Loading...
R2020-043 2020-02-24RESOLUTION NO. R2020-43 A Resolution of the City Council of the City of Pearland, Texas, awarding a contract with CenterPoint Energy, in the total amount of $112,058.00 for underground duct bank construction and utility pole relocation services associated with the Fire Station No. 8 Project (Shadow Creek Parkway west of Reflection Bay Drive). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City Council hereby authorizes expenditures to CenterPoint Energy, in the amount of $112,058.00. Section 2. The City Manager or his designee is hereby authorized to execute a contract with CenterPoint Energy for duct bank construction and utility pole relocation. PASSED, APPROVED and ADOPTED this the 24th day of February, A.D., 2020. TOM REID MAYOR 0 CRYSVAL N. ROAN, TRMC, CMC CITY SECRETARY APPROVED AS TO FORM: f �' - (A' DARRIN M. COKER CITY ATTORNEY CenterPoint. CenterPoint Energy Energy 3000-A Harrisburg Blvd Houston, TX 77003 January 23, 2020 RE: Terms and Conditions Package and Facilities Extension Agreement City of Pearland Dire Station No. 8 Convert Overhead to Underground 12255 Shadow Creek Parkway Job 90873881 Please find the attached Terms and Conditions (T&C) package and Facilities Extension Agreement (FLA) associated with the installation of underground facilities in place of overhead facilities, applicable for City of Pearland (Customer). The requested underground construction to be performed by CenterPoint Energy (CNP) involves the installation of underground conductors, equipment, and related ancillary materials necessary for their function. The responsibility for the construction of the concrete encased duct bank and the production of Plan and Profile drawings of the duct bank construction is the Customer. CNP is agreeable to this work on the basis of the Customer contributing the estimated cost of the requested service of $53,085. This estimated cost is based on using CNP standard installation equipment and includes no overtime premium. Major Underground Projects (MUG) has not included the costs associated with the installation or removal of any overhead facilities. Ryan Sauers, Service Consultant at the Brazoria Service Center is responsible for providing all overhead costs and construction. No foreign riser(s) allowed on the CNP terminal poles. The attached T&C package and the cost in the FEA is effective for 365 days from January 23, 2020 provided the field conditions existing as of the date and location of the facilities shown on the sketch within the T&C package remain the same. After that time, the estimate of cost must be reviewed by MUG before a final commitment is made to the Customer. If the T&C package and FEA are in accordance with your understanding; CNP would appreciate that the Customer indicate acceptance by signing the cover sheet of the T&C package, the FEA and returning the original executed documents; along with remittance in the above amount. Receipt of these items will he our authorization to prrxxed with this project. Note that the information contained in the T&C package is applicable for the life of the service. Before beginning the underground construction, please arrange for a pre -construction meeting with MUG and the Customers' contractors. Sincerely, Ronnie Biel Engineering Specialist Major Underground Projects Attachment(s) I 1l'age TERMS & CONDITIONS T DERGROUND ELECTRIC SERVICE FOR CITY OF PEARLAND FIRE STATION NO. 8 CONVERT OVERHEAD TO UNDERGROUND 12255 SHADOW CREEK PARKWAY FA 1501-CMAR Job 90873881 CenterPoint Encrgy (CNP) Major Underground Engineering P. O. Box 1700; Houston, Texas 77251-1700 REFERENCE DRAWINGS: Site Plan Received: 09-30-2019 Sealed Plan & Profile Drawings Received: 12-05-2019 REFERENCE CENTERPOINT ENERGY SPECIFICATIONS: Service Standards October 08, 2018 Ready-Mix Concrete 007-221-01 Reviewed And Agreed To By: na r T tle Date G Print N-4ne If this Terms & Conditions package is signed by anyone other than an official from CITY OF PEARLAND it will not be considered valid. A valid signature will be considered an acceptance of all information contained within this Terms & Conditions package. CenterPoint