Project (Project) covering construction services. The Engineer will provide construction service support for the Project over a total of 33 months including: Three (3) month bid phase (July through September 2020) Twenty-seven (27) month construction period from Notice to Proceed (October 1, 2020) to Final Completion (December 31, 2022) Three (3) additional months for record drawings and any remaining close out items aanuary through March 2023). Construction Services include the following items: ■ Task 4.1- Project Management, Meetings, and Site Visits ■ Task 4.2 - Bid Phase Support ■ Task 4.3 - Shop Drawings and Substitutions ■ Task 4.4 - Clarifications and Interpretations: Requests for Information (RFIs) and Work Change Directives (WCDs) ■ Task 4.5 - Substantial and Final Completion Inspections ■ Task 4.6 - Record Drawings ■ Task 4.7 - Additional Engineering Services Phase 4 - Construction Services (Not to Exceed, Hourly T&M) Task 4.1- Project Management, Meetings, Site Visits and Administration: Task 4.1.1- Project Management: Engineer shall oversee the delivery of the Phase 4 tasks for the Project. This task includes the Engineer's coordination with the City staff, CMAR firm, and Owner's Representative to manage the delivery of the work outlined in this scope of work. The Engineer will perform the duties of project oversight and reporting to provide updates on the following items: project performance, schedule updates, budget tracking, monthly status reports, and project invoicing. Engineer will provide a monthly M/WBE Report to the City documenting work performed by and payment to the M/WBE subconsultants. Deliverables: Monthly invoices, project status reports, and M/WBE Reports. Task 4.1.2 - Monthly Project Meetings and Site Visits: Engineer will attend Monthly Progress Meetings to be held during the project with the City staff, CMAR firm, and Owner's Representatives to discuss aspects of the project presently underway, project schedule, and upcoming issues. The scope of work assumes twenty-seven (27) progress meetings that will be facilitated by PLW/Ardurra. These meetings will generally be about four hours in duration. The appropriate Engineer team members shall attend these meetings to discuss pertinent issues, typically by one person unless some specialty support is required.. In addition to the in-person progress meetings, it is anticipated that 27 virtual meetings will be held once per month (effectively meeting every two weeks) over the course of construction to discuss construction progress, coordinate on RFI and shop drawings responses, and schedule of upcoming activities and meetings. It is assumed that CDM Smith will have one person unless Pearland Surface Water Treatment Plant 2 Phase 4 and 5 Scope September 2020 some specialty support is required at each call and the call duration will be two hours for each. The Engineer will make visits to the site to observe construction progress at intervals appropriate to the stage and on-going work being conducted. Visits will be conducted when deemed necessary by the Owners Representative or CMAR firm, and at a minimum of once per month in conjunction with the construction progress meetings to observe construction progress. The purpose of the visits will be to assess the construction progress, quality of the work, and determine if the work is proceeding in accordance with the Contract Documents. The site visits will be scheduled to coincide with the monthly project meetings and to walk the site and develop a standardized report on the general conformance of the work in place, construction observed and any issues identified by the project representatives that attended the meeting. In addition, 12 site visits are included to cover special inspections by various discipline leads (this assumes one project representative per visit). Deliverables: Meeting agenda and meeting summary by others for Monthly Progress Meetings. Site visit report (email summary) documenting details and photographs (photo log) of each visit. Task 4.2 - Bidding Support and Conformed Document Issuance: Bidding services will be performed as described below: • Engineer will respond in writing to written requests for clarifications from the CMAR firm to address clarification of scope intent and /or inconsistencies within the documents, no addenda will be issued by the Engineer. • Engineer will prepare and submit permit package to the City of Pearland Building Department. The budget assumes only CDM Smith's effort to complete and upload the required permit applications for each building and/or structure that requires City permit review. • Engineer will have an outside lab analyze, and supply Owner with summary comparison table of Missouri City WTP filtrate grab sample against