R2002-0112 08-12-02 RESOLUTION NO. R2002-112 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO EXECUTE CHANGE ORDER NO. 2 ASSOCIATED WITH CONSTRUCTION OF THE SOUTHWEST ENVIRONMENTAL DETENTION BASIN AND CONTROL STRUCTURE. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order associated with construction of the Southwest Environmental Detention Basin and Control Structure, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 2 associated with construction of the Southwest Environmental Detention Basin and Control Structure. PASSED, APPROVED and ADOPTED this the 12 dayof August , A.D., 2002. ATTEST: ~t'Y SEC?RETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR SWEC Detention Basin and Control Structure, B2001-063 CHANGE ORDER NO. 2 July 26, 2002 1. Specified color dye quantity is hereby increased from specified 4 pounds per cubic yard to 10 pounds per cubic yard. Required volume of concrete to be placed in the retaining wails of the cross-over structure is hereby reduced 32.7 cubic yards as a result of constructing the footings 2 feet higher than planned elevation. Similarly, structural excavation is reduced 131 cubic yards and riprap is reduced 24.7 cubic yards.. Amount of Item 1. NO CHANGE 2. Re-work existing E-Inlet and 60" CMP at southeast comer of East Pond south of Blue Line (BDD4 area) by removing the upper 60" pipe and seaiing manhole at the upper entry, saivaging 60 feet of the 60" CMP and with three new connection bands extend lower 60" to match construction drawings, and clean manhole and grade outlet as shown on construction drawings. Remainder of removed 60" CMP shall become property of the Contractor and shall be removed from the site. Amount of Item 2. $11,609 3. Perform additional work south of the Blue Line (BDD4 area): a) Finish grade 30' berm and construct berm drain swales 4690 LF~$3.50 b) Provide and Instail Type B Inlets c) Provide and Install Type E Inlet d) Provide and Instail 18" CMP Berm Drain Pipes e) Provide and Install 36" CMP Berm Drain Pipe f) Dispose offsite brush & debris from BDD4 Exc g) Remobilization and Engineering $16,415 3 Ea.~$1,400 4,200 1Ea. @$1,865 1,865 472LF~$30 14,160 192LF~$66 12,672 12 Loads~$250 3,000 LS 8,000 Amount of Item 3. $60,312 4. Extend Handrail 13 feet east and 13 feet west on top of weir wail. Install 36 feet of Handrail on top of 12" beam of the end treatment of box culvert at the intake structure. Amount of Item 4. 62 L.F.~$150 $ 9,300 END OF SHEET ONE of Change Order No. 2, B2001-063 b1063c2a(CO#2Cont.) Sheet 2 of 2 5. A. Extend contract 60 Calendar Days to complete all Items. of described work above. B. Extend contract additional 15 days to allow time for Contractor to dry out the basin from flooding that occurred the weekend of July 13 and 14. Amount of Item 5. NO CHANGE TOTAL AMOUNT OF CHANGE ORDER No. 2: Increase Contract $81,221 Contract Time is hereby increased 75 Calendar days from 171 Calendar Days (reference Change Order No. 1) to 246 Calendar days by this Change Order No. 2. Contract Price is increased from $1,946,636.71 to $2,027,857.71 by this Change Order No. 2. This Change Order No.2 to Contract B2001-063 