Energy Houston, Texas WRITTEN RGB 01-23-2020 CHECKED RDW 01-23-2020 APPROVED DP 01-23-2020 FDO808 SH ET 1 OF it NO. DATE ITEMS REVISED BY I CH I APP Job 90873881 GENERAL A. These Terms and Conditions arc for the conversion of existing overhead facilities to underground facilities for CITY OF PEARLAND. CITY OF PEARLAND and/or its contractors/representatives are herein referred to as the Customer. B. The CNP Major Underground Engineering (MUG) representative is Ronnie Biel at 713- 207-6046 or Ronnie.Biel@CenterPointEnergy.com. The CNP Overhead Service Consultant is Ryan Sauers at 231-5-95-6075. C. The Customer must comply with all CNP Service Standards, the National Electrical Code, the National Electrical Safety Code, all Occupational Safety and Health Administration (OSHA) requirements, the International Building Code and all local governing body codes. D. During installation of CNP equipment, CNP will make every effort to preserve the Customer's Iandscaping, parking areas, or other facilities. However, any cost that has been quoted to the Customer does not include any special replacements or repairs to these items. The Customer shall be solely responsible for any expenses associated with replacements or repairs to its facilities. E. The service arrangement outlined in these Terms and Conditions is based on the Customer request and customer drawings referenced on sheet 1. Any changes in the design as illustrated in the referenced drawings may impact CND's ability to meet the Customer's requested service date. Any changes, additions; deletions, rearrangements, relocations, rerouting, reduction of clearances, etc., of the Customer's and/or CNP's service facilities illustrated in these Terms and Conditions shall have the MUG's approval and may require a revised Terms and Conditions. It is the Customer's responsibility to coordinate the location of all Customer installed facilities outlined in these Terms and Conditions with all other structures and/or appurtenances not shown in the referenced drawings. F. Contact the MUG representative concerning Customer drawing revisions, information submission, questions, Terms and Conditions revision requests, etc. G. Hand copy submittals may be mailed to the MUG representative (address — 3000-A Harrisburg Blvd. — Houston, Texas 77003). Electronic submittals may be e-mailed to the MUG representative. The MUG representative will; "approve the submittals", "approve the submittals as noted" or "not approve the submittals". The Customer shall not install any item that requires CNP approval before receiving an official approval from the MUG. CNP shall not be responsible for any installed item that has not received MUG approval. REVISION NO. I SPECIFICATION NO. I I I I SHEET 2 OF 11 Job 90873881 ACCESS The Customer rnusL provide a twelve foot (12') minimum width, fourteen foot (14') minimum vertical clearance, all weather, road designed for HS -20-44 loading as recognized by the American Association of State Ilighway Dfficials, by which, CN P personnel and equipment shall have access to the proposed CNP facilities. CNP material may only be installed prior to [lie access road passing a final inspection (see Final Inspection, sheet 6) under the following conditions. A. The MUG has determined that the access route is dry and readily accessible to GNP's normal installation equipment. B. The Customer shall be responsible for all expenses associated with the repair and/or replacement of any CNP equipment, material, and infrastructure damaged by additional construction activity. Note, damage to CNP equipment and facilities may result in delays to the Customer's requested service date. C. CNP will not complete the construction, i.e. energizing CNP conductors or equipment as well as the Customer's service, etc. until the access road and all other facilities to be constructed by the Customer for CNP's use have passed final inspection (see Final Inspection, sheet 6). The Customer must maintain these requirements for the life of the service. CNP will utilize the existing streets, Customer's parking and driveway facilities for the required access. PLAN AND PROFILE DRAWINGS