Loading...
R2020-061 2020-04-13Date of Issuance: Consultant: CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 pearlandtx.gov/projects Professional Services Contract Amendment Hughes Ranch Gravity Trunk Sewer 11/26/2019 Freese & Nichols Amendment No.: CoP Project No.: P.O. No.: 1 WW1907 2019-00001723 Explanation: This change order encompasses the following: The scope of the project was revised to extend the sewer line across Cullen and to bid the work out instead of change ordering it into the current Hughes Ranch Road Expansion project. Both of these revisions required an additional LOA from the Engineer. Description of Work Cost Time $ 4,836.00 0 Days 1 2 Revise the quantity from 1 to 1.1465543366264623 on Item No. 1 1 Basic Services Revise the quantity from 3365 to 7182 on Item No. 3 3 Bid Phase Services Please attach back-up documentation. $ 3,817.00 Cost & Time Change Summary Cost Original Contract: Previous Amendment(s): Contract prior to this Amendment: Net increase (decrease) from this Amendment: Revised Contract: $ 47,200.00 $ 0.00 $ 47,200.00 $ 8,653.00 $ 55,853.00 0 Days Time 0 Days 0 Days 0 Days 0 Days 0 Days Finance Approval: ! t -o a— Date 02/10/2020 ACCEPTED*: APPROVED: By: `-------(2- �.'Date 12/12/2019 By: -40:--------_ Date 12/13/2019 Consultant Project Manager By: Date 02/10/2020 Owner *Consultant agrees to perform change(s) included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes identifies for the contract value and/or contract time shown, are made part of the Design 1 of 1 D4. Revised 7/08 RESOLUTION NO. R2020-61 A Resolution of the City Council of the City of Pearland, Texas, amending a contract with Freese and Nichols for design services, associated with the Hughes Ranch Road Gravity Trunk Sewer Project, in the additional amount of $8,653.00 (total contract amount of $55,853.00). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract for design services associated with the Hughes Ranch Road Gravity Trunk Sewer Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract for design services associated with the Hughes Ranch Road Gravity Trunk Sewer Project. PASSED, APPROVED and ADOPTED this the 13th day of April, l., 2020. ATTEST: Ci TAL ROAN, TRMC, CMC CITY SECRETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY eriq TOM REID MAYOR *1� •�...... 0 `r•• •. %.. r , . ' • �IM FREESE <NICNOLS Exhibit A Innovative approaches Practical results Outstanding service 11200 Broadway Street, Suite 2320 • Pearland, Texas 77584 • 832-456-4700 • FAX 817-735-7491 November 26, 2019 Jennifer Lee Senior Project Manager City of Pearland 2559 Hillhouse Drive Pearland, Texas 77584 RE: Hughes Ranch Road Trunk Sewer Amendment Dear Jennifer, www.freese.com In response to our meeting on October 9, 2019 and the TRC meeting held on November 6, 2019, we've prepared this proposal for an amendment to the contract for professional services related to the Hughes Ranch Road Trunk Sewer project. Two changes to the scope have occurred that are covered in this amendment, the first is the extension of the sanitary sewer across Cullen to the east side of Cullen for future extension along Hughes Ranch Rd. This requires additional sanitary sewer design and a TxDOT permit which are covered in this amendment. The second is the revision of the procurement to advertise as a separate project rather than being incorporated into the Hughes Ranch Rd Reconstruction project under the existing construction contract. This results in additional design and bid phase effort which is covered in this amendment. FNI has prepared a complete project manual, incorporated temporary paving, revised the traffic control approach, and revised the lateral tie in