the historical data for American Canal for use in contract negotiations with GCWA. • Engineer will update Issue for Bid Plans (dated May 29, 2020) and Specification (dated June 2020) to incorporate clarification updates and requested design changes, modifications or substitutions resulting from the bidding phase to produce a new set in August 2020 to be "Issued for Construction" or "Conformed" documents. Deliverables: Engineer will produce and transmit to program team electronic format copies (PDF) of all conformed plans and specifications in a searchable pdf format including all support documents such as Geotech reports, etc., one full- size and two half size plan sets to the CMAR firm, one half-size to the Owner's Representative, and three half-size sets to the City. Task 4.3 Shop Drawings and Substitutions: The Engineer will review and approve, or take other appropriate action, with respect to shop drawings, equipment operation manuals, samples, and other data which the CMAR firm is required to submit for conformance with the Contract Documents. The scope of work assumes up to 700 shop drawings and resubmittal reviews. The Engineer will evaluate and determine the acceptability of substitute materials and Pearland Surface Water Treatment Plant 3 Phase 4 and 5 Scope September 2020 equipment proposed by the CMAR firm and make recommendations to the City as to their acceptance or rejection. The scope of work assumes up to five (5) such individual substitution evaluations. Deliverables: Shop Drawing Review Responses. Task 4.4 Clarifications and Interpretations - RFIs and WCDs: The Engineer will issue necessary clarifications and interpretations of the Contract Documents as appropriate to facilitate the completion of the work. Such clarifications and interpretations will be consistent with the intent of and reasonably inferable from the Contract Documents. The Engineer will address Requests for Information (RFIs) submitted during construction to provide additional feedback regarding intent of the Contract Documents. The basis of estimate assumes the response of up to 100 RFIs during the construction period. Deliverables: Preparation of RFI response forms with supporting information. Task 4.5 Substantial and Final Completion Inspections: Each required discipline will have a representative on site following notice from the CMAR firm that they consider the entire work substantially complete. The Engineer, Owner's Representative and City staff, accompanied by the CMAR firm, shall conduct the necessary inspection(s) to determine if the work is substantially complete. If after considering any objections by the City, the Engineer will deliver a list of items to be corrected or completed prior to achieving Final Completion. The Engineer will conduct a final inspection to determine if the completed work is acceptable, so the Owner's Representative may recommend, in writing, final payment to the CMAR firm and may give written notice to the City and CMAR firm that the work is acceptable. The Engineer will indicate that the work is acceptable to the best of their knowledge, information and belief and based on the extent of services performed and furnished under this Agreement. Deliverables: Substantial Completion List inclusive of specification or drawing reference and supporting numbered photos of Outstanding Items and same for Final Completion Letter supporting information. Assumptions: 1. It is assumed the Owner's Representative will issue notice of Substantial Completion. 2. It is assumed the Engineer and Owners Representative will jointly provide a certification that work has been completed in accordance with the Contract Documents. The Owner's Representative will draft the main Final Completion documents for CDM Smith review and signature. 3. All Start Up Support, if requested, will be negotiated and paid for from the allowances included in Task 4.8. 4. The Owner's Representative will be responsible for all calculations, data collection, testing and coordination with TCEQ to address the conditional requirements from the TCEQ construction permit for the Pearland SWTP. Task 4.6 Record Drawings: The CMAR firm will provide the complete record of As -Built redlines (CMAR's record of field changes to the work in line, grade and elevation). The Engineer will develop record drawings for the SWTP based on the As -Built redlines provided Pearland Surface Water Treatment Plant 4 Phase 4 and 5 Scope September 2020 by the CMAR Firm. Deliverables: Record Drawings in electronic format (CAD and PDF files (searchable format) on CD or thumb drive including final specifications), two (2) hard copies in half-size and one (1) hard copies (full-size drawings) for City records. Task 4.7 Texas Department of Insurance: CDM Smith will