HomeMy WebLinkAboutR2019-148 2019-07-08 RESOLUTION NO. R2019-148
A Resolution of the City Council of the City of Pearland,Texas,awarding a bid
to Reddico Construction Company, Inc., in the amount of$5,138,949.90, for
construction of the McHard Road Trunk Sewer and the construction of the
Waterline Phase 2 Project.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the City obtained competitive bids for construction of the McHard Road
Trunk Sewer and the construction of the Waterline Phase 2 Project.
Section 2. That certain bid for construction of the McHard Road Trunk Sewer and
Waterline Phase 2 Project is hereby awarded to Reddico Construction Company, Inc., in the amount
of$5,138,949.90. •
Section 3. That the City Manager or his designee is hereby authorized to execute and
the City Secretary to attest a contract for construction of the McHard Road Trunk Sewer and the
construction of the Waterline Phase 2 Project.
PASSED, APPROVED and ADOPTED this the 8th day of July, A.D., 2019.
••:
•• . TOM REID
_� �cnr
_ MAYOR
:.
•
ATTEST: tiii'►‘‘`‘NN``
L4)'• ! ,
MARIA RODRIGUEZ I ,
INTERIM CITY SECRETARY
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
Resolution No.
Project Manual R2019-148
for:
McHard Road Trunk Sewer and Phase 2 Waterline
Trunk Sewer — Cullen to Garden
Phase 2 Waterline — Cullen to Mykawa
N. PF9
Ca v
TEX
' XAS
FST. 18,E
DOCUMENTS ISSUED FOR CONSTRUCTION
0 ,
These'Issued for Construction"Contract Documents have been prepared by
revising the Bidding Documents to record references to addenda,field orders or
change orders issued.
The Bidding Documents may have been revised to incorporate these revisions
directly into the"Issued for Construction"Contract Documents. Contractor is
responsible for determining that these documents are consistent with their
understanding of the Bidding Documents as modified per the appropriate
provisions of the Contract Documents. The Bidding Documents,as modified per
the appropriate provisions of the Contract Documents,take precedence over these
"Issued for Construction"documents.
Project No.: WW 1406/WA 1601
Bid No.: 0219-20
July, 2019
Prepared By:
FREESE
NICHOLS
�— \ Freese and Nichols, Inc.
LYTexas Registered Engineering Firm F-2144
11200 Broadway St, Suite 2330
Pearland, Texas 77584
Phone: 832-456-4700 Fax: 832-456-4701
Project Manual
for:
McHard Road Trunk Sewer and Phase 2 Waterline
Trunk Sewer — Cullen to Garden
Phase 2 Waterline — Cullen to Mykawa
PE9
SDE ��9
V . 0
.� �. 1
.\\
TEXAS
r• 1f a
DOCUMENTS ISSUED FOR CONSTRUCTION
These"Issued for Construction"Contract Documents have been prepared by
revising the Bidding Documents to record references to addenda,field orders or
change orders issued.
The Bidding Documents may have been revised to incorporate these revisions
directly into the"Issued for Construction" Contract Documents. Contractor is
responsible for determining that these documents are consistent with their
understanding of the Bidding Documents as modified per the appropriate
provisions of the Contract Documents. The Bidding Documents, as modified per
the appropriate provisions of the Contract Documents,take precedence over these
"Issued for Construction"documents.
Project No.: WW 1406/WA1601
Bid No.: 0219-20
July, 2019
Prepared By:
ISFREESE
?NICHOLS
Freese and Nichols, Inc.
Texas Registered Engineering Firm F-2144
11200 Broadway St, Suite 2330
Pearland, Texas 77584
Phone: 832-456-4700 Fax: 832-456-4701
Project Manual
for:
Mc'Hard Road Trunk Sewer and
Phase 2 Waterline
Trunk Sewer —, Cullen to Garden
Phase 2 Waterline — Cullen to Mykawa
••••••TF 1
*: %\ •*�I
JARED BARBER -
Grp S.
114173 447
.
1.9*. /CENSE G\44 7/10/19
O
FREESE AND NICHOLS, INC.
TEXAS REGISTERED
ENGINEERING FIRM
F-2144
ProJ•ect No. : WW1406/WA1 601
Bid No. 02,19-20
July, 2019
Prepared By:
FREESE
I :NICHOLS
Freese and Nichols,Inc.
Texas Registered Engineering Firm F-2144.
11200 Broadway.St, Suite 2330
Pearland, Texas 77584
Phone: 832-456-4700 Fax: 832-456-4701
CITY OF PEARLAND
BRAZORIA COUNTY, TEXAS
TABLE OF CONTENTS
SECTION TITLE
DIVISION 0—BIDDING AND CONTRACT DOCUMENTS
00100 Invitation to Bid
00200 Instructions to Bidders
00300 Bid Proposal
00500 Standard Form of Agreement
00610 Performance Bond
00611 Payment Bond
00612 One-Year Maintenance Bond
00615 Partial Waiver of Lien
00700 General Conditions of Agreement
00800 Special Conditions of Agreement
00811 Wage Scale for Engineering Construction
00900 Addenda
DIVISION 1—GENERAL REQUIREMENTS
01100 Summary of Work
01140 Contractor's Use of Premises
01200 Measurement and Payment Procedures
01290 Change Order Procedures
01310 Coordination and Meetings
01350 Submittals
01380 Construction Photographs
01420 Referenced Standards
01430 Contractor's Quality Control
01440 Observation Services
01450 Testing Laboratory Services
01500 Temporary Facilities and Controls
01505 Mobilization
01550 Stabilized Construction Exits
01555 Traffic Control.and Regulation
01561 Reinforced Filter Fabric Barrier
01562 Waste Material Disposal
01563 Tree and Plant Protection
01564 Control of Ground Water and Surface Water
01565 TPDES Requirements
01566 Source Controls for Erosion and Sedimentation
01570 Trench Safety System
01580 Project Identification Signs
01600 Material and Equipment •
01630 Product Options and Substitutions
00010- 1 of 3
CITY OF PEARLAND TABLE OF CONTENTS
01720 Field Surveying
01760 Project Record Documents
01770 Contract Closeout
DIVISION 2—SITE WORK
02200 Site Preparation
02220 Site Demolition
02252 Cement Stabilized Sand
02255 Bedding, Backfill, and Embankment Materials
023135 Utility Horizontal Directional Drilling
02316 Excavation and Backfill for Roadways
02318 Excavation and Backfill for Utilities
02330 Embankment
02335 Subgrade
02370 Geotextile
02415 Augering Pipe or Casing for Sewers
02417 Augering Pipe or Casing for Water Lines
02510 Water Mains
02514 Fire Hydrant Assembly
02520 Valve Boxes, Meter Boxes, and Meter Vaults
02530 Gravity Sanitary Sewers
02531 Sanitary Sewer Service Leads or Reconnections
02532W High Density Polyethylene (HDPE) Solid Wall Pipe for Water
02534 PVC Pipe
02540 Tapping Sleeves and Valves
02541 Water and Wastewater Line Valves
02542 Concrete Manholes and Accessories
02582 Thermoplastic Pavement Marking
02603 Frames, Gates, Rings, and Covers
02630 Storm Sewers
02631 Precast Inlets, Headwalls, and Wingwalls
02633 Adjusting Manholes, Inlets, and Valve Boxes
02634 Ductile Iron Pipe and Fittings
02635 Steel Pipe and Fittings
02636 Polyurethane Coating on Steel or Ductile Iron Pipe
02710. Base Course for Pavement
02741 Asphaltic Concrete Pavement
02742 Prime Coat
02743 Tack Coat
02744 Single Coarse Surface Treatment
02751 Concrete Pavement
02770 Curb, Curb & Gutter, and Headers
02771 Concrete Sidewalks
02775 Concrete Driveways
02811 Landscape Irrigation
00010 -2of3
CITY OF PEARLAND TABLE OF CONTENTS
02820 Wood Fences and Gates
• 02821 Chain Link Fences and Gates
02910 Topsoil
02921 Hydromulch Seeding
02922 Sodding
02931 Landscape and Tree Planting
02980 Pavement Repair
DIVISION 3—CONCRETE
03419S Precast Reinforced Concrete Valve Vault
03420S Valve Vault Hatches
DIVISION 11 —EQUIPMENT
11280 Pressure Reducing Valves
APPENDIX -
A Geotechnical Report
END OF SECTION
00010 -3 of 3
CITY OF PEARLAND INVITATION TO BID
Section 00100
INVITATION TO BID
CITY OF PEARLAND, TEXAS
LOWEST RESPONSIBLE BIDDER
Sealed Electronic Bids will be accepted for the following project, in the City's E-bid System.
Electronic bids shall be submitted through the City's web site at:
https://pearland.ionwave.net/Login.aspx. All interested Bidders are required to register as a
"supplier" on the City's E-bid System at the above web address and clicking on "Supplier
Registration". Registration provides automatic access to any changes to the Plans, Specifications
or Bid time and date.
However, submission of an E-bid requires completing a short registration questionnaire found on
this web site. When prompted to add or remove commodity codes registrants must add the codes
listed below:
* Building Construction Services,New (Includes Maintenance and Repair Services)
* Construction Services, General (Includes Maintenance and Repair Services)
* Construction Services, Heavy(Includes Maintenance and Repair Services)
* Construction Services, Trade (New Construction)
For more information regarding registration instructions, see INSTRUCTIONS TO BIDDERS,
Section 00200, included in the project bid documents viewable on the web site. Questions
regarding electronic bidding should be directed to City Purchasing Officer at
ebids(a),pearlandtx.gov. All Bids submitted electronically will remain confidential until the
opening date and time when they will be opened and read into the public record.
Bids, shall be submitted on the form provided in the E-bid System and submitted electronically
through this system to the City Purchasing Officer, City of Pearland, City Hall Annex located at
3523 Liberty Drive, Pearland, Texas 77581. Electronic bids will be accepted until 2:00 p.m.,
Thursday, May 16 2019. All Bids shall reference the following project information in the
appropriate locations in provided electronic format. All properly submitted bids shall be publicly
"opened" and read aloud into the public record following the closing of the acceptance period for
the construction of:
McHard Road Trunk Sewer and Phase 2 Waterline
Trunk Sewer- Cullen to Garden
Waterline Phase 2 - Cullen to Mykawa
City of Pearland, Texas
COP PN: WW1406/WA1601
BID NO.: 0219-20
A mandatory pre-bid conference will be held at the City of Pearland City Hall Council Chambers
at 3519 Liberty Drive, Pearland, Texas 77581 at 3:00 p.m. on May 02, 2019.
08-2018 00100- 1 of 4
CITY OF PEARLAND INVITATION TO BID
The project will entail the installation of approximately 9,600 LF of 18-inch and 15-inch trunk
sewer from Cullen Rd. to Garden Rd. The sewer line includes several driveway crossings,
manholes, and trenchless construction at existing roadways.
The project also includes Phase 2 of the McHard Rd water line which includes approximately
18,050 LF of 16-inch water line from Cullen Rd. to Mykawa Rd, including gate valves, air valves,
and other appurtenances. The water line.includes a 16-inch pressure reducing valve (PRV) and
vault as well as interconnections to the existing system where distribution lines are crossed. The
water line will be constructed by open cut and trenchless methods where required. Clearing will
be required as necessary for the installation of the proposed water and sewer lines.
Upon award of a contract, the successful Bidder will be required to utilize the City's web based
project management software, "Pro-Trak" for the administration of the construction project,
including but not limited to,all transmittals and material submittals,RFI's,RFC's,Change Orders,
Applications for Payment and all project communications with the City, its Construction Manager
and Engineer. This system has certain hardware, internet access and operation requirements that
form the basis for all project communications,documentation and records for the project.For more
information, see INSTRUCTIONS TO BIDDERS, Section 00200.
Electronic Bid Documents: including Contract Documents, Plans and Technical Specifications
are available for download on the City's Website at: https://pearland.ionwave.net/Login.aspx
upon registration. The documents are NOT viewable without registration. These same documents
may also available at the following locations. •
Amtek Plan Room (281) 376-4577
4001 Sherwood
Houston, TX 77092
The,Associated General Contractors of America, Inc. (713) 334-7100
2400 Augusta, Suite 350
Houston, TX 77057
Virtual Builders Exchange (832) 613-0201
7035 W. Tidwell Building J, Suite 112
Houston, TX 77092
No plan fees or deposits are required for plans and bid documents obtained through the City's E-
bid System. BIDDERS MUST REGISTER AS A SUPPLIER ON THE CITY'S E-BID SYSTEM
IN ORDER TO SUBMIT A BID EVEN IF BID DOCUMENTS ARE OBTAINED VIA ONE OF
THE PLAN HOUSES.
Bidders accept sole responsibility for downloading all of the required documents, plans,
specifications bid forms and addenda required for bidding.
08-2018 00100-2 of 4
CITY OF PEARLAND INVITATION TO BID
No bid may be withdrawn or terminated for a period of ninety (90) days subsequent to the bid
opening date without the consent of the City of Pearland. Unless otherwise expressly provided
herein, all references to "day(s)" shall mean calendar day(s).
Bid Security and Bonds: Bid Security in the form of Cashier's Check, Certified Check, or Bid
Bond payable to the City of Pearland in the amount of 5% of the total base bid price must
accompany each proposal. Bidders submitting bids electronically through the E-bid System shall
scan and up-load a copy of the sealed Bid Bond as an attachment to their bid. Original documents
for Bid Security shall be requested by the City from the lowest two bidders and delivered to
the City's Purchasing Officer within 48 business hours of the Bid Opening. Bid Security shall
be delivered to: Office of City Purchasing, Finance Department, City Hall Annex, 3523 Liberty
Drive, Pearland, Texas 77581.
The successful Bidder must furnish Performance and Payment Bonds as required by Chapter 2253
of the Texas Government Code or other applicable law, as amended, upon the form included in
the Contract Documents, in the amount of one hundred percent(100%) of the contract price, such
bonds to be executed by a corporate surety duly authorized to do business in the State of Texas,
and named in the current list of "Treasury Department Circular No. 570", naming the City of
Pearland, Texas as Obligee. Additionally,the successful bidder shall be required to provide a one
year Maintenance Bond for the improvements installed as part of this work, as provided in the
Special Conditions of Agreement.
Equal Opportunity: All responsible bidders will receive consideration for award of contract
without regard to race, color, religion, sex, or national origin.
The contractor, sub-recipient, or sub-contractor shall not discriminate on the
basis of race, color, national origin, or sex in the performance of this contract.
The contractor shall carry out applicable requirements of 49 CFR Part 26 in the
award and administration of DOT-assisted contracts. Failure by the contractor to
carry out these requirements is a material breach of this agreement, which may
result in the termination of this agreement or such other remedy as the recipient
deems appropriate.
Nondiscrimination: The City, in accordance with Title VI of the Civil Rights Act of 1964, 78
Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Depaitment of
Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-
Assisted programs of the Department of Transportation issued pursuant to such Act, hereby
notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this
advertisement, minority business enterprises will be afforded full opportunity to submit bids in
response to this invitation and will not be discriminated against on the grounds of race, color, or
national origin in consideration for an award.
DBE/SBE Goal: The Disadvantaged Business Enterprise (DBE) goal for this project is 0%. The
Small Business Enterprise (SBE) goal for this project is 0%. DBEs and SBEs selected must be
TxDOT approved. Race neutral participation is encouraged and can be achieved through various
supplier and subcontracting opportunities.
Selection Criteria: The Contract is to be awarded on the basis of Lowest Responsible Bidder.
In identifying this criteria the City will consider: 1) lowest total bid price for all work listed and
08-2018 00100-3 of 4
CITY OF PEARLAND INVITATION TO BID
specifically requested, including but not limited to: Base Bid, Extra Work items and selected
Alternates. The City of Pearland reserves the right to award a contract based on any combination
of the above considered to be in its best interests or to reject any or all bids.
A bid that has been"opened"may not be changed for the purposes of correcting an error in the bid
price.
Young Lorfing, TRMC
City Secretary,
City of Pearland
First Publication date April 24, 2019
Second Publication date May 01, 2019
08-2018 00100-4 of 4
CITY OF PEARLAND INSTRUCTIONS TO BIDDERS
Section 00200
INSTRUCTIONS TO BIDDERS (LRB)
1. Defined Terms
1.1 The term "Owner" hereinafter is defined as the City of Pearland and is used
interchangeably with the term "the City". Both terms are synonymous and refer to the City of
Pearland and may be used inter-changeably.
1.2 The term "Bidder" means one who submits a Bid Proposal directly to Owner, as distinct
from a sub-bidder, who submits a bid to a Bidder. The term "Successful Bidder" means the
Lowest Responsible Bidder to whom the Owner (on the basis of Owner's evaluation as
hereinafter provided) makes an award. The term "Bid Documents" includes the Invitation to
Bidders,Instructions to Bidders, the Bid Proposal, and the proposed Contract Documents (plans
and specifications including all Addenda issued prior to bid opening).
1.3 The term "E-bid System" refers to the City's electronic bidding system. This is a web-
based system (Ion Wave) that provides all Bid Documents electronically to interested parties
(potential Bidders and forms the pathway for Bidders to submit bids in response to The Invitation
to Bid. The term "e-bid" and/ or "electronic bid" means the Bidders' electronic response
submitted on the electronic Bid Proposal with all required attachments to the Owner by way of
the E-bid System. The terms "electronic bid" or "e-bid" are used inter-changeably to describe
the above bid submittal process to submit a bid to the City in response to an Invitation to Bidders.
1.4 The term "Pro-Trak" means the City's web-based contract administration and
construction records management software used by the contracting parties to administer the
project. This system serves as the web accessed centralized project information hub for
communications and document management, pay application processing and record retention
for all project documentation. Operational instructions for accessing this system will be issued
to the successful Bidder at the pre-Construction Meeting.
1.5 All other definitions set out in the Contract Documents are applicable to terms used in
the Bidding Documents.
1.6 Unless otherwise expressly provided herein, all references to "day(s)" shall mean
consecutive calendar day(s).
1.7 The term"Alternate(s)"or"Add Alternate(s)"as used here inter-changeably are defined
as an additive work item that may be selected or rejected by the Owner based on the Owner's
sole acceptance or rejection of the price proposed for this item. Alternate bid prices shall include
all labor, material, equipment and overhead costs to perform the work as specified, complete in
place. When selected by the Owner, the costs for an Alternate work item shall be added to the
Base Bid price and made a part of the Contract price.
2. Registration for E-bid System
2.1 The Owner's E-bid System is accessible via the City's web site at
https://pearland.ionwave.net/Login.aspx. Bid documents can be viewed by simply selecting a
specific project from the BID OPPORTUNITIES list and clicking on that project AFTER
registration as a Supplier. Interested Bidders MUST REGISTER as a "Supplier" by clicking on
08-2018 00200- 1 of 9
CITY OF PEARLAND INSTRUCTIONS TO BIDDERS
the Supplier Registration button and completing the registration form. When prompted to add or
remove commodity codes registrants must add the codes listed below:
* Building Construction Services,New (Includes Maintenance and Repair Services)
* Construction Services, General(Includes Maintenance and Repair Services)
* Construction Services, Heavy (Includes Maintenance and Repair Services)
* Construction Services, Trade (New Construction)
Select the appropriate Time Zone for the Bidder's location and whether that location observes
Daylight Savings time. Complete the registration information providing all required contact
information and establish password security for the E-bid System. Once complete, "suppliers"
will receive emails notifying of future bid opportunities. Downloading any project bid data will
automatically place the bidder's contact information on the list of plan holders and the E-bid
System will automatically send any and all updates, addenda, changes or additional information
associated with that project.
2.2 The electronic Bid Proposal can only be submitted through this system. The form can
be printed for Bidder's use, but the Bid Proposal MUST be submitted on the electronic form
within the E-bid System.
2.3 Questions regarding use of the E-bid System may be directed by email to:
ebids a,pearlandtx.gov.
3. Copies of Bidding Documents
3.1 Complete sets of "electronic" Bidding Documents are available for download to
registered Bidders at No Cost from the City's E-bid System at:
https://pearland.ionwave.net/Login.aspx.Interested Bidders must register as a"Supplier"on this
site in order to receive the Bid Documents, and all Addenda or other notifications of changes,
including communications from the Owner or Engineer. All Bid Documents are available to
download and print.
3.2 The Bidder accepts sole responsibility for ensuring that he obtains a full set of these
documents by completing the registration and executing a full and complete download of the
project documents. Downloading of Bid Documents automatically ensures receipt of any and
all subsequent communications,addenda or additional information from the City or its Engineer.
3.3 Copies of Bidding Documents are available or may be viewed at any of the Plan Houses
listed in the Invitation to Bidders. It is recommended that all interested Bidders,whether bidding
directly to the Owner or Sub-bidders/Vendors providing pricing to a Bidder, register as a
Supplier and download all of the project Bid Documents.
3.4 Complete sets of Bidding Documents must be used in preparing Bid Proposals; neither
Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from
the use of incomplete sets of Bidding Documents including,but not limited to all Addenda issued
prior to bid.
3.5 Owner and Engineer, in making copies of Bidding Documents available on the above
terms, do so only for the purpose of obtaining Bid Proposals on the Work, and do not confer a
license or grant for any other use.
08-2018 00200-2 of 9
CITY OF PEARLAND INSTRUCTIONS TO BIDDERS
4. Qualifications of Bidders
4.1 In determining to whom to award a contract, the City of Pearland may consider, in
addition to the other selection criteria identified in section 16 of these Instructions to Bidders,
the following Qualifications of Bidder, and each Bidder must be prepared to submit within two
(2) days of Owner's request any or all of such Qualifications requested. Failure to provide this
information within the specified time frame may be cause for rejection of the Bid.
1) A brief narrative of previous experience of the Bidder with projects of a similar nature and
scope; specifically including a list of 5 representative projects completed by the Bidder of a
similar nature and scope to the work covered by this proposed Contract..The references for the
projects provided must include the cost of the project, Owner's name,Engineer or prime contact
and telephone number;
2) A list, including owner name and project location, of on-going projects and contracts for
construction of projects of the Bidder which are not yet substantially complete including total
contract value and current percent complete by payment;
3) A list of proposed subcontractors and suppliers for the project being bid and the total value
of work awarded to subcontractors as shown on the Subcontractors List Bid Form;
4) A list of names, address and telephone number of references for other projects completed by
Bidder; and
5)A Financial Statement of Bidder,consisting of the balance sheet and annual income statement
of Bidder for the Bidder's last fiscal year end preceding the submission of the Bid Proposal,
which has been audited or examined by an independent certified public accountant. The
Financial Statement of Bidder shall be used to determine a Bidder's net working capital, which
is defined as current assets less current liabilities. A Bidder's net working capital shall be
considered evidence of the Bidder's ability to provide sufficient financial management of the
project being bid. The Bidder's Financial Statement shall be clearly and conspicuously marked
as "confidential", and shall be deemed and treated as confidential and excepted from the Public
Information disclosure requirements of Texas Government Code Section 552.001 et seq., as
such information, if released, would give advantage to a competitor or bidder, and/or would
cause substantial competitive harm to Bidder.
5. Examination of Contract Documents and Site
5.1 It is the responsibility of each Bidder before submitting a Bid Proposal, to (a) examine
the Bidding Documents thoroughly, (b) visit the site to become familiar with local conditions
that may affect cost,progress,performance or furnishing of the Work, (c) consider federal, state
and local laws and regulations that may affect cost, progress, performance or furnishing of the
Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and
(e) notify Engineer of all conflicts, errors, omissions or discrepancies in the Contract
Documents, (f)to recognize and plan for use of the City's"Pro-Trak" software to administer the
construction process and perform the work of the project.
5.2 Any reports of explorations and tests of conditions at the site which have been utilized
by the Engineer in preparation of the Contract Documents will be made available to Bidders for
review,but such reports are not part of the Contract Documents. Bidder may not and should not
rely upon the accuracy of the data contained in such reports, interpretations or opinions
contained therein, or the completeness thereof, for the purposes of bidding or construction.
08-2018 00200-3 of 9
CITY OF PEARLAND INSTRUCTIONS TO BIDDERS
5.3 Information and data reflected in the Contract Documents with respect to underground
utilities, equipment or other underground facilities at or contiguous to the site is based upon
information and data furnished to Owner and Engineer by owners of such underground facilities
or others, and Owner does not assume responsibility for the accuracy or completeness thereof.
5.4 Before submitting a Bid Proposal, each Bidder will, at Bidder's own expense, make or
obtain any additional examinations,investigations, explorations,tests and studies and obtain any
additional information and data which pertain to the physical conditions (surface, subsurface
and underground facilities) at or contiguous to the site or otherwise which may affect cost,
progress, performance or furnishing of the Work and which Bidder deems necessary to
determine its Bid Proposal prices for performing and furnishing the Work in accordance with
the Contract Time, Contract Price and other terms and conditions of the Contract Documents.
5.5 On request in advance, Owner will provide each prospective Bidder access to the site to
conduct such explorations and tests as each prospective Bidder deems necessary for submission
of a Bid Proposal. Prospective Bidders shall fill all holes, clean up and restore'the site to its
former condition upon completion of such explorations.
5.6 The lands upon which the Work is to be performed, rights-of-way and easements for
access thereto and other lands designated for use by Contractor in performing the Work are
identified in the Contract Documents. All additional lands, access thereto or contractual
arrangements for use by the Contractor required for temporary construction facilities or storage
of materials and equipment are to be provided by Contractor. Easements for permanent
structures or permanent changes in existing structures are to be obtained and paid for by Owner
unless otherwise provided in the Contract Documents.
5.7 The submission of a Bid Proposal will constitute an incontrovertible representation by
Bidder that Bidder has complied with every requirement of this Article 4,that without exception
the Bid Proposal is premised upon performing and furnishing all of the Work required by the
Contract Documents and such means, methods, techniques, sequences or procedures of
construction as may be indicated in, required by or reasonably inferred from the Contract
Documents, and that the Contract Documents are sufficient in scope and detail to indicate and
convey understanding of all terms and conditions for performance and furnishing of the Work.
6. Interpretations and Addenda
6.1 All questions about the meaning or intent of the Contract Documents are to be directed
to Engineer. Interpretations or clarifications considered necessary by Engineer in response to
such questions will be issued by Addenda delivered or transmitted by electronic means to all
registered Bidders in the City's E-bid System. Questions received less than five (5) days prior
to the date for opening of Bid Proposals may not be answered. Only questions answered by
formal written Addenda will be binding. Oral and other interpretations or clarifications will be
without legal effect.
6.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by
Owner or Engineer. Addenda will automatically be made available to all registered Bidders
that have downloaded Bid Documents from the City's E-bid System.
08-2018 00200-4 of 9
CITY OF PEARLAND INSTRUCTIONS TO BIDDERS
7. Bid Security
7.1 Each Bid Proposal must be accompanied by bid security made payable to Owner in
an amount of five percent (5%) of the Bidder's maximum Bid Proposal price, in the form of a
certified check, cashier's check or a Bid Bond("Bid Security").
7.2 Bidders submitting bids through the E-bid System shall scan and up-load a copy of their
Bid Security(sealed Bid Bond,Certified Check or Cashier's Check) as an attachment to their
electronic bid. Original documents for Bid Security shall be requested by the City from the
lowest two bidders and delivered to the City's Purchasing Officer within 48 business hours of
the Bid Opening. Bid Security shall be delivered to: Office of City Purchasing, City Hall Annex,
3523 Liberty Drive, Pearland, Texas 77581.
7.3 The Bid Security of the Successful Bidder will be retained until such time as Bidder has
executed the Standard Form of Agreement,and furnished the required Performance and Payment
Bonds, whereupon the Bid Security of both bidders will be returned. If the Successful Bidder
fails to execute and deliver the Standard Form of Agreement and furnish the required
performance and payment bonds within ten (10) days after the Notice of Award, Owner may
annul the Notice of Award and shall be entitled to make a claim against the Bid Security. The
Bid Security of other Bidders will be retained until the Contract is awarded and the Standard
Form of Agreement becomes effective, or all bids are rejected, whereupon Bid Security
furnished by all such Bidders will be returned.
8. Contract Time
8.1 The number of days in which the Work is to be Substantially Completed, as set forth in
the Bid Proposal form and the Standard Form of Agreement, subject to such extension of time
as may be due under the terms and conditions of the Contract Documents ("Contract Time").
All references to "time" or"days" shall be interpreted as consecutive calendar days.
9. Liquidated Damages and Early Completion Bonus
9.1 Provisions for liquidated damages and early completion bonus, if any, are set forth in the
Standard Form of Agreement.
10. Substitute or "Or-Equal" Items
10.1 The Contract, if awarded, will be on the basis of the specified materials and equipment
described in the Plans and Specifications without consideration of possible substitute or "or-
equal" items unless otherwise stated. Whenever it is indicated in the Plans or specified in the
Specifications that a substitute or "or-equal" item of material or equipment may be furnished or
used by the Contractor if acceptable to Engineer, application for such acceptance will not be
considered by Engineer until after the Agreement becomes effective. All "or-equal" references
shall be interpreted to mean "or Owner approved equal". Any substitution made by the Bidder
upon which the bid is based shall be at the Bidder's sole risk. The procedure for submission of
any such application by Contractor and consideration by Engineer is set forth in the Contract
Documents.
08-2018 00200-5 of 9
CITY OF PEARLAND INSTRUCTIONS TO BIDDERS
11. Bid Form
11.1 The Bid Proposal form (Section 00300 — Bid Proposal) is included with the Bidding
Documents when downloaded. This Document must be printed and signed, as required below,
and then uploaded as an Attachment to the Bid.
11.2 All E-bids must be submitted on the City's official E-bid System Bid Proposal document.
All blanks on the Bid Proposal form must be completed or filled in. The Bidder shall bid all
Alternates, if any. Incomplete Bid Proposals may be cause for rejection.
11.3 Bid Proposals by corporations must be executed in the corporate name by the president
or a vice-president(or other corporate officer accompanied be evidence of authority to sign)and
the corporate seal must be affixed and attested by the secretary or an assistant secretary. The
corporate address and state of incorporation must be shown below the signature. Once executed
the document is to be uploaded as an attachment to the Bid.
11.4 Bid Proposals by partnerships must be executed in the partnership name and signed by a
general partner, whose title must appear under the signature, and if a corporate general partner,
executed as required above for corporations and the official address of the partnership must be
shown below the signature. All names must be typed or printed below the signature. Once
executed the document is to be uploaded as an attachment to the Bid.
11.5 The Bidder shall acknowledge receipt of all Addenda (the number of which must be
filled in on the Bid Proposal form). Failure to do so could be cause for rejection of the Bid.
11.6 The address and telephone number for communications regarding the Bid Proposal must
be shown on the Bid Proposal form.
12. Submission of Bid Proposals
12.1 The place, date and/or time designated for opening Bid Proposals may be changed in
accordance with applicable laws, codes and ordinances. Any such changes to the Bid Schedule
shall be made by Addenda.
12.2 Electronic Bids shall be submitted per the requirements, instructions, terms and
conditions as stated in the registration and submittal instructions of the City's E-bid System
electronic bidding software. All Bidders utilizing this system MUST register as a potential
supplier, (Bidder). E-Bids are submitted directly via the City's Web based system located at
https://pearland.ionwave.net/Login.aspx.
12.3 Bid Proposals submitted after the bid date and time will be rejected.
13. Modification and Withdrawal of Bid Proposals
13.1 Prior to submission, E-bid Bid Proposals may be modified or withdrawn without
prejudice.
13.2 Once submitted, Bid Proposals may only be modified by an appropriate document duly
executed (in the manner that a Bid Proposal must be executed) and delivered to Office of City
Purchasing, City Hall Annex, 3523 Liberty Drive, Pearland, Texas 77581 and submitted any
time prior to the opening of Bid Proposals.
•
08-2018 00200-6 of 9
CITY OF PEARLAND INSTRUCTIONS TO BIDDERS
13.3 A Bidder may not modify or withdraw its Bid Proposal by facsimile or verbal means. A
withdrawn Bid Proposal may be resubmitted prior to the designated time for opening Bid
Proposals. No bid may be withdrawn or terminated for a period of one hundred fifty(150) days
subsequent to the bid opening date without the consent of the City of Pearland.
13.4 If,within twenty-four(24)hours after Bid Proposals are opened, any Bidder files a duly
signed, written notice with Owner and promptly thereafter demonstrates to the reasonable
satisfaction of Owner that there was a material mistake in the preparation of its Bid Proposal,
that Bidder may request to withdraw its Bid Proposal and the bid security may be returned or, at
the discretion of the Owner, Owner may make a claim against the bid security. Thereafter, that
Bidder will be disqualified from further bidding on the Project to be provided under the Contract
Documents.
13.5 Bid securities for unsuccessful Bidders will be returned to bidders once a successful
Bidder has be identified and notified of the Owner's intent to award a contract
14. Opening of Bid Proposals
14.1 Bid Proposals will be opened and(unless obviously non-responsive)read aloud publicly.
An abstract of the amounts of the base Bid Proposals and major alternates (if any)will be made
available to Bidders after the opening of Bid Proposals through E-Bid. Bid Proposals, in their
entirety, shall be open for public inspection after the contract is awarded, with the exception of
any trade secrets or confidential information contained therein, provided Bidder has expressly
identified any specific information contained therein as being trade secrets or confidential
information.
15. Bid Proposals to Remain Subject to Acceptance
15.1 All Bid Proposals will remain subject to acceptance for one hundred fifty (150) days
after the day of the Bid Proposal opening,but Owner may, in its sole discretion,release any Bid
Proposal and return the bid security prior to that date.
16. Award of Contract
16.1 Owner reserves the right to reject any and all Bid Proposals, to waive any and all
informalities not involving price, time or changes in the Work and to negotiate contract terms
with the Successful Bidder. Owner may reject a bid as non-responsive if: 1) Bidder fails to
provide required Bid Security; 2) Bidder improperly or illegibly completes or fails to complete
all information required by the Bidding Documents; 3) Bidder fails to sign the Bid Proposal or
improperly signs the Bid Proposal; 4) Bidder qualifies its Bid Proposal; 5) Bidder tardily or
otherwise improperly submits its Bid Proposal; 6) Bidder fails to submit the Qualifications of
Bidder as required under section 4 of these Instructions to Bidders; or 7) Bid Proposal is
otherwise non-responsive. Contracts are awarded on the basis of the Lowest Responsible
Bidder.
16.2 The Bidder agrees to submit to the Owner the Qualifications of Bidder, including the
Financial Statement of bidder, if requested to do so. As required by the Instructions to Bidders
and as a condition of Bid acceptability, the Contractor hereby agrees:
08-2018 00200-7 of 9
CITY OF PEARLAND INSTRUCTIONS TO BIDDERS
1. That the City, as Owner and Contract Administrator, retains the right to review
and approve the Contractor's and all Subcontractors' qualifications to perform
the Work of the Contract and to reject any Subcontractor not meeting the City's
standards, as outlined in the General Conditions, or TxDOT's and FHWA
qualifications for performing the Work.
16.3 Lowest Responsible Bidder. In determining Lowest Responsible Bidder, Owner will
consider: Lowest Total Bid price for all work including Base Bid, Extra Work, Add Alternates
and Cash Allowances, if any, and any other cost criteria. Additional evaluation criteria may
include: the Qualifications of the Bidders, whether or not the Bid Proposals comply with the
prescribed requirements, and such alternates,unit prices and other data, as may be requested in
the Bid Proposal form or prior to the Notice of Award. Discrepancies in the multiplication of
units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between
the indicated sum of any column of figures and the correct sum thereof will be resolved in favor
of the correct sum.
16.4 A contract to be awarded to the Lowest Responsible Bidder may be let on either a lump
sum basis or a unit cost basis dependent on the Bid Proposal format.
16.5 Acceptance of any and all bids maybe conditioned on compliance with the requirement
for attendance of the mandatory pre-bid meeting.
16.6 In either case, Owner may conduct such investigations as Owner deems necessary to
assist in the evaluation of any Bid Proposal and to establish the responsibility,qualifications and
financial ability of Bidders, proposed Subcontractors, suppliers and other persons and
organizations to perform and furnish the Work in accordance with the Contract Documents, to
Owner's satisfaction, within the Contract Time.
16.7 Each Bidder agrees to waive any claim it has or may have against the Owner, the
Professional/Engineer, and their respective employees, arising out of or in connection with the
administration, evaluation, or recommendation of any bid.
17. Contract Security
17.1 When the Successful Bidder delivers the executed Standard Form of Agreement to
Owner, it must be accompanied by the Performance, Payment, Maintenance and Surface
Correction Bonds required by the Contract Documents. Bonds may be on the forms provided
herein or an equal form containing no substantive changes, as determined by Owner.
18. Signing of Agreement
18.1 When Owner gives a Notice of Award to the Successful Bidder, it will be accompanied
by the required number of unsigned counterparts of the Standard Form of Agreement, and the
required Performance and Payment Bond forms. Within ten (10) days thereafter Contractor
shall sign and deliver the required number of counterparts of the Standard Form of Agreement
to Owner with the required Bonds. Within ten (10) days thereafter, Owner shall deliver one
fully signed counterpart to Contractor. There shall be no contract or agreement between Owner
and the Successful Bidder until proper execution and attestation of the Standard Form of
Agreement by authorized representatives of the Owner.
08-2018 00200-8 of 9
CITY OF PEARLAND INSTRUCTIONS TO BIDDERS
19. Pre-bid Conference
19.1 A pre-bid conference will be held as indicated in the Invitation to Bid.
20. Retainage
20.1 Provisions concerning retainage are set forth in the Contract Documents.
END OF SECTION
08-2018 00200-9 of 9
CITY OF PEARLAND BID PROPOSAL
Section 00300
BID PROPOSAL
Lowest Responsible Bid
Date: May 16, 2019
Bid of Reddico Construction Co., Inc. , an individual proprietorship/a
corporation organized and existing under the laws of the State of Texas/a partnership consisting
of , for the construction of:
McHard Road Trunk Sewer and Phase 2 Waterline
Trunk Sewer-Cullen to Garden
Phase 2 Waterline - Cullen to Mykawa
City of Pearland, Texas
COP PN: WW1406/WA1601
BID NO.: 0219-20
(Submitted in Electronic format)
To: The Honorable Mayor and City Council of Pearland
City of Pearland
3519 Liberty Drive
Pearland, Texas 77581
Pursuant to the published Invitation to Bidders, and Instructions to Bidders, the undersigned
Bidder hereby proposes to perform all the work and furnish all necessary superintendence, labor,
machinery, equipment, tools and materials, and whatever else may be necessary to complete all
the work described in or reasonably inferable from the Contract Documents for the construction of
the McHard Road Trunk Sewer and Phase 2 Waterline with all related appurtenances,
complete, tested, and operational, in accordance with the Plans and Specifications prepared by
Engineering Firm, Freese and Nichols, Inc., Jared Barber, P.E., 11200 Broadway Street, Suite
2320, Pearland, TX 77584, for the unit prices or applicable prices set forth in Exhibit "A,,, the
electronic bid form as contained in the City's E-bid system, which, once fully executed and
submitted shall constitute a legal and executable proposal from the Bidder. It is understood that,
in the event any changes are ordered on any part of the Work, the applicable unit prices bid shall
apply as additions to or deductions from the total prices for the parts of the Work so changed.
The Bid Security required under the Instructions to Bidders is included and has been uploaded as
an attachment within the E-bid system and, that a fully executed, signed and sealed hard copy has
been delivered to the Office of City Purchasing, Finance Department, City Hall Annex 3523
Liberty Drive, Pearland, Texas 77581.
The Bidder agrees to submit to the Owner the Qualifications of Bidder, including the Financial
Statement of Bidder, as required by the Instructions to Bidders if requested to do so as a condition
of the Bid process.
The Bidder binds himself, upon acceptance of his proposal, to execute the Standard Form of
Agreement and furnish an acceptable Performance and Payment Bond and Maintenance Bond,
each in the amount of one hundred percent (100%) of the total Contract Price, according to the
forms included in the Contract Documents, for performing and completing the said work within
Bidder's Initial's:
10-2017 00300
CITY OF PEARLAND BID PROPOSAL
the time stated and for the prices stated in Exhibit A of this proposal along with all required
insurance in the required amounts.
The undersigned Bidder agrees to commence work within 10 days of the date of a written Notice
to Proceed. It is understood that the Work is to be Substantially Complete within from Cullen Rd
to Stone Rd in 150 calendar days and the full project in 360 calendar days after the date of the
Notice to Proceed. Time for Substantial Completion shall begin on the date established by the
Notice to Proceed. The Contractor will pay liquidated damages in the amount(s) specified in
Section 00500 — Standard Form of Agreement, in the event the Work is not Substantially
Complete within the Contract Time.
The undersigned agrees that the amounts bid in this Bid Proposal will not be withdrawn or
modified for ninety (90) days following date of Bid Proposal opening, or such longer period as
may be agreed to in writing by the City of Pearland and Bidder.
It is understood that in the event the Successful Bidder fails to enter into the Standard Form of
Agreement and/or to furnish an acceptable Performance and Payment Bond and Maintenance
Bond, each in the amount of one hundred (100) percent of the Contract Price, along with all
required insurance in the stated amounts within ten (10) days of the Notice of Award, the
Successful Bidder will forfeit the Bid Security as provided in the Instructions to Bidders.
Unless otherwise expressly provided herein, all references to "day(s)„ shall mean calendar day(s).
The Bidder acknowledges that the following Addenda have been received. The modifications to
the Bidding Documents noted therein have been considered and all costs thereto are included in
the Bid Proposal prices.
Addendum No.: 1 Date: 5/9/19 Addendum No.: Date:
Addendum No.: Date: Addendum No.: Date:
Bidder hereby represents that the only person or parties interested in this offer as principals are
those named. Bidder has not directly or indirectly entered into any agreement, participated in any
collusion, or otherwise taken any action in restraint of free competitive bidding.
Firm Name: Reddico Construction Co., Inc.
By:
Title: J. Ryan Redd-President
Address: 10083 Airport Road
Phone No: (936) 441-9500
ATTEST:
Terri Bock- Secretary (Seal, if Bidder is a Corporation)
(Typed or Printed Name)
Signature
Date: May 16, 2019
Bidder's Initial's: /
10-2017 00300-2 of 3
CITY OF PEARLAND BID PROPOSAL
END OF SECTION
Bidder's Initial's:
10-2017 00300-3 of 3
CITY OFPEARLAND BID PROPOSAL
MCHARD ROAD TRUNK SEWER AND PHASE 2 WATERLINE BID FORM
Item No. Quantity Unit Description/Price in words Spec Reference Unit Price Total
TASK A:TRUNK SEWER
1.01 1 L5 MOBILIZATION(MAX 3%OF TASK A) 01505 $53,000 $53,000.00
1.02 3,000 IF 18-INCH SANITARY SEWER PIPE(OPEN CUT)(>18'TO 20'DEEP) 02530 $86.00 $258,000.00
1.03 1,230 IF 18-INCH SANITARY SEWER PIPE(OPEN CUT)(>20'TO 22'DEEP) 02530 $129.00 $158,670.00
1.04 900 LF 18-INCH SANITARY SEWER PIPE(OPEN CUT)(>22'TO 24'DEEP) 02530 $ 141.00 $126,900.00
1.05 530 LF 18-INCH SANITARY SEWER PIPE(OPEN CUT)(>24'TO 26'DEEP) 02530 $188.00 $99,640.00
1.06 94 LF 18-INCH SANITARY SEWER PIPE(TRENCHLESS) 02313 $ 221.00 $20 774.00
1.07 1,870 LF 15-INCH SANITARY SEWER PIPE(OPEN CUT)(>10'TO 12'DEEP) 02530 $41.00• $76,670.00
1.08 1,180 LF 15-INCH SANITARY SEWER PIPE(OPEN CUT)(>12'T014'DEEP) 02530 $44.00 $51,920.00
1.09 430 LF 15-INCH SANITARY SEWER PIPE(OPEN CUT)(>14'T016'DEEP) 02530 $52.00• $22,360.00
1.10 260 IF 15-INCH SANITARY SEWER PIPE(OPEN CUT)(>16'TO 18'DEEP) 02530 $59.00 $15,340.00
1.11 141 LF 15-INCH SANITARY SEWER PIPE(TRENCHLESS) 02313 $163.00 $22,983.00
1.12 255 LF 12-INCH SANITARY SEWER PIPE(OPEN CUT)(>8'TO 10'DEEP) 02530 $54.00 $13,770.00
1.13 129 LF 12-INCH SANITARY SEWER PIPE(OPEN CUT)(>10'TO 12'DEEP) 02530 $55.00 $7,095.00
1.14 129 LF 12-INCH SANITARY SEWER PIPE(OPEN CUT)(>18'TO 20'DEEP) 02530 $ 124.00 $15,996.00
1.15 300 LF 8-INCH SANITARY SEWER PIPE(OPEN CUT)(>8'TO 10'DEEP) 02530 $44.00• $13,200.00
1.16 28 EA 5-FOOT DIAMETER SANITARY SEWER MANHOLE(LINED)(UP TO 8'DEEP) 1 02542 $5 500.00 $154,000.00
1.17 267 VF 5-FOOT DIAMETER SANITARY SEWER MANHOLE(LINED)(EXTRA DEPTH OVER 8') 02542 $440.00 $117,480.00
1.18 1 EA TIE NEW 18-INCH PIPE INTO EXISTING 5-FOOT DIA.SANITARY SEWER MANHOLE 02530 $ 564.00 $564.00
1.19 47 SY REMOVE AND REPLACE EXISTING GRAVEL DRIVEWAY 02220 $44.00 $2,068.00
1.20 1,590 SY REMOVE AND REPLACE EXISTING ASPHALT DRIVEWAY(INCL.BASE MATERIAL) 02220 $83.00 $131,970.00
1.21 10,353 LF TRENCH SAFETY SYSTEM(UTILITIES) 01570 $3.00 $31,059.00
1.22 10,353 LF CONTROL OF GROUND WATER(OPEN EXCAVATION)(WELL POINTING)AS AUTHORIZED BY 01564
THE ENGINEER $.10 $1,035.30
1.23 1 LS SITE PREPARATION(INCLUDING CLEARING AND GRUBBING) 02200 $367,000.04 367,000.00
1.24 9 AC SITE RESTORATION(HYDRO-MULCH SEEDING) 02921 $1,000.00 $9,000.00
TASK A SUBTOTAL: 5 1,770,494.30
08/2017 00300-A 1
CITY OF PEARLAND BID PROPOSAL
TASK B:16-INCH WATER LINE
1.25 1 LS MOBILIZATION(MAX 3%OF TASK B) 01505 $ 69,000.00$ 68,000.00
126 1 LS TRAFFIC CONTROL®ULATION INCL.FLAGGERS 01555 $110,000.00$110,000.00
1.27 1 LS SWPPP PREPARATION,IMPLEMENTATION&MAINTENANCE 01566 $ 86,000.00$86,000,00
1.28 15,472 LF 16-INCH WATER LINE(OPEN CUT) 02510 $55.00 $850,960.00
1.29 580 IF 16-INCH WATER UNE(TRENCHLESS IN 24-INCH STEEL CASING) 02417 $275.00 $159,500.00
1.30 2,011 LF 16-INCH WATER UNE(TRENCHLESS) 02510 $137.00 $275,507.00
1.31 75 LF 16-INCH WATER LINE(OPEN CUTIN 24-INCH STEEL CASING) 02510 $ 253.00 $18,975.00
1.32 31 LF 8-INCH WATER LINE(OPEN CUT) 02510 $45.00 $1,395.00
1.33 278 LF 8-INCH WATER LINE(OPEN CUT IN 16-INCH STEEL CASING) 02510 $ 105.00 $29 190.00
1.34 18 EA 16-INCH GATE VALVE 02541 $6,500.00 $117,000.00
1.35 4 EA 8-INCH GATE VALVE 02541 $ 1,200.00 $4 800.00
1.36 15 EA STANDARD FIRE HYDRANT ASSEMBLY,INCL.LEAD&6-INCH GATE VALVE 02514 $4,900.00 $73,500.00
1.37 3 EA ALTERNATE FIRE HYDRANT ASSEMBLY,INCL.LEAD&6-INCH GATE VALVE 02514 $ 5,500.00 $16,500.00
1.38 11 EA 2-INCH COMBINATION AIR RELEASE/VACUUM VALVE AND VAULT 02541 $3,700.00 $40,700.00
1.39 2 EA TIE NEW 16-INCH WATER UNE TO EXISTING 16-INCH WATER LINE 02510 $ 1,700.00 $3,400.00
1.40 4 EA TIE NEW 16-INCH WATER UNE TO EXISTING 12-INCH WATER LINE Z1 02510 $12,000.00 $48,000.00
1.41 1 LS 124NCH PRV,INCL.PRECAST CONCRETE VAULT,BYPASS PIPING,&VALVES 11280 $81,000.00$81,000.00
1.42 424 SY REMOVE AND REPLACE EXISTING ASPHALT DRIVEWAY(INCL.BASE MATERIAL) 02220 $84.00 $35,616.00
1.43 15,856 IF TRENCH SAFETY SYSTEM(UTILITIES) 01570 $2.00 $31,712.00
1.44 15,856 CONTROL Of GROUND WATER(OPEN EXCAVATION)(WELL POINTING)AS AUTHORIZED BY 01564
THE ENGINEER $.10 $1,585.60
1.45 1 LS SITE PREPARATION(INCLUDING CLEARING AND GRUBBING) 02200 $245,000.0%245 000.00
1.46 18 AC SITE RESTORATION(HYDRO-MULCH SEEDING) 02921 $1,000.00 $18,000.00
TASK B SUBTOTAL: $2,317,340.60
CASH ALLOWANCE BID ITEMS Q
Item No. quantity Unit Description/Price In words Spec Reference Unit Price Total
2.01 1 LS BRACE OVERHEAD POWER POLES
$10,000 $10,000
CASH ALLOWANCE BID SUBTOTAL $10,000
08/2017 00300-A2
CITY OFPEARLAND BID PROPOSAL
SUPPLEMENTAL BID ITEMS
Item No. Quantity Unit Description/Price In words Spec Reference Unit Price Total
3.01 300 MAN HR. EXTRA WORK-LABOR(UNSKILLED) 00700 $15.00• $4,500.00
3.02 300 MAN HR. EXTRA WORK-LABOR(SKILLED) 00700 $ 18.00 $5,400.00
3.03 500 CY EXTRA WORK-MACHINE EXCAVATION 00700 $4.00 $2,000.00
3.04 500 CY EXTRA WORK-CEMENT STABILIZED SAND 02252 $28.00 $14,000.00
3.05 3,500 SY EXTRA WORK-ASPHALT PAVEMENT REPAIR 02980 $18.00 563,000.00
3.06 50 EA EXTRA WORK-DUCTILE IRON FITTINGS,ALL CLASSES AND SIZES,IN PLACE 02634 $ 300.00 $15,000.00
3.07 300 LF EXTRA WORK-ADDITIONAL DITCH GRADING 02316 $4.00 $1,200.00
3.08 3 AC EXTRA WORK-SITE RESTORATION(HYDRO-MULCH SEEDING) 02921 $ 1,500.00 $4,500.00
3.09 500 CV EXTRA WORK-ADDITIONAL BASE MATERIAL COMPACTED IN PLACE 02255 $45.00 $22,500.00
3.10 1,000 LF EXTRA WORK-TEMPORARY FENCING 01500 $ 2.25 $2,250.00
3.11 4 EA PROJECT SIGNS ON SKIDS f� 01580 $1,200.00 $4,800.00
3.12 500 CY EXTRA WORK-CRUSHED CONCRETE OR CRUSHED STONE / \ 00700 $550.00 5 25,000.00
SUPPLEMENTAL BID SUBTOTAL $164,150.00
TOTAL AMOUNT BID: $4,261,984.90
ALTERNATE BID ITEMS
Item No. Quantity Unit Description/PrIce In words Spec Reference
Unit Price Total
4.01 855 LF ADD/DEDUCT FOR INSTALUNG 18-INCH SANITARY SEWER BY TRENCHLESS CONSTRUCTION, J��\02313 �-�
TO BE ADDED TO/DEDUCTED FROM BID ITEM 1.02(STA 27+40 TO STA 35+95) Q$187.00 $159,885.00
4.02 1,230 LF ADD/DEDUCT FOR INSTALLING 18-INCH SANITARY SEWER BY TRENCHLESS CONSTRUCTION, 02313 1 216.00
TO BE ADDED TO/DEDUCTED FROM BID ITEM 1.03 $ $265,680.00
4.03 900 LF ADD/DEDUCT FOR INSTALLING 18-INCH SANITARY SEWER BY TRENCHLESS CONSTRUCTION, 02313266.00 239 400,00
TO BE ADDED TO/DEDUCTED FROM BID ITEM 1.04 $ $ ,
ADD/DEDUCT FOR INSTALLING 18-INCH SANITARY SEWER BY TRENCHLESS CONSTRUCTION,
4.04 530 LF 02313
TO BE ADDED TO/DEDUCTED FROM BID ITEM 1.05 1 $400.00 $212000.00
ALTERNATE BID SUBTOTAL $876,965.00
08/2017 00300-A3
CITY OF PEARLAND STANDARD FORM OF AGREEMENT
Section 00500
STANDARD FORM OF AGREEMENT
THIS AGREEMENT is by and between City of Pearland(hereinafter called OWNER or City) and
Reddico Construction Company, Inc., (hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth,
agree as follows:
Article 1. WORK
CONTRACTOR shall complete all work as specified or indicated in or reasonably inferable
from the Contract Documents (hereinafter the "Work"). The Work is generally described as
follows:
McHard Road Trunk Sewer and Phase 2 Waterline
Trunk Sewer-Cullen to Garden
Phase 2 Waterline-Cullen to Mykawa
City of Pearland,Texas
COP PN: WW1406/WA1601
BID NO.: 0219-20
Article 2. ENGINEER
The Work has been designed by Freese and Nichols, Inc., Jared Barber, P.E., 11200
Broadway Street, Suite 2320,Pearland,TX 77584 who is hereinafter called ENGINEER and
who is to assume all duties and responsibilities and have the rights and authority assigned to
ENGINEER in the Contract Documents in connection with completion of the Work in
accordance with the Contract Documents.
Article 3. CONTRACT TIME
3.1" The Work will be Substantially Complete (as defined in Article 1 of the General
Conditions) within 360 calendar days (including weekends and holidays) from the
date when the Contract Time commences to run as provided in paragraph 5.01 of the
General Conditions (as revised in the Special Conditions if applicable), and
completed and ready for Final Payment within 390 calendar days from the date when
the Contract Time commences to run. No work will be allowed on Sundays.
32 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is
not completed within the times specified in paragraph 3.1 above,plus any extensions
thereof allowed in accordance with Article 5 of the General Conditions. OWNER
and CONTRACTOR also recognize the delays, expense, and difficulties involved in
proving in a legal or arbitration preceding the actual loss suffered by OWNER if the
Work is not completed on time. Accordingly, instead of requiring any such proof,
OWNER and CONTRACTOR agree that as liquidated damages for delay (but not
as a penalty) CONTRACTOR shall pay OWNER one thousand
4-2015 00500- 1 of 7
CITY OF PEARLAND STANDARD FORM OF AGREEMENT
dollars $1,000.00 for each day that expires after the time specified in paragraph 3.1
for Substantial Completion until the Work is substantially complete. After
Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete
the remaining Work within the time set out in the Certificate of Substantial
Completion or any proper extension thereof granted by OWNER, CONTRACTOR
shall pay OWNER one thousand dollars $1,000.00 for each day that expires after the
time specified in the Certificate of Substantial Completion for completion and
readiness for Final Payment.
33 Inspection Time. Working hours for the Pearland Inspection personnel are from 7:30
a.m. to 4:30 p.m., Monday through Friday, excluding City approved holidays. The
Contractor shall notify the OWNER of any required inspection overtime work at least
48 hours in advance and shall pay the overtime wages for the required City
inspections.
Article 4. CONTRACT PRICE
4.1 OWNER shall pay CONTRACTOR for completion of the Work in strict accordance
with the Contract Documents in current funds $5,138,949.90 (the "Contract Price").
The Contract Price includes the Base Bid $4,261,984.90 as shown in Document
00300 —Bid Proposal.
Article 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with Section 6.0
"Measurement and Payment" of the General Conditions. Application for Payment will be
processed by ENGINEER as provided in the General Conditions.
5.1 Progress Payments. OWNER shall make progress payments on account of the
Contract Price on the basis of CONTRACTOR's Application for Payment as
recommended by ENGINEER as provided below. All progress payments will be on
the basis of the progress of the Work and actual quantity of Work completed, in
accordance with Article 6 "Measurement and Payment" of the General Conditions.
5.1.1 Prior to Substantial Completion, progress payments will be made in an
amount equal to the percentage or actual quantity of Work complete, but, in
each case, less the aggregate of payments previously made and less such
amounts as ENGINEER shall determine, or OWNER may withhold, in
accordance with the General Conditions. The OWNER shall make payment
within 30 days of receipt of application for payment by the ENGINEER.
5.12 Each progress payment shall be less retainage as specified in Paragraph 6.06
of the General Conditions, and further less all previous payments and all
further sums that may be retained by the OWNER under the terms of this
Agreement. It is understood,however,that in case the whole work be near to
completion and some unexpected and unusual delay occurs due to no fault or
neglect on the part of the CONTRACTOR, the OWNER may upon
4-2015 00500-2 of 7
CITY OF PEARLAND STANDARD FORM OF AGREEMENT
written recommendation of the ENGINEER pay a reasonable and equitable
portion of the retained percentage to the CONTRACTOR, or the
CONTRACTOR at the OWNER's option, may be relieved of the obligation
to fully complete the Work and,thereupon,the CONTRACTOR shall receive
payment of the balance due him under the contract subject only to the
conditions stated under"Final Payment."
5.2 Final Payment. Upon final completion and acceptance of the Work in accordance
with paragraph 6.09 of the General Conditions, OWNER shall pay the remainder of
the Contract Price as recommended by ENGINEER as provided in said paragraph
6.09.
Article 6. INTEREST
Interest on any overdue payment from OWNER to CONTRACTOR shall be paid in
accordance with the provisions of Chapter 2251.025 of the Texas Government Code, as
amended.
Article 7. CONTRACTOR'S REPRESENTATIONS
In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
following representations:
7.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract
Documents, Work, site, locality, and all local conditions and Laws and Regulations
that in any manner may affect cost,progress,performance,or furnishing of the Work.
72 CONTRACTOR has studied carefully all available surveys, assessments, reports of
explorations, investigations, and tests of subsurface conditions and drawings of
physical conditions of the site. Such technical reports and drawings are not Contract
Documents, and Owner makes no representations or warranties as to the accuracy of
such documents or information, or to whether or not they are complete,
comprehensive, or all-inclusive.
73 CONTRACTOR has obtained and carefully studied (or assumes responsibility for
obtaining and carefully studying)all such examinations,investigations,explorations,
tests, reports, and studies (in addition to or to supplement those referred to in
paragraphs 7.2 above) which pertain to the subsurface or physical conditions at or
contiguous to the site or otherwise may affect the cost, progress, performance or
furnishing of the Work, and CONTRACTOR assumes the risk of such subsurface
and physical conditions, and shall furnish the Work at the Contract Price, within the
Contract Time and in accordance with the other terms and conditions of the Contract
Documents; and no additional examinations, investigations, explorations, tests,
reports, and studies or similar information or data are or will be required by
CONTRACTOR for such purposes.
7.4 CONTRACTOR has reviewed and checked all information and data shown or
indicated on the Contract documents with respect to existing underground facilities
4-2015 00500-3 of 7
CITY OF PEARLAND STANDARD FORM OF AGREEMENT
at or contiguous to the site and assumes responsibility for the accurate location of
said underground facilities.No additional examinations,investigations,explorations,
tests, reports, studies or similar information or data in respect of said underground
facilities are or will be required by CONTRACTOR in order to perform and finish
the Work at the Contract Price,within the Contract Time and in accordance with the
other terms and conditions of the Contract Documents.
75 CONTRACTOR has correlated the results of all such observations, examinations,
investigations, explorations, tests, reports, and studies with the terms and conditions
of the Contract Documents.
7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or
discrepancies in the Contract Documents of which Contractor knew or should have
known, and CONTRACTOR shall perform the Work at the Contract Price, within
the Contract Time and in accordance with the other terms and conditions of the
Contract Documents, including any written resolution of any such conflict, error or
discrepancy by ENGINEER. In the event of a conflict that was not brought to the
OWNER's or ENGINEER's attention prior to the bid, the CONTRACTOR is
assumed to have bid the most expensive alternative.
Article 8. CONTRACT DOCUMENTS
The Contract Documents, which comprise the entire agreement between OWNER and
CONTRACTOR concerning the Work, consist of the following, each of which are
incorporated herein by reference:
8.1 Standard Form of Agreement(Section 00500).
8.2 Performance, Payment, and/or Maintenance Bonds (Sections 00610, 00611, and
00612).
8.3 General Conditions of Agreement (Section 00700), including Attachment No. 1
Workers' Compensation Insurance Coverage,Attachment No.2 Agreement for Final
Payment and Contractor's Sworn Release, and Attachment No. 3 Owner's Insurance
Requirements of Contractor.
8.4 Special Conditions of Agreement(Section 00800).
8.5 Plans, consisting of sheets numbered 1 through 51 inclusive with attachments with
each sheet bearing the following general title: McHard Road Trunk Sewer and Phase
2 Waterline.
8.6 Instructions to Bidders and CONTRACTOR's Bid Proposal, including any Addenda
referenced therein.
8.7 Technical Specifications for the Work.
4-2015 00500-4 of 7
CITY OF PEARLAND STANDARD FORM OF AGREEMENT
8.8 The following, which may be delivered or issued after this Agreement becomes
effective: Any Change Orders or other documents amending, modifying, or
supplementing the Contract Documents in accordance with the General Conditions.
There are no Contract Documents other than those listed above in this Article 8. The
Contract Documents may only be amended, modified or supplemented as provided in the
General Conditions.
Article 9. MISCELLANEOUS
9.1 Terms used in this Agreement which are defined in Section 1, "Definitions and
Interpretations" of the General Conditions will have the meanings indicated in the
General Conditions.
92 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of
the party sought to be bound; and specifically but without limitation moneys that
may become due and moneys that are due may not be assigned without such
consent(except to the extent that the effect of this restriction may be limited by
law), and unless specifically stated to the contrary in any written consent to an
assignment,no assignment will release or discharge the assignor from any duty or
responsibility under the Contract Documents.
93 OWNER and CONTRACTOR each binds itself, its partners, successors,assigns and
legal representative to the other party hereto, its partners, successors, assigns and
legal representatives in respect of all covenants, agreements and obligations
contained in the Contract Documents.
9.4 CONTRACTOR agrees to warranty the Work for a period of one (1) year from
Substantial Completion against defects in materials and workmanship.
CONTRACTOR agrees to repair or replace any defective work within this warranty
period immediately unless such repairs require long lead time materials and
equipment in which case CONTRACTOR shall provide an agreeable schedule for
repairs at no additional cost to OWNER.
95 The Work will be completed according to the Contract Documents and in accordance
with codes, ordinances, and construction standards of the City of Pearland, and all
applicable laws, codes and regulations of governmental authorities.
9.6 In the event any notice period required under the Contract Documents is found to be
shorter than any minimum period prescribed by applicable law, the notice period
required shall be construed to be the minimum period prescribed by applicable law.
9.7 This Contract and the Contract Documents, insofar as they relate in any part or in any
way to the Work undertaken therein, constitute the entire agreement between the
parties hereto, and it is expressly understood and agreed that there are no agreements
or promises by and between said parties, except as aforesaid, and that any additions
thereto or changes shall be in writing.
4-2015 00500-5 of 7
CITY OF PEARLAND STANDARD FORM OF AGREEMENT
9.8 The provisions of this Contract shall be applied and interpreted in a manner
consistent with each other so as to carry out the purposes and the intent of the parties,
but if for any reason any provision is unenforceable or invalid, such provisions shall
be deemed severed from this Contract and the remaining provisions shall be carried
out with the same force and effect as if the severed provision had not been part of
this Contract.
9.9 The headings of the paragraphs are included solely for the convenience of reference
and if there is any conflict between the headings and the text of this Contract, the
Contract text shall control.
9.10 The waiver of any breach hereof shall not constitute a waiver of any subsequent
breach of the same or any other provision hereof. Failure by the OWNER in any
instance to insist upon observance or performance by CONTRACTOR shall not be
deemed a waiver by CONTRACTOR of any such observance or performance. No
waiver will be binding upon OWNER unless in writing and then will be for the
particular instance only. Payment of any sum by OWNER to CONTRACTOR with
knowledge of any breach or default will not be deemed a waiver of such breach or
default or any other breach or default.
9.11 The CONTRACTOR acknowledges that the OWNER(through its employee
handbook)considers the following to be misconduct that is grounds for termination
of an employee of the OWNER: Any fraud, forgery, misappropriation of funds,
receiving payment for services not performed or for hours not worked,mishandling
or untruthful reporting of money transactions, destruction of assets, embezzlement,
accepting materials of value from vendors, or consultants, and/or collecting
reimbursement of expenses made for the benefit of the OWNER. The
CONTRACTOR agrees that it will not, directly or indirectly; cause an employee of
the OWNER to engage in such misconduct.
9.12 The CONTRACTOR agrees to comply with Appendix A(attached) of the City of
Pearland's Title VI Nondiscrimination Plan Assurances.
4-2015 00500-6 of 7
CITY OF PEARLAND STANDARD FORM OF AGREEMENT
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in
duplicate. One counterpart each has been delivered to OWNER and one to CONTRACTOR.
This Agreement will be effective upon execution and attestation by authorized representatives of
the City of Pearland and upon the following date: June 24 , 2019.
OWNER: CONTRACTOR:
CITY OF PEARLAND REDDICO CONSTRUCTION CO., INC.
By: l� 11ti By: WA° 14
Name: e.IY4 rest5On Name: J. Ryan Redd
Title: City fAKtri- Title: President
Date: SJ,k.t VP Date:
(Corporate Seal)
ATTEST: ATTEST: i C�—
Terri Bock, Secretary
Address for giving notices
10083 Airport Road
Conroe, Texas 77303
Phone: 936-539-6500
Fax: 936-760-3846
Agent for service of process:
J. Ryan Redd
END OF SECTION
4-2015 00500-7of7
CITY OF PEARLAND PERFORMANCE BOND
Section 00610
PERFORMANCE BOND
BOND NO. 70176415
STATE OF TEXAS §
COUNTY OF BRAZORIA §
KNOW ALL MEN BY THESE PRESENTS: That Reddico Construction Company, Inc., of the
City of Conroe, County of Montgomery, and State of Texas, as principal, and
The Guarantee Company of North * authorized under the laws of the State of Texas to act
as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee
(Owner), in the penal sum of$5,138,949.90 for the payment whereof, the said Principal and Surety
bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and
severally,by these presents: *America USA
WHEREAS,the Principal has entered into a certain written contract with the Owner, effective as of
the 24th day of June , 2019, (the "Contract") to commence and complete the
construction of certain improvements described as follows:
McHard Road Trunk Sewer and Phase 2 Waterline
Trunk Sewer-Cullen to Garden
Waterline Phase 2 -Cullen to Mykawa
City of Pearland,Texas
COP PN: WW1406/WA1601
BID NO.: 0219-20
which Contract,including the Contract Documents as defined therein,is hereby referred to and made
a part hereof as fully and to the same extent as if copied at length herein.
NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said
Principal shall faithfully perform said Contract Work and shall in all respects duly and faithfully
observe and perform all and singular the covenants, conditions, and agreements in and by said
Contract agreed and covenanted by the Principal to be observed and performed, and according to
the true intent and meaning of said Contract and Contract Documents, then this obligation shall be
void; otherwise to remain in full force and effect;
PROVIDED,HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253 of
the Texas Government Code as amended and all liabilities on this bond shall be determined in
accordance with the provisions of said Statute to the same extent as if it were copied at length herein.
Surety, for value received, stipulates and agrees that no change, extension of time, alteration or
addition to the terms of the contract, or to the Work performed thereunder, or the plans,
specifications, or drawings accompanying the same, shall in any way affect its obligation on this
bond, and it does hereby waive notice of any such change, extension of time, alteration or addition
to the terms of the Contract, or to the Work to be performed thereunder.
12/2007 00610- 1 of 2
CITY OF PEARLAND PERFORMANCE BOND
IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument
this 24th day of June , 2019.
Principal: Surety:
Reddico Construction Company, Inc. The Guarantee /.'any of North America USA
By. , --41111M By: k:/I ;
Name: 1. Ryan Redd Name: Steven W Berry
Title: President Title: Attorney-In-Fact
Address: Address:
10083 Airport Road One Towne Square, Suite 1470
Conroe, Texas 77303 Southfield, Michigan 48076
Telephone: 936-441-9500 Telephone: 936-372-2477
Fax: 936-760-3846 Fax: 936-372-2437
NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE
OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS
DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE
NUMBER; 1-800-252-3439.
END OF SECTION
12/2007 00610-2 of 2
THE The Guarantee Company of North America USA
*GUARANTEE®
Southfield, Michigan
POWER OF ATTORNEY
NOW ALL BY THESE PRESENTS:That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the
laws of the State of Michigan,having its principal office in Southfield,Michigan,does hereby constitute and appoint
Richard D.Bright,Nancy T.Berry,Steven W Berry,Kimberly J.Smith,Marla Gentry
INSURICA TX Insurance Services,Inc.
its true and lawful attorney(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of
indemnity and other writings obligatory in the nature thereof,which are or may be allowed,required or permitted by law,statute,rule,regulation,contract or
otherwise.
The execution of such instrument(s)in pursuance of these presents,shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA
as fully and amply,to all intents and purposes,as if the same had been duly executed and acknowledged by its regularly elected officers at the principal
office.
The Power of Attorney is executed and may be certified so,and may be revoked,pursuant to and by authority of Article IX, Section 9.03 of the By-Laws
adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31"day of December,2003.
The President,or any Vice President,acting with any Secretary or Assistant Secretary,shall have power and authority:
1. To appoint Attorney(s)-in-fact,and to authorize them to execute on behalf of the Company,and attach the Seal of the Company thereto, bonds and
undertakings,contracts of indemnity and other writings obligatory in the nature thereof;and
2. To revoke,at any time,any such Attorney-in-fact and revoke the authority given,except as provided below
3. In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and authority hereby given to the
Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts
required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation
making payment of the final estimate to the Contractor and/or its assignee,shall not relieve this surety company of any of its obligations under its bond.
4. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the
Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner—Department
of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation.
Further,this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting
duly called and held on the 6th day of December 2011,of which the following is a true excerpt:
RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification
thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and
such signature and seal when so used shall have the same force and effect as though manually affixed.
IN WITNESS WHEREOF,THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and
/ ""°).
)` its corporate seal to be affixed by its authorized officer,this 2nd day of October,2015.
/ THE GUARANTEE COMPANY OF NORTH AMERICA USA
E" a/4 6%ar-Kui_
STATE OF MICHIGAN Stephen C.Ruschak,President&Chief Operating Officer Randall Musselman,Secretary
County of Oakland
On this 2nd day of October,2015 before me came the individuals who executed the preceding instrument,to me personally known,and being by me duly
sworn, said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said
instrument is the Corporate Seal of said Company;that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of said
Company.
Cynthia A. Takai IN WITNESS WHEREOF,I have hereunto set my hand at The Guarantee
Notary Public, State of Michigan Company of North America USA offices the day and year above written.
County of Oakland �1
My Commission Expires February 27,2024 /! t-r-cc/ a• T �
Acting in Oakland County
I,Randall Musselman,Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA,do hereby certify that the above and foregoing is a true
and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA,which is still in full force and effect.
,roTie IN WITNESS WHEREOF, I have thereunto set my hand and attached the seal of said Company this 24th day of June 2019.
4fY
Randall Musselman,Secretary
CITY OF PEARLAND PAYMENT BOND
Section 00611
PAYMENT BOND
BOND NO. 70176415
STATE OF TEXAS §
COUNTY OF BRAZORIA §
KNOW ALL MEN BY THESE PRESENTS: That Reddico Construction Company, Inc., of the
City of Conroe, County of Montgomery, and State of Texas, as principal, and
The Guarantee Company of North * authorized under the laws of the State of Texas to act
as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee
(Owner), in the penal sum of$5,138,949.90 for the payment whereof, the said Principal and Surety
bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and
severally,by these presents: *America USA r.
WHEREAS,the Principal has entered into a certain written contract with the Owner, effective as of
the 24th day of June , 2019, (the "Contract") to commence and complete the
construction of certain improvements described as follows:
McHard Road Trunk Sewer and Phase 2 Waterline
Trunk Sewer-Cullen to Garden
Waterline Phase 2 -Cullen to Mykawa
City of Pearland,Texas
COP PN:WW1406/WA1601
BID NO.: 0219-20
which Contract,including the Contract Documents as defined therein,is hereby referred to and made
a part hereof as fully and to the same extent as if copied at length herein.
NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said
Principal shall pay all claimants supplying labor or material to him or a subcontractor in the
prosecution of the Work provided for in said Contract,then,this obligation shall be void; otherwise
to remain in full force and effect;
PROVIDED,HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253 of
the Texas Government Code as amended and all liabilities on this bond shall be determined in
accordance with the provisions of said Statute to the same extent as if it were copied at length herein.
Surety, for value received, stipulates and agrees that no change, extension of time, alteration or
addition to the terms of the contract, or to the Work performed thereunder, or the plans,
specifications, or drawings accompanying the same, shall in any way affect its obligation on this •
bond, and it does hereby waive notice of any such change, extension of time, alteration or addition
to the terms of the Contract, or to the Work to be performed thereunder.
07/2006 00611 - 1 of 2
CITY OF PEARLAND PAYMENT BOND
IN WITNESS WHEREOF,the said Principal and Surety have signed and sealed this instrument
this 24th day of June , 2019.
Principal: Surety:
Reddico Construction Company, Inc. The Guaran - Company of Nor h America USA
1111ra- B ' ����A
VZi
Name: J. Ryan Redd Name: Steven W Berry
Attorney-In-Fact
Title: Pr,2sicif nt Title:
Address: Address:
10083 Airport Road One Towne Square, Suite 1470
Conroe, Texas 77303 Southfield, Michigan 48076
Telephone: 936-441-9500 Telephone: 936-372-2477
Fax: 936-760-3846 Fax: 936-372-2437
NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE
OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS
DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE
NUMBER; 1-800-252-3439.
END OF SECTION
07/2006 00611 -2 of 2
111111 rt1Eo The Guarantee Company of North America USA
GUARANTEE. Southfield, Michigan
POWER OF ATTORNEY
NOW ALL BY THESE PRESENTS: That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the
laws of the State of Michigan,having its principal office in Southfield,Michigan,does hereby constitute and appoint
Richard D.Bright,Nancy T.Berry,Steven W Berry,Kimberly J.Smith,Marla Gentry
INSURICA TX Insurance Services,Inc.
its true and lawful attorney(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of
indemnity and other writings obligatory in the nature thereof,which are or may be allowed,required or permitted by law,statute,rule,regulation,contract or
otherwise.
The execution of such instrument(s)in pursuance of these presents,shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA
as fully and amply,to all intents and purposes,as if the same had been duly executed and acknowledged by its regularly elected officers at the principal
office.
The Power of Attorney is executed and may be certified so,and may be revoked,pursuant to and by authority of Article IX, Section 9.03 of the By-Laws
adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31st day of December,2003.
The President,or any Vice President,acting with any Secretary or Assistant Secretary,shall have power and authority:
1. To appoint Attorney(s)-in-fact,and to authorize them to execute on behalf of the Company,and attach the Seal of the Company thereto, bonds and
undertakings,contracts of indemnity and other writings obligatory in the nature thereof;and
2. To revoke,at any time,any such Attorney-in-fact and revoke the authority given,except as provided below
3. In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and authority hereby given to the
Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts
required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation
making payment of the final estimate to the Contractor and/or its assignee,shall not relieve this surety company of any of its obligations under its bond.
4. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the
Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner—Department
of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation.
Further,this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting
duly called and held on the 6th day of December 2011,of which the following is a true excerpt:
RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification
thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and
such signature and seal when so used shall have the same force and effect as though manually affixed.
IN WITNESS WHEREOF,THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and
ce„r., t its corporate seal to be affixed by its authorized officer,this 2nd day of October,2015.
I et\ THE GUARANTEE COMPANYJOF N/ORTH AMERICA USA
mai
STATE OF MICHIGAN Stephen C.Ruschak,PresidentVf &Chief Operating Officer Randall Musselman,Secretary
County of Oakland
On this 2nd day of October,2015 before me came the individuals who executed the preceding instrument,to me personally known,and being by me duly
sworn, said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said
instrument is the Corporate Seal of said Company;that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of said
Company.
Cynthia A. Takai IN WITNESS WHEREOF,I have hereunto set my hand at The Guarantee
Notary Public, State of Michigan Company of North America USA offices the day and year above written.
a- . County of Oakland /! �1
s My Commission Expires February 27,2024 y cam/ a• -u -v
Acting in Oakland County
I, Randall Musselman,Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA,do hereby certify that the above and foregoing is a true
and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA,which is still in full force and effect.
.M"'teot.j IN WITNESS WHEREOF,I have thereunto set my hand and attached the seal of said Company this 24111 day of June 2019.
e 0
Randall Musselman,Secretary
CITY OF PEARLAND ONE-YEAR MAINTENANCE BOND
Section 00612
ONE-YEAR MAINTENANCE BOND
BOND NO. 70176415
STATE OF TEXAS §
COUNTY OF BRAZORIA §
KNOW ALL MEN BY THESE PRESENTS: That Reddico Construction Company, Inc., of the
City of Conroe, County of Montgomery, and State of Texas, as principal, and
The Guarantee Company of North * authorized under the laws of the State of Texas to act
as surety on bonds for principals, are held and firmly bound unto City of Pearland as Obligee
(Owner), in the penal sum of$5,138,949.90 for the payment whereof, the said Principal and Surety
bind themselves, and their heirs, administrators, executors, successors, and assigns, jointly and
severally,by these presents: *America USA
WHEREAS,the Principal has entered into a certain written contract with the Owner, effective as of
the 24th day of June , 2019, (the "Contract") to commence and complete the
construction of certain improvements described as follows:
McHard Road Trunk Sewer and Phase 2 Waterline
Trunk Sewer- Cullen to Garden
Waterline Phase 2 -Cullen to Mykawa
City of Pearland,Texas
COP PN: WW1406/WA1601
BID NO.: 0219-20
which Contract is hereby referred to and made a part hereof as fully and to the same extent as if
copied at length herein.
NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said
Principal shall faithfully correct all such work not in accordance with the Contract Documents
discovered within the one-year period from the date of substantial completion, then this obligation
shall be void; otherwise to remain in full force and effect;
PROVIDED,HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253 of
the Texas Government Code as amended and all liabilities on this bond shall be determined in
accordance with the provisions of said Statute to the same extent as if it were copied at length herein.
Surety, for value received, stipulates and agrees that no change, extension of time, alteration or
addition to the terms of the contract, or to the work performed thereunder, or the plans,
specifications, or drawings accompanying the same, shall in any way affect its obligation on this
bond, and it does hereby waive notice of any such change, extension of time, alteration or addition
to the terms of the contract, or to the work to be performed thereunder.
07/2006 00612- 1 of 2
CITY OF PEARLAND ONE-YEAR MAINTENANCE BOND
IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument
this 24th day of June , 2019.
Principal: Surety:
Reddico Construction Company, Inc. The Guarantee "ompany of North America USA
By: By:
Name: J. Ryan Redd Name: teven W Berry
Title: President Title: Attorney-In-Fact
Address: Address:
10083 Airport Road One Towne Square, Suite 1470
Conroe. Texas 77303 Southfield, Michigan 48076
Telephone: 936-441-9500 Telephone: 936-372-2477
Fax: 936-760-3846 Fax: 936-372-2437
NOTICE: THE ADDRESS OF THE SURETY COMPANY TO WHICH ANY NOTICE
OF CLAIM SHOULD BE SENT MAY BE OBTAINED FROM THE TEXAS
DEPARTMENT OF INSURANCE BY CALLING ITS TOLL-FREE TELEPHONE
NUMBER; 1-800-252-3439.
END OF SECTION
07/2006 00612 -2 of 2
%, THE The Guarantee Company of North America USA
�t J,%;� GUARANTEE Southfield, Michigan
POWER OF ATTORNEY
NOW ALL BY THESE PRESENTS:That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the
laws of the State of Michigan,having its principal office in Southfield,Michigan,does hereby constitute and appoint
Richard D.Bright,Nancy T.Berry,Steven W Berry,Kimberly J.Smith,Marla Gentry
INSURICA TX Insurance Services,Inc.
-its true and lawful attorney(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of
indemnity and other writings obligatory in the nature thereof,which are or may be allowed,required or permitted by law,statute,rule,regulation,contract or
otherwise.
The execution of such instrument(s)in pursuance of these presents,shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA
as fully and amply,to all intents and purposes,as if the same had been duly executed and acknowledged by its regularly elected officers at the principal
office.
The Power of Attorney is executed and may be certified so,and may be revoked,pursuant to and by authority of Article IX,Section 9.03 of the By-Laws
adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31st day of December,2003.
The President,or any Vice President,acting with any Secretary or Assistant Secretary,shall have power and authority:
1. To appoint Attorney(s)-in-fact,and to authorize them to execute on behalf of the Company,and attach the Seal of the Company thereto, bonds and
undertakings,contracts of indemnity and other writings obligatory in the nature thereof;and
2. To revoke,at any time,any such Attorney-in-fact and revoke the authority given,except as provided below
3. In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and authority hereby given to the
Attorney-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts
required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation
making payment of the final estimate to the Contractor and/or its assignee,shall not relieve this surety company of any of its obligations under its bond.
4. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the
Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner—Department
of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation.
Further,this Power of Attomey is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting
duly called and held on the 6th day of December 2011,of which the following is a true excerpt:
RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification
thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and
such signature and seal when so used shall have the same force and effect as though manually affixed.
IN WITNESS WHEREOF,THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and
G,rar $4,TEecoits corporate seal to be affixed by its authorized officer,this 2nd day of October,2015.
? I:9 11 THE GUARANTEE COMPANY OF NORTH AMERICA USA
STATE OF MICHIGAN Stephen C.Ruschak,President&Chief Operating Officer Randall Musselman,Secretary
County of Oakland
On this 2nd day of October,2015 before me came the individuals who executed the preceding instrument,to me personally known,and being by me duly
sworn, said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said
instrument is the Corporate Seal of said Company;that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of said
Company.
: �• .•^,4� Cynthia A. Takai IN WITNESS WHEREOF,I have hereunto set my hand at The Guarantee
;• ,;r; .. _ Notary Public,State of Michigan Company of North America USA offices the day and year above written.
_;1.:1:10 ;=�„' County of Oakland /! •
�1
4`..xv. :•:;--V My Commission Expires February 27,2024 �-�/ � a cc IrGu�
"' Acting in Oakland County
I,Randall Musselman,Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA,do hereby_certify that the _above and foregoing is a true
and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA-USA,which is'still in full force and effect.
oJra�'Tco�A IN WITNESS WHEREOF, I have thereunto set my hand and attached the seal of said Company this 24th day of June 2019.
*il;
y°gTpAM£s\Op ` ,
Randall Musselman,Secretary
wr .THE The Guarantee Company of North America USA
GUARANTEE One Towne Square, Suite 1470
Southfield, Michigan 48076
Phone: 248-281-0281 Fax: 248-750-0431
Texas Consumer Notice
1 IMPORTANT NOTICE AVISO IMPORTANTE
To obtain information or make a complaint: Para obtener informacion o para someter una q ueja:
2 You may contact your agent at: Puede comunicarse con su agent al
3 You may call The Guarantee Company of North America Usted puede Ilamar al numero de telefono gratis de
USA's toll-free telephone number for information or to make a The Guarantee Company of North America USA's
complaint at: 1-866-328-0567 para informacion o para someter una queja al:
1-866-328-0567
4 You may also write to The Guarantee Company of North Usted tambien puede escribir a to The Guarantee
America USA at: Company of North America USA:
One Towne Square, Suite 1470 One Towne Square, Suite 1470
Southfield, Michigan 48076 Southfield, Michigan 48076
Web:www.gcna.com Web:www.gcna.com
E-mail: Info@gcna.com E-mail: Info@gcna.com
Fax: 248-750-0431 Fax: 248-750-0431
5 You may contact the Texas Department of Insurance to Puede comunicarse con el Departamento de
obtain information on companies, coverages, rights or Seguros de Texas para obtener informacion acerca
complaints at: 1-800-252-3439 de companias, coberturas, derechos o quejas al: 1 -
800-252-3439
•
6 You may write the Texas Department of Insurance: Puede escribir al Departamento de Seguros de
P.O. Box 149104 Texas:
Austin, TX 78714-91 04 P.O. Box 149104
Fax: (512)475-1771 Austin, TX 78714-91 04
Web: httq://www.tdi.state.tx.us Fax: (512)475-1771
E-mail: ConsumerProtection@tdi.state.tx. us Web: http://www.tdi.state.tx.us
E-mail: ConsumerProtection@tdi.state.tx. us
7 PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS 0 RECLAMOS:
Should you have a dispute concerning your premium or about a Si tiene una disputa concerniente a su prima o a un
claim you should contact the(agent) (company) (agent or the reclamo, debe comunicarse con el (agente) (la
company)first. If the dispute is not resolved, you may contact compania) (agente o la compania) primero. Si no se
the Texas Department of Insurance. resuelve la disputa, puede entonces comunicarse
con el departamento(TD I).
8 ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLIZA: Este aviso es solo
This notice is for information only and does not become a part para proposito de informacion y no se convierte en
or condition of the attached document. parte o condicion del documento adj unto.
CS0083
Texas Consumer Notice 07/12/12
REDDCONO3C BMEYER
AC-ORO" DATE(MMIDD/YYYY)
CERTIFICATE OF LIABILITY INSURANCE 7/8/2019
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject'to the terms and conditions of the policy,certain policies may require an endorsement A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER • NAME CT Brenda Meyer,CIC,CISR
INSURICA TX Insurance Services,Inc.
19450 State Highway 249 Suite 550 (A/CNNo,Ext):(713)934-2013 jA/C,No):(866)652-9382
Houston,TX 77070 AIMDRESS:Brenda.Meyer@INSURICA.COM
INSURER(S)AFFORDING COVERAGE NAIC B
INSURER A:National Trust Insurance Company 20141
INSURED INSURER B:FCCI Insurance Company 10178
Reddico Construction Company,Inc. INSURER C:Texas Mutual Insurance Company 22945
10083 Airport Road INSURER D:Hanover Insurance Company 22292
Conroe,TX 77303 INSURER E:Westchester Fire Insurance Company 10030
INSURER F:
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS
LTR INSD WVD (MMIDD/YYYYI (MM/DD/YYYY)
A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000
CLAIMS-MADE X OCCUR CPP100030115-01 10/1/2018 10/1/2019 DAMAGE TO RENTED 100,000
PREMISES(Ea occurrence) $
X Contractual LiabilitMED EXP(Any one person) s 10'000
PERSONAL&ADV INJURY $ 1,000,000
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000
POLICY X jECT X LOC PRODUCTS-COMP/OPAGG $ 2,000,000
OTHER: $
AUTOMOBILE LIABILITY (Ea
SINGLE LIMIT 1,000,000
(Ea accident) $
X ANY AUTO CA10000638202 10/1/2018 10/1/2019 BODILY INJURY(Per person) $ _
OWNED SCHEDULED
AUTOS ONLY AUTOS BODILY INJURY(Per accident) $
HIRED NON-OWNED PROPERTY
eOPE dentDAMAGE
AUTOS ONLY AUTOS ONLY
$
B X UMBRELLA UAB X OCCUR EACH OCCURRENCE _ $ 5,000,000
EXCESS UAB CLAIMS-MADE UMB100017648-02 10/1/2018 10/1/2019 AGGREGATE 5 5,000,000
DED X RETENTION$ 10,000
C WORKERS COMPENSATIONXOTH-
AND EMPLOYERS'LIABILITY STATUTE ER
1,000,000
ANY PROPRIETOR/PARTNER/EXECUTIVE Y/N 0001276752 10/1/2018 10/1/2019 E.L.EACH ACCIDENT $
OFFICER/MEMBER EXCLUDED? N N/A
(Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000
If yes,describe under 1,000,000
DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $
D Equipment IHD A413275 04 10/1/2018 10/1/2019 Leased/Rented 300,000
E Pollution G7153876A 001 6/25/2019 10/1/2020 Occurrence 1,000,000
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if mores ce is required)
Re: McHard Road Trunk Sewer and Phase 2 Waterline Cullen to Garden Phase 2 Waterline-Cyilen to Mykawas City of Pearland Texas
Certificate Holders Include City of Pearland and Freese and Niholes,Inc
30 Day Notice of Cancellation is provided
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
Cityof Pearland THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
3519 Liberty Dr
Pearland,TX 77581
-I AUTHORIZED REPRESENTATIVE
ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
AGENCY CUSTOMER ID:REDDCONO3C BMEYER
�."11 LOC#: 1
ACORD ADDITIONAL REMARKS SCHEDULE
Page 1 of 1
3ENCY NAMED INSURED
INSURICA TX Insurance Services,Inc. Reddico Construction Company,Inc.
10083 Airport Road
POLICY NUMBER Conroe,TX 77303
SEE PAGE 1
CARRIER NAIC CODE
SEE PAGE 1 SEE P 1 EFFECTIVE DATE:SEE PAGE 1
ADDITIONAL REMARKS
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
FORM NUMBER: ACORD 25 FORM TITLE: Certificate of Liability Insurance
Page 2 of 2
GENERAL LIABILITY: Additional Insured—Owners,Lessees or Contractors-Automatic Status when required by contract or
agreement-Ongoing Operations and Products-Completed Operations in favor of Any Person or Organization which is required in a
written agreement per form CGL121 0413 and CG2037 0413,Additional Insured Primary/Non-Contributory Coverage When Required
By Contract CG2001 0413,Blanket Waiver of Subrogation when required by contract per form CGL088 1015.
AUTO: Blanket Waiver of Subrogation in favor of Any Person or Organization required in a written agreement per CAU058 0115 and
Blanket Additional Insured as required by written contract per form CAU 042 0115.
WC:Blanket Waiver of Subrogation per form WC 420304B.
Umbrella Follows form.
Pollution: Additional Insured and primary non-contributory when required by written contract per forms ENV3226 ed 10/08 and
ENV3225 ed 10/08.,ENV3100 ed 04/04 and ENV3101 ed 08/04 Waiver of Subrogation when required by written contract per forms
ENV3143 ed 03/05
$1,000,000 Occurrence
,$2,000,000 Aggregate
ACORD 101 (2008/01) ©2008 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
IL 060 (07 13)
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
BLANKET NOTIFICATION TO OTHERS OF CANCELLATION
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
BUSINESS AUTO PHYSICAL DAMAGE COVERAGE FORM
BUSINESSOWNERS COVERAGE FORM
COMMERCIAL CRIME COVERAGE FORM
COMMERCIAL GENERAL LIABILITY COVERAGE PART
COMMERCIAL INLAND MARINE COVERAGE PART
COMMERCIAL LIABILITY UMBRELLA COVERAGE FORM
COMMERCIAL OUTPUT POLICY
COMMERCIAL PROPERTY COVERAGE PART
FARM COVERAGE PART
FARM UMBRELLA COVERAGE FORM
GARAGE COVERAGE FORM
LIQUOR LIABILITY COVERAGE PART
PRODUCT WITHDRAWAL COVERAGE PART
PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART
If we cancel this policy for any statutorily permitted reason other than nonpayment of premium we will
mail notice of cancellation to any person or organization to whom you have agreed in a written contract
that notice of cancellation of this policy will be given, but only if:
1. You send us a written request to provide such notice, including the name and address of such
person or organization, after the first Named Insured shown in the Declarations receives notice
from us of the cancellation of this policy; and,
2. We receive such written request at least 45 days before the effective date of cancellation.
We will mail such notice at least 30 days before the effective date of the cancellation.
Irrespective of any of the provisions above, nothing herein is intended to vest any right in the person or
organization to be given notice, and said person or organization shall have no rights under this policy if
he/it does not receive notice per this endorsement.
IL 060(07 13) Copyright 2013 FOCI Insurance Group. Page 1 of 1
Insured Copy
POLICY NUMBER:CPP100030115-01 COMMERCIAL GENERAL LIABILITY
CGL 121 (0413)
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED OWNERS, LESSEES OR CONTRACTORS -
AUTOMATIC STATUS WHEN REQUIRED IN CONTRACT OR AGREEMENT
ONGOING OPERATIONS AND PRODUCTS-COMPLETED OPERATIONS
(TEXAS LIMITED SOLE NEGLIGENCE)
This endorsement modifies Insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE.FORM
SCHEDULE(OPTIONAL)
Name of Additional Insured Persons or Organizations
•
(As required by written contract or agreement per Paragraph A.below.)
Locations of Covered Operations
(As per the written contract or agreement,provided the location is Within the"coverage territory".)
(Information required to complete this Schedule, if not shown above,will be shown in the Declarations.)
A. Section II—Who Is An Insured Is amended to indlude as an additional insured:
1. Any person or organization for whom you are performing operations when you and such person or
organization have agreed In writing in a contract or agreement in effect during the term of this policy that
such per-son of-organization be added as an additional insimed On your policy;and
2. Any other person or organization you are required to add as an additional insured under the contract or
agreement described in Paragraph 1.above;and
3. The particular person or organization,If any, scheduled above.
CGL 121 (04 13)Includes copyrighted Materiel of the Insurance Services Office;Inc.,with its permission. Page 1 of 3
Copyright 2013 FCCI Insdrance Group.
Moored Copy
II
•
Such person(s)or organization(s)is an additional insured only with respect to liability for"bodily injury", ,,'
"property damage"or"personal and advertising Injury"occurring after the execution of the contract or
agreement described In Paragraph 1.above and caused,in whole or in part, by:
a. Your acts or omissions;or
b. The acts or omissions of those acting on-your behalf;
In the performance of your ongoing operations for the additional Insured;or -
c. "Your.work"performed for the additional insured and Included in,the"products-completed operations
hazard"If such coverage is specifically required'in the written contract or agreement.
With respect to liability of the additional Insured.for"bodily Injury"Of ah employee or agent of a named Insured
or the employee of a named insured's subcontractor,coverage shall apply for the partial or sole negligence of
the additional insured,but only if such coverage is specifically required in the written contract or agreement.
However,the insurance afforded to such additional Insured(s)described.above:
a. Only applies to the extent permitted by law; •
b. Will not be broader-than that which you are required by the contract or agreement to provide for such
additional insured;
c. Will not be broader than that which is afforded to you under this policy;and
d. Nothing herein shall extend the term of this policy.
B. The Insurance provided to the additional insured does not apply to"bodily injury",."property damage"or
"personal and advertising Injury'arising out of the rendering of, orthe failure to render,any professional
•
architectural, engineering or surveying services,including:
1. The preparing,,approving,orfalling,to prepare or approve, maps,shop drawings,opinions,reports;
surveys,field orders,change orders or drawings and specifications;or
2. .Supervisory,'inspection architectural or engineering activities.
This insurance is excess over any other valid and collectible Insurance available to the additional insured
whether on a primary,excess,contingent or any other basis;unless the written contract or agreement
requires that.this insurance be primary and non-contributory,.In which case this insurance will be primary and
non-contributory relative to Insurance on which the additional insured Is a Named insured.
D. With respect to the insurance afforded to these additional insureds,the following is added to Section III—
Limits of Insurance:
The most we will pay on behalf of the additional insured Is the amount Of insurance:
1. Required by the contract or agreement described in Paragraph A.1:;or
2. Available under the applicable Limits of Insurance shown In the Declarations;
whichever Is less.
This endorsement shall not increase the applicable Limits of insurance_shown in the Declarations.
.E. Section IV-Commercial General Liability Conditions Is amended as follows:
The Duties in'The Event of Occurrence,Offense,Claim or Suit condition is amended to add the following
additional conditions applicable to the additional insured:
CGL,•121 (04 13) Includes copyrighted material of the Insurance SeNices Office,Inc.,with Its permission. Page 2 of 3
Copyright 2013 FCCI Insurande'Group,
Insured Copy
• An additional insured under this endorsement mustas soon as.practicable:
1. Give us written notice of an"occurrence"or an offense which may result in a claim or"suit"under this
1 insurance, and of any claim or"suit"that does result;
2. Send us copies of all legal papers received Inconnection with the claim or"suit",cooperate with us in the
Investigation or settlement Of the claim or defense against the"suit",and otherwise comply with all policy
conditions;and
3. Tender the defense and indemnity of any claim.or"suit"to eny provider of other Insurance which would.
:cover the additional insured for a loss we cover under this endorsement and agree to make available all.
such other Insurance. However,this condition doesnot affect Paragraph C.above.
We have no duty to defend or indemnify an additional insured under this endorsement until we receive from.
the additional Insured written notice of a claim or"suit".
F. This endorsement does not apply to any additional Insured or protect that Is specifically Identified in any other
additional Insured endorsement attached to the Commercial General Liability Coverage Form.
CGL 121(04 13) Includes Copyrighted material of the.Insurance Services Office;inc.,with Its permisslon. Page 3 of 3
Copyright 2013 FCC Insurance.Group. j
lnourod Copy
POLICY NUMBER: CPP100030115-01 COMMERCIAL AUTOMOBILE
CAU 042(01 15)
it
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY,
ADDITIONAL INSURED
DESIGNATED PERSON OR ORGANIZATION
PRIMARY/NON-CONTRIBUTORY COVERAGE
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
This endorsement Is subject to the terms;conditions,exclusions and any other provisions of the BUSINESS
AUTO COVERAGE FORM or any endorsement attached thereto unless changes or additions are Indicated
below.
For the purpose of this endorsement,Section II.A. 1.Who Is An insured is amended by adding the following:
1. Any person or organization designated In the schedule below is an"insured"for Liability Coverage but
only to the extent that person or organization qualifies as an"Insured"under the Who is An Insured
Provision,contained In Section II of the Coverage Form.
2. This Insurance Is primary and non-contributory to other coverages of the person or organization shown In
the Schedule when so required In a written contract or agreement that is executed prior to'the loss for
which coverage Is sought.
SCHEDULE
Name of Person or Organization:
1
CAU042(01 15) Includes copyrighted material of the Insurance Services Office,Inc.,with Its permission. Page 1 of
Copyright 2013 FCCI Insurance Group.
1
•
•
B. With respect to:the Insurance afforded,to these 1. Required by the contractor agreement,or
additional insureds; the following. Is added to • 2. Available .under .the.. applicable Limits of
Section III-Limits Of Insurance: Insurance shown In the Declarations;
If coverage provided to the additional.Insured Is whichever:is Tess; •
required by.a contract or agreement,the most we This endorsement shall not increase the applicable ,
will pay on behalf of the additional Insured Is the Limits of Insurance shown in the Declarations.
amount of.Insurance:
•
•
•
•
•
•
•
•
•
1 �
Page 2 of 2 AP150 Properties, Inc.; 200.4
CO 20 37 0413 CI
Insured Copy
�II
k,--
•
Policy Number:;CPP100030115-01
. COMMERCIAL GENERAL LIABILITY
CG 200104/3
THIS ENDORSEMENT.CHANGES THE POLICY PLEASE }
READ IT CAREFULLY.
. :PRI MARY AND NONCONTRIBUTORY .
OTHER INSURANCE CONDITION
This endorsement.modifies Insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
PRODUCTS/COMPLETED.OPERATIONS LIABILITY COVERAGE PART
The following,;is added: to• the Other Insurance (2) You have agreed In writing in.a contract or
Condition and supersedes any provision to the • agreement that this Insurance would be
contrary primary and would not seek contribution
Primary And Noncontributory Insurance from any other insurance available to, the
additional insured.
This insurance is primary to and will not seek
contribution from any other Insurance available,
to an •additional insured under your .policy
provided that:
(1) The additional Insured is a Named Insured
-under such other insurance;and •
• •
•
•CG 20 0104.13 ©Insurance Services.Office, Inc.,2012, Page 1 of:1
Insured Copy
COMMERCIAL GENERAL LIABILITY
Policy Number: CPP100030115-01 CGL 088(01 15)
THIS ENDORSEMENT CHANGES THE POLICY.PLEASE READ IT CAREFULLY.
FIRST CHOICE CONTRACTORS LIABILITY ENDORSEMENT
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE FORM,
NOTE:The following are additions,replacements and amendments to the Commercial General Liability Coverage
Form,and will apply unless excluded by separate endorsements)to the Commercial General Liability Coverage Form.
The COMMERCIAL GENERAL LIABILITY COVERAGE FORM is amended as follows:
SECTION I-COVERAGES,COVERAGE A.BODILY INJURY AND PROPERTY DAMAGE Is amended as follows:
1. Extended"Property Damage"
Exclusion 2:a.,Expected or Intended Injury,is replaced with the following:
a. "Bodily injury"or"property damage"expected or intended from the standpoint of the Insured.This
exclusion does not apply to"bodily Injury'or"property damage"resulting from the use of reasonable
force to protect persons or property.
2: Non-owned Watercraft
Exclusion 2.g. (2)(a)is replaced with the follovving:
(a) Less than 51 feet long;and
3. Property Damage Liability—Borrowed Equipment
The following Is added to Exclusion 2.J.(4):
Paragraph(4)of this exclusion does not apply to"property damage"to borrowed,.equipment while at a
jobsite and not being used to perform operations.The most we will pay for"property damage"to any one
borrowed equipment item under this coverage is$25,000 per"occurrence":The Insurance afforded under
this provision is excess over any other valid and collectible property insurance(Inciuding deductible)
available to the insured;whether primary,excess,contingent or on any other basis.
4: Limited Electronic Data Liability
Exclusion 2.p.is replaced with the following:
p. Electronic Data
Damages arising,out of the loss of,loss of use of,damage to,corruption of,inability to access,or
Inability to Manipulate"electronic data"that does not result from physical Injury to tangible property.
The most we will pay under Coverage A for"property damage"because of all loss of"electronic data"
arising out of any one"occurrence"is$10,000.
We have no duty toinvestigate or defend claims or"suits"covered by;this Limited Electronic Data Liability
coverage.
The following definition Is added to SECTION V-DEFINITIONS,of the Coverage Form:
"Electronic data"means information,facts or programs stored as or on,created or used on,or transmitted
to or from computer software(including systems and applications software), hard or floppy disks,CD-
) ROMS, tapes,drives,cells,data processing devices or any other media which are used with electronically
controlled equipment.
,CGL 085(01 15) Includes copyrighted material of the insurance Services Office,Inc.,with Its permission. Page 1 of 14.
Copyright 2015 FCCI Insurance Group_
Insured Copy
COMMERCIAL GENERAL LIABILITY
CGL 088(01 15) j
•
For purposes of this Limited Electronic Data Liability coverage,the definition of"Property Damage"in
SECTION V—DEFINITIONS of the Coverage Form is replaced by the following:
17."Property damage"means:
a. Physical injury to tangible property,including all resulting loss of use of that property. All such loss
of use shall be deemed to occur at the time Of the physical injury that caused It;
b. Loss of use of tangible property that is not physically injured., All such loss of use shall be deemed
to occur at the time of the"occurrence"that caused it;
c. Loss of,loss of use of,damage to,corruption of; inability to access,or inability to properly
manipulate"electronic data",resulting from physical injury to tangible property. All such loss of
"electronic data"shall be deemed to occur at the time of the"occurrence"that caused It.
For purposes of this'insurance,"electronic data"Is not tangible property.
SECTION I-COVERAGES,COVERAGE B.PERSONAL AND ADVERTISING INJURY LIABILITY Is amended
as follows:
Paragraph 2.e.Exclusions—the Contractual Liability Exclusion is deleted.
SECTION I—COVERAGES,the following coverages are added:
COVERAGE D.VOLUNTARY PROPERTY DAMAGE.
1. Insuring Agreement
We will pay,at your request,for"property damage"caused by an"occurrence",to property of others
caused by you,'or while in your possession,arising out of your business operations.The-amount we will
pay kir damages is described in SECTION III LIMITS OF INSURANCE.
2. Exclusions -•
This Insurance does not applyto;•
"Property Damage"to:
a. Property at premises owned, rented,leased or occupied by you;.
b. Property while In transit;
c. Property owned by,rented to,leased to,loaned to, borrowed by,or used by you;
d: Premises Ott sell,give away,or abandon,if the"property damage"arises out of any part of those.
premises;
e. Property caused by or arising out of the"products-completed'operations hazard';
f. Motor vehicles;
g. "Your product"arising out of it or any part of it;or
h. "Your work"arising out of it or any part of it.
3.. Deductible
We will not pay for ions in any one occurrence until the amount of loss,exceeds$250.We will then pay
the:amount.of loss in excess of$250 up to the applicable limit of insurance:
4. Cost Factor •
In the event of a covered loss,you shall,if requested by us, replace the damaged property or furnish the
labor and materials necessary for repairs thereto at your actual cost;e xcludin_g profit or overhead •
charges.
CGL 088.(01 15) Includes copyrighted material of.the Insurance Services Office,Inc„with Its permission; Page 2 of 14
Copyright 2015 FCCI:Insurance Group
Insured Copy
1
•
COMMERCIAL GENERAL LIABILITY
CGL 008(01 16)
The Insurance afforded under COVERAGE 13 is excess over any other valid and collectible property or-Inland
marine insurance(Including the deductIble applicable to the property or inland marine coverage)available to
you whether primary,excess,contingent or any other basis.
Coverag e D covers unintentional damage or destruction,but does not cover disappearance,theft,or loss of
use.
The insurance under COVERAGE D does not apply if a loss is paid under COVERAGE E.
COVERAGE E.CARE,CUSTODY OR CONTROL
1: Insuring Agreement
We will pay those sums that the Insured becomes legally obligated to pay-as damages because of
"property damage"caused by an"occurrence",:to property of others while.in your care,custody,or control
or property of others as to which you are exercising physical control If the"property damage"arises out of
your business operations;The amount we will pay for damages is described In SECTION III LIMITS OF
INSURANCE,
2. Exclusions
This Insurance does not apply to:
"Property Damage"to: •
a. Property at premises owned,rented,leased or occupied by-you;
b. Property while in transit;
c. Premises you sell,give away, or abandon,If the"property damage"arises out of any part of those
premises;
d. Property caused by or arising out of the"products-completed operations hazard",
e. Motor vehicles; •
f "Your product"arising out of it or any part of it;or
.g. "Your work"arising:out of it or any part of it.
3. Deductible •
We:will not pay for loss In any one"occurrence"until the amount of:loss exceeds$250.We will then pay
the amount Of loss in excess of$250 up to the-applIcable limit of insurance. •
4. Cost Factor
In the event of a covered_loss,you shall,If requested by us,replace ,the damaged property or furnish the
labor and materials necessary•for repairs thereto at your actual cost,excluding profit or overhead
charges: •
The Insurance afforded under COVERAGE E.is excess over any other valid and.collectible property or Inland
marine insurance(including the-deductible applicable to.the property or Inland marine coverage)available to
you whether primary,excess,contingent or any other basis.
The insurance under COVERAGE E does not apply If a loss Is paid under COVERAGE D.
COVERAGE F. LIMITED PRODUCT WITHDRAWAL EXPENSE
1, Insuring Agreement
.a. If you are a"seller",we will reimburse you for"product withdrawal expenses"associated with"your
product°incurred because of a"product withdrawal"to which this Insurance applies. 1
i The amount,of suchreimbursement Is limited as described in SECTION III-.LIMITS OF
INSURANCE.No other-obligation or liability to pay sums or perform acts orservices Is covered.
•
CGL 088(01 15) Includes copyrighted material Of the Insurance Services:Office;Inc.,with its permission.. page 3 of 14
Copyright 2015 FCCI Insurance Group.
jInsured Copy
•
•
•
COMMERCIAL GENERAL LIABILITY
CGL 088(01 15)
•
•
• a: This Insurance applies to a"product withdrawal"only if the "product withdrawal"is Initiated in the
"coverage territory"during the policy period because:
(1)•You determine that the"product withdrawal"is necessary;or
(2) An authorized government entity has ordered you to conduct a"product withdrawal".
c. We will reimburse only those"product withdrawal expenses"which are Incurred and reported to us �.
within one year of the date the."product withdrawal"was Initiated.
d. The initiation of a"product withdrawal"will be deemed to have been made only at the earliest of the.
following times:
(1) When you have announced,In any manner,to the general public,your vendors or to your
employees(other than those employees directly involved in making the determination)your
• decision to conduct a"product withdrawal"This applies regardless of whether the determination
to conduct a"product withdrawal"is made by you or is requested by a third party;
(2) When you received,either orally or in writing;notification of an order from an authorized
government entity to conduct a"product withdrawal;or •
(3) When a third party has initiated a"product withdrawal"and you communicate agreement with the
"product withdrawal",or you announce to the general public,your vendors or to your employees
(other than those employees directly involved in making the determination)your decision to
participate in the"product withdrawal",whichever comes first.
e. "Product withdrawal expenses"incurred to withdraw"your products"which contain:
(1) The same-"defect"will be deemed to have arisen out of the same"product Withdrawal";or
(2) A different"defect"will be deemed to have arisen out die separate"product withdrawal"if newly
determined or Ordered In accordance with paragraph 1.b of this coverage. •
2. Exclusions
This.Insurance does not apply to"product withdrawal"expenses"arising out of:
a. Any"product withdrawal"Initiated due to:
(1) The failure of"your products"to accomplish their intended purpose,including any breach of
warranty of fitness,whether written or implied.This exclusion does not apply If such failure has
caused or is reasonably expected to cause"bodily injury"or physical damage to tangible
• property.
(2) Copyright,patent,trade,secret or trademark infringements;
(3) Transformation of a chemical nature, deterioration or decomposition of"your product", except if it
is caused by
(a) An error.in manufacturing,design, processing or transportation of"your product';or
(b) "Product tampering".
(4) Expiration of the designated shelf life of"your product".
b. A"product withdrawal",Initiated because of a"defect"in "your product"known to exist by the Named
Insured or the Named Insured's"executive officers",prior to the Inception date of this Coverage Part
or prior to the time"your product"leaves your control or possession.
c. Recall_of any specific products for which"bodily injury"or"property damage"is excluded under
Coverage A-Bodily Injury And Property Damage Liability by endorsement.
I d. Recall of"your products"which have been banned from the market by an authorized government
entity prior to the polloy period; ;
.e. The defense of a claim Or"suit"against you for"product withdrawal expenses",
CGL 088(01 15) includes copyrighted material of the Insurance Services Office,Inc.,with Its permission. Page 4 of 14
Copyright 2015.FCCI Insurance Group
Insurod Copy
1
COMMERCIAL GENERAL LIABILITY
CGL 088(01 15)
3. For the purposes of the Insurance afforded under COVERAGE F,the following is added to 2.Duties In
The Event Of Occurrence,Offense, Claim Or Suit Condition under SECTION IV-COMMERCIAL
GENERAL LIABILITY CONDITIONS:
e. Duties In The Event Of A"Defect"Or A"Product Withdrawal"
(1) You must see to it that we are notified as soon as practicable of any actual,suspected or
threatened"defect'In"your products";or any governmental investigation,that may result in'a
"product withdrawal".To the extent possible,notice should include:
(a) How,when and where the"defect"was discovered;
• (b) The names and addresses of any injured persons and witnesses;and
(c) The nature,location and circumstances_ Of any Injury or damage arising out of use or
consumption of"your product".
(2) If a"product Withdrawal"is initiated,you must:
(a) Immediately record the specifics of the"product withdrawal"and the date it was initiated;
(b) Send us written notice of the."product withdrawal":as soon as practicable;and
(a) Not release,consign,ship or distribute by any other method,any product,or like or similar
products,with an actual,suspected or threatened defect.
(3) You_ and any other Involved insured must:
(a) immediately send us copies'of pertinent correspondence received in connection with the
"product withdrawal";
(b) Authorize us to obtain records and other information;and
(c) Cooperate with us in our investigation of the"produot withdrawal".
4. For the'purposes of this Coverage F,the following definitions are added to the Definitions Section:
a. "Defect"means a defect,deficiency or Inadequacy that creates a dangerous condition.
b. "Product tampering"is an act of intentional alteration of"your product"which may cause or has
caused"bodily injury"or physical injury to tangible property.
When"product tampering"Is known,suspected or threatened,a"product withdrawal"will not be
limited to those batches of"your product"which are known or suspected to have been tampered with.
c. "Product withdrawal"means the recall or withdrawal of"your products",or products which contain
"your products",from the market or from use,by any other person or organization,because of a
known or suspected"defect"in'"your product";.or a known or suspected"product tampering",which
has caused or is reasonably expected to cause"bodily injury"or physical Injury to tangible property.
d. "Product withdrawal expenses"means those reasonable and necessary extra expenses,listed below
paid and directly related to a"product withdrawal";
(1) Costs of notification;
(2) Costs of stationery,envelopes,production of announcementsand postage or facsimiles;
(3) Costs of overtime paid to your regular non-salaried employees and costs incurred by your
employees,Including costs of transportation and accommodations;
(4) Costs of computer time;
(5) Costs of hiring independent contractors and other temporary employees;
I (6) Costs of transportation,shipping or packaging;
(7) Costs of warehouse or storage space; or
CGL 088(01 15) Includes copyrighted material of the Insurance Services Office,Inc.,with its permission. Page 5 of 14
Copyright 2015 FOCI Insurance Group
Insured Copy
•
COMMERCIAL GENERAL LIABILITY
CGL 088(01 16)
•
(8) Costs of proper dispbsal of"your products",or products that contain"your products",that cannot
be reused,not exceeding your purchase price or your cost to produce the products;but"product
withdrawal expenses"does not Include costs of the replacement,repair or redesign of"your
product", or the costs of regaining your market share,goodwill,revenue or.profit.
e. "Seller"means a person or organization that manufactures,sells or distributes,goods or products.
"Seller"does not include a"contractor'as defined elsewhere In this endorsement. f-
The Insurance under COVERAGE F does not apply if a loss is paid under COVERAGE G.
COVERAGE G.CONTRACTORS ERRORS AND OMISSIONS
1. Insuring Agreement
if you are a"contractor",we will pay those sums that you become legally obligated to pay as damages
because of"property damage"to"your product","your work"or"impaired property",due to faulty
workmanship,material or design,or products including consequential loss,to which this insurance
applies.The damages must have resulted from your negligent act,error or omission while acting in your
business capacity as a contractor or subcontractor or from a defect in material ora product sold or
installed by you while acting in this capacity.The amount we will pay for damages is described in
SECTION ill LIMITS OF INSURANCE.
We have no duty to Investigate pr defend claims or"suits"covered by this Contractors Errors or
Omissions coverage.
This coverage applies only if the"property damage"occurs in the"coverage territory"during the policy
period.
This coverage does not apply to additional insureds,if any.
Supplementary Payments—Coverage A and B do not apply to Coverage G.Contractors Errors and
Omissions.
2. Exclusions
•
This Insurance does not apply to:
.a. "Bodily injury"or"personal and advertising Injury".
b. Liability or penalties arising from a delay or failure to complete a contract or project,or to complete a
contract or project on times
o. Liability.because of an error or omission:
(1) .In the preparation of estimates or Job costs;
•
(2) Where cost estimates are exceeded; .
(3) in the preparation of estimates of profit or return on capital;
(4) In advising or failure to advise on financing of the work or project;or
(5) In advising Or failing to advise on any legal work,title checks,form of insurance or suretyship.
d. Any liability which arises out of any actual or alleged infringement of copyright or trademark or trade dress
or"patent,unfair competition or piracy,or theft or wrongful taking of concepts or intellectual property.
e. Any liability for damages: •
(1) From the intentional dishonest,fraudulent,malicious or criminal acts of the Named Insured,or by
•
any partner,member of a limited liability company,or executive officer,or at the direction of any
of them;or
• (2) Which,is in fact expected or Intended by the insured, even if the injury or damage is of a different
degree or type than actually expected or intended. 'J
CGL 088.(01 15) Includes copyrighted material Of the insurance Services Office,Inc.,with its permission. Page 6 of 14
Copyright 2015 FCCI Insurance Group
Insurod Copy
COMMERCIAL GENERAL LIABILITY
CGL 088(01 15)
f. Any liability arising out of manufacturer's warranties or guarantees whether express or Implied.
g. Any liability arising from"property damage"to property owned by,rented or leased to the insured,
h. Any liability incurred or"property damage"which,occurs, in whole-or In part, before you have
completed"your work." "Your work"will be deemed completed at the earliest of the following times:
(1) When all of the Work called for in your contract or work order has been completed;
(2) When all the work to be done at the Job site has been completed if your contract calls for work at
more than one Job site;or
(3) When that part of the work done at a Job site has,been put to Its intended use by any person or
organization other than another contractor or subcontractor working on the same project.
Work that may need service or maintenance, correction,repair or replacement,but which is otherwise
complete,will be treated as complete.
i. Any liability arising from"property damage"to products that are still in your physical possession,
j. Any ilabllity'arising out of the rendering of or failure to render any professional services by you or On
your behalf,but only with respect to either Or both of the following operations:
(1) Providing engineering,architectural or surveying services to Others;and
(2) Providing or hiring Independent.professionals to provide engineering,architectural or surveying
services in connection with construction work you perform.
Professional services include the preparing,,approving or failing to prepare.or approve,maps,shop
drawings,opinions,reports;surveys,field orders, change orders,or drawings and specifications..
Professional services also include supervisory or inspection activities performed as part of any related
architectural or engineering activities.
But,professional services do.not include services within construction means;methods,techniques,
sequences and procedures employed by you in connection with construction work you perforin.
k. Your loss of profit or expected profit and any liabllily arising therefrom.
I. "Property damage"-to property:other than"your product,""your work"or"impaired property."
m. Any liability arising from claims or"suits"where the right of action against the insured has been
relinquished Or waived,
n. Any liability for"property damage"to,"your work"if the damaged work or•the work out of which the
damage arises was performed on your behalf bye subcontractor.
o. Any liabllity,arising from the substitution of a material or product for one specified.on blueprints,work
orders,contracts or engineering specifications unless there has been written authorization,or unless
the blueprints,work orders, contracts or engineering specifications were written by you,and you have
authorized the changes.
p. Liability of others assumed by the Insured under any contract or agreement,.whether oral or in writing.
'This exclusion does not apply tenability for damages that the Insured would have in the absence of
the contract or agreement.
3: For the purposes of Coverage G,the following definition is added to the Definitions section:
a. "Contractor".means a person or organization engaged In'abtivities'of building,clearing,filing,
excavating or improvement in the size,use or appearance of any structure or land. "Contractor"does
not Include a"seller'as defined elsewhere in this endorsement.
.4. Deductible
j We will not pay for loss in any one"occurrence"until the amount of loss exceeds$250.The limits of
insurance will not be:reduced by the application of the deductible amount.
:CGL 088(01 15) Includes copyrighted materia!of the Insurance Services Office;Inc:,with Its permission. Page 7 of 14
Copyright 2015 FOCI Insurance Group
Insured Copy
COMMERCIAL GENERAL LIABILITY
CGL 088(01 15)
We may pay any part or all Of the deductible amount to effect settlement of any claim or"suit",and upon
notification of the action:taken,you shall promptly reimburse us for such part of the deductible amount as
has been paid by us.
5. Cost Factor
In the event Of a covered loss;you shall,if requested by us,replace the damaged property or furnish the
labor and materials necessary for repairs thereto at your actual cost,:excluding profit or overhead
charges.
The insurance under COVERAGE G does not apply if a loss Is paid under COVERAGE R
COVERAGE H.LOST KEY COVERAGE
1. Insuring Agreement
We will pay those sums,subject to the limits of liability described In SECTION III LIMITS OF INSURANCE
In this endorsement and the deductible shown below,that you become legally obligated to pay as
damages caused by an"occurrence"and due to the loss or mysterious disappearance of keys entrusted
to or In the care,custody or control of you or your"employees"or anyone acting on your behalf.The
damages covered by this endorsement are limited to the:
a. Actual cost of the keys;
b. Cost to adjust locks to accept new keys;or.
C. Cost of new locks,If required,Including the cost of installation.
2. Exclusions
This insurance does not apply to:
P. Keys owned by any insured,employees of any insured,or anyone acting on behalf of any insured; 1
:b. Any resulting loss of Use;or
c. Any of the following acts by any Insured,employees of any insured,or anyone acting on behalf of any
insured:
1) Misappropriation;
2) Concealment; •
3) Conversion;
4) Fraud;or
5) Dishonesty:
3. Deductible
• We will not pay for loss in any one"occurrence"until the amount of loss exceeds$1,000..The limits of
insurance will not be reduced by the application of the deductible amount.
We may pay any part.or all of the deductible amount to effect settlement of any claim or"suit"and,upon
notification of the action taken,you shall promptly reimburse us for such part of the deductible amount as
has been paid by us.
EXPANDED COVERAGE FOR TENANT'S PROPERTYAND PREMISES RENTED TO YOU
The first paragraph after subparagraph(6)in Exclusion J., Damage to Property Is amended to read as follows:
Paragraphs(1),:(3)and(4)of this exclusion do not apply to"property damage"(Other than damage by fire)
to premises,including the contents of such premises, rented to you. A separate limit:of insurance applies
to Damage To Premises Rented To You as described In Section ill—Limits Of Insurance: J
I CGL 088(01 15) Includes copyrighted material of the Insurance Services Office,Inc.,with its permission. Page 8 of 14
Copyright2015 FCCI Insurance Group
Insured Copy
• COMMERCIAL GENERAL LIABILITY
CGL 088(01 16)
SECTION 1-COVERAGES,SUPPLEMENTARY PAYMENTS—COVERAGE A and B is amended as follows:
All references to SUPPLEMENTARY PAYMENTS—COVERAGES A and 13 are amended to SUPPLEMENTARY
PAYMENTS—COVERAGES A,B,D,E,G,and H.
.1:• Cost of Bail Bonds.
Paragraph 1.b,is replaced With the following;
b. Up to$2,500 for cost of bail bonds required because of accidents or traffic law violations arising out of the use
of any vehicle to which the Bodily Injury Liability Coverage applies.We do not have to furnish these bonds.
2. Loss of Earnings •
Paragraph 1.d.is replaced with the.following:
d. All reasonable expenses incurred by the Insured at-our request to assist us in the Investigation or defense
of the claim or"suit',including actual loss of earnings up to$500 a day because of time off from work.
SECTION II—WHO IS AN INSURED is amended as follows:
4. Incidental Malpractice
Paragraph 2.a.(1)(d)is replaced with the following:
(d) Arising'out of his or her providing or failing to provide professional health care services..However,this
. exclusion does not apply to a'nurse,emergency medical technician or paramedic employed by you to
provide medical services,unless: •
(t) You are engaged In the occupation or business of providing Or offering Medical,surgical,dental,x-ray
or nursing services,treatment,advice or instruction;or
(ii) The"employee"has another Insurance that would also cover claims arising under this provision,
whether the other Insurance is primary,excess,'contingent or on any other basis.
2. _Broadened Who Is An Insured
The following are added to Paragraph
Subsidiaries •
e. Your subsidiaries if:
(1) 'They are legally incorporated entities;and
(2) You own more than 50%of the voting stock in such subsidiaries as of the effective date of this policy.
If such subsidiaries are not shown in the Declarations,you must report them to us within 180 days of
the inception'of your original policy. •
Additional insureds • •
f.• Any person or organization described In paragraphs g.through k.below whom you are required to add as
an additional insured on this_policy under a written contract or agreement in effect during the term of this
policy,provided the written contract or agreement was executed prior to the"bodily injury","property
damage"or"personal and advertising injury"for which the additional.Insured seeks coverage;
• However;the insurance afforded to such additional insured(s):
(1) Oniy applies to the extent permitted by law;
.(2) Will not be broader than that which yqu.are required by the contract or agreement to provide for such
additional Insured;
(3) Will not be broader than that which Is afforded to you under this policy;
I
(4) Is subject to the conditions described in paragraphs g.through k.below;and
(5) Nothing herein shall extend the term of this policy.
• :CGL 088(01 15) Includes copyrlghted.materlai of the Insurance Services Office,Inc.,with Its permission. 'Page 9 of 14
Copyright 2015 FCCI Insurance Group
Insured Copy
•
•
COMMERCIAL GENERAL.LIABILITY
CGL 088(01 15)
g, Owner,Lessor or Manager of Premises
•
if the additional insured Is an owner, lessor or manager of premises,such person or organization shall be
covered only with respect to liability arising out of the ownership,maintenance or use of that part of:any
premises leased to you and subject to the following.additional exclusions:
(1) Any"occurrence"that takes place after you cease to occupy those premises;or
(2) Structural alterations,new construction or demolition operations performed by.or on behalf of such '
person or organization.
h. State orGovernmental Agency or Subdivision or Political Subdivision-Permits or Authorizations
If the additional insured Is the state.or any political subdivision,the state or political subdivision shall be
covered only with respect to operations performed by you or on your behalf for which the state or political
subdivision has issued a,permit or authorization. This insurance does not apply to:
(1) "Bodily injury","property damage",or "personal and advertising.injury'arising out of operations
performed for the federal government;state or municipality;or
(2) "Bodily injury"or"property damage"included within the"products-completed operations hazard",
1: Lessor of Leased Equipment
If the additional insured•is a lessor of leased'equipment,such lessor shall be covered only with respect to
liability for"bodily injury",'"property damage"or"personal and'advertising injury"caused,in whole or in
part,by yourmalntenance,operation or use of equipment leased to you by such person(s)or .
organization(s). With respect to the insurance afforded to these additional Insureds,fills Insurance does
not apply to any"occurrence"which takes place after the equipment lease expires.
J. Mortgagee,Assignee,or Receiver
If the additional Insured is a mortgagee,assignee,or receiverof premises,'such mortgagee,assignee or
receiver of premises is an additional insured only with respect to their liability as mortgagee,assignee,or
receiver and arising out of the ownership,maintenance,or use of the premises'by you.. This insurance
does not apply to structural'alterations, new construction and demolition operations performed by or for
that person or organization.
k. Vendor.
If the additional insured is a vendor,such vendor is an additional insured only with respect to"bodily
lnJury".or"property damage"caused by!your products"which are distributed or sold_in the regular course
of the vendor's business,subject to the following additional exclusions:
(1) The insurance afforded to the vendor does not apply to:
'(a) "Bodily injury"or"property damage"for which the vendor is obligated to pay damages by reason
of the assumption of liability in a contract or agreement. This exclusion does not apply to liability
for damages that the vendor would have in absence of the contract or.agreement.
(b) Any express warranty unauthorized by you;
(o) Any physical or chemical change in"your product"made intentionally by the vendor;
(d) Repackaging, unless unpacked solely for the purpose of inspection,demonstration,testing,or the
substitution of parts under Instructions from the manufacturer,and then repackaged in the original
container;
(e) Any failure to make such'inspections,adjustments,tests or servicing as.the vendorhas agreed
to make or normally undertakes to make in the usual course of business, in connection with the
distribution or sale of the products;
(f) Demonstration,installation,servicing or repair operations,except such operations performed'at I
the vendor's premises.in connection with the sale of the product;
•
'CGL.088.(01 95) Includes copyrighted material of.the Insurance Servlces.Office,Inc.,with Its permission. ••Page 10 of 14
Copyright 2045'FCCI Insurance Group
insured Copy
COMMERCIAL GENERAL LIABILITY
1 CGL 088(01 16)
(g) Products which,after distribution or sale by you, have been labeled or relabeled or used as a
container, part or Ingredient of any other thing or substance by or for the vendor;or
(h) "Bodily Injury or"property damage"arising out of the sole negligence of the vendor for its own
acts or omissions or those of its own acts or omissions or those of its employees or anyone else
acting on its behalf. However,this exclusion does not apply to:
I. The exceptions contained In Subparagraphs d.or f.;or
II. Such Inspections,adjustments,tests or servicing as the vendor has agreed to make or
normally undertakesto make In the usual course of business,in connection with the
distribution or sale of the products.
(2) This Insurance does not apply to any insured person or organization,from whom you have acquired such
products,or any ingredient,part or container,entering into,accompanying Or containing such products.
3. Newly Formed or Acquired Organizations
Paragraph 3.is amended:as follows:
a. Coverage under-this provision is afforded until the end of the policy period.
d. Coverage A does not apply to product recall expense arising out of any withdrawal or recallthat occurred
before you acquired or formed the organization. `
SECTION IiI-LIMITS OF INSURANCE is amended as follows:
1. Paragraph 2.isreplaced with the following:
Z The General Aggregate Limit is the most We will pay for the sum of:
) a. Medical expenses under"Coverage C;
L Damages under Coverage A,except damages because of"bodily injury"or"property damage"
included in the"products-completed operations hazard";
c. Damages under Coverage B;
d. Voluntary"property damage"payments under Coverage D;
e. Care,Custody or Control damages under.Coverage.E.;and
f. Lost Key Coverage under Coverage H.
2. Paragraph 5.Is replaced with the following:
5. Subject to Paragraph 2.or 3.above,whichever applies,the Each Occurrence.Limit is themost we will
pay for the sum Of: ,
a. Damages under Coverage A;
b. Medical expenses under Coverage C;
c. Voluntary"property damage"payments under Coverage D;
d. Care,Custody or Control damages under Coverage E;
e. Limited Product Withdrawal Expense under Coverage F;
f. Contractors Errors and Omissions under Coverage G.;and;
g: Lost Key Coverage under Coverage H.
because of all"bodily injury"and"property damage"arising out of any one"occurrence".
3. Paragraph 6.Is replaced with the following:
—! 6. Subject to Paragraph 5.above the Damage To Premises Rented To You Limit is the most we will pay
under Coverage A for damages because of"property damage"to any one premises,while rented to you,
CGL 088(01 15) Includes copyrighted material of the Insurance Services Office,Inc.,with Its permission. Page 11 of 14
Copyright 2015 FOCI Insurance Group
Insured Copy
1
COMMERCIAL GENERAL LIABILITY
CGL 088(01 15)
or In the case of damage by fire or explosion,while rented to you or temporarily occupied by you with
permission of the owner.
The Damage to Premises Rented to You Limit Is the higher of the Each Occurrence Limit shown In the
Declarations or the amount shown In the Declarations as Damage To Premises Rented To You Limit.
4. Paragraph7. is replaced with the following:
7. Subject to Paragraph 5.above,the higher of$10,000 or the Medical Expense Limit shown in the
Declarations is the most we will pay under Coverage C for all medical expenses because of"bodily injury"
sustained by any one person.
5. Paragraph 8. Is added as follows:
8. Subject to Paragraph 5.above,the most we will pay under Coverage D.Voluntary Property Damage for
loss arising out of any one"occurrence"Is$1,500.The most we will pay in any one-policy period,
regardless of the number of claims made or sults brought,is$3,000.
6. Paragraph 9.Is addedasfollows:
9. Subject to Paragraph 5.above,the most we will pay under Coverage E.Care,Custody or Control for
"property damage"arising out of any one"occurrence"Is$1,000.The most.we will pay in any one-policy
period,regardless of the number of claims made or suits.brought,Is$5,000.
7. Paragraph 10.1s added as follows:
10. Subject to Paragraph 5.above,the most we will pay under Coverage F.Limited Product Withdrawal
Expense for"product withdrawal expenses"in any one-policy period,regardless of the number of
insureds,"product withdrawals"Initiated or number of"your products"withdrawn is$10,000.
8. Paragraph 11.Is added as follows:
11. Subject to Paragraph 5.above,the most we will pay Under Coverage G.Contractors Errors and
Omissions for damage in any one-policy period,regardless of the number of insureds,claims or"suits"
brought,or persons or organizations making claim or bringing"suits"is$10,000.
For errors In contract or job specifications or in recommendations of products or materials to be used,this
policy will not pay for additional costs of products and materials to be used that would not have been
incurred had the correct recommendations or specifications been made.
9. Paragraph 12.1s added as follows:
12. Subject to Paragraph 5.above,the most we will pay under Coverage H.,Lost Key Coverage for damages
arising out of any one occurrence is$50,000.
10: Paragraph 13.1s added as follows:
13. The General Aggregate Limit applies separately to:
a. Each of your projects away from premises owned by or rented to you;or
b. Each "location"owned by or rented to you.
"Location"as used in this paragraph means premises involving the same or connecting lots,or premises
whose connection is Interrupted Only by a street,roadway,waterway or right-of-way of a railroad.
11. Paragraph 14.is added as follows:
14. With respect to the insurance afforded to any additional Insured provided coverage under this
endorsement:
If coverage provided to the additional insured is required by a contract or agreement,the most we.will pay
On behalf of the additional insured Is the amount of insurance:
I
a. Required by the contract or agreement;or
CGL 088(01 15) Includes copyrighted material of the.Insurance Services Ofiice,Inc.,with Its permission. Page 12 of 14
Copyright 2015 FOCI Insurance Group
• Insured Copy
.
COMMERCIAL GENERAL LIABILITY
CGL 088(01 15)
b. Available under the applicable Limits of Insurance shown in the Declarations;
whichever is less.
This endorsement shall not Increase the applicable Limits of Insurance shown in the Declarations.
SECTION IV—COMMERCIAL GENERAL LIABILITY CONDITIONS is amended as follows:
1. Subparagraph 2.a.of Duties in The Event Of Occurrence,Offense,Claim,or Suit Is replaced with the
following:
a. You must see to it that we are hotifled as soon as practicable of.an"occurrence"or an offense which may
result ina claim.This requirement applies only when the"occurrence"or offense is known to the
following:
(1) An individual who is the sole owner;
(2) A partner,if you are a partnership or joint venture;
(3) An"executive officer"or Insurance manager,if you ate a corporation;
(4) A manager,,if you are a limited liability company;
(5) A person or organization having proper temporary custody of your property if you die;
(6) The legal representative of:you if you die;or
(7) A person(other than an"employee")or an organization while acting as your real estate manager.
To the extent possible,notice should Include:
(1) How,when and where the"occurrence"or offense took place;
s,\ (2) The names,and addresses of any injured persons and witnesses;and
:(3) The.nature and location Of any injury or damage arising out of the"occurrence"or offense.
2. The'following Is-added to Subparagraph 2.b.of Duties In The Event Of Occurrence,Offense,.Claim,or
Suit:
The requirement In 2.b.applies only when the"occurrence"oroffense is known to the following:
(1) An individual who is the sole owner;
(2);A partner or insurance manager,if you are a partnership or.joint venture;
(3) An"executive officer"or insurance manager, if,you are a corporation;
(4).A.manager or insurance.manager,if you are Oh—tilted liability company;
(5)'Your officials,trustees,board members or insurance manager,if you are a.not-for-profit organization;
(6) A.person or organization having.proper temporary custody of your property if you die;
(7) The legal representative of you if you die;or
(8) A person(other than an"employee")or an organization while acting as your real-estate manager.
3. The following Is added to.paragraph 2.of Duties in the Event Of Occurrence,Offense,Claim or Suit:
e. If you report an"occurrence"to your workers compensation carrier that develops Into a liability claim for
which coverage is provided by the Coverage Form,failure to report such an"occurrence"to us at.the time
of the"occurrence"shall not be deemed a violation of paragraphs a.;b.,and c.above. However,you
shall give written notice of.this"occurrence"to us as soon as you become aware that this"occurrence"
maybe a liability claim rather than a workers compensation claim.
4. Paragraph 6.is replaced with the following:
I6. Representations
CGL 088(01 15) Includes copyrighted material of the Insurance Services Office,Inc.,with its'permission. Page 13 of 14
j Copyright.2015 FOCI Insurance Group
Insured Copy
•
COMMERCIAL GENERAL LIABILITY
CGL 088(01 15)
By accepting this policy;you agree:
a. The statements In the Declarations are accurate and complete;
b. Those statements are based upon representations you made to us;and '
c. We have issued this policy In reliance upon your representations: •
Any error or omission In the description of,or.failure to completely describe or disclose any premises,
operations or products Intended to be covered by the Coverage Form will not invalidate or affect coverage
for those premises, operations or products,provided such error or omission or failure to completely
describe or disclose premises,operations or products was not intentional.
You must report such error or omission to us as soon as practicable after Its discovery. However,this
provision does not affect our right to collect additional premium charges or exercise outright of
cancellation or nonrenewal.
5. The following Is added to paragraph 8.Transfer Of Rights Of Recovery Against Others To Us:
However,we waive any right of recovery we may have because of payments we make for injury or
damage arising out of your ongoing operations or"your work"included In.the"products-completed
operations hazard"under the following conditions:
a) Only when you have agreed In writing to waive such rights of recovery in a contract or agreement;
b) Only as to the person/entity as to whom you are required by the contract to waive rights of recovery;
and
c) Only if the contract or agreement is in effect during the term of this policy, and was executed by you
prior to the loss. -
6. Paragraph 10.is added as follows:.
10.Liberalization
if we revise this Coverage Form to provide more coverage without additional premium charge,your
policy will automatically provide the additional coverage as.of the day the revisioniis effective In the
applicable state(s).
•
I �
CGL 088(01 15) includes copyrighted material of the Insurance Services Office,Inc.,with Its permission. Page 14 of 14
Copyright 2015 FOCI insurance Group
Insured Copy
Policy Number: CA10000638202
AUTO FIRST CHOICE COVERAGE ENDORSEMENT
TABLE OF CONTENTS
DESCRIPTION PAGE
Airbag Coverage3
Auto Loan/Lease Gap Coverage •• 3
Broad Form Insured -
Concealment, Misrepresentation or Fraud • • • 4
Deductible 3
Duties In the Event of Accident,Clain'',Suit or Loss 4
Fellow Employee 2
Fire Department Service Charge -2
Other Insurance for Hired Auto Physical Damage.Coverage • 4
Loss of Earnings • - • '.2
Loss of Use Expenses • - 2
• `S.pplementary Payments• - • • • - -• • • - • • -2
Transfer of Rights of Recovery against Others to Us •: - • • • 4
�,. Transportation Expenses 2
•
.
•
Insured Copy
ff I
•
Policy Number: CA10000638202
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
AUTO FIRST CHOICE COVERAGE ENDORSEMENT
This endorsement modifies Insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
NOTE: The following are additions; replacements and amendments to the Business Auto Coverage Form, and
will apply unless excluded by separate endorsements)to the Business AutO Coverage Form.
With respect to coverages provided by this endorsement, the.provisions of the Business Auto Coverage Form
apply unless modified by this endorsement.
•
The Business Auto Coverage Form is amended as follows:
SECTION II—COVERED AUTOS LIABILITY COVERAGE is amended as follows:
A. Paragraph 1.Who Is An Insured in section A.Coverage is amended by the addition of the following:
d. Any legally incorporated subsidiary of yours in which you own more than 50%of the voting stock on the
effective date of this'coverage form. However, "insured" does not include any subsidiary that is an
"insured" under any other liability policy or would be an "insured" under such a policy but for its
termination or the exhaustion Of its limits of insurance. In order for such subsidiaries to be considered
insured underthis policy,you must notify us of such subsidiaries within 60 days of policy effective date.
e. Any organization you newly acquire or form during the policy period, other than a partnership or Joint
venture, and over which you maintain sole ownership or a majority Interest. However; coverage under
this provision:
'(1) Does not apply if the organization you acquire or form Is an"insured" under another liability policy •
or would be an"Insured"under such'a policy but for its termination or the exhaustion of its limits of
insurance;
(2) Does not apply to"bodily injury" or"property.damage"that occurred before you acquired or formed
the organization;and
(3) Is afforded only for the first 90 days after you acquire or form-the organization or until the end of the
policy period,whichever comes first.
f. Any person or organization who is required under a written contract or agreement between you and that
person or organization, that is signed and executed by you before the "bodily Injury" or "property
damage"occurs and that is in effect during the policy period,to be named as an additional insured is
an."insured"for Liability Coverage, but only for damages to which this Insurance applies and only to the
extent that person or organization qualifies as an "insured" under the Who Is•An Insured provision
contained in Section Ii.
•
g. Any"employee"of yours using:
(1) a covered "auto"you do not own, hire or borrow, or a covered"auto" not owned by an "employee"
or a member of his or her household, while performing duties related to -the conduct of your
business or your personal affairs;or
(2) an "auto" hired or rented under a contract or agreement In that "employee's" name, with your
permission, while performing duties related to the conduct of your business. However, your
"employee" does not qualify as an insured under this paragraph (2) while using a covered "auto"'
rented from you or from any member of the"employee's"household
h. Your members,'if you are a limited liability company,while using a covered"auto".you do not own, hire
. or borrow,while performing duties related to the conduct of your business or your personal affairs.
B. Paragraphs(2) and (4) under section 2. Coverage Extensions, a. Supplementary Payments are deleted
and replaced by the following:
CAU 058(01 15) Includes copyrighted material of the insurance Services Office,Inc.,with its permission. Page 1 of 4
Copyright 2015 FCCI Insurance Group..•
Insured Copy
•
COMMERCIAL AUTO
CAU 058(01 15)
(2) Up to$3,000 for cost of ball bonds(including,bonds for related traffic violations)required because of an
"accident"we cover.We do not have to furnish these bonds.
(4) All reasonable_expenses incurred by the "insured" solely at our request, Including actual loss of
• earnings up to$500 a day because•of time off from work.
• C. Paragraph 5.under section B.Exclusions Is deleted and replaced by the following:
5. Fellow•Employee
• 'Bodily injury"to:
. a. Any fellow "employee" of the "insured" arising out of and in the course of a fellow"erhployee:s"
employment or-while performing duties related to the conduct of your business. However, this
exclusion does not apply to your "employees" that are officers or.managers If the "bodily injury"
results from the use of a covered"auto"you'own, hire or borrow. CoVerage r excess over any other
collectible insurance;or
b. The spouse, child, parent, brother or sister of that fellow"employee"as a consequence of Paragraph
a.'above.
SECTION III--PHYSICAL DAMAGE COVERAGE Is amended as follows:
A. Paragraph 4,Coverage Extensions under section A:Coverage is deleted and replaced by the following:
4. Coverage Extensions
a. Transportation Expenses
We will pay up to$75 per day-to a total maximum of$2,000 for temporary transportation expense incurred
by.you due to covered loss to any covered auto. We will pay only for those covered"autos"for which you
carry either. Comprehensive or Specified Causes Of Loss Coverage. We will pay for temporary
transportation expenses Incurred during the period beginning 24 hours after a loss and ending, regardless
of the policy's expiration,when the covered"auto"is returned to use or we pay for its"loss",•
b. Loss of Use Expenses
For Hired Auto Physical Damage; we will pay expenses for .which an "insured" becomes legally
responsible to pay for loss of use of a vehicle rented or hired without a driver under a written rental
contract or agreement.We will pay for loss of use expenses if caused by; •
(.1) Other than collision only if the Declarations indicate that Comprehensive Coverage is provided for
hired"autos";
(2) Specified Causes of Loss only If the Declarations Indicate that Specified Causes of Loss
Coverage is provided for hired"autos";or
:(3) Collision only If the.Declarations indicate that Collision Coverage is provided for hired"autos".
However,the most we will pay for any expenses for loss Of use to any one vehicle Is$75 per day,to a
total maximum of$2,000.,
B. The following Is added to paragraph 4.Coverage Extensions under section A.Coverage:
• c. Fire Department•Service Charge
When a fire department Is called to save or protect a covered"auto", its equipment, Its contents, or
occupants from a covered cause of loss,we wiIl pay up,to$1,000 for your Liability for fire department
service charges assumed by contractor or agreement prior to loss.
No deductible applies to.th.is.additlonal coverage:
d. Auto LoanlLease Gap Coverage
•
• The following provisions apply:
(1) If a long term leased."auto", under an original lease agreement, is a covered "auto" under this
coverage form and the lessor of the covered "auto"is named as an additional Insured under this
policy,in the event of-a total loss to the.leased covered "auto", we will pay any unpaid amount
due on the lease, less the amount paid under the Physical Damage Coverage Section of the
policy;and less any:
(a) Overdue lease or-loan payments including penalties,interest, or other charges resulting from
CAU 058(01 15) Includes'copyrighted material of lila Insurance Services Office,Inc.,with Its'permisslpn.. Page 2 of 4
Copyright 2015 FOCI Insurance Group..
Ineurod Copy
COMMERCIAL AUTO
CAU 058(01 15)
overdue payments at the time of the"loss";
(b) Financial penalties imposed under a lease for excessive use, abnormal wear and tear or high
mileage;
(c) Security deposits not refunded by the lessor;
(d) Costs for extended warranties, Credit Life Insurance, Health Accident or Disability Insurance
purchased with the loan or lease;and
(e) Carry-over balances from previous loans or lease_s.,
(2) If an owned auto is a covered "auto" under this coverage form and the loss payee of the
covered"auto"is named a loss payee underthis policy,in the event of a total loss to the covered
• "auto", we will pay any unpaid amount due on the loan, less the amount paid under the Physical
Damage Coverage Section of the policy; and less any;
(a) Overdue loan payments at the time of the"loss";
(b) Costs for extended warranties, Credit Life Insurance, Health Accident or Disability Insurance
purchased with the loan;and
(c) Carry-over balances from previous loans.
C: Paragraph 3,under section B.Exclusions is deleted and replaced by the following:
3. We will not pay for"loss"due and confirmed to: _
a. Wear and tear,freezing,mechanical or electrical breakdown
b. Blowouts,punctures or other road damage to tires
This exclusion does not apply to such"loss"resulting from the total theft of a covered"auto".
However, this exclusion does not Include the discharge of an airbag in a covered "auto" you own that
inflates due to a cause other than a cause of"loss"setforth in Paragraphs A.1.b and A.1.c.but only:
a. If that"auto"ls a covered"auto"for Comprehensive Coverage under this policy;
'b. The airbags are not covered under any warranty;and
c. The airbags were not intentionally inflated
We will pay up to a maximum of$1,000 for any one"loss".
D. Section D.Deductible Is deleted and replaced by the following:
D. Deductible
For each covered "auto', our obligation to pay for, repair, return or replace damaged or stolen property
will be'reduced by the applicable deductible-shown in the Declarations subject to the following:
Any Comprehensive Coverage deductible shown in the Declarations does.not apply to: -
(1) "Loss"caused by fire orlightning;and
(2) "Loss"arising out of theft of your vehicle if your vehicle is equipped with an active GPS tracking system.
(3) Glass damage to the side or rear windows If the.glass Is repaired rather than replaced. However, no
deductible shall apply to damage to the windshield of any covered"auto"or to safety glass.
SEC_TION IV—.BUSINESS AUTO CONDITIONS is amended as follows:
A. The following is added to paragraph a. under section A. Loss Conditions, 2. Duties In the Event of
Accident,Claim,Suit or Loss:
This duty applies when the"accident", claim,"suit"or"loss"Is first known to:
(a) You;if you are an individual;
(b) A partner,if you are a partnership;
(c) An executive'officer or Insurance manager,If you are a corporation; or
CAU 058(01 15) Includes copyrighted material of the Insurance Services°Mee,Inc.,with Its permission. Page 3 of 4
Copyright 2015 FCCI Insurance Group.
Insured Copy
Ii
COMMERCIAL AUTO
CAU 058(01 15)
(d) A memberor manager, If you are a limited liability company.
• . B. Condition 5. Transfer of Rights of Recovery against Others to Us under section A. Loss Conditions Is
} deleted and replaced by the following:
5. Transfer of Rights of Recovery against Others to Us
If a person or organization to or for whom we make payment under this coverage form has rights to
recover damages from another, those rights are transferred to us. That person or organization must do
everything necessary to secure our rights and must do nothing after"accident" or"loss" to Impair them:
However, if the'insured has waived rights to recover through a written contract, or if your work was
commenced under a letter of intent or work order, subject to a subsequent reduction in writing of such a
waiver with customers whose customary contracts require a waiver, we waive any right of recovery we
may have under this coverage form.
C. The following is added to Condition 2. Concealment;Misrepresentation.or Fraud under section B:General
Con ditions:
However, if you unintentionally fall to disclose any hazards at the inception of your policy,we will not deny
coverage under this coverage form because of'such failure. This provision does not affect our right to
collect additional premium or exercise our right of cancellation or non-renewal.
D: Paragraph b.Of Condition 5. Other Insurance:under section B.General Conditions is deletedand replaced
by the following:
b. For Hired Auto Physical Damage Coverage, the following are deemed to be covered"autos"you own;
(1) Any covered"auto"you lease,hire;rent or borrow;and
(2) Any covered "auto hired or rented by your "employee" under a contract in that individual
"employee's' name, with your permission,,while performing duties,related to the conduct of your
business. However, any "auto" that is leased, hired, rented or borrowed with a driver is not a
covered."auto", nor is any "auto"you hire from any of your"employees", partners (if you are a
j partnership),members(if you are a limited liability company),or members of their households.
CAU 058(01 15) Includes copyrighted material of the Insurance Services Office,Inc.,with its permission. Page 4 of 4
Copyright 2015 FCCI insurance Group:
• Insured Copy
POLICY NUMBER: CA10000638202
COMMERCIAL AUTOMOBILE
CAU 042(01 15)
•
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL. INSURED
DESIGNATED PERSON OR ORGANIZATiON
PRIMARY/NON=CONTRIBUTORY COVERAGE (l
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
This endorsement is subject to the terms,conditions,exclusions and any other provisions of the BUSINESS
AUTO COVERAGE FORM or any endorsement attached thereto unless changes or additions are Indicated
below:
For the purpose of this endorsement,Section II.A. 1.Who Is An Insured is amended by adding the following:
1. Any person or organization designated in the schedule below is an"insured"for Liability Coverage but
only to the extent that person or`organization qualifies as an"Insured"under the Who Is An Insured
Provision contained in Section II of the Coverage Form.
2. This insurance Is primary and non-contributory to other coverages of the person or organization shown in
the Schedule when so required in a written contract or agreement that is executed prior to the loss for
which coverage Is sought.
SCHEDULE
Name of Person or Organization:
CAU042(01 15) Includes copyrighted material of the Insurance Services Office,Inc.,with its permission. Page 1 of 1
Copyright 2013 FCCI Insurance Group.
.. 1
XasM t u a .
'i WORKERS'COMPENSATION INSURANCE
WORKERS'COMPENSATION AND INC 42 03 04 B
EMPLOYERS LIABILITY POLICY Insured copy
TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT
Thisendorsement applies only to the.Insurance provided by the policy.because Texas is shown in Item 3.A.Of the
Information Page.
We have the right to recover our payments from anyone liable for an injury covered by this policy.We will not enforce our
right against the person or organization named in the Schedule,but this waiver applies only with respect to bodily injury
arising out of the operations described in the schedule where you are required by a written contract to obtain this waiver
from us.
This endorsement shall not Operate directly or indirectly to benefit anyone not named in the Schedule.
The premium for this endorsement is shown in the Schedule.
Schedule
,j () Specific Waiver •
Name Of person or organization
(X)Blenket Waiver
Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver.
2: Operations: All Texas operations
3: Premium:
The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection
with work performed for the above person(s)or organization(s)prising out of the operations described.
4. Advance Premium; Included,see Information Page
1
This endorsement changes the policy to which it Is attached effective on the Inception date of the:policy unless a different date is indicated below.
(The following"attaching clause"need be completed only when this endorsement Is Issued subsequent to preparation of the policy.)
This endorsement,effective on 1011!18 at 12;01 a.m.standard time,forms a part of:
Polley no.0001276752 of Texas Mutual Insurance Company effective on 1011/18
Issued to: REDDICO CONSTRUCTION CO INC J�
I _ I
This isnot a bill Authorized representative
NCCI Carrier Code: 29939 9121118
PO Box 12058,Austin,TX 78711-2058
1.of 1 texasmutual.com 1(800)859-59951 Fax(800)359-0650 WC 42 03 04 B
CITY OF PEARLAND PARTIAL WAIVER OF LIEN
Section 00615
PARTIAL WAIVER OF LIEN
AND PAYMENT AFFIDAVIT
The undersigned contracted with City of Pearland to furnish in
connection with certain improvements to real property located in the City of Pearland,
TX and owned by the City of Pearland which improvements are described as follows:
In consideration of Pay Estimate No. in the amount of$
the undersigned, on oath, states,that all persons and firms who supplied labor and
materials to the undersigned in connection with said Project will be fully paid within 30
days of the date of this document by the undersigned for such work through
In consideration of the payment herewith made, the undersigned does fully and
finally release and hold harmless the City of Pearland and its surety, if any, through the
above date from any and all claims, liens, or right to claim or lien, arising out of this
Project under any applicable bond, law or statue.
It is understood that this affidavit is submitted to induce payment of the above
sum and for use by the City of Pearland in assuring the Owner and others that all liens
and claims relating to the said Project furnished by the undersigned are paid.
Signature
Printed Name&Title
Company Name
State of
County of
Subscribed and sworn to,before me,this day of , 20
My Commission Expires:
Notary Public
� r
5-12-12
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
Section 00700
GENERAL CONDITIONS OF AGREEMENT
TABLE OF CONTENTS Page
No.
1.0 DEFINITIONS AND INTERPRETATIONS 1
1.01 Owner, Contractor and Engineer
1.02 Contract Documents
1.03 Subcontractor
1.04 Written Notice
1.05 Work
1.06 Extra Work
1.07 Work Day
r
1.07-1 Rain Day
1.07-2 Impact Day
1.08 Calendar Day
1.09 Substantially Completed
1.10 Interpretation of Words and Phrases
1.11 Referenced Standards
1.12 Contract Time
1.13 Construction Inspector
1.14 Balancing Change Order
2.0 RIGHTS AND RESPONSIBILITIES OF THE OWNER 4
2.01 No Warranty of Design
� J
2.02 Right of Entry
2.03 Ownership of Plans
10-2012 00700-i
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
2.04 Changes and Alterations
2.05 Damages
3.0 RIGHTS AND RESPONSIBILITIES OF THE ENGINEER 6
3.01 Owner-Engineer Relationship
3.02 Keeping of Plans and Specifications Accessible
3.03 Preliminary Approval
3.04 Inspection by Engineer
3.05 Determination of Questions and Disputes
3.06 Recommendation of Payment
4.0 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR 8
4.01 Independent Contractor
4.02 Contractor's Understanding
4.03 Laws and Ordinances
4.04 Assignment and Subletting
4.05 Performance and Payment Bonds [and Maintenance Bond]
4.06 Insurance
4.07 Permits and Fees
4.08 Texas State Sales Tax
4.09 Contractor's Duty and Superintendence
4.10 Character of Workers
4.11 Labor, Equipment, Materials, Construction Plant and Buildings
4.12 Sanitation
4.13 Cleaning and Maintenance
4.14 Performance of Work
4.15 Right of Owner to Accelerate the Work
10-2012 00700-ii
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
4.16 Layout of Work
4.17 Shop Drawings
4.18 Engineer-Contractor Relationship; Observations
4.19 Observation and Testing
4.20 Defects and Their Remedies
4.21 Liability for Proper Performance
4.22 Protection Against Accident To Employees and the Public
4.23 Protection of Adjoining Property
4.24 Protection against Claims of Subcontractors, Laborers, Materialmen,
and Furnishers of Equipment, Machinery and Supplies
4.25 Protection Against Royalties or Patented Invention
4.26 Indemnification
4.27 Losses From Natural Causes
4.28 Guarantee
5.0 PROSECUTION AND PROGRESS 18
5.01 Time and Order of Completion
5.02 Extension of Time
5.03 Hindrances and Delays
5.04 Suspension of Work
5.05 Liquidated Damages for Delay
5.06 Change of Contract Time
5.07 Delays Beyond Owner's and Contractor's Control
6.0 MEASUREMENT AND PAYMENT 21
6.01 Discrepancies and Omissions
6.02 Quantities and Measurements
10-2012 00700-iii
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
6.03 Estimated Quantities
6.04 Price of Work
6.05 Payments
6.06 Partial Payments
6.07 Use of Completed Portions &Punchlist
6.08 Substantial Completion
6.08-1
6.09 Final Payment
6.10 Correction of Work Before Final Payment
6.11 Correction of Work After Final Payment
6.12 Payments Withheld
6.13 Delayed Payments
7.0 EXTRA WORK AND CLAIMS 27
7.01 Differing Site Conditions
7.02 Change Orders
7.03 Change Orders
7.04 Request for Work Approval for Work on Non-Work Days
7.05 Minor Changes
7.06 Extra Work
7.07 Time of Filing Claims
8.0 DEFAULT 30
8.01 Default by Contractor
8.02 Supplementation of Contractor Forces
8.03 Cumulative Remedies & Specific Performance
8.04 Cross-Default
10-2012 00700-iv
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
8.05 Insolvency
8.06 Contingent Assignment
8.07 Waiver of Consequential Damages
8.08 Termination for Convenience
8.09 Default by Owner
9.0 DISPUTE RESOLUTION 35
ATTACHMENT NO. 1: WORKERS' COMPENSATION INSURANCE COVERAGE Al
ATTACHMENT NO. 2: AGREEMENT FOR FINAL PAYMENT AND CONTRACTOR'S
SWORN RELEASE BI
ATTACHMENT NO. 3: OWNER'S INSURANCE REQUIREMENTS OF CONTRACTOR Cl
l �
10-2012 00700-v
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
Section 00700
GENERAL CONDITIONS OF AGREEMENT
1.0 DEFINITIONS AND INTERPRETATIONS
1.01 OWNER, CONTRACTOR AND ENGINEER. The OWNER, the
CONTRACTOR and the ENGINEER are those persons or organizations identified as such in the
Agreement. The term ENGINEER as used in these General Conditions shall refer to the Engineer
or Architect identified in the Agreement, as applicable, and means a person authorized to act as a
representative of the entity designated by the OWNER to provide professional services required in
connection with the preparation of plans and specifications of this Contract. The term
CONSTRUCTION MANAGER as used in these General Conditions shall refer to the
Construction Manager identified in the Agreement, as applicable, and means a person authorized
to act as representative of the entity designated by the OWNER to provide professional services
required in connection with the performance of the work of this Contract. The Owner's
representative on the project site shall be the CONSTRUCTION MANAGER or ENGINEER as
designated.
1.02 CONTRACT DOCUMENTS. The Contract Documents shall consist of all of the
documents identified in Article 8 of the Standard Form of Agreement, which documents,
excluding such documents as may be delivered or issued after the Effective Date of the
Agreement, as referenced in Article 8, shall be bound together in a Project Manual for the Work.
All references to the "Contract" or the "Agreement" in these General Conditions of Agreement
shall include the Contract Documents.
The Contract Documents are complementary, and what is required by one shall be binding as if
required by all. In the event of any conflict among the Contract Documents, the Contract
Documents shall govern in the following order:
(1) Modifications in writing and signed by both parties, including any Change Orders;
(2) Standard Form of Agreement;
(3) Special Conditions of Agreement;
(4) General Conditions of Agreement, including Attachment No. 1 — Workers'
Compensation Insurance Coverage, Attachment No. 2 — Agreement for, Final
Payment and CONTRACTOR'S Sworn Release, and Attachment No. 3 — Owner's
Insurance Requirements of Contractor;
(5) Addenda, if any;
(6) Plans and Specifications referenced or included in the Project Manual;
(7) Instructions to Bidders;
(8) Bid Proposal; and
08-2018 00700- 1 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
(9) Exhibits: The following Exhibits, if any, attached hereto, are incorporated herein,
and are a part of this Contract:
In the event a conflict or inconsistency remains between or within the Contract Documents, or the
Contract Documents and applicable standards, codes and ordinances, CONTRACTOR shall
provide the greater quantity or better quality, or CONTRACTOR shall comply with the more
stringent requirements, as determined by ENGINEER.
Terms or phrases used in the Contract Documents with a well-known technical or construction
industry meaning shall have such recognized meanings. References to standards, specifications,
manuals or codes of any technical society, organization or association, or to the laws or
regulations of any governmental authority, shall mean the latest in effect on the effective date of
the Contract,unless otherwise stated in the Contract Documents.
1 .03 SUBCONTRACTOR. The term "subcontractor", as employed herein, includes
those entities having a contract with the CONTRACTOR or a subcontractor for performance of
work on the Project. OWNER shall have no responsibility to any subcontractor for performance of
work on the Project contemplated by these Contract Documents, and any such subcontractor shall
look exclusively to CONTRACTOR for any payments due subcontractor.
1.04 WRITTEN NOTICE. Written Notice shall be deemed to have been duly served if
delivered in person or by electronic means through the Pro-Trak to the individual or to a partner of
the partnership or joint venture, or to an officer of the corporation or company for whom it is
intended, or if delivered at or sent by Certified Mail, Return Receipt Requested, to the last known
business address or registered office of such individual, partnership,joint venture or corporation or
company, or to the address for giving notices listed in the Standard Form of Agreement.
1.05 WORK. Unless otherwise stipulated, the CONTRACTOR shall provide and pay
for all materials, supplies, machinery, equipment, tools, superintendence, labor, services,
insurance, and all water, light, power, fuel, transportation and all other facilities or services of any
• nature whatsoever necessary for the execution and completion of the Work described in the
Standard Form of Agreement. Unless otherwise specified, all materials shall be new, and both
workmanship and materials shall be of good quality. The CONTRACTOR shall, if required by the
ENGINEER as representative of the OWNER, furnish satisfactory evidence as to the kind and
quality of materials. Materials or work described in words which so applied have well-known,
technical or trade meaning shall be held to refer to such recognized standards. All work shall be
done and all materials shall be furnished in strict conformity with the Contract Documents.
1.06 EXTRA WORK. The term "Extra Work", as used in this Contract, shall be
understood to mean and include all work that may be required by the ENGINEER as
representative of the OWNER, to be performed by the CONTRACTOR to accomplish any change,
alteration or addition to the work shown in the plans. Extra work shall be authorized in writing by
the ENGINEER prior to commencement. Extra Work items are paid for on an as needed, as
authorized basis only.
1.07 WORK DAY: As used herein, a "Work Day" is defined as any Monday through
Friday, not a legal holiday, and any Saturday or Sunday specifically approved by the OWNER, in
which the CONTRACTOR can perform six or more hours of work per the current construction
schedule. CONTRACTOR agrees to request specific approval from the Construction Manager or
08-2018 00700-2 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
Owner, in advance, to perform work on Saturdays or Sundays and in so doing agrees to pay all
. charges and costs for Inspection and or Construction Management services required during the
performance of any such approved work. Refer to paragraph 7.04 for procedure to determine cost
for Construction Management and Inspection Services for work on non-work days.
1.07-1 RAIN DAY: As used herein, is defined as any WORK DAY during which weather
related conditions prevent the CONTRACTOR from performing four (4) or more consecutive
hours of work on critical path items as identified in the current construction schedule.
CONTRACTOR shall record Rain Days on the Pay Application each month for the review and
possible approval by the OWNER. The approved Rain Day is then added to the Contract Time.
(See 1.12 Contract Time below)
1.07-2 IMPACT DAY: As used herein, is a day that is added to the CONTRACT TIME
by the OWNER by Change Order to extend the Contract Time by one full Work Day. (See 1.12
Contract Time below) Impact Days, once approved by the OWNER, shall extend the Contract
Time on a one-to-one basis to replace a Work Day lost to conditions that prevented the
CONTRACTOR from performing four (4) or more consecutive hours of work on critical path
items. Impact Days are added to the Contract Time by Change Order only at the end of the work
and then only if, in the opinion of the OWNER, a time extension is warranted due to delays
beyond the control of the Contractor and required to complete the work within the Contract Time.
1.08 CALENDAR DAY. A "calendar day" is any day of the week, month or year no
days being excepted. Unless otherwise expressly provided, all references to "day(s)" shall mean
calendar day(s).
1 .09 SUBSTANTIALLY COMPLETED: The terms "Substantially Completed", or
"Substantially Complete" or "Substantial Completion" as used in this Contract, shall mean that all
major process components of the facility or work have been made suitable for use or occupancy,
including appropriate documentation from the equipment suppliers that all of the individual
components have been installed in accordance with the specifications and manufacturer's
recommendations, the installations have been approved by the ENGINEER and the items have met
the start-up and testing requirements of the contract documents.or is deemed to be in a condition to
serve its intended purpose or requires only minor miscellaneous work and adjustment to achieve
Final Completion and Acceptance as determined by the ENGINEER. Upon compliance with the
above referenced criteria, ENGINEER shall issue a Certificate of Substantial Completion.
PARTIAL SUBSTANTIAL COMPLETION: designation will be given on components of
the Work that must be placed into service prior to the completion of the entire Work. The
contractor's One Year Warranty period for these items shall begin on the date of Partial
Substantial Completion as designated by the ENGINEER. The ENGINEER shall determine and
make all such designations.
1.10 INTERPRETATION OF WORDS AND PHRASES. Whenever the words
"directed", "permitted", "designated", "required", "ordered", "considered necessary", "prescribed"
or words of like import are used, it shall be understood that the direction, requirement,permission,
order, opinion designation or prescription of the ENGINEER as the OWNER's representative is
intended. Similarly, the words "approved", "acceptable", "satisfactory" or words of like import
shall mean that no exception is taken by ENGINEER, but does not relieve CONTRACTOR of
responsibility for compliance with the Contract Documents.
08-2018 00700-3 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
Whenever in the Specifications or Plans of the Contract Documents, the terms of description of
various qualities relative to finish, workmanship or other qualities of similar kind which cannot,
from their nature, be specifically and clearly described and specified, but are necessarily described
in general terms, the fulfillment of which must depend on individual judgment, then, in all such
cases, any question of the fulfillment of said Specifications shall be decided by the ENGINEER as
the OWNER's representative, and said work shall be done in accordance with his interpretations
of the meaning of the words, terms or clauses defining the character of the work.
1.11 REFERENCED STANDARDS. No provision of any referenced standard
specification, or manual shall be effective to change the duties and responsibilities of the Owner,
Engineer, Contractor, or their consultants, employees, or representatives from those set forth in the
Contract Documents, nor shall it be effective to assign to the Engineer or its consultants,
employees, or representatives any duty or authority to supervise or direct the furnishing or
performance of the Work or any duty or authority to undertake responsibilities contrary to
provisions of the Contract Documents.
1.12 CONTRACT TIME The term Contract Time as used herein, refers to the number
of Calendar days provided to complete the work or the date, stated in the Agreement: (i) to achieve
Substantial Completion, and (ii) to complete the Work so that it is ready for final payment as
evidenced by ENGINEER's written recommendation of final payment in accordance with
Paragraph 6.09 and as modified as a result of any authorized Extensions.
The established Contract Time includes 40 Rain Days per year, based on the average
number of rain days per year for the period of June 1898 to December 1996 as recorded by the
Alvin Weather Center Record. The Contract Time shall only be extended by (a) the addition of
Rain Days equal to the number of actual Rain Days in excess of 40 days per year and (b) the
number of Impact Days granted for delays, in the opinion of the Owner, beyond the control of the
Contractor. The extension of the Contract Time shall be the CONTRACTOR's sole and exclusive
remedy for delays.
1.13 CONSTRUCTION INSPECTOR The term "Construction Inspector" here in
includes those professionals engaged by the OWNER to ensure CONTRACT work's compliance
with the specifications and any applicable statutory requirements.
1.14 BALANCING CHANGE ORDER is a change order executed during the close-out
process that may add/remove pay items, or adjust quantities of existing items or remove unused
pay items or quantities Balancing Change Orders are used to reconcile the unit cost of the work
performed or installed by the Contractor.
2.0 RIGHTS AND RESPONSIBILITIES OF THE OWNER
2.01 NO WARRANTY OF DESIGN. It is understood that the OWNER MAKES NO
WARRANTY OF THE ADEQUACY, ACCURACY OR SUFFICIENCY OF THE PLANS AND
SPECIFICATIONS OR ANY OTHER DESIGN DOCUMENTS, AND OWNER HEREBY
EXPRESSLY DISCLAIMS ANY SUCH WARRANTY, EXPRESSED OR IMPLIED. Prior to
commencing each portion of the Work, CONTRACTOR shall carefully study and compare the
relevant Contract Documents, shall observe conditions at the site affecting the Work, and shall
take field measurements of existing conditions related to the Work. Any errors, omissions or
08-2018 00700-4 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
inconsistencies in the Contract Documents noted by the CONTRACTOR, and/or any variance
between the Contract Documents and applicable codes, standards or ordinances, shall be promptly
reported by CONTRACTOR to ENGINEER in writing as a Request for Information. Work
performed prior to a Request for Information shall be at the Contractor's risk. If CONTRACTOR
fails to perform its obligations under this paragraph, CONTRACTOR shall pay such costs and
damages to OWNER as would have been avoided if CONTRACTOR had reported any errors,
omissions, inconsistencies or variances in the Contract Documents noted by CONTRACTOR or
which should have been noted by a careful study of the Contract Documents. CONTRACTOR
shall comply with the Contract Documents, all approved modifications thereof and additions and
alterations thereto approved in writing by the OWNER. The burden of proof of such compliance
shall be upon the CONTRACTOR to show that he has complied with the requirements of the
Contract Documents and approved modifications thereof and all approved additions and
alterations, thereto, as the same shall have been interpreted by the ENGINEER.
2.02 RIGHT OF ENTRY. The OWNER reserves the right to enter the property or
location on which the work herein contracted for is to be performed, constructed or installed, for
itself or such agent or agents as it may select, for the purpose of inspecting the work, or for the
purpose of performing, constructing or installing such collateral work as the OWNER may desire.
The OWNER shall have the right to make inspections at all reasonable times, and the
CONTRACTOR hereby waives any claims for extension of time and/or compensation for any loss
or damage if his work shall be delayed by reason of such inspection, performance, construction or
installation of collateral work.
2.03 OWNERSHIP OF PLANS. All plans, specifications and copies thereof furnished
by the OWNER shall not be reused on other work and, with the exception of the sets forming the
part of the signed Contract Documents, are to be returned to the OWNER on request at the
completion of the Work. All plans and models are the property of the OWNER.
2.04 CHANGES AND ALTERATIONS. The CONTRACTOR further agrees that the
Owner may make such changes and alterations, additions and deletions as the OWNER may see
fit, in the Work, including but not limited to changes in line, grade, form, dimensions, plans or
specifications for the Work herein contemplated, or any part thereof, either before or after the
beginning of construction, without affecting the validity of this Contract and the corresponding
Performance and Payment Bonds.
If such changes or alterations or deletions diminish the quantity or the value of the Work to be
done, they shall not constitute the basis for a claim for compensation or damages, including lost or
anticipated profits on the Work that may be affected. If the amount of Work is increased and the
work can fairly be classified under the specifications, such increase shall be paid for according to
the quantity actually done and at the unit price, if any, established for such work under this
Contract, otherwise, such additional work shall be paid for as provided under Article 7 hereof for
Extra Work. In case the OWNER shall make such changes or alterations as shall make useless
any Work already done or material already furnished or used in said Work, then the OWNER shall
compensate the CONTRACTOR for any material or labor so used and for any actual loss
occasioned by such change due to actual expenses incurred in preparation for the Work as
originally planned.
2.05 DAMAGES. In the event the OWNER is damaged in the course of the work by
the act, negligence, omission, mistake or default of the CONTRACTOR, or should the
08-2018 00700-5 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
CONTRACTOR unreasonably delay the progress of the work being done by others on the job so
as to cause loss for which the OWNER becomes liable, then the CONTRACTOR shall reimburse
the OWNER for such loss.
3.0 RIGHTS AND RESPONSIBILITIES OF THE ENGINEER
3.01 OWNER-ENGINEER RELATIONSHIP. The ENGINEER shall serve as the
OWNER'S representative during construction. The duties, responsibilities and limitations on the
authority of the ENGINEER as the OWNER's representative during construction are set forth in
the Contract Documents; and the ENGINEER shall not have authority to extend the OWNER's
liability or to bind the OWNER for any additional liability of any nature whatsoever without the
written consent of the OWNER. Any communications by the OWNER to the CONTRACTOR
regarding the Work shall be issued through the ENGINEER.
It is the intent of this Agreement that there shall be no delay in the execution of the Work;
therefore, written decisions or directions rendered by the ENGINEER as the OWNER's
representative shall be promptly carried out, and any claim arising therefrom shall be resolved as
provided in Article 7. Unless otherwise specified, it is mutually agreed between the parties to this
Agreement that the OWNER'S representative shall have the authority to issue written stop work
orders whenever such stoppage may be necessary to insure the performance of the Work in
accordance with the Contract Documents.
3.02 KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE. The
ENGINEER shall furnish the CONTRACTOR with four (4) copies of all Plans and Specifications
without expense to the CONTRACTOR, and the CONTRACTOR shall keep one full size copy of
the same constantly accessible on the job site, with the latest revisions noted thereon. The
CONTRACTOR shall be responsible for preserving the Plans and Specifications, timely and
accurately updated, for reference and review by the OWNER or the ENGINEER and submittal of
redlines during closeout.
3.03 PRELIMINARY APPROVAL. The ENGINEER shall not have the power to
waive the obligations imposed under this Contract for the furnishing by the CONTRACTOR of
new material of good quality, and for good and workmanlike performance of the Work as herein
described, and in full accordance with the Contract Documents, without alteration, deletion or
change. No failure or omission of the OWNER'S representative to discover, object to or condemn
any non-conforming or defective work or material, or to stop work, shall release the
CONTRACTOR from the obligation to fully and properly perform the Contract, including without
limitation, the obligation to at once remove and properly replace any defective work or material at
any time prior to final acceptance, upon discovery of such non-conforming or defective work or
material.
Any questioned Work may be ordered taken up or removed for inspection by the ENGINEER
prior to final acceptance, and if found not to be in accordance with the Contract Documents, all
expense of removing, inspection and repair or replacement shall be borne by the CONTRACTOR;
otherwise the expense thus incurred shall be allowed as Extra Work and shall be paid for by the
OWNER, provided that where inspection or approval is specifically required by the Specifications
prior to performance of certain work, should the CONTRACTOR proceed with such work without
requesting prior inspection or approval, he shall bear all expense of taking up, removing and
replacing this work if so directed by the ENGINEER.
08-2018 00700-6 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
3.04 INSPECTION BY ENGINEER. The ENGINEER will make periodic visits to the
site to observe the progress and quality of the executed Work and to determine if such Work
generally meets the essential performance and design features and the technical, functional /or
engineering requirements of the Contract Documents, and is in all other respects being performed
in compliance with the Contract Documents. However, the ENGINEER shall not be responsible
for making any detailed, exhaustive, comprehensive or continuous on-site inspections to check the
quality and/or quantity of the work, nor shall the ENGINEER be in any way responsible, directly
or indirectly, for the construction means, methods, techniques, sequences, quality, procedures,
programs, safety precautions or lack of same incident to the Work being performed or any part
thereof The ENGINEER shall use reasonable care to prevent deviation from the intent and
substance of the Contract Documents by the CONTRACTOR in the performance of the Work and
any part thereof and, on the basis of such on-site observations, will keep the OWNER informed of
the progress of the work and will endeavor to guard the OWNER against defects and deficiencies
in the Work of the CONTRACTOR. Notwithstanding any other provision of this Agreement or
any other Contract Document, the ENGINEER shall not be in any way responsible or liable for
any acts, errors, omissions or negligence of the CONTRACTOR, any subcontractors, agents,
servants or employees or any other person, firm or corporation performing or attempting to
perform any of the Work.
•
3.05 DETERMINATION OF QUESTIONS AND DISPUTES. In order to prevent
delays and disputes and to discourage litigation, it is agreed that the ENGINEER shall, in all cases,
determine the quantities and qualities of the several kinds of Work, which are to be paid for under
this Contract. The ENGINEER shall address all questions in relation to said Work and the
construction thereof, as well as all claims, disputes and other matters in question between the
CONTRACTOR and the OWNER relating to the execution or progress of the Work or the
interpretation of the Contract Documents. In the event the ENGINEER shall become aware of or
shall receive information that there is a dispute or a possible dispute as to the reasonable
interpretation of the terms and conditions of the Contract Documents, or any other dispute or
question, the ENGINEER shall, within a reasonable time, provide a written interpretation of the
Contract Documents or a written decision on all questions arising relative to the execution of the
Work, copies of which shall be delivered to all parties to the Contract. If the CONTRACTOR or
OWNER desires to take exception to any directions, order, interpretation or instructions of the
ENGINEER, CONTRACTOR or OWNER shall present any such claim to the ENGINEER in
accordance with the provisions of Section 7.07.
3.06 RECOMMENDATION OF PAYMENT. The ENGINEER shall review the
CONTRACTOR's application for payment and supporting documents, shall determine the amount
owed to the CONTRACTOR and shall provide written recommendation to the OWNER for
payment to the CONTRACTOR in such amount. Such recommendation of payment to
CONTRACTOR shall constitute a representation to the OWNER of the ENGINEER's judgment
that the work has progressed to the point indicated, to the best of his knowledge, information and
belief; however, such recommendation of an application for payment to CONTRACTOR shall not
be deemed an acceptance of any defective or non-conforming Work. Any recommendation of
payment by the ENGINEER shall be subject to OWNER's rights to withhold payment under
Section 6.12 and as otherwise provided in the Contract.
08-2018 00700-7 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
4.0 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR
4.01 INDEPENDENT CONTRACTOR. CONTRACTOR is, and shall remain, an
independent contractor, solely responsible for the manner and method of completing the Work
under this Contract, with full and exclusive power and authority to direct, supervise and control
his own employees and to determine the means, method and manner of performing such Work, so
long as such methods comply with the requirements of the Contract Documents, and do not
adversely affect the completed improvements or any other property abutting or adjoining the Work
area, the OWNER and ENGINEER being interested only in the result obtained and conformity of
such completed improvements to the Plans, Specifications and Contract Documents. The fact that
the OWNER or ENGINEER as the Owner's representative shall have the right to observe
CONTRACTOR's work during his performance and to carry out the other prerogatives which are
expressly reserved to and vested in the OWNER and the ENGINEER hereunder, is not intended to
and shall not at any time change or affect the status of the CONTRACTOR as an independent
contractor with respect to either the OWNER or the ENGINEER as the OWNER's representative
or to the CONTRACTOR's own employees or to any other person, firm or corporation.