locations. Additionally, FNI will attend a pre-bid meeting, answer prospective bidder questions, prepare addenda as necessary, prepare conformed construction drawings, review submitted bids, and prepare a recommendation of award as a part of this amendment effort. FNI will render professional services in connection with the development of the Project as defined above. FNI proposes to complete the additional final design effort for a lump sum fee of $4,836 and the additional bid phase effort for a fee not -to -exceed $3,817. The total proposed fee amendment is $8,653. The revised contract value will be $55,853. A compensation matrix is included as Attachment A. Upon authorization by the City, FNI will proceed with performance of professional services defined in this letter. If additional information or clarification is desired, please do not hesitate to contact us. Sincerely, FREESE AND NICHOLS, INC. Jared Barber, P.E. Project Manager Attachments cc: Skipper Jones, City of Pearland Freese and Nichols, Inc. City of Pearland Attachment A - Hughes Ranch Rd Sewer Line Amendment 11/26/2019 Detailed Cost Breakdown Project Fee Summary Basic Services Special Services Total Project 8.653 8.653 Basic Services Employee Jared Barber PM $169 Elizabeth Byrd Brent Handley Clay Herndon Alan Hutson Hon f3svaria-i Reek Lane QC — PIC Traffic/QC TCP $197 $225 $225 $197 Total Hours Total Labor (no escalation) Total Labor Effort Total Expense Effort Total Sub Effort Total Effort Phase Task Project Role 1 EIT CAD S130 $117 Tasks 1 1 Current Hourly Bill Rate - A Design Phase Services $ - $ - $ - 1 Plans and Specifications $ - $ - $ a Revise laterals to be in right-of-ways 1 2 2 _ 5 663 $ 663 $ - $ - $ 663 b Prepare traffic control requirements for TCP not in conjuction with roadway project 1 1 2 299 $ 299 $ - $ - $ 299 c Prepare TxDOT Permit Application 1 2 2 5 663 $ 663 $ - $ - $ 663 d Include temporary paving in roadway 1 1 1 3 416 $ 416 $ - $ - $ 416 e Preliminary planning for Cullen SS 1 1 2 299 $ 299 $ - $ - $ 299 f Including full specification set 1 2 3 429 $ 429 $ - $ - $ 429 g Additional Sanitary Sewer Design East of Cullen 2 6 8 16 2,054 $ 2,054 $ 13 $ - $ 2,067 B Bid Phase Services $ - $ - $ - $ - 1 Attend Pre -Bid meeting 2 2 338 $ 338 $ - $ - $ 338 2 Respond to questions from bidders 4 4 4 2 14 2,114 $ 2,114 $ - $ - $ 2,114 3 Produce conformed construction contract documents 1 2 4 7 897 $ 897 $ $ $ 897 4 Review Submitted Bids 1 1 2 299 $ 299 $ - $ - $ 299 5 I Provide Recommendation for Award 1 1 169 $ 169 $ - $ - $ 169 I $ - $ - $ - $ - $ - $ - $ - $ - Total Basic Services Hours 17 22 21 - - 2 $ - $ 450 - 62 8,640 $ 8.640 $ 13 $ - $ 8,653 Total Basic Services Labor Effort $ 2,873 $ 2,860 $ 2,457 $ - $ - 1 of 1 \\freese.com\fniinc2\Resources\OLCR\P\Pearland\Hughes Ranch Rd. Sewer\PRL193621Amd #1\Attachment A Hughes Ranch Sewer Fee_Spreadsheet rev2 11/26/2019 VICINITY MAP Stub out for future connection (Cullen Parkway manhole) Stub out for future connection (Linda Lane manhole) Stub out for future connection (Hillhouse Rd. manhole) Approximately 200LF- direction drilled under Cullen Parkway Stub out future Connection (Sterling Dr. Stub out to Crystal Lakes Lift Station Western Terminus (Brookney St. Manhole) (Manhole approximaieiy 100 ft. east of intersection for the future continuation of service east along Hughes Ranch Road) LEGEND: Project limits. From approximately 100 ft. east of the Cullen intersection to Brookney Street. ' Stub outs for future service connections 1:4,800 1 inch = 400 feet NORTH This product isfor i brmational purposes ori y e rol may not be prepared or be suitable fa legal, engineering, o rsu rveyin g purposes, MA P PREPAR ED. JA NUARV 1x,2020