retain a third -party firm certified for windstorm inspections to review the design and perform required wind storm inspections to obtain windstorm certification for the following structures located at the SWTP: Electrical Building at RWPS (Package 1) Canopies at Pre -Treatment and BFP Feed PS Dewatering Building BFP Pump Station Membrane Building Operations Building High Service Pump Station (Package 3) Chlorine Building Electrical Building Maintenance Building Deliverables: Windstorm certification documents. Task 4.8 - Additional Services These items are not part of the base engineering services and will be added to the scope of services upon written authorization from the City. Task 4.8.1 Construction Services Allowance: The ENGINEER shall provide services related to the CMAR project delivery during the Phase 4 - Final Design, when requested by Owner. The services provided under this task will be paid for from an allowance to be used at the Owner's Discretion with agreed to scope and fee impact negotiated prior to use. These services may include such items as: Task 4.8.1.1- Washwater Recycle Pump Station Re -design: Redesigning the WWRPS to reduce dewatering requirements and construction cost per request of CMAR firm. Task 4.8.1.2 - Sanitary Lift Station Re -Design Allowance: Revising design to reduce SLS depth and use a different diameter for optimizing formwork. This may or may not impact the SLS pump flowrate dependent on the results of the GCWA outfall to American Canal. CDM Smith will prepare a supplemental scope and budget and submit to the City for approval prior to beginning work. Task 4.8.1.3 Filtrate Outfall Design Allowance: This will include GCWA support in negotiating the new outfall and design of a gravity outfall line into the American Canal. CDM Smith will prepare a supplemental scope and budget and submit to the City for approval prior to beginning work. Pearland Surface Water Treatment Plant 5 Phase 4 and 5 Scope September 2020 Task 4.8.1.4 Filtrate Treatment or PS Allowance: Additional treatment or pumping of filtrate may be required once the GCWA scope is negotiated. This allowance will include additional funds for this design scope. CDM Smith will prepare a supplemental scope and budget and submit to the City for approval prior to beginning work for this allowance item. Task 4.8.1.5 Membrane Re -Design: Due to changes in the H2O Design from the bid proposal to shop drawings, the electrical system will require redesign (for a second time) and major modifications to the tank dimensions and pipe routing related to the CIP system are required in order to produce the conformed drawings for the Contractor to install the membrane system. The deliverable for this task will include a draft electronic deliverable for review by the CMAR, City, and .Owner's Rep, and then inclusion with the Conformed Construction Documents. Task 4.8.1.6 Membrane and Maintenance Building Allowance: To reduce overall construction cost, CDM Smith will redesign the Maintenance and Membrane Building exterior building systems, including evaluating impacts to HVAC, electrical and process design items. The deliverable for this task will include a draft electronic deliverable for review by the CMAR, City, and Owners Rep, and then inclusion with the Conformed Construction Documents. CDM Smith will prepare a supplemental scope and budget and submit to the City for approval prior to beginning work for this allowance item. Task 4.8.1.7 CMAR Allowance: This will be reserved for additional design revisions to address value engineering proposals by the CMAR firm; support Owner's Representative as needed in the preparation of Work Change Directives or start-up support for the program. CDM Smith will prepare a supplemental scope and budget and submit to the City for approval prior to beginning work under this allowance item. Pearland Surface Water Treatment Plant 6 Phase 4 and 5 Scope September 2020 BILLING INFORMATION The following table summarizes the billing terms for Phase 4 - Construction Services as outlined above. Pearland Surface Water Treatment Plant Project Package 2 - Engineering Fee Summary and Billing Terms2- Project Phase Engineering Fee Billing Terms Phase 4 - Construction Services $1,384,149 HRNTE1 Previously Authorized ASR Adjustment -$68,428 HRNTE1 Sub-Totalz- $1,315,721 $160 Phase 4 - Additional Engineering Services $603,380 TBD 3. Total Amendment 12. $1,919,101 - 1. HNTE is hourly not to exceed allowing a 10 -percent markup on direct costs and subcontractors, excluding Carollo Engineers, Inc. 2. Fee Detail is provided on Table 1 3. To be determined based on terms of authorization. Billing Rates - Construction Services (2019 Rates) Position Billing Rate Principal / Project Manager $250 Engineer 8 $230 