4.02 CONTRACTOR'S UNDERSTANDING. It is understood and agreed that the
CONTRACTOR has, by careful examination, satisfied himself as to the nature and location of the
Work, the conformation of the ground, the character, quality and quantity of the materials to be
encountered, the character of equipment and facilities needed preliminary to and during the
prosecution of the Work, the general and local conditions, including but not limited to weather,
access, lay down and storage areas, and all other matters which in any way affect the Work under
this Contract. It is further understood that the CONTRACTOR has satisfied himself as to the
terms, meaning, intent and requirements of all of the Contract Documents, and applicable laws,
codes, regulations and ordinances. CONTRACTOR hereby warrants and represents that it has
taken into consideration all of the foregoing factors, and CONTRACTOR shall perform the Work
for the Contract Price and within the Contract Time. No verbal agreement or conversation with
any officer, agent or employee of the OWNER or the ENGINEER, either before or after the
execution of this Contract, shall affect or modify any of the terms or obligations herein contained.
4.03 LAWS AND ORDINANCES. The CONTRACTOR shall at all times observe and
comply with all federal, state or local laws, codes, ordinances, permits and regulations, regardless
of whether the same are adopted before or after the execution of this Contract, which in any
manner affect th6 Contract or the work, and shall indemnify, save and hold harmless the OWNER
and the ENGINEER against any claim arising out of the violation of any such laws, ordinances
and regulations, whether by the CONTRACTOR or his agents, employees, subcontractors or
vendors. If the CONTRACTOR observes that the Plans and Specifications are at variance with
federal or state laws or codes or the ordinances or regulations of the City, he shall promptly notify
the ENGINEER in writing, and any necessary changes shall be made as provided in the Contract
for changes in the work. If the CONTRACTOR performs any work knowing it to be contrary to
such laws, codes, ordinances, rules or regulations, or if CONTRACTOR reasonably should have
known of any such violation, and without such notice to the ENGINEER, CONTRACTOR shall
bear all costs arising therefrom.
The OWNER is a Political Subdivision of the State of Texas, and the law from which it derives its
powers, insofar as the same regulates the objects for which, or the manner in which, or the
conditions under which the OWNER may enter into contracts, shall be controlling and shall be
considered as part of this Contract to the same effect as though embodied herein. Neither the act
08-2018 00700-8 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
of OWNER entering into this Contract, nor OWNER's performance hereunder, shall constitute a
waiver of any immunity from suit enjoyed by OWNER under applicable law, all such rights and
defenses being hereby expressly reserved, notwithstanding any term or provision herein to the
contrary. The Code of Ordinances and other applicable regulations of the OWNER shall be
deemed to be embodied in this Contract.
The prevailing wage rates applicable to this Project shall be either Document 00811 —Wage
Scale for Engineering Construction, or Document 00813 —Wage Scale for Building
Construction, or both, as set out in the Project Manual.
4.04 ASSIGNMENT AND SUBLETTING. The CONTRACTOR further agrees that he
will retain personal control and will give his personal attention to the fulfillment of this Contract
and that he will not assign, by power of attorney or otherwise, or sublet said Contract, or any
rights, duties or obligations arising thereunder, in whole or in part, without the prior written
consent of the OWNER, and that no part or feature of the Work will be sublet to anyone
objectionable to the ENGINEER or the OWNER. In addition, the OWNER reserves the right to
disapprove the subletting of this Contract or any portion hereof on any basis whatsoever. The
CONTRACTOR further agrees that the subletting of any portion or feature of the Work or
materials required in the performance of this Contract shall not relieve the CONTRACTOR from
his obligations to the OWNER, as provided for by this Agreement.
4.05 PERFORMANCE, PAYMENT AND MAINTENANCE BONDS. In the event the
Contract Price shall be in excess of $25,000.00, the CONTRACTOR shall execute separate
Performance, Payment and Maintenance Bonds, each in the sum of one hundred percent(100%) of
the Contract Price, and each in accordance with the provisions of Chapter 2253 of the Texas
Government Code. If the Contract Price does not exceed $25,000.00, the statutory bonds will not
be required. All required Bonds shall be payable to OWNER and on forms approved by the
OWNER, and shall be executed by a corporate surety in accordance with Article 7.19-1 of the
Texas Insurance Code. It is agreed that the Contract shall not be in effect until such original
Performance, Payment and Maintenance Bonds are delivered to and approved by the OWNER.
The cost of the premium for the Performance, Payment and Maintenance Bonds, should
Maintenance Bonds be required, shall be included in the CONTRACTOR's Bid Proposal. All
bonds shall be issued by Texas Department of Insurance approved surety companies.
4.06 INSURANCE. The CONTRACTOR, at his own expense, shall procure, maintain
and keep in force throughout the duration of the Work, and throughout the Guarantee Period,
insurance as specified in Attachment No. 1 hereto with regard to Workers' Compensation
Insurance, and as specified in Attachment No. 3 hereto with regard to all other Insurance. Such
insurance shall be carried with an insurance company licensed to transact business in the State of
Texas and shall cover all operations in connection with this Contract, whether performed by the
CONTRACTOR or a subcontractor, or others for whom CONTRACTOR is responsible.
4.07 PERMITS AND FEES. Unless otherwise provided in the Contract Documents,the
Contractor shall secure and pay for all permits, licenses, and inspections necessary for proper
execution and completion of the Work, and which are legally required at the time bids are
received. Permits required by the City of Pearland will be issued as a NO FEE permit.
4.08 TEXAS STATE SALES TAX. Materials incorporated into this project are exempt
from State Sales according to provisions of the Texas Tax Code, Chapter 151, Subsection H.
08-2018 00700-9 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
The Contractor must obtain a limited sales, excise and use tax permit or exemption certificate
which shall enable him to buy the materials to be incorporated into the Work without paying tax at
due time of purchase.
4.09 CONTRACTOR'S DUTY AND SUPERINTENDENCE. The CONTRACTOR
shall give adequate attention to the faithful prosecution and completion of this Contract and shall
keep on the work, during its progress, a competent superintendent and any necessary assistants, all
satisfactory to the ENGINEER as the OWNER'S representative. The superintendent shall
represent the CONTRACTOR in his absence and shall act as the agent of the CONTRACTOR,
and all directions given to him shall be binding as if given to the CONTRACTOR. Adequate
supervision by competent and reasonable representatives of the CONTRACTOR is essential to the
proper performance of the Work, and lack of such supervision shall be an act of default, and
grounds for suspending operations of the CONTRACTOR. The Superintendent cannot be
removed from the project without the consent of the Owner; the Superintendent must speak and
understand the English language; the Superintendent must be on site when any work on the project
is being done, even when a subcontractor is performing the work.
The Work, from its commencement to completion, shall be under the exclusive charge and control
of the CONTRACTOR, and all risk in connection therewith shall be borne by the
CONTRACTOR.
Neither the OWNER nor the ENGINEER as the OWNER's representative will be responsible for
the acts or omissions of the CONTRACTOR, its subcontractors or any of its agents or employees,
or any other persons performing any of the Work.
4.10 CHARACTER OF WORKERS. The CONTRACTOR agrees to employ only orderly and
competent workers, skillful in the performance of the type of work required under this Contract, to
do the Work, and agrees that whenever the ENGINEER shall inform him in writing that any
worker or workers on the Work are, in his opinion, incompetent, unfaithful or disorderly, or in the
ENGINEER's opinion, are not using their best efforts for the progress of the Work, such worker
or workers shall be discharged from the Work and shall not again be employed on the Work
without the ENGINEER's written consent. OWNER reserves the right to bar any person,
subcontractor, or supplier found to be incompetent, unfaithful, disorderly, or not using their best
efforts to progress work or considered to be a threat to the health, safety and welfare to the project
or workforce.
4.11 LABOR, EQUIPMENT, MATERIALS, CONSTRUCTION PLANT, AND
BUILDINGS. The CONTRACTOR shall provide all labor, services, tools, equipment, machinery,
supplies, facilities, utilities and materials necessary in the prosecution and completion of this
Contract where it is not otherwise specifically provided that the OWNER shall furnish same; and
further, the CONTRACTOR shall be responsible for the care, preservation, conservation and
protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities,
all means of construction and any and all parts of the Work, whether the CONTRACTOR has
been paid, partially paid or not paid for such Work, until the entire Work is completed and
accepted.
The building or placement of structures for housing workers or offices, or the erection of tents or
other forms of protection, will be permitted only with the ENGINEER's written permission, and at
08-2018 00700- 10 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
such places as the ENGINEER shall direct, and the sanitary conditions of the grounds in or about
such structures shall at all times be maintained in a manner satisfactory to the ENGINEER. Any
structures of any nature constructed, placed or erected by the CONTRACTOR for the purposes
herein set out, shall be the sole,responsibility of the CONTRACTOR as to the proper erection,
placement or construction thereof; and the CONTRACTOR agrees to indemnify and hold the
ENGINEER or OWNER harmless from any claims of any nature whatsoever brought against
either of them for damages allegedly sustained by anyone by reason of the erection, placement,
construction or maintenance of CONTRACTOR's buildings or structures.
4.12 SANITATION. Necessary sanitary conveniences for the use of laborers and others
on the Work site, properly secluded from public observation, shall be constructed and maintained
by the CONTRACTOR in such manner and at such points as shall be approved by the
ENGINEER, and their use shall be strictly enforced. Any structures of any nature constructed or
erected by the CONTRACTOR for the purposes herein set out, shall be the sole responsibility of
the CONTRACTOR as to the proper erection or construction thereof, and the CONTRACTOR
agrees to indemnify and hold the ENGINEER and OWNER harmless from any claims of any
nature whatsoever brought against either of them for damages allegedly sustained by anyone by
reason of the erection, construction or maintenance of CONTRACTOR's buildings.
4.13 CLEANING AND MAINTENANCE. The CONTRACTOR shall at all times keep
and maintain the premises free- from accumulation of debris, trash and waste. The
CONTRACTOR shall remove waste, debris and trash at the end of each work day.
CONTRACTOR shall remove all such debris, trash and waste, tools, scaffolding and surplus
materials, and shall leave the Work broom-clean or its equivalent, upon completion of the Work.
The Work shall be left in good order and condition. In case of dispute, the OWNER may remove
the debris, trash, waste and surplus materials, and charge the cost to the CONTRACTOR.
4.14 PERFORMANCE OF WORK. It is further agreed that it is the intent of this
Contract that all Work must be done and all material must be furnished in accordance with the
generally accepted practice for such materials furnished or work completed, unless otherwise
provided in the Contract Documents.
4.15 RIGHT OF OWNER TO ACCELERATE THE WORK. If at any time the
methods or equipment used by the CONTRACTOR, or the work force supplied are found to be
inadequate to achieve the progress required to Substantially Complete the Work within the
Contract Time, the OWNER or the ENGINEER as the OWNER's representative, may order the
CONTRACTOR in writing to supplement its forces and/or equipment, or work shifts or overtime,
or otherwise improve its efficiency and rate of progress to achieve Substantial Completion of the
Work within the Contract Time, and the CONTRACTOR shall comply with such order, at its own
cost and expense.
4.16 LAYOUT OF WORK. Except as specifically provided herein, the
CONTRACTOR shall be responsible for laying out work by means of construction surveying and
shall accomplish this work in a manner acceptable to the ENGINEER and in conformance with the
Contract Documents.
4.17 SHOP DRAWINGS. The CONTRACTOR shall submit to the ENGINEER, with
such promptness as to cause no delay in his own Work or in that of any other contractor, six (6)
checked copies, unless otherwise•specified, of all shop and/or setting drawings and schedules
08-2018 00700- 11 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
required for the work of the various trades. Contractor will check and approve shop drawings for
compliance with requirements of Contract Documents and will so certify by stamp on each
drawing prior to submittal to ENGINEER. Any drawings submitted without Contractor's stamp of
approval will not be considered and will be returned to him for proper submission. The
ENGINEER shall pass upon them with reasonable promptness, indicating desired corrections.
The CONTRACTOR shall make any corrections required by the ENGINEER, file with him two
(2) corrected copies and furnish such other copies as may be needed. The ENGINEER's approval
of such drawings or schedules shall not relieve the CONTRACTOR from responsibility for
deviations from the Contract Documents, unless he has, in writing, called the ENGINEER's
attention to such deviations at the time of the submission, and the ENGINEER has acknowledged
and accepted such deviations in writing, nor shall it relieve him from responsibility for errors of
any sort in shop drawings or schedules. It shall be the CONTRACTOR's responsibility to fully
and completely review all shop drawings to ascertain their effect on his ability to perform the
required Contract Work in accordance with the Contract Documents, and within the Contract
Time.
Such review by the ENGINEER shall be for the sole purpose of determining the apparent
sufficiency of said drawings or schedules to result in finished improvements in conformity with
the Contract Documents, and shall not relieve the CONTRACTOR of his duty as an independent
contractor as previously set forth, it being expressly understood and agreed that the ENGINEER
does not assume any duty to pass upon the propriety or adequacy of such drawings or schedules,
or any means or methods reflected thereby, in relation to the safety of either person or property
during CONTRACTOR's performance hereunder, and any action taken by the ENGINEER shall
not relieve the CONTRACTOR of his responsibility and liability to comply with the Contract
Documents.
OWNER, CONSTRUCTION MANAGER, ENGINEER, and CONTRACTOR shall make all
submittals, review comments, notes, corrections, schedules and updates, testing results, payment
applications, instructions and other communications by means of the OWNER'S Pro-Trak. The
OWNER, ENGINEER and CONTRACTOR shall each retain such hard copies form this system as
are required for their specific record keeping requirements. No documents shall be removed from
this system or destroyed except those being replaced by the systems protocols as a latest version
document.
All requirements for written communications, submittals, comments, instructions or other
documents processed by means of this system shall have the same legal or time sensitive status as
if they had been hand delivered in hard copy to their intended addressee.
4.18 ENGINEER-CONTRACTOR RELATIONSHIP; OBSERVATIONS. It is agreed
by the CONTRACTOR that the ENGINEER, as the OWNER's representative, shall be and is
hereby authorized to appoint such subordinate engineers, representatives or observers as the said
ENGINEER may from time to time deem proper to observe the materials furnished and the Work
done under this Agreement. The CONTRACTOR shall furnish all reasonable aid and assistance
required by the subordinate engineers, representatives or observers for the proper observation and
examination of the work. The CONTRACTOR shall regard and obey the directions and
instructions of any subordinate engineers, representatives or observers so appointed, when such
directions and instructions are consistent with the obligations of this Agreement and the Contract
Documents, provided, however, should the CONTRACTOR object to any orders by any
08-2018 00700- 12 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
subordinate engineer, representative or observer, the CONTRACTOR may, within three (3) days,
make written appeal to the ENGINEER for his decision.
4.19 OBSERVATION AND TESTING. The OWNER or the ENGINEER as the
OWNER's representative shall have the right at all reasonable times to observe, inspect and test
the Work. The CONTRACTOR shall make all necessary arrangements and provide proper
facilities and access for such observation, inspection and testing at any location wherever Work is
in preparation or progress. The CONTRACTOR shall ascertain the scope of any observation,
inspection or testing which may be contemplated by the OWNER or the ENGINEER and shall
give ample notice as to the time each part of the Work will be ready for such observation,
inspection or testing. The OWNER or the ENGINEER may reject any Work found to be defective
or not in accordance with the Contract Documents, regardless of the stage of its completion or the
time or place of discovery of such deficiencies, and regardless of whether the ENGINEER has
previously accepted the Work through oversight or otherwise. If any Work is covered without
approval or consent of the OWNER, it must, if requested by the OWNER or the ENGINEER, be
uncovered for examination, at the sole expense of the CONTRACTOR. In the event that any part
of the Work is being fabricated or manufactured at a location where it is not convenient for the
OWNER or the ENGINEER to make observations of such Work or require testing of said Work,
then in such event, the OWNER or the ENGINEER may require the CONTRACTOR to furnish
the OWNER or the ENGINEER with certificates of inspection, testing or approval made by
independent persons competent to perform such tasks at the location where that part of the work is
being manufactured or fabricated. All such tests will be in accordance with the methods prescribed
by the American Society for Testing and Materials or such other applicable organization as may
be required by law or the Contract Documents.
If any Work, which is required to be inspected, tested or approved, is covered up without written
approval or consent of the OWNER or the ENGINEER, it must, if requested by the OWNER or
the ENGINEER, be uncovered for observation and testing, at the sole 'expense of the
CONTRACTOR. The cost of all such inspections, tests and approvals shall be borne by the
CONTRACTOR unless otherwise provided herein. Any Work which fails to meet the
requirements of such tests, inspections or approval, and any Work which meets the requirements
of any such tests or approval but does not meet the requirements of the Contract Documents shall
be considered defective. Such defective Work and any other work affected thereby shall be
corrected at the CONTRACTOR'S expense.
Neither observations by the OWNER or by the ENGINEER, nor inspections, certifications, tests
or approvals made by the OWNER, the ENGINEER or other persons authorized under this
Agreement to make such inspections, tests or approvals, shall relieve the CONTRACTOR from
his obligation to perform the Work in accordance with the requirements of the Contract
Documents.
4.20 DEFECTS AND THEIR REMEDIES. It is further agreed that if the Work or any
part thereof or any material brought on the site of the Work for use in the Work or selected for the
same, shall be deemed by the ENGINEER as unsuitable or not in conformity with the Contract
Documents, the CONTRACTOR shall, after receipt of written notice thereof from the
ENGINEER, forthwith remove such material and rebuild or otherwise remedy such Work so that
it shall be in full accordance with this Contract, It is further agreed that any such remedial action
contemplated herein shall be at CONTRACTOR's expense.
08-2018 00700- 13 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
4.21 LIABILITY FOR PROPER PERFORMANCE. Engineering construction
drawings and specifications, as well as any additional instructions and information concerning the
Work to be performed, passing from or through the ENGINEER, shall not be interpreted as
requiring or allowing the CONTRACTOR to deviate from the Contract Documents, the intent of
such drawings, specifications and any other such instructions being to define with particularity the
agreement of the parties as to Work the CONTRACTOR is to perform. CONTRACTOR shall be
fully and completely liable and contractually bound, at his own expense, for design, construction,
installation and use or non-use of all items and methods incident to the performance of the
Contract, including, without limitation, the adequacy of all temporary supports, shoring, bracing,
scaffolding, machinery or equipment, safety precautions or devices, similar items or devices used
by him during construction, and work performed either directly or incident to construction, and for
all loss, damage or injury incident thereto, either to person or property, whether such damage be
suffered by the ENGINEER, the OWNER or any other person not a party to this Contract.
Any review of Work in progress or any visit or observation during construction, or any,
clarification of Contract Documents by the ENGINEER or OWNER, or any agent, employee or
representative of either of them, whether through personal observation on the Project site or by
means of approval of shop drawings for construction or construction processes, or by other means
or methods, is agreed by the CONTRACTOR to be for the purpose of observing the extent and
nature of Work completed or being performed, as measured against the Contract Documents, or
for the purpose of enabling the CONTRACTOR to more fully understand the Contract Documents
so that the completed construction Work will conform thereto, and shall in no way relieve the
CONTRACTOR from full and complete responsibility for proper performance of his Work on the
Project, including, without limitation, the propriety of means and methods of the CONTRACTOR
in performing said Contract, and the adequacy of any designs, plans or other facilities for
accomplishing such performance. Any action by the ENGINEER or the OWNER in visiting or
observing during construction, or any clarification of Contract Documents shall not constitute a
waiver of CONTRACTOR'S liability for damages as herein set out. Deviation by the
CONTRACTOR from Contract Documents, whether called to the CONTRACTOR's attention or
not, shall in no way relieve CONTRACTOR from his responsibility to complete all work in
accordance with said Contract Documents, and further shall not relieve CONTRACTOR of his
liability for loss, damage or injury as herein set out.
4.22 PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC.
The CONTRACTOR shall be solely responsible for the safety of himself, his employees and
persons entering the project site, as well as for the protection of the improvements being erected
and the property of himself or any other person, as a result of his operations hereunder. The
CONTRACTOR shall take out and procure a policy or policies of Workers' Compensation
Insurance with an insurance company licensed to transact business in the State of Texas, which
policy shall comply with the Workers' Compensation laws of the State of Texas. The
CONTRACTOR shall at all times exercise reasonable precautions for the safety of employees and
others on or near the Work and shall comply with all applicable provisions of federal, state and
municipal laws and building and construction codes. All machinery and equipment and other
physical hazards shall be guarded, as a minimum, in accordance with the "Manual of Accident
Prevention in Construction" of the Associated General Contractors of America, except where
incompatible with federal, state or municipal laws or regulations. The CONTRACTOR shall
provide all necessary machinery guards, safe walkways, ladders, bridges, gangplanks, barricades,
fences,traffic control,warning signs and other safety devices.
08-2018 00700- 14 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
No alcoholic beverages, non-prescription drugs, or unsafe practices shall be allowed on the Work
r site. CONTRACTOR shall dismiss anyone participating in any of the above from the Work site
for the duration of the Project. Only prescription drug uses with a doctor's authorization to
perform construction activities shall be allowed on the Work site. Violation of this provision is a
default under the Contract. The use, possession, sale, transfer, purchase or being under the
influence of alcohol, drugs or any other illegal or unlawful substance by CONTRACTOR or
CONTRACTOR's employees, or CONTRACTOR's subcontractors and employees at any time at
the Work site or while on company business is prohibited. CONTRACTOR shall institute and
enforce appropriate drug testing guidelines and program.
All accidents or injuries to CONTRACTOR's employees working on the job site must be reported
verbally and in writing to the ENGINEER immediately, and within no more than eight(8) hours.
The safety precautions actually taken and their adequacy shall be the sole responsibility of the
CONTRACTOR, in his sole discretion as an independent contractor. Inclusion of this paragraph in
the Agreement, as well as any notice which may be given by the OWNER or the ENGINEER as
the OWNER's representative concerning omissions under thus paragraph as the Work progresses,
are intended as reminders to the CONTRACTOR of his duty and shall not be construed as any
assumption of duty by ENGINEER, or OWNER's representative to supervise safety precautions
by either the CONTRACTOR or any of his subcontractors.
4.23 PROTECTION OF ADJOINING PROPERTY. The CONTRACTOR shall
employ proper means to protect the adjacent or adjoining property or properties in any way
encountered, which might be injured or seriously affected by any process of construction to be
undertaken under this Agreement, from any damage or injury by reason of said process of
construction; and he shall be liable for any and all claims for such damage on account of his
failure to fully protect all adjacent or adjoining property. THE CONTRACTOR AGREES TO
INDEMNIFY, DEFEND, SAVE AND HOLD HARMLESS THE CONSTRUCTION
MANAGER, OWNER AND ENGINEER AGAINST ANY CLAIM OR CLAIMS FOR
DAMAGES, LOSS, COSTS OR EXPENSES, INCLUDING BUT NOT LIMITED TO
ATTORNEY'S FEES, DUE TO ANY INJURY TO ANY ADJACENT OR ADJOINING
PROPERTY, ARISING OR GROWING OUT OF THE PERFORMANCE OF THE
CONTRACT, REGARDLESS OF WHETHER OR NOT SUCH DAMAGE, LOSS, COST OR
EXPENSE IS CAUSED IN PART BY THE NEGLIGENCE, GROSS NEGLIGENCE OR
STRICT LIABILITY OF OWNER AND/OR ENGINEER.
4.24 PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS,
MATERIALMEN AND FURNISHERS OF MACHINERY, EQUIPMENT AND SUPPLIES.
THE CONTRACTOR AGREES THAT HE WILL PROMPTLY PAY WHEN DUE, AND WILL
INDEMNIFY, SAVE AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM
ALL CLAIMS GROWING OUT OF THE DEMANDS OF SUBCONTRACTORS, LABORERS,
WORKERS, MECHANICS, MATERIALMEN AND FURNISHERS OF MACHINERY AND
PARTS THEREOF, EQUIPMENT, POWER TOOLS AND ALL SUPPLIES, INCLUDING
COMMISSARY, INCURRED IN THE FURTHERANCE OF THE PERFORMANCE OF THIS
CONTRACT. When so desired by the OWNER, the CONTRACTOR shall furnish satisfactory
- evidence that all obligations of the nature hereinabove designated have been paid, discharged or
waived. If the CONTRACTOR fails to do so, then the OWNER may, at the option of the
OWNER, either pay directly any unpaid bills of which the OWNER has written notice, or
withhold from the CONTRACTOR's unpaid compensation a sum of money deemed reasonably
08-2018 00700- 15 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
sufficient to liquidate any and all such claims until satisfactory evidence is furnished that all
liabilities have been fully discharged, whereupon payments to the CONTRACTOR shall be
resumed in full, in accordance with the terms of this Contract.
Any and all communications between• any parties under this paragraph shall be in writing.
Nothing contained in this paragraph or this Agreement shall create, establish or impose any
relationship, contractual or otherwise,between OWNER and any subcontractor, laborer or supplier
of CONTRACTOR, nor shall it create, establish or impose any duty upon OWNER to pay or to
see to the payment of any subcontractor, laborer or supplier of CONTRACTOR.
4.25 PROTECTION AGAINST ROYALTIES OR PATENTED INVENTION. The
CONTRACTOR shall pay all royalties and license fees and shall provide for the use of any
design, device, material or process covered by letters patent or copyright, by suitable legal
agreement with the patentee or owner thereof THE CONTRACTOR SHALL DEFEND ALL
SUITS OR CLAIMS FOR INFRINGEMENT OF ANY PATENT OR COPYRIGHT AND
SHALL INDEMNIFY, SAVE AND HOLD THE OWNER AND THE ENGINEER HARMLESS
FROM ANY LOSS OR LIABILITY ON ACCOUNT THEREOF, EXCEPT SUCH SUITS AND
CLAIMS ARISING OUT OF A PARTICULAR DESIGN, DEVICE, MATERIAL OR PROCESS
OR THE PRODUCT OF A PARTICULAR MANUFACTURER OR MANUFACTURERS
SPECIFIED OR REQUIRED BY THE, OWNER; PROVIDED, HOWEVER, IF CHOICE,OF
ALTERNATE DESIGN, DEVICE, MATERIAL OR PROCESS IS ALLOWED TO THE
CONTRACTOR, OR IF CONTRACTOR KNEW OR SHOULD HAVE KNOWN OF THE
PATENT OR COPYRIGHT AND FAILED TO PROMPTLY NOTIFY OWNER IN WRITING,
THEN THE CONTRACTOR SHALL INDEMNIFY, DEFEND, SAVE AND HOLD THE
OWNER HARMLESS FROM ANY LOSS OR LIABILITY ON ACCOUNT THEREOF.
4.26 INDEMNIFICATION. THE CONTRACTOR AGREES TO DEFEND,
INDEMNIFY AND HOLD THE ENGINEER AND THE OWNER HARMLESS FROM ANY
CLAIMS OR DEMANDS OF ANY NATURE WHATSOEVER MADE BY ANY EMPLOYEE,
EMPLOYEES, AGENTS OR SUBCONTRACTORS OF CONTRACTOR, OR BY ANY
UNION, TRADE ASSOCIATION, WORKER'S ASSOCIATION OR OTHER GROUPS,
ASSOCIATIONS OR INDIVIDUALS, ALLEGEDLY REPRESENTING EMPLOYEES OF THE
CONTRACTOR, IN ANY DISPUTE BETWEEN THE CONTRACTOR AND HIS
• EMPLOYEES, DIRECTLY OR INDIRECTLY INVOLVING, GROWING OUT OF OR
ARISING FROM CLAIMS BY SUCH EMPLOYEES FOR WAGES, SALARY,
COMPENSATION, BENEFITS, WORKING CONDITIONS OR ANY OTHER SIMILAR
COMPLAINT OR CLAIM WHICH MAY BE MADE.
THE CONTRACTOR, HIS SURETIES AND INSURANCE CARRIERS SHALL DEFEND,
INDEMNIFY AND HOLD HARMLESS THE OWNER AND THE ENGINEER AND THEIR
RESPECTIVE OFFICERS, REPRESENTATIVES, AGENTS AND EMPLOYEES FROM AND
AGAINST ALL DAMAGES, CLAIMS, LOSSES, DEMANDS, SUITS, LIABILITIES,
JUDGMENTS AND COSTS OF ANY CHARACTER WHATSOEVER, INCLUDING
REASONABLE ATTORNEY'S FEES AND EXPENSES, AND SHALL BE REQUIRED TO
PAY ANY JUDGMENT THEREFOR, WITH COSTS, WHICH MAY BE OBTAINED
AGAINST THE OWNER AND/OR THE ENGINEER OR ANY OF THEIR OFFICERS,
REPRESENTATIVES, AGENTS OR EMPLOYEES, ARISING OUT OF OR RESULTING
FROM OR ALLEGEDLY ARISING OUT OF OR RESULTING FROM THE PERFORMANCE
08-2018 - 00700- 16 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
OF THE WORK, PROVIDED THAT ANY SUCH DAMAGES, CLAIM, LOSS, DEMAND,
SUIT, LIABILITY, JUDGMENT, COST OR EXPENSE:
(A) ARISES OUT OF OR RESULTS FROM IN WHOLE OR IN PART, OR
ALLEGEDLY ARISES OUT OF OR RESULTS FROM IN WHOLE OR IN
PART, ANY BREACH. OF THIS AGREEMENT OR BREACH OF
WARRANTY BY CONTRACTOR; OR
(B) IS ATTRIBUTABLE. TO BODILY INJURY, SICKNESS, DISEASE OR
DEATH OR INJURY TO OR DESTRUCTION OF TANGIBLE PROPERTY,
INCLUDING THE LOSS OF USE RESULTING THEREFROM; AND
IS CAUSED IN WHOLE OR IN PART OR IS ALLEGEDLY CAUSED IN
WHOLE OR IN PART BY ANY NEGLIGENT ACT OR OMISSION OF THE
CONTRACTOR, ANY SUBCONTRACTOR, THEIR AGENTS OR
EMPLOYEES OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY
ANY ONE OF THEM OR ANYONE FOR WHOSE ACTS ANY OF THEM
MAY BE LIABLE, REGARDLESS OF WHETHER OR NOT IT IS CAUSED
IN PART OR ALLEGEDLY CAUSED IN PART BY THE NEGLIGENCE,
GROSS NEGLIGENCE OR STRICT LIABILITY, OF OWNER, ENGINEER
AND/OR A PARTY INDEMNIFIED HEREUNDER.
Notwithstanding the foregoing or anything in the Agreement to the contrary, in accordance with
the provisions of Section' 130.002 of the Texas Civil Practice and Remedies Code,
CONTRACTOR shall not be obligated to indemnify or hold harmless the ENGINEER, his agents,
servants or employees, from liability for damage that is caused by or results from defects in plans,
designs or specifications prepared, approved or used by the ENGINEER, or negligence of the
ENGINEER in the rendition or conduct of professional duties called for or arising out of any
construction contract and the plans, designs or specifications that are a part of the construction
contract, and arises from personal injury or death, property injury, or any other expense that arises
from personal injury, death, or property injury.
This indemnity agreement is a continuing obligation, and shall survive notwithstanding
completion of the Work, Final Payment, expiration of the warranty period, termination of the
Contract, and abandonment or takeover of the Work.
CONTRACTOR's indemnification obligations hereunder shall not be limited by a limitation on
amount or type of damages, compensation or benefits payable by or for the CONTRACTOR or a
subcontractor under workers' compensation acts, disability benefit acts or other employee benefit
acts, and shall not be limited by any limitation on amounts or coverage of insurance provided or to
be provided under this Contract.
4.27 LOSSES FROM NATURAL CAUSES. All loss, cost, expense or damage to the
CONTRACTOR arising out of the nature of the Work to be done or from any unforeseen
circumstances in the prosecution of the same, or from the action of the elements, or from unusual
obstructions or difficulties which may be encountered in the prosecution of the Work, shall be
sustained and borne by the CONTRACTOR at his own cost and expense.
08-2018 00700- 17 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
4.28 GUARANTEE. The CONTRACTOR hereby guarantees all the Work under the
Contract to be free from defects or deficiencies in material in every particular and free from i
defects or deficiencies in workmanship; and against unusual damage from proper and usual use;
and agrees to replace or to re-execute without cost to the OWNER such Work as may be found to
be defective, deficient or otherwise not in conformance with the Contract Documents, and to make
good all damages caused to other work or material, due to such defective Work or due to its
required replacement or re-execution. This guarantee shall cover a period of one year from the
date of Substantial Completion or Partial Substantial Completion of Work under the Contract, as
evidenced by the Certificate of Substantial Completion. Neither the Certificate of Substantial
Completion, Final Payment, nor any provision in the Contract Documents shall relieve the
CONTRACTOR of the responsibility for defective, deficient or non-conforming material or
workmanship during the period covered by the guarantee. The one-year period of guarantee will
not limit the OWNER'S other rights under common law with respect to any defects, deficiencies
or non-conforming Work discovered after one year. If this one-year guarantee conflicts with other
warranties or guarantees, the longer period of warranty or guarantee will govern.
5.0 PROSECUTION AND PROGRESS
5.01 TIME AND ORDER OF COMPLETION. It is the meaning and intent of this
Contract, unless otherwise herein specifically provided, that the CONTRACTOR shall be allowed
to prosecute his Work at such times and seasons, in such order of precedence, and in such manner
as shall be most conducive to economy of construction; provided, however, that the order and the
time of prosecution shall be such that the Work shall be Substantially Completed as a whole and in
part, in accordance with this Contract and the Contract Time; provided, also, that when the
OWNER is having other work done, either by contract or by his own forces, the ENGINEER may
direct the time and manner of constructing the Work done under this Contract, so that conflict will
be avoided and the construction of the various works being done for the OWNER shall be
harmonized, and the CONTRACTOR shall fully cooperate and coordinate its Work with OWNER
or such other contractors.
The CONTRACTOR shall submit, an updated schedule with every pay estimate for review by the
ENGINEER, schedules which shall show the order in which the CONTRACTOR proposes- to
carry on the Work, with dates on which the CONTRACTOR will start the several parts of the
work, and estimated dates of completion of the several parts. Such schedules shall show
completion of the Work within the Contract Time, and/or shall show such recovery efforts as
CONTRACTOR intends to undertake in the event Substantial Completion of the Work is delayed.
5.02 EXTENSION OF TIME. The CONTRACTOR agrees that he has submitted his
Bid Proposal in full recognition of the time required for the completion of this Project, taking into
consideration the average climatic range and industrial conditions prevailing in this locality, and
has considered the liquidated damage provisions as hereinafter set forth, and that he shall not be
entitled to, nor will he request, an extension of time on this Contract, except when Substantial
Completion of the Work has been delayed solely by strikes, lockouts, fires, Acts of God, or by any
other cause which the ENGINEER shall decide justifies the delay. The CONTRACTOR shall give
the ENGINEER prompt notice, in writing and within three (3) days of the start of any such delay,
of the cause of any such delay, and its estimated effect on the Work and the schedule for i
completion of the Work. Upon receipt of a written request for an extension of the Contract Time
from the CONTRACTOR, supported by relevant and all requested documentation, the
ENGINEER shall submit such written request, together with his written recommendation, to the
08-2018 00700- 18 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
OWNER for consideration. If the delay is not attributable in whole or in part to any act or
omission of CONTRACTOR, its subcontractors or suppliers, and if the OWNER determines that
CONTRACTOR is entitled to an extension of time under`the terms of the Contract, the OWNER
shall grant an extension of time for Substantial Completion of the Work, sufficient to compensate
for the delay, and such extension of time shall be CONTRACTOR's sole and exclusive remedy,
except as may be otherwise provided herein. No extensions of Contract Time shall be made for
delays occurring prior to the Contractor's mobilization as defined in Section 01505
MOBILIZATION.
The Contract Time as defined in the Bid Proposal and other sections herein incorporates
40 Rain Days per calendar year or an average of 3.33 days per calendar month. The
CONTRACTOR is required to keep record of all weather related delays and to submit the monthly
count on each Pay Application. The Owner's Representative shall review and sign off on this
record as a part of the Pay Application approval process every month. If, during preparation of the
Balancing Change Order, the status of the work progress requires an extension of the Contract
Time, Impact Days shall be added to the Completion Date equal to the total number of Weather or
Impact Days approved less the original 40 days resident in the original Contract Time. The
Addition of Weather or Impact Days will only alter the Contract Time when added by Change
Order. If the Work is completed prior to the Completion Date, No Days will be added. The
addition of Weather or Impact Days shall be the CONTRACTOR's sole remedy for delays to the
completion of the Work and their addition to the Contract Time shall not affect the Contract Price
through any "per diem" adjustment to the General Conditions costs, Temporary Facilities costs or
any other costs associated with the extension of the Contract Time.
5.03 HINDRANCES AND DELAYS. In executing the Contract, the CONTRACTOR
agrees that in undertaking to complete the Work within the time herein fixed, he has taken into
consideration and made allowances for all interference, disruption, hindrances and delays incident
to such Work, whether growing out of delays in securing material, workmen or otherwise. No
claim shall be made by the CONTRACTOR for damages, loss, costs or expense resulting from
interference,disruption, hindrances or delays from any cause during the progress of any portion of
the Work embraced in this Contract, except where the Work is stopped or suspended by order of
the OWNER's representative and such stoppage or suspension is not attributable to any act or
omission of CONTRACTOR.
5.04 SUSPENSION OF WORK. OWNER may, without cause, order the
CONTRACTOR in writing to suspend the Work, in whole or in part, for such period of time as
OWNER may request. The Contract Price and/or Contract Time shall be adjusted for any increase
in the cost of or the time required for performance of the Work caused by such suspension. No
adjustment shall be made to the extent performance was or would have been suspended by a cause
for which CONTRACTOR is responsible, or to the extent an adjustment is made or denied under
another provision of the Contract Documents.
5.05 LIQUIDATED DAMAGES FOR DELAY: It is understood and agreed that time
is of the essence, and that the CONTRACTOR will commence the Work on the date specified
herein or in any Notice to Proceed, and will Substantially Complete the Work within the Contract
Time. It is expressly understood and agreed, by and between the CONTRACTOR and the
OWNER, that the time for the Substantial Completion of the Work described herein is reasonable
time for the completion of the same, taking into consideration the average climatic range and
conditions and usual industrial conditions prevailing in this locality. The CONTRACTOR further
agrees that a failure to complete on time will cause damage to the OWNER,and that such damages
08-2018 00700- 19 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
cannot be accurately measured or that ascertainment will be difficult. Therefore, the parties agree
that for each and every calendar day the Work or any portion thereof shall remain uncompleted
after the expiration of the Contract Time, the CONTRACTOR shall pay, as liquidated damages
and as a reasonable estimate of OWNER's damages, and not as a penalty, the amount set out in the
Standard Form of Agreement.
However, the foregoing agreement as to liquidated damages constitutes only an agreement by the
OWNER and the CONTRACTOR as to the amount of damages which the OWNER will sustain
by reason of the CONTRACTOR'S failure to complete the work within the Contract Time. Should
the OWNER suffer damage by reason of any other breach by CONTRACTOR, the OWNER may
recover such actual damages in addition to any liquidated damages due.
The OWNER shall have the right to deduct and withhold the amount of any and all such damages
whether it be the minimum amount stipulated above or otherwise, from any monies owing by it to
said CONTRACTOR, or the OWNER may recover such amount from the CONTRACTOR and
the sureties of his bond; all of such remedies shall be cumulative and the OWNER shall not be
required to elect any one nor be deemed to have made an election by proceeding to enforce any
one remedy.
5.06 CHANGE OF CONTRACT TIME: The Contract Time may only be changed by a
Change Order. Any claim for an adjustment of Contract Time shall be based on written notice
delivered by the party making such claim to the other party and to the ENGINEER promptly, but
in no event later than ten (10) days after the event-giving rise to the claim. Notice of the extent of
the claim, along with supporting data, shall be delivered within thirty (30) days of the occurrence
and shall be accompanied by the claimant's written representation that the adjustment claimed is
the entire adjustment to which the claimant has reason to believe it is entitled as a result of the
occurrence of said event. All claims for adjustment in Contract Time shall be determined by the
ENGINEER in accordance with the requirements of this paragraph. Contractor shall submit, as a
minimum, the following data: •
A. Information showing that the time requested is not included in the existing
Contract and in addition to the Contract.
B. Information documenting that the number of days requested is accurate for the
event.
C. Revised, current construction schedule showing that the time requested affects
the project's critical path.
5.07 DELAYS BEYOND OWNER'S AND CONTRACTOR'S CONTROL: Where
CONTRACTOR is prevented from completing any part of the Work within the Contract Time due
to delays beyond the control of the OWNER and the CONTRACTOR, including, but not limited
to, interference by utility owners or other contractors performing other work, Contractor shall be
entitled to an extension of the Contract Time in an amount equal to the time lost. CONTRACTOR
shall not be entitled to any increase in Contract Price as a result of such delays. IN NO EVENT
SHALL OWNER BE LIABLE TO CONTRACTOR FOR DAMAGES ARISING OUT OF OR
RESULTING FROM (i) Delays caused by, or within the control of, the CONTRACTOR, or (ii)
Delays beyond the control of both parties including, but not limited to, interference by utility
owners or other contractors performing other work, fires, floods, epidemics, abnormal weather
conditions, acts of God, even if such delays are due in part to the negligence, other fault, breach of
contract or warranty, violation of the Texas Deceptive Trade Act, or strict liability without regard
08-2018 00700-20 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
to fault of OWNER. An extension of Contract time shall be CONTRACTOR's sole and exclusive
remedy for any such delays.
Delays attributed to, and within the control of, a Subcontractor or Supplier shall be
deemed to be delays within the control of the CONTRACTOR.
6.0 MEASUREMENT AND PAYMENT
6.01 DISCREPANCIES AND OMISSIONS. If the CONTRACTOR knows or
reasonably should have known of any discrepancies or omissions in the Contract Documents, he
shall notify the ENGINEER and obtain a clarification by Addendum before the bids are received,
and if no such request is received by the ENGINEER prior to the opening of bids, then it shall be
considered that the CONTRACTOR fully understands the Work to be performed and has provided
sufficient sums in his Bid Proposal to complete the Work in accordance with the Contract
Documents. It is further understood that any request for clarification must be submitted no later
than five (5) days prior to the opening of bids.
6.02 QUANTITIES AND MEASUREMENTS. No extra or customary measurements
of any kind will be allowed, but the actual measured and/or computed length, area, volume,
number and weight only shall be considered,unless otherwise specifically provided.
6.03 ESTIMATED QUANTITIES. This Agreement, including the Contract
Documents, and including any estimates contained therein, is intended to convey all Work to be
done and material to be furnished hereunder. Where the estimated quantities are shown for the
various classes of Work to be done and material to be furnished under this Contract, they are
approximate and are to be used only as a basis for estimating the probable cost of the Work and
for comparing the Bid Proposals offered for the Work. It is understood and agreed that the actual
amount of Work to be done and the materials to be furnished under this Contract may differ from
the estimates and that the items listed or estimated quantities stated, and/or any difference between
estimated and actual Work, shall not give rise to a claim by the CONTRACTOR against the
OWNER for loss, cost, expense, damages,unit price adjustment, quantity differences,unrecovered
overhead or lost or anticipated profits, or other compensation.
6.04 PRICE OF WORK. It is agreed that it is the intent of this Contract that all Work
described in the Bid Proposal, and Contract Documents, is to be done for the prices bid by the
CONTRACTOR and that such prices shall include all appurtenances necessary to complete the
Work in accordance with the intent of these Contract Documents as interpreted by the
ENGINEER, and all costs, expenses, bond and insurance premiums, taxes, overhead, and profit.
In consideration of the furnishing of all the necessary labor, equipment and material and the
completion of all Work by the CONTRACTOR, and upon the completion of all Work and the
delivery of all materials embraced in this Contract in full conformity with the Contract -
Documents, the OWNER agrees to pay to the CONTRACTOR the prices set forth in the Standard
Form of Agreement, OWNER and CONTRACTOR agree that the Contract is a unit cost
agreement, unless stated otherwise, and that the final Contract amount is equal to the unit cost
multiplied by the number of units authorized, installed and approved by the Owner.
The OWNER does not assume any obligation to pay for any services or material not
actually authorized and used. The CONTRACTOR hereby agrees to receive such prices as
payment in full for furnishing all materials and all labor required for the aforesaid Work, and for
all expenses incurred by him, and for full performance of the Work and the whole thereof in the
08-2018 00700-21 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
manner and according to this Agreement, Contract Documents, and the requirements of the
ENGINEER.
6.05 PAYMENTS. No payments made or approvals or certificates given shall be
considered as conclusive evidence of the performance of the Contract, either in whole or in part,
nor shall any certificate, approval or payment be considered as acceptance of defective, deficient
or non-conforming Work. CONTRACTOR shall, at any time requested during the progress of the
Work, furnish the OWNER or the ENGINEER with an affidavit showing the CONTRACTOR's
total outstanding indebtedness in connection with the Work. Before Final Payment is made, the
CONTRACTOR shall satisfy the OWNER, by affidavit or otherwise, that there are no unpaid
claims due subcontractors, suppliers or laborers by reason of any Work under the Contract.
Acceptance by CONTRACTOR of Final Payment shall constitute a waiver of any and all claims
of whatsoever nature against OWNER, arising out of or related to the Contract, or the Work, or
any acts or omissions of OWNER or ENGINEER, which have not theretofore been timely filed as
provided in this Contract.
6.06 PARTIAL PAYMENTS. When the Contract Price is a lump sum amount, prior to
the first Application for Payment, CONTRACTOR shall submit to ENGINEER for review and
approval a Schedule of Values, which shall fairly allocate the entire Contract Price among the
various portions of the Work and shall be prepared in such form and supported by such data to
substantiate its accuracy as the ENGINEER may reasonably require. The Schedule of Values
shall follow the trade divisions of the Specifications so far as practicable. Upon approval, this
Schedule of Values shall be used by ENGINEER as the basis for reviewing the Contractor's
Application for Payment. Applications for Payment shall indicate the percentage of completion of
each portion of the Work as of the end of the period covered by the Application for Payment.
On or before the tenth day of each month, the CONTRACTOR shall prepare and submit to the
ENGINEER, for approval or correction, an application for partial payment, being a statement
showing as completely as practicable, the agreed unit quantities and extended total value of the
Work done by the CONTRACTOR up to and including the twenty-fifth day of the preceding
month; said statement shall also include the value of all conforming materials to be fabricated into
the Work and stored in accordance with manufacturer's recommendations and as approved by the
OWNER or ENGINEER at the Work site only. No payment will be made for materials stored until
OWNER has approved in writing storage at the Work site. The ENGINEER shall then review
such statement of unit quantities and application for partial payment and the progress of the Work
made by the CONTRACTOR and, within ten days after the date ENGINEER receives
CONTRACTOR's application for payment, if the application is found to be accurate and correct
and the WORK conforming to the requirements of the Contract Documents, the ENGINEER shall
certify the application for partial payment and shall deliver his preliminary certification for
payment to the OWNER and the CONTRACTOR; or, if the ENGINEER finds that
CONTRACTOR's application for payment contains an error or is otherwise disputed, he shall
notify CONTRACTOR of such error or dispute, and shall prepare a preliminary certificate for
partial payment for the undisputed amount of the application for payment due CONTRACTOR,
and deliver it to the OWNER and CONTRACTOR. ENGINEER'S notice to CONTRACTOR that
a bona fide dispute for payment exists shall include a list of the specific reasons for nonpayment.
All payment applications made by CONTRACTOR and delivered to ENGINEER and all
verifications and certification of such applications shall be made and transmitted within the Pro-
Trak system and signed with the appropriate electronic signatures as provided for in the software.
Such applications for payment shall. not be considered complete unless accompanied by the
08-2018 00700-22 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
CONTRACTOR'S Partial Waiver of Lien and Payment Affidavit, Section 00615, duly executed
by an authorized representative of the CONTRACTOR and reflecting the correct corresponding
amount of the payment application.
The OWNER shall then pay the CONTRACTOR, within thirty (30) days of the date of
ENGINEER's receipt of the application for payment, the undisputed balance due, less applicable
retainage, and further less all previous payments and all further sums that may be retained or
withheld by the OWNER under the terms of this Agreement. CONTRACTOR may submit a
corrected application for payment after its receipt of the ENGINEER's notice of error or dispute,
and such corrected application for payment shall be reviewed by the ENGINEER and disputed or
paid under the same procedure and within the same time limits set out above.
As a condition of any progress payment under this Agreement, CONTRACTOR shall execute and
deliver to ENGINEER and OWNER a full release of all claims, direct or indirect, at law or in
equity, arising out of or related to the Work to date, excluding retainage or any claims previously
submitted as required under the terms of the Contract, and specifically identified and excluded by
CONTRACTOR in the release.
OWNER shall be entitled to retain from each progress payment five percent (5%) of the amount
thereof. Such retainage shall be retained until Final Completion and satisfaction of all conditions
for Final Payment. It is understood, however, that in case the whole Work be near to completion,
as certified by the ENGINEER, and some unexpected or unusual delay occurs, through no neglect
or fault on the part of the CONTRACTOR, the OWNER may, upon written recommendation of
the ENGINEER, pay a reasonable and equitable portion of the retained percentage to the
CONTRACTOR, or the CONTRACTOR, at the OWNER'S option, may be relieved of the
obligation to fully complete the Work, and thereupon, the CONTRACTOR shall receive, at the
OWNER'S option, payment of the balance due him under the Contract for Work completed in
accordance with the Contract Documents, subject to OWNER's rights to otherwise withhold or
retain payments, and subject to the conditions set forth under"6.09 FINAL PAYMENT."
The Owner at its option and in compliance with Texas law may reduce retainage to less than the
above-stated percentages.
6.07 USE OF COMPLETED PORTIONS & PUNCHLIST. The OWNER shall have
the right to take possession of and use any completed or partially completed portions of the Work,
notwithstanding that the time for completing the entire work or such portions may not have
expired; but such taking possession and use shall not be deemed an acceptance of any work not
completed in accordance with the Contract Documents. If such prior use increases the cost of or
delays the Work, the CONTRACTOR shall promptly and within three (3) days of OWNER's
taking possession, give OWNER written notice of same, and CONTRACTOR may be entitled to
such extra compensation or extension of time, or both, as may be determined in accordance with
the provisions of this Agreement.
6.08 SUBSTANTIAL COMPLETION. The CONTRACTOR shall notify the OWNER
AND ENGINEER, by letter executed by a duly qualified officer of CONTRACTOR that in
CONTRACTOR's opinion, the Work of the Contract, or an agreed portion thereof, is
"Substantially Complete". Such notification shall include a list of all outstanding or incomplete
items. Upon receipt, and within a reasonable time thereafter, of such notice, the ENGINEER and
the CONTRACTOR shall jointly perform a walk-through and inspection of the Work to determine
the status of all or the identified portion of the work, and the ENGINEER shall prepare a detailed
08-2018 00700-23 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
I
list of unfinished, incomplete, defective and/or non-conforming Work ("Punchlist"). If the
ENGINEER determines that the Work is Substantially Complete in accordance with the Contract
Documents, the ENGINEER shall issue to the OWNER and the CONTRACTOR a Certificate of -
Substantial Completion. OWNER shall have seven (7) days after receipt of Certificate to make
written objection to the ENGINEER as to any provision of the Certificate or the attached list of
non-conforming work. If ENGINEER concludes that the Work is not Substantially Complete,
ENGINEER will, within fourteen (14) days, notify CONTRACTOR of the reason he believes the
Work is not Substantially Complete. Upon Substantial Completion of the Work, ENGINEER will
deliver to OWNER and CONTRACTOR a written recommendation as to division of
responsibilities, pending final payment and acceptance, with respect to security, maintenance,
utilities and damage to the Work, except as otherwise provided in the Certificate of Substantial
Completion. NEITHER THE SUBSTANTIAL COMPLETION OF THE WORK, NOR THE
OMISSION OF AN ITEM FROM THE PUNCHLIST, SHALL EXCUSE THE CONTRACTOR
FROM PERFORMING ALL OF THE WORK UNDERTAKEN, WHETHER OF A MINOR OR
MAJOR NATURE, AND THEREBY COMPLETING THE WORK IN ACCORDANCE WITH
THE CONTRACT DOCUMENTS. The Certificate of Substantial Completion shall establish the
time period within which CONTRACTOR shall complete the Work for Final Acceptance by the
Owner and ENGINEER.
6.08-1 OWNER shall have the right to exclude CONTRACTOR from the Work after the
date of Substantial Completion, for security requirement reasons. OWNER may establish an
access procedure to facilitate CONTRACTOR's uninterrupted access to the Work for the purposes
of completing and correcting all items on the Punchlist in an expeditious manner.
6.09 FINAL PAYMENT. Final payment of the Retainage withheld from the Contract
Price shall be made by the OWNER to the CONTRACTOR at such time as:
(a) the Work, including all Change Orders and including all Punchlist work, has been
fully completed in strict accordance with the Contract Documents;
(b) the Contract has been fully performed except for the CONTRACTOR's
responsibility to correct nonconforming Work during the warranty period set forth
in the Contract Documents, and to satisfy other requirements, if any,which
necessarily survive final payment;
(c) CONTRACTOR delivers to OWNER a certificate evidencing that insurance
required by the Contract Documents to remain in force after final payment is
currently in effect and will not be cancelled or allowed to expire until at least 30
days prior written notice has been given to OWNER;
(d) CONTRACTOR delivers to OWNER a Consent of Surety, if any, to final payment;
(e) CONTRACTOR delivers to OWNER a complete set of As-Built Drawings,
reflecting all deviations from the Plans, Specifications and approved shop drawings
in the Work actually constructed, and delivers all maintenance and operating
manuals and/or instructions;
08-2018 00700-24 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
(f) CONTRACTOR delivers to OWNER all building certificates required prior to
occupancy and all other required inspections/approvals/acceptances by city,
county, state governmental entities or other authorities having jurisdiction;
(g) CONTRACTOR delivers to OWNER assignments of all guarantees and warranties
from subcontractors, vendors, suppliers or manufacturers, as well as names,
addresses and telephone numbers of contacts for each subcontractor,vendor,
supplier or manufacturer; -
(h) CONTRACTOR removes all equipment, tools, temporary facilities, surplus
materials and rubbish from the site, and final cleans the site to OWNER's
satisfaction;
(i) CONTRACTOR delivers.to OWNER a Full and Final Release and Affidavit of
Bills Paid in the form attached hereto as Attachment No. 2, executed by
CONTRACTOR;
•
(j) CONTRACTOR delivers to OWNER all other documentation required to be
submitted to OWNER pursuant to the Contract Documents, including but not
limited to any special guarantees or warranties, operation and maintenance
manuals, etc'. in each case in a form satisfactory to OWNER as determined in
OWNER's sole discretion; and
(k) The Final Application for Payment has been approved by the ENGINEER and
OWNER.
Acceptance of Final Payment by the CONTRACTOR shall constitute a waiver of all claims by
CONTRACTOR against OWNER other than any claims previously made in writing by
CONTRACTOR against OWNER, and still unsettled, and except for claims arising out of third
party actions, cross-claims and counterclaims. No interest shall be due or payable by OWNER to
CONTRACTOR on any sums retained or withheld by OWNER pursuant to the terms or
provisions of the Contract Documents, except as otherwise provided by applicable law. Neither
the Certificate of Substantial Completion nor the Final Payment nor possession or acceptance of
the Work shall relieve the CONTRACTOR of its obligation for correction of defective or non-
conforming Work, or for fulfillment of any warranty, which may be required by law or by the
Contract Documents.
6.10 CORRECTION OF WORK BEFORE FINAL PAYMENT. The CONTRACTOR
shall promptly remove from OWNER's premises all materials, equipment or Work which is
defective or otherwise not in conformance with the Contract Documents, whether actually
incorporated in the Work or not, and CONTRACTOR shall, at his own expense, promptly replace
such materials, equipment or Work with other materials conforming to the requirements of the
Contract. The CONTRACTOR shall also bear the expense of restoring all work of
CONTRACTOR or other contractors damaged by any such removal or replacement. If
CONTRACTOR does not remove and replace any such unsuitable Work within ten (10) business
days after receipt of a written notice from the OWNER or the ENGINEER, the OWNER may
remove, replace and remedy such work at CONTRACTOR's expense.
08-2018 00700-25 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
6.11 CORRECTION OF WORK AFTER FINAL PAYMENT. If within one (1) year
from the date of Substantial Completion or such longer period of time as may be prescribed by law
or by the terms of any applicable special warranty required by the Contract Documents, any of the
Work is found to be defective or not in accordance with the Contract Documents, CONTRACTOR
shall, at its sole cost, correct it and any other work affected thereby promptly after receipt of a
written notice from OWNER to do so. In addition, CONTRACTOR shall be responsible for any
damage to building contents, when such damage results from the CONTRACTOR's use of faulty
materials or defective workmanship; to the extent such damage is not covered by OWNER's
insurance. This warranty period shall renew and recommence for each corrected item of Work
upon completion of the remedial work. This time period for correction by CONTRACTOR is in
addition to, and not in lieu of, all warranties or remedies, which exist at common law or by statute.
These warranty obligations shall survive the termination of this Contract, and shall be enforceable
by a decree of specific performance, in addition to such other rights and remedies available to
OWNER at law or in equity.
6.12 PAYMENTS WITHHELD. The OWNER may withhold, or on account of
subsequently discovered evidence nullify and demand immediate repayment of, the whole or part
of any certificate for payment or payment, to such extent as may be necessary to protect OWNER
from loss on account of:
(a) Defective or non-conforming Work not remedied;
(b) Claims filed or reasonable evidence indicating probable filing of claims;
(c) Failure of the CONTRACTOR to make payments promptly to subcontractors or _-
for material or labor;
(d) Damage to another contractor, OWNER, existing improvements on the site, or to
adjacent or adjoining property;
(e) Reasonable doubt that the Work can be completed for the unpaid balance of the
Contract amount;
(f) Reasonable indication that the Work will not be completed within the Contract
Time;
(g) Failure on the part of the CONTRACTOR to execute any and all documents,
releases or other documents presented to the CONTRACTOR for execution, as
provided for herein or otherwise;
(h) Liquidated or other damages due to late completion; and/or
(i) Any breach by CONTRACTOR of this Contract or any other agreement between
OWNER and CONTRACTOR.
When the above grounds are removed to OWNER's satisfaction, the withheld payment shall be
made promptly. If the said causes are not so remedied, OWNER may remedy the same for
CONTRACTOR's account, charge the entire cost thereof to CONTRACTOR and deduct such cost
08-2018 00700-26 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
from the Contract Sum or from any payments due or to become due under any other agreement
between OWNER and CONTRACTOR.
6.13 DELAYED PAYMENTS. Should the OWNER fail to make payment to the
CONTRACTOR when payment is due in accordance with the terms of the Contract Documents,
any interest due CONTRACTOR for late payments shall accrue and be paid in accordance with
the provisions of Chapter 2251 of the Texas Government Code, as amended, and payment of such
interest shall fully liquidate and compensate any injury to the CONTRACTOR growing out of
such delay in payment. Should OWNER fail to pay CONTRACTOR an undisputed amount due
within the time limits provided in the Contract or applicable law, CONTRACTOR shall give the •
notice required and comply with the provisions of Section 2251.051 of the Texas Government
Code, and shall thereupon be entitled to the rights and remedies provided therein.
7.0 EXTRA WORK AND CLAIMS
7.01 DIFFERING SITE CONDITIONS. During the progress of the work, if subsurface, latent
physical conditions or unknown physical conditions of an unusual nature are encountered at the
site that differ materially from those indicated in the contract or from those ordinarily encountered
and generally recognized as inherent in the work provided for in the contract, the CONTRACTOR
shall notify the OWNER's Representative in writing within three (3) calendar days of the specific
differing conditions before the site is disturbed and before the affected work is performed.
(a)Upon written notification, the ENGINEER will investigate the conditions, and if it is
determined that the conditions materially differ and cause an increase or decrease in the
cost or time required for the performance of any work under the contract, an adjustment,
excluding anticipated profits, will be made and the contract modified in writing
accordingly. The ENGINEER will notify the CONTRACTOR in writing of the
determination whether or not an adjustment of the contract is warranted.
(b)No contract adjustment which results in a benefit to the CONTRACTOR will be
allowed unless the CONTRACTOR has provided the required written notice.
(c)No contract adjustment will be allowed under this clause for any effects caused on
unchanged work.
7.02 SUSPENSIONS OF WORK ORDERED BY THE ENGINEER. If the performance of all
or any portion of the work is suspended by the ENGINEER in writing for seven (7) calendar days
and the CONTRACTOR believes that additional compensation and/or contract time is due as a
result of such suspension, the CONTRACTOR shall submit a written request for adjustment to the
ENGINEER within seven (7) calendar days of receipt of the notice to resume work. The request
shall set forth the reasons and support for such adjustment.
(a)Upon receipt, the ENGINEER will evaluate the CONTRACTOR's request. If the
ENGINEER agrees that the cost and/or time required for the performance of the contract
has increased as a result of such suspension and the suspension was caused by conditions
beyond the control of and not the fault of the CONTRACTOR, its suppliers, or
subcontractors at any approved tier, and not caused by weather, the ENGINEER will make
an adjustment(excluding profit) and modify the contract in writing accordingly. The
CONTRACTOR will be notified of the ENGINEER's determination, in writing, whether or
08-2018 00700-27 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
not an adjustment of the contract is warranted.
(b)No contract adjustment will be allowed unless the CONTRACTOR has submitted the
request for adjustment within the time prescribed.
(c)No contract adjustment will be allowed under this clause to the extent that performance
would have been suspended by any other cause, or for which an adjustment is provided or
excluded under any other term or condition of this contract.
7.03 CHANGE ORDERS. Without invalidating this Agreement, the OWNER may, at
any time or from time to time, order additions, deletions or revisions to the Work; such changes
will be authorized by Change Order to be prepared by the ENGINEER for execution by the
OWNER and the CONTRACTOR. The Change Order shall set forth the basis for any change in
Contract Price, as hereinafter set forth for Extra Work, and any change in Contract Time, which
may result from the change.
7.04 In accordance with paragraph 1.06 CONTRACTOR'S request to work weekends,
the Owner's Construction Manager shall, upon receipt of written notice by the CONTRACTOR of
the need to conduct work on otherwise non-Work Days,prepare a cost estimate for providing
Construction Management and Inspection services during the requested period and submit this to
both OWNER and CONTRACTOR. If approved by both parties the Construction Manager shall
prepare a Deductive Change Order in the amount stated in the estimate for the signature of the
CONTRACTOR and the OWNER for inclusion in the next Pay Application. The Deductive
Change Order must be signed and executed by both the OWNER and CONTRACTOR prior to
start of work on any non-Work Day.
7.05 MINOR CHANGES. The ENGINEER may authorize minor changes in the Work
not inconsistent with the overall intent of the Contract Documents and not involving an increase in
Contract Price or time. If the CONTRACTOR believes that any minor changes authorized by the
ENGINEER involves Extra Work or entitles him to an increase in the Contract Price or the
Contract Time, the CONTRACTOR shall give notice of same by written request to the
ENGINEER for a written Work Order, with a copy to OWNER. Any such notice and request by
the CONTRACTOR shall be given prior to beginning the changed work. CONTRACTOR's
commencement of any minor change in the Work prior to such written notice and request shall
constitute a waiver of any and all claims for an increase in the Contract Price or the Contract Time
arising out of or related to such changed work.
7.06 EXTRA WORK. It is agreed that the CONTRACTOR shall perform all work
when presented with a written Change Order, Work Change Directive or Work Order signed by
the ENGINEER, subject, however, to the right of the CONTRACTOR to require written
confirmation of such Change Order, Work Change Directive or Work Order by the OWNER. It is
agreed that the basis of compensation or adjustment to the CONTRACTOR for work either
altered, added or deleted by a Change Order or Work Change Directive, or for which a claim for
Extra Work is made, shall be determined by one or more of the following methods:
Method (A) --By Contract unit prices applicable to the work, if any; or
Method (B) --By agreed unit prices or agreed stipulated lump sum price; or
08-2018 00700-28 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
Method (C) --If neither Method (A) nor Method (B) can be agreed upon before the Extra
Work is commenced, then the CONTRACTOR shall be paid the "Actual Field Cost" of
the work plus:
a) For subcontractors performing work mark-up shall be limited to fifteen
percent, ten (10%) for the subcontractor plus five (5%) for the General Contractor
or
b) For the General Contractor alone, self-performing the extra work, without
subcontractor, the mark-up shall not exceed ten percent (10%), as full and final
compensation for the Extra Work and all costs and expenses, direct or indirect,
arising out of or related thereto.
In the event said Extra Work or Change Order or Work Change Directive work is performed and
paid for under Method (C), then the provisions of this paragraph shall apply and the "Actual Field
Cost" is hereby defined as the cost to the CONTRACTOR of all workers, such as foremen,
timekeeper mechanics and laborers, and materials, supplies, trucks, rentals of machinery and
equipment, for the time actually employed or used on such Extra Work or Change Order or Work
Change Directive work, plus actual transportation charges necessarily incurred together with all
power, fuel, lubricants, water and similar operating expenses, plus all necessary incidental
expenses incurred directly on account of such Extra Work, including Social Security, Old Age
Benefits and other payroll taxes, and a rateable proportion of premiums on Performance and
Payment Bonds and Maintenance Bonds, Public Liability and Property Damage and Workers'
Compensation, and all other insurance as may be required by law or ordinance, or the Contract
Documents,plus all payments to subcontractors for such work.
The ENGINEER may direct the form in which accounts of the "Actual Field Cost" shall be kept
and the records of these accounts shall be made available to the ENGINEER. The ENGINEER or
OWNER may also specify in writing, before the work commences, the method of doing the work
and the type and kind of machinery and equipment to be used; otherwise these matters shall be
determined by the CONTRACTOR. Unless otherwise agreed upon, the prices for the use of
machinery and equipment shall be determined by using one hundred percent (100%), unless
otherwise specified, of the latest schedule of Equipment Ownership Expense adopted by the
Associated General Contractors of America where practicable. The mark-up of the "Actual Field
Cost" to be paid to the CONTRACTOR,shall cover and compensate him for his profit, overhead,
and all other elements of cost and expense not embraced within the "Actual Field Cost" as herein
defined, save that where the CONTRACTOR's field office must be maintained solely on account
of such Extra Work, then the cost to maintain and operate the same shall be included in the
"Actual Field Cost."
No claim for Extra Work of any kind will be allowed unless ordered by the ENGINEER in a
written Work Order. In case any orders or instructions, either oral or written, appear to the
CONTRACTOR to involve Extra Work for which he should receive compensation or an
adjustment in the Contract Time, he shall make written request to the ENGINEER for a written
Work Order authorizing such Extra Work within ten (10) days of ENGINEER's orders or
instructions, otherwise the orders or instructions will be considered minor changes. The issuance
of a Work Order by the ENGINEER shall not constitute or be construed as an agreement or
acknowledgement by the ENGINEER that the work which is the subject of the Work Order is
Extra Work outside the scope of the Contract Work, but shall merely constitute a direction to the
08-2018 00700-29 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
CONTRACTOR to perform the work, and the CONTRACTOR shall proceed with the work, and
shall keep an accurate account of the "Actual Field Cost" thereof, as provided under Method (C).
Upon completion of the alleged Extra Work, the CONTRACTOR shall promptly and within ten
(10) days submit his claim to the ENGINEER by proper certification and attestation, on forms
provided by the ENGINEER. The ENGINEER shall render a written decision on
CONTRACTOR's claim within ten (10) days. It is mutually agreed between the parties that the
ENGINEER's decision on all claims or questions in relation to the Work, CONTRACTOR's
performance of the Work, any changes in the Work or Extra Work, the Contract Price and/or the
Contract Time, shall be final and conclusive and binding upon the parties. If the ENGINEER
shall fail to respond in writing to CONTRACTOR's claim within thirty (30) days of the date of
submission, or if CONTRACTOR shall dispute or object to ENGINEER's decision on any claim,
and CONTRACTOR fails to file a Request for Mediation of such claim in accordance with the
provisions of Article 9.0, within sixty (60) days after the date of submission to the ENGINEER, or
such longer period as the parties may agree to in writing, the CONTRACTOR shall lose and
forfeit his right to make such claim for Extra Work at any later date, and all such claims held by
the CONTRACTOR shall be deemed waived, forfeited and forever barred. CONTRACTOR shall
continue to diligently prosecute the Work notwithstanding any pending claim, dispute, or dispute
resolution process between OWNER and CONTRACTOR.
7.07 TIME OF FILING CLAIMS. Except as otherwise provided herein, all questions
of dispute or adjustment shall be made within the Pro-Trak system and filed with the ENGINEER
within three (3) days after the ENGINEER has given any directions, order or instruction to which
the CONTRACTOR desires to take exception. The ENGINEER shall reply within thirty (30) days
to such written exceptions, and render his final decision in writing. It is mutually agreed between
the parties that the ENGINEER's decision on all claims or questions in relation to the Work,
CONTRACTOR's performance of the Work, any changes in the Work or Extra Work, the
Contract Price and/or the Contract Time, shall be final and conclusive and binding upon the
parties. In case the CONTRACTOR should desire to appeal from the ENGINEER's decision, the
CONTRACTOR may request a meeting between representatives of the OWNER and the
CONTRACTOR for the purposes of appealing the ENGINEER's decision directly to the
OWNER, such meeting to occur within ten (10) days after the date of the CONTRACTOR's
request, or such longer period as may be agreed to by the parties in writing. If the
CONTRACTOR shall still be aggrieved after a meeting with the OWNER and/or his
representative, the CONTRACTOR shall have sixty (60) days after the date of the meeting, or
such longer period as the parties may agree to in writing, to file a Request for Mediation of such
claim in accordance with the provisions of Article 9.0. In the event the CONTRACTOR shall fail,
for any reason, to timely file a Request for Mediation, the OWNER shall be released of any and all
liability, and the CONTRACTOR's failure to timely file a Request for Mediation shall constitute a
waiver, forfeit and final bar of all such claims held by the CONTRACTOR against the OWNER.
CONTRACTOR shall continue to diligently prosecute the Work notwithstanding any pending
claim, dispute, or dispute resolution process between OWNER and CONTRACTOR.
8.0 DEFAULT
8.01 DEFAULT BY CONTRACTOR. In case the CONTRACTOR should abandon
and fail or refuse to resume Work within five (5) days after written notification from the OWNER
or the ENGINEER, or if the CONTRACTOR fails to comply with the orders of the ENGINEER
when such orders are consistent with the Contract Documents, or if the CONTRACTOR otherwise
defaults on its obligations under the Contract, OWNER shall have the right, if it so elects and
08-2018 00700-30 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
without prejudice to any other rights it may have, after giving five (5) days written notice of
default to CONTRACTOR and any surety, to terminate the Contract or any part thereof and/or to
take over or cause others to take over the Work or any part thereof, and to complete such Work for
the account of CONTRACTOR. Where Performance and Payment Bonds exist, the sureties on
these bonds shall be directed to complete the Work in conjunction with the notice of default, and a
copy of said notice shall be delivered to the CONTRACTOR.
After receiving said notice of default, the CONTRACTOR shall promptly and within no more than
three (3) days, remove from the Work any machinery, equipment, or tools then on the job, not
intended for incorporation into the Work. Should CONTRACTOR fail to promptly remove such
machinery, equipment or tools, OWNER may remove such machinery, equipment or tools and
store same at CONTRACTOR's expense; return such machinery, equipment or tools to their
purported owner; or otherwise dispose of such machinery, equipment or tools as OWNER sees fit.
Any materials, supplies and/or equipment delivered for use in the Work, may be used in the
completion of the Work by the OWNER or the surety on the Performance Bond, or another
contractor in completion of the Work; it being understood that the use of such equipment, supplies
and materials will ultimately reduce the cost to complete the Work and be reflected in the final
settlement.
Where there is no Performance Bond or in case the surety should fail to commence compliance
with the notice for completion hereinabove provided for within ten (10) days after the service of
such notice, then the OWNER may provide for completion of the Work in either of the following
elective manners:
(a) The OWNER may thereupon employ such force of workers and use such
machinery, equipment, tools, materials and supplies as the OWNER may deem
necessary to expeditiously complete the Work, and charge the expense of such
labor, machinery, equipment, tools, materials and supplies to said
CONTRACTOR, and expense so charged shall be deducted and paid by the
OWNER out of such monies as may be due or that may thereafter at any time
become due to the CONTRACTOR under and by virtue of this Agreement or any
other agreement between OWNER and CONTRACTOR. In case such expense is
less than the sum which would have been payable under this Contract if the same
had been completed by the CONTRACTOR, then said CONTRACTOR shall be
credited with the difference. In case such expense is greater than the sum which
would have been payable under this Contract if the same had been completed by
such CONTRACTOR, then the CONTRACTOR and/or his surety shall promptly
pay the amount of such excess to the OWNER upon demand; or
(b) The OWNER, under sealed bids, under the times and procedures provided for by
law, may let the contract for completion of the Work under substantially the same
terms and conditions which are provided in this Contract. In case of any increase in
cost to the OWNER under the completion contract, as compared to what would
have been the cost under this Contract, such increase shall be charged to the
CONTRACTOR, and the amount of such increase may be deducted by the
OWNER out of such monies as may be due or that may thereafter at any time
become due to the CONTRACTOR under and by virtue of this Agreement or any
other agreement between OWNER and CONTRACTOR, or the CONTRACTOR
and/or his surety shall promptly pay the amount of such increase to the OWNER
08-2018 00700-31 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
upon demand. However, should the cost to complete any such completion contract
prove to be less than what would have been the cost to complete under this
Contract, the CONTRACTOR and/or his surety shall be credited therewith.
In the event of a default by CONTRACTOR, no further payments shall be made to
CONTRACTOR under the Contract until the Work is Finally Completed. When the Work shall
have been Finally Completed, the CONTRACTOR and his surety shall be so notified. A complete
itemized statement of the Contract accounts, certified by the ENGINEER as being correct, shall
then be prepared and delivered to the CONTRACTOR and his surety, whereupon the
CONTRACTOR and/or his surety shall pay the balance due as reflected by said statement. The
OWNER, prior to incurring an obligation to make payment hereunder, shall have such statement
of completion attested to by the CONTRACTOR and the surety as accurate, and in exchange for
payment of the sum stated therein, the OWNER shall be entitled to a full and final release of any
claims or demands by the CONTRACTOR or the surety.
In the event the statement of accounts shows that the cost to complete the work is less than that
which would have been the cost to the OWNER had the work been completed by the
CONTRACTOR under the terms of this Contract, or when the CONTRACTOR and/or his surety
shall pay the balance shown to be due by them to the OWNER, then all machinery, equipment,
tools or supplies left on the site of the Work shall be turned over to the CONTRACTOR and/or his
surety. Should the cost to complete the Work exceed the Contract Price, and the CONTRACTOR
and/or his surety fail to pay the amount due the OWNER within the time designated above, and
there remains any machinery, equipment, tools, materials or supplies which are the property of
CONTRACTOR on the site of the Work, notice thereof, together with an itemized list of such
equipment and materials, shall be mailed to the CONTRACTOR and his surety at the respective
addresses designated in the Contract, provided, however, that actual written notice given in any
manner will satisfy this condition. After mailing or other giving of such notice, such property
shall be held at the risk of the CONTRACTOR and his surety, subject only to the duty of the
OWNER to exercise ordinary care to protect such property. After fifteen (15) days from the date
of such notice, the OWNER may sell such property, equipment, tools, materials or supplies, and
apply the net sum derived from such sale to the credit of the CONTRACTOR and his surety. Such
sale may be made at either public or private sale, with or without notice, as the OWNER may
elect. The OWNER shall release any machinery, equipment, tools, materials or supplies, which
remain on the Work, and belong to persons other than the CONTRACTOR or his surety, to their
reputed owners.
8.02 SUPPLEMENTATION OF CONTRACTOR FORCES. If CONTRACTOR at any
time shall, in OWNER'S sole opinion, fail to furnish skilled workers, suitable materials, supplies
or adequate equipment sufficient for the prompt, timely and diligent prosecution of the Work in
accordance with OWNER's direction, OWNER shall have the right, without prejudice to the
exercise of other remedies for the same default and without fully taking over the Work, to
supplement CONTRACTOR's forces and to expedite delivery of and to procure and furnish such
workers, materials, tools, supplies or equipment for CONTRACTOR's account by employing
other contractors and suppliers engaged in the same class of work and charge the entire cost
thereof to CONTRACTOR, said cost to be deducted from sums due or to become due to
CONTRACTOR under the Contract or any other agreement with OWNER or any parent,
subsidiary or affiliate of OWNER.
08-2018 00700-32 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
8.03 CUMULATIVE REMEDIES & SPECIFIC PERFORMANCE. All rights and
remedies of OWNER, under the terms of the Contract and/or available at law or in equity, are
cumulative. In the event CONTRACTOR or any of its subcontractors, vendors or suppliers fails
or refuses for any reason to provide timely manufacture, fabrication, delivery, installation,
erection, construction or completion of any supplies, materials, expendables, equipment,
machinery, accessories or appurtenances to be furnished hereunder, CONTRACTOR
acknowledges and agrees that such items are required, necessary, essentially unique to the Project
and the Work and will cause irreparable harm to OWNER and the Project if not furnished in
accordance with the Contract, and OWNER shall have the right to obtain a decree of specific
performance and mandatory injunctive relief from any Court of competent jurisdiction to ensure
the timely furnishing of such items.
8.04 CROSS-DEFAULT. If, for any reason, CONTRACTOR is declared in default
and/or terminated by OWNER under any other agreement with OWNER, whether related to the
Project or not related to the Project, OWNER shall have the right to offset and apply any amounts
which might be owed to OWNER by CONTRACTOR under any other such agreements against
any earned but unpaid amounts owing to CONTRACTOR by OWNER under the Contract, any
retainage earned by CONTRACTOR under the Contract or any unearned, unpaid amount under
the Contract.
8.05 INSOLVENCY. It is recognized that if CONTRACTOR becomes a debtor in
voluntary- or involuntary bankruptcy proceedings, makes a general assignment for the benefit of
creditors, or if a receiver is appointed on account of his insolvency, such events could seriously
impair or frustrate CONTRACTOR's performance of the Work. Accordingly, it is agreed that
should CONTRACTOR become a debtor in bankruptcy, either voluntary or involuntary,
CONTRACTOR shall notify OWNER in writing within twenty-four (24) hours of the filing with
the bankruptcy court. Further, it is agreed that upon occurrence of any one or more such events,
OWNER shall be entitled to request of CONTRACTOR or its successors, trustees or receivers,
adequate assurances of future performance. In the event such adequate assurances are not given to
the reasonable satisfaction of OWNER within seventy-two (72) hours of such request, OWNER
shall have the right to immediately invoke the remedies of this Section 8 or as provided by law.
Pending receipt of such adequate assurances of such future performance, OWNER may proceed
with the Work on a temporary basis and deduct the costs, plus reasonable overhead and profit,
from any amounts due or which may become due to CONTRACTOR under the-Contract or any
other agreement with OWNER. hi this regard, OWNER and CONTRACTOR agree that delays in
performance could result in more damages to CONTRACTOR than would be sustained if
OWNER failed to exercise such remedies.
8.06 CONTINGENT ASSIGNMENT. CONTRACTOR hereby assigns to OWNER, all
of CONTRACTOR's rights under and interest in any and all subcontracts and/or purchase orders
entered into by CONTRACTOR pursuant to this Agreement, such assignment to become effective
upon CONTRACTOR's default under this Agreement or OWNER's termination of this Contract,
and OWNER's acceptance of such assignment. Upon CONTRACTOR's default or OWNER's
termination of this Contract, OWNER may, in the event there is no performance bond for the
Contract, or in the event the performance bond surety fails to complete the Contract, or if OWNER
otherwise so elects in its sole discretion, accept such assignment by written notice of such
acceptance to CONTRACTOR and subcontractor, and may require subcontractors to perform all
of the then unperformed duties and obligations under the subcontract, for the,direct benefit of
OWNER. In the event OWNER requires such performance by a subcontractor, then OWNER
08-2018 00700-33 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
shall be obligated to pay such subcontractor any amounts due and owing under the terms of the
subcontract/purchase order, at the subcontract prices and rates, and subject to any rights of
withholding or offset and other terms and conditions of the subcontract, for all work properly
performed by such subcontractor, to the date of OWNER's acceptance and thereafter. OWNER's
liability in this connection, however, shall not exceed the amount obtained by subtracting all
payments made by CONTRACTOR to subcontractor from the Subcontract Price at the time of
CONTRACTOR's default or OWNER's termination of CONTRACTOR. CONTRACTOR shall
include a provision in its subcontracts that allows such assignment and allows OWNER to take
these actions, and further provides that in the event of CONTRACTOR's termination for default,
the subcontractor agrees to give the OWNER or its agent the right to inspect all books and records
of subcontractor relating to the Work.
8.07 WAIVER OF CONSEQUENTIAL DAMAGES. CONTRACTOR expressly
waives any and all claims for consequential damages against OWNER arising out of or related to
this Contract, or any other agreements between CONTRACTOR and OWNER, including, but not
limited to, claims for damages incurred by CONTRACTOR for principal office expenses,
including the compensation of personnel stationed there, losses of financing, bonding capacity,
business and reputation, and claims for lost profit, whether on this Contract or otherwise.
8.08 TERMINATION FOR CONVENIENCE. OWNER may at its sole discretion,
upon five (5) days written notice to CONTRACTOR, terminate this Contract, in whole or in part,
if and when OWNER determines that it is in the best interest of OWNER to do so. Upon receipt
of such written notice from OWNER, CONTRACTOR shall cease all terminated Work and take
reasonable precautions to protect and preserve such work, and shall take all reasonable measures
after consultation with OWNER to terminate or assign to OWNER all subcontracts, purchase
orders or other commitments related to the Work or the Project on terms and conditions acceptable
to OWNER. CONTRACTOR will be paid for all Work performed in strict accordance with the
Contract Documents, based upon the Contract Price and the percentage of completion on the date
of termination, and less amounts previously paid, subject to any reasonable backcharges
attributable to CONTRACTOR's failure to comply with any of the provisions of this Contract and
further subject to the other terms of this Contract regarding payment. In no event will
CONTRACTOR receive or be entitled to any payment or compensation whatsoever for
interruption of business or loss of business opportunities, any other items of consequential
damages, for overhead or loss of profits on the unperformed Work and/or services and unfurnished
materials or for any intangible, impact or similarly described cost, damages or expense, and under
no circumstances shall the total sum paid to or received by CONTRACTOR under this Contract
exceed the Contract Price. The compensation provided herein shall be CONTRACTOR's sole and
exclusive remedy arising out of a termination for convenience.
8.09 DEFAULT BY OWNER. In case the OWNER shall default on its material
obligations under this Contract, other than OWNER's failure to pay CONTRACTOR a disputed
amount due within the time limits provided in the Contract or applicable law, as addressed by
Section 6.13 of this Agreement, and shall fail or refuse to cure, or to commence and diligently
pursue cure of such default within fifteen (15) days after written notification by the
CONTRACTOR, then the CONTRACTOR may suspend or wholly abandon the Work, and may
remove therefrom all machinery, tools and equipment, and all materials on the site of the Work
that have not been included in payments to the CONTRACTOR and have not been incorporated
into the Work. And thereupon, the ENGINEER shall make an estimate of the total amount earned
by the CONTRACTOR, which estimate shall include the value of all Work actually completed by
08-2018 00700-34 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
said CONTRACTOR (at the Contract Prices), the value of all partially completed Work at a fair
' and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or
provided for by the terms of this Contract, and a reasonable sum to cover the cost of any
provisions made by the CONTRACTOR to carry the whole Work to completion and which cannot
be utilized. The ENGINEER shall then make a final statement of the balance due the
CONTRACTOR by deducting from the above estimate all previous payments by the OWNER and
all other sums that may be retained by the OWNER under the terms of this Agreement, and shall
present the same to the OWNER, and OWNER's payment of said sum to the CONTRACTOR, on
or before thirty (30) days after OWNER's receipt of such statement, shall satisfy any and all
rights, claims or causes of action of CONTRACTOR arising out of or related to such default by
OWNER, and shall be CONTRACTOR's sole and exclusive remedy for such default. A disputed
or unilateral claim by the Contractor cannot by itself constitute a default hereunder.
9.0 DISPUTE RESOLUTION
Any dispute or pending claim or dispute resolution process between OWNER and
CONTRACTOR shall not excuse or relieve CONTRACTOR of its obligations under the Contract,
and CONTRACTOR shall diligently prosecute the Work notwithstanding any pending claim,
dispute, or dispute resolution process between OWNER and CONTRACTOR.
All claims, disputes and other matters in question arising out of or relating to, the Contract,
or the breach thereof, shall be subject to mediation as a condition precedent to any other dispute
resolution process as may be selected by OWNER. Unless mutually agreed otherwise the
mediation shall be conducted by a third party who will be selected by agreement between
OWNER and CONTRACTOR, and Request for Mediation shall be filed with the other party. The
parties shall share the mediator's fee and any filing fees equally.
If a claim, dispute or other matter in question between OWNER and CONTRACTOR
involves the work of a subcontractor or supplier, OWNER or CONTRACTOR may join such
subcontractor or supplier as a party to any mediation proceeding between OWNER and
CONTRACTOR hereunder. CONTRACTOR shall include in all subcontracts and/or purchase
orders related to the Work a specific provision whereby the subcontractor or supplier consents to
being joined in mediation between OWNER and CONTRACTOR involving the work of such
subcontractor or supplier.
This Contract shall be governed by the laws of the State of Texas and shall be considered
performable in Brazoria County, Texas, for venue purposes. Further, the OWNER and
CONTRACTOR stipulate that venue for any dispute resolution proceeding involving or touching
upon the Contract other than the conduct of an arbitration hearing shall be in Brazoria County,
Texas, or, if such choice of venue is prohibited or unenforceable by law, shall be held in the
county where the Project is located.
CONTRACTOR agrees to pay OWNER all reasonable attorneys' fees incurred by
OWNER in the event OWNER seeks to enforce any provision of this Contract whether by
arbitration or other dispute resolution process. Further, in the event OWNER defends any claim
instituted by CONTRACTOR against OWNER, whether in arbitration or other dispute resolution
process, CONTRACTOR agrees to pay OWNER all reasonable attorneys' fees incurred by
OWNER in defending such claim provided OWNER is the prevailing party, in whole or in part, in
such proceeding.
08-2018 00700-35 of 35
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
ATTACHMENT NO. 1 TO GENERAL CONDITIONS
WORKERS' COMPENSATION INSURANCE COVERAGE
A. DEFINITIONS:
Certificate of coverage ("certificate") _ A copy of a certificate of insurance, a
certificate of authority to self-insure issued by the commission, or a coverage
agreement (TWCC81, TWCC-82, TWCC-83 or TWCC-84), showing statutory
workers' compensation insurance coverage for the person's or entity's employees
providing services on a project for the duration of the Project..
Duration of the Project _includes the time from the beginning of the Work on the
Project until the contractor's/person's work on the Project has been completed and
the Project warranty period has expired.
Persons providing services on the project includes persons or entities performing
all or part of the services the contractor has undertaken to perform on the project,
regardless of whether that person contracted directly with due contractor and
regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, motor carriers and owner-
operators, (as defined at Section 406.121 of the Texas Labor Code), ,leasing
companies, and employees of any such entity, or employees of any entity which
furnishes persons to provide services on the project. "Services" include, without
limitation, providing, hauling, or delivering equipment or materials, or providing
labor, transportation, or other service related to a project' "Services" does not
include activities unrelated to the project, such as food/beverage vendors, office
supply deliveries, and delivery of portable toilets.
B. The CONTRACTOR shall provide coverage, based on proper reporting of classification
codes and payroll amounts and filing of any coverage agreements, which meets the
statutory requirements of Texas Labor Code, Title 5 Workers' Compensation, Subtitle A
Texas Workers' Compensation Act, for employees of the contractor providing services on
the project, for the duration of the project.
C. The CONTRACTOR must provide a certificate of coverage to the OWNER prior to being
awarded the Contract.
D. If the coverage period shown on the CONTRACTOR's current certificate of coverage
ends during the duration of the project, the CONTRACTOR must, prior to the end of the
coverage period, file a new certificate of coverage with the OWNER showing that
coverage has been extended.
E. The CONTRACTOR shall obtain from each subcontractor or other person providing
services on a project, and provide to the OWNER:
(I) a certificate of coverage, prior to that person beginning work on the Project, so the
OWNER will have on file certificates of coverage showing coverage for all
persons providing services on the Project; and
05/2007 00700-Al
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
(2) no later than seven days after receipt by the CONTRACTOR and prior to the end
of the coverage period, a new certificate of coverage showing extension of
coverage, if the coverage period shown on the current certificate of coverage ends
during the duration of the Project.
F. The CONTRACTOR shall retain all required certificates of coverage for the duration of
the Project and for one year thereafter.
G. The CONTRACTOR shall notify the OWNER in writing by certified mail or personal
delivery, within 10 days after the CONTRACTOR knew or should have known, of any
changes that materially affect the provision of coverage of any person providing services
on the Project.
H. The CONTRACTOR shall post on each Project site a notice, in the text, form and manner
prescribed by the Texas Workers' Compensation Commission, informing all persons
providing services on the Project that they are required to be covered, and stating how a
person may verify coverage and report lack of coverage.
NOTICE
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing
services related to this construction project must be covered by
workers' compensation insurance. This includes persons providing,
hauling, or delivering equipment or materials, or providing labor or
transportation or other service related to the project, regardless of
the identity of their employer or status as an employee."
"Call the Texas Workers' Compensation Commission at (512) 440-
3789 to receive information on the legal requirements for coverage,
to verify whether your employer has provided the required coverage,
or to report an employer's failure to provide coverage."
The CONTRACTOR shall contractually require each person with whom it contracts to
provide services on a project, too:
(1) provide coverage, based on proper reporting of classification codes and payroll
amounts and filing of any coverage agreements, which meets the statutory
requirements of Texas Labor Code, Title 5 Workers' Compensation, Subtitle A
Texas Workers' Compensation Act, for all of its employees providing services on
the Project, for the duration of the Project;
(2) provide to the CONTRACTOR,prior to that person beginning work on the
Project, a certificate of coverage showing that coverage is being provided for all
employees of the person providing services on the project, for,the duration of the
Project:
05/2007 00700-A2
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
(3) provide the CONTRACTOR,prior to the end of the coverage period, a new
certificate of coverage, showing extension of coverage, if the coverage period
shown on the current certificate of coverage ends during the duration of the
Project;
(4) obtain from each other person with whom it contracts, and provide to the
CONTRACTOR:
(a) a certificate of coverage,prior to the other person beginning work on the
Project; and
(b) a new certificate of coverage showing extension of coverage,prior to the
end of the coverage period, if the coverage period shown on the current
certificate of coverage ends during the duration of the Project;
(5) retain all required certificates of coverage on file for the duration of the Project
and for one year thereafter;
(6) notify the OWNER in writing by certified mail or personal delivery, within 10 days
after the person knew or should have known, of any change that materially affects
the provision of coverage of any person providing services on the Project; and
(7) contractually require each person with whom it contracts, to perform as required by
paragraphs (1) - (7), with the certificates of coverage to be provided to the person
for whom they are providing services.
J. By signing this Contract or providing or causing to be provided a certificate of coverage,
the CONTRACTOR is representing to the OWNER that all employees of the
CONTRACTOR who will provide services on the Project will be covered by workers'
compensation coverage for the duration of the Project, that the coverage agreements will
be based on proper reporting of classification codes and payroll amounts, and that all
coverage agreements will be filed with the appropriate insurance carrier or, in the case of a
self-insured, with the commission's Division of Self-Insurance Regulation. Providing false
or misleading information may subject the CONTRACTOR to administrative penalties,
criminal penalties, civil penalties, or other civil actions.
K. The CONTRACTOR's failure to comply with any of these provisions is a breach of
contract by the CONTRACTOR, which entitles the OWNER to pursue all rights and
remedies available to it under the Contract, at law or in equity, if the CONTRACTOR does
not remedy the breach within ten days after receipt of notice of breach from the OWNER.
05/2007 00700-A3
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
ATTACHMENT NO. 2 TO GENERAL CONDITIONS
AGREEMENT FOR FINAL PAYMENT
AND CONTRACTOR'S SWORN RELEASE
In consideration of the Final Payment under that certain contract between [Contractor's
Company Name] (hereafter "CONTRACTOR") and the City of Pearland (hereafter "OWNER")
for the Project known as McHard Road Trunk Sewer & Phase 2 Water Line (the "Contract"), the
CONTRACTOR makes the following representations to OWNER, either individually if a
proprietorship, or jointly and severally by all general partners if a partnership, or if a corporation,
by action of the president and secretary of said corporation, as duly authorized by appropriate
action of the stockholders and/or board of directors of said corporation, their signatures hereon
constituting a representation under oath by said individuals that they have the authority to execute
this Agreement for and on behalf of the said corporation:
1. The undersigned CONTRACTOR represents to OWNER that the Application for
Payment for the Final Payment under the Contract, and the final Change Order
issued under the Contract if any, whether or not modified, corrected or changed in
some way by the ENGINEER, the CONTRACTOR or the OWNER, a copy of
which are attached hereto and marked Exhibit "A", are true, correct and accurate,
and that CONTRACTOR has received payment in full for all other Applications for
Payment submitted under the Contract, and that CONTRACTOR has been fully
compensated for all labor, materials, equipment and/or services furnished in
connection with the Contract, except for the Final Payment.
2. It is agreed and stipulated by the undersigned CONTRACTOR that upon the
receipt of Final Payment in the amount as set out on the attached Application for
Payment, the CONTRACTOR, by execution of this instrument of release, does,
therefore, RELEASE and FOREVER DISCHARGE OWNER of and from all
manner of debts, claims, demands, obligations, suits, liabilities and causes of action
of any nature whatsoever, at law or in equity, in contract or in tort, now existing or
which may hereafter accrue, arising out of or related to the Contract, any Change
Orders or Work Orders, the Work, or any labor, materials, equipment or services
furnished by CONTRACTOR to OWNER.
3. The CONTRACTOR, acting by and through the person or persons whose names
are subscribed hereto, does solemnly swear and affirm that all bills and claims have
been paid to all materialmen, suppliers, laborers, subcontractors, or other entities
performing services or supplying materials or equipment, and that OWNER shall
not be subject to any bills, claims, demands, litigation or suits in connection
therewith.
4. It is further specifically understood and agreed that this Agreement for Final
Payment and Contractor's Sworn Release shall constitute a part of the Contract, and
it is also specifically understood and agreed that this Agreement shall not act as a
modification, waiver or renunciation by OWNER of any of its rights or remedies as
set out in the Contract itself, but this Agreement for Final Payment and
Contractor's Sworn Release shall constitute a supplement thereto for the additional
protection of OWNER.
05/2007 00700-B1
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
SIGNED and EXECUTED this, the_day of , 20_
CONTRACTOR:
By:
Signature
Print Name:
Title:
[If CONTRACTOR is a proprietorship, owner must sign; if a partnership, each general partner
must sign; if a corporation, the following language should be used.]
SIGNED and EXECUTED this, the day of
20 by , a Texas corporation, under authority
granted to the undersigned by said corporation as contained in the Charter, By-Laws or Minutes of _
a meeting of said corporation regularly called and held.
CONTRACTOR:
By:
President
ATTEST:
Corporate Secretary
(Corporate Seal)
[This form is for use by either a proprietorship or a partnership. In the event CONTRACTOR is a
partnership or a joint proprietorship, additional signature lines should be added for each
individual.]
05/2007 00700-B2
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
AFFIDAVIT
STATE OF TEXAS §
COUNTY OF §
BEFORE ME, the undersigned authority, on this day personally appeared the person or
persons whose name(s) are subscribed to the above and foregoing Agreement for Final Payment
and Contractor's Sworn Release, who each, after being by me duly sworn, on their oaths deposed
and said:
I (We) am (are) the person(s)who signed and executed the above and foregoing
Agreement for Final Payment and Contractor's Sworn Release, and I (we) have read the
facts and statements as therein set out and the representations as made therein, and I (we)
state that the above and foregoing are true and correct.
CONTRACTOR- Affiant
SWORN TO AND SUBSCRIBED TO before me, the day of 20_:
Notary Public, State of Texas
My Commission Expires:
[This form is for use in the event CONTRACTOR is a corporation.]
•
07/2006 00700-B3
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
AFFIDAVIT
STATE OF TEXAS §
COUNTY OF §
BEFORE ME, the undersigned authority, on this day personally appeared the persons
who signed and executed the above and foregoing Agreement for Final Payment mid Contractor's
Sworn Release, whose names are set out above, who each, after being by me duly sworn, on their
oaths deposed and said:
We each are the persons whose names are subscribed above, and hold respectively the
offices in the corporation as set out above, and each state under oath that we have the
authority to execute this Agreement for Final Payment and Contractor's Sworn Release
for and on behalf of said corporation, pursuant to authority granted to us in the Charter of
said corporation, the By-Laws of said corporation and/or the Minutes of said corporation;
and the facts, statements and representations as set out in the instrument to which this
Affidavit is attached, are true and correct.
SWORN TO AND SUBSCRIBED TO before me this, the day of
20
Notary Public, State of Texas
My Commission Expires:
07/2006 00700-B4
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
ATTACHMENT NO. 3 TO GENERAL CONDITIONS
OWNER'S INSURANCE REQUIREMENTS OF CONTRACTOR
1. Definitions. For purposes of this Agreement:
1.1 Owner Parties. "Owner Parties" means (a) the City of Pearland, its successors and
assigns, and the Engineer, (b) any officers, employees, or agents of such persons or
entities, and(c) others as required by the Contract Documents, if any.
1.2 Contractor. "Contractor" shall mean the vendor providing the service or work to be
performed under this Agreement.
1.3 Subcontractor. "Subcontractor" shall include subcontractors of any tier.
1.4 ISO. "ISO"means Insurance Services Office.
2. Contractor Insurance Representations to Owner Parties
2.1 It is expressly understood and agreed that the insurance coverages required herein:
2.1.1 represent Owner Parties' minimum requirements and are not to be
construed to void or limit the Contractor's indemnity obligations as contained in
this Agreement nor represent in any manner a determination of the insurance
coverages the Contractor should or should not maintain for its own protection; and
2.1.2 are being, or have been, obtained by the Contractor in support of the
Contractor's liability and indemnity obligations under this Agreement. Neither the
requirements as to insurance to be carried as provided for herein, the insolvency,
bankruptcy or failure of any insurance company carrying insurance of the
Contractor, nor the failure of any insurance company to pay claims accruing, shall
be held to affect, negate or waive any of the provisions of this Agreement.
2.2 Failure to obtain and maintain the required insurance shall constitute a material
breach of, and default under, this Agreement. If the Contractor shall fail to remedy
such breach within five (5) business days after notice by the Owner, the Contractor
will be liable for any and all costs, liabilities, damages and penalties resulting to the
Owner Parties from such breach, unless a written waiver of the specific insurance
requirement(s) is provided to the Contractor by the Owner. In the event of any
failure by the Contractor to comply with the provisions of this Agreement, the
Owner may, without in any way compromising or waiving any right or remedy at
law or in equity, on notice to the Contractor, purchase such insurance, at the
Contractor's expense, provided that the Owner shall have no obligation to do so
and if the Owner shall do so, the Contractor shall not be relieved of or excused
from the obligation to obtain and maintain such insurance amounts and coverages.
10-2012 00700-Cl
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
3. Conditions Affecting All Insurance Required Herein
3.1 Cost of Insurance. All insurance coverage shall be provided at the Contractor's
sole expense.
3.2 Status and Rating of Insurance Company. All insurance coverage shall be written
through insurance companies authorized to do business in the state in which the
work is to be performed and rated no less than A-: VII in the most current edition
of A. M. Best's Key Rating Guide.
3.3 Restrictive, Limiting, or Exclusionary Endorsements. All insurance coverage shall
be provided to the Owner Parties in compliance with the requirements herein and
shall contain no endorsements that restrict, limit, or exclude coverage required
herein in any manner without the prior express written approval of the Owner.
3.4 Limits of Liability. The limits of liability may be provided by a single policy of
insurance or by a combination of primary and umbrella policies, but in no event
shall the total limits of liability available for any one occurrence or accident be less
than the amount required herein.
3.5 Notice of Cancellation, Nonrenewal, or Material Reduction in Coverage. All
insurance coverage shall contain the following express provision:
In the event of cancellation, non-renewal, or material reduction in
coverage affecting the certificate holder, thirty (30) days prior
written notice shall be given to the certificate holder by certified
mail or registered mail, return receipt requested.
3.6 Waiver of Subrogation. The Contractor hereby agrees to waive its rights of
recovery from the Owner Parties with regard to all causes of property and/or
liability loss and shall cause a waiver of subrogation endorsement to be provided in
favor of the Owner Parties on all insurance coverage carried by the Contractor,
whether required herein or not.
3.7 Deductible/Retention. Except as otherwise specified herein, no insurance required
herein shall contain a deductible or self-insured retention in excess of $25,000
without prior written approval of the Owner. All deductibles and/or retentions shall
be paid by, assumed by, for the account of, and at the Contractor's sole risk. The
Contractor shall not be reimbursed for same.
4. Maintenance of Insurance. The following insurance shall be maintained in effect with
limits not, less than those set forth below at all times during the term of this
Agreement and thereafter as required:
10-2012 00700-C2
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
4.1 Commercial General Liability Insurance
4.1.1 Coverage. Such insurance shall cover liability arising out of all locations
and operations of the Contractor, including but not limited to liability
assumed under this contract (including the tort liability of another assumed
in a business contract). Defense shall be provided as an additional benefit
and not included within the limit of liability.
4.1.2 Form. Commercial General Liability Occurrence form (at least as broad as
an unmodified ISO CG 0001 0798 or its equivalent).
4.1.3 Amount of Insurance. Coverage shall be provided with limits of not less
than:
Each Occurrence Limit $1,000,000
General Aggregate Limit $2,000,000
Product-Completed Operations Aggregate Limit $2,000,000
Personal and Advertising Injury Limit $1,000,000
4.1.4 Required Endorsements
a. Additional Insured. Additional insured status shall be provided in
favor of the Owner Parties on any of the following:
i. ISO form CG 20 10 11 85; or
ii. ISO form CG 20 26 11 85; or
iii. a combination of ISO forms CG 20 33 10 01 and CG 20 37
1001; or
iv. any form providing equivalent protection to Owner.
b. Designated Construction Project(s) Aggregate Limit. The aggregate
limit shall apply separately to this Agreement through use of an ISO
CG 25 03 03 97 endorsement or its equivalent.
c. Notice of Cancellation, N/nrenewal or Material Reduction in
Coverage, as required in 3.5, above.
d. Personal Injury Liability. The personal injury contractual liability
exclusion shall be deleted.
e. Primary and Non-Contributing Liability. It is the intent of the
parties to this Agreement that all insurance required herein shall be -
primary to all insurance available to the Owner Parties. The
obligations of the Contractor's insurance shall not be affected by
any other insurance available to the Owner Parties and shall seek no
contribution from the Owner Parties' insurance, whether primary,
excess contingent, or on any other basis. The Contractor's insurance
coverage shall be endorsed to provide such primary and non-
contributing liability.
f. Waiver of Subrogation, as required in 3.6, above.
10-2012 00700-C3
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
4.1.5 Continuing Commercial General Liability Insurance. The Contractor shall
maintain such insurance in identical coverage, form and amount, including
required endorsements, for at least one (1) year following Date of
Substantial Completion of the Work to be performed under this Agreement.
The Contractor shall provide written representation to Owner stating Work
completion date.
4.2 Auto Liability Insurance
4.2.1 Coverage. Such insurance shall cover liability arising out of any auto
(including owned, hired, and non-owned).
4.2.2 Form. Business Auto form (at least as broad as an unmodified ISO CA
0001 or its equivalent).
4.2.3 Amount of Insurance. Coverage shall be provided with a limit of not less
than $1,000,000.
4.2.4 Required Endorsements
a. Notice of Cancellation, Nonrenewal or Material Reduction in
Coverage, as required in 3.5, above.
b. Waiver of Subrogation, as required in 3.6, above.
4.3 Employer's Liability Insurance
4.3.1 Coverage. Employer's Liability Insurance shall be provided as follows:
4.3.2 Amount of Insurance. Coverage shall be provided with a limit of not less
than:
Employer's Liability: $1,000,000 each accident and each disease.
4.3.3, Required Endorsements
a. Notice of Cancellation, Nonrenewal or Material Reduction in
Coverage, as required in 3.5, above.
b. Waiver of Subrogation, as required in 3.6, above.
4.4 Umbrella Liability Insurance
4.4.1 Coverage. Such insurance shall be excess over and be no less broad than all
coverages described above and shall include a drop-down provision for
exhaustion of underlying limits.
4.4.2 Form. This policy shall have the same inception and expiration dates as the
commercial general liability insurance required above.
10-2012 00700-C4
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
4.4.3 Amount of Insurance. Coverage shall be provided with a limit of not less
than$5,000,000.
4.4.4 Continuing Umbrella Liability Insurance. The Contractor shall maintain
such insurance in identical coverage, form and amount, including required
endorsements, for at least one (1) year following Date of Substantial
Completion of the Work to be performed under this Agreement. The
Contractor shall provide written representation to the Owner stating Work
completion date.
4.5 Professional Liability Insurance
4.5.1 Coverage. The Contractor shall provide professional liability insurance for
any professional design or engineering drawing required by the work. Such
insurance shall indemnify the Owner from claims arising from the negligent
performance of professional services of any type, including but not limited
to design or design/build services as part of the Work to be performed.
4.5.2 Form. This insurance shall include prior acts coverage sufficient to cover
all services rendered by the Contractor and by its consultants under this
Agreement. It is recognized that this coverage may be provided on a
Claims-Made basis.
4.5.3 Amount of Insurance. Coverage shall be provided with a limit of not less
than$1,000,000.
4.5.4 Continuing Professional Liability Insurance. The Contractor shall maintain
such insurance in identical coverage, form and amount for at least one (1)
year following Date of Substantial Completion of the Work to be performed
under this'Agreement. The Contractor shall provide written representation
to the Owner stating Work completion date.
4.6 Builder's Risk
4.6.1 Insureds. Insureds shall include:
a. Owner, General Contactor and all Loss Payees and Mortgagees as
Named Insureds; and
b. subcontractors of all tiers in the Work as Additional Insureds.
10-2012 00700-C5
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
4.6.2 Covered Property. Such insurance shall cover:
a. all structure(s) under construction, including retaining walls, paved
surfaces and roadways, bridges, glass, foundation(s), footings,
underground pipes and wiring, excavations, grading, backfilling or
filling;
b. all temporary structures (e.g., fencing, scaffolding, cribbing, false
work, forms, site lighting, temporary utilities and buildings) located
at the site;
c. all property including materials and supplies on site for installation;
d. all property including materials and supplies at other locations but
intended for use at the site;
e. all property including materials and supplies in transit to the site for
installation by all means of transportation other than ocean transit;
and
f. other Work at the site identified in the Agreement to which this
Exhibit is attached.
Form
a. Coverage shall be at least as broad as an unmodified ISO Special
form, shall be provided on a completed-value basis, and shall be
primary to any other coverage insurance available to the insured
parties, with that other insurance being excess, secondary and non-
contributing.
b. No protective safeguard warranty shall be permitted.
c. Required coverage shall further include:
i. Additional expenses due to delay in $ TBD
completion of project(where applicable)
ii. Agreed value Included without sublimit
iii. Damage arising from error, omission or Included without sublimit
deficiency in construction methods,
design,•specifications, workmanship or
materials, including collapse
iv. Debris removal additional limit 25% of direct damage
loss
v. Earthquake (where applicable) $ TBD
vi. Earthquake sprinkler leakage (where $ TBD
applicable)
vii. Expediting expenses $ TBD
viii. Flood (where applicable) $ TBD
ix. Freezing Included without sublimit
x. Mechanical breakdown, including hot& Included without sublimit
cold testing (where applicable)
xi. Notice of cancellation, non-renewal or Included
10-2012 00700-C6
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
material reduction—60 days prior
written notice to each insured
xii. Occupancy clause, as required in F, Included
below
xiii. Ordinance or law Included without sublimit
xiv. Pollutant clean-up and removal $ TBD
xv. Preservation of property Included without sublimit
xvi. Replacement cost Included
xvii. Theft Included without sublimit
xviii. Waiver of subrogation as required in G, Included
below.
4.6.3 Amount of Insurance. Coverage shall be provided in an amount equal at all
times to the full replacement value and cost of debris removal for any single
occurrence.
4.6.4 Deductibles. Deductibles shall not exceed the following:
a. All Risks of Direct Damage,Per $5,000
Occurrence, except
b. Delayed Opening Waiting Period 5 Days
c. Flood, Per Occurrence $25,000 or excess of
NFIP if in Flood Zone A,
• •B or V
d. Earthquake and Earthquake Sprinkler $25,000
Leakage, Per Occurrence
4.6.5 Termination of Coverage. The termination of coverage provision shall be
endorsed to permit occupancy of the covered property being constructed so
long as such occupancy does not exceed 20% of the usable area of the
property. This insurance shall be maintained in effect, unless otherwise
provided for in the Contract Documents, until the earliest of the following
dates:
a. the date on which all persons and organizations who are insureds
under the policy agree that it shall be terminated;
b. the date on which final payment, as provided for in the Agreement
to which this Exhibit is attached, has been made; or
c. the date on which the insurable interests in the Covered Property of
all insureds other than Contractor have ceased.
10-2012 00700-C7
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
4.6.6 Waiver of Subrogation. The waiver of subrogation provision shall be )
endorsed as follows:
a. A waiver of subrogation shall be provided in favor of all insureds.
b. The waiver of subrogation provisions shall be endorsed as follows:
Should a covered loss be subrogated, either in whole
or in part, your rights to any recovery will come first,
and we will be entitled to a recovery only after you
have been fully compensated for the loss.
5. Intentionally left blank.
6. Evidence of Insurance
6.1 Provision of Evidence. Evidence of the insurance coverage required to be
maintained by the Contractor, represented by certificates of insurance, evidence of
insurance, and endorsements issued by the insurance company or its legal agent,
and must be furnished to the Owner prior to commencement of Work and not later
than fifteen (15) days after receipt of this Agreement. New certificates of
insurance, evidence of insurance, and endorsements shall be provided to the Owner
prior to the termination date of the current certificates of insurance, evidence of
insurance, and endorsements.
6.2 Form
6.2.1 All property insurance required herein shall be evidenced by ACORD form
28, "Evidence of Property Insurance".
6.2.2 All liability insurance required herein shall be evidenced by ACORD form
25, "Certificate of Insurance".
6.3 Specifications. Such certificates of insurance, evidence of insurance, and
endorsements shall specify:
6.3.1 The Owner as a certificate holder with correct mailing address.
6.3.2 Insured's name, which must match that on this Agreement.
6.3.3 Insurance companies affording each coverage, policy number of each
coverage, policy dates of each coverage, all coverages and limits described
herein, and signature of authorized representative of insurance company.
6.3.4 Producer of the certificate with correct address and phone number listed.
6.3.5 Additional insured status required herein.
6.3.6 Amount of any deductibles and/or retentions.
6.3.7 Cancellation, non-renewal and material reduction in coverage notification
as required by this Agreement. Additionally, the words "endeavor to" and
"but failure to mail such notice shall impose no obligation or liability of any
kind upon Company, it agents or representatives" shall be deleted from the
cancellation provision of the ACORD 25 certificate of insurance form.
10-2012 00700-C8
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
6.3.8 Designated Construction Project Aggregate Limits required herein.
6.3.9 Personal Injury contractual liability required herein.
6.3.10 Primary and non-contributing status required herein.
6.3.11 Waivers of subrogation required herein.
6.4 Required Endorsements. A copy of each of the required endorsements shall also be
provided.
6.5 Failure to Obtain. Failure of any Owner Party to demand such certificate or other
evidence of full compliance with these insurance requirements or failure of any
Owner Party to identify a deficiency from evidence that is provided shall not be
construed as a waiver of the Contractor's obligation to maintain such insurance.
6.6 Certified Copies. Upon request of any Owner Party, the Contractor shall provide to
the Owner a certified copy of all insurance policies required herein within ten (10)
days of any such request. Renewal policies, if necessary, shall be delivered to the
Owner prior to the expiration of the previous policy.
6.7 Commencement of Work. Commencement of Work without provision of the
required certificate of insurance, evidence of insurance and/or required
endorsements, or without compliance with any other provision of this Agreement,
shall not constitute a waiver by any Owner Party of any rights. The Owner shall
have the right, but not the obligation, of prohibiting the Contractor or any
subcontractor from performing any Work until such certificate of insurance,
evidence of insurance and/or required endorsements are received and approved by
the Owner.
7. Insurance Requirements of Contractor's Subcontractors
7.1 Insurance similar to that required of the Contractor shall be provided by all
subcontractors (or provided by the Contractor on behalf of subcontractors) to cover
operations performed under any subcontract agreement. The Contractor shall be
held responsible for any modification in these insurance requirements as they apply
to subcontractors. The Contractor shall maintain certificates of insurance from all
subcontractors containing provisions similar to those listed herein (modified to
recognize that the certificate is from subcontractor) enumerating, among other
things, the waivers of subrogation, additional insured status, and primary liability
as required herein, and make them available to the Owner upon request.
7.2 The Contractor is fully responsible for loss and damage to its property on the site,
including tools and equipment, and shall take necessary precautions to prevent
damage to or vandalism, theft, burglary, pilferage and unexplained disappearance
of property. Any insurance covering the Contractor's or its subcontractor's property
shall be the Contractor's and its subcontractor's sole and complete means or
recovery for any such loss. To the extent any loss is not covered by said insurance
or subject to any deductible or co-insurance, the Contractor shall not be reimbursed
for same. Should the Contractor or its subcontractors choose to self insure this risk,
it is expressly agreed that the Contractor hereby waives, and shall cause its
10-2012 00700-C9
CITY OF PEARLAND GENERAL CONDITIONS OF AGREEMENT
subcontractors to waive, any claim for damage or loss to said property in favor of
the Owner Parties.
8. Use of the Owner's Equipment. The Contractor, its agents, employees, subcontractors or
suppliers shall use the Owner's equipment only with express written permission of the
Owner's designated representative and in accordance with the Owner's terms and
condition for such use. If the Contractor or any of its agents, employees, subcontractors or
suppliers utilize any of the Owner's equipment for any purpose, including machinery,
tools, scaffolding, hoists, lifts or similar items owned, leased or under the control of the
Owner, the Contractor shall defend, indemnify and be liable to the Owner Parties for any
and all loss or damage which may arise from such use.
9. Release and Waiver. The Contractor hereby releases, and shall cause its subcontractors to
release, the Owner Parties from any and all claims or causes of action whatsoever which
the Contractor and/or its subcontractors might otherwise now or hereafter possess resulting
in or from or in any way connected with any loss covered by insurance, whether required
herein or not, or which should have been covered by insurance required herein, including
the deductible and/or uninsured portion thereof, maintained and/or required to be
maintained by the Contractor and/or its subcontractors pursuant to this Agreement.
10-2012 00700-C10
CITY OF PEARLAND SPECIAL CONDITIONS OF AGREEMENT
Section 00800
SPECIAL CONDITIONS OF AGREEMENT
The following Special Conditions modify the General Conditions, Document 00700. Where a
portion of the General Conditions is modified or deleted by these Special Conditions, the unaltered
portions of the General Conditions shall remain in effect.
ARTICLE 1 DEFINITIONS AND INTERPRETATIONS
1.01 Add the following paragraph to the end of Article 1.01:
The OWNER'S representative on the project site is:
Jennifer Lee, telephone: 281. 652. 1760
The CONSTRUCTION MANAGER is: Jaime Dino, telephone: 281.652.1747
The CONSTRUCTION INSPECTOR is: Tim Ford, telephone:713.775.0681
ARTICLE 4 RIGHTS AND RESPONSIBILITIES OF THE CONTRACTOR
4.05 Add the following paragraph to Article 4.05:
A Maintenance Bond in accordance with Document 00612 of the Project Manual is required for
this Project. The cost of this bond shall be included in the CONTRACTOR'S Bid Proposal.
Attachment No. 3 To General Conditions, Owner's Insurance Requirements of Contractor,
Article 4.6 Builder's Risk—Builder's Risk Insurance is Not Required for this project.
ARTICLE 5 PROSECUTION AND PROGRESS
5.08 Add Article 5.08:
The Contract Time as defined in the bid and other sections of the Contract Documents includes a
certain number of rain days. Based on the Alvin Weather Center Records, the average annual rain
days from June 1898 to December 1996 is 40 days calculated from all precipitation days of record.
The CONTRACTOR is required to keep a record of rain days at the site. The record of rain days
must be accepted and signed by the City Inspector monthly, and shall be reported on the monthly
pay estimate submittal. At the end of the contract, the CONTRACTOR will be credited only for
the number of accepted rain days that exceed 40 rain days per year,proportionate to the original
Contract Time.
General Notes:
Section 01500 Temporary Facilities requires CONTRACTOR to provide high speed internet
access in the Field Office. BIDDER is Not Required to provide either a Field Office or any
internet access for this project. All other requirements remain and will be required per the section.
08/2018 00800- 1 of 2
CITY OF PEARLAND SPECIAL CONDITIONS OF AGREEMENT
It is the responsibility of the Contractor to coordinate with the Owner for all Traffic Control
Documents. Contractor to coordinate with the Owner for procurement of Traffic Control Documents
prior to permitting. Contractor is to keep a minimum of one lane open at all times,in both directions.
No lane closures to extend beyond the defined work day.
Contractor Will Not be required to provide an on-site construction office for the duration of this
project.
END OF SECTION
08/2018 00800-2 of 2
CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION
Section 00811
WAGE SCALE FOR ENGINEERING CONSTRUCTION
1.01 In accordance with the Prevailing Wage law on Public Works (Article 2258 of the Texas
Government Code), the public body awarding the contract does hereby specify the rates
shown in Table 00811-A following to be the general prevailing rates in the locality in
which the work is being performed.
1.02 This prevailing wage rate does not prohibit the payment of more than the rates stated.
1.03 The wage scale for engineering construction is to be applied to all site work greater than
five (5) feet from an exterior wall of new building under construction or from an exterior
wall of an existing building.
10-2012 00811 - 1 of 1
CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION
General Decision Number: TX190032 01/04/2019 TX32
Superseded General Decision Number: TX20180044
State: Texas
Construction Type: Heavy
County: Brazoria County in Texas.
HEAVY CONSTRUCTION PROJECTS (Including Water and Sewer Lines
(Does Not Include Flood Control)
Note: Under Executive Order (EO) 13658, an hourly minimum wage
of $10.60 for calendar year 2019 applies to all contracts
subject to the Davis-Bacon Act for which the contract is awarded
(and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay
all workers in any classification listed on this wage
determination at least $10. 60 per hour (or the applicable
wage rate listed on this wage determination, if it is higher)
for all hours spent performing on the contract in calendar
year 2019. If this contract is covered by the EO and a
classification considered necessary for performance of work on
the contract does not appear on this wage determination, the
contractor must pay workers in that classification at least
the wage rate determined through the conformance process set
forth in 29 CFR 5.5 (a) (1) (ii) (or the EO minimum wage rate,
if it is higher than the conformed wage rate) . The HO minimum
wage rate will be adjusted annually. Please note that
this EO applies to the above-mentioned types of contracts
entered into by the federal government that are subject
to the Davis-Bacon Act itself, but it does not apply
to contracts subject only to the Davis-Bacon Related Acts,
including those set forth at 29 CFR 5.1 (a) (2) - (60) . Additional
information on contractor requirements and worker protections
under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
* 5FTX0669-001 04/01/2017
Rates Fringes
SPRINKLER FITTER (Fire
Sprinklers) $ 29.03 15.84
SUTX2005-018 05/18/2005
Rates Fringes
Carperter $ 14 .38 0.00
01-2019 00811 - 1of5
CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION
CEMENT MASON/CONCRETE FINISHER $ 11.37 1.13
ELECTRICIAN $ 18.40 1.34
Formbuilder/Formsetter $ 9.83 1. 69
IRONWORKER, REINFORCING $ 11.29 0.00
Laborers:
Common $ 8.99 1.25
Landscape $ 7.35 0.00
Mason Tender Cement $ 9. 96 0.00
Pipelayer $ 9. 63 1.50
PIPEFITTER $ 17.00 0.04
POWER EQUIPMENT OPERATOR:
Backhoe $ 12.74 0.00
Bulldozer $ 12.46 0.00
Crane $ 11.00 0.74
Excavator $ 16.74 0.00
Front End Loader $ 10.47 , 1.28
Grader $ 12.20 1.48
Tractor $ 11.29 1.45
TRUCK DRIVER $ 14.42 1.00
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
•
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii) ) .
01-2019 00811 -2 of 5
CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION
The body of each wage determination lists the classification
and wage rates that have been found to be prevailing for the
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of "identifiers" that indicate whether the particular
rate is a union rate (current union negotiated rate for local) ,
a survey rate (weighted average rate) or a union average rate
(weighted union average rate) .
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed
in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198
indicates the local union number or district council number
where applicable, i.e. , Plumbers Local 0198. The next number,
005 in the example, is an internal number used in processing
the wage determination. 07/01/2014 is the effective date of the
most current negotiated rate, which in this example is July 1,
2014.
Union prevailing wage rates are updated to reflect all rate
changes in the collective bargaining agreement (CBA) governing
this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that
no one rate prevailed for this classification in the survey and
the published rate is derived by computing a weighted average
rate based on all the rates reported in the survey for that
classification. As this weighted average rate includes all
rates reported in the survey, it may include both union and
non-union rates. Example: SULA2012-007 5/13/2014. SU indicates
the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates
the State of Louisiana. 2012 is the year of survey on which
these classifications and rates are based. The next number, 007
in the example, is an internal number used in producing the
wage determination. 5/13/2014 indicates 'the survey completion
date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a
new survey is conducted.
Union Average Rate Identifiers
Classification (s) listed under the UAVG identifier indicate
that no single majority rate prevailed for those
01-2019 00811 -3of5
CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION
classifications; however, 100% of the data reported for the
classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union
average rate. OH indicates the state. The next number, 0010 in
the example, is an internal number used in producing the wage
determination. 08/29/2014 indicates the survey completion date
for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of
each year, to reflect a weighted average of the current
negotiated/CBA rate of the union locals from which the rate is
based.
WAGE DETERMINATION APPEALS PROCESS
1. ) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2. )
and 3. ) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2. ) If the answer to the question in 1. ) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator •
(See 29 CFR Part 1.8 and 29 CFR Part 7) . Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full .statement of the
01-2019 00811 -4 of 5
CITY OF PEARLAND WAGE SCALE FOR ENGINEERING CONSTRUCTION
interested party's position and by any information (wage
payment data, project description, area practice material,
etc. ) that the requestor considers relevant to the issue.
3. ) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board) . Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
•
01-2019 00811 -5 of 5
ADDENDA
See Attached Issued Addenda
ADDENDA
PRL17298—McHard Road Trunk Sewer and Phase 2 Waterline 00900
CITY OF PEARLAND ADDENDUM
Section 00900
ADDENDUM NO. 2
Date: May 9, 2019
%=P�ro f
F+d 1,
5�
o) 0#
PROJECT: McHard Road Trunk Sewer and Phase 2 Waterline
o' JARED BARBER %
BID NO.: 0219-20 /-,3%• 114173•
,•
Ox` ' /CE N
BID DATE: May 16, 2019, 2:00 pm 5/9/2019 0 �is •N• •• NG_
FROM: Jared Barber, P.E.
Freese and Nichols, Inc. FREESE AND NICHOLS, INC.
11200 Broadway Street.,Suite 2320 TEXAS REGISTERED
Pearland, TX 77584 ENGINEERING FIRM
F-2144
To: Prospective Bidders and Interested Parties
This addendum forms a part of the bidding documents and will be incorporated into the Contract
Documents, as applicable. Insofar as the original Contract Documents, Specifications, and
Drawings are inconsistent, this Addendum shall govern. Please acknowledge receipt of this
Addendum on the Bid Proposal form, Section 00300 submitted to the City of Pearland.
FAILURE TO ACKNOWLEDGE RECEIPT OF ADDENDA ON THE BID PROPOSAL
FORM MAY BE CAUSE FOR DISQUALIFICATION.
CONTRACT DOCUMENTS:
The City of Pearland is currently in the process of acquiring all necessary ROW for the McHard
Road Water and Sewer project. The City anticipates that all ROW will be obtained before the
Notice to Proceed date, which is anticipated to be in early July 2019. In the event that the City is
unable to complete the acquisitioning phase, the City will issue a NTP for construction to begin
material submittals and placing orders for long lead-time materials. The City will facilitate a
materials on hand payment for properly stored& secured materials.
SPECIFICATIONS:
N/A
CONSTRUCTION DRAWINGS:
N/A
END OF ADDENDUM NO. 2
2-22-12 00900- 1 of 2
CITY OF PEARLAND ADDENDUM
Section 00900
ADDENDUM NO. 1
Date: 5/9/2019
OF
.......
'•' .•
. .•• '••.I l
PROJECT: McHard Road Trunk Sewer and Phase 2 Waterline •'
•
JARED BARBER j
BID NO.: 0219-20
#0-1) • 114173 ;144,%
o
BID DATE: May 16, 2019; 2:00 p.m. 0�4FS . (, _
5/9/2019 1 0N '�
FROM: Jared Barber, P.E.
Project Manager
Freese and Nichols, Inc. FREESE AND NICHOLS, INC.
11200 Broadway Street, Suite 2320 TEXAS REGISTERED
Pearland, TX 77584 ENGINEERING FIRM
F-2144
To: Prospective Bidders and Interested Parties
This addendum forms a part of the bidding documents and will be incorporated into the Contract
Documents, as applicable. Insofar as the original Contract Documents, Specifications, and
Drawings are inconsistent, this Addendum shall govern. Please acknowledge receipt of this
Addendum on the Bid Proposal form, Section 00300 submitted to the City of Pearland.
FAILURE TO ACKNOWLEDGE RECEIPT OF ADDENDA ON THE BID PROPOSAL
FORM MAY BE CAUSE FOR DISQUALIFICATION.
CONTRACT DOCUMENTS:
The sign in sheet from the Mandatory Pre-Bid Meeting is attached.
Replace Specification 00300 Attachment Bid Proposal with the attached revised Specification
00300 Attachment Bid Proposal. The following summarizes the changes to the bid proposal:
Bid Item 1.16 and 1.17 revised to show lined manholes instead of coated
Bid Item 1.41 changed from 16" PRV to 12" PRV
Bid Item 2.01 added allowance for bracing overhead power poles
Bid Item 3.12 added Extra Work- Crushed Concrete or Crushed Stone
Bid Items 4.01-4.04 spec reference udpated to 02313
The City of Pearland is currently in the process of acquiring all necessary ROW for the McHard
Road Water and Sewer project. The City anticipates that all ROW will be obtained before the
Notice to Proceed date, which is anticipated to be in early July 2019. In the event that the City is
unable to complete the acquisitioning phase,the City will issue a NTP for construction to begin
material submittals and placing orders for long lead-time materials. The City will facilitate a
materials on hand payment for properly stored& secured materials.
2-22-12 00900- 1 of 4
CITY OF PEARLAND ADDENDUM
Answers to the questions asked by Contractors:
1. Question: Are there any portions of the project that will need to be Bored?
Answer: Yes, refer to the drawings
2. Question: Are the crossings to be Jack& Bored or Directionally Bored?
Answer: This is the contractors means and methods unless a specific method is specifically called
for on the plans.
3. Question: What are the approximate lengths and diameters of the portions to be bored?
Answer: Sanitary Sewer 18"pipe between 27 and 35 LF. Sanitary Sewer 15"pipe between 30 and
60 LF. Waterline 16"pipe between 35 and 285 LF. Waterline 16"pipe approximately 899 LF by
Horizontal Directional Drill.
4. Question: How much is the required bid bond for the project?
Answer: 5% of total Base Bid Price
5. Question: How much is the cost estimate of the project?
Answer: $7,500,000
6. Question: Have all the easements been obtained? Summary of Work implies not.
Answer: The City of Pearland is currently in the process of acquiring all necessary ROW for the
McHard Road Water and Sewer project. The City anticipates that all ROW will be obtained
before the Notice to Proceed date, which is anticipated to be in early July 2019. In the event that
the City is unable to complete the acquisitioning phase,the City will issue a NTP for construction
to begin material submittals and placing orders for long lead-time materials. The City will
facilitate a materials on hand payment for properly stored& secured materials.
7. Question: When will the NTP be issued?
Answer: The NTP is anticipated to be issued in early July 2019 and will be issued no later than
August 16, 2019
8. Question: If the C.O.P. requires the Contractor to jump to multiple areas due to lack of
easements,will the Contractor be compensated for the extra work and given a time extension?
Answer: The City of Pearland is currently in the process of acquiring all necessary ROW for the
McHard Road Water and Sewer project. The City anticipates that all ROW will be obtained
before the Notice to Proceed date,which is anticipated to be in early July 2019. In the event that
the City is unable to complete the acquisitioning phase,the City will issue a NTP for construction
to begin material submittals and placing orders for long lead-time materials. The City will
facilitate a materials on hand payment for properly stored& secured materials.
2-22-12 00900-2 of 4
CITY OF PEARLAND ADDENDUM
9. Question: Can Freese &Nichols supply the overall site plan in KMZ—Google Earth format?
Answer: Yes, this will be posted on the City's bidding website.
10. Question: Is the Contractor to clear&grub the entire r.o.w or just enough to install the
required sewer and water utilities as shown?
Answer: Clearing will be required as necessary for the installation of the proposed water and
sewer lines.
11. Question: Who is responsible to relocate all types of fences back to the new r.o.w. line?
Contractor or Property Owner?
Answer: The Property owner is responsible for relocating their fence to the R.O.W. line prior to
construction.
12. Question: General Note#3 indicates that a clear& grubbing permit will be required from the
C.O.P. Urban Forester. What is the cost of this permit?
Answer: There will be no cost for this permit.
13. Question: Will all public utilities be relocated prior to the work beginning?
Answer: Private utilities will be relocated, no City of Pearland utilities are anticipated to be
relocated prior to construction.
14. Question: Will the "Alternate Bid Items for Trenchless Construction"be a factor into the
Contract Award or will they be considered only with the low bidder on the Base Bid?
Answer: The City will select the lowest qualified bid based on the base bid and alternates the City
elects to use.
15. Question: Alternate Bid Items Spec Reference# is for water lines and not trenchless
construction for sewer. Is this correct?
Answer: The Spec refence has been updated in Addendum 1
16. Question: If the C.O.P. choses the Alternate Bid Items,will the 150 cal. Day completion time
for phase one be extended? Trenchless is more time consuming. This also relates to the overall
completion time.
Answer: No
17. Question: Who is responsible to remove/demo all the existing structures as shown?
Answer: The Property owner is responsible for removal/demo of existing structures shown to be
removed.
2-22-12 00900-3 of 4
CITY OF PEARLAND ADDENDUM
18. Question: Who is responsible to handle any hazmat materials if encountered?
Answer: The property owner is responsible for this removal, if it is encountered the City and
selected contractor will address it.
19. Question: Bid Items # 16 & 17 call for sewer manholes to be coated not lined. Is this correct?
Answer: Manholes are to be lined not coated
20. Question: Several of the longer wetland directional drilled bores only have 5 of of cover. Can
this cover be increased to 11'-12' to prevent a frac. Out in the wetlands area?
Answer: Max depth allowed is 10 vertical feet of cover.
21. Question: Can a Bid Item be established for"Wet Sand Construction Bedding"?
Answer: Yes, added as an extra unit price item in Addendum 1
22. Question: Can a cash allowance for Centerpoint Pole Bracing be added?
Answer: Yes, added as an allowance in Addendum 1
23. Question: Is Saturday work allowed?
Answer: Yes, if requested per requirements in the contract documents and approved by the City
24. Question: Should manholes deeper than 12' be 6' in diameter or 5'?
Answer: No,note on the detail is revised in Addendum 1 to be 5' in diameter for any depth.
SPECIFICATIONS:
Section 11280"Pressure Reducing Valves"
Reference Section 3.04 Schedules
Modification: Modify the size of the PRV in the Schedule from 16" Full Port to 12" Full Port
CONSTRUCTION DRAWINGS:
Replace Sheet 30, 36, and 37 with the attached revised Sheet 30, 36, and 37.
END OF ADDENDUM NO. 1
Jared Barber, P.E.
Project Manager
2-22-12 00900-4 of 4
�� ,,1. McHard Road Trunk Sewer and Phase 2 Waterline
4.A.° q`90 Trunk Sewer - Cullen to Garden
Phase 2 Waterline - Cullen to Mykawa
T a X AS Mandatory Pre-Bid Meeting Sign In Sheet
FST. 1 Sq% Thursday, May 02, 2019 at 3:00 p.m.
Name (Print) Company Phone Number Email
rAi ,lig c4 --I I/2'--1 .U.1 _ _-S�);8 v)c , *--occ , i r\c_.ns--�
f i MN yA- E•SlGQ,j t - 7/ z q-90g 5 7k , € cem
L (, ` -1Aocew) I.xcs 5 rte 4832T ?1(0`4 - SV-l5 L`,1� e Nti.ocesctl@ 1c 0. c cvl
.ci , w1 I<<��- _ r p1 C105-919-040 C (00+oyioq Irysor) i ea/el
kt Efz-T3 'S D. Z• eLUG'-7--- `7\3 ei 1 r7 c.c.G _ sc TT—4` all c1 I, c, , cc,"I
. c
kr ' iii 1W) Alan tr/Y) , 7S ' -3/L-0 P " ryr n) Prn iv)]. (cit"
.
J. r.., i=GCs /-useJ 7-4j zj.l-3s"s-- /'tz-0 -3-:•"1 • �14 •7 ®1 vs•d.;ol. cyouc.
F _S_ stD1-4L° ELI c '57 71T-991. 16685
.c',..,-.4i ,82.4,c7/_) .F /0 efra y `y, 7i3 -Z9)-f>9Z_3 Q tJ "o.14.'4"r-2Tkr? . <. ,.2
&WIS 1.0e.--)1.0e.--) EP &ty OP, -713- 641/- 0123 6h/is -0,14 I I .LAN--%
C ! �� hlf EVx_ !1 Pt'Z- ,'La 1'36 t41 ` S(2O GYOLtn� p, 'YJ ,'
c.e). Cby1
,pII
Fre,,,+ /V t 1 Ti c ��� Y5-6. L(7`iS
'Jere.) 1>el cree'se.CO
Construction 1 of 2 D4.Revised 2016
Name(Print) Company Phone Number Email
7
((ret C), ki�5 G/0\4) } u-52 ,L.0LI 2. eaa.\)i tau i p Cil tr.. 4-x. • 0111
J ,r,e,, Lu. Co? 2 45a. i 760 ) 12 C. p4,, Ian+x. c a ,
C10,-(e•)(Q 1,ti-,� -;i,Ar CJ p ,.;), - &c z - 14i(Ai
J tk. , e., IJ( &GLm0 ce- Q. b A e2c r t Gl ci '1,' , qO k)D�rtCti6i,oMt- jp ao 2?s1 q 2ti �-1v3/4 01 ,,vta2-@ pea(�.sttx- ,J
*To be included in consultant's meeting minutes
Construction 2 of 2 D4.Revised 2016
CITY OF PEARLAND TECHNICAL SPECIFICATIONS DIVISION 1
TECHNICAL SPECIFICATIONS
DIVISION 1
GENERAL REQUIREMENTS
04/2008
CITY OF PEARLAND SUMMARY OF WORK
Section 01100
SUMMARY OF WORK
1.0 GENERAL
1.01 SECTION INCLUDES
A A summary of the Work to be performed under this Contract,work by Owner,Owner
furnished products,Work sequence,future Work,Contractor's use of Premises,and
Owner occupancy.
1.02 WORK COVERED BY CONTRACT DOCUMENTS
A Work of the Contract is for the construction of the following:
• Approximately 15,472 Lf— 16" Diameter Water Line (Via Open
Excavation)At Various Depths
• Approximately 580 Lf— 16" Diameter Water Line (Via Trenchless
Excavation In 24" Casing)At Various Depths
• Approximately 2,011 Lf— 16" Diameter Water Line (Via Trenchless
Excavation)At Various Depths
• Approximately 75 Lf— 16" Diameter Water Line (Via Open Excavation In
24" Casing)At Various Depths
• Approximately 31 Lf—8" Diameter Water Line (Via Open Excavation) At
Various Depths
• Approximately 278 Lf—8" Diameter Water Line (Via Open Excavation In
16" Casing)At Various Depths
• Approximately 5,660 Lf— 18"Diameter Trunk Sewer(Via Open
Excavation)At Various Depths
• Approximately 94 Lf— 18"Diameter Trunk Sewer(Via Trenchless
Excavation) At Various Depths
• Approximately 3,740 Lf— 15"Diameter Trunk Sewer(Via Open
Excavation) At Various Depths
• Approximately 141 Lf— 15"Diameter Trunk Sewer(Via Trenchless
Excavation) At Various Depths
• Approximately 513 Lf— 12"Diameter Sewer(Via Open Excavation)At
Various Depths
05/2008 01100- 1 of 3
CITY OF PEARLAND SUMMARY OF WORK
• Approximately 300 Lf— 8"Diameter Sewer(Via Open Excavation) At
Various Depths
• 28 —5' Diameter Sanitary Sewer Manholes
• Approximately 20— 16" Gate Valves
• Approximately 4— 8" Gate Valves
• Approximately 10—2" Combination Air Release/Vacuum Valves And
Vaults
• Approximately 15 - Standard Fire Hydrant Assemblies, Including Lead
And 6" Gate Valve
• Approximately 3 - Alternate Fire Hydrant Assemblies, Including Lead
And 6" Gate Valve
• 16"Pressure Reducing Valve Including Precast Concrete Vault With
Double Door Hatch, Isolation Valves, Bypass Piping,And Appurtenances
• Connections To Existing Water And Sewer Lines
• Control Of Surface And Ground Water
• Site Preparation Including Clearing And Grubbing As Necessary To
Install Water Line And Trunk Sewer, Removal Of Structures Within
R.O.W., And Removal Of Concrete Barrier As Indicated In The Plans
• Site Restoration Including Removal And Replacement Of: Asphalt And
Gravel Driveways, Concrete Sidewalk, And Hydro-Mulch Seeding As
Indicated In The Plans.
• Preparation And Implementation Of A Traffic Control Plan
• Preparation And Implementation Of A Trench Safety Plan
• Implementation Of A Stormwater Pollution Prevention Plan
• All Associated Construction-Related Permits.
1.03 WORK BY OWNER
A None.
1.04 OWNER FURNISHED PRODUCTS
A None.
05/2008 01100-2 of 3
CITY OF PEARLAND SUMMARY OF WORK
1.05 WORK SEQUENCE
A Contractor shall construct the project in the following sequence:
• Work shall not be started until easements and/or right-of-way are acquired.
B Contractor to submit project schedule to Engineer&Owner for approval as specified
in Section 01300—Submittals.
C Contractor shall coordinate the Work with the Engineer and Owner as specified in
Section 01040 - Coordination and Meetings.
1.06 FUTURE WORK
A None.
1.07 CONTRACTOR'S USE OF PREMISES
A Comply with procedures for access to the site and Contractor's use of rights-of-way
as specified in Section 01140 - Contractor's Use of Premises.
B Contractor shall be responsible for all utilities required for construction.
1.08 OWNER OCCUPANCY
A Cooperate with the Owner to minimize conflict, and to facilitate the Owner's
operations. Coordinate Contractor's activities with Engineer.
B Schedule work to accommodate this requirement.
1.09 FINAL SURVEY
A Contractor to provide GPS coordinates for all valves, fire hydrants,gate valves,and
manholes at the end of construction to the City.
1.10 RIGHT-OF-WAY (ROW) ACQUISITION
A The Contractor may not access any properties that have not been acquired by the
City.
2.0 PRODUCTS -NotUsed
3.0 EXECUTION -NotUsed
END OF SECTION
05/2008 01100-3 of 3
CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES
Section 01140
CONTRACTOR'S USE OF PREMISES
1.1 GENERAL
1.2 SECTION INCLUDES
A General use of the Project Site including properties inside and outside of the limits of
construction, work affecting roads, ramps, streets and driveways and notification to
adjacent occupants.
B References to Technical Specifications:
1 Section 01350—Submittals
2 Section 01730—Cutting&Patching
3 Section 01555—Traffic Control&Regulation
4 Section 01562—Waste Material Disposal
5 Section 01720—Field Surveying
6 Section 02980—Pavement Repair
7 Section 02770—Curbs, Curb & Gutter, &Headers
8 Section 02255—Bedding, Backfill, &EmbankmentMaterials
9 Section 02922—Sodding
10 Section 02921 —Hydromulch Seeding
1.3 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
1.4 LIMITS OF CONSTRUCTION
A Confine access,operations,and storage areas to limits of construction as shown on the
Plans provided by Owner as stipulated in Section 00700 — General Conditions of
Agreement; trespassing on abutting lands or other lands in the area is not allowed.
B Contractor may make arrangements,at Contractor's cost,for temporary use of private
properties,in which case Contractor and Contractor's surety shall indemnify and hold
harmless the Owner against claims or demands arising from such use of properties
outside of the limits of construction.
1. Improvements to private properties made for the Contractor's use must be
removed upon completion of the Work.
a. No fill material maybe placed in temporary work areas or on adjacent
private properties without the written permission of the Engineer or the
issuance of a Fill Permit by the City of Pearland or other governing
entity.
C Restrict total length which materials may be distributed along the route of the
construction at any one time to 1,000 linear feet unless otherwise approved by
Engineer.
01/2018 01140- 1 of 4
CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES
1.5 PROPERTIES OUTSIDE OF LIMITS OF CONSTRUCTION
A If Contractor's means and methods require the acquisition of Temporary _
Construction Easements or any access to private property not already included in the
above, such access and documentation along with any costs involved shall be
the responsibility of the Contractor.
B Altering the condition of properties adjacent to and along the limits of construction
will not be permitted unless authorized by the Engineer and property owner(s) as
noted above.
C Means,methods,techniques,sequences,or procedures which will result in damage to
properties or improvements in the vicinity outside of the limits of construction will not
be permitted without temporary or permanent easements as determined by the
Engineer.
D Any damage to properties outside of the limits of construction shall be repaired or
replaced to the satisfaction of the Engineer and at no cost to the Owner.
E Contractor shall protect or replace all property corners, monuments or other
demarcations disturbed, damaged or lost as a result of his activities. The
replacement of these devices shall be properly documented to the satisfaction of the
City by a Registered Public Land Surveyor with copies delivered to the Owner or
private property owner.
1.6 USE OF SITE
A Obtain approvals of governing authorities prior to impeding or closing public roads or
streets. Do not close consecutive intersections simultaneously
B Notify Engineer 48 hours prior to closing a street or a street crossing. Permits for
street closures are required in advance and are the responsibility of the Contractor.
C Maintain access for emergency vehicles including access to fire hydrants.
D Avoid obstructing drainage ditches or inlets; when obstruction is unavoidable due to
requirements of the Work, provide grading and temporary drainage structures to
maintain unimpeded flow.
E Locate and protect private lawn sprinkler systems which may exist on rights-of-ways
within the Project Site. Repair or replace damaged systems to condition equal to or
better than that existing at start of the Work.
F When required by the Work, cutting, patching, and fitting of Work to existing
facilities,accommodating installation or connection of Work with existing facilities,or
uncovering Work for access, inspection, or testing shall be performed in accordance
with Section 01730—Cutting&Patching.
G Fires are not permitted on the Project Site.
01/2018 01140 -2of4
CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES
1.7 NOTIFICATION TO ADJACENT OCCUPANTS
A Notify individual occupants in areas to be affected by the Work of the proposed
construction and time schedule. Notification shall be 24 hours,72 hours and 2 weeks
prior to work being performed within 200 feet of the homes orbusinesses.
B Include in notification names and telephone numbers of two representatives for
resident contact,who will be available on 24-hour call. Include precautions which will
be taken to protect private property and identify potential access or utility
inconvenience or disruption.
C Submit proposed notification to Engineer for approval. Consideration shall be given to
the ethnicity of the neighborhood where English is not the dominant language. Notice
shall be in an understandable language.
1.8 EXCAVATION IN STREETS AND DRIVEWAYS
A Avoid hindering or needlessly inconveniencing public travel on a street or any
intersecting alley or street for more than two blocks at any one time, except by
permission of the Engineer.
B Obtain the Engineer's approval when the nature of the Work requires closing of an
entire street. Permits required for street closure are the Contractor's responsibility.
Avoid unnecessary inconvenience to abutting property owners.
C Remove surplus materials and debris and open 1000 feet or less for public use as work
in that block is complete.
D Acceptance of any portion of the Work will not be based on return of street to public
use.
E Avoid obstructing driveways or entrances to private property.
F Provide temporary crossing or complete the excavation and backfill in one continuous
operation to minimize the duration of obstruction when excavation is required across
drives or entrances.
G Provide barricades and signs in accordance with Section 01555 —Traffic Control &
Regulation.
1.9 CLEAN-UP
A Maintain Project Site in a neat and orderly manner.
B Perform daily clean-up in and around construction zone of dirt,debris,scrap materials,
other disposable items.
C Leave streets, driveways, and sidewalks broom-clean or its equivalent at the end of
each work day.
D Promptly remove barriers, signs, and components of other control systems that are no
01/2018 01140-3 of 4
CITY OF PEARLAND CONTRACTOR'S USE OF PREMISES
longer being utilized.
E Dispose of waste and excess materials in accordance with requirements of Section
01562—Waste Material Disposal.
•
1.10 RESTORATION
A Restore damaged permanent facilities to pre-construction conditions unless
replacement or abandonment of facilities is indicated on the Plans.
B Repair/Replace removed or damaged pavement in accordance with Section 02980—
Pavement Repair and removed or damaged curbs,gutters, and headers in accordance
with Section 02770 — Curbs, Curb & Gutter, & Headers. Repair/Replace with like
materials to match existing style, lines, grades, etc., unless otherwise directed by
Engineer.
C Repair turf areas which become damaged by Contractor's operations at no additional
cost to Owner.
D Level with bank sand or topsoil, conforming to Section 02255 —Bedding, Backfill,&
Embankment Materials, as approved by the Engineer.
E Provide sodding in areas of residential land use over the surface of ground disturbed
during construction and not paved, or not designated to be paved, in accordance with
Section 02922— Sodding. Use only block sodding; do not use spot sodding or
sprigging.
F Provide hydromulch seeding in areas of commercial, industrial or undeveloped land
use over the surface of ground disturbed during construction and not paved, or not
designated to be paved, in accordance with Section 02921 —Hydromulch Seeding.
G Water and level newly sodded areas with adjoining turf using steel wheel rollers
appropriate for sodding
2.0 PRODUCTS - Not Used
3.0 EXECUTION - NotUsed
END OF SECTION
01/2018 01140-4 of 4
CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES
Section 01200
MEASUREMENT AND PAYMENT PROCEDURES
1.0 GENERAL
1.01 SECTION INCLUDES
A Procedures for measurement and payment of Work.
B Conditions for nonconformance assessment and nonpayment for rejected products.
C References to Technical Specifications: See Bid Proposal Sheet
D Reference Standards:
1. Concrete Reinforcing Steel Institute (CRSI)
2. American Institute of Steel Construction (AISC)
1:02 AUTHORITY
A Units and methods delineated in this Section are intended to complement the criteria of
the Technical Specifications and Section 00300—Bid Proposal.
B In the event of conflict, the unit specified for Bid Items in Section 00300 — Bid
Proposal shall govern.
C Measurements and quantities submitted by the Contractor will be verified by the
Engineer.
D Contractor shall provide necessary equipment, workers, and survey personnel as
required by Engineer to verify quantities.
1.03 UNIT QUANTITIES SPECIFIED
A Quantity and measurement estimates stated in Section 00300—Bid Proposal are for
contract purposes only. Quantities and measurements supplied or placed in the Work,
authorized and verified by Engineer shall determine payment as stated in Section
00700—General Conditions of Agreement.
B If the actual Work requires greater or lesser quantities than those quantities indicated in
Section 00300 — Bid Proposal, provide the required quantities at the unit prices
contracted except as otherwise stated in Section 00700 — General Conditions of
Agreement or in executed Change Order.
1.04 MEASUREMENT OF QUANTITIES
A Measurement by Weight: Reinforcing steel, rolled or formed steel or other metal
shapes will be measured by CRSI or AISC Manual of Steel Construction weights.
Welded assemblies will be measured by CRSI or AISC Manual of Steel Construction
or scale weights.
05/2007 01200- 1 of 3
CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES
B Measurement by Volume:
1. Stockpiles: Measured by cubic dimension using mean length, width, and
height or thickness.
2. Excavation and Embankment Materials: Measured by cubic dimension
using the average end area method;
C Measurement by Area: Measured by square dimension using mean length and width or
radius.
D Linear Measurement: Measured by linear dimension, at the item centerline or mean
chord.
E Stipulated Price Measurement: By unit designated in the agreement.
F Other: Items measured by weight, volume, area, or lineal means or combination, as
appropriate, as a completed item or unit of the Work.
1.05 PAYMENT
A Payment includes full compensation for all required supervision,labor,products,tools,
equipment,plant,transportation,services,and incidentals;and erection,application or
installation of an item of the Work; and Contractor's overhead and profit. The price
bid shall include the total cost for required Work. Claims for payment as Unit Price
Work not specifically covered in Section 00300—Bid Proposal will not be accepted.
B Progress Payments for Unit Price Work will be based on the Engineer's observations
and evaluations of quantities incorporated in the Work multiplied by the unit price.
C Progress Payments for Lump Sum Work will be based on the Engineer's observations
and evaluations of the percentage of quantities included in the schedule of values
incorporated in the Work.
D Final Payment for Work governed by unit prices will be made on the basis of the actual
measurements and quantities determined by Engineer multiplied by the unit price for
Work which is incorporated in or made necessary by the Work.
1.06 NONCONFORMANCE ASSESSMENT
A Remove and replace the Work, or portions of the Work, not conforming to the
Contract Documents.
B If, in the opinion of the Engineer, it is not practical to remove and replace the Work,
the Engineer will direct one of the following remedies:
1. The nonconforming Work will remain as is, but the unit price will be
adjusted to a lower price at the discretion of the Engineer.
2. The nonconforming Work will be modified as authorized by the Engineer,
and the unit price will be adjusted to a lower price at the discretion of the
Engineer, if the modified Work is deemed to be less suitable than originally
specified.
05/2007 01200-2 of 3
CITY OF PEARLAND MEASUREMENT AND PAYMENT PROCEDURES
C Individual Technical Specifications may modify these options or may identify a
specific formula or percentage price reduction.
D The authority of the Engineer to assess the nonconforming Work and identify payment
adjustment is final.
1.07 NONPAYMENT FOR REJECTED PRODUCTS
A Payment will not be made for any of the following:
1. Products wasted or disposed of in a manner that is not acceptable to
Engineer.
2. Products determined as nonconforming before or after placement.
3. Products not completely unloaded from transporting vehicle.
4. Products placed beyond the lines and levels of the required Work.
5. Products remaining on hand after completion of the Work, unless specified
otherwise.
6. Loading, hauling, and disposing of rejected products.
2.0 PRODUCTS - Not Used
3.0 EXECUTION - NotUsed
END OF SECTION
05/2007 01200-3 of 3
CITY OF PEARLAND CHANGE ORDER PROCEDURES
Section 01290
CHANGE ORDER PROCEDURES
1.0 GENERAL
1.01 SECTION INCLUDES
A Procedures for processing Change Orders, including:
1. Assignment of a responsible individual for approval and communication of
changes in the Work;
2. Documentation of change in Contract Price and Contract Time;
3. Change procedures, using proposals and construction contract
modifications, Work Change Directive, Stipulated Price Change Order, Unit
Price Change Order, Time and Materials Change Order;
4. Execution of Change Orders;
5. Correlation of Contractor Submittals.
B References to Technical Specifications:
1. Section 01350—Submittals
2. Section 01760—Project Record Documents
C Other References:
1. Rental Rate Blue Book for Construction Equipment (Data Quest Blue
Book). Rental Rate is defined as the full unadjusted base rental rate for the
appropriate item of construction equipment.
1.02 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
1.03 RESPONSIBLE INDIVIDUAL
A Contractor shall provide a letter indicating the name and address of the individual
authorized to execute change documents, and who shall also be responsible for
informing others in Contractor's employ and Subcontractors of changes to the Work.
The information shall be provided at the Preconstruction Conference.
1.04 DOCUMENTATION OF CHANGE IN CONTRACT PRICE AND CONTRACT
TIME
A Provide full information required for identification and evaluation of proposed
changes, and to substantiate costs of proposed changes in the Work.
B Contractor shall document each Proposal for Change in cost or time with sufficient
data to allow for its evaluation.
02/2008 01290- 1 of 4
CITY OF PEARLAND CHANGE ORDER PROCEDURES
C Proposal for Change shall include, as a minimum, the following information as
applicable:
1. Original Quantities of items in Section 00300—Bid Proposal with additions, ---
reductions, deletions, and substitutions.
2. When Work items were not included in Section 00300—Bid Proposal,
Contractor shall provide unit prices for the new items, with supporting
information as required by the Engineer.
3. Justification for any change in Contract Time.
4. Additional data upon request.
D For changes in the Work performed on a time-and-material basis, the following
additional information may be required:
1. Quantities and description of products and equipment.
2. Taxes, insurance and bonds.
3. Overhead and profit as noted in Section 00700—General Conditions of
Agreement, 7.03 "Extra Work".
4. Dates and times work was performed, and by whom.
5. Time records and certified copies of applicable payrolls.
6. Invoices and receipts for products, rented equipment, and subcontracts,
similarly documented.
E Rented equipment will be paid to the Contractor by actual invoice cost for the duration
of time required to complete the extra work. If the extra work comprises only a
portion of the rental invoice where the equipment would otherwise be on the site, the
Contractor shall compute the hourly equipment rate by dividing the actual monthly
invoice by 176. (One day equals 8 hours and one week equals 40 hours.) Operating
costs shall not exceed the estimated operating costs given for the item of equipment in
the Blue Book.
F For changes in the work performed on a time-and-materials basis using Contractor-
owned equipment, compute rates with the Blue Book as follows:
1. Multiply the appropriate Rental Rate by an adjustment factor of 70 percent
plus the full rate shown for operating costs. The Rental Rate utilized shall
be the lowest cost combination of hourly, daily, weekly or monthly rates.
Use 150 percent of the Rental Rate for double shifts (one extra shift per day)
and 200 percent of the Rental Rate for more than two shifts per day. No
other rate adjustments shall apply.
2. Standby rates shall be 50 percent of the appropriate Rental Rate shown in
the Blue Book. Operating costs will not be allowed.
1.05 CHANGE PROCEDURES
A Changes to Contract Price or Contract Time can only be made by issuance of a Change
Order. Issuance of a Work Change Directive or written acceptance by the Engineer of
changes will be formalized into Change Orders. All such changes will be in
accordance with the requirements of Section 00700 — General Conditions of
Agreement, 7.01 "Change Orders".
02/2008 01290-2 of 4
CITY OF PEARLAND CHANGE ORDER PROCEDURES
B The Engineer will advise Contractor of Minor Changes in the Work not involving an
adjustment to Contract Price or Contract Time as authorized by Section 00700 —
General Conditions of Agreement, 7:02'Minor Changes", by issuing supplemental
instructions.
C Contractor may request clarification of Plans, Technical Specifications or Contract
Documents or other information. Response by the Engineer to a Request for
Information does not authorize the Contractor to perform tasks outside the scope of the
Work. All changes must be authorized as described in this Section.
1.06 PROPOSALS FOR CHANGE AND CONTRACT MODIFICATION
A The Engineer may issue a Request for Proposal,which includes a detailed description
of a proposed change with supplementary or revised Plans and Technical
Specifications.The Engineer may also request a proposal in the response to a Request
for Information. Contractor will prepare and submit its Proposal for Change within 7
days or as specified in the request.
B The Contractor may propose an unsolicited change by submitting a Proposal for
Change to the Engineer describing the proposed change and its full effect on the Work,
with a statement describing the reason for the change and the effect on the Contract
Price and Contract Time including full documentation.
1.07 WORK CHANGE DIRECTIVE
A Engineer may issue a signed Work Change Directive instructing the Contractor to
proceed with a change in the Work, for subsequent inclusion in a Change Order.
B The document will describe changes in the Work and will designate a method of
determining any change in Contract Price or Contract Time.
C Contractor shall proceed promptly to execute the changes in the Work in accordance
with the Work Change Directive.
1.08 STIPULATED PRICE CHANGE ORDER
A A Stipulated Price Change Order will be based on an accepted Proposal for Change
including the Contractor's lump sum price quotation.
1.09 UNIT PRICE CHANGE ORDER
A Where Unit Prices for the affected items of the Work are included in Section 00300-
Bid Proposal , the Unit Price Change Order will be based on unit prices as originally
bid, subject to provisions of Section 00700—General Conditions of Agreement.
B Where unit prices of the Work are not pre-determined in Section 00300 — Bid
Proposal, Work Change Directive or accepted Proposal for Change will specify the
unit prices to be used.
02/2008 01290-3 of 4
CITY OF PEARLAND CHANGE ORDER PROCEDURES
1.10 TIME-AND-MATERIAL CHANGE ORDER
A Contractor shall provide an itemized account and supporting data after completion of
change,within time limits indicated for claims in Section 00700—General Conditions
of Agreement.
B Engineer will determine the change allowable in Contract Price and Contract Time as
provided in Section 00700—General Conditions of Agreement.
C Contractor shall maintain detailed records of work done on time-and-material basis as
specified in this Section, 1.04 "Documentation of Change in Contract Price and
Contract Time".
D Contractor shall provide full information required for evaluation of changes,and shall
substantiate costs for changes in the Work.
1.11 EXECUTION OF CHANGE DOCUMENTATION
A Engineer will issue Change Orders, Work Change Directives, or accepted Proposals
for Change for signatures of parties named in Section 00500 — Standard Form of
Agreement.
1.12 CORRELATION OF CONTRACTOR SUBMITTALS
A For Stipulated Price Contracts, Contractor shall promptly revise Schedule of Values
and Application for Payment forms to record each authorized Change Order as a
separate line item and adjust the Contract Price.
B For Unit Price Contracts,the next monthly Application for Payment of the Work after
acceptance of a Change Order will be revised to include any new items not previously
included and the appropriate unit rates.
C Contractor shall promptly revise progress schedules to reflect any change in Contract
Time, and shall revise schedules to adjust time for other items of work affected by the
change, and resubmit for review.
D Contractor shall promptly enter changes to the on-site and record copies of the Plans,
Technical Specifications or Contract Documents as required in Section 01760 —
Project Record Documents.
2.0 PRODUCTS - Not Used
3.0 EXECUTION - NotUsed
END OF SECTION
02/2008 01290-4 of 4
CITY OF PEARLAND COORDINATION AND MEETINGS
Section 01310
COORDINATION AND MEETINGS
1.0 GENERAL
1.01 SECTION INCLUDES
A Section includes general coordination including Preconstruction Conference, Site-
Mobilization Conference, and Progress Meetings.
B References to Technical Specifications:
1. Section 01100—Summary of Work
1.02 RELATED DOCUMENTS
A Coordination is required throughout the documents. Refer to all of the Contract
Documents and coordinate as necessary.
1.03 ENGINEER AND REPRESENTATIVES
A The Engineer may act directly or through designated representatives as defined in
Section 00700 — General Conditions of Agreement, 1.01 "Owner, Contractor, and
Engineer", and as identified by name at the Preconstruction Conference.
1.04 CONTRACTOR COORDINATION
A Coordinate scheduling,submittals,and work of the various Technical Specifications to --
assure
assure efficient and orderly sequence of installation of interdependent construction
elements.
B Coordinate completion and clean up of the Work for Substantial Completion and for
portions of the Work designated for Owner's partial occupancy.
C Coordinate access to Project Site for correction of nonconforming work to minimize
disruption of Owner's activities where Owner is in partial occupancy.
1.05 PRECONSTRUCTION CONFERENCE
A Engineer will schedule a Preconstruction Conference.
B Attendance Required: Engineer's representatives,Consultants,Contractor,and major
Subcontractors.
C Agenda:
1. Distribution of Contract Documents.
2. Designation of personnel representing the parties to the Contract, and the
Consultant.
3. Review of insurance.
02/2008 01310- 1 of 3
CITY OF PEARLAND COORDINATION AND MEETINGS
4. Discussion of formats proposed by the Contractor for Schedule of Values,
and Construction Schedule.
5. Discussion of required Submittals, including, but not limited to, Work
Plans, Traffic Control Plans, Safety Programs, Construction Photographs.
6. Procedures and processing of Shop Drawings and other submittals,
substitutions, Applications for Payment, Requests for Information, Request
for Proposal, Change Orders, and Contract Closeout.
7. Scheduling of the Work and coordination with other contractors.
8. Review of Subcontractors.
9. Appropriate agenda items listed in this Section, 1.06 "Site Mobilization
Conference", when Preconstruction Conference and Site Mobilization
Conference are combined.
10. Procedures for testing.
11. Procedures for maintaining Project Record Documents.
12. Designation of the individual authorized to execute change documents and
their responsibilities.
13. Discussion of requirements of a Trench Safety Program.
1.06 SITE MOBILIZATION CONFERENCE
A When required by Section 01100—Summary of Work,Engineer will schedule a Site
Mobilization Conference at the Project Site prior to Contractor occupancy.
B Attendance Required: Engineer representatives, Consultants, Contractor's
Superintendent, and major Subcontractors.
C Agenda:
1. Use of premises by Owner and Contractor
2. Safety and first aid procedures
3. Construction controls provided by Owner
4. Temporary utilities
5. Survey and layout
6. Security and housekeeping procedures
1.07 PROGRESS MEETINGS
A Progress Meetings shall be held at Project Site or other location as designated by the
Engineer. Meeting shall be held at monthly intervals, or more frequent intervals if
directed by Engineer.
B Attendance Required: Job superintendent, major Subcontractors and suppliers,
Engineer representatives, and Consultants as appropriate to agenda topics for each
meeting.
C Engineer or City's representative will make arrangements for meetings,and recording
minutes.
D Engineer or City's representative will prepare the agenda and preside at meetings.
02/2008 01310-2 of 3
CITY OF PEARLAND COORDINATION AND MEETINGS
E Contractor shall provide required information and be prepared to discuss each agenda
item.
F Agenda:
1. Review minutes of previous meeting.
2. Review of Construction Schedule, Applications for Payment, payroll and
compliance submittals.
3. Field observations, problems, and decisions.
4. Identification of problems which impede planned progress.
5. Review of Submittal Schedule and status of submittals.
6. Review status of Requests for Information, Requests for Proposal.
7. Review status of Change Orders.
8. Review of off-site fabrication and delivery schedules.
9. Maintenance of updates to Construction Schedule.
10. Corrective measures to regain projected schedules.
11. Planned progress during succeeding work period.
12. Coordination of projected progress.
13. Maintenance of quality and work standards.
14. Effect of proposed changes on Construction Schedule and coordination.
15. Other items relating to the Work.
2.0 PRODUCTS - Not Used
3.0 EXECUTION - NotUsed
END OF SECTION
02/2008 01310-3 of 3
CITY OF PEARLAND SUBMITTALS
Section 01350
SUBMITTALS
1.0 GENERAL
This Section contains general lists of Submittals and Technical Specifications that may be
required for the Work. When Submittals are required elsewhere in these Technical
Specifications, refer to this Section for Submittal requirements and procedures.
1.01 SECTION INCLUDES
A Submittal procedures for:
1. Schedule of Values
2. Construction Schedules
3. Shop Drawings, Product Data, and Samples
4. Operations and Maintenance Data
5. Manufacturer's Certificates
6. Construction Photographs
7. Project Record Documents
8. Design Mixes
B References to the following Technical Specifications:
1. Section 01310—Coordination &Meetings
2. Section 01630—Product Options & Substitutions
3. Section 01100—Summary of Work
4. Section 01380—Construction Photographs
5. Section 01760—Project Record Documents
6. Section 02530—Gravity Sanitary Sewers
1.02 SUBMITTAL PROCEDURES
A Scheduling and Handling
1. Schedule Submittals well in advance of the need for material or equipment for
construction. Allow time to make delivery of material or equipment after
Submittal is approved.
2. Develop a Submittal Schedule that allows sufficient time for initial review,
correction,resubmission and final review of all submittals.The Engineer will
review and return submittals to the Contractor as expeditiously as possible but
the amount of time required for review will vary depending on the complexity
and quantity of data submitted. In no case will a Submittal Schedule be
acceptable which allows less than 30 days for initial review by the Engineer.
This time for review shall in no way be justification for delays or additional
compensation to the Contractor.
3. The Engineer's review of submittals covers conformity to the Plans,Technical
Specifications, and dimensions which affect the layout. The Contractor is
responsible for quantity determination. The Contractor is responsible for any
errors, omissions or deviations from the Contract requirements; review of
01/2008 01350- 1 of 6
CITY OF PEARLAND SUBMITTALS
submittals in no way relieves the Contractor from his obligation to furnish _
required items according to the Plans and Technical Specifications.
4. Submit 5 copies of documents unless otherwise specified in this Section or by -
individual Technical Specifications.
5. Revise and resubmit submittals as required. Identify all changes made since
previous submittal.
6. The Contractor shall assume the risk for material or equipment which is
fabricated or delivered prior to approval. No material or equipment shall be
incorporated into the Work or included in Applications for Payment until
approval has been obtained in the specified manner.
B Transmittal Form and Numbering
1. Transmit each submittal to the Engineer with a transmittal form.
2. Sequentially number each transmittal form beginning with the number 1. Re-
Submittals shall use the original number with an alphabetic suffix(i.e.,2A for
first Re-Submittal of Submittal 2 or 15C for third Re-Submittal of Submittal
15). Each submittal shall only contain one type of work, material, or
equipment. Mixed submittals will not be accepted.
3. Identify variations from requirements of Contract Documents and identify
product or system limitations.
4. For submittal numbering of video tapes, see this Section, 1.10 "Video".
C Contractor's Certification
1. Each submittal shall contain a statement or stamp signed by the Contractor,
certifying that the items have been reviewed in detail and are correct and in
accordance with Contract Documents, except as noted by any requested
variance.
1.03 SCHEDULE OF VALUES
A Submit a Schedule of Values at least 10 days prior to the first Application for Payment.
A Schedule of Values shall be provided for each of the items indicated as Lump Sum
(LS) in Section 00300 — Bid Proposal for which the Contractor requests to receive
Progress Payments.
B Schedule of Values shall be typewritten on 8-1/2"x 11",plain bond,white paper. Use
the Table of Contents of this Project Manual as a format for listing costs of Work by
Section.
C Round off figures for each listed item to the nearest $100.00 except for the value of
one item, if necessary, to make the total price for all items listed in the Schedule of
Values equal to the applicable Lump Sum in Section 00300—Bid Proposal.
D For Unit Price Contracts, items should include a proportional share of Contractor's
overhead and profit, such that the total of all items listed in the Schedule of Values
equals the Contract amount. For Stipulated Price Contracts,Mobilization,Bonds,and
Insurance may be listed as separate items in the Schedule of Values.
01/2008 01350-2of6
CITY OF PEARLAND SUBMITTALS
E For Lump Sum equipment items, where Submittals for Testing, Adjusting, and
Balancing Reports in conjunction with Operation and Maintenance Data are required,
include a separate item for equipment Operation and Maintenance Data Submittals and
a separate item for Submittals of equipment Testing, Adjusting, and Balancing
Reports, each valued at five (5) percent of the Lump Sum.
F Revise the Schedule of Values and resubmit for items affected by contract
modifications,Change Orders,and Work Change Directives. Submit revised Schedule
of Values 10 days prior to the first Application for Payment after the changes are
approved by the Engineer.
1.04 CONSTRUCTION SCHEDULES
A Submit Construction Schedules for the Work in accordance with the requirements of
this Section. The Construction Schedule Submittal shall be,at a minimum,a bar chart,
(computer generated or prepared manually) and a narrative report.
B During the Preconstruction Meeting, as noted in Section 01310 - Coordination and
Meetings, the Contractor shall provide a sample of the format to be used for the
Construction Schedule Submittal. The format is subject to approval by the Engineer.
Review of the Submittal will be provided within 7 days of the Submittal of the sample.
C Within 7 days of the receipt of approval of the Contractor's format, or 14 days of the
Notice to Proceed, whichever is later, the Contractor shall submit a proposed
Construction Schedule for review. The Construction Schedule Submittal shall meet
the following requirements:
1. The Construction Schedule shall usually include a total of at least 20 but not
more than 50 activities. Fewer activities may be accepted, if approved by the
Engineer.
2. For Projects with work at different physical locations,each location should be
indicated separately within the Construction Schedule.
3. For projects with multiple crafts or significant subcontractor components,these
elements should be indicated separately within the Construction Schedule.
4. For Projects with multiple types of tasks within the scope,these types of work
should be indicated separately within the Construction Schedule.
5. For Projects with significant major equipment items or materials worth over 25
percent of the Total Contract Price, the Construction Schedule shall indicate
dates when these items are to be purchased,when they are to be delivered,and
when installed.
6. For Projects where operating plants are involved, each period of work which
will require the shut down of any process or operation shall be identified in the
Construction Schedule and must be agreed to by the Engineer prior to starting
work in the area.
7. A Billing Schedule(tabulation of the estimated monthly billings)for the Work
shall be prepared and submitted by the Contractor with the first Construction
Schedule. This information is not required in the monthly updates, unless
significant changes in Work require re-submittal of the Construction Schedule
for review. The total for each month and a cumulative total will be indicated.
01/2008 01350-3 of 6
CITY OF PEARLAND SUBMITTALS
These monthly forecasts are only for planning purposes of the Engineer.
Monthly payments for actual work completed will be made by the Engineer in
accordance with Section 00700 - General Conditions of Agreement. -- f
D The Contractor must receive approval of the Engineer for the Construction Schedule
and Billing Schedule prior to the first monthly Application for Payment. No payment
will be made until these are accepted.
E Upon written request from the Engineer, the Contractor shall revise and submit for
approval all or any part of the Construction Schedule to reflect changed conditions in
the Work or deviations made from the original plan and schedule.
F The Contractor's Construction Schedule shall thereafter be updated with the Actual
Start and Actual Finish Dates, Percent Complete, and Remaining Duration of each
Activity and submitted monthly. The date to be used in updating the monthly
Construction Schedule shall be the same Date as is used in the monthly Application for
Payment. This monthly update of the Construction Schedule shall be required before
the monthly Application for Payment will be processed for payment.
G The narrative Construction Schedule Report shall include a description of changes
made to the Construction Schedule; Activities Added to the Construction Schedule;
Activities Deleted from the Construction Schedule; any other changes made to the
Construction Schedule other than the addition of Actual Start Dates and Actual Finish
Dates and Remaining Durations.
1.05 SHOP DRAWINGS,PRODUCT DATA,AND SAMPLES
A Shop Drawings
1. Submit Shop Drawings for review as required by the Technical Specifications.
2. Contractor's Certification, as described in this Section, 1.02 "Submittal
Procedures" shall be placed on each Shop Drawing.
3. The Shop Drawing shall accurately and distinctly present the following:
a. Field and erection dimensions clearly identified as such.
b. Arrangement and section views.
c. Relation to adjacent materials or structure including complete
information for making connections between work under this Contract
and work under other contracts.
d. Kinds of materials and finishes.
e. Parts list and descriptions.
f. Assembly Shop Drawings of equipment components and accessories
showing their respective positions and relationships to the complete
equipment package.
g. Where necessary for clarity, identify details by reference to sheet
numbers and detail numbers, schedule or room numbers as shown on
the Plans.
4. Shop Drawing Drawings shall be to scale, and shall be a true representation of
the specific equipment or item to be furnished.
01/2008 01350-4 of 6
CITY OF PEARLAND SUBMITTALS
B Product Data
1. Submit Product Data for review when required in individual Technical
Specifications.
2. Contractor's Certification, as described in this Section, 1.02 "Submittal
Procedures" shall be placed on each data item submitted.
3. Mark each copy to identify applicable products,models,options to be used in
this Project. Supplement manufacturers'standard data to provide information
unique to this Project, where required by the Technical Specification.
4. For products specified only by reference standard,submit manufacturer,trade
name,model or catalog designation, and applicable reference standard.
5. For Approved Products, those designated in the Technical Specifications
followed by the words"or approved equal",submit manufacturer,trade name,
model or catalog designation, and applicable reference standard.
6. For products proposed as alternates to Approved Products, refer to Section
01630-Product Options and Substitutions, 1.04"Selection Options"and 1.07
"Substitution Procedures".
7. For products that are neither Pre-Approved, Approved, specified only by
reference standard, nor proposed as alternates, submit product description,
trade name, manufacturer, and supplier. Contractor shall provide additional
information upon written request by Engineer or Owner.
C Samples
1. Submit samples for review as required by the Technical Specification.
2. Contractor's Certification,-as described in this Section, 1.02 "Submittal
Procedures", shall be placed on each sample or a firmly attached sheet of
paper.
3. Submit the number of samples specified in the Technical Specification;one of
which will be retained by the Engineer.
4. Reviewed samples which may be used in the Work are identified in the
Technical Specifications.
1.06 OPERATIONS AND MAINTENANCE DATA
A When specified in Technical Specification,submit manufacturers'printed instructions
for delivery, storage, assembly, installation, start-up, operation, adjusting, finishing,
and maintenance.
B Contractor's Certification, as described in this Section. 1.02"Submittal Procedures",
shall be placed on front page of each document.
C Identify conflicts between manufacturers'instructions and Contract Documents.
1.07 MANUFACTURER'S CERTIFICATES
A When specified in Technical Specification, submit manufacturers' certificate of
compliance for review by Engineer.
B Contractor's Certification, as described in this Section, 1.02"Submittal Procedures",
shall be placed on front page of the certificate.
01/2008 .01350-5 of 6
CITY OF PEARLAND SUBMITTALS
C Submit supporting reference data, affidavits, and certifications as appropriate.
D Manufacturer's Certificates may be recent or previous test results on material or
product, but must be acceptable to Engineer.
1.08 CONSTRUCTION PHOTOGRAPHS
A Submit photographs in accordance with Section 01380—Construction Photographs.
1. Prints: Prepare 2 prints of each view and submit 1 print directly to the City's
Representative within 7 days of taking photographs. One print shall be
retained by the Contractor and made available at all times for reference on the
job site.
B PRECONSTRUCTION PHOTOGRAPHS:
1. Prior to the commencement of any construction,take digital color photographs
on the entire route of the project
2. Photographs: Two prints, color, matte finish; 3 x 5 inch size, mounted on
81 x 11-inch soft card stock, with left edge binding margin for three hole
punch, or in plastic pockets in three-ring notebook.
3. Th photographs shall show:
a. Date photographs were taken
b. Location of the photograph, house number and street name. (This
information may be shown on a chalk board in the photograph by a
label on the mountings.)
4. Photographs should show the condition of the following
a. Esplanades and boulevards
b. Yards (near, side and far side of street)
c. Housewalk, sidewalk and driveway; curb
d. Area between walk and curb
1) Particular features(yard lights, shrubs, fences, trees, etc.)
2) Landscaping and decorative features.
C POST CONSTRUCTION PHOTOGRAPHS
1. On completion of construction, provide photographs of any public or private
property which has been repaired or restored and any damage which is or may
• be the subject of complaints.
1.09 PROJECT RECORD DOCUMENTS
A Submit Project Record Documents in accordance with Section 01760—Project Record
Documents.
1.10 VIDEO •
A Submit television video in DVD format as required in individual Technical
Specifications.
B Transmittal forms for video disks shall be numbered sequentially beginning with TO1,
T02, T03, etc.
01/2008 01350-6 of 6
CITY OF PEARLAND SUBMITTALS
1.11 DESIGN MIXES
A When specified, submit design mixes for review.
B Contractor's Certification, as described in this Section, 1.02"Submittal Procedures",
shall be placed on front page of each design mix.
C Mark each design mix to identify proportions,gradations,and additives for each class
and type of design mix submitted. Include applicable test results on samples for each
mix.
D Maintain a copy of approved design mixes at mixing plant.
2.0 PRODUCTS - Not Used
3.0 EXECUTION - NotUsed
END OF SECTION
01/2008 01350-7 of 6
CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS
Section 01380
CONSTRUCTION PHOTOGRAPHS
1.0 GENERAL
1.01 SECTION INCLUDES
A Requirements for construction photographs and submittals.
B References Technical Specifications:
1. Section 01100—Summary of Work
2. Section 01350—Submittals
•
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item, no separate payment will be made for Construction
Photographs under this Section. Include cost in Bid Items for installed Work.
1.03 SUBMITTALS
A When required by Section 01190 — Summary of Work, submit photographs in
accordance applicable provisions of this Section.
B Make Submittals required by this and related Sections under the provisions of Section
01350—Submittals.
C Prepare three(3)prints of each view and submit two (2) prints directly to the Project
Manager within seven(7)days of taking photographs. One(1)print shall be retained
by the Contractor in the field office at the Project Site and available at all times for
reference.
D When requested by the Project Manager, the Contractor shall submit extra prints of
photographs,for distribution directly to designated parties who will pay the costs for
the extra prints directly to the photographer.
E When required by individual Sections, submit photographs taken prior to start of the
Work to show original Project Site conditions.
F When required by Contract Documents, submit photographs with Application for
Payment.
G When required by individual Sections,submit photographs taken following completion
of the Work to show the condition in which the Project Site will be left.
H With each submittal,include photographic negatives in protective envelopes,identified
- by Project Name, Contractor, and date photographs were taken.
01/2008 01380- 1 of 3
CITY OF PEARLAND - CONSTRUCTION PHOTOGRAPHS
1.04 QUALITY ASSURANCE
A Contractor shall be responsible for the timely execution of the photographs, their -
vantage point, direction of shot, and quality.
2.0 PRODUCTS
2.01 PHOTOGRAPHS
A Photographs shall be digital quality and shall be submitted on a CD.
B The photographs shall show on a non-elective chalkboard or white board,readable in
the photograph:
1. Job number.
2. Date and time photographs were taken.
3. Location of the photograph, house number and street, along with the project
number.
C Indicate the condition of the following:
1. Esplanades and boulevards.
2. Yards (near side and far side of street).
3. House-walk and sidewalk.
4. Curb.
5. Area between walk and curb.
6. Particular features (yard lights, shrubs, fence, trees, etc.).
7. Date shall be on negative.
8. Provide notation of vantage point marked for location and direction of shot
on a key plan of the Project Site.