is effective upon date of signature by the City Manager. OWNER City of Pearland CONTRACTOR Bean Construction Company Bill Eisen Date W.B. Bean Date END CHANGE ORDER NO. 2, B2001-063 uly 26, 2oo2 Mike Yost Brazoria Drainage District No. 4 4805 Broadway Pearland, Texas 77581 Ref. SWEC Detention Basin Dear Mike: This letter presents segments of our revised proposed Change Order No. 2 (copy enclosed) to our contract with Bean Construction Company. The only difference between this letter and my July 18 letter to you is the reduction in Item 3., f., "Dispose offsite brush & debris from BDD4 Exc.". The revised amount is $3,000 instead of $30,000 in my July 18 letter. As I said there, these Change Order segments are proposed by the City to help an early completion of the detention basin, and to relieve BDD4 from the detail work of fine grading and inlet and piping work. Change Order No. 2 Segments: "2. Re-work existing E-Inlet and 60" CMP at southeast :comer of East Pond SOuth of Blue Line (BDD4 area) by removing the upper 60" pipe and sealing manhole at the upper entry, salvaging 60 feet of the 60" CMP and with three new connection bands extend lower 60" to match construction drawings, and clean manhole and grade outlet as shown on construction drawings. Remainder of removed 60" CMP shaJl become property of the Contractor and shall be removed from the site. Amount of Item 2. $11,609 3. Perform additional work south of the Blue Line (BDD4 area): a) Finish grade 30' berm and construct berm drain swales 4690 LF~$3.50 b) Provide and Install Type B Inlets c) Provide and Install Type E Inlet d) Provide and Install 18" CMP Berm Drain Pipes e) Provide and Install 36" CMP Berm Drain Pipe f) Dispose offsite brush & debris from BDD4 Exc. g) Remobilization and Engineering 3 Ea. ~ $1,400 1Ea. ~ $1,865 472LF ~$30 192LF ~$66 12 Loads @ $250 LS $16,415 4,200 1,865 14,160 12,762 3,000 8,000 Amount of Item 3. $60,312" 3519 LIBERTY DRIVE · PEARLAND, TEXAS 77581 · 281-652-1600 · www.ci.pearland.tx.us Printed on Recycled Paper ~ BD472602(Cont.) Sheet 2 of 2 TOTAL AMOUNT OF 2. and 3. (Above) $711,921 In our pre-construction interlocal agreement last October, BDD4 agreed to accept performance responsibility represented by cost estimates (copies enclosed) for these items that resulted in approximately 47.6% (copy of calculation enclosed) of the total estimated cost of the respective items. Please consider assuming responsibility for 47.6%, or $34,234 of the total mount of these Change Order No.2 segments of $71,921. (Clearing and disposal work already done by BDD4 has been recognized. Only a small amount remains to be hauled off site.) This would be in return for relief from performance of those tasks.. In our opinion, this change order will result in an earlier completion of SWEC Detention Basin, thereby better meeting expectations of citizens, and will remove from the responsibility of BDD4 the fine grading and detailed concrete and inlet and pipe setting work entailed. An early reply would be greatly appreciated. . .H~irgrO~e, P.E. Ci[y Engineer/ cc Bill Eisen, City Manager, w/enclosures Alan Mueller, Deputy City