R2020-010 2020-03-23RESOLUTION NO. R2020-10 A Resolution of the City Council of the City of Pearland, Texas, amending a contract for design services with Cobb, Fendley & Associates, in the additional amount of $115,641.07 (total contract amount of $629,201.25), associated with the Fite Road Expansion Project (McLean Road to Veterans Drive). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That a contract for design services associated with the Fite Road Expansion Project was previously awarded to Cobb, Fendley & Associates. Section 2. The City Manager or his designee is hereby authorized to execute an amended contract for design services associated with the Fite Road Expansion Project. PASSED, APPROVED and ADOPTED this the 23rd day of March, A.D., 2020. TOM REID MAYOR ATT T: C Y ftAL ROAN, TRMC, CMC CITY SECRETARY APPROVED AS TO FORM: nz_ el^ 6k-1- DARRIN M. COKER CITY ATTORNEY Date of Issuance: Consultant: Explanation: CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 pearlandtx.gov/projects Professional Services Contract Amendment Fite Road Extension 01/13/2020 Cobb Fendley & Associates, Inc. Amendment No.: CoP Project No.: P.O. No.: 1 TR1202 2017-00000471 This change order encompasses the following: This amendment extends the services for the Engineering Design and Construction Administration Phase for Fite Rd. Additional services were required due to Contractor failing to complete project within stated contract time of 283 days. Description of Work Cost Time Revise the quantity from 1 to 1.1001493549411593 on Item No. 4 $ 1,400.10 0 Days Field Surveying ? Revise the quantity from 3 to 183 on Item No. 30 Construction $ 34,198.20 0 Days Phase Services Senior Project Manager 3 Revise the quantity from 28 to 253 on Item No. 31 Construction $ 29,250.00 0 Days Phase Services Project Engineer 4 Revise the quantity from 8 to 79 on Item No. 32 Construction Phase $ 6,915.40 0 Days Services Engineer in Training § Revise the quantity from 2 to 38.5 on Item No. 34 Construction $ 2,222.12 0 Days Phase Services Clerical 6 Revise the quantity from 400 to 600 on Item No. 36 Site $ 11,600.00 0 Days Utilities/Pave Subgrade/Misc Engineering Technician 7 Revise the quantity from 100 to 175 on Item No. 37 Site $ 6,525.00 0 Days Utilities/Pave Subgrade/Misc Engineering Technician (OT) $ Revise the quantity from 50 to 100 on Item No. 38 Site Utilities/Pave $ 3,250.00 0 Days Subgrade/Misc Vehicle Charge 9 Revise the quantity from 320 to 462.5 on Item No. 39 Site $ 1,282.50 0 Days Utilities/Pave Subgrade/Misc Nuclear Gauge 10 Revise the quantity from 8 to 12 on Item No. 41 Site Utilities/Pave $ 780.00 0 Days Subgrade/Misc Moisture Density Relationship 11 Revise the quantity from 8 to 28 on Item No. 42 Site Utilities/Pave $ 1,060.00 0 Days Subgrade/Misc Atterberg Limits 12 Revise the quantity from 5 to 22 on Item No. 43 Site Utilities/Pave $ 765.00 0 Days Subgrade/Misc Percent Passing 200 Sieve (-200) 13 Revise the quantity from 140 to 291.25 on Item No. 44 Pave SW, $ 8,772.50 0 Days Curb Driveways Engineering Technician 14 Revise the quantity from 30 to 44.75 on Item No. 45 Pave SW, Curb $ 1,283.25 0 Days Driveways Engineering Technician (OT) 15 Revise the quantity from 20 to 75 on Item No. 46 Pave SW, Curb $ 3,575.00 0 Days Driveways Vehicle Charge 16 Revise the quantity from 400 to 228 on Item No. 47 Pave SW, Curb $(2,580.00) 0 Days Driveways Cylinder Test (4cyl/set) 17 Revise the quantity from 16 to 0 on Item No. 48 Pavement HMAC $(928.00) 0 Days Engineering Technician 18 Revise the quantity from 4 to 0 on Item No. 49 Pavement HMAC $(696.00) 0 Days Extraction and Gradation of HMAC Design 1 of 3 D4. Revised 7/08 Date of Issuance: Consultant: CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 pearlandtx.gov/projects Professional Services Contract Amendment Fite Road Extension 01/13/2020 Amendment No.: Cobb Fendley & Associates, Inc. CoP Project No.: P.O. No.: 1 TR1202 2017-00000471 Explanation: This change order encompasses the following: This amendment extends the services for the Engineering Design and Construction Administration Phase for Fite Rd. Additional services were required due to Contractor failing to complete project within stated contract time of 283 days. Description of Work Cost Time 19 Revise the quantity from 4 to 0 on Item No. 50 Pavement HMAC $(248.00) 0 Days Specific Gravity 20 Revise the quantity from 4 to 0 on Item No. 51 Pavement HMAC $(328.00) 0 Days Hveem Stability 21 Revise the quantity from 2 to 0 on Item No. 52 Pavement HMAC $(92.00) 0 Days Bulk Density 22 Revise the quantity from 2 to 0 on Item No. 53 Pavement HMAC $(108.00) 0 Days Molding Specimens 23 Revise the quantity from 2 to 0 on Item No. 54 Pavement HMAC $(130.00) 0 Days Vehicle Charge 24 Revise the quantity from 20 to 18 on Item No. 55 Project $(192.00) 0 Days Management Project Management & Administration 25 Revise the quantity from 4 to 3 on Item No. 56 Project Mnagement $(65.00) 0 Days Vehicle Charge 26 Add Item No. 57 Site Utilities/Pave Subgrade/Misc Cement Sand $ 6,893.00 0 Days Comp. Strength (D1633) 27 Add Item No. 58 Site Utilities/Pave Subgrade/Misc Preparation of $ 156.00 0 Days Core, Cap & Test (C 42) 28 Add Item No. 59 Site Utilities/Pave Subgrade/Misc Minimum $ 350.00 0 Days Concrete Coring (c-42) (Min 3 core) 29 Add Item No. 60 Pave SW, Curb Driveways Compressive Str., $ 560.00 0 Days Mortar/Grout Cubes 30 Add Item No. 61 Pave SW, Curb Driveways Sieve Analysis Base $ 170.00 0 Days Material Please attach back-up documentation. Cost & Time Change Summary Cost Time Original Contract: $ 513,560.18 0 Days Previous Amendment(s): $ 0.00 0 Days Contract prior to this Amendment: $ 513,560.18 0 Days Net increase (decrease) from this Amendment: $ 115,641.07 0 Days Revised Contract: $ 629,201.25 0 Days Design 2 of 3 D4. Revised 7/08 Date of Issuance: Consultant: CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 pearlandtx.gov/projects Professional Services Contract Amendment Fite Road Extension 01/13/2020 Cobb Fendley & Associates, Inc. Finance Approval: ACCEPTED*: By: —n�_ �- Date 03/11/2020 Consultant Amendment No.: CoP Project No.: P.O. No.: Date APPROVED: By: CaA'a`-balJi� Date Project Manager I TR1202 2017-00000471 nn/q-r;/qmn n:/q.,;/gron By: %y�� Date 03/25/2020 Owner *Consultant agrees to perform change(s) included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes identifies for the contract value and/or contract time shown, are made part of the Design 3 of 3 D4. Revised 7/08