R2019-224 2019-08-26RESOLUTION NO. R2019-224
A Resolution of the City Council of the City of Pearland, Texas, amending a
contract with International Paint and Body of Pearland, for vehicle repair
services, in the additional amount of $50,000.00, (total contract amount of
$90,000.00).
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That a contract for vehicle repair services was previously awarded to
International Paint and Body of Pearland.
Section 2. The City Manager or his designee is hereby authorized to execute an
amended contract for vehicle repair services.
PASSED, APPROVED and ADOPTED this the 269h day of August, A.D., 2019.
TOM REID
MAYOR
ATTEST:
MARIA RODRIGUEZ
INTERIM CITY SECRETARY
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
Attachment A
VENDOR: International Paint & Body
PO NUMBER: 2019-00001202
Unit Number and Type of Repair
Work Order #
Repair Type Date Out
Invoice No. Shop - Department Department
TL163
0000016454
1V000001160BN 1 04/15/20191 04/15/20191
113921COP 1PW - Construction
2,820.55
Body Repairs Complete Unit Coverted Repair
U192
0000016637
IV000001160BN 1 04/15/20191 04/15/20191
114791COP 1PD - Patrol
10,119.17
Body Repairs Complete Unit Coverted Repair
U206
0000016836
1V000001160BN 1 04/15/20191 04/15/20191
115711COP 1 PD - Patrol
8,241.90
Body Repairs Complete Unit Coverted Repair
U197
0000016848
1V000001160BN 1 03/15/20191 04/15/20191
115231COP 1PD - Patrol
2,406.65
Body Repairs Complete Unit Coverted Repair
U156
0000017365
1V000001160BN 1 11/05/20181 04/15/20191
11362ICOP 1PD-Patrol
2,277.17
Body Repairs Complete Unit Coverted Repair
C402
0000017501
12999999252BN 1 06/04/20191 06/19/20191
117461C0P IPD - CID
3,109.00
General General Parts Counter
C389
0000017526
12999999Z52BN 1 06/13/20191 06/19/20191
117481C0P 1PD - Patrol
3,210.85
General General Parts Counter
P368
0000017538
12999999Z52BN 1 05/30/20191 06/19/20191
117491C0P 1PW - Lift Stations
3,131.80
General General Parts Counter
U185
0000017752
12999999Z52BN 1 06/19/20191 06/19/20191
118061C0P PD - Patrol
2,859.60
General General Parts Counter
Pending Repairs to Units: TL192, P356, P374,
U183, U236
Subtotal Current Spend
38,176.69
Pending Estimated Repairs
30,173.50
Total Estimated Repairs
68,350.19
Total Estimated Spend
90,000.00
$90,000.00
$80,000.00
$70,000.00
$60,000.00
$50,000.00
c
00
E
$40,000.00
$30,000.00
$20,000.00
$10,000.00
$0.00
■ Spend
$23,275.50
International Paint and Body Spend Trend
$58,065.54
533,540.64
$39,176.69; r
$81,235.31
FY15 FY16 FY17 FY18 FY19 - EST.
$23,275.50
$58,065.54 $33,540.64
Spend 2 per. Mov. Avg. (Spend)
$ 39,176.69 $81,235.31
City of Pearland
3519 Liberty Drive
Pearland, TX 77581
Resolution No..
R2019-244
General Services Contract
• This Contract (Contract) is made between the City of Pearland, Texas (City), and Contractor.
The City and Contractor agree to the terms and conditions of this Contract which consists of the
follOwing parts:
I. Summary of Contract Terms
• II. Signatures
III. Standard Contractual Provisions.
IV. Special Terms and Conditions
V. Additional Contract Attachments
I. Summary of Contract Terms.
Contractor:
Description of Services:
Contract Type:
Effective Date:
Termination Date:
Renewal:
Lone Star Pavement Service§
27045 Hanna Road
Conroe, TX. 77385
Contractor will provide road striping services,for the City of
Pearland, as needed, per the specifications of Bid # 0819-63,
Resolution # 2019-244.
Unit Price Contract, Estimated Amount of $250,000.i
November 1, 2019
QctOber 31, 2020
Two renewal options available, upon the mutual agreement of both
parties.