Manager, w/enclosures Enclosures bd4726X.wpd ITEMS No. 2 AND :3, CHANGE ORDER No. 2, B2001-063 CALCULATIONS OF BDD4 SHARE OF PARTICIPATION (Using those line items of Change Order No. 2 that are called directly in cost estimates used to base the Intedocal Agreement between C.O.P. and BDD4) Item Clearing, Grubbing and Waste Disposal Modified Type B Inlets 3 ~ $1,000 E-Inlets 18"CGSP 472 L.F. ~ $25 36" CGSP 192 L.F. ~ $50 Total Cost* BDD4 Share** $135,000 $63,000 3,000 1,350 1,500 400 11,800 7,080 9,600 4,800 TOTALS $160,900 $76,630 BDD4 Share = $76,630/$160,900 = 47.6% of Items No. 2 and 3 of Change Order No. 2 ($11,609 + $60,312) BDD4 Share = 0.476 x ($11,609 + $60,312) = $34,234.40 * From "Total Estimated Cost for SWEC Detention Basin and Control Structure, B2001-063, July 18, 2001" (Exhibit to Intedocal Agreement between C.O.P. and BDD4) ** From "Interim Estimated Cost (BDD4 Only) for SWEC Detention Basin and Control Structure, Ref. (B2001-063), July 25, 2001" (Exhibit to Interlocal Agreement between C.O.P. and BDD4) TOTAL ESTIMATED COST FOR SWEC DETENTION BASIN AND CONTROL STRUCTURE B2001-063 July 18, 2001 ITEM NO. DESCRIPTION ESTIMATED UNIT UNIT QUANTITY PRICE TOTAL 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. Mobilization Clearing, Grubbing and Waste Disposal Excavation Manhole (Complete in Place) Construction of Hard Edge Storm and Ground Water Control Sediment Trap 36" RCP (Complete in Place) Flap Gate (Cast Iron Frame & Cover) Intake Weir, Concrete Walls, & Footing Slope Paving Handrails TuffEstablishment 5'x 8' Box Culvert Wingwalls @ Pipeline and Footing Articulated Concrete Block on Filter Fabric E-Inlets Mod. Type B Inlets (Berm Inlets) 18" Corrugated Galvanized Steel Pipe 24" Corrugated Galvanized Steel Pipe 36" Corrugated Galvanized Steel Pipe Crushed Concrete Fill LS Ea. $ 20,000.00 $ 20,000.00 Ac 45 $ 3,000.00 $ 135,000.00 CY 558,935 $ 3.30 $1,844,485.50 LS Ea. $ 24,000.00 $ 24,000.00 LF 9913 $ 10.00 $ 99,130.00 LS Ea. $ 50,000.00 $ 50,000.00 LS Ea. $ 5,000.00 $ 5,000.00 LF 272 $ 80.00 $ 21,760.00 EA Ea. $ 15,000.00 $ 15,000.00 LS Ea. $ 24,000.00 $ 24,000.00 SY 386 $ 70.00 $ 27,020.00 LF 58 $ 25.00 $ 1,450.00 Ac 28 $ 1,500.00 $ 42,000.00 LF 1068 $ 200.00 $ 213,600.00 LS Ea. $ 116,000.00 $ 116,000.00 SY 70 $ 35.00 $ 2,450.00 EA 2 $ 1,500.00 $ 3,000.00 EA 5 $ 1,000.00 $ 5,000.00 LF 712 $ 25.00 $ 17,800.00 LF 180 $ 30.00 $ 5,400.00 LF .174 $ 50.00 $ 8,700.00 CY 135 $ 100.00 $ 13,500.00 TOTAL ESTIMATED COST TM $ 2,694,295.50 SWEC INTERIM ESTLMATED COST (City of Pearland & BDD4) FOR SWEC DETENTION BASIN AND CONTROL STRUCTURE REF. (B2001,063) July 18, 2001 ITEM NO. DESCRIPTION ESTIMATED UNIT UNIT QUANTITY PRICE TOTAL 2. 3. 4. 5. 6. 7. 8. Clearing, Grubbing and Waste Disposal Excavation Storm and Ground Water Control Turf Establishment E-Inlets Mod. Type B Inlets 18" Corrugated Galvanized Steel Pipe 36" Corrugated Galvanized' Steel Pipe Ac 45 $ 3,000.00 $ 135,000.00 CY 316,593 $ 2.00 $ 633,186.00 LS 1 $ 50,000.00 $ 50,000.00 Ac 20 $ 1,500.00 $ 30,000.00 EA 1 $ 1,500,00 $ 1,500.00 EA 3 $ 1,000.00 $ 3,000.00 LF 382 $ 25.00 $ 9,550.00 LF 174 $ 50.00 $ 8,700.00 TOTAL ESTIMATED COST -- $ 870,936.00 SWEC INTERIM ESTIMATED COST ( BDD4 Only) . FOP, SWEC DETENTION BASIN AND CONTROL STRUCTURE REF. (B2001-063) July 25, 2001 ITEM NO. DESCRIPTION ESTE~IATED UNIT UNIT QUANTITY PRICE TOTAL 5. 