Loading...
R2019-239 2019-10-14_Fire Station No. 4RESOLUTION NO. R2019-239 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City Manager or his designee to enter into a contract with Joiner Architects, in the amount of $592,600.00, for professional services associated with the design, renovation and construction of Fire Station No. 4. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and Joiner Architects, a copy of which is attached hereto as Exhibit "A' and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract with Joiner Architects, for professional services associated with the Fire Station No. 4. PASSED, APPROVED and ADOPTED this the 14'h day of October, A.D., 2019. ATTEST: MARIA RODRI EZ INTERIM CITY SECRETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY 1 12 OM KEID MAYOR Resolution No. R2019-239 CONTRACT FOR PROFESSIONAL SERVICES Exhibit A THIS CONTRACT is entered into upon final execution by and between the City of Pearland ("CITY") and Joiner Architects ("CONSULTANT"). The CITY engages the CONSULTANT to perform professional services for a project known and described as Fire Station #4 ("PROJECT"). (Project # FA2001) SECTION I - SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A. The CONSULTANT shall perform design services. See Exhibit A, attached, for a detailed SCOPE OF WORK and PROJECT schedule. The PROJECT schedule shall be submitted in digital and hard copy form in the Microsoft Project for Windows format. B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C. The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of theC]'FY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D. The CONSULTANT shall submit all final construction documents in both hard copy and electronic format. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software version used shall be compatible to current CYI'Y standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. All Record Drawings electronic files shall be submitted to the CITY in TIF format. E. The CONSULTANT recognizes that all drawings, special provisions, field survey notes. reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. F. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors Design 1 of 7 Dz. Revised 04/2019 and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non -owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. The CONSULTANT shall agree to waive its Right to Subrogation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits ("Change in Coverage") except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT'S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. G. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorneys fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. H. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. Design 2 of 7 172 Revised 04/2019 SECTION II - PERIOD OF SERVICE This CONTRACT will be binding upon execution and end August 31, 2022. SECTION III - CONSULTANT'S COMPENSATION A. The total compensation for the services performed shall not exceed the total noted in Section 13. 13. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT based upon the following: I. Basic Services (Lump Sum) $398.000.00 2. Additional Services shall require independent and specific authorization and shall be billed as (Not to Exceed): $97.000.00 3. Bid Phase Services (Hourly Not to Exceed) $14,600.00 4. Construction Phase Services (Hourly Not to Exceed) $65,000.00 5. Reimbursable Expenses (Not to Exceed) $18 000.00 6. Total: $592,600.00 C. The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval ofa detailed invoice. Invoices shall be submitted on a monthly basis. D. CONSULTANT shall invoice for work performed during the preceding thirty day period ("Billing Period"). The Billing Period shall run from the 26th day to the 25th day of each consecutive month. Invoices shall be submitted to CITY not more frequently than once every 30 days. CONSULTANT shall be responsible for timely submittal of all invoices and CONSULTANT shall not be entitled to payment for invoices in arrears. All invoices shall reflect most recent single Billing Period only and represent the true, correct and accurate account of work performed during the Billing Period. E. For an agreed contract amount identified as "Lump Sum", Not to Exceed" and "Reimbursable" the CONSULTANT shall not exceed the fixed contractual amount without written authorization in the form of a Contract Amendment. CONSULTANT shall provide 45 days prior notice to the CITY in the event contract fees may exceed the fixed contract amount. CONSULTANT shall be responsible for ensuring that such authorization is complete and executed by all parties performing any work or submitting any invoices for work that exceeds the fixed contract amount under any expense category. Design 3017 D2 Itevised 042019 F. Allowable Reimbursable Expenses