Engineer 7 $210 AES Engineer Level 5/6 $180 AES Engineer Level 3/4 $160 AES Engineer Level 1/2 $140 Sr. Designer $170 Designer $130 Staff Support $120 Project Administrator $100 END OF SCOPE OF WORK Pearland Surface Water Treatment Plant 7 Phase 4 and 5 Scope September 2020 Purpose 15 SeptdWer 2020 omp— To: Mayor and City Council members Good and clear update and preview for the intricate and complex Surface Water Treatment Plan. Memo Foresight and experience making progress and saving money on very important investment for water, examples shared about the pre package and how that To: Clay Pearson, City Ma ager is paying off. Pictures after text show the progress to date. State TWDB causing some delays overall. Clay From: Skipper Jones, Ass' tant Dir — CC: Trent Epperson/,Assistant City Manager Robert D. Upto , P.E., Director Engineering Clarence Witt er, Director Public Works David Van ' er, Assistant Director Public Works Date: Septemb§% 17, 2020 Re: Surface Water Plant Engineering Construction Phase Services This memo provides information aboutthe progress on the Surface WaterTreatment Plant project's current status and the forthcoming proposed award of the Balance of Plant GMP for the CMAR, three contract Amendments for Engineering Construction Phase Services and one additional Task Order for Owner's Representative Construction Phase Services. These contracts are scheduled for presentation to Council on the September 28, 2020 meeting agenda. Background The Surface Water Treatment Plant project is designed to provide up to 10 million gallons per day (MGD) of safe clean drinking waterforthe citizens of Pearland beginning in January2023. This facilitywill supplement ground and other surface water sources currently in operation and reduce the City's dependence on expensive water supplied through an existing take or pay contract with the City of Houston on the far west side of the City. Design of the facility was split into 3 design packages and awarded separately with Freese & Nichols managing Package 1: Site Drainage and Raw Water Lift; CDM -Smith managing Package 2: Treatment Plant and associated facilities; and Stantec managing Package 3, high service pumps and building, ground storage and transmission lines. Council awarded the Construction ManagerAt Risk Pre -Construction Services contractto PLW WaterWorks in April 2019 and awarded the Early Works Package 1 (EWP1), in the amount of $7,479,256.00 in February 2020. TWDB issued a final approval in late April for this package. Early Works Package 2 (EWP2) was awarded in April 2020 in the amount of $13,758,502 and TWDB issued their approval in mid-June. Current Status Work on portions of the two Early Works Packages began on site almost immediately with large portions of the rough site work and drainage now underway or partially complete. Soil foundation work for the plant's several buildings and ground storage tank are also now nearing completion. Deep foundation work is well underway on the thickeners and wash water recovery basins. The Early Works package has allowed the deep foundation work to be done without the need or cost of expensive shoring. Progress on the early works packages is observable in aerials photos attached to the end of this memo. The site rough grading and preliminary drainage is in place making the site workable even afterthe heavy rains experienced in late July and early August. The CMAR received bids for the manufacture and supplyof plant membrane units in late -February 2020 and Staff has recently completed work with the Design Consultant to negotiate final equipment package details to improve the performance of the membrane equipment and to incorporate manufacturer performance recommendations. These were necessary to obtain the increased thru-put capacity desired. Themembrane package, consisting of three racks of membrane modules, piping, valving, pumps, instrumentation and controls, will have the ability and capacity to process the required 10 Million Gallons per Day (MGD) of drinking water. All three design consultants submitted plans and specifications to TCEQ for final approvals in July. At this time TCEQ has completed their reviews of Packages 1 and 2. All three Packages were also submitted to the City for permitting in early August on schedule. Plans have been designated as ISSUED FOR BID as they have not been finally approved by TCEQ, TWDB or the City constituting approximately 90% design level of effort. The CMAR advertised for bids to his pre -qualified bidders and held Pre -Bid meetings July 7th and 101h to answer any questions and provide clarifications for all bid packages. The packages contain the Balance of Project (BOP) work and form the basis for the CMAR's final GMP. Bid packages were assembled to maximize the