It is recommended that the Customer meet with the MUG representative to discuss the preparation of the drawings. The Customer shall provide plan and profile drawings in accordance with CN -P standards, which will be furnished by the MUG representative upon request. The drawings shall illustrate the proposed CNP MUG facilities. as well as any other entities; existing, abandoned, and proposed facilities within the extent of the its route. The drawings, in their final iteration shall be sealed by the Customer's Professional Engineer (PE) prior to approval by CNP. The Customer shall obtain approval from all the Authorities IIaving Jurisdiction within the scope of these drawings, as well as the acquisition of the applicable permits or exceptions required prior to construction. This may include; but is not limited to the municipalities or authorities in control of the road rights-of-way, as well as any manor of pipe lines, property owners or easement holders. If any portion of the MUG facilities are to be constructed in the City of Pearland's Road Right -of Way, The Customer shall deliver the sealed Mylar sheets to their MUG representative for the appropriate CNP approval signature. The Customer shall supply CNP with the approved final drawings in PDF format. If the actual installation differs from that proposed in the approved drawings, the Customer shall provide CNP with drawings revised to illustrate the installation as it was built. The drawing set shall be identified as "AS -BUILT" in the title block of each sheet. 'Those revised sheets are to also be sealed by the Customer's PE. REVISION NO. SPECIFICATION NO. SHEET 3 OF 11 Job 90873881 FACILITIES INSTALLED BY THE CUSTOMER All facilities are to be installed per the attached construction specifications. The Customer or its contractor is to request a preconstruction meeting prior to starting the specified underground construction by requesting a meeting with the MIJG representative or utilising the MUG FORM found at the web site link below. All facilities shall be inspected by CNP after the conduit is installed, pads are formed, reinforcing rods installed, etc. but prior to the placing of concrete. CNP recommends that the Customer complete the installation of concrete on the day the facilities are inspected and approved. If there is damage to the approved facilities prior to the placing of concrete, the effected portion must be re- inspected by CNP before the concrete is placed. The Customer will insure that all portions of the project that have passed inspection or approved for installation shall remain in that condition until the total installation has passed a final inspection. CNP reserves the right to require the Customer to break out any unapproved concrete pours at its expense as well as replace any conduit damaged by the placement or curing of the concrete or grout. It is the Customer's responsibility to replace and or re -configure the sidewalks and curb ramps effected by the construction of this project to the current standards of the Authority having jurisdiction of the right-of-way. CN -P will make a reasonable attempt to complete all inspection requests. To ensure that inspection requests can be fulfilled, they should be made prior to 5 p.m. the business day before the requested inspection to Major Underground Engineering Projects at htttxHwww.centemointenerp-v. com/en-us/naees/mueform. asnx. Job 90873881 must be provided as the inspection identification number. DUCT BANK INSTALLATION All proposed conduit for CNP's use is to be installed in straight runs, unless otherwise indicated on CNP drawings. Any bends to the conduit shall be accomplished with manufactured bends. No By- field bends will be allowed. Any deviations to the conduit fram a straight nm made without the addition of bends, shall have a minimum twenty -foot (20') radius. All bends, less than ninety - degrees must have a minimum three-foot (3') radius, unless indicated otherwise on CNP approved drawings. All ninety -degree bends shall have a minimum five-foot (5') radius. No more than two five -degree couplings/degree bends shall be installed consecutively. Turn -ups