CONSULTANT shall identify and include in the proposal any anticipated Reimbursable Expenses, and shall itemize Reimbursable Expenses by work category. Reimbursable Expenses shall be invoiced AT COST without subsequent markup by the CONSULTANT. All invoices containing a request for Reimbursable Expenses shall include copies of the original expense receipts itemized per the allowable category. Allowable Reimbursable Expenses include: • Hard copy reproductions, copies and/ or binding costs • Postage • Mileage, for travel from Consultant's local office (within a 25 mile radius) to meetings at the City or job -site. Mileage shall be charged at the current IRS rates. • Travel expenses, mileage from local office to State or federal regulatory agency office beyond 100 miles. • Lodging expenses, for destinations beyond 100 miles from the Consultant's local office AND when business hours exceed eight hours within one business day OR requires more than one eight hour day. F.2. Disallowed Expenses Disallowed Expenses include travel expenses for professional expertise traveling into the greater Houston area from Consultant offices outside of the greater Houston area. SECTION 1V - THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANTS work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of' the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub- consultant(s) or in any way affect the CONSULTANT'S status as an independent contractor of the CITY. Ocsign 4 of 7 D2 Itcviscd 04/2019 SECTION V - TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason -- with or without cause -- by delivering written notice to CONSULTANT personally or by certified mail at 700 Rockmead, Ste 265, Kingwood, TX 77339. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 1511' day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon t fixed fee or definitely ascertainable sum, the portion of such sum Sayable shall be proportionate to the percentage of services completed by the IXMNS1,1I.iANTta$ed upon the scope of work. E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F. If the. CITY terminates this CONTRACT for cause and/or if the CONSULTANT breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney's fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this CONTRACT. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties, 1ksigi 5 of 7 172 Revised 04/2019 SECTION VI — ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII —COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. SECTION VIII- SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. OF ARLAND, TEXAS DATE `71. CONSU TA DATE Design 6 of 7 D2 Revised 04/2019 House Bill 89 Verification I �J iY Gor'SY (Person name), the undersigned representative (hereafter referred to as "Representative") of .JcrI-l6✓—ArcLet4111 (company or business name, hereafter referred to as "Business Entity"), being an adult over the age of eighteen (18) years of age, after being duly sworn by the undersigned notary, do hereby depose and affirm the following: 1. That Representative is authorized to execute this verification on behalf of Business Entity; 2. That Business Entity does not boycott Israel and will not boycott Israel during the term of any contract that will be entered into between Business Entity and the City of Pearland; and 3. That Representative understands that the term "boycott Israel" is defined by Texas Government Code Section 2270.001 to mean refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli -controlled territory, but does not include an action made for ordinary business purposes. SE I -EPR SENTATIVE SUBS RIBED AND SWORN TO BEFORE ME, the undersigned authority, on this 1(9".day of < i2t^4O-Q ✓ ,201q. Notary Public jotiu-d,,,f2x Design 7 of7 D2 Revised 042019 JOINER ARCHITECTS 7006D:LrneA6. Sa)6'v MI]axrAl IX ;;3z ! 281.159 i90 AM 5.9veaag Se 3O Ltys CTy 1X ; TJ 1 iID il5 }'yl September 5, 2019 Mr. Robert Upton Director of Engineering City of Pearland, Texas 3519 Liberty Drive Pearland, TX 77581 RE: CITY OF PEARLAND NEW FIRE STATION NO. 4 & EXISTING FIRE STATION NO. 4 RENOVATION PROPOSAL FOR PROFESSIONAL SERVICES Dear Mr. Upton: Thank you for the opportunity to submit this proposal for professional services. We greatly appreciate it. Joiner Architects, Inc., the Architect, is pleased to provide this proposal to the City of Pearland, the Client, for professional services for the above referenced project. Below are our proposed Scope of Services based on our understanding of the following Project Description: Project Description: Construction of an approximately 12,000 square foot fire station on an existing twelve -acre site currently owned by the City of Pearland located northeast of the intersection of Cullen Blvd. and Freedom Dr. in Pearland, Texas. It is our understanding that the City intends to construct this new Fire Station at the