11. Signatures. By signing belOvv, the parties agree to the- terrn of this Contract:
ftSilr(ied by:
•City nager
Assistant City Manager
Director
Superintendent/Manager
*Contract Signature AuthoritY:
CONTRACTOR:
Title:.____
-.SUperintendent/Manager 45,999 or lest
Director - •$6,000 to $30,000
City Manager/Assistant-City Managers •- $39,001 to $50;000
City Council Resolution - $50,000+
•Pagp 1 of 4
III. Standard Contractual Provisions.
A. Definitions.
Contract means this Standard Services Contract.
Services means the services for which the City solicited bids or received proposals as
described in Exhibit A, attached hereto.
B. Services and Payment. Contractor will furnish Services to the City in accordance with the
terms and conditions specified in this Contract. Contractor will bill the City for the Services
provided at intervals of at least 30 days, except for the final billing. The City shall pay
Contractor for the Services in accordance with the terms of this Contract, but all payments to
be made by the City to Contractor, including the time of payment and the payment of interest
on overdue amounts, are subject to the applicable provisions of Chapter 2251 of the
Government Code.
C. Termination Provisions.
(1) City Termination for Convenience. Under this paragraph, the City may terminate
this Contract during its term at any time for the City's own convenience where the
Contractor is not in default by giving written notice to Contractor. If the City terminates
this Contract under this paragraph, the City will pay the Contractor for all services
rendered in accordance with this Contract to the date of termination.
(2) Termination for Default. Either party to this Contract may terminate this Contract
as provided in this paragraph if the other party fails to comply with its terms. The
party alleging the default will give the other party notice of the default in writing citing
the terms of the Contract that have been breached and what action the defaulting
party must take to cure the default. If the party in default fails to cure the default as
specified in the notice, the party giving the notice of default may terminate this
Contract by written notice to the other party, specifying the date of termination.
Termination of this Contract under this paragraph does not affect the right of either
party to seek remedies for breach of the Contract as allowed by law, including any
damages or costs suffered by either party.
(3) Multi -Year Contracts and Funding. If this Contract extends beyond the City's fiscal
year in which it becomes effective or provides for the City to make any payment during
any of the City's fiscal years following the City's fiscal year in which this Contract
becomes effective and the City fails to appropriate funds to make any required
Contract payment for that successive fiscal year and there are no funds from the City's
sale of debt instruments to make the required payment, then this Contract
automatically terminates at the beginning of the first day of the City's successive fiscal
year of the Contract for which the City has not appropriated funds or otherwise
provided for funds to make a required payment under the Contract.
D. Liability and Indemnity. Any provision of any attached contract document that limits the
Contractor's liability to the City or releases the Contractor from liability to the City for actual
or compensatory damages, loss, or costs arising from the performance of this Contract or
that provides for contractual indemnity by one party to the other party to this Contract is not
applicable or effective under this Contract. Except where an Additional Contract Document
provided by the City provides otherwise, each party to this Contract is responsible for
defending against and liable for paying any claim, suit, or judgment for damages, loss, or
costs arising from that party's negligent acts or omissions in the performance of this Contract
in accordance with applicable law. This provision does not affect the right of either party to
this Contract who is sued by a third party for acts or omissions arising from this Contract to
bring in the other party to this Contract as a third -party defendant as allowed by law.
E. Assignment. The Contractor shall not assign this Contract without the prior written
consent of the City.
F. Law Governing and Venue. This Contract is governed by the law of the State of Texas
and a lawsuit may only be prosecuted. on this -Contract in a court of competent jurisdiction
located in or having jurisdiction in Brazoria County, Texas.
G. Entire Contract. This Contract represents the entire Contract between the City and the
Contractor and supersedes all prior negotiations, representations, or contracts, either written
or oral. This Contract may be amended only by written instrument signed by both parties.
H. Independent Contractor. Contractor shall perform the work under this Contract as an
independent contractor and not as an employee of the City. The City has no right to
supervise, direct, or control the Contractor or Contractor's officers or employees in the
means, methods, or details of the work to be performed by Contractor under this Contract.
The City and Contractor agree that the work performed under this Contract is not inherently
dangerous, that Contractor will perform the work 'in a workmanlike manner, and that
Contractor will take proper care and precautions to insure the safety of Contractor's officers
and employees.