economies of scale including labor, material and equipmentwhere possible. Other, "Equipment Only" packages were developed to group like equipment, such as pumps, into one purchase to capture these economies. Bids were received in August and the CMAR has reviewed and analyzed each bid to ensure that the sub- contractor or vendor has included the entire scope of work and understands all specifications. The vetting process has included interviews of perspective sub -contractors in which Staff and the Owner's Rep have participated to ensure qualified sub's are awarded contracts and that cost reduction recommendations from these sub's were taken into consideration for Value Engineering purposes. The CMAR submitted bids to self -perform three packages within the BOP work and was low bidder on two of those: Yard Piping and Membrane and the Chemical and Granular Activated Carbon (GAC) facilities. The third package was the Dewater Deep Structure Equipment package which will ultimately be awarded to the low bidder, an MBE contractor. In all such cases, the CMAR submitted his bid to the Owner's Representative 24 hours before competitors bids were received. Working from the submitted results the CMAR delivered a preliminary GM P in late August along with a list of potential Value Engineering options that, once analyzed, could reduce the Cost of Work by as much as $1 million dollars further. That Preliminary GMP is currently $135,997,681. This is the total for ALL Work INCLUDING the Pre -Construction Services ($1,092,320) the previously awarded Early Works Packages totaling $21,237,758 leaving the Balance of Project Costs of $113,667,603. As VE items are reviewed and accepted the GMP will reduce further. Staff will present this Guaranteed Maximum Price (GMP) to Council for approval and award on September28th. The following table lists the packages and their respective costs that make up the balance of project work that produce the GMP. Cost of Work GMP Cost Breakdown EWP1 $ 6,970,160 EWP2 $ 12,866,502 Balance of Plant $105,728,304 Total Cost of Work $125,564,966 Fee* $ 6,023,378 Preconstruction $ 1,092,320 Bonds and Insurance* $ 3,317,017 TOTAL GMP $135,997,681 Authorizations Preconstruction $ 1,092,320 EWP1 $ 7,479,256 EWP2 $ 13,758,502 Balance of Plant $113,667,603 *Total of All Packages Balance of Plant — Cost of Work General Conditions $ 6,986,600 Site Logistics $ 3,916,812 Bid Pkg 02.04 Transmission Lines $ 15,928,205 Bid Pkg 02.05 Yard pipe $ 8,096,100 Bid Pkg 02.06B site Paving $ 2,391,534 Bid Pkg 02.061) site Fencing $ 365,000 Bid Pkg 11.02 Hor. Split Face Pumps $ 230,677 Bid Pkg 11.03 vertical Turbine Pumps $ 792,678 Bid Pkg 11.04 Submersible Pumps $ 556,570 Bid Pkg 11.05 slide and Weir Gates $ 66,780 Bid Pkg 11.06 Dewatering Equipment $ 1,887,000 Bid Pkg 11.07 GAC Equipment $ 2,094,635 Bid Pkg 15.01 Pipe and valves $ 3,792,000 Bid Pkg 16.01 Electrical & controls $ 18,482,096 Bid Pkg 16.04 Generators $ 1,559,867 Bid Pkg 20.01 RWPS $ 4,544,570 Bid Pkg 20.02 DewaterComplex $ 4,009,000 Bid Pkg 20.03 Pre -Treatment $ 4,232,500 Bid Pkg 20.04 Membrane complex $ 14,338,000 Bid Pkg 20.05 Commercial eidgs $11,182,680 Bid Pkg 20.06 control Structure $ 275,000 In the interim, the final plans from all three design packages have been sealed and submitted to City Plan Review for permitting. Any changes coming out of the permitting process will be handled by internal change orders between the CMAR and their Sub -Contractors without impacting the GMP. Budget Info Funding Sources Series To Date Future Total Budget W/S Revenue Bonds 2017B 6,012,500 Land 6,012,500 Impact Fee - Debt 2017B 6,012,500 12,415,111 6,012,500 W/S Revenue Bonds 2018A 4,325,000 113,667,603 4,325,000 Impact Fee - Debt 2018A 4,325,000 3,125,014 .4,325,000 W/S Revenue Bonds 2019A 10,500,000 10,500,000 Impact Fee - Debt 2019A 10,500,000 10,500,000 W/S Revenue Bonds 2020A 53,800,000 53,800,000 Impact Fee - Debt 2020A 53,800,000 53,800,000 W/S Revenue Bonds 14,562,500 14,562,500 Impact Fee - Debt 14,562,500 14,562,500 Total Funding Sources 149,275,000 29,125,000 178,400,000 Expenditures To Date Future Total PER 9,376,810 9,376,810 Land 59,455 500,000 559,455 Design 12,415,111 2,950,992 15,366,103 Construction 22,330,078 113,667,603 135,997,681 Construction Management/Inspection 3,125,014 3,125,014 Construction Materials Testing 462,860 462,860 FF& F Total Expenditures 2,000,000 2,000,000 44, 644, 313 122, 243, 609 166, 887, 922 Project Balance/Contingency 1 11,512,078 `Project budget and contingency will be reviewed, and final project budget will be reflected for future debt sales. Schedule Info At this time, the Design portion of the project is largely complete with minimal design or plan changes anticipated for permitting and final State approvals. The