southeast portion of the site, and provide minor interior renovations to the existing adjacent Fire Station to create a shared fitness and conference center for the Fire and Police Departments. The station shall be designed similarly to the recently designed Station 8 to house engine crews, Individual dorm rooms, restrooms with showers, a kitchen/dining area, a day room, a watch office, a treatment/PD room, a lieutenant's office, personnel and equipment decontamination areas, an exercise room, and storage areas for bunker gear and medical supplies. The facility will be constructed to 140 mph/3 second gust wind load standards, and will include metal stud and CMU walls, a backup generator, drive through apparatus bays with fully glazed red bi-fold doors and a bay workshop with ancillary support spaces. The site shall be modified to include drive -around curbed/concrete vehicular pavement, dumpster and generator enclosures, perimeter fencing with access -controlled gates, and adequate parking for full staffing on 24/7 operation. Land title and topographic surveys of the proposed site will be provided, including required elevation certificates at construction drawings, form work, and final elevation stages. The project will also include required floodplain mitigation. Sitework to include paving revisions, underground storm and sanitary sewer modifications, and new water and electrical services to the new Fire Station, The building foundation shall be a reinforced concrete slab -on -grade with footings as determined by the Geotechnical Investigation. The building superstructure shall be a conventional steel framed structure. The exterior building materials shall comply with City standards, be low maintenance, and harmonize with the neighboring structures onsite. With respect to the Page 1 of 4 JOINER ARCHITECTS 70 (leamese. St 245 199999U ix 1039 91999990 9, gp WW9* Ur ix 2;N91 m1]59904 59 , 2AL199Pot mechanical system, split systems or roof top units shall be provided. Dedicated outside air units will be provided for pretreatment of the outside air that will be connected to interior chilled water fan coil units with electric heat for humidity control. The fitness and conference center will be provided with new lighting, power and electrical service. LED lighting will be provided throughout both buildings with lighting controls to meet the IECC 2015 energy code requirements. The lighting controls will be provided with occupancy sensors, vacancy sensors, daylight sensors and lighting relay panels with schedule and photocell control. Sanitary and domestic water utilities will be provided to the facilities. Storm drainage to be routed underground through rooftop gutters and downspouts. New gas water heaters to be provided within the Fire Station. Natural gas to be provided to the Fire Station for the generator, kitchen, water heaters and apparatus bay unit heaters. Copper domestic water piping to be provided throughout. An air compressor and compressed air reels to be provided in the apparatus bays. Both buildings are to be fully fire sprinklered. Low voltage requirements to be coordinated with the owner to meet Peariand's facility standards. An alerting system will be provided for the new Fire Station. Scope of Basic Services: 1. Comply with all Services indicated in the City of Pearland "Architectural Services: Standard Scope of Work", pages 2-12, D23. Revised 10/12, unless noted as "Service Exclusions" herein. See attached Exhibit B for a complete description. 2. Multiple 3-D models and exterior renderings for the Client's review/approval. 3. Consult with Client's security and alerting system manufacturers, and specify preferred systems. 4. Consult with Client's door hardware consultant, and specify preferred access control and hardware systems. 5. Design project to meet Client's anticipated budget and make all necessary revisions to the contract documents to meet that budget at no additional cost to Client. Upon Client's request, value -engineer construction documents as required at no additional cost to Client, unless Client changes the established budget after document completion. 6. Coordinate all roadway modifications, right-of-way/easements, median revisions, and utility relocations. 7. Obtain all approvals and permits necessary to construct the project. Building code plan checking and permitting fees to be waived by Client. 8. Prepare interior and exterior finish color selections/schemes for the Client's approval. 9. Facilitate equipment demonstrations with the General Contractor and Client. 10. Coordinate with the General Contractor in obtaining the final Certificate of Occupancy. Additional Services: The following items shall be considered additional when determining the Compensation for this proposal and will result in additional service charges. All additional services require prior approval by Client. See attached Exhibit B for a complete description: 1. Consult with geotechnical engineer to provide geotechnical investigation/study. 