I. Dispute Resolution Procedures. The Contractor and City desire an expeditious means to
resolve any disputes that may arise between them regarding this Contract. If either party
disputes any matter relating to this Contract, the parties agree to try in good faith, before
bringing any legal action, to settle the dispute by submitting the matter to mediation before a
third party who will be selected by agreement of the parties. The parties will each pay one-
half of the mediator's fees. -
J. Attorney's Fees. Should either party to this Contract bring suit against the other party for
breach of contract or for any other cause relating to this Contract, neither party will seek or
be entitled to an award of attorney's fees or other costs relating to the suit.
K. Severability. If a court finds or rules that any part of this Contract is invalid or unlawful, the
remainder of the Contract continues to be binding on the parties.
IV. Special Terms or Conditions. None.
V. Additional Contract Documents. The following specified documents attached to this Contract
are part of this Contract. Any provision contained in the Contractor's Additional Contract Documents
that conflicts with this Contract shall have no legal effect.
A. Contractor's Additional Contract Documents:
1. The contractor's response to Bid # 0819-63 shall be construed as additional contract
documents.
2. Executed Contractor Insurance Requirements & Agreement (required insurance
certificate[s] shall be in possession of City at actual commencement of work).
B. City's Additional Contract Documents:
1. Scope of Services as listed on the attached.
EXHIBIT A
CONTRACTOR'S SCOPE OF SERVICES
Scope of services shall consist of the contractor providing road striping services for the City of
Pearland, as needed, per the specifications of Bid # 0819-63, Resolution # R2019-244. Pricing is
as follows per contractor's response to the same, as listed below:
Bid 8
0819-63
Title
Annual Contract for Road Striping Services
Line Items
Services_
LLC
Line
Description
UOM
QTY
Unit
Extended
1
ROAD STRIPING SERVICES - PAINT
PKG
1
$451.69
1.1
4" SOLID OR BROKEN WHITE LINE (PAINT) - MATERIAL COST PER LINEAR FOI
LF
1
50.11
1.2
4" SOLID OR BROKEN WHITE UNE (PAINT) - LABOR COST PER LINEAR FOOT
LF
1
50.07
1.3
4" SOLID OR BROKEN YELLOW UNE (PAINT) - MATERIAL COST PER LINEAR Ft
LF
1
50.11
14
4" SOLID OR BROKEN YELLOW UNE (PAINT) - LABOR COST PER LINEAR FOO1
LF
1
50.07
1.5
8" SOLID WHITE UNE (PAINT) - MATERIAL COST PER LINEAR FOOT
LF
1
50.86
1.6
8" SOUD WHLITE UNE (PAINT) - LABOR COST PER LINEAR FOOT
LF
1
50.12
1.7
12" SOLID WHITE LINE (PAINT) - MATERIAL COST PER LINEAR FOOT
LF
1
50.60
1.8
12" SOLID WHITE UNE (PAINT) - LABOR COST PER UN EAR FOOT
LF
1
50.40
1.9
24" SOLID WHITE UNE (PAINT) -MATERALCOST PER UNEAR FOOT
LF
1
$1.20
L10
24" SOLID WHITE LINE(PAINT) - LABOR COST PER UN EAR FOOT
LF
1
50.80
1.11