D Sufficient number of photographs shall betaken to show the existence or non-
existence of cracked concrete and the condition of trees, shrubs and grass.
E Identify each photograph with an applied label or rubber stamp on the back with the
following information:
1. Name of the Project.
2. Name and address of the photographer(if a professional photographer is
used).
3. Name of the Contractor.
4. Date the photograph was taken.
5. Photographs to be in plastic pockets and bound in three -ring notebook for
easy access and viewing.
3.0 EXECUTION
3.01 PRECONSTRUCTION PHOTOGRAPHS
A Prior to the commencement of the Work, take photographs of the entire route of the
Project Site.
01/2008 01380-2of3
CITY OF PEARLAND CONSTRUCTION PHOTOGRAPHS
3.02 POST-CONSTRUCTION PHOTOGRAPHS
A Following the completion of the Work,take photographs from corresponding vantage
points and direction of shots.
3.03 PROGESS PHOTOGRAPHS
A Take photographs at intervals, coinciding with the cutoff date associated with each
Application for Payment and submit on CD with monthly Application for Payment.
B Select the vantage points for each shot each month to best show the status of
construction and progress since the last photographs were taken. Take not less than
two (2) shots from the same vantage point creating a time-lapsed sequence.
C Follow direction when given by the Project Manager in selecting vantage points.
END OF SECTION
01/2008 01380-3 of 3
CITY OF PEARLAND REFERENCED STANDARDS
Section 01420
REFERENCED STANDARDS
1.0 GENERAL
1.01 SECTION INCLUDES
A General quality assurance as related to Reference Standards and a list of references.
B References to Technical Specifications: None
1.02 QUALITY ASSURANCE
A For Products or workmanship specified by association, trade, or Federal Standards
comply with requirements of the standard, except when more rigid requirements are
specified or are required by applicable codes.
B Conform to reference standard by date of issue current on the date as stated in Section
00700—General Conditions of Agreement.
C Request clarification from Engineer before proceeding should specified reference
standards conflict with Contract Documents.
1.03 SCHEDULE OF REFERENCES
AASHTO American Association of State Highway and Transportation Officials
444 North Capitol Street, N.W.
Washington, DC 20001
ACI American Concrete Institute
P.O. Box 19150
Reford Station
Detroit, MI 48219-0150
AGC Associated General Contractors of America
1957 E Street, N.W.
Washington,DC 20006
AI Asphalt Institute
Asphalt Institute Building
College Park, MD 20740
AITC American Institute of Timber Construction
333 W. Hampden Avenue
Englewood, CO 80110
02/2008 01420- 1 of 5
CITY OF PEARLAND REFERENCED STANDARDS
AISC American Institute of Steel Construction
400 North Michigan Avenue, Eighth Floor
Chicago, IL 60611
AISI American Iron and Steel Institute
1000 16th Street, N.W.
Washington, DC 20036
ASME American Society of Mechanical Engineers
345 East 47th Street
New York, NY 10017
ANSI American National Standards Institute
1430 Broadway
New York, NY 10018
APA American Plywood Association
Box 11700
Tacoma, WA 98411
API American Petroleum Institute
1220 L Street, N.W.
Washington, DC 20005
AREA American Railway Engineering Association
50 F Street, N.W.
Washington, DC 20001
ASTM American Society for Testing and Materials
1916 Race Street
Philadelphia, PA 19103
AWPA American Wood-Preservers' Association
7735 Old Georgetown Road
Bethesda, MD 20014
AWS American Welding Society
P.O. Box 35104
Miami, FL 33135
AWWA American Water Works Association ,
6666 West Quincy Avenue
Denver, CO 80235
02/2008 01420-2 of 5
CITY OF PEARLAND REFERENCED STANDARDS
•
CLFMI Chain Link Fence Manufacturers Institute
1101 Connecticut Avenue, N.W.
Washington, DC 20036
CRD U.S.A. Corps of Engineers
Code of Ordinances
City of Pearland
3519 Liberty Drive
Pearland, TX 77581
CRSI Concrete Reinforcing Steel Institute
933 Plum Grove Road
Schaumburg, IL 60173-4758
EJMA Expansion Joint Manufacturers Association
707 Westchester Avenue
White Plains, NY 10604
FDA U.S. Food and Drug Administration
5600 Fisher Lane
Rockville, MD 20857-0001
FS Federal Standardization Documents
General Services Administration, Specifications Unit(WFSIS)
7th and D Street S.W.
Washington, DC 20406
ICEA Insulated Cable Engineer Association
P.O. Box 440
S. Yarmouth, MA 02664
IEEE Institute of Electrical and Electronics Engineers
445 Hoes Lane
P.O. Box 1331
Piscataway, NJ 0855-1331
MIL Military Specifications
General Services Administration, Specifications Unit (WFSIS)
7th and D Street S.W.
Washington, DC 20406
NACE National Association of Corrosion Engineers
P. O. Box 986
Katy, TX 77450
02/2008 01420-3 of 5
CITY OF PEARLAND REFERENCED STANDARDS
NEMA National Electrical Manufacturers'Association
2101 L Street, N.W., Suite 300
Washington, DC 20037
NFPA National Fire Protection Association
Batterymarch Park, P.O. Box 9101
Quincy, MA 02269-9101
OSHA Occupational Safety Health Administration
U.S. Department of Labor, Government Printing Office
Washington, DC 20402
PCA Portland Cement Association
5420 Old Orchard Road
Skokie, IL 60077-1083
PCI Prestressed Concrete Institute
201 North Wacker Drive
Chicago, IL 60606
SDI Steel Deck Institute
Box 9506
Canton, OH 44711
SSPC Steel Structures Painting Council
4400 Fifth Avenue
Pittsburgh, PA 15213
TAC Texas Administrative Code
TCEQ Texas Commission on Environmental Quality
P. O. Box 13087
Austin, TX 78711-3087
TxDOT Texas Department of Transportation
125 East 11th Street
Austin, TX 78701-2483
Texas MUTCD Texas Manual on Uniform Traffic Control Devices (2003 Adoption)
(published by Texas Department of Transportation)
UL Underwriters'Laboratories, Inc.
333 Pfingston Road
Northbrook, IL 60062
UNI-BELL UNI-BELL Pipe Association
2655 Villa Creek Drive, Suite 155
02/2008 01420-4 of 5
CITY OF PEARLAND REFERENCED STANDARDS
Dallas, TX 75234
WRI Wire Reinforcement Institute
942 Main Street—Suite 300
Hartford, CT 06103
WWD/PI Water Well Drillers and Pump Installers Advisory Council
Texas Department of Licensing and Regulation
P.O. Box 12157
Austin, TX 78711
2.0 PRODUCTS - NotUsed
3.0 EXECUTION - NotUsed
END OF SECTION
02/2008 01420-5 of 5
CITY OF PEARLAND CONTRACTOR'S QUALITY CONTROL
Section 01430
CONTRACTOR'S QUALITY CONTROL
1.0 GENERAL
1.01 SECTION INCLUDES
A Quality assurance and control of installation and manufacturer's field services and
reports.
B References to Technical Specifications:
1. Section 01350—Submittals
1.02 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
1.03 QUALITY ASSURANCE/CONTROL OF INSTALLATION
A Monitor quality control over suppliers, manufacturers, products, services, site
conditions, and workmanship, to produce the Work of specified quality at no
additional cost to the Owner.
B Comply fully with manufacturers' installation instructions, including each step in
sequence.
C Request clarification from Project Manager before proceeding should manufacturers'
instructions conflict with Contract Documents.
D Comply with specified Standards as minimum requirements for the Work except when
more stringent tolerances,codes,or specified requirements indicate higher standards or
more precise workmanship.
E Perform work by persons qualified to produce the specified level of workmanship.
F Obtain copies of Standards and maintain at Project Site when required by individual
Technical Specifications.
1.04 MANUFACTURERS' FIELD SERVICES AND REPORTS
A When specified in individual Technical Specifications, provide material or product
suppliers' or manufacturers' technical representative to observe site conditions,
conditions of surfaces and installation,quality of workmanship,start-up of equipment,
operator training, test, adjust, and balance of equipment as applicable, and to initiate
operation,as required. Conform to minimum time requirements for start-up operations
and operator training if defined in Technical Specifications.
02/2008 01430- 1 of 2
l ,
CITY OF PEARLAND CONTRACTOR'S QUALITY CONTROL
B At the Project Manager's request, submit qualifications of manufacturer's
representative to Project Manager fifteen (15) days in advance of required
representative's services. The representative shall be subject to approval of Project
Manager.
C Manufacturer's -representative shall report observations and site decisions or
instructions given toapplicators or installers that are supplemental or contrary to
manufacturers'written instructions. Submit report within one(1)day of observation to
Project Manager for review.
2.0 PRODUCTS - Not Used
3.0 EXECUTION - NotUsed
END OF SECTION
02/2008 01430-2 of 2
CITY OF PEARLAND OBSERVATION SERVICES
Section 01440
OBSERVATION SERVICES
1.0 ' GENERAL
1.01 SECTION INCLUDES
A Observation services and references.
B References to Technical Specifications:
1. Section 01450—Testing Laboratory Services
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this Work is a component.
1.03 INSPECTION
A Project Manager will appoint an Observer as a representative of the Owner to oversee
inspections,tests, and other services specified in individual Technical Specifications.
B Alternately, Project Manager may appoint, employ, and pay an independent firm to
provide additional observation or construction management services as indicated in
Section 01450—Testing Laboratory Services.
C Reports will be submitted by the independent firm to Project Manager,Engineer, and
Contractor, indicating observations and results of tests and indicating compliance or
non-compliance with Contract Documents.
D Contractor shall assist and cooperate with the Observer;furnish samples of materials,
design mix, equipment, tools, and storage.
E Contractor shall notify Project Manager 24 hours prior to expected time for operations
requiring services. Notify Engineer and independent firm when noted.
F Contractor shall sign and acknowledge report for Observer.
2.0 PRODUCTS - Not Used
3.0 EXECUTION - NotUsed
END OF SECTION
09/2009 01440- 1 of 1
CITY OF PEARLAND TESTING LABORATORY SERVICES
Section 01450
TESTING LABORATORY SERVICES
1.0 GENERAL
1.01 SECTION INCLUDES
A Testing Laboratory Services and Contractor responsibilities related to those services.
B References to Technical Specifications:
1. Section 01350—Submittals
C Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 3740, "Practice for Evaluation of Agencies Engaged in
Testing and/or Inspection of Soil and Rock as Used in Engineering
Design and Construction"
b. ASTM E 329, "Recommended Practice for Inspection and Testing
Agencies for Concrete, Steel, and Bituminous Materials as Used in
Construction"
1.02 SELECTION AND PAYMENT
A Owner will select,employ,and pay for services of an independent testing laboratory to
perform inspection and testing identified in individual Technical Specifications.
B Employment of testing laboratory shall not relieve Contractor of obligation to perform
work in accordance with requirements of Contract Documents.
C Owner or designated representative shall schedule and monitor testing as required to
provide timely results and to avoid delay to the Work.
D Contractor shall be responsible for paying for services of commercial testing
laboratory, with prior approval of Owner, to perform the following:
1. Pipe diameter deflection tests on all flexible and semi-rigid sanitary sewer
collection system pipe installation
2. Laboratory services required to establish mix design proposed for use for
Portland cement concrete, asphaltic concrete mixtures and other material
mixes requiring control by testing laboratory when required because of
change in source of materials or other conditions not caused by Owner.
3. Tests required to establish optimum moisture of earth and base materials
and to determine required compactive effort to meet density requirements.
4. Cores to test for thickness.
5. Testing and inspection performed for the Contractor's convenience.
6. Retesting and repetitions of laboratory services when initial tests indicate
work does not comply with requirements of Contract Documents.
04/2008 01450- 1 of 3
CITY OF PEARLAND TESTING LABORATORY SERVICES
1.03 LABORATORY REPORTS
A The Engineer will receive 1 copy, the Project Manager will receive 2 copies, and the
Contractor will receive 2 copies of Laboratory Reports from the testing laboratory.
One of the Contractor's copies shall remain at the Project Site for duration of Project.
Test results which indicate non-conformance shall be transmitted immediately via fax
from the testing laboratory to the Contractor and Project Manager.
1.04 LIMITS ON TESTING LABORATORY AUTHORITY
A Laboratory may not release, revoke, alter, or enlarge on requirements of Contract
Documents.
B Laboratory may not approve or accept any portion of the Work.
C Laboratory may not assume any duties of Contractor.
D Laboratory has no authority to stop the Work.
1.05 CONTRACTOR RESPONSIBILITIES
A Notify Project Manager and laboratory 24 hours prior'to expected time for operations
requiring inspection and testing services. Notify Engineer if specification section
requires the presence of the Engineer.
B Cooperate with laboratory personnel in collecting samples to be tested or collected on
Project Site.
C Provide access to the Work and to manufacturer's facilities.
.D Provide samples to laboratory in advance of their intended use to allow thorough
examination and testing.
E Provide incidental labor and facilities for access to the Work to be tested;to obtain and
handle samples at the site or at source of products to be tested; and to facilitate tests
and inspections including storage and curing of test samples.
F Arrange with laboratory and pay for:
1. Retesting required for failed tests.
2. Retesting for nonconforming Work.
3. Additional sampling and tests requested by Contractor for his own purposes.
2.0 PRODUCTS - Not Used
3.0 EXECUTION
04/2008 01450-2 of 3
CITY OF PEARLAND TESTING LABORATORY SERVICES
3.01 CONDUCTING TESTING
A Laboratory sampling and testing shall conform to ASTM D 3740 and ASTME 329,as
well as other test standards specified in individual Technical Specifications.
END OF SECTION
04/2008 01450-3 of 3
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
Section 01500
TEMPORARY FACILITIES AND CONTROLS
•
1.0 GENERAL
1.01 SECTION INCLUDES
A Temporary facilities and the necessary controls for the Work including utilities,
telephone, sanitary facilities, field office, storage sheds and building, safety
requirements, first aid equipment, fire protection, security measures, protection of
the Work and property, access roads and parking, environmental controls, disposal
of trash, debris, and excavated material, pest and rodent control, water runoff and
erosion control.
B References to Technical Specifications:
Section 00200—Instructions to Bidders
Section 01100—Summary of Work
Section 01350—Submittals
Section 01566— Source Controls for Erosion& Sedimentation
Section 01100— Summary of Work
Section 01600—Material&Equipment
Section 01570—Trench Safety System
Section 01555 —Traffic Control &Regulation
Section 01720—Field Surveying
Section 01563 —Tree &Plant Protection
Section 01564—Control of Ground Water& Surface Water
Section 13730- Computer Equipment
C Referenced Standards:
Occupational Safety and Health Administration (OSHA)
National Fire Protection Association (NFPA)
Code of Ordinances, City of Pearland, Texas
D Definitions:
Underground Structures - sewer, water, gas, and other piping, and manholes,
chambers, electrical and signal conduits, tunnels, and other existing subsurface
installations located within or adjacent to the limits of the Work.
Surface Structures - existing buildings, structures and other constructed
installations above the ground surface. Included with such structures are their
foundations or any extension below the surface. Surface structures include, but are
12-2-2011 01500- 1 of 11
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
not limited to buildings, tanks, walls, bridges, roads, dams, channels, open
drainage, piping, poles, wires, posts, signs, markers, curbs, walks, guard cables,
fencing, and other facilities that are visible above the ground surface.
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item, no separate payment will be made for Work
performed under this Section. Include cost in Bid Items for which this Work is a
component.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
1.04 CONTRACTOR'S RESPONSIBILITY
A The facilities and controls specified in this Section are considered minimum for the
Work. The Contractor may provide additional facilities and controls for the proper
execution of the Work and to meet Contractor's responsibilities for protection of
persons and property.
B Comply with applicable requirements specified in other Technical Specifications.
Maintain and operate temporary facilities and systems to assure continuous service.
Modify and extend systems as Work progress requires.
Completely remove temporary materials and equipment when their use is no longer
required.
Restore existing facilities used for temporary services to specified or to original
condition.
1.05 TEMPORARY UTILITIES
A Temporary Service •
Make arrangements with utility service companies for such temporary services as
are necessary to construct the work and manage the site.
Abide by rules and regulations of the utility service companies or authorities having
jurisdiction.
Be responsible for utility service costs until the Work is Substantially Complete.
Included are fuel, power, light, heat, and other utility services necessary for
execution, completion, testing, and initial operation of the Work.
B Water
Provide water required for and in connection with Work to be performed and for
specified tests of piping, equipment, devices, or for other use as required for proper
completion of the Work.
12-2-2011 01500-2 of 11
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
For water to be drawn from public water supply, obtain special permit or license
and meter from the proper City officials. For facilities under construction, establish
a water/sewer billing account with City's Utility Billing Department. A deposit
based on rates established by latest ordinance will be required.
For water drawn from fire hydrants, apply for and receive a construction water
meter from City' Public Works Department. Identify specific location for
construction water meter installation. Once installed, water meter may not be
moved without notification of Public Works Department. Install backflow
preventer on fire hydrant supply if not included in City provided meter.
Provide and maintain an adequate supply, of potable water for domestic
consumption by Contractor personnel.
C Electricity and Lighting
1 Provide temporary electric power service in Contractor's name, as required for the
prosecution of the Work, including testing of Work. Provide power for lighting,
operation of the Contractor's equipment, or for any other use by Contractor or as
necessary to maintain any of Owner's on-going operations as may continue on the
site during any scheduled shutdown. Minimum lighting level shall be 5 foot-candles
for open areas; 10 foot-candles for stairs and shops.
2 Provide permanent electric power service, in the Contractor's name, to the work or
site as and when required by the schedule of the work to achieve Substantial
Completion or Partial. Substantial Completion. Contractor to establish service
billing in its name and transfer service and billing to the Owner upon acceptance of
the work as Substantially Complete and suitable for beneficial occupancy by the
Owner.
D Natural Gas
Provide and pay for natural gas service to the work as and when required by the
schedule to achieve Substantial Completion. Contractor to establish service billing
in its name and transfer service and billing to the Owner upon acceptance of the
work as Substantially Complete and suitable for beneficial occupancy by the
Owner.
E Temporary Heat and Ventilation
Provide temporary heat as necessary for protection or completion of the Work.
Provide temporary heat and ventilation to assure safe working conditions; maintain
enclosed areas at a minimum of 50 degrees F.
F Telephone
Provide emergency telephone service at the Project Site for use by Contractor
personnel and others performing work or furnishing services.
G Sanitary Facilities
12-2-2011 01500-3 of 11
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
Provide and maintain sanitary facilities for persons on the Project Site, in
compliance with federal, state, and local regulations. Locate toilets on the Project \, )
Site near the work and secluded from view insofar as possible. Keep toilets clean
and supplied throughout the course of the Work.
Enforce the use of sanitary facilities by construction personnel at the Project Site.
Such facilities shall be enclosed. Pit-type toilets will not be permitted. No
discharge will be allowed from these facilities. Collect and store sewage and waste
so as not to cause a nuisance or health problem; have sewage and waste hauled off-
site and properly disposed in accordance with local regulations.
Control areas where sanitary facilities are located in conformance with Section
01566—Source Controls for Erosion& Sedimentation.
1.06 FIELD OFFICE
A Provision of a Field Office and other specific temporary facilities as required
in paragraph B. below UNLESS otherwise stated in Section 00800 - Special
Conditions of the Agreement, or Section 01100 — Summary of Work. Provide
for transportation, move-in, set-up, tie-down and, when project is complete,
removal and move-out. The Contractor shall confirm location of office and other
temporary facilities with Owner's Representative at Pre-Construction Meeting prior
to delivery and set up. Location of temporary facilities shall be approved by the
Owner's Representative by way of the submittal process.
B. At a minimum, the Contractor's field office shall provide for, contain or serve to:
provide a secured space for project administrative operations, periodic progress
meetings, on-site storage for project files and plans, office space for
CONTRACTOR's field supervisory personnel and provide a separate securable
office space for OWNER's Representative including: meeting table and chairs, a
single two drawer filing cabinet, a built-in drawing table and plan holders. Provide
electric lighting and HVAC to the mobile office.
1. Field Office shall provide for, at a minimum, a high speed internes connection for
use by Owner's Representative or Construction Manager as controlled by Paragraph
A above.
1.07 STORAGE OF MATERIALS
A Provide for storage of materials under the provisions of Section 01600—Material &
Equipment.
1.08 SAFETY REQUIREMENTS
A Contractor shall prepare, submit and follow a Safety Program that complies with
federal, state, and local safety codes, statutes, and practices. Include in the Safety
Program documented response to excavation, embankment, and trench safety
requirements as specified in Section 01570—Trench Safety System.
B Conductoperations in strict accord with applicable federal, state and local safety
codes and statutes and with good construction practice. The Contractor is fully
12-2-2011 01500-4of11
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
responsible and obligated to establish and maintain procedures for safety of all
work,personnel and equipment involved in the Work.
C Observe and comply with Texas Occupational Safety Act (Art. 5182a, V.C.S.) and
with all safety and health standards promulgated by Secretary of Labor under
Section 107 of Contract Work Hours and Standards Act, published in OSHA
Standards - 29 CFR, Part 1926, and adopted by Secretary of Labor under the
Williams-Steiger Occupational Safely and Health Act of 1970, and to any other
legislation enacted for safety and health of Contractor employees. Such safety and
health standards apply to subcontractors and their employees as well as to the
Contractor and its employees.
D Observance of and compliance with the regulations shall be solely and without
qualification the responsibility of the Contractor without reliance or
superintendence of or direction by the Engineer or the Engineer's representative.
Immediately advise the Engineer of investigation or inspection by Federal Safety
and Health inspectors of the Contractor or subcontractor's work or place of work on
the Project Site under this Contract, and after such investigation or inspection,
advise the Engineer of the results. -Submit one copy of accident reports to Engineer
within ten(10) days of occurrence.
E Protect areas occupied by workmen using the best available devices for detection of
lethal and- combustible gases. Test such devices frequently to assure their
functional capability. Constantly observe infiltration of liquids into the Work area
for visual or odor evidence of contamination. Take immediate and appropriate
steps to seal off entry of contaminated liquids to the Work area.
F Safety measures, including but not limited to safety personnel, first-aid equipment,
ventilating equipment and safety equipment, in the Plans and Technical
Specifications are obligations of the Contractor.
G Maintain required coordination with the local Police and Fire Departments during
the entire period covered by the Contract.
1.09 FIRST AID EQUIPMENT
A Provide a first aid kit throughout the construction period. List telephone numbers
for physicians, hospitals, and ambulance services in each first aid kit.
B Have at least one person thoroughly trained in first aid procedures present on the
Project Site whenever work is in progress.
1.10 FIRE PROTECTION
A Fire Protection Standards.
Conform to specified fire protection and prevention requirements as well as those
that may be established by Federal, State, or local governmental agencies.
12-2-2011 01500-5 of 11
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
B. Comply with all applicable provisions of NFPA Standard No. 241, Safeguarding
Building Construction and Demolition Operations.
Provide portable fire extinguishers, rated not less than 2A or 5B in accordance with
NFPA Standard No. 10, Portable Fire Extinguishers, for each temporary building,
and for every 3000 square feet of floor area-of facilities under construction.
Locate portable fire extinguishers within 50 feet maximum from any point on the
Project Site.
C. Fire Prevention and Safety Measures.
Prohibit smoking in hazardous areas. Post suitable warning signs in areas that are
continuously or intermittently hazardous.
Use metal safety containers for storage and handling of flammable and combustible
liquids.
Do not store flammable or combustible liquids in or near stairways or exits.
Maintain clear exits from all points within a structure.
1.11 SECURITY MEASURES
A Protect all materials, equipment, and property associated with the Work from loss,
theft, damage, and vandalism. Contractor's duty to protect property includes
Owner's property.
B If existing fencing or barriers are breached or removed for purposes of construction,
provide and maintain temporary security fencing equal to existing as approved by
Owner's Representative.
1.12 PROTECTION OF PUBLIC UTILITIES
A Prevent damage to existing public utilities during construction. These utilities are
shown on the Plans at their approximate locations. Give owners of these utilities at
least 48 hours notice before commencing Work in the area, for locating the utilities
during construction, and for making adjustments or relocation of the utilities when
they conflict with the proposed Work.
1.13 PROTECTION OF PEOPLE AND PROPERTY
A Preventive Actions.
Take precautions, provide programs, and take actions necessary to protect the Work
and public and private property from damage.
Take action to prevent damage, injury or loss, including, but not limited to, the
following:
a. Store apparatus, materials, supplies, and equipment in an orderly,
safe manner that will not unduly interfere with progress of the Work
or the Work of any other contractor, any utility service company, or
the Owner's operations.
12-2-2011 01500-6 of 11
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
b. Provide suitable storage for materials that are subject to damage by
exposure to weather, theft, breakage, or otherwise.
c. Place upon the Work or any part thereof only such loads as are
consistent with the safety of that portion of the Work.
d. Frequently clean up refuse, rubbish, scrap materials, and debris
caused by construction operations, keeping the Work safe and
orderly.
e. Provide safe barricades and guard rails around openings, for
scaffolding, for temporary stairs and ramps, around excavations,
elevated walkways, and other hazardous areas.
Obtain written consent from proper parties before entering or occupying with
workers, tools, materials or equipment, privately owned land except on easements
provided for construction.
Assume full responsibility for the preservation of public and private property on or
adjacent to the site. If any direct or indirect damage is done by or on account of any
act, omission, neglect, or misconduct in execution of the Work by the Contractor, it
shall be restored by the Contractor to a condition equal to or better than that
existing before the damage was done.
B Barricades and Warning Signals.
Where Work is performed on or adjacent to any roadway, right-of-way, or public
place, furnish and erect barricades, fences, lights, warning signs, and danger
signals; provide watchmen; and take other precautionary measures for the
protection of persons or property and protection of the Work. Conform to Section
01555 —Traffic Control &Regulation.
C Preserving Control Points
Maintain permanent benchmarks, public or private elevation or property
demarcation and control monumentation, or other reference points. Unless
otherwise directed in writing, replace at no cost to the Owner, those monuments,
property corners or other permanent demarcations that are damaged or destroyed in
accordance with Section 01720—Field Surveying.
D Tree and Plant Protection.
Protect trees, shrubs, lawns, outside of grading limits and within the grading limits
as designated on the Plans, and in accordance with requirements of Section 01563 —
Tree &Plant Protection.
E Protection of Underground and Surface Structures
Known underground structures, including water, sewer, electric, and, telephone
services are shown on the Plans in accordance with the best information available,
but is not guaranteed to be correct or complete. Contractor is responsible for
making Locate Calls.
Explore ahead of trenching and excavation work and uncover obstructing
underground structures sufficiently to determine their location, to prevent damage
12-2-2011 .01500-7of11
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
to them and to prevent interruption of utility services. Restore to original condition
damages to underground structure at no additional cost to the Owner.
Immediately notify the agency or company owning, any existing utility which is
damaged, broken, or disturbed. Obtain approval from the Engineer and agency for
any repairs or relocations, either temporary or permanent.
Necessary changes in location of the Work may be made by the Engineer to avoid
unanticipated underground structures.
If permanent relocation of an underground structure or other subsurface
installations is required and not otherwise provided for in the Contract Documents,
the Engineer will direct Contractor in writing to perform the Work, which shall be
paid for under the provisions for changes in the Contract Price as described in
Section 00700—General Conditions of Agreement.
Support in place and protect from direct or indirect injury to underground and
surface structures located within or adjacent to the limits of the Work. Install such
supports carefully and as required by the party owning or controlling such structure.
Before installing structure supports, Contractor shall satisfy the Engineer that the
methods and procedures to be used have been approved by the owner of the
structure.
Avoid moving or in any way changing the property of public utilities or private
service corporations without prior written consent of a responsible official of that
service or public utility. Representatives of these utilities reserve the right to enter
within the limits of this project for the purpose of maintaining their properties, or of
making such changes or repairs to their property that may be considered necessary
by performance of this Contract.
Notify the owners and/or operators of utilities and pipelines of the nature of
construction operations to be performed and the date or dates on which those
operations will be performed. When construction operations are required in the
immediate vicinity of existing structures, pipelines, or utilities, give a minimum of
five (5) working days advance notice. Probe and flag the location of underground
utilities prior to commencement of excavation. Keep flags in place until
construction operations reach and uncover the utility.
Assume risks attending the presence or proximity of underground and surface
structures within or adjacent to the limits to the Work including but not limited to
damage and expense for direct or indirect injury caused by the Work to any
structure. Immediately repair damage caused, to the satisfaction of the owner of the
damaged structure.
1.14 PROTECTION OF THE WORK
Provide protection of installed products to prevent damage from subsequent
operations.
Remove 'protection facilities when no longer needed, prior to completion of the
Work.
Control traffic to prevent damage to equipment, materials, and surfaces.
12-2-2011 01500-8 of 11
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
1.15 ROADS AND PARKING
A Prevent interference with traffic and Owner operations on existing roads.
B Minimize use of existing streets and driveways by construction traffic.
C Control traffic to prevent damage to equipment, materials, and surfaces.
D Construct and maintain temporary detours, ramps, and roads to provide for normal
public traffic flow when use of public roads or streets is closed by necessities of the
Work.
E Provide mats or other means to prevent overloading or damage to existing
roadways from tracked equipment or exceptionally large or heavy trucks or
equipment
F Designate temporary parking areas to accommodate construction personnel. When
site space is not adequate, provide additional off-site parking. Locate as approved
by Engineer.
G Do not allow heavy vehicles or construction equipment unnecessarily in existing
parking areas.
1.16 ENVIRONMENTAL CONTROLS
A Provide and maintain methods, equipment, and temporary construction as necessary
for controls over environmental conditions at the construction site and adjacent
areas.
B Comply with statutes, regulations, and ordinances which relate to the proposed
Work for the prevention of environmental pollution and preservation of natural
resources, including but not limited to the National Environmental Policy Act of
1969, PL 91-190, Executive Order 11514.
C Provide, install and maintain storm water runoff control including but not limited to
temporary entrance, silt fencing, etc. as specified in Contract Documents.
D Recognize and adhere to the environmental requirements of the Project. Disturbed
areas shall be strictly limited to boundaries established by the Contract Documents.
Burning of rubbish, debris or waste materials is not permitted.
1.17 POLLUTION CONTROL
A Provide methods, means, and facilities required to prevent contamination of soil,
water or atmosphere by discharge of noxious substances from construction
operations.
B Provide equipment and personnel to perform emergency measures required to
contain any spillage, and to remove contaminated soils or liquids. Excavate and
12-2-2011 01500-9of11
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
dispose of any contaminated earth off-site, and replace with suitable compacted fill
and topsoil.
C Take special measures to prevent harmful substances from entering receiving
streams or storm water conveyance systems in conformance with TPDES
requirements and Section 01566— Source Controls for Erosion& Sedimentation.
D Provide systems for control of atmospheric pollutants.
Prevent toxic concentrations of chemicals.
Prevent harmful dispersal of pollutants into the atmosphere.
E Use equipment during construction that conforms to current federal, state, and local
laws and regulations.
1.18 PEST AND RODENT CONTROL
A Provide rodent and pest control as necessary to prevent infestation of Project Site.
B Employ methods and use materials which will not adversely affect conditions at the
Project Site or adjoining properties.
1.19 NOISE CONTROL
A Provide vehicles, equipment, and construction activities that minimize noise to the
greatest degree practicable. Noise levels shall conform to OSHA Standards - 29
CFR and in no case will noise levels be permitted which create a nuisance in the
surrounding neighborhoods.
B Conduct construction operations during daylight hours from 7:30 a.m. to 6:00 p.m.
except as approved by Engineer.
C Comply with Chapter 19 NOISE, Codes of Ordinances, City of Pearland, Texas.
1.20 DUST CONTROL
A Control objectionable dust caused by operation of vehicles and equipment under the
provisions of Section 01566—Source Controls for Erosion & Sedimentation.
1.21 WATER RUNOFF AND EROSION CONTROL
A Provide methods to control surface water, runoff; subsurface water, and water
pumped from excavations and structures to prevent damage to the Work, the
Project Site, or adjoining properties in accordance with Section 01564 — Control of
Ground Water & Surface Water and Section 01566 — Source Controls for Erosion
& Sedimentation.
B Inspect earthwork periodically to detect any evidence of the start of erosion. Apply
corrective measures as required to control erosion.
12-2-2011 01500- 10 of 11
CITY OF PEARLAND TEMPORARY FACILITIES AND CONTROLS
2.0 PRODUCTS - Not Used
3.0 EXECUTION - NotUsed
END OF SECTION
12-2-2011 01500- 11 of 11
CITY OF PEARLAND MOBILIZATION
•
Section 01505
MOBILIZATION
1.1 GENERAL
1.2 SECTION INCLUDES
A Mobilization of construction equipment and facilities onto the Work.
B Referenced Standards:
1. Texas Department of Transportation(TxDOT)
2. Texas Manual on Uniform Traffic Control Devices (Texas MUTCD)
1.3 MEASUREMENT AND PAYMENT
A. Payment for Mobilization is on a Lump Sum basis and shall not exceed three
percent(3%) of the total bid price.
B. Payment for 50% of the Mobilization lump sum bid item may be included in the
first monthly Application for Payment. Payment is subject to the receipt and
approval by Engineer of the following items, as applicable:
1. Schedule of Values (Section 01350—Submittals)
2. Trench Safety Program(Section 01570—Trench Safety System)
3. Construction Schedule (Section 01350—Submittals)
4. Pre-construction Photographs (Section 01380—Construction Photographs)
5. Installation and acceptance of Project Identification Sign(s)(Section
01580—Project Identification Signs)
6. Installation and acceptance of Field Office (Section 01500—Temporary
Facilities and Controls)
7. Installation and acceptance of TPDES requirements (Section 01565 -
TPDES Requirements)
C. Payment for 25% of the Mobilization lump sum bid item may be included in the
second monthly Application for Payment. Payment is subject to the receipt and
approval by Engineer of the following items, as applicable:
1. Installation of High Speed Internet Access (Section 01500—Temporary
Facilities and Controls)
D. Payment for 15% of the Mobilization lump sum bid item may be included in the
third monthly Application for Payment.
E. Payment for the remaining 10% of the Mobilization lump sum bid item maybe
included in the fourth monthly Application for Payment.
F. For contracts with a duration of less than 120 days,payment for the remaining
50% of the Mobilization lump sum bid item may be included in the second
monthly Application for Payment. Payment is subject to the receipt and
approval by Engineer of the items listed in B. and C. above, as applicable.
08/2018 01505- 1 of 1
CITY OF PEARLAND MOBILIZATION
G. Mobilization payments will be subject to Retainage as stipulated in Section 00700
General Conditions of Agreement.
2.1 PRODUCTS
2.2 PROJECT IDENTIFICATION SIGNS
A. Provide specified number of project identification sign(s)per Section 01580. The
name, address and contact information of the general contractor for the project
shall be shown on the sign per Section 01580 and the attached exhibit.
3.1 EXECUTION
3.2 PLACEMENT OF PROJECT IDENTIFICATION SIGNS
A. Place a Project Identification Sign as described in Section 01580, part 1.03,D
visible to passing traffic or as directed by Engineer.
END OF SECTION
08/2018 01505 - 1 of 1
CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS
Section 01550
STABILIZED CONSTRUCTION EXITS
1.0 GENERAL
1.01 SECTION INCLUDES
A Installation of erosion and sediment control for Stabilized Construction Exits used
during construction and until final development of the Project site.
B References to Technical Specifications:
1. Section 01350—Submittals
2. Section 01562—Waste Material Disposal
3. Section 01565 —TPDES Requirements
4. Section 01566—Source Controls for Erosion& Sedimentation
C Referenced Standards:
1. American Society of Testing and Materials (ASTM)
a. ASTM D 4632, "Standard Test Method for Grab Breaking Load and
Elongation of Geotextiles"
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this Work is a component.
1.03 SUBMITTALS
A Make Submittals required in this Section under the provisions of Section 01350 —
Submittals.
B Manufacturer's catalog sheets and other product data on Geotextile fabric.
C Sieve analysis of aggregates conforming to requirements in this Section,2.02"Course
Aggregates".
2.0 PRODUCTS
2.01 GEOTEXTILE FABRIC
A Provide woven or non-woven geotextile fabric made of either polypropylene,
polyethylene, ethylene, or polyamide material.
B By ASTM D 4632, geotextile fabric shall have a minimum grab strength of 270 psi
any principal direction, and the equivalent opening size between 50 and 140.
C Both the geotextile and threads shall be resistant to chemical attack, mildew, and rot
and shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6
months of expected usable life at a temperature range of 0°F to 120°F.
12/2015 01550- 1 of 3
CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS
D Representative Manufacturers: Mirafi, Inc., Or-Equal.
2.02 COARSE AGGREGATES
A Coarse aggregate shall consist of crushed stone,gravel,concrete,crushed blast furnace
slag,or a combination of these materials. Aggregate shall be composed of clean,hard,
durable materials free from adherent coatings, salt, alkali, dirt, clay, loam, shale, soft
or flaky materials, or organic and injurious matter.
B Course aggregates shalt be open graded with a size 3" to 6".
3.0 EXECUTION
3.01 PREPARATION AND INSTALLATION
A The Contractor shall provide stabilized construction exits at the construction,staging,
parking, storage, and disposal areas to keep the street clean of mud carried by
construction vehicle and equipment. Such erosion and sediment controls shall be
constructed in accordance with the requirements shown on the Plans and specified in
this Section.
B Erosion and sediment control measures shall be in place prior to the start of any Work
that exposes the soil, other than as specifically directed by the Engineer to allow soil
testing and surveying.
C Maintain existing erosion and sediment control systems located within the Project Site
until acceptance of the Work or until directed by the Engineer to remove and discard
the existing system. Maintenance shall be performed routinely to remove soil build up
or, as required by the Engineer.
D Regularly inspect and repair or replace components of stabilized construction exits.
Unless otherwise directed, maintain them until the Work is accepted by the Owner.
Remove stabilized construction exits promptly when directed by the Engineer.
Discard removed materials in accordance with Section 01562 — Waste Material
Disposal.
E Equipment and vehicles shall be prohibited by the Contractor from maneuvering on
areas outside of dedicated rights-of-way and easements for construction. Damage
caused by construction traffic to erosion and sediment control systems, including
vegetative systems shall be repaired immediately.
F Conduct all construction operations under this Contract in conformance with the
erosion control practices described in the Section 01566-Source Controls for Erosion
& Sedimentation and Section 01565 TPDES Requirements.
3.02 CONSTRUCTION METHODS
A Provide stabilized access roads, subdivision roads, parking areas, and other on-site
vehicle transportation routes where shown on Plans.
12/2015 01550-2 of 3
CITY OF PEARLAND STABILIZED CONSTRUCTION EXITS
B Provide stabilized construction exits, and truck washing areas when approved by
Engineer, of the sizes and locations where shown on Plans or as specified in this
Section.
C Vehicles leaving construction areas shall have their tires cleaned to remove sediment
prior to entrance onto public right-of-way. When washing is needed to remove
sediment, Contractor shall construct a truck washing area. Truck washing shall be
done on stabilized areas which drain into a drainage system protected by erosion and
sediment control measures.
D Details for Stabilized Construction Exits are shown on the Plans. Construction of all
other stabilized areas shall be to the same requirements. Roadway width shall be at
least 14 feet for one-way traffic and 20 feet for two-way traffic and shall be sufficient
for all ingress and egress. Furnish and place geotextile fabric as a permeable separator
to prevent mixing of coarse aggregate with underlying soil. Exposure of geotextile
fabric to the elements between laydown and cover shall be a maximum of 14 days to
minimize damage potential.
E Roads and parking areas shall be graded to provide sufficient drainage away from
stabilized areas. Use sandbags,gravel,boards,or similar methods to prevent sediment
from entering public right-of-way, receiving stream or storm water conveyance
system.
F The stabilized areas shall be inspected and maintained daily. Provide periodic top
dressing with additional coarse aggregates to maintain the required depth. Repair and
clean out damaged control measures used to trap sediment. All sediment spilled,
dropped,washed, or tracked onto public right-of-way shall be removed immediately.
G The length of the stabilized area shall be as shown on the Plans,but not less than 50
feet. The thickness shall not be less than 8 inches. The width shall not be less than
full width of all points of ingress or egress.
H Stabilization for other areas shall have the same coarse aggregate,thickness,and width
requirements as the stabilized construction exit,except where shown otherwise on the
Plans.
I Stabilized area may be widened or lengthened to accommodate truck washing area
when authorized by Engineer.
J Alternative methods of construction may be utilized when shown on Plans, or when
approved by the Engineer.
END OF SECTION
12/2015 01550-3 of 3
CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION
Section 01555
TRAFFIC CONTROL AND REGULATION
1.0 GENERAL
1.01 . SECTION INCLUDES
A Requirements for traffic control plans,signs,signals,control devices,flares,lights and
traffic signals, as well as construction parking control, designated haul routes and
bridging of trenches and excavations.
B Requirements for and qualifications of Flaggers.
C References to Technical Specifications:
1. Section 01350—Submittals
2. Section 01140—Contractor's Use of Premises
D Referenced Standards:
1. Texas Manual on Uniform Traffic Control Devices (Texas MUTCD)
1.02 MEASUREMENT AND PAYMENT
A Traffic Control and Regulation. Measurement is on-a Lump Sum basis for Traffic
Control and Regulation, including submittal of a traffic control plan if different from
the one provided on the Plans, provision of traffic control devices, and provision of
equipment and personnel as necessary to protect the Work and the public. The amount
invoiced shall be determined based on the Schedule of Values submitted for traffic
control and regulation. •
B Baggers. Measurement is on a Lump Sum basis for Baggers as required for the Work.
The amount invoiced shall be determined based on the Schedule of Values submitted
for Flaggers.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B A Traffic Control Plan responsive to the Texas MUTCD and sealed by a Registered
Professional Engineer is incorporated into the Plans. If the Contractor proposes to
implement traffic control different than the plan provided, he shall submit a Traffic
Control Plan in conformance with Texas MUTCD for approval of the Engineer.
C For both the Traffic Control Plan and Baggers' use, submit Schedules of Values
within 30 days following the Notice to Proceed.
D Each week submit a daily log for Baggers listing name,badge number,time start,time
finish, and hours worked.
03/2008 01555- 1 of 4
CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION
1.04 FLAGGERS
A Unless otherwise specified, use only Flaggers who are off-duty,regularly employed,
uniformed Peace Officers.
B Baggers are required at the following locations:
1. Where multi-lane vehicular traffic must be diverted into single-lane
vehicular traffic.
2. Where vehicular traffic must change lanes abruptly.
3. Where construction equipment either enters or crosses vehicular traffic
lanes and walks.
4. Where construction equipment may intermittently encroach on vehicular
traffic lanes and unprotected walks and cross-walks.
5. Where construction activities might affect public safety and convenience.
6. Where traffic regulation is needed due to rerouting of vehicular traffic
around the work site.
7. When requested by Owner.
C The use of Baggers is for the purpose of assisting in the regulation of,traffic flow and
movement, and does not in any way relieve the contractor of full responsibility for
taking such other steps and provide such other Baggers or personnel as the Contractor
may deem necessary to protect the work and the public, and does not in any way
relieve the Contractor of his responsibility for any damage for which he would
otherwise be liable.
Baggers shall be used and maintained at such points for such periods of time as
may be required to provide for the public safety and convenience of travel.
2.0 PRODUCTS
2.01 SIGNS, SIGNALS,AND DEVICES
A Comply with Texas MUTCD regulations.
B Traffic Cones and Drums, Bares and Lights: As approved by agencies having
jurisdiction.
3.0 EXECUTION
3.01 PUBLIC ROADS
A Abide by laws and regulations of governing authorities when using public roads. If the
Contractor's work requires that public roads be temporarily impeded or closed,
approvals shall be obtained from governing authorities and permits paid for before
starting any work. Coordinate activities with the Engineer.
B Contractor shall maintain at all times a 10-foot-wide all-weather lane adjacent to work
areas which shall be kept free of construction equipment and debris and shall be for the
use of emergency vehicles, or as otherwise provided in the Traffic Control Plan.
03/2008 ,01555-2 of 4
CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION
C Contractor shall not obstruct the normal flow of traffic from 7:00 a.m.to 9:00 a.m.and
4:00 p.m. to 6:00 p.m. on designated major arterials or as directed by the Engineer.
D Contractor shall maintain local driveway access to residential and commercial
properties adjacent to work areas at all times.
E Cleanliness of Surrounding Streets:
1. Keep streets used for entering or leaving the job.area free of excavated
material, debris, and any foreign material resulting from construction
operations. Leave the area broom-clean or its equivalent at the end of the
work day.
F Control vehicular parking to prevent interference with public traffic and parking, and
access by emergency vehicles.
G Monitor parking of construction personnel's vehicles in existing facilities. Maintain
vehicular access to and through parking areas.
H Prevent parking on or adjacent to access roads or in non-designated areas.
3.02 FLARES AND LIGHTS
A Provide flares and lights during hours of low visibility to delineate traffic lanes and to
guide traffic.
3.03 HAUL ROUTES
A Utilize haul routes designated by Owner or shown on the Plans for construction traffic.
B Confine construction traffic to designated haul routes.
C Provide traffic control at critical areas of haul routes to regulate traffic and minimize
interference with public traffic.
D Contractor shall be responsible for any damage caused by vehicles utilizing haul
routes.
3.04 TRAFFIC SIGNS AND SIGNALS
A Install traffic control devices at approaches to the site and on site, at crossroads,
detours, parking areas, and elsewhere as needed to direct construction and affected
public traffic.
B? Relocate traffic signs and control devices as Work progresses to maintain effective
traffic control.
3.05 BRIDGING TRENCHES AND EXCAVATIONS
A Whenever necessary,bridge trenches and excavation to permit an unobstructed flow of
traffic.
03/2008 01555-3 of 4
CITY OF PEARLAND TRAFFIC CONTROL AND REGULATION
B Secure bridging against displacement by using adjustable cleats,angles,bolts or other
devices whenever bridge is installed:
1. On an existing bus route;
2. When more than five percent of daily traffic is comprised of commercial or
truck traffic;
3. When more than two separate plates are used for the bridge; or
4. When bridge is to be used for more than five consecutive days.
C Install bridging to operate with minimum noise.
D Adequately shore the trench or excavation to support bridge and traffic.
E Extend steel plates used for bridging a minimum of one foot beyond edges of trench or
excavation. Use temporary paving materials (premix) to feather edges of plates to
minimize wheel impact on secured bridging.
F Use steel plates of sufficient thickness to support H-20 loading, truck or lane, that
produces maximum stress.
3.06 CLEAN-UP AND RESTORATION
A Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises.
B Remove equipment and devices when no longer required.
C Repair damage caused by installation. -
D Remove post settings to a depth of 2 feet.
END OF SECTION
03/2008 01555-4 of 4
CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER
Section 01561
REINFORCED FILTER FABRIC BARRIER
1.0 GENERAL
1.01 SECTION INCLUDES •
A Installation of reinforced filter fabric barrier to control erosion and contain sediments
and pollutants in channelized flow areas.
B References to Technical Specifications:
1. Section 01200—Measurement&Payment Procedures
2. Section 01350—Submittals
3. Section 01566—Source Controls for Erosion & Sedimentation
C Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 3786,"Standard Test Method for Hydraulic Bursting strength
of Textile Fabrics"
b. ASTM D 4632, Standard Test Method for Grab Breaking Load and
Elongation of Geotextiles"
1.02 MEASURMENT AND PAYMENT
A Measurement for reinforced filter fabric barrier is on a linear foot basis between the
limits of the beginning and ending fence posts, measured, accepted, and complete in
place.
B Payment for filter fabric barrier will include and be full compensation for all labor,
equipment, materials, supervision, and incidental expenses for construction of these
items,complete in place,including,but not limited to protection of trees,maintenance
requirements, repair and replacement ofdamaged sections, removal of sediment
deposits, and removal of erosion and sediment control systems at the end of
construction..
C Refer to Section 01200—Measurement&Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Manufacturer's catalog sheets and other product data on geotextile fabric.
05/2008 01561 - 1 of 3
CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER
2.0 PRODUCTS
2.01 FILTER FABRIC
A Provide woven or nonwoven geotextile filter fabric made of either polypropylene,
polyethylene, ethylene, or polyamide material.
B By ASTM - D4632, geotextile fabric shall have a grab strength of 100 psi in any
principal direction, a Mullen burst strength exceeding 200psi by ASTM-D3786,and
the equivalent opening size between 50 and 140.
C Filter fabric shall contain ultraviolet inhibitors and stabilizers to provide a minimum of
6 months of expected usable construction life at a temperature range of 0 degrees F to
120 degrees F.
D Representative Manufacturer: Mirafi, Inc., or equal.
2.02 FILTER FABRIC REINFORCEMENT
A Provide woven galvanized steel wire fence with minimum thickness of 14 gauge and a
maximum mesh spacing of 6 inches.
B Welded wire shall be galvanized, 2-inch by 4-inch, welded wire fabric, 121 gauge.
2.03 EXECUTION
2.04 PREPARATION
A Provide erosion and sediment control systems at the locations shown on Plans. Such
systems shall be of the type indicated and shall be constructed in accordance with the
requirements shown ori the Plans and specified in this Section.
B Erosion and sediment control measures shall be in place prior to the start of any Work
that exposes the soil, other than as specifically directed by the Engineer to allow soil
testing and surveying.
C Regularly inspect and repair or replace damaged components of filter fabric barrier.
Unless otherwise directed,maintain the erosion and sediment control systems until the
Work is accepted by the Owner. Remove erosion and sediment control systems
promptly when directed by the Engineer. Discard removed materials in accordance
with Section 1562—Waste Material Disposal.
D Conduct all construction operations under this Contract in conformance with the
erosion control practices described in Section 01566—Source Controls for Erosion&
Sedimentation.
05/2008 01561 -2 of 3
CITY OF PEARLAND REINFORCED FILTER FABRIC BARRIER
2.05 INSTALLATION
A Install reinforced filter fabric barriers for erosion and sediment control used during
construction and until the final development of the Project Site. Reinforced filter
fabric barriers are used to retain sedimentation in channelized flow areas.
B Provide reinforced filter fabric barrier in accordance with the Plan detail for
Reinforced Filter Fabric Barrier. Reinforced filter fabric barrier systems shall be
installed in such a manner that runoff will percolate through the system and allow
sediment to be retained and accumulated.
C Trench in the toe of the reinforced filter fabric bather with a spade or mechanical
trencher as shown on the Plans. Lay filter fabric along the edges of the trench.
Backfill andcompact trench.
D Reinforced filter fabric bather shall have a height of 18 inches.
E Securely fasten the filter fabric to the wire with tie wires.
F Provide the filter fabric in continuous rolls and cut to the length of the fence to
minimize the use of joints. When joints are necessary, splice the fabric together only
at a support post with a minimum 6-inch overlap and seal securely.
G Inspect the reinforced filter fabric barrier systems after each rainfall, daily during
periods of prolonged rainfall, and at a minimum once each week. Repair or replace
damaged sections immediately. Remove sediment deposits when silt reaches a depth
one-third the height of the barrier or 6 inches, whichever is less.
END OF SECTION
05/2008 01561 -3 of 3
CITY OF PEARLAND WASTE MATERIAL DISPOSAL
Section 01562
WASTE MATERIAL DISPOSAL
1.0 GENERAL
1.01 SECTION INCLUDES
A Disposal of waste material and salvageable material.
B References to Technical Specifications:
1. Section 01350—Submittals
2. Section 01566—Source Controls for Erosion & Sedimentation
3. Section 01600—Materials &Equipment
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this Work is a component.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Obtain and submit applicable permits for proposed disposal sites.
C Submit a Waste Material Disposal Plan.
D Submit a copy of written permission from property owners,along with a description of
the property,prior to disposal of excess material adjacent to the Project Site. Submit a
written and signed release from property owner upon completion of disposal work.
City of Pearland requires individual fill placement permits for all fill placed within the
City limits.
1.04 WASTE MATERIAL DISPOSAL PLAN
A Contractor shall formulate and implement a plan for the collection and disposal of
waste materials on the Project Site which includes the following information:
1. Schedule for collection and inspection.
2. Location of trash and waste receptacles.
3. Provisions for liquid waste and potential water pollutants material.
B The plan shall comply with applicable federal, state, and local health and safety
regulations and Section 01566—Source Controls for Erosion & Sedimentation.
2.0 PRODUCTS - NotUsed
•
07/2006 01562- 1 of 3
CITY OF PEARLAND WASTE MATERIAL DISPOSAL
3.0 EXECUTION
3.01 SALVAGEABLE MATERIAL
A Excavated,material: When indicated on Plans, load, haul, and deposit excavated
material at a location or locations outside the limits of Project Site.
B Base, surface, and bedding material: Deliver gravel, asphaltic, or other base and
surfacing material designated for salvage to the location designated by the Engineer.
C Pipe culvert: Deliver culverts designated for salvage to Owner's storage area.
D Other salvageable materials: Conform to requirements of individual Technical
Specifications.
E Coordinate delivery of salvageable material with Engineer.
F When temporary, on-site storage of salvaged materials is required, comply with
applicable provisions of Section 01600—Materials &Equipment.
3.02 SEDIMENT DISPOSAL
A Remove sediment deposits and dispose of them at the designated spoil site for the
Project. If a spoil site is not designated on the Plans, dispose of sediment off site at a
location not in or adjacent to a stream or floodplain.
B Off-site disposal is the responsibility of the Contractor.
C Sediment to be placed at the Project Site should be spread evenly throughout the
designated area,compacted and stabilized. Sediment shall not be allowed to flush into
a stream or drainage way.
D If sediment has been contaminated,it shall be disposed of in accordance with existing
federal, state, and local rules and regulations.
3.03 EXCESS MATERIAL,WASTE,AND EQUIPMENT
A Vegetation,rubble,broken concrete,debris,asphaltic concrete pavement,excess soil,
and other materials not designated for salvage,shall become the property of Contractor
and shall be removed from the Project Site and legally disposed of.
B Dispose of removed equipment,materials,waste and debris in a manner conforming to
applicable laws and regulations
C Excess soil may be deposited on private property adjacent to the Project Site when
written permission is obtained from property owner under the provisions of this
Section, 1.03D.
07/2006 01562-2 of 3
CITY OF PEARLAND WASTE MATERIAL DISPOSAL
D Verify the flood plain status of any proposed disposal site. Do not dispose of
excavated materials in an area designated as within the 100-year Flood Hazard Area.
E Waste materials shall be removed from the site on a daily basis, such that the site is
maintained in a neat and orderly condition.
F No materials shall be disposed in a manner to damage the Owner in any way.,
END OF SECTION
07/2006 01562-3 of 3
CITY OF PEARLAND TREE AND PLANT PROTECTION
Section 01563
TREE AND PLANT PROTECTION
1.0 GENERAL
1.01 SECTION INCLUDES
A Tree and plant protection.
B References to Technical Specifications: None
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this Work is a component.
1.03 PROJECT CONDITIONS
A Preserve and protect existing trees and plants to remain from foliage,branch,trunk,or
root damage that could result from construction operations.
B Prevent following types of damage:
1. Compaction of root zone by foot or•vehicular traffic, or material storage.
2. Trunk damage from equipment operations, material storage, or from nailing
or bolting.
3. Trunk and branch damage caused by ropes or guy wires or machine impacts.
4. Root poisoning from spilled solvents, gasoline,paint, and other noxious
materials.
5. Branch damage due to improper pruning or trimming.
6. Damage from lack of water due to:
• a. Cutting or altering natural water migration patterns near root zones.
b. Failure to provide adequate watering.
7. Damage from alteration of soil pH factor caused by depositing lime,
concrete,plaster, or other base materials near roots.
8. Cutting feeder of roots or roots larger than 1-1/2 inches in diameter.
1.04 DAMAGE ASSESSMENT
-A When trees, other than those designated for removal,are destroyed or badly damaged
as a result of construction operations,remove and replace with same size,species,and
variety up to and including 8 inches in trunk diameter. Trees larger than 8 inches in
diameter shall be replaced with an 8-inch diameter tree of the same species and variety
and total contract amount will be reduced by an amount determined from the following
International Shade Tree Conference formula: 0.7854 x D2 x $10.00 where D is
diameter in inches of tree or shrub trunk measured 12 inches above grade.
B All necessary tree replacements shall be as approved by Engineer/Urban Forester.
02/2013 01563 - 1 of 4
CITY OF PEARLAND TREE AND PLANT PROTECTION
2.0 PRODUCTS
2.01 MATERIALS
A Asphalt paint: Emulsified asphalt or other adhesive, elastic, antiseptic coating
formulated for horticultural use on cut or injured plant tissue,free from kerosene and
coal creosote.
B Burlap: Suitable for use as tree wrapping.
C Fertilizer: Liquid containing 20 percent nitrogen, 10 percent phosphorus, and 5.
percent potash.
D. Temporary Barrier Fence: Plastic, bright orange color for visibility, 48 inches in
height, 8.5 pounds weight minimum.
3.0 EXECUTION
3.01 PROTECTION AND MAINTENANCE OF EXISTING TREES AND SHRUBS
A Except for trees and shrubs shown on Plans to be removed,all trees and shrubs within
the Project Site area are to remain and be protected from damage.
B For designated trees to be removed,perform the following:
1. Stake right-of-way limits and identify any tree of diameter greater than 4
inches which is to be removed. Mark trees prior to felling with an X in
orange paint, clearly visible, on the trunk, and at eye level.
2. After marking trees give a minimum of 48-hours notice in writing to the
Engineer of intent to begin felling operations.
3. Trees whose trunks are only partially in the right-of-way shall be protected
and preserved as described below.
C For trees or shrubs to remain,perform the following:
1. Trim trees and shrubs only as necessary.
a. Trees and shrubs requiring pruning for construction should also be
pruned for balance as well as to maintain proper form and branching
habit.
b. Cut limbs at branch collar. No stubs should remain on trees. Branch
cuts should not gouge outer layer of tree structure or trunk.
2. Use extreme care to prevent excessive damage to root systems.
a. Roots in construction areas will be cut smoothly with a trencher before
excavation begins. Do not allow ripping of roots with a backhoe or
other equipment.
b. Temporarily cover exposed roots with wet burlap to prevent roots from
drying out.
c. Cover exposed roots with soil as soon as possible.
3. Prevent damage or compaction of root zone (area inside dripline)by
construction activities.
a. Do not allow scarring of trunks or limbs by equipment or other means.
02/2013 01563 -2 of 4
CITY OF PEARLAND TREE AND PLANT PROTECTION
b. Do not store construction materials, vehicles, or excavated material
inside dripline of trees.
c. Do not pour liquid materials inside dripline.
4. Water and fertilize trees and shrubs that will remain to maintain their health
during construction period.
a. Supplemental watering of landscaping during construction should be
done once a week in months receiving average rainfall and twice a
week in months receiving below average rainfall.
b. This watering shall consist of saturating soils at least 6 to 8 inches
beneath surface.
5. Water areas currently being served by private sprinkler systems while
systems are temporarily taken out of service to maintain health of existing
landscapes.
6. At option of the Contractor and with the Engineer's permission, trees and
shrubs to remain may be temporarily transplanted and returned to original
positions under supervision of professional horticulturist.
3.02 PROTECTIVE CONTROLS
A Protection of trees or shrubs in open area:
1. Install steel drive-in fence posts in protective circle, approximately 8 feet on
center, at the dripline of the leaf canopy of trees or 2 ft. around shrubs.
2. Drive steel drive-in fence posts 3 feet minimum into ground, leaving 5 feet
minimum above ground.
3. For trees or shrubs in paved areas,use moveable posts constructed from
concrete-filled steel pipe 2-1/2 inches minimum in diameter mounted in
rubber auto tires filled with concrete.
4. Mount plastic temporary barrier safety fence on posts.
B Timber-wrap protection for trees in close proximity of moving or mechanical
equipment and construction work:
1. Wrap trunk with layer of burlap.
2. Install 2 x 4's or 2 x 6's (5-foot to 6-foot lengths)vertically, spaced 3 inches
to 5 inches apart around circumference of tree trunk.
3. Tie in place with 12 to 9 gage steel wire.
3.03 MAINTENANCE OF NEWLY PLANTED TREES
A Water newly planted trees adequately to maintain and support healthy plants at the
time of planting.
B The Contractor guarantees that trees planted for this Work shall remain alive and
healthy at least until the end of a one-year warranty period.
1. Within four weeks of notice from Owner, Contractor shall replace, at his
expense, any dead trees or any trees that in the opinion of Owner, have
become unhealthy or unsightly or have lost their natural shape as a result of
additional growth, improper pruning or maintenance, or weather conditions.
02/2013 01563 -3 of 4
CITY OF PEARLAND TREE AND PLANT PROTECTION
2. When tree must be replaced, the guarantee period for that tree shall begin on
date of replacement of tree, subject to the Owner's inspection, for no less
than one year.
3. Straighten leaning trees and bear entire cost.
4. Dispose of trees rejected at any time by Engineer at Contractor's expense.
END OF SECTION
02/2013 01563 -4 of 4
CONTROL OF GROUND WATER
CITY OF PEARLAND AND SURFACE WATER
Section 01564
CONTROL OF GROUND WATER AND SURFACE WATER
1.0 GENERAL
1.01 SECTION INCLUDES
A Dewatering,depressurizing,draining,and maintaining trench and structure excavations
and foundation beds in dry and stable condition.
B Protecting work against surface runoff and rising flood waters.
C Disposing of removed water.
D References to Technical Specifications:
1. Section 01200—Measurement &Payment Procedures
2. Section 01350—Submittals
3. Section 01570—Trench Safety Systems
4. Section 01565 —TPDES Requirements
5. Section 01566—Source Controls for Erosion & Sedimentation
E Referenced Standards:
1. Occupational Safety and Health Administration (OSHA)
2. Texas Commission on Environmental Quality (TCEQ)
3. Code of Ordinances, City of Pearland, Texas
4. Water Well Drillers and Pump Installers Advisory Council (WWD/PI)
F Definitions:
1. Ground Water Control Systems - installations external to the excavation
such as well points, eductors, or deep wells. Ground water control includes
dewatering and depressurization.
a. Dewatering-lowering the water table and intercepting seepage which
would otherwise emerge from slopes or bottoms of excavations and
disposing of removed water. The intent of dewatering is to increase
stability of excavated slopes; prevent dislocation of material from
slopes or bottoms of excavations;reduce lateral loads on sheeting and
bracing; improve excavating and hauling characteristics of excavated
material; prevent failure or heaving of the bottom of excavations; and
to provide suitable conditions for placement of backfill materials and
construction of structures and other installations.
b. Depressurization -reduction in piezometric pressure within strata not
controlled by dewatering alone, as required to prevent failure or
heaving of excavation bottom.
2. Surface Water Control - diversion and drainage of surface water runoff and
rain water away from the excavation.
3. Excavation Drainage - keeping excavations free of surface and seepage
water.
02/2008 01564- 1 of 8
CONTROL OF GROUND WATER
CITY OF PEARLAND AND SURFACE WATER
1.02 MEASUREMENT AND PAYMENT
A Measurement for and control of ground water for open cut pipe excavations shall be on
a linear foot basis and shall not exceed the length of open cut pipe installation in the
area requiring ground water control.
B Unless indicated as a Bid Item,no separate payment will be made for control of ground
water for any condition(s) other than those described in this Section, 1.02A. No
separate payment will be made for control of surface water. Include the cost to control
non-pipe excavation ground water and surface water in price for Work requiring such
controls.
C Refer to Section 01200—Measurement&Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit a Ground Water and Surface Water Control Plan for review by the Engineer
prior to start of any field work. The plan shall be signed by a Professional Engineer
registered in the State of Texas. The plan shall include the following:
1. Results of subsurface investigation and description of the extent and
characteristics of water bearing layers subject to ground water control.
2. Names of equipment suppliers and installation subcontractors.
3. A description of proposed ground water control systems indicating
arrangement, location, depth and capacities of system components,
installation details and criteria, and operation and maintenance procedures.
4. A description of proposed monitoring and control system indicating depths
and locations of piezometers and monitoring wells, monitoring installation
details and criteria, type of equipment and instrumentation with pertinent
data and characteristics.
5. A description of proposed filters including types, sizes, capacities and
manufacturer's application recommendations.
6. Design calculations demonstrating adequacy of proposed systems for
intended applications. Define potential area of influence of ground water
control operation near contaminated areas.
7. Operating requirements, including piezometric control elevations for
dewatering and depressurization.
8. Excavation drainage methods including typical drainage layers, sump pump
application and other necessary means.
9. Surface water control and drainage installations.
10. Proposed methods and locations for disposing of removed water.
C Submit the following records upon completed initial installation:
1._ Installation and development reports for well points, eductors, and deep
wells.
02/2008 01564-2 of 8
CONTROL OF GROUND WATER
CITY OF PEARLAND AND SURFACE WATER
2. Installation reports and baseline readings for piezometers and monitoring
wells.
3. Baseline analytical test data of water from monitoring wells.
4. Initial flow rates.
D Submit the following records on a weekly basis during operations:
1. Records of flow rates and piezometric elevations obtained during
monitoring of dewatering and depressurization. Refer to this Section, 3.02
"Requirements for Eductor, Well Points, or Deep Wells".
2. Maintenance records for ground water control installations, piezometers,
and monitoring wells.
E Submit the following records at end of the Work. Decommissioning(abandonment)
reports for monitoring wells and piezometers installed by other during the design phase
and left for Contractor's monitoring and use.
1.04 PERFORMANCE REQUIREMENTS
A Conduct subsurface investigations to identify groundwater conditions and to provide
parameters for design, installation, and operation of groundwater control systems.
B Design a ground water control system, compatible with the requirements of OSHA
Standards - 29 CFR, Part 1926, and Section 01570 -Trench Safety Systems of these
Technical Specifications, to produce the following results:
1. Effectively reduce the hydrostatic pressure affecting excavations.
2. Develop a substantially dry and stable subgrade for subsequent construction
operations.
3. Preclude damage to adjacent properties, buildings, structures, utilities,
installed facilities, and other work.
4. Prevent the loss of fines, seepage, boils, quick condition, or softening of the
foundation strata.
5. Maintain stability of sides and bottom of excavations.
C Ground water control systems may include single-stage or multiple-stage well point
systems, eductor and ejector-type systems, deep wells, or combinations of these
equipment types.
D Provide drainage of seepage water and surface water, as well as water from any other
source entering the excavation. Excavation drainage may include placement of
drainage materials, such as crushed stone and filter fabric, together with sump
pumping:
E Provide ditches,berms,pumps and other methods necessary to divert and drain surface
water from excavation and other work areas.
•
F Locate ground water control and drainage systems so as not to interfere with utilities,
construction operations, adjacent properties, or adjacent water wells.
02/2008 01564-3 of 8
CONTROL OF GROUND WATER
CITY OF PEARLAND AND SURFACE WATER
G Assume sole responsibility for ground water control systems and for any loss or
damage resulting from partial or complete failure of protective measures and any
settlement or resultant damage caused by the ground water control operations.'Modify
ground water control systems or operations if they cause or threaten to cause damage to
new construction, existing site improvements, adjacent property, or adjacent water
wells,or affect potentially contaminated areas. Repair damage caused by ground water
control systems or resulting from failure of the system to protect property as required.
H Provide an adequate number of piezometers installed at the proper locations and depths
as required to provide meaningful observations of the conditions affecting the
excavation, adjacent structures, and water wells.
I Provide environmental monitoring wells installed at the proper locations and depths as
required to provide adequate observations of hydrostatic conditions and possible
contaminant transport from contamination sources into the work area or into the
groundwater control system.
J Decommission piezometers and monitoring wells installed during design phase studies
and left for Contractors monitoring and use.
1.05 ENVIRONMENTAL REQUIREMENTS
A Comply with requirements of agencies having jurisdiction.
B Comply with TCEQ regulations and WWD/PI Advisory Council for development,
drilling, and abandonment of wells used in dewatering system.
C Obtain permit from TCEQ under the Texas Pollutant Discharge Elimination System
(TPDES),for storm water discharge from construction sites. Refer to Section 01565—
TPDES, 3.02 "Certification Requirements".
D Obtain all necessary permits from agencies with control over the use of groundwater
and matters affecting well installation, water discharge, and use of existing storm
drains and natural water sources. Because the review and permitting process may be
lengthy, take early action to pursue and submit for the required approvals.
E Monitor ground water discharge for contamination while performing pumping in the
vicinity of potentially contaminated sites.
F Implement control of ground and surface water under the provisions of Section 01566
—Source Controls for Erosion & Sedimentation.
2.0 PRODUCTS
2.01 EQUIPMENT AND MATERIALS
A Equipment and materials are at the option of Contractor as necessary to achieve
desired results for dewatering. Selected equipment and materials are subject to review
02/2008 01564-4 of 8
CONTROL OF GROUND WATER
CITY OF PEARLAND AND SURFACE WATER
of the Engineer through Submittals required in Section 01350 — Submittals, 1.06
"Operations and Maintenance Data".
B Eductors, well points, or deep wells, where used, must be furnished, installed and
operated by an experienced contractor regularly engaged in ground water control
system design, installation, and operation.
C Equipment and instrumentation for monitoring and control of the ground water control
system includes piezometers and monitoring wells, and devices, such as flow meters,
for observing and recording flow rates.
D All equipment must be in good repair and operating order.
E Sufficient standby equipment and materials shall be kept available to ensure
continuous operation, where required.
3.0 EXECUTION
3.01 GROUND WATER CONTROL
A Perform a subsurface investigation by borings as necessary to identify water bearing
layers,piezometric pressures,and soil parameters for design and installation of ground
water control systems. Perform pump tests, if necessary to determine the drawdown
characteristics of the water-bearing layers. The results shall be presented in the
Ground Water and Surface Water Control Plan. Refer to this Section, 1.03B.
B Provide labor, material, equipment, techniques and methods to lower, control and
handle ground water in a manner compatible with construction methods and site
conditions. Monitor effectiveness of the installed system and its effect on adjacent
property.
C Install, operate, and maintain ground water control systems in accordance with the
Plan. Notify Engineer in writing of any changes made to accommodate field
conditions and changes to the Work. Provide revised drawings and calculations with
such notification.
D Provide for continuous system operation, including nights, weekends, and holidays.
Arrange for appropriate backup if electrical power is primary energy source for
dewatering system.
E Monitor operations to verify that the system lowers ground water piezometric levels at
a rate required to maintain a dry excavation resulting in a stable subgrade for
prosecution of subsequent operations.
F Where hydrostatic pressures in confined water bearing layers exist below excavation,
depressurize those zones to eliminate risk of uplift or other instability of excavation or
installed works. Allowable piezometric elevations shall be defined in the Plan.
02/2008 01564-5 of 8
CONTROL OF GROUND WATER
CITY OF PEARLAND AND SURFACE WATER
G Maintain water level below subgrade elevation. Do not allow levels to rise until
foundation concrete has achieved design strength.
H During backfilling,dewatering may be reduced to maintain water level a minimum of
5 feet below prevailing level of backfill. However, do not allow that water level to
result in uplift pressures in excess of 80 percent of downward pressure produced by
weight of structure or backfill in place. Do not allow water levels to rise into cement
stabilized sand until at least 48 hour after placement.
I Provide a uniform diameter for each pipe drain run constructed for dewatering.
Remove pipe drain when it has served its purpose. If removal of pipe is impractical,
provide grout connections at 50-foot intervals and fill pipe with cement-bentonite grout
or cement-sand grout when pipe is removed from service.
J Extent of construction ground water control for structures with a permanent perforated
underground drainage system may be reduced,such as for units designed to withstand
hydrostatic uplift pressure. Provide a means of draining the affected portion of
underground system,including standby equipment. Maintain drainage system during
operations and remove it when no longer required.
K Remove system upon completion of construction or when dewatering and control of
surface or ground water is no longer required.
L Compact backfill as required by the Contract Documents.
3.02 REQUIREMENTS FOR EDUCTOR,WELL POINTS, OR DEEP WELLS
A For aboveground piping in ground water control system,include a 12-inch minimum
length of clear, transparent piping between every eductor well or well point and
discharge header so that discharge from each installation can be visually monitored.
B Install sufficient piezometers or monitoring wells to show that all trench or shaft
excavations in water bearing materials are predrained prior to excavation. Provide
separate piezometers for monitoring of dewatering and for monitoring of
depressurization. Install piezometers and monitoring wells for tunneling as appropriate
for Contractor's selected method of work.
C Install piezometers or monitoring wells not less than one week in advance of beginning
the associated excavation.
D Dewatering may be omitted for portions of underdrains or other excavations,but only
where auger borings and piezometers or monitoring wells show that soil is predrained
by an existing system such that the criteria of the Ground Water and Surface Water
Control Plan are satisfied.
02/2008 01564-6 of 8
CONTROL OF GROUND WATER
CITY OF PEARLAND AND SURFACE WATER
E Replace installations that produce noticeable amounts of sediments after development.
F Provide additional ground water control installations or change the methods in the
event that the installations according to the Ground Water and Surface Water Control
Plan do not provide satisfactory results based on the performance criteria defined by
the Plan and by this Section. Submit a revised Plan according to this Section, 1.03A.
G Mechanical dewatering equipment shall comply with Chapter 19 NOISE, Code of
Ordinances, City of Pearland, Texas.
3.03 EXCAVATION DRAINAGE
A Contractor may use excavation drainage methods if necessary to achieve well drained,
stable trench conditions. The excavation drainage may consist of the following
methods or combination of methods:
1. Sump pumping in combination with:
a. Layer of crushed stone and filter fabric.
b. Sand and gravel drains.
2. Wells for ground water control.
B Use sump pumping and a drainage layer, as defined in ASTM D 2321, placed on the
foundation beneath pipe bedding or thickened bedding layer of Class I material.
3.04 MAINTENANCE AND OBSERVATION
A Conduct daily maintenance and observation of piezometers or monitoring wells while
the ground water control installations or excavation drainage are operating in an area.
Keep system in good operating condition.
B Replace damaged and destroyed piezometers or monitoring wells with new
piezometers or wells as necessary to meet observation schedule.
C Cut off piezometers or monitoring wells in excavation areas where piping is exposed,
only as necessary to perform observation as excavation proceeds. Continue to
maintain and make observations, as specified.
D Remove and grout piezometers inside or outside the excavation area when ground
water control operations are complete. Remove and grout monitoring wells when
directed by the Engineer.
3.05 MONITORING AND RECORDING
A Monitor and record average flow rate of operation for each deep well, or for each
wellpoint or eductor header used in dewatering system. Also monitor and record water
level and ground water recovery. These records shall be obtained daily until steady
conditions are achieved, and twice weekly thereafter.
02/2008 01564-7 of 8
CONTROL OF GROUND WATER
CITY OF PEARLAND AND SURFACE WATER
B Observe and record elevation of water level daily as long as ground water control
system is in operation, and weekly thereafter until the Work is completed or
piezometers or wells are removed, except when Engineer determines that more
frequent monitoring and recording are required. Comply with Engineer's direction for
increased monitoring and recording and take measures as necessary to ensure effective
dewatering for intended purpose.
3.06 SURFACE WATER CONTROL
A Intercept surface water and divert it away from excavations through use of dikes,
ditches,curb walls,pipes, sumps or other approved means. The requirement includes
temporary works required to protect adjoining properties from surface drainage caused
by construction operations.
B Divert surface water and seepage water into sumps and pump it into drainage channels
or storm drains, when approved by agencies having jurisdiction. Provide settling
basins when required by such agencies.
C Provide additional surface water control measures or change the methods in the event
that the measures according to the Ground Water and Surface Water Control Plan do
not provide satisfactory results based on the performance criteria defined by the Plan
and by'this Section. Submit a revised Plan according to this Section, 1.03B.
END OF SECTION
02/2008 01564-8 of 8
CITY OF PEARLAND TPDES REQUIREMENTS
Section 01565
TPDES REQUIREMENTS
1.0 GENERAL
A As used herein and in conjunction with TPDES General Permit No. TXR150000,the
term OPERATOR refers to the CONTRACTOR.
1.02 SECTION INCLUDES
A Description of the required documentation to be prepared,signed and submitted by the
Contractor before conducting construction operations, in accordance with the terms
and conditions of the Texas Pollutant Discharge Elimination System(TPDES)General
Permit as issued March 5, 2003, re-issued March 5, 2013, and re-issued March 5,
2018, by the Texas Commission on Environmental Quality under the provisions of
Section 402 of the Clean Water Act and Section 26.040 of the Texas Water Code.
B Contractor's responsibility for implementation,maintenance,and inspection of storm
water pollution prevention control measures including,but not limited to,erosion and
sediment controls,storm water management plans,waste collection and disposal,off-
site vehicle tracking,and other practices shown on the Plans or specified elsewhere in
this or other Technical Specifications.This Specification provides guidelines and Best
Management Practices (BMP's) information for the Contractor to use in adhering to
all local, state and federal environmental regulations with'respect to storm water
pollution prevention during construction activity.
C References to Technical Specifications:
1. Section 01350— Submittals
2. Section 01310—Coordination &Meetings
3. Section 01770—Contract Closeout
D Referenced Standards:
1. Texas Commission on Environmental Quality (TCEQ)
E Other References:
1. Storm Water Pollution Prevention Plan (SWPPP) found in Appendix A of
these Technical Specifications.
1.03 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this Work is a component.
1.04 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
2.0 PRODUCTS - Not Used
08/2018 01565 - 1 of 4
CITY OF PEARLAND TPDES REQUIREMENTS
3.0 EXECUTION
3.01 REQUIRED NOTICES
A The Contractor shall complete,sign,and date the Contractor's Notice of Intent(NOI)
attached in Appendix A. The signed copy of the Contractor's NOI shall be returned to
the TCEQ. It is contractor's responsibility to pay for any fees associated with the
permit. Submission of the NOI is required by both the Owner and the Contractor
before construction operations start.
B Upon completion of construction and acceptance of the Work by the Owner, the
Contractor shall complete, sign, and date the Contractor's Notice of Termination
(NOT) attached in Appendix A.
3.02 CERTIFICATION REQUIREMENTS
A On the Operator's Information form attached in Appendix A, the Contractor shall
complete name, address, and telephone number for the Contractor; the names of
persons or firms responsible for maintenance and inspection of erosion and sediment
control measures and all Subcontractors.
B The Contractor and Subcontractors named in the Contractor's Information form shall
read, sign, and date the Contractor's/Subcontractor's Certification form, attached in
Appendix A.
C The persons or firms responsible for maintenance and inspection of erosion and
sediment control measures shall read, sign, and date the Contractor's Inspection and
Maintenance Certification form, attached in Appendix A.
D The Contractor's Information form and all certification forms shall be submitted to the
Owner before beginning construction.
E Contractor shall review implementation of the SWPPP in a meeting with the Owner
and Engineer prior to start of construction in accordance with Section 01310 —
Coordination &Meetings.
3.03 RETENTION OF RECORDS
A The Contractor shall keep a copy of the SWPPP at the Project Site or at the
Contractor's office from the date that it became effective to the date the Work is
accepted by the Owner.
B At Contract Closeout,the Contractor shall submit to the Owner all TPDES forms and
certifications, as well as a copy of the SWPPP, in accordance with Section 01770—
Contract Closeout. The SWPPP records and data will be retained by Owner for a
period of 3 years from the date the Work is accepted by the Owner.
08/2018 01565 -2 of 4
CITY OF PEARLAND TPDES REQUIREMENTS
3.04 POSTING OF NOTICES
A The following notices shall be posted from the date that this SWPPP goes into effect
until the date the Work is accepted by the Owner:
1. Copies of the Notices of Intent submitted by the Owner and Contractor and
a brief Description of Construction Activity being conducted at the Project
Site, as given in Article 1 of the SWPPP, shall be posted at the Project Site
or at Contractor's office in a prominent place for public viewing.
2. Notice to drivers of equipment and vehicles, instructing them to stop, check,
and clean tires of debris and mud before driving onto traffic lanes. Post
such notices at every stabilized construction exit area.
3. In an easily visible location on Project Site,post a notice of waste disposal
procedures.
4. Notice of hazardous material handling and emergency procedures shall be
posted with the NOI on Project Site. Keep copies of Material Safety Data
Sheets at a location on Project Site that is known to all personnel.
5. Keep a copy of each signed certification at the Project Site or at
Contractor's office.
APPENDIX A FOLLOWS THIS SECTION
END OF SECTION
•
08/2018 01-565-3 of 4
CITY OF PEARLAND• TPDES REQUIREMENTS
Section 01565
TPDES REQUIREMENTS
(APPENDIX A)
Table of Contents
TCEQ General Permit
NOI TCEQ Form 20022
TCEQ Form—20134
NOC TCEQ Form—20023
Site Notice Forms
08/2018 01565 -4 of 4
=NW 711•11
NM -MINIM
C
General Permit to Discharge Under
TCEQ the Texas Pollutant Discharge
Elimination System
Stormwater Discharges Associated with
Construction Activities
TXR150000
Effective March 5, 2018
printed paper recycled pTEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Texas Commission on Environmental Quality
P.O.Box 13087,Austin,Texas 78711-3087
GENERAL PERMIT TO DISCHARGE UNDER THE
TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM
under provisions of
Section 402 of the Clean Water Act
and Chapter 26 of the Texas Water Code
This permit supersedes and replaces
TPDES General Permit No.TXRlg0000,issued March 5,2013
Construction sites that discharge stormwater associated with construction activity
located in the state of Texas
may discharge to surface water in•the state
only according to monitoring requirements and other conditions set forth in this general
permit,as well as the rules of the Texas Commission on Environmental Quality(TCEQ or
Commission),the laws of the State of Texas,and other orders of the Commission of the
TCEQ. The issuance of this general permit does not grant to the permittee the right to use
private or public property for conveyance of stormwater and certain non-stormwater
discharges along the discharge route. This includes property belonging to but not limited to
any individual,partnership,corporation or other entity. Neither does this general permit
authorize any invasion of personal rights nor any violation of federal,state,or local laws or
regulations. It is the responsibility of the permittee to acquire property rights as may be
necessary to use the discharge route.
This general permit and the authorization contained herein shall expire at midnight,five
years from the permit effective date.
EFFECTIVE DATE: March 5,2018
ISSUED DATE: 2.g,�f5
For 'e Co 'ission
TPDES GENERAL PERMIT NUMBER TXR150000 RELATING TO
STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION
ACTIVITIES
Table of Contents
Part I. Flow Chart and Definitions 5
Section A. Flow Chart to Determine Whether Coverage is Required 5
Section B. Definitions 6
Part II. Permit Applicability and Coverage 13
Section A. Discharges Eligible for Authorization 13
1. Stormwater Associated with Construction Activity 13
2. Discharges of Stormwater Associated with Construction Support Activities 13
3. Non-Stormwater Discharges 13
4. Other Permitted Discharges 14
Section B. Concrete Truck Wash Out 14
Section C. Limitations on Permit Coverage 14
1. Post Construction Discharges 14
2. Prohibition of Non-Stormwater Discharges 14
3. Compliance with Water Quality Standards 14
4. Impaired Receiving Waters and Total Maximum Daily Load(TMDL)Requirements
14
5. Discharges to the Edwards Aquifer Recharge or Contributing Zone 15
6. Discharges to Specific Watersheds and Water Quality Areas 16
7. Protection of Streams and Watersheds by Other Governmental Entities 16
8. Indian Country Lands 16
9. Oil and Gas Production and Transportation 16
10. Stormwater Discharges from Agricultural Activities 16
11. Endangered Species Act 16
12. Other 17
Section D. Deadlines for Obtaining Authorization to Discharge 17
1. Large Construction Activities 17
2. Small Construction Activities 17
Section E. Obtaining Authorization to Discharge 17
1. Automatic Authorization for Small Construction Activities with Low Potential for
Erosion. 17
2. Automatic Authorization for Small Construction Activities: 18
3. Authorization for Large Construction Activities: 19
Construction General Permit TPDES General Permit TXRi50000
4. Waivers for Small Construction Activities- 20
5. Effective Date of Coverage 20
6. Notice of Change(NOC) 21
7. Signatory Requirement for NOI Forms,Notice of Termination(NOT)Forms,NOC
Letters, and-Construction Site Notices 22
8. Contents of the NOI 22
Section F. Terminating Coverage 23
1. Notice of Termination(NOT)Required 23
2. Minimum Contents of the NOT 23
3. Termination of Coverage for Small Construction Sites and for Secondary Operators
at Large Construction Sites 24
4. Transfer of Day-to-Day Operational Control 24
Section G. Waivers from Coverage 25
1. Waiver Applicability and Coverage 25
2. Steps to Obtaining a Waiver 26
3. Effective Date of a LREW 26
4. Activities Extending Beyond the LREW Period 26
Section H. Alternative TPDES Permit Coverage 27
1. Individual Permit Alternative 27
2. Alternative Authorizations for Certain Discharges 27
3. Individual Permit Required 27
4. Alternative Discharge Authorization 27
Section I. Permit Expiration 27
Part III. Stormwater Pollution Prevention Plans(SWP3) 28
Section A. Shared SWP3 Development 29
Section B. Responsibilities of Operators' 29
1. Secondary Operators and Primary Operators with Control Over Construction Plans
and Specifications 29
2. Primary Operators with Day-to-Day Operational Control 30
Section C. Deadlines for SWP3 Preparation,Implementation, and Compliance 30
Section D. Plan Review and Making Plans Available 30
Section E. Revisions and Updates to SWP3s 31
Section F. Contents of SWP3 31
Section G. Erosion and Sediment Control Requirements Applicable to All Sites 40
Part IV. Stormwater Runoff from Concrete Batch Plants 42
Section A. Benchmark Sampling Requirements 42
Section B. Best Management Practices(BMPs) and SWP3 Requirements 44
Page 3
Construction General Permit TPDES General Permit TXR1.50000
Section C. Prohibition of Wastewater Discharges 46
Part V. Concrete Truck Wash Out Requirements 46
Part VI. Retention of Records 47
Part VII.Standard Permit Conditions 47
Part VIII. Fees 48
Appendix A: Automatic Authorization 50
Appendix B: Erosivity Index(EI)Zones in Texas 52
Appendix C: Isoerodent Map 53
Appendix D: Erosivity Indices for EI Zones in Texas 54
Page 4
Construction General Permit TPDES General Permit TXRi50000
Part I. Flow Chart and Definitions
Section A. Flow Chart to Determine Whether Coverage is Required
When calculating the acreage of land area disturbed,include the disturbed land-area of all
construction and construction support activities.
How much land will be disturbed?(*1)
• V
C.1 acre 1 or more acres
( l) (*1)
NO Do you meet the }'ES Will 5 or more
4 definition of acres he disturbed?
"operator?"(*2) (*t)
Aro YES
r
Permit Coverage Required
• Prepare and Implement SWP3
• Post Site Notice
• Submit Copy of Site Notice to
•
MS4 Operator V
•
• J
Are you a"primary
NOoperator?"(*2)
1 1
YES
Permit Coverage Not
Required Unless Part Permit Coverage Required
of a Larger Common - • Prepare and Implement SWP3
Plan of Development • Submit NOl to TCEQ •
or Sale • Post Site Notice
• Submit Copy of NOI to MS4
Operator
(*1) To determine the size of the construction project,use the size of the entire area to be disturbed,and
include the size of the larger common plan of development or sale,if the project is part of a larger
project(refer to Part 1.13., "Definitions,"for an explanation of"common plan of development or sale").
(*2) Refer to the definitions for"operator,""primary operator,"and"secondary operator"in Part 1.,
Section R.of this permit.
•
•
Page 5 •
Construction General Permit TPDES General Permit TXRi50000
Section B. Definitions
Arid Areas-Areas with an average annual rainfall of o to 10 inches.
Best Management Practices(BMPs)-Schedules of activities,prohibitions of practices,
maintenance procedures,structural controls,local ordinances,and other management
practices to prevent or reduce the discharge of pollutants. BMPs also include treatment
requirements,operating procedures, and practices to control construction site runoff,spills
or leaks,waste disposal,or drainage from raw material storage areas.
Commencement of Construction-The initial disturbance of soils associated with
clearing,grading,or excavation activities, as well as other construction-related activities
(e.g.,stockpiling of fill material,demolition).
Common Plan of Development-A construction activity that is completed in separate
stages,separate phases,or in combination with other construction activities. A common
plan of development(also known as a"common plan of development or sale")is identified
by the documentation for the construction project that identifies the scope of the project, and
may include plats,blueprints,marketing plans, contracts,building permits, a public notice
or hearing,zoning requests,or other similar documentation and activities. A common plan
of development does not necessarily include all construction projects within the jurisdiction
of a public entity(e.g., a city or university). Construction of roads or buildings in different
parts of the jurisdiction would be considered separate"common plans,"with only the
interconnected parts of a project being considered part of a"common plan"(e.g.,a building
and its associated parking lot and driveways,airport runway and associated taxiways,a
building complex,etc.). Where discrete construction projects occur within a larger common
plan of development or sale but are located 1/4 mile or more apart,and the area between the
projects is not being disturbed,each individual project can be treated as a separate plan of
development or sale,provided that any interconnecting road,pipeline or utility project that
is part of the same"common plan"is not included in the area to be disturbed.
Construction Activity-Includes soil disturbance activities,including clearing,grading,
excavating,construction-related activity(e.g.,stockpiling of fill material,demolition),and
construction support activity. This does not include routine maintenance that is performed
to maintain the original line and grade,hydraulic capacity,or original purpose of the site
(e.g.,the routine grading of existing dirt roads, asphalt overlays of existing roads,the routine
clearing of existing right-of-ways, and similar maintenance activities). Regulated
construction activity is defined in terms of small and large construction activity.
Construction Support Activity—A construction-related activity that specifically
supports construction activity,which can involve earth disturbance or pollutant-generating
activities of its own,and can include,but are not limited to, activities associated with
concrete or asphalt batch plants,rock crushers, equipment staging or storage areas, chemical
storage areas,material storage areas,material borrow areas, and excavated material disposal
areas. Construction support activity must only directly support the construction activity
authorized under this general permit.
Dewatering—The act of draining rainwater or groundwater from building foundations,
vaults,and trenches.
Discharge—For the purposes of this permit,the drainage,release,or disposal of pollutants
in stormwater and certain non-stormwater from areas where soil disturbing activities(e.g.,
clearing,grading,excavation,stockpiling of fill material, and demolition),construction
materials or equipment storage or maintenance(e.g.,fill piles,borrow area,concrete truck
wash out,fueling),or other industrial stormwater directly related to the construction process
(e.g.,concrete or asphalt batch plants)are located.
Drought-Stricken Area—For the purposes of this permit, an area in which the National
Oceanic and Atmospheric Administration's U.S. Seasonal Drought Outlook indicates for the
period during which the construction will occur that any of the following conditions are
Page 6
Construction General Permit TPDES General Permit TXR150000
likely: (1)"Drought to persist or intensify", (2)"Drought ongoing,some improvement", (3)
"Drought likely to improve,impacts ease",or(4)"Drought development likely". See
http://www.cpc.ncep.noaa.gov/products/expert assessment/seasonal drought.html.
Edwards Aquifer-As defined under Texas Administrative Code(TAC) § 213.3 of this title
(relating to the Edwards Aquifer),that portion of an arcuate belt of porous,water-bearing,
predominantly carbonate rocks known as the Edwards and Associated Limestones in the
Balcones Fault Zone trending from west to east to northeast in Kinney,Uvalde,Medina,
Bexar,Comal,Hays,Travis, and Williamson Counties; and composed of the Salmon Peak
Limestone,McKnight Formation,West Nueces Formation,Devil's River Limestone,Person
Formation,Kainer Formation,Edwards Formation,and Georgetown Formation. The
permeable aquifer units generally overlie the less-permeable Glen Rose Formation to the
south,overlie the less-permeable Comanche Peak and Walnut Formations north of the
Colorado River, and underlie the less-permeable Del Rio Clay regionally.
Edwards Aquifer Recharge Zone-Generally,that area where the stratigraphic units
constituting the Edwards Aquifer crop out,including the outcrops of other geologic
formations in proximity to the Edwards Aquifer,where caves,sinkholes,faults,fractures,or
other permeable features would create a potential for recharge of surface waters into the
Edwards Aquifer. The recharge zone is identified as that area designated as such on official
maps located in the offices of the Texas Commission on Environmental Quality(TCEQ)and
the appropriate regional office. The Edwards Aquifer Map Viewer,located at
http://www.tceq.texas.gov/compliance/field ops/eapp/rapdisclaimer.html, can be used to
determine where the recharge zone is located.
Edwards Aquifer Contributing Zone-The area or watershed where runoff from
precipitation flows downgradient to the recharge zone of the Edwards Aquifer. The
contributing zone is located upstream(upgradient) and generally north and northwest of the
recharge zone for the following counties: all areas within Kinney County,except the area
within the watershed draining to Segment No. 2304 of the Rio Grande Basin; all areas within
Uvalde,Medina,Bexar, and Comal Counties; all areas within Hays and Travis Counties,
except the area within the watersheds draining to the Colorado River above a point 1.3 miles
upstream from Tom Miller Dam,Lake Austin at the confluence of Barrow Brook Cove,
Segment No. 1403 of the Colorado River Basin; and all areas within Williamson County,
except the area within the watersheds draining to the Lampasas River above the dam at
Stillhouse Hollow reservoir,Segment No.1216 of the Brazos River Basin. The contributing
zone is illustrated on the Edwards Aquifer map viewer at
http://www.tceq.texas.gov/compliance/field ops/eapp/mapdisclaimer.html.
Effluent Limitations Guideline(ELG)—Defined in 4o Code of Federal Regulations
(CFR) §122.2 as a regulation published by the Administrator under§3o4(b)of the Clean
Water Act(CWA)to adopt or revise effluent limitations.
Facility or Activity—For the purpose of this permit, referring to a construction site,the
location of construction activity,or a construction support activity that is regulated under
this general permit,including all contiguous land and fixtures(for example,ponds and
materials stockpiles),structures,or appurtenances used at a construction site or industrial
site.
Final Stabilization-A construction site status where any of the following conditions are
met:
(a) All soil disturbing activities at the site have been completed and a uniform(that is,
evenly distributed,without large bare areas)perennial vegetative cover with a density of
at least 70%of the native background vegetative cover for the area has been established
on all unpaved areas and areas not covered by permanent structures,or equivalent
permanent stabilization measures (such as the use of riprap,gabions,or geotextiles)
have been employed.
Page 7
Construction General Permit TPDES General Permit TXR150000
(b) For individual lots in a residential construction site by either:
(i) the homebuilder completing final stabilization as specified in condition(a)above;
or
(2) the homebuilder establishing temporary stabilization for an individual lot prior to
the time of transfer of the ownership of the home to the buyer and after informing
the homeowner of the need for,and benefits of,final stabilization.If temporary
stabilization is not feasible,then the homebuilder may fulfill this requirement by
retaining perimeter controls or BMPs,and informing the homeowner of the need
for removal of temporary controls and the establishment of final stabilization.
Fulfillment of this requirement must be documented in the homebuilder's
stormwater pollution prevention plan(SWP3).
(c) For construction activities on land used for agricultural purposes(such as pipelines
across crop or range land),final stabilization maybe accomplished by returning the
disturbed land to its preconstruction agricultural use. Areas disturbed that were not
previously used for agricultural activities,such as buffer strips immediately adjacent to
surface water and areas that are not being returned to their preconstruction agricultural
use must meet the final stabilization conditions of condition(a)above.
(d) In arid,semi-arid, and drought-stricken areas only,all soil disturbing activities at the
site have been completed and both of the following criteria have been met:
(1) Temporary erosion control measures(for example,degradable rolled erosion
control product)are selected,designed,and installed along with an appropriate
seed base to provide erosion control for at least three years without active
maintenance by the operator,and
(2) The temporary erosion control measures are selected,designed, and installed to
achieve 7o%of the native background vegetative coverage within three years.
Hyperchlorination of Waterlines—Treatment of potable water lines or tanks with
chlorine for disinfection purposes,typically following repair or partial replacement of the
waterline or tank,and subsequently flushing the contents.
Impaired Water-A surface water body that is identified as impaired on the latest
approved CWA§303(d)List or waters with an EPA-approved or established total maximum
daily load(TMDL)that are found on the latest EPA approved Texas Integrated Report of
Surface Water Quality for CWA Sections 305(b)and 303(d),which lists the category 4 and 5
water bodies.
Indian Country Land—All land within the limits of any Indian reservation under the
jurisdiction of the United States government,notwithstanding the issuance of any patent,
and,including rights-of-way running through the reservation; (2)all dependent Indian
communities with the borders of the United States whether within the originally or
subsequently acquired territory thereof,and whether within or without the limits of a state;
and(3)all Indian allotments,the Indian titles to which have not been extinguished,
including rights-of-way running through the same. (4o CFR§122.2)
Indian Tribe-Any Indian Tribe,band,group,or community recognized by the Secretary of
the Interior and exercising governmental authority over a Federal Indian Reservation(40
CFR§122.2).
Infeasible—Not technologically possible,or not economically practicable and achievable in
light of best industry practices. (40 CFR§450.11(b)).
Large Construction Activity-Construction activities including clearing,grading,and
excavating that result in land disturbance of equal to or greater than five(5)acres of land.
Large construction activity also includes the disturbance of less than five(5)acres of total
Page 8
Construction General Permit TPDES General Permit TXRi50000
land area that is part of a larger common plan of development or sale if the larger common
plan will ultimately disturb equal to or greater than five(5)acres of land. Large construction
activity does not include routine maintenance that is performed to maintain the original line
and grade,hydraulic capacity,or original purpose of the site(for example,the routine
grading of existing dirt roads,asphalt overlays of existing roads,the routine clearing of
existing right-of-ways, and similar maintenance activities.)
Linear Project—Includes the construction of roads,bridges,conduits,substructures,
pipelines,sewer lines,towers,poles,cables,wires,connectors,switching,regulating and
transforming equipment and associated ancillary facilities in a long,narrow area.
Low Rainfall Erosivity Waiver(LREW)-A written submission to the executive director
from an operator of a construction site that is considered as small construction activity under
the permit,which qualifies for a waiver from the requirements for small construction
activities,only during the period of time when the calculated rainfall erosivity factor is less
than five(5).
Minimize-To reduce or eliminate to the extent achievable using stormwater controls that
are technologically available and economically practicable and achievable in light of best
industry practices.
Municipal Separate Storm Sewer System(MS4)-A separate storm sewer system
owned or operated by the United States,a state,city,town,county,district,association,or
other public body(created by or pursuant to state law)having jurisdiction over the disposal
of sewage,industrial wastes,stormwater,or other wastes,including special districts under
state law such as a sewer district,flood control or drainage district,or similar entity,or an
Indian tribe or an authorized Indian tribal organization,that discharges to surface water in
the state.
Notice of Change(NOC)—Written notification to the executive director from a
discharger authorized under this permit,providing changes to information that was
previously provided to the agency in a notice of intent form;
Notice of Intent(NOI)-A written submission to the executive director from an applicant
requesting coverage under this general permit.
Notice of Termination(NOT)-A written submission to the executive director from a -
discharger authorized under this general permit requesting termination of coverage.
Operator-The person or persons associated with a large or small construction activity that
is either a primary or secondary operator as defined below:
Primary Operator—the person or persons associated with construction activity that
meets either of the following two criteria:
(a) the person or persons have on-site operational control over construction plans and
specifications,including the ability to make modifications to those plans and
specifications;or
(b) the person or persons have day-to-day operational control of those activities at a
construction site that are necessary to ensure compliance with a Storm Water
Pollution Prevention Plan(SWP3)for the site or other permit conditions(for
example,they are authorized to direct workers at a site to carry out activities
required by the SWP3 or comply with other permit conditions).
Secondary Operator—The person or entity,often the property owner,whose
operational control is limited to:
(a) the employment of other operators,such as a general contractor,to perform or
supervise construction activities; or
Page 9
Construction General Permit TPDES General Permit TXR15oo00
(b) the ability to approve or disapprove changes to construction plans and specifications,
but who does not have day-to-day on-site operational control over construction
activities at the site.
Secondary operators must either prepare their own SWP3 or participate in a shared
SWP3 that covers the areas of the construction site,where they have control over the
construction plans and specifications.
If there is not a primary operator at the construction site,then the secondary operator is
defined as the primary operator and must comply with the requirements for primary
operators.
Outfall-For the purpose of this permit,a point source at the point where stormwater runoff
associated with construction activity discharges to surface water in the state and does not
include open conveyances connecting two municipal separate storm sewers, or pipes,
tunnels,or other conveyances that connect segments of the same stream or other water of
the U.S.and are used to convey waters of the U.S.
Permittee-An operator authorized under this general permit. The authorization may be
gained through submission of a notice of intent,by waiver,or by meeting the requirements
for automatic coverage to discharge stormwater runoff and certain non-stormwater
discharges from construction activity.
Point Source—Any discernible,confined,and discrete conveyance,including but not
limited to, any pipe,ditch,channel,tunnel,conduit,well,discrete fissure,container,rolling
stock concentrated animal feeding operation,landfill leachate collection system,vessel or
other floating craft from which pollutants are,or maybe,discharged. This term does not
include return flows from irrigated agriculture or agricultural stormwater runoff(40 CFR
§122.2).
Pollutant-Dredged spoil,solid waste,incinerator residue,sewage,garbage,sewage sludge,
filter backwash,munitions, chemical wastes,biological materials,radioactive materials,heat,
wrecked or discarded equipment,rock,sand,cellar dirt,and industrial,municipal,and
agricultural waste discharged into any surface water in the state. The term"pollutant"does
not include tail water or runoff water from irrigation or rainwater runoff from cultivated or
uncultivated rangeland,pastureland,and farmland. For the purpose of this permit,the term
"pollutant"includes sediment.
Pollution-The alteration of the physical,thermal,chemical,or biological quality of,or the
contamination of,any surface water in the state that renders the water harmful,detrimental,
or injurious to humans,animal life,vegetation,or property or to public health,safety,or
welfare,or impairs the usefulness or the public enjoyment of the water for any lawful or
reasonable purpose(Texas Water Code(TWC) §26.001(14)).
f..
Rainfall Erosivity Factor(R factor)-the total annual erosive potential that is due to
climatic effects,and is part of the Revised Universal Soil Loss Equation(RUSLE).
Receiving Water-A"Water of the United States"as defined in 4o CFR§122.2 or a surface
water in the state into which the regulated stormwater discharges.
Semiarid Areas-areas with an average annual rainfall of to to 20 inches.
Separate Storm Sewer System-A conveyance or system of conveyances(including
roads with drainage systems,streets,catch basins,curbs,gutters, ditches,man-made
channels,or storm drains),designed or used for collecting or conveying stormwater;that is
not a combined sewer,and that is not part of a publicly owned treatment works(POTW).
Small Construction Activity-Construction activities including clearing,grading,and
excavating that result in land disturbance of equal to or greater than one(1)acre and less
than five(5)acres of land. Small construction activity also includes the disturbance of less
than one(1)acre of total land area that is part of a larger common plan of development or
sale if the larger common plan will ultimately disturb equal to or greater than one(1)and
Page 10
Construction General Permit TPDES General Permit TXR150000
less than five(5)acres of land. Small construction activity does not include routine
maintenance that is performed to maintain the original line and grade,hydraulic capacity,or
original purpose of the site(for example,the routine grading of existing dirt roads,asphalt
overlays of existing roads,the routine clearing of existing right-of-ways,and similar
maintenance activities).
Steep Slopes—Where a state,Tribe,local government, or industry technical manual(e.g.
stormwater BMP manual)has defined what is to be considered a"steep slope",this permit's
definition automatically adopts that definition. Where no such definition exists,steep slopes
are automatically defined as those that are 15 percent or greater in grade.
Stormwater(or Stormwater Runoff)-Rainfall runoff,snow melt runoff,and surface
runoff and drainage.
Stormwater Associated with Construction Activity-Stormwater runoff, as defined
above,from a construction activity.
Structural Control(or Practice)-A pollution prevention practice that requires the
construction of a device,or the use of a device,to reduce or prevent pollution in stormwater
runoff. Structural controls and practices may include but are not limited to:silt fences,
earthen dikes,drainage swales,sediment traps,check dams,subsurface drains,storm drain
inlet protection,rock outlet protection,reinforced soil retaining systems,gabions,and
temporary or permanent sediment basins.
Surface Water in the State- Lakes,bays,ponds,impounding reservoirs,springs,rivers,
streams,creeks, estuaries,wetlands,marshes,inlets,canals,the Gulf of Mexico inside the
territorial limits of the state(from the mean high water mark(MHWM) out 10.36 miles into
the Gulf),and all other bodies of surface water,natural or artificial,inland or coastal,fresh
or salt,navigable or non-navigable, and including the beds and banks of all water-courses
and bodies of surface water,that are wholly or partially inside or bordering the state or
subject to the jurisdiction of the state; except that waters in treatment systems which are
authorized by state or federal law,regulation,or permit,and which are created for the
purpose of waste treatment are not considered to be water in the state.
Temporary Stabilization-A condition where exposed soils or disturbed areas are
provided a protective cover or other structural control to prevent the migration of pollutants.
Temporary stabilization may include temporary seeding,geotextiles,mulches, and other
techniques to reduce or eliminate erosion until either permanent stabilization can be
achieved or until further construction activities take place.
Thawing Conditions—for the purposes of this permit,thawing conditions are expected
based on the historical likelihood of two or more days with daytime temperatures greater
than 327. This date can be determined by looking at historical weather data.
Note: The estimation of thawing conditions is for planning purposes only. During
construction,the permittee will be required to conduct site inspections based upon actual
conditions(i.e.,if thawing conditions occur sooner than expected,the permittee will be
required to conduct inspections at the regular frequency).
Total Maximum Daily Load(TMDL)-The total amount of a pollutant that a water body
can assimilate and still meet the Texas Surface Water Quality Standards.
Turbidity-A condition of water quality characterized by the presence of suspended solids
and/or organic material.
Waters of the United States-Waters of the United States or waters of the U.S.means:
(a) all waters which are currently used,were used in the past,or may be susceptible to
use in interstate or foreign commerce,including all waters which are subject to the
ebb and flow of the tide; 0
(b) all interstate waters,including interstate wetlands;
Page 11
Construction General Permit TPDES General Permit TXR150000
(c) all other waters such as intrastate lakes,rivers,streams(including intermittent
streams),mudflats,sandflats,wetlands,sloughs,prairie potholes,wet meadows,
playa lakes,or natural ponds that the use,degradation,or destruction of which would
affect or could affect interstate or foreign commerce including any such waters:
(i) which are or could be used by interstate or foreign travelers for recreational or
other purposes;
(2) from which fish or shellfish are or could be taken and sold in interstate or foreign
commerce;or
(3) which are used or could be used for industrial purposes by industries in interstate
commerce;
(d) all impoundments of waters otherwise defined as waters of the United States under
this definition;
(e) tributaries of waters identified in paragraphs(a)through(d)of this definition;
(f) the territorial sea; and
(g) wetlands adjacent to waters(other than waters that are themselves wetlands)
identified in paragraphs(a)through(f) of this definition.
Waste treatment systems,including treatment ponds or lagoons designed to meet the
requirements of CWA are not waters of the U.S. This exclusion applies only to manmade
bodies of water which neither were originally created in waters of the U.S. (such as disposal
area in wetlands)nor resulted from the impoundment of waters of the U.S. Waters of the
U.S. do not include prior converted cropland. Notwithstanding the determination of an
area's status as prior converted cropland by any other federal agency,for the purposes of the
CWA,the final authority regarding CWA jurisdiction remains with EPA.
Page 12
Part II. Permit Applicability and Coverage
Section A. Discharges Eligible for Authorization
1. Stormwater Associated with Construction Activity
Discharges of stormwater runoff and certain non-stormwater discharges from small and
large construction activities may be authorized under this general permit.
2. Discharges of Stormwater Associated with Construction Support Activities
Discharges of stormwater runoff and certain non-stormwater discharges from
construction support activities as defined in Part I.B of this general permit may be
authorized,provided that the following conditions are met:
(a) the construction support activities are located within one(i)mile from the boundary
of the construction site where the construction activity authorized under the permit
is being conducted that requires the support of these activities;
(b) an SWP3 is developed for the permitted construction site according to the provisions
in Part III.F of this general permit, and includes appropriate controls and measures
to reduce erosion and the discharge of pollutants in stormwater runoff according to
the provisions in Part III.G of this general permit;
(c) the activities are directly related to the construction site;
(d) the activities are not a commercial operation,nor serve other unrelated
construction projects; and
(e) the activities do not continue to operate beyond the completion of the construction
activity at the project it supports.
Construction support activities that operate outside the terms provided in(a)through(e)
above must obtain authorization under a separate Texas Pollutant Discharge
Elimination System(TPDES)permit,which may include the TPDES Multi Sector
General Permit(MSGP),TXRo50000(related to stormwater discharges associated with
industrial activity),an alternative general permit(if available),or an individual water
quality permit.
3. Non-Stormwater Discharges
The following non-stormwater discharges from sites authorized under this general
permit are also eligible for authorization under this general permit:
(a) discharges from fire-fighting activities(fire-fighting activities do not include
washing of trucks,run-off water from training activities,test water from fire
suppression systems,or similar activities);
(b) uncontaminated fire hydrant flushings(excluding discharges of hyperchlorinated
water,unless the water is first dechlorinated and discharges are not expected to
adversely affect aquatic life),which include flushings from systems that utilize
potable water,surface water,or groundwater that does not contain additional
pollutants (uncontaminated fire hydrant flushings do not include systems utilizing
reclaimed wastewater as a source water);
(c) water from the routine external washing of vehicles,the external portion of
buildings or structures,and pavement,where detergents and soaps are not used,
where spills or leaks of toxic or hazardous materials have not occurred(unless
spilled materials have been removed; and if local state,or federal regulations are
applicable,the materials are removed according to those regulations), and where the
purpose is to remove mud,dirt,or dust;
Construction General Permit TPDES General Permit TXR3.50000
(d) uncontaminated water used to control dust;
(e) potable water sources,including waterline flushings,but excluding discharges of
hyperchlorinated water,unless the water is first dechlorinated and discharges are
not expected to adversely affect aquatic life;
(f) uncontaminated air conditioning condensate;
(g) uncontaminated ground water or spring water,including foundation or footing
drains where flows are not contaminated with industrial materials such as solvents;
and
(h) lawn watering and similar irrigation drainage.
4. Other Permitted Discharges
Any discharge authorized under a separate National Pollutant Discharge Elimination
System(NPDES),TPDES,or TCEQ permit may be combined with discharges authorized
by this general permit,provided those discharges comply with the associated permit.
Section B. Concrete Truck Wash Out
The wash out of concrete trucks at regulated construction sites must be performed in
accordance with the requirements of Part V of this general permit.
Section C. Limitations on Permit Coverage
1. Post Construction Discharges
Discharges that occur after construction activities have been completed,and after the
construction site and any supporting activity site have undergone final stabilization, are
not eligible for coverage under this general permit. Discharges originating from the sites
are not authorized under this general permit following the submission of the notice of
termination(NOT)or removal of the appropriate site notice, as applicable,for the
regulated construction activity.
2. Prohibition of Non-Stormwater Discharges
Except as otherwise provided in Part II.A of this general permit,only discharges that are
composed entirely of stormwater associated with construction activity may be
authorized under this general permit.
3. Compliance with Water Quality Standards
Discharges to surface water in the state that would cause,have the reasonable potential
to cause,or contribute to a violation of water quality standards or that would fail to
protect and maintain existing designated uses of surface water in the state are not
eligible for coverage under this general permit. The executive director may require an
application for an individual permit or alternative general permit(see Parts II.H.2 and
3.)to authorize discharges to surface water in the state if the executive director
determines that any activity will cause,has the reasonable potential to cause,or
contribute to a violation of water quality standards or is found to cause,has the
reasonable potential to cause,or contribute to,the impairment of a designated use. The
executive director may also require an application for an individual permit considering
factors described in Part II.H.3 of this general permit.
4. Impaired Receiving Waters and Total Maximum Daily Load(TMDL) Requirements
The permittee shall determine whether the authorized discharge is to an impaired water
body on the latest EPA-approved CWA Section 303(d)List or waters with an EPA-
approved or established TMDL that are found on the latest EPA-approved Texas
Page 14
Construction General Permit TPDES General Permit TXR1500o0
Integrated Report of Surface Water Quality for CWA Sections 305(b)and 303(d),
which lists the category 4 and 5 water bodies.
New sources or new discharges of the pollutants of concern to impaired waters are not
authorized by this permit unless otherwise allowable under 3o TAC Chapter 305 and
applicable state law. Impaired waters are those that do not meet applicable water
quality standard(s)and are listed as category 4 or 5 in the current version of the Texas
Integrated Report of Surface Water Quality,and waterbodies listed on the CWA§
303(d)list. Pollutants of concern are those for which the water body is listed as
impaired.
Discharges of the pollutants of concern to impaired water bodies for which there is a
TMDL are not eligible for coverage under this general permit unless they are consistent
with the approved TMDL. Permittees must incorporate the conditions and requirements
applicable to their discharges into their SWP3,in order to be eligible for coverage under
this general permit. For consistency with the construction stormwater-related items in
an approved TMDL,the SWP3 must be consistent with any applicable condition,goal,or
requirement in the TMDL,TMDL Implementation Plan(I-Plan),or as otherwise
directed by the executive director.
5. Discharges to the Edwards Aquifer Recharge or Contributing Zone
Discharges cannot be authorized by this general permit where prohibited by 3o TAC
Chapter 213(relating to Edwards Aquifer). In addition,commencement of construction
(i.e.,the initial disturbance of soils associated with clearing,grading,or excavating
activities,as well as other construction-related activities such as stockpiling of fill
material and demolition)at a site regulated under 3o TAC Chapter 213,may not begin
until the appropriate Edwards Aquifer Protection Plan(EAPP)has been approved by the
TCEQ's Edwards Aquifer Protection Program.
(a) For new discharges located within the Edwards Aquifer Recharge Zone,or within
that area upstream from the recharge zone and defined as the Contributing Zone
(CZ),operators must meet all applicable requirements of, and operate according to,
3o TAC Chapter 213(Edwards Aquifer Rule)in addition to the provisions and
requirements of this general permit.
(b) For existing discharges located within the Edwards Aquifer Recharge Zone,the
requirements of the agency-approved Water Pollution Abatement Plan(WPAP)
under the Edwards Aquifer Rule is in addition to the requirements of this general
permit. BMPs and maintenance schedules for structural stormwater controls,for
example,may be required as a provision of the rule. All applicable requirements of
the Edwards Aquifer Rule for reductions of suspended solids in stormwater runoff
are in addition to the requirements in this general permit for this pollutant.
(c) For discharges located within ten stream miles upstream of the Edwards Aquifer
recharge zone,applicants shall also submit a copy of the NOI to the appropriate
TCEQ regional office.
Counties: Comal,Bexar,Medina,Uvalde, and Kinney
Contact: TCEQ Water Program Manager
San Antonio Regional Office
14250 Judson Road
San Antonio,Texas 78233-4480
(210)490-3096
Counties: Williamson,Travis, and Hays
Contact: TCEQ Water Program Manager
Austin Regional Office
12100 Park 35 Circle
Page 15
Construction General Permit TPDES General Permit TXR150000
Room 179,Building A
Austin,Texas 78753
(512)339-2929
6. Discharges to Specific Watersheds and Water Quality Areas
Discharges otherwise eligible for coverage cannot be authorized by this general permit
where prohibited by 3o TAC Chapter 311(relating to Watershed Protection)for water
quality areas and watersheds.
7. Protection of Streams and Watersheds by Other Governmental Entities
This general permit does not limit the authority or ability of federal,other state,or local
governmental entities from placing additional or more stringent requirements on
construction activities or discharges from construction activities. For example,this
permit does not limit the authority of a home-rule municipality provided by Texas Local
Government Code§401.002.
8. Indian Country Lands
Stormwater runoff from construction activities occurring on Indian Country lands are
not under the authority of the TCEQ and are not eligible for coverage under this general
permit. If discharges of stormwater require authorization under federal NPDES
regulations,authority for these discharges must be obtained from the U.S.
Environmental Protection Agency(EPA).
9. Oil and Gas Production and Transportation
Stormwater runoff from construction activities associated with the exploration,
development,or production of oil or gas or geothermal resources,including
transportation of crude oil or natural gas by pipeline, are not under the authority of the
TCEQ and are not eligible for coverage under this general permit. Authorization for
stormwater discharges from construction activities that are associated with production
of oil or gas or geothermal resources,including transportation of crude oil or natural gas
by pipeline must be obtained,as required,from the U.S.EPA or the Texas Railroad
Commission,as applicable. Discharge of stormwater related to construction activity,
from a facility that stores both refined products intended for off-site use and crude oil in
aboveground storage tanks,is regulated by the TCEQ and is eligible for coverage under
this general permit.
10. Stormwater Discharges from Agricultural Activities
Stormwater discharges from agricultural activities that are not point source discharges
of stormwater are not subject to TPDES permit requirements. These activities may
include clearing and cultivating ground for crops,construction of fences to contain
livestock,construction of stock ponds, and other similar agricultural activities.
Discharges of stormwater runoff associated with the construction of facilities that are
subject to TPDES regulations,such as the construction of concentrated animal feeding
operations,would be point sources regulated under this general permit.
11. Endangered Species Act
Discharges that would adversely affect a listed endangered or threatened aquatic or
aquatic-dependent species or its critical habitat are not authorized by this permit,unless
the requirements of the Endangered Species Act are satisfied.Federal requirements
related to endangered species apply to all TPDES permitted discharges and site-specific
controls may be required to ensure that protection of endangered or threatened species
is achieved. If a permittee has concerns over potential impacts to listed species,the
permittee may contact TCEQ for additional information.
Page 16
Construction General Permit TPDES General Permit TXR150000
12. Other
Nothing in Part II of the general permit is intended to negate any person's ability to
assertforce majeure(act of God,war,strike,riot,or other catastrophe)defenses found
in 3o TAC§70.7. _
Section D. Deadlines for Obtaining Authorization to Discharge
1. Large Construction Activities
(a) New Construction-Discharges from sites where the commencement of construction
activity occurs on or after the effective date of this general permit must be
authorized,either under this general permit or a separate TPDES permit,prior to
the commencement of those construction activities.
(b) Ongoing Construction-Operators of large construction activities continuing to
operate after the effective date of this permit,and authorized under the TPDES
Construction General Permit TXR150000 (effective on March 5, 2013),must submit
an NOI to renew authorization or a NOT to terminate coverage under this general
permit within 90 days of the effective date of this general permit. During this
interimor grace period,as a requirement of this TPDES permit,the operator must
continue to meet the conditions and requirements of the 2013 TPDES general
permit.
2. Small Construction Activities
(a) New Construction-Discharges from sites where the commencement of construction
activity occurs on or after the effective date of this general permit must be
authorized,either under this general permit or a separate TPDES permit,prior to
the commencement of those construction activities.
(b) Ongoing Construction-Discharges from ongoing small construction activities that
commenced prior to the effective date of this general permit,and that do not meet
the conditions to qualify for termination of this permit as described in Part II.F of
this general permit,must meet the requirements to be authorized,either under this
general permit or a separate TPDES permit,within 90 days of the effective date of
this general permit. During this interim period,as a requirement of this TPDES
permit,the operator must continue to meet the conditions and requirements of the
2013 TPDES Construction General Permit.
Section E. Obtaining Authorization to Discharge
1. Automatic Authorization for Small Construction Activities with Low Potential for
Erosion:
Operators of small construction activity,as defined in Part I.B of this general permit,
shall not submit an NOI for coverage,unless otherwise required by the executive
director.
Operators of small construction activities,which occur in certain counties and during
periods of low potential for erosion that do not meet the conditions of the waiver
described in Part II.G of this general permit,may be automatically authorized under this
general permit if all the following conditions are met.
(a) the construction activity occurs in a county and during the corresponding date
range(s)listed in Appendix A;
(b) the construction activity is initiated and completed,including either final or
temporary stabilization of all disturbed areas,within the time frame identified in
Appendix A for the location of the construction site;
Page 17
Construction General Permit TPDES General Permit TXR150000
(c) all temporary stabilization is adequately maintained to effectively reduce or prohibit
erosion,permanent stabilization activities have been initiated, and a condition of
final stabilization is completed no later than 3o days following the end date of the
time frame identified in Appendix A for the location of the construction site;
(d) the permittee signs a completed TCEQ small construction site notice for low
potential for erosion,including the certification statement;
(e) a signed and certified copy of the small construction site notice for low potential for
erosion is posted at the construction site in a location where it is readily available for
viewing by the general public,local,state,and federal authorities prior to
commencing construction activities, and maintained in that location until
completion of the construction activity;
NOTE: Posted site notices may have a redacted signature as long as there is an
original signed and certified site notice,with a viewable signature,located on-
site and available for review by any applicable regulatory authority.
(f) a copy of the signed and certified small construction site notice for low potential for
erosion is provided to the operator of any MS4 receiving the discharge at least two
days prior to commencement of construction activities;
(g) discharges of stormwater runoff or other non-stormwater discharges from any
supporting concrete batch plant or asphalt batch plant is separately authorized
under an individual TPDES permit,another TPDES general permit,or under an
individual TCEQ permit where stormwater and non-stormwater is disposed of by
evaporation or irrigation(discharges are adjacent to water in the state);and
(h) any non-stormwater discharges are either authorized under a separate permit or
authorization,are not considered by TCEQ to be a wastewater,or are captured and
routed for disposal at a publicly operated treatment works or licensed waste disposal
facility.
If all of the conditions in(a)—(h) above are met,then the operator(s)of small
construction activities with low potential for erosion are not required to develop a SWP3.
If an operator is conducting small construction activities and any of the above conditions
(a)— (h)are not met,the operator cannot declare coverage under the automatic
authorization for small construction activities with low potential for erosion and must
meet the requirements for automatic authorization(all other)small construction
activities,described below in Part II.E.2.
For small construction activities that occur during a period with a low potential for
erosion,where automatic authorization under this section is not available,an operator
may apply for and obtain a waiver from permitting(Low Rainfall Erosivity Waiver—
LREW), as described in Part II.G of this general permit. Waivers from coverage under
the LREW do not allow for any discharges of non-stormwater and the operator must
ensure that discharges on non-stormwater are either authorized under a separate permit
or authorization.
2. Automatic Authorization for Small Construction Activities:
Operators of small construction activities as defined in Part I.B of this general permit
shall not submit an NOI for coverage,unless otherwise required by the executive
director. c
Operators of small construction activities, as defined in Part I.B of this general permit or
as defined but who do not meet in the conditions and requirements located in Part II.E'i
above,may be automatically authorized for small construction activities,provided that
they meet all of the following conditions:
Page 18
Construction General Permit TPDES General Permit TXRi50000
(a) develop a SWP3 according to the provisions of this general permit,that covers either
the entire site or all portions of the site for which the applicant is the operator,and
implement the SWP3 prior to commencing construction activities;
(b) all operators of regulated small construction activities must post a copy of a signed
and certified Small Construction site notice,the notice must be posted at the
construction site in a location where it is safely and readily available for viewing by
the general public,local,state, and federal authorities, at least two days prior to
commencing construction activity,and maintain the notice in that location until
completion of the construction activity(for linear construction activities,e.g.
pipeline or highway,the site notice must be placed in a publicly accessible location
near where construction is actively underway;notice for these linear sites may be
relocated,as necessary,along the length of the project, and the notice must be safely
and readily available for viewing by the general public;local,state,and federal
authorities);
(c) operators must maintain a posted site notice at the construction site until final
stabilization has been achieved; and
NOTE: Posted site notices may have a redacted signature as long as there is an
original signed and certified Small Construction site notice,with a viewable
signature,located on-site and available for review by an applicable regulatory
authority.
(d) provide a copy of the signed and certified construction site notice to the operator of
any municipal separate storm sewer system(MS4)receiving the discharge at least
two days prior to commencement of construction activities.
As described in Part I.B of this general permit,large construction activities include those
that will disturb less than five(5)acres of land,but that are part of a larger common plan
of development or sale that will ultimately disturb five(5)or more acres of land,and
must meet the requirements of Part II.E.3.below.
3. Authorization for Large Construction Activities:
Operators of large construction activities that qualify for coverage under this general
permit must meet all of the following conditions:
(a) develop a SWP3 according to the provisions of this general permit that covers either
the entire site or all portions of the site where the applicant is the operator. The
SWP3 must be developed and implemented prior to obtaining coverage and prior to
commencing construction activities;
(b) primary operators of large construction activities must submit an NOI prior to
commencing construction activity at a construction site.A completed NOI must be
submitted to TCEQ electronically using the online e-Permits system on TCEQ's
website. Operators with an electronic reporting waiver must submit a completed
NOI to TCEQ at least seven(7)days prior to prior to commencing construction
activity to obtain provisional coverage seven(7)days from the postmark date for
delivery to the TCEQ. An authorization is no longer provisional when the executive
director finds the NOI is administratively complete and an authorization number is
issued to the permittee for the construction site indicated on the NOI.
If an additional primary operator is added after the initial NOI is submitted,the
additional primary operator must meet the same requirements for existing primary
operator(s),as indicated above.
If the primary operator changes due to responsibility at the site being transferred
from one primary operator to another after the initial NOI is submitted,the new
primary operator must submit a paper NOI or an electronic NOI at least ten(1o)
Page 19
Construction General Permit TPDES General Permit TXR150000
days prior to assuming operational control of a construction site and commencing
construction activity.
•
Operators that submit NOIs electronically must use the online e-Permits system
available through the TCEQ website.
(c) all operators of large construction activities must post a site notice in accordance
with Part III.D.2 of this permit. The site notice must be located where it is safely
and readily available for viewing by the general public,local,state, and federal
authorities prior to commencing construction activities, and must be maintained in
that location until completion of the construction activity(for linear construction
activities, e.g.pipeline or highway,the site notice must be placed in a publicly
accessiblelocation near where construction is actively underway;notice for these
linear sites may be relocated,as necessary, along the length of the project,and the
notice must be safely and readily available for viewing by the general public,local,
state,and federal authorities);
(d) two days prior to commencing construction activities,all primary operators must:
i. provide a copy of the signed NOI to the operator of any MS4 receiving the
discharge and to any secondary construction operator, and
ii. list in the SWP3 the names and addresses of all MS4 operators receiving a copy;
(e) all persons meeting the definition of"secondary operator"in Part I of this permit are
hereby notified that they are regulated under this general permit,but are not
required to submit an NOI,provided that a primary operator at the site has
submitted an NOI,or prior to commencement of construction activities, a primary
operator is required to submit an NOI and the secondary operator has provided
notification to the operator(s)of the need to obtain coverage(with records of
notification available upon request). Any secondary operator notified under this
provision may alternatively submit an NOI under this general permit,may seek
coverage under an alternative TPDES individual permit,or may seek coverage under
an alternative TPDES general permit if available; and
(f) all secondary operators of large construction activities must post a copy of the signed
and certified Secondary Operator construction site notice and provide a copy of the
signed and certified site notice to the operator of any MS4 receiving the discharge at
least two days prior to the commencement construction activities.
NOTE: Posted site notices may have a redacted signature as long as there is an
original signed and certified Secondary Operator construction site notice,with
a viewable signature,located on-site and available for review by an applicable
regulatory authority.
Effective September 1, 2018,applicants must submit an NOI using the online e-Permits
system available through the TCEQ website,or request and obtain a waiver from
electronic reporting from the TCEQ. Waivers from electronic reporting are not
transferrable and expire on the same date as the authorization to discharge.
4. Waivers for Small Construction Activities:
Operators of certain small construction activities may obtain a waiver from coverage
under this general permit,if applicable. The requirements are outlined in Part II.G
below.
5. Effective Date of Coverage
(a) Operators of small construction activities as described in either Part II.E.1 or II.E.2
above are authorized immediately following compliance with the applicable
conditions of Part II.E.1 or II.E.2. Secondary operators of large construction
Page 20
Construction General Permit TPDES General Permit TXR150000
activities as described in Part II.E.3 above are authorized immediately following
compliance with the applicable conditions in Part II.E.3. For activities located in
areas regulated by 30 TAC Chapter 213,related to the Edwards Aquifer,this
authorization to discharge is separate from the requirements of the operator's
responsibilities under that rule. Construction may not commence for sites regulated
under 3o TAC Chapter 213 until all applicable requirements of that rule are met.
(b) Primary operators of large construction activities as described in Part II.E.3 above
that electronically submit an NOI are authorized immediately following confirmation
of receipt of the electronic form by the TCEQ,unless otherwise notified by the
executive director. Operators with an electronic reporting waiver are provisionally
authorized seven(7)days from the date that a completed paper NOI is postmarked
for delivery to the TCEQ,unless otherwise notified by the executive director. An
authorization is no longer provisional when the executive director finds the NOI is
administratively complete and an authorization number is issued to the permittee for
the construction site indicated on the NOI.
For construction activities located in areas regulated by 3o TAC Chapter 213,related
to the Edwards Aquifer,this authorization to discharge is separate from the
requirements of the operator's responsibilities under that rule. Construction
activities may not commence for sites regulated under 3o TAC Chapter 213 until all
applicable requirements of that rule are met.
(c) Operators are not prohibited from submitting late NOIs or posting late notices to
obtain authorization under this general permit. The TCEQ reserves the right to take
appropriate enforcement action for any unpermitted activities that may have
occurred between the time construction commenced and authorization was
obtained.
(d) If operators that submitted NOIs have active authorizations for construction
activities that are ongoing when the term of the current general permit expires and a
new general permit is issued,a 90-day interim(grace)period is granted to provide
coverage that is administratively continued until operators with active
authorizations can obtain coverage under the newly issued CGP. The 90-day grace
period starts on the effective date of the newly issued CGP. Deadlines for obtaining
coverage for operators of small and large construction are provided in Part II.D.1
and 2 above.
6. Notice of Change(NOC)
If relevant information provided in the NOI changes,the operator that has submitted the
NOI must submit an NOC to TCEQ at least fourteen(14)days before the change occurs,
if possible. Where a 14-day advance notice is not possible,the operator must submit an
NOC to TCEQ within 14-days of discovery of the change. If the operator becomes aware
that it failed to submit any relevant facts or submitted incorrect information in an NOI,
the correct information must be submitted to TCEQ in an NOC within 14 days after
discovery. The NOC shall be submitted on a form provided by the executive director,or
by letter if an NOC form is not available. A copy of the NOC form or letter must also be
placed in the SWP3 and provided to the operator of any MS4 receiving the discharge. A
list that includes the names and addresses of all MS4 operators receiving a copy of the
NOC(or NOC letter)must be included in the SWP3.
Information on an NOC may include,but is not limited to,the following: a change in the
description of the construction project; an increase in the number of acres disturbed(for
increases of one or more acres); or the name of the operator(where the name of the
operator has changed).
A transfer of operational control from one operator to another,including a transfer of
the ownership of a company. Coverage under this general permit is not transferable
Page 21
Construction General Permit TPDES General Permit TXR150000
from one operator to another or one company to another, and may not be included in an
NOC.
A transfer of ownership of a company may include,but is not limited to,the following:
changes to the structure of a company,such as changing from a partnership to a
corporation or changing corporation types,so that the filing number(or charter
number)that is on record with the Texas Secretary of State must be changed.
An NOC is not required for notifying TCEQ of a decrease in the number of acres
disturbed. This information must be included in the SWP3 and retained on site.
Effective September 1, 2018, applicants must submit an NOC using the online e-Permits
system available through the TCEQ website,or request and obtain a waiver from
electronic reporting from the TCEQ. Waivers from electronic reporting are not
transferrable and expire on the same date as the authorization to discharge.
7. Signatory Requirement for NOI Forms,Notice of Termination(NOT)Forms,NOC
Letters, and Construction Site Notices
NOI forms,NOT forms,NOC letters,and Construction Site Notices that require a
signature must be signed according to 3o TAC§305.44(relating to Signatories for
Applications).
8. Contents of the NOI
The NOI form shall require,at a minimum,the following information:
(a) the TPDES CGP authorization number for existing authorizations under this general
permit,where the operator submits an NOI to renew coverage within 90 days of the
effective date of this general permit;
(b) the name, address,and telephone number of the operator filing the NOI for permit
coverage;
(c) the name(or other identifier),address,county,and latitude/longitude of the
construction project or site;
(d) the number of acres that will be disturbed by the applicant;
(e) confirmation that the project or site will not be located on Indian Country lands;
(f) confirmation that a SWP3 has been developed in accordance with this general
permit,that it will be implemented prior to commencement of construction
activities,and that it is compliant with any applicable local sediment and erosion
control plans;for multiple operators who prepare a shared SWP3,the confirmation
for an operator may be limited to its obligations under the SWP3 provided all
obligations are confirmed by at least one operator;
(g) name of the receiving water(s);
(h) the classified segment number for each classified segment that receives discharges
from the regulated construction activity(if the discharge is not directly to a classified
segment,then the classified segment number of the first classified segment that
those discharges reach); and
(i) the name of all surface waters receiving discharges from the regulated construction
activity that are on the latest EPA-approved CWA§3o3(d) List of impaired waters
or Texas Integrated Report of Surface Water Quality for CWA Sections 305(b)and
3o3(d) as not meeting applicable state water quality standards.
Page 22
Construction General Permit TPDES General Permit TXR150000
Section F. Terminating Coverage
1. Notice of Termination(NOT)Required
Each operator that has submitted an NOI for authorization of large construction
activities under this general permit must apply to terminate that authorization following
the conditions described in this section of the general permit.
Authorization of large construction must be terminated by submitting an NOT on a
paper form to TCEQ supplied by the executive director or electronically via the online e-
Permits system available through the TCEQ website. Authorization to discharge under
this general permit terminates at midnight on the day a paper NOT is postmarked for
delivery to the TCEQ or immediately following confirmation of the receipt of the NOT
submitted electronically by the TCEQ. Compliance with the conditions and
requirements of this permit is required until an NOT is submitted.
Effective September 1, 2018,applicants must submit an NOT using the online e-Permits
system available through the TCEQ website,or request and obtain a waiver from
electronic reporting from the TCEQ. Waivers from electronic reporting are not
transferrable and expire on the same date as the authorization to discharge.
The NOT must be submitted to TCEQ,and a copy of the NOT provided to the operator of
any MS4 receiving the discharge(with a list in the SWP3 of the names and addresses of
all MS4 operators receiving a copy),within 3o days after any of the following conditions
are met:
(a) final stabilization has been achieved on all portions of the site that are the
responsibility of the operator;
(b) a transfer of operational control has occurred(See Section II.F.4 below);or
(c) the operator has obtained alternative authorization under an individual TPDES
permit or alternative TPDES general permit.
2. Minimum Contents of the NOT
The NOT form shall require,at a minimum,the following information:
(a) if authorization for construction activity was granted following submission of an
NOI,the permittee's site-specific TPDES authorization number for a specific
construction site;
(b) an indication of whether final stabilization has been achieved at the site and a NOT
has been submitted or if the permittee is simply no longer an operator at the site;
(c) the name,address, and telephone number of the permittee submitting the NOT;
(d) the name(or other identifier),address, county,and location(latitude/longitude)of
the construction project or site; and
(e) a signed certification that either all stormwater discharges requiring authorization
under this general permit will no longer occur,or that the applicant is no longer the
operator of the facility or construction site,and that all temporary structural erosion
controls have either been removed,will be removed on a schedule defined in the
SWP3,or have been transferred to a new operator if the new operator has applied
for permit coverage. Erosion controls that are designed to remain in place for an
indefinite period,such as mulches and fiber mats,are not required to be removed or
scheduled for removal.
Page 23
Construction General Permit TPDES General Permit TXRi50000
3. Termination of Coverage for Small Construction Sites and for Secondary Operators
at Large Construction Sites
(a) Each operator that has obtained automatic authorization for small construction or is
a secondary operator for large construction must perform the following when
terminating coverage under the permit:
i. remove the site notice;
ii. complete the applicable portion of the site notice related to removal of the site
notice; and
iii. submit a copy of the completed site notice to the operator of any MS4 receiving
the discharge(or provide alternative notification as allowed by the MS4 operator,
with documentation of such notification included in the SWP3).
(b) The activities described in Part II.F.3.(a) above must be completed by the operator
within 3o days of meeting any of the following conditions:
i. final stabilization has been achieved on all portions of the site that are the
responsibility of the operator;
ii. a transfer of day-to-day operational control over activities necessary to ensure
compliance with the SWP3 and other permit conditions has occurred(See Section
II.F.4.below); or
iii. the operator has obtained alternative authorization under an individual or
general TPDES permit.
Authorization to discharge under this general permit terminates immediately upon
removal of the applicable site notice. Compliance with the conditions and requirements
of this permit is required until the site notice is removed.
4. Transfer of Day-to-Day Operational Control
(a) When the primary operator of a large construction activity changes or operational
control over activities necessary to ensure compliance with the SWP3 and other
permit conditions is transferred to another primary operator,the original operator
must do the following:
i. submit an NOT within ten(io)days prior to the date that responsibility for
operations terminates,and the new operator must submit an NOI at least ten
(io) days prior to the transfer of operational control,in accordance with
condition(c)below; and
ii. submit a copy of the NOT from the primary operator terminating its coverage
under the permit and its operational control of the construction site and submit
a copy of the NOI from the new primary operator to the operator of any MS4
receiving the discharge in accordance with Part II.F.i above.
(b) For transfer of operational control, operators of small construction activities and
secondary operators of large construction activities who are not required to submit
an NOI must do the following:
i. the existing operator must remove the original site notice,and the new operator
must post the required site notice prior to the transfer of operational control,in
accordance with the conditions in Part II.F.4.(c)i or ii below; and
ii. a copy of the site notice,which must be completed and provided to the operator
of any MS4 receiving the discharge,in accordance with Part II.F.3 above.
(c) Each operator is responsible for determining its role as an operator as defined in
Part I.B and obtaining authorization under the permit, as described above in Part
Page 24
Construction General Permit TPDES General Permit TXR150000
II.E.1—3. Where authorization has been obtained by submitting an NOI for
coverage under this general permit,permit coverage is not transferable from one
operator to another. A transfer of operational control can include changes to the
structure of a company,such as changing from a partnership to a corporation, or
changing to a different corporation type such that a different filing(or charter)
number is established with the Texas Secretary of State. A transfer of operational
control can also occur when of the following criteria is met,as applicable:
i. Another operator has assumed control over all areas of the site that do not
meet the definition for final stabilization;
ii. all silt fences and other temporary erosion controls have either been removed,
scheduled for removal as defined in the SWP3,or transferred to a new
operator,provided that the original permitted operator has attempted to notify
the new operator in writing of the requirement to obtain permit coverage.
Records of this notification(or attempt at notification)shall be retained by the
operator transferring operational control to another operator in accordance
with Part VI of this permit. Erosion controls that are designed to remain in
place for an indefinite period,such as mulches and fiber mats, are not required
to be removed or scheduled for removal; or
iii. a homebuilder has purchased one or more lots from an operator who obtained
coverage under this general permit for a common plan of development or sale.
The homebuilder is considered a new operator and shall comply with the
requirements of this permit. Under these circumstances,the homebuilder is
only responsible for compliance with the general permit requirements as they
apply to the lot(s)it has operational control over in a larger common plan of
development, and the original operator remains responsible for common
controls or discharges,and must amend its SWP3 to remove the lot(s)
transferred to the homebuilder.
Section G. Waivers from Coverage
The executive director may waive the otherwise applicable requirements of this general
permit for stormwater discharges from small construction activities under the terms and
conditions described in this section.
1. Waiver Applicability and Coverage
Operators of small construction activities may apply for and receive a waiver from the
requirements to obtain authorization under this general permit,when the calculated
rainfall erosivity(R)factor for the entire period of the construction project is less than
five(5).
The operator must submit either a signed paper Low Rainfall Erosivity Waiver(LREW)
certification form to the TCEQ,supplied by the executive director,or complete the form
electronically via the online e-Permits system available through the TCEQ website. The
form is a certification by the operator that the small construction activity will commence
and be completed within a period when the value of the calculated R factor is less than
five(5).
The paper LREW certification form must be postmarked for delivery to the TCEQ at
least seven(7)days before construction activity begins or,if submitted electronically,
construction may begin at any time following the receipt of written confirmation from
TCEQ that a complete electronic application was submitted and acknowledged.
This waiver from coverage does not apply to any non-stormwater discharges,including
what is allowed under this permit. The operator must insure that all non-stormwater
discharges are either authorized under a separate permit or authorization,or are
captured and routed to an authorized treatment facility for disposal.
Page 25
Construction General Permit TPDES General Permit TXRi50000
Effective September 1, 2018, applicants must submit an LREW using the online e-
Permits system available through the TCEQ website,or request and obtain a waiver
from electronic reporting from the TCEQ. Waivers from electronic reporting are not
transferrable and expire on the same date as the authorization to discharge.
2. Steps to Obtaining a Waiver
The construction site operator may calculate the R factor to request a waiver using the
following steps:
(a) Estimate the construction start date and the construction end date. The
construction end date is the date that final stabilization will be achieved.
(b) Find the appropriate Erosivity Index(EI)zone in Appendix B of this permit.
(c) Find the EI percentage for the project period by adding the results for each period of
the project using the table provided in Appendix D of this permit,in EPA Fact Sheet
2.1,or in USDA Handbook 703,by subtracting the start value from the end value to
find the percent EI for the site.
(d) Refer to the Isoerodent Map(Appendix C of this permit) and interpolate the annual
isoerodent value for the proposed construction location.
(e) Multiply the percent value obtained in Step(c)above by the annual isoerodent value
obtained in Step(d). This is the R factor for the proposed project. If the value is less
than 5,then a waiver may be obtained. If the value is five(5)or more,then a waiver
may not be obtained, and the operator must obtain coverage under Part II.E.2.of
this permit.
Alternatively,the operator may calculate a site-specific R factor utilizing the following
online calculator: hllp://ei.tamu.edu/index.html,or using another available resource.
A copy of the LREW certification form is not required to be posted at the small
construction site.
3. Effective Date of a LREW
Unless otherwise notified by the executive director,operators of small construction
activities seeking coverage under a LREW are provisionally waived from the otherwise
applicable requirements of this general permit seven(7)days from the date that a
completed paper LREW certification form is postmarked for delivery to TCEQ,or
immediately upon receiving confirmation of approval of an electronic submittal,made
via the online e-Permits system available through the TCEQ website.
Effective September 1, 2018, applicants seeking coverage under a LREW must submit an
application for a LREW using the online e-Permits system available through the TCEQ
website,or request and obtain a waiver from electronic reporting from the TCEQ.
Waivers from electronic reporting are not transferrable and expire on the same date as
the authorization to discharge.
4. Activities Extending Beyond the LREW Period
If a construction activity extends beyond the approved waiver period due to
circumstances beyond the control of the operator,the operator must either:
(a) recalculate the R factor using the original start date and a new projected ending
date,and if the R factor is still under five(5),submit a new waiver certification form
at least two(2)days before the end of the original waiver period; or
(b) obtain authorization under this general permit according to the requirements for
automatic authorization for small construction activities in Part II.E.2 of this permit,
prior to the end of the approved LREW period.
Page 26
Construction General Permit TPDES General Permit TXR150000
Section H. Alternative TPDES Permit Coverage
1. Individual Permit Alternative
Any discharge eligible for coverage under this general permit may alternatively be
authorized under an individual TPDES permit according to 3o TAC §305(relating to
Consolidated Permits). Applications for individual permit coverage must be submitted
at least three hundred and thirty(330) days prior to commencement of construction
activities to ensure timely authorization. Existing coverage under this general permit
should not be terminated until an individual permit is issued and in effect.
2. Alternative Authorizations for Certain Discharges
Certain discharges eligible for authorization under this general permit may
alternatively be authorized under a separate general permit according to 3o TAC
Chapter 205(relating to General Permits for Waste Discharges),as applicable.
3. Individual Permit Required
The executive director may require an operator of a construction site,otherwise eligible
for authorization under this general permit,to apply for an individual TPDES permit in
the following circumstances:
(a) the conditions of an approved TMDL or TMDL I-Plan on the receiving water;
(b) the activity being determined to cause,has a reasonable potential to cause,or
contribute to a violation of water quality standards or being found to cause,or
contribute to,the loss of a designated use of surface water in the state: and
(c) any other consideration defined in 3o TAC Chapter 205(relating to General Permits
for Waste Discharges)including 3o TAC Chapter 205.4(c)(3)(D),which allows the
commission to deny authorization under the general permit and require an
individual permit if a discharger has been determined by the executive director to
have been out of compliance with any rule,order,or permit of the commission,
including non-payment of fees assessed by the executive director.
A discharger with a TCEQ compliance history rating of"unsatisfactory"is ineligible
for coverage under this general permit. In that case,3o TAC§ 60.3 requires the
executive director to deny or suspend an authorization to discharge under a general
permit. However,per TWC§26.040(h),a discharger is entitled to a hearing before
the commission prior to having an authorization denied or suspended for having an
"unsatisfactory"compliance history.
Denial of authorization to discharge under this general permit or suspension of a
permittee's authorization under this general permit for reasons other than compliance
history shall be done according to commission rules in 3o TAC Chapter 205(relating to
General Permits for Waste Discharges).
4. Alternative Discharge Authorization
Any discharge eligible for authorization under this general permit may alternatively be
authorized under a separate general permit according to 3o TAC Chapter 205 (relating
to General Permits for Waste Discharges),if applicable.
Section I. Permit Expiration
1. This general permit is effective for a term not to exceed five(5)years. All active
discharge authorizations expire on the date provided on page one(I)of this permit.
Following public notice and comment,as provided by 3o TAC§205.3(relating to
Public Notice,Public Meetings, and Public Comment),the commission may amend,
Page 27
Construction General Permit TPDES General Permit TXRi50000
revoke,cancel,or renew this general permit. All authorizations that are active at the
time the permit term expires will be administratively continued as indicated in Part
II.I.2 below and in Part II.D.i(b)and D.2(b) of this permit.
2. If the executive director publishes a notice of the intent to renew or amend this
general permit before the expiration date,the permit will remain in effect for
existing,authorized discharges until the commission takes final action on the
permit. Upon issuance of a renewed or amended permit,permittees may be
required to submit an NOI within 90 days following the effective date of the renewed
or amended permit,unless that permit provides for an alternative method for
obtaining authorization.
3. If the commission does not propose to reissue this general permit within 90 days
before the expiration date,permittees shall apply for authorization under an
individual permit or an alternative general permit. If the application for an
individual permit is submitted before the expiration date,authorization under this
expiring general permit remains in effect until the issuance or denial of an individual
permit. No new NOIs will be accepted nor new authorizations honored under the
general permit after the expiration date.
Part III. Stormwater Pollution Prevention Plans(SWP3)
All regulated construction site operators shall prepare an SWP3,prior to submittal of an
NOI,to address discharges authorized under Parts II.E.2 and II.E.3 of this general permit
that will reach Waters of the U.S. This includes discharges to MS4s and privately owned
separate storm sewer systems that drain into surface water in the state or Waters of the U.S.
Individual operators at a site may develop separate SWP3s that cover only their portion of
the project,provided reference is made to the other operators at the site. Where there is
more than one SWP3 for a site, operators must coordinate to ensure that BMPs and controls
are consistent and do not negate or impair the effectiveness of each other. Regardless of
whether a single comprehensive SWP3 is developed or separate SWP3s are developed for
each operator,it is the responsibility of each operator to ensure compliance with the terms
and conditions of this general permit in the areas of the construction site where that operator
has control over construction plans and specifications or day-to-day operations.
An SWP3 must describe the implementation of practices that will be used to minimize to the
extent practicable the discharge of pollutants in stormwater associated with construction
activity and non-stormwater discharges described in Part II.A.3,in compliance with the
terms and conditions of this permit.
An SWP3 must also identify any potential sources of pollutionthat have been determined to
cause,have a reasonable potential to cause,or contribute to a violation of water quality
standards or have been found to cause or contribute to the loss of a designated use of surface
water in the state from discharges of stormwater from construction activities and
construction support activities. Where potential sources of these pollutants are present at a
construction site,the SWP3 must also contain a description of the management practices
that will be used to prevent these pollutants from being discharged into surface water in the
state or Waters of the U.S.
NOTE: Construction support activities can also include vehicle repair areas,fueling
areas,etc.that are present at a construction site solely for the support construction
activities and are only used by operators at the construction site.
The SWP3 is intended to serve as a road map for how the construction operator will comply
with the effluent limits and other conditions of this permit and does not establish the effluent
limits that apply to the construction site's discharges. These limits are established in Part
III.G of the permit.
Page 28
Construction General Permit TPDES General Permit TXR150000
Section A. Shared SWP3 Development
For more effective coordination of BMPs and opportunities for cost sharing,a
cooperative effort by the different operators at a site is encouraged. Operators of small
and large construction activities must independently obtain authorization under this
permit,but may work together with other regulated operators at the construction site to
prepare and implement a single,comprehensive SWP3,which can be shared by some or
all operators,for the construction activities that each of the operators are performing at
the entire construction site.
1. The SWP3 must include the following:
(a) for small construction activities—the name of each operator that participates in
the shared SWP3;
(b) for large construction activities-the name of each operator that participates in
the shared SWP3,the general permit authorization numbers of each operator
(or the date that the NOI was submitted to TCEQ by each operator that has not
received an authorization number for coverage under this permit); and
(c) for large and small construction activities-the signature of each operator
participating in the shared SWP3.
2. The SWP3 must clearly indicate which operator is responsible for satisfying each
shared requirement of the SWP3. If the responsibility for satisfying a requirement is
not described in the plan,then each permittee is entirely responsible for meeting the
requirement within the boundaries of the construction site where they perform
construction activities. The SWP3 must clearly describe responsibilities for meeting
each requirement in shared or common areas.
3. The SWP3 may provide that one operator is responsible for preparation of a SWP3 in
compliance with the CGP,and another operator is responsible for implementation of
the SWP3 at the project site.
Section B. Responsibilities of Operators
1. Secondary Operators and Primary Operators with Control Over Construction Plans
and Specifications
All secondary operators and primary operators with control over construction plans
and specifications shall:
(a) ensure the project specifications allow or provide that adequate BMPs are
developed to meet the requirements of Part III of this general permit;
(b) ensure that the SWP3 indicates the areas of the project where they have control
over project specifications,including the ability to make modifications in
specifications;
(c) ensure that all other operators affected by modifications in project specifications
• are notified in a timely manner so that those operators may modify their BMP s
as necessary to remain compliant with the conditions of this general permit; and
(d) ensure that the SWP3 for portions of the project where they are operators
indicates the name and site-specific TPDES authorization number(s)for
operators with the day-to-day operational control over those activities necessary
to ensure compliance with the SWP3 and other permit conditions. If a primary
operator has not been authorized or has abandoned the site,the secondary
operator is considered to be the responsible party and must obtain authorization
Page 29
Construction General Permit TPDES General Permit TXR150000
as a primary operator under the permit,until the authority for day-to-day
operational control is transferred to another primary operator. The new primary
operator must update or develop a new SWP3 that will reflect the transfer of
operational control and include any additional updates to the SWP3 to meet
requirements of the permit.
2. Primary Operators with Day-to-Day Operational Control
Primary operators with day-to-day operational control of those activities at a project
that are necessary to ensure compliance with an SWP3 and other permit conditions
must ensure that the SWP3 accomplishes the following requirements:
(a) meets the requirements of this general permit for those portions of the project
where they are operators;
(b) identifies the parties responsible for implementation of BMPs described in the
SWP3;
(c) indicates areas of the project where they have operational control over day-to-
day activities; and
(d) the name and site-specific TPDES authorization number of the parties with
control over project specifications,including the ability to make modifications in
specifications for areas where they have operational control over day-to-day
activities.
Section C. Deadlines for SWP3 Preparation,Implementation, and Compliance
The SWP3 must be prepared prior to obtaining authorization under this general permit,
and implemented prior to commencing construction activities that result in soil
disturbance. The SWP3 must be prepared so that it provides for compliance with the
terms and conditions of this general permit.
Section D. Plan Review and Making Plans Available
1. The SWP3 must be retained on-site at the construction site or,if the site is inactive or
does not have an on-site location to store the plan,a notice must be posted describing
the location of the SWP3. The SWP3 must be made readily available at the time of an
on-site inspection to: the executive director; a federal,state,or local agency
approving sediment and erosion plans,grading plans, or stormwater management
plans;local government officials; and the operator of a municipal separate storm
sewer receiving discharges from the site. If the SWP3 is retained off-site,then it shall
be made available as soon as reasonably possible. In most instances,it is reasonable
that the SWP3 shall be made available within 24 hours of the request.
2. Operators with authorization for construction activity under this general permit must
post a TCEQ site notice at the construction site at a place readily available for viewing
by the general public,and local,state,and federal authorities.
(a) Primary and secondary operators of large construction activities must each post
a TCEQ construction site notice,respective to their role as an operator at the
construction site,as required above and according to requirements in Part II.E.3
of this general permit.
(b) Primary and secondary operators of small construction activities must post the
TCEQ site notice as required in Part III.D.2.(a) above and for the specific type of
small construction described in Part II.E.i and 2 of the permit.
(c) If the construction project is a linear construction project,such as a pipeline or
highway,the notices must be placed in a publicly accessible location near where
construction is actively underway. Site notices for small and large construction
Page 3o
•
Construction General Permit TPDES General Permit TXR150000
7
activities at these linear construction sites maybe located,as necessary,along
the length of the project,but must still be readily available for viewing by the
general public;local,state, and federal authorities; and contain the following
information:
i. the site-specific TPDES authorization number for the project if assigned;
ii. the operator name,contact name,and contact phone number;
iii. a brief description of the project; and
iv. the location of the SWP3.
3. This permit does not provide the general public with any right to trespass on a
construction site for any reason,including inspection of a site;nor does this permit
require that permittees allow members of the general public access to a construction
site.
Section E. Revisions and Updates to SWP3s
The permittee must revise or update the SWP3 within seven days of when any of the
following occurs:
1. a change in design,construction,operation,or maintenance that has a significant
effect on the discharge of pollutants and that has not been previously addressed in
the SWP3;
2. changing site conditions based on updated plans and specifications,new operators,
new areas of responsibility,and changes in BMPs; or
3. results of inspections or investigations by construction site personnel authorized by
the permittee,operators of a municipal separate storm sewer system receiving the
discharge, authorized TCEQ personnel,or a federal,state or local agency approving
sediment and erosion plans indicate the SWP3 is proving ineffective in eliminating or
significantly minimizing pollutants in discharges authorized under this general
permit.
Section F. Contents of SWP3,
The SWP3 must be developed and implemented by primary operators of small and large
construction activities and include,at a minimum,the information described in this
section and must comply with the construction and development effluent guidelines in
Part III, Section G of the general permit.
1. A site or project description,which includes the following information:
(a) a description of the nature of the construction activity;
(b) a list of potential pollutants and their sources;
(c) a description of the intended schedule or sequence of activities that will disturb
soils for major portions of the site,including estimated start dates and duration
of activities;
(d) the total number of acres of the entire property and the total number of acres
where construction activities will occur,including areas where construction
support activities(defined in Part I.B of this general permit)occur;
(e) data describing the soil or the quality of any discharge from the site;
(f) a map showing the general location of the site(e.g. a portion of a city or county
map);
(g) a detailed site map (or maps)indicating the following:
Page 31
Construction General Permit TPDES General Permit TXR1.50000
i. drainage patterns and approximate slopes anticipated after major grading
activities;
ii. areas where soil disturbance will occur;
iii. locations of all controls and buffers,either planned or in place;
iv. locations where temporary or permanent stabilization practices are
expected to be used;
v. locations of construction support activities,including those located off-site;
vi. surface waters(including wetlands) either at, adjacent,or in close
proximity to the site, and also indicate whether those waters are impaired;
vii. locations where stormwater discharges from the site directly to a surface
water body or a municipal separate storm sewer system;
viii. vehicle wash areas; and
ix. designated points on the site where vehicles will exit onto paved roads (for
instance,this applies to construction transition from unstable dirt areas to
exterior paved roads).
Where the amount of information required to be included on the map would
result in a single map being difficult to read and interpret,the operator shall
develop a series of maps that collectively include the required information.
(h) the location and description of support activities authorized under the
permittee's NOI,including asphalt plants,concrete plants, and other activities
providing support to the construction site that is authorized under this general
permit;
(i) the name of receiving waters at or near the site that may be disturbed or that
may receive discharges from disturbed areas of the project;
(j) a copy of this TPDES general permit;
(k) the NOI and the acknowledgement of provisional and non-provisional
authorization for primary operators of large construction sites, and the site
notice for small construction sites and for secondary operators of large
construction sites;
(1) stormwater and allowable non-stormwater discharge locations,including storm
drain inlets on site and in the immediate vicinity of the construction site where
construction support activities will occur; and
(m) locations of all pollutant-generating activities at the construction site and where
construction support activities will occur,such as the following: Paving
operations; concrete,paint and stucco washout and water disposal; solid waste
storage and disposal; and dewatering operations.
2. A description of the BMPs that will be used to minimize pollution in runoff.
The description must identify the general timing or sequence for implementation. At
a minimum,the description must include the following components:
(a) General Requirements
i. Erosion and sediment controls must be designed to retain sediment on-site
to the extent practicable with consideration for local topography,soil type,
and rainfall.
ii. Control measures must be properly selected,installed, and maintained
according to the manufacturer's or designer's specifications.
•
Page 32
Construction General Permit TPDES General Permit TXR150000
iii. Controls must be developed to minimize the offsite transport of litter,
construction debris,and construction materials.
(b) Erosion Control and Stabilization Practices
The SWP3 must include a description of temporary and permanent erosion
control and stabilization practices for the construction site,where small or large
construction activity will occur. The erosion control and stabilization practices
selected by the permittee must be compliant with the requirements for sediment
and erosion control,located in Part III.G of this permit. The description of the
SWP3 must also include a schedule of when the practices will be implemented.
Site plans must ensure that existing vegetation at the construction site is
preserved where it is possible.
i. Erosion control and stabilization practices may include but are not limited
to: establishment of temporary or permanent vegetation,mulching,
geotextiles,sod stabilization,vegetative buffer strips,protection of existing
trees and vegetation,slope texturing,temporary velocity dissipation
devices,flow diversion mechanisms,and other similar measures.
ii. The following records must be maintained and either attached to or
referenced in the SWP3,and made readily available upon request to the
parties listed in Part III.D.].of this general permit:
(A) the dates when major grading activities occur;
(B) the dates when construction activities temporarily or permanently
cease on a portion of the site; and
(C) the dates when stabilization measures are initiated.
iii. Erosion control and stabilization measures must be initiated immediately
in portions of the site where construction activities have temporarily
ceased and will not resume for a period exceeding 14 calendar days.
Stabilization measures that provide a protective cover must be initiated
immediately in portions of the site where construction activities have
permanently ceased. The term"immediately"is used to define the
deadline for initiating stabilization measures.In the context of this
requirement,"immediately"means as soon as practicable,but no later than
the end of the next work day,following the day when the earth-disturbing
activities have temporarily or permanently ceased. Except as provided in
(A)through(D)below,these measures must be completed as soon as
practicable,but no more than 14 calendar days after the initiation of soil
stabilization measures:
(A) Where the immediate initiation of vegetative stabilization measures
after construction activity has temporarily or permanently ceased due
to frozen conditions, non-vegetative controls must be implemented
until thawing conditions(as defined in Part I.B of this general permit)
are present, and vegetative stabilization measures can be initiated as
soon as practicable.
(B) In arid areas,semi-arid areas, or drought-stricken areas,as they are
defined in Part I.B of this general permit,where the immediate
initiation of vegetative stabilization measures after construction
activity has temporarily or permanently ceased or is precluded by arid
conditions, other types of erosion control and stabilization measures
must be initiated at the site as soon as practicable. Where vegetative
controls are infeasible due to arid conditions, and within 14 calendar
days of a temporary or permanent cessation of construction activity in
any portion of the site,the operator shall immediately install non-
Page 33
Construction General Permit TPDES General Permit TXR150000
vegetative erosion controls in areas of the construction site where
construction activity is complete or has ceased. If non-vegetative
controls are infeasible,the operator shall install temporary sediment
controls as required in Part III.F.2.(b).iii.(C)below.
(C) In areas where non-vegetative controls are infeasible,the operator
may alternatively utilize temporary perimeter controls. The operator
must document in the SWP3 the reason why stabilization measures
are not feasible, and must demonstrate that the perimeter controls will
retain sediment on site to the extent practicable. The operator must
continue to inspect the BMPs at the frequencies established in Part
III.F.7.(c)for unstabilized sites.
(D) The requirement for permittees to initiate stabilization is triggered as
soon as it is known with reasonable certainty that construction activity
at the site or in certain areas of the site will be stopped for 14 or more
additional calendar days. If the initiation or completion of vegetative
stabilization is prevented by circumstances beyond the control of the
permittee,the permittee must employ and implement alternative
stabilization measures immediately. When conditions at the site
changes that would allow for vegetative stabilization,then the
permittee must initiate or complete vegetative stabilization as soon as
practicable.
iv. Final stabilization must be achieved prior to termination of permit
coverage.
v. TCEQ does not expect that temporary or permanent stabilization measures
to be applied to areas that are intended to be left un-vegetated or un-
stabilized following construction(e.g.,dirt access roads,utility pole pads,
areas being used for storage of vehicles,equipment,or materials).
(c) Sediment Control Practices
The SWP3 must include a description of any sediment control practices used to
remove eroded soils from stormwater runoff,including the general timing or
sequence for implementation of controls.
i. Sites With Drainage Areas of Ten or More Acres
(A) Sedimentation Basin(s)
(i) A sedimentation basin is required,where feasible,for a common
drainage location that serves an area with ten(io)or more acres
disturbed at one time. A sedimentation basin may be temporary or
permanent, and must provide sufficient storage to contain a
calculated volume of runoff from a 2-year, 24-hour storm from
each disturbed acre drained. When calculating the volume of
runoff from a 2-year, 24-hour storm event,it is not required to
include the flows from offsite areas and flow from onsite areas that
are either undisturbed or have already undergone permanent
stabilization,if these flows are diverted around both the disturbed
areas of the site and the sediment basin. Capacity calculations shall
be included in the SWP3.
(2) Where rainfall data is not available or a calculation cannot be
performed,the sedimentation basin must provide at least 3,600
cubic feet of storage per acre drained until final stabilization of the
site.
Page 34
Construction General Permit TPDES General Permit TXRi50000
(3) If a sedimentation basin is not feasible,then the permittee shall
provide equivalent control measures until final stabilization of the
site. In determining whether installing a sediment basin is
feasible,the permittee may consider factors such as site soils,
slope,available area,public safety,precipitation patterns,site
geometry,site vegetation,infiltration capacity,geotechnical
factors,depth to groundwater, and other similar considerations.
The permittee shall document the reason that the sediment basins
are not feasible,and shall utilize equivalent control measures,
which may include a series of smaller sediment basins.
(4) Unless infeasible,when discharging from sedimentation basins
and impoundments,the permittee shall utilize outlet structures
that withdraw water from the surface.
(B) Perimeter Controls: At a minimum,silt fences,vegetative buffer
strips,or equivalent sediment controls are required for all down slope
boundaries of the construction area,and for those side slope
boundaries deemed appropriate as dictated by individual site
conditions.
ii. Controls for Sites With Drainage Areas Less than Ten Acres:
(A) Sediment traps and sediment basins may be used to control solids in
stormwater runoff for drainage locations serving less than ten(io)
acres. At a minimum,silt fences,vegetative buffer strips, or
equivalent sediment controls are required for all down slope
boundaries of the construction area, and for those side slope
boundaries deemed appropriate as dictated by individual site
conditions.
(B) Alternatively,a sediment basin that provides storage for a calculated
volume of runoff from a 2-year,24-hour storm from each disturbed
acre drained may be utilized. Where rainfall data is not available or a
calculation cannot be performed, a temporary or permanent sediment
basin providing 3,600 cubic feet of storage per acre drained may be
provided. If a calculation is performed,then the calculation shall be
included in the SWP3.
(C) If sedimentation basins or impoundments are used,the permittee
shall comply with the requirements in Part III.G.6 of this general
permit.
3. Description of Permanent Stormwater Controls
A description of any stormwater control measures that will be installed during the
construction process to control pollutants in stormwater discharges that may occur
after construction operations have been completed must be included in the SWP3.
Permittees are responsible for the installation and maintenance of stormwater
management measures,as follows:
(a) permittees authorized under the permit for small construction activities are
responsible for the installation and maintenance of stormwater control measures
prior to final stabilization of the site; or
(b) permittees authorized under the permit for large construction activities are
responsible for the installation and maintenance of stormwater control measures
prior to final stabilization of the site and prior to submission of an NOT.
4. Other Required Controls and BMPs
Page 35
Construction General Permit TPDES General Permit TXRi50000
(a) Permittees shall minimize,to the extent practicable,the off-site vehicle tracking
of sediments and the generation of dust. The SWP3 shall include a description
of controls utilized to accomplish this requirement.
(b) The SWP3 must include a description of construction and waste materials
expected to be stored on-site and a description of controls to minimize pollutants
from these materials.
(c) The SWP3 must include a description of potential pollutant sources in
discharges of stormwater from all areas of the construction site where
construction activity,including construction support activities,will be located,
and a description of controls and measures that will be implemented at those
sites to minimize pollutant discharges.
(d) Permittees shall place velocity dissipation devices at discharge locations and
along the length of any outfall channel(i.e.,runoff conveyance)to provide a non-
erosive flow velocity from the structure to a water course,so that the natural
physical and biological characteristics and functions are maintained and
protected.
(e) Permittees shall design and utilize appropriate controls to minimize the offsite
transport of suspended sediments and other pollutants if it is necessary to pump
or channel standing water from the site.
(f) Permittees shall ensure that all other required controls and BMPs comply with
all of the requirements of Part III.G of this general permit.
(g) For demolition of any structure with at least 10,000 square feet of floor space
that was built or renovated before January 1, 198o,and the receiving waterbody
is impaired for polychlorinated biphenyls(PCBs):
i. Implement controls to minimize the exposure of PCB-containing building
materials,including paint,caulk,and pre-198o fluorescent lighting fixtures
to precipitation and to stormwater; and
ii. Ensure that disposal of such materials is performed in compliance with
applicable state,federal,and local laws.
5. Documentation of Compliance with Approved State and Local Plans
(a) Permittees must ensure that the SWP3 is consistent with requirements specified
in applicable sediment and erosion site plans or site permits,or stormwater
management site plans or site permits approved by federal,state,or local
officials.
(b) SWP3s must be updated as necessary to remain consistent with any changes
applicable to protecting surface water resources in sediment erosion site plans or
site permits, or stormwater management site plans or site permits approved by
state or local official for which the permittee receives written notice.
(c) If the permittee is required to prepare a separate management plan,including
but not limited to a WPAP or Contributing Zone Plan in accordance with 3o TAC
Chapter 213(related to the Edwards Aquifer),then a copy of that plan must be
either included in the SWP3 or made readily available upon request to
authorized personnel of the TCEQ. The permittee shall maintain a copy of the
approval letter for the plan in its SWP3.
6. Maintenance Requirements
(a) All protective measures identified in the SWP3 must be maintained in effective
operating condition. If,through inspections or other means, as soon as the
permittee determines that BMPs are not operating effectively,then the permittee
shall perform maintenance as necessary to maintain the continued effectiveness
Page 36
Construction General Permit TPDES General Permit TXR150000
of stormwater controls,and prior to the next rain event if feasible. If
maintenance prior to the next anticipated storm event is impracticable,the
reason shall be documented in the SWP3 and maintenance must be scheduled
and accomplished as soon as practicable. Erosion and sediment controls that
have been intentionally disabled,run-over,removed,or otherwise rendered
ineffective must be replaced or corrected immediately upon discovery.
(b) If periodic inspections or other information indicates a control has been used
incorrectly,is performing inadequately,or is damaged,then the operator shall
replace or modify the control as soon as practicable after making the discovery.
(c) Sediment must be removed from sediment traps and sedimentation ponds no
later than the time that design capacity has been reduced by 5o%. For perimeter
controls such as silt fences,berms,etc.,the trapped sediment must be removed
before it reaches 5o%of the above-ground height.
(d) If sediment escapes the site,accumulations must be removed at a frequency that
minimizes off-site impacts, and prior to the next rain event,if feasible. If the
permittee does not own or operate the off-site conveyance,then the permittee
shall work with the owner or operator of the property to remove the sediment.
7. Inspections of Controls
(a) Personnel provided by the permittee must inspect disturbed areas (cleared,
graded,or excavated)of the construction site that do not meet the requirements
of final stabilization in this general permit, all locations where stabilization
measures have been implemented, areas of construction support activity covered
under this permit,stormwater controls(including pollution prevention controls)
for evidence of,or the potential for,the discharge of pollutants,areas where
stormwater typically flows within the construction site,and points of discharge
from the construction site.
i. Personnel conducting these inspections must be knowledgeable of this
general permit,the construction activities at the site, and the SWP3 for the
site.
ii. Personnel conducting these inspections are not required to have signatory
authority for inspection reports under 3o TAC§305.128.
(b) Requirements for Inspections
i. Inspect all stormwater controls(including sediment and erosion control
measures identified in the SWP3)to ensure that they are installed properly,
appear to be operational,and minimizing pollutants in discharges, as
intended.
ii. Identify locations on the construction site where new or modified
stormwater controls are necessary.
iii. Check for signs of visible erosion and sedimentation that can be attributed
to the points of discharge where discharges leave the construction site or
discharge into any surface water in the state flowing within or adjacent to
the construction site.
iv. Identify any incidents of noncompliance observed during the inspection.
v. Inspect locations where vehicles enter or exit the site for evidence of off-site
sediment tracking.
vi. If an inspection is performed when discharges from the construction site are
occurring: identify all discharge points at the site,observe and document
the visual quality of the discharge(i.e.,color,odor,floating,settled,or
Page 37
Construction General Permit TPDES General Permit TXRi50000
suspended solids,foam,oil sheen, and other such indicators of pollutants in
stormwater).
vii. Complete any necessary maintenance needed,based on the results of the
inspection and in accordance with the requirements listed in Part III.F.6
above.
(c) Inspection frequencies:
i. Inspections of construction sites must be conducted at least once every 14
calendar days and within 24 hours of the end of a storm event of 0.5 inches
or greater,unless as otherwise provided below in Part III.F.7.(c).ii—v
below.
ii. Inspection frequencies must be conducted at least once every month in
areas of the construction site that meet final stabilization or have been
temporarily stabilized.
iii. Inspection frequencies for construction sites,where runoff is unlikely due to
the occurrence of frozen conditions at the site,must be conducted at least
once every month until thawing conditions begin to occur(See definitions
for thawing conditions in Part I.B). The SWP3 must also contain a record of
the approximate beginning and ending dates of when frozen conditions
occurred at the site,which resulted in inspections being conducted monthly,
while those conditions persisted,instead of at the interval of once every 14
calendar days and within 24 hours of the end of a storm event of 0.5 inches
or greater.
iv. In arid,semi-arid,or drought-stricken areas,inspections must be conducted
at least once every month and within 24 hours after the end of a storm event
of 0.5 inches or greater. The SWP3 must also contain a record of the total
rainfall measured,as well as the approximate beginning and ending dates of
when drought conditions occurred at the site,which resulted in inspections
being conducted monthly,while those conditions persisted,instead of at the
interval of once every 14 calendar days and within 24 hours of the end of a
storm event of 0.5 inches or greater.
v. As an alternative to the inspection schedule in Part III.F.7.(c).i above,the
SWP3 maybe developed to require that these inspections will occur at least
once every seven(7)calendar days. If this alternative schedule is developed,
then the inspection must occur regardless of whether or not there has been
a rainfall event since the previous inspection.
vi. The inspection procedures described in Part III.F.7.(c).i.—v above can be
performed at the frequencies and under the applicable conditions indicated
for each schedule option,provided that the SWP3 reflects the current
schedule and that any changes to the schedule are made in accordance with
the following provisions: the inspection frequency schedule can only be
changed a maximum of one time each month;the schedule change must be
implemented at the beginning of a calendar month; and the reason for the
schedule change documented in the SWP3(e.g., end of"dry"season and
beginning of"wet"season).
(d) Utility line installation,pipeline construction, and other examples of long,
narrow,linear construction activities may provide inspection personnel with
limited access to the areas described in Part III.F.7.(a)above.
i. Inspection of linear construction sites could require the use of vehicles that
could compromise areas of temporary or permanent stabilization, cause
Page 38
Construction General Permit TPDES General Permit TXR150000
additional disturbance of soils, and result in the increase the potential for
erosion. In these circumstances,controls must be inspected at least once
every 14 calendar days and within 24 hours of the end of a storm event of
0.5 inches or greater,but representative inspections may be performed.
ii. For representative inspections,personnel must inspect controls along the
construction site for 0.25 mile above and below each access point where a
roadway,undisturbed right-of-way,or other similar feature intersects the
construction site and allows access to the areas described in Part III.F.7.(a)
above. The conditions of the controls along each inspected 0.25 mile
portion may be considered as representative of the condition of controls
along that reach extending from the end of the 0.25 mile portion to either
the end of the next 0.25 mile inspected portion,or to the end of the project,
whichever occurs first.
As an alternative to the inspection schedule described in Part III.F.7.(c).i
above,the SWP3 maybe developed to require that these inspections will
occur at least once every seven(7)calendar days. If this alternative
schedule is developed,the inspection must occur regardless of whether or
not there has been a rainfall event since the previous inspection.
iii. The SWP3 for a linear construction site must reflect the current inspection
schedule. Any changes to the inspection schedule must be made in
accordance with the following provisions:
(A) the schedule maybe changed a maximum of one time each month;
(B) the schedule change must be implemented at the beginning of a
calendar month,and
(C) the reason for the schedule change must be documented in the SWP3
(e.g.,end of"dry"season and beginning of"wet"season).
(e) In the event of flooding or other uncontrollable situations which prohibit access
to the inspection sites,inspections must be conducted as soon as access is
practicable.
(f) Inspection Reports
i. A report summarizing the scope of any inspection must be completed within
24-hours following the inspection. The report must also include the date(s)
of the inspection and major observations relating to the implementation of
the SWP3. Major observations in the report must include: the locations of
where erosion and discharges of sediment or other pollutants from the site
have occurred;locations of BMPs that need to be maintained;locations of
BMPs that failed to operate as designed or proved inadequate for a
particular location; and locations where additional BMPs are needed.
ii. Actions taken as a result of inspections must be described within,and
retained as a part of,the SWP3. Reports must identify any incidents of non-
compliance. Where a report does not identify any incidents of non-
compliance,the report must contain a certification that the facility or site is
in compliance with the SWP3 and this permit. The report must be retained
as part of the SWP3 and signed by the person and in the manner required by
3o TAC§305.128 (relating to Signatories to Reports).
iii. The names and qualifications of personnel making the inspections for the
permittee may be documented once in the SWP3 rather than being included
in each report.
(g) The SWP3 must be modified based on the results of inspections, as necessary,to
better control pollutants in runoff. Revisions to the SWP3 must be completed
Page 39
Construction General Permit TPDES General Permit TXRi50000
within seven(7)calendar days following the inspection. If existing BMPs are
modified or if additional BMPs are necessary, an implementation schedule
must be described in the SWP3 and wherever possible those changes
implemented before the next storm event. If implementation before the next
anticipated storm event is impracticable,these changes must be implemented
as soon as practicable.
8. The SWP3 must identify and ensure the implementation of appropriate pollution
prevention measures for all eligible non-stormwater components of the discharge,as
listed in Part II.A.3 of this permit.
9. The SWP3 must include the information required in Part III.B of this general permit.
10. The SWP3 must include pollution prevention procedures that comply with Part
III.G.4 of this general permit.
Section G. Erosion and Sediment Control Requirements Applicable to All Sites
Except as provided in 4o CFR§§125.3o-125.32,any discharge regulated under this
general permit,with the exception of sites that obtained waivers based on low rainfall
erosivity,must achieve, at a minimum,the following effluent limitations representing
the degree of effluent reduction attainable by application of the best practicable control
technology currently available(BPT).
1. Erosion and sediment controls.Design,install,and maintain effective erosion
controls and sediment controls to minimize the discharge of pollutants.At a
minimum,such controls must be designed,installed, and maintained to:
(a) Control stormwater volume and velocity within the site to minimize soil erosion
in order to minimize pollutant discharges;
(b) Control stormwater discharges,including both peak flowrates and total
stormwater volume,to minimize channel and streambank erosion and scour in
the immediate vicinity of discharge point(s);
(c) Minimize the amount of soil exposed during construction activity;
(d) Minimize the disturbance of steep slopes;
(e) Minimize sediment discharges from the site. The design,installation,and
maintenance of erosion and sediment controls must address factors such as the
amount,frequency,intensity and duration of precipitation,the nature of
resulting stormwater runoff, and soil characteristics,including the range of soil
particle sizes expected to be present on the site;
(f) If earth disturbance activities are located in close proximity to a surface water in
the state,provide and maintain appropriate natural buffers if feasible and as
necessary,around surface water in the state,depending on site-specific
topography,sensitivity,and proximity to water bodies. Direct stormwater to
vegetated areas and maximize stormwater infiltration to reduce pollutant
discharges,unless infeasible. If providing buffers is infeasible,the permittee
shall document the reason that natural buffers are infeasible and shall
implement additional erosion and sediment controls to reduce sediment load;
(g) Preserve native topsoil at the site,unless the intended function of a specific area
of the site dictates that the topsoil be disturbed or removed,or it is infeasible; •
and
(h) Minimize soil compaction. In areas of the construction site where final
vegetative stabilization will occur or where infiltration practices will be installed,
either:
i. restrict vehicle and equipment use to avoid soil compaction; or
Page 4o
Construction General Permit TPDES General Permit TXR150000
ii. prior to seeding or planting areas of exposed soil that have been compacted,
use techniques that condition the soils to support vegetative growth,if
necessary and feasible;
Minimizing soil compaction is not required where the intended function of a
specific area of the site dictates that it be compacted.
(i) TCEQ does not consider stormwater control features(e.g.,stormwater
conveyance channels,storm drain inlets,sediment basins)to constitute"surface
water"for the purposes of triggering the buffer requirement in Part III.G.i.(f)
above.