2. Consult with civil engineer to provide all required boundary/topo/utility/pond surveying, elevation certificates, traffic impact analysis, and plan/profile public utility connection drawings. 3. MEP Commissioning services required by the 2015 International Energy Conservation Code. Page 2 of 4 JOINER ARCHITECTS 700fl¢g4dc Sit 165 km O. IX ;7339 '8'3SP 6401 MOS Stoveliy0 Sf 3Y. legie(Ai !VT'S:" 1'141Pio EIDIA 4. Consult with windstorm engineer to provide certification WPI -8 for the specified wind loads including, but not limited to, execution of the Texas Department of Insurance (TDI) Application for Certificate of Compliance Form WPI -1, Inspection Verification From WPI -2 -BC -6, and all necessary document reviews and inspections. 5. Provide energy efficient/life cycle analyzed modeling through CenterPoint's plan review. 6. Third party mechanical system testing and balancing services. Reimbursable Expenses: The following items shall be paid by Architect and reimbursed by Client: 1. TDL&R registration, review, and inspection fees pertaining to Accessibility for compliance with the Texas Accessibility Standards. 2. Printing costs. 3. Couriering costs. Service Exclusions: The following items were not considered when determining the Compensation for this proposal and shall result in additional service charges: 1. Property platting. 2. Design of training tower and/or training props. 3. Design of radio tower. 4. Design of fuel storage tanks (if required, this service to be provided by the Sub Contractor as part of construction per State requirements). 5. Design of fire sprinkler system (this service to be included in Base Bid construction cost. Design must be provided by installer per State requirements. Performance spec provided by Plumbing Engineer. 6. LEED (Leadership in Energy and Environmental Design) Certification. 7. Construction material testing. 8. Fees associated with site and building plan checking and permitting (City, County, TI(DOT, or any authority having jurisdiction). 9. Fees associated with utility service connections/taps/impacts. 10. Environmental/Wetland/Faultline assessments/studies (other than geotechnical investigation). 11. Roadway warning signal design. 12. Third party photographic construction documentation. 13. Significant increase in project scope that increases the total budget by 10% or greater. Schedule: See attached Exhibit C for our Proposed Design and Construction Schedule. Anticipated Construction Budget: New Fire Station No. 4 Existing Fire Station No. 4 Renovation $5,400,000.00 $ 500,000.00 Page 3 of 4 JOINER ARCHITECTS Inc Fr.Wn as Ste 265 ; Siyn:. i Tx:2^.T! 2615 &r'ae W<.AeZO I.turi'-M' x:%*:J Compensation: Based on the above Scope of Basic Services, accepting all proposed Additional Services, and utilizing all proposed Reimbursable Expenses, we are proposing a lump -sum not to exceed fee of $592,600.00 (five hundred ninety-two thousand, six hundred dollars and zero cents). See attached Exhibit A for a complete fee breakdown. Additional Services Schedule of Hourly Fees: Administrative $125.00 Design Professional/CAD Operator $150.00 Project Architect/Technical Lead $225.00 Principal $250.00 Please feel free to contact me if you have any questions pertaining to this proposal. We look forward to working with you, and completing another successful project. Sincerely, Joby M. Copley, AIA Partner Page 4 of 4 JOINER h n c. H r s Pearland New Fire Station No. 4 & Existing Fire Station No. 4 Renovation S2 Im o0 ' ...,. ._ ... ..':.,... «.:..• vI is sl - Exhibit A 'AdY�ifiative ` 9/5/19 h' i12414.225.2180 CAO/Technical 5150 $1 53,600.00 4.00 CAD/Technical $150 53,600.00 24.00 ural/ Partner alReam Leader 5250 56,000m 24.00 Partner TOTAL 5250 16,000.00 24.00 51k000.00 00,00 ee Administrative 5125 00. $2,500 64.00 CADRedn 5150 $9,600.00 40.00 Partnectural/alf ream Leader $225 $6,000.00 44.00 Partner PHASE TOTAL 5x50 56,000.00 48.00 53;100.00 148.00 • - : nwlt.. ,. ...: �. rf6ddGY,3='agerteldk.:Yf1',16"_ ,J`r.S r $125 $4,000.00 32.00 Administrative CAO/Technical 5150 528,200.00 188.00 Architectural/Team Leader $325 516,200.00 22.00 Partner PHASE TOTAL 5250 510000.00 40.00 $504000.00 Uddrnetidll • -. .' ..: d: ¢���3333.2.'00�0 1133916,.1 9.111' ur't�a Administrative $125 $9,000.00 22.00 CADRechnlcal $150 $72,000.00 480.00 Archltectural/Team Leader 5225 518,000.00 80.00 Partner PHASE TOTAL 5250 $15,000.00 60.00 5114,000.00 692.00 . ::.'lam bla''i 11 Administrative 5125 $1,000.00 800 CAD/Technical $150 $6,000.00 40.00 PauralReam Leader ® 53,600.00 16.00 Partner PHASE TOTAL $250 $4,000.00 16.00 $14,60000 00.00 CciStrtic aDAdlld -.:. ,. -..t g:I�"PMtartgatiE9L Administrative ® 56,000.00 48.00 CAD/Technical 5150 519,050.00 122.00 Architectural eam Leader 5225 516,200.00 22.00 Partner PHASE TOTAL 5250 523,250.00 95.00 $65,000 00 342.00 .._:::U�.:ia9/:1::'.