6. 7. 1,400.00 Clearing, Grubbing and Waste Disposal Ac 45 $ (Labor Only) Excavate and Fill Sand Pit to Desired Grade CY 316,593 $ 2.00 (Equipment, Labor & Incidentals) Storm and Ground Water Control LS 1 $ (Labor & Minor Tools) Turf Establishment (Labor & Minor Equipment) Ac 20 $ E-Inlets (Installation and Labor) EA 1 $ Mod. Type B Inlets (Installation and Labor) EA 3 $ 18' Corrugated Galvanized Steel Pipe LF 382 $ (Installation and Labor) Install 36" Corrugated Galvanized Steel Pipe LF 174 $ 25.00 (Installation and Labor) 20,000.00 500.00 400.00 450.00 15.00 $ 63,000.00 $ 633,186.00 $ 20,000.00 $ 10,000.00 $ 400.00 $ 1,350.00 $ 5,730.00 $ 4,350.00 TOTAL ESTIMATED COST = $ 738,016.00 SWEC INTERIM ESTIMATED COST (City o£Pearland Only) ~ FOR SWEC DETENTION BASIN AND CONTROL STRUCTURE REF. (B2001-063) July 25, 2001 ITEM NO. DESCRYPTION ESTIMATED UNIT UNIT QUANTITY PRICE TOTAL 1, 2. 3. 4. 5. 6. 7. Clearing, Grubbing and Waste Disposal (Chipper Rental, Truck & Incidentals) Storm and Ground Water Control (Pump Rental & Electric Cost) TuffEstablishment (Hydromulcher Rental & Materials) E-Inlets(Purchase E-Inlet) Mod. Type B Inlet(Purchase B-Inlets) 18" Corrugated Galvanized Steel Pipe (Purchase 18" Pipes) 36" Corrugated Galvanized Steel Pipe (Purchase 36" Pipes) Ac 45 $ 1,600.00 $ 72,000.00 LS 1 $ 30,000.00 $ 30,000.00 Ac 20 $ 1,000.00 $ 20,000.00 EA 1 $ 1,100.00 $ 1,100.00 EA 3 $ 550.00 $ 1,650.00 LF 382 $ 10.00 $ 3,820.00 LF 174 $ 25.00 $ 4,350.00 TOTAL ESTIMATED COST = $132,920.00 CONTRACTOR: ADDRESS: PHONE: I Bean Construction Company P. O. Box 9~'~','Stafford, TX~'7749~209~88 281-403-232~" - " Eatima~e ahg ~rg~cat/on hr Payme,t .......... SWEC Detention Basin & Control Structure PROJECT: oWNER: ADDRESS: AFl'N: CITY OF PF_ARLAND 3519 Ubezty Drive Pearland, TX 77581 Mr. John W. Hetgrove, P.E. Estimate No: 4 InvoiceNo: 06hi q4 StartDa~e: 07/n4/02 ' ~ent ~ ~~ ~e: E~a~ C~ ~e: __ ~ 5 ~e ~ E~a~: n~/7~/02 Initial Contract T, me Current Approved Extensions + or. Pmvioua Approval Exton~or~ + of- $~ Days Day~ Remaining f)7/.03/02 Rain Days to Date ]50 21. _day~ 66 days Contact Amount to Date; 1. Contract Pric~ Z Approv.d Cha,'~m Orders: 1,946,636.71 To~al Changes to Date: 1. PreviousWo~ Completed 2. Work ~ This Pedod 3. lvlmedal~ On Site TOTAL CONTRACT AMOUNT: 1 5 9 2 8 3 0.0 0 Previous Earnings: 1 60032.50 Eamlngsthls period: '1,9'4 b, b'.~ 6.7 i 1~592,830 00 ' _. [160,,,0,32,~50 Reductions: TOTAL EARNINGS: 1 , 752,862.50 1. Reb~nage 5 . %of 1,752j862.50 (87,643.13) Total Payments Due: 1,665,21 9.37 Le~ Previous Payments: ' '( I :.5_1 3; 1 88. ~50~ ) Total Amoun~ Due Contractor Thl~ Estimate: 1 5 2,0 3 0.8 7 The undersigned Contractor certifies that to the beat of his knowledge, infonn~on, and bel~ that the Work has been cemple~d in accordance vath the Plans and Spectr~atlor~ and the currant payment shown on th~ ~i'.:~on ~ Payment L~ now due, ~~'I'~)R'$ REPRESENTATIVE Pro~ ~ntative ** TOTRL PRGE.OE **