2. Soil stabilization.Stabilization of disturbed areas must, at a minimum,be initiated
immediately whenever any clearing,grading,excavating,or other earth disturbing
activities have permanently ceased on any portion of the site,or temporarily ceased
on any portion of the site and will not resume for a period exceeding 14 calendar
days. In the context of this requirement,"immediately"means as soon as practicable,
but no later than the end of the next work day,following the day when the earth-
disturbing activities have temporarily or permanently ceased. Temporary
stabilization must be completed no more than 14 calendar days after initiation of soil
stabilization measures,and final stabilization must be achieved prior to termination of
permit coverage. In arid,semi-arid,and drought-stricken areas where initiating
vegetative stabilization measures immediately is infeasible, alternative non-
vegetative stabilization measures must be employed as soon as practicable.Refer to
Part III.F.2.(b)for complete erosion control and stabilization practice requirements.
In limited circumstances,stabilization may not be required if the intended function
of a specific area of the site necessitates that it remain disturbed.
3. Dewatering.Discharges from dewatering activities,including discharges from
dewatering of trenches and excavations,are prohibited,unless managed by
appropriate controls.
4. Pollution prevention measures.Design,install,implement, and maintain effective
pollution prevention measures to minimize the discharge of pollutants.At a
minimum,such measures must be designed,installed,implemented,and maintained
to:
(a) Minimize the discharge of pollutants from equipment and vehicle washing,
wheel wash water,and other wash waters.Wash waters must be treated in a
sediment basin or alternative control that provides equivalent or better
treatment prior to discharge;
(b) Minimize the exposure of building materials,building products, construction
wastes,trash,landscape materials,fertilizers,pesticides,herbicides,detergents,
sanitary waste, and other materials present on the site to precipitation and to
stormwater;
(c) Minimize the exposure of waste materials by closing waste container lids at the
end of the work day.For waste containers that do not have lids,where the
container itself is not sufficiently secure enough to prevent the discharge of
pollutants absent a cover and could leak;the permittee must provide either a
cover(e.g.,a tarp,plastic sheeting,temporary roof)to minimize exposure of
wastes to precipitation,or a similarly effective means designed to minimize the
discharge of pollutants(e.g.,secondary containment);and
(d) Minimize the discharge of pollutants from spills and leaks,and implement
chemical spill and leak prevention and response procedures.
5. Prohibited discharges.The following discharges are prohibited:
Page 41
Construction General Permit TPDES General Permit TXR150000
(a) Wastewater from wash out of concrete,unless managed by an appropriate
control;
(b) Wastewater from wash out and cleanout of stucco,paint,form release oils,
curing compounds and other construction materials;
(c) Fuels, oils,or other pollutants used in vehicle and equipment operation and
maintenance;
(d) Soaps or solvents used in vehicle and equipment washing; and
(e) Toxic or hazardous substances from a spill or other release.
6. Surface outlets.When discharging from basins and impoundments,utilize outlet
structures that withdraw water from the surface,unless infeasible.
Part IV. Stormwater Runoff from Concrete Batch Plants
Discharges of stormwater runoff from concrete batch plants present at regulated
construction sites and operated as a construction support activity may be authorized under
the provisions of this general permit,provided that the following requirements are met for
concrete batch plant(s) authorized under this permit. Only the discharges of stormwater
runoff and non-stormwater from concrete batch plants that meet the requirements of a
construction support activity can be authorized under this permit(see the requirements for
"Non-Stormwater Discharges"in Part II.A.3 and"Discharges of Stormwater Associated with
Construction Support Activity"in Part II.A.2).
If discharges of stormwater runoff or non-stormwater from concrete batch plants are not
authorized under this general permit,then discharges must be authorized under an
alternative general permit or individual permit[see the requirement in Part II.A.2.(c)].
This permit does not authorize the discharge or land disposal of any wastewater from
concrete batch plants at regulated construction sites. Authorization for these wastes must be
obtained under an individual permit or an alternative general permit.
Section A. Benchmark Sampling Requirements
1. Operators of concrete batch plants authorized under this general permit shall sample
the stormwater runoff from the concrete batch plants according to the requirements
of this section of this general permit,and must conduct evaluations on the
effectiveness of the SWP3 based on the following benchmark monitoring values:
Table 1. Benchmark Parameters
Benchmark Benchmark Value Sampling Sample Type
Parameter Frequency
Oil and Grease(*1) 15 mg/L 1/quarter(*2) (*3) Grab(*4)
Total Suspended 50 mg/L 1/quarter(*2) (*3) Grab(*4)
Solids(*1)
pH 6.o—9.o Standard Units 1/quarter(*2) (*3) Grab(*4)
Total Iron(*1) 1.3 mg/L 1/quarter(*2) (*3) Grab(*4)
(*1) All analytical results for these parameters must be obtained from a laboratory
that is accredited based on rules located in 3o TAC§25.4(a)or through the
National Environmental Laboratory Accreditation Program(NELAP).
Analysis must be performed using sufficiently sensitive methods for analysis
that comply with the rules located in 4o CFR§136.1(c) and 4o CFR
§122.44(i)(1)(iv).
Page 42
Construction General Permit TPDES General Permit TXR150000
(*2) When discharge occurs. Sampling is required within the first 3o minutes of
discharge. If it is not practicable to take the sample, or to complete the
sampling,within the first 3o minutes,sampling must be completed within the
first hour of discharge. If sampling is not completed within the first 3o
minutes of discharge,the reason must be documented and attached to all
required reports and records of the sampling activity.
(*3) Sampling must be conducted at least once during each of the following periods.
The first sample must be collected during the first full quarter that a
stormwater discharge occurs from a concrete batch plant authorized under this
general permit.
January through March
April through June
July through September
October.through December
For projects lasting less than one full quarter,a minimum of one sample shall
be collected,provided that a stormwater discharge occurred at least once
following submission of the NOI or following the date that automatic
authorization was obtained under Section II.E.2,and prior to terminating
coverage.
(*4) A grab sample shall be collected from the stormwater discharge resulting from
a storm event that is at least 0.1 inches of measured precipitation that occurs at
least 72 hours from the previously measurable storm event. The sample shall
be collected downstream of the concrete batch plant, and where the discharge
exits any BMPs utilized to handle the runoff from the batch plant,prior to
commingling with any other water authorized under this general permit.
2. The permittee must compare the results of sample analyses to the benchmark values
above,and must include this comparison in the overall assessment of the SWP3's
effectiveness. Analytical results that exceed a benchmark value are not a violation of
this permit, as these values are not numeric effluent limitations. Results of analyses
are indicators that modifications of the SWP3 should be assessed and may be
necessary to protect water quality. The operator must investigate the cause for each
exceedance and must document the results of this investigation in the SWP3 by the
end of the quarter following the sampling event.
The operator's investigation must identify the following:
(a) any additional potential sources of pollution,such as spills that might have
occurred;
(b) necessary revisions to good housekeeping measures that are part of the SWP3;
(c) additional BMPs,including a schedule to install or implement the BMPs; and
(d) other parts of the SWP3 that may require revisions in order to meet the goal of
the benchmark values.
Background concentrations of specific pollutants may also be considered during the
investigation. If the operator is able to relate the cause of the exceedance to
background concentrations,then subsequent exceedances of benchmark values for
that pollutant may be resolved by referencing earlier findings in the SWP3.
Background concentrations may be identified by laboratory analyses of samples of
stormwater run-on to the permitted facility,by laboratory analyses of samples of
stormwater run-off from adjacent non-industrial areas,or by identifying the •
pollutant is a naturally occurring material in soils at the site.
Page 43
Construction General Permit TPDES General Permit TXR150000
Section B. Best Management Practices(BMPs) and SWP3 Requirements
Minimum SWP3 Requirements—The following are required in addition to other SWP3
requirements listed in this general permit,which include,but are not limited to the
applicable requirements located in Part III.F.7 of this general permit, as follows:
1. Description of Potential Pollutant Sources-The SWP3 must provide a description of
potential sources(activities and materials)that can cause,have a reasonable
potential to cause or contribute to a violation of water quality standards or have been
found to cause, or contribute to,the loss of a designated use of surface water in the
state in stormwater discharges associated with concrete batch plants authorized
under this permit. The SWP3 must describe the implementation of practices that will
be used to minimize to the extent practicable the discharge of pollutants in
stormwater discharges associated with industrial activity and non-stormwater
discharges(described in Part II.A.3 of this general permit),in compliance with the
terms and conditions of this general permit,including the protection of water quality,
and must ensure the implementation of these practices.
The following must be developed,at a minimum,in support of developing this
description:
(a) Drainage—The site map must include the following information:
i. the location of all outfalls for stormwater discharges associated with
concrete batch plants that are authorized under this permit;
ii. a depiction of the drainage area and the direction of flow to the outfall(s);
iii. structural controls used within the drainage area(s);
iv. the locations of the following areas associated with concrete batch plants
that are exposed to precipitation:vehicle and equipment maintenance
,activities(including fueling,repair, and storage areas for vehicles and
equipment scheduled for maintenance); areas used for the treatment,
storage,or disposal of wastes;liquid storage tanks;material processing and
storage areas; and loading and unloading areas; and
v. the locations of the following: any bag house or other dust control device(s);
recycle/sedimentation pond,clarifier or other device used for the treatment
of facility wastewater(including the areas that drain to the treatment
device); areas with significant materials; and areas where major spills or
leaks have occurred.
(b) Inventory of Exposed Materials—A list of materials handled at the concrete
batch plant that may be exposed to stormwater and that have a potential to
affect the quality of stormwater discharges associated with concrete batch
plants that are authorized under this general permit.
(c) Spills and Leaks-A list of significant spills and leaks of toxic or hazardous
pollutants that occurred in areas exposed to stormwater and that drain to
stormwater outfalls associated with concrete batch plants authorized under this
general permit must be developed,maintained,and updated as needed.
(d) Sampling Data-A summary of existing stormwater discharge sampling data
must be maintained,if available.
2. Measures and Controls-The SWP3 must include a description of management
controls to regulate pollutants identified in the SWP3's"Description of Potential
Pollutant Sources"from Part N.B.i of this permit, and a schedule for implementation
of the measures and controls. This must include,at a minimum:
Page 44
Construction General Permit TPDES General Permit TXR150000
(a) Good Housekeeping-Good housekeeping measures must be developed and
implemented in the area(s)associated with concrete batch plants.
i. Operators must prevent or minimize the discharge of spilled cement,
aggregate(including sand or gravel),settled dust,or other significant
materials from paved portions of the site that are exposed to stormwater.
Measures used to minimize the presence of these materials may include
regular sweeping or other equivalent practices. These practices must be
conducted at a frequency that is determined based on consideration of the
amount of industrial activity occurring in the area and frequency of
precipitation,and shall occur at least once per week when cement or
aggregate is being handled or otherwise processed in the area.
ii. Operators must prevent the exposure of fine granular solids,such as
cement,to stormwater.Where practicable,these materials must be stored
in enclosed silos,hoppers or buildings,in covered areas,or under covering.
(b) Spill Prevention and Response Procedures-Areas where potential spills that
can contribute pollutants to stormwater runoff,and the drainage areas from
these locations,must be identified in the SWP3. Where appropriate,the SWP3
must specify material handling procedures,storage requirements,and use of
equipment. Procedures for cleaning up spills must be identified in the SWP3
and made available to the appropriate personnel.
(c) Inspections-Qualified facility personnel(i.e.,a person or persons with
knowledge of this general permit,the concrete batch plant,and the SWP3
related to the concrete batch plant(s)for the site)must be identified to inspect
designated equipment and areas of the facility specified in the SWP3.
Personnel conducting these inspections are not required to have signatory
authority for inspection reports under 3o TAC§305.128. Inspections of
facilities in operation must be performed once every seven days. Inspections of
facilities that are not in operation must be performed at a minimum of once per
month. The current inspection frequency being implemented at the facility
must be recorded in the SWP3. The inspection must take place while the
facility is in operation and must, at a minimum,include all areas that are
exposed to stormwater at the site,including material handling areas,above
ground storage tanks,hoppers or silos,dust collection/containment systems,
truck wash down and equipment cleaning areas. Follow-up procedures must be
used to ensure that appropriate actions are taken in response to the inspections.
Records of inspections must be maintained and be made readily available for
inspection upon request.
(d) Employee Training-An employee training program must be developed to
educate personnel responsible for implementing any component of the SWP3,
or personnel otherwise responsible for stormwater pollution prevention,with
the provisions of the SWP3. The frequency of training must be documented in
the SWP3,and at a minimum,must consist of one training prior to the
initiation of operation of the concrete batch plant.
(e) Record Keeping and Internal Reporting Procedures-A description of spills and
similar incidents,plus additional information that is obtained regarding the
quality and quantity of stormwater discharges,must be included in the SWP3.
Inspection and maintenance activities must be documented and records of
those inspection and maintenance activities must be incorporated in the SWP3.
(f) Management of Runoff-The SWP3 shall contain a narrative consideration for
reducing the volume of runoff from concrete batch plants by diverting runoff or
otherwise managing runoff,including use of infiltration,detention ponds,
retention ponds,or reusing of runoff.
Page 45
Construction General Permit TPDES General Permit TXR150000
3. Comprehensive Compliance Evaluation—At least once per year,one or more
qualified personnel(i.e.,a person or persons with knowledge of this general permit,
the concrete batch plant,and the SWP3 related to the concrete batch plant(s)for the
site)shall conduct a compliance evaluation of the plant. The evaluation must include
the following.
(a) Visual examination of all areas draining stormwater associated with regulated
concrete batch plants for evidence of,or the potential for,pollutants entering
the drainage system. These include,but are not limited to: cleaning areas,
material handling areas,above ground storage tanks,hoppers or silos,dust
collection/containment systems,and truck wash down and equipment cleaning
areas. Measures implemented to reduce pollutants in runoff(including
structural controls and implementation of management practices)must be
evaluated to determine if they are effective and if they are implemented in
accordance with the terms of this permit and with the permittee's SWP3. The
operator shall conduct a visual inspection of equipment needed to implement
the SWP3,such as spill response equipment.
(b) Based on the results of the evaluation,the following must be revised as
appropriate within two weeks of the evaluation: the description of potential
pollutant sources identified in the SWP3(as required in Part IV.B.1,
"Description of Potential Pollutant Sources"); and pollution prevention
measures and controls identified in the SWP3(as required in Part IV.B.2,
"Measures and Controls"). The revisions may include a schedule for
implementing the necessary changes.
(c) The permittee shall prepare and include in the SWP3 a report summarizing the
scope of the evaluation,the personnel making the evaluation,the date(s)of the
evaluation,major observations relating to the implementation of the SWP3,and
actions taken in response to the findings of the evaluation. The report must
identify any incidents of noncompliance. Where the report does not identify
incidences of noncompliance,the report must contain a statement that the
evaluation did not identify any incidence(s),and the report must be signed
according to 3o TAC§305.128,relating to Signatories to Reports.
(d) The Comprehensive Compliance Evaluation may substitute for one of the
required inspections delineated in Part IV.B.2.(c)of this general permit.
Section C. Prohibition of Wastewater Discharges
Wastewater discharges associated with concrete production including wastewater
disposal by land application are not authorized under this general permit. These
wastewater discharges must be authorized under an alternative TCEQ water quality
permit or otherwise disposed of in an authorized manner. Discharges of concrete truck
wash out at construction sites maybe authorized if conducted in accordance with the
requirements of Part V of this general permit.
Part V. Concrete Truck Wash Out Requirements
This general permit authorizes the land disposal of wash out from concrete trucks at
construction sites regulated under this general permit,provided the following requirements
are met. Any discharge of concrete production waste water to surface water in the state must
be authorized under a separate TCEQ general permit or individual permit.
A. Discharge of concrete truck wash out water to surface water in the state,including
discharge to storm sewers,is prohibited by this general permit.
B. Concrete truck wash out water shall be disposed in areas at the construction site
where structural controls have been established to prevent discharge to surface water
Page 46
Construction General Permit . TPDES General Permit TXR150000
in the state,or to areas that have a minimal slope that allow infiltration and filtering
of wash out water to prevent discharge to surface water in the state. Structural
controls may consist of temporary berms,temporary shallow pits,temporary storage
tanks with slow rate release, or other reasonable measures to prevent runoff from the
construction site.
C. Wash out of concrete trucks during rainfall events shall be minimized. The discharge
of concrete truck wash out water is prohibited at all times,and the operator shall
insure that its BMPs are sufficient to prevent the discharge of concrete truck wash out
as the result of rainfall or stormwater runoff.
D. The disposal of wash out water from concrete trucks,made under authorization of
this general permit must not cause or contribute to groundwater contamination.
E. If a SWP3 is required to be implemented,the SWP3 shall include concrete wash out
areas on the associated site map.
Part VI. Retention of Records
The permittee must retain the following records for a minimum period of three(3)years
from the date that a NOT is submitted as required in Part II.F.1 and 2 of this permit. For
activities in which an NOT is not required,records shall be retained for a minimum period of
three(3)years from the date that the operator terminates coverage under Section II.F.3 of
this permit. Records include:
A. A copy of the SWP3;
B. All reports and actions required by this permit,including a copy of the construction
site notice;
C. All data used to complete the NOI,if an NOI is required for coverage under this
general permit; and
D. All records of submittal of forms submitted to the operator of any MS4 receiving the
discharge and to the secondary operator of a large construction site,if applicable.
Part VII. Standard Permit Conditions
A. The permittee has a duty to comply with all permit conditions. Failure to comply
with any permit condition is a violation of the permit and statutes under which it was
issued(CWA and TWC),and is grounds for enforcement action,for terminating,
revoking and reissuance,or modification,or denying coverage under this general
permit,or for requiring a discharger to apply for and obtain an individual TPDES
permit,based on rules located in TWC§23.086,30 TAC§305.66 and 4o CFR§122.41
(a).
B. Authorization under this general permit may be modified,suspended,revoked and
reissued,terminated or otherwise suspended for cause,based on rules located in
TWC§23.086,30 TAC§305.66 and 4o CFR§122.41(f). Filing a notice of planned
changes or anticipated non-compliance by the permittee does not stay any permit
condition. The permittee must furnish to the executive director,upon request and
within a reasonable time,any information necessary for the executive director to
determine whether cause exists for modifying,revoking and reissuing,terminating
or,otherwise suspending authorization under this permit,based on rules located in
TWC§23.086,3o TAC§305.66 and 4o CFR§122.41(h). Additionally,the permittee
must provide to the executive director,upon request,copies of all records that the
permittee is required to maintain as a condition of this general permit.
C. It is not a defense for a discharger in an enforcement action that it would have been
necessary to halt or reduce the permitted activity to maintain compliance with the
permit conditions.
Page 47
Construction General Permit TPDES General Permit TXR150oo0
D. Inspection and entry shall be allowed under TWC Chapters 26-28,Texas Health and
Safety Code§§361.032-361.o33 and 361.037, and 4o CFR§122.41(i).The statement
in TWC§26.014 that commission entry of a facility shall occur according to an
establishment's rules and regulations concerning safety,internal security,and fire
protection is not grounds for denial or restriction of entry to any part of the facility or
site,but merely describes the commission's duty to observe appropriate rules and
regulations during an inspection.
E. The discharger is subject to administrative,civil,and criminal penalties,as
applicable,under TWC Chapter 7 for violations including but not limited to the
following:.
1. negligently or knowingly violating the federal CWA§§301,302,306,307,308,
318,or 405,or any condition or limitation implementing any sections in a
permit issued under CWA§402,or any requirement imposed in a pretreatment
program approved under CWA§§4o2(a)(3) or 402(b)(8);
2. knowingly making any false statement,representation,or certification in any
record or other document submitted or required to be maintained under a
permit,including monitoring reports or reports of compliance or
noncompliance; and
3. knowingly violating CWA§303 and placing another person in imminent danger
of death or serious bodily injury.
F. All reports and other information requested by the executive director must be signed
by the person and in the manner required by 3o TAC§305.128 (relating to
Signatories to Reports).
G. Authorization under this general permit does not convey property or water rights of
any sort and does not grant any exclusive privilege.
H. The permittee shall take all reasonable steps to minimize or prevent any discharge in
violation of this permit that has a reasonable likelihood of adversely affecting human
health or the environment.
I. The permittee shall at all times properly operate and maintain all facilities and
systems of treatment and control(and related appurtenances)that are installed or
used by the permittee to achieve compliance with the conditions of this permit.
Proper operation and maintenance also includes adequate laboratory controls and
appropriate quality assurance procedures.This provision requires the operation of
back-up or auxiliary facilities or similar systems that are installed by a permittee only
when the operation is necessary to achieve compliance with the conditions of the
permit.
J. The permittee shall comply with the monitoring and reporting requirements in 40
CFR§122.41(j)and(1),as applicable. ,
K. Analysis must be performed using sufficiently sensitive methods for analysis that
comply with the rules located in 4o CFR§136.1(c)and 40 CFR§122.44(i)(1)(iv).
Part VIII. Fees
A. A fee of must be submitted along with the NOI:
1. $325 if submitting a paper NOI,or
2. $225 if submitting an NOI electronically.
B. Fees are due upon submission of the NOI. An NOI will not be declared
administratively complete unless the associated fee has been paid in full.
C. No separate annual fees will be assessed for this general permit. The Water Quality
Annual Fee has been incorporated into the NOI fees as described above.
Page 48
Construction General Permit TPDES General Permit TXR150000
D. Effective September 1, 2018, applicants seeking coverage under an NOI or LREW
must submit their application using the online e-Permits system available through
the TCEQ website,or request and obtain a waiver from electronic reporting from the
TCEQ. Waivers from electronic reporting are not transferrable and expire on the
same date as the authorization to discharge.
Page 49
Construction General Permit TPDES General Permit TXR150000
Appendix A: Automatic Authorization
Periods of Low Erosion Potential by County—Eligible Date Ranges
Andrews: Nov. 15-Apr.3o Ector: Nov. 15-Apr.30
Archer: Dec.15-Feb.14 Edwards: Dec. 15-Feb. 14
Armstrong: Nov. 15-Apr. 3o El Paso: Jan.1-Jul.14,or May 15-Jul.
Bailey: Nov. 1-Apr.30,or Nov. 15-May 31,or Jun. 1-Aug. 14,or Jun. 15-Sept. 14,
14 or Jul.1-Oct.14, or Jul. 15-Oct.31,or
Aug. 1-Apr.30,or Aug. 15-May 14,or
Baylor: Dec.15-Feb. 14 Sept. 1-May 30, or Oct. 1-Jun.14,or
Borden: Nov. 15-Apr. 3o Nov. 1-Jun.30,or Nov. 15-Jul. 14
Brewster: Nov. 15-Apr.3o Fisher: Dec. 15-Feb.14
Briscoe: Nov. 15-Apr.3o Floyd: Nov. 15-Apr.30
Brown: Dec.15-Feb.14 Foard: Dec. 15-Feb.14
Callahan: Dec. 15-Feb. 14 Gaines: Nov. 15-Apr.30
Carson: Nov. 15-Apr.3o Garza: Nov.15-Apr.30
Castro: Nov. 15-Apr.30 Glasscock: Nov. 15-Apr. 30
Childress: Dec. 15-Feb. 14 Hale: Nov. 15-Apr.30
Cochran: Nov. 1-Apr. 30,or Nov. 15- Hall: Feb. 1-Mar.30
May 14 Hansford: Nov. 15-Apr.30
Coke: Dec. 15-Feb.14 Hardeman: Dec. 15-Feb. 14
Coleman: Dec. 15-Feb. 14 Hartley: Nov.15-Apr.30
Collingsworth: Jan. 1-Mar.30,or Dec. 1- Haskell: Dec. 15-Feb. 14
Feb. 28 Hockley: Nov. 1-Apr.14,or Nov. 15-
Concho: Dec. 15-Feb.14 Apr.30
Cottle: Dec. 15-Feb. 14 Howard: Nov. 15-Apr.30
Crane: Nov.15-Apr.3o Hudspeth: Nov. 1-May 14
Crockett: Nov. 15-Jan.14,or Feb. 1- Hutchinson: Nov. 15-Apr.30
Mar.3o Irion: Dec.15-Feb. 14
Crosby: Nov.15-Apr.30
Jeff Davis: Nov. 1-Apr.30 or Nov. 15-
Culberson: Nov. 1-May 14 May 14
Dallam: Nov. 1-Apr. 14,or Nov. 15-Apr. Jones: Dec. 15-Feb. 14
30 Kent: Nov. 15-Jan. 14 or Feb. 1-Mar. 30
Dawson: Nov. 15-Apr.30 Kerr: Dec. 15-Feb. 14
Deaf Smith: Nov.15-Apr.3o Kimble: Dec. 15-Feb. 14
Dickens: Nov. 15-Jan.14,or Feb.1-Mar. King: Dec. 15-Feb. 14
30
Dimmit: Dec. 15-Feb. 14 Kinney: Dec. 15-Feb. 14
Donley: Jan. 1-Mar.30,or Dec. 1-Feb. Knox: Dec. 15-Feb. 14
28 Lamb: Nov. 1-Apr. 14,or Nov. 15-Apr.
Eastland: Dec. 15-Feb.14 30
Page 50
Construction General Permit TPDES General Permit TXR150000
Loving: Nov. 1-Apr.30,or Nov. 15-May Scurry: Nov. 15-Apr.30
14 Shackelford: Dec.15-Feb. 14
Lubbock: Nov.15-Apr.3o Sherman: Nov. 15-Apr.30
Lynn: Nov. 15-Apr.3o Stephens: Dec. 15-Feb.14
Martin: Nov. 15-Apr.3o Sterling: Nov. 15-Apr.30
Mason: Dec.15-Feb. 14 Stonewall: Dec. 15-Feb.14
Maverick: Dec. 15-Feb. 14 Sutton: Dec.15-Feb. 14
McCulloch: Dec. 15-Feb. 14 Swisher: Nov. 15-Apr.30
Menard: Dec. 15-Feb. 14 Taylor: Dec. 15-Feb. 14
Midland: Nov.15-Apr.3o Terrell: Nov.15-Apr.30
Mitchell: Nov. 15-Apr.3o Terry: Nov. 15-Apr.30
Moore: Nov.15-Apr.3o Throckmorton: Dec. 15-Feb. 14
Motley: Nov. 15-Jan. 14,or Feb. 1-Mar.
30 Tom Green: Dec. 15-Feb. 14
Nolan: Dec. 15-Feb. 14 Upton: Nov. 15-Apr.30
Oldham: Nov.15-Apr.30 Uvalde: Dec. 15-Feb. 14
Parmer: Nov. 1-Apr. 14,or Nov. 15-Apr. Val Verde: Nov. 15-Jan. 14,or Feb. 1-
Mar.30
30
Pecos: Nov. 15-Apr.3o Ward: Nov. 1-Apr. 14,or Nov.15-Apr.
30
Potter: Nov. 15-Apr.3o Wichita: Dec. 15-Feb. 14
Presidio: Nov. 1-Apr.30,or Nov. 15-
May 14 Wilbarger: Dec. 15-Feb. 14
Randall: Nov.15-Apr.3o Winkler: Nov. 1-Apr.30,or Nov. 15-
May 14
Reagan: Nov.15-Apr.3o Yoakum: Nov. 1-Apr.30,or Nov.15-
Real: Dec. 15-Feb. 14 May 14
Reeves: Nov. 1-Apr.30,or Nov. 15-May Young: Dec. 15-Feb. 14
14 Wheeler: Jan. 1-Mar.30,or Dec. 1-Feb.
Runnels: Dec.15-Feb. 14 28
Schleicher: Dec.15-Feb. 14 Zavala: Dec. 15-Feb. 14
Page 51
Construction General Permit TPDES General Permit TXR150000
Appendix B: Erosivity Index(EI)Zones in Texas
'yiM� « • • »i ...1
_`i. d. , !W : Y: 7*,,,11 ,..,.. „_ .a i • 1ss s'i P s `. * } 4.41 ..: — ..e aa**v«w
1
• 4E
..*::244.10r.
vcv ffes i •r .., e s4 ''r s i' 6•D• B am AN mor_.ay.r.:-.a*
M ' ar 'mc„. f•� �► + e f • •«ff s • • _r ! .111'6 i•i' ,+�...—wi:—
a+ `SN:vy .is O �•.,*♦ tv.....s ...., i .•i i'4 * 4 i rya i,4 O 6..r.4
6
4 r.w%.*
•. •_,R .... c .1' • _.f Y i Y .......•...aa.
Aliat AM *fa *we
. 0 N.., y ,4 . f •: t»s a , r. i yl •• .4•
s,, .9t. • .au •.aa _�. ''..It;1
,• **vv++"" lip.i5 R :.% .w s .i ,a e:+:. w.e .. ... a ° *t •....
off aes P•#do 11, .
•
f� ,
• m. " r f A F 9 . fT iw • P ••p x�L 4 9 i
»+ L an- •y: 4i: � • .J i`� AAA f4 ♦.
+•..• ` ,,.• .�4i.=x 1P •f;,
.•w 1 r^ a 'C1C'.-.. '. •
•e .•:•+/- s. as®— a t y� . .%YY t +• 4**4 I
rs•u.yG�; +a# +. fr,r . ►�. «... w ..s� sse'• rr. J `f. ti.st, ai •
.•,y eMe�a �t{ Y }f•y r. f♦ .; 0101...:37:1*
�m' aw'P.**.m 1.s 7.,Py. *4.'/•. .....„.„.....,/:„.4s.„ ,
Yt 4}i1
r.a 1.t,q ;rf.k -t.,+•r t• s r-._.r• am•W . . mw G ,r,. { - .. 4..4.44* O
1t%•.yr. tRr .. • ...a �'.'w ••1 . 3`4:,.. : • •
ea��,�gp'y17##fps�j•� , y• 4e..r = 3 - • C:`•*g` -� •• `y s4*6
+Y' 11.41 44
'.'",-11.t •• .:-.. �.�� .U �. Smart 'Sly.}0 q 4s.t i �!
.. t•a ft AI �s�:`.a�` ...... ......r•..r. + a C'a -+ i� J:; "J• a•a, 4 f•m
Sirs`v% ira%�!Alai..44= sw n. �...� .A't '+'•t k.i 11 ,.-1:r h.26 r•
414;11. ...e4.4 - s .o asamrsm-.. 4` ii. d: i .. ••I •
MA74 we . i i. rrI
S.
r , 1 r.. till l..,..
d 'III
.
Adapted from Chapter 2 of USDA Agriculture Handbook 703:`Predicting Soil Erosion by Water:A Guide to
Conservation Planning With the Revised Universal Soil Loss Equation(RUSLE),"U.S.Department of
Agriculture,Agricultural Research Service
r
Page 52
Construction General Permit TPDES General Permit TXR150000
Appendix C: Isoerodent Map
iiraige1
Y
WAfiltaraliMPINIMPariiirliiallaibilizipilifer
Irraralrillaffarl Who" 104111aRillis 6:1-7"
11111WANAlysradintirs#0111416,40,0111411,3144
'''"' 111X REV,111101/044110FALA114110/
Jill/1111111111,11111111171 tigliiiip11141241:111WiltriLlidr.
I 11/rim ntmarilimiteAllikostilltvit
sun malice itiavirkraimmeassikar
instarstimiumprAw
pr4
3 v�il wirarir itrA 4pourte ,r!-mrghibitar
" epirti Faint lifillid AdlimlikillAilkwialltiAgi
20 .4, eq frinfirras -4,44100pdliprrip-orsiroa
wi? Jir iffiallitt"40.4110*0401.10-14-0
s 34v4v P11141111eNie rINgiffirafiraniseler
Es°kb, -3' 1 rillitilliaboitikeirP Ir, 5'7° 0 4)
p la
175 all Weer14/411111ffirilifelfAaAlir 141"Pr'a
qr
ltot
46
225 'Mr
IL",
-w,y211101140
Adapted from Chapter 2 of USDA Agriculture Handbook 703:`Predicting Soil Erosion by Water:A Guide to
Conservation Planning With the Revised Universal Soil Loss Equation(RUSLE),"U.S.Department of
Agriculture,Agricultural Research Service
Page 53
co 00 00 0 0 0 0 0 00 0
0 0 0 0 0 0 0
N - .1 N H N .1 .1 .1 N H
.'.. 0 Q) 0 0 OT M CO 1. as N.
N 00 as 00 00 as O% as rn 0' as
.1
VD
O \ 0 CO 0 0 p, 0\ as as p,co 0,
O .1 1-1 - ti
N
0 - 0`, N. 0' 0' CO V co 0 Un 0
O — a a 0, 0, O, CA 0, (7, o, rn Cl..)
, N ' .o •Cu
,,/
W00 M CT)C' Cr) t•••• .1 CC N C 0)
O as as as as rn co co as co r. ri
N W COr. ti
+J •1 N. CV U) U) .1 0o V' N ON V O cp
▪ " O\ as O' as as O, CO CO CO CO CO ,1] .n -,
CA N V N. OO CO Li) M O1 CO '0 .1 yo:I 1.. p
O` oo co co co oo N. L. cO CO b vP4 X tl
C' c) c) c)
.Ni o . .1 .1 0 '0 M v - CO ^�
c• F rn co co co co N. N. N. CO N *� .o
cu crsC o Q,
0) co
b 0.A
rn 0_
Al Q m VD 0' N. N. N fit) N 'O N . Cl) O wp
N. '.O '.O '.O N. '.O 'O '.O N. h CO 'b
Pi •
r0 RI
N oo v,
H II
W CI‘ 0, u) 0 0 N. ,1 N. N oo N. p ,� w
O
7 N 0 M co N 1. .1 co .1 , 0)
t "CS Tr
i* .1VO ,0 u) u) 'O u) in lO VD � O X, o4 L.0
. . C.) G N 7 'u
4- , u4 4 LI \-8 La ^? aj
Cd
g •` :1- W ca
A
M 0) • O� OCT h) O� �O O� .1..+ .St
Il d d• Cr CO CO V 7 'ct to V
O O O y _
M M M N N m• co M o• o• {'".i cs N
.54. a
k .to N N so so N N N. CO N. CO CO
Win •� o ,Vy
/� ) co N '0 M N M CO M 0.) •� U .�
~ Cd a •O)
▪^ ;gin N ,M.� N N 00 ,M.� N N N �Oy
O gi �+" ('1 •�
a •
G) M t-- c0 .+ .1 so O .-+ .-i n- N O 0 Cl) )
C6 a m
Gam) c o .0
a \ v o .1 .1 et co rn -
M O 0 1°)
O .1 co d , , CO O h a t\ M F tl N
C' 0 a ' U •�
U \ N CO N `Zr0 0 u] 'O L1) O, b ti
O d
N a c.)
co \ .1 N 0 0. - N M d' CO so V d �+ �i
O
U W w ti 'Ga a
• .-, .1 O O .1 .1 ." N .1 M b a
61 y •U
O 0 0 0 0 0 0 0 0 0 '0 0
* Q
r"• 000 a O' O' ON a as T ON O
W �
TCEQ Office Use Only
Permit No:
CN:
RN:
r Notice of Intent (NOI) for an Authorization for
Stormwater Discharges Associated with
^ter Construction Activity tY under
TCEQ TPDES General Permit TXR150000
IMPORTANT INFORMATION
Please read and use the General Information and Instructions prior to filling out each
question in the NOI form.
Use the NOI Checklist to ensure all required information is completed correctly.
Incomplete applications delay approval or result in automatic denial.
Once processed your permit authorization can be viewed by entering the following link
into your internet browser: http://www2.tceq.texas.gov/wq_dpa/index.cfm or you can
contact TCEQ Stormwater Processing Center at 512-239-3700.
re-PERMITS-7
Effective September 1, 2018, this paper form must be submitted to TCEQ with a
completed electronic reporting waiver form(TCEQ-20754).
To submit an NOI electronically, enter the following web address into your internet
browser and follow the instructions: https://www3.tceq.texas.gov/steers/index.cfm
APPLICATION FEE AND PAYMENT
The application fee for submitting a paper NOI is $325. The application fee for electronic
submittal of a NOI through the TCEQ ePermits system (STEERS) is $225.
Payment of the application fee can be submitted by mail or through the TCEQ ePay
system. The payment and the NOI must be mailed to separate addresses. To access the
TCEQ ePay system enter the following web address into your internet browser:
http://www.tceq.texas.gov/epay.
Provide your payment information for verification of payment:
• If payment was mailed to TCEQ, provide the following:
o Check/Money Order Number
o Name printed on Check: t a �
• If payment was made via ePay, provide the following:
o Voucher Number
o A copy of the payment voucher is attached to this paper NOI form.
TCEQ-20022(3/6/2018) Page 1
Notice of Intent for Construction Stormwater Discharges under TXR150000
;RENEWAL(This portion,of the NOI is not applicable after June), 2018) f_ _ V M,
Is this NOI for a renewal of an existing authorization? D Yes D No
If Yes, provide the authorization number here: TXR15 r ,
NOTE: If an authorization number is not provided, a new number will be assigned.
SECTION 1. OPERATOR (APPLICANT)
a) If the applicant is currently a customer with TCEQ, what is the Customer Number
(CN) issued to this entity? CN
(Refer to.Section 1.a) of the Instructions)
b) What is the Legal Name of the.entity (applicant) applying for this permit? (The
legal name must be spelled exactly as filed with the Texas Secretary of State,
County, or in the legal document forming the entity.)
c) What is the contact information for the Operator (Responsible Authority)?
Prefix (Mr. Ms. Miss): r _ R
First and Last Name: Suffix r'
Title: . Credentials: j
Phone Number: Fax Number: r
E-mail
Mailing Address .
City, State, and Zip Code:
Mailing Information if outside USA:
Territory: )
Country Coder Postal Code: 1
d) Indicate the type of customer:
0Individual b Federal Government
O Limited Partnership 0 County Government
0: General Partnership 0 State Government
0 Trust 0 City Government
O Sole Proprietorship (D.B.A.) 0 Other Government
o Corporation 0 Other:
0 Estate
e) Is the applicant an independent operator? 0 Yes 0 No
TCEQ-20022(3/6/2018) Page 2
Notice of Intent for Construction Stormwater Discharges under TXR150000
(If a governmental entity, a subsidiary, or part of a larger corporation, check No.)
f) Number of Employees. Select the range applicable to your company.
❑ 0-20 ❑ 251-500
1❑ 21400 p 50 or higher
❑ 101-250
g) Customer Business Tax and Filing Numbers: (Required for Corporations and Limited
Partnerships. Not Required for Individuals, Government, or Sole Proprietors.)
State Franchise Tax ID Number:
Federal Tax ID:
Texas Secretary of State Charter (filing) Number: t
DUNS Number (if known): ;_
SECTION 2. APPLICATION CONTACT
Is the application contact the same as the applicant identified above?
❑ Yes, go to Section 3
❑ No, complete this section
Prefix (Mr. Ms. Miss): 1 _
First and Last Name: : � Suffix:
Title: Credential:
Organization Name: _-
Phone Number: ____ _ ___ Fax Number:
E-mail: ,�
Mailing Address: ______ __
Internal Routing (Mail Code, Etc.): _ _
City, State, and Zip Code: _______ _ _ ___ ._ ,
Mailing information if outside USA:
Territory:
Country Code: i _ Postal Code:
SECTION 3. REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE
a) If this is an existing permitted site, what is the Regulated Entity Number (RN)
issued to this site? RN
(Refer to Section 3.a) of the Instructions)
TCEQ-20022(3/6/2018) Page 3
Notice of Intent for Construction Stormwater Discharges under TXR150000
b) Name of project or site (the name known by the community where it's located):
c) In your own words, briefly describe the type of construction occurring at the
regulated site (residential, industrial, commercial, or other): _
d) County or Counties (if located in more than one): r
e) Latitude: Longitude: --__-
f) Site Address/Location
If the site has a physical address such as 12100 Park 35 Circle, Austin, TX 78753,
complete Section A.
If the site does not have a physical address, provide a location description in Section B.
Example: located on the north side of FM 123, 2 miles west of the intersection of FM
123 and Highway 1.
Section A:
Street Number and Name:
City, State, and Zip Code: r � _
Section B:
Location Description: r
City(or city nearest to) where the site is located:
Zip Code where the site is located:
SECTION 4. GENERAL CHARACTERISTICS
a) Is the project or site located on Indian Country Lands?
p Yes, do not submit this form. You must obtain authorization through EPA Region
6.
❑ No
b) Is your construction activity associated with a facility that, when completed, would be
associated with the exploration, development, or production of oil or gas or geothermal
resources?
Yes. Note: The construction stormwater runoff may be under jurisdiction of the
Railroad Commission of Texas and may need to obtain authorization through EPA
Region 6.
❑ No
c) What is the Primary Standard Industrial Classification (SIC) Code that best describes the
construction activity being conducted at the site? Lw
d) What is the Secondary SIC Code(s), if applicable?
e) What is the total number of acres to be disturbed? i
f) Is the project part of a larger common plan of development or sale?
TCEQ-20022(3/6/2018) Page 4
Notice of Intent for Construction Stormwater Discharges under TXR150000
❑ Yes
0 No. The total number of acres disturbed, provided in e) above, must be 5 or more.
If the total number of acres disturbed is less than 5, do not submit this form. See
the requirements in the general permit for small construction sites..
g) What is the estimated start date of the project?
h) What is the estimated end date of the project? !__� _
i) Will concrete truck washout be performed at the site? 5 Yes .0 No
j) What is the name of the first water body(ies) to receive the stormwater runoff or
potential runoff from the site? _______
k) What is the segmentnumber(s) of the classified water body(ies) that the discharge will
eventually-reach? r__
1) Is the discharge into a Municipal Separate Storm Sewer System (MS4)?
Yes r0 No
If Yes, provide the name of the MS4 operator: _
Note: The general permit requires you to send a copy of this NOI form to the MS4
operator.
m) Is the discharge or potential discharge from the site within the Recharge Zone,
Contributing Zone, or Contributing Zone within the Transition Zone of the
Edwards Aquifer, as defined in 30 TAC Chapter 213?
0 Yes, complete the certification below.
r
No, go to Section 5
I certify that the copy of the TCEQ approved Plan required by the Edwards Aquifer Rule
(30 TAC Chapter 213) that is included or referenced in the Stormwater Pollution
Prevention Plan will be implemented. 0 Yes
SECTION 5. NOI CERTIFICATION
a) I certify that I have obtained a copy and understand the terms and conditions of the
Construction General Permit (TXR150000). Yes
b) I certify that the full legal name of the entity applying for this permit has been provided
and is legally authorized to do business in Texas. 0 Yes
c) I understand that a Notice of Termination(NOT) must be submitted when this
authorization is no longer needed. 0.Yes
d) I certify that a Stormwater Pollution Prevention Plan has been developed, will be
implemented prior to construction and to the best of my knowledge and belief is
compliant with any applicable local sediment and erosion control plans, as required in
the Construction General Permit (TXR150000). 0 Yes
Note: For multiple operators who prepare a shared SWP3, the confirmation of an
operator may be limited to its obligations under the SWP3, provided all obligations are
confirmed by at least one operator.
TCEQ-20022(3/6/2018) Page 5
Notice of Intent for Construction Stormwater Discharges under TXR150000
SECTION 6. APPLICANT CERTIFICATION SIGNATURE
Operator Signatory Name: L •
Operator Signatory Title:
I certify under penalty of law that this document and all attachments were prepared under
my direction or supervision in accordance with a system designed to assure that qualified
personnel properly gather and evaluate the information submitted. Based on my inquiry of
the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for
knowing violations.
I further certify that I am authorized under 30 Texas Administrative Code §305A4 to sign
and submit this document, and can provide documentation in proof of such authorization
upon request.
Signature (use blue ink): Date:
TCEQ-20022(3/6/2018) Page 6
Notice of Intent for Construction Stormwater Discharges under TXR150000
NOTICE OF INTENT CHECKLIST (T150000)
Did you complete everything? Use this checklist to be sure!
Are you ready to mail your form to TCEQ? Go to the General Information Section of the
Instructions for mailing addresses.
Confirm each item(or applicable item) in this form is complete. This checklist is for use by
the applicant to ensure a complete application is being submitted. Missing information
may result in denial of coverage under the general permit. (See NOI process description in
the General Information and Instructions.)
APPLICATION FEE ` e _._ � 2 _w _
If paying by check:
0 Check was mailed separately to the TCEQs Cashier's Office. (See Instructions for Cashier's
address and Application address.)
0' Check number and name on check is provided in this application.
If using ePay:
0 The voucher number is provided in this application and a copy of the voucher is attached,
1-RENEWAL
"O If this application is for renewal of an existing authorization, the authorization number is
provided.
OPERATOR INFORMATION
0 Customer Number (CN) issued by TCEQ Central Registry
0 Legal name as filed to do business in Texas. (Call TX SOS 512463-5555 to verify.)
0 Name and title of responsible authority signing the application.
D Phone number and e-mail address
0 Mailing address is complete &verifiable with USPS. www.usps.com
0 Type of operator (entity type). Is applicant an independent operator?
0 Number of employees.
0 For corporations or limited partnerships - Tax ID and SOS filing numbers.
D Application contact and address is complete &verifiable with USPS. http://www.usps.com
REGULATED ENTITY_(RE)-INFORMATION ON-PROJECT OR SITE
0 Regulated Entity Number (RN) (if site is already regulated by TCEQ)
0 Site/project name and construction activity description
0 County
p Latitude and longitude http://www.tceq.texas.gov/gis/sgmaview.html
TCEQ-20022 Checklist(03/06/2018) Page 1
• Site Address/Location. Do not use a rural route or post office box.
GENERAL CHARACTERISTICS
❑ Indian Country Lands -the facility is not on Indian Country Lands.
Construction activity related to facility associated to oil, gas, or geothermal resources
• Primary SIC Code that best describes the construction activity being conducted at the site.
www.osha.gov/oshstats/sicser.html
Estimated starting and ending dates of the project.
Confirmation of concrete truck washout.
p Acres disturbed is provided and qualifies for coverage through a NOI.
l Common plan of development or sale.
O Receiving water body or water bodies.
• Segment number or numbers.
.d MS4 operator.
Edwards Aquifer rule.
CERTIFICATION
E I Certification statements have been checked indicating Yes.
• Signature meets 30 Texas Administrative Code (TAC) §305.44 and is original.
TCEQ-20022 Checklist (03/06/2018) Page 2
Instructions for Notice of Intent (NOI) for
Stormwater Discharges Associated with Construction
Activity under TPDES General Permit (TXR150000)
GENERAL INFORMATION
Where to Send a the Notice of Intent (NOD;
By Regular Mail: By Overnight or Express Mail:
TCEQ TCEQ
Stormwater Processing Center (MC228) Stormwater Processing Center (MC228)
P.O. Box 13087 12100 Park 35 Circle
Austin, Texas 78711-3087 Austin, TX
Application Fee
The application fee of $325 is required to be paid at the time the NOI is submitted.
Failure to submit payment at the time the application is filed will cause delays in
acknowledgment or denial of coverage under the general permit. Payment of the fee
may be made by check or money order, payable to TCEQ, or through EPAY.(electronic
payment through the web).
Mailed Payments: '
Use the attached General Permit Payment Submittal Form. The application fee is
submitted to a different address than the NOI. Read the General Permit Payment
Submittal Form for further instructions, including the address to send the payment.
ePAY Electronic Payment: http://www.tceq.texas.gov/epay
When making the payment you must select Water Quality, and then select the fee
category "General Permit Construction Storm Water Discharge_NOI Application". You
must include a copy of the payment voucher with your NOI. Your NOI will not be
considered complete without the payment voucher.
'TCEQ Contact List
Application - status and form questions: 512-239-3700, swpermit@tceq.texas:gov
Technical questions: 512-239-4671, swgp@tceq.texas.gov
Environmental Law Division: 512-239-0600
Records Management - obtain copies of forms: 512-239-0900
Reports from databases (as available): 512-239-DATA(3282)
Cashier's office: 512-239-0357 or 512-239-0187
Notice of Intent Process;.
When your NOI is received by the program, the form will be processed as follows:
• Administrative Review: Each item on the form will be reviewed for a
complete response. In addition, the operator's legal name must be
verified with Texas Secretary of State as valid and active (if applicable).
The address(es) on the form must be verified with the US Postal service
as receiving regular mail delivery. Do not give an overnight/express
mailing address.
TCEQ 20022 (3/6/2018) Page 1
Instructions for Notice of Intent for TPDES General Permit TXR150000
• Notice of Deficiency: If an item is incomplete or not verifiable as indicated
above, a notice of deficiency (NOD) will be mailed to the operator. The
operator will have 30 days to respond to the NOD. The response will be
reviewed for completeness.
• Acknowledgment of Coverage: An Acknowledgment Certificate will be mailed
to the operator. This certificate acknowledges coverage under the general
permit.
or
Denial of Coverage: If the operator fails to respond to the NOD or the response
is inadequate, coverage under the general permit may be denied. If coverage is
denied, the operator will be notified.
;General Permit (Your Permit)___. ._wv.
For NOIs submitted electronically through ePermits, provisional coverage under the
general permit begins immediately following confirmation of receipt of the NOI form by
the TCEQ.
For paper NOIs, provisional coverage under the general permit begins 7 days
after a completed NOI is postmarked for delivery to the TCEQ.
You should have a copy of your general permit when submitting your application. You
may view and print your permit for which you are seeking coverage, on the TCEQ web
site http://www.tceq.texas.gov. Search using keyword TXR150000.
,Change in aerator
An authorization under the general permit is not transferable. If the operator of the
regulated project or site changes, the present permittee must submit a Notice of
Termination and the new operator must submit a Notice of Intent. The NOT and NOI must
be submitted no later than 10 days prior to the change in Operator status.
tTCEQ Central Registry Core Data Form
The Core Data Form has been incorporated into this form. Do not send a Core Data Form
to TCEQ. After final acknowledgment of coverage under the general permit, the program
will assign a Customer Number and Regulated Entity Number, if one has not already been
assigned to this customer or site.
For existing customers and sites, you can find the Customer Number and Regulated Entity
Number by entering the following web address into your internet browser:
http://wwwl5.tceq.texas.gov/crpub/ or you can contact the TCEQ Stormwater Processing
Center at 512-239-3700 for assistance. On the website, you can search by your permit
number, the Regulated Entity(RN) number, or the Customer Number (CN). If you do not
know these numbers; you can select "Advanced Search" to search by permittee name, site
address, etc.
The Customer (Permittee) is responsible for providing consistent information to the TCEQ
and for updating all CN and RN data for all authorizations as changes occur.For this permit,
a Notice of Change form must be submitted to the program area.
TCEQ 20022 (3/6/2018) Page 2
Instructions for Notice of Intent for TPDES General Permit TXR150000
INSTRUCTIONSFOR FILLING OUT THE NOl FORM
Renewal of General Permit. Dischargers5holding active authorizations under the expired
General Permit are required to submit a NOI to continue coverage. The existing permit
number is required. If the permit number is not provided or has been terminated, expired,
or denied, a new permit number will be issued.
Section 1 OPERATOR(APPLICANT)
a) Customer Number (CN)
TCEQ's Central Registry will assign each customer a number that begins with CN,
followed by nine digits. This is not a permit number, registration number, or license
number.
If the applicant is an existing TCEQ customer, the Customer Number is available at
the following website: http://wwwl5.tceq.texas.gov/crpub/. If the applicant is not an
existing TCEQ customer, leave the space for CN blank.
b) Legal Name of Applicant
Provide the current legal name of the applicant. The name must be provided exactly as
filed with the Texas Secretary,of State (SOS), or on other legal documents forming the
entity, as filed in the county. You may contact the SOS at 512-463-5555, for more
information related to filing in Texas. If filed in the county, provide a copy of the legal
documents showing the legal name.
c) Contact Information for the Applicant (Responsible Authority)
Provide information for the person signing the application in the Certification section.
This person is also referred to as the Responsible Authority.
Provide a complete mailing address for receiving mail from the TCEQ. The mailing
address must be recognized by the US Postal Service. You may verify the address on
the following website: https://tools.usps.com/go/ZipLookupAction!input.action.
The phone number should provide contact to the applicant.
The fax number and e-mail address are optional and should correspond to the
applicant.
d) Type of Customer (Entity Type)
Check only one box that identifies the type of entity. Use the descriptions below to
identify the appropriate entity type. Note that the selected entity type also indicates
the name that must be provided as an applicant for an authorization.
Individual
An individual is a customer who has not established a business,but conducts an
activity that needs to be regulated by the TCEQ.
Partnership
A customer that is established as a partnership as defined by the Texas Secretary
of State Office (TX SOS). If the customer is a `General Partnership' or `Joint Venture'
filed in the county (not filed with TX SOS), the legal name of each partner forming
the `General Partnership' or `Joint Venture' must be provided. Each `legal entity'
must apply as a co-applicant.
TCEQ 20022 (3/6/2018) Page 3
Instructions for Notice of Intent for TPDES General Permit TXR150000
Trust or Estate
A trust and an estate are fiduciary relationships governing the trustee/executor
with respect to the trust/estate property.
Sole Proprietorship (DBA)
A sole proprietorship is a customer that is owned by only one person and has not
been incorporated. This business may:
1. be under the person's name
2. have its own name (doing business as or DBA)
3. have any number of employees.
If the customer is a Sole Proprietorship or DBA, the `legal name' of the individual
business `owner' must be provided. The DBA name is not recognized as the `legal
name' of the entity. The DBA name may be used for the site name (regulated
entity).
Corporation
A customer that meets all of these conditions:
1. is a legally incorporated entity under the laws of any state or country
2. is recognized as a corporation by the Texas Secretary of State
3: has proper operating authority to operate in Texas
The corporation's `legal name' as filed with the Texas Secretary of State must be
provided as applicant. An `assumed' name of a corporation is not recognized as the
`legal name' of the entity.
Government
Federal, state, county, or city government (as appropriate)
The customer is either an agency of one of these levels of government or the
governmental body itself. The government agency's `legal name' must be provided
as the applicant. A department name or other description of the organization is not
recognized as the `legal name'.
Other
This may include a utility district, water district, tribal government, college district,
council of governments, or river authority. Provide the specific type of government.
e) Independent Entity
Check No if this customer is a subsidiary, part of a larger company, or is a
governmental entity. Otherwise, check Yes.
f) . Number of Employees
Check one box to show the number of employees for this customer's entire
company, at all locations. This is not necessarily the number of employees at the site
named in the application.
TCEQ 20022 (3/6/2018) Page 4
Instructions for Notice of Intent for TPDES General Permit TXR150000
g) Customer Business Tax and Filing Numbers
These are required for Corporations and Limited Partnerships. These are not required
for Individuals, Government, and Sole Proprietors.
State Franchise Tax ID Number
Corporations and limited liability companies that operate in Texas are issued a
franchise tax identification number. If this customer is a corporation or limited
liability company, enter the Tax ID number.
Federal Tax ID
All businesses, except for some small sole proprietors, individuals, or general
partnerships should have a federal taxpayer identification number (TIN). Enter this
number here. Use no prefixes, dashes, or hyphens. Sole proprietors, individuals, or
general partnerships do not need to provide a federal tax ID.
TX SOS Charter (filing) Number
Corporations and Limited Partnerships required to register with the Texas Secretary of
State are issued a charter or filing number. You may obtain further information by
calling SOS at 512-463-5555.
DUNS Number
Most businesses have a DUNS (Data Universal Numbering System) number issued by
Dun and Bradstreet Corp. If this customer has one, enter it here.
Section 2 APPLICATION CONTACT
Provide the name and contact information for the person that TCEQ can contact for
additional information regarding this application.
=Section 3. REGULATED ENTITY(RE) INFORMATION ON PROJECT OR SITE
a) Regulated Entity Number (RN)
The RN is issued by TCEQ's Central Registry to sites where an activity is regulated by
TCEQ. This is not a permit number, registration number, or license number. Search
TCEQ's Central Registry to see if the site has an assigned RN at
http://wwwl5.tceq.texas.gov/crpub/. If this regulated entity has not been assigned an
RN, leave this space blank.
If the site of your business is part of a larger business site, an RN may already be
assigned for the larger site. Use the RN assigned for the larger site.
If the site is found, provide the assigned RN and provide the information for the site
to be authorized through this application. The site information for this authorization
may vary from the larger site information.
An example is a chemical plant where a unit is owned or operated by a separate
corporation that is accessible by the same physical address of your unit or facility.
Other examples include industrial parks identified by one common address but
different corporations have control of defined areas within the site. In both cases, an
RN would be assigned for the physical address location and the permitted sites would
be identified separately under the same RN.
TCEQ 20022 (3/6/2018) Page 5
Instructions for Notice of Intent for TPDES General Permit TXR150000
b) Name of the Project or Site
Provide the name of the site or project as known by the public in the area where the
site is located. The name you provide on this application will be used in the TCEQ
Central Registry as the Regulated Entity name.
c) Description of Activity Regulated
In your own words, briefly describe the primary business that you are doing that
requires this authorization. Do not repeat the SIC Code description.
d) County
Provide the name of the county where the site or project is located. If the site or project
is located in more than one county, provide the county names as secondary.
e) Latitude and Longitude
Enter the latitude and longitude of the site in degrees, minutes, and seconds or
decimal form. For help obtaining the latitude and longitude, go to:
http://www.tceq.texas.gov/gis/sqmaview.html.
f) Site Address/Location
If a site has an address that includes a street number and street name, enter the
complete address for the site in Section A. If the physical address is not recognized as
a USPS delivery address, you may need to validate the address with your local police
(911 service) or through an online map site used to locate a site. Please confirm this to
be a complete and valid address. Do not use a rural route or post office box for a site
location.
If a site does not have an address that includes a street number and street name,
provide a complete written location description in Section B. For example: "The site
is located on the north side of FM 123, 2 miles west of the intersection of FM 123
and Highway 1."
Provide the city(or nearest city) and zip code of the site location.
!Section 4.rv(E—NERAL CHARACTERISTICS
a) Indian Country Lands
If your site is located on Indian Country Lands, the TCEQ does not have authority to
process your application. You must obtain authorization through EPA Region 6,
Dallas. Do not submit this form to TCEQ.
b) Construction activity associated with facility associated with exploration, development,
or production of oil, gas, or geothermal resources
If your activity is associated with oil and gas exploration, development, or production,
you may be under jurisdiction of the Railroad Commission of Texas (RRC) and may
need to obtain authorization from EPA Region 6.
Construction activities associated with a facility related to oil, gas or geothermal
resources may include the construction of a well site; treatment or storage facility;
underground hydrocarbon or natural gas storage facility; reclamation.plant; gas
processing facility; compressor station; terminal facility where crude oil is stored prior
to refining and at which refined products are stored solely for use at the facility; a
TCEQ 20022 (3/6/2018) Page 6
Instructions for Notice of Intent for TPDES General Permit TXR150000
carbon dioxide geologic storage facility; and a gathering, transmission, or distribution
pipeline that will transport crude oil or natural gas, including natural gas liquids, prior
to refining of such oil or the use of the natural gas in any manufacturing process or as
a residential or industrial fuel.
Where required by federal law, discharges of stormwater associated with construction
activities under the RRC's jurisdiction must be authorized by the EPA and the RRC, as
applicable. Activities under RRC jurisdiction include construction of a facility that,
when completed, would be associated with the exploration, development, or
production of oil or gas or geothermal resources, such as a well site; treatment or
storage facility; underground hydrocarbon or natural gas storage facility; reclamation
plant; gas processing facility; compressor station; terminal facility where crude oil is
stored prior to refining and at which refined products are stored solely for use at the
facility; a carbon dioxide geologic storage facility under the jurisdiction of the RRC;
and a gathering, transmission, or distribution pipeline that will transport crude oil or
natural gas, including natural gas liquids, prior to refining of such oil or the use of the
natural gas in any manufacturing process or as a residential or industrial fuel. The RRC
also has jurisdiction over stormwater from land disturbance associated with a site
survey that is conducted prior to construction of a facility that would be regulated by
the RRC. Under 33 U.S.C. §1342(1)(2) and §1362(24), EPA cannot require a permit for
discharges of stormwater from field activities or operations associated with{oil and
gas} exploration, production, processing, or treatment operations, or transmission
facilities, including activities necessary to prepare a site for drilling and for the
movement and placement of drilling equipment, whether or not such field activities or
operations may be considered to be construction activities unless the discharge is
contaminated by contact with any overburden, raw material, intermediate product,
finished product, byproduct, or waste product located on the site of the facility. Under
§3.8 of this title (relating to Water Protection), the RRC prohibits operators from
causing or allowing pollution of surface or subsurface water. Operators are encouraged
to implement and maintain best management practices (BMPs) to minimize discharges
of pollutants, including sediment, in stormwater during construction activities to help
ensure protection of surface water'quality during storm events.
For more information about the jurisdictions of the RRC and the TCEQ, read the
Memorandum of Understanding (MOU)between the RRC and TCEQ at 16 Texas
Administrative Code, Part 1, Chapter 3, Rule 3.30, by entering the following link into
an Internet browser:
http://texreg.sos.state.tx.us/public/readtac$ext.TacPage?s1=R&app=9&p_dir=&p_rloc=
&p_tloc=&p_ploc=&pg=1&p_tac=&ti=16&pt=1&ch=3&r1=30 or contact the TCEQ
Stormwater Team at 512-239-4671 for additional information.
c) Primary Standard Industrial Classification(SIC) Code
Provide the SIC Code that best describes the construction activity being conducted at
this site.
Common SIC Codes related to construction activities include:
• 1521 - Construction of Single Family Homes
• 1522 - Construction of Residential Buildings Other than Single Family Homes
• 1541 - Construction of Industrial Buildings and Warehouses
TCEQ 20022 (3/6/2018) Page 7
Instructions for Notice of Intent for TPDES General Permit TXR150000
• 1542 - Construction of Non-residential Buildings, other than Industrial Buildings
and Warehouses
• 1611 - Highway and Street Construction, except Highway Construction
• 1622 - Bridge, Tunnel, and Elevated Highway Construction
• 1623 - Water, Sewer, Pipeline and Communications, and Power Line Construction
For help with SIC Codes, enter the following link into your Internet browser:
http://www.osha.gov/p1s/imis/sicsearch.html or you can contact the TCEQ Small
Business and Local Government Assistance Section at 800-447-2827 for assistance.
d) Secondary SIC Code
Secondary SIC Code(s) may be provided. Leave this blank if not applicable. For help
with SIC Codes, enter the following link into your Internet browser:
http://www.osha.gov/pls/imis/sicsearch.html or you can contact the TCEQ Small
Business and Environmental Assistance Section at 800-447-2827 for assistance.
e) Total Number of Acres Disturbed
Provide the approximate number of acres that the construction site will disturb.
Construction activities that disturb less than one acre, unless they are part of a
larger common plan that disturbs more than one acre, do not require permit
coverage. Construction activities that disturb between one and five acres, unless
they are part of a common plan that disturbs more than five acres, do not require
submission of an NOI. Therefore, the estimated area of land disturbed should not be
less than five, unless the project is part of a larger common plan that disturbs five
or more acres. Disturbed means any clearing, grading, excavating, or other similar
activities.
If you have any questions about this item, please contact the stormwater technical
staff by phone at 512-239-4671 or by email at swgp@tceq.texas.gov.
f) Common Plan of Development
Construction activities that disturb less than five acres do not require submission of
an NOI unless they are part of a common plan of development or for sale where the
area disturbed is five or more acres. Therefore, the estimated area of land disturbed
should not be less than five, unless the project is part of a larger common plan that
disturbs five or more acres. Disturbed means any clearing, grading, excavating, or
other similar activities.
For more information on what a common plan of development is, refer to the
definition of "Common Plan of Development" in the Definitions section of the general
permit or enter the following link into your internet browser:
www.tceq.texas.gov/permitting/stormwater/common_plan_of_development_steps.html
For further information, go to the TCEQ stormwater construction webpage enter the
following link into your Internet browser: www.tceq.texas.gov/goto/construction and
search for "Additional Guidance and Quick Links". If you have any further questions
about the Common Plan of Development you can contact the TCEQ Stormwater Team
at 512-239-4671 or the TCEQ Small Business and Environmental Assistance at 800-447-
2827.
TCEQ 20022 (3/6/2018) Page 8
Instructions for Notice of Intent for TPDES General Permit TXR150000
g) Estimated Start Date of the Project
This is the date that any construction activity or construction support activity is
initiated at the site. If renewing the permit provide the original start date of when
construction activity for this project began.
h) Estimated End Date of the Project
This is the date that any construction activity or construction support activity will
end and final stabilization will be achieved at the site.
i) Will concrete truck washout be performed at the site?
Indicate if you expect that operators of concrete trucks will washout concrete trucks
at the construction site.
j) Identify the water body(s) receiving stormwater runoff
The stormwater may be discharged directly to a receiving stream or through a MS4
from your site. It eventually reaches a receiving water body such as a local stream or
lake, possibly via a drainage ditch. You must provide the name of the water body that
receives the discharge from the site (a local stream or lake).
If your site has more than one outfall you need to include the name of the first water
body for each outfall, if they are different.
k) Identify the segment number(s) of the classified water body(s)
Identify the classified segment number(s) receiving a discharge directly or indirectly.
Enter the following link into your Internet browser to find the segment number of the
classified water body where stormwater will flow from the site:
www.tceq.texas.gov/waterquality/monitoring/viewer.html or by contacting the TCEQ
Water Quality Division at (512) 239-4671 for assistance.
You may also find the segment number in TCEQ publication GI-316 by entering the
following link into your Internet browser: www.tceq.texas.gov/publications/gi/gi-316
or by contacting the TCEQ Water Quality Division at (512) 239-4671 for assistance.
If the discharge is into an unclassified receiving water and then crosses state lines
prior to entering a classified segment, select the appropriate watershed:
• 0100 (Canadian River Basin)
• 0200 (Red River Basin)
• 0300 (Sulfur River Basin)
• 0400 (Cypress Creek Basin)
• 0500 (Sabine River Basin)
Call the Water Quality Assessments section at 512-239-4671 for further assistance.
1) Discharge into MS4 - Identify the MS4 Operator
The discharge may initially be into a municipal separate storm sewer system (MS4). If
the stormwater discharge is into an MS4, provide the name of the entity that operates
the MS4 where the stormwater discharges. An MS4 operator is often a city, town,
county, or utility district, but possibly can be another form of government. Please note
that the Construction General Permit requires the Operator to supply the MS4 with a
TCEQ 20022 (3/6/2018) Page 9
Instructions for Notice of Intent for TPDES General Permit TXR150000
copy of the NOI submitted to TCEQ. For assistance, you may call the technical staff at
512-239-4671.
m) Discharges to the Edwards Aquifer Recharge Zone and Certification
The general permit requires the approved Contributing Zone Plan or Water Pollution
Abatement Plan to be included or referenced as a part of the Stormwater Pollution
Prevention Plan.
See maps on the TCEQ website to determine if the site is located within the Recharge
Zone, Contributing Zone, or Contributing Zone within the Transition Zone of the
Edwards Aquifer by entering the following link into an Internet browser:
www.tceq.texas.gov/field/eapp/viewer.htnil or by contacting the TCEQ Water Quality
Division at 512-239-4671 for assistance.
If the discharge or potential discharge is within the Recharge Zone, Contributing Zone,
or Contributing Zone within the Transition Zone of the Edwards Aquifer, a site-specific
authorization approved by the Executive Director under the Edwards Aquifer
Protection Program (30 TAC Chapter 213) is required before construction can begin.
For questions regarding the Edwards Aquifer Protection Program, contact the
appropriate TCEQ Regional Office. For projects in Hays, Travis and Williamson
Counties: Austin Regional Office, 12100 Park 35 Circle, Austin, TX 78753, 512-339-
2929. For Projects in Bexar, Comal, Kinney, Medina and Uvalde Counties: TCEQ San
Antonio Regional Office, 14250 Judson Rd., San Antonio, TX 78233-4480, 210-490-
3096.
Section 5. NOI CERTIFICATION
Note: Failure to indicate Yes to all of the certification items may result in denial of
coverage under the general permit.
a) Certification of Understanding the Terms and Conditions of Construction General
Permit (TXR150000)
Provisional coverage under the Construction General Permit (TXR150000)begins 7
days after the completed paper NOI is postmarked for delivery to the TCEQ. Electronic
applications submitted through ePermits have immediate provisional coverage. You
must obtain a copy and read the Construction General Permit before submitting your
application. You may view and print the Construction General Permit for which you are
seeking coverage at the TCEQ web site by entering the following link into an internet
browser: www.tceq.texas.gov/goto/construction or you may contact the TCEQ
Stormwater processing Center at 512-239-3700 for assistance.
b) Certification of Legal Name
The full legal name of the applicant as authorized to do business in Texas is required.
The name must be provided exactly as filed with the Texas Secretary of State (SOS), or
on other legal documents forming the entity, that is filed in the county where doing
business. You may contact the SOS at 512-463 5555, for more information related to
filing in Texas.
c) Understanding of Notice of Termination
A permittee shall terminate coverage under the Construction General Permit through
the submittal of a NOT when the operator of the facility changes, final stabilization has
TCEQ 20022 (3/6/2018) Page 10
Instructions for Notice of Intent for TPDES General Permit TXR150000
been reached, the.discharge becomes authorized under an individual permit, or the
construction activity never began at this site.
d) Certification of Stormwater Pollution Prevention Plan
The SWP3 identifies the areas and activities that could produce contaminated runoff at
your site and then tells how you will ensure that this contamination is mitigated. For
' example, in describing your mitigation measures, your site's plan might identify the
devices that collect and filter stormwater, tell how those devices are to be maintained,
and tell how frequently that maintenance is to be carried out. You must develop this
plan in accordance with the TCEQ general permit requirements. This plan must be
developed and implemented before you complete this NOI. The SWP3 must be
available for a TCEQ investigator to review on request.
Section 6_APPLICANT aCERTIFICATION SIGNATURE
The certification must bear an original signature of a person meeting the signatory
requirements specified under 30 Texas Administrative Code (TAC) §305.44.
If you are a corporation:
The regulation that controls who may sign an NOl or similar form is 30 Texas
Administrative Code §305.44(a)(1) (see below). According to this code provision, any
corporate representative may sign an NOI or similar form so long as the authority to sign
such a document has been delegated to that person in accordance with corporate
procedures. By signing the NOI or similar form, you are certifying that such authority has
been delegated to you. The TCEQ may request documentation evidencing such authority.
If you are a municipality or other government entity:
The regulation that controls who may sign an NOI or similar form is 30 Texas
Administrative Code §305.44(a)(3) (see below). According to this code provision, only a
ranking elected official or principal executive officer may sign an NOI or similar form.
Persons_such as the City Mayor or County Commissioner will be considered ranking
elected officials. In order to identify the principal executive officer of your government
entity, it may be beneficial to consult your city charter, county or city ordinances, or the
Texas statute(s)under which your government entity was formed. An NOI or similar
document that is signed by a government official who is not a ranking elected official or
principal executive officer does not conform to §305.44(a)(3). The signatory requirement
may not be delegated to a government representative other than those identified in the
regulation. By signing the NOI or similar form, you are certifying that you are either a
ranking elected official or principal executive officer as required by the administrative
code. Documentation demonstrating your position as a ranking elected official or
principal executive officer may be requested by the TCEQ.
If you have any questions or need additional information concerning the signatory
requirements discussed above, please contact the TCEQ's Environmental Law Division at
512-239-0600.
TCEQ 20022 (3/6/2018) Page 11
Instructions for Notice of Intent for TPDES General Permit TXR150000
30 Texas Admuustrative tode
§305.44. Signatories to Applications
(a) All applications shall be signed as follows.
(1) For a corporation, the application shall be signed by a responsible
corporate officer. For purposes of this paragraph, a responsible corporate officer means
a president, secretary, treasurer, or vice-president of the corporation in charge of a
principal business function, or any, other person who performs similar policy or decision-
making functions for the
corporation; or the manager of one or more manufacturing, production, or operating
facilities employing more than 250 persons or having gross annual sales or expenditures
exceeding $25 million (in second-quarter 1980 dollars), if authority to sign documents
has been assigned or delegated to the manager in accordance with corporate procedures.
Corporate procedures governing authority to sign permit or post-closure order
applications may provide for assignment or delegation to applicable corporate positions
rather than to specific individuals.
(2) For a partnership or sole proprietorship, the application shall be signed
by a general partner or the proprietor, respectively.
(3) For a municipality, state, federal, or other public agency, the application
shall be signed by either a principal executive officer or a ranking elected official. For
purposes of this paragraph, a principal executive officer of a federal agency includes the
chief executive officer of the agency, or a senior executive officer having responsibility
for the overall operations of a principal geographic unit of the agency(e.g., regional
administrator of the EPA).
TCEQ 20022 (3/6/2018) Page 12
Instructions for Notice of Intent for TPDES General Permit TXR150000
Texas Commission on Environmental Quality
General Permit Payment Submittal Form
Use this form to submit your Application Fee only if you are mailing your payment.
'Instructions
• Complete items 1 through 5 below:
• Staple your check in the space provided at the bottom of this document.
• Do not mail this form with your NOI form.
• Do not mail this form to the same address as your NOL
Mail this formand your check to either of the 4following:^A
By Regular U.S. Mail By Overnight or Express Mail
Texas Commission on Environmental Quality Texas Commission on Environmental Quality
• Financial Administration Division Financial Administration Division
Cashier's Office, MC-214 Cashier's Office, MC-214
P.O. Box 13088 12100 Park 35 Circle
Austin, TX 78711-3088 Austin, TX 78753
;Fee Code GPA General Permit: TXR150000
1. Check or Money Order No: r
2. Amount of Check/Money Order
3. Date of Check or Money Order:
4. Name on Check or Money Order:
5. NOI Information:
If the check is for more than one NOI, list each Project or Site (RE) Name and Physical
Address exactly as provided on the NOI. Do not submit a copy of the NOI withthis
form, as it could cause duplicate permit application entries!
If there is not enough space on the form to list all of the projects or sites the authorization
will cover, then attach a list of the additional sites.
Project/Site (RE) Name
Project/Site (RE) Physical Address
Staple the check or money order to this form in this space.
TCEQ-20134 (03/06/2018) Page 1
Texas Commission on Environmental Quality
General Permit Payment Submittal Form
Use this form to submit your Application Fee only if you are mailing your payment.
• Complete items 1 through 5 below:
• Staple your check in the space provided at the bottom of this document.
• Do not mail this form with your NOI form.
• Do not mail this form to the same address as your NOI.
Mail this form and your check to:
BY REGULAR U.S.MAIL BY OVERNIGHT/EXPRESS MAIL
Texas Commission on Environmental Texas Commission on Environmental
Quality Quality
Financial Administration Division Financial Administration Division
Cashier's Office, MC-214 Cashier's Office,MC-214
P.O. Box 13088 12100 Park 35 Circle
Austin,TX 78711-3088 Austin,TX 78753
Fee Code: GPA General Permit: TXG920000
1. Check/Money Order No: YY
2. Amount of Check/Money Order:
3. Date of Check or Money Order:
4. Name on Check or Money Order:
5. NOI INFORMATION
If the check is for more than one NOI,list each Project/Site (RE)Name and Physical
Address exactly as provided on the NOI. DO NOT SUBMIT A COPY OF THE NOI WITH
THIS FORM AS IT COULD CAUSE DUPLICATE PERMIT ENTRIES.
See Attached List of Sites (If more space is needed,you may attach a list.)
Project/Site (RE)Name:
Project/Site(RE) Physical Address:
YYuY
Staple Check in This Space
TCEQ-20134(o4/i3/2006), Page 1
TCEQ Office Use Only
Permit No:
CN:
RN:
NMI
Region:
`al Notice of Termination (NOT) for Authorizations under
TCEQ TPDES General Permit TXR150000
IMPORTANT INFORMATION:
Please read and use the General Information and Instructions prior to filling out each
question in the form.
Effective September 1, 2018, this paper form must be submitted to TCEQ with a completed
electronic reporting waiver form(TCEQ-20754).
ePermits: This form is available on our online permitting system.
Sign up for online permitting at: https://www3.tceq.texas.gov/steers/
What is the permit number to be terminated?
TXR15 TXRCW __ _
Section 1. OPERATOR (Permittee)
a) What is the Customer Number(CN)issued to this entity?
CN
b) What is the Legal Name of the current permittee?
c) Provide the contact information for the Operator(Responsible Authority).
Prefix(Mr. Ms. or Miss): r
First and Last Name:i � � Suffix.
Title: � Credentials:
Phone Number: _ Fax Number:
Email:
Mailing Address
City, State, and Zip Code: r
Country Mailing Information, if outside USA:
Section 2. APPLICATION CONTACT
This is the person TCEQ will contact if additional information is needed regarding this
application.
Is the application contact the same as the permittee identified above?
a Yes, go to Section 3.
b No, complete section below
TCEQ-20023 (03/09/2018) Page 1
Notice of Termination for TXR150000
Prefix(Mr. Ms. or Miss) , _—
First and Last Name _ _ Suffix.
Title:rCredentials
Phone Number ' =Fax Number
Email:;_:_ m `=
Mailing Address: L
City, State, and Zip Code:
Country Mailing Information, if outside USA: ��
Section 3. REGULATED ENTITY (RE) INFORMATION ON PROJECT OR SITE
a) TCEQ issued RE Reference Number(RN): RN
b) Name of project or site as known by the local community: _
c) County,or counties if more than 1:
d) Latitude: _ f Longitude ? �
e) Site Address/Location:
If the site has a physical address such as 12100 Park 35 Circle, Austin, TX 78753,
complete Section 3A.
If the site does not have a physical address, provide a location description in Section 3B.
Example: located on the north side of FM 123, 2 miles west of the intersection of FM 123
and Highway 1. -
Section 3A: Physical Address of Project or Site:
Street Number and Name: .
City, State, and Zip Code:
Section 3B: Site Location Description:
Location description: r ' 17__
City where the site is located or, if not in a city,what is the nearest city:
Zip Code where the site is located:
Section 4. REASON FOR TERMINATION
Check the reason for termination:
0 Final stabilization has been achieved on all portions of the site that are the responsibility
of the Operator and all silt fences and other temporary erosion controls have been
removed, or scheduled for removal as defined in the SWP3.
p Another permitted Operator has assumed control over all areas of the site that have not
been finally stabilized, and temporary erosion controls that have been identified in the
SWP3 have been transferred to the new Operator.
TCEQ-20023 (03/09/2018) Page 2
Notice of Termination for TXR150000
0, The discharge is now authorized under an alternate TPDES permit.
0 The activity never began at this site that is regulated under the general permit.
Section 5. CERTIFICATION
Signatory Name:
Signatory Title
I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information,the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
I further certify that I am authorized under 30 Texas Administrative Code §305.44 to sign and
submit this document, and can provide documentation in proof of such authorization upon
request.
Signature (use blue ink): Date:
•
TCEQ 20023 (03/09/2018) Page 3
Notice of Termination for TXR150000
Instructions for Notice of Termination (NOT) for Authorizations
under TPDES General Permit TXR150000
GENERAL INFORMATION
Where to Send the Notice of Termination(NOT):
BY REGULAR U.S. MAIL: BY OVERNIGHT/EXPRESS MAIL:
Texas Commission on Environmental Quality Texas Commission on Environmental Quality
Stormwater Processing Center (MC-228) Stormwater Processing Center (MC-228)
P.O.Box 13087 12100 Park 35 Circle
Austin, Texas 78711-3087 Austin, TX 78753
TCEQ Contact List:
Application status and form questions: 512-239-3700, swperinit@tceq.texas.gov
Technical questions: 512-239-4671, swgp@tceq.texas.gov
Environmental Law Division: 512-239-0600
Records Management- obtain copies of forms: 512-239-0900
Reports from databases (as available): 512-239-DATA(3282)
Cashier's office: 512-239-0357 or 512-239-0187
Notice of Termination Process:
A Notice of Termination is effective on the date postmarked for delivery to TCEQ.
When your NOT is received by the program,the form will be processed as follows:
1) Administrative Review: The form will be reviewed to confirm the following:
• the permit number is provided;
• the permit is active and has been approved;
• the entity terminating the permit is the current permittee;
• the site information matches the original permit record; and
• the form has the required original signature with title and date.
•
2) Notice of Deficiency:.If an item is incomplete or not verifiable as indicated above, a phone
call will be made to the applicant to clear the deficiency. A letter will not be sent to the
permittee if unable to process the form.
3) Confirmation of Termination: A Notice of Termination Confirmation letter will be mailed to
the operator.
Chan:e in Operator:
An authorization under the general permit is not transferable. If the operator of the regulated
entity changes, the present permittee must submit a Notice of Termination and the new operator
must submit a Notice of Intent. The NOT and NOI must be submitted not later than 10 days
prior to the change in Operator status.
INSTRUCTIONS FOR FILLING OUT THE FORM
The majority of permit information related to the current operator and regulated entity are
available at the following website: http://www2.tceq.texas.gov/wq_dpa/index.cfm.
TCEQ-20023 (03/09/2018) Page 1
Instructions for Notice of Termination for TXR150000
Section 1. 0 s erator (Current Permittee):
a) Customer Number(CN)
TCEQ's Central Registry assigns each customer a number that begins with CN, followed by
nine digits. This is not a permit number, registration number, or license number. The
Customer Number, for the current permittee, is available at the following website:
http://www2.tceq.texas.gov/wq_dpa/index.cfm.
b) Legal Name of Operator
The operator must be the same entity as previously submitted on the original Notice of
Intent for the permit number provided. The current operator name, as provided on the
current authorization, is available at the following website:
http://www2.tceq.texas.gov/wq_dpa/index.cfm.
c) Contact Information for the Operator (Responsible Authority)
Provide information for person signing the NOT application in the Certification section.
This person is also referred to as the Responsible Authority.
Provide a complete mailing address for receiving mail from the TCEQ. Update the address
if different than previously submitted for the Notice of Intent or Notice of Change. The
mailing address must be recognized by the US Postal Service. You may verify the address
on the following website: https://tools.usps.coin/go/ZipLookupAction!input.action.
The phone number should provide contact to the operator.
The fax number and e-mail address are optional and should correspond to the
operator.
Section 2. As •lication Contact:
Provide the name, title and contact information of the person that TCEQ can contact for
additional information regarding this application.
Section 3. Re: lated Entity(RE) Information on Pro.ect or Site:
a) Regulated Entity Reference Number(RN)
A number issued by TCEQ's Central Registry to sites where an activity regulated by TCEQ.
This is not a permit number, registration number, or license number. The Regulated Entity
Reference Number is available at the following website:
http://www2.tceq.texas.gov/wq_dpa/index.cfm.
b) Name of the Project or Site
Provide the name of the site as known by the public in the area where the site is located.
c) County
Identify the county or counties in which the regulated entity is located.
d) Latitude and Longitude
Enter the latitude and longitude of the site in degrees, minutes, and seconds or decimal
form. The latitude and longitude as provided on the current authorization is available at the
following website: http://www2.tceq.texas.gov/wq_dpa/index.cfm.
e) Site/Project(RE) Physical Address/Location Information
The physical address/location information, as provided on the current authorization, is
available at the following website: http://www2.tceq.texas.gov/wq_dpa/index.cfm.
TCEQ-20023 (03/09/2018) Page 2
Instructions for Notice of Termination for TXR150000
Section 3A. If a site has an address that includes a street number and street name, enter the
complete address for the site. If the physical address is not recognized as a USPS
delivery address,you may need to validate the address with your local police(911
service) or through an online map site used to locate the site. Please confirm this
to be a complete and valid address. Do not use a rural route or post office box for
a site location.
Section 3B. If a site does not have an address that includes a street number and street
name, provide a complete written location description.For example: "The site is
located on the north side of FM 123, 2 miles west of the intersection of FM 123
and Highway 1."
Provide the city(or nearest city) and Zip Code of the facility location.
Section 4. Reason for Termination:
The Notice of Termination form is only for use to terminate the authorization(permit). The
Permittee must indicate the specific reason for terminating by checking one of the options. If
the reason is not listed then provide an attachment that explains the reason for termination.
Please read your general permit carefully to determine when to terminate your permit. Permits
will not be reactivated after submitting a termination form. The termination is effective on the
date postmarked for delivery to TCEQ.
Section 5. Certification:
The certification must bear an original signature of a person meeting the signatory requirements
specified under 30 Texas Administrative Code §305.44.
IF YOUAREA CORPORATION:
The regulation that controls who may sign an application form is 30 Texas Administrative
Code §305.44(a), which is provided below. According to this code provision, any corporate
representative may sign an NOI or similar form so long as the authority to sign such a document
has been delegated to that person in accordance with corporate procedures. By signing the NOI or
similar form,you are certifying that such authority has been delegated to you. The TCEQ may
request documentation evidencing such authority.
IF YOUAREA MUNICIPALITY OR OTHER GOVERNMENT ENTITY
The regulation that controls who may sign an NOI or similar form is 30 Texas Administrative
Code.§305.44(a), which is provided below. According to this code provision, only a ranking
elected official or principal executive officer may sign an NOI or similar form. Persons such as
the City Mayor or County Commissioner will be considered ranking elected officials. In order to
identify the principal executive officer of your government entity,it may be beneficial to consult
your city charter, county or city ordinances, or the Texas statutes under which your government
entity was formed.An NOI or similar document that is signed by a government official who is
not a ranking elected official or principal executive officer does not conform to §305.44(a)(3).
The signatory requirement may not be delegated to a government representative other than
those identified in the regulation.By signing the NOI or similar form,you are certifying that you
are either a ranking elected official or principal executive officer as required by the
administrative code. Documentation demonstrating your position as a ranking elected official or
principal executive officer may be requested by the TCEQ.
If you have any questions or need additional information concerning the signatory requirements
discussed above,please contact the Texas Commission on Environmental Quality's Environmental
Law Division at 512-239-0600.
TCEQ-20023 (03/09/2018) Page 3
Instructions for Notice of Termination for TXR150000
30 Texas Administrative Code§305.44. Signatories to Applications
(a) All applications shall be signed as follows.
(1) For a corporation,the application shall be signed by a responsible corporate
officer. For purposes of this paragraph, a responsible corporate officer means a president,
secretary, treasurer, or vice-president of the corporation in charge of a principal business
function, or any other person who performs similar policy or decision-making functions for
the corporation; or the manager of one or more manufacturing,production,or operating
facilities employing more than 250 persons or having gross annual sales or expenditures
exceeding $25 million(in second-quarter 1980 dollars),if authority to sign documents has
been assigned or delegated to the manager in accordance with corporate procedures.
Corporate procedures governing authority to sign permit or post-closure order applications
may provide for assignment or delegation to applicable corporate positions rather than to
specific individuals.
(2) For a partnership or sole proprietorship,the application shall be signed by a
general partner or the proprietor,respectively.
(3) For a municipality, state, federal, or other public agency, the application shall
be signed by either a principal executive officer or a ranking elected official. For purposes of
this paragraph, a principal executive officer of a federal agency includes the chief executive
officer of the agency, or a senior executive officer having responsibility for the overall
operations of a principal geographic unit of the agency(e.g.,regional administrator of the EPA).
TCEQ 20023 (03/09/2018) Page 4
Instructions for Notice of Termination for TXR150000
— -
IPM
- -
M
•
LARGE CONSTRUCTION SITE NOTICE
FOR THE •
Texas Commission on Environmental Quality(TCEQ)
Stormwater Program
TPDES GENERAL PERMIT TXR150000
"PRIMARY OPERATOR"NOTICE
This notice applies to construction sites operating under Part II.E.3. of the TPDES General Permit
Number TXR150000 for discharges of stormwater runoff from construction sites equal to or-greater
than five acres, including the larger common plan of development. The information on this notice is
required in Part III.D.2. of the general permit. Additional information regarding the TCEQ
stormwater permit program may be found on the interne at:
http://www.tceq.state.tx.us/nav/permits/wq_construction.html
Site-Specific TPDES Authorization Number:
Operator Name:
Contact Name and Phone Number:
Project Description: Physical address or description of the
site's location, and estimated start date and projected end
date, or date that disturbed soils will be stabilized
Location of Stormwater Pollution Prevention Plan:
1111111110111111111111111111111
•
ImEm
F Wple
Nor AMMo
LARGE CONSTRUCTION SITE NOTICE
FOR THE
Texas Commission on Environmental Quality(TCEQ)
Stormwater Program
TPDES GENERAL PERMIT TXR150000
"SECONDARY OPERATOR "NOTICE
This notice applies to secondary operators of construction sites operating under Part II.E.3. of the
TPDES General Permit Number TXR150000 for discharges of stormwater runoff from construction
sites equal to or greater than five acres, including the larger common plan of development. The
information on this notice is required in Part III.D.2. of the general permit. Additional information
regarding the TCEQ stormwater permit program may be found on the internet at:
http://www.tceq.state.tx.us/nav/permits/wq construction.html
Site-Specific TPDES Authorization Number:
• Operator Name:
Contact Name and Phone Number:
Project Description: Physical address or description of the
site's location, and estimated start date and projected end
date, or date that disturbed soils will be stabilized.
Location of Stormwater Pollution Prevention Plan(SWP3):
For Large Construction Activities Authorized Under Part II.E.3. (Obtaining Authorization to Discharge)
the following certification must be completed:
I (Typed or Printed Name Person Completing This Certification)certify under
penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.E.3. of
TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A stormwater pollution prevention
plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this
signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for
providing false information or for conducting unauthorized discharges,including the possibility of fine and imprisonment for
knowing violations.
Signature and Title Date
Date Notice Removed
MS4 operator notified per Part II.F.3.
MININNEr
NNW
NEM
leing
SMALL CONSTRUCTION SITE NOTICE
FOR THE
Texas Commission on Environmental Quality(TCEQ)
Stormwater Program
TPDES GENERAL PERMIT TXR150000
The following information is posted in compliance with Part II.E.2. of the TCEQ General Permit
Number TXR150000 for discharges of stormwater runoff from small construction sites. Additional
information regarding the TCEQ stormwater permit program may be found on the internet at:
http://www.tceq.state.tx.us/nav/permits/wq construction.html
11 Operator Name:
Contact Name and Phone Number:
?roject.Description: Physical address or
description of the site's location, estimated start
date and projected end date, or date that disturbed
soils will be stabilized
Location of Stormwater Pollution Prevention Plan:
For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge)
the following certification must be completed:
I (Typed or Printed Name Person Completing This Certification)certify under
penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.E.2. of
TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A stormwater pollution prevention
plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this
signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for
providing false information or for conducting unauthorized discharges,including the possibility of fine and imprisonment for
knowing violations.
Signature and Title Date
Date Notice Removed
MS4 operator notified per Part II.F.3.
CITY OF PEARLAND SOURCE CONTROLS FOR
EROSION AND SEDIMENTATION
Section 01566
SOURCE CONTROLS FOR EROSION AND SEDIMENTATION
1.0 GENERAL
1.01 SECTION INCLUDES
A Descriptions of measures and practices, in response to TPDES General Permit TXR
150000, which shall be used on the Work to eliminate or significantly minimize
pollutants in discharges into Surface Water in the State by controlling erosion and
sediments at their source.
B References to Technical Specifications:
1. Section 01550—Stabilized Construction Exit
2. Section 01562—Waste Material Disposal
3. Section 01500—Temporary Facilities and Controls
C Definitions:
1. Potential Water Pollutant- any substance that could potentially alter the
physical, thermal, chemical, or biological quality of the Surface Water in the
State, rendering the water harmful, detrimental, or injurious to humans,
- animal life, vegetation, or property, or to public health, safety or welfare, or
impairs the usefulness or the public enjoyment of the water for any lawful or
reasonable purpose.
1.02 MEAUSREMENT AND PAYMENT
A • Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this Work is a component.
2.0 PRODUCTS - Not Used
3.0 EXECUTION
3.01 PREPARATION AND INSTALLATION
A Contractor shall conduct all construction operations under this Contract in
conformance with the erosion control practices described in the Plans and this
Technical Specification.
B Erosion and sediment control measures shall be in place prior to the start of any Work
that exposes the soil, other than as specifically directed by the Engineer to allow soil
testing and surveying.
C The Contractor shall install, maintain, and inspect erosion and sediment control
measures and practices that operate effectively and as specified in the Plans and in this
or other Technical Specifications.
07/2006 01566- 1 of 5
CITY OF PEARLAND SOURCE CONTROLS FOR
EROSION AND SEDIMENTATION
D Equipment and vehicles shall be prohibited by the Contractor from maneuvering on
areas outside of the limits of construction or dedicated rights-of-way and easements.
Damage caused by construction traffic to erosion and sediment control systems shall
be repaired immediately by the Contractor.
E The Contractor shall be responsible for collecting, storing, hauling, and disposing of
spoil, silt, waste materials, and contaminated material resulting from erosion and
sediment control measures as specified in this or other Technical Specifications and in
compliance with applicable federal, state, and local rules and regulations.
3.02 EXPOSED SOIL
A When soil is exposed as a result of clearing,grading,excavating,stockpiling,or other
soil disturbing activities, the Contractor shall implement measures to effectively
control erosion and prevent the escape of sediments from the Project Site.
B Control measures may include the following practices:
1. Preserve existing vegetation to the extent possible.
2. Construct drainage swales,berms, or sediment basins.
3. Maintain grades to minimize the velocity of sheet flow over disturbed areas
and promote evaporation and infiltration of storm water directly into the
ground.
4. Install filter fabric fences or barriers, sediment traps, seepage basins,
gabions, or storm drain inlet protection devices.
5. Utilize vegetative buffer strips, mulching, or riprap
C When the placement of topsoil,bank sand, or other soil material is specified, after an
area has been brought to grade and immediately prior to placement, loosen the
subgrade discing or by scarifying to a depth of at least 2 inches to permit bonding to
the subsoil.
D When all soil disturbing activities have been completed, establish a perennial
vegetative cover on all areas that are not paved, covered by permanent structures, or
otherwise permanently stabilized.
3.03 DUST CONTROL
A Implement control measures to minimize dust creation and movement on construction
sites and roads and to prevent airborne sediment from reaching receiving streams or
storm water conveyance systems, to reduce on-site and off-site damage, to prevent
health hazards, and to improve traffic safety.
B Control blowing dust by using one or more of the following measures:
1. Mulches bound with chemical binders.
2. Temporary vegetative cover.
3. Tillage to roughen surface and bring clods to the surface.
4. Irrigation by water sprinkling.
07/2006 01566-2 of 5
CITY OF PEARLAND SOURCE CONTROLS FOR
EROSION AND SEDIMENTATION
5. Barriers using solid board fences, burlap fences, crate walls, bales of hay, or
similar materials.
C Implement dust control measures immediately whenever dust can be observed blowing
on the Project Site.
3.04 DEMOLITION AREAS
A Demolition activities which create large amounts of dust with significant
concentrations of heavy metals or other potential water pollutants shall use methods
described in this Section,3.03 "Dust Control",to limit transport of airborne pollutants.
However, water or slurry used to control dust contaminated with heavy metals or
potential water pollutants shall be retained on the Project Site and shall not be allowed
to run directly into watercourses or storm water conveyance systems by the appropriate
use of control measures described in this Section. Methods of ultimate disposal of
these materials shall be carried out in accordance with applicable local, state, and
federal health and safety regulations.
3.05 SEDIMENT TRACKING
A Minimize off-site tracking of sediments and the generation of dust by construction
vehicles, keeping the streets clean or construction debris and mud, by implementing
one or more of the following control measures:
1. Restrict all ingress and egress to stabilized construction exits.
2. Stabilize areas used for staging, parking, storage or disposal.
3. Stabilize on-site vehicle transportation routes.
4. Remove mud and other debris, washing if necessary, from vehicles prior to
entrance onto public roadways from the Project Site.
5. Maintain grade to minimize the occurrence of mud on the Project Site.
B Construct stabilized construction areas under the provisions of Section 01550 —
Stabilized Construction Exists.
C In addition to Stabilized Construction Exits shovel or sweep the pavement to the extent
necessary to keep the street clean. Water-hosing or sweeping of debris and mud off of
the street into adjacent areas is not allowed.
3.06 EQUIPMENT MAINTENANCE AND REPAIR
A Control equipment maintenance and repair so that oils,gasoline,grease,solvents,and
other potential water pollutants cannot be washed directly into receiving streams or
storm water conveyance systems.
B Control measures may include the following practices:
1. Confine maintenance and repair of construction machinery and equipment
to areas specifically designated for that purpose.
2. Provide these areas with adequate waste disposal receptacles for liquid as
well as solid waste.
07/2006 01566-3 of 5
CITY OF PEARLAND SOURCE CONTROLS FOR
EROSION AND SEDIMENTATION
3. Clean and inspect maintenance and repair areas daily.
4. Stabilize the area with coarse aggregate.
5. Maintain grade to prevent surface water from flowing over the area.
6. Place plastic matting, packed clay, tar paper, or other impervious material to
prevent contamination of soil in the area.
7. Isolate areas of contaminated soil or other materials to facilitate proper
removal and disposal.
C Where effective control measures are not feasible,equipment shall be taken off-site for
maintenance and repair.
3.07 WASTE COLLECTION AND DISPOSAL
A Conduct operations in conformance with the plan provided in Section 01562—Waste
Material Disposal and utilize such control measures,described in this Section,as may
be necessary to eliminate or significantly reduce the discharge of possible water
pollutants from the Project Site as a result of waste collection and disposal.
B Keep receptacles and waste collection areas neat and orderly to the extent possible.
Waste shall not be allowed to overflow its container or accumulate from day-to-day.
Locate trash collection points where they will least likely be affected by concentrated
storm water runoff.
3.08 WASHING AREAS
A Vehicles such as concrete delivery trucks or dump trucks and other construction
equipment shall not be washed at locations where the runoff will flow directly into a
watercourse or storm water conveyance system. Preventative measures may include
the following practices:
1. Designate special areas for washing vehicles.
2. Locate these areas where the wash water will spread out and evaporate or
infiltrate directly into the ground, or where the runoff can be collected in a
temporary holding or seepage basin.
3. Beneath wash areas construct a gravel or rock base to minimize mud
production.
B Construct washing areas under the provisions of Section 01550 — Stabilized
Construction Exists.
3.09 STORAGE AND USAGE OF POTENTIAL WATER POLLUTANTS
A Store and use potential water pollutants such as pesticides,fertilizers, distillate fuels,
lubricants, solvents, cements, paints, acids, caustics, and other toxic substances in
accordance with manufacturers' guidelines, Material Safety Data Sheets, and with
local, state, and federal regulations.
07/2006 01566-4 of 5
CITY OF PEARLAND SOURCE CONTROLS FOR
EROSION AND SEDIMENTATION
B Isolate these substances'in areas where they are to be stored, opened or used such that
they will not cause pollution of runoff from the Project Site. Preventative measures
may include the following practices:
1. Stabilize the area with coarse aggregate.
2. Store containers on raised platforms.
3. Place plastic matting, packed clay, tar paper, or other impervious material to
prevent contamination of soil in the area.
4. Provide protective cover or weather proof enclosure.
5. Minimize accidental spillage.
6. Keep containers tightly closed.
7. Periodically inspect containers for leakage.
8. Maintain grade to prevent surface water from flowing over the area.
9. Provide berms, filter fabric fences or barriers, or sediment basins.
10. Designate washing areas for containers and other items that have come in
contact with potential water pollutants.
• C Avoid overuse of substances such as pesticides and fertilizer which could produce
contaminated runoff.
3.10 SANITARY FACILITIES
•
A Provide the Project Site with adequate portable toilets for workers in accordance with
Section 01500—Temporary Facilities and Controls,and applicable health regulations.
B Control areas where sanitary facilities are located so that sewage or chemicals will not
be washed directly into receiving streams or storm water conveyance systems by using
one or more of the following measures.
1. Inspect the facilities daily.
2. Service the facilities as often as necessary to maintain cleanliness and
prevent overflows.
3. Stabilize the area with coarse aggregate
4. Maintain grade to prevent surface water from flowing over the area
END OF SECTION
07/2006 01566-5 of 5
CITY OF PEARLAND TRENCH SAFETY SYSTEM
Section 01570
TRENCH SAFETY SYSTEM
1.0 GENERAL
1.01 SECTION INCLUDES
A. Trench safety system for the construction of trench excavations.
B. Trench safety system for excavation of utilities, excavation of structures, and
embankment which fall under provisions of federal, state, or local excavation safety
laws.
C. References to Technical Specifications:
1. Section 01200—Measurement&Payment Procedures
2. Section 01350—Submittals
D. Referenced Standards:
1. Occupational Safety and Health Administration(OSHA)
E. Definitions:
1. Trench. A narrow excavation(in relation to its depth) made below the
surface of the ground. In general, the depth is greater than the width,but the
width of a trench (measured at the bottom) is not greater than 15 feet.
2. Trench safety system requirements apply to larger open excavations if the
erection of structures or other installations limits the space between the
excavation slope and the installation to dimensions equivalent to a trench as
defined.
3. Trench safety systems include both Protective Systems and Shoring Systems
but are not limited to sloping, sheeting, trench boxes or trench shields, slide
rail systems, sheet piling, cribbing,bracing, shoring, dewatering or
diversion of water to provide adequate drainage.
5/2013 - 01570- 1 of 5
CITY OF PEARLAND TRENCH SAFETY SYSTEM
a. Protective System: A method of protecting employees from cave-ins,
from material that could fall or roll from an excavation face or into an
excavation, or from the collapse of an adjacent structure.
b. Shoring System: A structure, which supports the sides of an
excavation, to prevent cave-ins, maintain stable soil conditions, or to
prevent movements of the ground affecting adjacent installations or
improvements.
c. Special Shoring: A shoring system meeting Special Shoring
Requirements for locations identified on the Plans.
4. Competent Person- one who is capable of identifying existing and
predictable hazards in the surroundings or working conditions which are
unsanitary, hazardous, or dangerous to employees, and who has
authorization to take prompt corrective measures to eliminate them.
1.02 MEASUREMENT AND PAYMENT
A. Measurement for trench safety systems used on utility excavations is on a linear foot
basis, measuredalong the centerline of the trench. Payment for trench safety systems
includes payment for manholes and other line structures.
B. Unless indicated in as a Bid Item,no separate payment will be made for shoring systems
under this Section. Include cost in Bid Items for trench safety systems.
C. If shown on the Plans and included in Section 00300—Bid Proposal as a separate Bid
Item, Measurement and Payment for Special Shoring system installation for trench
excavation is on a square foot basis, measured and completed in place.
D. Unless indicated as a Bid Item, no separate payment will be made for trench safety
systems used on structural excavations under this Section. Include cost for trench safety
system used on structural excavations in applicable structure installation.
E. Unless indicated as a Bid Item, no separate payment will be made for trench safety
systems used on roadway excavation or embankment under this Section. Include cost in
applicable Sections.
F. Refer to Section 01200—Measurement&Payment Procedures.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit a safety plan specifically for the construction of trench excavation, excavation
of utilities, excavation of structures, and embankment which fall under provisions of
5/2013 01570-2 of 5
CITY OF PEARLAND 1 TRENCH SAFETY SYSTEM
federal, state, or local excavation safety laws. Design the Trench Safety Plan to be in
accordance with OSHA Standards - 29CFR governing the presence and activities of
individuals working in and around trench excavations, and in accordance with any
Special Shoring requirements at locations shown on the Plans. Include in the plan,
submittal of the contact information for the Competent Person.
C. Have Shop Drawings for trench safety systems sealed, as required by OSHA, by a
Professional Engineer, licensed by the State of Texas, retained and paid by the
Contractor.
1.04 REGULATORY REQUIREMENTS
A. Install and maintain trench safety systems in accordance with the provision of
Excavations,Trenching,and Shoring,OSHA Standards-29 CFR,Part 1926,Subpart P,
as amended,including Final Rule,published in the Federal Register Vol.54,No.209 on
Tuesday, October 31, 1989. The sections that are incorporated into these Technical
Specifications,by reference,include Standard 1926.650—652.
B. A reproduction of, the OSHA Standards — 29 CFR included in Subpart P —
"Excavations"from the Federal Register Vol. 54,No. 209 is available upon request to
Contractors bidding on the Work. The Owner assumes no responsibility for the
accuracy of the reproduction. The Contractor is responsible for obtaining a copy of this
section of the Federal Register.
C. Include in the Trench Safety Program measures that establish compliance with the
standard interpretation of the General Duty Clause,Section 5.(a)(1),of the Occupational
Safety and Health Act of 1970—20 USC 654 which states, "Employers must shore or
otherwise protect employees who walk/work at the base of an embankment from
possible collapse."
D. Legislation that has been enacted by the State of Texas with regard to Trench Safety
Systems is hereby incorporated, by reference, into these specifications. Under Texas
Statutes, refer to Chapter 756 of the Health and Safety Code, SUBCHAPTER C.
TRENCH SAFETY.
E. Reference materials, if developed for this Work, will be issued by the Engineer along
with the Bid Documents, including the following:
1. Geotechnical information obtained for use in design of the trench safety
system.
2. Special Shoring Requirements.
1.05 INDEMNIFICATION
A. Contractor shall indemnify and hold harmless the Owner, its employees, and agents,
from any and all damages, costs (including,without limitation, legal fees, court costs,
and the cost of investigation),judgments or claims by anyone for injury or death of
5/2013 01570-3 of 5
CITY OF PEARLAND TRENCH SAFETY SYSTEM
persons resulting from the collapse or failure of trenches constructed under this
Contract.
B. Contractor acknowledges and agrees that this indemnity provision provides indemnity
for the Owner in case the Owner is negligent either by act or omission in providing for
trench safety, including, but not limited to safety program and design reviews,
inspections, failures to issue stop work orders, and the hiring of the Contractor.
C. Review of the safety program by the Engineer will only be in regard to compliance with
the Contract Documents and will not constitute approval by the Engineer nor relieve
Contractor of obligations under state and federal trench safety laws.
2.0 PRODUCTS - Not Used
3.0 EXECUTION
3.01 INSTALLATION
A. Install and maintain trench safety systems in accordance with provisions of OSHA
Standards—29 CFR.
B. Specially designed trench safety systems shall be installed in accordance with the
Contractor's trench excavation safety program for the locations and conditions
identified in the program.
C. Install Special Shoring at the locations shown on the Plans.
D. Obtain verification from a Competent Person, defined in this Section and as identified
in the Contractor's Trench Safety Program, that trench boxes and other pre-
manufactured systems are certified for the actual installation conditions.
3.02 INSPECTION
A. Conduct daily inspections by Contractor or Contractor's independently retained
consultant, of the trench safety systems to ensure that the installed systems and
operations meet OSHA Standards—29 CFR and other personnel protection regulations
requirements.
B. If evidence of possible cave-ins or slides is apparent, immediately stop work in the
trench and move personnel to safe locations until necessary precautions have been taken
to safeguard personnel.
C. Maintain a permanent record of daily inspections.
5/2013 01570-4 of 5
CITY OF PEARLAND TRENCH SAFETY SYSTEM
•
3.03 FIELD QUALITY CONTROL
A. Verify specific applicability of the selected or specially designed trench safety systems
to each field condition encountered on the Work.
END OF SECTION
5/2013 01570-5 of 5
CITY OF PEARLAND PROJECT IDENTIFICATION SIGNS
Section 01580
PROJECT IDENTIFICATION SIGNS
1.0 GENERAL
1.01 SECTION INCLUDES
A Project identification sign description.
B. Installation.
C. Maintenance and removal.
1.02 UNIT PRICES
A. No separate payment will be made for design, fabrication, installation, and
maintenance of project identification signs under this Section. Include cost of work
performed under this Section in the pay item for Section 01505 -Mobilization.
B. If changes to project identification signs are requested by the City Engineer to keep
them current,payment will be made by change order.
C. Skid-mounted signs shall be relocated as directed by the City Engineer at no
additional cost to the City. Post-mounted signs shall be relocated once, if directed
in writing by the City Engineer, at no additional cost to the City. If a post-mounted
sign is relocated more than once at the written direction of the City Engineer,
payment will be made by change order.
1.03 SYSTEM DESCRIPTION
A. Sign Construction: Project identification signs shall be constructed of new
materials and painted new for the project. Construct post-mounted signs as shown
on Construction Sign Details.
B. Appearance: Project identification signs shall be maintained to present a clean and
neat look throughout the project duration.
C. Sign Manufacturer/Maker: Experienced as a professional sign company.
D. Sign Placement: Place signs at locations as directed by the City Engineer. The
City Engineer will provide sign placement instructions at the Pre-construction
Meeting.
1. A linear project is one involving paving, overlay, sewer lines, storm
drainage, or water mains that run in the right-of-way over a distance. A
10/2014 01580-1
CITY OF PEARLAND PROJECT IDENTIFICATION SIGNS
linear project requires a project identification sign at each end of the
construction site.
2. Single Site or Building Projects: Provide one project identification
sign.
3. Multiple Sites: Provide one project identification sign at each site.
4. Sign Relocation: As work progresses at each site, it may be necessary
to move and relocate project identification signs. Relocate signs as
directed in writing by the City Engineer.
E. Alternate Skid-mounted Sign Construction: Post-mounted signs are preferred, but
skid-mounted signs are allowed, especially for projects with noncontiguous
locations where work progresses from one location to another. The skid structure
shall be designed so that the sign will withstand a 60-mile-per-hour wind load
directly to the face or back of the sign. Use stakes, straps, or ballast. Approval of
the use of skid-mounted signs shall not release the Contractor from responsibility
of maintaining a project identification sign on the project site and shall not make
the City responsible for the security of such signs.
1.04 SUBMITTALS
A. Submit shop drawings under provisions of Section 01350 - Submittal Procedures.
B. Show content, layout, lettering style, lettering size, and colors. Make sign and
lettering to scale, clearly indicating condensed lettering, if used.
2.0 PRODUCTS
2.01 SIGN MATERIALS
A. Structure and Framing: All sign materials shall be new.
1. Sign Posts: Use 4-inch by 4-inch treated wood posts, sized to fix
top of sign at 6 FEET ABOVE GROUND.
2. Sign Supports and Skid Bracing: 2-inch by 4-inch wood framing
material.
3. Skid Members: 2-inch by 6-inch wood framing material.
4. Fasteners:
a. Use galvanized steel fasteners.
b. Use 3/8-inch by 5-1/2-inch button head carriage bolts to attach sign to posts.
Secure with nuts and flat head washers at locations as'recommended by Sign
Manufacturer.
c. Cover button heads with white reflective film or paint to match sign background
B. Sign and Sign Header: Use medium density overlaid marine plywood, minimum
1/2-inch thick. Use full-size 4-foot by 8-foot sheets for sign and a single piece for
header to minimize joints; do not piece wood to fabricate a sign face.
C. Paint and Primers: White paint used to prime surfaces and to resist weathering shall
be an industrial grade,fast-drying,oil-based paint with gloss finish. Paint structural
10/2014 01580-2
CITY OF PEARLAND PROJECT IDENTIFICATION'SIGNS
and framing members white on all sides and edges to resist weathering. Paint sign
and sign header material white on all sides and edges to resist weathering. Paint all
sign surfaces with this weather-protective paint prior to adding any sign paint or
adhesive applications.
D. Colors:
Follow criteria established by attached Exhibit
3.0 EXECUTION
3.01 INSTALLATION
A. Install project identification signs within 10 calendar days after Date of
Commencement.
B. " Erect signs where designated by the City Engineer at the Pre-construction Meeting
or as described in part 1.03 of this Section. Position the sign in such a manner as
to be fully visible and readable to the general public.
C. Erect sign level and plumb.
D. If mounted on posts, sink posts a minimum of 30 inches below grade in 10-inch
diameter posthole. Stabilize posts with sharp sand or concrete to minimize lateral
motion. Leave a minimum of 8 feet of post above existing grade for mounting of
the sign and header.
E. Erect sign so that the top edge of the sign, is no higher than 6 feet above existing
grade.
3.02 MAINTENANCE AND REMOVAL
A. Keep signs and supports clean. Repair deterioration and damage.
B. Remove signs, framing, supports, and foundations to a depth of 2 feet upon
completion of Project. Restore the area to a condition equal to or better than before
construction.
END OF SECTION
10/2014 01580-3
CITY OF PEARLAND PROJECT IDENTIFICATION SIGNS
•
PROJECT IDENTIFICATION SIGN
EXHIBIT
k First
f I -- Impression
PROJECT NAME LOCATED HERE _ - --
“.
i ,PROJECT: 1
WWI I
PROJECT NO. 12345678 I j Capital Improvement j
CITY OF L PEARLAND T I Signage Layout
j PROJECT SCHEDULE:MONTH/YEAR ADDRESS:
CAPITAL PROJECT , I Various I
MAYOR:TOM REID I BUDGET: $DOLLAR AMOUNT I
�: I GTVrsTATE:
COUNOE POSfON t:TONY CARBONF ` Peadand,Texas
COUNOtPOSITION 3 SCOTTTHERMAN ENGINEERIARCHITECT: DATE: October 2014 I
COUNCIL POStON3:GARYMOORE NAME GOES HERE I aur: I
MAYOR PRO TEM CUNT ORDENEAUX I capital improvement O M
CONTRACTOR: 4x8 blank template Eyi
COUNCIL POSITION 5:GREG HUI I I iI
Ott MANAGER CLAY PEARSON CONTRACTOR NAME GOES HERE oD�ober zot4
DEPUTY CITY MANAGER:ION RRANSON i r "�-'�sbe�4isT,E�m'ians
ASST CRY:MANAGER:TRENT EPPERSON earlandtx. ov/de artmentslen ineerin -ca ital- ro ectsl ro ects i emoamRITRESISa„�a` `a`iasT,�rra 1
P 9 P 9 9 P P 1 P 1 I ramm�cezw:IgncanaTurxauna3Er
__.__.______..._�._____-...._��______----- __�..__...._..._._...----._,_.- ,POCORCZAEPOIREEMOLCELOESANINERVE
(MISDEVYAROMLINICDORTATIFIMEROPti
SPECIAL NOTE:CONTACT CITY SECRETARY FOR CURRENT COUNCIL NAMES j VO TEELECTRICALSERNCE
SINGLE SIDE MDO MARINE GRADE PLYWOOD FINISHED WITH ALKYD ENAMEL GLOSS WHITE ( 120 CLIENT TO PROVIDE ALL PRIMARY '
COMPUTER CUT VINYL AND DIGITAL PRINT 5 YEAR LIFE MINIMUM MATERIALS j ELECTRICAL
SERVICES ED N I
INSTALL ON TWO 4"X4"TREATED POSTS,MIN.DEPTH IS 24",OR SKID MOUNTED AS SITE REO'D.. i CLIENT APPROVAL
! i
•
•
10/2014 01580-4
CITY OF PEARLAND MATERIAL AND EQUIPMENT
Section 01600
MATERIAL AND EQUIPMENT
1.0 GENERAL
1.01 SECTION INCLUDES
A Requirements for transportation, delivery, handling, and storage of materials and
equipment.
B References to Technical Specifications:
1. Section 01566—Source Controls for Erosion & Sedimentation
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this works is a component.
1.03 PRODUCTS
A Products: Means material,equipment,or systems forming the Work. Does not include
machinery and equipment used for preparation,fabrication,conveying and erection of
the Work. Products may also include existing materials or components designated for
reuse.
B Do not reuse materials and equipment, designated to be removed, except as specified
by the Contract Documents.
C Provide equipment and components from the fewest number of manufacturers as is
practical, in order to simplify spare parts inventory and to allow for maximum
interchangeability of components. For multiple components of the same size,type or
application, use the same make and model of component throughout the Work.
1.04 TRANSPORTATION
A Make arrangements for transportation, delivery, and handling of equipment and
materials required for timely completion of the Work.
B Transport and handle products in accordance with instructions.
C Consign and address shipping documents to the proper party giving name of Project,
street number, and City. Shipments shall be delivered to the Contractor.
1.05 DELIVERY
A Arrange deliveries of products to accommodate the Construction Schedule and in
ample time to facilitate inspection prior to installation. Avoid deliveries that cause
lengthy storage or overburden of limited storage space.
07/2006 01600- 1 of 3
CITY OF PEARLAND MATERIAL AND EQUIPMENT
B Coordinate deliveries to avoid conflict with Work and conditions at the Project Site
and to accommodate the following:
1. Work of other contractors or the Owner.
2. Limitations of storage space.
3. Availability of equipment and personnel for handling products.
4. Owner's use of premises.
C Have products delivered to the Project Site in manufacturer's original, unopened,
labeled containers.
D Immediately upon delivery, inspect shipment to assure:
1. Product complies with requirements of Contract Documents.
2. Quantities are correct.
3. Containers and packages are intact; labels are legible.
4. Products are properly protected and undamaged.
1.06 PRODUCT HANDLING
A Coordinate the off-loading of materials and equipment delivered to the Project Site. If
necessary to move stored materials and equipment during construction, Contractor
shall relocate materials and equipment at no additional cost to the Owner.
B Provide equipment and personnel necessary to handle products, including those
provided by the Owner, by methods to prevent damage to products or packaging.
C Provide additional protection during handling as necessary to prevent breaking
scraping, marring, or otherwise damaging products or surrounding areas.
D Handle products by methods to prevent over bending or overstressing.
E Lift heavy components only at designated lifting points.
F Handle materials and equipment in accordance with Manufacturer's recommendations.
G Do not drop, roll, or skid products off delivery vehicles. Hand carry or use suitable
materials handling equipment.
1.07 STORAGE OF MATERIAL
A Store and protect materials in accordance with manufacturer's recommendations and
requirements of these Technical Specifications. Control storage of potential water
pollutants in conformance with Section 01566 — Source Controls for Erosion &
Sedimentation.
B Make necessary provisions for safe storage of materials and equipment. Place loose
soil materials,and materials to be incorporated into the Work to prevent damage to any
part of the Work or existing facilities and to maintain free access at all times to all
parts of the Work and to utility service company installations in the vicinity of the
Work.
07/2006 01600-2 of 3
CITY OF PEARLAND MATERIAL AND EQUIPMENT
C Keep materials and equipment neatly and compactly stored in locations that will cause
a minimum of inconvenience to other contractors, public travel, adjoining owners,
tenants, and occupants. Arrange storage in a manner to provide easy access for
inspection.
D Provide adequately ventilated, watertight storage facilities with floor above ground
level for materials and equipment susceptible to weather damage.
E Restrict storage to areas available on the construction site for storage of material and
equipment as shown on Plans or approved by the Project Manager.
F Provide off-site storage and protection when on-site storage is not adequate.
G Do not use lawns, grass plots, or other private property for storage purposes without
written permission of the owner or other person in possession or control of such
premises. Damage to lawns,sidewalks,streets or other improvements shall be repaired
or replaced to the satisfaction of the Project Manager.
H Protect stored materials and equipment against loss or damage.
I Store materials in manufacturers' unopened containers.
J Materials delivered and stored along the line of the Work shall be not closer than 3 feet
to any fire hydrant. Public and private drives and street crossings shall be kept open.
K The total length which materials may be distributed along the route of construction at
any one time is 1000 lineal feet, unless otherwise approved in writing by the Project
Manager.
2.0 PRODUCTS - Not Used
3.0 EXECUTION - NotUsed
END OF SECTION
07/2006 01600-3 of 3
CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS
Section 01630
PRODUCT OPTIONS AND SUBSTITUTIONS
1.0 GENERAL
1.01 SECTION INCLUDES
A Options for making product or process selections.
B Procedures for proposing equivalent construction products or processes,including pre-
approved, and approved products or processes
C References to Technical Specifications:
1. - Section 01350—Submittals
1.02 SUBMITTALS
A Make Submittals required by this and related Sections under the provisions of Section
01350—Submittals.
1.03 DEFINITIONS
A Product: Means,materials,equipment,or systems incorporated into the Work.Product
does not include machinery and equipment used for production,fabrication,conveying,
and erection of the Work. Products may also include existing materials or components
designated for re-use.
B Process: Any proprietary system or method for installing system components resulting
in an integral, functioning part of the Work. For this Section, the word Product
includes Processes.
1.04 SELECTION OPTIONS
A Pre-approved Products: Products of certain manufacturers or suppliers are designated
in the Technical Specifications as"pre-approved". Products of other manufacturers or
suppliers will not be acceptable under this Contract and will not be considered under
the submittal process for approving alternate products.
B Approved Products: Products of certain manufacturers or suppliers designated in the
Technical Specifications followed by the words "or approved equal". Approval of
alternate products not listed in the Technical Specifications may be obtained through
provisions of this Section and Section 01350—Submittals. The procedure for approval
of alternate products is not applicable to Pre-approved Products.
C Product Compatibility: To the maximum extent possible,provide products that are of
the same type or function from a single manufacturer, make, or source. Where more
than one choice is available as a Contractor's option, select a product which is
compatible with other products already selected, specified, or in use by the Owner.
07/2006 01630- 1 of 3
CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS
1.05 CONTRACTOR'S RESPONSIBILITY
A Furnish information the Engineer deems necessary to judge equivalency of the
alternate product.
B Pay for laboratory testing as well as any other review or examination cost needed to
establish the equivalency between products which enables the Engineer to make such a
judgment.
C If the Engineer determines that an alternate product is not equivalent to that named in
the Technical Specifications,the Contractor shall furnish one of the specified products.
1.06 ENGINEER'S REVIEW
A Alternate products may be used only if approved in writing by the Engineer. The
Engineer's determination regarding acceptance of a proposed alternate product is final.
B Alternate products will be accepted if the product is judged by the Engineer to be
equivalent to the specified product or to offer substantial benefit to the Owner.
C The Owner retains the right to accept any product deemed advantageous to the Owner,
and similarly, to reject any product deemed not beneficial to the Owner.
1.07 SUBSTITUTION PROCEDURE
A Collect and assemble technical information applicable to the proposed product to aid in
determining equivalency as related to the Approved Product specified.
B Submit a written request for a product to be considered as an alternate product along
with the product information within fourteen (14)days after the Effective Date of the
Agreement.
C After the submittal period has expired, requests for alternate products will be
considered only when a specified product becomes unavailable because of conditions
beyond the Contractor's control.
D Submit 5 copies of each request for alternate product approval. Include the following
information:
1. Complete data substantiating compliance of proposed substitution with
Contract Documents.
2. For products:
a. Product identification, including manufacturer's name and address.
b. Manufacturer's literature with product description, performance and
test data, and reference standards.
c. Samples, as applicable.
d. Name and address of similar projects on which product was used and
date of installation. Include the name of the Owner,
Architect/Engineer, and installing contractor.
07/2006 01630-2 of 3
CITY OF PEARLAND PRODUCT OPTIONS AND SUBSTITUTIONS
3. For construction methods:
a. Detailed description of proposed method.
b. Shop Drawings illustrating methods.
4. Itemized comparison of proposed substitution with product or method
specified.
5. Data relating to changes in Construction Schedule
6. Relationship to separate contracts, if any.
7. Accurate cost data on proposed substitution in comparison with product or
method specified.
8. Other information requested by the Engineer.
E Approved alternate products will be subject to the same review process as the specified
product would have been for Shop Drawings, Product Data, and Samples.
2.0 PRODUCTS - Not Used
3.0 EXECUTION - Not Used
END OF SECTION
07/2006 01630-3 of 3
CITY OF PEARLAND FIELD SURVEYING
Section 01720
FIELD SURVEYING
1.0 GENERAL
1.01 SECTION INCLUDES
A Requirements for surveyors and surveys.
B Procedures pertaining to survey control points and reference points.
C References to Technical Specifications:
1. Section 01350—Submittals
2. Section 01760—Project Record Documents
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this Work is a component.
1.03 QUALITY CONTROL
A Conform to State of Texas laws for surveys requiring licensed surveyors. Employ a
land surveyor acceptable to Engineer.
1.04 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit to Engineer the name, address, and telephone number of Surveyor before
starting survey work.
C Submit documentation verifying accuracy of survey work on request.
1.05 PROJECT RECORD DOCUMENTS
A Maintain a complete and accurate log of control and survey work as it progresses.
B Submit Record Documents under provisions of Section 01760 — Project Record
Documents.
1.06 EXAMINATION
A Verify locations of survey control points prior to starting Work.
B Notify Engineer immediately of any discrepancies discovered.
07/2006 01720- 1 of 2
CITY OF PEARLAND FIELD SURVEYING
1.07 SURVEY REFERENCE POINTS
A Control datum for survey is that established by Owner-provided survey and indicated
on Plans.
B Locate and protect survey control points,including property corners,prior to starting
site work. Use caution to preserve permanent reference points during construction.
C The Contractor shall not reset; nor cause to be reset, lost, disturbed, or damaged;
control points. Promptly notify Engineer of disturbance or damage to any control
point(s).
D Notify Engineer 48 hours in advance of need for relocation of reference points due to
changes in grades or other reasons.
E Report promptly to Engineer the loss or destruction of any reference point.
F Any re-staking of control points lost,disturbed,or damaged by Contractor's operations
will be provided by Owner at Contractor's expense.
G Employ a Registered Public Land Surveyor to reset any missing,disturbed,or damaged
monumentation.
1.08 SURVEY REQUIREMENTS
A Utilize recognized engineering survey practices. -
B Establish a minimum of two permanent bench marks on Project Site, referenced to
established control points. Record locations, with horizontal and vertical data, on
Project Record Documents.
C Establish and record in survey notes elevations, lines and levels to provide quantities
required for Measurement and Payment and to provide appropriate controls for the
Work. Locate and lay out by instrumentation and similar appropriate means:
1. Site improvements including pavements; stakes for grading; fill and topsoil
placement; utility locations, slopes, and invert elevations.
2. Grid or axis for structures.
3. Mounumented Baseline.
D Verify periodically layouts by same means.
2.0 PRODUCTS - Not Used
3.0 EXECUTION - NotUsed
END OF SECTION
07/2006 01720-2 of 2
CITY OF PEARLAND PROJECT RECORD DOCUMENTS
Section 01760
PROJECT RECORD DOCUMENTS
1.0 GENERAL
1.01 SECTION INCLUDES
A Maintenance and Submittal of Record Documents and Samples.
B References to Technical Specifications:
1. Section 01350—Submittals
2. Section 01770—Contract Closeout
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this Work is a component.
1.03 SUBMITTALS
A Make Submittals required by this and related Sections under the provisions of Section
01350—Submittals.
1.04 MAINTENANCE OF DOCUMENTS AND SAMPLES
A Maintain one copy of Record Documents at the Project Site in accordance with Section
00700 — General Conditions of Agreement, 3.02 "Keeping Plans and Specifications
Accessible".
B Store Record Documents and Samples in field office if a field office is required by
Contract Documents, or in a secure location. Provide files,racks, and secure storage
for Record Documents and Samples.
C Label each document "PROJECT RECORD" in neat, large, printed letters.
D Maintain Record Documents in a clean,dry,and legible condition. Do not use Record
Documents for construction purposes.
E Keep Record Documents and Samples available for inspection by Engineer.
1.05 RECORDING
A Record information concurrently with construction progress. Do not conceal any work
until required information is recorded.
B Plans, Change Orders, and Shop Drawings: Legibly mark each item to record all
actual construction, or "as built" conditions, including:
1. Measured horizontal locations and elevations of underground utilities and
appurtenances, referenced to permanent surface improvements.
07/2006 01760- 1 of 2
CITY OF PEARLAND PROJECT RECORD DOCUMENTS
2. Elevations of underground utilities referenced to bench marks utilized for
the Work.
3. Field changes of dimension and detail.
4. Changes made by modifications.
5. Details not on original Plans.
6. References to related Shop Drawings and Modifications.
C Record information with a red pen or pencil on a set of drawings indicated as the
Record Document Set, provided by Engineer.
2.0 PRODUCTS - Not Used
3.0 EXECUTION
A Deliver Record Documents and Samples to Owner in accordance with Section 01770—
Contract Closeout.
END OF SECTION
07/2006 01760-2 of 2
CITY OF PEARLAND CONTRACT CLOSEOUT
Section 01770
CONTRACT CLOSEOUT
1.0 GENERAL
1.01 SECTION INCLUDES
A Closeout procedures including final submittals such as operation and maintenance
data, warranties, and spare parts and maintenance materials.
B ' References to Technical Specifications:
1. Section 01350—Submittals
2. Section 01760—Project Record Documents
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this Work is a component.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
1.04 CLOSEOUT PROCEDURES
A Comply with Section 00700 — General Conditions of Agreement regarding Final
Completion and Final Payment when Work is complete and ready for Engineer's final
inspection.
B Provide Record Documents under provisions of Section 01760 — Project Record
Documents.
C Complete or correct items on punch list,with no new items added. Any new items will
be addressed during warranty period.
D The Owner will occupy portions of the Work as specified in Section 00700—General
Conditions of Agreement.
E Contractor shall request Final Inspection at least two weeks prior to Final Acceptance.
1.05 FINAL CLEANING
A Execute final cleaning prior to final inspection.
B Clean debris from drainage systems.
•
C Clean Project Site; sweep paved areas, rake clean landscaped surfaces.
09/2009 01770- 1 of 2
CITY OF PEARLAND CONTRACT CLOSEOUT
D Remove waste and surplus materials, rubbish, and temporary construction facilities
from the Project Site following the final test of utilities and completion of the Work.
1.06 OPERATION AND MAINTENANCE DATA
A Submit Operations and Maintenance data under provisions of Section 01350 —
Submittals.
1.07 WARRANTIES
A Provide one original of each warranty from Subcontractors, Suppliers, and
Manufacturers.
B Provide Table of Contents and assemble warranties in 3-ring/D binder with durable
plastic cover.
C Submit warranties prior to Final Application for Payment.
• 1. Warranties shall commence in accordance with the requirements of Section
00700—General Conditions of Agreement, 1.09 "Substantially Completed".
2.0 PRODUCTS - Not Used
3.0 EXECUTION Contractor shall diligently pursue completion of the items and
activities contained in the Contract Close Out and Project Record Document sections
of the project manual. Notwithstanding any performance of warranty work, the
work of Contract Closeout shall be complete within thirty (30) days of the date of
Final Completion and Acceptance of the work.
END OF SECTION
}
J 1
09/2009 01770-2 of 2
CITY OF PEARLAND TECHNICAL SPECIFICATIONS DIVISION 2
TECHNICAL SPECIFICATIONS
DIVISION 2
SITE WORK
07/2006
CITY OF PEARLAND SITE PREPARATION
Section 02200
SITE PREPARATION
1.0 GENERAL
1.01 SECTION INCLUDES
A Removal of topsoil, stripping and stockpiling, clearing and grubbing.
B Removal and disposal of waste materials, excess materials, debris and trash.
C Removal of obstructions.
D Excavation and fill.
E Salvaging of designated item.
F References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01450—Testing Laboratory Services
4. Section 01500—Temporary Facilities and Controls
5. Section 02255 —Bedding, Backfill and Embankment Material
6. Section 02330—Embankment
7. Section 01140—Contractor's Use of Premises
G Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 4318, "Standard Test Methods for Liquid Limit, Plastic
Limit, and Plasticity Index of Soils"
1.02, MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for which this Work is a component.
B If Site Preparation is included as a Bid Item,measurement will be based on the Units
shown in Section 00300 — Bid Proposal and in accordance with Section 01200 —
Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit embankment material sources and product quality information in accordance
this Section.
1/2018 02200- 1 of 4
CITY OF PEARLAND SITE PREPARATION
1.04 TESTING
A Testing and analysis of product quality, material sources, or field quality shall be
performed by an independent testing laboratory provided by the Owner under the
provisions of Section 01450 — Testing Laboratory Services and as specified in this
Section.
1.05 PROTECTION OF PEOPLE AND PROPERTY
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
2.0 PRODUCTS
2.01 MATERIALS
A Contractor shall provide materials used as embedment, backfill, back-dressing, and
embankment identified on the Plans in accordance with Section 02255 — Bedding,
Backfill and Embankment Material.
3.0 EXECUTION
3.01 CLEARING AND GRUBBING.
A Clear Project Site of trees,shrubs,and other vegetation,except for those designated by
Owner to be left standing.
B Use only hand methods for grubbing inside drip line of trees designated to remain.
C Completely remove stumps,roots,and other debris protruding through ground surface.
1. On areas required for roadway, channel, or structural excavation, remove
stumps, 2" diameter or larger limbs and roots, to depth of 2 feet below lower
elevation of excavation.
2. On areas required for embankment construction, remove 2" diameter limbs,
stumps and roots to depth of 2 feet below ground surface
3. Trees and stumps may be cut off as close to natural ground as practicable on
areas which are to be covered by at least 3 feet of embankment
D Fill depressions caused by clearing and grubbing operations with satisfactory soil
material,unless further excavation or earthwork is indicated.
1. Place fill material in horizontal layers not exceeding 6 inches loose depth,and
thoroughly compact to density equal to adjacent original ground.
E Complete operations by bulldozing,blading, and grading so that prepared area is free
of holes,unplanned ditches, abrupt changes in elevations and irregular contours, and
preserve drainage of area.
1. Blade entire area to prevent ponding of water and to provide drainage, except
in areas to be immediately excavated
1/2018 02200-2 of 4
CITY OF PEARLAND SITE PREPARATION
3.02 TOPSOIL STRIPPING AND STOCKPILING
A Obtain approval of topsoil quality before excavating and stockpiling.
B Excavate topsoil for esplanades and areas to receive grass or landscaping from areas to
be further excavated.
C Topsoil Stripping:
1. Remove growths of grass from areas before stripping.
2. Topsoil is defined as surface soil found of depth of not less than 4 inches.
3. Strip topsoil to depths encountered.
4. Perform stripping in a manner to prevent intermingling of topsoil with
underlying sterile subsoil and remove objectionable materials, including clay
lumps, stones over 2 in. in diameter, weeds, roots, leaves, and debris.
5. Where trees are designated by Owner to be left standing,stop topsoil stripping
at extreme limits of tree drip line to prevent damage to main root system.
D Topsoil Stockpiling:
1. Stockpile in areas designated on Plans.
2. Construct storage piles to freely drain surface water.
3. Cover storage piles, if required to prevent wind-blown dust.
4. Stockpile topsoil to depth not exceeding 8 feet. Stockpile in a manner to
prevent erosion.
3.03 UNSUITABLE MATERIAL
A Undercut, remove, and replace material which Engineer designates as unsuitable for
subsequent construction.
B Material used to replace unsuitable material shall be suitable material from site
excavation or as indicated on Plans.
3.04 EXCAVATION AND FILL
A Construction surveying shall be performed by qualified personnel under the direction
of the contractor. Contractor shall be responsible for the accuracy and correctness of
this work. In the event that the work consists of significant alteration of the
topographic features of natural grade, contractor shall perform enough topographic
survey to substantiate existing pre-construction elevations. No claim shall be made for
additional excavation or grade adjustment in excess of quantities contained in the
contract documents without demonstrable evidence that such conditions existed prior
to start of the work
B Depressed site areas shall be filled using material from high areas, insofar as
practicable.
1/2018 02200-3 of 4
CITY OF PEARLAND SITE PREPARATION
C When fill obtained from high areas is exhausted, fill to indicated rough grade
elevations under roadways with"Structural Fill"and open areas not under structures or
roadways with"General Fill", or as indicated on Plans.
D Place and compact fill in accordance with Section 02330—Embankment.
3.05 SALVAGEABLE ITEMS AND MATERIAL
A Items designated by Engineer to be salvaged are to be carefully removed,so as to cause
no damage to the salvaged items and delivered to Owner's storage yard.
3.06 CLEAN-UP AND RESTORATION
A Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises.
END OF SECTION
1/2018 02200-4 of 4
CITY OF PEARLAND SITE DEMOLITION
Section 02220
SITE DEMOLITION
1.0 GENERAL
1.01 SECTION INCLUDES
A Demolishing and removing existing pavements, structures, equipment and materials
only to the extent as indicated on the Plans.
B Removing concrete paving, asphaltic concrete pavement, and base courses.
C Removing concrete curbs, concrete curb and gutters, sidewalks and driveways.
D Removing pipe culverts and sewers.
E Removing miscellaneous structures of wood,plastics, metals, concrete, masonry, or
combination of concrete and masonry, etc.
F Disposing of demolished materials and equipment.
G References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01500—Temporary Facilities and Control
4. Section 01100—Summary of Work
5. Section 01730—Cutting and Patching
6. Section 01140—Contractor's Use of Premises
7. Section 01562—Waste Material Disposal
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item, no separate payment will be made for removing and
disposing of existing pavement and structures under this Section. Include cost for
removing and disposing of existing pavement and structures in Bid Items for which
this Work is a component.
B If indicated as a Bid Item, measurement will be as follows:
1. Measurement for removing and disposing of concrete base and surfacing,and
removing asphaltic surfacing,is on a square yard basis measured between lips
of gutters.
2. Measurement for removing and disposing of cement stabilized shell base
course, with or without asphalt surfacing, is on a square yard basis.
3. Measurement for removing and disposing of concrete base and surfacing with
curbs,is on a square yard basis measured from back to back of curbs. Payment
includes removal of all base,asphaltic surfacing,concrete pavement,esplanade
curbs, curb and gutters, and paving headers.
07/2006 02220- 1 of 5
CITY OF PEARLAND SITE DEMOLITION
4. Measurement for removing and disposing of concrete pavement is on a square
yard basis measured from back to back of curbs.
5. Measurement for removing and disposing of monolithic curb and gutter,
removing monolithic concrete curb,and removing concrete curb,is on a lineal
foot basis measured along the face of the curb.
6. Measurement for removing and disposing of concrete sidewalk and driveway is
on a square yard basis.
7. Measurement for removing and disposing of miscellaneous concrete and
masonry removal is on a cubic yard basis of the structure in place.
8. Measurement for removing and disposing of pipe culverts and sewers is on a
lineal foot basis for each diameter of type of pipe removed.
9. Measurement for removing and disposing of unlisted materials shall be on the
lump sum basis.
C No payment will be made for work outside maximum payment limits indicated on
Plans, or in areas removed for Contractor's convenience.
D Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit proposed methods, equipment, materials and sequence of operations for
demolition. Describe coordination for shutting off,capping,and removing temporary
utilities. Plan operations to minimize temporary disruption of utilities to existing
facilities or adjacent property.
C Submit proposed demolition and removal schedule for approval. Notify Engineer in
writing at least 48 hours before starting demolition.
D Submit an approved copy of demolition schedule to Engineer prior to commencement
of demolition operations.
E Obtain a permit for building demolition, as required.
1.04 PROTECTION OF PEOPLE AND PROPERTY
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
B The Contractor shall be responsible for safety and integrity of adjacent structures and
shall be liable for any damage due to movement or settlement. Provide proper framing
and shoring necessary for support. Cease operations if an adjacent structure appears to
be endangered. Resume demolition only after proper protective measures have been
taken.
07/2006 02220-2 of 5
CITY OF PEARLAND SITE DEMOLITION
1.05 OWNERSHIP OF MATERIAL AND EQUIPMENT
A Materials and equipment designated for reuse or salvage are listed in Section 01100—
Summary of Work. Protect items designated for reuse or salvage from damage during
demolition, handling and storage. Restore damaged items to satisfactory condition.
B Materials and equipment not designated for reuse or salvage become the property of
the Contractor.
1.06 STORAGE AND HANDLING
A Store and protect materials and equipment designated for reuse until time of
installation.
B Deliver and unload items to be salvaged to storage areas indicated on Plans.
C Remove equipment and materials not designated for reuse or salvage and all waste and
debris resulting from demolition from site. Remove material as work progresses to
avoid clutter.
2.0 PRODUCTS
2.01 EQUIPMENT AND MATERIALS FOR DEMOLITION
A Use equipment and materials approved as prescribed in this Section, 1.03"Submittals'.
B Use of a"drop hammer"must have the Engineer's prior approval.
3.0 EXECUTION
3.01 EXAMINATION
A Prior to demolition, make an inspection with Engineer to determine the condition of
existing structures and features adjacent to items designated for demolition.
B Engineer will mark or list existing equipment to remain the property of the Owner.
C Do not proceed with demolition or removal operations until after the joint inspection
and subsequent authorization by Engineer.
B Stop demolition and notify Engineer if underground fuel storage tanks, asbestos,
PCB's, contaminated soils, or other hazardous materials are encountered.
3.02 UTILITY SERVICES
A Follow rules and regulations of authorities or companies having jurisdiction over
communications,pipelines, and electrical distribution services.
B Notify and coordinate with utility company and adjacent building occupants when
temporary interruption of utility service is necessary.
07/2006 02220-3 of 5
CITY OF PEARLAND SITE DEMOLITION
C When required by the Work, cutting, patching, and fitting of Work to existing
facilities,accommodating installation or connection of Work with existing facilities,or
uncovering Work for access, inspection, or testing shall be performed in accordance
with Section 01730—Cutting and Patching
3.03 MECHANICAL WORK ITEMS
A Mechanical removals consist of dismantling and removing existing piping, pumps,
motors,water tanks,equipment and other appurtenances. It includes cutting,capping,
and plugging required to restore use of existing utilities.
B Remove existing process,water, chemical, gas, fuel oil and other piping not required
for new work. Take out piping to the limits shown or to a point where it will not
interfere with the new work. Piping not indicated to be removed or which does not
interfere with new work shall be removed to the nearest solid support,capped,and the
remainder left in place. Purge chemical and fuel lines and tanks. Verify that such lines
are safe prior to removal or capping.
C Where piping that is to be removed passes through existing walls, cut and cap piping
on each side of the wall. Use cap appropriate for pipe material to be capped. Provide
fire-rated sealant for walls classified as fire-rated.
D When underground piping, which is not located in the public right-of-way, is to be
altered or removed,cap the remaining piping. Abandoned underground piping maybe
left in place unless it interferes with new work or is shown or specified to be removed.
Piping less than 15 inches in diameter may be plugged and abandoned in place. For
piping 15 inches in diameter and greater to be abandoned,fill with sand,pressure grout
or other approved method and plug with concrete or brick masonry bulkhead.
E Remove waste and vent piping to points shown. Plug pipe and cleanouts and plugs.
Where vent stacks pass through an existing roof that is to remain,remove the stack and
patch the hole in the roof,making it watertight. Comply with requirements of existing
roof installer so as to maintain roof warranty.
F Conform to applicable codes when making any changes to plumbing and heating
systems.
3.04 ELECTRICAL WORK ITEMS
A Electrical removals consist of disconnecting and removing existing switchgear,
distribution switchboards, control panels,bus duct, conduits and wires,panel boards,
lighting fixtures, and miscellaneous electrical equipment.
B Remove existing electrical equipment and fixtures to prevent damage to allow
continued operation of existing systems and to maintain the integrity of the grounding
systems.
07/2006 02220-4 of 5
CITY OF PEARLAND SITE DEMOLITION
C Remove poles and metering equipment, if designated for removal on the Plans.
Coordinate electrical removals with the power company, as necessary. Verify that
power is properly de-energized and disconnected.
D Where shown or otherwise required, remove wiring in underground duct systems.
Verify function of wiring before disconnecting and removing. Plug ducts which are
not to be reused at entry to buildings.
E Changes to electrical systems shall conform to applicable codes.
3.05 CLEAN-UP AND RESTORATION
A Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises.
B Remove from the site all items contained in or upon the structure not designated for
reuse or salvage in accordance with this Section and Section 01562—Waste Material
Disposal.
C Follow method of disposal as required by regulatory agencies.
END OF SECTION
ti
07/2006 02220-5 of 5
CITY OF PEARLAND CEMENT STABILIZED SAND
Section 02252
CEMENT STABILIZED SAND
1.0 GENERAL
1.01 SECTION INCLUDES
A Cement stabilized sand for backfill and bedding.
B References to Technical Specifications:
1. Section 01350— Submittals
2. Section 02255 —Bedding, Backfill, and Embankment Materials
3. Section 01450—Testing Laboratory Services
C Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 558, "Standard Test Methods for Moisture-Density (Unit
Weight)Relations of Soil-Cement Mixtures"
b. ASTM D 1632, "Practice for Making and Curing Soil-Cement
Compression and Flexure Test Specimens in the Laboratory"
c. ASTM D 1633, "Standard Test Method for Compressive Strength of
Molded Soil-Cement Cylinders"
d. ASTM C 150, "Standard Specification for Portland Cement"
e. ASTM C 33, "Standard Specification for Concrete Aggregates"
f. ASTM D 2487, "Standard Classification of Soils for Engineering
Purposes (Unified Soil Classification System)"
g. ASTM C 142, "Standard Test Method for Clay Lumps and Friable
Particles in Aggregates"
h. ASTM C 123, "Standard Test Method for Lightweight Particles in
Aggregate"
i. ASTM C 40, "Standard Test Method for Organic Impurities in Fine
Aggregates for Concrete"
j. ASTM C 4318, "Standard Test Methods for Liquid Limit, Plastic
Limit, and Plasticity Index of Soils"
k. ASTM C 94, "Standard Specification for Ready-Mixed Concrete"
1. ASTM C 31,"Standard Practice for Making and Curing Concrete Test
Specimens in the Field"
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as an Extra Item, no separate payment will be made for cement
stabilized sand under this Section. Include cost in Bid Items for applicable utility or
structure installation.
B If use of cement stabilized sand is allowed, based on the Engineer's direction, and
indicated in Section 00300—Bid Proposal as an Extra Item,measurement will be on a
per ton basis. A conversion between volumes calculated based on theoretical limits
and total weight will be made based on a ratio of 1.64 tons per cubic yard.
02/2009 02252- 1 of 5
CITY OF PEARLAND CEMENT STABILIZED SAND
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit material qualification and design mix tests to include:
1. Three series of tests of sand or fine aggregate material from the proposed
source. Tests shall include procedures defined in this Section, 2.01
"Materials".
2. Three moisture-density relationship tests prepared using the material qualified
by the tests in this Section, 1.03B1. Blends of fine aggregate from crushed
concrete and bank run sand shall be tested at the ratio to be used for the design
mix testing.
3. Design mix report to meet the specifications of this Section, 1.04 "Design
Requirements". The design mix shall include compressive strength tests after
48-hours and 7 days curing.
1.04 DESIGN REQUIREMENTS
A Design sand-cement mixture to produce a minimum unconfined compressive strength
of 100 pounds per square inch in 48 hours when compacted to a minimum 95 percent
in accordance with ASTM D 558 and when cured in accordance with ASTM D 1632,
and tested in accordance with ASTM D 1633. Mix shall contain a minimum of 1-1/2
sacks of cement per cubic yard. Compact mix with a moisture content on the dry side
of optimum.
2.0 PRODUCTS
2.01 MATERIALS
A Cement shall be Type 1 Portland cement conforming to ASTM C 150.
B Sand shall be clean, durable, and meet grading requirements for fine aggregates of
ASTM C 33 and the following requirements:
1. Classified as SW, SP or SM by the United Soil Classification System of
ASTM D 2487.
2. Deleterious material content:
a. Clay lumps shall comprise less than 0.5 percent by ASTM C 142.
b. Lightweight pieces shall comprise less than 5.0 percent by ASTM C
123.
c. Organic impurities shall produce color no darker than the standard
color by ASTM C 40 ASTM.
3. Plasticity index of 4 or less when tested in accordance with ASTM D 4318.
C Fine aggregate,manufactured from crushed concrete meeting the quality requirements
for crushed rock material in Section 02255 - Bedding, Backfill, and Embankment
Materials, may be used as a complete or partial substitute for Bank Sand. The
blending ratio of fine aggregate from crushed concrete and Bank Sand shall be defined
in the mix design report.
02/2009 02252-2 of 5
CITY OF PEARLAND CEMENT STABILIZED SAND
D Water shall be potable,free of oils,acids,alkalies,organic matter,or other deleterious
substances, meeting requirements of ASTM C 94.
2.02 MIXING MATERIALS
A Thoroughly mix sand, cement and water in proportions of the mix design using a
pugmill-type mixer. The plant shall be equipped with automatic weight controls to
ensure correct mix proportions.
B Stamp batch ticket at plant with time of loading directly after mixing. Material not
placed and compacted within 4 hours after mixing shall be rejected.
3.0 EXECUTION
3.01 PLACEMENT AND COMPACTION
A Place sand-cement mixture in 8-inch-thick loose lifts and compact to a minimum of
95 percent of ASTM D 558, unless otherwise specified on Plans. The moisture
content during compaction shall be on the dry side of optimum but sufficient for
hydration. Perform and complete compaction of sand-cement mixture within 4 hours
after addition of water to mix at the plant.
B Do not place or compact sand-cement mixture in standing or free water.
3.02 FIELD QUALITY CONTROL
A Testing will be performed under provisions of Section 01450 - Testing Laboratory
Services.
B Mixing plant inspections will be performed periodically. Material samples will be
obtained and tested in accordance with this Section, 2.01 "Materials", if there is
evidence of change in material characteristic.
C One sample of cement stabilized sand shall be obtained for each 150 tons of material
placed per day with no less than one sample per day of production. Random samples
of delivered cement stabilized sand shall be taken in the field at point of delivery in
accordance with ASTM 3665.Obtain three individual samples of approximately 12 to
15 lb each from the first, middle, and last third of the truck and composite them into
one sample for test purpose.
D Prepare and mold four specimens (for each sample obtained) in accordance with
ASTM D558,Method A,without adjusting moisture content. Samples will be molded
at approximately same time material is being used,but no later than 4 hours after water
is added to mix.
E After molding, specimens will be removed from molds and cured in accordance with
ASTM D 1632.
02/2009 02252-3 of 5
CITY OF PEARLAND CEMENT STABILIZED SAND
F Specimens will be tested for compressive strength in accordance with ASTM D 1633,
Method A. Two specimens will be tested at 48 hours plus or minus 2 hours and two
specimens will be tested at 7 days plus or minus 4 hours.
G A strength test will be average of strengths of two specimens molded from same
sample of material and tested at same age. Average daily strength will be average of
strengths of all specimens molded during one day's production and tested at same age.
H Precision and Bias: Test results shall meet recommended guideline for precision in
ASTM D 1633 Section 9.
I Reporting: Test reports shall contain, as a minimum, the following information:
1. Supplier and plant number
2. Time material was batched
3. Time material was sampled
4. Test age (exact hours)
5. Average 48-hour strength
6. Average 7-day strength
7. Specification section number
8. Indication of compliance/non-compliance
9. Mixture identification
10. Truck and ticket numbers
11. The time of molding
12. Moisture content at time of molding
13. Required strength
14. Test method designations
15. Compressive strength data as required by ASTM D 1633
16. Supplier mixture identification
17. Specimen diameter and height, in.
18. Specimen cross-sectional area, sq. in.
J The cement content will be checked on samples obtained in the field whenever there
are apparent changes in the mix properties.
3.03 ACCEPTANCE
A Strength level of material will be considered satisfactory if:
1. The average 48-hour strength is greater than 100 psi with no individual
strength test below 70 psi.
2. All 7-day individual strength tests(average of two specimens)are greater than
or equal to 100 psi.
B Material will be considered deficient when 7-day individual strength test(average of
two specimens) is less than 100 psi but greater than 70 psi. See Paragraph 3.04
Adjustment for Deficient Strength.
C The material will be considered unacceptable and subject to removal and replacement
at Contractors expense when individual strength test(average of two specimens)has
7-day strength less than 70 psi
02/2009 02252-4 of 5
CITY OF PEARLAND CEMENT STABILIZED SAND
D When moving average of three daily 48-hour averages falls below 100 psi,discontinue
shipment to project until plant is capable of producing material,which exceeds 100 psi
at 48 hours. Five 48-hour strength tests shall be made in this determination with no
individual strength tests less than 100 psi.
E Testing laboratory shall notify Contractor,Project Manager,and material supplier by
facsimile of tests indicating results falling below specified strength requirements
within 24 hours.
F If any strength test of laboratory cured specimens falls below the specified strength,
Contractor may, at his own expense, request test of cores drilled from the area in
question in accordance with ASTM C42. In such cases,three(3)cores shall be taken
for each strength test that falls below the values given in 3.03.A.
•
G Cement stabilized sand in an area represented by core tests shall be considered
satisfactory if the average of three(3)cores is equal to at least 100 psi and if no single
core is less that 70 psi.Additional testing of cores extracted from locations represented
by erratic core strength results will be permitted.
3.04 ADJUSTMENT FOR DEFICIENT STRENGTH
A When mixture produces 7-day compressive strength greater than or equal to 100 psi,
then material will be considered satisfactory and bid price will be paid in full.
B When mixture produces 7-day compressive strength less than 100 psi and greater than
or equal to 70 psi,material shall be accepted contingent on credit in payment Compute
credit by the following formula:
Credit per Cubic Yard= $30.00 x 2 (100 psi -Actual psi)
100
C When mixture produces 7-day compressive strength less than 70 pounds per square
inch, then remove and replace cement-sand mixture and paving and other necessary
work at no cost to City.
END OF SECTION
02/2009 02252-5 of 5
CITY OF PEARLAND BEDDING,BACKFILL,AND
EMBANKMENT MATERIALS
`<< Section 02255
BEDDING,BACKFILL,AND EMBANKMENT MATERIALS
1.0 GENERAL
1.01 SECTION INCLUDES
A A reference source for materials used as embedment, backfill, back-dressing, and
embankment,specified elsewhere in the Technical Specifications,and their associated
material qualification testing requirements.
B Source qualifications and handling of these materials.
C Material use and application is specified on the Plans or in individual Technical
Specifications referencing materials either by Material Classification or by Product
Description.
D References to Technical Specifications:
1. Section 03300—Cast-in-Place Concrete
2. Section 02910—Topsoil
3. Section 02252—Cement Stabilized Sand
E Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 2487, "Standard Classification of Soils for Engineering
Purposes (Unified Soil Classification System)"
b. ASTM C 142, "Standard Test Method for Clay Lumps and Friable
Particles in Aggregates"
c. ASTM C 123, "Standard Test Method for Lightweight Particles in
Aggregate"
d. ASTM C 40, "Standard Test Method for Organic Impurities in Fine
Aggregates for Concrete"
e. ASTM C 4318, "Standard Test Methods for Liquid Limit, Plastic
Limit, and Plasticity Index of Soils"
f. ASTM D 1140, "Standard Test Methods for Amount of Material in
Soils.Finer the No. 200 (70-um) Sieve"
g. ASTM C 33, "Standard Specification for Concrete Aggregates"
h. ASTM C 136, "Standard Test Method for Sieve Analysis of Fine and
Coarse Aggregates"
i. ASTM C 131, "Standard Test Methods for Resistance to Degradation
of Small-Size Coarse Aggregate by Abrasion and Impact in the Los
Angeles Machine"
07/2007 02255 - 1 of 7
CITY OF PEARLAND BEDDING,BACKFILL,AND
EMBANKMENT MATERIALS
2.0 PRODUCTS
2.01 MATERIAL CLASSIFICATIONS
A Materials shall be classified for the purpose of quality control in accordance with the
Unified Soil Classification Symbols as defined in ASTM D 2487.
1. Class I: Well-graded gravels and sands, gravel-sand mixtures, crushed well-
graded rock, little or no fines (GW, SW):
a. Plasticity index: non-plastic.
b. Gradation: D60/Dio - greater than 4 percent; amount passing No. 200
sieve - less than or equal to 5 percent.
2. Class II: Poorly graded gravels and sands, silty gravels and sands, little to
moderate fines:
a. Plasticity index: non-plastic to 4.
b. Gradations:
Gradation (GP, SP): amount passing No. 200 sieve - less than 5
percent.
Gradation(GM,SM): amount passing No.200 sieve-between 12
percent and 50 percent.
c. Borderline gradations with dual classifications (e.g.,SP-SM): amount
passing No. 200 sieve - between 5 percent and 12 percent.
3. Class III: Clayey gravels and sands, poorly graded mixtures of gravel, sand,
silt, and clay(GC, SC, and dual classifications, e.g., SP-SC):
a. Plasticity index: greater than 7.
b. Gradation: amount passing No. 200 sieve-between 12 percent and 50
percent.
4. Class WA: Lean clays (CL).
a. Plasticity Indexes:
Plasticity index: greater than 7, and above A line.
Borderline plasticity with dual classifications (CL-ML): PI
between 4 and 7.
b. Liquid limit: less than 50.
c. Gradation: amount passing No. 200 sieve - greater than 50 percent.
d. Inorganic.
5. Class IVB: Fat clays (CH)
a. Plasticity index: above A line.
b. Liquid limit: 50 or greater.
c. Gradation: amount passing No. 200 sieve - greater than 50 percent.
d. Inorganic.
B Use soils with dual class designation according to ASTM D 2487, and which are not
defined above, according to the more restrictive class.
2.02 PRODUCT DESCRIPTIONS
A Unsuitable Material. Unsuitable soil materials are the following:
07/2007 02255 -2 of 7
CITY OF PEARLAND BEDDING,BACKFILL,AND
EMBANKMENT MATERIALS
1. Materials that are classified as ML,CL-ML,MH,PT,OH and OL according to
ASTM D 2487.
2. Materials that cannot be compacted to the required density due to either
gradation, plasticity, or moisture content.
3. Materials that contain large clods, aggregates, stones,greater than 3 inches in
any dimension, debris, vegetation, waste or any other deleterious materials.
4. Materials that are contaminated with hydrocarbons or other chemical
contaminants.
B Suitable Material. Soil materials meeting specification requirements. Unsuitable soils
meeting specification requirements for suitable soils after treatment with,for example,
lime or cement shall be considered suitable, unless otherwise indicated.
C General Fill. Material that is free of stones greater than 3 inches,free of roots,waste,
debris,trash,organic material,unstable material,non-soil matter,hydrocarbon or other
contamination, conforming to the following limits for deleterious materials:
1. Clay lumps: Less than 0.5 percent for Class I, and less than 2.0 percent for
Class II, when tested in accordance with ASTM C 142.
2. Lightweight pieces: Less than 5 percent when tested in accordance with
ASTM C 123.
3. Organic impurities: No color darker than standard color when tested in
accordance with ASTM C 40.
D Random Fill. Soils defined by ASTM D 2487 as Class I, II, III,IV, or fat clay(CH),
sand,gravel,or a combination,from excavation or borrow,which can be compacted to
form stable embankments, and conforming to:
1. Liquid Limit: 65 maximum, ASTM -D4318.
2. Plasticity Index: 0 minimum, 45 maximum, ASTM -D4318.
3. Free from trash, vegetation, organic matter, large stones,hard lumps of earth
and frozen, corrosive or perishable material.
4. Well broken up, free of clods greater than 6 inches, hard earth, rocks, and
stones greater than 2-inch dimension.
E Structural Fill. Soils defined by ASTM D 2487 as Class I,II,III,or IV,sand,gravel,or
a combination, from excavation or borrow, which can be compacted to form stable
embankments and fills conforming to:
1. Liquid Limit: 45 maximum, ASTM D 4318.
2. Plasticity Index: 12 minimum, 20 maximum, ASTM D 4318.
3. Free from trash, vegetation, organic matter, large stones, hard lumps of earth
and frozen, corrosive or perishable material.
4. Well broken up, free of clods greater than 6 inches,.hard earth, rocks, and
stones greater than 2-inch dimension.
F Select Fill. Class III clayey gravel or sand or Class IV lean clay or clayey soils treated with
lime or cement, and conforming to:
07/2007 02255-3 of 7
CITY OF PEARLAND BEDDING,BACKFILL,AND
EMBANKMENT MATERIALS
1. Plasticity Index: 7 minimum, 20 maximum, ASTM D 4318.
2. Free from trash, vegetation, organic matter, large stones,hard lumps of earth
and frozen, corrosive or perishable material.
3. Well broken up, free of clods greater than 6 inches, hard earth, rocks, and
stones greater than 2-inch dimension.
G Concrete Fill. Conform to requirements for Class B concrete as specified in Section
03300 - Cast-in-Place Concrete.
H Topsoil. Conform to requirements specified in Section 02910 -Topsoil.
Bank Sand: Durable Bank Sand classified as SP, SW, or SM by the Unified Soil
Classification System (ASTM D 2487) meeting the following requirements:
1. Less than 15 percent passing the number 200 sieve when tested in accordance
with ASTM D 1140. The amount of clay lumps or balls not exceeding 2
percent.
2. Material passing the number 40 sieve shall meet the following requirements
when tested in accordance with ASTM D 4318:
a. Liquid limit: not exceeding 25 percent.
b. Plasticity index: not exceeding 7.
J Cement Stabilized Sand. Conform to requirements of Section 02252 - Cement
Stabilized Sand.
K . Concrete Sand. Natural sand, manufactured sand, or a combination of natural and
manufactured sand conforming to the requirements of ASTM C 33 and graded within
the following limits when tested in accordance with ASTM C 136:
SIEVE PERCENT PASSING
3/8" 100
No. 4 95 to 100
No. 8 80 to 100
No. 16 50 to 85
No. 30 25 to 60 -
No. 50 10 to 30
No. 100 2 to 10
L Gem Sand. Sand conforming to the requirements of ASTM C 33 for course aggregates
specified for number 8 size and graded within the following limits when tested in
accordance with ASTM C 136:
SIEVE PERCENT PASSING
3/8" 95 to 100 _
No. 4 60 to 80
No. 8 15 to 40
07/2007 02255-4 of 7
r
CITY OF PEARLAND BEDDING,BACKFILL,AND
EMBANKMENT MATERIALS
M Pea Gravel. Durable particles composed of small, smooth,rounded stones or pebbles
and graded within the-following limits when tested in accordance with ASTM C 136:
SIEVE PERCENT PASSING
1/2" 100
3/8" 85 to 100
No. 4 10 to 30
No. 8 0 to 10
No. 16 ` 0 to 5
N Crushed Aggregates. Crushed aggregates consist of durable particles obtained from an
approved source and meeting the following requirements:
1. Materials of one product delivered for the same construction activity from a
single source.
2. Non-plastic fines.
3. Los Angeles Abrasion Test wear not exceeding 45 percent when tested in
accordance with ASTM C 131.
4. Crushed aggregate shall have a minimum of 90 percent of the particles retained
on the No.4 sieve with 2 or more crushed faces as determined by TxDOT Tex-
460-A, Part I.
5. Crushed stone: Produced from oversize plant processed stone or gravel,sized
A by crushing to predominantly angular particles from a naturally occurring
single source. Uncrushed gravel are not acceptable materials for embedment
where crushed stone is shown on the applicable utility embedment drawing
details.
6. Crushed Concrete: Crushed concrete is an acceptable substitute for crushed
stone as utility backfill. Gradation and quality control test requirements are the
same as crushed stone. Provide crushed concrete produced from normal
weight concrete of uniform quality; containing particles of aggregate and
cement material,free from other substances such as asphalt,reinforcing steel
fragments, soil, waste gypsum (calcium sulfate), or debris.
7. Gradations, as determined in accordance with TxDOT Tex-110-E.
PERCENT PASSING BY WEIGHT FOR PIPE
SIEVE EMBEDMENT BY RANGES OF NOMINAL PIPES SIZES
>15" 15" - 8" <8"
1" 95 - 100 100 -
3/4" 60 - 90 90— 100 100
1/2" 25 - 60 - 90— 100
3/8" - 20—55 40 - 70
No. 4 0 - 5 0- 10 0 - 15
No. 8 - 0- 5 0 - 5
07/2007 02255-5 of 7
CITY OF PEARLAND BEDDING,BACKFILL,AND
EMBANKMENT MATERIALS
3.0 EXECUTION
3.01 SOURCE QUALIFICATIONS FOR BORROW MATERIAL
A Use of material encountered in excavations is acceptable, provided applicable
requirements are satisfied. If excavation material is not acceptable,provide from other
approved source.
B Identify off-site sources for materials at least 14 days ahead of intended use so that the
Engineer may obtain samples for verification testing.
C Obtain approval for each material source by the Engineer before delivery is started. If
sources previously approved do not produce uniform and satisfactory products,furnish
materials from other approved sources. Materials may be subjected to inspection or
additional verification testing after delivery. Materials which do not meet the
requirements will be rejected. Do not use material which,after approval,has become
unsuitable for use due to segregation, mixing with other materials, or by
contamination. Once a material is approved by the Engineer, a Change Order is
required to change to a different material.
D Bank sand, select fill, and random fill, if available in the project excavation, may be
obtained by selective excavation and acceptance testing. Obtain additional quantities
of these materials and other materials required to complete the Work from off-site
sources.
E The Owner does not represent or guarantee that any soil found in the excavation work
will be suitable and acceptable as backfill material.
3.02 MATERIAL HANDLING
A When material is obtained from either a commercial or non-commercial borrow pit,
open the pit to expose the vertical faces of the various strata for identification and
selection of approved material to be used. Excavate the selected material by vertical
cuts extending through the exposed strata to achieve uniformity in the product.
B Establish temporary stockpile locations for practical material handling and control,and
verification testing by the Engineer in advance of final placement. Obtain approval
from landowner for storage of backfill material on adjacent private property.
C When stockpiling material near the Project Site,use appropriate methods to eliminate
blowing of materials into adjacent areas and prevent runoff containing sediments from
entering the drainage system.
D Place material suitable for backfilling in stockpiles at a distance from the trench to
prevent slides or cave-ins. Do not place stockpiles of excavated materials on public
streets.
07/2007 02255 -6 of 7
CITY OF PEARLAND BEDDING,BACKFILL,AND
EMBANKMENT MATERIALS
E Place stockpiles in layers to avoid segregation of processed materials. Load material
by making successive vertical cuts through entire depth of stockpile.
END OF SECTION
07/2007 02255-7 of 7
CITY OF PEARLAND UTILITY HORIZONTAL DIRECTIONAL DRILLING
Section 02313
UTILITY HORIZONTAL DIRECTIONAL DRILLING
1.00 General
1.01 WORK INCLUDED
A. Provide and install underground water and sewer line using the horizontal directional
drilling(HDD) method of installation, also commonly referred to as directional
boring, guided horizontal boring. This work shall include all services, equipment,
i materials, and labor for the complete and proper installation, testing, restoration of
underground utilities and erosion and sedimentation control and restoration.
1.02 QUALITY ASSURANCE
A. The requirements set forth in this document specify a wide range of procedural
precautions necessary to provide the very basic, essential aspects of a proper
directional bore installation and are adequately controlled. Strict adherence shall be
required under specifically covered conditions outlined in this specification.
Adherence to the specifications contained herein, or the Owner's Representative
approval of any aspect of any directional bore operation covered by this specification,
shall in no way relieve the Contractor of their ultimate responsibility for the
satisfactory completion of the work authorized under the Contract.
1. Installer's Qualifications: Installation shall be by a competent, experienced
contractor or sub-contractor. The installation contractor shall have a
satisfactory experience record of at least 3 years engaged in similar work of
equal scope. If patented processes are involved based on the pipe selection,the
installer shall be licensed, trained and in good standing with the pipe
manufacturer.
2. Performance Requirements: Lateral or vertical variation in the final position
of the carrier pipe from the line and grade established by the plans shall be
permitted only to the extent of 4 percent for water lines and horizontal
deflections for sewer lines,provided that such variation shall be regular and
only in the direction that will not detrimentally affect the function of the
carrier pipe. Vertical deflections for sewer lines may be permitted as long as
the slope is continuous (no sags),meets Texas Commission on Environmental
Quality minimum slope requirements, and will flow by gravity with no
surcharge and into existing or proposed downstream improvements.
3. Certification: Pipe products shall have been tested and approved by an
independent third-party laboratory for continuous use at rated pressures. Pipe
and couplings intended for contact with potable water shall be evaluated,
tested, and certified for conformance with NSF Standard 61 by an acceptable
certifying organization.
4. Design Criteria: The maximum allowable load for PVC pipe installations
shall produce a maximum deflection of 4 percent.
06/2012 02313-1 of 10
CITY OF PEARLAND UTILITY HORIZONTAL DIRECTIONAL DRILLING
1.03 SUBMITTALS
A. Submittals shall be in accordance with Section 01350 "Submittals" and shall include:
1. Work Plan: Prior to beginning work,the Contractor shall submit to the Owner's
Representative a work plan as record data detailing the procedure and schedule to
be used to execute the project. The work plan should include a description of all
equipment to be used, down-hole tools, a list of personnel and their qualifications
and experience (including back-up personnel in the event that an individual is
unavailable), list of subcontractors, a schedule of work activity, a safety plan
(including MSDS of any potentially hazardous substances to be used), traffic
control plan(if applicable), all excavation locations, interfering utilities, and flow
bypass, an erosion and sedimentation control plan and contingency plans for
possible problems. Work plan should be comprehensive,realistic and based on
actual working conditions for the project.
2. Equipment: Contractor will submit specifications on directional drilling
equipment as record data. Equipment shall include but not be limited to: drilling
rig, butt fusion welding apparatus, mud system, mud motors (if applicable), down-
hole tools, guidance system, rig safety systems. Calibration records for guidance
equipment shall be included. Specifications for any drilling fluid additives that
Contractor intends to use or might use will be submitted.
3. Material: Provide shop drawings of the pipe with material specifications,
including size,type, diameter and manufacturer's data and certifications on piping
and jointing methods. The shop drawing shall include a Certificate of Adequacy
of Design stating the pipe and fittings are satisfactory for the loads which will be
imposed during for all loading conditions.
4. Contractor shall maintain a daily project log of drilling operations and a guidance
system log along with a fusion report for all butt fused welding of joints with a
copy given to Owner's Representative at completion of project.
1.04 STANDARDS
A. The applicable provisions of the following standards shall apply as if written here in
their entirety:
1. American National Standards Institute(ANSI)/NSF Standards:
a. ANSI/NSF 61 -Drinking Water System Components—Health Effects
2: American Society for Testing and Materials (ASTM) Standards:
06/2012 02313-2 of 10
CITY OF PEARLAND UTILITY HORIZONTAL DIRECTIONAL DRILLING
a. ASTM D2241 - Standard Specification for Poly(Vinyl Chloride) PVC
Pressure Rated Pipe
b. ASTM D3034 - Standard Specification for type PSM Poly (Vinyl
Chloride) (PVC) Sewer Pipe and Fittings
c. ASTM D1784 - Standard Specification for Rigid PVC Compounds
and Chlorinated PVC Compounds
d. ASTM D2837 - Standard Test Method for Obtaining Hydrostatic
Design Basis for Thermoplastic Pipe Materials
e. ASTM D3139 - Standard Specification for Joints for Plastic Pressure
Pipes Using Flexible Elastomeric Seals
f. ASTM F477 - Standard Specification for Elastomeric Seals (Gaskets)
for Joining Plastic Pressure Pipe /'
g. ASTM F714 - Polyethylene (PE) Plastic Pipe (SDR-PR) Based on
Outside Diameter
h. ASTM D1248 - Specification for Polyethylene Plastics Molding and
Extrusion Materials
i. ASTM D3350 - Specification for Polyethylene Plastics Pipe and
Fittings Material
j. ASTM F1804 - Standard Practice for Determining Allowable Tensile
Load for Polyethylene (PE) Gas Pipe During Pull-In Installation
3'. American Water Works Associations (AWWA) Standards:
k. AWWA C901 - Standard Specification for Polyethylene (PE) Pressure
Pipe and Tubing, 1/2 through 3 Inches, for Water Service
1. AWWA C900 - Standard for PVC Pressure Pipe and Fabricated
Fittings, 4 through 12 inches, for Water Distribution
m. AWWA C905 - Standard for PVC Pressure Pipe and Fabricated
Fittings, 14 through 48 inches, for Water Distribution
n. AWWA C906 - Standard for Polyethylene (PE) Pressure Pipe and
Fittings, 4 through 63 inches, for Water Distribution and Transmission
1.05 DELIVERY AND STORAGE
A. Store PVC pipe material so that there is no exposure to sunlight.
1.06 JOB CONDITIONS; PERMITS AND EASEMENT REQUIREMENTS
A. Where the work is in the public right-of-way or railroad company right-of-way,the
Owner will secure the appropriate permits or easements. The Contractor shall
observe regulations and instructions of the right-of-way Owner as to the methods of
performing the work and take precautions for the safety of the property and the public.
Negotiations and coordination with the right-of-way Owner shall be carried on by the
Contractor, not less than 5 days prior to the time of his intentions to begin work on the '
right-of-way.
B. Comply with the requirements of the permit and/or easement. Work within the Texas
Department of Transportation(TXDOT)right of way shall comply with TXDOT
requirements. If required by the Right-of-Way Owner, obtain Protective Liability
Insurance in the amount required by the particular company or other insurance as is
06/2012 02313-3 of 10
CITY OF PEARLAND UTILITY HORIZONTAL DIRECTIONAL DRILLING
specified in the permit at no cost to the Owner. Acquire a permit, agreement, or work
order from the right-of-way Owner as is required.
C. Construction along roads, railroads and public areas shall be performed in such
manner that does not interfere with the operations of the roads, driveways, sidewalks,
pedestrian traffic and railroads.
D. Barricades, warning signs, and flagmen, when necessary and specified, shall be
provided by the Contractor.
E. No blasting shall be allowed.
F. Existing pipelines and underground conduits are to be protected. The Contractor shall
verify location and elevation of any pipe lines, telephone cable and fiber optics before
proceeding with the construction and shall plan his construction so as to avoid
damage to the existing pipe lines or telephone cables. Verification of location
(vertical and horizontal) of existing utilities shall be the complete responsibility of the
Contractor.
2.00 PRODUCTS
•
2.01 GENERAL
A. The directional drilling equipment shall consist of a directional drilling rig of
sufficient capacity to perform the bore and pullback the pipe, a drilling fluid mixing,
delivery and recovery system of sufficient capacity to successfully complete the
crossing, a drilling fluid recycling system to remove solids from the drilling fluid so
that the fluid can be re-used, a guidance system to accurately guide boring operations,
a vacuum truck of sufficient capacity to handle the drilling fluid volume, trained and
competent personnel to operate the system.
B. All equipment shall be in good, safe operating condition with sufficient supplies,
materials and spare parts on hand to maintain the system in good working order for
the duration of this project.
2.02 DRILLING SYSTEM
A. Drilling Rig: The directional drilling machine shall consist of a hydraulically
powered system to rotate,push and pull hollow drill pipe into the ground at a variable
angle while delivering a pressurized fluid mixture to a guidable drill (bore) head. The
machine shall be anchored to the ground to withstand the pulling,pushing and
rotating pressure required to complete the crossing. The hydraulic power system shall
be self-contained with sufficient pressure and volume to power drilling operations.
Hydraulic system shall be free of leaks. Rig shall have a system to monitor and
record maximum pull-back pressure during pullback operations. The rig shall be
grounded during drilling and pull-back operations. There shall be a system to detect
electrical current from the drill string and an audible alarm which automatically
sounds when an electrical current is detected.
B. Drill Head: The drill head shall be steerable by changing its rotation and shall
provide the necessary cutting surfaces and drilling fluid jets.
06/2012 02313-4 of 10
CITY OF PEARLAND UTILITY HORIZONTAL DIRECTIONAL DRILLING
C. Mud Motors (if required): Mud motors shall be of adequate power to turn the
required drilling tools.
D. Drill Pipe: Shall be constructed of high quality 4130 seamless tubing, grade D or
better,.with threaded box and pins. Tool joints should be hardened to 32-36 RC.
2.03 GUIDANCE SYSTEM
A. A Magnetic Guidance System(MGS) or,roven gyroscopic system shall be used to
provide a continuous and accurate determination of the location of the drill head
during the drilling operation. The guidance shall be capable of tracking at all depths
up to 100 feet and in any soil condition, including hard rock. It shall enable the driller
to guide the drill head by providing immediate information on the tool face, azimuth
(horizontal direction), and inclination(vertical direction). The guidance system shall
be accurate to plus or minus 2 percent of the vertical depth of the bore hole at sensing
position at depths up to 100 feet and accurate within 1.5 meters horizontally.
B. The.Guidance System shall be of a proven type and shall be operated by personnel
trained and experienced with this system. The Operator shall be aware of any
magnetic anomalies on the surface of the drill path and shall consider such influences
in the operation of the guidance system if using a magnetic system.
2.04 DRILLING FLUID MUD SYSTEM
A. Mixing System: A self-contained, closed, drilling fluid mixing system shall be of
sufficient size to mix and deliver drilling fluid. The drilling fluid reservoir tank shall
be of sufficient size for making the bore. Mixing system shall continually agitate the
drilling fluid during drilling operations.
B. Drilling Fluids: Drilling fluid shall be composed of clean water and appropriate
additives. Water shall be from an authorized source with a pH of 8.5 to 10. Water of
a lower pH or with excessive calcium shall be treated with the appropriate amount of
sodium carbonate or equal. The water and additives shall be mixed thoroughly and be
absent of any clumps or clods. No potentially hazardous material may be used in
drilling fluid.
C. Delivery System: The mud pumping system shall have a minimum capacity to
maintain correct boring alignment and be capable of delivering the drilling fluid at a
constant pressure. The delivery system shall have filters in-line to prevent solids from
being pumped into the drill pipe. Connections between the pump and drill pipe shall
be relatively leak-free. Used drilling fluid and drilling fluid spilled during drilling
operations shall be contained and conveyed to the drilling fluid recycling system. A
berm,minimum of 12 inches high, shall be maintained around drill rigs, drilling fluid
mixing system, entry and exit pits and drilling fluid recycling system to prevent spills
into the surrounding environment. Pumps and or vacuum truck(s) of sufficient size
shall be in place to convey excess drilling fluid from containment areas to storage and
recycling facilities.
D. Drilling Fluid Recycling System: The drilling fluid recycling system shall separate
sand, dirt and other solids from the drilling fluid to render the drilling fluid reusable.
Spoils separated from the drilling fluid will be stockpiled for later use or disposal.
06/2012 02313-5 of 10
CITY OF PEARLAND UTILITY HORIZONTAL DIRECTIONAL DRILLING
2.05 OTHER EQUIPMENT
A. Pipe Rammers: Hydraulic or pneumatic pipe rammers may only be used if necessary
and with the authorization of Engineer.
B. Restrictions: Other devices or utility placement systems for providing horizontal
thrust other than those previously defined in the preceding sections shall not be used
unless approved by the Engineer prior to commencement of the work. Consideration
for approval will be made on an individual basis for each specified location. The
proposed device or system will be evaluated prior to approval or rejection on its
potential ability to complete the utility placement satisfactorily without undue
stoppage and to maintain line and grade within the tolerances prescribed by the
particular conditions of the project.
2.06 PIPING MATERIALS
A. Water Line Materials:
1. PVC Water Line Piping 4 through 12 inches shall be Fusible C 900 CLASS 235
(DR-18)by Underground Solutions or approved equal. PVC Water Line Piping
14 through 36 inches shall be Fusible C 905 CLASS 235 (DR-18)by
Underground Solutions or approved equal.
B. Pipe Markings: Pipe shall be legibly marked in permanent ink with the manufacturer
and trade name, nominal size and DR rating/pressure class, hydrostatic proof test
pressure,NSF 61 if applicable, and manufacturer date code. Pipe and couplings shall
also bear the mark of the certifying agency which have tested and approved the
product for use in fire protection applications.