�::Lt�.ul�u�'.LL 71/7"T" .0 .i.l w '}LL,La ... TOTAL FEE s >e. ss:hi' $295,100.00 aias:vrja i I Nie ,., ,_, ,. ..... ]s'+a+:E s-6.4`Aic'.d`9f "£.T' awa'rrl c.;x- ", rife 1 'Ti- 10 5r2 r .,r. . �.,+53�2�nrG:Pv4' rr"r:ar ." 'I .1,,r,---vsisimmemplimmemmassammzem . . : I.k�':: � s'.. £a ?' �'rts�t, :a`i.ea �:.,td•1+ a=i5 LL� if: _.R.e�..Ik-iI -1137721';' Pcarland New Fire Station No. 4 & Existing Fire Station No. 4 Renovation - Exhibit B ARCHITECTURAL SCOPE OF SERVICES FOR New Fire Station No. 4 & Renovation of Existing Fire Station No. 4 Design 1 of5 D23. Revised 10/19 Pearland New Fire Station No. 4 & Existing Fire Station No. 4 Renovation - Exhibit B Architectural Services: Standard Scope of Work Services provided would include complete architectural, structural (including Windstorm Cetifcation-WPI-6 Certificate), mechanical, electrical, plumbing, and civil design services. In addition the following services will be included. I. Programming Phase 1. Attend Pre -Development meeting and address point of clarification regarding the project. 2. Create a comprehensive Site Plan in accordance with the Unified Development Code (UDC), site utilities, facilities and drainage requirements and traffic planning. a. Coordinate with acquisitions manager 3. Create a Program of Spaces for building interior, including: basic information such as sizes, space requirements, workflows, activities and special uses. 4. Facilitate meetings with City staff as needed to develop basic components of the building, including City's standard building systems, equipment, materials and specialized requirements. 5. Review the Geotechnical Report provided by the City and incorporate findings and recommendations into site design. Coordinate with structural and civil engineer as related to the design. 6. Review the Boundary and Topographical Survey provided by the City. Coordinate with civil engineer for design. 7. Review the Traffic Impact Analysis (TIA) (if required), provided by the City and incorporate the findings and recommendations into site design. Coordinate with civil engineer as related to the design. 8. Attend coordination meetings with City staff and any pertinent external agencies (County, State and Federal) as required to determine and gain approvals from all pertinent entities. 9. Provide a schematic statement of probable cost and conceptual project schedule. 10. Prepare and submit one set of Final Project Program of Spaces (site plan program of spaces and adjacencies layout) for review and approval. a. Attend review meeting with the City. II. Schematic Design Phase (30%) I. Attend and chair monthly (or as requested by Project Manager) progress meetings with City of Pearland. a. Prepare and submit agenda at least two days prior to progress meeting. b. Prepare and submit progress meeting minutes in a timely manner. 2. Facilitate meetings with City staff to review building square footage, required utilities, drainage, zoning and traffic needs to develop Schematic Design Documents. 3. Obtain and review applicable City standards and guidelines for design (Design Criteria Manual, Unified Development Code) and provide design that meets City codes. 4. Prepare and submit four (4) sets of Schematic Design Documents, Preliminary Specifications, Schematic cost estimate and Schedule to complete the design to the City staff for review and approval. (30% plan review). Components to include: a. Site plans, paving layouts, traffic circulation. b. Floor plans, building circulation. c. Exterior elevations, perspectives, rendering and color palette. Design 2 of5 D23. Revised 10/19 Pearland New Fire Station No. 4 & Existing Fire Station No. 4 Renovation - Exhibit B d. Relevant site requirements. e. Relevant right of way information such as easements, building set backs etc. f. Identify utility requirements. 5. After receiving schematic design comments, initiate plan review process with critical stakeholders: a. Planning Department, Building officials and Fire Marshall to review project requirements. b. City Engineer and Brazoria Drainage District 4 (BDD4) to review project drainage. c. Public Works to review utilities. 6. Respond in writing to all City comments from items 4 and 5 in Excel format. 7. Coordinate and send full set of plans to private utilities and service providers. Provide copy of transmittal letters to the City. 111. Design Development Phase (60%) 1. Attend and chair monthly (or as requested by Project Manager) progress meetings with City of Pearland. a. Prepare and submit agenda at least two days prior to progress meeting. b. Prepare and submit progress meeting minutes in a timely manner. 2. Facilitate and attend meetings with City staff to develop Design Development Documents. 