into equipment pads and terminal pole pedestals shall be made with one ninety -degree joint. Any deviations from these requirements shall have written approval from the MUG representative prior to installation. During installation, the minimum depth for a conduit run must be referenced to the fmal grade. The Customer is to delay installation of approximately the last twenty feet (20') of the conduit run and the pole pedestal to any terminal pole until the pole has been set by CNP. Before trenching to the base of any terminal pole, the Customer must securely brace the pole. The Customer must request staking and setting of any terminal pole by contacting the Service Consultant. The Customer must provide a jet line in each conduit installed. This jet line shall extend a minimum of seven feet (7') beyond the end of each conduit. Job 94873881 DUCT BANK INSTALLATION (continued) The Customer shall also install a i#14 American Wire Gage (AWG) or larger aluminum or copper 600 volt insulated conductor in the center conduit for use by the CNT Surveyor. For installations with manholes, the conductor must be electrically continuous and accessible to the survey crew at grade. The conductor may be looped through each manhole lid and tied to a concrete insert in the neck of each manhole. This conductor is to facilitate surveying of the duct bank by CNP. The duct bank cannot be surveyed until this conductor is installed as prescribed. The Customer must take adequate measures to assure the conductor will be in place until all necessary surveying is completed. After surveying of the duct bank is completed, but prior to CNP installing any primary cable, the Customer may retrieve its conductor at its option. The ends of conduit comprising a duct line shall not be left open. If the conduit is installed in stages, the Customer must keep each section of conduit sealed until the next section is installed. The use of rags and or tape to plug conduit is not acceptable. A conduit end cap or plug shall be used to temporarily seal the section. Rigid PVC end caps shall be installed on all conduits that are installed as a stub out. If, prior to CNP using any conduit, the conduit is found to be blocked, the Customer will be responsible, at its expense, for removing the obstruction. CLEARANCES Final approval for the location of the terminal poles is contingent upon proper clearance, as determined by CNP, from cooling towers, vents, buildings, structures, or other underground utilities, etc. It is in the Customer's and CNP's best interest to have all service equipment in a contamination - free enviromnent to avoid unscheduled outages and'or premature equipment failures. Therefore, prior to any construction, the Customer shall inform the MUG representative of any existing or future contamination or pollutants which may affect the equipment so that the necessary clearances can be secured. The MUG representative shall be notified promptly if the Customer intends to install any obstructions such as walls/fences, carports, hedges, bushes, trees, etc., around any pad mounted equipment, manhole, pole, or any CNP facilities so that additional clearances and or alternative access can be secured. If, in the future, there is a problem with contamination of CNP's equipment, or proper clearances are not maintained, CNP reserves the right to relocate the equipment at the Customer's expense. A one tbot (P) minimum vertical clearance must be maintained between CNP duct banks and all non -CNP facilities crossing the duct bank. If the Authority having jurisdiction of the right of way requires greater clearance than above that clearance will apply. A five foot (5') minimum horizontal clearance must be maintained between CNP duct banks and other facilities running parallel to the duct bank. CNP will not allow joint trenching between MUG duct banks and other facilities. No telecommunication, electrical, or any other entities facilities are to use CNP terminal poles as a point to riser from underground to overhead. Existing aerial attachments to the terminal poles may be accommodated if approved by the MUG representative. In order to maintain