C. Tracer Wire: All piping shall be installed with a continuous, insulated TW, THW,
THWN or HMWPE insulated copper, 10 gauge or thicker wire for pipeline location
purposes by means of an electronic line tracer. The wire shall be installed along the
entire length of pipe. The insulation color shall match the color of the pipe being
installed. Sections of wire shall be spliced together using approved splice caps and
water proof seals. Twisting the wires together is not acceptable.
D. PVC Couplings: Pipes shall be jointed using non-metallic couplings which have been
designed as an integral system. High strength thermoplastic splines shall be inserted
into mating precision machined grooves in the pipe and coupling to provide full 360-
degree restraint with evenly distributed loading. No external pipe to pipe restraining
devices which clamp onto or otherwise damage the pipe surface will be allowed. Pipe
couplings shall have a leading beveled edge to reduce resistance during pulling
operations. Couplings shall,be designed for use at the rated pressure of the pipe which
they are used and shall incorporate twin elastomeric sealing gaskets meeting the
requirements of ASTM F477. Joints shall be designed to meet the leakage
requirements of ASTM D3139.
3.00 EXECUTION
3.01 GENERAL ,
A. The Engineer and Owner's Representative must be notified 48 hours in advance of
starting work. The Directional Bore shall not begin until the Owner's Representative
06/2012 02313-6 of 10
CITY OF PEARLAND UTILITY HORIZONTAL DIRECTIONAL DRILLING
is present at the job site and agrees that proper preparations for the operation have
- been made.
B. The approval for beginning the installation shall in no way relieve the Contractor of
the ultimate responsibility for the satisfactory completion of the work as authorized
under the Contract. It shall be the responsibility of Owner's Representative to
provide inspection personnel at such times as appropriate without causing undue
hardship by reason of delay to the Contractor.
3.02 PERSONNEL REQUIREMENTS
A. All personnel shall be fully trained in their respective duties as part of the directional
drilling crew and in safety. The operator of the drilling rig must have at least 3 years
directional drilling experience. A responsible representative who is thoroughly
familiar with the equipment and type work to be performed, must be in direct charge
and control of the operation at all times. In all cases the supervisor must be
continually present at the job site during the actual Directional Bore operation. The
Contractor shall have a sufficient number of competent workers on the job at all times
to insure the Directional Bore is made in a timely and satisfactory manner.
3.03 DRILLING PROCEDURES
A. Site Preparation: Prior to any alterations to work-site, contractor shall photograph or
video tape entire work area, including entry and exit points, one copy of which shall
be given to Owner's Representative and one copy to remain with contractor for a
period of 1 year following the completion of the project. Work sites shall be within
right-of-way and shall be graded or filled to provide a level working area. No
alterations beyond what is required for operations are to be made. Contractor shall
confine all activities to designated work areas.
B. Drill Path Survey: Entire drill path shall be accurately surveyed by the Contractor
with entry and exit stakes placed in the appropriate locations within the areas
determined in the field with the Owner's Representative Locate existing utilities in
advance of boring operations. The Contractor shall be responsible for repairing
damage to existing utilities at no additional cost to the Owner. Repair of existing
utilities shall proceed until complete and the existing utility is back in service. If
contractor is using a magnetic guidance system, drill path will be surveyed by the
Contractor for any surface magnetic variations or anomalies.
C. Environmental Protection: Contractor shall place silt fence between all drilling
operations and any drainage,wetland, waterway or other area designated for such
protection by contract documents, state, federal and local regulations. Additional
environmental protection necessary to contain any hydraulic or drilling fluid spills
shall be put in place, including berms, liners,turbidity curtains and other measures.
Contractor shall adhere to all applicable environmental regulations. Fuel may not be
stored in bulk containers within 200 feet of any water-body or wetland.
D. Safety: Contractor shall adhere to all applicable state, federal and local safety
regulations and all operations shall be conducted in a safe manner.
06/2012 02313-7 of 10
CITY OF PEARLAND UTILITY HORIZONTAL DIRECTIONAL DRILLING
E. Pilot Hole:
1. Pilot hole shall be drilled on bore path with no deviations greater than 4 percent
horizontally or vertically(water lines) over a length of 100 feet. In the event that
pilot hole does deviate from bore path more than 4 percent, Contractor shall notify
Owner's Representative who may require contractor to pull-back and re-drill from
the location along bore path before the deviation. In the event that a drilling fluid
fracture, inadvertent returns or returns loss occurs during pilot hole drilling
operations, contractor shall cease drilling, wait at least 30 minutes, inject a
quantity of drilling fluid with a viscosity exceeding 120 seconds as measured by a
March funnel and then wait another 30 minutes.
2. If mud fracture or returns loss continues, contractor will cease operations and
notify Owner's Representative. Owner's Representative and contractor will
discuss additional options and work will then proceed accordingly.
F. Reaming: Upon successful completion of pilot hole, contractor will ream bore hole to
a minimum of 25 percent greater than outside diameter of pipe using the appropriate
tools. Contractor will not attempt to ream at one time more than the drilling
equipment and mud system are designed to safely handle.
G. Pull-Back:
1. After successfully reaming bore hole to the required diameter, contractor will pull
the pipe through the bore hole. In front of the pipe will be a swivel and reamer to
compact bore hole walls. Pull loads shall not exceed the limits shown in the
following tables. Once pull-back operations have commenced, operations must
continue without interruption until pipe is completely pulled into bore hole.
PVC Diamond Lok-21
Maximum Pull Loads
AWWA C905
Size DR Minimum Maximum Pull
(in.) Radius (ft.) In Force (lb.)
16 18 (235 psi) 400 60,000
PVC Fusible PVC -Underground Solutions Maximum
Pull Loads
AWWA C905
Size DR Minimum Maximum Pull
(in.) Radius (ft.) In Force (lb.)
16 18 (235 psi) 363 139,700
2. During pull-back operations contractor will not apply more than the maximum
safe pipe pull pressure at any time. In the event that pipe becomes stuck,
contractor will cease pulling operations to allow any potential hydro-lock to
subside and will recommence pulling operations. If pipe remains stuck, contractor
06/2012 02313-8 of 10
CITY OF PEARLAND UTILITY HORIZONTAL DIRECTIONAL DRILLING
will notify Owner's Representative to discuss options and then work will proceed
accordingly.
3.04 FUSIBLE PVC PIPE JOINING
A. The pipe shall be assembled and joined at the site using the thermal butt-fusion
method to provide a leak proof joint. Threaded or solvent-cement joints and
connections are not permitted. All equipment and procedures used shall be used in
strict compliance with the manufacturer's recommendations. Fusing shall be
accomplished by personnel certified as fusion technicians by a manufacturer of
polyethylene pipe and/or fusing equipment.
B. The butt-fused joint shall be true alignment and shall have uniform roll-back beads
resulting from the use of proper temperature and pressure. The joint shall be allowed
adequate cooling time before removal of pressure. When cool, all weld beads shall
then be removed from both the inside and outside surface such that the joint surfaces
shall be smooth. The fused joint shall be watertight and shall have tensile strength
equal to that of the pipe. All joints shall be subject to acceptance by the Owner's
Representative prior to insertion. All defective joints shall be cut out and replaced at
no cost to the Owner. Any section of the pipe with a gash,blister, abrasion, nick, scar
or other deleterious fault greater in depth than 10 percent of the wall thickness, shall
not be used and must be removed from the site. However, a defective area of the pipe
may be cut out and the joint fused in accordance with the procedures stated above. In
addition, any section of pipe having other defects such as concentrated ridges,
discoloration, excessive spot roughness,pitting,variable wall thickness or any other
defect of manufacturing or handling as determined by the Owner's Representative
shall be discarded and not used.
C. Terminal sections pipe that are joined within the insertion pit shall be connected with
a full circle pipe repair clamp. The butt gap between pipe ends shall not exceed 1/2
inch.
3.05 PIPE TESTING
A. Following successful pull-back of pipe, contractor will test pipe using potable water
according to Section 01430 "Contractor's Quality Control." A calibrated pressure
recorder will be used to record the pressure during the test period. This record will be
presented to Owner's Representative.
3.06 TRACER WIRE TESTING
A. Upon completion the Contractor shall demonstrate that the wire is continuous and
unbroken through the entire run of the pipe including full signal conductivity
(including splices). If the wire is broken, the Contractor shall repair or replace it.
Pipeline installation will not be accepted until the wire passes a continuity test.
3.07 SITE RESTORATION
A. Following drilling operations, contractor will de-mobilize equipment and restore the
worksite to original condition. All excavations will be backfilled and compacted to
95 percent of original density. Landscaping will be subcontracted to a local
professional landscaping company.
06/2012 02313-9 of 10
CITY OF PEARLAND UTILITY HORIZONTAL DIRECTIONAL DRILLING
END OF SECTION
06/2012 02313-10 of 10
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR ROADWAYS
Section 02316
EXCAVATION AND BACKFILL FOR ROADWAYS
1.1 GENERAL
1.2 SECTION INCLUDES
A. Excavation of materials for roadways.
B. Excavation of materials for roadside ditches.
C. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01760-Project Record Documents
4. Section 01450—Testing Laboratory Services
5. Section 01500—Temporary Facilities and Controls
6. Section 02255—Bedding,Backfill and Embankment Material
7. Section 01570—Trench Safety Systems
8. Section 01564—Control of Ground Water and Surface Water
9. Section 01720—Field Surveying
10. Section 02220—Site Demolition
11. Section 02200—Site Preparation
12. Section 02330—Embankment
13. Section 01140—Contractor's Use of Premises
D. Referenced Standards:
1. American Society for Testing and Materials(ASTM)
a. ASTM D 698,"Standard Test Methods for Laboratory Compaction
Characteristics of Soil Using Standard Effort"
b. ASTM D 1556,"Standard Test Method for Density and Unit Weight of
Soil in Place by the Sand-Cone Method"
c. ASTM D 2922,"Standard Test Method for Density of Soil and Soil-
Aggregate in Place by Nuclear Methods(Shallow Depth)"
d. ASTM D 3017,"Standard Test Method for Water Content of Soil and
Rock in Place by Nuclear Methods(Shallow Depth)"
1.3 MEASUREMENT AND PAYMENT
A. Measurement shall be by the cubic yard measured in place,including labor,equipment,
tools and incidentals necessary to complete the work.
1/2018 02316-1 of 5
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR ROADWAYS
B. Payment includes control of ground water and surface water,trench safety systems,
removal of existing pavements and structures,repair and maintenance of excavated or
backfilled areas, and other measures specified in this Section and not included in
payment elsewhere.
C. Refer to Section 01200—Measurement and Payment Procedures.
D. No payment will be made for material excavated under the following conditions:
1. More than 2 feet outside of vertical planes behind back of curbs.
2. For portion within limits of trench for utilities constructed by open-cut
methods.
3. As indicated otherwise on Drawings.
E. Construction Surveying shall be performed by qualified personnel under the direction
of the Contractor. Contractor shall be responsible for the accuracy and correctness of
this work. In the event that the Work consists of significant alteration of the
topographic features of natural grade,Contractor shall perform enough topographic
survey to substantiate existing pre-construction elevations. No claim shall be made
for additional excavation or grade adjustment in excess of quantities contained in the
contract documents without demonstrable evidence that such conditions existed prior
to start of the Work.
F. Excavation and Backfill quantities that exceed the construction plans shall be
substantiated with topographic survey of finished grade by survey (RPLS) and
verified by the Engineer at contractor's expense.
1.4 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit product quality,material sources,and field quality information in accordance
with this Section.
C. Submit field red lines documenting location of roadway excavation as installed,
referenced to survey Control Points,under the provisions of Section 01760—Project
Record Documents, 1.04C. Include location of utilities and structures encountered or
rerouted. Give horizontal dimensions, elevations,inverts and gradients.
1.5 TESTING
A. Testing and analysis of product quality, material sources, or field quality shall be
performed by an independent testing laboratory provided by the Owner under the
provisions of Section 01450—Testing Laboratory Services and as specified in this
Section.
1/2018 I 02316-2of5
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR ROADWAYS
1.6 PROTECTION OF PEOPLE AND PROPERTY
A. Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
2.1 PRODUCTS
2.2 MATERIALS
A. Contractor shall provide materials used as embedment,backfill,back-dressing, and
embankment identified on the Plans in accordance with Section 02255 —Bedding,
Backfill and Embankment Material.
3.1 EXECUTION
3.2 PREPARATION
A. Employ a Trench Safety Plan as specified in Section 01570—Trench Safety Systems.
B. Install and operate necessary dewatering and surface water control measures in
accordance with requirements of Section 01564 — Control of Ground Water and
Surface Water.
C.' Identify required lines, levels, and datum. Coordinate with Section 01720 —Field
Surveying.
D. Identify existing structures and utilities above and below grade. Stake and flag their
location.
E. Remove existing pavements and structures, including sidewalks and driveways, in
conformance with requirements of Section 02220—Site Demolition,as applicable.
F. Area shall be cleared and grubbed under the provisions of Section 02200 — Site
Preparation prior to excavation.
G. , Strip and stockpile topsoil under the provisions of Section 02200—Site Preparation.
H. Upon discovery of unknown or badly deteriorated utilities,or concealed conditions,
discontinue work. Notify Engineer and obtain instructions before proceeding in such
areas.
3.3 EXCAVATION
A. Excavate to lines and grades shown on Plans.
1/2018 02316-3 of
7
CITY OF PEARLAND. EXCAVATION AND BACKFILL
FOR ROADWAYS
B. Areas of unsuitable material shall be removed,backfilled with embankment materials,
and compacted under the provisions of Section 02330—Embankment.
C. At intersections,grade back at minimum slope of one inch per foot. Produce a smooth
riding junction with intersecting street. Maintain proper drainage.
1/2018 02316-4 of 5
•
CITY OFPEARLAND EXCAVATION AND BACKFILL
FOR ROADWAYS
D. Fill over-excavated areas in accordance with requirements of Section 02330 —
Embankment at no cost to the Owner.
3.4 COMPACTION REQUIREMENTS
A. Maintain moisture content of embankment materials to attain required compaction
density.
B. Compact to minimum densities at moisture content of optimum to 3 percent above
optimum as determined by ASTM D 698,unless otherwise indicated on the Drawings.
1. Areas under future paving and shoulders:Minimum density of 95 percent of
maximum dry density.
2. Other areas: Minimum density of 90 percent of maximum drydensity.
3.5 TOLERANCES
A. Top of compacted surface:Plus or minus 1/2 inch in cross section,or in 16 foot length.
3.6 FIELD QUALITY CONTROL
A. Compaction Testing will be performed in accordance with ASTM D 1556 or ASTM D
2922 and ASTM D 3017 under provisions of Section 01450— Testing Laboratory
Services.
B. Three or more tests,at Engineer's/Owner's option,will be taken for each 1,000 linear
feet per lane of roadway or 500 square yards of embankment per lift.
C. If tests indicate work does not meet specified compaction requirements,recondition,
re-compact,and retest at Contractor's expense.
3.7 CLEAN-UP AND RESTORATION
A. Perform clean-up and restoration in and around construction zone in accordance with
Section 01140-Contractor's Use of Premises.
•
B. In unpaved areas, grade surface as a uniform slope from installed appurtenances to
natural grade and stabilize as indicated on Plans.
1/2018 02316-5 of 5
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR ROADWAYS
3.8 PROTECTION OF THE WORK
A. Maintain excavation and embankment areas until start of subsequent work. Repair and
re-compact slides,washouts,settlements,or areas with loss of density at no cost to the
Owner
B. Prevent erosion at all times. Maintain ditches and cut temporary swales to allow
natural drainage in order to avoid damage to roadway. Do not allow water to pond in
excavations.
C. Distribute construction traffic evenly over compacted areas,where practical,to aid in
obtaining uniform compaction. Protect exposed areas having high moisture content
from wheel loads that cause rutting.
END OF SECTION
1/2018 02316-6 of 5
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
Section 02318
EXCAVATION AND BACKFILL FOR UTILITIES
1.0 GENERAL
1.01 SECTION INCLUDES
A. Excavation,trenching,foundation,embedment,and backfill for installation of utilities,
storm sewers including manholes, pipeline structures and other associated
appurtenances.
B. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350— Submittals
3. Section 01570—Trench Safety System
4. Section 01564—Control of Ground Water and Surface Water
5. Section 01760—Project Record Documents
6. Section 01450—Testing Laboratory Services
7. Section 01500—Temporary Facilities and Controls
8. Section 02255—Bedding, Backfill, and Embankment Materials
9. Section 02370—Geotextile
10. Section 02220—Site Demolition
11. Section 01140—Contractor's Use of Premises
C. Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 2321, "Standard Practice for Underground Installation of
Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications"
b. ASTM D 698, "Standard Test Methods for Laboratory Compaction
Characteristics of Soil Using Standard Effort"
c. ASTM D 558, "Standard Test Methods for Moisture-Density (Unit
Weight) Relations of Soil-Cement Mixtures"
d ASTM D 4318, "Standard Test Methods for Liquid Limit, Plastic
Limit, and Plasticity Index of Soils"
e. ASTM D 1556,"Standard Test Method for Density and Unit Weight of
Soil in Place by the Sand-Cone Method"
f. ASTM D 2922, "Standard Test Method for Density of Soil and Soil-
Aggregate in Place by Nuclear Methods (Shallow Depth)"
g. ASTM D 3017, "Standard Test Method for Water Content of Soil and
Rock in Place by Nuclear Methods (Shallow Depth)"
5/2013 02318- 1 of 15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
2. Texas Department of Transportation (TxDOT)
a. Tex-101-E, Preparing Soil and Flexible Base Materials for Testing
b. Tex-110-E, Particle Size Analysis of Soils
D. Definitions:
1. Excavation - Any man-made cut, cavity, trench, or depression in an earth
surface, formed by removal of material.
a. Extra Hand Excavation- excavation by manual labor at locations
designated by the Engineer, which is not included in other Bid Items.
b. Extra Machine Excavation- excavation by machine at locations
designated by the Engineer, which is not included in other Bid Items. _
c. Special Excavation-excavation necessitated by obstruction of pipes,
ducts, or other structures, not shown on Plans, which interfere with
installation of utility piping by normal methods of excavation or
augering. Contractor shall be responsible for locating such
underground obstructions,sufficiently in advance of trench excavation
or augering, to preclude damage to the obstructions.
2. Pipe Foundation-suitable and stable native soils that are exposed at the trench
subgrade after excavation to depth of bottom of the bedding as shown on the
Plans, or foundation backfill material placed and compacted in over-
excavations.
3. Pipe Bedding-the portion of trench backfill that extends vertically from top of
foundation up to a level line at bottom of pipe, and horizontally from one
trench sidewall to opposite sidewall.
4. Haunching-the material placed on either side of pipe from top of bedding up
to spring-line of pipe and horizontally from one trench sidewall to opposite
sidewall.
5. Initial Backfill - the portion of trench backfill that extends vertically from
spring-line of pipe(top of haunching)up to a level line 12 inches above top of
pipe, and horizontally from one trench sidewall to opposite sidewall.
6. Pipe Embedment - the portion of trench backfill that consists of bedding,
haunching, and initial backfill.
7. Trench Zone-the portion of trench backfill that extends vertically from top of
pipe embedment up to pavement subgrade or up to final grade when not
beneath pavement.
5/2013 02318 -2 of 15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
8. Trench Conditions - description of the stability of trench bottom and trench
walls of pipe embedment zone. Maintain trench conditions that provide for
effective placement and compaction of embedment material directly on or
against undisturbed soils or foundation backfill,except where structural trench
support is necessary.
a. Dry Stable Trench: Stable and substantially dry trench conditions exist
in pipe embedment zone as a result of typically dry soils or achieved by
ground water control (dewatering or depressurization) for trenches
extending below ground water level.
b. Stable Trench with Seepage: Stable trench in which ground water
seepage is controlled by excavation drainage.
1) Stable Trench with Seepage in Clayey Soils: Excavation
drainage is provided in lieu of or to supplement ground
water control systems to control seepage and provide stable
trench subgrade in predominately clayey soils prior to
bedding placement.
2) Stable Wet Trench in Sandy Soils: Excavation drainage is
provided in the embedment zone in combination with
ground water control in predominately sandy or silty soils.
c. Unstable Trench: Unstable trench conditions exist in the pipe
embedment zone if ground water inflow or high water content causes
soil disturbances,such as sloughing,sliding,boiling,heaving or loss of
density.
9. Sub-trench - a special case of benched excavation. Sub-trench excavation
below trench shields or shoring installations may be used to allow placement
and compaction of foundation or embedment materials directly against
undisturbed soils. Depth of a sub-trench depends upon trench stability and
safety as determined by the Contractor.
10. Trench Dam - a placement of low permeability material in pipe embedment
zone or foundation to prohibit ground water flow along the trench.
11. Over-Excavation and Backfill - excavation of subgrade soils with
unsatisfactory bearing capacity or composed of otherwise unsuitable materials
below top of foundation as shown on Plans, and backfilled with foundation
backfill material.
12. Foundation Backfill Materials - natural soil or manufactured aggregate of
controlled gradation, and geo-textile filter fabrics as required, to control
5/2013 02318 -3 of 15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
drainage and material separation. Foundation backfill material is placed and
compacted as backfill to provide stable support for bedding. Foundation
backfill materials may include concrete seal slabs.
13. Trench Shield(Trench Box) - a portable worker safety structure moved along
the trench as work proceeds, used as a Protective System and designed to
withstand forces imposed on it by cave-in, thereby protecting persons within
the trench. Trench shields may be stacked if so designed or placed in a series
depending on depth and length of excavation to be protected.
1.02 MEASUREMENT AND PAYMENT
A. Unless indicated as a Bid Item, no separate payment will be made for trench
excavation,embedment,and backfill under this Section. Include cost in Bid Items for
all excavation and backfill associated with the placement and construction of:
underground piping,boxes,manholes and associated appurtenances including conduit,
or duct work.
B. If Special Excavation is allowed, based on the Engineer's direction, and indicated in
Section 00300—Bid Proposal as an Extra Item,measurement will be on a cubic yard
basis, measured in place, without deduction for space occupied by portions of pipes,
ducts, or other structures left in place across trenches excavated under this item.
1. Payment for Special Excavation shall include:
a. Dewatering and surface water control.
b. Protection of pipes, ducts, or other structures encountered including
bracing, shoring, and sheeting necessary for support.
c. Replacement of pipes, ducts, or structures damaged by special
excavation operations, except where payment for replacement is
authorized by Engineer due to deteriorated condition of pipes,ducts,or
structure.
•
d. Temporary disconnecting,plugging, and reconnecting of low volume
water pipes,to allow machine excavation or augering,when approved
by Engineer. Pipe for replacement shall be new and conform to
specification requirements for type of existing pipe removed.
e. Placement of material from Special Excavation.
f. Geo-textile material and concrete trench dams required to complete the
placement of material from Special Excavation.
g. Re-sodding required for surface restoration within designated limits of
Special Excavation.
h. Disposal of excess excavated material not suitable for bedding or
backfill, or not required for the Work.
2. The items listed below will not be included in payment for Special Excavation.
Include cost in Bid Items for which the Work is a component:
5/2013 02318-4of15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
a. Trench safety systemincludingsheeting and shoring.
b. Utility piping installed in trenches excavated under this item.
c. Removal and replacement of associated streets, driveways, and
sidewalks.
C. If Extra Hand Excavation is allowed,based on the Engineer's direction,and indicated
in Section 00300—Bid Proposal as an Extra Item,measurement will be on a cubic yard
basis,measured in place.
1. Payment for Extra Hand Excavation shall include:
a. Dewatering and surface water control.
b. Disposal of excess excavated material not suitable for bedding or
backfill, or not required for the Work.
c. Placement of material from Extra Hand Excavation.
d. s Re-sodding required for surface restoration within designated limits of
Extra Hand Excavation.
2. The items listed below will not be included in payment for Special Excavation.
Include cost in Bid Items for which the Work is a component.:
a. Trench safety system including sheeting and shoring.
b. Removal and replacement of associated streets, driveways, and
sidewalks.
D. If Extra Machine Excavation is allowed, based on the Engineer's direction, and
indicated in Section 00300—Bid Proposal as an Extra Item,measurement will be on a
cubic yard basis, measured in place.
1. Payment for Extra Machine Excavation shall include:
a. Dewatering and surface water control.
b. Disposal of excess excavated material not suitable for bedding or
backfill, or not required for the Work.
c. Placement of material from extra machine excavation.
d. Re-sodding required for surface restoration within designated limits of
Extra Machine Excavation.
2. The items listed below will not be included in payment for Special Excavation.
Include cost in Bid Items for which the Work is a component:
a. Trench safety system including sheeting and shoring.
b. Removal and replacement of associated streets, driveways, and
sidewalks.
5/2013 02318 -5 of 15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
E. Refer to Section 01200-Measurement and Payment Procedures. No payment will be
made for delays in completion of Work resulting from Extra Item Work.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit a written description for information only of the planned typical method of
excavation,backfill placement and compaction, including:
1. Sequence of work and coordination of activities.
2. Selected trench widths.
3. Procedures for foundation and embedment placement, and compaction.
4. Procedure for use of trench boxes and other pre-manufactured systems while
assuring specified compaction against undisturbed soil.
5. Procedure for installation of Special Shoring at locations identified on the
Plans.
C. Submit product quality,material sources,and field quality information in accordance
with this Section.
D. Submit field red lines documenting location of Utilities as installed, referenced to
survey Control Points, under the provisions of Section 01760 — Project Record
Documents, 1.04C. Include location of utilities and structures encountered or rerouted.
Give horizontal dimensions, elevations, inverts and gradients.
1.04 TESTING
A. Testing and analysis of product quality, material sources, or field quality shall be
performed by an independent testing laboratory provided by the Owner under the
provisions of Section 01450 — Testing Laboratory Services and as specified in this
Section.
1.05 PROTECTION OF PEOPLE AND PROPERTY
A. Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
5/2013 02318 -6 of 15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
1.06 SPECIAL SHORING DESIGN REQUIREMENTS
A. Special Shoring shall be, in accordance with Section 01570—Trench Safety System,
designed by a Professional Engineer, licensed by the State of Texas,At Contractor's
expense.
B. Special Shoring shall be designed to provide support for the sides of the excavations,
including soils and hydrostatic ground water pressures as applicable, and to prevent
ground movements affecting adjacent installations or improvements such as structures,
pavements and utilities.
C. Special Shoring may be a pre-manufactured system or a field fabricated system that
• meets the requirements of the Work.
2.0 PRODUCTS
2.01 MATERIALS
A. Contractor shall provide materials used as embedment, backfill, back-dressing, and
embankment identified on the Plans in accordance with Section 02255 — Bedding,
Backfill and Embankment Material.
B. Manufactured materials, such as crushed concrete,may be substituted for natural soil
or rock products where indicated in the product specification, and approved by the
Engineer,provided that the physical property criteria are determined to be satisfactory
by testing.
C. Geotextile (Filter Fabric): Conform to requirements of Section 02370—Geotextile.
D. Concrete for Trench Dams: Concrete backfill or 3 sack premixed (bag) concrete.
E. Timber Shoring Left in Place: Untreated oak.
2.02 EQUIPMENT
A. Perform excavation with track mounted excavator or other equipment suitable for
achieving the requirements of this Section.
B. Use only hand-operated tamping equipment until a minimum cover of 12 inches is
obtained over pipes, conduits, and ducts. Do not use heavy compacting equipment
until adequate cover is attained to prevent damage to pipes, conduits, or ducts.
C. Use trench shields or other Protective Systems or Shoring Systems which are designed
and operated to achieve placement and compaction of backfill directly against
undisturbed native soil.
5/2013 02318 -7 of 15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
D. Use Special Shoring systems where required which may consist of braced sheeting,
braced soldier piles and lagging, slide rail systems, or other systems meeting the
Special Shoring design requirements.
3.0 EXECUTION
3.01 PREPARATION
A. Employ a Trench Safety Program as specified in Section 01570 — Trench Safety
Systems.
B. Install and operate necessary dewatering and surface water control measures conform
to Section 01564—Control of Ground Water and Surface Water.
C. Remove existing pavements and structures, including sidewalks and driveways, to
conform with requirements of Section 02220—Site Demolition, as applicable.
D. Area shall be cleared and grubbed under the provisions of Section 02200 — Site
Preparation prior to excavation.
E. Strip and stockpile topsoil under the provisions of Section 02200—Site Preparation
F. Schedule work so that pipe embedment can be completed on the same day that
acceptable foundation has been achieved for each section of pipe installation,manhole,
or other structures.
3.02 EXCAVATION
A. Except as otherwise specified or shown on the Plans,, install underground utilities in
open cut trenches with vertical sides.
B. Perform excavation work so that pipe,conduit,and ducts can be installed to depths and
alignments shown on the Plans. Avoid disturbing surrounding ground and existing
facilities and improvements.
C. Determine trench excavation widths using the following schedule as related to pipe
outside diameter(O.D.). Maximum trench width shall be the minimum trench width
plus 24 inches.
NOMINAL MINIMUM TRENCH
PIPE SIZE,INCHES WIDTH,INCHES
Less than 18 O.D. + 18
18 to 30 O.D. +24
Greater than 30 O.D. +36
5/2013 02318 -8of15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
D. Use sufficient trench width or benches above the embedment zone for installation of
well point headers or manifolds and pumps where depth of trench makes it
uneconomical or impractical to pump from the surface elevation. Provide sufficient
space between shoring cross braces to permit equipment operations and handling of
forms,pipe, embedment and backfill, and other materials.
E. Upon discovery of unknown utilities, badly deteriorated utilities not designated for
removal, or concealed conditions, discontinue work at that location. Notify the
Engineer and obtain instructions before proceeding.
F. Shoring of Trench Walls.
1. Install Special Shoring in advance of trench excavation or simultaneously with
the trench excavation, so that the soils within the full height of the trench
excavation walls will remain fully laterally supported at all times.
2. For all types of shoring, support trench walls in the pipe embedment zone
throughout the installation. Provide trench wall supports sufficiently tight to
prevent washing the trench wall soil out from behind the trench wall support.
3. Unless otherwise directed by the Engineer,leave sheeting driven into or below
the pipe embedment zone in place to preclude loss of support of foundation
and embedment materials. Leave rangers,walers, and braces in place as long
as required to support sheeting,which has been cut off, and the trench wall in
the vicinity of the pipe zone.
4. Employ special methods for maintaining the integrity of embedment or
foundation material. Before moving supports,place and compact embedment
to sufficient depths to provide protection of pipe and stability of trench walls.
As supports are moved, finish placing and compacting embedment.
5. If sheeting or other shoring is used below top of the pipe embedment zone,do
not disturb pipe foundation and embedment materials by subsequent removal.
Maximum thickness of removable sheeting extending into the embedment zone
1 inch. Fill voids left on removal of supports with compacted backfill material.
G. Use of Trench Shields. When a trench shield(trench box) is used as a worker safety
device, the following requirements apply:
1. Make trench excavations of sufficient width to allow shield to be lifted or
pulled freely,without damage to the trench sidewalls.
2. Move trench shields so that pipe, and backfill materials, after placement and
compaction, are not damaged nor disturbed, nor the degree of compaction
reduced.
5/2013 02318 -9 of 15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
3. When required, place, spread, and compact pipe foundation and bedding
materials beneath the shield. For backfill above bedding, move the shield as
backfill is placed and ramped in. Place and compact backfill materials against
undisturbed trench walls and foundation.
4. Maintain trench shield in position to allow sampling and testing to be
performed in a safe manner.
3.03 TRENCH FOUNDATION
A. Excavate bottom of trench to uniform grade to achieve stable trench conditions and
satisfactory compaction of foundation or bedding materials.
B. Place trench dams in Class I foundations in line segments longer than 100 feet between
manholes, and not less than one in every 500 feet of pipe placed. Install additional
dams as needed to achieve workable construction conditions. Do not place trench
dams closer than 5 feet from manholes.
3.04 PIPE EMBEDMENT PLACEMENT AND COMPACTION
A. Immediately prior to placement of embedment materials,the bottoms and sidewalls of
trenches shall be free of loose, sloughing, caving, or otherwise unsuitable soil.
B. Place Geotextile,if specified,to prevent particle migration from the in-situ into open-
graded(Class I) embedment materials or drainage layers.
C. Place embedment including bedding, haunching and initial backfill to meet
requirements indicated on Plans. PVC & HDPE require cement stabilized sand
bedding and backfill to one foot below subgrade or below grade if under pavement,or
one foot above top of pipe if not under pavement.
D. For pipe installation,manually spread embedment materials around the pipe to provide
uniform bearing and side support when compacted. Do not allow materials to free-fall
from heights greater than 24 inches above top of pipe. Perform placement and
compaction directly against the undisturbed soils in the trench sidewalls, or against
sheeting which is to remain in place.
E. Do not place trench shields or shoring within height of the embedment zone unless
means to maintain the density of compacted embedment material are used. If
moveable supports are used in embedment zone, lift the supports incrementally to
allow placement and compaction of the material against undisturbed soil.
F. Do not damage coatings or wrappings of pipes during backfilling and compacting
operations. When embedding coated or wrapped pipes, do not use crushed stone or
other sharp, angular aggregates.
5/2013 02318- 10 of 15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
G. Place haunching material manually around the pipe and compact it to provide uniform
bearing and side support. If necessary, hold small-diameter or lightweight pipe in
place during compaction of haunch areas and placement beside the pipe with sand bags
or other suitable means.
H. Place electrical conduit directly on foundation without bedding.
Shovel pipe embedment material in place and compact it using pneumatic tampers in
restricted spaces,and vibratory-plate compactors or engine-powered jumping jacks in
unrestricted spaces. Compact each lift before proceeding with placement of the next
lift.
1. Class I embedment materials.
a. Maximum 6-inches compacted lift thickness.
b. Systematic compaction by at least two passes of vibrating equipment.
Increase compaction effort as necessary to effectively embed the pipe
to meet the deflection test criteria.
c. Moisture content as determined by Contractor for effective compaction
without softening the soil of trench bottom,foundation or trench walls.
2. Class II embedment and cement stabilized sand.
a. Maximum 6-inches compacted thickness.
b. Compaction by methods determined by Contractor to achieve a
minimum of 95 percent of the maximum dry density as determined
according to ASTM D 698 for Class II materials and according to
ASTM D 558 for cement stabilized materials.
c. Moisture content of Class II materials within 3 percent of optimum as
determined according to ASTM D 698. Moisture content of cement
stabilized sands on the dry side of optimum as determined according to
ASTM D 558 but sufficient for effective hydration.
J. Place trench dams in Class I embedments in line segments longer than 100 feet
between manholes, and not less than one in every 500 feet of pipe placed. Install
additional dams as needed to achieve workable construction conditions. Do not place
trench dams closer than 5 feet from manholes.
3.05 TRENCH ZONE BACKFILL PLACEMENT AND COMPACTION
A. Place backfill for pipe or conduits and restore surface as soon as practicable. Leave
only the minimum length of trench open as necessary for construction. Backfill
placement and compaction shall apply to all soils excavated for the trench especially
including any areas that were "benched" or over-excavated in place of trenched
shoring. All disturbed soils generated during excavation,whether inside the trench or
associated with it, shall be considered to fall under this requirement.
5/2013 02318 - 11 of 15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
B. Where damage to completed pipe installation work is likely to result from withdrawal
of sheeting, leave the sheeting in place. Cut off sheeting 1.5 feet or more above the
crown of the pipe. Remove trench supports within 5 feet from the ground surface.
C. For sewer pipes,use backfill materials described here as determined by trench limits.
As trench zone backfill in paved areas for streets and to one foot back of curbs and
pavements,use cement stabilized sand for pipe of nominal sizes less than 36 inches,or
Bank Sand for pipe of nominal sizes 36 inches and larger as indicated on the
Drawings. Uniformly backfill trenches unless specified otherwise according to the
paved area criteria. Use select backfill within one foot below pavement subgrade for
rigid pavement. For asphalt concrete,use flexible base material within one foot below
pavement subgrade.
D. For water lines,backfill in trench zone, including auger pits,with Bank Sand, Select
Fill, or Random Fill material as specified in this Section.
E. For trench excavations under pavement,place trench zone backfill in lifts and compact
by methods indicated below. Fully compact each lift before placement of the next lift.
1. Bank Sand.
a. Maximum 9-inches compacted lift thickness.
b. Compaction by vibratory equipment to a minimum of 95 percent of the
maximum dry density determined according to ASTM D 698.
c. Moisture content within 3 percent of optimum determined according to
ASTM D 698
2. Cement Stabilized Sand.
a. Maximum lift thickness determined by Contractor to achieve uniform
placement and required compaction,but not exceeding 24 inches.
b. Compaction by vibratory equipment to a minimum of 95 percent of the
maximum dry density determined according to ASTM D 558.
c. Moisture content on the dry side of optimum determined according to
ASTM D 558 but sufficient for cement hydration.
3. Select Fill.
a. Maximum 6-inches compacted thickness.
b. Compaction by equipment providing tamping or kneading impact to a
minimum of 95 percent of the maximum dry density determined
according to ASTM D 698.
c. Moisture content within 2 percent of optimum determined according to
ASTM D 698.
F. For trench excavations outside pavements, a Random Fill of suitable material may be
used in the trench zone.
5/2013 02318 - 12of15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
1. Fat clays (CH) may be used as trench zone backfill outside paved areas at the
Contractor's option. If the required density is not achieved,the Contractor, at
his option and at no additional cost to the Owner,may use lime stabilization to
achieve compaction requirements or use a different suitable material.
2. Maximum 9-inch compacted lift thickness for clayey soils and maximum 12-
inch lift thickness for granular soils.
3. Compact to a minimum of 90 percent of the maximum dry density determined
according to ASTM D 698, or to same density as adjacent soils.
4. Moisture content as necessary to achieve density.
3.06 MANHOLES,JUNCTION BOXES AND OTHER PIPELINE STRUCTURES
A. Meet the requirements of adjoining utility installations for backfill of pipeline
structures, as shown on the Plans.
3.07 FIELD QUALITY CONTROL
A. Quality Control
1. The Engineer may sample and test backfill at:
a. Sources including borrow pits, production plants and Contractor's
designated off-site stockpiles.
b. On-site stockpiles.
c. Materials placed in the Work.
2. The Engineer may resample material at any stage of work or location if
changes in characteristics are apparent.
B. Production Verification Testing: The Owner's testing laboratory will provide
verification testing on backfill materials,as directed by the Engineer. Samples maybe
taken at the source or at the production plant, as applicable.
C. Provide excavation and Trench Safety Systems at locations and to depths required for
testing and retesting during construction.
D. Tests will be performed on a minimum of three different samples of each material type
for plasticity characteristics, in accordance with ASTM D 4318, and for gradation
characteristics, in accordance with Tex-101-E and Tex-110-E. Additional
classification tests will be performed whenever there is a noticeable change in material
gradation or plasticity.
5/2013 02318- 13of15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
E. At least three tests for moisture-density relationships will be performed initially for
backfill materials in accordance with ASTM D 698, and for cement stabilized sand in
accordance with ASTM D 558. Additional moisture-density relationship tests will be
performed whenever there is a noticeable change in material gradation or plasticity.
F. In-place density tests of compacted pipe foundation, embedment and trench zone
backfill soil materials will be performed according to ASTM D 1556, or ASTM D
2922 and ASTM D 3017, and at the following frequencies and conditions.
1. A minimum of one test for every 100 linear feet measured along pipe for
compacted embedment and for every 100 linear feet measured along pipe for
compacted trench zone backfill material. Testing shall be performed for each
lift thickness for different backfill material specified in Item 3.05.
2. A minimum of three density tests for each full shift of Work when backfill is
placed.
3. Density tests will be distributed among the placement areas. Placement areas
are: foundation,bedding, haunching, initial backfill and trench zone.
4. The number of tests will be increased if inspection determines that soil type or
moisture content are not uniform or if compacting effort is variable and not
considered sufficient to attain uniform density, as specified.
5. Density tests may be performed at various depths below the fill surface by pit
excavation. Material in previously placed lifts may therefore be subject to
acceptance/rejection.
6. Two verification tests will be performed adjacent to in-place tests showing
density less than the acceptance criteria. Placement will be rejected unless
both verification tests show acceptable results.
7.. Re-compacted placement will be retested at the same frequency as the first test
series, including verification tests.
G. Recondition,re-compact,and retest at Contractor's expense if tests indicate Work does
not meet specified compaction requirements. For Cement Stabilized Sand with
nonconforming density,core and test for compressive strength at Contractor's expense.
H. Acceptability of crushed rock compaction will be determined by inspection.
3.08 CLEAN-UP AND RESTORATION
A. Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises.
5/2013 02318 - 14 of 15
CITY OF PEARLAND EXCAVATION AND BACKFILL
FOR UTILITIES
/— 3.09 PROTECTION OF THE WORK
A. Maintain excavation and embankment areas until start of subsequent work. Repair and
re-compact slides,washouts,settlements,or areas with loss of density at no cost to the
Owner
B. Prevent erosion at all times. Do not allow water to pond in excavations.
C. Distribute construction traffic evenly over compacted areas,where practical,to aid in
obtaining uniform compaction. Protect exposed areas having high moisture content
from wheel loads that cause rutting.
D. Coordinate excavation within 15 feet of existing utilities with utility representative.
Excavate by hand to locate existing utility, support utility with methods agreed upon
by utility representative. All work shall be subsidiary to bid items in Section 00300
Bid Proposal. No additional cost to City.
END OF SECTION
5/2013 02318- 15 of 15
CITY OF PEARLAND EMBANKMENT
Section 02330
EMBANKMENT
1.0 GENERAL
1.01 SECTION INCLUDES
A Construction of embankments with excess excavated material and borrow.
B References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350— Submittals
3. Section 01760—Project Record Documents
4. Section 01570—Trench Safety System
5. Section 01450—Testing Laboratory Services
6. Section 01500—Temporary Facilities and Controls
7. Section 02255—Bedding, Backfill and Embankment Material
8. Section 02910—Topsoil
9. Section 01564—Control of Ground Water and Surface Water
10. Section 01720—Field Surveying
11. Section 02220—Site Demolition
12. Section 02200— Site Preparation
13. Section 01140—Contractor's Use of Premises
C Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 698, "Standard Test Methods for Laboratory Compaction
Characteristics of Soil Using Standard Effort"
b. ASTM D 1556,"Standard Test Method for Density and Unit Weight of
Soil in Place by the Sand-Cone Method"
c. ASTM D 2922, "Standard Test Method for Density of Soil and Soil-
Aggregate in Place by Nuclear Methods (Shallow Depth)"
d. ASTM D 3017, "Standard Test Method for Water Content of Soil and
Rock in Place by Nuclear Methods (Shallow Depth)"
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item, no separate payment will be made for Embankment
under this Section. Include cost in Bid Items for which this Work is a component.
B If embankment is included as a Bid Item, measurement will be based on the Units
shown in Section 00300 — Bid Proposal and in accordance with Section 01200 —
Measurement and Payment Procedures.
5/2013 02330- 1 of 5
CITY OF PEARLAND EMBANKMENT
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit product quality,material sources,and field quality information in accordance
with this Section.
C Submit field red lines documenting location of embankments as installed,referenced to
survey Control Points, under the provisions of Section 01760 — Project Record
Documents, 1.04C. Include location of utilities and structures encountered or rerouted.
Give horizontal dimensions, elevations, inverts and gradients.
D Submit a Trench Safety Plan under the provisions of Section 01570—Trench Safety
System that included measures that establish compliance with the standard
interpretation of the General Duty Clause,Section 5.(a)(1),of the Occupational Safety
and Health Act of 1970 — 20 USC 654 which states, "Employers must shore or
otherwise protect employees who walk/work at the base of an embankment from
possible collapse."
1.04 TESTING
A Testing and analysis of product quality, material sources, or field quality shall be
performed by an independent testing laboratory provided by the Owner under the
provisions of Section 01450 — Testing Laboratory Services and as specified in this
Section.
1.05 PROTECTION OF PEOPLE AND PROPERTY
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
2.0 PRODUCTS
2.01 MATERIALS
A Contractor shall provide materials used as embedment, backfill, back-dressing, and
embankment identified on the Plans in accordance with Section 02255 — Bedding,
Backfill and Embankment Material.
B Topsoil: Conform to requirements of Section 02910—Topsoil.
C Borrow Material: Conform to requirements of intended use. Take borrow material
from sources approved by Engineer.
5/2013 02330-2 of 5
CITY OF PEARLAND EMBANKMENT
3.0 EXECUTION
3.01 EXAMINATION
A Verify borrow and excess excavated materials to be reused, are approved.
B Verify removals, and clearing and grubbing operations, have been completed.
C Verify backfill of new or relocated utilities and structures, below future grade, is
complete.
3.02 PREPARATION
A Employ a Trench Safety Plan as specified in Section 01570—Trench Safety Systems.
B Install and operate necessary dewatering and surface water control measures in
accordance with requirements of Section 01564 — Control of Ground Water and
Surface Water.
C Identify required lines, levels, and datum. Coordinate with Section 01720 — Field
Surveying.
D Remove existing pavements and structures, including sidewalks and driveways, in
conformance with requirements of Section 02220—Site Demolition, as applicable.
E Area shall be cleared and grubbed under the provisions of Section 02200 — Site
Preparation prior to placing embankment or opening borrow source.
F Strip and stockpile topsoil under the provisions of Section 02200—Site Preparation.
G Backfill test pits, or stump holes and other surface irregularities such as small swales
with embankment materials and compact in proper lift depths according to the
compaction requirements of this Section.
H Areas of unsuitable material shall be removed,backfilled with embankment materials
and compacted in proper lift depths according to the compaction requirements of this
Section.
I Upon discovery of unknown or badly deteriorated utilities, or concealed conditions,
discontinue work. Notify Engineer and obtain instructions before proceeding in such
areas.
3.03 PLACEMENT AND COMPACTION
A Do not conduct placement operations during inclement weather or when existing
ground or embankment materials exceed 3 percent of optimum moisture content.
Contractor may manipulate wet material to facilitate drying,by disking or windrowing,
at Contractor's expense.
5/2013 02330-3 of 5
CITY OF PEARLAND EMBANKMENT
B Do not place embankment material until density and moisture content of previously
placed material complies with specified requirements.
C Scarify areas to receive embankment to a minimum depth of 4 inches to bond existing
and new materials. Mix with first layer of embankment material.
D Spread embankment material evenly,from dumped piles or windrows,into horizontal
layers approximately parallel to finished grade. Place to meet specified compacted
thickness. Break clods and lumps and mix materials by blading,harrowing,discing,or
other approved method. Each layer shall extend across full width of embankment.
E Each layer shall be homogeneous and contain uniform moisture content before
compaction. Mix dissimilar abutting materials to prevent abrupt changes in
composition of embankment.
F Layers shall not exceed depth as indicated on the Plans.
G Where shown on Plans for steep slopes, cut benches into slope and scarify before
placing embankment. Place increasingly wide horizontal layers of specified depth,to
the level of each bench.
H Build embankment layers on back slopes,adjacent to existing roadbeds,to level of old
roadbed. Scarify top of old roadbed to minimum depth of four inches and re-compact
with next layer.
I Construct to lines and grades shown on Plans.
3.04 COMPACTION REQUIREMENTS
A Maintain moisture content of embankment materials to attain required compaction
density.
B Compact to minimum densities shown on the Plans with a moisture content of
optimum to 3 percent above optimum as determined by ASTM D 698.
3.05 TOLERANCES
A Top of compacted surface:Plus or minus 1/2 inch in cross section,or in 16 foot length.
3.06 FIELD QUALITY CONTROL
A Compaction testing will be performed in accordance with ASTM D 1556 or ASTM D
2922 and ASTM D 3017 under provisions of Section 01450 — Testing Laboratory
Services.
B A minimum of three tests will be taken for each 1,000 linear feet per lane of roadway
or 500 square yards of embankment per lift.
5/2013 02330-4of5
CITY OF PEARLAND EMBANKMENT
C If tests indicate work does not meet specified compaction requirements,recondition,
re-compact,and retest at Contractor's expense.
3.07 CLEAN-UP AND RESTORATION
A Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises.
B In unpaved areas, grade surface as a uniform slope from installed appurtenances to
natural grade and stabilize as indicated on Plans.
3.08 PROTECTION OF THE WORK
A Maintain all embankment areas in good condition until completion of Work.
B Repair and re-compact slides, washouts, settlements, areas with loss of density, or
excavation damaged by Contractor's operations at no additional cost to Owner.
C Distribute construction traffic evenly over compacted areas,where practical,to aid in
obtaining uniform compaction. Protect exposed areas having high moisture content
from wheel loads that cause rutting.
END OF SECTION
5/2013 02330-5 of 5
CITY OF PEARLAND SUBGRADE
Section 02335
SUBGRADE
1.0 GENERAL
1.01 SECTION INCLUDES
A. Foundation course of lime and Portland Cement stabilized in situ subgrade material.
B. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01450—Testing Laboratory Services
4. Section 01500—Temporary Facilities and Controls ,
5. Section 01564—Control of Ground Water and Surface Water
6. Section 01720—Field Surveying
7. Section 01140—Contractor's Use of Premises
C. Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 4318, "Standard Test Methods for Liquid Limit, Plastic
Limit, and Plasticity Index of Soils"
b. ASTM D 698, "Standard Test Methods for Laboratory.Compaction
Characteristics of Soil Using Standard Effort"
c. ASTM D 1556,"Standard Test Method for Density and Unit Weight of
Soil in Place by the Sand-Cone Method"
d. ASTM D 2922, "Standard Test Method for Density of Soil and Soil-
Aggregate in Place by Nuclear Methods (Shallow Depth)"
e. ASTM D 3017, "Standard Test Method for Water Content of Soil and
Rock in Place by Nuclear Methods (Shallow Depth)"
f. ASTM C 150 - Standard Specification for Portland Cement.
g. ASTM D 558 - Standard Test Method for Moisture-Density Relations
of Soil-Cement-Mixtures.
1.02 MEASUREMENT AND PAYMENT
A. Measurement for subgrade is on a square yard basis. Separate payment will be made
for each different required type and thickness of stabilized Subgrade. Limits of
measurement shall match actual pavement replaced, but no greater than maximum
pavement replacement limits shown on Drawings. Limits for measurement will be
extended to include installed stabilized subgrade material that extends 2 foot beyond
outside edge of pavement to be replaced, except where proposed pavement section
5/2013 02335 - 1 of 10
CITY OF PEARLAND SUBGRADE
shares common longitudinal or transverse edge with existing pavement section. No
payment will be made for stabilized subgrade in areas beyond these limits.
B. Measurement for hydrated lime and quicklime is by the ton of 2,000 pounds dry-
weight basis,determined by the area to be covered and the rate of application. Do not
include cost of hydrated lime or quicklime in Bid Item for subgrade.
C. Measurement for lime slurry is by the ton of 2,000 pounds of lime calculated on the
percentage by weight of dry solids for the grade of slurry. Do not include cost of lime
slurry in Bid Item for subgrade.
D. Measurement for Portland Cement is by the ton of 2,000 pounds of dry weight basis.
Do not include cost of Portland Cement in Bid Item for subgrade.
E. Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit certificates stating that hydrated lime, commercial lime slurry and quicklime
complies with the requirements in this Section.
C. Submit weight tickets,certified by supplier,with each bulk delivery of lime to Project
Site.
D. Submit manufacturer's description and characteristics for rotary speed mixer and
compaction equipment for approval.
1.04 TESTING AND SAMPLING
A. Testing will be performed under provisions of Section 01450 — Testing Laboratory
Services.
B. Tests and analysis of soil materials will be performed in accordance with ASTM D
4318.
C. Sampling and testing of lime slurry shall be in accordance with Tex-600-J.
D. Sample mixtures of Portland Cement, hydrated lime or quicklime in slurry form will
be tested to establish compliance with the requirements in this Section.
E. Soil will be evaluated to establish percent of hydrated lime,quicklime,or lime slurry to
be applied to subgrade material.
F. Moisture-density relationship will be established on material sample from roadway,
after stabilization, in accordance with ASTM D 698.
5/2013 02335 -2 of 10
CITY OF PEARLAND SUBGRADE
G. Soil will be evaluated to establish ratio of cement to soil to obtain desired stability.
Normal range is 6 percent to 10 percent by weight.
H. The percentage of moisture in soil, at time of cement application,will be determined
by ASTM D 558. Moisture will not be allowed to exceed quantity that will permit
uniform, complete mixture of soil and cement during dry mixing operations nor
specified optimum moisture content for soil cement mixture, as determined.
1.05 PROTECTION OF PEOPLE AND PROPERTY
A. Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
1.06 DELIVERY, STORAGE,AND HANDLING
A. Bagged lime shall bear manufacturer's name, product identification, and certified
weight.Bags varying more than 5 percent of certified weight may be rejected;average
weight of 50 random bags in each shipment shall not be less than certified weight.
B. Store lime in weatherproof enclosures. Protect lime from ground dampness.
C. Quicklime can be dangerous; exercise extreme caution if used for the Work.
Contractor shall become informed about recommended precautions in the handling,
storage and use of quicklime.
2.0 PRODUCTS
2.01 WATER
A. Water shall be clean; clear; and free from oil, acids, alkali, or organic matter.
2.02 LIME
A. Type A-Hydrated Lime: Dry material consisting essentially of calcium hydroxide or
mixture of calcium hydroxide and an allowable percentage of calcium oxide and
magnesium hydroxide.
B. Type B-Lime Slurry:Liquid mixture consisting essentially of lime solids and water in
slurry form. Water or liquid portion shall not contain dissolved material in sufficient
quantity to be injurious or objectionable for purpose intended.
C. Type C - Quicklime: Dry material consisting essentially of calcium oxide. Furnish
quicklime in either of the following grades:
5/2013 02335 -3 of 10
CITY OF PEARLAND SUBGRADE
1. Grade DS: Pebble quicklime of a gradation suitable for use in the preparation
of a slurry for wet placing.
2. Grade S:Finely-graded quicklime for use in the preparation of a slurry for wet
placing. Do not use Grade S quicklime for dry placing. (So called "Blue
Lime" is not acceptable.)
D. Lime shall conform to following requirements:
CHEMICAL COMPOSITION TYPE
A B C
Active lime content, 1 2
%by weight Ca(OH)2+CaO 90.0 min 87.0 min -
Unhydrated lime content, %by weight CaO 5.0 max - 87.0 min
Free water content, %by weight H2O 5.0 max - -
SIZING
Wet Sieve, as %by weight residue retained:
No. 6 0.2 max 0.2 max2 8.0 max3
No. 30 4.0 max 4.0 max2 -
Dry sieve, as %by weight residue retained:
1-inch - - 0.0
3/4-inch - - 10.0 max
Notes:
1 Maximum 5.0% by weight CaO shall be allowed in determining total active
lime content.
2 Maximum solids content of slurry.
3 Total active lime content, as CaO, in material retained on the No. 6 sieve shall
not exceed 2.0%by weight of original Type C lime.
E. Lime Slurry may be delivered to the Project Site as Commercial Lime Slurry, or may
be prepared at the Project Site using Hydrated Lime or Quicklime. The slurry shall be
free of liquids other than water and shall be of a consistency that can be handled and
uniformly applied without difficulty.
2.03 PORTLAND CEMENT (ONLY WHEN DIRECTED BY ENGINEER)
A. ASTM C 150 Type I,bulk or sacked.
5/2013 02335 -4 of 10
CITY OF PEARLAND SUBGRADE
2.04 SOIL
A. Provide soil consisting of approved material free from vegetation or other objectable
matter encountered in existing roadbed.
3.0 EXECUTION
3.01 EXAMINATION
A. Verify backfill of new or relocated utilities and structures below future grade is
complete.
B. Verify compacted subgrade is ready to support imposed loads.
C. Verify subgrade lines and grades are correct.
3.02 PREPARATION
A. Install and operate necessary dewatering and surface water control measures in
accordance with requirements of Section 01564 — Control of Ground Water and
Surface Water.
B. Identify required lines, levels, and datum. Coordinate with Section 01720 — Field
Surveying.
C. Cut material to bottom of subgrade using an approved cutting and pulverizing machine
meeting following requirements:
1. Cutters accurately provide a smooth surface over entire width of cut to plane of
secondary grade.
2. Visible indication that cut is to proper depth.
D. Alternatively, scarify or excavate to bottom of stabilized subgrade. Remove material
or windrow to expose secondary grade. Correct wet or unstable material below
secondary grade by scarifying,adding lime,and compacting. Obtain uniform stability.
E. Upon discovery of unknown or badly deteriorated utilities, or concealed conditions,
discontinue work. Notify Engineer and obtain instructions before proceeding in such
areas.
3.03 LIME SLURRY APPLICATION
A. Mix hydrated lime or quicklime with water to form a slurry of the solids content
specified. Commercial lime slurry shall have dry solids content as specified. Conform
to cautionary requirements in this Section, 1.06C, concerning use of quicklime.
5/2013 02335 -5 of 10
CITY OF PEARLAND SUBGRADE
B. Apply slurry with a distributor truck equipped with an agitator to keep lime and water
in a consistent mixture. Make successive passes over measured section of roadway to
attain proper moisture and lime content. Limit spreading to an area where preliminary
mixing operations can be completed on the same working day.
3.04 PRELIMINARY MIXING
A. Do not mix and place material when temperature is below 40 degrees F and falling.
Base may be placed when temperature taken in shade and away from artificial heat is
above 35 degrees F and rising.
B. Use approved single-pass or multiple-pass rotary speed mixers to mix soil, lime, and
water to required depth. Obtain a homogeneous friable mixture free of clods and
lumps.
C. Shape mixed subgrade to final lines and grades.
D. Seal subgrade as a precaution against heavy rainfall by rolling lightly with light
pneumatic rollers.
E. Cure soil-lime material for 1 to 4 days. Keep subgrade moist during cure.
3.05 FINAL MIXING
A. Use approved single-pass or multiple-pass rotary speed mixers to uniformly mix cured
soil and lime to required depth.
B. Add water to bring moisture content of soil mixture to a minimum of optimum or
above.
C. Mix and pulverize until all material passes a 1 inch sieve; a minimum of 90 percent,
excluding non-slaking fractions,passes a 3/4-inch sieve;and a minimum of 65 percent
excluding non-slaking fractions passes a No. 4 sieve.
D. Shape mixed subgrade to final lines and grades.
E. Do not expose hydrated lime to open air for more than 6 hours during interval between
application and mixing: Avoid excessive hydrated lime loss due to washing or
blowing.
3.06 MIXING-PORTLAND CEMENT (ONLY WHEN DIRECTED BY ENGINEER)
A. Do not place and mix cement when temperature is below 40 degrees F and falling.
Place Portland Cement base when temperature taken in shade and away from artificial
heat is above 35 degrees F and rising.
5/2013 02335 -6 of 10
CITY OF PEARLAND SUBGRADE
B. Spread cement uniformly on soil at rate specified by laboratory. When bulk cement
spreader is used,position it by string lines or other approved method to ensure uniform
distribution of cement. Apply cement only to area where operations can be continuous
and completed in daylight,within 1 hour of application. Amount of moisture in soil at
time of cement placement shall not exceed quantity that will permit uniform mixture of
soil and cement during dry mixing operations. Do not exceed specified optimum
moisture content for soil cement mixture.
C. Do not allow equipment other than that used in spreading and mixing, to pass over
freshly spread cement until it is mixed with soil.
D. Dry mix cement with soil after cement application. Continue mixing until cement has
been sufficiently blended with soil to prevent formation of cement balls when water is
applied. Mixture of soil and cement that has not been compacted and finished shall not
remain undisturbed for more than 30 minutes.
E. Immediately after dry mixing is complete, uniformly apply water as necessary and
incorporate it into mixture. Pressurized equipment must provide adequate supply to
ensure continuous application of required amount of water to sections being processed
within 3 hours of cement application. Ensure proper moisture distribution at all times.
After last increment of water has been added, continue mixing until thorough and
uniform mix has been obtained.
F. Ensure percentage of moisture in mixture,based on dry weights,is within 2 percentage
points of specified optimum moisture content prior to compaction. When
uncompacted soil cement mixture is wetted by rain indicating that average moisture
content exceeds tolerance given at time of final compaction;reconstruct entire section
in accordance with this Section at no additional cost to City.
3.07 COMPACTION-LIME SUBGRADE
A. Aerate or sprinkle to attain optimum moisture content as determined by Testing
Laboratory. Remove and reconstruct sections where average moisture content exceeds
ranges specified at time of final compaction.
B. Start compaction immediately after final mixing, unless approved by Engineer.
C. Spread and compact in two or more approximately equal layers where total compacted
thickness is to be greater than 8 inches.
D. Compact with approved heavy pneumatic or vibrating rollers, or a combination of
tamping rollers and light pneumatic rollers. Begin compaction at the bottom and
continue until entire depth is uniformly compacted.
E. Do not allow stabilized base to mix with underlying material. Correct irregularities or
weak spots immediately by replacing material and re-compacting.
5/2013 02335 -7 of 10
CITY OF PEARLAND SUBGRADE
F. Compact to following minimum densities at a moisture content of optimum to 3
percent above optimum as determined by ASTM D 698,unless otherwise indicated on
the Plans:
1. Areas to receive pavement without subsequent base course:Minimum density
of 98 percent of maximum dry density.
2. Areas to receive subsequent base course: Minimum density of 95 percent of
maximum dry density.
G. Seal with approved light pneumatic tired rollers: Prevent surface hair line cracking.
Rework and re-compact at areas where hair line cracking develops.
H. Contractor shall conduct operations to minimize elapsed time between mixing and
compacting stabilized subgrade in order to take advantage of rapid initial set
characteristics. Complete compaction within 2 hours of commencing compaction and
not more than 6 hours after adding and mixing the last stabilizing agent.
3.08 COMPACTION-PORTLAND CEMENT SUBGRADE(ONLY WHEN DIRECTED
BY ENGINEER)
A. Prior to beginning compaction, ensure mixture is in loose condition for its full depth.
Uniformly compact the loose mixture to specified density, lines and grades.
B. After soil and cement mixture is compacted,apply water uniformly as needed and mix
thoroughly. Then reshape surface to required lines, grades and cross section and
lightly scarify to loosen imprints left by compacting or shaping equipment.
C. Roll resulting surface with pneumatic-tired roller and "skin" surface with power
grader. Thoroughly compact mixture with pneumatic roller,adding small increments
of moisture, as needed. When aggregate larger than No.4 sieve is present in mixture,
make one complete coverage of section with flat-wheel roller immediately after
skinning operation. When approved by Project Manager, surface finishing methods
may be varied from this procedure, provided dense uniform surface, free of surface
compaction planes, is produced. Maintain moisture content of surface material at its
specified optimum during finishing operations. Compact and finish surface within
period not to exceed 2 hours, to produce smooth, closely knit surface, free of cracks,
ridges, or loose material, conforming to crown, grade and line shown on Drawings
within period not to exceed 2 hours.
3.09 CURING
A. Moist cure for a minimum of 3 days before placing base or surface course,or opening
to traffic. Time may be adjusted as approved by Engineer. Subgrade may be opened
to traffic after 2 days if adequate strength has been attained to prevent damage.Restrict
traffic to light pneumatic rollers or vehicles weighing less than 10 tons.
5/2013 02335 -8 of 10
CITY OF PEARLAND SUBGRADE
B. Keep subgrade surface damp by sprinkling. Roll with light pneumatic roller to keep
surface knit together.
C. Place base, surface, or seal course within 14 days after final mixing and compaction
unless prior approval is obtained from Engineer.
3.10 TOLERANCES
A. Top of compacted surface:Plus or minus 1/4 inch in cross section or in 16 foot length.
3.11 FIELD QUALITY CONTROL
A. A minimum of three phenolphthalein test will be made at random locations per 1000
linear feet per lane of roadway or 500 square yards of base to determine in-place depth.
B. Contractor may, at his own expense, request additional cores in the vicinity of cores
indicating nonconforming in-place depths. If the average of the tests falls below the
required depth,place and compact additional material at no cost to the Owner.
C. Compaction Testing will be performed in accordance with ASTM D 1556 or ASTM D
2922 and ASTM D 3017 at random locations near depth determination tests. Three
tests will be performed for each 1000 foot roadway section. Rework and re-compact
areas that do not conform to compaction requirements at no cost to the Owner.
3.12 CLEAN-UP AND RESTORATION
A. Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises.
B. Fill test pits with new compacted lime stabilized subgrade.
C. Completed surface shall be smooth and conform to typical section and established
lines and grades.
D. In unpaved areas, grade surface as a uniform slope from installed appurtenances to
natural grade and stabilize as indicated on Plans.
3.13 PROTECTION OF THE WORK
A. Maintain stabilized Subgrade to lines and grades and in good condition until placement
of base or surface course.
B. Protect the asphalt membrane, if used, from being picked up by traffic.
5/2013 02335 -9 of 10
CITY OF PEARLAND SUBGRADE
C. Repair settlements, areas with loss of density, or areas of subgrade damaged by
Contractor's operations at no additional cost to Owner by replacing and re-compacting
material to full depth.
D. Distribute construction traffic evenly over compacted areas,where practical,to aid in
obtaining uniform compaction. Protect exposed areas having high moisture content
from wheel loads that cause rutting.
END OF SECTION
5/2013 02335 - 10 of 10
CITY OF PEARLAND GEOTEXTILE
Section 02370
GEOTEXTILE
1.0 GENERAL
1.01 SECTION INCLUDES
A Geotextile, also called filter fabric, in applications such as under a granular fill, as a
pipe embedment wrap,around the exterior of a tunnel liner,or around the foundations
of pipeline structures.
B References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
C Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 4632, Standard Test Method for Grab Breaking Load and
Elongation of Geotextiles"
b. ASTM D 4533,"Standard Test Method for Trapezoid Tearing Strength
of Geotextiles"
c. ASTM D 4833,"Standard Test Method for Index Puncture Resistance
of Geotextiles, Geomembranes, and Related Products"
d. ASTM D 3786,"Standard Test Method for Hydraulic Bursting strength
of Textile Fabrics"
e. ASTM D 4751, "Standard Test Method for Determining Apparent
Opening Size of a Geotextile"
f. ASTM D 4491, "Standard Test Method for Water Permeability of
Geotextiles by Permittivity"
2. American Association of State Highway and Transportation Officials
(AASHTO)
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item, no separate payment will be made for work performed
under this Section. Include cost in Bid Items for Work requiring geotextile.
B If Geotextile is included as a Bid Item,measurement will be based on the Units shown
in Section 00300—Bid Proposal and in accordance with Section 01200—Measurement
and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit the standard manufacturer's catalog sheets and other pertinent information,for
approval, prior to installation.
07/2006 02370- 1 of 2
CITY OF PEARLAND GEOTEXTILE
C Submit installation methods, as a part of the work plan for tunneling or for excavation
and backfill for utilities. Obtain approval from Engineer for Geotextile material and
the proposed installation method prior to use of the geotextile.
2.0 PRODUCTS
2.01 GEOTEXTILE
A Provide a geotextile(filter fabric)designed for use in geotechnical applications which
forms a permeable layer or media while retaining the soil matrix.
B Use a fabric which meets the physical requirements for Class A Subsurface Drainage
installation conditions as defined in AASHTO M288 and as specified in this Section,
2.02 "Properties".
2.02 PROPERTIES
A Material: Non-woven,non-biodegradable,fabric consisting only of continuous chain
polymer filaments or yarns, at least 85 percent by weight poly-olefins, polyesters or
polyamide, formed into a dimensionally stable network.
B Chemical Resistance: Inert to commonly encountered chemicals and hydrocarbons
over a pH range of 3 to 12.
C Physical Resistance: Resistant to mildew and rot, ultraviolet light exposure, insects
and rodents.
D Minimum Test Values:
PROPERTY VALUE (MIN) TEST METHOD
Grab strength 180 lbs ASTM D 4632
Trapezoidal Tear Strength 50 lbs ASTM D 4533
Puncture Strength 80 lbs ASTM D 4833
Mullen Burst Strength 290 psi ASTM D 3786
Apparent Opening Size (1) 0.25 mm ASTM D 4751
Permittivity (sec-1) 0.2 ASTM D 4491
(1) Maximum average roll value
3.0 EXECUTION - Notused
END OF SECTION
07/2006 02370-2 of 2
CITY OF PEARLAND AUGERING PIPE OR
CASING FOR SEWERS
Section 02415
AUGERING PIPE OR CASING FOR SEWERS
1.0 GENERAL
1.01 SECTION INCLUDES
A Installation of pipe and casing for sanitary sewer by methods of augering.
B References to Technical Specifications:
1. Section 01570—Trench Safety System
2. Section 01200—Measurement and Payment Procedures
3. Section 01350—Submittals
4. Section 01563 —Control of Ground Water and Surface Water
5. Section 01500—Temporary Facilities and Controls
6. Section 02530—Gravity Sanitary Sewers
7. Section 02430—Tunnel Grout
8. Section 02318 —Excavation and Backfill for Utilities
9. Section 01140—Contractor's Use of Premises
C Referenced Standards:
1. American Railway Engineering Association (AREA) Manual for Railway
Engineering
2. American Association of State Highway and Transportation Officials
(AASHTO)
3. American Water Works Association (AWWA)
a. AWWA C200, Steel Water Pipe - 6 in. (150 mm) and Larger
D Definitions:
1. Dry Augering - installation of steel casing by excavating the soil at the
advancing end of casing and transporting the spoil through the casing by an
otherwise uncased auger, while advancing the casing by jacking at the same
rate as the auger excavation progresses.
2. Slurry Augering - installation of casing or sewer pipe by first drilling a small
diameter pilot hole from auger pit to auger pit,followed by reaming the bore to
full diameter by augering with slurry, and installing the casing or pipe by a
pull-back or jacking method.
3. Augered Pipe-the Contractor's installed water or sewer pipe in augered hole.
4. Augered Casing with Pipe - the Contractor's installed water or sewer pipe in
augered casing.
1.02 MEASUREMENT AND PAYMENT
A Measurement for augered casing with sewer pipe will be on a linear foot basis
measured from end to end of the casing.
07/2006 02415 - 1 of 7
CITY OF PEARLAND AUGERING PIPE OR
CASING FOR SEWERS
B Payment of augered casing with sewer pipe will be full compensation for all labor,
equipment,casing,sewer pipe,materials and supervision for construction complete in
place including dewatering,augering,joints,spoil removal,pipe installation,grouting,
utility adjustments,testing, and cleanup, and other work necessary for construction as
shown on the Plans and as specified.
C Measurement of augered sewer pipe will be on a linear foot basis along the axis of the
pipe from auger pit to auger pit.
D Payment of augered sewer pipe will be full compensation for labor,pipe, equipment,
materials, and supervision for construction complete in place including dewatering,
jacking,utility adjustments,testing,cleanup,and other work necessary for construction
as shown on the Plans and as specified.
E No separate payment will be made for auger pits and other excavations under this
section. Include cost of excavation, surface restoration, pavement repair, etc., for
auger pits or observation pits in Sections related to the open-cut sewer installation
portion of the Work. Include cost of trench safety for auger pits or observation pits in
Section 01570—Trench Safety Systems.
F Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A Review. Submittal shall be made in accordance with Section 01350—Submittals. The
Engineer will review submitted plans, details and data for compliance with
specifications. Contractor shall not commence work on any items requiring pipe and
casing augering work plan, or other submittal until the submittal have been reviewed
and accepted by the Engineer. Such review by the Engineer shall not be construed in
any way of relieving the Contractor of his responsibilities under the Contract,shall not
be construed by the contractor as an endorsement by the Engineer that such methods
are constructable or will work for the specific subsurface soils encountered. Structural
designs and other engineered components shall be signed and sealed by a Professional
Engineer registered in the State of Texas.
B Pipe and Casing Augering Operation.
1. Submit for review a Pipe and Casing Augering Work Plan with complete
drawings and written description identifying details of the proposed method of
construction and the sequence of operations to be performed during
construction, as required. The drawings and descriptions shall be sufficiently
detailed to demonstrate to the Engineer whether the proposed materials and
procedures will meet the requirements of this Section.
2. Depending on the Contractor's method of construction, the Pipe and Casing
Augering Work Plan shall be submitted on the following items:
a. Arrangement drawings and technical specifications of the augering
equipment and experience record of the Contractor. -
b. Method of controlling line and grade of augering operation.
07/2006 02415-2 of 7
CITY OF PEARLAND AUGERING PIPE OR
CASING FOR SEWERS
c. Method of spoil and slurry removal, including surface storage and
disposal.
d. Details of the pipe or casing installation.
e. Grouting techniques to be used for filling annular void between casing
and sewer pipe,where required,and for filling over excavation,if any,
including equipment,pumping and injection procedures,pressure grout
types, and mixtures.
f. Location and construction of auger pits, including details for all
required ground support installation not included in the Trench Safety
Plan.
g. Groundwater control system per requirements in this section and in
accordance with Section 01563—Control of Ground Water and Surface
Water, as required by construction method.
3. Casing and pipe fabrication drawings, including joint details.
C Trench Safety
1. Shall be in accordance with Section 01570—Trench Safety System.
2. To the extent that excavation for pipe and casing augering involves work not
covered by Contractor's Trench Safety Plan, the safety provisions of these
excavations shall be addressed in the Pipe and Casing Augering Work Plan.
D Quality Control Methods. At least 30 days prior to the start of augering,the Contractor
shall submit a description of the quality control methods proposed for use in this
operation to the Project Manager. The submittal shall include:
1. Supervision. Supervisory control to ensure that work is performed in
accordance with the Plans and Specifications, and Pipe and Casing Augering
Work Plan.
2. Line & Grade. Procedures for surveying, controlling and checking line and
grade, including field forms.
3. Augering Observation and Monitoring. Procedures for preparing and
submitting daily logs of augering operations, including field forms.
4. Products and Materials. A plan for testing and submittal of test results to
demonstrate compliance with the specification and Contractor's design criteria
for permanent products, material and installations. The plan shall identify
applicable standards and procedures for testing and acceptance.
5. Monitoring Settlement. Submit a settlement Monitoring Plan if requested by
the Engineer.
1.04 PROTECTION OF PEOPLE AND PROPERTY
•
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
07/2006 02415 -3 of 7
CITY OF PEARLAND AUGERING PIPE OR
CASING FOR SEWERS
1.05 CRITERIA FOR DETERMINING INSTALLATION LOADS
A Pipes and casings shall be selected by the Contractor to carry overburden pressure and
applicable surcharge and installation loads.
B The criteria to be used for truck loading shall be HS-20 vehicle loading distributions in
accordance with AASHTO.
C The Contractor shall be responsible for the selection of the casing,pipe,and pipe joints
to carry the thrust of the jacks or loads due to the pulling mechanism.
D The Contractor shall select the diameter of the casing to meet the minimum
dimensions defined in the Plans, and to permit practical installation(including skids,
pipe spiders and shims, if applicable) and grouting, where required.
2.0 PRODUCTS
2.01 MATERIALS
A Casing shall be provided where shown on Plans or indicated in Technical
Specifications and be new, uncoated welded steel pipe, manufactured in accordance
with AWWA C200. The design stress in the pipe wall shall be 50 percent of the
minimum yield point of the steel or 18,000 psi, whichever is less, when subjected to
the loading conditions. The design deflection to be used in determining wall thickness
shall not exceed 3 percent of nominal casing pipe size.
B Sewer pipe shall be provided in accordance with Section 02530 — Gravity Sanitary
Sewers. The sewer pipe shall be selected by the Contractor and verified by the
Contractor's engineer to safely withstand all service loads, including overburden
pressures and surcharge loads together with all forces and pressures induced in pipe
and joints during installation.
C For grouting materials refer to Section 02430—Tunnel Grout.
D Where casings are required by Plans,casing insulator width 8 inches for pipe sizes 4 to
14 inches; 12 inches for pipe sizes 16 to 30 inches.
1. For welded steel pipe 12 inches and smaller, use Pipeline Seal & Insulator
Model PE, or approved equal.
2. For other pipe materials, use Pipeline Seal & Insulator Model C8G-2 or
approved equal for pipe sizes up to 12 inches.
3. For all pipe sizes above 12 inches,use Pipeline Seal&Insulator Model C 12G-
2 or approved equal.
E Casing End Seals: Provide Pipeline Seal &Insulator Model C or approved equal.
3.0 EXECUTION
07/2006 02415 -4 of 7
CITY OF PEARLAND AUGERING PIPE OR
CASING FOR SEWERS
3.01 DRY AUGERING (CASING ONLY)
A Provide horizontal augering equipment of sufficient capacity for the diameter and
length of the casing to be installed and the anticipated ground conditions.
B Provide heavy-duty jacks of a capacity suitable for forcing the excavating auger and
casing through the ground and a suitable jacking frame or backstop. Use operating
jacks constructed so that even pressure is applied to all jacks used.
C Provide steerable front section of casing to allow vertical grade adjustments. A water
level or other means shall be provided to allow monitoring of the grade elevation of the
auger casing.
D Set casing to be jacked on guides, properly braced together, to support the section of
pipe and direct it to proper line and grade. Place the whole jacking assembly so as to
line up with the direction and grade of the pipe.
E In unconsolidated soil formations,bentonite may be used to seal the voids outside the
wall and furnish lubrication for the installation of casing. The use of water to assist in
lubrication to facilitate the removal of spoil is permitted,however,water jetting of the
soil is not allowed when jacking the casing.
F Insofar as practical and depending on the character of the soil encountered during the
augering operation, conduct operations without interruption to prevent the pipe from
seizing up in the hole before the installation is complete.
G Repair casing damaged in augering operations by method acceptable to the Engineer or
remove and replace it.
3.02 SLURRY AUGERING
A Provide horizontal boring equipment for drilling of pilot hole, slurry augering
equipment for excavating the full-sized hole for casing or pipe installation.
B Drill a small diameter pilot hole for the entire length of the augered pipe. Check the
pilot hole for line and grade at the receiving end to determine if the larger diameter
casing hole will comply with this Specification. The pilot hole shall be redrilled if the
installed pipe would not meet the specified tolerances.
C Auger the large-diameter hole by mechanical means for reaming the pilot hole. The
diameter of the augered hole shall be not more than 1 inch greater than the outside
diameter of the installed pipe measured from the barrel of the pipe. Place excavated
material outside the working pit and dispose of it, as specified in Section 01500 —
Temporary Facilities and Controls. Jetting is not permitted. Augered holes which do
not meet the specified tolerances shall be grouted.
D In unconsolidated soil formations,use a bentonite slurry to maintain a stable hole and
furnish lubrication for the installation of the pipe. Install the pipe or casing in one
07/2006 02415-5 of 7
CITY OF PEARLAND AUGERING PIPE OR
CASING FOR SEWERS
operation with the displacement of cuttings and slurry from the hole in potentially
unstable soils to prevent casing and settlement of the ground surface.
E Depending on the character of the soil encountered during the augering operation,
conduct operations without interruption,insofar as practical,to prevent the pipe from
seizing up in the hole before the installation is complete.
F Repair casing or sewer pipe damaged in augering operations by method acceptable to
the Engineer or remove and replace it.
3.03 AUGER PITS
A Contractor's Pipe and Casing Augering Work Plan shall identify the location, size,
depth and layout, and ground support design of all augering and observation pits, as
well as a schedule of dates that each pit is expected to be open.
B Auger pits that are excavated as a part of open-cut sewer construction shall be in
accordance with Section 02318 —Excavation and Backfill for Utilities.
C Install sheeting,lining,shoring,and bracing required for the protection of the workmen
and the public in accordance with Section 01570—Trench Safety Systems.
3.04 PIPE IN CASING
A Pipes shall be installed in augered casings in accordance with this Section, as
applicable.
B Bottom of trench adjacent to each end of casing should be graded to provide firm,
uniform, and continuous support for carrier pipe. If trench requires some backfill to
establish final trench bottom grade, backfill material should be placed in 6-inch lifts
and each layer properly compacted.
C Install casing end seals in accordance with manufactures specifications.
3.05 SPACER AND INSULATOR INSTALLATION
A Casing spacers and/or insulators should be installed in accordance with manufacturer's
instructions. Special care should be taken to ensure that all subcomponents are
correctly assembled and evenly tightened,and that no damage occurs during tightening
or carrier pipe insertion.
B Spacing of spacers or insulators should ensure that carrier pipe is adequately supported
throughout its length, particularly at ends, to offset settling and possible electrical
shorting. End spacer must be within 6 inches of end of casing pipe,regardless of size
of casing and carrier pipe or type of spacer used. Casing spacers are designed to
withstand much greater loads than can be safely applied to most coatings. Therefore,
spacing between spacers depends largely on load bearing capabilities of pipe coating
and flexibility of pipe.
07/2006 02415-6 of 7
CITY OF PEARLAND AUGERING PIPE OR
CASING FOR SEWERS
1. Spacing shall be as shown on Plans with maximum distance between spacers to
be 10 feet for pipe sizes 4 to 14 inches and 8 feet for pipe sizes 16 to 30 inches.
2. For ductile iron pipe, flanged pipe, or bell-and-spigot pipe, spacers should be
installed within one foot on each side of bell or flange and one in center of
joint when 18- to 20-foot-long joints are used.
3. If casing or carrier pipe is angled,bent, or dented, spacing should be reduced.
C Where metallic carrier pipe is to be placed in metallic casing, provide electric
insulating type spacers to ensure no contact between carrier pipe and casing.
3.06 TOLERANCES
A Acceptance criteria for Augered Casing, as defined in this Section, 1.O1D, shall be±6
inches in horizontal alignment from theoretical at any point between manholes,
including the receiving end, and±1-1/2 inches in elevation from the theoretical.
B Acceptance criteria for Augered Pipe, as defined in this Section, 1.O1D, shall be±6
inches in horizontal alignment from theoretical at any point between manholes,
including the receiving end, and±1/8 inch in elevation from the theoretical.
C If a deviation exceeds these tolerances,the Contractor may be required to re-auger the
casing or sewer pipe at no additional cost to the City, including any backfilling or
grouting of the abandoned hole. Any redesign of the sewer and manholes made
necessaryby out-of-tolerance casing or sewer pipe shall be at the Contractor's expense
and shall be signed by a Professional Engineer registered in the State of Texas. The
installed pipe must be capable of meeting the design flow and velocities for a full pipe
condition. Contractor is responsible for final selection of casing diameter to assure
these tolerances.
3.07 FIELD QUALITY CONTROL
A Sewer pipes installed under this Section shall be tested under the provisions of the
applicable Technical Specification for the type of sewer pipe installed.
3.08 CLEAN-UP AND RESTORATION
A Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises.
3.09 PROTECTION OF THE WORK
A Protect and maintain all pipe and casing augering in good condition until completion of
Work.
END OF SECTION
07/2006 02415-7 of 7
CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES
Section 02417
AUGERING PIPE OR CASING FOR WATER LINES
1.0 GENERAL
1.01 SECTION INCLUDES
A Installation of pipe and casing for water lines by methods of augering.
B References to Technical Specifications:
1. Section 01570—Trench Safety System
2. Section 01200—Measurement and Payment Procedures
3. Section 01350—Submittals
4. Section 01500—Temporary Facilities and Controls
5. Section 02635 —Steel Pipe and Fittings
6. Section 02318 —Excavation and Backfill for Utilities
7. Section 01140—Contractor's Use of Premises
C Referenced Standards:
1. American Association of State Highway and Transportation Officials
(AASHTO)
1.02 MEASUREMENT AND PAYMENT UNIT PRICES
A Measurement for augered casing with water pipe will be on a linear foot basis
measured from end to end of the casing.
B Payment of augered casing with water pipe will be full compensation for all labor,
equipment,casing,water pipe,materials and supervision for construction complete in
place including dewatering,augering,joints, spoil removal,pipe installation,grouting,
utility adjustments,testing,and cleanup,and other work necessary for construction as
shown on the Plans and as specified.
C Measurement of augered water pipe will be on a linear foot basis along the axis of the
pipe from auger pit to auger pit.
D Payment of augered water pipe will be full compensation for labor, pipe, equipment,
materials, and supervision for construction complete in place including dewatering,
jacking,utility adjustments,testing,cleanup,and other work necessary for construction
as shown on the Plans and as specified.
E No separate payment will be made for auger pits and other excavations under this
section. Include cost of excavation, surface restoration, pavement repair, etc., for
auger pits or observation pits in Sections related to the open-cut utility installation
portion of the Work. Include cost of trench safety for auger pits or observation pits in
Section 01570—Trench Safety Systems.
F Refer to Section 01200 - Measurement and Payment Procedures.
02/2008 02417- 1 of 6
CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES
1.03 SUBMITTALS
A Submit product data in accordance with requirements of Section 01350- Submittals.
B Submit product data for casing insulators for approval.
C Prior to commencement of work,furnish for the Engineer's approval, a plan showing
pit locations. Approval of this plan will not relieve Contractor from responsibility to
obtain specified results.
D Show actual pit locations dimensioned on as-built drawings so that they can be
identified in field.
1.04 REGULATORY REQUIREMENTS
A Conform to Texas Department of Transportation for installations under state highways.
Owner will obtain required permits for State Highway crossings. City will make
submittal to TxDOT. Contractor will supply Traffic Control Plans.
B Installations under railroads:
1. Secure and comply with requirements of right-of-entry for crossing railroad
company's easement or right-of-way from railroad companies affected.
Comply with railroad permit requirements. Submit copy to the Engineer.
2. Use dry auger method only.
3. No extra compensation for damages due to delays caused by the railroad
requesting work to be done at hours which will not inconvenience the railroad.
4. Maintain minimum 35-foot clearance from centerline of tracks.
1.05 PROTECTION OF PEOPLE AND PROPERTY
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
1.06 CRITERIA FOR DETERMINING INSTALLATION LOADS
A Pipes and casings shall be selected by the Contractor to carry overburden pressure and
applicable surcharge and installation loads.
B The criteria to be used for truck loading shall be HS-20 vehicle loading distributions in
accordance with AASHTO.
C The Contractor shall be responsible for the selection of the casing,pipe,and pipe joints
to carry the thrust of the jacks or loads due to the pulling mechanism.
•
D The Contractor shall select the diameter of the casing to meet the minimum
dimensions defined in the Plans, and to permit practical installation (including skids,
pipe spiders and shims, if applicable) and grouting, where required.
02/2008 02417-2 of 6
CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES
2.0 PRODUCTS
2.01 MATERIALS
A Piping and Fittings: As required by Plans.
B Casings: Where required by Plans,in accordance with Section 02635-Steel Pipe and
Fittings.
C Insulators: -Where casings are required by Plans, casing insulator width 8 inches for
pipe sizes 4 to 14 inches; 12 inches for pipe sizes 16 to 30 inches.
1. For welded steel pipe 12 inches and smaller, use Pipeline Seal & Insulator
Model PE, or approved equal.
2. For other pipe materials, use Pipeline Seal & Insulator Model C8G-2 or
approved equal for pipe sizes up to 12 inches.
3. For all pipe sizes above 12 inches, use Pipeline Seal & Insulator Model
C 12G-2 or approved equal.
D Casing End Seals: Provide Pipeline Seal &Insulator Model C or approved equal.
3.0 EXECUTION
3.01 GENERAL
A Do not exceed 100 feet for length of auger hole for uncased PVC pipe less than 12
inches in diameter without intermediate pit.
B Do not exceed 75 feet for length of auger hole for uncased PVC pipe 12 inches to 16
inches in diameter without intermediate pit.
C Do not exceed 80 feet for length of auger hole for uncased PVC pipe greater than 16-
inches in diameter without intermediate pit.
3.02 PREPARATION
A Secure right-of-entry for crossing railroad company's easement or right-of-way.
3.03 JACKING
A Comply with Section 01570 - Trench Safety Systems for all pits, access shafts, end
trenches and other excavations relating to work required by this specification.
B If grade of pipe at jacking end is below ground surface, excavate suitable pits or
trenches for conducting jacking operations and for placing end joints of pipe.
Wherever end trenches are cut in sides of embankment or beyond it, sheath securely
and brace such work to prevent earth caving.
C No more than one joint shall be made-up in pit or trench prior to jacking.
02/2008 02417-3 of 6
CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES
D Construction shall not interfere with operation of railroad, street, highway, or other
facility, nor weaken or damage embankment or structure.
E During construction operations,furnish and maintain barricades and lights to safeguard
traffic and pedestrians as directed by the Engineer,until such time as backfill has been
completed and removed from site.
F Provide heavy-duty jacks suitable for forcing pipe through embankment. Use suitable
jacking head, usually of timber, and suitable bracing between jacks and jacking head
and suitable jacking frame or backstop so that jacking pressure will be applied to pipe
uniformly around ring of pipe. Set pipe to be jacked on guides, properly braced
together, to support section of pipe and to direct it in proper line and grade. Place
jacking assembly in line with direction and grade of pipe. Excavate embankment
material just ahead of pipe and remove material through pipe. Force pipe through
embankment with jacks, into space thus provided.
G Conform excavation for underside of pipe to contour and grade of pipe,for at least one
third of circumference of pipe. Provide clearance of not more than 2 inches for upper
half of pipe. Taper off upper clearance to zero at point where excavation conforms to
contour of pipe.
H Distance that excavation shall extend beyond end of pipe depends on character of
material,but it shall not exceed 2 feet in any case. Decrease distance on instructions
from the Engineer,if character of material being excavated makes it desirable to keep
advance excavation closer to end of pipe.
I Jack pipe from low or downstream end. Lateral or vertical variation in final position
of pipe from line and grade established by the Engineer will be permitted only to extent
of 1 inch in 10 feet, provided such variation is regular and only in one direction and
that final grade of flow line is in direction indicated on plans.
J Use cutting edge of steel plate around head end of pipe extending short distance
beyond end of pipe with inside angles or lugs to keep cutting edge from slipping back
onto pipe.
K Once jacking of pipe is begun, carry on without interruption to prevent pipe from
becoming firmly set in embankment.
L Remove and replace any pipe damaged in jacking operations.
M Backfill pits or trenches excavated to facilitate jacking operations immediately after
completion of jacking of pipe.
N Grout annular space when loss of embankment occurs or when clearance of two inches
is exceeded.
02/2008 02417-4 of 6
CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES
3.04 AUGERING (BORING)
A Auger from approved pit locations. Excavate for pits and install shoring as outlined
above under "Jacking." Auger mechanically with use of a pilot hole entire length of
crossing and check for line and grade on opposite end of bore from work pit. The large
hole is to be no more than 2 inches larger than diameter of bell. Place excavated
material outside working pit and dispose of as required. Use water or other fluids in
connection with boring operation only to lubricate cuttings; jetting will not be
permitted.
B In unconsolidated soil formations, a gel-forming colloidal drilling fluid may be used.
Fluid is to consist of at least 10 percent of high-grade processed bentonite and shall
consolidate cuttings of bit, seal walls of hole, and shall furnish lubrication for
subsequent removal of cuttings and installation of pipe.
3.05 PIPE IN CASING
A Pipes shall be installed in augered casings in accordance with this Section, as
applicable.
B Bottom of trench adjacent to each end of casing should be graded to provide firm,
uniform, and continuous support for carrier pipe. If trench requires some backfill to
establish final trench bottom grade, backfill material should be placed in 6-inch lifts
and each layer properly compacted.
C Install casing end seals in accordance with manufactures specifications.
3.06 INSULATOR INSTALLATION
A Casing spacers and/or insulators should be installed in accordance with manufacturer's
instructions. Special care should be taken to ensure that all subcomponents are
correctly assembled and evenly tightened,and that no damage occurs during tightening
or carrier pipe insertion.
B Spacing of spacers or insulators should ensure that carrier pipe is adequately supported
throughout its length, particularly at ends, to offset settling and possible electrical
shorting. End spacer must be within 6 inches of end of casing pipe,regardless of size
of casing and carrier pipe or type of spacer used. Casing spacers are designed to
withstand much greater loads than can be safely applied to most coatings. Therefore,
spacing between spacers depends largely on load bearing capabilities of pipe coating
and flexibility of pipe.
1. Spacing shall be as shown on Plans with maximum distance between spacers to
be 10 feet for pipe sizes 4 to 14 inches and 8 feet for pipe sizes 16 to 30 inches.
2. For ductile iron pipe, flanged pipe, or bell-and-spigot pipe, spacers should be
installed within one foot on each side of bell or flange and one in center of
joint when 18- to 20-foot-long joints are used.
3. If casing or carrier pipe is angled,bent, or dented, spacing should be reduced.
02/2008 02417-5 of 6
CITY OF PEARLAND AUGERING PIPE OR CASING FOR WATER LINES
C Where metallic carrier pipe is to be placed in metallic casing, provide electric
insulating type spacers to ensure no contact between carrier pipe and casing.
3.07 FILLING ANNULAR SPACE
A Allowable variation from line and grade shall be as specified under"Jacking." Block
void space around pipe in augered hole with approximately 12 inches of packed clay or
similar material approved by the Engineer,to prevent bedding or backfill from entering
the void around the pipe in the augered hole when compacted. For pipe diameters 4
inches through 8 inches use minimum 1/2 cubic foot clay for pipe diameters 12 inches
through 16 inches use minimum 3/4 cubic foot clay.
3.08 AUGER PITS
A Locate auger pits where there is minimum interference with traffic or access to
property.
B Pit Size: Provide minimum 6-inch space between pipe and walls of bore pit.
Maximum allowable width of pit shall be 5 feet unless approved by the Engineer.
Width of pit at surface shall not be less than at bottom. Maximum allowable length of
pit shall be no more than 5 feet longer than one full joint of pipe and shall not exceed
25 feet unless approved by the Engineer.
C Excavate bore pits to finished grade at least 6 inches lower than grade indicated by
stakes or as approved by the Engineer.
D Backfill in accordance with Section 02318 —Excavation and Backfill for Utilities.
3.09 CLEAN UP AND RESTORATION
A Perform clean up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises.
3.10 PROTECTION OF THE WORK
A Protect and maintain all pipe and casing augering in good condition until completion of
Work.
END OF SECTION
02/2008 02417-6 of 6
CITY OF PEARLAND WATER MAINS
Section 02510
WATER MAINS
1.0 GENERAL
1.01 SECTION INCLUDES
A. - Installation of water mains, including valves, fire hydrants,wet connections, cut and
plug of mains, disinfection, and hydrostatic testing for pipelines.
B. References to Technical Specifications:
1. Section 01200 -Measurement and Payment Procedures
2. Section 01350 - Submittals
3. Section 02514 -Fire Hydrant Assembly
4. Section 03300 - Cast-in-Place Concrete
5. Section 02512 -Polyethylene Wrap
6. Section 02417 -Augering Pipe for Water Lines
7. Section 02515 -Water Tap and Service Line Installation
8. Section 02318 -Excavation and Backfill for Utilities
9. Section 02980 -Pavement Repair
10. Section 01450 - Testing Laboratory Services
11. Section 02634 -Ductile Iron Pipe and Fittings
C. Referenced Standards:
1. Texas Commission on Environmental Quality(TCEQ)
2. American Water Works Association(AWWA)
3. American Society for Testing and Materials (ASTM)
1.02 MEASUREMENT AND PAYMENT
A. Measurement for water mains open cut or augered, with or without casing, is on a
linear foot basis for each size of pipe installed.
Mains: Measure along axis of pipe and include fittings and valves.
Branch Pipe: Measure from axis of main to end of branch.
B. Refer to Section 01200—Measurement and Payment Procedures.
1.03 QUALITY ASSURANCE
A. Regulatory Requirements:
1. Pipe shall bear Underwriter's Laboratories(UL)or Factory Mutual(FM)label.
6/2014 02510- 1 of 22
CITY OF PEARLAND WATER MAINS •
2. Pipe material acceptable without penalty to State's community fire insurance
rating agency.
3. System acceptable to City and TCEQ.
4. Bacteriological disinfection acceptable to local health officials and Texas
Department of Health, and TCEQ.
5. Water taps and draw off lines in compliance with local municipal
specifications and regulations.
1.04 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Product Data:
1. Obtain from pipe manufacturer installation instructions,manuals, and printed
recommendations, except for Owner furnished pipe.
•
2. Retain product data on job site for reference.
3. Submit certified record of tests of pipe, fittings, or valves upon request of
Engineer.
4. Submit hydrant manufacturer flow and friction loss curve.
C. Samples:
1. Notify City when system is pressure tested and disinfected. City will take all
samples for bacteriological testing as required by TCEQ.
1.05 PRODUCT HANDLING
A. Deliver pipe to trench in sound,undamaged condition.
B. Cut pipe neatly avoiding sharp, ragged, or unbeveled, plain ends and do not damage
lining by cutting.
C. Remove damaged or rejected materials from project site.
1.06 ENVIRONMENTAL REQUIREMENTS
A. Do not lay pipe when it is raining or when trench is muddy, soft, or contains standing
water.
B.
6/2014 02510-2 of 22
CITY OF PEARLAND WATER MAINS
2.0 PRODUCTS
2.01 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE
A. Conform to requirements of Section 02534-PVC Pipe. All pipe used for water mains
shall be blue.
2.02 HIGH DENSITY POLYETHYLENE
A. Conform to requirements of Section 02532W-HDPE
2.03 STEEL PIPE AND FITTINGS FOR LARGE DIAMETER WATER LINES
A. Conform to requirements of Section 02513 - Steel Pipe and Fittings for Large
Diameter Water Lines.
2.04 DUCTILE IRON PIPE AND FITTINGS
A. Conform to requirements of Section 02634 -Ductile Iron Pipe and Fittings.
2.05 FIRE HYDRANTS •
A. Conform to'requirements of Section 02514 -Fire Hydrant Assembly.
2.06 VALVES
A. General: Conform to requirements of Section 02541 — Water and Wastewater Line
Valves.
1. Manual operators:
a. Provide hand wheel manual operators for in-plant valves.
b. Equip buried valves with 2 in. square operating nuts.
2. Furnish no less than one operating key with each lot of 10 buried valves with
nut operators.
3. Rotation:
a. Direction: OPEN COUNTERCLOCKWISE (OPEN LEFT).
4. Shop coating:
a. Shop coat ferrous metal surfaces of valves both interior and exterior for
corrosion protection.
b.Protect internal and external iron surfaces of valves with coating of 4 mils of
two-part thermosetting epoxy: AWWA C 550.
5. Working and test pressures:
a. Valves 2 in. through 12 in.: 200 psi working pressure, 400 psi hydrostatic
test pressure.
b.Valves 14 in. through 36 in.: 150 psi working pressure, 300 psi hydrostatic
test pressure.
6/2014 02510-3 of 22
CITY OF PEARLAND WATER MAINS
B. Gate Valves (2 in. Through 36 in.):
1. Buried valves:
a. Comply with AWWA C500,non-rising stem(NRS); resilient wedge.
b. Epoxy-coated ductile iron body and bonnet, inside screw.
c. Bronze: Seat and disc rings, stem and mountings, and disc wedges.
d. "0" ring sealed stem and 2 in. square operating nut.
e. Valves 2 in. through 12 in.: Vertical type without by-passes.
f. Valves 16 in.through 36 in.: Horizontal type with enclosed steel bevel
gears resilient wedge, standard size by-pass valves.
g. Stuffing box and bonnet bolts and nuts to be 304 stainless steel.
h. Install in section of horizontal pipe.
i. Mechanical joint ends with gasket complying with AWWA C 111.
j. Acceptable product:
1) East Jordan, American Flow Control, Mueller Co. "A-2380
Series"
C. Tapping Valves and Tapping Sleeves:
1. Tapping sleeves shall be solid stainless steel and valves shall conform with all
others as mentioned above.
D. Valve Boxes:
1. Cast iron,threaded screw extension sleeve type,adjustable suitable for depth of
cover over pipe,with base and cover.
2. 3/16 in. thick, 5 in. diameter minimum.
3. Provide with suitable cast iron bases and covers.
4. Covers: Cast name designating type of service, e.g., "WATER" for water
service.
2.07 RELATED MATERIALS
A. Concrete: As specified in Section 03300—Cast-in-Place Concrete.
6/2014 02510-4 of 22
CITY OF PEARLAND WATER MAINS
B. Meter Box:
1. Cast iron to Owner's dimensions: ASTM A 48.
C. The service line between Curb stop and Corporation Stop shall be CTS Polyethylene,
SDR—9.
D. Corporation and Curb Stops and Fittings: ASTM B 62,NSF 61 lead free
3.0 EXECUTION
A. Conform to requirements in Section 02534-PVC Pipe, Section 02634-Ductile Iron
Pipe and Fittings, Section 02532W—HDPE, Section 02635 Steel Pipe and Fittings,
and Section 02513 - Steel Pipe and Fittings for Large Diameter Water Lines.
3.02 PREPARATION
A. Thoroughly clean pipe interiors of foreign matter before being lowered into trench.
B. Clean hydrant and valve interiors of foreign matter before installation.
C. Employ workmen who are skilled and experienced in laying pipe of type and joint
configuration being furnished. Provide watertight pipe and pipe joints.
D. Lay pipe to lines and grades shown on Drawings and Details.
E. If asbestos-cement (A.C.) pipe is encountered, follow safety practices outline in
American Water Works Association's publication, "Work Practices for A/C Pipe".
Strictly adhere to "recommended practices" contained in this publication and make
them"mandatory practices" for this project.
F. For pipe diameters 36 inches and greater,clearly mark each section of pipe and fitting
with unique designation on inside of pipe along with pressure class. Locate unique
identifying mark minimum of five feet away from either end of each section of pipe.
Provide one unique identifying mark in middle of each fitting. Place markings at
consistent locations. Use permanent black paint and minimum letter height of 4 inches
to mark designations.
G. Contractor is responsible for assuring chosen manufacturer fulfills requirements for
extra fittings and,therefore, is responsible for costs due to downtime if requirements
are not met.
•
3.03 INSTALLATION
A. Inspection:
1. Carefully examine each piece of pipe for soundness and specifications
compliance after delivery at trench before placing in trench.
6/2014 02510-5 of 22
CITY OF PEARLAND WATER MAINS
2. Remove rejected pipe and fittings from site of work and replace with sound
pipe.
3. Pipe and fittings will be rejected because of any of the following:
a. Cracks in pipe or fittings.
b. Damaged or cracked ends.
c. Damaged gaskets or gasket grooves.
d. Less than minimum wall thickness.
e. Defects and deformations.
B. Cleaning:
1. Clean interior of pipe and fittings of foreign matter before laying.
2. Keep interiors and ends clean during installation.
3. Keep joint contact surfaces clean during installation.
4. Take precautions to prevent foreign material from entering pipe during
installation.
5. Do not place rubbish, tools, rags, or other materials in pipe.
6. Whenever pipe laying is stopped,place plugs in uncompleted ends of pipe.
C. Installation:
1. Install pipe, couplings, and fittings in accordance with pipe manufacturer's
recommendations. Conform to applicable installation specifications for types
of pipes use.
2. Install gaskets and lubricants as recommended by manufacturer.
3. Full length of each barrel of pipe shall rest solidly on pipe bed with recesses
excavated to accommodate bells and joints.
4. Take up and relay pipe that has grade or joint disturbed.
5. Do not joint pipe with water in trench.
6. Keep water out of trench until jointing is completed.
7. Do not lay water pipe closer than 10 ft. horizontally from sanitary sewer.
8. Do not locate joints at cross-overs with sanitary sewers closer than 9 ft. from
cross-over point.
6/2014 02510-6 of 22
CITY OF PEARLAND WATER MAINS
9. Where water lines cross sanitary sewers,construct in accordance with the City
of Pearland Engineering Design Criteria Manual for water line or TCEQ
standards whichever is more stringent 10. Where pipe ends are left for future
connections, install valve and plug or cap end. Forty feet minimum line
section required between valve and plug or cap end.
11. Install concrete thrust blocking at bends and tees and at ends of lines to provide
adequate reaction backing.
12. Lay not more than 100 feet of pipe in trench ahead of backfilling operations.
13. Dig trench proper width as shown in details. When trench width below top of
pipe becomes 4 feet wider than specified, install higher class of pipe or
improved bedding,as determined by Engineer. No additional payment will be
made for higher class of pipe or improved bedding.
14. Use adequate surveying methods and equipment;employ personnel competent
in use of this equipment. Horizontal and vertical deviations from alignment as
indicated on Drawings shall not exceed 0.10 feet. Measure and record "as
built"horizontal alignment and vertical grade at maximum of every 100 feet on
record drawings.
15. Before assembling couplings,lightly coat pipe ends and outside of gaskets per
manufacturer's specification.
16. Prevent damage to coating when placing backfill. Use backfill material free of
large rocks or stones, or other material which could damage coatings.
D. Setting Valves, Valve Boxes and Fire Hydrants:
1. Set plumb.
2. Center valve boxes on valves.
3. Where feasible, locate valves outside area of roads and streets.
4. Carefully tamp back fill around each valve box to distance of 4 ft. on all sides
or to undisturbed trench face if less than 4 ft.
5. Set hydrants at elevation so that connecting pipe will not have less cover than
mains.
6. Set hydrants on concrete pad.
7. Depth of bury of hydrant is defined as distance from bottom of inlet pipe to
ground line.
6/2014 02510-7of22
CITY OF PEARLAND WATER MAINS
8. Place concrete thrust block back of hydrant opposite pipe connections set
against vertical face of trench to prevent from blowing off line.
9. Use 5/8 in. stock stainless steel bridle rods and rod collars.
10. Place not less than 5 cu. ft. of broken stone around base of hydrant to ensure
drainage.
11. Compact backfill to grade in accordance with specification section 02318 —
Excavation and Backfill for Utilities
12. Tightenstuffing boxes.
13. Test hydrant and valve in opened and closed position to ensure that parts are in
working condition.
E. Joints and Jointing:
1. Rubber Gasketed Bell-and-Spigot Joints for PVC,Steel,and Ductile Iron Pipe:
2. a.After rubber gasket is placed in spigot groove of pipe,equalize rubber gasket
cross section by inserting tool or bar recommended by manufacturer under
rubber gasket and moving it around periphery of pipe spigot.
b. Lubricate gaskets per manufacturer's specification.
c.Fit pipe units together in manner to avoid twisting or otherwise displacing or
damaging rubber gasket.
d.After pipe sections are joined, check gaskets to ensure that no displacement
of gasket has occurred. If displacement has occurred,remove pipe section and
remake joint as for new pipe. Remove old gasket, inspect for damage and
replace if necessary before remaking joint.
e.Where preventing movement of 16-inch diameter or greater pipe is necessary
due to thrust,use restrained joints as shown on Drawings.
1) Include buoyancy conditions for soil unit weight when
computing thrust restraint calculations. .
2) Do not include passive resistance of soil in thrust restraint
calculations.
f. Except for PVC pipe, provide means to prevent full engagement of spigot
into bell as shown on Drawings. Means may consist of wedges or other types
of stops as approved by Engineer.
6/2014 02510-8 of 22
CITY OF PEARLAND WATER MAINS
2. Flanged Joints where required on Ductile Iron Pipe, or Steel Pipe:
a. AWWA C 207. Prior to installation of bolts, accurately center and
align flanged joints to prevent mechanical prestressing of flanges,pipe
and equipment. Align bolt holes to straddle vertical, horizontal or
north-south center line.Do not exceed 3/64 inch per foot inclination of
flange face from true alignment.
b. Use full-face gaskets for flanged joints. Provide 1/8-inch-thick cloth
inserted rubber gasket material. Cut gaskets at factory to proper
dimensions.
c. Use stainless steelnuts and bolts to match flange material.Use stainless
steelnuts and bolts underground.Tighten bolts progressively to prevent
unbalanced stress. Maintain at all times approximately same distance
between two flanges at points around flanges.Tighten bolts alternately
(180°apart)until all are evenly tight.Draw bolts tight to ensure proper
seating of gaskets.
d. Full length bolt isolating sleeves and washers shall be used with
flanged connections.
e. For in-line flange joints 30 inches in diameter and greater and at
butterfly valve flanges, provide Pyrox G-10 with nitrite seal,
conforming to ANSI A 21.11 mechanical joint gaskets. For in-line
flange joints sized between 12 inches in diameter and greater and 24
inches in diameter and smaller,provide Phenolic PSI with nitrite seal
gasket conforming to ANSI A 21.11 mechanical joint gaskets.
3. Welded Joints (Steel Pipe):
a. Prior to starting work,provide certification of qualification for welders
employed on project for type of work procedures and positions
involved.
b. Joints: AWWA C 206. Full-fillet, single lap-welded slip-type either
inside or outside, or double butt-welded type; use automatic or hand
welders; completely penetrate deposited metal with base metal; use
filler metal compatible with base metal; keep inside of fittings and •
joints free from globules of weld metal which would restrict flow or
become loose. Do not use mitered joints. For interior welded joints,
complete backfilling before welding. For exterior field-welded joints,
provide adequate working room under and beside pipe. Use exterior
welds for 30-inch and smaller.
6/2014 02510-9 of 22
CITY OF PEARLAND WATER MAINS
c. Furnish welded joints with trimmed spigots and interior welds for 36-
inch and larger pipe.
d. Bell-and-spigot,lap-welded slip joints:Deflection maybe taken at joint •
by pulling joint up to 3/4 inch as long as 1 Y2 inch minimum lap is
maintained. Spigot end may be miter cut to take deflections up to 5
degrees as long as joint tolerances are maintained. Miter end cuts of
both ends of butt-welded joints maybe used for joint deflections of up
to 5 degrees.
e. Align piping and equipment so that no part is offset more than 1/8 inch.
Set fittings and joints square and true, and preserve alignment during
welding operation. For butt welded joints, align abutting ends to
minimize offset between surfaces. For pipe of same nominal wall
thickness, do not exceed 1/16 inch offset. Use line-up clamps for this
purpose; however, take care to avoid damage to linings and coatings.
f. Protect epoxy or cement lining during welding by draping an 18-inch
wide strip of heat resistant material over top half of pipe on each side
of lining holdback to avoid damage to lining by hot splatter. Protect
tape coating similarly if external welding is required.
g. Welding rods: Compatible with metal to be welded to obtain strongest
bond, E-7018. Root or"Stringer"pass shall be performed with 6011
rods and Filler and Cap shall be done using 7018 rods.
h. Deposit metal in successive layers to provide at least 2 passes or beads
for automatic welding and 3 passes or beads for manual welding in
completed weld.
i. Deposit no more than 1/4 inch of metal on each pass.Thoroughly clean
each individual pass with wire brush or hammer to remove dirt,slag or
flux.
j. Do not weld under weather condition that would impair strength of
weld, such as wet surface, rain or snow, dust or high winds, unless
work is properly protected.
k. Make tack weld of same material and by same procedure as completed
weld. Otherwise, remove tack welds during welding operation. •
1. Remove dirt,scale,and other foreign matter from inside piping before
tying in sections, fittings, or valves.
m. Welded Joints for Large Diameter Water Lines:
6/2014 02510- 10 of 22
CITY OF PEARLAND-, WATER MAINS
1) Furnish pipe with trimmed spigots and interior welds for 36
inch and larger pipe.
2) Use exterior welds for 30 inch and smaller.
3) Only one end may be miter cut.Miter end cuts of both ends of
butt-welded joints may be used for joint deflections of up to 2
%2 degrees.
4) For large diameter water lines,employ an independent certified
testing laboratory, approved by Engineer, to perform weld
acceptance tests on welded joints. Include cost of such testing
and associated work to accommodate testing in contract unit
price bid for water line. Furnish copies of test reports to
Engineer for review. Engineer has final decision as to
suitability of welds tested.
A) Weld acceptance criteria:
i) Cracking.
ii) Lack of fusion/penetration.
iii) Slag which exceeds one-third (t) where (t) quals
material thickness.
iv) Porosity/Relevant rounded indications greater than
3/16 inch; rounded indication is one of circular or
elliptical shape with length equal to or less than three
times its width.
v) Relevant linear indications in which length of linear
indication exceeds three times its width.
vi) Four or more relevant 1/16 inch rounded indications in
line separated by 1/16 inch or less edge to edge.
n. After pipe is joined and prior to start of welding procedure, make
spigot and bell essentially concentric by jacking, shimming or tacking
to obtain clearance tolerance around periphery of joint except for
deflected joints.
o. Furnish each welder employed steel stencil for marking welds,so work
of each welder can be identified. Mark pipe with assigned stencil
adjacent to weld. When welder leaves job, stencil must be voided and
not duplicated.Welder making defective welds must discontinue work
and leave project site. Welder may return to project site only after
recertification
p. Provide cylindrical corrosion barriers for epoxy lined steel pipe 24 inch
diameter and smaller,unless minimum wall thickness is 0.5 inches or
greater.
6/2014 02510- 11 of 22
CITY OF PEARLAND WATER MAINS
1) In additional to welding requirements contained herein
Paragraph 3.06, conform to protection fitting manufacturer's
installation recommendations.
2) Provide services of technical representative of manufacturer
available on site at beginning of pipe laying operations.
Representative to train welders and advise regarding
installation and general construction methods. Welders must
have 12 months prior experience installing protection fittings.
3) All steel pipe is to have cutback 3/4 inch to no greater than 1
inch of internal diameter coating from weld bevel.
4) Furnish steel fittings with cylindrical corrosion barriers with
shop welded extensions to end of fittings. Extension length to
measure no less than diameter of pipe. Shop apply lining in
accordance with AWWA C210 or AWWA C213.
5) All steel pipe receiving field adjustments are to be cold cut
using standard practices and equipment. No cutting using
torch is to be allowed.
4. Restrained Joints:
a. For existing water lines and water lines less than 16 inches in diameter,
restrain pipe joints with concrete thrust blocks.
b. Thrust restraint lengths shown on Drawings are minimum anticipated
lengths. These lengths are based on deflections indicated for large
diameter lines and ductile iron pipe for small diameter lines.
Adjustments in deflections or use of other pipe material may result in
reduction or increase of thrust lengths. Perform calculations by pipe
manufacturer to verify proposed thrust restraint lengths. Submit
calculations for all pipe materials sealed by a registered Professional
Engineer in State of Texas for review by Engineer. Make adjustments
in thrust restraint lengths at no additional cost to City.
c. Passive resistance of soil will not be permitted in calculation of thrust
restraint.
d. For 16 inch lines and larger use minimum 16 foot length of pipe in and
out of joints made up of beveled pipe where restraint joint lengths are
not identified on Drawings. Otherwise, provide restraint joints for a
minimum length of 16 feet on each side of beveled joints.
e. Installation:
6/2014 02510- 12 of 22
CITY OF PEARLAND WATER MAINS
1) Install restrained joints mechanism in accordance with
manufacturer's recommendations.
2) Examine and clean mechanism; remove direct, debris and
other foreign material.
3) Apply gasket and joint NSF 61 FDA per manufacturer's
specification.
4) Verify gasket is evenly seated.
5) Do not over stab pipe into mechanism
f. Prevent any lateral movement of thrust restraints throughout pressure
testing and operation.
g. Place 2500 psi concrete conforming to Section 03315 - Concrete for
Utility Construction, for blocking at each change in direction of
existing water lines, to brace pipe against undisturbed trench walls.
Finish placement of concrete blocking, made from Type I cement, 4
days prior to hydrostatic testing of pipeline. Test maybe made 2 days
after completion of blocking if Type II cement is used.
5. Joint Grout(Steel Pipe):
a. Mix cement grout mixture by machine except when less than 1/2 cubic
yard is required. When less than 1/2 cubic yard is required,grout may
be hand mixed. Mix grout only in quantities for immediate use. Place
grout within 20 minutes of mixing. Discard grout that has set.
Retempering of grout by any means is not permitted.
b. Prepare grout in small batches to prevent stiffening before it is used.
Do not use grout which has become so stiff that proper placement
cannot be assured without retempering. Use grout for filling grooves
of such consistency that it will adhere to ends of pipe.
c. Surface Preparation: Remove defective concrete, laitance, dirt, oil,
grease and other foreign material from concrete surfaces with wire
brush or hammer to sound, clean surface. Remove rust and foreign
materials from metal surfaces in contact with grout.
6/2014 02510- 13 of 22
CITY OF PEARLAND WATER MAINS
d. Follow established procedures for hot and cold weather concrete
placement.
e. Complete joint grout operations and backfilling of pipe trenches as
closely as practical to pipe laying operations. Allow grouted exterior
joints to cure at least 1 hour before compacting backfill.
• f. Grouting exterior joint space: Hold wrapper in place on both sides of
joint with minimum 5/8-inch-wide steel straps or bands. Place no
additional bedding or backfill material on either side of pipe until after
grout band is filled and grout has mechanically stiffened. Pull ends of
wrapper together at top of pipe to form access hole. Pour grout down
one side of pipe until it rises on other side. Rod or puddle grout to
ensure complete filling of joint recess.Agitate for 15 minutes to allow
excess water to seep through joint band. When necessary, add more
grout to fill joint completely. Protect gap at top of joint band from
backfill by allowing grout to stiffen or by covering with structurally
protective material. Do not remove band from joint. Proceed with
placement of additional bedding and backfill material.
g. Interior Joints for Pipe 24 inches and Smaller: Circumferentially butter
bell with grout prior to insertion of spigot,strike off flush surplus grout
inside pipe by pulling filled burlap bag or inflated ball through pipe
with rope. After joint is engaged, finish off joint grout smooth and
clean. Use swab approved by Project Manager for 20-inch pipe and
smaller.
h. Protect exposed interior surfaces of steel joint bands by metallizing,by
other approved coatings, or by pointing with grout.Joint pointing may
be omitted on potable water pipelines if joint bands are protected by
zinc metalizing or other approved protective coatings.
i. Remove and replace improperly cured or otherwise defective grout.
j. Strike off grout on interior joints and make smooth with inside
diameter of pipe.
k. When installed in tunnel or encasement pipe and clearance within
casing does not permit outside grout to be placed in normal manner,
apply approved flexible sealer,such as Flex Protex or equal,to outside
joint prior to joint engagement. Clean and prime surfaces receiving
sealer in accordance with manufacturer's recommendations. Apply
sufficient quantities of sealer to assure complete protection of steel in
6/2014 02510- 14 of 22
CITY OF PEARLAND WATER MAINS
joint area. Fill interior of joint with grout in normal manner after joint
closure.
1. Interior Joints for Water Lines 30 inches and Larger: Clean joint space,
wet joint surfaces,fill with stiff grout and trowel smooth and flush with
inside surfaces of pipe usingsteel trowel so that surface is smooth.
Accomplish grouting at end of each work day. Obtain written
acceptance from Project Engineer of inside joints before proceeding
with next day's pipe laying operation. During inspection, insure no
delamination of joint mortar has occurred by striking joint mortar
lining with rubber mallet. Remove and replace delaminated mortar
lining.
m. Work which requires heavy equipment to be over water line must be
completed before mortar is applied to interior joints.
n. Do not apply grout to joints that are out of tolerance until acceptable •
repairs are made.
6. Large Diameter Water Main Joint Testing: In addition to testing individual
joints with feeler gauge approximately 1/2 inch wide and 0.015-inch thick,use
other joint testing procedure approved or recommended by pipe manufacturer
which will help ensure watertight installation prior to backfilling.Perform tests
at no additional cost to City.
7. Make curves and bends by deflecting joints or other method as recommended
by manufacturer and approved by the Engineer. Submit details of other
methods of providing curves and bends which exceed manufacturer's
recommended deflection prior to installation.
a. Deflection of pipe joints shall not exceed maximum deflection
recommended by pipe manufacturer, unless otherwise indicated on
Drawings.
b. If deflection exceeds that specified but is less than 5 percent, repair
entire deflected pipe section such that maximum deflection allowed is
not exceeded.
c. If deflection is equal to or exceeds 5 percent from that specified,
remove entire portion of deflected pipe section and install new pipe.
d. Replace, repair, or reapply coatings and linings as required.
e. Assessment of deflection may be measured by the Engineer at location
along pipe. Arithmetical averages of deflection or similar average
measurement methods will not be deemed as meeting intent of
standard.
6/2014 02510- 15 of 22
CITY OF PEARLAND WATER MAINS
f. When rubber gasketed pipe is laid on curve, join pipe in straight
alignment and then deflect to curved alignment.
8. Closures Sections and Approved Field Modifications to Steel Pipe and
Fittings:
a. Apply welded-wire fabric reinforcement to interior and exterior of
exposed interior and exterior surfaces greater than 6 inches in diameter.
Welded-wire fabric: minimum W1; maximum spacing 2 inches by 4
inches; 3/8 inch from surface of steel plate or middle third of lining or
coating thickness for mortar thickness less than 3/4 inch.
b. Fill exposed interior and exterior surfaces with nonshrink grout.
c. For pipe diameters 36 inches and greater, perform field welds on
interior and exterior of pipe.
d. For large diameter water lines,provide minimum overlap of 4 inches of
butt strap over adjacent piece on butt-strap closures.
F. Cathodic Protection Appurtenances:
1. Where identified on Drawings,modify pipe for cathodic protection as detailed
on Drawings and specified. Unless otherwise noted, provide insulation kits
including test stations at connections to existing water system or at locations to
isolate one type of cathodic system from another type, between water line,
access manhole piping and other major openings in water line,or as shown on
Drawings.
2. Bond joints for pipe installed in tunnel or open cut, except where insulating
flanges are provided. Weld strap or clip between bell and spigot of each joint
or as shown on Drawings. No additional bonding required where joints are
welded for thrust restraint.Repair coatings as specified by appropriate AWWA
standard, as recommended by manufacturer,and as approved by the Engineer
3. Bonding Strap or Clip: Free of foreign material that may increase contact
resistance between wire and strap or clip.
6/2014 02510- 16 of 22
CITY OF PEARLAND WATER MAINS
G. Anchorage of Fittings:
1. Anchor tees, elbows and plugs in water mains with concrete thrust blocks.
2. Place blocks so that joints will be accessible for inspection and repair.
H., Handling:
1. Place pipe along project site where storm water or other water will not enter or
pass through pipe.
2. Load, transport, unload, and otherwise handle pipe and fittings to prevent
damage of any kind. Handle and transport pipe with equipment designed,
constructed and arranged to prevent damage to pipe,lining and coating.Do not
permit bare chains, hooks, metal bars, or narrow skids or cradles to come in
contact with coatings. Where required, provide pipe fittings with sufficient
interior strutting or cross bracing to prevent deflection under their own weight.
3. Hoist pipe from trench side into trench by means of sling of smooth steel cable,
canvas, leather, nylon or similar material.
4. For large diameter water lines, handle pipe only by means of sling of canvas,
leather,nylon,or similar material. Sling shall be minimum 36 inches in width.
Do not tear or wrinkle tape layers.
5. Use precautions to prevent injury to pipe,protective linings and coatings.
a. Package stacked pipe on timbers.Place protective pads under banding
straps at time of packaging.
b. Pad fork trucks with carpet or other suitable material.Use nylon straps
around pipe for lift when relocating pipe with crane or backhoe.
c. Do not lift pipe using hooks at each end of pipe.
d. Do not place debris, tools, clothing, or other materials on pipe.
6. Repair damage to pipe or protective lining and coating before final acceptance.
7. For cement mortar line and coated steel pipe, permit no visible cracks longer
than 6 inches,measured within 15 degrees of line parallel to pipe longitudinal
axis of finished pipe, except:
a. In surface laitance of centrifugally cast concrete.
b. In sections of pipe with steel reinforcing collars or wrappers.
c. Within 12 inches of pipe ends.
6/2014 02510- 17 of 22
CITY OF PEARLAND WATER MAINS
8. Reject pipe with visible cracks (not meeting exceptions) and remove from
project site.
Cleaning: Thoroughly clean and dry interior of pipe and fittings of foreign matter
before installation, and keep interior clean until Work has been accepted. Keep joint
contact surfaces clean until jointing is completed.Do not place debris,tools, clothing
or other materials in pipe. After pipe laying and joining operations are completed,
clean inside of pipe and remove debris.
J. Inspection: Before installation, inspect each pipe and fitting for defects. Reject
r defective, damaged or unsound pipe and fittings and remove them from site.
3.04 WET CONNECTIONS
A. Definitions:
1. Wet connections consist of isolating sections of pipe to be connected with
installed valves,draining the isolated sections,and completing the connections.
2. Connection of 2 inch or smaller lines,which may be referred to on Plans as "2
inch standard connections"or"gooseneck connections"will be measured as 2"
wet connections. This item is not to be used as any part of a 2-inch service
line.
B. Materials:
1. Corporation stops and saddles shall conform to requirements of Section 02515-
Water Tap and Service Line Installation.
2. Valves shall conform to requirements of Section 02541 — Fire Hydrant
Assembly.
3. Brass fittings shall conform to requirements of AWWA C800.
C. Execution:
1. Plan wet connections in such manner and at such hours as to least
inconvenience public. Notify Public Works Department at least 48 hours in
advance of making connections.
2. DO NOT OPERATE VALVES ON MAINS IN USE BY OWNER.Owner will
handle, at no cost to Contractor, all operations involving opening and closing
valves for wet connections.
3. Conduct connection operations when Inspector is at job site. Connection work
shall progress without interruption until complete, once existing mains have
been cut or plugs have been removed for making connections.
6/2014 02510- 18 of 22
CITY OF PEARLAND WATER MAINS
D. 2-Inch Wet Connections:
1. Tap water main. Provide and install corporation stops,saddles,as required for
line and grade adjustment; and brass fittings necessary to adapt to existing
main. Provide one Corporation Stop at main line and one Curb Stop at meter.
The service line between Curb Stop and Corporation Stop shall be CTS
Polyethylene, SDR-9.
3.05 CUT, PLUG AND ABANDONMENT OF MAINS
A. Materials:
1. Concrete for thrust blocks: Class B conforming to requirements of Section
03305.
2. Plugs and clamps shall be suitable for type of pipe to be plugged.
B. Execution:
1. Do not begin cut,plug and abandonment operations until replacement main has
been constructed, disinfected, and tested, and all service lines have been
transferred to replacement main.
2. Install plug, clamp, and concrete thrust block and make cut at location shown
on Plans.
3. Main to be abandoned shall not be valved off and shall not be cut or plugged
other than at supply main or as shown on Plans.
4. After main to be abandoned has been cut and plugged,check for other sources
feeding abandoned main. If sources are found,notify Engineer immediately.
Cut and plug abandoned main at point of other feed as directed by Engineer.
5. Plug or cap all ends or openings in abandoned main in an acceptable manner
approved by Engineer.
6. Remove and dispose of all surface identifications such as valve boxes and fire
hydrants. Valve boxes in improved streets,other than shell,may be poured full
of concrete after removing cap.
7. Backfill all excavations in accordance with Section 02318 —Excavation and
Backfill for Utilities.
8. Repair all street surfaces in accordance with Section 02980—Pavement Repair.
6/2014 02510- 19 of 22
CITY OF PEARLAND WATER MAINS
3.06 HYDROSTATIC TESTING
A. Hydrostatically test all new water pipelines for liquids before connecting to water
distribution system.
B. Pipelines shall be tested in lengths between valves, or plugs, of not more than 1,500
feet unless greater length is approved by Engineer.
C. Conduct hydrostatic tests in presence of Engineer.
•
D. Preparation:
1. Disinfect water system pipelines prior to hydrostatic testing.
E. Test Procedures:
1. Furnish,install,and operate connections,pump,meter and gages necessary for
hydrostatic testing.
2. Allow pipeline to sit minimum of 24 hours from time it is initially disinfected
until testing begins, to allow pipe wall or lining material to absorb water.
Contractor should be aware that periods of up to 7 days may be required for
mortar lining to become saturated.
3. Expel all air and apply a minimum test pressure of 125 psi or 150 psi as
directed by Engineer.
4. Maintain test pressure for 8 hours. If a large quantity of water is required to
maintain pressure during test,testing shall be discontinued until cause of water
loss is identified and corrected.
F. Allowable Leakage for Water Mains:
1. During hydrostatic tests,no leakage will be allowed for sections of water mains
consisting of welded joints.
2. Maximum allowable leakage for water mains with rubber gasketed joints:
11.65 gallons per inch nominal diameter per mile of pipe per 24 hours while
testing at the required pressure.
G. Correction for Failed Tests:
1. Repair all joints showing visible leaks on surface regardless of total leakage
shown on test. Check all valves and fittings to ensure that no leakage occurs
that could affect or invalidate test. Remove any cracked or defective pipes,
fittings and valves discovered during pressure test and replace with new items. —
2. Repeat test until satisfactory results are obtained.
6/2014 02510 7 20 of 22
A
CITY OF PEARLAND WATER MAINS
3.07 DISINFECTION
A. All waterlines constructed shall be promptly disinfected before any tests are conducted
on waterlines and before waterlines are connected to water distribution system.
B. Water for disinfection and flushing will be furnished without charge to Contractor.
C. Preparation:
1. Furnish all required temporary blind flanges,cast-iron sleeves,plugs,and other
items needed to facilitate disinfection of new mains prior to connecting them to
water distribution system. Normally,each valved section of waterline requires
two each 3/4-inch taps. A 2-inch minimum blow-off is required for waterlines
up to and including 6-inch diameter.
2. .Fire hydrants shall be used as blow-offs to flush newly constructed waterlines
8-inch diameter and above. Where fire hydrants are not available on
waterlines, locations and designs for blow-offs shall be as indicated on Plans.
Install temporary blow-off valves and remove promptly upon successful
completion of disinfection and testing. Abandon by turning off corp and
using a stainless steel cap.
3. Slowly fill each section of pipe with water in a manner approved by Engineer.
Average water velocity when filling pipeline should be less than 1 fps and shall
not, under any circumstance, exceed 2 fps. Before beginning disinfection
operations, expel all air from pipeline.
4. All excavations made shall be backfilled immediately after installation of risers
or blow-offs.
5. Install blow-off valves at end of main to facilitate flushing at all dead-end
water mains. Install permanent blow-off valves/auto flusher per drawing Ll
D. Disinfection:
1. Use not less than 100 parts of chlorine per million parts of water. Introduce
chlorinating material to water lines in accordance with AWWA C651. After
contact period of not less than 24 hours, flush system with clean water until
residual chlorine is no greater than 1.0 parts per million parts of water. Open
and close valves in lines being sterilized several times during contact period.If
super-chlorinated water (i.e. chlorine concentration above 4mg/1) is used for
cleaning water main disinfection and flushing,the water must be dechlorinated
prior to discharge.The water discharged into the stormsewer system or natural
waterway must meet the Clean Water Act (33 USC § 1251 et seq.) and any
subsequent amendments thereof
2. If a chemical compound is used for a sterilizing agent, it shall be placed in
pipes as directed by Engineer.
6/2014 02510-21 of 22
CITY OF PEARLAND WATER MAINS
E. Bacteriological Testing:
1. After disinfection and flushing of waterlines, bacteriological tests will be
performed by Owner or testing laboratory in accordance with Section 01450—
Testing Laboratory Services. If test results indicate need for additional
disinfection of waterlines based upon Texas Department of Health and TCEQ
requirements,Contractor shall perform additional disinfection operations at no
additional cost to the Owner.
E. Completion:
1. Upon completion of disinfection and testing, remove risers except those
approved for use in subsequent hydrostatic testing, and backfill excavation
promptly.
END OF SECTION
6/2014 02510-22 of 22
CITY OF PEARLAND FIRE HYDRANT ASSEMBLY
Section 02514
FIRE HYDRANT ASSEMBLY
1.0 GENERAL
1.01 SECTION INCLUDES
A Fire hydrants.
B References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350— Submittals
3. Section 02634—Ductile Iron Pipe and Fittings
4. Section 02635—Steel Pipe and Fittings
5. Section 02534—PVC Pipe
6. Section 02510—Water Mains
C Referenced Standards:
1. National Fire Protection Association (NFPA)
2. American Water Works Association(AWWA)
3. American National Standards Institute (ANSI)
4. National Association of Corrosion Engineers (NACE)
5. Food and Drug Administration (FDA)
6. Steel Structures Painting Council (SSPC)
7. Texas Commission on Environmental Quality(TCEQ)
8. National Sanitation Foundation(NSF)
1.02 MEASUREMENT AND PAYMENT
A Measurement for installation of fire hydrants is on a per each basis,complete in place.
Payment includes all valves,fittings,bedding,backfill,and thrust blocking required for
the installation of the fire hydrant assembly.
B If fire hydrant leads are included as a Bid Item, measurement will be on a linear foot
basis. Separate payment will be made for open cut and augered leads.
C Measurement for removing and salvaging of fire hydrants is on a per each basis.
Payment includes removing hydrant and valve if available, plugging lead, and
removing materials from site or returning salvaged fire hydrants to Owner.
D Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
06/2014 02514- 1 of 6
CITY OF PEARLAND FIRE HYDRANT ASSEMBLY
1. Shop drawing(s) for proposed hydrant: Include model number, parts list, and
material specifications, unique drawing number and descriptive legend
identifying hydrant.
2. Material safety data sheets for lubricants.
3. Affidavit of compliance for coating materials.
4. Certified hydraulic performance test report for proposed hydrant.
2.0 PRODUCTS
2.01 HYDRANT MATERIALS
A Hydrants: AWWA C502; dry barrel design; tamper resistant; same manufacturer
throughout project.
1. 0-Ring Seal Packing: Prevent water leakage between barrel and lubrication
chamber. Provide dynamic seals of Buna "N" or other oil resistant material
and static seals of Buna "N" or other approved synthetic rubber.
2. Bronze: Hydrant components in waterway to contain not more than 15 percent
zinc and not more than 8 percent lead.
3. Acceptable Manufacturer:Mueller Super Centurian 250,American Darling B-
84-B, or East Jordan Iron Works WaterMaster 5CD250.
B Operating Stems: Everdur, or other high-quality non-corrodible metal where threads
are located in barrel or waterway. Bronze-to-bronze working parts in waterway;
genuine wrought iron or steel where threads are not located in barrel or waterway,
bronze bushed at penetration of stuffing box; seal threads against contact with water
regardless of open or closed position of main valve. Connect operating stems with
breakable coupling.
C Main Valve (shut-off valve): Circular; compression-type; closes with line pressure;
minimum opening of 5-1/4 inches in diameter. Seal bottom end of stem threads from
contact with water with cap nut.
D Valve Mechanism: Bronze valve seat ring threaded into bronze drain ring; seat ring
and main valve assembly removable from above ground through upper barrel with
lightweight seat removal wrench;breakable stem coupling opposite barrel breakaway;
bronze or corrosion-resistant pins and locking devices; bronze valve stem sleeve, 0-
ring seals and travel stop; sealed lubricating reservoir at top and bottom which fully
lubricates threads and bearing surfaces when opening or closing main valve; thrust
bearing or lubricated thrust collar for operating assembly. Lubricants: Food Grade.
Valve Seat: Molded "Natural" rubber; scale durometer rating of 90 ±5; minimum
thickness of 1/2 inch. Natural Rubbers: Resistant to microbiological attack.
E Lower Hydrant Barrel: Single piece coupled to upper barrel to allow 360°rotation of
upper barrel. Bury Length: Distance from bottom of inlet to ground line as specified.
Ground Line: Clearly marked on barrel. Indicate inside diameter and wall thickness
(with tolerances)for upper barrel,lower barrel,and bonnet sections. Show dimensions
at minimum sections to demonstrate compliance with Paragraph 3.2.6 of AWWA
C502.
06/2014 02514-2 of 6
CITY OF PEARLAND FIRE HYDRANT ASSEMBLY
F Extensions: Permit use of one or more standard extensions available from
manufacturer in lengths from 6 inches to 60 inches in 6 inch increments.
G Provide hydrants with automatic, positively operating, non-corrodible drain or drip
valve to drain hydrant completely when main valve is shut. Bronze or corrosion
resistant drain line. Tapping of drain holes is not required.
H Inlet Connection: Elbow with AWWA Standard bell designed for 6-inch mechanical
joint,restrained push-on, or flanged joint and valves.Flanged ends shall comply with
ANSI/ASME B16.1, class 125 flanges. Joints: ANSI A21.11; AWWA C111.
I Operating Nut and Hold-down Nuts: Stainless steel or cast or ductile iron with bronze
inserts or, as an alternative,provide security device with bronze operating nut. Any
such security devices shall not require special tools for normal off/on operation of
hydrant. Fabricate hold-down assemblies of suitable metallic materials for service
intended.
J Field-Replaceable Nozzles: NFPA No. 194,ANSI B26-1925;mechanically attached
to hydrant body counterclockwise; sealed with 0-rings and mechanically located into
place; provide two hose nozzles with 2-1/2 inch nominal inside diameter and one
pumper nozzle with 4.492"nominal inside diameter;National Standard Threads;lock
in place with security device.
K Pumper Nozzle: Allow a minimum unobstructed radius of 10 inches from threaded
surface of nozzle throughout path of travel of wrench or other device used to fasten
hose to nozzle.
•
L Nozzle Caps: Security chains to hydrant barrel,minimum 1/8 inch diameter; "Natural"
rubber or neoprene gasket seals.
M Hydrant shoe with 6-inch cast or ductile-iron pipe diameter inlet, flanged, swivel or
slip joint with harnessing lugs for restrained joints. Underground flanging shall
incorporate minimum of six, full, 3/4-inch stainless steel bolts or four 5/8-inch
diameter stainless steel bolts. All bolts and nuts shall be stainless steel.
N Provide traffic model hydrants equipped with safety flange on hydrant barrel and stem.
Equip body of hydrant with breakable flange, or breakable bolts, above finish grade.
0 Lubricants: Food grade oil or grease meeting requirements of FDA 21CFR178.3570
and manufactured with FDA approved oxidation inhibitors.
P Hydrant Painting:
1. COLOR CODE (BONNETS)
Main Size
6" and less Gloss White Code No 225A120
8" Safety Orange Code No 225A122
10" and 12" John Deere Green Code No 225A133
16" and 20" John Deere Yellow Code No 225A138
22" and up Safety Red Code No 225A123
06/2014 02514-3 of 6
CITY OF PEARLAND FIRE HYDRANT ASSEMBLY
2. COLOR CODE
Fire Hydrant Barrel Safety Blue Code No 225A120
Fire Hydrant Caps (Same as Bonnet Color)
Q Shop coated as follows:
1. Exterior Above Traffic Flange (including bolts and nuts)
a. Surface Preparation: SSPC-SP10 (NACE 2);near white blast cleaned
surface.
b. Fire hydrants shall be power coated with zinc rich primer followed by a
polyester powder coating of 10 to 12 mils, shall meet all the
requirements of ANSI/AWWA C-550 (latest edition) and AAMA
2604.
2. Exterior Below Traffic Flange:
a. Surface Preparation: SSPC-SP 10 (NACE 2); near white blast cleaned
surface.
b. Fire hydrants shall be power coated with zinc rich primer followed by a
polyester powder coating of 10 to 12 mils, shall meet all the
requirements of ANSI/AWWA C-550 (latest edition) and AAMA
2604.
3. Interior Surfaces Above and Below Main Valve:
a. All materials used for internal coating of hydrant interior ferrous
surfaces must conform to ANSI/NSF Standard 61 as suitable for
contact with potable water as required by TCEQ, Chapter 290,
Subchapter D: Rules and Regulations for Public Water Systems.
b. Surface Preparation: SSPC-SP 10 (NACE 2); near white blast cleaned
surfaces.
c. Coating: Powder coating in accordance with manufacturer's
recommendation.
4. General Coating Requirements:
a. Coatings: Applied in strict accordance with manufacturer's
recommendations. No requirements of this specification shall cancel or
supersede written directions and recommendations of specific
manufacturer so as to jeopardize integrity of applied system.
b. Hydrant supplier shall furnish an affidavit of compliance that all
materials and work furnished complies with requirements of this
specification and applicable standards referenced herein.
2.02 HYDRANT PERFORMANCE STANDARDS
A Hydraulic Performance Standards:
1. Provide hydrants capable of a free discharge of 1500 gpm or greater from
single pumper nozzle at a hydrant inlet static pressure not exceeding 20 PSIG
as measured at or corrected to hydrant inlet at its centerline elevation.
2. Provide hydrants capable of a discharge of 1500 gpm or greater from single
pumper nozzle at a maximum permissible head loss of 8.0 psig (when
06/2014 02514-4 of 6
CITY OF PEARLAND FIRE HYDRANT ASSEMBLY
corrected for inlet and outlet velocity head)for an inlet operating pressure not
exceeding 37 psig as measured at or corrected to hydrant inlet at its centerline
elevation.
-B Hydraulic Performance Testing: AWWA C502; conduct certified pressure loss and
quantity of flow test by qualified testing laboratory on production model(5-foot bury
length)of hydrant(same catalog number)proposed for certification. Submit certified
test report containing following information:
1. Date of test, no more than five years prior to date of proposed use, on fire
hydrant with similar hydraulic characteristics.
2. Name, catalog number, place of manufacture, and date of production of
hydrant(s) tested.
3. Schematic drawing of testing apparatus, containing dimensions of piping
elements including:
a. Inside diameter and length of inlet piping.
b. Distance from flow measuring points to pressure measurement point.
c. Distance from flow and pressure monitoring points to hydrant inlet.
d. Distance from pressure monitoring point to nozzles.
e. Inside diameter and length of discharge tubing.
4. Elevation of points of measurement, inlet, and reports, or certificates
documenting accuracy of measuring devices used in test.
5. Conduct test on at least three separate hydrants of same fabrication design.
Inlet water temperature: 70° F+ 5° F.
C Provide hydrants equipped with breakable barrel feature and breakable valve stem
coupling such that vehicular impact will result in clean and complete break of barrel
and valve stem at breakable feature. Provide hydrant shutoff valve which remains
closed and tight against leakage upon impact.
2.03 LEADS
A Branches(Leads): Conform to requirements of Section 02634—Ductile-Iron Pipe and
Fittings, Section 02635 — Steel Pipe and Fittings, Section 02534 — PVC Pipe, and
section 02532W-HDPE.
3.0 EXECUTION
3.01 INSTALLATION
A Set fire hydrant plumb and brace at locations and grades as shown on Plans. When
barrel of hydrant passes through concrete slab, place a piece of standard sidewalk
expansion joint material, 3/4 inch thick, around section of barrel passing through
concrete.
B Locate nozzle centerline minimum 18 inches above finish grade.
C Place 12-inch x 12-inch yellow indicators (plastic, sheet metal, plywood, or other
material approved by Engineer) on pumper nozzles of new or relocated fire hydrants
06/2014 02514-5 of 6
CITY OF PEARLAND FIRE HYDRANT ASSEMBLY
installed on new mains not in service. Remove indicators after new main is tested and
approved by Engineer.
D Do not cover drain ports when placing concrete thrust block.
E Lubricate hydrants with food grade oil or with grease meeting requirements of FDA
21CFR178.3570 and manufactured with FDA approved oxidation inhibitors.
F Accomplish replenishment of lubricant for hydrant working parts without removing
hydrant bonnet. Store lubricant system in reservoir. Lubricate bearing surfaces and
working parts during normal operation of fire hydrant.
G All changes in profile from approved plans due to obstructions not shown on plans
which require a change in depth of bury of fire hydrant shall be approved in writing by
Engineer for design prior to installation of hydrant. Any adjustment required in flow
line of water main or to barrel length of fire hydrant shall be incidental to unit price of
fire hydrant and no separate payment shall be made for such adjustments.
H Remove and dispose of or salvage fire hydrants shown on Plans.
I Owner may,at any time prior to or during installation of hydrants for a specific project,
randomly select a furnished hydrant for disassembly and laboratory inspection, at
Owner's expense,to verify compliance with Owner's requirements. If such hydrant is
found to be non-compliant, replace at Contractor's expense, all or a portion of
furnished hydrants with hydrants that comply with Owner's requirements.
J Install leads in accordance with Section 02510—Water Mains.
END OF SECTION
06/2014 02514-6 of 6
CITY OF PEARLAND VALVE BOXES,METER BOXES,
AND METER VAULTS
Section 02520
VALVE BOXES, METER BOXES,AND METER VAULTS
1.0 GENERAL
1.01 SECTION INCLUDES
A Valve boxes for water service.
B Meter boxes for water service.
C Meter vaults for water service.
D References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350— Submittals
3. Section 03300—Cast-in-Place Concrete
4. Section 02542—Concrete Manholes and Accessories
5. Section 02318—Excavation and Backfill for Utilities
6. Section 01140—Contractor's Use of Premises
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item, no separate payment will be made for valve boxes
under this Section. Include cost in Bid Items for which this Work is a component.
B No separate payment will be made for installation of meter boxes furnished by the
Owner under this Section. Include cost of installation of meter boxes in Bid Items for
which the Work is a component.
C Measurement for installation of meter vaults is on a per each basis for each meter vault
type and size,complete in place. Payment includes all labor and materials required to
complete installation as indicated on Plans.
D Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit manufacturer's product data for following items for approval:
1. Each type of valve box and lid.
2. Each type of meter box and cover.
3. Each type of meter vault frame and cover.
06/2014 02520- 1 of 4
CITY OF PEARLAND VALVE BOXES,METER BOXES,
AND METER VAULTS
C Submit Shop Drawings for cast-in-place meter vaults for approval if proposed
construction varies from Plans.
D Submit manufacturer's certification that meter boxes purchased for Work meet the
requirements of this Section.
2.0 PRODUCTS
2.01 VALVE BOXES
•
A Provide adjustable, cast-iron, screw-type, valve boxes as manufactured by Bass and
Hays Foundry,Inc.,or approved equal. Design of valve box shall minimize stresses on
valve imposed by loads on box lid.
B Cast the word"WATER" into lid, 1/2 inch in height and raised 3/32 inch, for valves
serving potable water lines.
C Provide 6-inch PVC, Class 150, DR 18, riser pipes.
D Concrete for valve box placement:
1. For locations in new concrete pavement,use strength and mix design of new
pavement.
2. For other locations, use class "A" concrete, with minimum compressive
strength of 3000 psi, conforming to requirements of Section 03300—Cast-in-
Place Concrete.
2.02 METER BOXES
A Refer to City of Pearland Standard Details or contact the Public Works Depai nnent for
list of acceptable products.
2.03 METER VAULTS
A Meter vaults may be constructed of precast concrete, cast-in-place concrete, or solid
masonry unless a specific type of construction is required by Plans.
B Concrete for meter vaults: Class A concrete, conforming to requirements of Section
03300—Cast-in-Place Concrete,with minimum compressive strength of 4000 psi at 28
days.
C Vaults for meters 3" and greater shall be procured through the City's utility billing
department.
3.0 EXECUTION
3.01 EXAMINATION
06/2014 02520-2 of 4
CITY OFPEARLAND VALVE BOXES,METER BOXES,
AND METER VAULTS
A Obtain approval from the City Engineer or designee for location of meter vault.
B Verify lines and grades are correct.
C Verify compacted subgrade will support loads imposed by vaults.
3.02 VALVE BOXES
A Provide riser pipe with suitable length for depth of cover indicated on Plans or to
accommodate actual finish grade.
B Install adjustable valve box and riser piping plumbed in a vertical position. Provide 6
inches telescoping freeboard space between riser pipe top butt end,and interior contact
flange of valve box, for vertical movement damping. Riser may rest on valve flange,
or provide suitable footpiece to support riser pipe.
C Paint covers of new valve boxes as directed by the Owner.
3.03 METER BOXES
A Install plastic boxes in accordance with manufacturer's instructions.
B Construct concrete meter boxes to dimensions shown on Plans.
C Adjust top of meter boxes to conform to cover elevations specified in this Section,
3.05 "Frame and Cover for Meter Vaults".
B Do not locate under paved areas unless approved by Engineer. Use approved traffic-
type box with cast iron lid when meter must be located in paved areas.
3.04 METER VAULTS
A Construct concrete meter vaults to dimensions and requirements shown on Plans. Do
not cast in presence of water. Make bottom as uniform as practicable.
B Precast Meter Vaults:
1. Install precast vaults in accordance with manufacturer's recommendations. Set
level on a minimum 3 inch thick bed of sand conforming to the requirements of
Section 02318 —Excavation and Backfill for Utilities.
2. Seal lifting holes cement-sand mortar or non-shrink grout.
C Meter Vault Floor Slab:
1. Construct floor slabs of 6-inch-thick reinforced concrete. Slope floor 1/4 inch
per foot toward sump. Make sump 12 inches in diameter,or 12 inches square,
and 4 inches deep, unless other dimensions are required by Plans. Install
dowels at maximum of 18 inches,center-to-center,or install mortar trench for
keying walls to floor slab.
2. Precast floor slab elements may be used for precast vault construction.
06/2014 02520-3 of 4
CITY OF PEARLAND VALVE BOXES,METER BOXES,
AND METER VAULTS
3.05 FRAME AND COVER FOR METER VAULTS
A Diamond Plate Aluminum as follows:
1. In unpaved areas,set top of meter box or meter vault cover 2 to 3 inches above
natural grade.
2. In sidewalk areas,set top of meter box or meter vault cover 1/2 to 1 inch above
adjacent concrete.
3.06 CLEAN-UP AND RESTORATION
A Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises
B Backfill and compact in accordance with Section 02318—Excavation and Backfill for
Utilities.
C In unpaved areas, slope backfill around meter boxes and vaults to provide a uniform
slope 1 to 5 from top to natural grade.
D Meter boxes are not allowed in sidewalk.
END OF SECTION
06/2014 02520-4 of 4
CITY OF PEARLAND GRAVITY SANITARY SEWERS
Section 02530
GRAVITY SANITARY SEWERS
1.0 GENERAL
1.01 SECTION INCLUDES
A Gravity sanitary sewers and appurtenances, including cleanouts, stacks, service
connections, and reconnections.
B References to Technical Specifications:
1. Section 02415 —Augering Pipe or Casing for Sewers
2. Section 01200—Measurement and Payment Procedures
. 3. Section 01350—Submittals
4. Section 01450—Testing Laboratory Services
5. Section 01500—Temporary Facilities and Controls
6. Section 015.7.0—Trench Safety System
7. Section 02318—Excavation and Backfill for Utilities
8. Section 01564—Control of Ground Water and Surface Water
9. Section 02220— Site Demolition
10. Section 01140 - Contractor's Use of Premises
C Reference Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D1784,"Standard Specification for Rigid Poly Vinyl Chloride
(PVC) Compounds and Chlorinated Poly Vinyl Chloride (CPVC)
Compounds"
b. ASTM F 477,"Standard Specification for Elastomeric Seals(Gaskets)
for Joining Plastic Pipe"
c. ASTM D 3034, "Standard Specification for Type PSM Poly Vinyl
Chloride (PVC) Sewer Pipe and Fittings"
d. ASTM F 679, "Standard Specification for Poly Vinyl Chloride(PVC)
Large-Diameter Plastic Gravity Sewer Pipe and Fittings"
e. ASTM F 949, "Standard Specification for Poly Vinyl Chloride(PVC)
Corrugated Sewer Pipe with a Smooth Interior and Fittings"
f. ASTM D 794,"Standard Specification for Poly Vinyl Chloride(PVC)
Profile Gravity Sewer Pipe and Fittings Based on Controlled Inside
Diameter"
g. ASTM D 2241,"Standard Specification for Poly Vinyl Chloride(PVC)
Pressure-Rated Pipe (SDR Series)"
h. ASTM D 3212,"Standard Specification for Joints for Drain and Sewer
Plastic Pipes Using Flexible Elastomeric Seals"
i. ASTM D 3139,"Standard Specification for Joints for Plastic Pressure
Pipes Using Flexible Elastomeric Seals"
j. ASTM D 2444, "Standard Test Method for Determination for the
Impact Resistance of Thermoplastic Pipe and Fittings by Means of a
Tup (Falling Weight)"
4/2013 02530- 1 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
k. ASTM F 714, "Standard Specification for Polyethylene (PE) Plastic
Pipe (SDR-PR)Based on Outside Diameter"
1. ASTM D 2657, "Standard Practice for Heat Fusion Joining and
Polyolefin Pipe and Fittings"
m. ASTM D 1248, "Standard Specification for Polyethylene Plastics
Extrusion Materials for Wire and Cable"
n. ASTM D 3350, "Standard Specification for Polyethylene,Plastic Pipe
and Fittings Materials"
o. ASTM D 3681, "Standard Test Method for Chemical Resistance of
Fiberglass (Glass-Fiber Reinforced Thermosetting-Resin) Pipe in a
Deflected Condition"
p. ASTM D 4161, "Standard Specification for Fiberglass (Glass-Fiber-
Reinforced Thermosetting-Resin) Pipe Joints Using Flexible
Elastomeric Seals"
q. ASTM D 3262, "Standard Specification for Fiberglass (Glass-Fiber-
Reinforced Thermosetting-Resin) Sewer Pipe"
r. ASTM D 3754, "Standard Specification for Fiberglass (Glass-Fiber-
Reinforced Thermosetting-Resin)Sewer and Industrial Pressure Pipe"
s. ASTM D 618, "Standard Practice for Conditioning Plastics for
Testing"
t. ASTM C 828, "Standard Test Method for Low-Pressure Air Test of
Vitrified Clay Pipe Lines"
u. ASTM C 924, "Standard Practice for Testing Concrete Pipe Sewer
Lines by Low-Pressure Air Test Method"
v. ASTM F 1417, "Standard Test Method for Installation Acceptance of
Plastic Gravity Sewer Lines Using Low-Pressure Air"
2. American Water Works Association(AWWA)
a. AWWA C 900 Polyvinyl Chloride (PVC) Pressure Pipe,4"— 12" for
Water Distribution
b. AWWA C 905 Polyvinyl Chloride (PVC) Water Transmission Pipe,
Nominal Diameters, 14in. Through 36 in.
3. Plastic Pipe Institute (PPI)
a. PPI TR3,"Policies and Procedures for Developing Hydrostatic Design
Basis (HDB), Pressure Design Basis (PDB), Strength Design Basis
(SDB), and Minimum Required Strength (MRS) Ratings for
Thermoplastic Piping Materials or Pipe"
4. Texas Commission on Environmental Quality(TCEQ)
5. Texas Administrative Code (TAC)
1.02 MEASUREMENT AND PAYMENT
A Measurement of pipe installed at depths 8-feet and less by open cut method is on a
linear foot basis,measured and complete in place. Measurement will be taken along
the center line of the pipe from center line to center line of manholes,except for pipe
in casing or augered installation.
B Payment includes sewer pipe, excavation, bedding, backfill and special backfill,
shoring, earthwork, connections to existing manholes and pipe, stacks, cleanouts,
4/2013 02530-2 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
accessories, inspection and testing. Depths beyond 8'will be paid by 2 vertical feet
increments.
C Refer to Section 02415 —Augering Pipe or Casing for Sewers for measurement and
payment of augered sewer pipe.
D Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit inspection reports,testing reports, and video tape of television inspections as
directed by Engineer.
C Submit proposed methods, equipment, materials and sequence of operations for
Gravity Sanitary Sewer construction. Plan operations to minimize disruption of
utilities to occupied facilities or adjacent property.
1.04 QUALITY ASSURANCE
A Qualifications. Gravity Sanitary Sewer shall be watertight both in pipe-to-pipe joints.
and in pipe-to-manhole connections. Perform testing in accordance with this Section
and Section 01450—Testing Laboratory Services.
B Regulatory Requirements.
1. Install Gravity Sanitary Sewer to meet the minimum separation distance from
any potable water line,as scheduled below. The separation distance is defined
as the distance between the outside of the water pipe and the outside of the
sewer pipe. When possible, install new Gravity Sanitary Sewers no closer to
water lines than 9 feet in all directions. Where this separation distance cannot
be achieved,new Gravity Sanitary Sewers shall be installed as specified in this
Section.
2. Makenotification to the Engineer if water lines are uncovered during Gravity
Sanitary Sewer installation where the minimum separation distance cannot be
maintained.
3. Lay Gravity Sanitary Sewers lines in straight alignment and grade.
1.05 PROTECTION OF PEOPLE AND PROPERTY
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities
and Controls.
1.06 PRODUCT DELIVERY, STORAGE AND HANDLING
A Inspect pipe and fittings upon arrival of materials at the Project Site.
4/2013 02530-3 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
B Handle and store pipe materials and fittings to protect them from damage due to
impact,shock,shear,or free fall. Do not drag pipe and fittings along the ground. Do
not roll pipe unrestrained from delivery trucks.
C Use mechanical means to move or handle pipe. Employ acceptable clamps, rope or
slings around the outside barrel of pipe and fittings. Do not use hooks,bars,or other
devices in contact with the interior surface of the pipe to lift or move lined pipe
2.0 PRODUCTS
2.01 GASKET MATERIAL FOR USE IN POTENTIALLY CONTAMINATED AREAS
A Gravity Sanitary Sewer pipes to be installed in potentially contaminated areas,
especially where free product is found near the elevation of the proposed sewer,shall
have the following Gasket Material for the noted contaminants:
I
CONTAMINANT GASKET MATERIAL REQUIRED
Petroleum(diesel, gasoline) -Nitrile Rubber
contaminants As recommended by the pipe manufacturer
2.02 POLYVINYL CHLORIDE (PVC) PIPE
A Use PVC compounds in the manufacture of pipe that contain no ingredient in an
amount that has been demonstrated to migrate into water in quantities considered to
be toxic.
B Furnish PVC pressure pipe manufactured from Class 12454-A or Class 12454-B virgin
PVC compounds as defined in ASTM D 1784. Use compounds qualifying for a
rating of 4000 psi for water at 73.4° F per requirements of PPI TR3. Provide pipe
which is homogeneous throughout, free of voids, cracks, inclusions, and other
defects, uniform as commercially practical in color, density, and other physical
properties. Deliver pipe with surfaces free from nicks and scratches with joining
surfaces of spigots and joints free from gouges and imperfections which could cause
leakage. All pipe used for gravity sanitary sewer shall be green.
C Gaskets:
1. Gaskets shall meet the requirements of ASTM F477. When no contaminant is
identified,use elastomeric factory-installed gaskets to make joints flexible and
watertight.
D Lubricant for rubber-gasketed joints: Water soluble, non-toxic, non-objectionable in
taste and odor imparted to fluid, non-supporting of bacteria growth, having no
deteriorating effect on PVC or rubber gaskets.
4/2013 02530-4 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
E PVC Gravity Sanitary Sewer pipe shall be green in color and shall be in accordance
with the provisions in the following table:
WALL PRODUCT ASTM SDR(MAX.)/ DIAMETER
TYPE MANUFACTURER OPTIONS DESIGNATION STIFFNESS SIZE
(MIN.) RANGE
Solid J-M Pipe Approved D 3034 SDR 26/PS 115 6"to 15"
CertainTeed
Can-Tex Approved F 679 SDR 26/PS 115 18"to 48"
Carlon Approved AWWA C900 DR 18/N/A*** 4"to 12"
Diamond _
Approved AWWA C905 DR 18/N/A*** 14"to 36"
Profile* Contech A-2000** Only when F 949 N/A/50 psi 12"to 36"
ETI Ultra-Rib included in F 794 N/A/46 psi 12"to 48"
the Bid
Lamson Vylon Schedule F 794 N/A/46 psi 21"to 48"
* Allowed to be used where there are no service taps.
** Allowed to be used to a maximum depth of 10' only.
***For water-sewer separation requirements unless specifically noted in Bid Schedule.
F When solid wall PVC pipe 18 inches to 27 inches in diameter is required in SDR 26,
provide pipe conforming to ASTM F 679,except provide wall thickness as required
for SDR 26 and pipe strength of 115 psi.
G For Gravity Sanitary Sewers up to 12 inch diameter crossing over waterlines, or
crossing under waterlines with less than 2 feet separation,provide minimum 150 psi
pressure-rated pipe conforming to ASTM D 2241 with suitable PVC adapter
couplings.
H Joints: Spigot and integral wall section bell with solid cross section elastometric or
rubber ring gasket conforming to requirements of ASTM D 3212 and ASTM F 477,
or ASTM D 3139 and ASTM F 477, shall be provided. Gaskets shall be factory-
assembled and securely bonded in place to prevent displacement. The manufacturer
shall test a sample from each batch conforming to requirements ASTM D 2444.
I Fittings: Provide PVC gravity sanitary sewer bends, tee, or wye fittings for new
sanitary sewer construction. PVC pipe fittings shall be full-bodied,either injection
molded or factory fabricated. Saddle-type tees,wye fittings,or solvent welds are not
acceptable.
2.03 HIGH DENSITY POLYETHYLENE(HDPE)SOLID AND PROFILE WALL PIPE
A Provide HDPE pipe as follows and only when listed as a Bid Item:
WALL PRODUCT ASTM PIPE DIAMETER
TYPE MANUFACTURER OPTIONS DESIGNATION STIFFNESS RANGE
(MIN) (INCHES)
Solid Wall Drisco 1000
Drisco 8600 Approved F 714 115 psi 8 to 10
Quail Pipe
4/2013 02530-5 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
Poly Pipe
Plexco
B Solid wall pipe shall be produced with plain end construction for heat joining (butt
fusion)conforming to ASTM D 2657. Utilize controlled temperatures and pressures
for joining to produce a fused leak-free joint.
C Pipe and Fittings: High density, high molecular weight polyethylene pipe material
meeting the requirements of Type III, Class C, Category 5,Grade P34,as defined in
ASTM D1248. Material meeting the requirements of cell classification in
accordance with ASTM D 3350 are also suitable for making pipe products under
these specifications.
D Gaskets:
1. Use gaskets meeting requirement of ASTM F 477. Use gasket molded into a
circular form or extruded to the proper section and then spliced into circular
form. When no contaminant is identified, use gaskets of a properly cured,
high-grade elastomeric compound. The basic polymer shall be natural rubber,
synthetic elastomer, or a blend of both.
E Lubricant. Use a lubricant for assembly of gasketed joints which has no detrimental
effect on the gasket or on the pipe, in accordance with manufacturer's
recommendations.
F Furnish pipe and fittings that are homogeneous throughout and free from visible
cracks,holes,foreign inclusions,or other injurious defects. Provide pipe as uniform
as commercially practical in color, opacity, density, and other physical properties.
2.04 CENTRIFUGALLY CAST FIBERGLASS PIPE
A Manufacturers
1. Pre-approved manufacturer for centrifugally cast fiberglass pipe is Hobas Pipe
USA, Inc.
B Materials
1. Resin Systems: The manufacturer shall use only polyester resin systems with a
proven history of performance in this particular application. The historical data
shall have been collected from applications of a composite material of similar
construction and composition as the proposed product.
2. Glass Reinforcements: The reinforcing glass fibers used to manufacture the
components shall be of highest quality commercial grade glass filaments with
binder and sizing compatible with impregnating resins.
3. Fillers: Silica sand or other suitable materials may be used.
4. Additives: Resin additives,such as pigments,dyes,and other coloring agents,
if used, shall in no way be detrimental to the performance of the product nor
shall they impair visual inspection of the finished products.
5. Rubber Gaskets: Supply from an approved gasket manufacturer in accordance
with ASTM F 477, when no contaminant is identified and suitable for the
service intended. Gaskets shall either be affixed to the pipe by means of a
4/2013 02530-6 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
suitable adhesive or shall be installed in such a manner so as to prevent the
gasket from rolling out of the pre-cut groove in the pipe or sleeve coupling.
6. The internal liner resin shall be suitable for service as sewer pipe,and shall be
highly resistant to exposure to sulfuric acid as produced by biological activity
from hydrogen sulfide gases. Pipe shall meet or exceed requirements of
ASTM D 3681.
C Pipes
1. Furnish pipes in the diameters specified and within the tolerances specified
below.
2. Manufacture pipe by the centrifugal casting process to result in a dense,
nonporous, corrosion-resistant, consistent composite structure to meet the
operating conditions as shown on the Plans.
3. Do not use stiffening ribs or rings.
D Couplings: Unless otherwise specified, the pipe shall be field connected with
fiberglass sleeve couplings that utilize elastomeric sealing gaskets as the sole means
to maintain joint watertightness. The joints must meet the performance requirements
of ASTM D 4161.
E Fittings: Flanges, elbows, reducers, tees, and other fittings shall be capable of
withstanding operating conditions when installed. They may be contact molded or
manufactured from mitered sections of pipe joined by glass fiber reinforced overlays.
F Manhole Connections: Provide a water stop flange (wall pipe) for connection to a
cast-in-place manhole base or other structure.
G Grout Ports: Provide grout ports in the wall of pipe when required. Provide plugs of
316 stainless steel or other corrosion-resistant material compatible with the pipe.
Grout port plugs shall be designed and installed to meet the test pressure of the pipe.
H Dimensions
1. Diameters:The actual outside diameter of the pipes shall be in accordance with
Table 3 of ASTM D 3262 for Gravity Sanitary Sewers, or ASTM D 3754 for
force mains.
2. Lengths: The pipe standard length will be approximately 20 feet. A maximum
of 10 percent of the lengths, excluding special order pipes,may be supplied in
random lengths.
3. Wall Thickness: The minimum average wall thickness shall be the stated
design thickness. The minimum single point thickness shall not be less than 90
percent of the stated design thickness.
4. End Squareness: Pipe ends shall be square to the pipe axis.
5. Tolerance of Fittings: The tolerance of the angle of an elbow and the angle
between the main and leg of a wye or tee shall be plus or minus 2 degrees. The
tolerance on the laying length of a fitting shall be plus or minus 2 inches.
Stiffness Classes
4/2013 02530-7 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
1. Stiffness class of FRP pipe shall satisfy design requirements,but shall not be
less than 46 psi, when used in direct bury operation; 36 psi, when installed
within a primary tunnel liner.
2. Stiffness class of FRP in a pipe jacking operation shall be governed either by
the ring deflection limitations or by a pipe design providing longitudinal
strength required by the jacking method and shall satisfy design requirements
stated below. Submit design calculations as required in Paragraph 1.05,
Submittals.
a. Pipe stress calculations based on jacking loads shall be provided by the
pipe supplier.
b. Ring deflection calculations shall conform to design requirements of 30
TAC Chapter 317.20 pertaining to flexible pipe used in Gravity
Sanitary Sewers. The pipe deflection calculations shall ensure that
predicted deflection will be less than 5 percent under long-term loading
conditions (soil prism load).for the highest density of soil overburden
and surcharge loads. Deflection on calculations shall be prepared using
long-term (drained) values for soil parameters contained in the
geotechnical investigation report for the Project, or other site-specific
data obtained by the Contractor as approved by the Engineer.
J Testing
1. Pipes shall be tested in accordance with ASTM D 3262 or ASTM D 3754, as
applicable, except that the factory hydrostatic pressure testing is not required.
2. Joints: Coupling joints shall be qualified per the tests of Section 7 of ASTM D
4161.
K Packaging, Handling, and Shipping
1. Packing, handling, and shipping should be done in accordance with the
manufacturer's recommendations.
L Installation
1. Install pipe and fittings in accordance with requirements of this Section.
2. The manufacturer must supply a suitable qualified field service representative
to be present periodically during the installation of pipe.
3. Pipe Bedding: Conform to requirements of Section 02318—Excavation and
Backfill for Utilities.
4. Pipe Handling: Use textile slings.
5. Jointing
a. Clean ends of pipe and coupling components.
b. Check pipe ends and couplings for damage. Correct any damage
found.
c. Coupling grooves must be completely free of dirt.
d. Apply joint lubricant to pipe ends and rubber seals of coupling. \Use
only lubricants approved by the pipe manufacturer.
e. Use suitable auxiliary equipment, such as a wire rope puller, to pull
joints together.
4/2013 02530-8 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
f. Do not exceed forces recommended by the manufacturer for coupling
pipe. If excessive force is required,remove coupling,determine source
of problem, and correct it.
g. In the process of jointing the pipe, do not allow the deflection angle to
exceed the deflection permitted by the manufacturer.
6. If pressure grouting of the pipe is conducted as part of a pipe jacked tunnel
installation,seal the grout holes with liner resin to a thickness equal to the pipe
liner thickness, or with a threaded plug for that purpose.
7. Tests: Conform to requirements of this Section.
2.05 INSPECTIONS.
A The Engineer reserves the right to inspect pipes or witness pipe manufacturing. Such
inspection shall in no way relieve the manufacturer of the responsibilities to provide
products that comply with the applicable standards and these Specifications.
B Manufacturer's Notification to Customer. Should the Engineer wish to witness the
manufacture of specific pipes, the manufacturer shall provide the Engineer with
adequate advance notice of when and where the production of those specific pipes
will take place.
C Failure to Inspect. Approval of the products or tests is not implied by the Engineer's
decision not to inspect the manufacturing,testing, or finished pipes.
2.06 TEST METHODS
A Conditioning. Conditioning of samples prior to and during tests are subject to
approval by the Engineer. When referee tests are required,condition the specimens
in accordance with Procedure A in ASTM D 618 at 73.4 degrees F plus or minus 3.6
degrees F(23 degrees C plus or minus 2 degrees C)and 50 percent relative humidity
plus or minus 5 percent relative humidity for not less than 40 hours prior to test.
Conduct tests under the same conditions of temperature and humidity unless
otherwise specified.
B Flattening. Flatten three specimens of pipe, prepared in accordance with Paragraph
2.05A, in a suitable press until the internal diameter has been reduced to 40 percent
of the original inside diameter of the pipe. The rate of loading shall be uniform and
at 2-inches per minute. The test specimens,when examined under normal light and
with the unaided eye, shall show no evidence of splitting, cracking, breaking, or
separation ofthe pipe walls or bracing profiles.
C Joint Tightness. Test for joint tightness in accordance with ASTM D 3212, except
replace the shear load transfer bars and supports with 6 inch wide support blocks that
can be either flat or contoured to conform to the pipe's outer contour.
D Purpose of Tests. The flattening and the joint tightness tests are not intended to be
routine quality control tests, but rather to qualify pipe to a specified level of
performance.
4/2013 02530-9 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
2.07 MARKING
A Mark each standard and random length of pipe in compliance with these Specifications
with the following information:
1. Pipe size
2. Pipe class
3. Production code
4. Material designation
3.0 EXECUTION
3.01 PREPARATION
A Employ a Trench Safety Plan as specified in Section 01570—Trench Safety Systems.
B Install and operate dewatering and surface water control measures in accordance with
Section 01564 - Control of Ground Water and Surface Water.
C Remove existing pavements and structures, including sidewalks and driveways, in
conformance with requirements of Section 02220—Site Demolition,as applicable.
3.02 DIVERSION PUMPING
A Install and operate required bulkheads, plugs, piping, and diversion pumping
equipment to maintain sewage flow and to prevent backup or overflow. Obtain
approval for diversion pumping equipment and procedures from the Engineer.
B Design piping,joints and accessories to withstand twice the maximum system pressure
or 50 psi, whichever is greater.
C No sewage shall be diverted into any area outside of the sanitary sewer.
D In the event of accidental spill or overflow, immediately stop the overflow and take
action to clean up and disinfect spillage. Promptly notify the Engineer so that
required reporting can be made to the TCEQ and the Environmental Protection
Agency by the Engineer.
3.03 INSPECTION AND TESTING
A Acceptance testing of sanitary sewers including:
1. Visual inspection of sewer pipes
2. Mandrel testing for flexible sewer pipes.
3. Leakage testing of sewer pipes.
4. Leakage testing of manholes.
B Performance Requirements:
1. Gravity sanitary sewers are required to have a straight alignment and uniform
grade between manholes.
4/2013 02530- 10 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
2. Flexible pipe,including"semi-rigid"pipe,is required to show no more than 5
percent deflection. Test pipe no sooner than 30 days after backfilling of a line
• segment but prior to final acceptance using a standard mandrel to verify that
installed pipe is within specified deflection tolerances.
3. Maximum allowable leakage for Infiltration or Exfiltration
a. The total exfiltration,as determined by a hydrostatic head test,shall not
exceed 50 gallons per inch diameter per mile of pipe per 24 hours at a
minimum test head of 2 feet above the crown of the pipe at the
upstream manhole or 2 feet above the groundwater elevation,
whichever is greater.
b. When pipes are installed more than 2 feet below the groundwater level,
an infiltration test shall be used in lieu of the exfiltration test. The total
infiltration shall not exceed 50 gallons per inch diameter per mile of
pipe per 24 hours. Groundwater elevation must be at least 2 feet above
the crown of the pipe at the upstream manhole.
c. Refer to Table 2530-1,Water Test Allowable Leakage,at the end of the
Section, for measuring leakage in sewers. Perform leakage testing to
verify that leakage criteria are met.
4. Perform air testing in accordance with requirements of this Section and the
Texas Natural Resources Conservation Commission requirements. Refer to
Table 02530-2, Time Allowed For Pressure Loss From 3.5 psig to 2.5 psig,
Table 02530-3,Minimum Testing Times for Low Pressure Air Test,and Table
02530-4,Vacuum Test Time Table, at the end of this Section.
C Gravity Sanitary Sewer Quality Assurance:
1. Repair, correct, and retest manholes or sections of pipe which fail to meet
specified requirements when tested.
2. Provide testing reports and video tape of television inspection as directed by
Engineer.
3. Upon completion of tape reviews by Engineer, Contractor will be notified
regarding final acceptance of the sewer segment.
D Sequencing and Scheduling:
1. Perform testing as work progresses. Schedule testing so that no more than
1000 linear feet of installed sewer remains untested at any one time.
2. Coordinate testing schedules with Engineer. Perform testing under observation
of Engineer.
E Deflection Mandrel:
1. Mandrel Sizing. The rigid mandrel shall have an outside diameter(O.D.)equal
to 95 percent of the inside diameter(I.D.) of the pipe. The inside diameter of
the pipe, for the purpose of determining the outside diameter of the mandrel,
shall be the average outside diameter minus two minimum wall thicknesses for
O.D. controlled pipe and the average inside diameter for I.D. controlled pipe,
dimensions shall be per appropriate standard. Statistical or other "tolerance
packages" shall not be considered in mandrel sizing.
2. Mandrel Design. The rigid mandrel shall be constructed of a metal or a rigid
plastic material that can withstand 200 psi without being deformed. The
4/2013 02530- 11 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
mandrel shall have nine or more"runners"or"legs"as long as the total number
of legs is an odd number. The barrel section of the mandrel shall have a length
of at least 75 percent of the inside diameter of the pipe. The rigid mandrel
shall not have adjustable or collapsible legs which would allow a reduction in
mandrel diameter during testing. A proving ring shall be provided and used for
modifying each size mandrel.
3. Proving Ring. Furnish a"proving ring"with each mandrel. Fabricate the ring
of 1/2 inch thick, 3-inch-wide bar steel to a diameter 0.02 inches larger than
approved mandrel diameter.
4. Mandrel Dimensions (5 percent allowance). Average inside diameter and
minimum mandrel diameter are specified in Table 02530-5,Pipe vs. Mandrel
Diameter,at the end of this Section. Mandrels for higher strength,thicker wall
• pipe or other pipe not listed in the table may be used when approved by the
Engineer.
F Exfiltration Test:
1. Water Meter: Obtain a transient water meter from the City for use when water
for testing will be taken from the City system. Conform to City requirements
for water meter use.
2. Test Equipment:
a. Pipe plugs.
b. Pipe risers where the manhole cone is less than 2 feet above highest
point in pipe or service lead.
G Infiltration Test:
1. Test Equipment:
a. Calibrated 90 degree V-notch weir.
b. Pipe plugs.
H Low Pressure Air Test:
1. Minimum Requirement for Equipment:
a. Control panel.
b. Low-pressure air supply connected to control panel.
c. Pneumatic plugs: Acceptable size for diameter of pipe to be tested;
capable of withstanding internal test pressure without leaking or
requiring external bracing.
d. Air hoses from control panel to:
1) Air supply.
2) Pneumatic plugs.
3) Sealed line for pressuring.
4) Sealed line for monitoring internal pressure.
2. Testing Pneumatic Plugs: Place a pneumatic plug in each end of a length of
pipe on the ground. Pressurize plugs to 25 psig;then pressurize sealed pipe to
5 psig. Plugs are acceptable if they remain in place against the test pressure
without external aids.
I Ground Water Determination:
4/2013 02530- 12 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
1. Equipment: Pipe probe or small diameter casing for ground water elevation
determination.
J Visual Inspection:
1. Check pipe alignment visually by flashing a light between structures. Verify if
alignment is true and no pipes are misplaced. In case of misalignment or
damaged pipe, remove and re-lay or replace pipe segment.
K Mandrel Testing:
1. Perform deflection testing on flexible and semi-rigid pipe to confirm pipe has
no more than 5 percent deflection. Mandrel testing shall conform to ASTM D
3034. Perform testing no sooner than 30 days after backfilling of line segment,
but prior to final acceptance testing of the line segment.
2. Pull the approved mandrel by hand through sewer sections. Replace any
section of sewer not passing the mandrel. Mandrel testing is not required for
stubs.
3. Retest repaired or replaced sewer sections.
L Leakage Testing:
1. Test Options:
a. Test Gravity Sanitary Sewer pipes for leakage by either exfiltration or
infiltration methods, as appropriate, or with low pressure air testing.
b. Test new or rehabilitated sanitary sewer manholes with water or low
pressure air. Manholes tested with low pressure air shall undergo a
physical inspection prior to testing.
c. Leakage testing shall be performed after backfilling of a line segment,
and prior to tie-in of service connections.
d. If no installed piezometer is within 500 feet of the sewer segment,
Contractor shall provide a temporary piezometer for this purpose.
2. Compensating for Ground Water Pressure:
a. Where ground water exists,install a pipe nipple at the same time sewer
line is placed. Use a 1/2-inch capped pipe nipple approximately 10
inches long. Make the installation through manhole wall on top of the
sewer line where line enters manhole.
b. Immediately before performing line acceptance test,remove cap,clear
pipe nipple with air pressure,and connect a clear plastic tube to nipple.
Support tube vertically and allow water to rise in the tube. After water
stops rising, measure height in feet of water over invert of the pipe.
Divide this height by 2.3 feet/psi to determine the ground water
pressure to be used in line testing.
3. Exfiltration test:
a. Determine ground water elevation.
b. Plug sewer in downstream manhole.
c. Plug incoming pipes in upstream manhole.
d. Install riser pipe in outgoing pipe of upstream manhole if highest point
in service lead (house service) is less than 2 feet below bottom of
manhole cone.
4/2013 02530- 13 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
e. Fill sewer pipe and manhole or pipe riser,if used,with water to a point
2-1/2 feet above highest point in sewer pipe, house lead, or ground
water table, whichever is highest.
f. Allow water to stabilize for one to two hours. Take water level reading
to determine drop of water surface, in inches, over a one-hour period,
and calculate water loss (1 inch of water in 4 feet diameter manhole
equals 8.22 gallons) or measure the quantity of water required to keep
water at same level. Loss shall not exceed that calculated from
allowable leakage according to Table 02530-1 at the end of this
Section.