3. Prepare and submit four (4) sets of Design Development Documents including Detailed Specifications, Cost Estimate and Schedule to the City staff for review and approval. (60% plan review). Components to include: a. Site plans, paving layouts, traffic circulation, lighting, signage and utilities. b. Floor plans, Structural (WPI -8), Civil, Architectural, Storni Water Pollution Prevention Plan (SWPPP), MEP, Fire Protection, landscaping and irrigation. c. Exterior elevations, perspectives, renderings and color palette. d. All building sections and details. e. Interior elevations, casework and millwork elevations. f. Drainage Study and calculations. g. Report addressing all City's Design Criteria and Code requirements. 4. Respond in writing to all City comments on plans from item 3 in Excel format. 5. Coordinate final utility plans. 6. Coordinate and send full set of plans to private utilities and service providers. Provide copy of transmittal letters to City. 7. Coordinate architectural plans with mechanical, electrical, plumbing and structural plans. IV. Construction Documents Phase (90%) 1. Attend and chair monthly (or as requested by Project Manager) progress meetings with City of Pearland. a. Prepare and submit agenda at least two days prior to progress meeting. b. Prepare and submit progress meeting minutes in a timely manner. 2. Prepare complete Construction Documents and Specifications and submit four (4) sets to City staff for Code and general review and approval (90% plan review). 3. Attend follow up meetings with Fire Marshall, BDD4, City Engineer, Planning, Public Works, Building Maintenance, Information Technology and Chief Building Official (CBO). a. Obtain BDD4's approval and signature of plans. 4. Respond in writing to all City comments from items 2 and 3 in Excel format. Design 3 of 5 D23. Revised 10/19 Pearland New Fire Station No. 4 & Existing Fire Station No. 4 Renovation - Exhibit 13 5. Complete Platting and record Plat. 6. Complete final coordination with private utilities and service providers and obtain all necessary signatures on each page of the full set of plans. 7. Prepare and submit four (4) complete sets of Construction Documents, including 90% written responses, Specifications and Architect's Cost Estimate and Schedule to: a. Projects Department for review and approval (100% plan review) b. Community Development for formal Plan Review for Permit 8. Submit plans and coordinate with Texas Department of Licensing and Regulation (TDLR) or Registered Accessibility Specialist (RAS) for accessibility review. Obtain EAB Number and Plan Review Report. 9. Correct plans to reflect issues noted by Review for Permit. 10. Acquire signature of City Engineer and Chief Building Official. V. Bid Phase a. Provide Notice to Bidders (NTB) to the Project Manager in an electronic form appropriate for the e -bid system format. City is responsible for advertising. b. Provide electronic copy of bid ready plans and project manual to the Project Manager for the e -bid system. c. Coordinate and chair pre-bid meeting and attend the Bid Opening. d. Respond in writing to questions from bidders and prepare Addenda as necessary. e. Assist with design of Bid Proposal. f Prepare Engineer's Recommendation of Award Letter that includes the following required content: i. Check for math errors and reconcile any mathematical discrepancies ii. Review for unbalance bid items. iii. Certified Bid Tabulation including Architect's estimate. iv. Review of contractor's financial standing and references provided. v. Explanation of discrepancies between the Engineer's estimate and bids. vi. Recommendation to award. 2. Attend City Council meeting and recommend award of Contract for Construction. 3. Produce and transmit to selected contractor five (5) sets of project documents ready for execution with City's Notice of Intent to Award (NOI). VI. Construction Administration Phase I. Facilitate Pre -Construction meeting with agenda. 2. Attend and chair monthly (or as requested by Project Manager) constmction progress meetings. a. Provide and submit agenda at least two days prior to progress meeting. b. Provide and upload progress meeting minutes into Pro -Trak in a timely manner. 3. Provide Construction Administration. a. Coordinate with Project Coordinator on Pro -Trak training. b. Obtain and review schedule of values form contractor. i. Prepare and submit schedule of values in Excel format ready for Pro - Trak (template provided by City) to Project Manager. c. Review, log and approve submittals, shop drawings, samples, product data, Request for Information, Request for Proposals, Change Orders, etc. in Design 4 of D23. Revised 10/19 Pearland New Fire Station No. 4 & Existing Fire Station No. 4 Renovation - Exhibit 13 accordance with Contract Documents using City's Pro -Trak system. Coordinate with Construction Manager and Project Manager. d. Review Construction Materials Testing reports in Pro -Trak system. e. Review and approve applications for payment in Pro -Trak system. f. Provide direction for questions and concerns from the contractor and Construction/Project Manager in resolution of problems. 