proper clearances, the installation of taller terminal poles or relocation of the foreign attachments may be required. Job 90873881 FINAL INSPECTION After the Customer has advised CNP that all "Customer installed" facilities pertaining to this service arrangement have been completed and inspected, a final on-site inspection will be made by a MUG representative. This final inspection will verify that all Customer installed facilities are in accordance with these Terms and Conditions. The Customer and the Service Consultant will be advised of any needed corrections and/or changes. When all necessary corrections and/or changes have been completed, CND's portion of the construction may begin. EASEMENT INSTRUMENT GNP will prepare an instrument for easements to he granted by the property owner after all installations for CNP's use have been completed according to these Terms and Conditions. The service cannot be energized until CNP has accepted the signed instrument for all easements. The Customer also has the option of signing a blanket easement document. Use of the blanket easement allows the service to be energized before the final signed instrument for all easements has been completed. The Customer may request use of the blanket easement document by contacting the MUG representative. CNP will need access to and from the proposed easements. CNP will use these easements, for the purposes of erecting, installing, operating, maintaining, replacing, inspecting and removing electrical distribution facilities. The Customer shall keep these easements free and clear of any obstructions (trees, shrubs, other structures, etc.) that may endanger or interfere with the efficiency, safety, and proper operation of the proposed facilities for the life of the service. INDEMNIFICATION AND LIABILITY LIMITS Indemnity: This indemnity is pursuant to Company's Tariff located on our website at www.centerpointenergy.com. RETAIL CUSTOMER ASSUMES THE RISK OF AND SHALL INDEMNIFY COMPANY AGAINST DAMAGES FOR INJURIES OR DEATH TO PERSONS OR LOSS TO RETAIL CUSTOMER'S PROPERTY, OR TO THF PROPERTY OF COMPANY, WHEN OCCASIONED BY ACTIVITIES OF RETAIL CUSTOMER OR THIRD PARTIES ON CUSTOMER'S PREMISES, RESULTING FROM THE INSTALLATION, EXISTENCE, REPLACEMENT; OR REPAIR OF COMPANY'S UNDERGROUND FACIUTIF.S, AND AS FURTHER PROVIDED IN THE TERMS OF "LIMITS ON LIABILITY." SECTIONS 4.2 AND 5.2 OF THIS TARIFF. NOTWITHSTANDING ANY OF THE ABOVE, THE PROVISIONS REQUIRING A RETAIL CUSTOMER TO INDEMNIFY, FULLY PROTECT, OR SAVE COMPANY HARMLESS APPLY TO A GOVERNMENTAL ENTITY AS THIS TERM IS DEFINED IN CHAPTER 2251 OF THE TEXAS GOVERNMENT CODE, TO THE EXTENT OTHERWISE CONSISTENT WITH LAW, PROVIDED, HOWEVER, THAT ANY GOVERNMENTAL ENTITY TILAT 1S A RETAIL CUSTOMER TO WHICH THIS SUBSECTION 2.5 APPLIES MUST TAKE NECESSARY STEPS TO ENSURE THAT THE INDEMNIFICATION REQUIREMENTS OF THIS SUBSECTION 2.5 DO NOT CREATE A "DEBT" INVIOLATION OF ARTICLE XI, SECTION 7 OF TILE TEXAS CONSTITUTION. SUCH STEPS MAY INCLUDE, BUT ARE NOT NECESSARILY LIMITED TO, A THIRD-PARTY INDEMNIFICATION IN WHICH THE CONTRACTOR PERFORMING THE WORK FOR THE GOVERNMENTAL ENTITY INDEMNIFIES THE COMPANY OR TIIE ESTABLISHMENT OF A SINKING FUND. (see Governmental Entity Addendum if applicable) REVISION NO. SPECIFICATION NO. I I SHEET 6 OF 11 FINAL GRADE (ROAD, PARKING AREA, ETC.) i= 4• 2, a~ 2 - 6' CONDUITS SHEET 7 DF 11 JOB 90873881 DRIV- tt3 PCDA0 m e SPACER AN (SEE NUI E SPACER (SEE NOTE #3 BARS 3'-0' _ONG (SEE NOTE 5) 2 (B TI NOTE: THE CUSTOMER AND/OR ITS CONTRACTOR, IS TO REQUEST 6 FRECONSTRUCTION MEETING PRIOR TO STARTING CONS—RUCTION B" CONTACTING HTTP://WWW.CENTERPOINTENERGY.COM/EN—US/PAGES/MVGFORM.ASPX. NOTES: '. CONDUIT TO BE PVC, MINIMUM 09AOE TYPE EE. 2. SPAC-HS SHUULJ EE INSIALLLO NUI MOHE IHAN 10'-0"APART. 3. CONDJITS TERMINATING AT MANHOLES SHCULD BE SLOPED 0.5% DOWN TOWARD MAN -TOLE. 4. ALL =XTER:OR CONCRETE CCVER DIMENSIONS AR= MINIMUM. 5. CONCRETE SHALL EE IN ACCORDFNCE WI -H CNP SPECIFICATION 007-221-01, LATEST REVISION. 6. PLACE REINFORCING BARS IN 4 CCRNEP.S OF T -4E CONCRETE W1ERE SPACERS ARE USED. 7. ON C01 n .JOINT r.nNCPFTF Pf71R HSF #5 RFRAR (3'-0' IN LENGTH. EXPOSED 1'-6'I. 8. LENGTH OF P,EBAR FOR SPACER ANCHOR WILL VARY PER DUCT BANK HEIGHT. 