4. Infiltration test: Ground water elevation must be not less than 2.0 feet above
highest point of sewer pipe or service lead(house service).
a. Determine ground water elevation.
b. Plug incoming pipes in upstream manhole.
c. Insert calibrated 90 degree V-notch weir in pipe on downstream
manhole.
d. Allow water to rise and flow over weir until it stabilizes.
e. Take five readings of accumulated volume over a period of 2 hours and
use average for infiltration. The average must not exceed that
calculated for 2 hours from allowable leakage according to the Table
02530-1 at the end of this Section.
5. Low Air Pressure Test: When using this test conform to ASTM C 828,ASTM
C 924, or ASTM F 1417, as applicable, with holding time not less than that
listed in Table 02530-2.
a. Air testing for sections of pipe shall be limited to lines less than 36-
inch average inside diameter.
b. Lines 36-inch average inside diameter and larger shall be tested at each
joint. The minimum time allowable for the pressure to drop from 3.5
pounds per square inch gauge to 2.5 pounds per square inch during a
joint test shall be 10 seconds, regardless of pipe size.
c. For pipe sections less than 36-inch average inside diameter:
1) Determine ground water level.
2) Plug both ends of pipe. For concrete pipe, flood pipe and
allow 2 hours to saturate concrete. Then drain and plug
concrete pipe.
3) After a manhole-to-manhole section of sanitary sewer main
has been sliplined and prior to any service lines being
connected to new liner, plug liner at each manhole with
pneumatic plugs.
4) Pressurize pipe to 4.0 psig. Increase pressure 1.0 psi for
each 2.3 feet of ground water over highest point in system.
Allow pressure to stabilize for 2 to 4 minutes. Adjust
pressure to start at 3.5 psig (plus adjustment for ground
water table). Refer to Table 02530-2 at the end of this
Section.
5) To determine air loss, measure the time interval for
pressure to drop to 2.5 psig. The time must exceed that
4/2013 02530- 14 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
listed in the Table 02530-2 at the end of this Section for
pipe diameter and length. For sliplining, use diameter of
carrier pipe.
6. Retest: Any section of pipe which fails to meet requirements shall be repaired
and retested.
M Test Criteria Tables
1. Exfiltration and Infiltration Water Tests: Refer to Table 02530-1,Water Test
Allowable Leakage, at the end of this Section.
2. Low Pressure Air Test:
a. Times in Table 02530-2, Time Allowed For Pressure Loss From
3.5 psig to 2.5 psig, at the end of this Section, are based on the
equation from TCEQ Design Criteria for Sewerage Systems:
317.2(a)(4)(B).
T= 0.0850(D)(K)/(Q)
Where:
T = Time for pressure to drop 1.0 pounds per square
inch gauge in seconds
K = 0.000419 DL, but not less than 1.0
D = Average inside diameter in inches
L = Length of line of same pipe size in feet
Q = Rate of loss, 0.0015 ft3/min./sq. ft. internal surface
b. Since a K value of less than 1.0 shall not be used, there are
minimum testing times for each pipe diameter as given in Table
02732-3, Minimum Testing Times for Low Pressure Air Test.
Notes: 1. When two sizes of pipe are involved, the time shall
be computed by the ratio of lengths involved.
2. Line with a 27-inch average inside diameter and
larger maybe air tested at each joint.
3. Lines with an average inside diameter greater than
36 inches must be air tested for leakage at each joint
4. If the joint test is used, a visual inspection of the
joint shall be performed immediately after testing.
5. For joint test, the pipe is to be pressurized to 3.5 psi
greater than the pressure exerted by groundwater
above the pipe. Once the pressure has stabilized,the
minimum times allowable for the pressure to drop
from 3.5 pounds per square inch gauge to 2.5
pounds per square inch gauge shall be 10 seconds.
N Leakage Testing for Manholes
4/2013 02530- 15 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
1. After completion of manhole construction,wall sealing, or rehabilitation,but
prior to backfilling, test manholes for water tightness using hydrostatic or
vacuum testing procedures.
2. Plug influent and effluent lines, including service lines, with suitably-sized
pneumatic or mechanical plugs. Ensure plugs are properly rated for pressures
required for test; follow manufacturer's safety and installation
recommendations. Place plugs a minimum of 6 inches outside of manhole
walls. Brace inverts to prevent lines from being dislodged if lines entering
manhole have not been backfilled.
3. Vacuum testing:
a. Install vacuum tester head assembly at top access point of manhole
and adjust for proper seal on straight top section of manhole
structure. Following manufacturer's instructions and safety
precautions,inflate sealing element to the recommended maximum
inflation pressure; do not over-inflate.
b. Evacuate manhole with vacuum pump to 10 inches mercury(Hg),
disconnect pump, and monitor vacuum for the time period
specified in Table 02530-4, Vacuum Test Time Table.
c. If the drop in vacuum exceeds 1 inch Hg over the specified time
period tabulated above,locate leaks,complete repairs necessary to
seal manhole and repeat test procedure until satisfactory results are
obtained.
4. Hydrostatic exfiltration testing shall be performed as follows:
a. Seal wastewater lines coming into the manhole with an internal
pipe plug. Then fill the manhole with water and maintain it full for .
at least one hour.
b. The maximum leakage for hydrostatic testing shall be 0.025 gallons
per foot diameter per foot of manhole depth per hour.
c. If water loss exceeds amount tabulated above, locate leaks, complete
repairs necessary to seal manhole and repeat test procedure until
satisfactory results are obtained.
3.04 BACKFILL
A Backfill and compact soil in accordance with Section 02318—Excavation and Backfill
for Utilities.
B Backfill the trench in specified lifts only after pipe installation is approved by the
Engineer.
3.05 CLEAN UP AND RESTORATION
A Perform clean up and restoration in and around construction zone in accordance with
Section 01140 - Contractor's Use of Premises.
4/2013 02530- 16 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
3.06 PROTECTION OF THE WORK
A Maintain gravity sanitary sewer installations in good condition until completion of the
work.
Table 02530-1
WATER TEST ALLOWABLE LEAKAGE '
DIAMETER OF VOLUME PER INCH OF DEPTH ALLOWANCE LEAKAGE*
RISER OR STACK
IN INCHES INCH GALLONS PIPE SIZE IN GALLONS/MINUTE
INCHES PER 100 FT.
1 0.7854 .0034 6 0.0039
2 3.1416 .0136 8 0.0053
2.5 4.9087 .0212 10 0.0066
3 7.0686 .0306 12 0.0079
4 12.5664 .0306 15 0.0099
5 19.6350 .0544 18 0.0118
6 28.2743 .1224 21 0.0138
8 50.2655 .2176 24 0.0518
27 0.0177
30 0.0197
36 0.0237
42 0.0276
For other diameters, multiply square of diameters by Equivalent to 50 gallons per inch
value for 1" diameter inside diameter per mile per 24 hours
* Allowable leakage rate shall be reduced to 10 gallons per inch of inside diameter per mile per 24
hours, when sewer is identified as located within the 25-year flood plain.
4/2013 02530- 17 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
Table 02530-2
ACCEPTANCE TESTING FOR SANITARY SEWERS
TIME ALLOWED FOR PRESSURE LOSS FROM 3.5 PSIG TO 2.5 PSIG
Pipe Min. Length Time for Specification Time for Length(L)Shown(min:sec)
Diam Time for Min. Longer
Le
(in) (min:sec). Time(ft) (0) 100 ft 150 ft 200 ft 250 ft 300 ft 350 ft 400 ft 450 ft 500 ft 550 ft 600 ft
6 5:40 398 0.8548 5:40 5:40 5:40 5:40 5:40 5:40 5:42 6:25 7:07 7:50 8:33
8 7:33 298 1.5196 7:33 7:33 7:33 7:33 7:36 8:52 10:08 11:24 12:40 13:36 15:12
10 9:27 239 2.3743 9:27 9:27 9:27 9:54 11:52 13:51 15:50 17:48 19:47 21:46 23:45
12 11:20 199 3.4190 11:20 11:20 11:20 14:15 17:06 19:57 22:48 25:39 28:30 31:20 34:11
15 14:10 159 5.3423 14:10 14:10 17:48 22:16 26:43 31:10 35:37 40:04 44:31 48:58 53:25
18 17:00 133 7.6928 17:00 19:14 25:39 32:03 38:28 44:52 51:17 57:42 64:06 70:31 76:56
21 19:50 114 10.4708 19:50 26:11 34:54 43:38 52:21 61:05 69:48 78:32 87:15 95:59 104:42
24 22:40 99 13.6762 22:48 34:11 45:35 . 56:59 68:23 79:47 91:10 102:34 113:58 125:22 136:46
27 25:30 88 17.3089 28:51 43:16 57:42 72:07 86:33 100:58 115:24 129:49 144:14 158:40 173:05
30 28:20 80 21.3690 35:37 53:37 71:14 89:02 106:51 124:39 142:28 160:16 178:05 195:53 213:41
'33 31:10 72 25.8565 43:06 64:38 86:11 107:44 129:17 150:50 172:23 193:55 215:28 237:01 258:34
Table 02530-3
MINIMUM TESTING TIMES FOR LOW PRESSURE AIR TEST
PIPE MINIMUM LENGTH FOR TIME FOR
DIAMETER TIME MINIMUM TIME LONGER LENGTH
(INCHES) (SECONDS) (FEET) (SECONDS)
•
6 340 398 0.855 (L)
8 454 298 1.520 (L)
10 567 239 2.374 (L)
12 680 199 3:419 (L)
15 850 159 5.342 (L)
18 1020 133 7.693 (L)
21 1190 114 10.471 (L)
24 1360 100 13.676 (L)
27 1530 88 17.309 (L)
30 . 1700 80 21.369 (L)
33 1870 72 25.856 (L)
4/2013 02530- 18 of 20
CITY OF PEARLAND - GRAVITY SANITARY SEWERS
Table 02530-4
VACUUM TEST TIME TABLE
TIME IN SECONDS BY PIPE DIAMETER
DEPTH IN FEET
48" 60" 72"
4 10 13 16
8 20 26 32
12 30 39 48
16 40 52 64
20 50 65 80
24 , 60 78 96
* 5.0 6.5 8.0
*Add T times for each additional 2-foot depth.
(The values listed above have been extrapolated from ASTM C 924-85)
4/2013 02530- 19 of 20
CITY OF PEARLAND GRAVITY SANITARY SEWERS
Table 02530-5
PIPE VS. MANDREL DIAMETER
NOMINAL AVERAGE
MATERIAL AND SIZE I.D. MINIMUM MANDREL
WALL CONSTRUCTION (INCHES) (INCHES) DIAMETER(INCHES)
PVC-Solid(SDR 26) 6 5.764 5.476
8 7.715 7.329
10 9.646 9.162
PVC-Solid(SDR 35) 12 11.737 11.150
15 14.374 13.655
18 17.629 16.748
21 20.783 19.744
24 23.381 22.120
27 26.351 25.033
PVC-Profile(ASTM F 794) 12 11.740 11.153
15 14.370 13.652
18 17.650 16.768 _
21 20.750 19.713
24 23.500 22.325
27 26.500 25.175
30 29.500 28.025
36 35.500 33.725
_ 42 41.500 39.425
48 47.500 45.125
HDPE-Profile 18 _ 18.000 17.100
21 21.000 19.950
24 24.000 22.800
27 _ 27.000 25.650
30 _ 30.000 28.500
36 36.000 34.200
42 42.000 39.900
48 48.000 45.600
54 54.000 51.300
60 60.000 57.000
Fiberglass-Centrifugally Cast 12 12.85 11.822
(Class SN 46) 18 18.66 17.727
20 20.68 19.646
24 24.72 23.484
30 30.68 29.146
36 36.74 34.903
42 42.70 40.565
48 48.76 46.322
54 54.82 52.079
60 60.38 57.361
END OF SECTION
4/2013 02530-20 of 20
CITY OF PEARLAND SANITARY SEWER SERVICE LEADS
OR RECONNECTIONS
Section 02531
SANITARY SEWER SERVICE LEADS OR RECONNECTIONS
1.0 GENERAL
1.01 SECTION INCLUDES
A Installation of service stubs on new sanitary sewers serving areas where sanitary sewer
service did not previously exist.
B Reconnection of existing service connections alongparallel, replacement, or
rehabilitated sanitary sewers.
C References to Technical Specifications:
1. Section 01350—Submittals
2. Section 01760—Project Record Documents
3. Section 01500—Temporary Facilities and Controls
4. Section 01570—Trench Safety System
5. Section 01564—Control of Ground Water and Surface Water
6. Section 02318—Excavation and Backfill for Utilities
7. Section 02530—Gravity Sanitary Sewers
8. Section 01140—Contractor's Use of Premises
D Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 1784,"Standard Specification for Rigid Poly Vinyl Chloride
(PVC) Compounds and Chlorinated Poly Vinyl Chloride (CPVC)
Compounds"
b. ASTM D 3034, "Standard Specification for Type PSM Poly Vinyl
Chloride (PVC) Sewer Pipe and Fittings"
c. ASTM D 3212,"Standard Specification for Joints for Drain and Sewer
Plastic Pipes Using Flexible Elastomeric Seals"
1.02 MEASUREMENT AND PAYMENT
A Measurement for single, near-side service leads is on a per each basis, complete in
place.
B Measurement for double, near-side service leads is on a per each basis, completed in
place.
C Measurement for single,far-side service leads is on a per each basis,complete in place.
D Measurement for double, far-side service leads is on a per each basis, complete in
place.
02/2008 02531 - 1 of 6
CITY OF PEARLAND SANITARY SEWER SERVICE LEADS
OR RECONNECTIONS
E Payment for service leads includes service connections, couplings, clean-outs,
adapters, disconnecting existing services, reconnecting new service, fittings,
excavation, backfill, and testing.
F Measurement for sanitary sewer stacks up to 3 vertical feet is on a per each basis,
complete in place. Payment includes riser pipe,service connections,couplings,clean-
outs, adapters, disconnecting existing services, reconnecting new service, fittings,
excavation, backfill, and testing.
G Measurement for extra depth sanitary sewer stacks greater than 3 vertical feet is on a
vertical foot basis from the top of the receiving sewer to the invert of the service
connection, measured and complete in place. Payment includes excavation, pipe,
bedding, and backfill for that portion of the stack in excess of 3 feet.
H Measurement for sanitary sewer service reconnections with stacks located within 5 feet
of the sanitary sewer main centerline shall be per each reconnection,complete in place.
I Measurement for sanitary sewer service reconnections without stacks located within 5
feet of the sanitary sewer main centerline shall be per each reconnection, complete in
place.
J Payment for sanitary sewer service reconnections includes include service connections,
couplings, clean-outs, adapters disconnecting existing services, reconnecting new
service, fittings, excavation, backfill, and testing.
K Augered pipe for service leads will be paid as provided in Section 02415—Augering
Pipe or Casing for Sewer.
L One or more connections discharging into a common point are considered one service
connection. The Contractor shall not add service reconnections without approval of
the Engineer. The Engineer may require reconnections to be moved or relocated to
avoid having more than two single family units per reconnection.
M Measurement for abandonment of service connection is on a per each basis. No
additional payment will be made for abandonment of service connection unless
excavation is required beyond new or replacement sewer or service lead trench zone.
No separate payment will be made for excavation of sanitary sewer services within the
new or replacement sewer trench.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit product data for each pipe product,fitting, coupling and adapter.
C Submit field red lines documenting location of sanitary sewer stubs and reconnections
as installed,referenced to survey Control Points,under the provisions of Section 01760
02/2008 02531 -2 of 6
CITY OF PEARLAND SANITARY SEWER SERVICE LEADS
OR RECONNECTIONS
— Project Record Documents, 1.04C. Include location of utilities and structures
encountered or rerouted. Give horizontal dimensions, elevations, inverts and
gradients. Record the exact distance from each service connection to the nearest
downstream manhole.
1.04 PROTECTION OF PEOPLE AND PROPERTY
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
2.0 PRODUCTS
2.01 PVC SERVICE CONNECTION
A As stubouts, use PVC sewer pipe, 4-inch through 10-inch, conforming to ASTM D
1784 and ASTM D 3034, with a cell classification of 12454-B. The SDR (ratio of
diameter to wall thickness) shall be 26 for pipe 10 inches in diameter or less.
B PVC pipe shall be gasket jointed with gasket conforming to ASTM D3212.
C Provide service connection pipe in sizes shown on the Plans. For reconnection of
existing services, select service connection pipe diameter to match existing service
diameter.
D Provide a 6-inch service connection when more than one service discharges into a
single pipe.
E Connect service pipes to new parallel or replacement sewer mains with prefabricated,
full-bodied tee or wye fittings conforming to specifications for the sewer main pipe
material as specified in other Sections for all sewers up to 18 inches in diameter.
F Where new sewers are installed using pipe augering or tunneling, or where the new
sewer is greater than 18 inches in diameter, use Fowler"Inserta-Tee" to connect the
service to the new sewer main.
2.02 PIPE SADDLES
A Use pipe saddles only on rehabilitated sanitary sewer mains. Comply with Paragraph
2.01E for new parallel and replacement sanitary sewer mains.
02/2008 02531 -3 of 6
CITY OF PEARLAND SANITARY SEWER SERVICE LEADS
OR RECONNECTIONS
2.03 COUPLINGS AND ADAPTERS
A For connection between new PVC pipe stubout and existing service;4-, 6-, or 8-inch
diameter, use flexible adapter coupling consisting of a neoprene gasket and stainless
steel shear ring, with 1/2-inch stainless steel band clamps:
1. Fernco Pipe Connectors, Inc., Series 1055 with shear ring SR-8;
2. Band Seal by Mission Rubber Co., Inc.;
3. Approved equal.
B For connection between new PVC pipe stub out and new service,use rubber-gasketed
adapter coupling:
1. GPK Products, Inc., IPS & Sewer Adapter.
2. Approved Equal.
2.04 STACKS
A Provide stacks for service connections wherever the crown of the sewer is 8 feet or
more below finished grade.
B Construct stacks of the same material as the sanitary sewer and as shown on the Plans.
C Provide stacks of the same nominal diameter at the sanitary service line.
2.05 CLEAN-OUTS
A Install clean-outs at property line on each service connection as shown in detail on the
Plans.
2.06 PLUGS AND CAPS
A Seal the upstream end of unconnected sewer service stubs with rubber gasketed plugs
or caps of the same pipe type and size. Provide plugs or caps by GPK Products, Inc.,
or equal.
3.0 EXECUTION
3.01 PERFORMANCE REQUIREMENTS
A Accurately field locate service connections, whether in service or not, as pipe laying
progresses from downstream to upstream.
B Properly disconnect existing connections from the sewer and reconnect to the new
sewer, as described in this Section.
C Reconnect service connections, including those that go to unoccupied or abandoned
buildings, unless directed otherwise by the Engineer. Plug the service connection at
the R.O.W. for vacant lots.
02/2008 02531 -4 of 6
CITY OF PEARLAND SANITARY SEWER SERVICE LEADS
OR RECONNECTIONS
D Connect services 8 inches in diameter and larger to the sewer by construction of a
manhole.
3.02 PREPARATION
A Employ a Trench Safety Plan as specified in Section 01570—Trench Safety System.
B Install and operate necessary dewatering and surface water control measures in
accordance with requirements of Section 01564 — Control of Ground Water and
Surface Water.
C Provide a minimum of 48 hours notice to customers whose sanitary sewer service will
potentially be interrupted.
D Schedule Work so that reconnection of service lines can be completed within 24 hours
after disconnection.
E Where sewers are existing,field locate existing service connections,whether in service
or not. Use existing service locations for reconnection of service lines to new liner or
new sanitary sewer main.
F For new parallel and replacement sanitary sewer mains, complete testing and
acceptance of downstream sewers as applicable.
3.03 EXCAVATION AND BACKFILL
A Excavate and backfill in accordance with Section 02318—Excavation and Backfill for
Utilities.
3.04 RECONNECTION ON NEW SEWER
A Install the new service connection on the new sanitary sewer main for each service
connection.
B Remove and replace cracked, offset or leaking service line for up to 5 feet,measured
horizontally, from the centerline of the new sanitary sewer main.
C Make up the connection between the new main and the existing service line using PVC
sewer pipe and approved couplings, as shown on the Plans.
D Test service connections before backfilling.
E Embed the service connection and service line as specified for the new sanitary sewer
main at this location, and as shown on the Plans. Place and compact trench zone
backfill in compliance with Section 02318 —Excavation and Backfill for Utilities.
02/2008 02531 -5 of 6
CITY OF PEARLAND SANITARY SEWER SERVICE LEADS
OR RECONNECTIONS
3.05 INSTALLATION OF NEW SERVICE LEADS
A Install the new service connections on the new sanitary sewer main for each service
connection. Provide the length of stub indicated on the Plans. Install plug or cap on
the upstream end of the service stub as needed.
B Test service connections before backfilling.
C Embed the service connection and service line as specified for the new sanitary sewer
main at this location, and as shown on the Plans. Place and compact trench zone
backfill in compliance with Section 02318 —Excavation and Backfill for Utilities.
3.06 FIELD QUALITY CONTROL
A Test service reconnections and service stubs. Follow applicable procedures given in
Section 02530—Gravity Sanitary Sewers.
3.07 CLEAN-UP AND RESTORATION
A Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises.
3.08 PROTECTION OF THE WORK
A Protect and maintain all installations good condition until completion of Work.
B Replace installations by Contractor's operations at no cost to Owner.
C Do not allow sand, debris or runoff to enter sewer system.
END OF SECTION
02/2008 02531 -6 of 6
CITY OF PEARLAND HIGH DENSITY POLYETHYLENE (HDPE)
SOLID WALL PIPE FOR WATER
Section 02532W
HIGH DENSITY POLYETHYLENE (HDPE)
SOLID WALL PIPE FOR WATER
1.00 GENERAL
1.01 SECTION INCLUDES
A. Furnish labor,materials, equipment and incidentals necessary to install polyethylene
pipe, and complete installation in accordance with the Contract Documents. The
finished pipe shall be continuous over the entire length of the water line between
fittings and be free from defects.
B. Domestic water piping shall be approved by the Underwriters Laboratory and shall be
accepted by the State Fire Insurance Commission for use in water distribution
systems. HDPE water pipe shall bear the seal of approval (or"NSF"mark) of the
National Sanitation Foundation Testing Laboratory for potable water pipe.
C. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 02510—Water Mains
D. Standards: Comply with local governing regulations if more stringent than specified
herein. Piping shall meet the following standards and shall be a part of this Section as
if written here in their entirety.
1. American Society for Testing and Materials (ASTM) Standards:
a. ASTM F1473, Test Method for Notch Tensile Test to Measure the
Resistance to Slow Crack Growth of Polyethylene Pipes and Resins
b. ASTM D2122, Determining Dimensions of Thermoplastic Pipe and
Fittings
c. ASTM F2620, Standard Practice for Heat Fusion Joining of
Polyethylene Pipe and Fittings
d. ASTM D2837, Obtaining Hydrostatic Design Basis for Thermoplastic
Pipe Materials
e. ASTM D3035, Specification for Polyethylene (PE) Plastic Pipe (SDR-
PR) Based on Controlled Outside Diameter(up to 3-Inch IPS)
f. ASTM D3350, Specification for Polyethylene Plastics Pipe and
Fittings Material
g. ASTM F714, Specification for Polyethylene (PE) Plastic Pipe (SDR-
PR) Based on Outside Diameter(4-Inch IPS and larger)
2. American Water Works Association (AWWA) Standards:
a. AWWA C906, Polyethylene (PE) Pressure Pipe and Fittings, 4 through
64 Inches, for Water Distribution
b. AWWA M55, Polyethylene (PE) Pipe Design and Installation
04/2014 02532W- 1 of 5
CITY OF PEARLAND HIGH DENSITY POLYETHYLENE (HDPE)
SOLID WALL PIPE FOR WATER
1.02 MEASUREMENT AND PAYMENT
A. Unless indicated as a Bid Item, no separate payment will be made for HDPE pipe
under this Section. Include cost in Bid Items for water mains.
B. If HDPE pipe is included as a Bid Item, measurement will be based on the units
shown in Section 00300—Bid Proposal and in accordance with Section 01200—
Measurement and Payment Procedures.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350—
Submittals.
B. Submit Shop Drawings showing design of pipe and fittings indicating alignment and
grade, laying dimensions, fabrication, fittings, flanges, and special details.
C. Submit product quality, material sources, and field quality information in accordance
with this Section.
1.04 QUALITY ASSURANCE
A. Polyethylene pipe jointing shall be performed by personnel trained in the use of the
thermal butt-fusion equipment and recommended methods for new pipe connections.
Personnel directly involved with installing the new pipe shall have received training
in the proper methods for handling and installing the polyethylene pipe. Training
shall be performed by a qualified representative of the pipe manufacturer. The
Contractor shall maintain records of trained personnel, and shall certify that training
was received not more than 12 months before commencing construction.
1.05 DELIVERY AND STORAGE
A. Transport, handle, and store pipe and fittings as recommended by manufacturer.
B. If new pipe and fittings become damaged before or during installation, it shall be
repaired as recommended by the manufacturer or replaced as required by the Owner's
Project Representative at the Contractor's expense, before proceeding further.
C. Deliver, store, and handle other materials as required to prevent damage.
2.00 PRODUCTS
2.01 MATERIALS
A. Pipe: Polyethylene Plastic Pipe shall be high density polyethylene pipe (HDPE).
1. Solid wall high density polyethylene for pressure water pipe shall meet the
requirements of AWWA C906 "Polyethylene (PE)Pressure Pipe and Fittings,
4 through 64 Inches, for Water Distribution" (Ductile Iron Pipe Sizing).
04/2014 02532W-2 of 5
CITY OF PEARLAND HIGH DENSITY POLYETHYLENE (HDPE)
SOLID WALL PIPE FOR WATER
B. All pipe shall be made of virgin material. No rework except that obtained from the
manufacturer's own production of the same formulation shall be used.
1. The pipe shall be homogenous throughout and shall be free of visible cracks,
holes, foreign material,blisters, or other deleterious faults.
2. Dimension Ratios: The minimum wall thickness of the polyethylene pipe
shall meet the following:
a. Pressure Applications: AWWA C906 DR-11 Pressure Class 160.
3. All HDPE shall be carbon black or solid gray stabilized throughout the
structural wall for ultra-violet protection. The pipe shall have a near white
inside diameter to facilitate future TV inspection.
C. Bends and Fittings: ANSI A21.10, ductile iron; ANSI A21.11 single rubber gasket
push-on type joint; minimum 150 psi pressure rating.
D. Coatings and Linings: Conform to requirements of Section 02634—Ductile Iron Pipe
and Fittings.
2.02 MATERIALS TEST
A. Tests for compliance with this Section shall be made as specified herein and in
accordance with the applicable ASTM Specification. A certificate of compliance
with ISO 9000 shall be furnished,by the manufacturer for all material furnished under
this Section. Polyethylene plastic pipe and fittings may be rejected for failure to meet
any of the requirements of this Section.
3.00 EXECUTION
3.01 HANDLING
A. The joints shall be handled near the middle with wide web slings and spreader bars.
Rope slings also work well with straight lengths. The use of chains, end hooks or
cable slings that may scar the pipe are not permitted. The following procedures shall
be observed when handling HDPE pipe.
1. Always stack the heaviest series of pipe at the bottom.
2. Protect the pipe from sharp edges when overhanging the bed of a truck or
trailer by placing a smooth, rounded protecting strip on the edge of the bed.
•
3. The load should be anchored securely to prevent slippage.
B. Lengths of small-diameter, lightweight pipe can be unloaded manually.
C. Pipe applications shall normally be handled by:
1. Unloading the pipe from the truck in a row along the side of the installation
area and moving the fusion unit along the row of joints.
2. Stacking the pipe beside the fusion unit and trailing the pipe out after fusion,
then dragging the long length of pipe into place for installation. It is suggested
that as the pipe is fused and moved through the fusion machine, additional
joints of pipe should be placed in the moveable jaw side of the machine for
04/2014 02532W-3 of 5
CITY OF PEARLAND HIGH DENSITY POLYETHYLENE (HDPE)
SOLID WALL PIPE FOR WATER
each subsequent fusion. This prevents the hydraulic system of the machine
from having to pull the previously fused long length.
D. Dragging the pipe into place is permitted provided the pipe isn't damaged from sharp
rocks or excessive abrasion created by pulling the pipe great distances.
3.02 PIPE JOINING
A. The polyethylene pipe shall be assembled and joined at the Site using the thermal
butt-fusion method to provide a leak proof joint. Threaded or solvent-cement joints
and connections are not permitted. All equipment and procedures used shall be in
strict compliance with the manufacturer's recommendations. Fusing shall be
accomplished by personnel certified as fusion technicians by a manufacturer of
polyethylene pipe and/or fusing equipment.
B. The butt-fused joint shall be in true alignment and shall have uniform roll-back beads
resulting from the use of proper temperature and pressure. The joint shall be allowed
adequate cooling time before removal of pressure. When cool, all weld beads shall
then be removed from the inside surface such that the joint surfaces shall be smooth.
The fused joint shall be watertight and shall have a tensile strength equal to that of the
pipe. All joints shall be subject to acceptance by the Owner's Project Representative.
All defective joints shall be cut out and replaced at no cost to the Owner. Any section
of the pipe with a gash, blister, abrasion, nick, scar or other deleterious fault greater in
depth than 10 percent of the wall thickness, shall not be used and must be removed
from the Site. However, a defective area of the pipe may be cut out and the joint
fused in accordance with the procedures stated above. In addition, any section of pipe
having other defects such as concentrated ridges, discoloration, excessive spot
roughness,pitting, variable wall thickness or any other defect of manufacturing or
handling as determined by the Owner's Project Representative shall be discarded and
not used.
3.03 BENDING PIPE
A. HDPE may be cold-bent to a minimum radius of 40 times the pipe diameter as it is
installed, eliminating the need in many cases for elbows for slight bends. The
minimum bending radius that can be applied to the pipe without kinking varies with
the diameter and wall thickness of the pipe. Contractor shall conform to
manufacturer's recommendations. If adequate space is not available for the required
radius, a fitting of the desired angle shall be fused into the piping system to obtain the
necessary change in direction.
3.04 INSTALLATION BELOW GROUND
A. Conform to requirements of Section 02510—Water Mains.
04/2014 02532W-4 of 5
CITY OF PEARLAND HIGH DENSITY POLYETHYLENE (HDPE)
SOLID WALL PIPE FOR WATER
B. Pipe Laying:
1. When pulling pipe, either a pulling head or a suitable wraparound sleeve with
rubber protective cover shall be used to prevent the pulling cables from
damaging the pipe. The pipe shall not be pulled by the flanged end.
2. Install pipe in accordance with Section 02318 —Excavation and Backfill for
Utilities, and manufacturer's recommendations.
3.05 FIELD QUALITY CONTROL
A. Testing shall be as specified in Section 01450 - Testing Laboratory Services.
B. Hydrostatic Testing for pressure piping systems shall be performed in accordance
with ASTM F2164. Testing pressure shall not exceed 1.5 times the system design
pressure and total testing time including the time required to pressurize, stabilize,
hold test pressure, and depressurize should not exceed 8 hours. If 5 psi is lost during
testing pipeline must be re-pressurized.
C. HDPE pipe deflection shall not exceed deflection percentages identified in ASTM
F1962 or manufacturer's maximum allowable deflection, whichever is lower.
Allowable pipe deflection varies based on DR rating. The following maximum
deflection percentages can be used for the following DR ratings: DR21 —7.5 percent,
DR17—6.0 percent, DR15.5 —6.0 percent, DR13.5 —6.0 percent,DR11 —5.0
percent, DR9—4.0 percent, DR7.3 —3.0 percent. Deflection measurements can be
taken by mandrel or by measurement of inside diameter before and after backfill
operations.
D. Do not enclose or cover any Work until inspected.
3.06 CLEAN AND ADJUST
A. Remove surplus pipeline materials, tools, rubbish and temporary structures and leave
the construction site clean, to the satisfaction of the Owner's Project Representative.
END OF SECTION
04/2014 02532W-5 of 5
CITY OF PEARLAND PVC PIPE
Section 02534
PVC PIPE
1.0 GENERAL
1.01 SECTION INCLUDES
A. Polyvinyl chloride pressure pipe for water distribution in nominal diameters 4 inches
through 16 inches.
B. Polyvinyl chloride sewer pipe for gravity sanitary sewers in nominal diameters 4
inches through 48 inches.
C. Polyvinyl chloride pressure pipe for gravity sanitary sewers and force mains in nominal
diameters 4 inches through 36 inches.
D. References to Technical Specifications:
1. Section 01350— Submittals
2. Section 02634—Ductile Iron Pipe and Fittings
3. Section 02533 — Sanitary Sewage Force Mains
4. Section 02512—Polyethylene Wrap
5. Section 02510—Water Mains
6. Section 02530—Gravity Sanitary Sewers
7. Section 02731 —Sanitary Sewage Force Mains
8. Section 02630—Storm Sewers
9. Section 02318—Excavation and Backfill for Utilities
E. Referenced Standards:
1. American Water Works Association(AWWA)
a. AWWA C900 Polyvinyl Chloride (PVC) Pressure Pipe, 4"— 12" for
Water Distribution.
b. AWWA C905 Polyvinyl Chloride (PVC) Water Transmission Pipe,
Nominal Diameters, 14in. Through 36 in.
c. AWWA Cl 10 Ductile-Iron and Gray Iron Fittings for Water.
2. American Society for Testing and Materials (ASTM)
a. ASTM D 1784,"Standard Specification for Rigid Poly Vinyl Chloride
(PVC) Compounds and Chlorinated Poly Vinyl Chloride (CPVC)
Compounds"
b. ASTM F 477,"Standard Specification for Elastomeric Seals(Gaskets)
for Joining Plastic Pipe"
05/2013 02534- 1 of 7
CITY OF PEARLAND PVC PIPE
c. ASTM D 3139, "Standard Specification for Joints for Plastic Pressure
Pipes Using Flexible Elastomeric Seals"
d. ASTM D 3034, "Standard Specification for Type PSM Poly Vinyl
Chloride (PVC) Sewer Pipe and Fittings"
e. ASTM F 949,"Standard Specification for Poly Vinyl Chloride(PVC)
Corrugated Sewer Pipe with a Smooth Interior and Fittings"
f. ASTM D 794,"Standard Specification for Poly Vinyl Chloride(PVC)
Profile Gravity Sewer Pipe and Fittings Based on Controlled Inside
Diameter"
g. ASTM F 679, "Standard Specification for Poly Vinyl Chloride(PVC)
Large-Diameter Plastic Gravity Sewer Pipe and Fittings"
h. ASTM D 2241,"Standard Specification for Poly Vinyl Chloride(PVC)
Pressure-Rated Pipe (SDR Series)"
i. ASTM D 3212,"Standard Specification for Joints for Drain and Sewer
Plastic Pipes Using Flexible Elastomeric Seals"
j. ASTM D 2444, "Standard Test Method for Determination for the
Impact Resistance of Thermoplastic Pipe and Fittings by Means of a
Tup (Falling Weight)"
k. ASTM D 1248, "Standard Specification for Polyethylene Plastics
Extrusion Materials for Wire and Cable"
1. ASTM D 2321, "Standard Practice for Underground Installation of
Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications"
3. American National Standards Institute (ANSI)
a. ANSI A21.10 Cast Iron and Ductile Iron Fittings,2 thru 48 in./Water.
b. ANSI A21.11 Rubber Gasket Joints Cast and Ductile Iron Press Pipe.
1.02 MEASUREMENT AND PAYMENT
A. Unless indicated as a Bid Item,no separate payment will be made for PVC pipe under
this Section. Include cost in Bid Items for Water Mains, Gravity Sanitary Sewer,and
Sanitary Sewage Force Mains.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit Shop Drawings showing design of new pipe and fittings indicating alignment
and grade, laying dimensions, fabrication, fittings, flanges, and special details.
05/2013 02534-2 of 7
•
CITY OF PEARLAND PVC PIPE
1.04 QUALITY CONTROL
A. Submit manufacturer's certifications that PVC pipe and fittings meet requirements of
this Section and AWWA C900 or AWWA C905 for pressure pipe applications,or the
appropriate ASTM standard specified for gravity sewer pipe.
B. Submit manufacturer's certification that PVC pressure pipe has been hydrostatically
tested at the factory in accordance with AWWA C900 or AWWA C905 and this
Section.
C. When foreign manufactured material is proposed for use, have material tested for
conformance to applicable ASTM requirements by certified independent testing
laboratory located in United States. Certification from any other source is not
acceptable. Furnish copies of test reports to the Engineer for review. Cost of testing
shall be borne by Contractor or Supplier.
2.0 PRODUCTS
2.01 MATERIAL
A. Use PVC compounds in the manufacture of pipe that contain no ingredient in an
amount that has been demonstrated to migrate into water in quantities considered to be
toxic.
B. Furnish PVC pressure pipe manufactured from Class 12454-A or Class 12454-B virgin
PVC compounds as defined in ASTM D 1784. Use compounds qualifying for a rating
of 4000 psi for water at 73.4 degrees F per requirements of PPI TR3. Provide pipe
which is homogeneous throughout,free of voids,cracks,inclusions,and other defects,
uniform as commercially practical in color, density, and other physical properties.
Deliver pipe with surfaces free from nicks and scratches with joining surfaces of
spigots and joints free from gouges and imperfections which could cause leakage.
C. For PVC pressure pipe used for water mains,provide self-extinguishing PVC pipe that
bears Underwriters'Laboratories mark of approval and is acceptable without penalty to
Texas State Fire Insurance Committee for use in fire protection lines.
D. Gaskets:
1. Gaskets shall meet the requirements of ASTM F 477. Use elastomeric factory-
installed gaskets to make joints flexible and watertight.
2. Pipes to be installed in potentially contaminated areas, especially where free
product is found near the elevation of the proposed sewer, shall have the
following gasket materials for the noted contaminants. '
05/2013 02534-3 of 7
CITY OF PEARLAND PVC PIPE
CONTAMINANT GASKET MATERIAL REQUIRED
Petroleum(diesel, gasoline) Nitrile Rubber
Other contaminants As recommended by the pipe manufacturer
E. Lubricant for rubber-gasketed joints: Water soluble, non-toxic, non-objectionable in
taste and odor imparted to fluid, non-supporting of bacteria growth, having no
deteriorating effect on PVC or rubber gaskets.
2.02 WATER SERVICE PIPE
A. Pipe 4-inch through 12-inch: AWWAC900, Class 150, DR 18; nominal 20-foot
lengths; cast iron equivalent outside diameters.
B. Pipe 16-inch: AWWA C905; Class 235; DR 18; nominal 20 foot lengths; cast iron
equivalent outside diameter.
C. Joints: ASTM D 3139; push-on type joints in integral bell or separate sleeve
couplings. Do not use socket type or solvent weld type joints.
D. Make curves and bends by deflecting the joints. Do not exceed maximum deflection
recommended by the pipe manufacturer. Submit details of other methods of providing
curves and bends for review by the Engineer.
E. Hydrostatic Test: AWWA C900, AWWA C905, ANSI A21.10 (AWWA C110); at
point of manufacture; submit manufacturer's written certification.
2.03 BENDS AND FITTINGS FOR PVC PRESSURE PIPE
A. Bends and Fittings: ANSI A21.10, ductile iron; ANSI A21.11 single rubber gasket
push-on type joint; minimum 150 psi pressure rating.
B. Coatings and Linings: Conform to requirements of Section 02634—Ductile Iron Pipe
and Fittings.
2.04 GRAVITY SANITARY SEWER PIPE
A. PVC gravity sanitary sewer pipe shall be in accordance with the provisions in the
following table:
05/2013 02534-4 of 7
CITY OF PEARLAND PVC PIPE
WALL PRODUCT ASTM SDR(MAX.)/ DIAMETER
TYPE MANUFACTURER OPTIONS DESIGNATION STIFFNESS(MIN.) SIZE RANGE
Solid J-M Pipe - Approved D3034 SDR 26/PS 115 6"to 15"
CertainTeed Approved F679 SDR 26/PS 115 18"to 48"
Can-Tex Approved AWWA C900 DR 18/N/A*** 4"to 12"
Carlon
Diamond Approved AWWA C905 DR 18/N/A*** 14"to 36"
Profile* Contech A-2000** Only when F949 N/A/50 psi 12"to 36"
included in the
ETI Ultra-Rib Bid Schedule F794 N/A/46 psi , 12"to 48"
Lamson Vylon F794 N/A/46 psi 21"to 48"
* Allowed to be used where there are no service taps.
** Allowed to be used to maximum depth of 10' only.
***For water-seer separation requirements unless specifically noted in Bid Schedule.
B. When solid wall PVC pipe 18 inches to 27 inches in diameter is required in SDR 26,
provide pipe conforming to ASTM F679,except provide wall thickness as required for
SDR 26 and pipe strength of 115 psi.
C. For sewers up to 12-inch-diameter crossing over waterlines, or crossing under
waterlines with less than 2 feet separation,provide minimum 150 psi pressure-rated
pipe conforming to ASTM D 2241 with suitable PVC adapter couplings.
D. Joints: Spigot and integral wall section bell with solid cross section elastometric or
rubber ring gasket conforming to requirements of ASTM D 3212 and ASTM F 477.
E. ASTM D 3139 and ASTM F 477 shall be provided. Gaskets shall be factory-
assembled and securely bonded in place to prevent displacement. The manufacturer
shall test a sample from each batch conforming to requirements ASTM D 2444.
F. Fittings: Provide PVC gravity sewer sanitary bends, tee, or wye fittings for new
sanitary sewer construction. PVC pipe fittings shall be full-bodied, either injection
molded or factory fabricated. Saddle-type tee or wye fittings are not acceptable.
2.05 SANITARY SEWER FORCE MAIN PIPE
A. Provide PVC pressure pipe conforming to the requirements for water service pipe,and
conforming to the minimum working pressure rating specified in Section 02533 —
Sanitary Sewage Force Mains.
B. Acceptable pipe joints are integral bell-and-spigot,containing a bonded-in elastomeric
sealing ring meeting the requirements of ASTM F 477. In designated areas requiring
restrained joint pipe and fittings, use EBAA Iron Series 2000PV, Uniflange Series
1350 restrainer,or equal joint restraint device conforming to UNI-B-13,for PVC pipe
12-inch diameter and less.
05/2013 02534-5 of 7
•
CITY OF PEARLAND PVC PIPE
C. Fittings: Provide ductile iron fittings as per this Section,2.03 "Bends and Fittings for
PVC Pressure Pipe", except furnish all fittings with one of the following internal
linings:
1. Nominal 40 mils (35 mils minimum) virgin polyethylene complying with
ASTM D 1248,heat fused to the interior surface of the fitting,as manufactured
by American Cast Iron Pipe "Polybond", or U.S. Pipe "Polyline".
2. Nominal 40 mils(35 mils minimum)polyurethane,Corro-pipe II by Madison
Chemicals, Inc.
3. Nominal 40 mils(35 mils minimum)ceramic epoxy,Protecto 401 by Enduron
Protective Coatings.
D. Exterior Protection: Provide polyethylene wrapping of ductile iron fittings as required
by Section 02512—Polyethylene Wrap.
E. Hydrostatic Tests: Hydrostatically test pressure rated pipe in accordance with this
Section, 2.02E.
F. Manufacturers: Approved manufacturers of pressure rated, solid wall PVC pipe for
sanitary sewer force mains are:
1. J &M Manufacturing Company, Inc.
2. CertainTeed Corporation
3. Diamond Plastics Corporation
4. Carlon Company
5. North American Pipe Corporation(NAPCO)
3.0 EXECUTION
3.01 PROTECTION
A. Store pipe under cover out of direct sunlight and protect from excessive heat or
harmful chemicals in accordance with the manufacturer's recommendations.
3.02 INSTALLATION
A. Conform to requirements of Section 02510—Water Mains, Section 02530—Gravity
Sanitary Sewers, Section 02731 —Sanitary Sewage Force Mains,and Section 02630—
Storm Sewers.
B. Install PVC pipe in accordance with Section 02318 — Excavation and Backfill for
Utilities, ASTM D 2321, and manufacturer's recommendations.
05/2013 02534-6 of 7
CITY OF PEARLAND PVC PIPE
C. Water service pipe 12 inches in diameter and smaller: Installed to clear utility lines
and have minimum 4 feet of cover below lowest property line grade of street, unless
otherwise required by Plans.
D. For water service,exclude use of PVC within 200 feet(along the public right-of-way)
of underground storage tanks or in undeveloped commercial acreage. Underground
storage tanks are primarily located on service stations but can exist at other
commercial establishments.
E. Avoid imposing strains that will overstress or buckle the pipe when lowering pipe into
trench.
F. Hand shovel pipe bedding under the pipe haunches and along the sides of the pipe
barrel and compact to eliminate voids and ensure side support.
END OF SECTION
05/2013 02534-7 of 7
CITY OF PEARLAND TAPPING SLEEVES & VALVES
Section 02540
TAPPING SLEEVES & VALVES
1.0 GENERAL
1.01 SECTION INCLUDES
A Tapping sleeves and valves for connections to existing water system.
B References to Technical Specifications:
1. Section 01200—Measurement &Payment Procedures
2. Section 01350—Submittals
3. Section 02541 —Water&Wastewater Line Valves
4. Section 02520—Valve Boxes, Meter Boxes, &Meter Vaults
5. Section 02512—Polyethylene Wrap
6. Section 02318 —Excavation &Backfill for Utilities
C Referenced Standards:
1. American Water Works Association (AWWA)
a. AWWA C500 Gate Valves, 3 Through 48 in. NPS, for Water and
Sewage Systems.
b. AWWA C110 Ductile-Iron and Gray Iron Fittings for Water
c. AWWA C207 Steel Pipe Flanges for Waterworks Service—Sizes 4 In.
Through 144 In.
1.02 MEASUREMENT AND PAYMENT
A Measurement for installation of tapping sleeves and valves is on a per each basis.
Payment includes all labor and materials required for installation as indicated on Plans.
B Refer to Section 01200—Measurement&Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
1.04 QUALITY CONTROL
A Provide manufacturer's affidavit that all valves purchased for tapping of existing
waterlines conform to Section 02541 — Water & Wastewater Line Valves and to
applicable requirements of AWWA C500 and that they have been satisfactorily tested
in accordance with AWWA C500.
02/2008 02540- 1 of 3
CITY OF PEARLAND 0 TAPPING SLEEVES &VALVES
2.0 PRODUCTS
2.01 MATERIALS
A Tapping Sleeves:
1. Tapping Sleeve Bodies: Stainless steel; in two sections to be bolted together
with high-strength,corrosion-resistant,low-alloy,steel bolts;mechanical joint
ends.
a. 12 inch and smaller: stainless steel; JCM 432, Romac, or approved
equal.
b. 16 inch and larger: epoxy coated ductile iron;JCM,or approved equal.
2. Branch Outlet of Tapping Sleeve: Flanged; machined recess; AWWA C207,
Class D,ANSI 150 lb drilling. Gasket: Affixed around recess of tap opening
to preclude rolling or binding during installation.
3. Where fire service from 6-inch main is approved, use cast iron split sleeve.
B Tapping Valves: Meet all requirements of Section 02541—Water&Wastewater Line
Valves with following exceptions:
1. Inlet Flanges:
a. AWWA CI10; Class 125.
b. AWWA C110; Class 150 and higher: Minimum eight hole flange.
2. Outlet: Standard mechanical or push-on joint; to fit any standard tapping
machine.
3. Valve Seat Opening: Accommodate full-size shell cutter for nominal size tap
without any contact with valve body; double disc.
4. Open Left operation only.
C Valve Boxes: Furnish and install according to Section 02520—Valve Boxes, Meter
Boxes, &Meter Vaults.
3.0 EXECUTION
3.01 GENERAL
A Install tapping sleeves and valves at locations and of sizes as shown on Drawings.
B Thoroughly clean tapping sleeve, tapping valve and pipe prior to installation and in
accordance with manufacturer's instructions.
C Hydrostatically test installed tapping sleeve to 150 psig for a minimum of 15 minutes.
Inspect sleeve for leaks, and remedy leaks prior to tapping operation.
D When tapping concrete pressure pipe, size on size, use shell cutter one standard size
smaller than waterline being tapped.
E Do not use Large End Bell(LEB)increasers with a next size tap unless existing pipe is
asbestos-cement.
02/2008 02540-2 of 3
CITY OF PEARLAND TAPPING SLEEVES & VALVES
3.02 INSTALLATION
A Tighten bolts in proper sequence so that undue stress is not placed on pipe.
B Align tapping valve properly and attach it to tapping sleeve.
C Make tap with sharp, shell cutter:
1. For 12-inch and smaller tap, use minimum cutter diameter one-half inch less
than nominal tap size.
2. For 16-inch and larger tap,use manufacturer's recommended cutter diameter.
D Withdraw coupon and flush all cuttings from newly-made tap.
E Wrap completed tapping sleeve and valve in accordance with Section 02512 —
Polyethylene Wrap.
F Place concrete thrust block behind tapping sleeve (NOT over tapping sleeve and
valve).
G Block under valve using concrete blocks.
H Request inspection of installation prior to backfilling.
I Backfill in accordance with Section 02318—Excavation &Backfill for Utilities.
END OF SECTION
02/2008 02540-3 of 3
CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES
Section 02541
WATER AND WASTEWATER LINE VALVES
1.0 GENERAL
1.01 SECTION INCLUDES
A Gate valves, Plug Valves, Butterfly Valves, Air Release and Pressure Reducing
Valves.
B References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350 - Submittal Procedures
3. Section 02520—Valve Boxes, Meter Boxes, and Meter Vaults
4. Section 02542—Concrete Manholes
5. Section 02318 —Excavation and Backfill for Utilities
6. Section 02510—Water Mains
C Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM A 307, "Standard Specification for Carbon Steel Bolts and
Studs, 60 000 PSI Tensile Strength"
b. ASTM B 763,"Standard Specification for Copper Alloy Sand Casting
for Valve Applications"
c. ASTM B 62, "Standard Specification for Composition Bronze or
Ounce Metal Castings"
d. ASTM D 429,"Standard Test Methods for Rubber Property-Adhesion
to Rigid Substrates"
e. ASTM A 126, "Standard Specification for Gray Iron Castings for
Valves, Flanges, and Pipe Fittings"
f. ASTM A 48, "Standard Specification for Gray Iron Castings"
g. ASTM A 240,"Standard Specification for Chromium and Chromium-
Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and
for General Applications"
h. ASTM A 276, "Standard Specification for Stainless Steel Bars and
Shapes"
i. ASTM B 584,"Standard Specification for Copper Alloy Sand Castings
for General Applications"
j. ASTM A 313,"Standard Specification for Stainless Steel Spring Wire"
2. American Water Works Association (AWWA)
a. AWWA C500 Gate Valves, 3 Through 48 in. NPS, for Water and
Sewage Systems.
b. AWWA C509 or AWWA C515 Resilient-seated Gate Valves, 3
through 12 NPS, for Water and Sewage Systems
c. AWWA C550 Protective Epoxy Interior Coatings for Valves and
Hydrants-
d. AWWA C504 Rubber-Sealed Butterfly Valves
04/2009 02541 - 1 of 8
CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES
3. American National Standards Institute (ANSI)
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for valves under this
Section. Include cost in Bid Items for water mains.,
B Refer to Section 01200—Measurement and Payment Procedures.
C Stipulated Price(Lump Sum). If the Contract is a Stipulated Price Contract,payment
for work in this Section is included in the total Stipulated Price.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit manufacturer's product data for proposed valves for approval.
1.04 QUALITY CONTROL
A Submit manufacturer's affidavit that gate valves are manufactured in the United States
and conform to stated requirements of AWWA C500, AWWA C509 and AWWA
C515 and this Section,and that they have been satisfactorily tested in the United States
in accordance with AWWA C500, AWWA C509 and AWWA C515.
2.0 PRODUCTS -
2.01 GATE VALVES
A Gate Valves: AWWA C500, AWWA C509 or C515 and additional requirements of
this Section.Direct bury valves and those in subsurface vaults,aboveground and plant
valves open counterclockwise.
B If type of valve is not indicated on Plans, use gate valves as line valves for sizes less
than 16-inches. If type of valve is indicated, no substitute is allowed.
C Gate Valves 1-1/2 Inches in Diameter and Smaller: 125 psig; bronze; rising-stem;
single-wedge; disc type; screwed ends; such as Crane No. 428, or approved equal.
D Coatings for Gate Valves 2 Inches and Larger: AWWA C550; Indurall 3300 or
approved equal, non-toxic,imparts no taste to water,functions as physical,chemical,
and electrical barrier between base metal and surroundings, minimum 8-mil-thick,
fusion-bonded epoxy. Prior to assembly of valve, apply protective coating to interior
and exterior surfaces of body.
E Gate Valves 2 Inches in Diameter: Iron body,double gate,non-rising stem, 150-pound
test, 2 inch square nut operating clockwise to open.
04/2009 02541 -2 of 8
CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES
.l
F Gate Valves 4 Inches to 12 Inches in Diameter: Non-directional, resilient seated
(AWWA C509 or AWWA C515) or parallel seat double disc (AWWA C500), 200
psig, bronze mounting, push-on bell ends with rubber joint rings, and nut-operated
unless otherwise specified. Provide resilient seated valves manufactured by American
Darling AFC-500, US Pipe Metroseal 200, or approved equal. Provide double disc
valves manufactured by American Darling 52, Clow F-6102, or approved equal.
Comply with following requirements:
1. Design: Fully encapsulated rubber wedge or rubber seat ring mechanically
attached with minimum 304 stainless-steel fasteners or screws; threaded
connection isolated from water by compressed rubber around opening.
2. Body: Cast or ductile iron, flange bonnet and stuffing box together with
ASTM A 307 Grade B bolts.Manufacturer's initials,pressure rating, and year
manufactured shall be cast in body.
3. Bronze: Valve components in waterway to contain not more than 15 percent
zinc and not more than 2 percent aluminum.
4. Stems: ASTM B 763 bronze, alloy number 995 minimum yield strength of
40,000 psi; minimum elongation in 2 inches of 12 percent, non-rising.
5. 0-rings: AWWA C509, sections 2.2.6 and 4.8.2.
6. Stem Seals: Consist of three 0-rings, two above and one below thrust collar
with anti-friction washer located above thrust collar.
7. Stem Nut: Independent or integrally cast of ASTM B 62 bronze.
8. Resilient Wedge: Molded, synthetic rubber,vulcanized and bonded to cast or
ductile iron wedge or attached with 304 stainless steel screws tested to meet or
exceed ASTM D 429, Method B; seat against epoxy-coated surface in valve
body.
9. Bolts: AWWA C509 Section 4.4; stainless steel; cadmium plated, or zinc
coated.
G Gate Valves 16 Inches to 24 Inches in Diameter: AWWA C500 by Mueller;push-on
bell ends with rubber rings and nut-operated unless otherwise specified, double disc,
150 psi, and comply with the following:
1. Body: Cast or ductile iron; flange together bonnet and stuffing box with
ASTM A 307 Grade B bolts. Manufacturer's initials,pressure rating,and year
manufactured shall be cast in body. Equip with rollers, tracks, and scrapers:
2. Stems: Machined from ASTM B 62 bronze rod with integral forged thrust
collar machined to size; non-rising.
3. Stem Seals: Consist of one 0-ring above and one 0-ring below thrust collar
with anti-friction washer located above thrust collar for operating torque.
4. Stem Nut: Independent or integrally cast of ASTM B 62 bronze.
5. Discs: Cast iron with bronze disc rings securely peened into machined
dovetailed grooves.
6. Wedging Device: Solid bronze or cast-iron, bronze-mounted wedges. Thin
plates or shapes integrally cast into cast-iron surfaces are acceptable. Other
moving surfaces integral to wedging action shall be bronze monel or nickel
alloy-to-iron.
04/2009 02541 -3 of 8
CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES
7. Bronze Mounting: Built as integral unit mounted over, or supported on, cast
iron base and of sufficient dimensions to be structurally sound and adequate for
imposed forces.
8. Gear Cases: Cast iron;furnished on 18-inch and larger valves and of extended
type with steel side plates, lubricated, gear case enclosed with oil seal or 0-
rings at shaft openings.
9. Stuffing Boxes: Located on top of bonnet and outside gear case.
H Gate Valves 20 Inches and Larger: Furnish and equip with bypass valves.
1. Sizes: Provide 3-inch bypass valves for 16-inch through 20 inch gate valves.
Provide 4-inch bypass valves for 24-inch gate valves.
I Valves 4 Inches through 12 Inches for Installation in Vertical Pipe Lines:
1. Double disc, square bottom.
J Valves 14 Inches and Larger for Installation in Horizontal Pipe Lines:
1. Equipped with bronze shoes and slides.
K Gate Valves Installed at Greater than 4 foot Depth:
1. Provide non-rising, extension stem having coupling sufficient to attach
securely to operating nut of valve. Upper end of extension stem shall terminate
in square wrench nut no deeper than 4 feet from finished grade.
L. Gate Valves in Factory Mutual (Fire Service) Type Meter Installations:
1. Conform to provisions of this specification; outside screw and yoke valves;
carry label of Underwriters'Laboratories,Inc.;flanged,Class 125;clockwise to
close.
M Provide flanged joints when valve is connected to steel or PCCP.
2.02 BUTTERFLY VALVES AND ACTUATORS
A Butterfly Valves and Actuators: Conform to AWWA C504, except as modified or
supplemented herein. Provide valves manufactured by Keystone International,
American-Darling, or approved equal.
B If type of valve is not indicated on Plans,butterfly valves shall be used for line valve
sizes 16 inch and larger. If type of valve is specified, no substitute will be allowed.
C Butterfly valves shall be short-body,flanged design and installed at locations as shown-
on
hownon Plans.
D Direct-bury valves,valves in subsurface vaults. Above-ground and plant valves shall
open counterclockwise.
E Provide flanged joints when valve is connected to steel or PCCP.
F , Butterfly Valves and Actuators (Additional Requirements for Large-Diameter Water
Mains): Valves larger than 72 inches in diameter shall have all components designed
04/2009 02541 -4 of 8
CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES
so that the allowable stresses at rated pressure shall not exceed one-third of the yield
strength or one-fifth of the ultimate strength of the material used. Provide valves
manufactured by Keystone International, American-Darling, or equal.
2.03 BUTTERFLY VALVE CONSTRUCTION
A Valves: AWWA C504, Class 150B. Body: Cast iron, ASTM A 126, Class B.
Flanges: ANSI B 16.1, Class 125 lb.
B Discs for Butterfly Valves: Either cast iron or ductile iron.
C Seats: Buna-N or neoprene, and may be applied to disc or body. Seats shall be
mechanically secured and may not rely solely on adhesive properties of epoxy or
similar bonding agent to attach seat to body. Seats on disc shall be mechanically
retained by stainless steel(18-8)retaining ring held in place by stainless steel(18-8)
cap screws that pass through rubber seat for added retention. When seat is on disc,
seat shall be retained in position by shoulders located on both disc and stainless-steel
retaining ring. Mating surfaces for seats: Type 304 or 316,stainless steel and secured
to disc by mechanical means. Sprayed-on or plated mating surfaces will not be
allowed.
D Coat interior wetted ferrous surfaces of valve,including disc,with epoxy suitable for
potable-water conditions. Epoxy, surface preparation, and epoxy application: In
accordance with AWWA C550 and coating manufacturer's recommendations. Provide
two coats of two-component, high-build epoxy with minimum dry thickness of 10
mils. Epoxy coating: Indurall 3300 or approved equal. Coatings shall be holiday
tested and measured for thickness.
E Valve shaft and keys,dowel pins, or taper pins used for attaching valve shaft to valve
disc: Type-304 or 316 stainless steel. Shaft Bearings: Stainless steel,bronze,nylon,
or Teflon (supported by fiberglass mat or backing material with proven record of
preventing Teflon flow under load) in accordance with AWWA C504.
F Packing: Field-adjustable, split-V type, and replaceable without removing operator
assembly.
G Retaining Hardware for Seats: Type 304 or 316 stainless steel. Nuts and screws used
with clamps and discs for rubber seats shall be held securely with locktight, or other
approved method, to prevent loosening by vibration or cavitational effects.
H Valve disc shall seat in position at 90 degrees to the pipe axis and shall rotate 90
degrees between full-open and tight-closed position. Install valves with valve shafts
horizontal and convex side of disc facing anticipated direction of flow, except where
shown otherwise on Plans.
2.04 BUTTERFLY VALVE ACTUATOR CONSTRUCTION
A Provide actuators for valves with size based on line velocity of 16 feet per second,
and, unless otherwise shown on Plans, equip with geared manual actuators. Provide
04/2009 02541 -5 of 8
CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES
fully enclosed and traveling-nut type, rack-and-pinion type, or worm-gear type for
valves 24 inches and smaller.
B Provide actuator designed for installation with valve shaft horizontal unless otherwise
indicated on Plans.
C Provide valve shaft extended from valve to actuator. Space between actuator housing
and valve body shall be completely enclosed so that no moving parts are exposed to
soil or elements.
D - Provide oil-tight and watertight actuator housings for valves,specifically designed for
buried service or submerged service when located in valve vaults, and factory packed
with suitable grease.
E Install a valve position indicator on each actuator housing located above ground or in
valve vaults. Valves shall be equipped with 2-inch actuator nut only.
F Indicate direction of opening of valve on exposed visible part of assembly.
G Design worm-gear or traveling-nut actuators so that a torque of 150 foot-pounds, or
less,will operate valve at most adverse condition for which valve is designed.Vertical
axis of actuating nut shall not move as valve is opened or closed.
2.05 VALVE BOXES
A Provide standard adjustable valve boxes only conforming to requirements of Section
02520—Valve Boxes, Meter Boxes, and Meter Vaults.
2.06 VALVE SERVICE MANHOLES
A For large-diameter water mains, provide manholes to dimensions shown on Plans
conforming to requirements of Section 02542—Concrete Manholes.
2.07 AIR RELEASE AND VACUUM RELIEF VALVES
A Air Release Valves: Apco No. 200, GA Industries Fig. 2-AR, or equal. Materials:
body and cover, ASTM A 48, Class 30, cast iron; float and leverage mechanism,
ASTM A 240 or A276 stainless steel;orifice and seat,stainless steel against Buna-N or
Viton mechanically retained with hex head nut and bolt;other valve internals,stainless
steel or bronze. Provide inlet and outlet connections, and orifice as shown on Plans.
B Air Release and Vacuum Valves: Provide single-body, standard combination or
duplex-bodycustom combination valves as indicated on Plans.
1. For 2 inch and 3 inch, single-body valves, provide inlet and outlet sizes as
shown on Plans and orifice sized for 100 psi working pressure. Valve
materials: body, cover and baffle, ASTM A 48, Class 35, or ASTM A 126,
Grade B cast iron;plug or poppet,ASTM A 276 stainless steel;float,ASTM A
240 stainless steel; seat,Buna-N; other valve internals, stainless steel. Valve
exterior: Painted with shop-applied primer suitable for contact with potable
04/2009 02541 -6 of 8
CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES
water. Provide Apco Model 145C or 147C, Val-Matic Series 200, or equal
valves.
2. For 3 inch and larger duplex body valves as shown on Plans, provide Apco
Series 1700 with No. 200 air release valve, GA Industries Fig. No. AR/GH-
21K/280, or equal. Air and vacuum valve materials: body and cover,ASTM
A 48, Class 35, cast iron; float, ASTM A 240 stainless steel; seat, Type-304,
stainless steel and Buna-N;other valve internals,stainless steel or bronze. Air
release valve: Constructed as specified in paragraph above on Air Release
Valves.
C Vacuum Relief Valves: Provide air inlet vacuum relief valves with flanged inlet and
outlet connections as shown on Plans. Provide air release valves in combination with
inlet and outlet, and orifice as shown on Plans. Valve shall open under pressure
differential not to exceed 0.25 psi. Provide Apco Series 1500 with a No. 200A air
release valve, GA Industries Fig. No. HCARV, or approved equal. Materials for
vacuum relief valves: valve body, ASTM A 48, Class 35, cast iron; seat and plug,
ASTM B 584 bronze, copper alloy 836; spring, ASTM A 313, Type-304, stainless
'steel;bushing,ASTM B 584 bronze,copper alloy 932;retaining screws,ASTM A 276,
Type-304, stainless steel.
D Air Release Valve Vault as detailed'in Plans.
2.08 PRESSURE REDUCING VALVES
A Provide Cla-Val Model 90-01, or approved equal, PRV with strainer in location and
arrangement as shown on Plans. Valve body: ASTM A 48,cast iron or ASTM A 126,
Class B, cast iron with ANSI B16.1, Class 125, flanges. Valve cover: ASTM A 48
cast iron. Valve internals: Type-303, stainless steel or B-62 bronze. Rubber parts:
Buna-N. No leather parts shall be allowed. Resilient seat shall have rectangular cross
section.
B Control Tubing: Contain shutoff cocks with "Y" strainer.
C PRV: Equip with valve position indicator. Initially set in field by authorized
manufacturer's representative with 60 psi downstream pressure.
D Provide basket strainer upstream of PRV as shown on Plans. Strainer body: quick-
opening type, fabricated-steel construction with ANSI B16.1, Class 150, flanges.
Basket: Type-304, stainless steel. Provide Hayward Model 90, or equal,for PRV 4-
inch through 24-inch. Provide Hayward Model 510, or equal, for PRV 14 inches or
greater when space limitations dictate the use of smaller strainer housing.
E Pilot Systems for PRV: Adjustable and pressure sustaining.
F Valve Box: Valve Box conforming to requirements of Section 02520-Valve Boxes,
Meter boxes, and Meter Vaults.
04/2009 02541 -7 of 8
CITY OF PEARLAND WATER AND WASTEWATER LINE VALVES
3.0 EXECUTION
3.01 INSTALLATION
A Earthwork. Conform to applicable provisions of Section 02318 — Excavation and
Backfill for Utilities.
B Operation. Do not use valves for throttling without prior approval of manufacturer.
3.02 SETTING VALVES AND VALVE BOXES
A Remove foreign matter from within valves prior to installation. Inspect valves in open
and closed positions to verify that parts are in satisfactory working condition.
B Install valves and valve boxes where shown on Plans. Set valves plumb and as
detailed. Center valve boxes on valves. Carefully tamp earth around each valve box
for minimum radius of 4 feet, or to undisturbed trench face if less than 4 feet. Install
valves completely closed when placed in water line.
C For pipe section of each valve box,use only cast iron,ductile iron,or DR18 PVC pipe
cut to proper length. Size to allow future operation of valve. Assemble and brace box
in vertical position as indicated on Plans.
3.03 DISINFECTION AND TESTING
A Perform disinfection and testing of valves and appurtenances as required by Section
02510—Water Mains.
B Repair or replace valves which exceed the allowable specified leakage rate.
3.04 PAINTING OF VALVES
A Paint valves in vaults, stations, and above ground using ACRO Paint No. 2215, or
approved equal.
•
END OF SECTION
04/2009 02541 -8 of 8
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
Section 02542
CONCRETE MANHOLES AND ACCESSORIES
1.0 GENERAL
1.01 SECTION INCLUDES •
A. Pre-Cast Concrete Manholes for sanitary.
B. Pre-Cast and Cast-in-Place Manholes for storm sewer.
C. Iron castings for manhole frames and covers, inlet frames and grates, catch basin
frames and grates, meter vault frames and covers, adjustment rings and extensions.
D. Ring grates.
E. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01500—Temporary Facilities and Controls
4. Section 03300—Cast-in-Place Concrete
5. Section 02255-Bedding, Backfill, and Embankment Materials
6. Section 02318—Excavation and Backfill for Utilities
7. Section 02530—Gravity Sanitary Sewers
8. Section 01140—Contractor's Use of Premises
F. Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM C 478,"Standard Specification for Precast Reinforced Concrete
Manhole Sections"
b. ASTM C 443,"Standard Specification for Joints for Concrete Pipe and
Manholes,Using Rubber Gaskets"
c. ASTM C 270, "Standard Specification for Mortar for Unit Masonry"
d. ASTM C 923, "Standard Specification for Resilient Connectors
Between Reinforced Concrete Manhole Structures,Pipes and Laterals"
e. ASTM C 1107,"Standard Specification for Packaged Dry,Hydraulic-
Cement Grout(Nonshrink)"
f. ASTM A 48, "Standard Specification for Gray Iron Castings"
g. ASTM A 615, "Standard Specification for Deformed and Plain
Carbon-Steel Bars for Concrete Reinforcement"
h. ASTM D 698, "Standard Test Methods for Laboratory Compaction
Characteristics of Soil Using Standard Effort"
05/2013 02542- 1 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
2. American Association of State Highway and Transportation Officials
(AASHTO)
3. American Water Works Association(AWWA)
4. American Welding Society(AWS)
a. AWS D12.1, "Reinforcing Steel Welding Code"
5. Texas Commission on Environmental Quality(TCEQ)
a. Chapter 217.55 "Minimum Clear Opening"
G. Definitions:
1. Shallow Depth Manholes-manholes having a depth of 4 feet or less measured
from the top of cover to sewer invert.
2. Normal Depth Manholes-manholes having a depth of greater than 4 feet and
up.to 8 feet measured from top of cover to sewer invert.
3. Extra Depth Manholes- manholes having a depth of greater than 8 feet
measured from the top of cover to sewer invert.
4. Corrosion Resistant Manholes- concrete manholes incorporating additional
material, such as liners or coatings, which make them more resistant to
corrosion than typical concrete manholes.
5. Standard Manholes Drops- drops of up to 3 vertical feet measured from the
invert of the T-fitting to the sewer invert.
6. Extra Depth Manhole Drops-drops in excess of 3 vertical feet measured from
the invert of the T-fitting to the sewer invert.
1.02 MEASUREMENT AND PAYMENT
A. Measurement for Normal Depth Manholes and/or Normal Depth Corrosion Resistant
Manholes shall be per each.
B. Measurement for Shallow Depth Manholes and/or Shallow Depth Corrosion Resistant
Manholes shall be per each.
C. Measurement for Extra Depth Manholes and/or Extra Depth Corrosion Resistant
Manholes is on a vertical foot basis for each foot of depth greater than 8 feet.
D. Payment for Manholes under this Section shall be for complete installation including
riser, frames, grates, adjustment rings, stainless steel inflow preventers, cut-in work,
covers,penetrations,other appurtenances,and be in accordance with Section 01200—
Measurement and Payment Procedures.
05/2013 02542-2 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
E. Measurement for Standard Manhole Drops shall be per each.
F. Measurement for Extra Depth Manhole Drops is on a vertical foot basis for each foot
of Drop greater than 3 feet.
G. Payment for Drops under this Section shall be for assembly components,encasement,
other appurtenances, and be in accordance with Section 01200 —Measurement and
Payment Procedures.
H. Payment for Air Release Manhole with Valves and Fittings installed is on a unit price
basis for each manhole with air release valves,fittings and appurtenances installed and
in accordance with Section 01200 Measurement and Payment Procedures.
1.03 PERFORMANCE REQUIREMENTS
A. Perform work needed to make manholes structurally sound, improve flow, prevent
entrance of inflow or groundwater, prevent entrance of soil or debris, and provide
protection against hydrogen sulfide gas attack.
B. Manufacturer's Product Support.
1. Through the Contractor,manufacturers of wall sealing or lining systems shall
submit to Engineer for review and approval a detailed description of the
proposed coating installation process. Describe surface preparation,
independent laboratory test results, mix design procedures and method of
controlling uniform thickness.
2. A representative employed by the manufacturer and having technical training
in epoxy or cementitious liner shall be named and available for consultation by
telephone during business hours and on site upon 48 hours notice.
3. Manufacturer's representative on concrete lining systems shall provide
technical assistance to applicators to ensure proper usage of dispensing
equipment and accurate proportions of admixtures.
1.04 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit proposed design mix and test data for each type and strength of concrete.
C. Submit manufacturer's data and details of following items for approval:
1. Frames, grates, rings, and covers.
2. Materials to be used in fabricating drops.
05/2013 02542-3 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
3. Materials to be used for pipe connections at manhole walls.
4. Materials to be used for stubs and stub plugs.
5. Plugs to be used for sanitary sewer hydrostatic testing.
6. Shop Drawings of manhole sections and base units and construction details,
including reinforcement,jointing methods, materials and dimensions.
7. Certification from manufacturer that precast manhole design is in full
accordance with ASTM C 478 and design criteria as established in this
Section, 2.03E, "Design Loading Criteria".
8. Product data, materials and procedures for corrosion resistant liner and
coatings, if required. For coating and resistant liner\systems requiring 10-yr
manufacturer warranty, submit specific coating system including product,
thickness, and application for Engineer's approval.
L
9. Manufacturer's data for pre-mix(bag)concrete,if used for channel inverts and
benches.
D. Installer Qualifications: Installers of liners and wall repair systems shall submit
qualifications to Engineer at least 14 days prior to start of any material application.
Submittal shall consist of:
1. Manufacturer's approved equipment list, by name and model number for
application ofproduct and contractor's equipment list showing approved
equipment available for use in product application.
2. List of contractor's personnel who have satisfactorily completed
manufacturer's training in product application within previous two years.
Include date of certification for each person.
E. Provide Shop Drawings for fabrication and erection of casting assemblies. Include
plans, elevations, sections and connection details. Show anchorage and accessory
items. Include Setting Drawings for location and installation of castings and
anchorage devices.
2.0 PRODUCTS
2.01 MATERIALS -
A. Concrete shall conform to requirements in Section 03300 - Cast-In Place Concrete.
B. Minimum concrete compressive strength of 4000 psi.
05/2013 02542-4 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
C. Reinforcing Steel shall conform to requirement in Se ction 03300-Cast-In Place
r Concrete.
D. Mortar shall conform to requirements of ASTM C 270,Type S using Portland cement,
2.02 PRECAST CONCRETE MANHOLES
A. Use manhole sections and base sections conforming to ASTM C 478. Use base riser
section with integral floors,unless shown otherwise. Provide adjustment rings which
are standard components of the manufacturer of the manhole sections meeting material
requirements of ASTM C 478. Mark date of manufacture and name or trademark of
manufacturer on inside of barrel.
B. Construct barrels for precast manholes from 48-inch diameter standard reinforced
concrete manhole sections unless otherwise indicated on Plans. Use various lengths of
manhole sections in combination to provide the correct height with the fewest joints.
Wall sections shall be designed for depth as shown and loading conditions as described
in this Section,2.03E,"Design Load Criteria",but shall not be less than 5 inches thick.
Base section shall have a minimum thickness of 12 inches under the invert.
.C. Provide cone tops to receive 30-inch cast iron frames and covers, unless indicated
otherwise. Use tops designed to support an AASHTO H-20 loading.
D. Where the Plans indicate that manholes larger than 48-inch diameter are required,
precast base sections of the required diameter shall be provided with flat slab top
precast sections used to transition to 48-inch diameter manhole access riser sections.
Transition can be concentric or eccentric. The transition shall be located to provide a
minimum of 7-foot head clearance from the top of bench to underside of transition.
E. Design Loading Criteria: The manhole walls,transition slabs,cone tops,and manhole
base slab shall be designed by the manufacturer to the requirements of ASTM C 478
for the depth as shown on Plans and the following design criteria:
1. AASHTO H-20 loading applied to the manhole cover and transmitted down to
the transition and base slabs.
2. Unit soil weight of 120 pcf located above all portions of the manhole,
including base slab projections.
3. Lateral soil pressure based on saturated soil conditions producing an at-rest
equivalent fluid pressure of 100 pcf, with soil pressure acting on empty
manhole.
4. Internal liquid pressure based on a unit weight of 63 pcf,with manhole filled
with liquid from invert to cover,with no balancing external soil pressure.
5. Dead load of manhole sections fully supported by the transition and base slabs.
05/2013 02542-5 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
6. Design additional reinforcing steel to transfer stresses at openings.
7. The minimum clear distance between any two wall penetrations shall be 12
inches or half the diameter of the smaller penetration,whichever is greater.
F. Form joints between sections with 0-ring gaskets conforming to ASTM C 443.
G. bo not incorporate manhole steps in manhole sections.
H. Do not use brick masonry in construction of sanitary sewer manholes.
2.03 MISCELLANEOUS METALS
A. Provide cast-iron frames, grates, rings, covers,,and stainless steel inflow preventers
conforming to requirements of this Section and the City of Pearland Standard
Construction Details.
2.04 DROPS
A. Drops shall conform to the same pipe material requirements used in the main pipe,
unless otherwise indicated on the Plans.
2.05 PIPE CONNECTIONS
A. Use resilient connectors conforming to requirements of ASTM C 923. Metallic
mechanical devices as defined in ASTM C 923 shall be made of the following
materials:
1. External clamps:.
a. Type 304 stainless steel.
2. Internal, expandable clamps on standard manholes:
a. Type 304 stainless steel, 11 gage minimum.
3. Internal, expandable clamps on corrosion-resistant manholes:
a. Type 316 stainless steel, 11 gage minimum.
b. Type 304 stainless steel, 11 gage minimum, coated with minimum
16 mm fusion-bonded epoxy conforming to AWWA C-213.
4. All precast openings shall be fully circular, 360° openings.
B. Where rigid joints between pipe and a cast-in-place manhole base are specified or
shown on the Plans, use polyethylene-isoprene water-stop meeting the physical
property requirements of ASTM C 923, Press-Seal WS Series, or equal.
05/2013 02542-6 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
C. Storm sewer pipe connections:
1. Connections acceptable for sanitary sewers.
2. Line pipe grouted in place with mortar. Rehabilitate.
2.06 WALL CLEANING MATERIAL
A. Cleaners: Detergent or muriatic acid capable of removing dirt, grease, oil and other
matter which would prevent a good bond of sealing material to wall. Refer to sealing
material manufacturer's recommendations.
2.07 SEALANT MATERIALS
A. Sealing materials between precast concrete adjustment ring and manhole cover frame
shall be Adeka Ultraseal P201, or approved equal.
2.08 WALL REPAIR MATERIALS
A. Hydraulic Cements:Use a blend of cement powders or hydraulic cement to stop active
leaks in the manhole structure.
B. Quickset Mortar: Use a quickset mortar to repair wide cracks, holes or disintegrated
mortar.
2.09 CORROSION RESISTANT MANHOLE MATERIALS
A. Provide one of the following as indicated on the Plans:
1. Precast cylindrical Portland cement concrete sanitary sewer manhole sections,
base sections, and cone sections with one of the following factory applied
internal coatings or approved equal:
a. NeoPoxyTM NPR-5300 Series "PureEpoxy" spray on epoxy liner
and other required fillers/sealants per manufacturer's
recommendations:
b. NeoPoxy NPR-3501 high tensile elongation epoxy elastomeric gout
and sealant.
c. NeoPoxy NPR-5305 trowelable epoxy filler, grout and sealant,
"d. Chemical and cementitious rapid set hydraulic grouts such as
Strong-Plug, Strong-Seal QSR, Quadex Hyperform and Quadex
Hydro-Plug, or other equivalents pre-approved by the engineer.
05/2013 02542-7 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
e. NeoPoxy P-88 ultraviolet light resistant topcoat.
f. EMACO liner(contact City of Pearland Public Works Department
for specific type).
g. Raven liner(contact City of Pearland Public Works Department for
specific type).
h. , SewperCoat 100% Calcium aluminate by KerneosTM Aluminate
Technologies.
2. Type I Coating: The manufacturer of these applied products shall provide a
minimum 10-year material and labor warranty. A 10-year manufacturer
warranty shall be applicable for the following sanitary sewer manholes:
a. Manholes that receive force main discharge.
•
b. Manholes within the lift/pump station site including last manhole
before wet well.
c. Manholes with 5 feet diameter and larger or manholes that receive
discharge from 15" or larger diameter gravity sewer.
d. Manholes as determined by City Engineer. •
3. Type II Coating: All other sanitary sewer manholes shall be coated with
minimum 125 mil thick coating of products specified in Section 2.09.1.a-d,or
approved equal.
2.10 BACKFILL MATERIALS
A. Backfill materials shall conform to the requirements of Section 02255 — Bedding,
Backfill, and Embankment Materials.
2.11 NON-SHRINK GROUT
A. For non-shrink grout,use prepackaged, inorganic, flowable,non-gas-liberating,non-
metallic, cement-based grout requiring only the addition of water. It shall meet the
requirements of ASTM C 1107 and shall have a minimum 28-day compressive
strength of 7000 psi.
05/2013 02542-8 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
2.12 CASTINGS
A. Castings for frames, grates, rings and covers shall conform to City of Pearland
Standard Construction Details and shall be ASTM A 48, Class 30. Provide locking
covers if indicated on Plans.
B. Castings shall be capable of withstanding the application of an AASHTO H-20 loading
without permanent deformation.
C. Fabricate castings to conform to the shapes, dimensions, and with wording or logos
shown on the Plans.
D. Castings shall be clean, free from blowholes and other surface imperfections. Cast
holes in covers shall be clean and symmetrical, free of plugs.
2.13 BEARING SURFACES
A. Machine bearing surfaces between covers or grates and their respective frames so that
even bearing is provided for any position in which the casting may be seated in the
frame.
2.14 SPECIAL FRAMES AND COVERS
A. Where indicated on the Plans,provide watertight manhole frames and covers with a
minimum of four bolts and a gasket designed to seal cover to frame. Supply watertight
manhole covers and frames, Model R-1916 manufactured by Neenah Foundry
Company, Model V-2420 by East Jordan Iron Works, or approval equal.
B. Where personnel entry is 'anticipated, minimum clear openings of 30-inches is
required.
2.15 FABRICATED RING GRATES
A. Ring grates shall be fabricated from reinforcing steel conforming to ASTM A 615.
B. Welds connecting the bars shall conform to AWS D12.1.
2.16 INFLOW PREVENTERS
A. Provide stainless steel inflow preventers with air release vents on all sanitary sewer
manholes.
05/2013 02542-9 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
3.0 EXECUTION
3.01 EXAMINATION
A. Verify lines and grades are correct.
B. Determine if the subgrade,when scarified and re-compacted,can be compacted to 95
percent of maximum Standard Proctor Density according to ASTM D 698 prior to
placement of foundation material and base section. If it cannot be compacted to that
density,the subgrade shall be moisture conditioned until that density can be reached or
shall be treated as an unstable subgrade.
C. Do not build sanitary or storm sewer manholes in ditches, swales, or drainage paths
unless approved by the Engineer:
3.02 PLACEMENT OF PRECAST MANHOLES
A. Install precast manholes to conform to locations and dimensions shown on Plans.
B. Place manholes at points of change of alignment, grade, size,pipe intersections, and
end of sewer.
3.03 MANHOLE BASE SECTIONS AND FOUNDATIONS
A. Place precast base on 12-inch-thick(minimum)foundation of cement stabilized sand
or a concrete foundation slab. Compact cement-sand in accordance with requirements
of Section 02318—Excavation and Backfill for Utilities.
B. Unstable Subgrade Treatment: When unstable subgrade is encountered,the subgrade
will be examined by the Engineer to determine if the subgrade has heaved upwards
after being excavated. If heaving has not occurred, the subgrade shall be oyer-
excavated to allow for a 24-inch thick layer of crushed stone wrapped in filter fabric as
the foundation material under the manhole base. If there is evidence of heaving,a pile-
supported concrete foundation, as detailed on the Plans, shall be provided under the
manhole base, when indicated by the Engineer.
3.04 PRECAST MANHOLE SECTIONS
A. Install sections, joints, and gaskets in accordance with manufacturer's printed
recommendations.
B. Install precast or steel adjustment rings above tops of cones or flat-top sections as
required to adjust the finished elevation and to support manhole frame.
C. Seal any lifting holes with non-shrink grout.
05/2013 02542- 10 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
D. Where PVC liners are required, seal joints between sections in accordance with
manufacturers recommendations.
3.05 PIPE CONNECTIONS AT MANHOLE
A. Install approved resilient connectors at each pipe entering and exiting sanitary sewer
manholes in accordance with manufacturer's instructions.
B. Ensure that no concrete,cement stabilized sand,fill,or other rigid material is allowed
to enter the space between the pipe and the edge of the wall opening at and around the
resilient connector on either the interior or exterior of the manhole. If necessary, fill
the space with a compressible material to guarantee the full flexibility provided by the
resilient connector. All pipe openings shall be fully circular, 360° openings.
C. Where a new manhole is to be constructed on an existing sewer, install precast
manhole base with factory installed Fernco type connections and pipe stubouts at least
two (2) feet outside manhole wall. Manhole shall be cut-in to existing pipe. No
"horseshoe" or"dog house"type connections will be permitted.
D. Do not construct joints on sanitary sewer pipe within wall sections of manholes. Use
approved connection material.
E. Construct pipe stubs with resilient connectors for future connections at locations and
with material indicated on Plans. Install approved stub plugs at interior of manhole.
F. Test connection for watertight seal before backfilling.
3.06 INVERTS FOR SANITARY SEWERS
A. Construct invert channels to provide a smooth flow transition waterway with no
disruption of flow at pipe-manhole connections. Conform to following criteria:
1. Slope of invert bench: 1 inch per foot minimum; 1-1/2 inch per foot maximum.
2. Depth of bench to invert:
Pipes smaller than 15-inches: one-half largest pipe diameter
Pipes 15 to 24-inches: three-fourths the largest pipe diameter
Pipes larger than 24-inches: equal to the largest pipe diameter
3. Invert slope through manhole: 0.10-foot drop across manhole with smooth
transition of invert through manhole, unless otherwise indicated on Plans.
B. Form invert channels with class A concrete if not integral with manhole base. For
direction changes of mains, construct channels tangent to mains with maximum
possible radius of curvature. Provide curves for side inlets and smooth invert fillets for
flow transition between pipe inverts.
05/2013 02542- 11 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
3.07 DROPS FOR SANITARY SEWERS
A. Construct Drops with same materials used in main pipe unless otherwise indicated on
Plans or approved by the Engineer. Install a Drop when a sewer line enters a manhole
higher than 30-inches above the invert of the manhole. All drops must be interior
drops.
B. Terminate encasement of blind drops a minimum of 5 inches below top of bell and not
less than 12 inches above top of next lower bell. Install approved plug at bell.
3.08 MANHOLE FRAME AND ADJUSTMENT RINGS
A. Combine precast concrete adjustment rings so that the elevation of the installed casting
cover is 3/8 inch below the pavement surface. Seal between adjustment ring and the
manhole top with non-shrink grout; do not use mortar between adjustment rings.
Apply a latex-based bonding agent to concrete surfaces to be joined with non-shrink
grout. Set the cast iron frame on the adjustment ring in a bed of approved sealant. The
sealant bed shall consist of two beads of sealant, each bead having minimum
dimensions of 1/2-inch and 3/4-inch wide.
B. For manholes in unpaved areas,top of frame shall be set a minimum of 6 inches above
existing ground line unless otherwise indicated on Plans. In unpaved areas,encase the
manhole frame in mortar or non-shrink grout placed flush with the face of the manhole
ring and the top edge of the frame. Provide a rounded corner around the perimeter.
3.09 BACKFILL
A. Place and compact backfill materials in the area of excavation surrounding manholes
in accordance with requirements of Section 02318 — Excavation and Backfill for
Utilities. Use embedment zone backfill material,as specified for the adjacent utilities,
from manhole foundation up to an elevation 12 inches over each pipe connected to the
manhole. Provide trench zone backfill,as specified for the adjacent utilities,above the
embedment zone backfill.
B. Where rigid joints are used for connecting existing sewers to the manhole, backfill
under the existing sewer up to the spring-line of the pipe with Class B concrete or
flowable fill.
3.10 MANHOLE WALL CLEANING
A. The floor and interior walls of the manhole shall be thoroughly cleaned and made free
of all foreign materials including dirt, grit, roots, oils, grease, sludge, incompatible
existing coatings,waxes,form release,curing compounds,efflorescence,sealers,salts,
or other contaminants which may affect the performance and adhesion of the coating to
the substrate.
05/2013 02542- 12 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
1. High pressure water blasting with a minimum of 3,500 psi shall be used to
clean free all foreign material within the manhole
2. When grease and oil are present within the manhole,an approved detergent or
muriatic acid ased rally with the high pressure cleaning water.
3. All materials resultingshllbe ufrom the integcleaning of the manhole shall be removed prior
to application of the coating.
4. All loose grout, ledges, steps and protruding ledges shall be removed to
provide an even surface prior to application of coating.
B. Prevent any foreign material from entering the adjoining pipes. Remove droppings of
foreign and wall sealant materials before they harden on the bottom of the manhole.
C. No separate pay shall be made for this item. Include cost for sealing in the unit price
for manholes.
D. Manufacturer's representative shall be available at all times on site to answer questions
and approve manhole preparation work prior to lining.
3.11 MANHOLE WALL SEALING
A. Seal active leaks in the manhole structure by using non-shrink grout. '
B. Remove loose or defective wall material. Wipe or brush surface clean prior to the
application of hydraulic cement
C. Drill weep holes at bottom of manhole walls to relieve hydrostatic pressure to stop
leaks. Plug pressure relief holes after leaks are stopped using hydraulic cement
materials. Lead wool may also be used to plug large leaks.
D. Repair wide cracks,or holes with quickset mortars. Follow manufacturer's application
procedures.
E. Shape manhole inverts before wall sealing work. Apply concrete to cleaned manhole
benches as specified in Section 03300.
F. After all active leaks have been stopped, clean and prepare walls for application of
selected liner material.
G. Properly apply the sealing compound to provide the minimum required uniform
coating to the wall surface.
H. Prevent any foreign material from entering the adjoining pipes. Remove droppings of
foreign and wall sealant materials before they harden on the bottom of the manhole.
05/2013 02542- 13 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
I. Strictly follow product manufacturer's published technical specifications and
recommendations for surface preparation, application and proportioning.
3.12 FIELD QUALITY CONTROL
A. Conduct leakage testing of manholes in accordance with requirements of Section
02530—Gravity Sanitary Sewers. Vacuum test shall be completed prior to coating of
the manhole.
3.13 INSPECTION
A. After manhole wall sealing has been completed, visually inspect the manhole in the
presence of Engineer. Check for cleanliness and for elimination of active leaks.
B. At completion of manhole construction, assist Engineer in verifying installation of
minimum coating thickness of concrete liner. Test several points on the manhole wall.
Repair verification points prior to final acceptance for payment.
C. During application of corrosion resistant liner, a wet film thickness gauge, meeting
ASTM D4414, shall be used. Measurements shall be taken,documented and attested
by the Contractor for submission to the Owner.
D. At completion of manhole construction, assist Engineer in inspection of installation.
3.14 TESTING
A. After the coating product(s)have set in accordance with manufacturer's instructions,
all surfaces shall be inspected for holidays with high-voltage holiday detection
equipment. Reference NACE RPO 188-99 for performing holiday detection. All
detected holidays shall be marked and repaired by abrading the coating surface with
grit disk paper or other hand tooling method. After abrading and cleaning, additional
coating can be hand applied to the repair area. All touch-up/repair procedures shall
follow the coating manufacturer's recommendations. Documentation on areas tested,
results and repairs made shall be provided to Owner by Contractor.
B. Visual inspection shall be made by the Project Engineer and/or Inspector. Any
deficiencies in the finished coating shall be marked and repaired according to the
procedures set forth herein by Contractor.
3.15 CLEAN-UP AND RESTORATION
A. Perform clean-up and restoration in and around construction zone in accordance with
Section 01140'—Contractor's Use of Premises.
05/2013 02542- 14 of 15
CITY OF PEARLAND CONCRETE MANHOLES AND ACCESSORIES
3.16 PROTECTION OF THE WORK
A. Protect Manholes from damage until subsequent work has been accepted.
B. Repair or replace damaged elements of Manholes at no additional cost to the Owner.
C. In unpaved areas,provide positive drainage away from manhole frame to natural grade.
END OF SECTION
05/2013 02542- 15 of 15
THERMOPLASTIC
City of Pearland PAVEMENT MARKING
Section 02582
THERMOPLASTIC PAVEMENT MARKING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Thermoplastic pavement markings.
1.02 UNIT PRICES
A. Measurement for linear pavement markings is on a linear foot basis for
each width, measured in place.
B. Measurement for words and symbols is on a lump sum basis for each word
or symbol.
C. Refer to Section 01025 — Measurement and Payment for unit price
procedures.
1.03 SUBMITTALS
A. Submittals shall conform to requirements of Section 01300—Submittals.
B. Each container shall be clearly marked to indicate the color, weight, Type
of material, manufacturer's name and the lot/batch number.
PART 2 PRODUCTS
A. Pavement markings are thermoplastic type marking materials that require
heating to elevated temperatures for application.
B. Materials shall conform to TxDOT Specification Item 666.
PART 3 EXECUTION
3.01 GENERAL
A. Prepare pavement surfaces and install markings in accordance with
manufacturer's recommendations and TxDOT specifications.
B. Accurately locate and install approved markings to conform to classes,
colors, lengths, widths, and configurations indicated on Drawings.
Page 1 of 2
THERMOPLASTIC
City of Pearland PAVEMENT MARKING
3.02 PREPARATION
A. Clean and repair surfaces to receive markups. Blast clean surfaces
indicated on Drawings or where directed by the Engineer in accordance
with requirements of Section 02581. Do not clean portland cement
concrete pavements by grinding.
3.04 SURFACE INSTALLATION
A. Test pavement surface for moisture content prior to application of
markings. Place an approximate 2 square foot sheet of clear plastic or tar
paper on road surface and hold in place for 20 minutes. Immediately
inspect the sheet for build up of condensed moisture. If sufficient
moisture has condensed to cause water to drip from sheet, do not apply
markings. Repeat test as necessary until adequate moisture has evaporated
from pavement to allow placement.
B. Observe manufacturer's recommended pavement and ambient air
temperature requirements for application. If manufacturer has no
temperature recommendations, do not install markings if pavement
temperature is below 60 degrees F or above 120 degrees F.
C. Prime pavement surface and apply markings as recommended by
manufacturer.
3.05 FIELD QUALITY CONTROL
A. Pavement markings shall present a neat, uniform appearance.
B. Repair,or replace improperly installed markers at Contractors expense.
3.06 CLEANING
A. Keep project site free of unnecessary traffic hazards at all times.
B. Clean area upon completion of work and remove rubbish from work site.
3.07 WARRANTY
A. Contractor shall warrant material and labor for a period of twelve months
from date of installation of markings. Immediately upon notification,
replace portions of pavement marking lines or legends that have lifted,
shifted or spread, lost daytime color, or nighttime retro-reflectivity.
END OF SECTION
Page 2 of 2
CITY OF PEARLAND FRAMES, GRATES,
RINGS,AND COVERS
Section 02603
FRAMES, GRATES,RINGS,AND COVERS
1.0 GENERAL
. 1.01 SECTION INCLUDES
A. Iron castings for manhole frames and covers, inlet frames and grates, catch basin
frames and grates, meter vault frames and covers, adjustment rings and extensions.
B. Ring grates.
C. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350 - Submittals
D. Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM A 48, "Standard Specification for Gray Iron Castings"
b. ASTM A 615, "Standard Specification for Deformed and Plain
Carbon-Steel Bars for Concrete Reinforcement"
c. ASTM C 270, "Standard Specification for Mortar for Unit Masonry"
2. American Association of State Highway and Transportation Officials
(AASHTO)
a. AASHTO M 306, "Drainage, Sewage,Utility, and Related Castings"
3. American Welding Society(AWS)
a. AWS D12.1, "Reinforcing Steel Welding Code"
4. Texas Commission on Environmental Quality(TCEQ)
a. Chapter 217.55 "Minimum Clear Opening"
1.02 MEASUREMENT AND PAYMENT
A. Unless indicated as a Bid Item,no separate payment will be made for frames, grates,
rings, covers, and seals under this Section. Include cost in Bid Items for which this
Work is a component.
B. If frames, grates, rings, covers, and seals are included as a Bid Items, measurement
will be based on the Units shown in Section 00300—Bid Proposal and in accordance
with Section 01200—Measurement and Payment Procedures.
12/2015 02603 - 1 of 3
CITY OF PEARLAND FRAMES, GRATES,
RINGS,AND COVERS
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Provide copies of manufacturer's specifications, load tables, dimension diagrams,
anchor details, and installation instructions. Manufacturer shall be East Jordan Iron
Works, Inc. or as approved by public works.
C. Provide Shop Drawings for fabrication and erection of casting assemblies. Include
plans, elevations, sections and connection details. Show anchorage and accessory
items. Include Setting Drawings for location and installation of castings and
anchorage devices.
2.0 PRODUCTS
2.01 CASTINGS
A. Castings for frames,grates,rings and covers shall conform to ASTM A 48,Class 35B
and AASHTO M 306. Provide locking covers if indicated on Plans.
B. Castings shall be capable of withstanding the application of an AASHTO H-20 loading
without permanent deformation.
C. Fabricate castings to conform to the shapes, dimensions, and with wording or logos
shown on the Plans.
D. Castings shall be 75%post-consumer recycled material, clean, free from blowholes
and other surface imperfections. Cast holes in covers shall be clean and symmetrical,
free of plugs.
2.02 BEARING SURFACES
A. Machine bearing surfaces between covers or grates and their respective frames so that
even bearing is provided for any position in which the casting may be seated in the
frame.
•
2.03 SPECIAL FRAMES AND COVERS
A. Where indicated on the Plans,provide stainless steel inflow preventers and watertight
manhole frames,and covers with a minimum of four bolts and a gasket designed to seal
cover to frame. Supply watertight.manhole Frames and Covers, Model R-1916
manufactured by Neenah Foundry Company, Model V-2420 by East Jordan Iron
Works, or as approved by public works.
B. Where personnel entry is anticipated,minimum clear opening of 30-inches is required.
12/2015 02603 -2 of 3
CITY OF PEARLAND FRAMES, GRATES,
RINGS,AND COVERS
2.04 FABRICATED RING GRATES
A. Ring grates shall be fabricated from reinforcing steel conforming to ASTM A 615.
B. Welds connecting the bars shall conform to AWS D12.1.
2.05 MORTAR
A. Conform to requirements of ASTM C 270, Type S using Portland cement.
3.0 EXECUTION
3.01 INSTALLATION
A. All installations that have an elevation difference between the final elevation of the
manhole cover and the surrounding finished grade greater than 18 inches will be
required to be hinged, lift assist gasketed ring and cover.
B. Install castings according to approved Shop Drawings, instructions given in related
Sections, and applicable directions from the manufacturer's printed materials.
C. Set castings accurately at required locations to proper alignment and elevation. Keep
castings plumb, level, true and free of rack. Measure location accurately from
established lines and grades. Brace or anchor frames temporarily in formwork until
permanently set.
D. Ring grates shall be fabricated in accordance with Plans and shall be set in mortar in
the mouth of the pipe bell.
END OF SECTION
12/2015 02603 -3 of 3
CITY OF PEARLAND STORM SEWERS
Section 02630
STORM SEWERS
•
1.0 GENERAL
1.01 SECTION INCLUDES
A. Storm sewers and appurtenances.-
B. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01450—Testing Laboratory Services
4. Section 03300—Cast-in-Place Concrete
5. Section 02255 —Bedding, Backfill, and Embankment Materials
6. Section 02318—Excavation and Backfill for Utilities
7. Section 02415—Augering Pipe or Casing for Sewers
8. Section 01140—Contractor's Use of Premises
9. Section 02629 - Safety End Treatments
C. Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM C 76,"Standard Specification for Reinforced Concrete Culvert,
Storm Drain, and Sewer Pipe
b. ASTM C 443,"Standard Specification for Joints for Concrete Pipe and
Manholes, Using Rubber Gaskets"
c. ASTM C 506, "Standard Specification for Reinforced Concrete Arch
Culvert, Storm Drain, and Sewer Pipe"
d. ASTM C 877, "Standard Specification for External Sealing Bands for
Concrete Pipe, Manholes, and Precast Box Sections"
e. ASTM C 507, "Standard Specification for Reinforced Concrete
Elliptical Culvert, Storm Drain, and Sewer Pipe"
f. ASTM C 655, "Standard Specification for Reinforced Concrete D-
Load Culvert, Storm Drain, and Sewer Pipe"
g. ASTM D 3350, "Standard Specification for.Polyethylene Plastic Pipe
and Fittings Materials"
h. ASTM C 1433, "Standard Specification for Precast Reinforced
Concrete Box Sections for Culverts, Storm Drains, and Sewers"
i. ASTM B 633, "Standard Specification for Electrodeposited Coatings
of Zinc on Iron and Steel"
j. ASTM A 760, "Standard Specification for Corrugated Steel Pipe,
Metallic-Coated for Sewers and Drains"
5/2013 02630- 1 of 12
CITY OF PEARLAND STORM SEWERS
2. American Association of State Highway and Transportation Officials
(AASHTO)
1.02 MEASUREMENT AND PAYMENT
A. Measurement for storm sewers is on a linear foot basis taken along the center line of
,the pipe from center line to center line of manholes or from end to end of culverts,
measured and complete in place. Separate measurement will be made for each type
and size of pipe installed.
B. Payment for storm sewer includes pipe, earthwork,connections to existing manholes
and pipe,accessories,equipment and execution required are incidental to storm sewer
work.
C. Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit manufacturer's literature for product specifications and installation instructions.
C. Submit product quality,material sources, and field quality information in accordance
with this Section.
1.04 TESTING
A. Testing and analysis of product quality, material sources, or field quality shall be
performed by an independent testing laboratory provided by the Owner under the
provisions of Section,01450 — Testing Laboratory Services and as specified in this
Section. ,
1.05 QUALITY ASSURANCE
A. The condition for acceptance will be a storm sewer that is watertight both in pipe-to-
pipe,box-to-box joints and in pipe-to-manhole connections and in box connections.
5/2013 02630-2 of 12
CITY OF PEARLAND STORM SEWERS
1.06 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Comply with manufacturer's recommendations.
B. Handle pipe, fittings, and accessories carefully with approved handling devices. Do
not drop or roll pipe off trucks or trailers. Materials cracked,gouged,chipped,dented,
or otherwise damaged will not be approved for installation.
C. Store pipe and fittings on heavy timbers or platforms to avoid contact with the ground.
D. Unload pipe,fittings,and specials as close as practical to the location of installation to
avoid unnecessary handling.
E. Keep interiors of pipe and fittings completely free of dirt and foreign matter.
2.0 PRODUCTS
2.01 MATERIAL
A. Materials for storm sewers shall be of the sizes and types indicated on the Plans.
B. Materials for pipe and fittings, other than those specified or referenced, may be
considered for use in storm sewers.
C. For consideration of other materials, submit complete manufacturer's data including
materials,sizes,flow carrying capacity,installation procedures,and history of similar
installations to Engineer for pre-bid evaluations, if allowed, or as a substitution.
2.02 REINFORCED CONCRETE PIPE
A. Circular reinforced concrete pipe shall conform to requirements of ASTM C 76, for
Class III wall thickness. Joints shall be rubber gasketed conforming to ASTM C 443.
B. Reinforced concrete arch pipe shall conform to the requirements of ASTM C 506 for
Class A-M. Joints shall conform to ASTM C 877.
C. Reinforced concrete elliptical pipe, either vertical or horizontal, shall conform to the
requirements of ASTM C 507 for Class VE-III for vertical or Class HE-III for
horizontal: Joints shall be rubber gaskets conforming to ASTM C 877.
D. Reinforced concrete D-load pipe shall conform to the requirements of ASTM C 655.
5/2013 02630-3 of 12
CITY OF PEARLAND STORM SEWERS
2.03 PRECAST AND CAST-IN-PLACE REINFORCED CONCRETE BOX SEWERS
A. All box sewer sections shall conform to ASTM C1433.
B. All pipe and boxes,shall be machine-made or cast by a process which will provide for
uniform placement of concrete in the forms and compaction by mechanical devices
which will assure a dense concrete.
C. Concrete shall conform to requirements of Section 03300 —Cast-in-Place Concrete
with minimum compressive strength of 4000 psi.
D. Concrete shall be mixed in a central batch plant or other batching facility from which
the quality and uniformity of the concrete can be assured. Transit-mixed concrete is
not acceptable.
E. Make test specimens in test cylinders at the same time and in the same manner as the
box sections they represent. Make a minimum of 4 test cylinders for each day's
production run and each mix design. Cure test cylinders in the same manner and for
the same times as the boxes they represent. The producer must furnish all equipment
required for testing concrete for boxes produced in a precasting plant.
F. For precast boxes,provide no more than 4 lifting holes in each section. Lifting holes
may be cast, cut into fresh concrete after form removal, or drilled. Provide lifting
holes of sufficient size for adequate lifting devices based on the size and weight of the
box section. Do not use lifting holes larger than 3 in. in diameter. Do not cut more
than 1 longitudinal.
G. Rubber gaskted joints for precast reinforced concrete box culverts and sewers may be
selected in lieu of boxes with preformed,flexible,mastic gasket material.When rubber
gasket joints are selected, they shall meet the requirements of ASTM C 1677 for
design of the joints, performance and joint tolerances. When selecting the rubber
gasket joint for box,neither filter fabric nor external joint wrap shall be required.
2.04 CORRUGATED METAL PIPE AND FITTINGS
A. Corrugated metal pipe may be galvanized steel, aluminized steel, aluminum or
precoated galvanized steel as indicated on Plans and conforming to the following:
Galvanized Steel AASHTO M218
Aluminized Steel AASHTO M274
Aluminum AASHTO M197
Precoated Galvanized Steel AASHTO M246
1. Reference to gauge of metal is to U.S. Standard Gauge for uncoated sheets.
Tables in AASHTO M218 and AASHTO M274 list thicknesses for coated
sheets in inches. The tables in AASHTO M197 list thicknesses in inches for
clad aluminum sheets.
5/2013 02630-4 of 12
CITY OF PEARLAND STORM SEWERS
B. Coupling bands and other hardware for galvanized or aluminized steel pipe shall
conform to requirements of AASHTO M36 for steel pipe and AASHTO M196 for
aluminum pipe.
1. Coupling bands shall be not more than 3 nominal sheet thicknesses lighter than
thickness of pipe to be connected and in no case lighter than 0.052 inch for
steel or 0.048 inch for aluminum.
2. Coupling bands shall be made of same base metal and coating (metallic or
otherwise) as pipe.
3. Minimum width of corrugated locking bands shall be as shown below for
corrugations which correspond to end circumferential corrugations on pipes
being joined:
a. 10 '/2 inches wide for 2 z/3 inch x 1/2-inch corrugations.
b. 12 inches wide for 3 inch x 1 inch corrugations.
4. Helical pipe without circumferential end corrugations will be permitted only
when it is necessary to join a new pipe to an existing pipe which was installed
with no circumferential end corrugations. In this event pipe furnished with
helical corrugations at ends shall be field jointed with either helically
corrugated bands or with bands with projections (dimples). The minimum
width of helical corrugated bands shall conform to the following:
a. 12 inches wide for 1/2 inch-deep helical end corrugations.
b. 14 inches wide for one inch-deep helical end corrugations.
5. Bands with projections shall have circumferential rows of projections with one
projection for each corrugation. Width of bands with projections shall be not
less than the following:
a. 12 inches wide for pipe diameters up to and including 72 inches.
Bands shall have two circumferential rows of projections.
b. 16 1/4 inches wide for pipe diameters of 78 inches and greater. Bands
shall have four circumferential rows of projections.
6. Bolts for coupling bands shall be 1/2 inch diameter. Bands 12 inches wide or
less will have a minimum of 2 bolts per end at each connection, and bands
greater than 12 inches wide shall have a minimum of 3 bolts at each
connection.
7. Galvanized bolts may be hot dip galvanized in accordance with requirements
of AASHTO M 232,mechanically galvanized to provide same requirements as
- AASHTO M 232, or electro-galvanized per ASTM B 633, Type RS.
5/2013 02630-5 of 12
CITY OF PEARLAND STORM SEWERS
C. Bituminous coated pipe or pipe arch shall be coated inside and out with a bituminous
coating which shall meet these performance requirements and requirements of
AASHTO M190.
1. Pipe shall be uniformly coated inside and out to a minimum thickness of 0.05
inch, measured on crests of corrugations.
2. Bituminous coating shall adhere to the metal so that it will not chip, crack, or
peel during handling and placement;and shall protect pipe from corrosion and
deterioration.
3. Where a paved invert is shown on Plans,pipe or pipe arch,in addition to fully-
coated treatment described above,shall receive additional bituminous material,
same as specified above, applied to the bottom quarter of circumference to
form a smooth pavement. Maintain a minimum thickness of 1/8 inch above
crests of corrugations.
D. Furnish all fittings and specials required for bends, end sections, branches, access
manholes,and connections to other fittings. Design fittings and specials in accordance
with Plans and ASTM A 760. Fittings and specials are subject to same internal and
external loads as straight pipe.
2.05 PIPE FABRICATION
A. Steel Pipe:
1. Galvanized or aluminized steel pipe shall be full circle or arch pipe conforming
to AASHTO M 36, Type I, Type IA, or Type II, as indicated on the Plans.
2. Fabrication with circumferential corrugations, lap joint construction with
riveted or spot-welded seams,helical corrugations with continuous helical lock
seam, or ultra-high frequency resistance butt-welded seams is acceptable.
B. Aluminum Pipe:
1. Pipe shall conform to the requirements of AASHTO M 196,Type I, Type IA,
circular pipe, or Type II,pipe arch as indicated on the Plans.
2. Fabrication with circumferential corrugations, lap joint construction with
riveted or spot-welded seams,or helical corrugations with a continuous helical
lock seam.
3. Portions of aluminum pipe that will be in contact with concrete or metal other
than aluminum, shall be insulated from these materials with a coating of
bituminous material meeting requirements of AASHTO M 190. Extend
coating a minimum distance of one foot beyond area of contact.
5/2013 02630-6 of 12
CITY OF PEARLAND STORM SEWERS
C. Precoated Galvanized Steel Pipe:
1. Pipe shall be full circle or arch pipe conforming to AASHTO M 245, Type I,
Type IA or Type II as indicated on the Plans.
2. Fabrication with circumferential corrugations, lap joint construction with
riveted seams, or helical lock seams is acceptable.
3. Inside and outside coating shall be a minimum of 10 mils.
2.06 SOURCE QUALITY CONTROL
A. Tolerances: Allowable casting tolerances for concrete units are plus or minus 1/4 inch
from dimensions shown on the Plans. Concrete thickness in excess of that required
will not constitute cause for rejection provided that such excess thickness does not
interfere with proper jointing operations.
B. Precast Unit Identification: Mark date of manufacture and name or trademark of
manufacturer clearly on the inside of inlet,headwall or wingwall.
C. Rejection: Precast units may be rejected for non-conformity with these specifications
and for any of the following reasons:
1. Fractures or cracks passing through the shell,except for a single end crack that
do not exceed the depth of the joint.
2. Surface defects indicating honeycombed or open texture.
3. Damaged or misshaped ends, where such damage would prevent making a
satisfactory joint.
D. Replacement: Immediately remove rejected units from the work site and replace with
acceptable units.
E. Repairs: Occasional imperfections resulting from manufacture or accidental damage
may be repaired if, in the opinion of the Engineer, repaired units conform to
requirements of these specifications.
2.07 BEDDING,BACKFILL,AND TOPSOIL MATERIAL
A. Bedding and Backfill Material: Conform to Plans and requirements of Sections 02255
—Bedding, Backfill, and Embankment Materials.
5/2013 02630-7 of 12
CITY OF PEARLAND STORM SEWERS
3.0 EXECUTION
3.01 PREPARATION
A. Conform to requirements of Section 02318 — Excavation and Backfill for Utilities,
3.02 "Preparation".
3.02 EARTHWORK
A. Excavate in accordance with requirements of Section 02318—Excavation and Backfill
for Utilities, except where tunneling or jacking methods are shown on the Plans.
When pipes are laid in a trench,the trench when completed and shaped to receive the
pipe,shall be of sufficient width to provide free working space for satisfactory bedding
and jointing and thorough tamping of backfill and bedding material under and around
pipe.
B. Bed pipe in accordance with Plans and Specifications. When requested by Engineer,
furnish a simple template for each size and shape of pipe for use in checking shaping
of bedding. Template shall consist of a thin plate or board cut to match lower half of
cross section.
C. Where rock in either ledge or boulder form exists below pipe,remove the rock below
grade and replace with suitable materials so that a slightly yielding compacted earth
cushion is provided below pipe a minimum of 12 inches thick.
D. Where soil encountered at established grade is quicksand, muck or similar unstable
materials, such unstable soil shall be removed and replaced in accordance with
requirements of Section 02318—Excavation and Backfill for Utilities. Do not allow
cement stabilized materials for backfill to come into contact with any uncoated •
aluminum or aluminized pipe surface.
E. After metal pipe structure has been completely assembled on proper line and grade and
headwalls constructed when required by the drawing details, place selected material
from excavation or borrow along both sides of the completed structures equally, in
uniform layers not exceeding 6 inches in depth(loose measurement),wetted if required
and thoroughly compacted between adjacent structures and between structure and sides
of trench, or for a distance each side of structure equal to diameter of pipe. Backfill
material shall be compacted to the same density requirements as specified for adjoining
sections of embankment in accordance with specifications. Above three-fourths point
of structure,place uniformly on each side of pipe in layers not to exceed 12 inches.
F. Only hand operated tamping equipment will be allowed within vertical planes 2 feet
beyond horizontal projection of outside surface of structure for backfilling, until a
minimum cover of 12 inches is obtained. Remove and replace damaged pipe.
G. Do not permit heavy earth moving equipment to haul over structure until a minimum
of 4 feet of permanent or temporary compacted fill has been placed.
5/2013 02630-8 of 12
CITY OF PEARLAND STORM SEWERS
H. During backfilling, obtain uniform backfill material and uniform compacted density
throughout length of structure so that unequal pressure will be avoided. Provide
proper backfill under structure.
I. Prior to adding each new layer of loose backfill material,an inspection will be made of
inside periphery of structure for local or unequal deformation caused by improper
construction methods. Evidence of deformation will be reason for such corrective
measures as may be directed by Engineer.
3.03 CORRUGATED METAL PIPE INSTALLATION
A. Place pipes on prepared foundation starting at outlet end. Join sections firmly together,
with side laps or circumferential joints pointing upstream and with longitudinal laps on
sides.
B. Metal in joints which is not protected by galvanizing or aluminizing shall be coated
with an approved asphaltum paint.
C. Provide proper equipment for hoisting and lowering sections of pipe into trench
without damaging pipe or disturbing prepared foundation and sides of trench. Pipe
which is not in alignment or which shows undue settlement after laying,or is damaged,
shall be taken up and relaid.
D. Multiple installations of corrugated metal pipe and pipe arches shall be laid with the
center lines of individual barrels parallel. Unless otherwise indicated on the Plans,
maintain the following clear distances between outer surfaces of adjacent pipes:
DIAMETER CLEAR DISTANCE BETWEEN PIPES PIPE ARCH
OF PIPE FULL CIRCLE AND PIPE ARCH DESIGN NO.
18" 1' 2" 2
24" 1' 5" 3
30" 1' 8" 4
36" 1' 11" 5
42" 2' 2" 6
•48" 2' 5" 7
54" 2' 10" 8
60"—84" 3' 2" 9
90"— 120" 3' 5" 10 & Over
E. Where extensions are attached to existing structures, install a proper connection
between structure and existing as indicated on Plans, coat the connection with
bituminous material when required.
F. When existing headwalls and aprons are indicated for reuse on the Plans,sever portion
to be reused from the existing culvert, and relocate to prepared position. Damaged
5/2013 02630-9 of 12
CITY OF PEARLAND STORM SEWERS
headwalls, aprons or pipes attached to the headwall, shall be restored to their original
condition.
3.04 JOINTING
A. Field joints shall maintain pipe alignment during construction and prevent infiltration
of side material.
B. Coupling bands shall lap equally on pipes being connected to form a tightly-closed
joint.
C. Use corrugated locking bands to field join pipes furnished with circumferential
corrugations including pipe with helical corrugations having reformed circumferential
corrugations on ends. Fit locking bands into a minimum of one full circumferential
corrugation of pipe ends being coupled.
3.05 CONCRETE PIPE INSTALLATION
4e
A. Install in accordance with the Plans and pipe manufacturer's recommendations and as
specified in this Section.
B. Install pipe only after excavation is completed, the bottom of the trench shaped,
bedding material is installed, and the trench has been approved by the Engineer.
C. Install pipe to the line and grade indicated. Place pipe so that it has continuous bearing
of barrel on bedding material and is laid in the trench so the interior surfaces of the
pipe follow the grades and alignments indicated.
D. Install pipe with the spigot ends toward the direction of flow.
E. Form a concentric joint with each section of adjoining pipe so as to prevent offsets.
F. , Place and drive home newly laid sections with come-a-long winches so as to eliminate
damage to sections. Use of back hoes or similar powered equipment will not be
allowed unless protective measures are provided and approved in advance by the
Engineer.
G. Keep the interior of pipe clean as the installation progresses. Where cleaning after
laying the pipe is difficult because of small pipe size,use a suitable swab or drag in the
pipe and pull it forward past each joint immediatelyafter the joint has been completed.
H. Keep excavations free of water during construction and until final inspection.
I. When work is not in progress, cover the exposed ends of pipes with an approved plug
to prevent foreign material from entering the pipe.
5/2013 • 02630- 10 of 12
CITY OF PEARLAND STORM SEWERS
3.06 PRECAST AND CAST-IN-PLACE CONCRETE BOX SEWERS INSTALLATION
A.- Placement of Boxes: when precast boxes are used to form multiple barrel structures,
place the box sections in conformance with the plans or as directed. Place material to
be used between barrels as shown on the plans or as directed. Unless otherwise
authorized, start the laying of boxes on the bedding at the outlet end and proceed
toward the inlet end with the abutting sections properly matched. Fit,match, and lay
the boxes to form a smooth,uniform conduit true to the established lines and grades.
For trench installations, lower the box sections into the trench without damaging the
box or disturbing the bedding and the sides of the trench. Carefully clean the ends of
the box before it is placed. Prevent the earth or bedding material from entering the box
as it is laid. Remove and re-lay, without extra compensation, boxes that are not in
alignments or that show excessive settlement after laying. Form and place cast-in-
place boxes in accordance with Section 03300 - Cast-in-Place Concrete.
B. Connections and Stub Ends: Make connections of boxes to existing boxes, pipes,
storm drains, or storm drain appurtenances as shown on the plans. Mortar or concrete
the bottom of existing structures if necessary to eliminate any drainage pockets created
by the connections. Connect boxes to any required headwalls,wingwalls, safety end
treatments or riprap, or other structures as shown on the plans or as directed. Repair
any damage to the existing structure resulting from making the connections. Finish
stub ends for connections to future work not shown on the plans by installing
watertight plugs into the free end of the box.
C. For precast boxes,fill lifting holes with mortar or concrete and cure. Precast concrete
or mortar plugs may be used.
3.07 INSTALLATION OTHER THAN OPEN CUT
A. For installation of pipe by augering,boring, or jacking pipe,conform to requirements
of Section 02415 - Augering Pipe or Casing for Sewers.
B. Design pipe and box sewers for jacking,boring or tunneling considering the specific
installation conditions such as the soil conditions, installation methods, anticipated
deflection angles and jacking pressures. When requested, provide design notes and
drawings signed by a Texas licensed professional engineer.
3.08 CONNECTIONS
A. Connect inlet leads to the inlets as shown on the Plans. Use non-shrink grout jointing
material as shown on the Plans Drawing or as approved. Make connections water
tight.
5/2013 02630- 11 of 12
CITY OF PEARLAND STORM SEWERS
3.09 FINISHES
A. Cut off inlet leads neatly at the inside face of inlet wall. Point up with mortar or field
galvanizing.
B. When the box section of the inlet has been completed, shape the floor of the inlet with
mortar to conform to the detailed Plans.
C. Finish concrete surfaces in accordance with requirements of Section 03300—Cast-in-
Place Concrete.
3.10 BACKFILL
A. Backfill the trench only after pipe and box sewer installation is approved by the
Engineer.
B. Bed pipes with materials conforming to requirements of Section 02318-Excavation
and Backfill for Utilities and as indicated on Plans.
C. Backfill and compact soil in accordance with Section 02318—Excavation and Backfill
for Utilities.
3.11 INSPECTION
A. Remove and replace all nonconforming work at no additional cost to City.
3.12 SAFETY END TREATMENTS (SET)
A. Install safety end treatments in accordance with Section 02629 and as indicated on the
plans. Use only approved pre-cast SET's with cross bars.
3.13 CLEAN-UP AND RESTORATION
A. Perform clean-up and restoration in and around construction zone in accordance with,
Section 01140—Contractor's Use of Premises.
B. In unpaved areas,grade surface as a uniform slope to natural grade as indicated on the
Plans.
END OF SECTION
5/2013 02630- 12 of 12
CITY OF PEARLAND PRECAST INLETS, HEADWALLS,
AND WINGWALLS
Section 02631
PRECAST INLETS,HEADWALLS,AND WINGWALLS
1.0 GENERAL
1.01 SECTION INCLUDES
A. Precast concrete inlets for storm or sanitary sewers,including cast iron frame and plate
or grate.
B. Precast concrete headwalls and wingwalls for storm sewers.
C. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350— Submittals
3. Section 01630—Product Options and Substitution
4. Section 03300—Cast-in-Place Concrete
5. Section 02542—Concrete Manholes and Accessories
6. Section 02318—Excavation and Backfill for Utilities
D. . Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM C 76,"Standard Specification for Reinforced Concrete Culvert,
Storm Drain, and Sewer Pipe
b. ASTM C 270, "Standard Specification for Mortar for Unit Masonry"
E. Definitions:
1. Normal Depth Type A,Type B,Type C and Type E Inlets-depth of 2.25 feet
or less(2'3")plus pipe inside diameter when measured from grating,bottom of
gutter, or throat to flow line of inlet lead.
2. Normal Depth Type BB Inlet - depth of 2.55 feet (2' 6% ") plus pipe inside
diameter when measured from curb beam to flow line of inlet lead.
3. Extra Depth Inlet- specified depth exceeding normal depth for the type inlet
used.
5/2013 02631 - 1 of 5
CITY OF PEARLAND PRECAST INLETS, HEADWALLS,
AND WINGWALLS
1.02 MEASUREMENT AND PAYMENT
A. Measurement for normal depth inlets is on a per each basis, complete in place.
B. When extra depth is specified on the Plans,measurement for extra depth inlets is on a
vertical foot basis for each foot in excess of normal depth,measured and complete in
place.
C. Measurement for headwalls and wingwalls is on a per each basis, complete in place.
D. Payment for inlets and for culvert headwalls and wingwalls includes connection of
lines, and furnishing and installing frames, grates, rings and covers.
E. Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit Shop Drawings for approval of design and construction details for precast
concrete inlets, headwalls and wingwalls. .
C. Submit proposals for using equivalent construction products or processes according to
Section 01630—Product Options and Substitution.
D. Submit manufacturer's data and details for frames, grates, rings, and covers.
1.04 STORAGE AND SHIPMENT
A. Store precast units on level blocking. Do not place loads on them until design strength
is reached. Shipment of acceptable units may be made when the 28 day strength
requirements have been met.
2.0 PRODUCTS
2.01 MATERIALS
A. Concrete: Concrete for precast machine-made units meeting requirements of ASTM C
76 regarding reinforced concrete, cement, aggregate, mixture, and concrete test.
Minimum 28-day compressive strength shall be 4,000 psi.
B. Reinforcing steel: Conform to requirements of Section 03300 — Cast-in-Place
Concrete. Place reinforcing steel to conform to details shown on Plans and as follows:
5/2013 02631 -2 of 5
CITY OF PEARLAND PRECAST INLETS, HEADWALLS,
AND WINGWALLS
1. Provide a positive means for holding steel cages in place throughout
production of concrete units. The maximum variation in reinforcement
position is plus or minus 10 percent of wall thickness or plus or minus 1/2 inch
whichever is less. Regardlessof variation, the minimum cover of concrete
over reinforcement as shown on the Plans shall be maintained.
2. Welding of reinforcing steel is not permitted unless noted on the Plans.
C. Mortar: Conform to requirements of ASTM C 270, Type S using Portland cement.
D. Miscellaneous metal: Cast-iron frames and plates conforming to requirements of
Section 02542—Concrete Manholes and Accessories.
2.02 SOURCE QUALITY CONTROL
A. Tolerances: Allowable casting tolerances for concrete units are plus or minus 1/4 inch
from dimensions shown on the Plans. Concrete thickness in excess of that required
will not constitute cause for rejection provided that such excess thickness does not
interfere with proper jointing operations.
B. Precast Unit Identification: Mark date of manufacture and name or trademark of
manufacturer clearly on the inside of inlet,headwall or wingwall.
C. Rejection: Precast units maybe rejected for non-conformity with these specifications
and for any of the following reasons:
1. 'Fractures or cracks passing through the shell,except for a single end crack that
does not exceed the depth of the joint.
2. Surface defects indicating honeycombed or open texture.
3. Damaged or misshaped ends, where such damage would prevent making a
satisfactory joint.
D. Replacement: Immediately remove rejected units from/the work site and replace with
acceptable units.
E. Repairs: Occasional imperfections resulting from manufacture or accidental damage
may be repaired if, in the opinion of the Engineer, repaired units according to
requirements of these specifications.
5/2013 02631 -3 of 5
CITY OF PEARLAND PRECAST INLETS,HEADWALLS,
AND WINGWALLS
3.0 EXECUTION
3.01 EXAMINATION
A. Verify lines and grades are correct.
B. Verify compacted subgrade will support loads imposed by inlets.
3.02 INSTALLATION
A. Install inlets,headwalls,and wingwalls complete in place to the dimensions,lines and
grades as shown on the Plans.
B. Excavate in accordance with requirements of Section 02318—Excavation and Backfill
for Utilities.
C. Bed precast concrete units on cement stabilized sand on foundations of firm, stable
material accurately shaped to conform to the shape of unit bases.
D. Provide adequate means to lift and place concrete units.
3:03 FINISHES
A. Use a cement-sand mortar mix to seal joints, fill lifting holes, and as otherwise
required.
B. When the box section of the inlet has been completed,shape the floor of the inlet with
mortar to conform to Plans details.
C. Accurately adjust cast iron inlet plate frames to line,grade,and slope. Grout frame in
place with mortar.
3.04 INLET WATERTIGHTNESS
A. Test each inlet for leaks. Verify that inlets are free of visible leaks. Repair leaks in an
approved manner.
3.05 CONNECTIONS
A. Connect inlet leads to the inlets as shown on the Plans. Use non-shrink jointing
material as shown on the Plans or as approved. Make connections water tight.
5/2013 02631 -4 of 5
CITY OF PEARLAND PRECAST INLETS,HEADWALLS,
AND WINGWALLS
3.06 BACKFILL
A. Backfill the area of excavation surrounding each completed inlet, headwall or
wingwall according to the requirements of Section 02318—Excavation and Backfill
for Utilities.
END OF SECTION
5/2013 02631 -5 of 5
CITY OF PEARLAND ADJUSTING MANHOLES,INLETS,AND VALVE BOXES
Section 02633
ADJUSTING MANHOLES,INLETS,AND VALVE BOXES
1.0 GENERAL
1.01 SECTION INCLUDES
A Adjusting elevation of manholes, inlets, and valve boxes to new grades.
B References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 03300—Cast-in-Place Concrete
4. Section 02542—Concrete Manholes and Accessories
5. Section 02318—Excavation and Backfill for Utilities
6. Section 02910—Topsoil
7. Section 02921 —Hydromulch Seeding
C Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM C 270, "Standard Specification for Mortar for Unit Masonry"
1.02 MEASUREMENT AND PAYMENT
A Measurement for adjusting utility structures to grade is on a lump sum basis for:
1. Adjusting manholes.
2. Adjusting inlets.
3. Adjusting valve boxes.
B Refer to Section 01200 - Measurement and Payment Procedures.
C Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
2.0 PRODUCTS
2.01 CONCRETE MATERIALS
A For cast in place concrete, refer to Section 03300—Cast-in-Place Concrete.
B For precast concrete manhole sections and adjustment rings,refer to Section 02542—
Concrete Manholes and Accessories.
C For mortar mix, conform to requirements of ASTM C 270, Type S using Portland
cement.
07/2006 02633- 1 of 3
CITY OF PEARLAND ADJUSTING MANHOLES,INLETS,AND VALVE BOXES
2.02 CAST IRON ADJUSTING RINGS
A For cast iron adjusting rings, refer to Section 02542 — Concrete Manholes and
Accessories.
2.03 PIPING MATERIALS
A For riser pipes and fittings, refer to applicable piping materials specifications in
Sections 02542—Concrete Manholes and Accessories.
•
3.0 EXECUTION
3.01 EXAMINATION
A Examine existing structure, valve box,frame and cover or inlet box,frame and cover
or inlet,and piping and connections for damage or defects that would affect adjustment
to grade. Report such damage or defects to the Engineer.
3.02 ESTABLISHING GRADE
A Coordinate grade related items with existing grade and finished grade or paving, and
relate to established bench mark or reference line.
3.03 ADJUSTING MANHOLES AND INLETS
•
A Elevation of manhole or inlet can be raised using precast concrete rings or metal
adjusting rings. Use of brick for adjustment to grade is prohibited. Elevation of
manhole or inlet can be lowered by removing existing masonry, adjusting rings or the
top section of the barrel below the new elevation and then rebuilding or raising the
elevation to the proper height.
B Grout inside and outside adjusting ring joints.
C Salvage and reuse cast iron frame and cover or grate.
D Protect or block off manhole or inlet bottom using wood forms shaped to fit so that no
debris or soil falls to the bottom during adjustment.
E Set the cast iron frame for the manhole cover or grate in a full mortar bed and adjust to
the established elevation. In streets, adjust covers to be flush to 1/8 inch above
pavement.
F Verify that manholes and inlets are free of visible leaks as a result of reconstruction.
Repair leaks in a manner subject to the Engineer's approval.
3.04 ADJUSTING VALVE BOXES
A If usable, salvage and reuse valve box and surrounding concrete block.
07/2006 02633-2 of 3
CITY OF PEARLAND ADJUSTING MANHOLES,INLETS,AND VALVE BOXES
B Remove and replace 6 inch ductile iron riser pipe with suitable length for depth of
cover required to establish the adjusted elevation to accommodate actual finish grade.
C Reinstall in-kind adjustable valve box and riser piping plumbed in vertical position.
Provide minimum 6 inches telescoping freeboard space between riser pipetop butt end
and interior contact flange of valve box for vertical movement damping.
D After valve box has been set, aligned, and adjusted so that top lid is level with final
grade, pour a 24 inch by 24 inch by 8 inch thick concrete pad around valve box.
Center valve box horizontally within concrete slab.
3.05 BACKFILL AND GRADING
A Backfill the area of excavation surrounding each adjusted manhole, inlet, and valve
box and compact according to requirements of Section 02318 — Excavation and
Backfill for Utilities.
B' Grade the ground surface to drain away from each manhole and valve box. Place earth
fill around manholes to the level of the upper rim of the manhole frame. Place earth
fill around the valve box concrete block.
C In unpaved areas,grade surface at a uniform slope of 1 to 5 from the manhole frame to
natural grade. Provide a minimum of 4 inches of topsoil conforming to requirements
of Section 02910—Topsoil and seed in accordance with Section 02921—Hydromulch
Seeding.
END OF SECTION
07/2006 02633-3 of 3
CITY OF PEARLAND DUCTILE IRON PIPE AND FITTINGS
Section 02634
DUCTILE IRON PIPE AND FITTINGS
1.0 GENERAL
1.01 SECTION INCLUDES
A. Ductile iron pipe and fittings for water mains,wastewater force mains,gravity sanitary
sewers, and storm sewers.
B. References to Technical Specifications:
1. Section 01350—Submittals
2. Section 02676—Hydrostatic Testing of Pipelines
3. Section 02533 —Sanitary Sewage Force Mains
4. Section 02630—Polyethylene Wrap
5. Section 02510—Water Mains
6. Section 02530—Gravity Sanitary Sewers
C. Referenced Standards:
1. American National Standards Institute (ANSI)
a. ANSI A21.51, Ductile-Iron Pipe Centrifugal Cast, in Metal Molds
b. ANSI A21.11, Rubber Gasket Joints Cast and Ductile Iron Press Pipe
c. ANSI A21.15, Flanged Cast and Ductile Iron
d. ANSI A21.50, Thickness Design of Ductile Iron Pipe
e. ANSI A21.10, Cast Iron and Ductile Iron Fittings,2 thru 48 in./Water
f. ANSI B16.1, Cast Iron Pipe Flanges and Flanged Fittings
g. ANSI A21.53, Ductile-Iron Compact Fittings for-Water Service
h. ANSI A21.4, Cement-Mortar lining/Cast and Ductile Iron Pipe and
Fittings
2. American Water Works Association(AWWA)
a. AWWA C111 Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and
Fittings
b. AWWA C110 Ductile-Iron and Gray Iron Fittings for Water
c. AWWA C153 Ductile-Iron Compact Fittings for Water Service
d. AWWA C600 Installation for Ductile-Iron Water Mains and Their
Appurtenances
3. Steel Structures Painting Council (SSPC)
a. SSPC-SP 6, Commercial Blast Cleaning
4. American Society for Testing and Materials (ASTM)
5/2013 02634- 1 of 5
CITY OF PEARLAND DUCTILE IRON PIPE AND FITTINGS
a. ASTM G 62,"Standard Test Method for Holiday Detection in Pipeline
Coatings"
b. ASTM D 1248, "Standard Specification for Polyethylene Plastics
Extrusion Materials for Wire and Cable"
1.02 MEASUREMENT AND PAYMENT
A. Unless indicated as a Bid Item,no separate payment will be made,for ductile iron pipe
and fittings under this Section. Include cost in Bid Items for Water Mains, Sanitary
Sewage Force Mains,Gravity Sanitary Sewers, and Storm Sewers.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit Shop Drawings showing design of new pipe and fittings indicating alignment
and grade, laying dimensions, fabrication, fitting, flange, and special details. Show
station numbers for pipe and fittings corresponding to Plans. Production of pipe and
fittings prior to review by the Engineer is at Contractor's risk.
1.04 QUALITY CONTROL
A. Provide manufacturer's certifications that all ductile iron pipe and fittings meet
provisions of this Section and have been hydrostatically tested at factory and meet
requirements of ANSI A21.51.
B. Provide certifications that all pipe joints have been tested and meet requirements of
ANSI A21.11.
2.0 PRODUCTS
2.01 DUCTILE IRON PIPE
A. Ductile iron pipe barrels: ANSI A21.15,ANSI A21.50 or ANSI A21.51;bear mark of
Underwriters'Laboratories approval.
B. ` Provide pipe sections in standard lengths,not less than 18 feet long,except for special
fittings and closure sectionsasindicated on Shop Drawings.
C. Unless otherwise shown on Drawings,use minimum Pressure Class 250 for waterlines
or thickness Class 52 for waterlines in casing or augered hole. Provide minimum
thickness Class 52 for sanitary sewers. Provide minimum Pressure Class 350 for
flanged pipe.
5/2013 02634-2 of 5
CITY OF PEARLAND DUCTILE IRON PIPE AND FITTINGS
2.02 JOINTS
A. Joint types: ANSI A21.11 push-on;ANSI A21.11 mechanical joint;or ANSI A21.15
flanged end. Provide push-on joints unless otherwise indicated on the Plans or
required by these specifications.For bolted joints,bolts shall conform to requirements
of AWWA C111.
B. Where restrained joints for buried service are required by Plans, provide one of the
following, or Approved Equal (restrained joints shall be polyethylene wrapped):
1. Super-Lock Joint by Clow Corporation.
2. Flex-Ring or Lok-Ring by American Cast Iron Pipe Company.
3. TR-Flex Joint by U.S. Pipe and Foundry Company.
4. EBAA IRON MEGALUG Mechanical Joint Restraint.
C. Threaded or grooved type joints which reduce pipe wall thickness below minimum
required are not acceptable.
D. Provide for restrained joints designed to meet test pressures required under Section
02676 - Hydrostatic Testing of Pipelines or Section 02533— Sanitary Sewage Force
Mains, as applicable.
E. Where ductile iron water main is cathodically protected from corrosion,bond rubber
•
gasketed joints as shown on Plans to provide electrical continuity along entire pipeline,
except where insulating flanges are required by Plans.
2.03 GASKETS
A. Furnish, when no contaminant is identified, plain rubber (SBR) gasket material; for
flanged joints 1/8-inch thick gasket in accordance with ANSI A21.15.
B. Pipes to be installed in potentially contaminated areas,especially where free product is
found near the elevation of the proposed pipeline, shall have the following gasket
materials for the noted contaminants:
CONTAMINANT GASKET MATERIAL REQUIRED
Petroleum(diesel, gasoline) Nitrile Rubber,Nitrile Rubber, FKM Viton Type
Gasket(ASTM 1418)
Other contaminants As recommended by the pipe manufacture
5/2013 02634-3 of 5
CITY OF PEARLAND DUCTILE IRON PIPE AND FITTINGS
2.04 FITTINGS
A. Use fittings of same size as pipe. Reducers are not permitted to facilitate an off-size
fitting. Reducing bushings are also prohibited. Make reductions in piping size by
reducing fittings. Line and coat fittings as specified for pipe they serve.
B. Push-on Fittings will not be allowed above grade.
C. Flanged Fittings: ANSI A21.10; ANSI B16.1 cast or ductile iron. Flanges: ANSI
B16.1, Class 125;pressure rated at 250 psig.
D. Mechanical Joint Fittings: ANSI A21.10 (AWWA C110);pressure rated at 250 psi.
E. Ductile Iron Compact Fittings for Water Mains:ANSI A21.53 (AWWA C153);4-inch
through 12-inch diameter; cement-mortar lining; conform to requirements of Section
02630—Polyethylene Wrap.
2.05 COATINGS AND LININGS
A. Water Main Interiors: ANSI A21.4, cement lined with seal coat.
B. Sanitary Sewer and Force Main Interiors:
1. Preparation: Commercial blast cleaning conforming to SSPC-SP6.
2. Liner thickness: Nominal 40 mils,minimum 35 mils, for pipe barrel interior;
minimum 6- 10 mils at gasket groove and outside spigot end to 6-inches back
from end.
3. Testing: ASTM G 62, Method B for voids and holidays; provide written
certification.
4. Acceptable Lining Materials:
a. Virgin polyethylene conforming to ASTM D 1248, with inert fillers
and carbon black to resist ultraviolet degradation during storage heat
bonded to interior surface of pipe and fittings;"Polyline"by American
Cast Iron Pipe Company; or Approved Equal.
b. Polyurethane: Corro-pipe II by Madison Chemicals.
c. Ceramic Epoxy: Protecto-401 by Enduron Protective Coatings.
C. Sanitary Sewer Point Repair Pipe: For pipes which will be lined with high density
polyethylene,liner pipe or cured-in-place liner,provide cement-lined with seal coat in
accordance with ANSI A21.4. For pipes which will not be provided with named liner,
provide pipe as specified in this Section, 2.05B "Sanitary Sewer and Force Main
Interiors".
5/2013 02634-4 of 5
CITY OF PEARLAND DUCTILE IRON PIPE AND FITTINGS
D. Exterior: Prime coat and outside asphaltic coating conforming to ANSI A21.10,ANSI
A21.15, or ANSI A21.51 for pipe and fittings in open cut excavation and in casings.
E. Polyethylene Wrap: For buried water lines and sanitary sewers, including point
repairs, provide polyethylene wrap unless otherwise specified or shown. Provide
Polyethylene Wrap for all buried ductile iron pipe,including polyurethane coated pipe.
F. For flanged joints in buried service,provide petrolatum wrapping system, Denso, or
Approved Equal, for the complete joint and all alloy steel fasteners. Alternatively,
provide bolts made of Type 304 Stainless Steel.
G. Pipe to be installed in potentially contaminated areas shall have coatings and linings
recommended by the manufacturer as resistant to the contaminants.
2.06 MANUFACTURERS
A. Pre-approved manufacturers of ductile iron are American Cast Iron Pipe Co.,McWane
Cast Iron Pipe Co., and U. S. Pipe and Foundry Co.
3.0 EXECUTION
3.01 INSTALLATION
A. Conform to installation requirements of Section 02510—Water Mains,Section 02530
—Gravity Sanitary Sewers,and Section 02533—Sanitary Sewage Force Mains,except
as modified in this Section.
B. Install in accordance with AWWA C600 and manufacturer's recommendations.
C. Install all ductile iron pipe in polyethylene wrap, unless cathodic protection is
provided. Do not use polyethylene wrap with a cathodic protection system.
3.02 GRADE
A. Unless otherwise specified on Plans,install ductile iron pipe for water service to clear
utility lines with following minimum cover:
DIAMETER DEPTH OF COVER
(INCHES) (FEET)
16 and 24 5
12 and smaller 4
END OF SECTION
5/2013 02634-5 of 5
CITY OF PEARLAND STEEL PIPE AND FITTINGS
Section 02635
STEEL PIPE AND FITTINGS
1.0 GENERAL
1.01 SECTION INCLUDES
A New steel pipe and fittings for water mains, pumping facilities, and casings.
B References to Technical Specifications:
1. Section 01350—Submittals
2. Section 02636—Polyurethane Coatings on Steel or Ductile Iron Pipe
3. Section 02510—Water Mains
C Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM A 36, "Standard Specification for Carbon structural Steel"
b. ASTM A 570, "Standard Practice for Roof System Assemblies
Employing Steel Deck, Performed Roof Insulation, and Bituminous
Built-Up Roofing"
c. ASTM A 53, "Standard Specification for Pipe, Steel, Black and Hot-
Dipped, Zinc-Coated, Welded and Seamless"
d. ASTM A 135,"Standard Specification for Electric-Resistance-Welded
Steel Pipe"
e. ASTM A 139, "Standard Specification for Electric-Fusion (arc)-
Welded Steel Pipe (NPS 4 and Over)"
f. ASTM C 150, "Standard Specification for Portland Cement"
g. ASTM C 33, "Standard Specification for Concrete Aggregates"
h. ASTM D 512, "Standard Test Method for Chloride Ion in Water"
i. ASTM D 1293, "Standard Test Method for pH of Water"
j. ASTM D 4541, "Standard Test Method for Pull-Off Strength of
Coatings Using Portable Adhesion Testers"
2. American Water Works Association (AWWA)
a. AWWA C200 Steel Water Pipe—6 in. and Larger
b. AWWA C206 Field Welding of Steel Water Pipe
c. AWWA Ml1 Steel Water Pipe: A Guide for Design and Installation,
Fourth Edition
d. AWWA C207 Steel Pipe Flanges for Waterworks Service—Sizes 4 in.
Through 144 in.
e. AWWA C214 Tape Coating Systems for the Exterior of Steel Water
Pipelines
f. AWWA C210 Liquid-Epoxy Coating Systemg for the Interior and
Exterior of Special Sections,Connections,and Fittings for Steel Water
Pipelines
02/2008 02635- 1 of 10
CITY OF PEARLAND STEEL PIPE AND FITTINGS
g. AWWA C205 Cement-Mortar Protective Lining and Coating for Steel
Water Pipe—4 in. and Larger—Shop Applied
h. AWWA C602 Cement-Mortar Lining of Water Pipelines in Place-4 in.
and Larger
i. AWWA C209 Cold-Applied Tape Coatings for the Exterior of Special
Sections, Connections, and Fittings for Steel Water Pipelines
3. American National Standards Institute (ANSI)
4. National Sanitation Foundation (NFS)
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item, no separate payment will be made for steel pipe and
fittings under this Section. Include cost in Bid Items for water mains, pumping
facilities and casings.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit Shop Drawings for aerial crossings and water plant/facilities. Include design
of new pipe and fittings indicating alignment and grade,laying dimensions,lining and
coating systems,proposed welding procedures,fabrication,fitting,flange,and special
details.
C Show station numbers for pipe and fittings corresponding to Plans.
1.04 QUALITY CONTROL •
A Provide manufacturer's certifications that all pipe and fittings have been hydrostatically
tested at factory in accordance with AWWA C200, Section 3.4.
B Provide manufacturer's affidavits that polyurethane coatings,linings and tape coatings
comply with applicable requirements of this Section and that coatings were applied and
allowed to cure at a temperature 5 degrees above the dew point.
C Provide manufacturer's affidavits that mortar coatings and linings comply with
applicable requirements of this Section and that linings were applied and allowed to
cure at a temperature above 32 degrees F.
D Prior to work being started, provide proof of certification of qualification for all
welders employed for type of work,procedures and positions involved. Qualifications
shall be in accordance with AWWA C206.
E Production of pipe and fittings prior to review by the Engineer shall be at Contractor's
risk.
02/2008 02635 -2 of 10
CITY OF PEARLAND . STEEL PIPE AND FITTINGS
2.0 PRODUCTS
2.01 STEEL PIPE
A Provide steel pipe designed and manufactured in conformance with AWWA C200 and
AWWA Ml1 except as modified herein. Steel shall be minimum of ASTM A 36,
ASTM A 570 Grade 36, ASTM A 53 Grade B, ASTM A 135 Grade B, or ASTM A
139 Grade B.
B Minimum Allowable Steel-Wall Thickness: In accordance with following table for
HS-20 live loads and depths of bury of up to 16 feet and AWWA C200 new uncoated
welded steel.
CASING PIPE
(ENCASEMENT SLEEVES)
CASING MINIMUM WALL APPROXIMATE WEIGHT
PIPE SIZE PER
O.D. THICKNESS LINEAR FOOT UNCOATED
8" 8.625" 0.219" 19.64
10" 10.75" 0.219" • 24.60
12" 12.75" 0.219" 29.28
14" 14.00" 0.219" 32.00
16" 16.00" 0.219" 36.86
20" 20.00" 0.250" 52.73
24" 24.00" 0.250" 63.41
30" 30.00" 0.250" 79.43
C Provide pipe sections in lengths of no less than 20 feet except as required for special
fittings or closure sections.
D Fittings: Factory forged for sizes 4 inches through 24 inches; long radius bends;
beveled ends for field butt welding; wall thickness: equal to or greater than pipe to
which fittings is to be welded; unless otherwise shown on the Plans.
E Joints:
1. Standard field joint for steel pipe; including casings: AWWA C206.
a. Single-welded, lap joint.
b. Double-welded, butt joint.
2. Provide mechanically coupled or flanged joints where required for valves and
fittings, and as shown on Plans. Flanges: AWWA C207, Class D; same
diameter and drilling as Class 125 cast iron flanges, ASA B16.1. Maintain
electrically isolated flanged joints between steel and cast iron by using epoxy-
02/2008 02635-3 of 10
CITY OF PEARLAND STEEL PIPE AND FITTINGS
coated bolts, nuts, washers and insulating type gasket unless otherwise
approved by Engineer.
F Make curves and bends by use of beveled joints unless otherwise indicated on Plans.
Contractor may submit details of other methods of providing curves and bends for
consideration by the Engineer. If other methods are deemed satisfactory,install at no
additional cost to Owner.
G Provide shop coated and shop lined steel pipe with minimum of one coat of shop
applied primer approved for use in potable water transmission on all exposed steel
surfaces. Primer for tape coated steel pipe to be used for field-applied coatings shall
have no less than 5 percent solids. Provide primer compatible with coating system and
in accordance with coating manufacturer's recommendations.
H Standard or Special Sections: Within 1/8 inch + of specified or theoretical lengths.
Flanges: Square with pipe with bolt holes straddling both horizontal and vertical axis.
Provide 1/2-inch gap between pipe ends where pipe is to be coupled with sleeve
couplings.
2.02 EXTERNAL COATING SYSTEMS FOR BURIED STEEL PIPE
A General: Supplied with either tape coatings as specified herein.
1. Tape Coating: AWWA C214; 80-mil,shop-applied,Polyken YG-III,Tek-Rap
Yard-Rap,or equal,except as modified herein. Components: primer,one 20-
mil layer of inner-layer tape for corrosion protection and two 30-mil layers of
outer-layer tape for mechanical protection. Primer: compatible with tape
coating, supplied by coating-system manufacturer. Provide pipe with shop
coatings cut back from joint ends to facilitate joining and welding of pipe.
Taper successive tape layers by 1-inch staggers to facilitate field wrapping of
joints. Cut back approximately 4 to 4-1/2 inches to facilitate welding. Inner
and outer tape widths:
DIAMETER TAPE WIDTH
4"—6" 6"
8"— 12" 9"
14"— 16" 12"
18"—24" 18"
2.03 EXTERNAL COATING SYSTEM FOR STEEL PIPE IN TUNNEL, CASING OR
AUGER HOLES
A Provide exterior coating system of pipe in augered holes or casing, without annular
grout, as specified in Section 02636—Polyurethane Coatings on Steel or Ductile Iron
Pipe. No additional exterior coating is required for mortar coated pipe.
02/2008 02635 -4 of 10
CITY OF PEARLAND STEEL PIPE AND FITTINGS
2.04 EXTERNAL COATING SYSTEM FOR STEEL PIPE INSTALLED
ABOVEGROUND (OR EXPOSED)
A Provide a 3-coat epoxy/polyurethane coating system as designated below.
Surface Preparation SSPC SP10
Near White Blast Clean
2.0 to 3.0 mils surface profile
Prime Coat ACRO 4422 Inhibitive Epoxy Primer, or approved equal
2.0 to 4.0 mils DFT
Intermediate Coat ACRO 4460 Chemical Resistant Epoxy, or approved equal
4.0 to 6.0 mils DFT
Finish Coat ACRO 4428 Polyurethane, or approved equal
1.5 to 2.0 mils DFT
B Total minimum allowable dry film thickness for system: 10 mils.
C All materials shall be from same manufacturer.
2.05 INTERNAL LINING SYSTEMS FOR STEEL PIPE
A General: Supply steel pipe with either epoxy lining or shop applied cement mortar
lining,capable of conveying water at temperatures not greater than 140°F.All linings
shall conform to American National Standards Institute/National Sanitation
Foundation (ANSI/NFS) Standard 61 and certified by an organization accredited by
ANSI. Unless otherwise noted, coat all exposed (wetted) steel parts of flanges, blind
flanges, bolts, access manhole covers, etc., with epoxy lining, as specified herein.
B Epoxy Lining: AWWA C210 - White, or approved equal for shop and field joint
applied, except as modified herein.
1. Surface Preparation: SSPC-SP-10(64);Near White Blast Clean;2.0 to 3.0 mils
surface profile.
2. Prime Coat:, ACRO 4460 NSF Certified Epoxy-Buff;4.0 to 6.0 mils DFT or
approved equal.
3. Intermediate Coat: ACRO 4460 NSF Certified Epoxy- Buff: 4.0 to 6.0 mils
DFT or approved equal.
4. Finish Coat: ACRO 4460 NSF Certified Epoxy-White 4.0 to 6.0 mils DFT or
approved equal.
5. Minimum allowable dry film system thickness: 12.0 mils.
6. Maximum allowable dry film system thickness: 18.0 mils.
7. Minimum field adhesion: 700 psi.
8. Dry film thicknesses for approved alternate products in accordance with the
product manufacturer's recommendations.
9. The lining system may consist of three or more coats of the same approved
alternate epoxy lining without the use of a separate primer.
02/2008 02635 -5 of 10
CITY OF PEARLAND STEEL PIPE AND FITTINGS
10. Provide materials from the same manufacturer.
C Shop Applied Cement Mortar Lining: AWWA C205; shop-applied, cement mortar
linings, except as specified herein 3/8 inch minimum thickness for pipe diameters 24
inches and smaller.Pipe with cut back lining from joint ends no more than 2 inches to
facilitate joining and welding of pipe.
2.06 MORTAR FOR EXTERIOR JOINTS
A Cement Mortar: One part cement to two parts of fine, sharp clean sand; mix with
water to a consistency of thick cream.
B Portland Cement: ASTM C 150, Type II.
C Sand:
1. Inside joints: AWWA C602; fine graded natural sand.
2. Outside joints: ASTM C 33; natural sand with 100 percent passing No. 16
sieve.
D Water: total dissolved solids less than 1000 mg/l;ASTM D 512 chloride ions less than
100 mg/1 for slurry and mortar cure; ASTM D 1293 pH greater than 6.5.
3.0 EXECUTION
3.01 PIPING INSTALLATION
A Conform to applicable provisions of Section 02510—Water Mains except as modified
herein.
3.02 EXTERNAL COATING SYSTEM FOR BURIED STEEL PIPE
A Tape Coating System:
1. Inspect pipe, prior to shipment, for holidays and damage to coating. Perform
electrical holiday test of minimum of 6,000 volts with a 60 cycle current audio
detector. If test indicates no holidays and outer wrap(s) is torn, remove
damaged layers of outer wrap by carefully cutting with sharp razor-type utility
knife. Wash with Xylol area to be patched and at least 4 inches of undamaged
tape where hand-applied tape wrap will overlap. AWWA C209 cold-applied
tape; compatible with tape-wrapping system applied for each layer of outer-
wrap tape that has been removed. If damaged area shows holiday when tested,
remove outer layers and expose inner wrap. Prime exposed area and overlaps
with light coat of primer. Firmly press into place patch of inner wrap of
sufficient size to extend 4 inches from holidays in all directions. Holiday test
patch to verify that it is installed satisfactorily. Retrim outer layer of tape to
expose first wrap of outer-wrap tape sufficiently to allow minimum lap of 2
inches in all directions. Wash exposed outer wrap tape with Xylol and prime.
Apply two layers of AWWA C209 outer wrap with 35 mils minimum
thickness.
02/2008 02635 -6 of 10
CITY OF PEARLAND STEEL PIPE AND FITTINGS
2. Regardless of results of electrical holiday test,bubbles in tape coating system
are not allowed. Cut out bubbles and patch as detailed above.
3. Field repairs and applications of coatings: AWWA C209 around joint
cutbacks except as modified herein. Field-welded joints: clean shop-primed
ends of weld splatter, damaged primer and rust to achieve required surface
preparation prior to field repair of linings and coatings.
a. Immediately prior to placing joint in trench, remove shop-applied
primer by abrasive blasting,solvent or other method as approved by the
Engineer. Avoid damage to adjacent existing coatings. Clean surfaces
to achieve surface preparation at least equivalent to SSPC SP6 in
accordance with AWWA C209. Solvent: environmentally safe and
compatible with coating-system primer.
b. Apply primer immediately_Iprior to application of first layer of tape to
achieve maximum bond. Apply tape while primer is still"tacky"with
3-inch minimum overlap over shop-applied coating.
4. Do not expose tape coatings to harmful ultraviolet light for more than 90 days.
Discard (remove) and replace outer layer of tape coating when exposure
exceeds 90 days. In case of factory applied coatings,remove joint from site for
removal and reapplication of outer layer of tape coatings.
B At Owner's option,coating system and application may be tested and inspected at plant
site in accordance with AWWA C214.
C Cement Mortar Coating: AWWA C205; 1-inch minimum thickness; cut back from
joint ends no more than 2 inches to facilitate joining and welding of pipe.
3.03 EXTERNAL COATING SYSTEM FOR STEEL PIPE INSTALLED
ABOVEGROUND, IN VAULTS, TUNNELS OR CASINGS, AND INTERNAL
LINING FOR ALL INSTALLATIONS
A Cement Mortar Lining: AWWA C205; 1/2-inch minimum thickness; cut back from
joint ends to facilitate joining and welding of pipe.
B Safety: Paints,coatings,and linings specified herein are hazardous materials. Vapors
may be toxic or explosive. Protective equipment, approved by appropriate regulatory
agency, is mandatory for all personnel involved in painting, coating, and lining
operations.
C Workmanship:
1. Application: By qualified and experienced workers who are knowledgeable in
surface preparation and application of high-performance industrial coatings.
2. Paint Application Procedures: SSPC Good Painting Practices, Volume 1.
D Surface Preparation:
1. Prepare all surfaces for painting with abrasive blasting.
2. Schedule cleaning and painting so that detrimental amounts of dust or other
contaminants do not fall on wet,newly-painted surfaces. Protect surfaces not
intended to be painted from effects of cleaning and painting operations.
02/2008 02635-7 of 10
CITY OF PEARLAND STEEL PIPE AND FITTINGS
3. Prior to blasting, clean surfaces to be coated or lined of grease, oil and dirt by
steaming or detergent cleaning in accordance with SSPC SP1.
4. Metal and Weld Preparation: Remove all surface defects such as gouges,pits,
welding and torch-cut slag, welding flux and spatter by grinding to 1/4-inch
minimum radius.
5. Abrasive Material:
a. Blast only as much steel as can be coated same day of blasting.
b. Use sharp, angular, properly-graded abrasive capable of producing
depth of profile specified herein. Transport abrasive to jobsite in
moisture-proof bags or airtight bulk containers. Copper slag abrasives
are not acceptable.
c. After abrasive blast cleaning, verify surface profile with replica tape
such as Tes-Tex Coarse or Extra Coarse Press-O-Film Tape, or
approved equal. Furnish tapes to Owner for filing and future reference.
d. Do not blast if metal surface may become wet before priming
commences, or when metal surface is less than 5 degrees F above dew
point.
6. Remove all dust and abrasive residue from freshly blasted surfaces by brushing
or blowing with clean, dry air.
E Coating and Lining Application:
1. Environmental Conditions: Do not apply coatings or linings when metal
temperature is less than 50 degrees F;when ambient temperature is less than 5
degrees F above dew point; when expected weather conditions are such that
ambient temperature will drop below 40 degrees F within 6 hours after
application of coating;or when relative humidity is above 85 percent. Measure
relative humidity and dew point by use of sling psychrometer in conjunction
with U.S. Department of Commerce Weather Bureau Psychometric Tables.
Provide dehumidifiers for all field-applied coatings and linings to maintain
proper humidity levels.
2. Application Procedures:
a. Apply coatings and linings in accordance with manufacturer's
recommendations and requirements of this Section. Provide a finish
free of runs, sags, curtains,pinholes, orange peel, fish eyes, excessive
overspray or de-laminations.
b. Thin materials only with manufacturer's recommended thinners. Thin
only amount required to adjust viscosity for temperature variations,
proper atomization and flow-out. Mix material components using
mechanical mixers.
c. Discard catalyzed materials remaining at end of day.
3. Apply primer immediately after surface has been cleaned. Thoroughly dry pipe
before primer is applied. Apply succeeding coats before contamination of
under surface occurs.
4. Allow each coat of paint either to dry or cure amount of time recommended by
coating or lining manufacturer before successive coats of paint are applied.
Apply all successive coats of paint within recoat threshold time as
02/2008 02635 -8 of 10
CITY OF PEARLAND STEEL PIPE AND FITTINGS
recommended by coating or lining manufacturer on printed technical data
sheets or through written communications.
3.04 INSPECTION
A Procure services of an independent testing laboratory or inspection service, approved
by the Engineer, to perform tests on all portions of coating and lining applications.
Laboratory shall supply services of NACE Certified Coatings Inspectors having Level
III Certification for all coating and linings inspection work. Include cost of such
testing in contract unit price bid for water main. Furnish copies of all test reports to
the Engineer for review. If defective coatings or lining are revealed,cost of repair and
testing of repair will be paid for by Contractor. The Engineer shall have full and final
decision as to suitability of all coatings and linings tested.
B For all field applied coatings and linings,including joints,notify Owner sufficiently in
advance of work so that Owner can perform examination of and acceptance of surface
preparation and application of each coat prior to application of next coat. Furnish
appropriate test data to Owner verifying compliance with requirements of this Section
of each coat prior to proceeding with next coat. Recoat or repair runs, overspray,
roughness and/or abrasives in coating, or other indications of improper application in
accordance with coating or lining manufacturer's and the Engineer's instructions.
C Repairs, surface preparation and painting will be subject to inspection by Owner.
Guidelines published by Steel Structures Painting Council will be used as basis for
acceptance or rejection of cleaning, painting or coating application. SSPC VISI,
Pictoral Surface, along with single-probe magnetic pull-off type dry film thickness
gages,electrical holiday detectors, and standard wet film thickness gages will be used
to determine acceptability of paint applications.
D Check film thickness with nondestructive magnetic pull-off gage such as Mikrotest
Model DFG-100 or electronic thickness gage. National Bureau of Standards certified
thickness calibration plates will be used to verify accuracy of thickness gage.
Determine maximum and minimum thickness in accordance with SSPC PA2 for
frequency and method. Evaluate each length of pipe under SSPC PA2. Consider each
field joint area separate and discrete for purpose of DFT measurements. Perform five
spot DFT measurements on each field joint area (15 individual readings). Check
thickness of each individual coat as well as thickness of overall system with respect to
compliance with this Section. Failure to meet either overall system thickness
requirements or requirements of component coats shall be cause for rejection and
recoat or repair of entire joint or length of pipe.
E Holiday Test:
1. Begin inspection after coating has sufficiently cured,usually one to five days.
(Consult coating manufacturer for specific curing schedule.)
2. Use high-voltage d-c holiday detector such as D.E. Stearns Company Model
14/20 or Tinker & Rasor Model AP/W. Use 1600 volts, plus or minus 100
volts. Use brass brush type electrode.
02/2008 02635-9 of 10
CITY OF PEARLAND STEEL PIPE AND FITTINGS
3. Ground high-voltage d-c holiday detector to metal being inspected. Earth-type
ground tape is not acceptable. Mark detected defects with white chalk,repair
and reinspect.
4. Adhesion Tests: ASTM D 4541; pull-off testing using an Elcometer Model
106 Fixed Alignment Adhesion Tester. Adhesion testing may be directed by
the Engineer on any length of pipe or joint which exceeds maximum coating
thickness limitations specified in this Section.
3.05 COATINGS AND LININGS INSPECTION
A Owner reserves right to inspect or acquire service of independent third-party inspector
who is fully knowledgeable of, and qualified to inspect, surface preparation and
application of high-performance coatings to inspect any and all phases of all coatings
and linings work,whether field or shop applied. Contractor responsible for application
and performance of coating and lining whether or not Owner provides such inspection.
END OF SECTION
02/2008 02635- 10 of 10
CITY OF PEARLAND POLYURETHANE COATING ON
STEEL OR DUCTILE IRON PIPE
Section 02636
POLYURETHANE COATING ON STEEL OR DUCTILE IRON PIPE
1.0 GENERAL
1.01 SECTION INCLUDES
A Two-component polyurethane coating system for use as an internal or external coating
for steel or ductile iron pipe.
B References to Technical Specifications:
1. Section 01350—Submittals
2. Section 02634 -Ductile Iron Pipe and Fittings
3. Section 02635 —Steel Pipe and Fittings
C Referenced Standards:
1. American Water Works Association-(AWWA)
a. AWWA C210, Liquid Epoxy Coating Systems for the Interior and
Exterior of Steel Water Pipelines
2. American Society for Testing and Materials (ASTM)
a. ASTM D 16, "Standard Terminology for Paint, Related Coatings,
Materials, and Applications"
b. ASTM D 1737, "Standard Guide for Testing Industrial Water-
Reducible Coatings"
3. Steel Structures Painting Council (SSPC)
a. SSPC-PA 2, Measurement of Dry Paint Thickness with Magnetic
Gauges
b. SSPC-PA 3, A Guide to Safety in Paint Application
c. SSPC-PS Guide 17.00,Guide for Selecting Urethane Painting Systems
d. SSPC-SP 1, Solvent Cleaning
e. SSPC-SP 10, Near-White Blast Cleaning
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for work performed
under this Section.Include cost of polyurethane coatings in Bid Items for steel pipe or
ductile iron pipe.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit coating manufacturer's catalog sheets and technical information for approval,
prior to delivery of pipe.
07/2006 02636- 1 of 6
CITY OF PEARLAND POLYURETHANE COATING ON
STEEL OR DUCTILE IRON PIPE
C Obtain from coating manufacturer and submit a coating "affidavit of compliance" to
requirements of this Section stating that coatings were applied in factory and in
accordance with manufacturer's minimum requirements.
1.04 SAFETY
A Secure, from manufacturer, Material Safety Data Sheet (MSDS) for polyurethane
coatings and repair materials listed in this Section.
B Safety requirements stated in this and related Sections apply in addition to applicable
federal, state and local rules and regulations. Comply with instructions of coating
manufacturer and requirements of insurance underwriters.
C Follow handling and application practices of SSPC-PA Guide 3; SSPC-PS Guide
17.00; Coating Manufacturer's Material Safety Data Sheet.
1.05 DELIVERY, STORAGE, AND HANDLING
A Use standard containers to prevent gelling,thickening deleteriously or forming of gas
in closed containers within period of one year from date of manufacture.
B Label each container of separately packaged component clearly and durably to indicate
date of manufacture, manufacturer's batch number, quantity, color, component
identification and designated name or formula specification, number of coatings
together with special instructions. Do not use coating components older than one year.
C Deliver coating materials to pipe manufacturer in sealed containers showing designated
name, batch number, color, date of manufacture and name of coating manufacturer.
D Store materials on site in enclosures which are out of direct sunlight, and in warm,
ventilated, and dry area.
E Prevent puncture, inappropriate opening, or other action which may lead to product
contamination.
2.0 PRODUCTS
2.01 COATING MATERIAL
A Coating Standard: ASTM D 16.
B Coating System: Use Type V system which is a 2-package polyisocyanate, polyol-
cured urethane coating, mixed in 1:1 ratio at time of application. The components
shall be balanced viscosities in their liquid state and not require agitation during use.
C Exterior Coating Material: CORROPIPE II-TX and Joint Coating Material
CORROPIPE II-PW, manufactured by Madison Chemical Industries, Inc., 5673 Old
Dixie Road, Forest Park, Georgia 30050, or approved equal.
07/2006 02636-2 of 6
CITY OF PEARLAND POLYURETHANE COATING ON
STEEL OR DUCTILE IRON PIPE
D Internal Coating Material: Joint Coating Material CORROPIPE II-PW,manufactured
by Madison Chemical Industries, Inc., 5673 Old Dixie Road, Forest Park, Georgia
30050, or approved equal.
E Cured Coating Properties:
1. Conversion to Solids by Volume: 97 percent plus or minus 3 percent.
2. Temperature Resistance: Minus 40 degrees F and plus 130 degrees F.
3. Minimum Adhesion: 500 psi,when applied without primer to ductile iron pipe
which has been blasted to comply with SSPC-SP 10.
4. Cure Time: For handling in 1 minute at 120 degrees F, and full cure within 7
days at 70 degrees F.
5. Maximum Specific Gravities: Polyisocyanate resin, 1.20. Polyol resin, 1.15.
6. Minimum Impact Resistance: 80 inch-pounds using 1-inch diameter steel ball
where coating is applied at 30 mils to ductile iron pipe surface which has been
blasted to SSPC No. 10 finish.
7. Minimum Tensile Strength: 2000 psi.
8. Hardness: 55 plus or minus 5 Shore D at 70 degrees F.
9. Flexibility Resistance: ASTM D 1737 using 1-inch mandrel. Allow coating to
cure for 7 days. Perform testing on test coupons held for 15 minutes at
temperature extremes specified in this Paragraph.
2.02 REPAIR AND TOUCHUP MATERIAL
A CORROPIPE II PW (two-component, brush applied, or approved equal). Mix in
accordance with coating manufacturer's recommendations.
3.0 EXECUTION
3.01 SURFACE PREPARATION
A Remove deposits of oil,grease or other organic contaminates before blast cleaning by
using solvent wash as specified in SSPC-PA Guide 3. Clean and dry surfaces making
them completely dry, free of moisture, dust, grit, oil, grease or any other deleterious
substances prior to application of coating.
B Exterior and Interior Surfaces: SSPC-SP10, near-white metal blast cleaning. The
blasting shall be done with clean, hard, sharp cutting abrasives with no steel or cast
iron shot in the mix.
C Ductile Iron Pipe: Prior to the start of production blasting, prepare specimens for a
white metal blast and a near-white metal blast using the equipment and abrasives
proposed for the work. During preparation of the specimens,the blasting intensity and
abrasive shall be changed as necessary to provide the degree of cleaning required by
SSPC-SP10,except that the color of the blasted substrate is not expected to match the
color of blasted steel. After examination and concurrence by the Engineer, the
production blasting may begin. Monitor and control the production blasting so that
production pipe surfaces match the surface of the approved blasting specimens.
07/2006 02636-3 of 6
CITY OF PEARLAND POLYURETHANE COATING ON
STEEL OR DUCTILE IRON PIPE
3.02 THICKNESS
A External Coatings: Minimum DFT of 25 mils (0.025 inch).
B Internal Coatings: Minimum DFT of 35 mils.
C Thickness Determinations: Use Type 1 magnetic thickness gauge as described in SSP-
PA2 specification. Individual readings below 90 percent of specified minimum are not
acceptable. Average individual spot readings(consisting of three point measurements
within 3 inches of each other) less than 95 percent of minimum are not acceptable.
Average of all spot readings less than minimum thickness specified is not acceptable.
3.03 FACTORY APPLICATION OF POLYURETHANE COATING
A Equipment: Two-component, 1:1 mix ratio, heated airless spray unit.
B Temperature: Minimum 5 degrees F above dew point temperature. The temperature
of the surface shall not be less than 60 degrees F during application.
C Humidity: Heating of pipe surfaces may be required to meet the requirements of this
Section, 2.01E, "Cured Coating Properties", if relative humidity exceeds 80 percent.
D Do not thin or mix resins; use as received. Store resins at a temperature above 55
degrees F at all times:
E Application: Conform to coating manufacturer's recommendations. Apply directly to
substrate to achieve specified thickness. Multiple-pass,one-coat application process is
permitted provided maximum allowable recoat time specified by coating manufacturer
is not exceeded.
F Recoat only when coating has cured less than maximum time specified by coating
manufacturer. When coating has cured for more than recoat time, brush-blast or
thoroughly sand coating surface. Blow-off cleaning using clean, dry, high pressure
compressed air.
G Cure at ambient temperature above 0 degrees F. Do not handle pipe until coating has
been allowed to cure as follows:
AMBIENT MINIMUM FULL
TEMPERATURE CURE TIME
Over 70 degrees F 7 days
50 to 70 degrees F 9 days
•
0 to 50 degrees F 12 days
07/2006 02636-4 of 6
CITY OF PEARLAND POLYURETHANE COATING ON
STEEL OR DUCTILE IRON PIPE
3.04 JOINTS
A Apply coating to unlined pipe surfaces including inside of bell socket and outside of
spigot.
B Coating thickness on sealing areas of spigot end of pipe exterior: Minimum 8 mils
(0.008 inch),maximum of 10 mils (0.010 inch). Maximum 10 mils may be exceeded
in spigot end provided maximum spigot diameter as specified by pipe manufacturer is
not exceeded.
3.05 INSPECTION
A Engineer may inspect coatings at coating applicator's facilities.
B Secure approval of surface preparation by coating manufacturer's representative prior
to coating application.
C Holiday Inspection: Conform to AWWA C 210, Section 5.3.3.1. Follow coating
manufacturer's recommendation. Conduct inspection any time after coating has
reached initial cure. Repair in accordance with this Section, 3.07 "Repair and Field
Touchup".
3.06 PIPE INSTALLATION
A When required by the Engineer,provide services of manufacturer's representative for
period of not less than 2 weeks at beginning of actual pipe laying operations to advise
Contractor regarding installation including but not limited to handling and storing,
cleaning and inspecting,coatings repairs, and general construction methods as to how
they may affect pipe coatings.
B Use nylon straps, padded lifts and padded storage skids. Field cuts should be kept to
minimum. Repair damage to coating due to handling or construction practices. Refer
to Section 02634-Ductile Iron Pipe and Fittings and Section 02635—Steel Pipe and
Fittings for additional requirements.
C Just before each section of pipe is to be placed into the trench, conduct a visual and
holiday inspection. Defects in the coating system shall be repaired before the pipe is
installed.
3.07 REPAIR AND FIELD TOUCHUP
A Apply repair and touchup materials in conformance with factory application of
polyurethane coating requirements specified in this Section, excluding equipment
requirements.
B Repair Procedure- Holidays:
1. Remove traces of oil, grease, dust, dirt, and other deleterious materials
2. Roughen area to be patched by sanding with rough grade sandpaper(40 grit).
07/2006 - 02636-5 of 6
CITY OF PEARLAND POLYURETHANE COATING ON
STEEL OR DUCTILE IRON PIPE
3. Apply one coat of repair material described above. Work repair material into
scratched surface by brushing.
C Repair Procedure -Field Cuts or Large Damage:
1. Remove burrs from field cut ends or handling damage and smooth out edge of
polyurethane coating.
2. Remove traces of oil, grease, dust, dirt, and other deleterious materials
3. Roughen area to be patched with rough grade sandpaper (40-grit). Feather
edges and include overlap of 1 inch to 2 inches of roughened polyurethane in
area to be patched.
4. Apply thick coat of repair material described above. Work repair material into
scratched surface by brushing. Feather edges of repair material into prepared
surface. Cover at least 1 inch of roughened area surrounding damage, or
adjacent to field cut.
D Repair Procedure - Thermite Brazed Connection Bonds:
1. Remove polyurethane coating with power wire brush from area on metal
surface which is to receive thermite brazed connection.
2. Grind metal surface to shiny metal with power grinder and coarse grit grinding
wheel.
3. Apply thermite-brazed connection using equipment, charge and procedure
recommended by manufacturer of thermite equipment.
4. After welded surface has cooled to temperature below 130 degrees F, apply
protective coating repair material to weld, exposed pipe surface and damaged
areas of polyurethane coating.
5. Do not cover or backfill freshly repaired areas of coating at thermite-brazed
connection until repair material has completely cured. Allow material to cure
in conformance with manufacturer's recommendations.
END OF SECTION
07/2006 02636-6 of 6
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
Section 02710
BASE COURSE FOR PAVEMENT
1.0 GENERAL
1.01 SECTION INCLUDES
A. Base course of crushed stone, recycled crushed concrete base, cement-stabilized
crushed stone,cement-stabilized bank-run gravel,recycled crushed stone and hot mix
asphalt base course.
B. _ References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350 - Submittals
3. Section 01450—Testing Laboratory Services
4. Section 02742—Prime Coat
C. Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM C 131, "Standard Test Methods for Resistance to Degradation
of Small-Size Coarse Aggregate by Abrasion and Impact in the Los
Angeles Machine"
b. ASTM D 4318, "Standard Test Methods for Liquid Limit, Plastic
Limit, and Plasticity Index of Soils"
c. ASTM C 150, "Standard Specification for Portland Cement"
d. ASTM C 33, "Standard Specification for Concrete Aggregates"
e. ASTM D 1557, "Standard Test Methods for Laboratory Compaction
Characteristics of Soil Using Modified Effort"
f. ASTM D 1556,"Standard Test Method for Density and Unit Weight of
Soil in Place by the Sand-Cone Method"
g. ASTM D 2922, "Standard Test Method for Density of Soil and Soil-
Aggregate in Place by Nuclear Methods (Shallow Depth)"
h. ASTM D 3017,"Standard Test Method for Water Content of Soil and
Rock in Place by Nuclear Methods (Shallow Depth)"
2. Texas Department of Transportation (TxDOT)
a. Tex-101-E, "Preparing Soil and Flexible Base Materials for Testing"
b. Tex-110-E, "Particle Analysis of Soils"
c. Tex-120-E, "Soil-Cement Testing"
d. Tex-106-E, "Calculating the Plasticity Index of Soils"
e. Tex-203-F, "Sand Equivalent Test"
5/2013 02710- 1 of 12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
f. Tex-126-E,"Molding,Testing,and Evaluating Bituminous Black Base
Material"
g. Tex-204-F, "Design of Bituminous Mixtures"
h. Tex-208-F, "Test for Stabilometer Value of Bituminous Material"
i. Tex-227-F, "Theoretical Maximum Specific Gravity of Bituminous
Mixtures"
j. Standard Specifications for Construction and Maintenance of
Highways, Streets and Bridges, 2004 Adoption
1) Item 340, "Dense-Graded Hot-Mix Asphalt(Method)"
1.02 MEASUREMENT AND PAYMENT
A. • Measurement for base course is on a square yard basis. Separate measurement will be
made for each different required thickness of base course.
•
B. When required by Section 01100—Summary of Work,unit price adjustments shall be
made for insufficient in-place depth determined by cores as follows:
1. Adjusted unit price shall be reduced by a ratio of average thickness determined
by cores to thickness bid upon, times unit price bid.
2. Adjustment shall apply to lower limit of 90 percent of unit price bid.
C. Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit samples of crushed stone,gravel,crushed concrete and soil binder for testing.
C. Submit weight tickets,certified by supplier,with each bulk delivery of cement to work
site.
D. Submit manufacturer's description and characteristics for pug mill and associated
equipment, spreading machine, and compaction equipment for approval.
E. Submit manufacturing description and characteristics of spreading and finishing
machine for approval.
1.04 TESTING
A. Testing and analysis of product quality, material sources, or field quality shall be
performed by an independent testing laboratory provided by the Owner under the
5/2013 02710-2 of 12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
provisions of Section 01450 — Testing Laboratory Services and as specified in this
Section.
1.05 DELIVERY, STORAGE,AND HANDLING
A. Stockpiles shall be made up of layers of processed aggregate materials. Load material
by making successive vertical cuts through entire depth of stockpile. Comply with
applicable requirements of Section 01600 — Material and Equipment and Section
02255 —Bedding, Backfill, and Embankment Material.
2.0 PRODUCTS
2.01 CRUSHED STONE FLEXIBLE BASE COURSE
A. Crushed Stone: Material retained on the No. 40 Sieve meeting the following
requirements:
1. Durable particles of crusher-run broken limestone,sandstone,gravel or granite
obtained from an approved source.
2. Los Angeles abrasion test percent of wear not to exceed 40 when tested in
accordance with ASTM C 131.
B. Soil Binder: Material passing the No. 40 Sieve meeting the following requirements
when tested in accordance with ASTM D 4318:
1. Maximum Liquid Limit: 40.
2. Maximum Plasticity Index: 12.
3. Maximum Lineal Shrinkage: 7(when calculated from volumetric shrinkage at
liquid limit).
C. Mixed Materials shall meet the following requirements:
1. Minimum compressive strength of 35 psi at 0 psi lateral pressure and 175 psi at
15 psi lateral pressure using triaxial testing procedures.
2. Grading in accordance with Tex-101-E and Tex-110-E within the following
limits:
SIEVE PERCENT RETAINED
1 3/4-inch 0 to 10
No. 4 45 to 75
No. 40 60 to 85
5/2013 02710-3 of 12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
2.02 CEMENT STABILIZED BASE COURSE
A. Cement: ASTM C 150 Type I; bulk or sacked.
B. Water: Clean; clear; and free from oil, acids, alkali, or vegetable matter.
C. Crushed Stone: material retained on the No. 40 Sieve meeting the following
requirements:
1. Durable particles of crusher-run broken limestone obtained from an approved
source.