4. Provide Field Services for entire construction period a. Architect's Construction Administrator to conduct a site visit a minimum of one (1) times per month, including observation of structural concrete placement, underground piping installation and inspections, mechanical/electrical/plumbing cover-up, masonry installation, ceiling cover- ups, etc. b. Coordinate with City's Engineering inspector on a monthly basis c. Provide and upload site visit report to Project Manager in Pro -Trak. d. Coordinate WPI -8 inspections and documentation. e. Coordinate stnictural/mechanical/electrical/plumbing observations and certifications. 5. Conduct Substantial Completion Inspection. a. Coordinate with Construction Manager/Project Manager to create punch list. b. Substantiate that items noted are completed through Pro -Trak. c. Issue Certificate of Substantial Completion in Pro -Trak. VII. Project Close Out I. Conduct Final Completion Inspection a. Coordinate with Construction Manager/Project Manager to create and submit final punch list. b. Substantiate that items noted are completed through Pro -Trak. 2. Provide Warranty Administration Services during the entire Warranty Period. Architect to issue Warranty Reports and review items after the Contractor has notified the City that these items are complete. 3. Coordinate WPI -8 inspection and obtain certificate. 4. Chair project close out meeting and coordinate project close out process. 5. Obtain and review close out submittal from the contractor for completeness before transmitting to the City which include but are not limited to: a. Contractor's red lines and as -built notes. b. Warranty information. c. Material Safety Data Sheet (MSDS). d. Operating Manuals. e. Start up and testing reports. f Building commissioner report. g. As -Built record drawings (in hard copy and digital format). 6. Issue Architect's Certificate of Final Completion and Acceptance letter to the City recommending acceptance. Additional Services 1. Testing and Balancing/Building Commissioning. a. Fundamental Commissioning of Building Energy System. Design 5 of 5 D23. Revised 10/19 JOINER ARCHITECTS ,wA:.wi d. 5*Z4 N444 IFxn;, I HSS SUtRul VOW 11tv re 1v1 Exhibit C Pearland New Fire Station No. 4 & Existing Fire Station No. 4 Renovation Proposed Design & Construction Schedule JA Project No. 19018 September 5, 2019 CONTRACT AWARD Present Proposal for Professional Services to the City Council September 23, 2019 PROGRAMMING PHASE Begin Programming September 24, 2019 Programming Complete October 11, 2019 SCHEMATIC DESIGN PHASE Begin Schematic Design October 14, 2019 Schematic Design Complete December 13, 2019 DESIGN DEVELOPMENT PHASE Begin Design Development December 16, 2019 Design Development Complete March 13, 2020 CONSTRUCTION DOCUMENT PHASE Begin Construction Documents March 16, 2020 30% Document Completion May 1, 2020 60% Document Completion June 12, 2020 90% Document Completion July 24, 2020 100% Document Completion August 10, 2020 PROCUREMENT /CONTRACT AWARD Issue Request for Proposals for Construction Managers at Risk December 16, 2019 Receive Proposals from Construction Managers at Risk January 15, 2020 Evaluations Complete & Construction Manager Approved by the City Council February 10, 2020 Submit 60% Construction Documents for Guaranteed Maximum Price June 12, 2020 Present Guaranteed Maximum Price/Contract Amendment to the City Council July 27, 2020 CONSTRUCTION PHASE Issue Notice to Proceedlaegln Construction July 28, 2020 Substantial Completion & Owner Move -in July 29, 2021 PUNCH LIST/CLOSEOUT Final Completion July 29, 2021 — October 29, 2021 WARRANTY PHASE Warranty Phase July 29, 2021 — July 29, 2022 Client#: 161899 JOINEPAR ACORD.. CERTIFICATE OF LIABILITY INSURANCE DATE IMMIDDIYYYY) 8/02/2019 THIS CERTIFICATE 15 ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must have ADDRIONAL INSURED provisions or be endorsed. N SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder In lieu of such endorsement(s). PRODUCER USI Southwest 9811 Katy Freeway, Suite 500 Houston, TX 77024 713 490-4600 UT Callus Renaud lursOo {Flo, E,m 713 490-4800 EA. mss; Callie.Renaud@usi.com INSURERIS) AFFORDING COVERAGE INC.FAX No 7134904700 INSURER A: XLFW.W Imu,rw cans NAME 37885 SU RED Joiner Archhects, Inc. 700 Rockmead Dr Ste 265 Kingwood, TX 77339-2192 INSURER B INSURER C: INSURER 0: .CURER E NBUMER F COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES INDICATED. NOTWITHSTANDING ANY R CERTIFICATE MAY BE ISSUED OR MAY P NS EXCLUSIONS AND CONDITIONS OF