9. CONDUITS ENDS SHALL BE PLUGGED WITH A DUCT CAP OR OTHER TYPE OF CAPPING DEVICE. 10. A ONE FOOT VERTICAL CLEARANCE MLST BE MAINTAINED BETWEEN CNP'S DUCT BANK AND ALL NON -CNP FACILITIES CROSSING THE DUCT BANK. 11. A FIVE FOOT H3RIZONTAL CLEARANCE MUST BE MAIN I AINED 8L I W=LN CNF'S DUCT BANK AND ALL NON -CNP FACILITIES RUNNING PARALLEL TO THE DUCT BANK (JOINT TRENCHING NOT PERMITTED). THREE PHASE DUCT BANK 2. INSTA, I .JFT I TNF IN AI I F.nNFIIIITS ANF' A z14 AWG WIRE IN ONE CONDUIT. FEEDER BASED ON OISTR-BUTION STANDPRD DLFS2C 0 s a !m 0 F7 II `_.0 NON-T-iRF_AnF0 PVC COUPLING I I I I � I I I I I I I I I � I I I L22" SCRAP PVC PIPE SEE NOTE 5 3Y CNP BY CUSTCMER ? = I I1 1 I 11 1 I I I I GROUND LINE I ! I! 1 CONDUIT 5'R v r OUT OF LINE PLACEMENT OF CONDUIT OVERHEAD LINE DIRECTION NOTES: 1. CONDUIT BENDS AT TERMINA_ POLE SHPLL BE PVC. 2. BRACE THE 'OLE SECURELY BEFORE TRENCHING. 3.INSTALL CCNDUIT BENDS TO BAS= OF POLE. ADD PORTIDNS OF STRAIGHT CONDUIT PS NECESSARY TO OBTAIN THE PRCPER HEIGHT ABOVE FINAL GRADE. �. ATTACH COUPLINS TO EVD OF CONOUI-. 5. INSERT, BUT DO NOT GLUE. A SHORT PIECE OF SCRAP PVC CONDUIT INTO THE -OP COUPLING. TIE CONDU-T TO BRACKET. G. ECRM AREA AROUND PEDESTAL TO THE TO? OF THE COUPI.ING. FORM PEDESTAL SO THAT NO CONCRETE WILL CONTACT POLE. 7. AFTFR INSPFCTTON RY CNP, ?OIIR f:ONCRFTF TC TOP OF COUPLINGS. P,. AI I-nNOUII'S SHAI.I HAVF A M"NTMIIM 4" CONCRETE CCVER. TOP VIEW TF 1 SHEET 8 OF 11 JUB 908738E1 ERMINAL POLE TO BE INSTALLE3 BY CNP TERMINAL POLE CONDUIT PLACEMENT 12KV & 35 KV BASED ON D:STR[BUTION STANDARD 65-500 y, I0'/' II `JC NON -THREADED PVC COUGLING y-1 b CONDUIT 5'R r �� --I L2 SCRAP PVC PIPE SEE NOTE 5 3Y CNP BY CUSTCMER z m I 11 I I II 1 I II GROUND LINE I II I I I f Jf ! OUT OF LINE PLACEMENT OF CONDUIT NOTES: 1. CONDUIT BENDS AT TE:PIAINA_ POLE SHALL BE PVC. TOP VIEW 2. BRACE THE POLE SECURELY BEFORE TRENCHING. TP 3.INSTALL CCNDUIT BENDS TO BASE OF POLE. oDO PORTIONS OF STRAIGHT CONDUI- AS NECESSARY TO OBTPIN THE PRCPER HEIGHT ABOVE FINAL UKAUE. 4. A f I A -H LOUPLiNJ 10 END OF CONCUIT. 5. INSERT, BUT 00 NOT GLUE, A SHORT PIECE OF SCRAP PVC CONDUIT INTO THE -OP COUPLING. TIE CCNDJIT TO BRACKET. 6. FORM AREA AROUND PEDESTAL TO THE TOP OF THE COUPLING. FORK PEDESTAL SO THAT NO CONCRETE WILL CONTACT POLE. 7. AFTER INSPECTION BY CNP. POUR CONCRETE TO TOP OF COUFLINGS. B. ALL CONDUITS SHALL HAVE A MINIMUM 4" CONCRETE CCVER. SHEET 9 02 11 JOB 90873381 OVERHEAD LINE CIRECTION TERMINAL POLE TO 3E INSTALLED BY CNP TERMINAL POLE CONDUIT PLACEMENT 12KV & 35 KV BAS: -:'D ON DISTRIEUTION STANDARD 65-500 TP 1 CONDUIT 11000 POLE , o 24 " , 30 -ERMINAL POLE PROTECTIVE BARRIER PLACEMENT TP 2 30 " F-,---.f,�ONDUIT STUB \ O -WOOD POLE 24 SHEET 10 OF 11 JOB 9087?881 E NOTE 4- U.I.l_UNUUI I LAMBERT NO. 5349-A1 WORKING SKETCH KEY MAP CIRCUIT FUNCTIONAL LOCATION SCALE JOB 612-G SO -48 UDG-007318 T NTS 90873881 CITY OF PEARLAND FIRE STATION #8 12255 SHADOW CREEK PARKWAY THIS SKETCH IS PROVIDED FOF LIMITED TO CONCEPTUAL DES] ! FOR, NOR MAY BE USED FOR C I DRAWINGS PROVIDED BY THE I SHALL BE USED FOR CONSTRL CNP IS TO ACQUIRE AN EXCLU: DUCT BANK LOCATED ON PRIM I! z d a 0 a S S � EXIST. CNP OVERHEAD PROP. CNP TP \ U I i I I I ; I �/ I BARRIERS (2) PROP. CNP TP BARRIERS (2) II IP. CNP TP 1 - I -10 --PROP. CNP TP 2 30 25' W. S. E. --'---- -'o --EXIST. ROW ----- ------ - ---- - EXIST. ROW ------- -'----.___-_...___--- --"-EXIST.ROW .. _--- -----__-- -. PROP. CNP 12' WIDE- ( -PROP. CNP 2 - 6" PVC ALL-WEATHER \� CONDUITS CONC. ENCASED ACCESS DRIVEWAY 310' SHADOW CREEK PARKWAY REFLECTION BAY ST. (-435' FROM � OF DRIVEWAY) Chapter 6: Company Specific Items Sheet No. 6.24 Page 1 of 2 CenterPoint Energy Houston Electric, LLC Applicable: Entire Service Area CNP 8038 6.3 AGREEMENTS AND FORMS 6.3.1 FACILITIES EXTENSION AGREEMENT This Facilities Extension Agreement is entered into by and between CITY OF PEARLAND, herein called "Retail Customer" and CenterPoint Energy Houston Electric, i,i.C, herein called "Company" (hereinafter referred to as Agreement) for the