Design Consultants have all met their planned delivery dates. The previous efforts to get early work packages (EWP1 and EWP2) started has paid off in that a good deal of site work is already underway despite the delays in approvals at TWDB and the rain days experienced on site in June and July. However, TWDB's approval of work packages has been slow. Work contained in Early Works Package 1 was not approved by TWDB until April 21 t Some portions of work in Early Works Package 2 was finally approved on June 10th leaving some portions still un -approved. Initially, individual bid packages within the Early Works packages were being reviewed and assessed as if each sub -contract package was a separate project requiring independent review, duplication of all front-end documents and environmental clearances. Seeking to maintain the project schedule, Staff provided NTPs to the CMAR for portions of these packages as soon as TWDB approvals came in. As a result, portions of field work were able to proceed but, progress has suffered from these delays due to TWDB's slow approval procedures and their lack of complete understanding of the CMAR process. TWDB is in the process of creating their review/approval processes for this alternative delivery methodology. The combination of lack of understanding and absences of existing procedures is at the heart of these delays. The project Team met with TWDB in early June and presented an informational package containing an in-depth discussion on the CMAR process as described in Title 10: Chapter 2269.255 of Government Code. This discussion focused on the commercial aspects of the sub- contractor bidding process, the development of sub -contract bid packages and offered guidance for the development of TWDB's forthcoming procedures. Although TWDB's procedures are being created at this time, the delay to the work has cost the project approximately six months in the overall schedule. Schedule recovery discussions with the CMAR indicate that "float" available in the original schedule has nowbeen consumed by the TWDB delays and has pushed construction completion into December 2022 and commissioning of the plant into early 2023 versus a planned completion of mid -year 2022 with full operations and testing complete before December 2022. Timing for final water to the system will be dependent on the project schedule for Plant Commissioning. The exact Commissioning schedule is anticipated to be early first quarter of 2023 but will be refined based upon system components beginning to come on line. Our current Water Model indicates that a delay into early 2023 will not cause an impact on our water system. Design Start- Package 9 Design Start - Package 2 Design Start - Package 3 Bid Start Construction Start Proposed Construction Completion Base Line Current August -19 September -19 February -19 March -19 August -19 September -19 March -20 January -19 May -20 June -20 December -22 Rain Days: 18 CMAR) process. The original base line _hown as Bid Start originally referred to Early Works Packages but has been changed nowto reflect bidding forthe GMP Next Steps As the project moves into the Balance of Project (BOP) Construction Phase, engineering contracts will need to be amended to provide engineering services during construction or "Construction Phase Services". All three Design Consultants will be needed forthe Construction Phase, albeit at differing levels of involvement, based on the complexity of earlier design contributions. Additionally, The Owner's Representative Master Service Agreement contract with Ardurra will require the addition of Task 5 for Construction Phase Services. Construction Phase services were not included in any of the previous Preliminary or Final Design contracts in order to simplify those scope definitions and fee negotiations. All three Design Consultant Packages will be presented as contract amendments to the existing Final Design Services contracts. All three Contract Amendments will have very similar scopes of services and will be based on an Hourly Not to Exceed billing. Scope of work in all three will contain but may not necessarily be limited to: • Personnel hours for attending on-site progress meetings as well as virtual meetings during construction and occasional site visits to monitor work progress and quality control. • All three will contain hours for reviewof material and product submittals, o addressing Requests for Information (RFIs). o This work will include hours for sub -consultant involvement where the source of design was vested in third parties contracted to the prime consultant. • Each proposal will also include hours for project completion and assistance during start up services which will include inspections at substantial and final