SUCH LTM OF INSURANCE LISTED BELOW HAVE BEEN ISSUE EOUIREMENT, TERM OR CONDITION OF ANY CONT ERTAIN, THE INSURANCE AFFORDED BY THE PO POLICIES LIMITS SHOWN MAY HAVE BEEN RE MOOLSWIA #HiMJY° D TO M RAN TYPE OF INSURANCE COMMERCMLCENERAL LIABILITY 7 CLAIMS -MADE u OCCUR GEHL AGGREGATE LIMIT APPLIES PER: POLICY ` f JEC J LOC OTHER AUTOMOBILE WBLITY ANY AUTO INRI1p1ETIpB q LY MImS ONLY SCHEDULED _ AUTOS NON -OWNED _ AUTOS ONLY CT CIES ACED POLICY NUMBER fNL II OP'YY'_' 1 THE INSURED NAMEDABOVE FOR THE POLICY PERIOD OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, BY PAID CLAIMS. (Aggyeergl_ LIMITS EACH OCCURRENCE t P95M JFwu jrrs,KoI 1 MED EXP (Any ^'NBOSON_ S PERSONAL a AMIN-WHY S GENERAL AGGREGATE S PRODUCTS- COMP/OP FAG e COMBINED SINGLE Lehi (Ea rrMP d) BODILY INJURY (Pa person) BWILY INJURY Po aCU11M) RMc'td' wIII 1 f S 1 S S UMBRELLA UAB EXCESS MAB OCCUR CLAIMS -MADE DEIJ [pRETENTIOX WORKERS COMPENSATION AND EMPLOYES' UANLm' t. ANY PROPRIETOR/PARTNER/EXECUTE/Er-/1 OFFICE.MEMBER EXCLUDED) (WASMWy M NH) 11 Y.S. dowle We, PTION OF OPERATIONS bolos NIA EACH OCCURRENCE AGGREGATE 1 1 __. 1 -PER ERN- EAAHIITE.... _ _T _. ER E.L. M/' .... EACH EL. DISEASE EA EMPLOYEE 1 S EL. DISEASE - POLICY LINT 1 A Professional Liability DPR9943394 05/29/2019 05/29/2020 $2,000,000 per claim $2,000,000 annl aggr. DEBCMPTION OF OPERATIONS I LOCATIONS I VEHICLES IACONO IDI, MdWlmul Nmwi. Modulo. may bo attached IImore .pace N rapW,WI CERTIFICATE HOLDER CANCELLATION City of Peadand 3519 Liberty Drive Pearland, TX 77581 ACORD 25 (2016/03) of 1 0326292043/M26292030 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS AUTNORaEO REPRESENTATIVE Y " - 4{ 019883015 ACORD CORPORATION. All rights reserver The ACORD name and logo we registered marks of ACORD CERHA ACME) ! CERTIFICATE OF LIABILITY INSURANCE DATE 01 00E/YYY1 09117/2019 THIS CERTIFICATE 15 ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURERIS), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: 11 the con locate holder Ban ADDmONAL INSURED, the polioylbs) must have ADDRIONAL INSURED provisions or S endorsed N SUBROGATION 15 WAIVED, subject to the toms and conditions of the policy, Eerteln pWHLs may rpuM an ondonanp2 A statement on this certificate don not cooler rights to No ceretcate holder B lieu of such endorsementia). C1311nel BAd1 SDIGGeder raws, 281.381-8188 1 FEE 281.361-0402 S bUIch®bNdatanderfeE.com PROOUGRR StaleFAN1n Butch Slanderfer 1329 Kingwood Dr Kingwood DT 77339 a. Joiner ATdRocte, Inc 700 Rocbnead Dr Ste 265 Kingwood, TX 773312191 b$YRER(SI WORDING COVERAGE NSW9t A: State Farm Lloyds "mat $,7 SMB Farm MYWN Automobile Insurance Company ,mnm,; State Farm Fire ane Casualty Company .. n x�ro: State Farm FM and Cavalry Company INSURER E: "'SURERF: rMC# 43419 25179 25143 25143 COVERAGES CERTIFICATE NUMBER: THIS INDICATED. CERTIFICATE e�gEXCLUSIONS I. IS TO CERTIFY THAT THE NOTWITHSTANDING MAY BE ISSUED AND CONDmONS TYPE Of NANAMC POUCIES ANY REQUIREMENT. OR MAY OF SUCK _-... OF INSURANCE PERTNN. POLI�CESI mSO MYe USTED BELOW HAVE BEEN TERM OR CONDITION OF ANY THE INSURANCE AFFORDED BY LIMITS SHOWN MAY NAVE BEEN POLICY 111•11101RTmby ISSUED TO CONTRACT THE POLICES REDUCED BY THE INSURED OR OTHER DESCRIBED PAID CMS. A NAMED ABOVE FOR THE POLICY PERIOD DOCUMENT WITH RESPECT TO NMICH MPS HEREIN 15 SUBJECT TO AU. THE TERMS, Weis A l GOIt X1OUCY COMYFJMMLGpINML M ) ClASMAOE AGGREWIEgLIMIT [ j 9*HFA. Wa-lw X OCOJR APPIIfS PER CB- { 1 LOC Y Y 90DX-12448-2 01)072079 01/01/2020 EACH °CCUNn!MQ P 1.000.000 3300.000 L 5.000 S 1.000.0 00 f 2.°00.0°° S 2,000.000 y..__ _ 7RIS/ITO TIIISED1Elatt poomymlavpnml PEASOxAL 4Apr GEHAML AGGREG.&ATEir bmOLCTS.0 UPA.V M'c B AUTOPOOL1UYanY I�AUTOS 1� ANY AUTO owuE0 Gy.Y 5 ear SCHEDULED p O$ AUTOS v Y Y 3026955-A07-531 3511700F17.53A 356 9379 -B09 -53C 01/07/2019 07/17/2019 , 02/0/12019 01/07/2020 07/172020 02/092020 ua SICLE LfeT BOCer1NNRV Pm ODDLY WOW ENE mPriO $ L 1000.000 _... 1 1.000.000 s 1.000.000 _ P S740E C X ILA LMA X MESS LMA j DEO igirtErc OCCUR W CESJMOE 1000 90CX-12741-6 01/01/2019 01/012020 *o spor,MAENCE_ •OGnscATP 5.000.000 - $ 5.000.000 D wCARenva.pl luTroN AMOFAIHOVERS UVaDY Priv MOMnm1iLPMTXEA/FYFCVrnE �Y1M GEFTCDSIDADE) EXCLUDED? l'J INRNNW bNm DC aMPQ110FO 4nbe _pa CIP ITIS QGDPEMimNF M1 MrA Y 90-CH-GOT12 El/012019 01/012020 IrT:UM DOA". EL EAcnALsmwr ri dSE/5E-EA EWLOYEf EL acne.. POUCV Lem ris 1.000.000 s 1.000.000 E 1.000.000 .wsaa.w RnM.sew,E.mar 00 bambini if .m.. mpice Is •••16n4) CERTIFICATE HOLDER CANCELLATION Cly of Pearland 3519 Liberty Drive Pearland. TX 77581 SHOULD AMY OF THE ABOVE DESCRMED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF. NOTICE WEL BE DELIVERED ACCORDANCE WITH THE POLICY PROVISIONS. 6A R@REW(TA1NE 0 1 986 401 6 ACORD CORPORATION. All rights reserved ACORD 25 (2016/63) The ACORD risme and logo are registered marks of ACORD +001400 13284.12 031410