2. Los Angeles abrasion test percent of wear not to exceed 40 when tested in
accordance with ASTM C 131.
D. Gravel: Durable particles of bank-run gravel or processed material.
E. Soil Binder: Material passing the No. 40 Sieve meeting the following requirements
when tested in accordance with ASTM D 4318:
1. Maximum Liquid limit: 35.
2. Maximum Plasticity index: 10.
F. Mixed aggregate and soil binder shall meet the following requirements:
1. Grading in accordance with Tex-101-E and Tex-110-E within the following
limits:
PERCENT RETAINED
SIEVE CRUSHED PROCESSED GRAVEL BANKRUN
STONE GR. 1 GR.2 GRAVEL
•
1 3/4-inch 0 to 10 0 to 5 - 0 to 5
'/2-inch - - 0 -
No. 4 45 to 75 30 to 75 15 to 35 30 to 75
No. 40 55 to 80 60 to 85 55 to 85 65 to 85
2. Obtain prior permission from Engineer for use of additives to meet above
requirements.
G. Cut back asphalt: MC30 conforming to requirements of Section 02742—Prime Coat.
H. Emulsified petroleum resin: EPR-1 Prime conforming to requirements of Section
02742—Prime Coat.
5/2013 02710-4 of 12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
I. Design mix for minimum average compressive strength of 200 psi at 48 hours using
Tex-120-E unconfined compressive strength testing procedures. Provide minimum
cement content of 1-1/2 sacks, weighing 94 pounds each,per ton of mix.
J. Increase cement content if average compressive strength of tests on field samples fall
below 200 psi. Refer to Part 3 concerning field samples and tests.
K. Mix in stationary pug mill equipped with feeding and metering devices which shall add
specified quantities of base material, cement, and water into mixer. Dry mix base
material and cement sufficiently to prevent cement balls from forming when water is
added.
L. Resulting mixture shall be homogeneous and uniform in appearance.
2.03 CEMENT-STABILIZED RECYCLED CRUSHED CONCRETE BASE (RCCB)
COURSE
A. System Description: Provide RCCB with following performance:
1. Minimum 5 percent cement.
2. Minimum Compressive Strength: 650 psi at 7 days following TxDOT Tex-
120-E.
3. Prepare concrete product in an on- or off-site pug mill, or in an on-or off-site
portable concrete mixer.
B. Preliminary Design: Prepare preliminary mix for 4 cement ratios; 5, 6, 7 and 8
percent.
1. Designate source of concrete for crushing.
2. Results of compression tests will be used by Engineer to select the final mix
design.
C. Cement: ASTM C 150 Type I, II or III; bulk or sacked.
D. Water: Potable.
E. Aggregate: Recycled Crushed Concrete: Material retained on the No. 40 Sieve, and
durable coarse particles of crusher-run reclaimed cured Portland cement concrete,
obtained from an approved source. Organic material is prohibited.
F. Soil Binder (classified below): Meeting the following requirements when tested
following TxDOT Tex-106-E:
1. Maximum Liquid Limit: 35
2. Maximum Plasticity Index: 10
5/2013 02710-5 of 12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
G; Mixed Aggregate and Soil Binder: Grading following Tex-101-E and Tex-110-E
within the following limits:
SIEVE PERCENT RETAINED
1 3/4-inch 0 to 10
No. 4 45 to 75
No. 40 55 to 80; classified as "Soil Binder"
1. Obtain prior permission from Engineer for use of additives to meet above
requirements.
H. Asphaltic Seal Cure:
1. Use following as Contractor's option to curing by sprinkling, at no additional
cost or time.
2. Cut-back asphalt: MC30 following Section 02742—Prime Coat.
3. Emulsified petroleum resin: EPR-1 Prime following Section 02742—Prime
Coat.
Material Mix and Mixing Equipment
1. Design mix for minimum compressive strength of 650 psi at 7 days following
Tex-120-E unconfined compressive strength.
2. Cement Ratio: If compressive strength of field samples of installed products
fails to meet strength requirements above, increase cement content in one
percent increments up to a maximum of 8 percent.
3. Mix according to the requirement s of this Section, 2.03A, with metering
devices adding specified quantities of crushed concrete,cement,and water into
mixer. Dry mix crushed concrete and cement to prevent cement balls from
forming when water is added. Produce homogeneous and uniformly mixed
product.
2.04 HOT MIX ASPHALT BASE COURSE (BLACK BASE)
A. Coarse Aggregate: Gravel or crushed stone,or combination thereof that is retained on
No. 10 sieve, uniform in quality throughout and free from dirt, organic, or other
injurious matter occurring either free or as coating on aggregate. Aggregate shall
conform to ASTM C 33 except for gradation. Furnish rock or gravel with Los Angeles
abrasion loss not to exceed 40 percent by weight when tested in accordance with
ASTM C 131.
5/2013 02710-6 of 12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
B. Fine Aggregate: Sand or stone screenings, or combination thereof, passing No. 10
sieve. Aggregate shall conform to ASTM C 33 except for gradation. Use sand
composed of sound,durable stone particles free from barns or other injurious foreign
matter. Furnish screenings of same or similar material as specified for coarse
aggregate. Plasticity index of that part of fine aggregate passing No.40 sieve shall be
not more than 6 when tested by Tex-106-E. Sand equivalent shall have a minimum
value of 45 when tested by Tex-203-F.
C. Composite Aggregate: Conform to the grading limits of TxDOT Item 340 for the
paving type indicated on the Plans.
D. Asphaltic Material: Moisture-free homogeneous material which will not foam when
heated to 347°F, meeting the following requirements:
VISCOSITY GRADE
TEST AC-10 AC-20
min. max. min. max.
Viscosity, 140°F stokes 1000 ±200 2000 +400
Viscosity, 275°F stokes 1.9 - 2.5 -
Penetration, 77°F, 100 g, 5 sec. 85 - 55 -
Flash Point, C.E.C., F. 450 - 450 -
Solubility in trichloroethylene,percent 99.0 - 99.0 -
Tests on residues from thin film oven tests:
Viscosity, 140°F stokes - 3000 - 6000
Ductility, 77°F, 5 cms per min., ems 70 - 50
Spot tests Negative for all
1. Material shall not be cracked.
2. Engineer will designate grade of asphalt to use after design tests have been
made. Use only one grade of asphalt after grade is determined by test design
for project.
E. Mixing Plant: Weight-batching or drum mix plant with capacity for producing
continuously mixtures meeting specifications. Plant shall have satisfactory conveyors,
power units, aggregate handling equipment,hot aggregate screens and bins, and dust
collectors. Provide equipment to supply materials adequately in accordance with rated
capacity of plant and produce finished material within specified tolerances. Following
equipment is essential:
1. Cold aggregate bins and proportioning device
2. Dryer
3. Screens
5/2013 02710-7of12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
4. Aggregate weight box and batching scales
5. Mixer
6. Asphalt storage and heating devices
7. Asphalt measuring devices
8. Truck.scales
F. Bins: Separate aggregate into minimum of four bins to produce consistently uniform
grading and asphalt content in completed mix.
G. Mix: Employ and pay certified testing laboratory to prepare design mixes. Test in
accordance with Tex-126-E, Tex-204-F, Tex-208-F, and Tex-227-F.
H. Density and Stability Requirements:
PERCENT DENSITY PERCENT HVEEM STABILITY PERCENT
MIN MAX OPTIMUM NOT LESS THAN
95 99 97 35
I. Proportions for Asphaltic Material:As specified in TxDOT Item 340 for the mix type
shown on the Plans.
3.0 EXECUTION
3.01 EXAMINATION
A. Verify compacted subgrade is ready to support imposed loads.
B. Verify lines and grades are correct.
3.02 PLACEMENT
A. Do not mix and place cement stabilized base when temperature is below 40° F and
falling. Base may be placed when temperature taken in shade and away from artificial
heat is above 35°F and rising.
B. Place material on prepared subgrade in uniform layers to produce thickness indicated
on Plans. Depth of layers shall not exceed 8 inches. Do not dump material in piles or
windrows.
C. Spread with approved spreading machine. Conduct spreading so as to eliminate planes
of weakness or pockets of non-uniformly graded material resulting from hauling and
dumping operations.
5/2013 02710-8of12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
D. Provide construction joints between new material and stabilized base that has been in
place 4 hours or longer. Joints shall be approximately vertical. Form joint with a
temporary header or make vertical cut of previous base immediately before placing
subsequent base.
E. Use only one longitudinal joint at center line under main lanes and shoulder. Do not
use longitudinal joints under frontage roads and ramps.
F. Place base so that projecting reinforcing steel from curbs remain at approximate center
of base. Secure a firm bond between reinforcement and base.
G. Do not place asphaltic base when air temperature is below 50 F and falling. Base may
be placed when air temperature taken in shade and away from artificial heat is above
40 F and rising.
H. Haul prepared and heated asphaltic concrete mixture to project in tight vehicles
previously cleaned of foreign material. Mixture shall be at temperature between 250°
F and 325°F when laid.
I. Spread material into place with approved mechanical spreading and finishing machine
of screening or tamping type. Use track-mounted finish machine to place base course
directly on earth subgrade.
J. Place base courses 4 inches or greater in thickness in two or more layers,each having
compacted thickness of not greater than 4 inches. Spread all lifts. Attain smooth
course of uniform density to section, line and grades as indicated on Plans.
K. Place courses as nearly continuously as possible. Pass roller over unprotected ends of
freshly laid mixture only when mixture has become cooled. When work is resumed,
cut back laid material to produce slightly beveled edge for full thickness of course.
Remove old material which has been cut away and lay new mix against fresh cut.
L. When new asphalt/concrete is laid against existing asphalt, existing asphalt/concrete
shall be saw cut full depth to provide straight smooth joint.
M. In restricted areas where use of paver is impractical, spread and finish asphalt by
mechanical compactor. Use wood or steel forms, rigidly supported to assure correct
grade and cross section. Carefully place materials to avoid segregation of mix. Do not
broadcast material. Remove any lumps that do not break down readily. Place asphalt
courses in same sequence as if placed by machine.
3.03 COMPACTION
A. Start compaction as soon as possible but not more than 60 minutes from start of moist
mixing. Compact loose mixture with approved tamping rollers until entire depth is
uniformly compacted. Do not allow stabilized base to mix with underlying material.
5/2013 02710-9of12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
B. Correct irregularities or weak spots immediately by replacing material and
recompacting.
C. Apply water to maintain moisture between optimum and 3 percent above optimum
moisture as determined by ASTM D 1557. Mix in with a spiked tooth harrow or
equal. Reshape surface and lightly scarify to loosen imprints made by equipment.
D. Remove and reconstruct sections where average moisture content exceeds ranges
specified at time of final compaction.
E. Finish by blading surface to final grade after compacting final course. Seal with
approved pneumatic tired rollers which are sufficiently light to prevent surface hair
line cracking. Rework and recompact at areas where hair line cracking develops.
F. Compact to minimum density of 95 percent of modified Proctor density at a moisture
content of treated material between optimum and 3 percent above optimum as
determined by ASTM D 1557, unless otherwise indicated on the Plans.
G. Maintain surface to required lines and grades throughout operation.
3.04 CURING
A. Moist cure for minimum of 7 days before adding pavement courses. Restrict traffic on
base to local property access. Keep subgrade surface damp by sprinkling.
B. If indicated on Plans, cover base surface with a curing membrane as soon as finishing
operation is complete. Apply with approved self-propelled pressure distributer at
following rates, or as indicated on Plans:
1. MC30: 0.1 gallon per square yard.
2. EPR-1 Prime: 0.15 gallon per square yard.
C. Do not use cutback asphalt during the period of April 16 to September 15.
3.05 TOLERANCES
A. Completed surface shall be smooth and conform to typical section and established
lines and grades.
B. Top surface of base course: Plus or minus 1/4 inch in cross section, or in 16 foot
length.
5/2013 02710- 10 of 12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
3.06 FIELD QUALITY CONTROL
A. At the direction of the Engineer, a minimum of one core will be taken at random
locations per 1,000 linear feet per lane of roadway or 500 square yards of base to
determine in-place depth.
B. Contractor may, at his own expense, request additional cores in the vicinity of cores
indicating nonconforming in-place depths. If the average of the tests falls below the
required depth,place and compact additional material at no cost to the Owner.
C. Compaction Testing will be performed in accordance with ASTM D 1556 or ASTM D
2922 and ASTM D 3017 at a random location near each depth determination core.
Rework and recompact areas that do not conform to compaction requirements at no
additional cost to the Owner.
D. Fill cores and density test sections with new compacted cement stabilized base.
3.07 NONCONFORMING PAVEMENT
A. Recompact pavement sections not meeting specified densities or replace them with
new asphaltic concrete material. Replace with new material, sections of base course
not meeting surface test requirements or having unacceptable surface texture. Patch
asphalt pavement sections in accordance with procedures established by Asphalt
Institute.
B. Remove and replace areas of asphaltic concrete base course found by cores to be
deficient in thickness by more than 10 percent at no cost to Owner. Use new asphaltic
concrete base material of thickness shown on Plans.
C. Areas of asphaltic concrete base course found by cores to be deficient in thickness by
less than 10 percent shall be remedied at the Owner's direction by one of the following
methods:
1. Remove and replace using new asphaltic concrete base material of thickness
shown on Plans and in accordance with the requirements of this Section at no
cost to Owner.
2. Reduce the Unit Price by the ratio of the average thickness (as determined by
cores)to the thickness required.
D. No adjustments will be made for excess thickness.
3.08 PROTECTION OF THE WORK
A. Maintain stabilized base in good condition until completion of work. Repair defects
immediately by replacing base to full depth.
5/2013 02710- 11 of 12
CITY OF PEARLAND BASE COURSE
FOR PAVEMENT
B. Protect the asphalt membrane,if used,from being picked up by traffic. The membrane
may remain in place when proposed surface courses or other base courses are to be
applied.
END OF SECTION
5/2013 02710- 12 of 12
CITY OF PEARLAND ASPHALTIC CONCRETE
PAVEMENT
Section 02741
ASPHALTIC CONCRETE PAVEMENT
1.0 GENERAL
1.01 SECTION INCLUDES
A. Surface courses of compacted mixture of coarse and fine aggregates and asphaltic
material.
B. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350 - Submittals
3. Section 01450—Testing Laboratory Services
4. Section 02742—Prime Coat
5. Section 02743 —Tack Coat
C. Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM C 33, "Standard Specification for Concrete Aggregates"
b. ASTM C 131, "Standard Test Methods for Resistance to Degradation
of Small-Size Coarse Aggregate by Abrasion and Impact in the Los
Angeles Machine"
2. Texas Department of Transportation(TxDOT)
a. Tex-106-E, "Calculating the Plasticity Index of Soils"
b. Tex-203-F, "Sand Equivalent Test"
c. Tex-126-E,"Molding,Testing,and Evaluating Bituminous Black Base
Material"
d. Tex-204-F, "Design of Bituminous Mixtures"
e. Tex-208-F, "Test for Stabilometer Value of Bituminous Material"
f. Tex-207-F, "Determining Density of Compacted Bituminous
Mixtures"
g. Tex-227-F, "Theoretical Maximum Specific Gravity of Bituminous
Mixtures"
•
h. Standard Specifications for Construction and Maintenance of
Highways, Streets and Bridges, 2004 Adoption
1) Item 340, "Dense-Graded Hot-Mix Asphalt(Method)"
5/2013 02741 - 1 of 7
CITY OF PEARLAND ASPHALTIC CONCRETE
PAVEMENT
1.02 MEASUREMENT AND PAYMENT
A. Measurement for asphaltic concrete pavement is on square yard basis. Separate
measurement will be made for each different required thickness of pavement.
B. Payment for asphaltic concrete pavement includes all labor and materials required to
complete placement as indicated on Plans.
C. Refer to Section 01200—Measurement and Payment Procedures.
D. Refer to this Section,3.07"Noncomforming Pavement"for unit price adjustments for
deficient thickness.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit certificates that asphaltic materials and aggregates meet requirements of this
Section.
C. Submit proposed design mix and test data for each type and strength of surface course
in Work.
D. Submit manufacturer's description and characteristics of mixing plant for approval.
E. Submit manufacturer's description and characteristics of spreading and finishing
machine for approval.
1.04 TESTING
A. Testing and analysis of product quality, material sources, or field quality shall be
performed by an independent testing laboratory provided by the Owner under the
provisions of Section 01450 — Testing Laboratory Services and as specified in this
Section.
2.0 PRODUCTS
2.01 MATERIALS
A. Coarse Aggregate: Crushed stone or gravel or combination thereof,that is retained on
No. 10 sieve, uniform in quality throughout and free from dirt, organic or other
injurious matter occurring either free or as coating on aggregate. Aggregate shall
conform to ASTM C 33 except for gradation. Furnish rock or gravel with Los Angeles
5/2013 02741 -2 of 7
CITY OF PEARLAND ASPHALTIC CONCRETE
PAVEMENT
abrasion loss not to exceed 40 percent by weight when tested in accordance with
ASTM C 131.
B. Fine Aggregate: Sand or stone screenings or combination of both passing No. 10
sieve. Aggregate shall conform to ASTM C 33 except for gradation. Use sand
composed of sound,durable stone particles free from loams or other injurious foreign
matter. Furnish screenings of same or similar material as specified for coarse
aggregate. Plasticity index of that part of fine aggregate passing No.40 sieve shall be
not more than 6 when tested by Tex-106-E. Sand equivalent shall have a minimum
value of 45 when tested by Tex-203-F.
C. Composite Aggregate: Conform to the grading limits of TxDOT Item 340 for the
paving type indicated on the Plans.
D. Asphaltic Material: Moisture-free homogeneous material which will not foam when
heated to 347°F, meeting following requirements:
VISCOSITY GRADE
TEST AC-10 AC-20
MIN. MAX. MIN. MAX.
Viscosity, 140° stokes 1000 ±200 2000 ±400
Viscosity, 275° stokes 1.9 - 2.5 -
Penetration, 77°, 100 g, 5 sec. 85 - 55 -
Flash Point, C.O.C., F. 450 - 450 -
Solubility in trichloroethylene,percent 99.0 - 99.0 -
Tests on residues from thin film oven tests:
Viscosity, 140° stokes - 3000 - 6000
Ductility, 77°, 5 cms per min., cms 70 - 50 -
Spot tests Negative for all grades
1. Material shall not be cracked.
2. The Engineer will designate grade of asphalt to use after design tests have been made. Use
only one grade of asphalt after grade is determined by test design for project.
2.02 EQUIPMENT
A. Mixing Plant: Weight-batching or drum mix plant with capacity for producing
continuously mixtures meeting specifications. Plant shall have satisfactory conveyors,
power units, aggregate handling equipment,hot aggregate screens and bins, and dust
5/2013 02741 -3 of 7
CITY OF PEARLAND ASPHALTIC CONCRETE
PAVEMENT
collectors. Provide equipment to supply materials adequately in accordance with rated
capacity of plant and produce finished material within specified tolerances. Following
equipment is essential:
1. Cold aggregate bins and proportioning device.
2. Dryer.
3. Screens.
4. Aggregate weight box and batching scales.
5. Mixer.
6. Asphalt storage and heating devices.
7. Asphalt measuring devices.
8. Truck scales.
B. Bins: Separate aggregate into minimum of four bins to produce consistently uniform
grading and asphalt content in completed mix.
2.03 MIXES
A. Employ and pay certified testing laboratory to prepare design mixes. Test in
accordance with Tex-126-E or Tex-204-F and Tex-208-F.
B. Density and Stability Requirements:
PERCENT DENSITY PERCENT HVEEM STABILITY PERCENT
MIN. MAX. OPTIMUM NOT LESS THAN
95 99 97 35
C. Proportions for Asphaltic Material: As specified in TxDOT Item 340 for the paving
type shown on the Plans.
3.0 EXECUTION
3.01 EXAMINATION
A. Verify compacted base course is ready to support imposed loads.
B. Verify lines and grades are correct.
3.02 PREPARATION
A. Prime Coat: If indicated on the Plans,apply a prime coat conforming to requirements
of Section 02742—Prime Coat. Do not apply a tack coat until primed base has cured
to satisfaction of the Engineer.
5/2013 02741 -4 of 7
CITY OF PEARLAND ASPHALTIC CONCRETE
PAVEMENT
B. Tack Coat: Conform to requirements of Section 02743 — Tack Coat. Where the
mixture will adhere to the surface on which it is to be placed without use of a tack
coat, tack coat may be eliminated if approved by the Engineer.
C. Do not use cutback asphalt during the period of April 16 to September 15.
3.03 PLACEMENT
A. Do not place asphaltic mixture in rain or when air temperature is below 50° F and
falling. Mixture may be placed when air temperature taken in shade and away from
artificial heat is above 40 F and rising.
B. Haul prepared and heated asphaltic concrete mixture to the project in tight vehicles
previously cleaned of foreign material. Mixture shall be at temperature between 250°
F and 325°F when laid.
C. Spread material into place with approved mechanical spreading and finishing machine
of screening or tamping type. Use track-mounted finish machine to place base course
directly on earth subgrade.
D. Surface Course Material: Surface course 2 inches or less in thickness may be spread in
one lift. Spread all lifts in such manner that,when compacted,finished course will be
smooth, of uniform density, and will be to section,line and grade as shown. Coincide
construction joints on surface courses with lime lines, or as directed by the Engineer.
E. Place courses as nearly continuously as possible. Pass roller over unprotected ends of
freshly laid mixture only when mixture has cooled. When work is resumed,cut back
laid material to produce slightly beveled edge for full thickness of course. Remove old
material which has been cut away and lay new mix against fresh cut.
F. When new asphalt is laid against existing or old asphalt mat, existing or old asphalt
shall be saw cut full depth to provide straight smooth joint.
G. In restricted areas where use of paver is impractical, spread and finish asphalt by
mechanical compactor. Use wood or steel forms, rigidly supported to assure correct
grade and cross section. Carefully place materials to avoid segregation of mix. Do not
broadcast material. Remove any lumps that do not break down readily. Place asphalt
courses in same sequence as if placed by machine.
3.04 COMPACTION
A. Begin rolling while pavement is still hot and as soon as it will bear roller without
undue displacement or hair cracking. Keep wheels properly moistened with water to
prevent adhesion of surface mixture. Do not use excessive water.
5/2013 02741 -5 of 7
CITY OF PEARLAND ASPHALTIC CONCRETE
PAVEMENT
B. Compress surface thoroughly and uniformly, first with power-driven, 3-wheel, or
tandem rollers weighing from 8 to 10 tons. Obtain subsequent compression by starting
at side and rolling longitudinally toward center of pavement,overlapping on successive
trips by at least one-half width of rear wheels. Make alternate trips slightly different in
length. Continue rolling until no further compression can be obtained and all rolling
marks are eliminated. Complete all rolling before mixture temperature drops below
175 F.
C. Use tandem roller for final rolling. Double coverage with approved pneumatic roller
on asphaltic concrete surface is acceptable after flat wheel and tandem rolling has been
completed.
D. Along walls,curbs,headers and similar structures,and in all locations not accessible to
rollers, compact mixture thoroughly with lightly oiled tamps.
E. Compact binder course and surface course to density not less than 93 percent of the
maximum possible density of voidless mixture composed of same materials in like
proportions.
3.05 TOLERANCES
A. Furnish templates for checking surface in finished sections. Maximum deflection of
templates, when supported at center, shall not exceed 1/8 inch.
B. Completed surface,when tested with 10-foot straightedge laid parallel to center line of
pavement,shall show no deviation in excess of 1/8 inch in 10 feet. Correct any surface
not meeting this requirement.
3.06 FIELD QUALITY CONTROL
A. At the direction of the Engineer, minimum of one core may be taken at random
locations per 1,000 feet per lane of roadway or 500 square yards of asphalt concrete
pavement to determine in-place depth and density.
B. In-place density will be determined in accordance with Tex-207-F and Tex-227-F from
cores or sections of asphaltic base located near each core. Other methods of
determining in-place density,which correlate satisfactorily with results obtained from
roadway specimens, may be used when approved by the Engineer.
C. Contractor may,at his own expense,request three additional cores in vicinity of cores
indicating nonconforming in-place depths. In-place depth at these locations shall be
average depth'of four cores.
D. Fill cores and density test sections with new compacted asphaltic concrete pavement.
5/2013 02741 -6 of 7
CITY OF PEARLAND ASPHALTIC CONCRETE
PAVEMENT
3.07 NONCONFORMING PAVEMENT
A. Recompact pavement sections not meeting specified densities or replace them with
new asphaltic concrete material. Replace with new material sections of surface course
pavement not meeting surface test requirements or having unacceptable surface
texture. Patch asphalt pavement sections in accordance with procedures established by
Asphalt Institute.
B. Remove and replace areas of asphaltic concrete pavement found by cores to be
deficient in thickness by more than 10 percent at no cost to Owner. Use new asphaltic
concrete pavement of thickness shown on Plans.
C. Areas of asphaltic concrete pavement found by cores to be deficient in thickness by
less than 10 percent shall be remedied at the Owner's direction by one of the following
methods:
1. Remove and replace using new asphaltic concrete pavement of thickness
shown on Plans and in accordance with the requirements of this Section at no
cost to Owner.
2. Reduce the Unit Price by the ratio of the average thickness (as determined by
cores) to the thickness required.
D. No adjustments will be made for excess thickness.
3.08 PROTECTION OF THE WORK
A. Do not open pavement to traffic until 12 hours after completion of rolling,or as shown
on Plans.
B. Maintain asphaltic concrete pavement in good condition until completion of Work.
C. Repair defects immediately by replacing asphaltic concrete pavement to full depth at
no cost to Owner.
END OF SECTION
5/2013 02741 -7 of 7
CITY OF PEARLAND PRIME COAT
Section 02742
PRIME COAT
1.0 GENERAL
1.01 SECTION INCLUDES
A. Prime coat for asphaltic concrete paving
B. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
1.02 MEASUREMENT AND PAYMENT
A. Unless indicated as a Bid Item,no separate payment will be made for prime coat under
this Section. Include cost in Bid Items for which this Work is a component.
B. If prime coat is included as a Bid Item,measurement will be based on the units shown
in Section 00300—Bid Proposal and in accordance with Section 01200—Measurement
and Payment Procedures.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit product data for proposed prime coat.
C. Submit report of recent calibration of distributor.
2.0 PRODUCTS
2.01 CUTBACK ASPHALT
A. Provide moisture-free homogeneous material which will not foam when heated to 347°
F and which meets following requirements:
1. Asphalt material for prime coat shall be MC-30 or MC-70 and shall meet
following requirements:
5/2013 02742- 1 of 4
CITY OF PEARLAND PRIME COAT
TYPE-GRADE MC-30 MC-70
PROPERTIES MIN. MAX. MIN. MAX.
Water,percent --- 0.2 --- 0.2
Flash Point, T.O.C., °F 100 --- 100 ---
Kinematic Viscosity at 140°F, cst 30 ' 60 70 140
2. Distillate shall be as follows,expressed as percent by volume of total distillate
to 680°F:
MC-30 MC-70
MIN. MAX. MIN. MAX.i
to 437°F --- 25 --- 20
to 500°F 40 70 20 60
to 600°F 75 93 65 90
Residue from 680°F Distillation,
Volume,percent 50 --- 55 ---
3. Tests on Distillation Residue:
MC-30 MC-70
MIN. MAX. MIN. MAX.
Penetration at 77°F, 100g, 5 sec. 120 250 120 250
Ductility at 77°F, 5 cm/min. cms 100* --- 100* ---
Solubility in trichloroethylene, % 99 --- 99 ---
Spot Test All Negative
* If penetration of residue is more than 200 and ductility at 77°F is less than
100 cm, material will be acceptable if its ductility at 60°F is more than 100.
5/2013 02742-2 of 4
CITY OF PEARLAND PRIME COAT
2.02 EMULSIFIED PETROLEUM RESIN
A. EPR-1 Prime: Slow curing emulsion of petroleum resin and asphalt cement
conforming to the following requirements:
PROPERTIES MIN. MAX.
Fural Viscosity at 77 °F, sec 14 40
Residue by Evaporation, %by weight 60 -
Sieve Test, % - 0.1
Particle Charge Test Positive
Tests on the Distilation Residue:
Flash Point, COC (F) 400 • -
Kinematic Viscosity @ 140°F (cSt) 190 350
B. For use,EPR-1 maybe diluted with water up to a maximum of three parts water to one
part EPR-1 in order to achieve the desired concentration of residual resin/asphalt and
facilitate application.
3.0 EXECUTION
3.01 EXAMINATION
A. Verify base is ready to support imposed loads.
B. Verify lines and grades are correct.
3.02 PREPARATION
A. Thoroughly clean base course surface of loose material by brooming prior to
application of prime coat.
B. Prepare sufficient base in advance of paving for efficient operations.
3.03 APPLICATION, GENERAL
A. Apply prime coat with approved type of self-propelled pressure distributor. Distribute
prime coat evenly and smoothly under pressure necessary for proper distribution.
B. Keep all storage tanks,piping,retorts,booster tanks and distributors used in handling
asphaltic materials clean and in good operating conditions. Conduct operations so that
asphaltic material does not become contaminated.
C. If yield of asphaltic material appears to be in error, recalibrate distributor prior to
continuing Work.
5/2013 02742-3 of 4
CITY OF PEARLAND PRIME COAT
D. Maintain the surface until Work is accepted by Owner.
3.04 APPLICATION, CUTBACK ASPHALT
A. Do not use cutback asphalt during the period of April 16 to September 15.
B. Do not place prime coat in rain or when air temperature is below 60° F and falling.
Materials may be placed when air temperature taken in shade and away from artificial
heat is above 50°F and rising.
C. Distribute at rate of 0.25 to 0.35 gallons per square yard.
D. Provide all necessary facilities for determining temperature of asphaltic material in all
heating equipment and in distributor, for determining rate of application, and for
obtaining uniformity at junction of two distributor loads. Provide and maintain in
good working order, recording thermometer at storage Heating unit at all times.
E. Temperature of application shall be based on temperature-viscosity relationship that
will permit application of asphalt with viscosity of 100 to 125 centistokes. Maintain
asphalt within 15°F of temperature required to meet viscosity. Selected temperature
shall be within following range:
PRIME COAT TYPE MINIMUM (° F) MAXIMUM (° F)
MC-30 70 150
MC70 125 175
F. Do not allow temperature of MC-30 to exceed 175°F at any time.
G. Do not allow temperature of MC-70 to exceed 200°F at any time.
3.05 APPLICATION, EMULSIFIED PETROLEUM RESIN
A. Do not place prime coat in rain or when air temperature is below 36°F and falling.
B. Distribute at rate of 0.15 to 0.25 gallons per square yard.
3.06 PROTECTION OF THE WORK
A. No traffic or placing of subsequent courses shall be permitted over freshly applied
prime coat until authorized by the Engineer.
END OF SECTION
5/201.3 02742-4 of 4
CITY OF PEARLAND TACK COAT
Section 02743
TACK COAT
1.0 GENERAL
1.01 SECTION INCLUDES
A. Tack coat for asphaltic concrete paving.
B. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350 - Submittals
C. Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 244, "Standard Test Methods and Practices for Emulsified
Asphalts"
1.02 MEASUREMENT AND PAYMENT
A. Unless indicated as a Bid Item,no separate payment will be made for tack coat under
this Section. Include cost in Bid Items for which this Work is a component.
B. If tack coat is included as a Bid Item,measurement will be based on the units shown in
Section 00300—Bid Proposal and in accordance with Section 01200—Measurement
and Payment Procedures.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit product data for proposed tack coat.
C. Submit report of recent calibration of distributor.
2.0 PRODUCTS
2.01 QUTBACK ASPHALT
A. Provide moisture-free, homogeneous material which will not foam when heated to
347° F and which meets following requirements:
5/2013 02743 - 1 of 4
CITY OF PEARLAND TACK COAT
1. Asphalt material for tack coat: RC-250 and meet following:
PROPERTIES MIN. MAX.
Water,percent --- 0.2
Flash Point, T.O.C., °F 80 ---
Kinematic Viscosity at 140°F, cst 250 400
2. Distillate: Expressed as percent by volume of total distillate to 680°F:
MIN MAX
to 437°F • 40 75
to 500°F 65 90
to 600°F 85 ---
Residue from 680°F Distillation
Volume,percent 70 ---
3. Tests on Distillation Residue:
MIN. MAX
Penetration at 77°F, 100g, 5 sec. 100 150
Ductility at 77°F, 5 cms 100 ---
Solubility in trichloroethylene, % 99 ---
Spot Test All Negative
2.02 EMULSION
A. Provide homogeneous material which shall show no separation of asphalt after mixing
and shall meet the viscosity requirements at any time within 30 days after delivery.
1. Emulsion material for tack coat: SS-1 and meet following:
400.
5/2013 02743 -2 of 4
CITY OF PEARLAND TACK COAT
MIN. MAX
Furol Viscosity at 77°F, sec. 30 100
Residue by Distillation, % 60 ---
Oil Portion of Distillate, % --- 2
Sieve Test, % --- 0.1
Miscibility(Standard Test) Passing Passing
Cement Mixing, % --- 2.0
Storage Stability, 1 Day, % --- 1
Test on Residue:
Penetration at 77°F, 100 g, 5 sec 120 160
Solubility in Trichloroethylene, % 97.5 ---
Ductility at 77°F, 5 cm/min, cros 100 ---
2. For emulsions used for tack coats during the period of April 16 to September
15,volatile organic compound solvents(VOC)shall not exceed 12%by weight
when tested in accordance with ASTM D 244.
3.0 EXECUTION
3.01 EXAMINATION
A. Verify compacted base is ready to support imposed loads.
B. Verify lines and grades are correct.
3.02 PREPARATION
A. Thoroughly clean base course or concrete surface of loose material by brooming prior
to application of tack coat.
3.03 APPLICATION
A. Apply tack coat uniformly by use of approved distributor at rate not to exceed 0.05
gallons per square yard of surface.
B. Paint all contact surfaces of curbs and structures, and all joints with thin uniform coat
of tack coat.
5/2013 02743 -3 of 4
CITY OF PEARLAND TACK COAT
C. Cutback Asphalt:
1. Do not use cutback asphalt during the period of April 16 to September 15.
2. Do not place tack coat in rain or when air temperature is below 50° F and
falling. Materials may be placed when air temperature taken in shade and away
from artificial heat is above 40°F and rising.
3. Temperature of tack coat shall be between 125° F and 180° F when applied.
4. Do not heat tack coat above 200° F at any time.
3.04 PROTECTION OF THE WORK
A. No traffic or placing of subsequent courses shall be permitted over freshly applied tack
coat until authorized by the Engineer.
END OF SECTION
5/2013 02743 -4 of 4
CITY OF PEARLAND SINGLE COURSE SURFACE TREATMENT
Section 02744
SINGLE COURSE SURFACE TREATMENT
1.0 GENERAL
1.01 SECTION INCLUDES
A A wearing surface, also known as Seal Coat or Chip-Seal, composed of a single
application of asphaltic material, covered with aggregate, constructed on a prepared
surface or base course.
B References to Technical Specifications:
1. Section 01100—Summary of Work
2. Section 01200—Measurement and Payment Procedures
3. Section 01350—Submittals
4. Section 02980—Pavement Repair
C Referenced Standards:
1. Texas Department of Transportation (TxDOT)
a. Standard Specifications for Construction and Maintenance of
Highways, Streets and Bridges, 2004 Adoption
1) Item 300, "Asphalts, Oils, and Emulsions"
2) Item 302, "Aggregates for Surface Treatments"
3) Item 316, "Surface Treatments"
4) Item 210, "Rolling"
1.02 MEASUREMENT AND PAYMENT
A Measurement for Single Course Surface Treatment is on square yard basis,measured
and completed in place. Payment includes materials, equipment, preparation, and
work associated with the application of the Surface Treatment.
B Unless indicated as a Bid Item,no separate payment will be made for repair of failed or
defective areas of pavement prior to resurfacing.
C If paving repair is included as a Bid Item,measurement is on a square yard basis. The
limits are as defined in Section 01100—Summary of Work, or as shown on Plans.
D Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 -
Submittals.
B Submit test results and certifications that asphaltic materials and aggregates meet
requirements of this Section prior to use.
07/2006 02744- 1 of 4
CITY OF PEARLAND SINGLE COURSE SURFACE TREATMENT
C Submit manufacturer's description and characteristics of aggregate spreading and
finishing machine(s) for approval.
D Submit calibration report of emulsion distributor. The requirement of this submittal
may be waived by Engineer when a computer controlled distributor is used.
2.0 PRODUCTS
2.01 EMULSION
A Asphaltic material shall conform to the requirements of TxDOT,Item 300, "Asphalts,
Oils, and Emulsions".
B The asphaltic material shall be Grade CRS-JP or CRS-2P
1. The CRS-1P shall be a rapid setting, cationic emulsion for use in placing
surface treatments when the air temperature is between 40°F and 70°F.
2. The CRS-2P shall be a rapid setting, cationic emulsion for use in placing
surface treatments when the air temperature is 60°F and rising.
C The emulsion shall break and cure in a reasonable amount of time when the aggregate
is applied, regardless of sunlight or humidity conditions.
2.02 AGGREGATE
A Aggregate material shall conform in type, grade, classification, and quality to the
requirements of TxDOT, Item 302, "Aggregates for Surface Treatments". Samples
submitted for testing shall be taken from stockpiles located on the Project Site.
B Stockpile aggregate separately. Take necessary steps to prevent stockpiles from being
contaminated. Do not add materials to approved stockpiles without the Engineer's
approval.
C When tested by TxDOT, Tex-200-F, Part 1, the aggregate gradation shall meet the
requirements in the table below for the specified grade:
Aggregate Gradation Requirements
(Cumulative % Retained)
SIEVE GRADE GRADE
SIZE 3 4
3/ in 0
% in 0-2 0
s/in 20-40 0-5
% in 80— 100 20-40
'/a in 95 - 100 —
#4 — 95 — 100
#8 99 - 100 98 - 100
07/2006 02744-2 of 4
CITY OF PEARLAND SINGLE COURSE SURFACE TREATMENT
2.03 EQUIPMENT
A Equipment used in each phase of application shall conform to the requirements of
TxDOT, Article 316.3 "Equipment".
3.0 EXECUTION
3.01 EXAMINATION
A Verify compacted base or prepared surface is ready to support imposed loads.
B Verify lines and grades are correct.
3.02 PREPARATION
A All holes, ruts, depressions, or other defects in the surface shall be repaired and
defective areas cleaned out by scarifying or acceptable hand methods under the
provisions of Section 02980—Pavement Repair.
B Fill defects with new material of the same character,or other materials approved by the
Engineer,the road surface shall be compacted by rolling or tamping so that a smooth,
hard, well cemented surface, conforming to the lines,grade, and typical cross-section
shown on the plans is-secured.
C After the patches have been allowed to set-up under traffic, sweep the surface of the
roadway clean from dirt, dust, and other deleterious matter by means of mechanical,
rotary street sweeper, hand brooms, or compressed air.
D Before any asphaltic material is applied,all cakes of dust or clay and all foreign matter
shall be removed and the surface thoroughly cleaned until the embedded aggregate is
cleaned but not discharged or loosened.
E The surface may be lightly sprinkled just prior to application of the asphalt if found
necessary by the Engineer.
3.03 APPLICATION
A Air temperature shall be taken in the shade and away from artificial heat.
1. Treatment may be applied when air temperature is above 40°F and rising.
2. Do not apply treatment when air temperature is below 50°F and falling.
3. Do not apply treatment when roadway surface temperature is below 60°F.
4. When, in the opinion of the Engineer, general weather conditions are not
suitable, do not apply treatment.
B When Grade 3 aggregate is specified, the asphaltic material shall be applied on the
prepared surface at a rate of approximately 0.35 gallons per square yard.
C When Grade 4 aggregate is specified, the asphaltic material shall be applied on the
prepared surface at a rate of approximately 0.30 gallons per square yard.
07/2006 02744-3 of 4
CITY OF PEARLAND SINGLE COURSE SURFACE TREATMENT
D When Type B (crushed gravel,crushed slag,crushed stone,or limestone rock asphalt)
aggregate is specified, the rate of spread shall be one cubic yard to each 90 square
yards of surface area.
E When Type PB (precoated crushed gravel, crushed slag, crushed stone, or limestone
rock asphalt) aggregate is specified, the rate of spread shall be one cubic yard to each
95 square yards of surface area.
F The surface shall be thoroughly rolled as soon as aggregate is applied with a self-
propelled light, pneumatic roller in accordance with applicable sections of TxDOT,
Item 316, "Surface Treatment" and TxDOT, Item 210, "Rolling".
G The Contractor shall repair all fatty areas with additional cover material and all lean
areas by adding asphalt to the extent that a uniformly dense treatment is finally
obtained. Should depressions, unevenness, or irregular spots develop on the surface,
they shall be remedied and the surface brought to true grade and cross-section.
H The surface shall be broomed to remove excess aggregate as soon as aggregate has
sufficiently bonded. Brooming shall be repeated the following work day.
3.04 PROTECTION OF THE WORK
A No traffic or placing of subsequent courses shall be permitted over freshly applied tack
coat until authorized by the Engineer.
B Contractor is responsible for maintaining Single Course Surface Treatment until
Owner accepts the Work.
END OF SECTION
07/2006 02744-4 of 4
CITY OF PEARLAND CONCRETE PAVEMENT
Section 02751
CONCRETE PAVEMENT
1.0 GENERAL
1.01 SECTION INCLUDES
A Portland Cement Concrete Pavement for Concrete Streets,Driveways and Sidewalks;
Joints and Curing Materials.
B References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01450—Testing Laboratory Services
C Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM C 150, "Standard Specification for Portland Cement"
b. ASTM C 94, "Standard Specification for Ready-Mixed Concrete"
c. ASTM C 33, "Standard Specification for Concrete Aggregates"
d. ASTM C 131, "Standard Test Methods for Resistance to Degradation
of Small-Size Coarse Aggregate by Abrasion and Impact in the Los
Angeles Machine"
e. ASTM C 136, "Standard Test Method for Sieve Analysis of Fine and
Coarse Aggregates"
f. ASTM C 40, "Standard Test Method for Organic Impurities in Fine
Aggregates for Concrete"
g. ASTM C 260
h. ASTM C 494, "Standard Specification for Chemical Admixtures for
Concrete"
i. ASTM A 615, "Standard Specification for Deformed and Plain
Carbon-Steel Bars for Concrete Reinforcement"
j. ASTM D 994,"Standard Specification for Preformed Expansion Joint
Filler for Concrete (Bituminous Type)"
k. ASTM D 1751,"Standard Specification for Preformed Expansion Joint
Filler for Concrete Paving and Structural Construction(Nonextruding
and Resilient Bituminous Type)
1. ASTM D 6690, "Standard Specification for Joint and Crack Sealants,
Hot-Applied, for Concrete and Asphaltic Pavements"
m. ASTM C 39, "Standard Test Method for Compressive Strength of
Concrete"
n. ASTM C 31,"Standard Practice for Making and Curing Concrete Test
Specimens in the Field"
o. ASTM C 143,"Standard Test Method for Slump of Hydraulic Cement
Concrete"
08/2011 02751 - 1 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
p. ASTM C 138,"Standard Test Method for Density(Unit Weight),Yield,
and Air Content (Gravimetric) of Concrete"
q. ASTM C 231,"Standard Test Method for Air Content of Freshly Mixed
Concrete by the Pressure Method"
r. ASTM C 171, "Standard Specification for Sheet Materials for Curing
Concrete"
s. ASTM C 309,"Standard Specification for Liquid Membrane-Forming
Compounds for Curing Concrete"
t. ASTM C 42,"Standard Test Method for Obtaining and Testing Drilled
Cores and Sawed Beams of Concrete"
2. Texas Department of Transportation (TxDOT)
a. Tex-406-A, "Material Finer than 75-µm (No. 200) Sieve in Mineral
Aggregates (Decantation Test for Concrete Aggregates)
b. Tex-203-F, "Sand Equivalent Test"
c. Standard Specifications for Construction and Maintenance of
Highways, Streets and Bridges, 2004 Adoption
1) Item 438 "Cleaning and Sealing Joints and Cracks (Rigid
Pavements and Bridge Decks)"
1.02 MEASUREMENT AND PAYMENT
A Measurement for concrete paving is on square yard basis. Separate measurement will
be made for each different required thickness of pavement.
B Payment includes all labor and materials required for installation of concrete paving,
joints and curing material, as indicated on Plans.
C Refer to Section 01200—Measurement and Payment Procedures.
D Refer to this Section,3.26"Noncomforming Pavement"for unit price adjustments for
deficient thickness.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals. Submittals shall conform to requirements of Section 01350-Submittals.
B Submit proposed mix design and test data for each type and strength of concrete in
Work. Include proportions and actual compressive strength obtained from design
mixes at required test ages.
C Submit manufacturer's description and characteristics for mixing equipment, and for
traveling form paver, if proposed for use, for approval.
D Submit manufacturer's certificates giving properties of reinforcing steel. Provide
specimens for testing when required by the Engineer.
08/2011 02751 -2 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
E Submit product data for joint sealing compound and proposed sealing equipment for
approval.
F Submit samples of dowel cup,metal supports, and deformed metal strip for approval.
1.04 HANDLING AND STORAGE
A Do not mix different classes of aggregate without written permission of the Engineer.
B Class of aggregate being used may be changed before or during Work with written
permission of the Engineer. New class shall comply with specifications.
C Segregated aggregate will be rejected. Before using aggregate whose particles are
separated by size, mix them uniformly to grading requirements.
D Aggregates mixed with dirt, weeds or foreign matter will be rejected.
E Do not dump or store aggregate in roadbed.
2.0 PRODUCTS
2.01 MATERIALS
A Portland Cement:
1. Sample and test cement to verify compliance with Standards of ASTM C 150,
Type I or Type III.
2. Bulk cement which meets referenced standards may be used if the method of
handling is approved by the Engineer. When using bulk cement, provide
satisfactory weighing devices.
B Water: Conform to requirements for water in ASTM C 94.
C Coarse Aggregate: Gravel or crushed stone, or combination thereof, which is clean,
hard, durable, conforms to requirements of ASTM C33, and has abrasion loss not
more than 45 percent by weight when subjected to Los Angeles Abrasion Test(ASTM
C 131). No pit run gravel will be allowed.
1. Maximum percentage by weight of deleterious substances shall not exceed
following values:
PERCENT BY WEIGHT
ITEM OF TOTAL
SAMPLE MAXIMUM
Clay lumps and friable particles. 3.0
Material finer than 75-µm (No. 200) sieve:
Concrete subject to abrasion. 3.0*
08/2011 02751 -3 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
All other concrete. 5.0*
Coal and lignite:
Where surface appearance of concrete is of 0.5
importance.
All other concrete. 1.0
* In case of manufactured sand, if material finer than 75-µm (No. 200)
sieve consists of dust of fracture, essentially free from clay or shale,
these limits may be increased to 5 and 7 percent, respectively.
2. Coarse aggregate(size 1 1/2 inch to No.4 sieve)shall conform to requirements
of ASTM C 33. Gradation shall be within following limits when graded in
accordance with ASTM C 136:
SIEVE DESIGNATION
(SQUARE OPENINGS) (PERCENTAGE BY WEIGHT)
Retained on 1 3/4 inch sieve 0
Retained on 1 1/2 inch sieve 0 to 5
Retained on 3/4 inch sieve 30 to 65
Retained on 3/8 inch sieve 70 to 90
Retained on No. 4 sieve 95 to 100
Loss by Decantation Test
*Method Tex-406-A 1.0 maximum
* In case of aggregates made primarily from crushing of stone, if
material finer than 200 sieve is dust of fracture essentially free from
clay or shale as established by Part III of Tex-406-A, percent may be
increased to 1.5
D Fine Aggregate: Sand,manufactured sand,or combination thereof,composed of clean,
hard,durable,uncoated grains,free from loams or other injurious foreign matter. Fine
aggregate for concrete shall conform to requirements of ASTM C 33. Gradation shall
be within following limits when graded in accordance with ASTM C 136:
SIEVE DESIGNATION
(SQUARE OPENINGS) (PERCENTAGE BY WEIGHT)
Retained on 3/8 inch sieve 0
Retained on No. 4 sieve 0 to 5
•
Retained on No. 8 sieve 0 to 20
Retained on No. 16 sieve 15 to 50
Retained on No. 30 sieve 35 to 75
Retained on No. 50 sieve 65 to 90
08/2011 02751 -4 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
Retained on No. 100 sieve 90 to 100
Retained on No. 200 sieve 97 to 100
1. When subjected to color test for organic impurities (ASTM C 40), fine
aggregate shall not show color darker than standard color. Fine aggregate shall
be subjected to Sand Equivalent Test(Tex-203-F). Sand equivalent value shall
not be less than 80, unless higher value is shown on Plans.
E Air Entraining Agent: Furnish an air entraining agent conforming to requirements of
ASTM C 260.
F Water Reducer: Water reducing admixture conforming to requirements of ASTM C
494 may be used if required to improve the workability of concrete. Amount and type
of such admixture shall be subject to approval by the Engineer.
G Reinforcing Steel:
1. Provide new billet steel manufactured by open hearth process and conforming
to ASTM A 615,Grade 60. Store steel to protect it from mechanical injury and
rust. At time of placement,steel shall be free from dirt,scale,rust,paint,oil or
other injurious materials.
2. Cold bend reinforcing steel to shapes shown. Once steel has been bent,it may
not be rebent.
2.02 CONCRETE JOINTS
A When allowed on the Plans, or with approval of the Engineer,Board Expansion Joint
Material may be used: Filler board of selected stock. Use wood of density and type as
follows:
1. Clear, all-heart cypress weighing no more than 40 pounds per cubic foot, after
being oven dried to constant weight.
2. Clear,all-heart redwood weighing no more than 30 pounds per cubic foot,after
being oven dried to constant weight.
3. Use wood only when part of a load transmission device assembly.
B Unless specified otherwise,use Preformed Expansion Joint Material: Bituminous fiber
and bituminous mastic composition material conforming to ASTM D 994 and ASTM
D 1751.
C Joint Sealing Compound:
1. Hot poured rubber-asphalt compound meeting the requirements of ASTM D
6690.
2. When indicated on Plans, self-leveling Low Modulas Silicone sealant single
component meeting the requirements of TxDOT Specification 438.
D Load Transmission Devices:
08/2011 02751 -5 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
1. Smooth, steel dowel bars conforming to ASTM A 615, Grade 60. When
indicated on Plans,encase one end of dowel bar in approved cap having inside
diameter 1/16 inch greater than diameter of dowel bar.
2. Deformed steel tie bars conforming to ASTM A 615, Grade 60.
E Metal Supports for Reinforcing Steel and Joint Assembly: Employ metal supports of
approved shape and size that will secure reinforcing steel and joint assembly in correct
position during placing and finishing of concrete. Space supports as directed by the
Engineer.
2.03 EQUIPMENT
A Equipment: Conform to requirements of ASTM C 94.
2.04 MIXING
A Employ and pay certified testing laboratory to prepare mix designs. Compressive
strength shall be as specified using test specimens prepared in accordance with ASTM
C 31 and tested in accordance with ASTM C 39. Contractor shall determine and
measure batch quantity of each ingredient,including all water for batch designs and all
concrete produced for Work. Mix shall conform to these specifications and other
requirements indicated on Plans.
B Mix design to produce concrete which will have a minimum compressive strength of
2500 psi at 7days and 3500 psi at 28 days. When high-early-strength cement is used,it
shall reach a minimum compressive strength of 3500 psi at 7 days and 4000 at 28 days.
Slump of concrete shall be at least 2 inch, but no more than 5 inches, when tested in
accordance with ASTM C 143.
1. Concrete pavement shall contain at least 5 1/2 sacks (94 pounds per sack) of
cement per cubic yard,with not more than 6.5 gallons of water,net,per sack of
cement (water cement ratio maximum 0.57). Cement content shall be
determined in accordance with ASTM C 138. Addition of mineral filler may
be used to improve workability or plasticity of concrete to limits specified.
2. Coarse dry aggregate shall not exceed 85 percent of loose volume of concrete.
3. Add air-entraining admixture to ensure uniform distribution of agent
throughout batch. Base air content of freshly mixed air-entrained concrete
upon trial mixes 'with materials to be used in Work, adjusted to produce
concrete of required plasticity and workability. Percentage of air entrainment
in mix shall be 4 1/2 percent plus or minus 1 1/2 percent. Air content shall be
determined by testing in accordance with ASTM C 231.
4. Use retardant when temperature exceeds 90 degrees F. Proportion shall be as
recommended by manufacturer. Use same brand as used for air-entraining
agent. Add and batch material using same methods as used for air-entraining
agent. Accelerators will not be allowed unless approved by the Engineer.
08/2011 02751 -6 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
2.05 COVER MATERIALS FOR CURING
A Curing materials shall conform to one of following:
1. Polyethylene Film: Opaque pigmented white film conforming to requirements
of ASTM C 171.
2. Waterproofed Paper: Paper conforming to requirements of ASTM C 171.
3. Cotton Mats: Single layer of cotton filler completely enclosed in cover of
cotton cloth. Mats shall contain not less than 3/4 of a pound of uniformly
distributed cotton filler per square yard of mat. Cotton cloth used for covering
materials shall weigh not less than 6 ounces per square yard. Mats shall be
stitched so that mat will contact surface of pavement at all points when
saturated with water.
4. Liquid Membrane-forming Compounds: Liquid membrane-forming
compounds shall conform to ASTM C 309. Membrane shall restrict loss of
water to not more than 0.55 kg/m2 of surface in 72 hours.
3.0 EXECUTION
3.01 EXAMINATION
A Verify compacted base is ready to support imposed loads and meets compaction
requirements.
B Verify lines and grades are correct.
3.02 PREPARATION
A Properly prepare, shape and compact each section of subgrade before placing forms,
reinforcing steel or concrete. After forms have been set to proper grade and alignment,
use subgrade planer to shape subgrade to its final cross section. Check contour of
subgrade with template.
B Remove subgrade that will not support loaded form. Replace and compact subgrade to
required density.
3.03 EQUIPMENT
A Alternate equipment and methods, other than those required by this article, may be
used provided the Contractor demonstrates that equal, or better, results will he
obtained. Maintain equipment for preparing subgrade and for finishing and
compacting concrete in good working order. Unless approved otherwise by the
Engineer or the Plans, slip form paving methods shall be used.
B Subgrade Planer and Template:
1. Use subgrade planer with adjustable cutting blades to trim subgrade to exact
section shown on Plans. Select planer mounted on visible rollers which ride on
forms. Planer frame must have sufficient weight so that it will remain on form
08/2011 02751 -7 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
at all times, and have such strength and rigidity that, under tests made by
changing support from wheels to center,planer will not develop deflection of
more than 1/8 inch. Tractors used to pull planer shall not produce ruts or
indentations in subgrade. When slip form method of paving is used, operate
subgrade planer on prepared track grade or have it controlled by electronic
sensor system operated from string line to establish horizontal alignment and
elevation of subbase.
2. Provide template for checking contour of subgrade. Template shall be long
enough to rest upon side forms and have such strength and rigidity that, when
supported at center, maximum deflection shall not exceed 1/8 inch. Fit
template with accurately adjustable rods projecting downward at 1 foot
intervals. Adjust these rods to gauge cross sections of slab bottom when
template is resting on side forms.
C Texturing Equipment
1. Carpet Drag
a. Provide a carpet drag mounted on a work bridge or a moveable support
system. Provide a single piece of carpet of sufficient transverse length
of carpet is in contact with the concrete being placed to produce the
desired texture.
D Machine Finisher: Provide a power-driven,transverse finishing machine designed and
operated to strike off and consolidate concrete. Machine shall have two screeds
accurately adjusted to crown of pavement and with frame equipped to ride on forms.
Use finishing machine with rubber tires if it operates on concrete pavement.
E Hand Finishing:
1. Provide mechanical strike and tamping template 2 feet longer than width of
pavement to be finished. Shape template to pavement section.
2. Provide two bridges to ride on forms and span pavement for finishing
expansion and dummy joints. Provide floats and necessary edging and
finishing tools.
F Vibrators: Furnish mechanically operated synchronized vibrators mounted on tamping
bar which rides on forms and hand-manipulated mechanical vibrators. Furnish
vibrators with frequency of vibration to provide maximum consolidation of concrete
without segregation.
3.04 FORMS
A Side Forms: Use clean metal forms of approved shape and section. Preferred depth of
form shall be equal to required edge thickness of pavement. Forms with depths greater
or less than required edge thickness of pavement will be permitted,provided difference
between form depth and edge thickness if not greater than 1 inch, and further provided
that forms of depth less than pavement edge are brought to required edge thickness by
securely attaching wood or metal strips to bottom of form,or by grouting under form. -
08/2011 02751 -8 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
Bottom flange of form shall be same size as thickness of pavement. Aluminum forms
are not allowed. All forms shall be approved by the Engineer. Length of form sections
shall be not less than 10 feet and each section shall provide for staking in position with
not less than 3 pins. Flexible or curved forms of wood or metal of proper radius shall
be used for curves of 200 foot radius or less. Forms shall have ample strength and
shall be provided with adequate devices for secure setting so that when in-place they
will withstand, without visible springing or settlement, impact and vibration of
finishing machine. In no case shall base width be less than 8 inches for form 8 inches
or more in height. Forms shall be free from warp, bends or kinks and shall be
sufficiently true to provide reasonable straight edge on concrete. Top of each form
section, when tested with straight edge, shall conform to requirements specified for
surface of completed pavement. Provide sufficient forms for satisfactory placement of
concrete. For short radius curves, forms less than 10 feet in length or curved forms
may be used. For curb returns at street intersections and driveways, wood forms of
good grade and quality may be used.
B Form Setting:
1. Rest forms directly on subgrade. Do not shim with pebbles or dirt. Accurately
set forms to required grade and alignment and, during entire operation of
placing, compacting and finishing of concrete, do not deviate from this grade
and alignment more than 1/8 inch in 10 feet of length. Do not remove forms
for at least 8 hours after completion of finishing operations. Provide supply of
forms that will be adequate for orderly and continuous placing of concrete. Set
forms and check grade for at least 300 feet ahead of mixer or as approved by
the Engineer.
2. Adjacent slabs may be used instead of forms, provided that concrete is well
protected from possible damage by finishing equipment. These adjacent slabs
shall not be used for forms until concrete has aged at least 7 days.
3.05 REINFORCING STEEL AND JOINT ASSEMBLIES
A Accurately place reinforcing steel and joint assemblies and position them securely as
indicated on Plans. Wire reinforcing bars securely together at intersections and splices.
Bars and coatings shall be free of rust, dirt or other foreign matter when concrete is
placed. Place all reinforcing steel and secure to chairs. All reinforcing steel must be
positively supported before pour begins.
B Place pavement joint assemblies at required locations and elevations, and rigidly
secure all parts in required positions. Install dowel bars accurately in joint assemblies
as shown, each parallel to pavement surface and to center line of pavement. Rigidly
secure in required position to prevent displacement during placing and finishing of
concrete. Accurately cut header boards,joint filler and other material used for forming
joints to receive each dowel bar. Drill dowels into existing pavement, secure with
epoxy, and provide paving headers, as required, to provide rigid pavement sections.
08/2011 02751 -9 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
3.06 PLACEMENT
A Place concrete only in rain-free days when air temperature taken in shade and away
from artificial heat is above 35 degrees F and rising. Concrete shall not be placed
when temperature is below 40 degrees F and falling.
Place concrete that is between 40 degrees F and 95 degrees F at the time of discharge.
Do not exceed 60 minutes between introduction of cement to the aggregates and
discharge. When the weather is such that the concrete temperature would exceed 90
degrees F, employ effective means, such as pre-cooling of aggregates and mixing
water, using ice or placing at night, as necessary to maintain concrete temperature, as
placed, below 95 degrees F. Do not place when concrete temperature is above 95
degrees F at the time of discharge.
B Place concrete within 60 minutes of mixing. Remove and dispose of concrete not
placed within this period.
C Concrete slump during placement shall be 2 to 5 inches,except when using traveling-
form paver slump shall be a maximum of 3 inches.
D Deposit concrete rapidly and continuously on subgrade or subbase in successive
batches. Distribute concrete to required depth and for entire width of placement in
manner that will require as little rehandling as possible. Where hand spreading is
necessary, distribute concrete with shovels or by other approved methods. Use only
concrete rakes in handling concrete. At end of day or in case of unavoidable
interruption of more than 30 minutes, place transverse construction joint at point of
stopping work. Remove and replace sections less than 10 feet long.
E Take special care in placing and spading concrete against forms and at longitudinal and
transverse joints to prevent honeycombing. Voids in edge of finished pavement will be
cause for rejection.
3.07 FINISHING
A Finish concrete pavement with power-driven transverse finishing machines or by hand
finishing methods.
1. Use transverse finishing machine to make at least two trips over each area.
Make last trip continuous run of not less than 40 feet. After transverse
screeding, use hand-operated longitudinal float to test and level surface to
required grade.
2. Hand finish with mechanical strike and tamping template as wide as pavement
to be finished. Shape template to pavement section. Move strike template
forward in direction of placement, maintaining slight excess of material in
front of cutting edge. Make at least two trips over each area. Screed pavement
surface to required section. Work screed with combined transverse and
longitudinal motion in direction work is progressing. Maintain screed in
contact with forms. Use longitudinal float to level surface.
08/2011 02751 - 10 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
B On narrow strips and transitions,finish concrete pavement by hand. Thoroughly work
concrete around reinforcement and embedded fixtures. Strike off concrete with strike-
off screed. Move strike-off screed forward with combined transverse and longitudinal
motion in direction work is progressing,maintaining screed in contact with forms,and
maintaining slight excess of materials in front of cutting edge. Tamp concrete with
tamping template. Use longitudinal float to level surface.
C While concrete is still workable,give surface final belting to produce a uniform surface
of gritty texture. Perform belting with short rapid transverse strokes having sweeping
longitudinal motion.
3.08 JOINTS AND JOINT SEALING
A When new work is adjacent to existing concrete, place joints at same location as
existing joints in adjacent pavement.
B If the limit of removal of existing concrete or asphaltic pavement does not fall on
existing joint, saw cut existing pavement minimum of 1 1/2 inches deep to provide
straight, smooth joint surface without chipping, spalling or cracks.
3.09 CONSTRUCTION JOINTS
A Place transverse construction joint wherever concrete placement must be stopped for
more than 30 minutes. Place longitudinal construction joints at interior edges of
pavement lanes using No.5 deformed tie bars,30 inches long and spaced 18 inches on
centers.
3.10 EXPANSION JOINTS
A Place 3/4 inch expansion joints at locations shown on Plans. Use no filler shorter than
6 feet. When pavement is 24 feet or narrower, use not more than 2 lengths of filler.
Secure pieces to form straight joint. Shape filleraccurately to cross section of concrete
slab. Use load transmission devices of type and size shown on Plans. Seal with joint
sealing compound.
3.11 CONTRACTION JOINTS
A Place contraction joints at same locations as in adjacent pavement or at spaces
indicated on Plans. Maximum spacing of contraction/construction joints,20 feet. Seal
groove with joint sealing compound.
3.12 LONGITUDINAL WEAKENED PLANE JOINTS
A Place longitudinal weakened plane joints at spaces indicated on Plans. Seal groove
with joint sealing compound.
08/2011 02751 - 11 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
3.13 SAWED JOINTS
A Contractor may use sawed joints as an alternate to contraction and weakened plane
joints. Circular cutter shall be capable of cutting straight line groove minimum of 1/2
inch wide.Depth shall be one quarter of pavement thickness plus 1/2 inch. Commence
sawing as soon as concrete has hardened sufficiently to permit cutting without
chipping, spalling or tearing and prior to initiation of cracks. Once sawing has
commenced, it shall be continued until completed. Make saw cut with one pass.
Complete sawing within 24 hours of concrete placement. Saw joints at required
spacing consecutively in sequence of concrete placement.
B Concrete Saw: Provide sawing equipment adequate in power to complete sawing to
required dimensions and within required time. Provide at least one standby saw in
good working order. Maintain an ample supply of saw blades at work site at all times
during sawing operations. Sawing equipment shall be on job at all times during
concrete placement.
3.14 JOINTS FOR CURB,AND CURB AND GUTTER
A Place 3/4 inch preformed expansion joints through curb and gutters at locations of
expansion and contraction joints in pavement; at end of radius returns at street
intersections and driveways; and at curb inlets. Maximum spacing shall be 60 foot
centers.
3.15 JOINTS FOR CONCRETE DRIVEWAYS
A Provide 3/4 inch expansion joints conforming to ASTM D 1751 across driveway in
line with street face of sidewalks, at existing concrete driveways, and along
intersections with sidewalks and other structures. Extend expansion joint material full
depth of slab. Where dowels are used, wrap or sleeve one end.
3.16 JOINT SEALING
A Seal joints only when surface and joints are dry, ambient temperature is above 50'
degrees F but less than 85 degrees F, and weather is not foggy or rainy.
B Joint sealing equipment shall be in first-class working condition, and be approved by
the Engineer. Use concrete grooving machine or power-operated wire brush and other
equipment such as plow, brooms, brushes, blowers or hydro or abrasive cleaning as
required to produce satisfactory joints.
C Clean joints of loose scale,dirt,dust and curing compound. Term joint includes wide
joint spaces, expansion joints, dummy groove joints or cracks, either preformed or
natural. Remove loose material from concrete surfaces adjacent to joints.
08/2011 0275.1 - 12 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
D Fill joints neatly with joint sealer to depth shown. Pour sufficient joint sealer into
joints so that, upon completion, surface of sealer within joint will be 1/4 inch below
level of adjacent surface or at elevation as directed.
3.17 CONCRETE CURING
A Concrete pavement shall be cured by protecting it against loss of moisture for period of
not less than 72 hours immediately upon completion of finishing operations. Do not
use membrane curing for concrete pavement to be overlaid by asphaltic concrete.
B Where curing requires use of water,curing shall have prior right to all water supply or
supplies. Failure to provide sufficient cover material shall be cause for immediate
suspension of concreting operations.
3.18 POLYETHYLENE FILM CURING
A Immediately after finishing surface, and after concrete has taken its initial set, apply
water in the form of a fine spray. Cover surface with polyethylene film so film will
remain in intimate contact with surface during specified curing period.
B Cover entire surface and both edges of pavement slab. Joints in film sheets shall
overlap minimum of 12 inches. Immediately repair tears or holes occurring during
curing period by placing acceptable moisture-proof patches or by replacing.
3.19 WATERPROOFED PAPER CURING
A Immediately after finishing surface, and after concrete has taken its initial set, apply
water in form of fine spray. Cover surface with waterproofed paper so paper will
remain in intimate contact with surface during specified curing period.
B Prepare waterproofed paper to form blankets of sufficient width to cover entire surface
and both edges of pavement slab, and not be more than 60 feet in length. Joints in
blankets caused by joining paper sheets shall lap not less than 5 inches and shall be
securely sealed with asphalt cement having melting point of approximately 180
degrees F. Place blankets to secure an overlap of at least 12 inches. Tears or holes
appearing in paper during curing period shall be immediately repaired by cementing
patches over defects.
3.20 COTTON MAT CURING
A Immediately after finishing surface, and after concrete has taken its initial set,
completely cover surface with cotton mats,thoroughly saturated before application,in
such manner that they will contact surface of pavement equally at all points.
B Mats shall remain on pavement for specified curing period. Keep mats saturated so
that,when lightly compressed,water will drip freely from them. Keep banked earth or
cotton mat covering edges saturated.
08/2011 02751 - 13 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
3.21 LIQUID MEMBRANE-FORMING COMPOUNDS
A Immediately after finishing surface, and after concrete has taken its initial set, apply
liquid membrane-forming compound in accordance with manufacturer's instructions.
3.22 TOLERANCES
A Test entire surface before initial set and correct irregularities or undulations. Bring
surface within requirements of following test and then finish. Place 10 foot
straightedge parallel to center of roadway to bridge any depressions and touch all high
spots. Do not permit ordinates measured from face of straight edge to surface of
pavement to exceed 1/16 inch per foot from nearest point of contact. Maximum
ordinate with 10 foot straightedge shall not exceed 1/8 inch. Grind spots in excess of
requirements of this paragraph to meet surface test requirements. Restore texture by
grooving concrete to meet surface finishing specifications.
3.23 FIELD QUALITY CONTROL
A Testing will be performed under provisions of Section 01450 —Testing Laboratory
Services.
B Test Specimens: Four test specimen cylinders for compressive strength tests will be
made for each 150 cubic yards or less of pavement that is placed in one day. Two
specimens will be tested at 7 days. For failed 7-day tests, remaining two specimens
will be tested at 28 days. Specimens will be made,cured and tested in accordance with
ASTM C 31 and ASTM C 39.
C Yield test will be made in accordance with ASTM C 138 for cement content per cubic
yard of concrete. If such cement content is found to be less than that specified per
cubic yard, reduce batch weights until amount of cement per cubic yard of concrete
conforms to requirements.
D At the Engineer's direction a minimum of one 4-inch core may be taken at random
locations per 1,000 feet per lane or 500 square yards of pavement to measure in-place
depth. Each core may be tested for 28 day compressive strength according to methods
of ASTM C 42. The 28 day compressive strength of each core tested shall be a
minimum of 3000 pounds per square inch.
E Contractor may, at his own expense,request three additional cores in vicinity of cores
indicating nonconforming in-place depths. In-place depth at these locations shall be
the average of depth of four cores.
F Fill cores and density test sections with new concrete paving or non shrink grout.
08/2011 02751 - 14 of 15
CITY OF PEARLAND CONCRETE PAVEMENT
3.24 NONCONFORMING PAVEMENT
A Remove and replace areas of pavement found by cores to be deficient in thickness by
more than 10 percent, or that fail compressive strength tests, with new concrete
pavement of thickness shown on Plans at no cost to the Owner.
B Areas of concrete pavement found by cores to be deficient in thickness by less than 10
percent shall be remedied at the Owner's direction by one of the following methods:
1. Remove and replace using new concrete pavement of thickness shown on Plans
and in accordance with the requirements of this Section at no cost to Owner.
2. Reduce the Unit Price by the ratio of the average thickness (as determined by
cores) to the thickness required.
C No adjustments will be made for excess thickness.
3.25 PAVEMENT MARKINGS
A Restore pavement markings to match those existing in accordance with City of
Pearland Standard Details and the Engineer's requirements.
3.26 PROTECTION
A Barricade pavement section from use until concrete has attained minimum design
strength.
B On those sections of pavement to be opened to traffic,seal joints,clean pavement and
place earth against pavement edges before permitting use by traffic. Such opening of
pavement to traffic shall not relieve Contractor from his responsibility for Work.
C Maintain concrete paving in good condition until completion of Work.
D
Repair defects by replacing concrete to full depth.
END OF SECTION
08/2011 02751 - 15 of 15
CITY OF PEARLAND CURB, CURB & GUTTER,AND HEADERS
Section 02770
CURB, CURB & GUTTER,AND HEADERS
1.0 GENERAL
1.01 SECTION INCLUDES
A Reinforced concrete curb, reinforced monolithic concrete curb and gutter, and
mountable curb.
B Paving headers and railroad headers poured monolithically with concrete base or
pavement.
C References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 02751 —Concrete Pavement
4. Section 02335 —Subgrade
5. Section 02710—Base Course for Pavement
1.02 MEASUREMENT AND PAYMENT
A Measurement for curbs and for curbs and gutter is on linear foot basis measured along
face of curb.
•
B Measurement for headers is on linear foot basis measured between lips of gutters
adjacent to concrete base and measured between backs of curbs adjacent to concrete
pavement.
C No separate payment will be made for curbs poured monolithically with concrete
pavement.
D Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit details of proposed formwork for approval.
C Submit proposed mix design and test data for each type and strength of concrete in
Work. Include proportions and actual flexural strength obtained from design mixes at
required test ages.
D Submit manufacturer's certifications giving properties of reinforcing steel. Provide
specimens for testing when required by the Engineer.
07/2006 02770- 1 of 4
CITY OF PEARLAND CURB, CURB & GUTTER,AND HEADERS
2.0 PRODUCTS
2.01 MATERIALS
A Concrete: Conform to material and proportion requirements for concrete of Section
02751 —Concrete Pavement.
B Reinforcing Steel: Conform to material requirements for reinforcing steel of Section
02751 —Concrete Pavement.
C Grout: Nonmetallic, nonshrink grout containing no chloride producing agents
conforming to the following requirements.
Compressive strength at 7 days 3,500 psi
Compressive strength at 28 days 8,000 psi
Initial set time 45 minutes
Final set time 1.5 hours
D Preformed Expansion Joint Material: Conform to material requirements for preformed
expansion joint material of Section 02751 —Concrete Pavement.
E Joint Sealing Compound: Conform to material requirements of Section 02751 —
Concrete Pavement.
F Mortar: Mortar finish composed of one part Portland cement and 11/2 parts of fine
aggregate. Use only when approved by the Engineer.
3.0 EXECUTION
3.01 PREPARATION
A Prepare subgrade or base in accordance with applicable portions of Section 02335 —
Subgrade or Section 02710—Base Course for Pavement.
3.02 PLACEMENT
A Guideline: Set to follow top line of curb. Attach indicator to provide constant
comparison between top of curb and guideline. Insure flow lines for monolithic curb
and gutters conform to slopes indicated on Plans.
B Forms: Brace sufficiently to maintain position during pour. Use metal templates cut
to section shown on Plans.
C Reinforcement: Secure in proper position so that steel will remain in place throughout
placement.
07/2006 02770-2 of 4
CITY OF PEARLAND CURB, CURB & GUTTER,AND HEADERS
D Joints: Place in accordance with Section 02751 —Concrete Pavement. Place dummy
groove joints at 6-foot centers at right angles to curb lines. Cut dummy grooves 1/4
inch deep using an approved edging tool.
E Place concrete in forms to required depth. Consolidate thoroughly. Do not permit
rock pockets in form. Entirely cover top surfaces with mortar.
3.03 MANUAL FINISHING
A After concrete is in place, remove front curb forms. Form exposed portions of curb,
and of curb and gutter,using mule which conforms to curb shape, as shown on Plans.
B Thin coat of mortar may be worked into exposed face of curb using mule and two-
handled wooden darby at least 3 feet long.
C Before applying final finish move 10 foot straightedge across gutter and up curb to
back form of curb. Repeat until curb and gutter are true to grade and section. Lap
straightedge every 5 feet.
D Steel trowel finish surfaces to smooth, even finish. Make face of finished curb true
and straight.
E Edge outer edge of gutter with 1/4-inch edger. Finish edges with tool having 1/4 inch
radius.
F Finish visible surfaces and edges of finished curb and gutter free from blemishes,form
marks and tool marks. Finished curb or curb and gutter shall have uniform color,
shape and appearance.
3.04 MECHANICAL FINISHING
A Mechanical curb forming and finishing machines may be used instead of, or in
conjunction with,previously described methods,if approved by the Engineer. Use of
mechanical methods shall provide specified curb design and finish.
3.05 CURING
A Immediately after finishing operations, cure exposed surfaces of curbs and gutters in
accordance with Section 02751 —Concrete Pavement.
3.06 TOLERANCES
A Top surfaces of curb and gutter shall have uniform width and shall be free from
humps,sags or other irregularities. Surfaces of curb top,curb face and gutter shall not
vary more than 1/8 inch from edge of a 10-foot long straightedge laid along them,
except at grade changes.
3.07 PROTECTION OF THE WORK
A Maintain curbs and gutters in good condition until completion of Work.
07/2006 02770-3 of 4
CITY OF PEARLAND CURB, CURB & GUTTER,AND HEADERS
B Replace damaged curbs and gutters to comply with this Section.
(I")END OF SECTION
"I")
II
'al)
07/2006 02770-4 of 4
CITY OF PEARLAND CONCRETE SIDEWALKS
Section 02771
CONCRETE SIDEWALKS
1.0 GENERAL
1.01 SECTION INCLUDES
A. Portland Cement Concrete Pavement for Concrete Sidewalks.
B. References to Technical Specifications:
1. Section 01200 -Measurement and Payment Procedures
2. Section 01350 - Submittals
3. Section 01450 —Testing Laboratory Services
4: Section 02751 - Concrete Pavement
C. Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM C 150, "Standard Specification for Portland Cement"
b. ASTM C 94, "Standard Specification for Ready-Mixed Concrete"
c. ASTM C 33, "Standard Specification for Concrete Aggregates"
d. ASTM A 615, "Standard Specification for Deformed and Plain
Carbon-Steel Bars for Concrete Reinforcement"
e. ASTM D 994, "Standard Specification for Preformed Expansion
•
Joint Filler for Concrete (Bituminous Type)"
f. ASTM D 1751, "Standard Specification for Preformed Expansion
Joint Filler for Concrete Paving and Structural Construction (Non
extruding and Resilient Bituminous Type)
g. ASTM D 6690, "Standard Specification for Joint and Crack
Sealants, Hot-Applied, for Concrete and Asphaltic Pavements"
h. ASTM C 39, "Standard Test Method for Compressive Strength of
Concrete"
i. ASTM C 31, "Standard Practice for Making and Curing Concrete
Test Specimens in the Field"
j. ASTM C 138, "Standard Test Method for Density (Unit
Weight),Yield, and Air Content(Gravimetric) of Concrete"
k. ASTM C 231,"Standard Test Method for Air Content of Freshly
Mixed Concrete by the Pressure Method"
1. ASTM C 42, "Standard Test Method for Obtaining and Testing
Drilled Cores and Sawed Beams of Concrete"
2. Texas Accessibility Standards of Architectural Barriers Act, Article 9102,
Texas Civil Statues
5/2013 02771 - 1 of 5
CITY OF PEARLAND CONCRETE SIDEWALKS
1.02 MEASUREMENT AND PAYMENT
A. Measurement for concrete sidewalks is on square foot basis.
B. Payment includes all labor and materials required for installation of concrete
sidewalks,joints and curing material. No payment will be made for work in areas
where sidewalk has been removed for contractor's convenience.
C. Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A. Submittals shall conform to requirements of Section 01350 - Submittals.
2.0 PRODUCTS
2.01 MATERIALS
A. Concrete: Conform to material and proportion requirements for concrete of Section
02751 - Concrete Paving.
B. Reinforcing Steel: conform to material requirements of Section 02751 - Concrete
Paving for reinforcing steel. Use No. 4 reinforcing bars.
C. Preformed Expansion Joint Material: Conform to material requirements for
preformed expansion joint material of Section 02751 - Concrete Paving.
D. Expansion Joint Filler: Conform to material requirements for expansion joint
material of Section 02751 - Concrete Pavement.
E. Forms: Use straight, unwarped wood or metal forms with nominal depth equal to
or greater than proposed sidewalk thickness.
F. Sand Bed: Conform to material requirements for bank run sand.
3.0 EXECUTION
3.01 REPLACEMENT
A. Replace sidewalks which are removed or damaged during construction with
thickness and width equivalent to one removed or damaged unless otherwise shown
on Drawings. Finish surface (exposed aggregate, brick pavers, etc.) to match
existing sidewalk.
B. Provide replaced and new sidewalks with wheelchair ramps when sidewalk
intersects curb at street.
5/2013 02771 -2 of 5
CITY OF PEARLAND CONCRETE SIDEWALKS
3.02 PREPARATION
A. Identify and protect utilities which are to remain.
B. Protect living trees, other plant growth and features designated to remain.
C. Conduct clearing and grubbing operations in accordance with Section 02200 - Site
Preparation.
D. Determine sidewalk horizontal and vertical alignment to facilitate drainage and
prevent ponding. Location and slopes must be in compliance with Texas
Accessibility Academy Standards latest edition and revisions.
E. Excavate subgrade 6 inches beyond outside lines of sidewalk. Shape to line, grade
and cross section. Compact 6 inches of select fill to minimum of 95% maximum
dry density at optimal or above optimal moisture content as per ASTM D698. For
soils with plasticity index above 40 percent, stabilize soil with lime in accordance
with Section 02335 - Subgrade. Compact subgrade to minimum of 90 percent
maximum dry density at optimum to 3 percent above optimum moisture content, as
determined by ASTM D 698. No separate pay for this requirement. This work
shall be subsidiary to sidewalk square foot unit pricing.
F. Immediately after subgrade'is prepared, cover with compacted sand bed to depth as
shown on Drawings. Lay concrete when sand is moist but not saturated.
3.03 PLACEMENT
A. Setting Forms: Straight, unwarped wood or metal forms with nominal depth 1/2"
greater than proposed sidewalk thickness. Securely stake forms to line and grade.
Maintain position during concrete placement.
B. Reinforcement:
1. Install No. 4 reinforcing bars.
2. Install reinforcing steel as shown on the Drawings. Lay longitudinal bars in
walk continuously through expansion joints. Reinforcing bars shall not
vary from plan placement by more than 1/4 inch.
3. ' Use sufficient number of chairs to support reinforcement in manner to
maintain reinforcement in center of slab vertically during placement.
4. Drill dowels into existing paving, sidewalk and driveways, secure with
epoxy and provide headers as required.
C. Expansion Joints: Install expansion joints with load transfer units in accordance
with Section 02751 - Concrete Pavement.
5/2013 02771 -3 of 5
CITY OF PEARLAND CONCRETE SIDEWALKS
D. Place concrete in forms to specified depth and tamp thoroughly with "jitterbug"
tamp, or other acceptable method. Bring mortar to surface.
E. Strike off to smooth finish with wood strike board. Finish smoothly with wood
hand float. Brush across sidewalk lightly with fine-haired brush.
F. Apply coating to wheelchair ramp with contrasting color.
G. Unless otherwise indicated on Drawings, mark off sidewalk joints 1/2 inch deep, at
spacing equal to width of walk. Use joint tool equal in width to edging tool.
H. Finish edges with tool having 3/8 inch radius.
I. After concrete has set sufficiently, refill space along sides of sidewalk to 1 inch
from top of walk with suitable material. Tamp until firm and solid, place sod as
applicable. Dispose of excess material. Repair driveways and parking lots
damaged by sidewalk excavation in accordance with Section 02980 - Pavement
Repair and Resurfacing.
3.04 CURING
A. Conform to requirements of Section 02751 - Concrete Pavement.
3.05 FIELD QUALITY CONTROL
A. Testing will be performed under provisions of Section 01450 - Testing Laboratory
Services.
B. Compressive Strength Test Specimens: Four test specimens for compressive
strength test will be made in accordance with ASTM C 31 for each 30 cubic yards
or less of sidewalk that is placed on one day. Two specimens will be tested at 7
days. Remaining two specimens will be tested at 28 days. Specimens will be
tested in accordance with ASTM C 39. Minimum compressive strength: 2500 psi
at 7 days and 3500 psi at 28 days.
C. Yield test for cement content per cubic yard of concrete will be made in accordance
with ASTM C 138. When cement content is found to be less than that specified per
cubic yard, reduce batch weights until amount of cement per cubic yard of concrete
conforms to requirements.
D. If the Contractor places concrete without notifying the City, Contractor will have
the concrete tested by means of core test as specified in ASTM C 42. When
concrete does not meet specification, cost of test will be deducted from payment.
Contractor will replace the cored section of sidewalk at no cost to City.
E. Sampling of fresh concrete shall be in accordance with ASTM C 172.
5/2013 02771 -4 of 5
CITY OF PEARLAND CONCRETE SIDEWALKS
F. Take slump tests when cylinders are made and when concrete slump appears
excessive.
G. Concrete shall be acceptable when average of two 28 day compression tests is
equal to or greater than minimum 28 day strength specified.
H. If either of two tests on field samples is less than average of two tests by more than
10 percent, that entire test shall be considered erratic and not indicative of concrete
strength. Core samples will be required of in-place concrete in question.
I. If 28 day laboratory test indicates that concrete of low strength has been placed,test
concrete in question by taking cores as directed by Project Manager. Take and test
at least three representative cores as specified in ASTM C 42 and deduct cost from
payment due.
3.06 NONCONFORMING CONCRETE
A. Remove and replace areas that fail compressive strength tests, with concrete of
thickness shown on Drawings.
B. Replace nonconforming sections at no additional cost to City. Replacement section
shall be no less in length than the width of sidewalks.
3.07 PROTECTION
A. Maintain newly placed concrete in good condition until completion of Work.
B. Replace damaged areas at no cost to City.
END OF SECTION
5/2013 02771 -5 of 5
CITY OF PEARLAND CONCRETE DRIVEWAYS
Section 02775
CONCRETE DRIVEWAYS
1.0 GENERAL
1.01 SECTION INCLUDES
A. Portland Cement Concrete Pavement for Driveways.
B. References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350— Submittals
3. Section 01450—Testing Laboratory Services
4. Section 02751 - Concrete Pavement
C. Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM C 94, "Standard Specification for Ready-Mixed Concrete"
b. ASTM C 33, "Standard Specification for Concrete Aggregates"
c. ASTM C 260
d. ASTM A 615, "Standard Specification for Deformed and Plain
Carbon-Steel Bars for Concrete Reinforcement"
e. ASTM D 994, "Standard Specification for Preformed Expansion
Joint Filler for Concrete (Bituminous Type)"
f. ASTM D 1751, "Standard Specification for Preformed Expansion
Joint Filler for Concrete Paving and Structural Construction
(Nonextruding and Resilient Bituminous Type)
g. ASTM D 6690, "Standard Specification for Joint and Crack
Sealants, Hot-Applied, for Concrete and Asphaltic Pavements"
h. ASTM C 39, "Standard Test Method for Compressive Strength of
Concrete"
i. ASTM C 31, "Standard Practice for Making and Curing Concrete
Test Specimens in the Field"
j. ASTM C 143, "Standard Test Method for Slump of Hydraulic
Cement Concrete"
k. ASTM C 231,"Standard Test Method for Air Content of Freshly
Mixed Concrete by the Pressure Method"
1. ASTM C 171, "Standard Specification for Sheet Materials for
Curing Concrete"
m. ASTM C 309, "Standard Specification for Liquid Membrane-
Forming Compounds for Curing Concrete"
n. ASTM C 42, "Standard Test Method for Obtaining and Testing
Drilled Cores and Sawed Beams of Concrete"
5/2013 02775- 1 of 8
CITY OF PEARLAND CONCRETE DRIVEWAYS
1.02 MEASUREMENT AND PAYMENT
A. Measurement for concrete driveways is on square yard basis and includes removal
of existing driveway, driveway curbs, select fill subgrade and reinforcement
dowels.
B. Payment includes all labor and materials required for installation of concrete
driveways,joints and curing material. No payment will be made for work in areas
where driveway has been removed for contractor's convenience.
C. Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A. Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B. Submit proposed mix design and test data for each type and strength of concrete in
Work. Include proportions and actual compressive strength obtained from design
mixes at required test ages.
C. , Submit product data for joint sealing compound and proposed sealing equipment
for approval.
D. Submit samples of dowel cup, metal supports, and deformed metal strip for
approval.
2.0 PRODUCTS
2.01 MATERIALS
A. Concrete: Conform to material and proportion requirements for concrete of Section
02751 - Concrete Paving.
B. Reinforcing Steel: Conform to material requirements for reinforcing steel of
Section 02751 - Concrete Paving. Use No. 4 reinforcing bars.
C. Subgrade Materials: Conform to subgrade material requirements of Section 02335
- Subgrade.
D. Joints: Conform to concrete joint requirements of Section 02751 - Concrete
Paving.
5/2013 02775-2 of 8
CITY OF PEARLAND CONCRETE DRIVEWAYS
3.0 EXECUTION
3.01 EXAMINATION
A. Verify compacted subgrade is ready to support imposed loads and meets
compaction requirements.
B. Verify lines and grades are correct.
3.02 PREPARATION
A. When removing existing concrete, all sawcuts shall be full depth unless otherwise
approved by City.
B. Properly prepare, shape and compact each section of subgrade before placing
forms, reinforcing steel or concrete.
C. Excavate subgrade 6 inches beyond outside lines of driveway. Shape to line, grade
and cross section. Place compacted select fill as needed to bring grade up. Select
fill shall be compacted to minimum of 95% maximum dry density at optimal or
above optimal moisture content as per ASTM D698. Stabilize top 8" of subgrade
with lime in accordance with Section 02335 - Subgrade. Compact subgrade to
minimum of 90 percent maximum dry density at optimum to 3 percent above
optimum moisture content, as determined by ASTM D 698. No separate pay for
this requirement. This work shall be subsidiary to driveway square yard unit
pricing.
3.03 FORMS
A. Side Forms: Use clean forms of approved shape and section. Preferred depth of
form shall be equal to required edge thickness of pavement. Forms with depths
greater or less than required edge thickness of pavement will be permitted,
provided difference between form depth and edge thickness if not greater than 1
inch, and further provided that forms of depth less than pavement edge are brought
to required edge thickness by securely attaching wood or metal strips to bottom of
form, or by grouting under form. Bottom flange of form shall be same size as
thickness of pavement. Aluminum forms are not allowed. All forms shall be
approved by the Engineer. Length of form sections shall be not less than 10 feet
and each section shall provide for staking in position with not less than 3 pins.
Flexible or curved forms of wood or metal of proper radius shall be used for curves
of 200 foot radius or less. Forms shall have ample strength and shall be provided
with adequate devices for secure setting so that when in-place they will withstand,
without visible springing or settlement, impact and vibration of finishing machine.
In no case shall base width be less than 8 inches for form 8 inches or more in
height. Forms shall be free from warp, bends or kinks and shall be sufficiently true
to provide reasonable straight edge on;concrete. Top of each form section, when
tested with straight edge, shall conform to requirements specified for surface of
completed pavement. Provide sufficient forms for satisfactory placement of
5/2013 02775-3 of 8
CITY OF PEARLAND CONCRETE DRIVEWAYS
concrete. For short radius curves, forms less than 10 feet in length or curved forms
may be used. For curb returns at street intersections and driveways, wood forms of
good grade and quality may be used.
B. Form Setting:
1. Rest forms directly on subgrade. Do not shim with pebbles or dirt.
Accurately set forms to required grade and alignment and, during entire
operation of placing, compacting and finishing of concrete, do not deviate
from this grade and alignment more than 1/8 inch in 10 feet of length. Do
not remove forms for at least 8 hours after completion of finishing
operations.
3.04 REINFORCING STEEL AND JOINT ASSEMBLIES
A. Accurately place reinforcing steel and joint assemblies and position them securely.
Wire reinforcing bars securely together at intersections and splices. Bars and
coatings shall be free of rust, dirt or other foreign matter when concrete is placed.
Place all reinforcing steel and secure to chairs. All reinforcing steel must be
positively supported before pour begins.
B. Place pavement joint assemblies at required locations and elevations, and rigidly
secure all parts in required positions. Install dowel bars accurately in joint
assemblies as shown, each parallel to pavement surface and to center line of
pavement. Rigidly secure in required position to prevent displacement during
placing and finishing of concrete. Accurately cut header boards, joint filler and
other material used for forming joints to receive each dowel bar. Drill dowels into
existing pavement, secure with epoxy, and provide paving headers, as required, to
provide rigid pavement sections.
3.05 PLACEMENT
A. Place concrete only in rain-free days when air temperature taken in shade and away
from artificial heat is above 35 degrees F and rising. Concrete shall not be placed
when temperature is below 40 degrees F and falling.
When concrete temperature is 85 degrees F or above, do not exceed 60 minutes
between introduction of cement to the aggregates and discharge. When the weather
is such that the concrete temperature would exceed 90 degrees F, employ effective
means, such as pre-cooling of aggregates and mixing water, using ice or placing at
night, as necessary to maintain concrete temperature, as placed, below 90 degrees
F.
B. Place concrete within 60 minutes of mixing. Remove and dispose of concrete not
placed within this period.
C. Concrete slump during placement shall be 2 to 4 inches.
5/2013 02775-4 of 8
CITY OF PEARLAND CONCRETE DRIVEWAYS
D. Deposit concrete rapidly and continuously on subgrade or subbase in successive
batches. Distribute concrete to required depth and for entire width of placement in
manner that will require as little rehandling as possible. Where hand spreading is
necessary, distribute concrete with shovels or by other approved methods. Use
only concrete rakes in handling concrete.
E. Take special care in placing and spading concrete against forms and at longitudinal
and transverse joints to prevent honeycombing. Voids in edge of finished
pavement will be cause for rejection.
3.06 FINISHING
A. Finish concrete driveway with power-driven transverse finishing machines or by
hand finishing methods.
1. Use transverse finishing machine to make at least two trips over each area.
Make last trip continuous run of not less than 40 feet. After transverse
screeding, use hand-operated longitudinal float to test and level surface to
required grade.
2. Hand finish with mechanical strike and tamping template as wide as
pavement to be finished. Shape template to pavement section. Move strike
template forward in direction of placement, maintaining slight excess of
material in front of cutting edge. Make at least two trips over each area.
Screed pavement surface to required section. Work screed with combined
transverse and longitudinal motion in direction work is progressing.
Maintain screed in contact with forms. Use longitudinal float to level
surface.
B. On narrow strips and transitions, finish concrete driveway by hand. Thoroughly
work concrete around reinforcement and embedded fixtures. Strike off concrete
with strike-off screed. Move strike-off screed forward with combined transverse
and longitudinal motion in direction work is progressing, maintaining screed in
contact with forms, and maintaining slight excess of materials in front of cutting
edge. Tamp concrete with tamping template. Use longitudinal float to level
surface.
C. While concrete is still workable, give surface final belting to produce a uniform
surface of gritty texture. Perform belting with short rapid transverse strokes having
sweeping longitudinal motion.
3.07 JOINTS AND JOINT SEALING
A. When new work is adjacent to existing concrete, place joints at same location as
existing joints in adjacent pavement.
B. Contractor may use sawed joints as an alternate to contraction and weakened plane
joints. Circular cutter shall be capable of cutting straight line groove minimum of
5/2013 02775-5 of 8
CITY OF PEARLAND CONCRETE DRIVEWAYS
1/2 inch wide. Depth shall be one quarter of pavement thickness plus 1/2 inch.
Commence sawing as soon as concrete has hardened sufficiently to permit cutting
without chipping, spalling or tearing and prior to initiation of cracks. Once sawing
has commenced, it shall be continued until completed. Make saw cut with one
pass. Complete sawing within 24 hours of concrete placement. Saw joints at
required spacing consecutively in sequence of concrete placement.
C. Concrete Saw: Provide sawing equipment adequate in power to complete sawing
to required dimensions and within required time. Provide at least one standby saw
in good working order. Maintain an ample supply of saw blades at work site at all
times during sawing operations. Sawing equipment shall be on job at all times
during concrete placement.
D. Provide 3/4 inch expansion joints conforming to ASTM D 1751 across driveway in
line with street face of sidewalks, at existing concrete driveways, and along
intersections with sidewalks and other structures. Extend expansion joint material
full depth of slab. Where dowels are used,wrap or sleeve one end.
E. Seal joints only when surface and joints are dry, ambient temperature is above 50
degrees F but less than 85 degrees F, and weather is not foggy or rainy.
F. Joint sealing equipment shall be in first-class working condition, and be approved
by the Engineer. Use concrete grooving machine or power-operated wire brush and
other equipment such as plow, brooms, brushes, blowers or hydro or abrasive
cleaning as required to produce satisfactory joints.
G. Clean joints of loose scale, dirt, dust and curing compound. Term joint includes
wide joint spaces, expansion joints, dummy groove joints or cracks, either
preformed or natural. Remove loose material from concrete surfaces adjacent to
joints.
H. Fill joints neatly with joint sealer to depth shown. Pour sufficient joint sealer into
joints so that, upon completion, surface of sealer within joint will be 1/4 inch below
level of adjacent surface or at elevation as directed.
I. Install the first expansion joint at Right-of-Way. The expansion joint shall be
spaced at intervals same as the width of driveway. Expansion joint shall be placed
at half of the width of the driveway if the width of driveway exceeds 20'.
3.08 CONCRETE CURING
A. Concrete driveway shall be cured by protecting it against loss of moisture for
period of not less than 72 hours immediately upon completion of finishing
operations. Do not use membrane curing for concrete pavement to be overlaid by
asphaltic concrete.
B. Where curing requires use of water, curing shall have prior right to all water supply
or supplies. Failure to provide sufficient cover material shall be cause for
immediate suspension of concreting operations.
5/2013 02775-6 of 8
CITY OF PEARLAND CONCRETE DRIVEWAYS
C. Cotton Mat Curing:
1. Immediately after finishing surface, and after concrete has taken its initial
set, completely cover surface with cotton mats, thoroughly saturated before
application, in such manner that they will contact surface of pavement
equally at all points.
2. Mats shall remain on pavement for specified curing period. Keep mats
saturated so that, when lightly compressed, water will drip freely from
them. Keep banked earth or cotton mat covering edges saturated.
D. Liquid Membrand-Forming Compounds:
1. Immediately after finishing surface, and after concrete has taken its initial
set, apply liquid membrane-forming compound in accordance with
manufacturer's instructions.
3.09 TOLERANCES
A. Test entire surface before initial set and correct irregularities or undulations. Bring
surface within requirements of following test and then finish. Place 10 foot
straightedge parallel and longitudinal to center of driveway. Correct any
depressions and all high spots.
3.10 FIELD QUALITY CONTROL
A. Testing will be performed under provisions of Section 01450 —Testing Laboratory
Services and Section 02751 - Concrete Paving.
3.11 PAVEMENT MARKINGS
A. Restore pavement markings to match those existing in accordance with City of
Pearland Standard Details and the Engineer's requirements.
3.12 PROTECTION
A. Barricade pavement section from use until concrete has attained minimum design
strength.
B. On those sections of driveway to be opened to traffic, seal joints, clean pavement
and place earth against pavement edges before permitting use by traffic. Such
opening of driveway to traffic shall not relieve Contractor from his responsibility
for Work.
C. Maintain concrete paving in good condition until completion of Work.
5/2013 02775-7 of 8
CITY OF PEARLAND CONCRETE DRIVEWAYS
D. Repair defects by replacing concrete to full depth and limits as directed by Project
Manager. Replace nonconforming work at no additional cost to City.
END OF SECTION
5/2013 02775-8 of 8
CITY OF PEARLAND LANDSCAPE IRRIGATION
Section 02811
LANDSCAPE IRRIGATION
1.0 GENERAL
1.01 SECTION INCLUDES
A Pipe and fittings, valves, sprinkler heads, accessories.
B Control system and wiring for automatic control irrigation system.
C References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 02931 —Landscape and Tree Planting
4. Section 01310—Coordination and Meetings
D Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM D 2564,"Standard Specification for Solvent Cements for Poly
(Vinyl Chloride) (PVC) Plastic Piping Systems
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item, no separate payment will be made for landscape
irrigation under this Section. Include cost in Bid Items for which this Work is a
component.
B If landscape irrigation is included as a Bid Item, measurement will be based on the
Units shown in Section 00300—Bid Proposal and in accordance with Section 01200—
Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit manufacturer's data and details for landscape irrigation system to include
pressure ratings, rated capacities, and settings of selected models for the following:
1. General-duty valves.
2. Specialty valves.
3. Control-valve boxes.
4. Sprinklers.
5. Irrigation accessories.
6. Controllers.
C Evidence of State of Texas irrigation license and required experience.
12/2014 02811 - 1 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
D Shop Drawings: Show irrigation system piping, including plan layout, and locations,
types, sizes, capacities, and flow characteristics of irrigation system piping
components.Include water meters,backflow preventers,valves,piping,sprinklers and
accessories,controls,and wiring. Show areas of sprinkler spray and overspray. Show
wire size and number of conductors for each control cable.
1.04 DEFINITIONS
A Irrigation Lateral Lines: Downstream from control valves to sprinklers, specialties,
and drain valves. Piping is under pressure during flow.
B Drain Piping: Downstream from circuit-piping drain valves. Piping is not under
pressure.
C Irrigation Main Piping: Downstream from point of connection to water distribution
piping to, and including, control valves. Piping is under water-distribution-system
pressure.
D Architect: The word Architect as used herein shall refer to the Owner's authorized
representative or the Landscape Architect or the design engineer.
1.05 RECORD AND AS-BUILT DRAWINGS
A The Contractor shall provide and keep up to date and complete"as-built"record set of
drawings which shall be corrected daily and show every change from the original
drawings and specifications and the exact "as-built" locations, sizes, and kinds of
equipment. This set of drawings shall be kept on the site and shall be used only as a
record set.
B These drawings shall also serve as work progress sheets and shall be available at all
times for inspection and shall be kept in a location designated by the Architect.Should
the record as-built progress sheets not be available for review or not up-to-date at the
time of any inspection, it will be assumed no work has been completed and the
Contractor will be assessed the cost of that site visit at the current billing rate of the
Architect.No other observations shall take place prior to payment of that assessment.
C The Contractor shall make neat and legible notations on the as-built progress sheets
daily as the work proceeds, showing the work as actually installed.
D Before the date of the final inspection, the Contractor shall transfer all information
from the "as-built" prints to a mylar. Contractor shall use symbols and notation
consistent with original drawings.
E The Contractor shall dimension from two(2)permanent points of reference,building
comers, sidewalk, or road intersections, etc., the location of the following items:
1. Connection to existing water lines
2. Connection to existing electrical power
3. Gate valves
4. Routing of sprinkler pressure lines (dimensions max. 100' along routing)
12/2014 02811 -2 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
5. Sprinkler control valves
6. Routing of control wiring
7. Quick coupling valves
8. Other related equipment as directed by the Architect
9. Sleeve locations
1.06 EXPLANATION OF DRAWINGS
A Due to the scale of drawings, it is not possible to indicate all offsets, fittings, sleeves,
etc., which may be required. The Contractor shall carefully investigate the structural
and finished conditions affecting all of his work and plan his work accordingly,
furnishing such fittings,etc.,as maybe required to meet such conditions.Drawings are
generally diagrammatic and indicative of the work to be installed. The work shall be
installed in such a manner as to avoid conflicts between irrigation systems,planting,
and architectural features.
B All work called for on the drawings by notes or details shall be furnished and installed
whether or not specifically mentioned in the specifications.
C The Contractor shall not willfully install the irrigation system as shown on the
drawings when it is obvious in the field that obstructions, grade differences or
discrepancies in area dimensions exist that might not have been considered in
engineering. Such obstructions or differences should be brought to the attention of the
Owner's authorized representative. In the event this notification is not performed,the
irrigation contractor shall assume full responsibility for any revisions necessary.
D No irrigation shall be required for undisturbed natural areas or undisturbed existing
trees.
1.07 CONTROLLER CHARTS
A As-built drawings shall be approved by the Architect before controller charts are
prepared.
1. Index sheet stating Contractor's address and telephone number, list of
equipment with name and addresses of local manufacturer's representative.
2. Catalog and parts sheets on every material and equipment installed under this
contract.
3. Guarantee statement.
4. Complete operating and maintenance instruction on all major equipment.
1.08 UNIFIED DEVELOPMENT CODE (UDC) REFERENCES
A Except for single-family lots and developments,all required landscaping areas shall be
100% irrigated by one of, or a combination of, the following methods:
1. An automatic underground irrigation system:
2. A drip irrigation system;
3. A hose attachment within 100 feet of all plant material, provided, however ,
that a hose attachment within 200 feet of all plant material in non-street yards
shall be sufficient
12/2014 02811 -3 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
B Irrigation zone design-A site plan,at a readable and defined scale,shall be submitted
illustrating zones, delineating micro-irrigation zones and areas utilizing irrigation
techniques other than micro-irrigation. Fifty (50) percent of the on-site green space
shall be allowed to utilize irrigation techniques other than micro-irrigation.Turf areas
shall be on separate irrigation zones from other landscaping plant zones.The irrigation
system should be prepared by a licensed irrigator and designed to accommodate
separate landscape plant zones based on different watering requirements unless
approved by the Parks Director as indicated in the UDC Section 4.2.2.5, Item 8.D.1.
C Overspray/ Runoff - All irrigation systems shall be designed to avoid overspray /
runoff, low head drainage, or other similar conditions where water flows onto or over
adjacent property, non-irrigated areas, roadways, walkways, structures, or water
features. Narrow areas (four feet wide or less) shall not be irrigated unless micro-
irrigation is utilized.
D Landscaping - a site plan shall be submitted identifying all existing vegetation to be
preserved,proposed turf, and other landscape areas. Installed trees and plants should
be grouped together into landscape plant zones according to water and cultural (soil,
climate and light) requirements. Plant groupings based on water requirements are as
follows: natural, drought tolerant, and oasis.
E Turf/Turfgrass-A maximum of fifty(50)percent of green space may be planted with
turf grass configured with a permanent irrigation system.Turfgrass planted in excess of
this limitation shall not have a permanent irrigation system.Micro-irrigation shall not
be used on turfgrass unless approved by the Parks Director as indicated in the UDC
Section 4.2.2.5, Item 8.D.1.
1.09 SYSTEM DESCRIPTION
A Electric solenoid controlled underground irrigation system.
B Source Power: 120 volt
1.10 QUALITY ASSURANCE
A Electrical Components, Devices, and Accessories: Listed and labeled as defined in
NFPA 70,Article 100,by a testing agency acceptable to authorities having jurisdiction,
and marked for intended use.
B All irrigation systems shall be designed and sealed in accordance with the Texas
Licensed Irrigations Act and shall be professionally installed.
C Installer-Installation of Irrigation System shall be performed under the direction of a
State of Texas licensed irrigator with not less than 5 years' experience in this type of
work.
D Manufacturer's Directions: Manufacturer's directions and detailed drawings shall be
followed in all cases where the manufacturers of articles used in this contract furnish
directions covering points not shown in the drawings and specifications.
12/2014 02811 -4 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
E Ordinances,Codes and Regulations:All local,municipal and state laws,and rules and
regulations governing or relating to any portion of this work are hereby incorporated
into and made a part of these specifications,and their provisions shall be carried out by
the Contractor. Anything contained in these specifications shall not be construed to
conflict with any of the above rules and regulations and requirements of the same.
However, when these specifications and drawings call for or describe materials,
workmanship,or construction of a better quality,higher standard,or larger size than is
required by the above rules and regulations, these specifications and drawings shall
take precedence.
1.11 REGULATORY REQUIREMENTS
A Conform to applicable code for piping and component requirements.
1.12 PRE-INSTALLATION CONFERENCE
A Convene one week prior to commencing work of this Section.
1.13 COORDINATION
A Coordinate work under provisions of Section 01310—Coordination and Meetings
B Coordinate work under provisions of Section 02931 —Landscape and Tree Planting.
C Coordinate the work with site landscape grading and delivery of plant life.
1.14 PRODUCT DELIVERY AND HANDLING
A Materials shall be delivered in manufacturer's unopened packaging labeled to indicate
manufacturer's name and product identification. Ensure that packaging and labeling
remain intact until installation. Materials shall be stored protected from the elements,
including direct sunlight.
B Pipes shall be handled so as to prevent them from being damaged and to maintain their
straightness. Pipe ends shall be wrapped;Pipes shall be stored on beds the full length
of the pipes; Damaged or dented pipes or fittings shall not be used.
1.15 SUBSTITUTIONS
A If the Irrigation Contractor wishes to substitute any equipment or materials for those
equipment or materials listed on the irrigation drawings and specifications,he may do
so by providing the following information to the Owner's authorized representative for
approval:
1. Provide a statement indicating the reason for making the substitution. Use a
separate sheet of paper for each item to be substituted.
2. Provide descriptive catalog literature,performance charts and flow charts for
each item to be substituted.
3. Provide the amount of cost savings if the substituted item is approved.
12/2014 02811 -5 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
B Owner's authorized representative shall have the sole responsibility in accepting or
rejecting any substituted item as an approved equal to those equipment and materials
listed on the irrigation drawings and specifications.
1.16 EXTRA MATERIALS
A Furnish extra components listed as Extra Items in Section 00300—Bid Proposal.
1. Two sprinkler heads of each type and size.
2. Two valve box keys.
3. Two wrenches for each type head core and for removing and installing each
type head.
2.0 PRODUCTS
2.01 MANUFACTURERS
A In other Part 2 articles where titles below introduce lists, the following requirements
apply to product selection:
1. Available Manufacturers: Subject to compliance with requirements,
manufacturers offering products that may be incorporated into the Work
include,but are not limited to, manufacturers specified.
2. Manufacturers: Subject to compliance with requirements, provide
products by one of the manufacturers specified.
2.02 PIPES, TUBES, AND FITTINGS
A Soft Copper Tube: ASTM B 88, Type L water tube, annealed temper.
1. Copper Pressure Fittings: ASME B16.18, cast-copper-alloy or ASME
B 16.22,wrought-copper,solder-joint fittings.Furnish wrought-copper fittings
if indicated.
2. Copper Unions: MSS SP-123, cast-copper-alloy,hexagonal-stock body,with
ball-and-socket, metal-to-metal seating surfaces and solder joint or threaded
ends.
B Hard Copper Tube: ASTM B 88, Type K, water tube, drawn temper.
1. Copper Pressure Fittings: ASME B 16.18, cast-copper-alloy or
ASME B 16.22,wrought-copper,solder-joint fittings.Furnish wrought-copper
fittings if indicated.
2. Copper Unions: MSS SP-123, cast-copper-alloy,hexagonal-stock body,with
ball-and-socket, metal-to-metal seating surfaces and solder joint or threaded
ends.
C Mainline PVC pipe:
1. Pressure Main Line:
12/2014 02811 -6 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
a. All main line shall be schedule 40 with solvent welded joints.
b. Pipe shall be made from an NSF approved Type I, Grade I, PVC
compound conforming to ASTM resin specification D1785. All pipe
must meet requirements as set forth in Federal Specification PS-22-70,
with an appropriate standard dimension(S.D.R.)(Solvent-weld pipe).
2. PVC Non-Pressure Lateral Line Piping:
a. Non-pressure buried lateral line piping shall be PVC class 200 with
solvent-weld joints.
b. Pipe shall be made from NSF approved, Type I, Grade II PVC com-
pound conforming to ASTM resin specification D I 784. All pipes
must meet requirements set forth in Federal Specification PS-22-70
with an appropriate standard dimension ratio.
3. Fittings 4"and larger shall be push-on Ductile Iron designed and manufactured
using ASTM A-536 Grade 70-50-05 ductile iron with tensile strength of
70,000 psi such as manufactured by Harco or approved equal.
4. Fittings 3" and smaller shall be Schedule 40, I-2, II-I NSF approved
conforming to ASTM test procedure D2466 PVC solvent-weld fittings.
5. Solvent cement and primer for PVC solvent-weld pipe and fittings shall be of
Christie's Red Hot Blue Glue and Primer.
6. All PVC pipe must bear the following markings:
a. Manufacturer's name.
b. Nominal pipe size.
c. Schedule or class.
d. Pressure rating in P.S.I.
e. NSF (National Sanitation Foundation) approval.
f. Date of expiration.
7. All fittings shall bear the manufacturer's name or trademark, material
designation, applicable I.P.S., schedule number and NSF seal of approval
D Irrigation Lateral Line pipe
1. Pipes 1/2 inch diameter and larger ASTM D 2231, PVC, 1120 or 1220, SDR
21.0, 200 PSI
2. Pipes 1/4 inch diameter: ASTM D 2241, PVC, 1120 or 1220, SDR 13.5,
315 PSI
E Fittings for Threaded Joints
1. ASTM D 2466, PVC, Schedule 80
F Length of pipes used
1. Use of pipe less than five(5)feet in length is prohibited unless otherwise noted
on the plans.
G No use of small scrap material to extend water lines
2.03 GENERAL DUTY VALVES
A Gate valves 4" and smaller shall be MSS SP-80, Class 125, Type 1, nonrising-stem,
bronze body with solid wedge, threaded ends, and malleable-iron hand wheel.
12/2014 02811 -7of19
CITY OF PEARLAND LANDSCAPE IRRIGATION
B Gate valves 3"and smaller shall be similar to those manufactured by Nibco,Hammond
or approved equal
C All gate valves shall be installed per installation detail.
D Install six (6) inches of pee gravel into bottom of all valve boxes.
E Gate valves 6 inch and larger shall be cast or ductile iron. They shall conform to
AWWA C-509. Stem shall be fitted with a 2" x2" square wrench nut and shall be
opened counter-clockwise. Stem extension shall be added to bring operating nut to
within 2 (two) feet of finished grade.
2.04 REMOTE CONTROL VALVES
A Plastic Automatic Control Valves: Molded-plastic body,normally closed, diaphragm
type with manual flow adjustment, and operated by 24-V ac solenoid.
1. All electric control valves shall be of the same manufacturer.
2. All electric control valves shall have a manual flow adjustment and pressure
regulating module.
3. Provide and install one control valve box for each electric control valve.
4. Electric remote control valve shall be Hunter ICV Series.
5. Install six (6) inches of pea gravel into bottom of all valve boxes.
B Automatic Drain Valves
1. Spring-loaded-ball type of construction and designed to open for drainage if
line pressure drops below 2'/2 to 3 psi.
C Quick-Couplers
1. Factory-fabricated,bronze or brass,two-piece assembly.Include coupler water-
seal valve; removable upper body with spring-loaded or weighted, rubber-
covered cap;hose swivel with ASME B 1.20.7,3/4-11.5NH threads for garden
hose on outlet; and operating key.
a. Manufacturers:
i. Hunter
2. All quick couplers shall be installed using "O"-ring style swing joint and
located in 10" round valve box with purple lids.
D Remote Control-Valve Boxes
1. Box and cover, with open bottom and openings for piping; designed for
installing flush with, grade. Include size as required for valves and service.
2. Valve boxes shall be heavy duty plastic 17 inch by 11-3/4 inch by 12 inch
depth,black with black cover.
3. Valve box shall be Series 1419, non-hinged, non-bolt cover, by Carson
Industries, Inc.,.or approved equal.
a. Manufacturers:
i. Carson Industries, LLC.
ii. Christy Concrete Products, Inc.
E Gate Valve and Control Wire Splice Boxes
12/2014 02811 -8 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
4
1. Gate valves and control wire splice boxes shall be heavy duty plastic 10 inch
diameter by 10'/4 inch deep, black with black cover,No. 910-12B,by Carson
Industries, Inc. or approved equal.
F Drainage Backfill
1. Cleaned gravel or crushed stone, graded from 3/8 inch minimum to 1 inch
maximum.
2.05 SPRINKLERS
A Brass or plastic housing and corrosion-resistant interior parts designed for uniform
coverage over entire spray area indicated,at available water pressure. Manufacturers:
Hunter Industries.
B Flush, Surface Sprinklers or VANs (Variable Angle Nozzle): Fixed pattern, with
screw-type flow adjustment.
C Bubblers: Fixed pattern, with screw-type flow adjustment.
D Shrubbery Sprinklers: Fixed pattern,with screw-type flow adjustment.
E Pop-up, Spray Sprinklers: Fixed pattern, with screw-type flow adjustment and
stainless-steel retraction spring.
F Pop-up, Rotary, Spray Sprinklers: Gear drive, full-circle and adjustable part- circle
types.
G Pop-up, Rotary, Impact Sprinklers: Impact drive, full-circle and part-circle types.
H Aboveground, Rotary, Impact Sprinklers: Impact drive, full-circle and part- circle
types.
I Matched precipitation rates - Sprays and rotors shall have matching application rates
within each irrigation zone.
J MP Rotators: wind resistant multi stream nozzle
2.06 CONTROLLERS
A The ACC controller shall be capable of two-wire decoder control of up to 99 stations
via a plug-in decoder output module. The decoder output module shall be field-
installable without tools.The decoder output module shall have an intrinsic capability
of up to 99 stations, and shall occupy 3 modular expansion slots inside the ACC
controller cabinet.
B The decoder output module shall have 6 two-wire output paths to the field. The
decoders may be wired in sequence over any combination of the two-wire paths,
including all 99 on a single two-wire path.Each path may extend up to 10,000 ft.to the
end of the wire run over 14 AWG(1.5mm dia.)wire,or 15,000 ft.over 12 AWG(2mm
dia.)
12/2014 02811 -9of19
CITY OF PEARLAND LANDSCAPE IRRIGATION
C The wire paths shall be twisted pair; solid-core, color-coded red/blue pairs with each
conductor in a polyethylene jacket suitable for direct burial. The two-wire paths shall
be Hunter Industries Model IDWIRE I for 14 AWG (1.5mm) conductors, or Model
IDWIRE2 for 12 AWG (2mm) conductors for extended range (over 10,000 ft., up to
15,000 ft.).
D All connections in the two-wire paths(outside the controller enclosure)shall be made
with 3M DBR-6 waterproof, strain relieving direct burial connectors,or exact equals.
Decoder output to solenoid connections shall be made with 3M DBY waterproof,
strain-relieving connectors or exact equals.No substitution of wire or wire connection
specifications is permissible. All connections,tees, and splices shall be positioned in
valve boxes in valve boxes for future location and service.
E One Decoder per valve, installed in the valve box is required unless otherwise
approved.
F The installer shall provide adequate earth ground(not to exceed I 0 Ohms)and connect
it to one of the decoder ground leads every 750 ft., or every 10th decoder module,
whichever is shorter. Also install on each dead end of the wire path.
G The ICD decoders and Sensor Decoders shall be UL and c-UL listed,and shall be CE
and C-tick approved.
H Final location of automatic controllers shall be approved by the Owner's authorized
representative.
I Unless otherwise noted on the plans, the 120 volt electrical power to the automatic
controller location to be furnished by others. The final electric hook-up shall be the
responsibility of the Irrigation Contractor.
J If two wire systems are not fitting to the system needed, another Hunter Controller
with conventional wiring will be used.
K Controllers will be capable of communicating with offsite Hunter software, unless
otherwise approved by owner.
L Control Equipment - Irrigation control equipment shall include and automatic
irrigation controller with the following features; program flexibility such as repeat
cycles and multiple program capabilities; battery back-up to retain the irrigation
programs; and a rain sensor device.
2.07 WIRING
A Wiring: AWG-ULUF 600 volt with solid-copper conductors and insulated cable;
suitable for direct burial.
1. Manufacturers:
12/2014 02811 - 10 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
a. Paige Cable
b. Regency Wire and Cable
c. Approved equal
B Feeder-Circuit Cables:No. 12 AWG minimum,between building and controllers and
runs over 1,000 LF. Low-Voltage, Branch-Circuit Cables: No. 14 AWG minimum,
between controllers and automatic control valves; color coded different from feeder-
circuit-cable jacket color;with jackets of different colors for multiple-cable installation
in same trench.
C Install 3 spare wires from each controller to farthest valve in each direction.
D Where more than one(1)wire is placed in a trench,the wiring shall be taped together
at intervals of ten (10) feet.
E An expansion curl shall be provided within three (3) feet of each wire connection.
Expansion curl shall be of sufficient length at each splice connection at each electric
control, so that in case of repair, the valve bonnet may be brought to the surface
without disconnecting the control wires.
F Control wires shall be laid loosely in trench without stress or stretching of control wire
conductors.
G All splices shall be made with Scotch-Lok #3576 Connector Sealing Packs, DBY
(Direct Bury) Splice by 3M or approved equal. Use one splice per connector sealing
pack.
H Field splices between the automatic controller and electrical control valves, less than
500' apart, will not be allowed without prior approval of the Architect.
I All field splices shall be installed in a 10"round valve box as specified in section 2.04
2.08 BACKFLOW PREVENTERS
A Backflow Preventers shall be bronze and copper,pressure vacuum breaker assembly
Febco No. 765 by Febco Sales,Inc. (CMB Industries), or approved equal. Size as per
drawings.
1. Reduced Pressure Backflow: Febco No. 825Y
2. Double Check Assembly: Febco No. 850
3. Or approved equal.
2.09 REMOTE CONTROL VALVE TIES
A Remote control valve ties shall be Christy's Valve I.D.tag model ID-STD-Y with wire
to attach numbered tag to valve.
2.10 SOLVENT CEMENT FOR SOLVENT WELDED JOINTS
12/2014 02811 - 11 of 19 .
CITY OF PEARLAND LANDSCAPE IRRIGATION
A CHRISTY'S RED HOT BLUE GLUE T. Christy Enterprises,Inc.,or approved equal.
Use a compatible primer recommended by the solvent cement manufacturer.
2.11 SEALANT FOR THREADED JOINTS UNDER CONSTANT PRESSURE
A RECTOR SEAL LIQUID TEFLON by Rector Seal Corp., or approved equal.
2.12 SLEEVES UNDER PAVING FOR CONTROL WIRE AND IRRIGATION LINES
A ASTM D 2455, PVC, Schedule 40 sized as shown on drawings.
2.13 FITTINGS FOR THREADED JOINTS
A ASTM D 2466, PVC, Schedule 80
2.14 BACKFLOW ENCLOSURES
A The backflow enclosure shall be of a vandal and weather resistant nature manufactured
entirely of formed tubing and rod,coated with a performance polymer alloy coating to
prevent injury. The mounting base and locking mechanism shall be manufactured
entirely of metal or fiber glass.The locking mechanism shall be of the full release type
which allows for complete removal of the enclosure from its mounting base without
the use of tools. The handle controlling the locking mechanism shall be concealed
within the surface of,the enclosure and provide for a padlock.
B The backflow enclosure shall be Strong Box Model manufactured by V.I.T.Products
Inc., 800-729-1314. No. SBBC-30CR Or approved equal.
C Hot Box Enclosure—CDR Systems Corporation or approved equal.
2.15 RAINFALL MONITOR
A Provide a Mini-Clik by Hunter Industries or approved equal.
2.16 FLOW SENSOR
A Install Flow sensor-Hunter Flow Click
3.0 EXECUTION
3.01 EXAMINATION
A Site Conditions:
1. Verify location of existing utilities.
2. Verify that required utilities are available,in proper location,and ready for use.
3. All scaled dimensions are approximate.
4. The Contractor shall check and verify all size dimensions and receive
Architect's approval prior to proceeding with work under this section.
5. Exercise extreme care in excavating and working near existing utilities.
12/2014 02811 - 12 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
6. Contractor shall be responsible for damages to utilities which are caused by his
operations or neglect. Check existing utilities drawings for existing utility
locations.
7. Coordinate installation of sprinkler irrigation materials including pipe,so there
shall be No interference with utilities or other construction or difficulty in
planting trees, shrubs, and ground covers.
8. Coordinate work with other site contractors.
9. The Contractor shall carefully check all grades to satisfy himself that he may
safely proceed before starting work on the sprinkler irrigation system.
10. No machine trenching,unless approved by Architect,is to be done within drip
line of trees. Trenching is done by hand,tunneling or boring or other methods
shall be approved by Architect.
11. It is understood that the piping layout is diagrammatic and piping shall be
routed around trees and shrubs in such manner to avoid damage to plants.
3.02 PREPARATION
A Physical Layout:
1. Piping and head layout is shown on plans in schematic form only.
2. All pipes to be installed directly behind curbs, walks, and walls wherever
possible.
3. Prior to installation, the Contractor shall stake out all pressure supply lines,
routing and location of sprinkler heads.
4. All layouts shall be approved by Architect prior to installation.
5. Route pipes to avoid plants, ground cover and structures.
6. Review layout requirements with other affected work. Coordinate locations of
sleeves under paving to accommodate system.
B Water Supply:
1. Sprinkler Irrigation system shall be connected to water supply points-of-
connection as indicated on the drawings.
2. Connections shall be made at approximate locations as shown on drawings.
Contractor is responsible for minor changes caused by actual site conditions.
3. Reclaimed systems utilizing purple pipe may be requested by owner. In the
event of the installation of a reclaimed system.All components will utilize the
same previously described manufacturer to provide `purple pipe'components.
4. All Reclaimed/Purple Pipe systems will conform to 30 TAC §344.1
3.03 TRENCHING
A Refer to Section 02318 — Excavation and Backfill for Utilities for excavating,
trenching, and backfilling.
B Location of Heads - Design location is represented as accurately as possible. Make
minor adjustments on site with approval of Landscape Architect as necessary to ensure
consistent and even spacing where applicable. Set all heads minimum 6"from back of
curb and 6" from edge of concrete walls.
12/2014 02811 - 13 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
C. Install piping and wiring in sleeves under sidewalks, roadways, parking lots, and
railroads.
D Drain Pockets: Excavate to sizes indicated. Backfill with cleaned gravel or crushed
stone, graded from 3/4 to 3, to 12 inches below grade. Cover gravel or crushed stone
with sheet of asphalt-saturated felt and backfill remainder with excavated material.
E Provide minimum cover over top of underground piping according to the following:
1. Irrigation Main Piping: Minimum depth of 18 inches below finished grade.
2. Circuit Piping: 12 inches.
3. Drain Piping: 12 inches.
4. Sleeves: 24 inches.
F Backfill
1. The trenches shall not be backfilled until all required tests are performed, or
until cover up is approved by the owner.
2. Trenches shall be carefully back-filled with the excavated materials approved
for backfilling, consisting of earth, loam, sandy clay, sand, or other approved
materials, free from large clods of earth or stones. Backfill shall be
mechanically compacted in landscaped areas to a dry density equal to adjacent
undisturbed soil in planting area.
3. Backfill will conform to adjacent grades without dips,sunken areas,humps or
other surface irregularities.
4. A sand material backfill will be initially placed on all lines (minimum 3"
depth). No foreign matter larger than one-half(1/2) inch in size will be per-
mitted in the initial backfill.
5. Where rock is encountered in trenching, 4" of sand above the pipe and 4" of
sand below the pipe will be used as the initial backfill.
6. Flooding of trenches will be permitted only with approval of Architect.
7. If settlement occurs and subsequent adjustments in pipe, valves, sprinkler
heads, lawn or planting, or other construction are necessary, the Contractor
shall make all required adjustments without cost to the Owner.
8. Trench shall be excavated to accommodate grade changes.
9. Trench shall not be left open overnight unless caution taped or fenced off
10. Existing Lawns-Where trenching is required across existing lawns, (or in the
event of changes or repairs after new lawn has been established),uniformly cut
strips of sod 6 inches wider than trench. Remove sod in rolls of suitable size
for handling and keep moistened until replanted.
11. Backfill trench to within 6 inches of finished grade and compact.
12. Continue fill with acceptable topsoil and compact to bring sod even with
existing lawn.
13. Replant sod within 2 days after removal,roll and water generously;unless new
sod or hydro mulch is to be installed.
14. All sod areas not in healthy condition equal to adjoining lawns 30 days after
replanting shall be re-sodded and restored to original condition.
3.04 INSTALLATION
12/2014 02811 - 14 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
A Pipes
1. Piping Mains and Laterals - Lay out sprinkler mainlines and perform line
adjustments and site modifications to laterals prior to excavation.Lay pipe on
solid sub base,uniformly sloped without humps or depressions.
2. Coordinate pipe installation with conduit installation.
3. PVC pipe Assembly
a. Cut PVC pipe square and de-burr.
b. Clean pipe and fittings using primer as recommended by the PVC pipe
manufacturer. Use tinted primer to aid in visual inspection and blue
glue.
c. Apply a thin even flow coat of PVC solvent cement to inside of the
fitting and pipe mating surface.
d. Cure joints as recommended by the manufacturer and keep pipe and
fitting out of service during curing period.
e. Construct watertight joints equal or greater in strength than the pipe.
Do not tap pipe at fittings.
f. Install plastic pipe in dry weather, when temperature is above 40
degrees F. and in accordance with manufacturer's written instructions.
g. Allow joints to cure at least 24 hours at temperature above 40 degrees F
before testing.
h. Plastic pipe shall be snaked in the trenches in a manner to provide for
expansion and contraction as recommended by pipe manufacturer.
i. Extend primer 1/2"beyond glue joint for visual inspection.
j. Ensure that the pipe is not laid on top of fittings and put under stress in
any way prior to cover-up.
B Sleeves under Paving
1. The majority of sleeves under paving exist as shown on drawings. Where
boring is required for new sleeves(refer to drawings),it shall be a"wet bore."
Install sleeves 12" beyond edge of pavement. Perform trench and backfill in
accordance with these specifications.
2. Sleeves shall be marked on the concrete with 1/4" deep "V" cut into curb.
C Concrete Thrust Blocks
1. Install where the rubber-gasketed irrigation main changes direction as at ells
and tees and where the rubber-gasketed main terminates.
2. Pressure tests shall not be made for a period of 36 to 48 hours following the
completion of pouring of the blocks.
3. Blocks for these mains shall be sized and placed in strict accordance with the
pipe manufacturer's specifications and shall be of an adequate size and so
placed as to take all thrust created by the maximum internal water pressure.
D Irrigation Heads
1. Flush irrigation lines with full head of water and install heads after hydrostatic
test is completed.
2. Install heads at manufacturer's recommended heights.
12/2014 02811 - 15 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
3. Locate part-circle heads to maintain a minimum distance of 4, 12, 24, 48
inches from walls and inches from other boundaries, unless otherwise
indicated.
4. Check for uniformity of coverage and pattern correctness. Adjust for 100%
coverage where required.
5. Install nozzles with water running at reduced pressure starting with the head
closest to the valve.
6. Adjust arcs and radius at normal operating pressure.
7. Ensure heads do not spray into areas not intended to receive water. Example:
streets and sidewalks.
8. Install heads at minimum of six (6) inches from back of curb.
9. Spacing - Sprinkler spacing shall not exceed 55 percent of the sprinkler
diameter of coverage.
10. Separate spray and rotors - Sprays and rotors shall not be combined on the
same control valve circuit
E Drip Tubing
1. Tubing installed in planting beds is to be placed at spacing indicated on
drawings in shallow trench and covered with planting backfill mix 1"-2" deep
and then covered with mulch.
2. Tubing is to be placed after bed preparation is complete and plant material is
planted and root ball anchor is installed.
3. Drip tubing is to be placed on top of root balls of trees in planting beds to
allow for even watering of trees.
4. All tubing is to be reviewed by Owner's Representative prior to burying.
F Electric Remote Control Valves
1. Adjust automatic control valves to provide flow rate at rated operating pressure
required for each irrigation section.
2. Install valves in valve boxes,arranged for easy adjustment and removal.Locate
valves to ensure ease of access for maintenance such that no physical
interference with other elements of the project exists.
3. Remote Control Valve Tags to be used in Section 2.09
4. One Remote Control Valve Tag shall be attached to stem of each electric
remote control valve. Tags shall be numbered sequentially. Numbers shall
correspond to station numbers in electric controller. Provide tags and
corresponding numbers for wires pulled for future valves.
5. Valve Boxes - Install valve be
to cover electric remote control valves.
Install one valve per valve box. Top of valve box shall be flush with finished
grade. Bury minimum 4 bricks under base of each box as support.
6. Control Wire Splice Boxes-Install control wire splice box to cover any splice
in control wire. Top of valve box shall be flush with finished grade. Bury
minimum 4 bricks under base of each box as support.Install control wire splice
box to cover wires pulled for future valves.
G Gravel Backfill
1. Backfill valve boxes and control wire splice boxes with gravel, minimum 6
inch depth.
12/2014 02811 - 16 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
H Electric Controller
1. Controllers shall be fully grounded.
2. Connect remote control valves to controller in clockwise sequence to
correspond with stations 1, 2, 3, successively.
3. Affix a non-fading copy of irrigation diagram to cabinet door below
controller's name.Irrigation diagram shall be sealed between two plastic sheets,
20 mils. Minimum thickness. Irrigation diagram shall show clearly all valves
operated by the controller, showing station number, valve size, and type of
planting irrigated.
4. Provide lockable cabinet.Provide two keys to Owner.Keys to be matched with
existing controller key locking mechanisms.
5. Power to Controller&Locations: Locations shown on plan for controllers is
approximate. Final location shall be determined on site by Owner.
6. Contractor shall supply 120 VAC to controller from adjacent existing power
sources. Follow local governing codes in electrical work.
7. Lightning Protection and Grounding: Provide full grounding and lightning
protection per system manufacturer's recommendations.
8. Wall mounted controllers; electrical meters and breaker boxes shall be
mounted on I-beam structures.
Irrigation Control Wires
1. Provide 24 volt system for control of automatic circuit-section valves of
underground irrigation system.Provide unit capacity to suit number of circuits
indicated.
2. Install control wires with irrigation mains and laterals in common trench where
possible.Lay control wires neatly together to side of pipe.Provide looped slack
at valves, corners,bores and snake wire in trench to allow for contraction. Tie
wires in bundles at 10 foot intervals. Line splices will be allowed on runs of
500 Ft. or more. Splices shall be made and placed in control wire splice boxes.
3. Provide 12 inch long expansion loop within 3 feet of each wire connection and
splice on runs of wire 100 feet or longer.
J Backflow Preventers
1. Make required connection to water supply according to local codes and
manufacturer's written instructions.
2. Install pressure type backflow devices at required grade in accordance with the
local Plumbing Code.
3. Insulate all above ground piping.
3.05 FIELD QUALITY CONTROL AND TESTING
A General - Notify Landscape Architect 48 hours in advance when testing will be
conducted. Conduct tests in presence of Landscape Architect and owner.
B The Parks and Recreation Department will conduct open trench inspections daily,prior
to cover-up.
12/2014 02811 - 17 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
C Hydrostatic Test - Test irrigation main line, before backfilling trenches, to a
hydrostatic pressure of not less than 100 psi for 1 hour. Piping may be tested in
sections to expedite work.Remove and repair or replace piping and connections which
do not pass hydrostatic testing.
D Shut off mainline at backflow preventer during non-working hours until Contractor has
demonstrated the mainline is stable.
E Operational Testing - Perform operational testing after hydrostatic testing is
completed, backfill is in place and irrigation heads are adjusted to final position.
F Demonstrate to Landscape Architect that system meets coverage requirements, is as
specified and indicated, and that automatic controls function properly.
G Coverage requirements are based on operation of one circuit at a time.
H After completion of grading, sodding and rolling of grass areas, carefully adjust lawn
sprinkler heads so they will be flush with finish grade. Set shrub sprinkler heads not
more than 1/2 inch above top of mulch.
I Ensure watering does not extend into unintended areas, such as roadways _and
sidewalks.
J Field inspection and testing will be performed.
K Prior to filling,test system for leakage for whole system to maintain 100 psi pressure
for one hour.
3.06 FILLING
A Provide 3 inch sand cover over piping. Fill trench and compact to subgrade elevation.
Protect piping from displacement.
3.07 ADJUSTING
A Adjust control system to achieve time cycles required.
B Change and adjust head types for full water coverage as directed.
3.08 MAINTENANCE
A Contractor shall correctly maintain the irrigation system during the installation process
and throughout the landscaping maintenance service period.
B Contractor shall provide "As Built" Drawings for new work, showing dimensioned
location of valves,meters,backflow preventers,controllers,and mainline. Contractor
shall request reproducible mylar from the Landscape Architect in preparation of"As
Built" Drawings. Contractor shall also provide a small laminated set of plans in each
irrigation controller, which is color coded for each set of heads each valve operates.
12/2014 02811 - 18 of 19
CITY OF PEARLAND LANDSCAPE IRRIGATION
C Maintenance and management - The landscape and irrigation system shall be
maintained and managed to ensure water efficiency, and prevent wasteful practices.
This should include,but not limited to:resetting the automatic controller according to
the season; flushing the filters; testing the rain sensor device; monitoring, adjusting,
and repairing irrigation equipment such that the efficiency of the system is maintained
and utilizing turf and landscape best management practices during the maintenance
period.
3.09 DEMONSTRATION
A Provide system demonstration.
B Instruct Owner's personnel in operation and maintenance of system, including
adjustment of sprinkler heads. Use operation and maintenance material as basis for
demonstration.
END OF SECTION
12/2014 02811 - 19 of 19
CITY OF PEARLAND WOOD FENCES AND GATES
Section 02820
WOOD FENCES AND GATES
1.0 GENERAL
1.01 SECTION INCLUDES
A Fence framework, material components, and accessories.
B Excavation for post bases, concrete foundation for posts, and installation of gates.
1. Manual gates and related hardware.
C References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
D Referenced Standards:
1. 'American Society of Testing and Materials (ASTM)
2. American Association of State Highway and Transportation Officials
(AASHTO)
1.02 MEASUREMENT AND PAYMENT
A Measurement for fencing shall be on a linear foot basis for type and height noted,
measured and complete in place.
B Measurement for gates shall be per each, complete in place.
C Payment includes all labor and materials required to complete installation as indicated
on Plans.
D Refer to Section 01200—Measurement and Payment Procedures.
1.03 •SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Shop Drawings: Indicate plan layout, spacing of components, post foundation
dimensions, hardware anchorage, and specific description of material components.
C Product Data: Provide data on material components including posts, rails, bracing,
accessories, fittings, and hardware.
1.04 SYSTEM DESCRIPTION
A Fence height shall be as indicated on Plans or as noted to match height of existing.
B Line post spacing shall not exceed 10 feet, or as shown on Plans.
07/2006 02820- 1 of 3
CITY OF PEARLAND WOOD FENCES AND GATES
C Provide bracing as appropriate for structural integrity.
D Concrete posts in the ground at a depth of, at least, 1/a the height of the fence.
E The diameter of the post hole shall be, at least, 11/2 times that of the post,or as shown
on Plans.
1.05 QUALIFICATIONS
A Company specializing in installation of the products specified in this Section with
minimum three years experience.
1.06 FIELD MEASUREMENTS
A Verify that field measurements are as indicated on Shop Drawings.
2.0 PRODUCTS
A When the Work entails replacement of fence structures, the products shall match or
exceed the quality of existing.
3.0 EXECUTION
3.01 INSTALLATION
A Install fence in accordance with the directions of the manufacturer and these Technical
Specifications.
B Use a Class B concrete base or better to set posts into the ground. Allow concrete to
cure for at least 7 days before attaching remainder of fence.
C Where type of material applies,use standard fence stretching equipment to stretch the
fencing before tying it to the rails and posts. Repeat the stretching and tying operations
about every 100 feet. Use bottom tension wire where specified on Plans.
D Erect gates so they swing or slide in the appropriate direction. Provide gate stops as
required. Secure hardware, adjust, and leave in perfect working order. Adjust hinges
and diagonal bracing so that gates will hang level. Adjust rollers and guides of sliding
gates so that gates are level.
E Accommodate contour of ground as indicated on Plans.
F Where new fence joins an existing fence, set a corner post and brace post at the
junction, or tie in as directed on Plans.
G Nuts and bolts shall be in conformance with ASTM-A307 and shall be galvanized in
accordance with AASHTO M232.
07/2006 02820-2 of 3
CITY OF PEARLAND WOOD FENCES AND GATES
H Other hardware indicated on Plans shall be in accordance with ASTM Standards.
END OF SECTION
07/2006 02820-3 of 3
CITY OF PEARLAND CHAIN LINK FENCES AND GATES
Section 02821
CHAIN LINK FENCES AND GATES
1.0 GENERAL
1.01 SECTION INCLUDES
A Fence framework, fabric, and accessories.
B Excavation for post bases, concrete foundation for posts and center drop for gates.
1. Manual gates and related hardware.
C References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
D Referenced Standards:
1. American Society for Testing and Materials (ASTM)
a. ASTM A 570, "Standard Practice for Roof System Assemblies
Employing Steel Deck, Performed Roof Insulation, and Bituminous
Built-Up Roofing"
b. ASTM A 1011, "Standard Specification for Steel, Sheet, and Strip,-
Hot-Rolled, Carbon, Structural, High-Strength Low Alloy and High-
Strength Low Alloy with Improved Formability"
c. ASTM A 307, "Standard Specification for Carbon Steel Bolts and
Studs, 60 000 PSI Tensile Strength"
2. American Association of State Highway and Transportation Officials
(AASHTO)
1.02 MEASUREMENT AND PAYMENT
A Measurement for fencing shall be on a linear foot basis for height noted,measured and
complete in place.
B Measurement for gates shall be per each, complete in place.
C Payment for chain link fences and gates includes all labor and materials required to
complete installation as indicated on Plans.
D _ Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
07/2006 02821 - 1 of 4
CITY OF PEARLAND CHAIN LINK FENCES AND GATES
B Shop Drawings: Indicate plan layout, spacing of components, post foundation
dimensions, hardware anchorage, and schedule of components.
C Product Data: Provide data on fabric, posts, accessories, fittings and hardware that
indicates that items match or exceed the quality of existing.
1.04 SYSTEM DESCRIPTION
A Fence Height shall be as indicated on Plans or as noted to match height of existing.
B Extension arms for barbed wire shall match existing.
C Line Post Spacing shall not exceed 10 feet, or as shown on Plans.
1.05 QUALIFICATIONS
A Manufacturer: Company specializing in manufacturing the products specified in this
Section with minimum three years experience.
1.06 FIELD MEASUREMENTS
A Verify that field measurements are as indicated on Shop Drawings.
2.0 PRODUCTS
2.01 GALVANIZED FENCING
A Fence fabric shall be No. 9 steel wire, hot galvanized after weaving, to match or
exceed existing.
B Framework shall be hot-dipped galvanized with a minimum coating of 2 ounces/sf,or
one ounce/sf plus 30 micrograms/square inch chromate conversion coating.
C Line posts shall be 2" and conform to ASTM A 570 Grade 45 steel or ASTM A 569,
cold rolled steel. All posts shall have spherical plugs.
D End corner, angle, and pull posts shall be 2 1//2" and conform to ASTM A 570 Grade
45 steel or ASTM A 569 for steel pipe.
E Top rails shall be 1.65 x 1.25 inch formed C-section; or 1.6 inch round ASTM A 569,
1.35 lbs/ft; or one 5/8 inch outside diameter steel pipe,2.27 lbs/ft. Top rails shall pass
through openings provided for that purpose in post tops.
F Fabric ties shall be hog rings, galvanized steel wire not less than 9-ga with a zinc
coating of not less than 1.2 ounces/sf.
G Bolts and nuts shall be in conformance with ASTM A 307 and shall be galvanized in
accordance with AASHTO M232.
07/2006 02821 -2 of 4
CITY OF PEARLAND CHAIN LINK FENCES AND GATES
H Install horizontal braces fabricated of one 5/8 inch,2.271b copper bearing steel pipe at
all corner, gate, and end posts.
I All posts to have malleable iron top caps.
J Bottom tension wire shall be#7 gauge wire.
K Gates shall be either swing or slide as shown on the plans. Swing gates shall be hinged
to swing 90 degrees from closed to open or hinged to swing 180 degrees from close to
open. Slide gates shall be roller type with no vertical obstructions. All gate leaves
shall have intermediate members and diagonal stress rods as required for rigid
construction and shall be free from sag or twist. All gates shall be fitted with vertical
extension arms or shall have frame end number extended to carry barbed wire. Gate
posts for gates shall be 4-inch, 9.1 lb pipe. Gate frames shall be made of 2-inch
outside diameter,castings. Fabric shall be the same as for the fence. Gates shall have
malleable iron ball and socket hinges, catches, stops and padlocks with 3 keys each.
Posts for single gates shall be the same as end posts.
3.0 EXECUTION
3.01 INSTALLATION
A Install chain link fence in accordance with the directions of the manufacturer and these
Specifications.
B Install line fence posts at not more than loft centers and concreted at least 36 inches x
12" diameter into the ground in a Class B concrete base. Allow concrete to cure for at
least 7 days before erecting remainder of fence. Fasten fabric to line posts with wire
ties spaced about 14 inches apart and to top rail spaced about 24 inches apart.
C Use standard chain link fence stretching equipment to stretch the fabric before tying it
to the rails and posts. Repeat the stretching and tying operations about every 100 feet.
D Erect gates so they swing or slide in the appropriate direction. Provide gate stops as
required. Secure hardware, adjust,and leave in perfect working order. Adjust hinges
and diagonal bracing so that gates will hang level. Adjust rollers and guides of sliding
gates so that gates are level.
E At small natural or drainage ditches where it is not practical for the fence to conform to
the contour of the ground, span the opening below the fence with wire fastened to
stakes of required length. The finished fence shall be plumb, taut, true to line and
ground contour. When directed, stake down the chain link fence at several points
between posts.
07/2006 02821 -3 of 4
CITY OF PEARLAND CHAIN LINK FENCES AND GATES
F Where new fence joins an existing fence, set a corner post and brace post at the
- junction and brace as directed. If the connection is made at other than the corner of the
new fence the last span of the old fence shall contain a brace.
END OF SECTION
07/2006 02821 -4 of 4
CITY OF PEARLAND TOPSOIL
Section 02910
TOPSOIL
1.0 GENERAL
1.01 SECTION INCLUDES
A Furnishing and placing topsoil for finish grading and for seeding, sodding, and
planting.
B References to Technical Specifications:
1. Section 01200 -Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01450—Testing Laboratory Services
4. Section 01500—Temporary Facilities and Controls
5. Section 02200—Site Preparation
6. Section 01140—Contractor's Use of Premises
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for topsoil under this
Section. Include,cost in Bid Items for which topsoil is a component.
B If topsoil is included as a Bid Item,measurement will be based on the units shown in
Section 00300—Bid Proposal and in accordance with Section 01200—Measurement
and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit product quality,material sources, and field quality information in accordance
with this Section.
1.04 TESTING
A Testing and analysis of product quality, material sources, or field quality shall be
performed by an independent testing laboratory provided by the Owner under the
provisions of Section 01450 — Testing Laboratory Services and as specified in this
Section.
1.05 PROTECTION OF PEOPLE AND PROPERTY
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
07/2006 02910- 1 of 3
CITY OF PEARLAND TOPSOIL
2.0 PRODUCTS
2.01 TOPSOIL
A Topsoil shall be fertile, friable, natural sandy loam surface soil obtained from
excavation or borrow operations having the following characteristics:
1. pH value of between 5.5 and 6.5.
2. Liquid limit: topsoil not exceed 50
3. Plasticity index: 10 or less.
4. Gradation: maximum of 40 percent with a passing the#280 sieve.
B Topsoil shall be reasonably free of subsoil, clay lumps,weeds,non-soil materials and
other litter or contamination. Topsoil shall not contain roots,stumps,and stones larger
than 2 inches.
C Obtain topsoil from the top material from naturally well drained areas where topsoil
occurs at a minimum depth of 4 inches and has similar characteristics to that found at
the placement site. Do not obtain topsoil from areas infected with a growth of, or
reproductive parts of nut grass or other noxious weeds.
3.0 EXECUTION
3.01 EXAMINATION
A Verify that excavation and embankment operations have been completed to correct
lines and grades:
3.02 TOPSOIL STRIPPING AND SOTCKPILING
A Conform to topsoil stripping and stockpiling requirements of Section 02200 — Site
Preparation.
3.03 PLACEMENT
A Contractor shall conduct erosion control practices described in Section 01566-Source
Controls for Erosion and Sedimentation during topsoil placement operations.
B For areas to be seeded or sodded, scarify or plow existing surface material to a
minimum depth of 4 inches, or as indicated on the Plans. Remove any vegetation and
foreign inorganic material. Place 4 inches of topsoil on the loosened material and roll
lightly with an appropriate lawn roller to consolidate the topsoil.
C Increase depth pf topsoil to 6 inches when placed over cement stabilized sand used as
bedding and backfill material.
D For areas to receive bushes or trees,excavate existing material and place topsoil to the
depth and dimensions shown on the Plans.
07/2006 02910-2 of 3
CITY OF PEARLAND TOPSOIL
E Remove spilled topsoil from curbs, gutters, and, paved areas and dispose of excess
topsoil in accordance with requirements of Section 01140 — Contractor's Use of
Premises.
3.04 PROTECTION OF THE WORK
A Protect and maintain topsoil until a vegetative cover is established.
B Repair areas damaged by Contractor's operations at no cost to Owner.
END OF SECTION
07/2006 02910-3 of 3
CITY OF PEARLAND HYDROMULCH SEEDING
Section 02921
HYDROMULCH SEEDING
1.0 GENERAL
1.01 SECTION INCLUDES
A Seeding, fertilizing, mulching, and maintaining areas of commercial, industrial, or
undeveloped land disturbed during construction and not paved or designated to be
paved, or as indicated on Plans.
B References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01500—Temporary Facilities and Controls
4. Section 02910—Topsoil
5. Section 02255 —Bedding, Backfill, and Embankment Materials
6. Section 01140—Contractor's Use of Premises
1.02 MEASUREMEN AND PAYMENT
A Measurement for hydromulch seeding is on a per acre basis,measured and complete in
place.
B Payment for hydromulch seeding shall include all labor, materials, equipment, and
preparation necessary for application and maintenance.
C No payment shall be made for hydromulch seeding used in restoration of areas
disturbed by Contractor outside the limits of construction.
D Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit certification from supplier that each type of seed conforms to these
specification requirements and the requirements of the Texas Seed Law. Certification
shall accompany seed delivery.
C Submit a certificate stating that fertilizer complies with these specification
requirements and the requirements of the Texas Fertilizer Law.
1.04 PROTECTION OF PEOPLE AND PROPERTY
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
07/2006 02921 - 1 of 4
CITY OF PEARLAND HYDROMULCH SEEDING
2.0 PRODUCTS
2.01 MATERIALS
A Topsoil: Conform to material requirements of Section 02910—Topsoil.
B Bank Sand: Conform to material requirements of Section 02255—Bedding,Backfill,
and Embankment Materials.
C Seed: Conform to U.S.Department of Agriculture rules and regulations of the Federal
Seed Act and the Texas Seed Law. Seed shall be certified 90 percent pure and furnish
80 percent germination and meet the following requirements:
1. Rye: Fresh, clean, Italian rye grass seed (lollium multi-florum), mixed in
labeled Proportions. As tested, minimum percentages of impurities and
germination must be labeled. Deliver in original unopened containers.
2. Bermuda: Extra-fancy, treated, lawn type common bermuda (Cynodon
dactylon). Deliver in original, unopened container showing weight, analysis,
name of vender, and germination test results.
3. Wet, moldy, or otherwise damaged seed will not be accepted.
D Fertilizer:Dry and free flowing,inorganic,water soluble commercial fertilizer,which
is uniform in composition. Deliver in unopened containers which bear the
manufacturers guaranteed analysis. Caked,damaged,or otherwise unsuitable fertilizer
will not be accepted. Fertilizer shall contain minimum percentages of the following
elements:
Nitrogen: 10 Percent
Phosphoric Acid: 20 Percent
Potash: 10 Percent
E Mulch:Virgin wood cellulose fibers from whole wood chips having a minimum of 20
percent fibers 0.42 inches(10.7 mm)in length and 0.01 inches(0.27 mm)in diameter.
Mulch shall be dyed green for coverage verification purposes.
F Soil Stabilizer: "Terra Tack" 1 or approved equal.
G Weed control agent: Pre-emergent herbicide for grass areas, "Benefin" or approved
equal.
3.0 EXECUTION
3.01 PREPARATION
A Do not start or perform work under conditions that are not satisfactory to perform tasks
due to inclement or impending inclement weather.
B After the areas to receive hydromulch seeding have been brought to grade,rake out any
foreign organic or inorganic material, including stones, hard clay lumps, and other
debris.
07/2006 02921 -2 of 4
CITY OF PEARLAND HYDROMULCH SEEDING
C Level with Bank Sand or Topsoil, as approved by the Engineer.
D Loosen the subgrade by discing or by scarifying to a depth of at least 4 inches.
E Place and compact a layer of topsoil in accordance with requirements of Section 02910
—Topsoil.
F Surface of topsoil shall be smooth and free of weeds,rocks,and other foreign material
immediately before applying hydromulch seeding.
3.02 APPLICATION
A Seed: Apply uniformly at the following rates for type of seed and planting date:
APPLICATION PLANTING
TYPE RATE DATE
POUNDS/A
Hulled Common Bermuda Grass 98/88 40
Unhulled Common Bermuda Grass 98/88 40 Jan 1 to Mar 31
Hulled Common Bermuda Grass 98/88 40 Apr 1 to Sep 30
Hulled Common Bermuda Grass 98/88 40
Unhulled Common Bermuda Grass 98/88 40 Oct 1 to Dec 31
Annual Rye Grass(Gulf) 30
B Fertilizer: Apply uniformly at a rate of 500 pounds per acre.
C Mulch: Apply uniformly at a rate of 50 pounds per 1000 square feet.
D Soil stabilizer: Apply uniformly at a rate of 40 pounds per acre.
E Weed control agent: Apply at manufacturer's recommended rate prior to
Hydromulching.
F Suspend all operations under conditions of drought,excessive moisture,high winds,or
extreme or prolonged cold. Obtain the Engineer's approval before resuming
operations.
3.03 MAINTENANCE
A Maintain grassed areas by watering,fertilizing,weeding, and trimming as required to
establish and sustain 70% acceptable vegetative cover.
B For areas seeded in the fall, continue maintenance the following spring until an
acceptable lawn is established.
3.04 CLEAN-UP AND RESTORATION
A Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises.
07/2006 02921 -3 of 4
CITY OF PEARLAND HYDROMULCH SEEDING
3.05 PROTECTION OF THE WORK
A Protect and maintain grassed areas a minimum of 90 days, or as required to establish
an acceptable lawn.
B Once a lawn is established, protect and maintain it until completion of the Work.
C Replace seeded areas damaged by Contractor's operations at no cost to Owner.
END OF SECTION
•
07/2006 02921 -4 of 4
CITY OF PEARLAND SODDING
Section 02922
SODDING
1.0 GENERAL
•
1.01 SECTION INCLUDES
A Sodding areas of residential lawns disturbed during construction and not paved or
designated to be paved, or as indicated on Plans.
B References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01500—Temporary Facilities and Controls
4. Section 02910—Topsoil
5. Section 02255 —Bedding, Backfill, and Embankment Materials
6. Section 01140—Contractor's Use of Premises
C Definitions:
1. Lawn - ground covered with fine textured grass kept neatly mowed.
2. Sod-blocks, squares, strips of turf grass, and adhering soil used for
vegetative planting.
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for Work performed
under this Section. Include cost in Bid Items for utility or paving.
B If sodding is included as a Bid Item,measurement will be based on the units shown in
Section 00300—Bid Proposal and in accordance with Section 01200—Measurement
and Payment Procedures.
C No payment shall be made for sodding of restoration areas disturbed by Contractor
outside the limits of construction.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit material sources and product quality information in accordance with this
Section.
C Submit a certificate stating that fertilizer complies with these specification
requirements and the requirements of the Texas Fertilizer Law.
07/2006 02922- 1 of 4
CITY OF PEARLAND SODDING
1.04 PROTECTION OF PEOPLE AND PROPERTY
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
2.0 PRODUCTS
2.01 MATERIALS
A Topsoil: Conform to material requirements of Section 02910—Topsoil.
B Bank Sand: Conform to material requirements of Section 02255—Bedding,Backfill,
and Embankment Materials.
C Fertilizer: Available nutrient percentage by weight: 12 percent nitrogen, 4 percent
phosphoric acid, and 8 percent potash; or 15 percent nitrogen, 5 percent phosphoric
acid, and 10 percent potash.
D Weed and Insect Treatment: Provide acceptable treatment to protect sod from weed
and insect infestation. Submit treatment method to the Engineer for approval. All
insect and disease control shall be installed within guidelines set forth by the Structural
Pest Control Board of the State of Texas
E Water: Potable, available on-site through Contractor's water trucks. Do not use
private resident's water.
2.02 SOD
A Species: Bermuda (Cynodon Dactylon), Buffalo (Buchloe Dactyloides), or St.
Augustine to match existing or as directed.
B Contents: 95 percent permanent grass suitable to climate in which it is to be placed;
not more than 5 percent weeds and undesirable grasses; good texture, free from
obnoxious grasses, roots, stones and foreign materials.
C Size: 12 inch wide strips,uniform in thickness(2 inch minimum with clean-cut edges.
D Sod is to be supplied and maintained in a healthy condition as evidenced by the grass
being a normal, green color.
3.0 EXECUTION
3.01 PREPARATION
A Do not start work until conditions are satisfactory. Do not start work during inclement
or impending inclement weather. Perform Sodding only when weather and soil
conditions are deemed-by Engineer to be suitable for proper placement.
07/2006 02922-2 of 4
CITY OF PEARLAND SODDING
B After the areas to receive sod are brought to grade, rake out any foreign organic or
inorganic material, including stones, hard clay lumps and other debris.
C Level with Bank Sand or Topsoil, as approved by the Engineer.
D Loosen the subgrade by discing or by scarifying to a depth of at least 4 inches.
E Place and compact topsoil in accordance with requirements of Section 02910 —
Topsoil. Top soil shall be free of weeds and foreign material immediately before
sodding.
F Spread 2-inch (+1") layer of Bank Sand over prepared topsoil.
G Prior to placing sod,rake areas smooth,free from unsightly variations,bumps,ridges,
or depressions, and completely free from stones, hard clay lumps and other debris.
H Apply fertilizer at a rate of 25 lbs/1000 SF. Apply after raking soil surface and not
more than 48 hours prior to laying sod. Mix thoroughly into upper 2 inches of soil.
Lightly water to aid in dissipation of fertilizer.
3.02 APPLICATION
A Lay sod with closely fitted joints leaving no voids and with ends of sod strips
staggered. Sod shall be laid within 24 hours of harvesting.
B After sod is laid, irrigate thoroughly to secure 6-inch minimum penetration into soil
below sod.
C Tamp and roll sod with approved equipment to eliminate minor irregularities and to
form close contact with soil bed immediately after planting and watering. Submit type
of tamping and rolling equipment to be used to the Engineer for approval, prior to
construction.
3.03 MAINTENANCE
A Maintenance Period:
1. Begin maintenance immediately after each section of grass sod is installed
and continue for a 30-day period from date of Substantial Completion.
2. Re-sod unacceptable areas.
3. Water, fertilize, control disease and insect pests, mow, edge, replace
unacceptable materials, and perform other procedures consistent with good
horticultural practice to ensure normal, vigorous and healthy growth. All
disease control shall be installed within guidelines set forth by the Structural
Pest Control Board of the State of Texas.
4. Notify Engineer 10 days before end of maintenance period for inspection.
B Watering:
1. Water lawn areas once a day with minimum 1/2 inch water for the first 3
weeks after area is sodded.
07/2006 02922-3 of 4
CITY OF PEARLAND SODDING
2. After 3-week period, water twice a week with 3/4 inch of water each time
unless comparable amount has been provided by rain.
3. Make weekly inspections to determine moisture content of soil unless soil is
in frozen condition.
4. Water in the morning to enable soil to absorb maximum amount of water
with minimum evaporation.
C Mowing:
1. Mow sod at intervals which will keep grass height from exceeding 3-1/2
inches.
2. Set mower blades at 2-1/2 inches.
3. Do not remove more than one-half of grass leaf surface.
4. Sodded areas requiring mowing within 1 month after installation, shall be
mowed with a light-weight rotary type mower. The sod shall be mowed
only when dry and not in a saturated or soft condition.
5. Remove grass clippings during or immediately after mowing.
D Fertilizer and Pest Control:
1. Evenly spread fertilizer composite at a rate of 40 pounds per 5,000 square
feet or as recommended by manufacturer. Fertilizer shall not be placed until
2 weeks after placement of sod.
2. Restore bare or thin areas by topdressing with a mix of 50 percent sharp
sand and 50 percent sphagnum peat moss.
3. Apply mixture 1/4 to 1/2 inch thick.
4. Treat areas of heavy weed and insect infestation as recommended by
treatment manufacturer.
3.04 CLEAN-UP AND RESTORATION
A Perform clean-up and restoration in and around construction zone in accordance with
Section 01140 - Contractor's Use of Premises.
3.05 PROTECTION OF THE WORK
A Protect and maintain sod in good condition until 30 days after Substantial Completion.
B Replace sod damaged by Contractor's operations at no cost to Owner.
END OF SECTION
07/2006 02922-4 of 4
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
Section 02931
,
LANDSCAPE AND TREE PLANTING
1.0 GENERAL
1.01 SECTION INCLUDES
A Furnishing all plants and trees, labor, equipment, appliances and materials for
landscape and tree planting. Rough and finish grading is part of the landscape work.
B References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 02910—Topsoil
4. Section 02921 —Hydromulch Seeding
5. Section 01562—Waste Material Disposal
1.02 MEASUREMENT AND PAYMENT
A Measurement for Landscape Planting is on a Lump Sum.
B Payment for Tree Planting is on lump sum basis for each tree planted.
C Refer to Section 01200—Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make Submittals required by this Section under the provisions of Section 01350 —
Submittals.
B Submit samples of the plants and grasses to be used for approval prior to installation.
Inspection will be done on the project site.
C Provide materials from the same source and of the same quality and variety as those
inspected and approved.
D Soils and/or compost materials must be approved at their source prior to delivery.
1.04 REFERENCES
A ANSI Z 60.1 -Nursery Stock.
B Federal Specification Q-P-166E-Peat, Moss; Peat, Humus; and Peat,Reed-Sedge.
1.05 SCHEDULE
A The plant schedule gives quantities, scientific names, common names, sizes, and
special remarks.
12/2014 02931 - 1 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
B The plant list conforms with Standardized Plant Names, 1942,and American Standard
for Nursery Stock, 1949, revised April 14, 2014, as prepared by the American Joint
Committee on Horticultural Nomenclature and the American Association of
Nurserymen, Inc.
C In case of discrepancies between the plant list and drawings, the working drawings
shall govern.
1.06 DELIVERY AND STORAGE OF MATERIALS
A Pack all plant material to provide protection against damage from wind, weather or
other possible sources. Tie plants to prevent whipping when shipment is made by
truck.
B When shipment is made by rail,pack plants and ventilate cars as required to prevent
sweating.
C Provide a platform from all B&B root balls over 24 inches in diameter.
D Store plants on the site as directed.
E Spray with anti-transpirant at time of delivery in warm season months. Apply at rates
in accordance with manufacturer's recommendations.
F Ship trees with Certificates of Inspection as required by governing authorities. Label
each tree and shrub with securely attached waterproof tag bearing legible designation
of botanical and common name. Do not remove container grown stock from
containers before time of planting.
G Deliver packaged materials in fully labeled original containers showing weight,
analysis and name of manufacturer. Protect materials from deterioration during
delivery, and while stored at Site.
H Materials shall not be pruned prior to installation unless approved by the Engineer in
writing. Do not bend or bind-tie trees or shrubs in such a manner as to damage bark,
break branches, or destroy natural shape. Use protective covering during delivery.
1.07 SUBSTITUTIONS
A Substitution of larger size or better grade than specified will be allowed,but with no
increase in unit cost.
B Substitution of an alternate species may be accepted upon written approval from the
Engineer.
1.08 ACCEPTANCE AND APPROVAL
A There will be no partial acceptance of grasses.
12/2014 02931 -2 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
B Upon Contractor's request,final approval will be made within 15 working days of date
of notice to the Engineer if contracted work has been satisfactorily completed.
C Final approval of grasses will be given when the following conditions are met:
1. There are no bare spots larger than 9 inches square.
2. The total area of bare spots does not exceed 5 percent of the entire grass area.
1.09 WARRANTY
A Provide 1-year warranty on all plants and grasses. The warranty period commences
after fmal completion.
B Replace plants that fail during the warranty period according to the specifications
governing the original plants.
C Periodically inspect plants for proper watering and spraying, during warranty period.
D Damage caused by natural hazards such as hail,high winds or storm is not covered by
the warranty.
E Plant materials and grasses which die due to normal insects or diseases are included in +
the warranty.
F Existing in situ plant material required to be moved on the site will be protected under
the warranty.
G Contractor shall warrant trees against defects including death,unsatisfactory growth,or
loss of shape due to improper pruning,maintenance,or weather conditions,for 1 year
after completion of planting. Contractor shall plumb leaning trees during warranty
period.
H Remove and replace trees found to be dead during warranty period. Remove and
replace trees which are in doubtful condition at end of warranty period,or if approved
by the Engineer, extend warranty period for such trees for a full growing season.
1.10 SOIL ANALYSIS
A Submit for approval an analysis of all soils obtained from off-site sources prior to
delivery.
B Analysis of existing soil is not required. •
1.11 PLANT CERTIFICATES
A Submit inspection certificates approved by the Engineer as required by law with the
invoice for each shipment or order of stock:
1. Submit certificates to the Engineer for review in ample time to be reviewed and
meet installation schedule.
12/2014 02931 -3 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
1.12 PROTECTION OF PERSONS AND PROPERTY
A Take all reasonable precautions to prevent injury to people and to avoid damage to
existing structures,plants and grasses. Keep the area free of hazardous obstructions.
B Construct barricades where necessary for the protection of persons and property. Mark
all barricades with red and white paint and with red reflectors. Erect barricades in the
following locations:
1. Areas dangerous to workmen and passersby.
2. Along adjoining property that requires protection.
3. Across streets and walks that are temporarily closed or rerouted.
4. Around plants and trees to be protected.
C Excavations larger than 1 foot deep and 1 foot wide must be covered when not
attended. ,
D Existing trees which may be subject to damage must be protected by fencing or boxing.
E During the course of planting operations, protect all installed plants and lawns from
damage. If heavy equipment or materials must be moved across lawns,use planks or
pontoons to protect the turf. Similarly protect walks across which heavy equipment
must pass.
1.13 DEFINITIONS
A In situ refers to any soil which is existing and in place on the project site at the time
landscape work commences.
B Establishment period refers to a period of 45 days after installation during which time
5 percent of the construction costs will be withheld.
1.14 QUALITY ASSURANCE
A Landscaper shall be a firm specializing in landscape and planting work.
B Do not make substitutions of approved trees unless approved in writing by the
Engineer. If specified planting material is not obtainable, submit proof of non-
availability together with proposal for use of equivalent material. Substitutions of
larger size or better grade than specified will be allowed,but with no increase in unit
price.
2.0 PRODUCTS
2.01 TOPSOIL
A Topsoil: Conform to requirements of Section 02910 - Topsoil.
B Peat moss, bark, and fertilizer: Use material recommended by nursery for
establishment of healthy stock after replanting. Moss shall conform to requirements of
Federal Specification Q-P-166E.
12/2014 02931 -4 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
2.02 FERTILIZER
A Provide an inorganic commercial fertilizer which is uniform in composition, dry and
free flowing, in original unopened containers, each bearing the manufacturer's
guaranteed analysis. Caked, damaged or otherwise unsuitable fertilizer will not be
accepted.
1. For lawns: 12-24-12.
2. For ground cover areas,shrub beds and tree holes: 20-10-5(Except for Genus
Pyrus (Pear).
2.03 ADDITIVES
A Adjustment of pH. For topsoil to attain the specified pH level, furnish raw, ground
agricultural limestone containing not less than 85 percent calcium carbonate of which
50 percent will pass through a 100-mesh sieve and 90 percent through a 70-mesh sieve.
Wait 2 months after planting before application of fertilizer.
1. following table is a guideline to establish the pounds of limestone needed per
1000 square feet of turf:
LIMESTONE NEEDED PER 1000 SQUARE FEET
SOIL PH SANDS,LOAMY SANDS SANDY LOAM CLAY LOAM,CLAY
>6.0 0 0 0
5.1 - 6.0 50 75 100
<5.0 100 125 175
B Humus. Provide a rich humus material free of sticks, stones, weedy roots, or other
foreign matter. Humus must have ample water holding capacity and plant food
retention. Use a humus with a dark brown to black color.
C Dressing Mulch. Provide pine or redwood bark that is evenly shredded,consisting of
90 percent organic matter, brown in color, and free of harmful minerals. Maximum
particle size not to exceed 3 inches in diameter.
D Sharp Sand. Obtain clean sharp sand of hard durable grains, free from dirt, organic
matter or other impurities. Use sand with a grade between 0.05 mm and 2 mm.
E Concrete Gravel. Provide clean, crushed stone consisting of hard, durable,uncoated
particles free from injurious amounts of soft friable, thin or laminated pieces. Use
gravel which conforms to ASTM C 33. The sieve size will be 3/4 inch, 90 to 100
percent passing.
2.04 CONSTRUCTION MATERIALS
A Root Ball Anchors:
1. Duck bills will be used to secure the root ball anchors.
B Edging:
12/2014 02931 -5 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
1. Provide 1/2-inch x 4 inches, Cypress or Treated Lumber headerboard.
2. Provide 1 inch x 2 inches x 12 inches, Cypress or Treated Lumber stakes.
C Cloth for Balling Trees. Use burlap of jute weighing at least 7.2 ounces'per square
yard. Secure balled plants with 2-ply twine made of jute.
D Paper for Wrapping Trees. Use first quality, 4-inch-wide bituminous impregnated
tape, corrugated or crepe paper, specifically manufactured for tree wrapping and
having qualities to resist insect infestation.
E Materials for Flagging Trees:
1. Mark guyed trees with surveyors white plastic tape.
2. Use surveyors plastic tape for marking as follows.
a. Red to be removed.
b. Yellow to be transplanted.
c. Green to remain.
d. Blue to identify special handling.
F Labels. Legibly label plants with durable labels that identify the plant by scientific and
common name. Use waterproof ink.
G Tree Seal. All pruning cuts,bruises,or scars over 3/4 inch in diameter on trees will be
treated with a commercial tree wound dressing.
H Polyethylene. Use virgin base,resin blended polyethylene sheeting with carbon black
concentrate of 2.5 percent.
2.05 SPRAYS
A Sterilization:
1. Use approved solution of Dyclomec 4G, or equal, for areas to be planted.
2. Use Pramitol, or equal, for areas to be paved.
B Herbicides:
1. Use an approved systemic non-selective,post emergent herbicide on specified
areas to kill all vegetation.
2. Use Confront, or equal, for general control of broadleaf weeds in lawns.
3. Use Preemerg, Eptam, Dryclomec, or equal for ground cover.
4. Use an approved pre-emergent to control seed germination in specified areas.
C Antitranspirant:
1. Use approved antitranspirant for all plant material that is stored and/or heeled-
in on the site.
2. Use approved antitranspirant on all planted trees and shrubs.
D Root Stimulant. Use approved root stimulant on all newly planted trees,shrubs,vines
and/or ground cover areas.
12/2014 02931 -6 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
2.06 PLANT CHARACTERISTICS
A Provide plants which are true to type and name,and typical of their species or variety.
Plants must have a normal, well-developed branch structure, with a vigorous root
system, and must be generally sound and healthy. Use plants which are free from
defects, including:
1. Disfiguring knots.
2. Sun scald.
3. Injuries.
4. Bark abrasions.
5. Plant diseases.
6. Insect eggs.
7. Borers.
8. Infestations.
B Select well-formed plants balanced between height and spread typical of the species or
variety with branches in normal position. Heading back plants to meet size limits will
not be permitted.
C Unless otherwise specified, all plants will be nursery grown and at least twice
transplanted. Use plants which have been growing under similar climatic conditions to
those of the project for at least 2 years prior to the date of the contract. Recently
stepped-up plants will not be acceptable. All B&B or bare root plants must be freshly
dug; heeled-in or cold storage plants will not be accepted.
D Balled,bare root,and container-grown plants will conform to the definitions given in
American Standards for Nursery Stock.
E No tree will be accepted which has had leaders cut or damaged, or which has a thin,
weak trunk and/or poorly formed tops.
F Regardless of sample selection, a plant may be rejected at the site by the Engineer.
2.07 NURSERY STOCK
A Deciduous Trees. Provide trees which are straight and symmetrical and have a
persistently preferred main leader. The crown must be in good overall proportion to
the entire height of the tree. Where a clump is specified,a plant having a minimum of
three stems originating from a common base at the ground line will be furnish.
Measure trees by average caliper of trunk.
1. For trees up to 4 inches in diameter, measure caliper 6 inches above ground.
2. For trunks larger than 4 inches, measure caliper 12 inches above ground.
B Evergreen Trees. Form of the top will be typical of the species and not unnaturally
sheared or color-treated. Measure by average caliper. Caliper will be taken 6 inches
above the ground on trees up to 4 inches in diameter and 12 inches above the ground
on trees larger than 4 inches.
12/2014 02931 -7 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
C Vines and Ground Cover. Provide plants which are container-grown for sufficient
time to ensure adequate root growth to hold the soil in place and retain the original
shape when removed from the container.
2.08 FIELD-COLLECTED PLANTS
A Field-collected plants must be grown,in favorable locations that ensure fibrous roots
and vigorous growth. Such plants will be selected on site by the Landscape architect.
B Provide balls at least 1/3 greater in diameter than those specified for nursery stock.
C If dug in dormant season and bare root is acceptable, the spread of roots must be at
least 1/3 greater than the spread of roots for bare root nursery stock.
2.09 SEED
A Seasonal Limitations:
1. Bermuda:
a. Hulled seeds may be planted between October and March.
b. Unhulled seeds may be planted between April and September.
2. Rye:
a. Plant between October and February.
B Bermuda. Provide common Bermuda seed that is extra-fancy, treated, lawn type.
Deliver in original,unopened container showing weight,analysis,name of vendor and
germination test results. Wet,moldy,or otherwise damaged seed will not be accepted.
C Rye. Deliver annual Winter Rye seed in original unopened containers. Seed must be
fresh, clean, and mixed in labeled proportions. As tested, minimum percentages of
impurities and germination must be labeled.
2.10 HYDROMULCH
A Provide hydromulch seeding as noted in Section 02921 —Hydromulch Seeding.
2.11 GRASS
A Obtain certified sod from an approved source.
B Provide material which is true to type and name,and is typical of the species or variety.
C Delivery:
1. Identify and tag sods with correct scientific and common name for each
species.
2. Do not deliver more sods than can be planted within 8 hours.
3. Transport and deliver sods in/on pallets.
4. Protect sods against dehydration, overheating or contamination during
transportation and delivery. _
12/2014 02931 -8 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
5. Cover unplanted sods with moistened burlap to prevent dehydration or
overheating while awaiting installation.
6. Sods must be harvested within 12 hours of planting and arrive at the project
site in a moist condition.
D Products:
1. Material to be uniform in color, leaf texture and density.
2. Material to be graded No. 1, or better.
3. Uniform mowed height at time of harvesting material: 1-1/2 inches.
4. Inspected and certified free of diseases,nematodes,and undesirable insects by
authorized representative of State Department of Agriculture.
5. Material will not be acceptable if it contains any quack grass, Johnson grass,
poison ivy, nut grass, thistle, common bent grass, wild garlic, morning glory,
perennial sorrell, or brome grass.
6. Turf will be considered weed free when found to contain less than 1 percent of
dandelion,jimson weed, mustard, chickweed,per 100 square feet.
2.12 TREES
A Provide container grown trees which are straight and symmetrical and have a
persistently preferred main leader. The crown shall be in good overall proportion to
the entire height of tree with branching configuration as recommended by ANSI Z60.1
for type and species specified. Where a clump is specified,a plant having a minimum
of three stems originating from a common base at the ground line shall be furnished.
Measure trees by average caliper of trunk as follows:
1. For trunks up to 4 inches or less in diameter, measure caliper 6 inches above
top of root ball.
2. For trunks more than 4 inches, measure caliper 12 inches above top of root
ball.
3. Caliper measurements shall be by diameter tape measure. Indicated calipers on
plans are minimum. Averaging of plant calibers will not be allowed.
B Trees shall conform to following requirements:
1. Healthy, vigorous stock, grown in a recognized nursery.
2. Free of disease, insects, eggs, larvae; and free of defects such as knots, sun-
scald, injuries, abrasions, disfigurement, or borers and infestations.
2.13 WATER
A Water shall be potable from municipal water supplies.
2.14 SOURCE QUALITY CONTROL
A Notify Engineer,prior to installation, of location where trees that have been selected
for planting may be inspected. Plant material will be inspected for compliance with
following requirements.
1. Genus, species, variety, size and quality.
2. Size and condition of balls and root systems, insects, injuries and latent
defects.
12/2014 02931 -9 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
2.15 WORK CONDITIONS
A Site Availability. Begin no landscape work where conflicting site work is incomplete
or as otherwise directed by the Engineer.
B Weather Restrictions. Stop all work during inclement weather such as drought,high
winds, excessive rain, extreme heat, cold, or freeze. Obtain authorization before
resuming work.
2.16 PLANTING PROCEDURES
A Temporary Nursery. A temporary nursery may be used to store plants, but no more
than 5 days before planting. Keep plants-well watered and protected.
1. Immediately upon delivery, heel-in balled and burlapped (B&B) plants and
spray all plants with an antitranspirant. Apply spray from top to bottom.
Thoroughly cover plants,but not to the point of run-off. Spray block units and
not individual plants. Use a low-pressure,fine-mist applicator. Spray at rates
recommended in the manufacturer's directions.
2. Handle all balled and burlapped plants by the ball only.
3. Upon delivery, immediately heel-in bare root plants. Open bundles, separate
plants, set roots in trenches, and cover with topsoil. Water plants with an
approved root stimulant containing vitamin B.
4. Handle container plants by the container.
5. Handle ground cover plants in flats. Pack flats tightly together and sprinkle
plants everyday.
6. Special plants so designated must be kept in an approved enclosure or planted
the day of delivery.
7. Store soils and additives on approved platforms.
B Digging and Handling:
1. The actual planting operation must proceed without delay and in a manner to
avoid undue drying of the in-situ soil or roots because of exposure to air and
sun. Keep an ample supply of sawdust available to cover the roots of B&B
stock arriving from the storage nursery. Keep the roots well covered and moist
until the plants can be placed in the final location and permanently planted.
2. Handle all plant stock with care to prevent injuries to the trunk,branches and
roots.
3. Dig bare root plants when fully dormant. Keep all of the root system intact;do
not prune the root system. However, any roots that are broken, crushed, or
bruised must be cleanly cut back to sound wood. Make the cut on an angle so
that the exposed end faces downward. Seal any cut root exceeding 3/4 inch in
diameter with an approved tree wound dressing.
4. Balled and burlapped plants must have the root system encased in a firm,solid
ball of natural earth, wrapped in burlap and tightly bound. Each ball must be
of sufficient size to encompass all the fibrous feeding roots and not smaller
than required by American Standards for Nursery Stock. The ball must remain
firm and compact throughout the planting operations.
12/2014 02931 - 10 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
3.0 EXECUTION
3.01 SITE PREPARATION
A Schedule work so that planting can proceed rapidly as portions of site become
available. Plant trees after final grades are established and prior to planting of lawns,
unless otherwise approved by Engineer in writing. If planting of trees occurs after
seeding work,protect lawn areas and promptly repair damage to lawns resulting from
tree planting operations.
B Layout individual trees at locations shown on Drawings. In case of conflicts, notify
Engineer before proceeding with Work. Trees shall be staked and approved by
Engineer prior to planting.
C Existing Trees:
1. Protection: Protect tops,trunks and roots of trees to remain on the site. Before
starting work, box, fence or otherwise protect trees subject to construction
damage. Remove boxing when directed. Permit no stockpiles of heavy
equipment within the branch spread of trees.