completion for the major components within their respective packages. • Hourly fees for the creation of record drawings from the CMAR's redlined records. • Each proposal will include hours for additional services as authorized which will cover hours for o unforeseen problem resolutions, additional submittal review and approval work, o redesign of work to meet constructability issues and o additional hours for extended startup and commissioning services if required. Staff Plan to bring all three proposals; Packages 1, 2 & 3, for Construction Phase services to Council for award at the September 28th meeting. Package 1, Freese and Nichols' proposal includes Basic Services in the amount of $152,215 and Additional Services of $40,226 for a total of $192,441 Package 2, CDM/ Smith's proposal includes Basics Services in the amount of $1,315,721 and Additional Services of $603,380 for a total of $1,919,101. Package 3, Stantec's proposal includes Basic Service in the amount of $688,640 and Additional Services of $150,810 for a total of $839,450. Finally, Staff will bring Task Order #5 for Ardurra Group's Owner's Representative contract for Construction Phase Services. This scope of work is based on Hourly, Not to Exceed basis and consists of Basic Services includes hours for continued coordination with TWDB on funding issues and TCEQ for regulatory issues during construction as well as hours for continuing to coordinate between design package consultants, attending monthly progress meetings, trouble shooting and problem resolution all under the Project Management category. Basic Services total $1,339,405 Additional Services (also Hourly, Not to Exceed) include site inspection and construction management based on the 27 month construction and start-up schedule, on-call as authorized water system modeling, coordination and responsibility for completing the Operations and Maintenance Manual, performing a feasibility analysis including 3 alternatives for the future development of a plant forebay and engineering support during the 12 month warranty period. Additional Services total 1,785,609. Total for all Owner's Representative Construction Phase services during construction is $3,125,014 Recommendation On April 271h Staff will recommend that Council: • Approve the Guaranteed Maximum Price for the project of$135,997,681 and Award to Balance of Project Amendment to PLW Waterworks • Approve amendments to all three Design Package contracts for Construction Phase Services • Approve the amendment to the Owner's Representative's contract for Construction Phase Services Previous Memos 6/10/16, 2/2/17, 3/9/17,4/13/17, 3/29/18, 01/10/19, 08/01/19, 08/08/19, 12/05/19,1/23/20, 3/05/20, 4/16/20 View from Southeast corner showing GST soil foundation in forefront. Behind and further north in the foundation for the High Service Pump building and west of that is the foundation for the Operations control building. Mustang Bayou on right and GCWA source water canal on left. Foreground shows foundations for De- Watering and Belt Press Filter building with Sludge Thickeners, and BFP Pump Basin in the center. Further east is the Pre-treatment facility foundation followed immediately by theme mbrane building foundation. This photo was taken during the heavy rains at the end of July. This photo shows progression of the deep foundation work on Sludge Gravity Thickeners and the Belt Filter Press Pump Basin. This photo was taken in early August showing preliminary concrete foundations. These components are part of the "deep foundation" work from Early Works Package 2. Note the laid-back walls of excavation to allow the work to be performed without the use of expensive shoring. 44 - This is the same Gravity Sludge Thickeners and BFP Pump Basin approximately two weeks later showing progression of the work. This photo was taken about two weeks later, mid-August showing extensive soil foundation work going in around the preliminary concrete. This photo was taken at the end of August showing concrete formwork and reinforcing for the concrete floor of the Gravity Sludge Thickener with the Belt Press Pump basin in the background. _ "K Ya `� ti 1� . 'j� ��� • i �w may_ `'��•, `y �. This shows the soil foundation for the GST with casting beds for tank wall and roof panels and installation of under -floor drain piping being installed bythe tank sub -contractor DN Tanks. A This shot was taken from the west end looking east showing the beginnings of the De -Watering Belt Press Filter building foundation in the foreground with Sludge thickeners towards the centerof the site. East of that is the foundation work for Pre -Treatment facility and then the Membrane building. Further east are the foundations forthe Operations building and the Maintenance building.