construction, extension, installation, modification, repair, upgrade, conversion, relocation, de-energization or removal of Company's Delivery System, including ternporary facilities (hereinafter refmcd to as facilities extension or extension), as described herein. This Agreement covers the facilities extension to Retail Customer at 12255 Shadow Crock Parkway located in Pearland, TX for Fire Station No. 8. The Company agrees to accept payment of $53,085 Dollars to be paid by the Retail Customer, as a Non -Refundable Construction Payment in connection with the Retail Customer request to extend Company facilities to the above described location as follows: Customer is responsible for the installation of the duct bank, detailed in the T&C Package, Job 90873881. Customer is to provide Plan & Profile drawings to CNP. CNP is to inspect construction of the duct bank. CNP is to install the underground conductors. This agreement does not include cost for the modification, installation or removal of the overhead facilities. • Unless otherwise stated by Company in writing, the Non -Refundable Construction Payment amount above is valid for twelve months. In consideration of said Non -Refundable Payment, to be paid to Company by Retail Customer prior to commencement of construction, Company agrees to install and operate lines and equipment necessary to distribute electric service to the identified location under the following General Conditions: Company shall at all times have title to and complete ownership and control over facilities installed by Company. • Retail Customer must make satisfactory payment airangcmcnts (if payment is required to proceed extend Company facilities) and sign and return this Agreement before Company can with the requested extension. • Extension of service facilities is contingent on acquisition of all necessary easements and rights of way. Revision Number: 5th 306 Effective: 9/1/11 Chapter 6: Company Specific Items Sheet No. 6.24 Page 2 of 2 CenterPoint Energy Houston Electric, LLC Applicable: F;ntire Service Area CNF' 8038 Nothing herein contained within this Agreement shall be construed as a waiver or relinquishment by Company of any right that it has or may hereafter have to discontinue service for or on account of default in the payment of any bill owing or to become owing thereafter for any other reason or cause stated in Company's Tariff. This Agreement shall not be binding upon Company unless and until it is signed by an authorized representative of the Company. CenterPoint Energy Houston Electric, LLC Ronnie Biel Title Engineering Specialist Date 01/23/2020 Please make check payable to CenterPoint Energy CITY OF PEARLAND Retail Customer By (name pn nted or typed) Title --(!ti Date Z �i`'I ' �'l� Revision Number: 5th 307 Effective: 9/1/11 Chapter 6: Company Specific Items CenterPoint Energy Houston Electric, LLC Applicable: Entire Service Area 6.3 AGREEMENTS AND FORMS 6.3.1 FACILITIES EXTENSION AGREEMENT This Facilities Extension Agreement is entered into by and between City of Pearland Sheet No. 6.24 Page 1 of 2 CNP 8038 'herein called "Retail Customer" and CenterPoint Energy Houston Electric, LLC, herein called "Company" (hereinafter referred to as Agreement) for the construction, extension, installation, modification, repair, upgrade, conversion, relocation, de-energization or removal of Company's Delivery System, including temporary facilities (hereinafter referred to as facilities extension or extension), as described herein. This Agreement covers the facilities extension to Retail Customer location at 12255 Shadow Creek PKWY, Pearland The Company agrees to accept payment of $58,973.00 Dollars to be paid by the Retail Customer, as a Non -Refundable Construction Payment in connection with the Retail Customer request to extend Company facilities to the above described location as follows: To reconfigure existing overhead facilities to provide service to new fire station and dip the existing circuit in front of the station. This price also includes the defined easement charge. • Unless otherwise stated by Company in writing, the Non -Refundable Construction Payment amount above is valid for twelve months. In