6" LANE LINE SHADOW PAINT (8 FOOT WHITE/8 FOOT BLACK) - MATERIAL C
LF
1
5027
1.12
6" LANE UNE SHADOW PAINT (8 FOOT WHITE/8 FOOT BLACK) - LABOR COS"
LF
1
50.18
1.13
ELIMINATION OF PAVEMENT MARKINGS BY GRINDING - LABOR COST PERLI
LF
1
50.45
1.14
ELIMINATION OF PAVEMENT MARKINGS BY GRINDING - LABOR COST PER Li
LF
1
50.60
1.15
ELIMINATION OF PAVEMENT MARKINGS BY GRINDING- LABOR COST PERU
LF
1
50.60
1.16
EUMINA11ON OF PAVEMENT MARKINGS BY GRINDING - LABOR COST PER U
LF
1
$125
1.17
ELIMINATION OF PAVEMENT MARKINGS BY GRINDING- LABOR COST PER LI
LF
1
52.00
1.18
ELIMINATION OF PAVEMENT MARKINGS BY GRINDING - LABOR COST PER U
LF
1
$50.00
119
WHITE ARROW (PAINT) - MATERIAL COST
EA
1
$33.00
1.20
WHITE ARROW (PAINT) - LABOR COST
EA
1
$22.00
1.21
ONLY LEGEND (PAINT) - MATERIAL COST
EA
1
533.00
1.22
ONLY LEGEND(PAINT)-LABORCOST
EA
1
522.00
1.23
RAILROAD CROSSING LEGEND COMPLETE (PAINT) - MATERIAL COST
EA
1
$123.00
1.24
RAILROAD CROSSING LEGEND COMPLETE (PAINT) - LABOR COST
EA
1
582.00
1.25 \
SCHOOL ZONE LEGEND(PAINT)-MATERIAL COST
EA
1
546.16
1.26
SCHOOL ZONE LEGEND (PAINT) - LABOR COST
EA
1
530.84
2
ROAD STRIPING SERVICES -THERMO-PLASTIC
PKG
1
S490.05
2.1
4" SOLID OR BROKEN WHITE UNE (THERMO-PLASTIC) - MATERIAL COST PER
LF
1
50.34
2.2
4" SOUD OR BROKEN WHITE LINE (THERMO-PLASTIC) - LABOR COST PER UI1
LF
1
S021
2.3
4" SOLID OR BROKEN YELLOW UNE (THERMO-PLASTIC) - MATERIAL COST PE
LF
1
$0.34
2.4
4" SOUD OR BROKEN YELLOW UNE (THERMO-PLASTIC) - LABOR COST PER U
LF
1
50.21
2.5
8" SOLID WHITE UNE (THERMO-PLASTIC) - MATERIAL COST PER LINEAR FOO
LF
1
$0.41
2.6
8" SOLID WHITE UNE (THERMO-PLASTIC) - LABOR COST PER LINEAR FOOT
LF
1
$029
2.7
12" SOLID WHITE UNE (THERMO-PLASTIC) - MATERIAL COST PER LINEAR FO
IF
1
S0.84
2.8
12" SOLID WHITE UNE (THERMO-PLASTIC) - LABOR COST PER LINEAR FOOT
LF
1
50.56
2.9
24" SOLID WHITE UNE (THERMO-PLASTIC) - MATERIAL COST PER LINEAR FO
IF
1
S1.78
2.10
24" SOUD WHITE UNE (THERMO-PLAST1C) - LABOR COST PER LINEAR FOOT
LF
1
$122
2.11
WHITE ARROW (THERMO-PLASTIC) - MATERIAL COST
EA
1
_ S60.00
2.12
WHITE ARROW (THERMO-PLASTIC) - LABOR COST
EA
1
S40.00
2.13
ONLY LEGEND (THERMO-PLASTIC) - MATERIAL COST
EA
1
S75.00
r2.14
ONLY LEGEND (THERMO-PLASTIC) - LABOR COST
EA
1
$50.00
r2. s
RAILROAD CROSSING LEGEND COMPLETE (THERMO-PLASTIC) - MATERIAL 0
EA
1
S77.10
L2.16
RAILROAD CROSSING LEGEND COMPLETE (THERMO-PLASTIC)-LABOR COST
EA
1
$58.40
12.17
SCHOOLZONE LEGEND (THERMO-PLASTIC) - MATERIAL COST
EA
1
474.00
'2.18
SCHOOLZONE LEGEND (THERMO-PLASTIC) - LABOR COST
EA
1
549.35
I3
TRAFFIC BUTTON/MARKER
PKG
1
S1,501.00
r3.1
REMOVAL OF TRAFFIC BUTTONS/MARKERS
EA
1
51.00
r3.2
SUPPLY AND INSTALL ONE SIDED REFLECTOR ON CONCRETE
EA
100
S4.00
r3.3
SUPPLY AND INSTALL ONE SIDED REFLECTOR ON ASPHALT
EA
100
$3.00
r3.4
SUPPLY AND INSTALLTWO SIDED REFLECTOR ON CONCRETE
EA
100
54.50
3.5
SUPPLY AND INSTALLTWO SIDED REFLECTOR ON ASPHALT
EA
100
53.50
Total