consideration of said Non -Refundable Payment, to be paid to Company by Retail Customer prior to commencement of construction, Company agrees to install and operate lines and equipment necessary to distribute electric service to the identified location under the following General Conditions: Company shall at all times have title to and complete ownership and control over facilities installed by Company. • Retail Customer must make satisfactory payment arrangements (if payment is required to extend Company facilities) and sign and return this Agreement before Company can proceed with the requested extension. Revision Number: 5th 306 Effective: 9/1/11 Chapter 6: Company Specific Items CenterPoint Energy Houston Electric, LLC Applicable: Entire Set -vice Area Sheet No. 6.24 Page 2 of 2 CNP 8038 • Extension of service facilities is contingent on acquisition of all necessary easements and rights of way. Nothing herein contained within this Agreement shall be construed as a waiver or relinquishment by Company of any right that it has or may hereafter have to discontinue service for or on account of default in the payment of any bill owing or to become owing thereafter for any other reason or cause stated in Company's Tariff. This Agreement shall not be binding upon Company unless and until it is signed by an authorized representative of the Company. CenterPoint Energy Houston Electric, LLC By- .— Ryan Sauers (name printed or typed) Title Service Consultant Date By C.Gr,V (name printed or typed) Title Date/�- Revision Number: 5th 307 Effective: 9/1/11 CE14TERPOINT ENERGY - 55' CL2 PL FPAMED SKWYE BANK (3X75'5) w/ PAR 4/0 Cu CUSTOMER SIGNATURE: + __Il�i .)"� rJI L DATE: *CUST WILL RISER POLE FOR CT 58MCE PL10- 75 ✓ EXIST 55CL2 PL WORK ORDER# MAIN WORK CENTER ORDER TYPE MAINTACCTTYPE awx.cmara FRAMED Q053/Q43C 91987115 BRZ HDC2 64 / \ 15320 L J PI ( 1 REMOVE 3C LATERAL FRAMING ADDRESS KEY MAP GLN FUNCTIONAL LOCATION -04- F I 10 INST 55' a2 PIL t/ I 12 5 SHADOW CREEK P 612G 5349147795 DIM32515-OVH J FRAMED Q193/Q553 W/ STATIC / DG CONSULTANT PHONE NUMBER MOBILE NUMBER CIRCUIT ID NUMBER i RYAN SAVERS 281-595.6075 SO48 INST POLE r EASE of PROPERTY LINE DATE REQUESTED FIELD TECH FIELD COMPLETION DATE SCALE: r = NTS .Y� I L03- Q 5 Q GIS PRI: 1 2 3 4 5 """LLLLLL NST 60' CL2 PL a 0 2->PL04- INST 90'+/- 600 MCM 3PH CBL I ED (X733 Yg REDUCED TENSION L11 _ I T INST POLE T EAST OF PROPERTY LINE G 04->PL05- INST 160'+/. 600MCN 3PH CIR NST 55 CL2 PL (TO BE FRAMED LATER AS TERMINAL POLE) I 532646 J p TIGHT NST PL 30' INTO PROPERTY FROM ROAD ROW PL02- **OUST TO RISER PLO5 FOR CT SERVICE' - D T INSIDE EAST PROPERTY LINE o o , NST 60' CL2 PLY T t 25 Q pT U ,y 1 _ FRAMED Q203/Q203 (DOUBLE DEADEND RUNNING EAST AND WEST) t N N 600290Y AA N / Q463 TO THE NORTH B Q45C TO THE SOUTH * �F�'iRLc3A N N N#410 AAA ' 7 "INST POLE 1'+ - INSIDE ROAD ROW A T EAST OF PROPERTY IN � � BB N-+ X �' N C amU 600 AA a m a 7 AAA 100 ID N#410 G 100 $ '------------ A B 100 �: IwCHARD 0604 M EXIST 60 CL2 PL SHADOW CREEK PKWY L06- RAMED Q053�Q43C 0 5' C PL FRAMED Q193 TRANSFER LF 18 AMS 65K TO PL06 6 50 C 596476 E EXIST FRAMIND AND DG B A 50 ,10133 33 FRAMING C 50 24ARV 30T ,A„ — Do "237 '`r' �,*'w `",u• RES , B" ES m *w�i�9*""' o \ #2AAAC Q U 4r,w,w "" "`w'` 265 n "` 18AMS -Q 100 65T I ; 60' CL2 PL FRAMED Q033 OVE EXIST FRAMING \\ 5964j1% J 4988 — '' I N O BA NST Q393/Q43C W/ DG 1 l i C "TRANSFER EXIST LF 24ARV 30T FROM PLIC 0 I l BA 00 i J C 35 60' 0.Pl. L09- ED Q0303 3 I I MOVE EXIST 57 0L2 PL FARMED Q033 E EXIST POLE W/ Q033 FRAMING (EAST TO WEST) I W I NST 55' CL2 PL FRAMED Q033/Q43C / Q43C FRAMING TO THE SOUTH 100 I Z I 9RANSFER EXIST LF 18 AMS 65T FROM PI -01 LF 18 AMS 65T TRANSFERED FROM PLOT 100 / O I "TRANSFER DOSTING 120/208V XFRMR BANK FROM PLB7"* SEER EXIST 120/209V BANK 3X 505 TO PL09 00,%997i 100,11997t ' f— INST 4/0 3/C AL TWT TO BACK FEED EXISTING CUSTOMER RISER AT PL0750 / SUB 12152 / V I I if'1 J I� o I �/\\ LL I C II PL06-->PLOB-INST- lu I #2AAAC 3PH PRI I N I m m \ Lim I I I' I REMOV PLOI-->PL07- REMOVE EXIST LATERAL CROSSING SHADOW CREEK PKWY \ C) 250 1 PL10-->PL08- REMOVE EXIST LATERAL CROSSING SHADOW CREEK PKWY \` 5 I79