2. Removal: Remove trees marked for removal. Do not remove any tree without
proper authorization. Stumps within 36 inches of final grade must also be
removed.
3. Pruning and Surgery: Cut and trim trees only as directed; do not cut any tree
without proper authorization. Trim existing trees of dead or diseased limbs.
Cut limbs close to the trunk. Cover cuts over 3/4 inch in diameter with an
approved tree would dressing.
D Grading Around Trees. As required, fill or grade within the branch spread of trees to
remain, observing the following requirements.
1. For trenching beneath trees, tunnel under the tree roots with careful hand
digging. Where possible, avoid cutting or injuring roots.
2. Do not raise or lower the grade around an existing tree in any way unless so
directed.
E Placing Topsoil:
1. Disk,drag,harrow,or handrake subgrade. Scarify the subgrade to a depth of 1-
1/2 inches. Before placing topsoil, rake the subsoil surface clear of stones,
wood,rubbish and other debris. Place no topsoil until the subgrade preparation
has been approved.
2. Spread, rake, and compact topsoil to form a layer with a minimum depth of 4
inches in lawn areas and 6 inches in shrub areas. Place topsoil to conform to
finished gradients as shown on the grading plan.
3. Remove spilled topsoil from curbs, gutters, and, paved areas and dispose of
excess topsoil in accordance with requirements of Section 01562 — Waste
Material Disposal.
12/2014 02931 - 11 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
F In Situ Soil Preparation:
1. Cross-till in two directions all existing soil in designated areas to be planted,as
follows:
a. In lawn areas to a minimum depth of 6 inches.
b. In shrub areas to a minimum depth of 10 inches.
2. Evenly broadcast fertilizers and soil additives and thoroughly work into soil.
a. Smooth all tilled and amended areas to establish a rough gradient.
b. Deeply irrigate all tilled and amended areas to thoroughly wet soil
particles and promote settlement.
c. After a settlement period of not less than 5 days,and before proceeding
with any planting, smooth and rake as necessary to establish finish
gradient as required.
3. In all areas which have been utilized for parking, storage or construction lots
and/or where heavy equipment has been used, cross-rip the entire compacted
areas in two directions to a depth of 10 inches before tilling and amending the
soil as specified. A heavy float or drag harrow should be used to smooth all
surface areas.
a. Verify location of all underground utilities before ripping.
b. Ripping teeth should not be set at more than 10-inch spacing.
G Fertilizer. Evenly broadcast and work fertilizer into soil at the following rates:
1. Lawns: ,1-1/2 N pounds per 1000 square feet.
2. Ground Cover, Shrub, and Tree Areas: 1-1/2 N pounds per 1000 square feet.
H Additives:
1. Humus. Evenly broadcast and work into in situ soil at a rate of 1 cubic yard
per 200 square feet.
2. Sharp Sand. Evenly broadcast and work into in situ soil at a rate of 1 cubic
yard per 200 square feet.
3. Concrete Gravel. Utilize as a drainage course as shown on construction
drawings.
3.02 PREPARATION OF PLANTING SOIL
A Before mixing, clean topsoil of roots, plants, sod, stones, clay lumps, and other
extraneous materials harmful or toxic to plant growth.
B Strip and utilize 4-inch layer of top soil,placed on esplanades under Section 02921 —
Hydromulch Seeding, for planting soil mixture.
C Mix recommended soil amendments with topsoil at following rates:
1. Top soil: 50 percent.
2. Peat moss: 25 percent.
3. Well rotted Bark: 25 percent.
4. Fertilizer: Rate recommended by nursery.
D Delay mixing of fertilizer if planting will not follow placing of planting soil within 48
hours, unless otherwise directed.
12/2014 02931 - 12 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
E Incorporate amendments into the soil as a part of the soil preparation process prior to
r fine grading, fertilizing, and planting. Broadcast or spread amendments evenly at the
specified rate over the planting area. Thoroughly incorporate amendments into the top
3 or 4 inches of soil until amendments are pulverized and have become a homogeneous
layer of topsoil ready for planting.
3.03 PLANTING
A Excavate pits, beds, or trenches with vertical sides and with bottom of excavation
raised a minimum of 6 inches at center for proper drainage. Provide following
•
minimum widths:
1. 15-gallon containers or larger, 2 feet wider than diameter of root ball.
2. 1- and 5-gallon containers, 6 inches wider than diameter of root ball.
B When conditions detrimental to plant growth are encountered, such as unsatisfactory
soil, obstructions, or adverse drainage conditions, notify the Engineer of such
conditions before planting.
C Deliver trees after preparations for planting have been completed and plant
immediately. If planting is delayed more than 6 hours after deliver, set trees and
shrubs in shade,protect from weather and mechanical damage,and keep roots moist by
covering with mulch, burlap, or other acceptable means of retaining moisture, and
water as needed. •
D Set root ball on undisturbed soil in center of pit or trench and plumb plant. Place
plants at such a level that, after settlement, a natural relationship of plant crown with
ground surface will be established.
E When set,place additional backfill around base and sides of ball,and work each layer
to settle backfill and eliminate voids and air pockets. When excavation is
approximately 2/3 full,water thoroughly before placing remainder of backfill. Repeat
watering until no more water is absorbed.
F Dish top of backfill to allow for mulching. Mulch pits, trenches and planted areas.
Provide no more than 4-inch thickness of mulch,work into top of backfill, and finish
level with adjacent fmish grades. Cover entire root ball.
G Prune, thin out and shape trees in accordance with standard horticultural practice.
Prune trees to retain required height and spread. Unless otherwise directed in writing,
do not cut tree leaders, and remove only injured and dead branches from flowering
trees. Remove and replace excessively pruned or misformed stock resulting from
improper pruning.
H Inspect tree trunks for injury, improper pruning and insect infestation and take
corrective measures.
I Anchor root ball immediately after planting.
12/2014 02931 - 13 of 15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
J Control dust caused by planting operations. Dampen surfaces as required. Comply
with pollution control regulations of governing authorities.
3.04 PLANTING GRASS
A Preparation: Prepare imported topsoil and/or in situ soil. Hand rake to remove all
sticks, stones and clods larger than 1 inch. Apply the final grade but do not
mechanically compact the soil.
B Seed:
1. Evenly broadcast seed specified in 2.09 at the following rates:
a. Bermuda: 1 pound per 1000 square feet
b. Rye: 6 pounds per 1,000 square feet
2. Roll the entire seeded area in two directions with a dry/weighted roller.
3. Evenly top dress the entire seeded area with an approved sterilized commercial
steer manure. Apply at 2 cubic feet per 100 square feet.
4. Lightly but thoroughly sprinkle the entire seeded area with water after top dress
application.
C Sod:
1. Use Bermuda, Buffalo, or St. Augustine sod in accordance with 2.11A.
2. Prepare soil in accordance with 3.03.
3. Apply eptam (or approved equal) to all areas to be sodded. Follow
manufacturer's recommended rates and apply during soil preparation period.
4. Lay sod in a running bond pattern. Pieces should be consistently cut with
joints tightly butted together. Water the in-place sod liberally and roll it in two
direction with a heavy roller. Areas not level due to fluctuations in the sod
depth should be covered and leveled with a 50/50 mix of sharp sand and
topsoil. Fertilize in 6 weeks as directed by landscape Architect.
3.05 FIELD QUALITY CONTROL
A The Engineer may reject unsatisfactory or defective material at anytime during
progress of Work. Contractor shall remove rejected trees immediately from site and
replace with specified materials. Plant material not installed in accordance with these
Specifications will be rejected.
B An inspection to determine final acceptance will be conducted by the Engineer at the
end of the 12 month maintenance period. Additional inspections will be conducted for
extended warranty periods provided for in paragraph 1.07B.
3.06 CLEANING AND MAINTENANCE
A Contractor shall maintain trees during planting operations and for a period of 12
months after completion of planting.
B Water trees to full depth a minimum of once each week, or as required to maintain a
healthy vigorous growth.
12/2014 02931 - 14of15
CITY OF PEARLAND LANDSCAPE AND TREE PLANTING
C Prune, cultivate, and weed as required for healthy growth. Restore planting saucers.
Tighten and repair rootball anchors, and reset trees and shrubs to proper grades or
vertical position as required. Restore or replace damaged wrappings. Spray as
required to keep trees and shrubs free of insects and disease.
3.07 PROTECTION OF THE WORK
A During planting work, keep pavements clean and work area in an orderly condition.
B Protect planting work and materials from damage due to planting operations. Maintain
protection during installation and maintenance period. Treat, repair, or replace
damaged planting work as directed by the Engineer.
C Dispose of excess soil and waste in accordance with requirements of Section 01562—
Waste Material Disposal.On-site burning of combustible cleared materials will not be
permitted.
END OF SECTION
~5
12/2014 02931 - 15of15
CITY OF PEARLAND PAVEMENT REPAIR
Section 02980 ,
PAVEMENT REPAIR
1.0 GENERAL
1.01 SECTION INCLUDES
A Repairing streets,highways,driveways,sidewalks,and other pavements that have been
cut, broken, or otherwise damaged during construction.
B Repairing areas of failed paving in preparation for resurfacing.
C References to Technical Specifications:
1. Section 01200—Measurement and Payment Procedures
2. Section 01350—Submittals
3. Section 01500—Temporary Facilities and Controls
4. Section 02335 —Subgrade
5. Section 02710—Base Course for Pavement
6. Section 02330—Embankment
7. Section 01140—Contractor's Use of Premises
1.02 MEASUREMENT AND PAYMENT
A Unless indicated as a Bid Item,no separate payment will be made for pavement repair
under this section. Include cost in Bid Items for which this Work is a component.
B If pavement repair is included as a Bid Item,measurement is on a square yard basis. as
follows:
1. Trench width plus 48 inches for utilities.
2. Trench width plus 10 feet for structures.
3. As marked in field for failed paving.
C If provisions of this Section, 3.01D, require the limits of pavement repairs to be
increased, then the payment limits shall be increased to the same extent.
D No payment will be made for work outside payment limits, in areas that are not
specifically called out as pay items and are incidental to the work or in areas removed
for Contractor's convenience.
E Refer to Section 01200 -Measurement and Payment Procedures.
1.03 SUBMITTALS
A Make submittals required by this section under the provisions of Section 01350 —
Submittals.
05/2008 02980- 1 of 3
CITY OF PEARLAND PAVEMENT REPAIR
1.04 PROTECTION OF PEOPLE AND PROPERTY
A Contractor shall conduct all construction operations under this Contract in
conformance with the practices described in Section 01500—Temporary Facilities and
Controls.
2.0 PRODUCTS
2.01 MATERIALS
A Provide materials of the same character as existing materials encountered in a cross
section of the area to be repaired, or as approved by the Engineer.
B Subgrade: Provide on site soil stabilized with lime, lime fly ash, etc., as required by
the testing laboratory under the provisions of Section 02335 —Subgrade.
C Base: Provide new base material as required by applicable portions of Section 02710—
Base Course for Pavement.
D Pavement: Provide new paving materials as required by Technical Specifications of
applicable surface course treatments.
3.0 EXECUTION
3.01 EXAMINATION
A Verify backfill is complete before repairing pavement over installed utilities or
structures.
B Verify remaining subgrade is ready to support imposed loads before repairing areas of
failed paving.
3.02 PREPARATION
A For installation of utilities and utility appurtenances, saw cut and remove pavement
(including base material for asphalt paving)24 inches beyond the width of excavation,
unless otherwise indicated on Plans.
B For installation of structures, saw cut and remove pavement(including base material
for asphalt paving) 5 feet beyond the width of excavation,unless otherwise indicated
on Plans.
C For repair of areas of failed paving, saw cut and remove pavement (including base
material for asphalt paving) where indicated in the field or as directed by Engineer.
Remove subgrade that is soft and yielding, or to depth as directed by Engineer.
D If removed pavement is greater than one-half of pavement lane width, or within 18
inches of a longitudinal joint, on concrete pavement, replace pavement for full lane
width or to nearest longitudinal joint as approved by the Engineer.
05/2008 02980-2 of 3
CITY OF PEARLAND PAVEMENT REPAIR
E Protect edges of existing pavement to remain from damage during removals, utility
placement,backfill, and paving operations. For concrete pavement,leave and protect
minimum of 18 inches of undisturbed subgrade on each side of trench to support
replacement slab.
3.03 EXAMINATION :
A Verify backfill is complete before repairing pavement over installed utilities or
structures.
B Verify remaining subgrade is ready to support imposed loads before repairing areas of
failed paving.
3.04 INSTALLATION
A Replace subgrade with material specified in this Section, 2.01B. Place and compact
under the provisions of Section 02330—Embankment for areas under future paving to
match lines and grade of surrounding subgrade.
B Replace base course with material specified in this Section,2.O1C. Place and compact
under the provisions of Section 02710—Base Course for Pavement to match lines and
grade of surrounding base course.
C Replace pavement with material specified in this Section,2.O1D,and according to the
Technical Specifications of the particular surface course treatment so that a smooth,
hard, well cemented surface, conforming to the lines and grade of the surround
pavement is secured
D For concrete pavement, install size and length of reinforcing steel and pavement
thickness indicated on Plans. Place types and spacing of joints to match existing or as
indicated on Plans.
E Where existing pavement consists of concrete pavement with asphaltic surfacing,
resurface with minimum 2-inch depth asphaltic pavement.
F Repair state highway crossings in accordance with highway department permit and
within 1 week after utility work is installed.
3.05 CLEAN-UP AND RESTORATION
A Perform clean-up and restoration in and around construction zone in accordance with
Section 01140—Contractor's Use of Premises. ')
3.06 PROTECTION OF THE WORK
A Protect and maintain all pavement in good condition until completion of Work.
B Replace pavement damaged by Contractor's operations at no cost to Owner.
END OF SECTION
05/2008 02980-3 of 3
CITY OF PEARLAND PRECAST REINFORCED CONCRETE VALVE VAULT
03419S PRECAST REINFORCED CONCRETE VALVE VAULT
1.00 GENERAL
1.01 WORK INCLUDED
A. Furnish all labor, materials, equipment, incidentals and transportation necessary for placing
precast reinforced concrete valve vault.
1.02 QUALITY ASSURANCE
A. Design Criteria:
1. Precast reinforced concrete valve vault shall conform:
a. To the requirements of ASTM C857 and C858 for underground precast concrete
utility structures.
b. Be designed for the specific site conditions and construction document
requirements.
c. Be designed to resist buoyant forces due saturated soil. ?
B. Test Requirements:
1. For testing of precast(machine-made)valve vaults, a minimum of four test cylinders for
design compressive strength shall be made for each day's production run of each size
and class of culvert section. Strength tests for each production run will be based on the
average strength of two cylinders which may be tested any time after completion of the
specified curing period. When design strength is attained on the initial test,further
tests on that run will not be required. Should the initial test fail to meet the design
strength,subsequent tests shall be made at 28 days unless additional test cylinders
were made during production of that run. Failure to attain design compression strength
by the 28-day test will result in rejection of the run represented by the test. Equipment
required for testing for precast(machine-made)valve vaults shall be furnished by the
fabricator. Cylinders for compressive strength tests shall be made in accordance with
ASTM C31.
C. Permissible Variations:
1. Tolerances for precast sections shall conform to ASTM C858.
a. Deviations from the above tolerances will be acceptable if the sections can be fitted
at the plant or job site and it is determined that an acceptable joint can be made.
For this condition an acceptable joint is:
1). When two sections are fitted together on a flat surface, in proper alignment and
in the position they will be installed,the longitudinal opening at any point shall
not exceed 1 inch. Sections fitted together at the plant and accepted in this
manner shall be match-marked for installation.
Precast Reinforced Concrete Valve Vault 03419S-1
CITY OF PEARLAND PRECAST REINFORCED CONCRETE VALVE VAULT
D. Inspection:
1. The quality of materials,the process of manufacture,and the finished valve vault shall
be subject to inspection and approval by the Owner or an authorized representative at
the manufacturing plant. In addition,the valve vault shall be subject to further
inspection by the Owner at the Project Site prior to and during installation.
E. Cause for Rejection:
1. The valve vault shall be subject to rejection on account of failure to conform to any of
the specification requirements. Individual sections of valve vault may be rejected
because of the following:
a. Fractures or cracks in the vault.
b. Defects that indicate imperfect proportioning, mixing and molding.
c. Surface defects indicating honeycombed or open texture.
d. Damaged ends, where such damage would prevent making a structurally sound and
water tight joint.
1.03 SUBMITTALS
A. Submittals shall be in accordance with Section 01300 "Submittal Procedures", and shall
include:
1. Manufacturer's product data sheets.
2. Concrete mix and test results.
1.04 STANDARDS
A. The applicable provisions of the following standards shall apply as if written here in their
entirety:
1. American Society of Testing and Materials (ASTM) Standards:
ASTM C857 Standard Practice for Minimum Structural Design Loading for
Underground Precast Concrete Utility Structures
ASTM C858 Standard Specification for Underground Precast Concrete Utility
Structures
ASTM C31 Standard Practice for Making and Curing Concrete Test Specimens in
the Field
2. American Association of State Highway and Transportation Officials (AASHTO)
Standards:
Standard Specification for Joints for Concrete Pipe, Manholes,
AASHTO M198-08 and Precast Box Sections using Preformed Flexible Joint
Sealants
3. State Department of Highways and Public Transportation,Austin,Texas.
Precast Reinforced Concrete Valve Vault 03419S-2
CITY OF PEARLAND PRECAST REINFORCED CONCRETE VALVE VAULT
1.05 DELIVERY AND STORAGE
A. Coordinate delivery with installation where possible to avoid unnecessary handling and
equipment movement. When stockpiling is required,storage shall be made as close as
possible to the point of installation.
B. Store precast sections on level blocking in a manner acceptable to the Engineer. No load
shall be placed upon them until design strength is reached and curing completed. Shipment
of sections may be made when the design strength and curing requirements have been met.
C. Store flexible gasket materials not on the box section, and joint lubricating compounds in a
cool dry place. Gaskets and preformed plastic materials for pipe joint construction shall be
kept clean, away from oil, grease, excessive heat and out of the direct rays of the sun.
2.00 PRODUCTS
2.01 MIXES
A. Concrete: Mixed in a central batch plant or other approved batching facility from which the
quality and uniformity of the concrete can be assured. Transit mixed concrete will not be
acceptable. Concrete shall be 5000 psi minimum.
2.02 MANUFACTURED PRODUCTS
A. Valve Vault: Materials, manufacture and curing of precast reinforced concrete valve vault
shall conform to ASTM C858. Vault shall be a precast concrete structure in accordance with
the Drawings and Specifications, and shall be manufactured by Oldcastle Precast, 1100
Heritage Pkwy, Mansfield,TX 76063-2759, or approved equal.
B. Cold Applied Preformed Gaskets:
1. Cold applied preformed gaskets shall be suitable for sealing joints of tongue and groove
concrete box sections. The gasket sealing the joint shall be produced from blends of
refined hydrocarbon resins and-plasticizing compounds reinforced with inert mineral
filler and shall contain no solvents, irritating fumes or obnoxious odors. The gasket joint
sealer shall not depend on oxidizing, evaporating, or chemical action for its adhesive or
cohesive strength, and shall be supplied in extruded rope-form of suitable cross-section.
The size of the gasket joint sealer shall be in accordance with the manufacturer's
recommendations and sufficient to obtain the squeeze-out as described in Paragraph
3.02.
2. Gasket joint sealer shall be protected by a suitable removable two-piece wrapper. The
two-piece wrapper shall be so designed that half may be removed longitudinally without
disturbing the other half to facilitate application as noted below.
3. The chemical composition of the gasket joint sealing compound shall conform to the
requirements of AASHTO M198-08 1,Type B, Flexible Plastic Gasket(Bitumen).
C. Workmanship and Finish: Valve Vault shall be substantially free from fractures, large or
deep cracks and surface roughness. The ends of the valve vault shall be normal to the walls
and centerline of the valve vault within the limits of Permissible Variations specified above.
The vault exterior shall be coated with a bituminous coating for areas to be install below
grade.
Precast Reinforced Concrete Valve Vault 034193-3
CITY OF PEARLAND PRECAST REINFORCED CONCRETE VALVE VAULT
D. Markings: The following information shall be clearly marked on each section. Markings
shall be indented on the valve vault or painted thereon with waterproof paint.
1. The load rating and ASTM Designation No.of the valve vault.
2. The date of manufacture.
3. The name or trade name of the manufacturer.
3.00 EXECUTION
3.01 EXCAVATION AND EMBEDMENT
A. Excavation and embedment shall conform to the requirements in Section 02255 "Bedding,
Backfill, & Embankment Materials"
3.02 INSTALLATION •
A. Laying:
1. Valve vault sections shall be installed such that the bottom section(s) shall be full
sections. Partial sections, if necessary, shall be utilized'for the top most section only.
Valve vault cover shall be separate from the vault walls.
B. Jointing:
1. Joints using cold applied preformed plastic gaskets shall be made as follows:
a. A suitable primer of the type recommended by the manufacturer of the gasket joint
sealer shall be brush-applied to the tongue and groove joint surfaces and the end
surfaces and allowed to dry and harden. No primer shall be applied over mud, sand,
dirt or sharp cement protrusions. Clean and dry the surface to the primed when
primer is applied.
b. Before laying the valve vault in the trench, attach the plastic gasket sealer around
the tapered tongue or tapered groove near the shoulder or hub of each joint.
Remove the paper wrapper from one side only of the two-piece wrapper on the
gasket and press firmly to the clean, dry valve vault joint surface. Do no remove the
outside wrapper until immediately before pushing the valve vault into its final
position.
c. When the tongue is correctly aligned with the flare of the groove, remove the
outside wrapper on the gasket and pull or push home the valve vault with sufficient
force and power(Back Hoe shovel, chain hoist, ratchet hoist or winch)to cause the
evidence of squeeze-out of the gasket material on the side of outside around the
complex valve vault joint perimeter.
d. When the atmospheric temperature is below 60 F, plastic joint seal gaskets shall
either be stored in an area warmed to above 70 F, or artificially warmed to this
temperature in a manner satisfactory to the Engineer. Apply gaskets to valve vault
joints immediately prior to placing valve vault in trench,followed by connection to
previously laid box section.
Precast Reinforced Concrete Valve Vault 034195.-4
CITY OF PEARLAND PRECAST REINFORCED CONCRETE VALVE VAULT
3.03 BACKFILL
A. After the valve vault has been placed, bedded and jointed as specified and approved by the
Owner or his authorized representative, perform backfilling in accordance with Section
02255 "Bedding, Backfill, & Embankment Materials."Take special precautions in placing and
compacting the backfill to avoid any movement of the valve vault or damage to the joints.
END OF SECTION
Precast Reinforced Concrete Valve Vault 03419S-5
CITY OF PEARLAND VALVE VAULT HATCHES
03420S VALVE VAULT HATCHES
1.00 GENERAL
1.01 WORK INCLUDED
A. Furnish labor, materials, equipment and incidentals necessary to install new access hatches
as indicated on the plans.
B. Provide safety grate at each of the access doors to the precast valve vault. Verify actual size
of the access doors. Installation of the safety grate shall be in accordance with the
manufacturer's recommendations and the manufacturer shall provide an Equipment
Installation Report certifying that it was installed properly. The manufacturer shall furnish
brackets, anchor bolts and anchor bolt layouts and appurtenances required for the
installation of the safety grate.
C. References to Technical Specifications:
1. Section 01350"Submittals"
1.02 QUALITY ASSURANCE
A. ACCEPTABLE MANUFACTURERS
1. Halliday.
2. USB Fab.
3. Xylem.
4. Approved Equal.
1.03 SUBMITTALS
A. Submittals shall be in accordance with Section 01350"Submittals" and shall include:
1. Shop Drawings.
2. Operation and Maintenance Manuals
1.04 DELIVERY AND STORAGE
A. The Vendor shall be responsible for delivery of the hatch and accessories,f.o.b.to the job
site or to such storage site as may be designated by the Owner or Construction Contractor,
in good condition and undamaged.
B. Unloading and storage of the equipment shall be the responsibility of the Construction
Contractor who shall inspect the equipment for apparent damage. Equipment which is
found to be damaged shall not be accepted until properly repaired or replaced by the
Vendor.
2.00 PRODUCTS
2.01 ACCESS COVER
Valve Vault Hatches 03420S-1
CITY OF PEARLAND VALVE VAULT HATCHES
A. Heavy duty access cover shall be constructed of a minimum 3/8-inch aluminum checkered
plate. The structural frame for the cover shall be designed to support a minimum live load
of 300 pounds per square foot for one of the valves at any location on the cover. The
supplier shall provide the construction details and dimensions for the cover to the
Contractor so that he will have adequate information to construct the adjacent flooring
system. The access cover shall be provided with open assist-slow closure device and hold
open device. Provide hasp and staple or other means for locking. Coat access cover frame
exterior in contact with concrete with bituminous coating.
2.02 SAFETY GRATE
A. The safety grate shall be designed to withstand a minimum live load of 300 pounds per
square foot using 17,300 psi as the design stress for the aluminum. Deflection shall not
exceed 1/150th of the span. Each safety grate shall be designed to combine covering of the
opening,fall through protection per OSHA standard 1910.23 and controlled confine space
entry per OSHA standard 1910.146.
B. The safety grate shall be made of 6061-T6 aluminum and designed per the "Specifications
for Aluminum Structures", by the Aluminum Association, Inc., 5th Edition, Dec. 1986 for
"Bridge Type Structures." This specification requires the manufacturer to use 38,000 psi as
the ultimate strength and 35,000 psi as the minimum yield strength,for grade 6061-T6
aluminum and then a safety factor of 2.2 be applied, leaving a 17,300 psi design stress.
C. Grate openings shall allow for visual inspection, limited maintenance and float adjustments
while the safety grate fall through protection is left in place.
D. Grating design shall provide an opening for the valve power cable once the valve is pu,Iled.
This design allows the safety grate(s)to be closed after the valve is pulled, while leaving a
space for the power cable.
E. Design must assure that the fall through protection is in place before the doors can be
closed.
F. Each grate shall be provided with a permanent hinging system, which will lock the grate in
the 90 degree position once opened.
G. Each grate shall have an opening arm,which will allow opening of the grate,while providing
the grate as a barrier between the operator and the pit. The opening arm shall also be
equipped with a controlled confined space entry lock(lock provided by Owner). This
locking device will prevent unauthorized entry to the confined space. The grating system
will allow anyone to make visual inspection and float adjustments without entering the
confined space.
H. Each aluminum safety grate shall be coated with a safety orange color, promoting visual
awareness of the hazard. Powder coat system shall be applied by the electrostatic spray
process. The coating is a thermosetting, powder coat finish with a minimum thickness of 2
to 4 mils and shall be baked at 350 to 375 F, or as recommended by the manufacturer, until
cured.
I. Welding shall be in accordance with ANSI/AWS D1.2-90 Structural Welding Code for
Aluminum.
J. All mounting hardware, bolts, nuts,etc. shall be 316 stainless steel.
Valve Vault Hatches 03420S-2
CITY OF PEARLAND VALVE VAULT HATCHES
3.0 EXECUTION
3.01 INSTALLATION
A. Installation shall be in accordance with the Manufacturer's instructions. Any modification
to the structure as a result of requiring different size access door hatchways is the
responsibility of the Contractor.
END OF SECTION
Valve Vault Hatches 03420S-3
CITY OF PEARLAND VALVE VAULT HATCHES
THIS PAGE INTENTIONALLY LEFT BLANK
Valve Vault Hatches 03420S-4
CITY OF PEARLAND TECHNICAL SPECIFICATIONS DIVISION 11
TECHNICAL SPECIFICATIONS
DIVISION 11
EQUIPMENT
07/2006
CITY OF PEARLAND PRESSURE REDUCING VALVES
SECTION 11280
PRESSURE REDUCING VALVES
1.00 GENERAL
1.01 WORK INCLUDED
A. Furnish labor, materials, equipment and incidentals with all appurtenances and accessories
necessary to install and test the pressure reducing valve at the location indicated on the contract
documents.
B. The equipment furnished under this specification shall be suitable for use in a potable municipal
water system.
1.02 QUALITY ASSURANCE
A. Experience Requirements: Valves shall be the product of a manufacturer who has a least 10 years'
of successful experience in the design, manufacture and application of pilot operated pressure
reducing valves used in water service.
B. Assembly: The valve,strainers, piping, opening and closing speed control valves and other
appurtenances shall be completely assembled, and tested at the factory. The valve seats shall be
adjusted at the factory for correct seating.
C. Manufacturer's Representative: The valve manufacturer shall furnish the services of a competent
service technician for the duration of time necessary to assist in the installation,adjustment and
start-up operation, and field acceptance testing. Thetechnician shall issue a written certification
that the equipment has been properly installed.The technician shall also provide a minimum of 16
hours of training for up to 8 of the Owner's personnel in the proper care, maintenance, adjustment
and operation of the equipment.
D. Acceptable Manufacturers: Acceptable valve manufacturers include the following:
1. Cla-Val Company
2. Or Approved Equal •
1.03 SUBMITTALS
A. Submittals shall be provided in accordance with Section 01350 "Submittals" and shall include:
/1. Shop Drawings.
a. Data sheets of pilot systems, and pressure reducing device being provided
b. Provide specific information on all optional features specified and confirm that these items
are provided.
2. Operation and Maintenance Manuals.
11280 - 1 of 6
CITY OF PEARLAND PRESSURE REDUCING VALVES
1.04 STANDARDS
A. The applicable provisions of the following standards shall apply as if written here in their entirety.
1. American Society for Testing and Materials(ASTM) Standards:
ASTM A48 Standard Specification for Gray Iron Castings
ASTM B61 Standard Specification for Steam or Valve Bronze Castings
ASTM B62 Standard Specification for Composition Bronze or Ounce Metal Castings
2. American Water Works Association (AWWA) Standards:
AWWA C530-
12 Standard Specification for Pilot-Operated Control Valves
AWWA C550 Standard Specification for Protective Interior Coatings for Valves and
Hydrants
3. American National Standards Institute (ANSI).
1.05 WARRANTY
A. Vendor shall warrant the equipment furnished under this specification for a period of three years
against defects in materials,workmanship and operational failure from the date of project final
acceptance as outlined in the manufactures product warranty excluding installation by others.
B. In the event of failure of any part or parts of the equipment during the first three years of operation,
the Vendor shall furnish, deliver and install the defective part or parts at no additional expense to
the Owner as outlined in the manufactures product warranty excluding installation by others.
2.00 PRODUCTS
2.01 PRESSURE REDUCING VALVE
A. General:
1. The valves shall meet NSF, and AWWA requirements for potable water service.
2. The valve body shall be hydraulically operated diaphragm actuated,globe or angle pattern.See
drawing for pattern configuration.
3. Valves shall be diaphragm actuated, hydraulic operated, pilot controlled type, and designed to
limit downstream pressure to the preset maximum, regardless;of changing upstream pressure.
The diaphragm assembly shall be the only moving part and shall be fully guided by bearings in
the valve cover and lower operating unit.
4. Valves shall be tight closing,with BUNA-N-Synthetic rubber discs. The discs shall be field
replaceable, and the valves shall be serviceable inline by removing the cover. Valves shall be
drip tight at rated pressures with flow in one direction and shall be satisfactory for applications
involving valve operation after long periods of inactivity.
5. Valve body interior and exterior surfaces shall be epoxy resin coated and shall be suitable for
high velocity service.The coating shall be applied by the fusion bond method and will be a
minimum thickness of 8 mills when complete.
11280 -2of6
CITY OF PEARLAND PRESSURE REDUCING VALVES
6. The pilot system shall have an inline hydraulic check valve option.
7. End Connections for control valve shall be flanged per ASME/ANSI B16.42, Class 150.
8. Provide piping to convey water expelled from the valve bonnet to floor drains, sumps or as
directed by the Owner.
9. The valve body and cover shall be ductile iron in accordance with ASTM A536. The disc guide,
seat, and cover bearing shall be Stainless Steel 316L.
10. Pilot system check valve shall be of the diaphragm type to assure drip type shutoff and equipped
with one y-pattern strainer to protect the pilot system from foreign matter. Pilot system materials
to be cast bronze ASTM B62 with 303 stainless steel trim.
11. Valve shall be Model#90-01 BCSY KC Pressure Reducing valve.
Material Specifications
Main Valve Body&Cover ASTM A536, Ductile Iron
End Connections Flanged 150# Fig. Class ANSI Standard B16.42 rated for 250 psi
max. working pressure
Main Valve Trim Stainless Steel 316L
Valve Seat Stainless Steel
Pilot control system Cast Brass ASTM B62 with 303 Stainless Steel trim
Seal Disc Buna-N®Synthetic Rubber
Diaphragm Nylon Reinforced Buna-N® Rubber
Tubing&Control Piping Stainless Steel Piping& Fittings
Stem, Nut and Spring Stainless Steel
B. Operation:
1. The valve shall function to limit downstream pressure to the preset maximum, regardless of
upstream pressure.The pilot system shall be a direct acting diaphragm valve designed to close
when the controlling differential exceeds the adjustable spring setting.
2. The range of downstream pressure set points for the valve shall be adjustable from 30 pounds
per square inch to 90 pounds per square inch and set initially as shown in the Schedule.
3. Over long periods of inactivity(6 months)the valve should be exercised open and close to
ensure the continued operation of the main valve and pilot system.
4. Valve rubber components in the main valve and pilot system should be replaced as needed to
ensure proper continued operation.The frequency should be determined by water chemistry
and historical data for that system and rubber components.
5. Strainers on the valves should also checked and cleaned as needed to ensure proper continued
operation.The frequency should be determined by water chemistry and historical data for that
system.
2.02 VALVE FLOW MEASUREMENTS
A. See Attached
2.03 MAIN VALVE BODY
• 11280 -3 of 6
CITY OF PEARLAND PRESSURE REDUCING VALVES
A. The valve shall contain a resilient, synthetic rubber disc with a rectangular cross-section and that
forms a tight seal against a single removable seat insert. No 0-ring type discs shall be permitted as
the seating surface.The disc guide shall be of the contoured type to permit smooth transition of
flow and shall hold the discs firmly in place.The disc retainer shall be of a sturdy one-piece design
capable of withstanding opening and closing shocks.
B. The valve seat shall be a solid,one-piece design and drip-tight shut off.The stem shall be drilled and
tapped in the cover end to receive and affix such accessories as may be deemed necessary. The
diaphragm assembly shall be the only moving part and shall form a sealed chamber in the upper
portion of the valve, separating the operating pressure from the line pressure.
C. The diaphragm shall not be used as the seating surface.The diaphragm shall be fully supported in
the valve body and cover by machined surfaces which support no less than one-half of the total
surface area of the diaphragm in either the fully opened or fully closed position.
D. The main valve seat and stem bearing in the valve cover shall be removable.The valve seat in the 8"
and larger size valves shall be retained by flat head machine screws for ease of maintenance. The
lower bearing of the valve stem shall be contained concentrically within the seat and shall be
exposed to the flow on all sides to avoid deposits. Cover bearing, disc retainer and seat shall be
made of the same material. All necessary repairs and/or modifications other than replacement of
the main valve body shall be possible without removing the valve from the pipeline. The valve shall
be designed such that both the cover assembly and internal diaphragm assembly can be
disassembled and lifted vertically straight up from the top of a narrow opening/vault.The seat shall
be of the solid one-piece design.
2.04 PILOT CONTROL SYSTEM
A. The pressure reducing pilot control shall be a direct-acting, adjustable, spring-loaded, normally
open, diaphragm valve designed to permit flow when controlled pressure is less than the spring
setting. The pilot control is held open by the force of the compression on the spring above the
diaphragm and it closes when the delivery pressure acting on the underside of the diaphragm
exceeds the spring setting. The pilot control shall have a second downstream sensing port which
can be utilized to install a pressure gauge. Pilot shall comply with NSF/ANSI 61 and certified lead
free to NSF/ANSI 372 as a safe drinking water system component.
B. The pilot control system shall include a strainer, a fixed orifice closing speed and all required control
accessories, equipment, control tubing and fittings. No variable orifices shall be permitted. The
pilot system shall include an opening speed control on all valves sizes 3" and smaller as standard
equipment. The pilot system shall include isolation ball valves on sizes 4" and larger as standard
equipment. A full range of spring settings shall be available in ranges of 0 to 400 psi. Pilot to be
manufactured by control valve manufacturer.
Material Specifications
Body&Cover Bronze, Low Lead CuZn21Si3P or UNS C87850
Pilot Trim Brass&Stainless Steel 303
Rubber Buna-N®
Connections FNPT
Pressure Rating 400 psi Max.
Control Tubing Copper
Control Fittings Brass
2.05 FACTORY TESTING:
11280-4 of 6
CITY OF PEARLAND PRESSURE REDUCING VALVES
A. Each control valve shall be factory tested.
B. The Quality Management System of the factory shall be certified in accordance with ISO 9001: 2008
C. The standard factory tests shall include a valve body and cover leakage test, seat leakage test and a
stroke test. Control valves and pilot valves, in the partially open position,with both ends closed off
with blind flanges (valves) and pipe plugs (pilots),shall be subject to an air test. The applied air
pressure shall be 90 psi minimum. All air pressure tests shall be applied for a minimum of 15
minutes. No visible leakage is permitted through the valve seat,the pressure boundary walls of the
valve body,valve cover, pilot body, pilot cover or the body-cover joint.
D. The diaphragm must withstand a Mullins Burst Test of a minimum of 600 X per layer of nylon fabric
and shall be cycled tested 100,000 times to ensure longevity.
E. Control valve manufacturer shall, upon request,offer additional testing, such as high pressure
hydrostatic testing, positive material inspection testing,ferrite testing, liquid penetration inspection
testing, magnetic particle examination testing and radiographic examination testing.
2.06 FACTORY ASSEMBLY
A. Each control valve shall be factory assembled.
B. The Quality Management System of the factory shall be certified in accordance with ISO 9001: 2008.
C. For all control valves,the factory assembly shall include the complete main valve, pilot valve(s), and
all associated accessories and control equipment.
D. During factory assembly the control valve manufacture shall make all necessary adjustments and
correct any defects.
3.00 EXECUTION
3.01 INSTALLATION
A. Install the valve in the piping with the valve diaphragm shaft in the vertical position. Make all
connections between the valve and the valve pilot. Installation of the valve shall be in accordance
with the valve manufacturer's recommendations.
3.02 FIELD QUALITY CONTROL
A. Upon completion of the installation of the equipment, an acceptance test to verify the satisfactory
operation of the valve shall be performed. The test shall be conducted in a manner, approved by
and in the presence of the Engineer. The valve manufacturer's representative shall be present
during the valve acceptance test. The unit must perform in a manner acceptable to the Engineer
before final acceptance will be made by the Owner.
3.03 CLEAN AND ADJUST
A. All adjustments will be performed in accordance with the valve manufacturer's instructions.
3.04 SCHEDULES
A. The control valve furnished under this specification shall meet the following requirements:
Location Size(in.) Initial Setting for Downstream Pressure
STA 16+00 16" Full Port 40 PSI
11280 -5of6
CITY OF PEARLAND PRESSURE REDUCING VALVES
END OF SECTION
11280 - 6of6
APPENDIX "A"
GEOTECHNICAL REPORT
The report has been prepared for use in developing an overall design concept.
Paragraphs, statements, test results, boring logs, diagrams, etc. should not be taken out
of context, nor utilized without a knowledge and awareness of their intent within the
overall concept of the report. Statements, conclusions, and recommendations in the
report are directed to the Owner and the Owner's design engineers, and not to bidding
contractors. The context of statements, conclusions, and recommendations have been
conveyed to the Owner and the Owner's design engineers through various meetings,
correspondence, and shall not be interpreted by bidding contractors to have singular
meaning or interpretation for bidding purposes. The report was made for design
purposes only. Any verification of the subsurface conditions for other purposes
including, but not limited to determining difficulty of excavation, traffic ability,
suitability of on site soil materials or quantities, etc., is the sole responsibility of bidding
contractors.
GEOTECHNICAL INVESTIGATION
PROPOSED MCHARD ROAD EXTENSION
CULLEN BLVD. TO MYKAWA RD.
PEARLAND, TEXAS
Submitted to:
Texas +
iofr
epartment
hash
s
Di
Transportation ,s P. 0,'
Prepared for:
FREESE
®® QNICHOLS
11200 Broadway St., Suite 2332
Pearland, Texas 77584
Submitted by:
, GEOTEST
ENGINEERING,INC.
5600 Bintliff Drive
Houston, Texas 77036
May 19, 2017
. 1 Ell TES ,`0: I i , I, \,! (
Geotechnical Engineers&Materials Testing
5600 Bintliff Drive Houston,Texas 77036 Telephone: (713) 266-0588
Fax: (713) 266-2977
Report No. 1140215001
• May 19, 2017
Joseph AHD Waring, P.E.
Freese and Nichols, Inc.
10497 Town and County Way, Suite 600
Houston, Texas 77024
• Reference: Geotechnical Investigation
McHard Road Extension
City of Pearland, Texas
CSJ: 0912-31-290
Dear Mr. Waring,
Submitted herein is our final report of the geotechnical investigation performed for the
referenced project. This report presents geotechnical recommendations for the design of drilled shaft
and driven pile foundations for the traffic signals, pavement subgrade soil information, open cut
excavation stability,groundwater control and bedding and backfill criteria for storm sewers and stable •
slope for the detention ponds. TxDOT WinCore logs were forwarded to you on April 4, 2016.
Pavement recommendations for side streets were provided to you on May 24,2016 and June 7,2016.
A draft report was submitted to you on August 2,2016. A revised draft report was submitted to you on
August 31, 2016. This final report supersedes all previously submitted reports,transmittals, etc. for
the referenced project. This study was authorized through subcontract for professional services
agreement effective October 6, 2014 and a notice to proceed on November 18, 2015.
We appreciate this opportunity to be of service to you on the referenced project. Please call us
if you have any questions regarding this report, or if we can be of further assistance.
4 o...........
13i2
Very truly yours, `,P° 1 i ��
GEOTEST ENGINEERINQ, r •• 6 •• pLtl
•
TBPE Registration No. F-416;'...`�1P !F�1K• `...9 •r
lrjl„0.% .� Og2B s a.�=� r
Naresh Kolli,P.E. -41,1
Project Engineer F'��e
+
Mohan Ballagere, P.E. g MOHAN BALLAGERE
Vice President v •., 87622
MB\FL\ego Qo�� s�%CEN• .-• �
kk98%, ttiti .FN
Copies Submitted: (4+1-pdf) aN,-,%17 ;
PC38\Geotechnical\}0215001 F.DOC
TABLE OF CONTENTS
Page
EXECUTIVE SUMMARY 1
1.0 INTRODUCTION
1.1 General 4
1.2 Project Description 4
1.3 Scope of Work 5
2.0 FIELD EXPLORATION
2.1 General 7
2.2 Sampling Methods 7
2.3 Groundwater Observations 8
2.4 Borehole Completion 8
2.5 Piezometer Installation 8
3.0 LABORATORY TESTING 9
4.0 GENERAL SITE CONDITIONS
4.1 Site Geology 12
4.2 Geologic Faults 12
4.3 Existing Pavement 12
4.4 Subsurface Conditions 13
4.5 Groundwater Conditions 15
5.0 GEOTECHNICAL RECOMMENDATIONS
5.1 Traffic Signal Foundation 18
5.1.1 Recommended Foundation Types 18
5.1.2 Minimum Embedment Requirement 18
5.1.3 Axial Capacities of Drilled Shafts and Driven Piles 19
5.1.4 Group Effects 21
5.1.5 Settlement 21
5.1.6 Lateral Capacity 21
5.2 Proposed Storm Sewer 22
5.2.1 Geotechnical Parameters 22
5.2.2 Trench Stability 22
5.2.3 Groundwater Control 24
5.2.4 Bedding and Backfill 24
5.2.5 Live Loads on Pipeline Due to Traffic 24
5.3 Trenchless Installation 24
5.3.1 Geotechnical Parameters 24
5.3.2 Earth Pressure on Pipe and Auger Casing 25
5.3.3 Influence of Tunneling on Adjacent Structures 25
5.3.4 Groundwater Control 26
TABLE OF CONTENTS (cont'd)
Page
5.4 Structures 26
5.4.1 Foundation Conditions 26
5.4.2 Foundation Design Recommendations 26
5.4.3 Structural Backfill 29
5.4.4 Protection of Below Grade Structures 29
5.4.5 Groundwater Control During Construction 29
5.5 Detention Ponds 29
5.5.1 Slope Stability Analyses 30
5.5.2 Method of Analyses 30
5.5.3 Soil Parameters and Water Level 30
5.5.4 Loading Conditions 32
5.5.5 Factors of Safety 32
5.5.6 Conclusions and Recommendations 33
5.5.7 Clay Liner Properties 34
5.5.8 Borrow Material Analysis 35
5.5.9 Slope Protection and Erosion Control 35
5.6 Pavement Structure Design 36
5.6.1 Design Parameters 36
5.6.2 Recommended Pavement Section 39
5.6.2.1 McHard Road 39
5.6.2.2 Side Streets 40
5.6.3 Preparation of Pavement Subgrade 40
6.0 CONSTRUCTION CONSIDERATIONS
6.1 Drilled Shaft Foundation Installation 42
6.2 Driven Pile Foundation Installation 42
6.3 Groundwater Control 42
7.0 PROVISIONS 43
ILLUSTRATIONS
Figure
Vicinity Map 1
Plan of Borings 2.1 thru 2.6
Boring Log Profile 3.1 thru 3.7
Symbols and Abbreviations used on Boring Log Profile 4
Skin Friction Design—Drilled Shaft Design(Accumulative Graphs) 5.1 thru 5.7
Skin Friction Design—Driven Pile Design(Accumulative Graphs) 6.1 thru 6.7
Point Bearing Design—Drilled Shaft Design 7.1 thru 7.7
Excavation Support Earth Pressure 8.1 thru 8.3
Stability of Bottom for Braced Cut 9
Vertical Stress on Pipes Due to Traffic Loads 10
Earth Pressure on Pipe and Casing Augering 11
Lateral Earth Pressure Diagram for Permanent Wall 12.1 thru 12.3
Uplift Pressure and Resistance 13
Slope Stability Analyses for Detention Ponds 14.1 thru 14.15
Possible Horizontal Limits of Cohesionless Soils 15.1 thru 15.3
TABLES
Table
Summary of Boring Information 1
Summary of Soil Parameters for LPile Input 2
Geotechnical Design Parameter Summary—Open-Cut Excavation 3
Geotechnical Design Parameter Summary—Trenchless Installation 4
Summary of Soil Parameters Used for Slope Stability Analyses for
Detention Ponds 5.1 thru 5.4
APPENDIX A
Figure
Logs of Borings A-1 thru A-37
Symbols and Terms Used on Boring Logs A-38
Piezometer Installation Report A-39 thru A-41
APPENDIX B
Figure
Summary of Laboratory Test Results B-1 thru B-32
Grain Size Distribution Curves B-33 thru B-36 •
California Bearing Ratio (CBR) of Laboratory—Compacted Soils B-37a thru B-37f
Dry Density versus Laboratory CBR B-38a and B-38b
Consolidated Undrained Triaxial Compression Test Results B-39 thru B-42
Permeability Test Results B-43 thru B-45
Pinhole Test Results B-46
APPENDIX C
Figure
WinCore Soil Strength Analysis—Drilled Shaft Design C-1 thru C-7
WinCore Soil Strength Analysis—Piling Design C-8 thru C-14
APPENDIX D
Borings from Previous Study
APPENDIX E
Phase I Geologic Fault Study
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City ofPearland, Texas
EXECUTIVE SUMMARY
A geotechnical investigation was performed for the design and construction of McHard Road
extension from Cullen Boulevard to Mykawa Road in City of Pearland, Texas.
The project calls for the design and construction of approximately 18,150 LF of 4-lane
concrete roadway with proposed storm sewer. The storm sewer range from 24 to 48-inch diameter
and will be placed at depths ranging from 5 to 12 feet. The proposed construction of storm sewer is
generally by open cut method except at the roadway and utility crossings, where tunneling is
proposed. The project includes several traffic signals at the intersections of Max Road, Roy Road
Garden Road, O'Day Road, and Hatfield Road. The existing traffic signals at Cullen Road and
Mykawa Road will be modified. The project also includes construction of three detention ponds
(HS-1, HS-2 and CC-1). The pond HS-1 is about 5 feet deep and has a side slope of 4H:1V; the
pond HS-2 is about 9 feet deep with a side slope of 411:1V and pond CC-1 is about 15 feet deep with
a side slope of 4H:1V.
The purposes of this study were to evaluate soil and groundwater,conditions and to provide
geotechnical recommendations for the proposed McHard Road Extension in City ofPearland,Texas.
This investigation included drilling and sampling thirty seven (37) soil borings to depths ranging
from 3 to 35 feet, converting three (3) borings to piezometers for long term water level
measurements,performing laboratory tests on soil samples recovered from the borings,performing
engineering analyses and developing geotechnical engineering recommendations and preparing a
geotechnical report.
I
The principal findings and conclusions developed from this investigation are summarized as
follows.
• Based on. the Phase I Geologic Fault.Assessment, two active faults cross the project
alignment. Geologic Fault 40A crosses the project alignment near the west end and Geologic
Fault 41A crosses the project alignment near Woody Road. The Phase I Geologic Fault
Study report is presented in Appendix E.
1
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
• The subsurface soils, as encountered along proposed roadway and at detention ponds, are
summarized below:
• Proposed Roadway (Borings GB-49 through GB-68 and C-1 through C-5). The
subsurface soil soils as encountered in borings GB-49 through GB-68 consist of soft
to hard dark gray,yellowish and reddish brown and gray clay, sandy and silty clay to
the explored depths of 25 and 35 feet. Stratum of loose to compact silty sand and
clayey sand were encountered between the depths of 6 and 16.5 feet and 25 to 35 feet
in borings GB-55, GB-56, GB-63 and GB-66. Fill material consisting of medium
stiff dark gray and brown clay and sandy clay with calcareous and ferrous nodules
were encountered to depths of 1 to 3 feet in borings GB-49 through GB-53, GB-56,
GB-58„ GB-62 and GB-64. The subsurface soils below the pavement as encountered
in borings C-1 through C-5, drilled along the side streets consist of gray and brown
clay and sandy clay to the explored depth of 3 feet.
• Detention Pond HS-1 (Borings GB-69 through GB-71). The subsurface soils as
encountered in borings GB-69 through GB-71 consist of soft to very stiff dark gray
and brown clay and sandy clay to the explored depth of 15 feet. A stratum of very
loose brown silty sand was encountered between depths of 5 and 9 feet in boring GB-
70.
• Detention Pond HS-2 (Borings GB72 through GB-78). The subsurface soils as
encountered in borings GB-72 through GB-78 consists of very soft to very stiff
brown, reddish brown and gray clay, silty clay and sandy clay to the explored depth
of 20 feet. A stratum of loose to slightly compact gray silty and sandy silt was
encountered between depths of 6 to 11.5 feet in borings GB-72 and GB-75.
• Detention Pond CC-1 (Borings GB-79 through GB-84). The subsurface soils as
encountered in borings GB-79 through GB-84 consists of soft to very stiff clay,silty
clay and sandy clay to the explored depth of 30. Stratum of loose to compact silt,
sandy silt and silty sand was encountered between the depths of 12.5 to 21.5 feet in
borings GB-79, GB-80, GB-82 and GB-83. Further, loose to compact gray and
2
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
brown silty sand was encountered between the depths of 10 and 30 feet in boring
GB-84.
• Groundwater was initially encountered at depths ranging from 4.0 to 22 feet below existing
grade during drilling in all the borings except in borings GB-73,GB-83 and C-1 through C-5
drilled for this study. The groundwater measured 15 minutes after water was first
encountered was at depths of 2.0 to 14.4 feet below the existing grade in these borings. The
water level measured 30 days after completion of drilling in Piezometers GB-70P, GB-75P
and GB-81P was at a depths ranging from 1.6 to 7.0 feet. No ground water was encountered
in borings GB-73 and GB-83 and shallow borings C-1 through C-5.
• Recommendations for design of drilled shafts and driven full-displacement piles (i.e.,
prestressed precast concrete piles),for support of the traffic signal foundations are presented
in Section 5.0 of this report.
• The storm sewer installation"recommendations are presented in Sections 5.2 and 5.3 of this
report.
• The recommendations pertaining to proposed manholes are presented in Section 5.4 of this
report.
• The recommendations pertaining to the proposed detention ponds are presented in Section
5.5 of this report.
• Pavement subgrade conditions and stabilization requirements for the pavement subgrade
including proposed pavement section by TxDOT and City of Pearland are presented in
Section 5.6 of this report.
• Construction considerations for installation of drilled shaft and driven pile foundations are
provided in Section 6.0 of this report.
•
3
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
1.0 INTRODUCTION
1.1 General
A geotechnical investigation was performed for the design and construction of McHard Road
extension from Cullen Boulevard to Mykawa Road in City of Pearland, Texas.
1.2 Project Description
The project calls for the design and construction of approximately 18,150 LF of 4-lane
concrete roadway with proposed storm sewer. The storm sewer range from 24 to 48-inch diameter
and will be placed at depths ranging from 5 to 12 feet. The proposed construction of storm sewer is
generally by open cut method except at the roadway and utility crossings, where tunneling is
proposed. The project includes several traffic signals at the intersections of Max Road,Roy Road
Garden Road, O'Day Road, and Hatfield Road. The existing traffic signals at Cullen Road and
Mykawa Road will be modified. The project also includes construction of three detention ponds
(HS-1, HS-2 and CC-1). The pond HS-1 is about 5 feet deep and has a side slope of 4H:1V; the
pond HS-2 is about 9 feet deep with a side slope of 4H:1V and pond CC-1 is about 15 feet deep with
a side slope of 4H:1V.
The project also includes construction of three detention ponds(HS-1,HS-2 and CC-1). The
details of each detention pond are given below.
• The detention pond HS-1 is located near the intersection of proposed McHard Road and
O'Day Road. The proposed pond is about 5 feet deep and will have a side slope of
4(H):1(V). The detention pond will include construction of an outfall structure at the
southwest corner of the pond.
• The detention pond HS-2 is located along the proposed McHard Road between the
intersections of Hatfield Road and Woody Road. The proposed pond is about 9 feet deep
and will have a side slope of 4(H):1(V). The detention pond will include construction of a
1211f of 4'x2'RC Box on the northwest corner and a 42 inch RCP on the southeast side.
The 100-year flood elevation is at El. 46.0 feet.
4
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City ofPearland, Texas
• The detention pond CC-1,is offsite and will be constructed as two interconnecting ponds.
Both ponds will be approximately 15 feet deep and will have a side slope of 4(H):1(V).
There are several 24 to 30-inch HDPE inlets into the pond and a 6'x4'RCB connecting the
two ponds. There will also be a 6'x4'RCB outlet at the northwest corner of the proposed
pond. The 100-year flood elevation is at El. 47 feet.
The vicinity map is shown on Figure 1.
1.3 Scope of Work
The purposes of this study were to perform a geotechnical investigation and to develop
geotechnical recommendations for the proposed McHard Road extension with roadway construction,
traffic signals, storm sewer and proposed detention ponds.
The scope of services consisted of the following:
1) Pavement coring was performed at seven(7)locations to access the subsurface soils
and to verify the existing pavement thickness.
2) Drilled and continuous sampled thirty seven(37)soil borings to depths ranging from
3 to 35 feet. Texas Cone Penetration (TCP) tests were performed on every 5-foot
interval for all borings, except shallow 3-foot borings.
2) Performed laboratory tests on representative soil samples to evaluate the engineering
properties of the soils. Perform California Bearing Ratio tests to determine modulus
of subgrade reaction in accordance with AASHTO criteria for Rigid Pavement
Design.
3) Performed engineering analyses to develop geotechnical recommendations for the
design of the proposed roadway extension. The recommendations as a minimum
include the following:
■ Developed design axial capacity curves for traffic signal foundation and
other structure(if any)including skin friction and point bearing for piling
5
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
and drilled shaft in accordance with TxDOT Houston District's
procedures.
• Provided geotechnical recommendations pertaining to the proposed storm
sewer construction including bedding and backfill criteria(in accordance
with TxDOT or available Brazoria County guidelines),trench excavation
stability, ground water control and select fill criteria, if required.
• Performed slope stability analyses for the proposed detention ponds and
provide recommendations for the side slopes and clay liner properties.
• Provided subgrade stabilization requirement for the proposed pavement
section by TxDOT and City of Pearland.
6
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
2.0 FIELD EXPLORATION
2.1 General
Subsurface conditions along the proposed McHard Road and detention ponds were
investigated by drilling thirty seven(37)soil borings,designated as GB-49 through GB-84 and C-1
through C-5,in general accordance with TxDOT procedures. Borings GB-49 through GB-68 were
drilled to depths ranging from 25 to 35 feet along the proposed McHard Road. The borings C-1
through C-3 were drilled to a depth of 3 feet in the side streets. Pavement coring was also performed
in the existing asphalt pavement at these locations(C-1 through C-5). Borings GB-69 through GB-
71 were drilled to a depth of 15 feet in the proposed detention pond HS-1. Borings GB-72 through
GB-78 were drilled to a depth of 20 feet in the proposed detention pond HS-2 and the borings GB-79
through GB-84 were drilled to a depth of 30 feet in the proposed detention pond CC-1. All borings
were drilled with a buggy mounted drilling rig at the approximate locations shown on Figures 2.1
through 2.6,Plan of Borings. A summary of boring information is provided in Table 1. The staking
and tie-in of soil borings (Station no., offset and ground surface elevation)were provided to us by
Freese and Nichols. The borings GB-57,GB-59,GB-65 and GB-74 could not be drilled due to wet
ground and difficulty in accessing the boring locations. Borings (GB-1 through GB-48) from
previous study were included for information only in Appendix D.
2.2 Sampling Methods
At each boring location soil samples were obtained at 5-ft intervals in granular soils, and
continuously in cohesive soils between the TxDOT Cone Penetrometer Tests. TxDOT Cone
Penetrometer Tests (Tex-132-E) were performed at approximate 5-foot intervals throughout the
depth of each boring. Results of the tests are recorded on the boring logs as the number of blows for
the first and second 6 inches of penetration at the respective test depths; Samples of cohesive soils
were obtained with a 3-inch diameter thin-walled tube sampler in general accordance with ASTM
Method D 1587. Granular soils were sampled every 5 feet with a 2-inch diameter split-barrel
sampler in general accordance with ASTM Method D`1586. Each sample was removed from the
sampler in the field by our soils technician, carefully examined, and classified according to the
Unified Soil Classification System (USCS). Suitable portions of each sample were wrapped and
7
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
sealed in the field and transported to Geotest's laboratory. The shear strength of cohesive soil
samples was estimated in the field using a calibrated hand pocket penetrometer.
Detail descriptions of the soils encountered,together with recorded blow counts from TxDOT,
Cone Penetrometer Tests,are provided on the boring logs presented on Figures A-1 through A-37 in
Appendix A. A key to symbols and terms used on the boring logs is given on Figure A-38 in
Appendix A. The consistency (strength description) of cohesive soils is based on test data from
triaxial compression test (TAT) and TxDOT cone penetrometer data, where TAT data is not
available.
2.3 Groundwater Observations
Measurements of the depth to water were taken in the open boreholes during drilling. The
results of these observations are noted at the bottom of the boring logs presented on Figures A-1
through A-37, in Appendix A.
2.4 Borehole Completion
After taking final measurements of the depth to groundwater at each boring location,each of
the open boreholes with exception of the boring converted to piezometer, were backfilled with
cement-bentonite grout.
2.5 Piezometer Installation
During the field investigation, piezometers were installed in the open boreholes of borings
GB-70, GB-75 and GB-81. The location of the piezometer designated as GB-70P, GB-75P and
GB-81P are shown on Figures 2.4, 2.5 and 2.6. The piezomter installation reports showing the,
details of the construction of the piezometers are provided on Figures A-39 through A-41 in
Appendix A.
8
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
3.0 LABORATORY TESTING
A laboratory test program was developed to measure pertinent physical and strength
characteristics of representative samples from the field exploration. Classification tests were
performed on selected samples to aid in soil classification. All geotechnical tests were performed in
accordance with TxDOT procedures and ASTM procedures where TxDOT procedures are not
available.
Undrained shear strengths of selected cohesive soil samples were measured by unconfined
compression(ASTM ID 2166)and unconsolidated-undrained(U-U)triaxial compression(Tex-118-
E)tests. Shear strengths of cohesive samples were also estimated in the field using a calibrated hand
pocket penetrometer and in the laboratory with a Torvane.
Moisture content and dry unit weight were measured for each unconfined compression and
U-U triaxial compression test sample. Moisture content measurements (Tex-103-E) were also
conducted on most samples to identify the moisture profile at each boring location. Liquid and
plastic limit tests(Tex-104-E,Tex-105-E)were performed on selected cohesive samples to measure
soil plasticity characteristics and to aid in soil classification. Sieve analysis tests(Tex-110-E)were
performed on selected samples to provide information on grain size distribution. Results of most
laboratory tests are tabulated on the boring logs presented on Figures A-1 through A-37,in Appendix
A. The laboratory tests data are also summarized in the Summary of Laboratory Test Results
presented on Figures B-1 through B-32 in Appendix B. Grain size distribution curves, based on
results of sieve analyses tests,are presented graphically on Figure B-33 through B-36 in Appendix B.
Two (2) California Bearing Ratio (CBR) tests (ASTM D 1883) were conducted on a
composite sample(1 to 6 feet) of the near surface clay soils. Results of the CBR test are presented
on Figures B-37a, through B-37f in Appendix B. The curves of dry density versus CBR are
presented.on Figures B-38a and B-38b in Appendix B.
Four(4)multi-stage Consolidated-Undrained(CU)triaxial compression tests were conducted
on two undisturbed soil samples. Three stages of consolidation (with pore pressure measurements)
9
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City ofPearland, Texas
were carried out on the samples following saturation of the samples and consolidation to approximately
100%,200%and 400%of estimated in situ overburden pressures. Results of consolidated-undrained
(C-U)triaxial compression tests with pore pressure measurements are presented in the table below and
also presented on Figures B-39 through B-42 in Appendix B.
Summary of C-U Triaxial Compression Test Results
Total Stress Effective Stress
Sample ID Cru(psf) 4 (deg) C'(psf) 4' (deg)
GB-69, 6.5'-8', Sandy Clay 608 20 173 27.2
GB-75, 13'-15', Clay• 548 14.8 107 22.0
GB-79, 2'-4', Clay 589 15 145 23.5
GB-80, 8'-10', Sandy Clay 391 20.9 139 26.0
Three(3)permeability tests(ASTM D5084)with back pressure saturation were performed on
three (3) selected soil samples. Permeability tests were conducted to measure the hydraulic
conductivity of the side slope and bottom soils in the proposed canal. The permeability laboratory test
results are presented in the table below and also shown on Figures B-43 through B-45 in Appendix B.
Summary of Permeability Test Results
Boring Depths Soil Description Hydraulic Conductivity at
No. (feet) 20°c(K20),cm/sec
GB-70 3-5 Sandy Clay 1.15 x 10"7
GB-78 6.5-8 Sandy Clay ' 5.58 x 10-'
GB-83 4-5 Sandy Clay 5.27 x 10-8
Four(4)pinhole tests(ASTM D4647)were performed to measure the potential for dispersion
of soils in distilled water. Pinhole dispersion test results provide a qualitative evaluation of the
potential for soil dispersion in the presence of distilled water. The test results for the pinhole dispersion
tests are presented in the table below and also shown on Figure B-46 in Appendix B.
10
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
Summary of Dispersive Test Results
Dispersive Test Results
Boring No. Depth(feet) Soil Description Pinhole(ASTM D 4647)
GB-71 8-10 Sandy Clay ND2 -Nondispersive
GB-76 4-5 Sandy Clay ND2—Nondispersive
GB-80 4-5 Sandy Clay ND1 —Nondispersive
GB-84 6.5-8 Sandy Clay ND 3—Nondispersive
•
11
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
4.0 GENERAL SITE CONDITIONS
4.1 Site Geology
The geology of Brazoria County is characterized by two formations, the Beaumont and the
Alluvium. These formations are a part of the fluvial and marine coastal complex resulting from the
glacial cycles within Holocene/Pleistocene epoch. The lithology includes clay, silt and sand. The
McHard Road project lies within the Beaumont Formation. The clays and sands of this formation
are overconsolidated as a result of desiccation or frequent raising and lowering of the sea level and
subsequently the groundwater table. Consequently, clays of this formation have moderate to high
shear strength and relatively low compressibility. Sands of the Beaumont Formation are typically
very fine and often silty.
4.2 Geologic Faults
A Geological Phase I Fault study was performed by HVJ Associates,Inc.,a subconsultant for
Geotest for the project area. Based on the Phase I Geologic Fault Assessment,two active faults cross
the project alignment. Geologic Fault 40A crosses the project alignment near the west end and
Geologic Fault 41A crosses the project alignment near Woody Road. The Phase I Geologic Fault
Study report is presented in Appendix E.
4.3 Existing Pavement
The existing pavement as encountered in borings GB-58 and GB-60 drilled along McHard
Road consist of 1.5 to 3 inches of asphalt over 11 to 16 inches of limestone base and sand,gravel and
oyster shell mix. The existing pavement as encountered in the borings/corings C-1 through C-5
performed on the side streets consists of 2.75 to 5 inches of asphalt over 5.5 to 9 inches of
limestone, sand and shell mix. The details are given below.
12
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
Boring/Coring Location Pavement
GB-58 McHard Road 3" asphalt over 11" limestone base
GB-60 McHard Road 1.5" asphalt over 16" sand, gravel and oyster shell mix
C-1 Stone Road 4" asphalt over 9" limestone base
C-2 Max Road 3.5" asphalt over 5.5" limestone, sand and shell mix
C-3 O'Day Road 2.75" asphalt over 5.5" limestone, sand and shell mix
C-4 Hatfield Road 5" asphalt over 8.5" limestone, sand and shell mix
C-5 Woody Road 5" asphalt over 8.5" shell and sand mix
4.4 Subsurface Conditions
Graphical representations of the major strata encountered in borings drilled along the project
alignment are presented on a boring log profiles on Figure 3.1 through 3.7. To the left of each boring
shown on/the profile is an indication of the consistency or density of soils within each stratum. For
cohesive soils, consistency is related to the undrained shear strength of the soil. Consistency of
granular soils is related to the relative density of the soil. To the right of each boring shown on the
profile is the USCS classification of the soil within each stratum. The symbols and abbreviations
used on the boring log profiles are given on Figure 4.
Proposed Roadway(Borings GB-49 through GB-68 and C-1 through C-5). The subsurface
soil soils as encountered in borings GB-49 through GB-68 and also presented on boring log profiles
Figures 3.1 through 3.4,consist of soft to hard dark gray,yellowish and reddish brown and gray clay,
sandy and silty clay to the explored depths of 25 and 35 feet. Stratum of loose to compact silty sand
and clayey sand were encountered between the depths of 6 and 16.5 feet and 25 to 35 feet in borings
GB-55, GB-56, GB-63 and GB-66. Fill material consisting of medium stiff dark gray and brown
clay and sandy clay with calcareous and ferrous nodules were encountered to depths of 1 to 3 feet in
borings GB-49 through GB-53, GB-56,GB-58,GB-62 and GB-64. The subsurface soils below the
pavement as encountered in borings C-1 through C-5, drilled along the side streets consist of gray
and brown clay and sandy clay to the explored depth of 3 feet.
13
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
The clay is of high to very high plasticity with liquid limits ranging from 50 to 85 and
plasticity indices ranging from 29 to 54. The sandy clay and silty clay are of low to high plasticity
with a liquid limits ranging from 24 to 49 and plasticity indices ranging from 9 to 31. The percent
fines of sandy silt ranges from 52 to 58 percent. The fines content(passing No. 200 sieve) of silt
with sand ranges from 71 to 78 percent. The fines content of clay and silty clay ranges from 71 to 87
percent. The fines content of sandy clay ranges from 69 to 78 percent. The fines content of silt is
about 71 percent. The fines content of clayey sand is about 47 percent. The fines content of silty
sand ranges from 30 to 31 percent.
Detention Pond HS-1 (Borings GB-69 through GB-71). The subsurface soils as encountered
in borings GB-69 through GB-71 and also presented on boring log profile Figure 3.5,consist of soft
to very stiff dark gray and brown clay and sandy clay to the explored depth of 15 feet. A stratum of
very loose brown silty sand was encountered between depths of 5 and 9 feet in boring GB-70.
The clay is of high to very high plasticity with liquid limits ranging from 56 to 78 and
plasticity indices ranging from 31 to 49. The sandy clay are of low to high plasticity with a liquid
limits ranging from 32 to 45 and plasticity indices ranging from 12 to 25. The fines content of silty
sand is about 32 percent.
Detention Pond HS-2(Borings GB72 through GB-78). The subsurface soils as encountered
in borings GB-72 through GB-78 and also presented on boring log profile Figure 3.6 consists of very
soft to very stiff brown,reddish brown and gray clay,silty clay and sandy clay to the explored depth
of 20 feet. A stratum of loose to slightly compact gray silty and sandy silt was encountered between
depths of 6 to 11.5 feet in borings GB-72 and GB-75.
The clay is of high to very high plasticity with liquid limits ranging from 51 to 82 and
plasticity indices,ranging from 31 to 49'. The sandy clay and silty clay are of low to high plasticity
with a liquid limits ranging from 27 to 49 and plasticity indices ranging from 10 to 31. The fines
content of clay is about 83 percent and the fines content of sandy clay ranges from 73 to 74 percent.
The fines content of sandy silt is about 56 percent. The fines content of silty sand is about 15
percent.
14
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City ofPearland, Texas
Detention Pond CC-1 (Borings GB-79 through GB-84). The subsurface soils as encountered
in borings GB-79 through GB-84 and also presented on boring log profile Figure 3.7,consists of soft
to very stiff clay, silty clay and sandy clay to the explored depth of 30 feet. Stratum of loose to
compact silt, sandy silt and silty sand was encountered between the depths of 12.5 to 21.5 feet in
borings GB-79,GB-80,GB-82 and GB-83. Further,loose to compact gray and brown silty sand was
encountered between the depths of 10 and 30 feet in boring GB-84.
The clay is of high to very high plasticity with liquid limits ranging from 50 to 82 and
plasticity indices ranging from 30 to 49. The sandy clay and silty clay are of low to high plasticity
-with a liquid limits ranging from 21 to 49 and plasticity indices ranging from 5 to 29. The percent
fines of clay and silty clay ranges from 67 to 98 percent. The fines content of sandy clay ranges from
53 to 85 percent. The fines content of sandy silt is about 56 percent. The fines content of silt is
about 82 percent. The fines content of silty sand ranges from 12 to 36 percent.
4.5 Groundwater Conditions
Groundwater was initially encountered at depths ranging from 4.0 to 22 feet below existing
grade during drilling in all the borings except in borings GB-73,GB-83 and C-1 through C-5 drilled
for this study. The groundwater measured 15 minutes after water was first encountered was at depths
of 2.0 to 14.4 feet below the existing grade in these borings. The water level measured 30 days after
completion of drilling in Piezometers GB-70P, GB-75P and GB-81P was at a depths ranging from ,
1.6 to 7.0 feet. No groundwater was encountered on borings GB-73 and GB83 and shallow borings
C-1 through C-5. The details of the groundwater is encountered in each boring are presented in the
table below.
Boring Groundwater Groundwater Measured Groundwater
Encountered During 15 minutes after Measured after 24
Drilling,ft completion of drilling,ft hours or more
GB-49 18 8.5 NA
GB-50 22 15.75 NA
GB-51 15 3.42 NA
GB-52 10 5.67 NA
GB-53 13 4.42 NA
15
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
Boring Groundwater Groundwater Measured Groundwater •
Encountered During 15 minutes after Measured after 24
Drilling, ft completion of drilling,ft hours or more
GB-54 15 4.33 NA
GB-55 15 7.58 NA
GB-56 5.0 3.0 NA
GB-58 21.0 12.08 NA
GB-60 15 7.17 NA
GB-61 16.5 3.0 NA
GB-62 13.0 10.0 NA
GB-63 5.3 2.0 NA
GB-64 13.0 5.92 NA
GB-66 9.0 3.3 NA
GB-67 12.0 4.0 NA
GB-68 15.5 6.0 NA
GB-69 13.25 6.75 NA
GB-70P 8.0 5.17 1.6 (01-28-16)
3.3 (02-29-16)
GB-71 10.0 6.75 NA
GB-72 4.0 2.0 NA
GB-75P 10.0 6.17 2.5 (01-26-16)
2.8 (02-26-16)
GB-76 13.0 10.66 NA
GB-77 16.0 14.42. NA
GB-78 10.0 7.83 NA
GB-79 15.0 8.66 NA
GB-80 15.0 8.25 NA
GB-81P 16.0 9.17 7.0 (04-01-16) ,
5.0 (05-02-16)
GB-82 17.0 9.0 NA
GB-84 - 17.0 11.0 NA
16
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
However,various environmental and man-made factors such as amounts of precipitation and
changes in construction, can substantially influence groundwater level.
17
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City ofPearland, Texas
5.0 GEOTECHNICAL RECOMMENDATIONS
5.1 Traffic Signal Foundations
As part of McHard Road Extension proj ect,traffic signals will be installed at the intersections
of Max Road,Roy Road,Garden Road, O'Day Road and Hatfield Road. The existing traffic signals
r at Cullen Boulevard and Mykawa Road will be modified.
5.1.1 Recommended Foundation Types. Based on the subsurface conditions revealed by
borings GB-49,GB-56,GB-58,GB-60,GB-62, GB-64,and GB-68,the traffic signals at Max Road,
Roy Road, Garden Road, O'Day Road and Hatfield Road can be supported on either cast-in-place
drilled shafts or driven prestressed precast concrete piles. Design of the traffic signal foundations
should ensure adequate axial and lateral capacities of the foundations under consideration. Capacity
curves for both drilled shafts and driven piles are presented and discussed in the following sections.
The capacity curves were developed for these borings drilled near the proposed traffic signal
foundations.
5.1.2 Minimum Embedment Requirement. We recommend that design of the shafts or piles
consider the following minimum embedment requirements:
• The shafts or piles should have a depth of embedment adequate for support of the
imposed axial and lateral loads.
• Computation of design capacities of the shafts or piles should provide for reductions
in capacities due to construction-related disturbance and shrink-swell of surficial soils
with changes in moisture.
• Shafts and piles should penetrate into the base stratum(the stratum in which the shaft
tip is placed) at least 2 times their diameter or width.
18
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
5.1.3 Axial Capacities of Drilled Shafts and Driven Piles. Allowable skin friction capacity
and point bearing capacity were computed for cast-in-place drilled shafts and driven full-
displacement piles(i.e.,prestressed precast concrete piles)for the boring locations GB-49,GB-56,
GB-58, GB-60, GB-62, GB-64 and GB-68 using TxDOT WinCore (Version 3.1) software. The
WinCore software was developed by TxDOT to compute pile capacities based on design methods
included in the TxDOT Geotechnical Manual. The program computes allowable axial capacity
based on a safety factor of at least 2.0 for skin friction and end bearing. Allowable axial capacities of
cast-in-place drilled shafts should be computed based on the sum of the allowable skin friction acting
on the side area of the shaft plus the allowable point bearing, acting on the end area of the shaft. It
should be noted that TxDOT Houston District places a limit an end bearing values of 2.0 tsf, for
shafts with diameters over 24 inches and less than or equal to 48 inches. End bearing is neglected in
the design of shafts with diameters less than,or equal to 24 inches. End bearing developed based on
TAT data and/or TCP data can be used for shafts with diameter over 48 inches. TxDOT Houston
District practice calls for computation of allowable axial capacities of driven piles based on the
accumulative allowable skin friction acting on the side area of the pile,without any contribution due
to point bearing. Values of accumulative skin friction for drilled shafts and driven full-displacement
piles are based on unit skin friction values computed from laboratory triaxial (TAT) tests for
cohesive soils, and from TxDOT cone penetrometer (TCP) tests for cohesionless soils. A soil
reduction factor(SR)of 0.7 was applied to the computed values of allowable skin friction for drilled
shaft design. The computed unit skin friction values were limited to 1.25 tsf for driven piles and
0.88 tsf for drilled shafts in accordance with TxDOT Houston District practice. In addition,the ratio
of TCP unit friction to TAT unit friction in cohesive soils was verified with reference to TxDOT
Houston District practice which is between 0.5 and 2.0. Adjustments were made accordingly to meet
the above ratio requirements.
Allowable axial capacity for cast-in-place drilled shafts, installed at the location of borings
GB-49, GB-56, GB-58,GB-60,GB-62, GB-64 and GB-68 should be computed using the curves of
accumulative static frictional resistance (in tons/ft of perimeter)presented on Figures 5.1 through
5.7, respectively, and curves of allowable unit point bearing presented on Figures 7.1 through 7.7,
respectively. The allowable point bearing for a given shaft size should be computed based on the
19
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
value of allowable unit point bearing (in TSF), at the design penetration, times the end area of the
shafts.
Thus, an equation to determine the allowable axial capacity, Qa,for the drilled shafts can be
expressed as below.
it
Qa = irdS n d-qp in tons
Where,
S is Accumulative Friction in tons per foot of perimeter of drilled shaft
qp is Point Bearing in tsf
d is Diameter of drilled shaft in feet
Allowable axial capacity for driven full-displacement(precast concrete)piles,installed at the
location of borings GB-49, GB-56, GB-58, GB-60, GB-62, GB-64 and GB-68 should be computed
using the curves of accumulative static frictional resistance (in tons/ft of perimeter) presented on
Figures 6.1 through 6.7, respectively.
Thus, an equation to determine the allowable axial capacity, Qa, for driven piles can be
expressed as below.
Qa= 4wS in tons
Where,
S is Accumulative Friction in tons per foot of perimeter of driven pile
w is Width of square driven pile in feet
Tables of numerical values of unit skin friction, computed using WinCore software, are
provided on forms titled "Soil Strength Analysis" in Appendix C, on Figures C-1 through C-7 for
drilled shafts, and on Figures C-8 through C-14 for driven piling.
, 20
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
The designer should account for the effects of seasonal moisture variations at traffic signal
foundation location by subtracting the accumulated skin friction at a depth of seasonal moisture
variations from the total accumulated skin friction at the design tip elevation. A 5 to 10-foot depth
may be considered as the zone of seasonal moisture variation. The final design tip elevation should
be based on a total load equivalent to the design load plus the capacity of accumulated skin friction
determined at the depth(elevation)of the seasonal moisture variations from the skin friction design
curve.
5.1.4 Group Effects. To reduce group effects it is recommended that the piles or shafts be
spaced with a minimum center-to-center distance(i.e.,based on a single row of piles or shafts)of at
least 3 times the pile width or 2.5 times the shaft diameter.
5.1.5 Settlement. Although detailed settlement analyses were not within the scope of this
study, it is believed that drilled shafts and driven piles,designed in accordance with the above
recommendations, should experience small settlements. Differential settlements, resulting from
variation in subsurface conditions and loading conditions, are also expected to be small.
5.1.6 Lateral Capacity. The lateral load capacity will depend on the ground surface
deflection,maximum bending moment,stiffness factor and soil modulus between the shafts/piles and
surrounding soils. Allowable lateral load can be developed based on allowable ground surface
deflection, soil modulus and stiffness of shaft or pile. However,maximum bending moment in the
pile or shaft will need to be verified. Lateral load-deflection analyses, using a soil-structure
interaction (p-y) model, can be used (if needed).to provide refined estimates of deflections and
bending moments along the length of the pile or shaft. The soil parameters which include LPile
program soil type, submerged unit weight, undrained cohesion/internal friction angle and£50 were
developed for the borings GB-49, GB-56, GB-58, GB-60, GB-62, GB-64 and GB-68 and are
presented in Table 2. These soil parameters can be used for LPile program input for the design of
traffic signal foundations at Max Road, Roy Road, Garden Road, O'Day Road and Hatfield Road.
21
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
5.2 Proposed Storm Sewer
Based on the information provided by Freese and Nichols, Inc., it is understood that the
proposed storm sewer will be installed by open cut method of construction except at the roadway
crossings and utility crossings where tunneling is proposed.
The following subsections provide information for the design and construction of the
proposed storm sewer and the excavations required for the proposed open cut installations and access
shafts.
5.2.1 Geotechnical Parameters. Based on the soil conditions revealed by the borings GB-49
through GB-68, geotechnical parameters were developed for the design of the storm sewer
installation. The design parameters are provided in Table 3. For design, the groundwater level
should be assumed to exist at the ground surface, since these conditions may exist after a heavy rain
, or flooding.
5.2.2 Trench Stability. The trench excavation may be shored or laid back to a stable slope
or supported by some other equivalent means used to provide safety for workers and adjacent
structures, if any. The excavating and trenching operations should be in accordance with OSHA
Standards, OSHA 2207, Subpart P, latest revision or the TxDOT Specifications.
• Excavation Shallower Than 5 Feet - Excavations that are less than 5 feet deep (critical
height)should be effectively protected when an indication of dangerous ground movement is
anticipated.
• Excavations Deeper Than 5 Feet-Excavations that are deeper than 5 feet should be sloped,
shored, sheeted,braced or laid back to a stable slope or supported by some other equivalent
means or protection such that workers are not exposed to moving ground or cave-ins. The
slopes and shoring should be in accordance with the trench safety requirements as per OSHA
Standards. The following items provide design criteria for trench stability.
22
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
(i) OSHA Soil Type. Based on the soil conditions revealed by borings drilled for this
study and assumed groundwater level at surface,OSHA soil type"C"should be used
for determination of allowable maximum slope and/or the design of shoring along the
alignment for full proposed depth of trench excavation. For shoring deeper than 20
feet(if needed),an engineering evaluation is required and deeper soil borings will be
needed.
(ii) Trench Support Earth Pressure. Based on the subsurface conditions indicated by our
field investigation and laboratory testing results, trench support earth pressure
diagrams were developed and are presented on Figures 8.1 through 8.3. These
pressure diagrams can be used for the design of temporary trench bracing. For a
trench box, a lateral earth pressure resulting from an equivalent fluid with a unit
weight of 94 pcf can be used. The effects of any surcharge loads at the ground
surface should be added to the computed lateral earth pressures. A surcharge load,q,
will typically result in a lateral load equal to 0.5 q. The above value of equivalent
_ fluid pressure is based on assumption that the groundwater level is near the ground
surface, since these conditions may exist after a heavy rain or flooding.
(iii) Bottom Stability. In braced cuts,if tight sheeting is terminated at the base of the cut,
the bottom of the excavation can become unstable. The parameters that govern the
stability of the excavation base are the soil shear strength and the differential
hydrostatic head between the groundwater level within the retained soils and the
groundwater level at the interior of the trench excavation. For cut in cohesive soils as
predominantly encountered in borings, the bottom stability can be evaluated as
outlined on Figure 9. However, in semi-cohesionless (such as sandy silt and silty
sand)or granular soils(such as silty sand),as encountered in borings GB-52,GB-55,
and GB-63 at the invert or within 3 feet below bottom of invert, the excavation
should be done after dewatering to avoid bottom stability problems.
23
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
5.2.3 Groundwater Control. Excavations for the storm sewer may encounter groundwater
seepage to varying degrees depending upon the groundwater conditions at the time of construction
and the location and depth of the trench. In cohesive soils,if groundwater is encountered then it may
be managed by collection in trench bottom sumps for pumped disposal. In granular or semi
cohesionless soils, as encountered near borings GB-52, GB-55 and GB-63 at the invert or within 3
feet below bottom of invert, dewatering such as vacuum well points for excavation depths up to 15
feet or deep well with submersible pumps for excavation depths greater than 15 feet will be required
to lower the groundwater level to at least 5 feet below the bottom of the excavation. It is
recommended that the actual groundwater conditions should be verified by the contractor at the time
of construction. It is contractor's responsibility to perform appropriate groundwater control during
construction.
5.2.4 Bedding and Backfill. The bedding and backfill for storm sewer should be in
accordance with TxDOT Standard Specification Item No. 400 "Excavation and Backfill for
Structures", Section 400.3.2 and 400.3.3.
5.2.5 Live Loads on Pipeline Due to Traffic. Loads on the pipe due to traffic should be
considered. A graph providing calculated vertical stress on pipe due to traffic loads is given on
Figure 10.
5.3 Trenchless Installation
It is understood that the proposed storm sewer will be installed by trenchless method of
construction at the existing roadway crossings and utility crossings.
5.3.1 Geotechnical Parameters. Based on the soil conditions revealed by soil borings and
laboratory test data,geotechnical design parameters were developed for cohesive soils and cohesionless
soils and are provided in Table 4. The cohesive soils include clays and lean clays,and the cohesionless
soils include fine sand w/silt,silty sand and sandy silt. For design conditions,the groundwater levels
should be assumed to exist at the ground surface, since these conditions may exist after heavy rain or
flooding.
24
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
5.3.2 Earth Pressure on Pipe and Auger Casing. The earth pressure values on pipe and auger
casing should be determined from Figure 11. Equations to calculate the tunnel liner loads are also
shown on Figure 11.
5.3.3 Influence of Tunneling on Adjacent Structure. Surface and near-surface structures near
the tunnel alignment consist primarily of private properties,city streets and public and private utilities.
Ground movement,in terms of loss of ground or ground lost,is commonly associated with soft
ground tunneling. If such ground movement is excessive,it may cause damage to the structures,roads
and services located above the tunnel. While ground movement cannot be eliminated, it can be
controlled within certain limits by the use of proper construction techniques and good quality
workmanship. These include, but are not limited to, prevention of excessive ground loss during
tunneling with the use of grouting and filling the annular space between the pipe or casing and the
surrounding soil and prevention of undue loss of fines through dewatering.
The selection and execution of tunneling methods that are best suited to anticipated ground
conditions along the proposed tunnel are, in fact, the contractor's primary contribution to successful
completion of the proposed tunnel. On review of the boring logs,the ground conditions for tunneling
(excavation face)will be primarily through cohesive soils and interface of cohesive and cohesionless
soils. The cohesive soils are stiff to very stiff and the ground in this area may be expected to behave as
firm to raveling ground near the invert. Cohesionless soils consisting of medium dense to dense silty
sand and sandy silt were encountered near or within 3 feet of the proposed invert depths of trenchless
installation in borings GB-52, GB-55 and GB-63. The ground at these locations may be expected to
behave raveling to running ground near the invert depths. Hence,extra precautions will be required at
these locations during the trenchless installation to prevent any excessive ground loss due to the
disturbance and removal of the cohesionless soils. Close monitoring of ground movement should be
carried out during the trenchless installation.
At locations near borings GB-52, GB-55 and GB-63 the ground conditions for trenchless
operation (excavation face) will be through cohesive soil interface with cohesionless soils. In such
conditions,dewatering will be required. However due to spacing of borings,soil conditions other than
those encountered in borings could exist.
25
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City ofPearland, Texas
The proposed tunnel is parallel with or cross beneath utility lines. The largest potential
problems from utilities may result from:
• Leaking water pipes
• Gas pipe breakage leading to a potential explosion
• Breakage of storm or sanitary sewers
In general,it is the contractor's responsibility to investigate these and other possible third party
interactions along the proposed tunnel alignment and to accommodate all of these interactions with the
use of good construction methods.
5.3.4 Groundwater Control. Groundwater control should be followed in accordance with the
section 5.2.3 of this report.
5.4 Structures
The structures for the McHard Road extension will include storm sewer manholes. The
depth of the proposed manholes range from 4 feet to 12 feet. The project also includes construction
of outfall structure at detention pond HS-1, 4'x2' RC Box in detention pond HS-2 and 6'x4' RC
Boxes in detention pond CC-1.
5.4.1 Foundation Conditions. Based on the soil conditions revealed by borings GB-49
through GB-68 the manhole bases placed at depths ranging from 4 to 12 feet will be in soft to very
stiff clay, sandy clay and silty clay. Based on the soil conditions encountered in borings GB-69
through GB-84, the RC Boxes in detention ponds HS-1, HS-2 and CC-1 placed at depths ranging
from 5 to 16 feet will be in medium stiff to stiff clay and/or medium dense silty sand.
5.4.2.Foundation Design Recommendations. The bases of structures placed at approximate
depths ranging from 4 to 16 feet at the various locations may be proportioned for an allowable(net)
bearing pressure as presented in the table below.
26
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
Station No. Nearest Boring Depth Allowable Bearing
(ft.) Pressure(psf)
0 to 20+00 GB-49, GB-50 4-10 2,500
and GB-51
20+00 to 35+00 GB-52 and 8-12 2,500
GB-53
35+00 to 50+00 GB-54 and 8-12 1,000
GB-55
50+00.to 80+00 GB-56 and 6-12 2,500
GB-58
80+00 to 100+00 GB-60 6-10 3,750
10-12 2,000
100+00 to 125+00 GB-61 and 6-12 3,750
GB-62
125+00 to 150+00 GB-63 and 6-12 2,500
GB-64
150+00 to 181+00 GB-66, GB-67 6-12 1,250
and GB-68
Outfall Structure at GB-69 through 5 1,800
Detention Pond HS-1 GB-71
4'x2'RC Boxes Outfall GB-72 through 8-12 1,250
and inlet structures at GB-78
Detention Pond HS-2
6'x4' RC Boxes, Outfall GB-79 through 13-16 2,000
and inlet structures at GB-84
Detention Pond CC-1
The allowable bearing pressures include a safety factor of 2.0. The above recommendation
assumes that the final bearing surfaces consist of undisturbed natural soils and that underlying semi-
transmissive zones are properly pressure-relieved.
27
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
• Bottom Stability. Bottom stability is described earlier in Section 5.2.2 under
Excavation Stability.
• Lateral Earth Pressure. The pressure diagrams presented on Figures 8.1
through 8.3 can be used for the design of braced excavation. The lateral earth
pressure diagram presented on Figures 12.1 through 12.3 are applicable for the
design of the permanent walls.
• Hydrostatic Uplift Resistance. Structures extending below the groundwater
level should be designed to resist uplift pressure resulting from excess
piezometric head. Design uplift pressures should be computed based on the
assumption that the water table is at ground surface. To resist the hydrostatic
uplift at the bottom of the structure,one of the following sources of resistance
can be utilized in each of the designs.
a. Dead weight of structure,
b. Weight of soil above base extensions plus weight of structure, or
c. Soil-wall friction plus dead weight of structure.
The uplift force and resistance to uplift should be computed as detailed on Figure 13.
In determining the configuration and dimensions of the structure using one of the approaches
presented on Figure 13, the following factors of safety are recommended.
a. Dead weight of concrete structure, Sn = 1.10,
b. Weight of soil (backfill) above base extension, Sf2= 1.5, and
c. Soil-wall friction, Sf3 =3.0.
Friction resistance should be discounted for the upper 5 feet, since this zone is affected by
seasonal moisture changes.
28
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City ofPearland, Texas
5.4.3 Structure Backfill.Excavations for the proposed structures should be backfilled
in accordance with the TxDOT Specification Item 400.
5.4.4 Protection of Below Grade Structures. The design of the proper means for
protection of below grade structures will depend upon the potential of the aggressivity or
corrosivity of soil and groundwater properties. The aggressivity testing was not within the
scope of this study. The design of the protection of below grade structures is beyond the
scope of services for the study.
5.4.5 Groundwater Control During Construction. Excavations may encounter
groundwater seepage to varying degrees depending upon groundwater conditions at the time
of construction and the location and depth of excavation. The groundwater control should be
followed according to the Section 5.2.3 of this report.
5.5 Detention Ponds
The project also includes construction of three detention ponds(HS-1,HS-2 and CC-1).
The details of each detention pond are given below.
• The detention pond HS-1 is located near the intersection of proposed McHard Road and
O'Day Road. The proposed pond is about 5 feet deep and will have a side slope of
4(H):1(V). The detention pond will include construction of an outfall structure at the
southwest corner of the pond.
• The detention pond HS-2 is located along the proposed McHard Road between the
intersections of Hatfield Road and Woody Road. The proposed pond is about 9 to 10 feet
deep and will have a side slope of 4(H):1(V). The detention pond will include
construction of a 121 if of 4'x2'RC Box on the northwest corner and a 42 inch RCP on the
southeast side. The 100-year flood elevation is at El. 46.0 feet.
• The detention pond CC-1,is offsite and will be constructed as two interconnecting ponds.
Both ponds will be approximately 15 feet deep and will have a side slope of 4(H):1(V).
There are several 24 to 30-inch HDPE inlets into the pond and a 6'x4'RCB connecting the
29,
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
two ponds. There will also be a 6'x4'RCB outlet at the northwest corner of the proposed
pond. The 100-year flood elevation is at El. 47 feet.
5.5.1 Slope Stability Analyses. Slope stability analyses were performed for the proposed
detention ponds HS-2 and CC-1. Since the detention pond HS-1 is about 5 feet deep, no slope
stability analyses was performed for this pond. The analyses were performed using GSTABLE7 and
the Modified Bishop Method of Analyses. Analyses conditions consisted of End of Construction,
Rapid Drawdown and Long Term cases. The TxDOT minimum required factors of safety for short
term(end of construction and rapid drawdown)and long term condition are 1.3 and 1.5,respectively.
5.5.2 Method of Analyses. Experience indicates that the failure of a slope occurs by slippage
along a surface of nearly circular cross section. Sufficiently accurate estimates of the stability of
such slopes can be made if the surface of sliding is assumed to be circular. Several methods of slope
stability analysis are available. The most commonly used method is known as the Bishop Method.
For this study, the slope stability analyses were conducted using a computer program. The
calculation of the factor of safety against instability was performed using the Modified Bishop
Method. Slope stability analyses were performed on critical sections of the proposed detention pond
by computer program GSTABLE7 with the built-in critical section search algorithm.
5.5.3 Soil Parameters and Water Level. To evaluate the potential stability of a slope, or to
assess the effectiveness of a slope, requires the physical properties of the geological material
involved to be measured. Based on the subsurface conditions encountered in borings two (2) soil
cases were evaluated for each pond. The soil parameters are derived from empirical correlation
between the soil index properties as well as consolidated undrained triaxial results and shear strength
characteristics of corresponding types of soil. Slope stability analyses were performed for the End of
Construction,Rapid Drawdown and Long Term design cases for the proposed earthen bank slope of
4(H):1(V). The soil parameters used for the slope stability analyses are presented in Tables 5.1
through 5.4
• End of Construction: The rapid drawdown case models the condition where high
floodwater saturates and piezometrically"loads"the slope and then quickly recedes leaving
30
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City ofPearland, Texas
a large unbalanced piezometric head in the bank slope. This unbalanced force increases the
shear stresses in the soils behind the slope. For this analysis, the 100-year flood level
within each pond was considered to be near the pond top of the bank and a completely
saturated slope from the bottom of each pond to near the top of the pond slope was
considered for analyses. The water level within each pond was assumed to instantaneously
drop from the 100-year flood level to the bottom of pond. For granular/cohesionless soils,
the angle of internal friction is based on the Standard Penetration test(SPT)data obtained
in the field. For cohesive soil, unconsolidated undrained shear strength parameters were
used for the analyses. The selected unconsolidated undrained shear strength parameters
were based on a lower bound value of the undrained shear strength profile developed from
the laboratory unconfined compression tests, unconsolidated-undrained triaxial
compression tests, torvanes, and pocket penetrometers.
• Rapid Drawdown: The rapid drawdown case models the condition where high floodwater
saturates and piezometrically "loads" the slope and then quickly recedes leaving a large
unbalanced piezometric head in the bank slope. This unbalanced force increases the shear
stresses in the soils behind the slope. For this analysis,the 100-year flood level within the
pond was considered to be near the pond top of the bank and a completely saturated slope
from the bottom of pond to near the top of the pond slope was considered for analyses.
The water level within the pond was assumed to instantaneously drop from the 100-year
flood level to the bottom of pond.
For earthen slopes, a most critical rapid drawdown case occurs when shrinkage cracks
develop all through the slope soils due to the drying of the soil, the shrinkage cracks are
filled with water as the water level rises in the pond and the slopes become"saturated"and
then the water level in the pond drops rapidly. This case is most common in highly
plasticity clay. As shrinkage cracks develop in the high plasticity clay after long periods of
exposure to environmental conditions(wetting-drying, swelling-shrinking, etc.),the high
plasticity clay shear strength degrades to weathered effective stress shear strength.
Experience with shallow slope failure associated with matric suction loss and strength
degradation suggests that realistic crack depths will vary between 3 and 8 feet with an
31
LJ
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City ofPearland, Texas
average of about 6 feet. Thus, based on the depth of assumed seasonal moisture variation
zone, a crack depth of 7 feet was used for developing the weathered soil parameters. In
order to incorporate the effects of weathering on the high plasticity'clay shear strength,we
used a weathered effective stress angle of internal friction WW) and weathered effective
stress cohesion(C'W)for the rapid drawdown condition analyses. The(I)'W was assumed to
be the residual secant friction angle of the soil and the C'W was assumed to be the
mobilized cohesion intercept of the soil.
• Long-Term: The long term design case represents steady state piezometric and stress
conditions. When a slope is excavated, altered stress conditions create pore pressure
changes within the slope and the undrained strength of the bank soils is mobilized. With
time, the soil pore pressures adjust to the imposed stress and piezometric conditions and
the bank soils rely on their available strength for long term stability. In this analysis, the
static water level within the embankment soils and within the pond was assumed to be the
water level measured in the borings.
For earthen slopes, the shear strength of the upper 7 feet of the slope soils can degrade
because of the weathering or wetting and drying and shrinking/swelling of these soils
(especially highly plastic clays). Weathered effective stress shear strength parameters
consisting of a weathered effective stress angle of internal friction (h) and a weathered
effective stress cohesion (C'W), as described in the previous section rapid drawdown, were
used to analyze the long term condition in order to account for the degradation of the slope
soil shear strength due to weathering.
5.5.4 Loading Conditions. A surcharge load(construction or maintenance equipment)of 250
psf was assumed at the top of the bank and was considered for the short term(end of construction),
rapid drawdown and long term conditions.
5.5.5 Factors of Safety. Based on the soil parameters and water level conditions discussed
previously, slope stability analyses were performed for proposed 4(H):1(V)earthen bank slope for -
detention ponds HS-2 and CC-1. The results of these analyses are presented on Figures 14.1 through
32
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
14.12. The computed factors of safety for these soil conditions are also summarized below.
Detention Soil Factor of Safety
Boring No. Slope Figure No.
Pond Case EC RD LT
Pond HS-2 GB-72 4(H):1(V) 1 2.29 1.33 1.89 14.1, 14.2, 14.3
through
2 4.11 1.43 1.76 14.4, 14.5, 14.6
GB-78
Pond CC-1 GB-79 4(H):1(V) 1 1.86 1.31 1.95 14.7, 14.8,14.9
through 2 1.94 1.25 1.95 14.10, 14.11, 14.12
GB-84
Based on the above table of factor of safety for soil case 2, the proposed section of
4(H):1(V) slope does not meet the required factor of safety for rapid drawdown condition.
Additional analyses was performed for this case by placing a 2-foot thick clay liner at the side
slopes and bottom of the proposed detention pond. The slope stability analyses results are
presented on Figures 14.13 through 14.15 and in the table below.
Detention T I Soil Factor of Safety
Boring No. Slope Figure No.
Pond Case EC RD LT
Pond CC-1 GB-79 4(H):1(V) 2 2.10 1.34 2.04 14.13, 14.14, 14.15
through
GB-84
As can be seen from the above table, the proposed detention pond with a 4(H):1(V) slope
with a 2-foot clay liner will meet the minimum required factors of safety.
5.5.6 Conclusions and Recommendations. A minimum factor of safety of 1.3 is considered
acceptable for short term condition(end of construction and rapid drawdown conditions),while a
minimum factor of safety of 1.5 is considered acceptable for long term condition. Based on the slope
stability analyses results,the proposed detention ponds HS-2 and CC-1 with a 4(H):1(V)side slope
will be stable.
33
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
The side slopes in the offsite detention ponds HS-2 and CC-1 may be improved by lining
the slope bottom and along the slope (where sand and silt layers are encountered)with a 24-
inch thick clay liner for 4(H):1(V) slope inclination. Further,the shallow pond HS-1 may be
improved by lining the slope bottom and along the slope (where sand and silt layers are
encountered) with a 24-inch thick clay liner for 4(H):1(V) slope inclination. Approximate
horizontal limits of the cohesionless soils encountered in detention ponds are presented on Figures
15.1 through 15.3.
The areas where silty sand and sandy silt encountered in the borings are given below.
Detention Pond Boring No. Range of Soil Type
Depth, ft
HS-1 GB-70 5-9 Silty Sand
HS-2 GB-72 6-11.5 Silty Sand
GB-75 8-11 Sandy Silt
CC-1 GB-79 13-16.5 Silt
GB-80 12.5-20 Sandy Silt
GB-82 13-21.5 Silty Sand
21.5-23 Silt
GB-83 10-16.5 Silty Sand
GB-84 10-30 Silty Sand
5.5.7 Clay Liner Properties. The properties of the constructed clay liner material should meet
the following criteria:
Property Criteria
Coefficient of Permeability <4 x 10-7 cm/sec
Soil Fines > 65%passing No. 200 sieve
34
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
Property Criteria
Liquid Limit > 35 and< 65
Moisture/Density Relationship >95% of maximum dry density at or above
optimum moisture content
Thickness Minimum 24 inches over
granular/cohesionless soils
5.5.8 Borrow Material Analysis. Based on TxDOT"Texas Standard Specifications—2014"
Item 132, Type A, the liquid limit for select fill should not be greater than 45 and plasticity index
should not be greater than 15. The soils that meet the TxDOT Fill Specifications criteria are:
Detention
Pond Boring No. Range of Depths, feet Soil Type
HS-2 GB-75 4-8 Clay, Sandy
GB-82 6-13 Clay, Sandy
CC-1
GB4i4 4-10 Clay, Sandy
The borrow material (described earlier) at this site can be used as a backfill material for
trenches and due to its swelling and shrinkage potential, it is least suitable as backfill for building
pads or behind retaining walls.
5.5.9 Slope Protection and Erosion Control. It is expected that pond side slope sloughing
and erosion will occur in areas where silty sand, sandy silt and silt were encountered near borings
GB-70 in detention pond HS-1 borings GB-72 and GB-75 in detention pond HS-2 and in borings
GB-79,GB-80,GB-82,GB-83 and GB-84 in detention pond CC-1. To minimize the sloughing and
erosion,riprap with a woven geosynthetic beneath the riprap or a clay lining can be used to protect
the slopes along these cohesionless soil zones as given below.
35
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
Detention Pond Boring No. Range of Soil Type
Depth, ft
HS-1 GB-70 5-9 Silty Sand
HS-2 GB-72 6-11.5 Silty Sand
GB-75 8-11 Sandy Silt
CC-1 GB-79 13-16.5 Silt
GB-80 12.5-20 Sandy Silt
GB-82 13-21.5 Silty Sand
21.5-23 Silt
GB-83 10-16.5 Silty Sand
GB-84 10-30 Silty Sand
5.6 Pavement Structure Design
It is understood that McHard Road extension will be a 4-lane boulevard with a rigid
pavement from Cullen Boulevard to Mykawa Road. The project also includes construction of small
section of pavement at the intersections of side streets at Adamo Lane,Stone Road,Max Road,Roy
Road,Garden Road,O'Day Road,Hatfield Road,and Woody Road. The pavement design presented
below was developed in accordance with "AASHTO Guide for Design of Pavement Structures," r
1993 Edition.
5.6.1 Design Parameters
Subgrade Soil Properties. Based on the laboratory test data obtained from the natural
subgrade soils, the effective roadbed soil resilient modulus (MR) is estimated to be
about 2,792 psi. Based on an estimated resilient modulus of the 8-inch lime-
stabilized subgrade,the effective modulus of subgrade reaction(k)is estimated to be
about 62 pci. The effective modulus of subgrade reaction(k),with a loss of support
36
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
value of 1, was estimated to be about 110 pci for a composite base/subbase course
consisting of 1-inch bond breaker(ASB)over 6-inch cement stabilized base(CTB)
and over 8-inch lime stabilized subgrade.
Traffic Data. A traffic data of approximately 10.6 x 106 ESAL(W18)over a 30 year
design period was utilized for the pavement design for McHard Road extension. This
traffic volume is based on a total of 11,633 vehicles per day with 3%truck traffic and
a growth rate of 2% as provided by Freese and Nichols, Inc. and also meeting the
minimum requirements for major thoroughfare road per City of Pearland Standards.
A traffic data of approximately 0.33 x 106 ESAL(W18)over a 10 year design period
was utilized of the pavement design for the side streets. This traffic volume is based
on a total of 1,000 vehicles per day with 2%percent busses and 2%truck traffic with
a growth rate of 2%.
Other Design Parameters. Other design parameters used in the development of rigid
pavement and flexible pavement(side streets) thickness are given below:
TxDOT Criteria
Material Properties of Concrete:
Modulus of Elasticity of Concrete (Es): 500,000 psi
Mean value of Modulus of Rupture of Concrete after 28 days
(S'O: 620 psi
Load Transfer coefficient(J): 2.6
Drainage coefficient(Cd): 0.95
Overall Standard Deviation(So): 0.35
Reliability Level (R): 95%
Serviceability Index
Initial (Po): 4.5
Terminal (Pt): 2.50
37
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
Reinforcement Variables
Allowable Working Stress (fs): 45,000 psi (grade 60 steel)
Friction Factor(F): 1.8
City of Pearland Criteria
Material Properties of Concrete:
Modulus of Elasticity of Concrete (E.): 3,600,000 psi
Mean value of Modulus of Rupture of Concrete after 28 days
(S'.): 650 psi
Load Transfer coefficient(J): 3.2
Drainage coefficient(Ca): 1.20
Overall Standard Deviation (S0): 0.35
Reliability Level (R): 95%
Serviceability Index
Initial (P0): 4.5
Terminal (Pt): 2.50
Reinforcement Variables
Allowable Working Stress (fs): 45,000 psi (grade 60 steel)
Friction Factor(F): 1.8
Flexible Pavement.
• Flexible Pavement:
Overall Standard Deviation (S0): 0.45
Reliability Level (R): 90%
Serviceability Index
Initial (P0): 4.2
Terminal (Pt): 2.0
Layer, coefficient:
38
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City ofPearland, Texas
al, a2, a3 = layer coefficient for surface,base and
subbase course,respectively. Values of the layer
coefficient for each pavement material are as
follows:
al =0.44 for HMHL asphalt concrete surface
a2 =0.34 for Asphalt concrete black base
=0.23 for Cement stabilized base
= 0.17 for lime and flyash stabilized base
a3 = 0.11 for Lime stabilized soils
Drainage coefficient:
m2, m3 = Drainage coefficient for base and
subbase layers; m2 = 1.15 and m3 = 1.15 (based
on a fair quality of drainage)
5.6.2 Recommended Pavement Section
Based on the design parameters described above and the AASHTO design
procedures,the thickness of rigid pavement for McHard Road and flexible pavement for side
streets were determined. The recommended pavement sections are given below:
5.6.2.1 McHard Road
TxDOT Criteria
Pavement Course Thickness, inches
Reinforced Concrete (CRCP) 10
Bond Breaker 1
Cement Stabilized Base 6
6% Lime-Stabilized Subgrade 8
39
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
City of Pearland Criteria
Pavement Course Thickness, inches
Reinforced Concrete (JRCP) 10
6%Lime-stabilized subgrade 8
For the 10-inch continuous reinforced concrete pavement(CRCP),the required longitudinal
reinforcing steel and transverse reinforcing steel as provided in TxDOT drawing CRCP(1)-13 should
be followed.
Based on the reinforcement variables and recommended pavement section, the minimum
required longitudinal and transverse reinforcing steel (No. 4, Grade 60 Steel) spacing for 10-inch
concrete pavement are 12 inches and 30 inches, respectively. The reinforcement details should be
followed in accordance with TxDOT Standard Specification Item No. 440.
5.6.2.2 Side Streets (Flexible Pavement).
Pavement Course Thickness, Inches
Asphaltic,Cement Concrete 2
Black Base 6
5%Lime stabilized subgrade 8
Or
Pavement Course Thickness,Inches
Asphaltic Cement Concrete 2
Black Base 9
5.6.3 Preparation of Pavement Subgrade
Based on the field and laboratory test data,the subgrade soils at this site consist of clay and
sandy clay of high plasticity. These soils should be stabilized with approximately 6 percent lime to a
depth of at least 8 inches. This corresponds to approximately 40 pounds of hydrated lime per square
40
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
yard based upon a soil dry unit weight of 110 pcf. The actual percentage of lime must be confirmed
by laboratory tests at the time of construction.
Subgrade preparation for the proposed pavement should consist of stripping,proof-rolling,
and stabilization. The following procedures for subgrade preparation are recommended:
1. Strip the surficial soils to a suitable depth to remove all surficial vegetation and
achieve grade. In isolated areas where soft, compressible, or very loose soils are
encountered, additional stripping may be required. Stripping should extend to a
minimum of 2 feet beyond the edge of the proposed pavement.
2. After stripping, the exposed surface should be proof-rolled with a minimum of 3
passes of a 30-ton pneumatic-tired roller or a partially loaded truck utilizing a tire
pressure of approximately 90 psi. If rutting develops, the tire pressure should be
reduced. The purpose of the proof-rolling operation is to identify any underlying
zones or pockets of soft soils so these weak materials can be removed and replaced.
3. Lime stabilization of clay and sandy clay subgrade should be performed in
accordance with TxDOT Standard Specification Item No. 260.
41
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
6.0 CONSTRUCTION CONSIDERATIONS
6.1 Drilled Shaft Foundation Installation
Drilled shaft construction should follow TxDOT Standard Specifications for Construction
and Maintenance of Highways, Streets, and Bridges,2004,Item 416. Due to the presence of water
bearing cohesionless soils encountered at the site,it is anticipated that shaft installation will require
the use of slurry displacement methods,and possible surface casing. The surface casing is temporary
and shall be retrieved as outlined in TxDot Standard Specifications. If structural design calls for
shaft diameters in excess of 60 inches to terminate in sand, we recommend a more restrictive
construction specification that limits slurry sand content to four(4)percent.
6.2 Driven Pile Foundation Installation
Piling should be installed in accordance with TxDOT Standard Specifications for
Construction and Maintenance of Highways, Streets and Bridges, 2004, Items 404 and 409. The
allowable skin friction curves,presented on Figures 6.1 through 6.7,were based on the assumption
that the piles will be installed by driving.
6.3 Groundwater Control
Excavations for the water,sanitary sewer and storm sewer lines may encounter groundwater
seepage to varying degrees depending upon the groundwater conditions at the time of construction
and the location and depth of the trench. In cohesive soils,if groundwater is encountered then it may
be managed by collection in trench bottom sumps for pumped disposal. In granular or semi
cohesionless soils, as encountered near borings GB-52, GB-55 and GB-63 at the invert or within 3
feet below bottom of invert, dewatering such as vacuum well points for excavation depths up to 15
feet or deep well with submersible pumps for excavation depths greater than 15 feet will be required
to lower the groundwater level to at least 5 feet below the bottom of the excavation. It is
recommended that the actual groundwater conditions should be verified by the contractor at the time
of construction. It is contractor's responsibility to perform appropriate groundwater control during
construction.
42
Geotest Engineering,Inc. Report No. 1140215001
McHard Road Extension May 19, 2017
City of Pearland, Texas
7.0 PROVISIONS
The subsurface conditions and design information contained in this report are based on the
test borings made at the time of drilling at specific locations. Some variations in soil conditions may
exist between test borings. Should any subsurface conditions other than those described in our
boring logs be encountered,Geotest should immediately be notified so that further investigation and
supplemental recommendations can be provided. The depth to the groundwater level may vary with
changes in environmental conditions such as frequency and magnitude of rainfall, as well as area
construction activities.
The analysis and recommendations presented in this report are based, in part,upon the data
obtained from subsurface explorations made at the time test borings were drilled at specific
locations. The stratification lines on the boring logs represent approximate boundaries between soil
types. Actual transitions between soil types may be more gradual than depicted.
This report has been prepared for the exclusive use of Freese and Nichols, Inc., City of
Pearland,and TxDOT,specifically for the design of the McHard Road Extension project in Pearland,
Texas.
This report may not be reproduced in whole or part without the written permission of Geotest
Engineering, Inc., Freese and Nichols, Inc., City of Pearland, or TxDOT.
43
ILLUSTRATIONS
Figure
Vicinity Map 1
Plan of Borings 2.1 thru 2.6
Boring Log Profile 3.1 thru 3.7
Symbols and Abbreviations used on Boring Log Profile 4
Skin Friction Design—Drilled Shaft Design(Accumulative Graphs) 5.1 thru 5.7
Skin Friction Design—Driven Pile Design(Accumulative Graphs) 6.1 thru 6.7
Point Bearing Design—Drilled Shaft Design 7.1 thru 7.7
Excavation Support Earth Pressure 8.1 thru 8.3
Stability of Bottom for Braced Cut 9
Vertical Stress on Pipes Due to Traffic Loads 10
Earth Pressure on Pipe and Casing Augering 11
Lateral Earth Pressure Diagram for Permanent Wall 12.1 thru 12.3
Uplift Pressure and Resistance 13
Slope Stability Analyses for Detention Ponds 14.1 thru 14.15
Possible Horizontal Limits of Cohesionless Soils 15.1 thru 15.3
o
. I— .•
,..,
0
z
0 •
ti
To To
• Tomball Spring To
Porter
L.!9_5
To 1960 t19601
Waller Humble.
Cypress Vglia h ,a,m
290 / 8 `
• 90_
. Houston
Katy, : ;
1110411111
To
• Pasadena
1 oni • 225
Clodine 'PROJEC
Bellaire SITE
•
90 Ak
Sugarland- 1-- �
�s' 288' •
v To
Alvin
. . VICINITY MAP
.(NOT TO SCALE)
Ge otest Engineering, Inc. • FIGURE 1
Job No. 1140215001
0
J
m
z
W
J
J
D
U
BEGIN STA-1+00,00
0+00
STA 25+00
W
z
1+00
0+00
GB-49
1 BEGIN STA 0+00.00
McHARD RD
25+00
N87' 00' 41"E
1,976.59'
5+00
5+00
N86' 57' 03"E
1,821.65'
30+00 35+00
L2
GB-53
30+00
N87' 00' 41 "E
1,976.59'
10+00
L19
O
O
+
O
L22
N2' 44' 351W
1,240.69'
10+00
McHARD RD
71
C-1+
35+00
0
0
L1
L12
1
N87' 23' 00'E
2,586.65'
15+00
- G B-51
15+00
N87' 00' 41 "E
1,976.47'
STONE RD
5+00
40+00
N85' 53' O9" E
74.16'
L20
L11
N2' 37' 00'W
288.58'
PC STA 44+63,12
PC STA 43+82.78
1
GB-54
40+00
2+89
20+00
20+00
PI STA 18+95.80 L21
ADAMO LN
LINE STA 45+00
0
O
N87' 23' 00"E
510.39'
PI STA 24+86.65
25+00
PI STA 24+06.19
0
0
1n
1a-
w
z
U
i-
Q
I
I
0 50' 100' 200'
SCALE IN FEET
LEGEND
011) Boring
Boring
w/Piezometer
NOT FOR CONSTRUCTION
1N5 DOCUMENT 6 RE EASED FOR DIE
PURPOSE OF IIITERM RENEW UNDER THE
AUTHORITY OF UEHRAN BAVARWI P.E.
TEXAS NO:48811 011 DATE.7/6/2016
R TS N01 TO OE USED FOR CONSTRUCTION,
0101340 OR PERMIT PURPOSES.
FREESE
NICHOLS
11200 Broadway Street, Suite 2332
Pearland, Texas 77584
Phone — (832) 456-4700
Fax — (832) 456-4701
Freese and Nichols, Inc.
Texas Registered Engineering Firm F-2144
HORIZONTAL ALIGNMENT
DATA
McHARD ROAD
CULLEN BLVD TO MYKAWA RD
SHEET 3 OF 7
Texas Department of Transportation
2016
FED.RO.
0 v.T40.
PROJECT NO.
SHEET
No.
6
STP 2014 (326) MM
65
SLATE
DIST.
COUNTY
PLAN OF BORINGS
TEXAS
12
BRAZORIA
CONT
SECT.
JOB
HIGHWAY NO.
912
31
290
CS
FIGURE 2.1
Job No. 1140215001
45+00
C1
CURVE DATA
A = 13.25'
R = 2000,00'
= 232.25'
= 462.42'
PCC STA 49+25.54
50+00
G B 5 5-•�rj r �`Ii
45+UU c10
CURVE DATA
= 1125'
R = 1965.00'
T = 228.18'
L = 454.33'
PCC STA 48+37.11
50+00
CURVE DATA
A = 24.34'
R = 965.00'
T = 208.08'
L = 409.88' PRC STA 52+46.99
C2
C11
CURVE DATA
A = 24.34'
R = 1000.00'
T = 215.63'
L = 424,75'
•
55+00
PRC STA 53+50.29
55+00
C12
CURVE DATA
A = 37.59'
R = 1035.00'
T = 352.20'
L = 678.96'
in
in
4.
•4.
10+00
CURVE DATA
A = 37.59'
R = 1000.00'
T = 340.29'
L = 656.00'
GB-56
C3
0
0
to
0
0
0
N2' 48' 31 "W
1,457.08'
L13
60+00
PT STA 60+06.29
60+00
— PT STA 59+25.95
McHARD RD
N87' 00' 3211E
4,410.95'
65+00
G B-57
1
65+00
MATCH LINE STA 70+00
0 50' 100' 200'
SCALE IN FEET
LEGEND
Boring
Boring
w/Piezometer
NOT FOR CONST UCTION
HIS DOCUMENT 5 RELEASED FOR THE
URPOSE OF INERRA RENEW UNDER THE
AUTHORITY OF MEHRA/I BAVARIAN P.E
ERAS 110:48811 ON OATE:7/6/2016
IT IS NOT TO OE USED FOR CONSTRUCTION,
OIODNC OR PERMIT PURPOSES.
FREESE
NICHOLS
11200 Broadway Street, Suite 2332
Peariand, Texas 77584
Phone — (832) 456-4700
Fax — (832) 456-4701
Freese and Nichols, Inc.
Texas Registered Engineering Firm F-2I44
HORIZONTAL ALIGNMENT
DATA
McHARD ROAD
CULLEN BLVD TO MYKAWA RD
SHEET 4 OF 7
Texas Depaltnt,ent of Transportation
2016
FEO.RD.
D VNO.
PROJECT NO.
SHEET
NO.
6
STP 2014 (326) MM
66
PLAN OF BORINGS
STATE
DIST.
COUNTY
TEXAS
12
BRAZOR IA
CON T.
SECT.
912
31
JOB
290
HICIIWAY NO.
CS
FIGURE 2.2
Job No. 1140215001
0
0
0
N
w
0
F—•
0
0
+
10
rn
10
LiJ
Z
J
0
0
0
0
70+00
N87' 00' 32'E
4,410495'
75+00
70+00
12+46
95+00
0
0
1
— 95+00
N2' 57' 59'W
1,246.47'
0
0
to
i`
t-.GB-60?i
/
75+00
L15
100+00
0
cc
Z
W
Q
i5
100+00
5+00
0
0
+
0
GB-584
s
PC STA 104+17.24
10+62
L14
NT 59' 56'W
1,061.52'
80+00
0
>-
0 CURVE DATA
e= 9.99'
R = 2000.00'
T = 174.73'
L = 348.58'
PC STA 103+36.90
CURVE DATA
= 9.99'
R = 1965.00'
T = 171.67'
L = 342.48'
105+00 —
105+00
GB-61
C13
C4
PRC STA 106+79.38
— L23
CURVE DATA
e = 9.72'
R = 2035.00'
T = 172499'
L = 345.16'
McHARD RD
90+00
GB-59 1 I t t ( t I
PRC STA 107+65.82
C5
85+00
N87' 00' 32't
44410.95'
CURVE DATA
e = 9.72'
R = 2000.00'
T = 170.02'
L = 339.22'
110+00
PT STA 111+05.04
11114111M
Y =alllir
C14
1 10+00
McHARD RD
PT STA 110+24.54
115+00
0
0
to
1
(✓
L►_!
Z
J
0
90+00
STA 95+00
0 50' 100' 200'
SCALE IN FEET
LEGEND
Boring
Boring
w/Piezometer
NOT FOR CONSTRUCTION
H6 DOCUUDTT IS RE EASED TOR DIE
PURPOSE OF 1RERIU REVIEW UNDER THE
AUDIORRY OF UEHRA I DAVAAUII P. .
EXAS H0: 40811 0R DATE: 7/6/2 16
R 6 001 TO BE USED FOR COHSTRucT10H,
DIDOfG OR PERUR PURPOSES.
FREESE
NICHOLS
11200 Broadway Street, Suite 2332
Pearlond, Texas 77584
Phone — (832) 456-4700
Fax — (832) 456-4701
Frees* and Nichols, Inc.
Texas Registered Engineering Firm F-2144
HORIZONTAL ALIGNMENT
DATA
McHARD ROAD
CULLEN BLVD TO MYKAWA RD
SHEET 5 OF 7
Texas Department of Transportation
2016
FED.RO.
D V.NO.
PROJECT N0.
SHEET
No.
6
STP 2014 (326) MM
67
STATE
01sr.
COUNTY
0
0
0
0
PLAN OF BORINGS
TEXAS
12
BRAZORIA
COY T.
SECT.
JOU
HIGHWAY N0.
912
31
290
CS
FIGURE 2.3
ri
0
1n
N
0
r-1
0
MATCH LINE STA
0
12+19
L4
McHARD RD
7
0
O
+
O
GB 62
L24
'- N87' 16' 37'E
1,148.29'
115+00
11+25
L17
0
0
0
S89' 00' 0411E 73.65'
N86' 49' 21 "E 293.76'
L6
IGB-64
L26
PI STA 138+60.95
5+00
L27
N3' 28' 41 "W
1,125,47'
0
0
1n
C-4
r
.101
140+00
L16
PC STA 122+53.33
120+00
[-- 00
GB-69 GB-70P
CURVE DATA
A = 16.17'
R = 2000.00'
T = 284.10'
L = 564.43'
125+00
ct
0
N87' 16' 37E
1,148.29'
N3' 04' 13"W
1,218,67'
0+00
PC STA 12
PI STA 140+16.11 McHARD RD
140+00
CURVE DMA
A = 16.17'
R = 1965.00'
T = 279.13'
L = 554.55'
145+00
17
PI 139+34.57
P1 S' G B-7212'45
GB-73
145+00
N86' 55' 2911E
2,040.19'
C6
125+00
PT Sl i 97+27.37
GB-71
S76' 33' 1211E
250.65'
L28
— PT STA 128+17.75
G B-63
L5
S76' 331 1211E
250.65'
130+00
PC STA 130+68.41
4411.4111111111.11°111111--- ”1111.11111"11.1111111
L25 130+00 �� pa
__-
CURVF DATA
A = 16.62'
R = 2000.00'
T = 292.19$
L = 580.28'
PT STA 136+48.69
135+00
PC STA 129+78.02
CURVE DATA
6 = 16.62'
R = 2035.00'
T = 297.31'
L = 590.44'
N86' 55' 2911E
2,038.95'
155+00
C7
C16
1
1
150+00
G B-74
z- 0+00
MATCH LINE STA
135+00
PT STA 135+68.46
0
0
N
0 50' 100' 200'
SCALE IN FEET
LEGEND
® Boring
Boring
w/Piezometer
NOT FOR CONSTRUCTION
THIS OOCUUDR 6 RELEASED FOR Inc
PURPOSE OF NTERRU RENEW UNDER THE
AUTHORITY OF LIDIRAN OAVARWI P.E.
TEXAS NO:46811 011 DATE:7/6/2016
R 6 NOT TO 8E USED FOR CONSTRUCTION,
0100010 OR PERUR PURPOSES.
FREESE
NICHOLS
11200 Broadway Street, Suite 2332
Pearlond, Texos 77584
Phone — (832) 456-4700
Fox — (832) 456-4701
Freese and Nichols, Inc.
Texos Registered Engineering Firm F-2144
HORIZONTAL ALIGNMENT
DATA
McHARD ROAD
CULLEN BLVD TO MYKAWA RD
SHEET 6 OF 7
AggeH Texas Department of Transportation
2016
FEORO.
DIV.NO.
6
STATE
PROJECT NO.
STP 2014 (326) MM
SHEET
Na
68
TEXAS
PLAN OF BORINGS 912
Dist.
12
SECT.
31
COUNTY
BRAZORIA
J00
290
HIGHWAY NO.
CS
1FIGURE 2.4
Job No. 1140215001
1486' 55' 29" E
2,040.19'
13+54
CURVE DATA
A = 4.86'
R = 2035.00'
T = 86.29'
L = 172.47'
PC STA 160+55.05
160+00
McHARD RD
PC STA 159+74,76
160+00
CURVE DATA
A = 4.86'
R — 2000.00'
T = 84.80'
L = 169.51'
GB-78
0
0
+
0
8
GB-76n
f
>-
0
GB-77j I
C-5
111110110.
L18
165+00
PC STA 164+81,95 —
N82' 04' O8"E
257 40'
L29
C17
C8
L9
N82' 04' O8"E
257.40'
CURVE DATA
A = 5.33'
R = 1965.00'
T = 91.53'
L = 182.92'
C9
C18 165+00
PC STA 164+04.63
PT STA 162+24.56
PT STA 161+47.23
N3' 30' 04'W
1,353.98'
0+00
CURVE DATA
A = 5.33'
R = 2000.00'
T = 93.16'
L = 186.18'
PT STA 166+68.13
— N87' 24' 09'E
732.99'
PT STA 165+87.55
GB-67
L30 —1
170+00
PI STA 173+20.54
170+00
L10
N87' 24' 09'E
1,528.74'
L31
N88' 18' 26"E
285,04'
175+00
175+00
PI STA 176+05.58
N87' 24' 09"E
454.76'
END STA 181+96.87
180+00
GB-68
180+00 —�
L32
END STA 180+60,34
0 50' 100' 200'
0
181+97
>—
SCALE IN FEET
LEGEND
Boring
Boring
w/Piezometer
NOT FOR CONSTRUCTION
THIS DOCUUUR 5 RELEASED FOR THE
PURPOSE OF I BERM REVIEW UNDER 111
AUTHORITY OF %EIIRAN DAVARWI P, .
TEXAS NO:488 1 ON UATE:7/6/2016
R IS INN 10 DE USED FOR CONSTRUCTION,
8100R1C OR PERUIT PURPOSES.
FREESE
NICHOLS
11200 Broadway Street, Suite 2332
Pearlond, Texos 77584
Phone — (832) 456-4700
Fax — (832) 456-4701
Freese and Nichols, Inc.
Texos Registered Engineering nrm F-2144
HORIZONTAL ALIGNMENT
DATA
McHARD ROAD
CULLEN BLVD TO MYKAWA RD
SHEET 7 OF 7
a* Texas Department of Transportalion
2016
FED.RO.
DIVNO.
6
srATE
PROJECT NO.
STP 2014 (326) MIA
SHEET
N0.
69
DIST.
12
SECT.
31
COUNTY
PLAN OF BORINGS
TEXAS
CON T.
912
BRAZORIA
JoO
290
IIIOHWAY NO.
CS
FIGURE 2.5
1140215001
z
O
ti
E
to
-o
Z
a.
0
0
a.
0
to
.c
0
0
I }.SPHA T UZIVE
PROP. 30'
EDRAINAGE/ACCESS EST
PROP 2-6'X4' RCB 1 Rr� cFt\T
in GRAVEL
PROP. BACKSLOPE
INTERCEPTOR STURCTURE
SIMMONS %MA ISIS' Ili
MI MOM
IS
OM OEM WM
WENN
MU
PROP. BACKSLOPE
INTERCEPTOR STURCJ RE
E
POND SUMMARY
PROPOSED
POND cc-1_
G B-80
PROP. BACKSLOPE
INTERCEPTOR STURCTURE
BWF
PROP. 195' DE
STORM WATER DETENTION REQUIRED - 13.2 AC -FT
FLOODPLAIN MITIGATION REQUIRED - 1,0 AC -FT
TOTAL POND VOLUME REQUIRED - 14,2 AC -FT
TOTAL POND VOLUME PROVIDED - 18.0 AC -FT
100-YR W S E - 47.0 FT
OUTFALL STRUCTURE - 1-6'X4' BOX AT EL. 34.70 FT
BARBWIRE FENCE/TR
GB-81P __
� ,1
PROP. BACKSLOPE
INTERCEPTOR STURCTURE
E LINE
RARBWIRE FENCE/TREE LIN
C �.
NNW WSW
-- IN gliMIAA
IA _ _ iGB-rail
G�� SII
MIINEEMI OM VMS
has��� NISI
\\\\\\ "' : MINIM Illkh,1111111111,
)
PROPOSED _
PON[4N 1 45
PROP. 195' DE
PROP. INTERCEPTOR
STURCTURE
PROP. BACKSLOPE
INTERCEPTOR STURCTURE
BARBWIRE FENCE
PROPERTY LINE
LEGEND
Boring
Boring
w/Piezometer
\ PLAN OF BORINGS
PROP. 140' DE \ r
FROM CLEAR CREEK
CENTERLINE (PER BDD4)
'III�X4' RCB
tGBGB-84
GC ENGINEERING, INC.
2505 Park Avenue, Pearland, Texas 77581
PH: 281-412-7008, FAX: 281-412-4623
TBPE Registration No. F-7889
NOT FOR CONSTRUCTION
7HIS DOCUVEITT IS RELEASED FOR THE
PURPOSE OF MERIII REVIEW UUOER THE
AITRTORJTY OF A VAHEIWRA ROL IGO, P.E.
TEXAS NO: 87523 ON DATE: 01/19/2016
IT 15 NOT TO BE USED FOR COISTRUCIWN,
HODIHG OR PERMIT PURPOSES.
NICHOLS
11200 Broadway Street, Suite 2332
Pearland, Texas 77564
Phone — (832) 456-4700
Fax — (832) 456-4701
Freese and Nichols. Inc.
Teach s Registered Engineering Firm F-2144
McHARD ROAD EXTENSION
DRAINAGE
OVERALL POND LAYOUT
FED.RD.
D V.NO.
6
STATE DIS
TEXAS 12
CANT. SECT. JOB
POND CC-1
SHEET 1 OF 4
PROJECT NO.
SHEET
NO.
110
COUNTY
BRAZORIA
HIGHWAY NO.
FIGURE 2,6
GB-51
ELEVATION IN FEET
35
25
15
5
-15
GENERAL NOTES:
1. See Figure 2.1 for approximate locotion of borings and profile section.
2. Doto concerning subsurface conditions hove been obtained of boring locations only.
Actual conditions between borings moy differ from the profile shown here.
3. See logs of boring for detailed description of soils encountered in each borehole.
4. See Figure 4 for symbols and obbreviotions used on this profile.
5. Ground surface elevotion at eoch boring location wos based on survey doto provided
to us by Frees and Nichols
GB-52
GB-53
GB-54
V/So-So
so-V/St CL
CH
Proposed 36" to 48"
Storm Sewer
45
35
25
15
-5
-15
ELEVATION IN FEET
BORING LOG PROFILE
McHard Road
0 200 400 600 800
HORIZONTAL SCALE IN FEET
Job No. 1140215001
Geotest Engineering, Inc.
FIGURE 3.1
GB-55
So-V/S
45
35
SC
So-V/S
CH
ELEVATION IN FEET
25
15
5
-5
-15
GENERAL NOTES:
Proposed 42" to 36"
Storm SSwer
GB-56
So -5
Lo
So -St
St-Hd
M/St-St
i
CH
SC
CH
CL
CL
1. See Figures 2.2 & 2.3 for approximate location of borings and profile section.
2. Data concerning subsurfoce conditions have been obtained at boring locations only.
Actuol conditions between borings may differ from the profile shown here.
3. See logs of boring for detailed description of soils encountered in eoch borehole.
4. See Figure 4 for symbols and abbreviations used on this profile.
5. Ground surface elevation at each boring location wos based on survey data provided
to us by Freese and Nichols
GB-58
So-V/S
CI Q
Si
So -St
CH
Stil':I
St
CL
CH
Proposed 30" to 36"
Storm Sewer
GB-60
St -V/St
St
St
M/St -St
t.
•
CL
CF
r.5
35
25
15
5
-5
-15
ELEVATION IN FEET
BORING LOG PROFILE
McHard Road
0 200 400 600 B00
HORIZONTAL SCALE IN FEET
Job No. 1140215001
Geotest Engineering, Inc.
FIGURE 3.2
Proposed 24" to 36"
Storm Sewer
ELEVATION IN FEET
45
35
25
15
-15
GENERAL NOTES:
GB-61
v/Sl
So-M/St
St
1. See Figures 2.3 & 2.4 for approximate location of borings and profile section.
2. Doto concerning subsurfoce conditions hove been obtoined at boring locutions only.
Actuol conditions between borings may differ from the profile shown here.
3. See logs of boring for detailed description of soils encountered in eoch borehole.
4. See Figure 4 for symbols and obbreviotions used on this profile.
5. Ground surfoce elevotion at eoch boring location wos bosed on survey doto provided
to us by Freese and Nichols
GB-62
GB-63
SM
CH
CL
CL
Proposed 24" to 42"
Storm Sewer
45
35
25
15
5
-15
w
w
ELEVATION IN
BORING LOG PROFILE
McHard Rood
0 200 400 600 800
HORIZONTAL SCALE IN FEET
Job No. 1140215001
Geotest Engineering, Inc.
FIGURE 3.3
55
GB-66
So-st
ELEVATION IN FEET
•5
35
25
15 —
5
-15
GENERAL NOTES:
1. See Figure 2.5 for opproximote location of borings and profile section.
2. Data concerning subsurface conditions have been obtained of boring locotions only.
Actuol conditions between borings moy differ from the profile shown here.
3. See logs of boring for detailed description of soils encountered in each borehole.
4. See Figure 4 for symbols and abbreviations used on this profile.
5. Ground surfoce elevotion at each boring location was bosed on survey dato provided
to us by Freese and Nichols
GB-67
Proposed 24" to 30"
Storm Sewer
- -- GB-68
So-V/St
St-V/St
V/St
MIMEINMEME
3 3
35
25
15
5
—5
-15
ELEVATION IN FEET
BORING LOG PROFILE
McHard Road
0 200 400 600 800
HORIZONTAL SCALE IN FEET
Job No. 1140215001
Geotest Engineering, Inc.
FIGURE 3.4
NI
O
33 NI NOIVA31:1
L-8J dOL-8O
•
o
V)
I
ton
N
>
Nii
(n
r
0
,(//0y•(/'
•
..!:•/:%'•
•
•//
t
///
/!�
••
.' .
•
-I
VI
>
>
I
0
J
o
0
fr/
C
to
N
N
N
1)
N
N
V
M
1333 NI NOIIVAJ13
NG LOG PROFILE
Cn
W
O
Z
O CY
LLI
w
0
0
0
0
0
0
N
O
Detention Pond HS-1
_T
0
O
p
O
L.,3 a)
U C
• •L L c
O tn 44
N .O -0 = C
• 0 -0
2O :,- O
o_� O OC
O OL c
N y 0 O
oEm3
•� • C O 00 c
O k.-(1)y0
d , O
O
O N (n
C—
C t O• D o.0
O >�p 0 c
ol
o c E O N O
O to
U OLJAPI
O O
- C C O
O 00O�0
E �0a'c°'
• �•9 0�. rn
O O c O N O 0
p _0 a)-oc C
o D 3 •z
• N TO
p • ND �N °j�
N .0 L O
C L
N• . c.0.0o uQ)
• Did OW
N C O
N U p O
3 C 0 to O
• O
Op O(N
o O N p
0) O O O 0
Cn OQ(n V)"
N l(]
HORIZONTAL. SCALE IN FEET
Jab No. 114021 001
Geotest Engineering, Inc.
FIGURE 3.5
55
ELEVATION IN FEET
45
35
25
15
5
-15
GENERAL NOTES:
v/So
GB-72
S/Co
So-V/St
V/So
GB-73
s7;17\74.
V/So
CH
1. See Figures 2.4 & 2.5 for opproximate locotion of borings and profile section.
2. Dota concerning subsurface conditions hove been obtained at boring locotions only.
Actuol conditions between borings may differ from the profile shown here.
3. See logs of boring for detailed description of soils encountered in eoch borehole.
4. See Figure 4 for symbols and abbreviations used on this profile.
5. Ground surfoce elevation at each boring location was bosed on survey doto provided
to us by Freese & Nichols.
Approx. Bottom
of the Pond at El. 37.5 ft.
to El. 39 ft.
GB-76
GB ,••�
so -sr
CL
V/So-V/St
ML
CL
CH
V/So-St
CH
GB-77
GB-78
55
45
35
25
15
5
-15
ELEVATION IN FEET
BORING LOG PROFILE
Detention Pond HS-2
0 150 300 450 600
HORIZONTAL SCALE IN FEET
Job No. 1140215001
Geotest Engineering, Inc.
FIGURE 3.6
5 _-
GB-80 GB-81P
ELEVATION IN FEET
35
25
15
5
-5
—15
GENERAL NOTES:
1. See Figure 2.6 for approximate location of borings and profile section.
2. Data concerning subsurfoce conditions hove been obtained of boring locotions only.
Actual conditions between borings moy differ from the profile shown here.
3. See logs of boring for detailed description of soils encountered in each borehole.
4. See Figure 4 for symbols and abbreviations used on this profile.
5. Ground surface elevotion at each boring location was bosed on survey doto provided
to us by Freese & Nichols.
GB-82
S��v7Si T. GB-83
•
GB-84
Approx. Bottom
of the Pond at El. 35.5 ft. to
El 34.5 ft,
c'5
-445
35
25
15
5
—5
—15
ELEVATION IN FEET
BORING LOG PROFILE
Detention Pond CC-1
0
100
200
300
400
HORIZONTAL SCALE IN FEET
Job No. 1140215001
Geotest Engineering, Inc.
FIGURE 3.7
0
0
in
r.. o SYMBOLS AND ABBREVIATIONS USED ON BORING LOG PROFILE
Ti-
,
0
Z LEGEND
a
0
CLAY SAND SILT CLAY, Sandy CLAY, Silly SAND, Clayey SAND. Silty
a
s
°o
401i ao°o° __
SILT. Clayey SILT, Sandy GRAVEL FILL SANDSTONE SHALE or LIMESTONE
or SILTSTONE CLAYSTONE
I .0074
JUL
e¢c a id{1n
dPJuL
MUCK, PEAT ASPHALT CONCRETE BRICK SHELL BLACKBASE RUBBLE
or LIGNITE or HMAC or DEBRIS
— v.v.
4 z
rsAe
♦LAG 'EM Depth of Water Depth of Water after
SLAG PAVEMENT Encountered During Completion of Boring
Drilling (for details see
individual boring log)
ABBREVIATIONS USED FOR CONSISTENCY/DENSITY
COHESIVE SOILS COHESIONLESS SOILS
V/So : Very Soft V/Lo : Very Loose
So : Soft Lo : Loose
Fm : Firm S/Co : Slightly Compact
M/St : Medium Stiff Co : Compact
St : Stiff M/De : Medium Dense
V/St : Very Stiff De : Dense
Hd : Hord V/De : Very Dense
V/Hd : Very Hard
Geotest Engineering, Inc.
FIGURE 4
SKIN FRICTION DESIGN
WinCoCounty Brazoria Hole GB-49 District Houston
Version 1.1
Highway McHard Road Structure Traffic Signals Modification Date 1-6-16
Control 0912-31-290 Station 0+84.4 Grnd.Elev. 51.30 ft
.`, Offset 31.6'RT GW Elev. NIA
Drilled Shaft Design: Soil Reduction Factor= 0.7
TAT Friction Values Used
Skin Friction Limit=0.88 tsf per
TxDOT Houston District Practice Unit Frictional Resistance(TISF)
0 1 2 3 4
+51.3
0
P,
41.3
10
N
+31.3
20
E
D
(\o‘"
e
I
+21.3 C. ..., ____°JmeV+off 30 p
I.C.
vt
i4-
Unit Frictional Resistance
• h
(Ft) +11.3
40 (Ft)
+ 7.3
50
•
87 - 60
Note: The designer should take into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-18.7 70
tea` 0 5 10 15 20 25 30
Accumulative Friction(TIF) FIGURE 5.1
SAGeotechnical lobs\1 a@150n1Cny of Pearland Mciard Road Expans'on WNCore Design\14021 W%Jloadway_storm sewee_Tremc elgnals_0B49.56.5860s2,64,68 C10
/ .
SKIN FRICTION DESIGN
WinCore
Version 3.1 County Brazoria Hole GB-56 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-11-16
Control 0912-31.290 Sta0on 58+00.00 Grnd.Elev. 50.10 ft y
Offset 10'RT GW Elev. NIA 'u
Drilled Shaft Design: Soil Reduction Factor= 0.7
TAT Friction Values Used
Skin Friction Limit=0.88 tsf per
TxDOT Houston District Practice Unit Frictional Resistance(T/SF)
0 1 2 3 4
+50.1 0
+40.1 10
+30.1 20
�t`o00
E ______ `oJae D 3
F� V
+20.1 ie.,V+00).
30 e
e — p
✓ t
4—Unit Frictional Resistance
•
h
(Ft) +10.1 40 (Ft)
+0.1 50
-9'9 Note: The designer should take into account the effects of - 60
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-19.9 70
0 5 10 15 20 25 30Nod
Accumulative Friction (T/F) ----- FIGURE 5.2
S rGeoledmieal Joes11140215001 Guy of Pearland McHard Road ExpansionIWinCore Resign l 140215001 Roa&way Storm Sewer imhc Sigmis_GB4956,5B,60.6$64,68.GLG
. F SKIN FRICTION DESIGN
/ L
WinCore County Brazoria Hole GB-58 District Houston
Version 3.1
Highway McHard Road Structure Roadway/Storm Sewer Date 1-7-15
Control 0912-31-290 Station 78+09.3 Grnd.Elev. 50.00 ft
/few Offset 9.9'LT GW Elev. N/A
Drilled Shaft Design: Soil Reduction Factor= 0.7
TAT Friction Values Used
Skin Friction Limit=0.88 tsf per
TxDOT Houston District Practice Unit Frictional Resistance(T/SF)
0 1 2 3 4
+50 0
\ i
li
it
1 \
+40 10
+30 i 20
E Iomd`oO`le c`\oo D
\P'SP
V I e
+20 30
e I \ P
v t
I,1'unuFrictional Resistance h
+•
10 40
(Ft) (Ft)
0 50
•
-10 - 60
Note: The designer should take into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-20 70
0 5 10 15 20 25 30
Accumulative Friction (T/F) FIGURE 5.3
S\Geol hnical Jobs11140215001-City M Pear'kind McHard Road ExpenslonlWlnCora Dmign1140215001_Roadway_Slorm Sewer Tran S'grals_GB49,$586062.646 CLG
SKIN FRICTION DESIGN
• WinCore County Brazoria Hole GB-60 District Houston
Version 3.1
Highway McHard Road Structure Roadway/Storm Sewer Date 1-2846
Control 0912.31-290 Station 98+36.9 Grnd.Elev. 50.00 ft }
Offset 14 LT GW Elev. N/A V
Drilled Shaft Design: Soil Reduction Factor= 0.7
TAT Friction Values Used
Skin Friction Limit=0.88 tsf per
TxDOT Houston District Practice Unit Frictional Resistance(T/SF)
0 1 2 3 4
+50 0
40 j 10
V
30 20
E D
e
+20 \
n 30
e pccomulaii
✓ \ eptica° P
r t
Unit Frictional Re,' h
(Ft) +10 nce 40 (Ft)
0 50
-10 - 60
Note: The designer should take Into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-20 70
0 5 10 15 20 25 30
Accumulative Friction (TIF) ----- FIGURE 5.4
S IGeotechnrcal Jobs1114021500lL'y of Pearfand McHard Road ExpansioclWnCore Oesign1114021300I_Roadway_61orm SewerTrafm elgnaIs_GO49.56.56.60.62i64,66 CLO
SKIN FRICTION DESIGN
WinCore
Version 3.1 County Brazoria Hole GB-62 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-11-16
Control 0912-31-290 Station 118+00.8 Grnd.Elev. 48.90 ft
Name Offset 15.9'LT GW Elev. NIA
Drilled Shaft Design: Soil Reduction Factor= 0.7
TAT Friction Values Used
Skin Friction Limit=0.88 tsf per
TxDOT Houston District Practice Unit Frictional Resistance(T/SF)
0 1 2 3 4
+48.9 0
\-11
+38.9 --`-� 10
oc
v
+28.9 pc° 20
ie
m5
9
E et
D
V-
i
\/ I e
+16.9 30
e 1 p
✓ \ t
r,Unit Frletio0al Reh
slstanea
(Ft) +8.9 40 (Ft)
-1.1 50
-11.1 - 60
Note: The designer should take into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-21.1 70
%ow 0 5 10 15 20 25 30
Accumulative Friction(T/F) FIGURE 5.5
SrGeoledinical Jobs11140215001Lily of Pearland McHard Road Expanelen\P(nCore Gesipn11140215001 Roa*ay_Storm Sewer—Traffic Signals_G13495656,60. 2v4.66.CLG
--A- SKIN FRICTION DESIGN
WinCore County Brazoria Hole GB-64 District Houston
Version 3.1
Highway McHard Road Structure Roadway/Storm Sewer Date 1-8-16
Control 0912.31-290 Station 139+39.9 Grnd.Elev. 47.30 ft
Offset 10.1'RT GW Elev. N/A
Drilled Shaft Design: Soil Reduction Factor= 0.7
TAT Friction Values Used
Skin Friction Limit=01181st per
ThDOT Houston District Practice Unit Frictional Resistance(T/SF)
0 1 2 3 4
+47.30
•
•
•
•
+37.3 — 10
+27.3 _ 20
E aoo D
Qac
+17.3 ---� �a 30
e N ooF P
pc
v r t
r–Unit Frictional Resistan
•
ce
(Ft) +7.3 40 (Ft)
-2.7 50
-12.7 Note: The designer should take Into account the effects of 60
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design Up
penetration.
-22.7 70 }
0 5 10 15 20 25 30 ‘•+/
Accumulative Friction(T/F) ------ FIGURE 5.6
S\Geatetntcal Jcbs/140215001 City of Pearland McHard Road Expansion\Wneore Design 1140215001Roadway_Sbnn Sewer_Traffic Signals GB49,56.586062,646e6LG
. 4' SKIN FRICTION DESIGN
7th.
WinCore
Version 3.1 County Brazoria Hole GB-68 District Houston
Highway McHard Road Structure Traffic Signals Modification Date 2-1-16
Control 0912-31-290 Station 181+20.2 Grnd.Elev. 44.70 ft
Niare Offset 15.3'RT GW Elev. NIA
Drilled Shaft Design: Soil Reduction Factor= 0.7
TAT Friction Values Used
Skin Friction Limit=0.88 tsf per
TOOT Houston District Practice Unit Frictional Resistance(T/SF)
0 1 2 3 4
+44.7 0
N
+34.7 10
,
+24.7 00. 20
�aV�
\ Oc°�
P
E D
`eI + 14.7 \
veer
30
e _ p
Th
✓ \ t
• DnirF
nation
a/Resistants h
(Ft) +4.7 40 (Ft)
-5.3 50
-15.3 - 60
Note: The designer should take into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-25.3 70
view 0 5 10 15 20 25 30
Accumulative Friction(TIE) FIGURE 5.7
a‘Geotechnical Jobs\119@15001 Oily of 4earland Mo ave Road Expansion 1WInCore Design\11403153I_Roedway_$1wm Sewer Trapc Signals Ga<9.55,58,s0.e2646B CLG
Fe:-
SKIN FRICTION DESIGN
WinCore County Brazoria Hole GB-49 District Houston
Version 3.1
Highway McHard Road Structure Traffic Signals Modification Date 1-6-16
Control 0912-31-290 Station 0+84.4 Grnd.Elev. 51.30 ft
Offset 31.6'RT GW Elev. N/A
Piling Design: No Soil Reduction Factor
TAT Friction Values Used
Skin Friction Limit=1.25 tsf Unit Frictional Resistance(T/SF)
0 1 2 3 4
+51.3 0
•
+41.3 10
+31.3 20
E "ifD
Qs
�m
+21.3 p�o'S 30 e
e of P
V.
v
IV t
r—Unit Frictional Resistance h
(Ft) +11.3 40 (Ft)
+1.3 50
-8.7 Note: The designer should take into account the effects of -- 60
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
•
-18.7 70
0 5 10 15 20 25 30
Accumulative Friction (TIF) FIGURE 6.1
6\Geoteclmlml lchs\1140216001 Lily of Peetland McHard Road Eapens c4\WinCore Design1114021 c001Jtoadway_Slorm Sewer_Traffic S ynals OB4%56506062.61.6e CLG
.. ii' SKIN FRICTION DESIGN
Z
WinCore
Version 3.1 County Brazoria Hole GB-56 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-11.16
Control 0912-31-290 Station 58+00.00 Grnd.Elev. 50.10 ft
`V.+ Offset 10'RT GW Elev. NM
Piling Design: No Soil Reduction Factor
TAT Friction Values Used
Skin Friction Limit=1.25 tsf Unit Frictional Resistance(T/SF)
0 1 2 3 4
+50.1 0
7---
\ I
I
l\
+40.1 A
10
+30.1 I 20
aoo
E ��a� p
I
Ismer
+20.1 —__�. P° 30 e
e �J P
✓ L______,It-Unit Frictional Resistance t
h
•
(Ft) +10.1 40 (Ft)
+0.1 50
-9.9 •• 60
Note: The designer should take into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-19.9 - ' 70
0 5 10 15 20 25 30
Accumulative Friction(T/F) FIGURE 6.2
SiGeoletlmlval dob91110215001-Cny or Pearland McHard Road Expansion lwlncore oeilgnu 14021`001_Roadway_storm Sewer Tram SigneU ce4e,5 5660e2,5469.CLG
--* SKIN FRICTION DESIGN
WinCore County Brazoria Hole GB-58 District Houston
Version 3.1
Highway McHard Road Structure Roadway/Storm Sewer Date 1-7-15
Control 0912-31-290 Station 78+09.3 Grnd.Elev. 50.00 ft
g
Offset 9.9'LT GW Elev. NIA V
Piling Design: No Soil Reduction Factor
TAT Friction Values Used
Skin Friction Limit=1.251sf Unit Frictional Resistance(TISF)
0 1 2 3 4
+50 0
i
+40
10
J
+30 20
J
E 0tG. D
etNo a Nes'
lj
I
+20 { r PGGotc3p p
v
4—Unit Frictional Resistance \ t
h
+10 40
(Ft) (Ft)
0 50
-10 - 60
Note: The designer should take Into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-20 70
0 5 10 15 20 25 30
Accumulative Friction(TIF) --- - FIGURE 6.3
S'Geolecbnkal Jobs l 140215001.Ci1y of Pearland IMHerd Road ElpansonlWnCOre Gesign11140715001_Roadway_Slcrm Sewed Traflm Si9nals_GB49i56i59.60.62i64.68 LUG
SKIN FRICTION DESIGN
WlnCore
Version 3.1 County Brazoria Hole GB-60 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-28-16
Control 091241-290 Station 98+36.9 Grnd.Elev. 50.00 ft
'fir Offset 1T LT GW Elev. N/A
Piling Design: No Soil Reduction Factor
TAT Friction Values Used
Skin Friction Limit=1.25 tsf Unit Frictional Resistance(T/SF)
0 1 2 3 4
+50 0
+40 I \ 10
N
N
+30 1 20
\E D
L e +20 \; ka<`vopitcfloo 30 e
N°como p
v Jr t
t
unit Pt/Ctiona/ h
+ 10 Resistanee 40
(Ft) (Ft)
0 50
-10 - 60
Note: The designer should take into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-20 70
yew 0 5 10 15 20 25 30
Accumulative Friction(T/F) ----- FIGURE 6.4
S lGeolechnlrar.Mbs l 140215001 Cily of PearlaM McHard Road ExpanslonMincore Gas19A1140215001fRoadway Slorm Smwr liat Ix SlBnals G849,5S56,6n,62i64i6601G
-4 SKIN FRICTION DESIGN
le-
WinCore County Brazoria Hole GB-62 District Houston
Version 3.1
Highway McHard Road Structure Roadway/Storm Sewer Date 1-11-16
Control 091231-290 Station 118+00.8 Grnd.Elev. 48.90 ft
Offset 15.9'LT GW Elev. NIA Nacid
Piling Design: No Soil Reduction Factor
TAT Friction Values Used
Skin Friction Limit=1.25 tsf Unit Frictional Resistance(T/SF)
0 1 2 3 4
+46.9
0
+38.9
J 10
C4C
4�
+28.9 - -r-c—--r
cc 20
O
I
1 30
e
+ 18.9
e
P
v C t
f—Unit Frictional Resistance h
•
+8.9
40
(Ft) (Ft)
-1.1 50
-11.1 - 60
Note: The designer should take Into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-21A 70 J
0 5 10 15 20 25 30
Accumulative Friction (TIF) - —_----
FIGURE 6.5
S 1Geolechmcal lobs11I4021 W0)City of Pearlar✓I McHard Road ExpafsiorMinCore Despn111<0215001 RoaArry_Gidm Sewer_Traffic SignalsGe4956.58Gn,62,H.68.CLG
SKIN FRICTION DESIGN
WlnCore
Version 3.1 County Brazoria Hole GB-64 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-8-16
Control 0912-31-290 Station 139+39.9 Grnd.Elev. 47.30 ft
"ewe Offset 10.1'RT GW Elev. N/A
Piling Design: No Soil Reduction Factor
TAT Friction Values Used
Skin Friction Limit=1.25 tsf Unit Frictional Resistance(T/SF)
0 1 2 3 4
+47.3 0
1
+37.3 - 10
+27.3 20
00
E 0
te
�o
+ 17.3 „...2 4, 30 e
e 8�F P
\\KP
vt
r Unit Frictional Resistance
h
(Ft) +7.3 40 (Ft)
-2.7 50
-12.7 60
Note: The designer should take into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-22.7 70
fir'" 0 5 10 15 20 25 30
Accumulative Friction (T/F) --- -- FIGURE 6.6
S IGeolecbniwl Jobs11140215001 Clly of Pearland McHard Road ExpanslonlWinCore Design11140215001Roadway Storm SewerTrafIC Signals G849.56.50.60.62264,68.CIG
SKIN FRICTION DESIGN
it
WinCore County Brazoria Hole 09-66 District Houston
Version 3.1
Highway McHard Road Structure Traffic Signals Modification Date 2-1-16
Control 0912-31-290 Station 181+20.2 Grnd.Elev. 44.70 ft .
Offset 15.3'RT GW Elev. NIA "
S
Piling Design: No Soil Reduction Factor
TAT Friction Values Used
Skin Friction Limit=125 tsf Unit Frictional Resistance(T/SE)
0 1 2 3 4
+44.7 0
+34.7 10
1
+24.7 e 20
e�m
E m°�� D
Ie
+ 14.7
30
e t
N'N
✓ +-Unit Frictional Resistance \\ t
h
(Ft) +4.7 - 40 (Ft)
-5.3 50
-15.3 60
Note: The designer should take into account the effects of
seasonal moisture variation by subtracting the accumulated skin
friction at the depth to which seasonal moisture variation occurs
from the total accumulated skin friction at the design tip
penetration.
-25.3 70
Viti
0 5 10 15 20 25 30
Accumulative Friction (TIF) - — FIGURE 6.7
S 1Geolchnlcal.obs11140215001-Gly of Pearland mcHard Road Erpansim\WrnCore 0es'gn111402150e1Roadway_Sform Sewer_Trafm SIgnals_G849565866,6264.6btLG
4 POINT BEARING DESIGN
WinCore
Version 3.1 County Brazoria Hole GB-49 District Houston
Highway McNard Road Structure Traf0c Signals Modification Date 1-6-16
Control 0912-31-290 Station 0+04.4 Grnd.Elev. 51.30 ft
`r Offset 31.6'RT GW Elev. N/A
Diameters Below Tip Checked = 0
TAT Bearing Values Used
+ 51.30
+41.3 •
10
+31.3 20
E D
lir I e
+21.3 30
e I P
✓ t
h
(Ft) + 11.3 40 (Ft)
+ 1.3 50
-8.7 - — - 60
For Shaft Size: In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>24 inches and<48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist.
-18.7 I I I 70
Nor
0 1 2 3 4 5 6
Point Bearing (TSF)
FIGURE 7.1a
s IGeolechnlwl Jobs11140215001 Cily of Fearland McHard Road EapensionlW'nCve nesign1114021500I_Roadway_Slorm Sewed➢M SignalsGae9,56,,56,66,6164.68 CUB
-F POINT BEARING DESIGN
/ .
WinCore
Version 3.1 County Brazoria Hole G134.9 District Houston
Highway McHard Road Structure Traffic Signals Modification Date 1-6-16
Control 0912-31-290 Station 0+84.4 Grnd.Elev. 51.30 ft }
Offset 31.6 RT GW Elev. N/A head
Diameters Below Tip Checked= 0
TAT Bearing Values Used
+51.3 0
+41.3 10
+31.3 20
E D
I 30 a ',Si
+21.3
e P
✓ t
h
(Ft) +11.3 40 (Ft)
+1.3 50
-8.7 — 60
For Shaft Size In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist.
-18.7 ' I I
70Naid
0 1 2 3 4 5 6
Point Bearing (TSF)
FIGURE 7.1b
S.Geotechnical Jobs\1140215001-City of Pearland MoMard Road Evpansm\W'Core 0ssyn1114021501 Raadway_Smn Sewer_Traffic Signals GB9e56,58,60,62.54,69.CLO
POINT BEARING DESIGN
It
WinCore
Version 3.1 County Brazoria Hole GB.56 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-11-16
Control 0912.31-290 Station 58+00.00 Gmd.Elev. 50.10 ft
`e Offset 10'RT GW Elev. N/A
Diameters Below Tip Checked= 0
TAT Bearing Values Used
+50.1 •
0
•
+40.1 -- -- - - 10
+30.1 20
E D
`r I e
+20.1 30
e p
v - t
h
(Ft) +10.1 40 (Ft)
+0.1 50
-9.9 — - 60
For Shaft Size: In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>24 inches and<48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist.
-19.9 � I
°� 70
0 1 2 3 4 5 6
Point Bearing (TSF)
FIGURE 7.2a
S\Geolechnl®uoMtl1402155001 City of Pearland Mwam Road ExpanslenlwnGo a Design1114021500I Roadway_6Iorm sever Trams agnea—Ga49.56,50.00.6264.0a.CLG
it POINT BEARING DESIGN
/,. a
WinCore
Version 3.1 County Brazoria Hole GB-56 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-11-16
Control 0912-31-290 Station 58+00.00 Grnd.Elev. 50.10 tt
Offset 10'RT GW Elev. NIA
Diameters Below Tip Checked= 0
TAT Bearing Values Used
+50.1 0
+40.1 10
+30.1 20
E D
I 30 a Vi
+20.1
e P
✓ t
h
(Ft) +10.1 40 (Ft)
+0.1 50
-99 - 60
For Shaft Size • In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist.
-19.9 I I 70 ;i
0 1 2 3 4 5 6 J
Point Bearing(TSF)
FIGURE 7.2b
SAGeMxhnical Jobs11140216 1C4 of Pearland McHard Road Expansion\WnCore Design\114M16N1 Roadway_srwm Sewer_Tnlric Signals GB49,56.5560.6264,sa.CLG
POINT BEARING DESIGN
WinCore
Version 3.7 County Brazoria Hole GB-58 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-7-15
Control 0912-31-290 Station 78+09.3 Grnd.Elev. 50.00 ft
`w Offset 9.9'LT GW Elev. NIA
Diameters Below Tip Checked = 0
TAT Bearing Values Used
+50 0
+40 10
+30 20
E D
Nee I +20 - 30
e p
✓ t
h
+ 10 40
(Ft) (Ft)
0 50
-10 - — - 60
For Shaft Size: In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>24 inches and<48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist.
-20 70
‘0111' 0 1 2 3 4 5 6
Point Bearing(TSF)
FIGURE 7.3a
S\Gemec mica)Jcbs\1140215001-CIIy ci Pealend McHard Road E pansionlWincore Design\1140215001 Roadway_SIorm sewer_Traffic Signals GB4e5856,60,62,6488 LUG
POINT BEARING DESIGN
WinCoCounty Brazoria Hole GB-50 District Houston
Version
3.1
Highway McHard Road Structure Roadway/Storm Sewer Date 1-7-15
Control 0912-31-290 Station 78+09.3 Grnd.Elev. 50.00 ft
Offset 9.9'LT GW Elev. N/A
Diameters Below Tip Checked= 0
TAT Bearing Values Used
+50 0
+40 10
+30 20
E D
+20
30
e P
✓ t
h
(Ft) + 10 40 (Ft)
0 50
-10 - 60
For Shaft Size In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist.
_20 r 70
vead
0 1 2 3 4 5 6
Point Bearing(TSF)
FIGURE 7.36
S'.\Geotechnical Jcb%l l4OR15001 Llry of Pearand MCHartl Road @panslon1w1Core Oeslgn1114G215001_RoaMay_Slwm 6ewer_Trafc Signals GB49,56,5e.6o.6a64,ee CLG
-4 POINT BEARING DESIGN
WinCore
Version 3.1 County Brazoria Hole GB-60 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1.28-16
Control 0912-31-290 Station 98+36.9 Grnd.Elev. 50.00 ft
Now Offset 12'LT GW Elev. N/A
Diameters Below Tip Checked= 0
TAT Bearing Values Used
+50 0
+40 I 10
+30 i 20
E D
'V I +20 30
e f p
✓ t
(Ft) +10 40 (Ft)
0 50
-10 - - 60
For Shaft Size: In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>24 inches and<48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist.
-20 70
0 1 2 3 4 5 6
Point Bearing (TSF)
FIGURE 7.4a
51Geotec nlwl Jobs11140215001-Ci1y o1 Pearland MCNaM Road Expansion\WiOMe Desian1114021 WOt Roa&ay_Slo,m Sever Traffic Signals Ga4e56,68,60,6264,68 LIG
-# POINT BEARING DESIGN
WinCore County Brazorla Hole GB-60 District Houston
Version 3.1
Highway McHard Road Structure Roadway/Storm Sewer Date 1-28-16
Control 0912-31-290 Station 98+36.9 Grnd.Elev. 50.00 ft
Offset 12'LT GW Elev. N/A
Diameters Below Tip Checked = 0
TAT Bearing Values Used
+50 0
+40 10
+30 • 20
E D
I 'wed
+20 - 30 e
e P
✓ t
h
(Ft) +10 40 (Ft)
0 50
-10 - - 60
For Shaft Size In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers, if exist.
-20 ' , 70 y
0 1 2 3 4 5 6 V
Point Bearing (TSF)
FIGURE 7.4b
s.Geo:echncai aobs\1 1 4°215W1-city of Peariend mcHard Road ExpansionMincore Deslem1 ta0215W1_Raadway_storm Sewer_Traffic Signala_GB49,5650.60,e2,54.606LG
POINT BEARING DESIGN
WinCore
Version 3.1 County Brazoria Hole GB-62 District Houston
Highway McHard Road Structure RoadwaylStorm Sewer Date 1-11-16
Control 0912-31-290 Station 118+00.8 Grnd.Elev. 48.90 ft
Near Offset 15.9'LT GW Elev. N/A
Diameters Below Tip Checked= 0
TAT Bearing Values Used
+48.9 0
I _
+38.9 I 10
+28.9 20
E D
bar +18.9 - 30
e p
✓ t
h
(Ft) +8.9 40 (Et)
-1.1 50
-11.1 - — - 60
For Shaft Size: In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>24 inches and<48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist,
-21.1 70
Now 0 1 2 3 4 5 6
Point Bearing (TSF)
FIGURE 7.5a
S Weoledimml Jobs\1140215001-City of PeaLnd McHerd Road Expansion\WinCore Design11140215001_Roa wsy Slmm Sewer_Traffic Signals GB4956,58,6g6264,6B.CLG
Az.,
POINT BEARING DESIGN
WinCore
Version 3.1 County Brazoria Hole GB-62 District Houston
Highway McHard Road Structure RoadwaylStorm Sewer Date 1-11-16
Control 0912-31-290 Station 110+00.8 Grnd.Elev. 48.90 ft
Offset 15.9'LT GW Elev. N/A NS old
Diameters Below Tip Checked= 0
TAT Bearing Values Used
+48.9 0
+ 38.9I 10
n
+28.9 I 20
E I D
I 30 a IS
+18.9
e P
V t
h
(Ft) +8.9 40 (Ft)
-1.1 50
-11.1 - - 60
For Shaft Size In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist.
-21.1 70
0 1 2 3 4 5 6
Point Bearing (TSF)
FIGURE 7.5b
S IGeoU[M1mrel Jabs 110 0 21 5 001 Odyof Pearland McHard Road ErpanslwlWnCora Design\1140215001_Roadway_Slorm Sewer Traffic Signals_GB4955,58.6062 6.66 CtG
POINT BEARING DESIGN
WinCore
Version 3.1 County Brazoria Hole GB-64 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-8-16
Control 0912-31-290 Station 139+39.9 Grnd. Elev. 47.30 ft
Offset 10.1'RT GW Elev. N/A
Diameters Below Tip Checked= 0
TAT Bearing Values Used
+47.3 0
J
+37.3 10
•
+27.3 20
E D
+ 17.3 — 30
e p
•
V t
h
+7.3 40
(Ft) (Ft)
-2.7 50
•
-12.7 - — - 60
In developing the shaft capacity,the designer should check
For Shaft Size: if softer/weaker layers exist within two shaft diameters of
>24 inches and<48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist.
-22.7 � � 70
0 1 2 3 4 5 6
Point Bearing (TSF)
FIGURE 7.6a
s.lceotechnital JWsn 140215001 City of Peanand Md4aro Road ErpenaonNincore Design11140215001_Roa&vey_stem sever TraKc slab Ga49,G6,5e,W,63.646S 0Lc
1=-
POINT BEARING DESIGN
WinCore County Brazoria Hole GB-64 District Houston
Version 3.1
Highway McHard Road Structure Roadway/Storm Sewer Date 1-8-16
Control 0912-31-290 Station 139+39.9 Grnd.Elev. 47.30 ft
Offset 10.1'RT GW Elev. NIA vvel
Diameters Below Tip Checked= 0
TAT Bearing Values Used
+47.3 0
+37.3 10
+27.3 20
E D
+17.3 30
e p
v
t
h
(Ft) +7.3 40 (Ft)
-2.7 50
-12.7 - - 60
For Shaft Size In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers,if exist.
-22.7 70 J
0 1 2 3 4 5 6
Point Bearing (TSF)
FIGURE 7.6b
s:1Geoechnlcal 1Ms11140215001QIy W Peartand F&Hard Road EwansleMwincore neslenu 140215001_Rwtlway_Stormm sewer traffic eignals_GB495858,60.6$64,se.CLG
POINT BEARING DESIGN
WinCore
Version 3.1 County Brazoria Hole GB-68 District Houston
Highway McHard Road Structure Traffic Signals Modification Date 2.1-16
Control 0912-31-290 Station 181+20.2 Gold.Elev. 44.70 ft
`/ Offset 15.3'RT GW Elev. N/A
Diameters Below Tip Checked = 0
TAT Bearing Values Used
+44.7 0
+34.7 - - - 10
\+24.7 - 20
E D
Isar- I e
+ 14.7 30
e p
✓ t
h
(Ft) +4.7 40
- (Ft)
-5.3 50
-15.3 - - 60
In developing the shaft capacity,the designer should check
For Shaft Size: if softer/weaker layers exist within two shaft diameters of
the proposed tip and should use allowable point bearing
>24 inches and<_48 inches values of the underlying softer/weaker layers,if exist.
-25.3 I 70
0 1 2 3 4 5 6
Point Bearing (TSF)
FIGURE 7.7a
S IGeoled nivel Jobs1114O215001-Cly of Penland Md a,E Road Espanslmlw'Cole Design111 W21`A01_RoaWay_$bnn Sewer_Traffic Gignals_GB4O h,5R6n,a{6O,S&CLG
-* POINT BEARING DESIGN
WinCore
Version 3.1 County Brazorla Hole GB-66 District Houston
Highway McHard Road Structure Traffic Signals Modification Date 2-1-16
Control 0912-31-290 Station 181+20.2 Grnd.Elev. 44.70 ft
Offset 15.3'RT GW Elev. N/A
Diameters Below Tip Checked= 0
TAT Bearing Values Used
+44.7 0
+34.7 10
+24.7 20
E D
+14.7 30 e
e P
v
t
h
+4.7 40
(Ft) (Ft)
-5.3 50
-15.3 - — 60
For Shaft Size In developing the shaft capacity,the designer should check
if softer/weaker layers exist within two shaft diameters of
>48 inches the proposed tip and should use allowable point bearing
values of the underlying softer/weaker layers, if exist.
-25.3 70 j
0 1 2 3 4 5 6 ter/
Point searing(TSF)
FIGURE 7.7b
SlGenletfmcal Jolas11140215001-City of Penland MWand Road ExpansimlWlnCare nesign1114021 W0t Roadway—S1am Sewer Traffic Signals_G949.56,58.60,62,64,68 CIG
O
O
v q
z NOME x
d
o H/4
•
H COHESIVE Pa= H/2 + +
H/4
•
— —I
k- RH P'
TYPICAL SOIL PARAMETERS BRACED WALL
See Table 3 for typical For yH/c s 4
values of soil parameters -
Pi=0.3y.'H
P.=y.H=62.4 H
P.=0.5q
Where:
yd=Submerged unit weight of cohesive soil,pcf;
y.=Unit weight of water,pcf;
q =Surcharge load at surface,psf,
P.=Lateral pressure,psf,
P,=Active earth pressure,psf;
P.=Horizontal pressure due to surcharge,psf;
P.=Hydrostatic pressure due to groundwater,psf;
H =Depth of braced excavation,feet
c =Shear strength of cohesion soil,psf;
EXCAVATION SUPPORT EARTH PRESSURE
\.. SUBMERGED COHESIVE SOIL
Geoteet Engineering, Inc.
FIGURE 8.1
0
CD
,
EEO T
H/4
d COHESIVE
z -
Pi
0
.)
COHESIONLESS •
or
H SEMI-COHESIONLESS H/2 + +
pa=
•
COHESIVE IT
H/I4
i
F— Pa —'I Pq—I
TYPICAL SOIL PARAMETERS BRACED WALL
See Table 3 for typical PI - 0.3 Inavg H
values of soil parameters Pw - Yw H - 62.4 H
Pei - 0.5q
Vel d + Y5' (e-d) + (R-e)
Y avg - H
Yw - 62.4 pcf
Where:
= Submerged unit weight of cohesive soil,pcf
7.1 = Submerged unit weight of cohesionless or semi-cohesionless soil,pcf;
y- - Unit weight of water, pcf;
.yc.r = Average submerged unit weight of soil,pcf;
q = Surcharge load at surface,psf;
P, = Lateral pressure,psf;
P, =Active earth pressure,psf;
Pa = Horizontal pressure due to surcharge,psf;
P„ = Hydrostatic pressure due to groundwater,psf;
H = Depth of braced excavation,feet
EXCAVATION SUPPORT EARTH PRESSURE
SUBMERGED COHESIVE SOIL
INTERBEDDED WITH COHESIONLESS OR
SEMI-COHESIONLESS SOIL
Geotest Engineering, Inc. •
FIGURE 8.2
O
O
h
Iwo
OMEN =
z -
H/4
d COHESIVE
— R
H Pa= + +
/.H
COHESIONLESS
w
SEMI.COIfSIONLESS
PI I, I —I
I- P.' kP'
TYPICAL SOIL PARAMETERS BRACED WALL
`' See Table 3 for typical
values of soil parameters
P�=0.3y'...H
y,'d+y;(H-d) P.=62.4 H
H
Where:
y.' =Submerged unit weight of cohesive soil,pcf;
y.' =Submerged unit weight of cobesionless soil,pcf;
y'm=Average submerged unit weight of soils,pcf;
q =Surcharge load at surface,psf;
P. =Lateral pressure,psf
P� =Active earth pressure,psf,
P. =Horizontal pressure due to surcharge,psf,
=Hydrostatic pressure due to groundwater,psf,
H =Depth of braced excavation,feet
EXCAVATION SUPPORT EARTH PRESSURE
v.. SUBMERGED COHESIVE SOIL OVER
COHESIONLESS OR SEMI-COHESIONLESS SOIL
Geotest Engineering, Inc. FIGURE 8.3
0
0
CUT IN COHESIVE SOIL,
DEPTH OF COHESIVE SOIL UNLIMITED (T>0.7 Bd)
L = LENGTH OF CUT
ad
isia
��
WWI
1427:1 13
FAILURE SURFACE
If sheeting terminates at base of cut:
NcC
Safety factor, Fs =
y H + q
Ne = Bearing capacity factor, which depends on dimensions of the excavation :
Bd , L and H (use Nc from graph below)
C = Undrained shear strength of day in failure zone beneath and surrounding
base of cut Ned
y = Wet unit weight of soil:(see Table 3)
q = Surface surcharge (assumed q=500 psf)
If safety factor is less than 1.5, sheeting or soldier piles must be carried below the base of cut to
insure stability -(see note)
NIBuried length = Ed 2 5 feet Note : If soldier piles are used, the
2 center to center spacing should
not exceed 3 times the width or
Force on buried length, PH: diameter of soldier pile .
2 Bd
If Ht >— — , PH = 0.7 (y HBd - 1.4CH - nCBd) in lbs/ linear foot
3 V2
2 Bd 1.4CH
If H, <— — , PH = 1.5H1 (y H - — - 4C) in lbs/linear foot
3 ✓2 B4
9
a
7 - �
5 i 2 3 4 5' STABILITY OF BOTTOM
0
H/Bd FORNed
For trench excavations BRACED CUT
For squore pit or circle shaft
Genies! Engineering, inc.
FIGURE 9
VERTICAL STRESS, psf
in
O
Weir c
0 60 t'20 180 240 300 - 360
n 10
20
ui
Er
u.
0 30
o.
a
Ll
° 40 I
`v
I
50 ' -
60
Legend:
One passing truck
Two passing trucks
_ _ _ Four passing trucks
Notes: 1. The vertical stress wos estimated using AASHTO H2O or HS20 truck axle
loadings on paved surfaces.
2. Impact factor was included in the vertical stress.
VERTICAL STRESS ON PIPES
DUE TO TRAFFIC LOADS
♦r
Ceotest Engineering, Inc.
FIGURE 10
0
0
o PI •
! 11111111111111
$ P2 2
• •
• O
•
•
P3 111111 11ii1i1 3
P1 4.014
P1 = [ (H + ) x (Y — Yv) + Dw x yw1 + qs , for Dw< H + 2
Pl = [ (H + 2) x7) + qs , for D>_ H + 2
P2 = (H x Y)+ qs
P3 = [ (H + D) x y1+ qs
Where: P1, P2, P3 = Tunnel liner load, psf.
D = Tunnel outside diameter, ft.
H = Depth to top of tunnel; ft.
Dw = Depth to ground water level; ft.
7 = Wet unit weight of soil, pcf (seeTable4)
Yw = Unit weight of water, 62.4 pcf
qs = Surcharge load, psf.
EARTH PRESSURE
ON PIPE AND CASING AUGERING Ned
Genies! Engineering, Inc. FIGURE 11
Niro
fly.
z I
S
a
a
H .
COHESIVE = H + +
•
Ia
P,
SRH HH
TYPICAL SOIL PARAMETERS PERMANENT WALL
NS, R=K.y.H
See Table 3 for typical
values of soil parameters P.=y.H=62.4 H
P.=0.5q
Ka= 1.0
Where:
y.' =Submerged unit weight of cohesive soil,pcf;
=Coefficient of at-rest earth pressure in cohesive soil;
y. =Unit weight of water,pef;
q =Surcharge load at surface,psf;
P. =Lateral pressure,psf;
P, =At-rest earth pressure,psf;
P. =Horizontal pressure due to surcharge,psf;
P. =Hydrostatic pressure due to groundwater,psf,
H =Depth of excavation,feet
LATERAL EARTH PRESSURE DIAGRAM
FOR PERMANENT WALL
1r
SUBMERGED COHESIVE SOIL
Coolest Engineering, Inc. FIGURE 12.1
0 9
d COHESIVE , d
z
e 1 ®Plc
e
COHESIONLESS
or
SEMI-COHESIONLESS Pa= Ile
- + +
� •
c
COHESIVE
11•1111111111
P •3 •
DPW Pq
TYPICAL SOIL PARAMETERS PERMANENT WALL
Pm=y'.dKa
See Table 3 for typical
values of soil parameters Pa=y'°d I{a'
Pas Pas '.(e-d)K„
IC0(= 1.0
Kos= 1 -sin+.
_ [y'.d+'t''.(e-d))K�
Ps=(Y=d+y'.(e-d)+y'.(H-e)I K.
=62.4 psf
Pa=y„H=62.4H
_
Where:
Pv=0.5q
y,' = Effective unit weight of cohesive soil,pcf;
y, ' = Effective unit weight of cohesionless or semi-cohesionless soil, pcf;
•
4), = Internal friction angle of cohesionless or semi-cohesionless soil, degree;
= Coefficient of earth pressure at rest in cohesive soils;
Ko„ = Coefficient of earth pressure at rest in cohesionless or semi-cohesionless soil;
y„ = Unit weight of water, pcf;
q = Surcharge load at surface, psf;
P, = Lateral pressure, psf;
Pf, P. Pa = Earth pressure at rest, psf; i = 1, 2, 3;
Pa = Horizontal pressure due to surcharge,psf;
PW = Hydrostatic pressure due to groundwater, psf;
H = Height of wall, feet
•
•
LATERAL EARTH PRESSURE DIAGRAM
FOR PERMANENT WALL •
SUBMERGED COHESIVE SOIL
INTERBEDDED WITH COHESIONLESS
OR SEMI-COHESIONLESS SOIL
Ceotest Engtin,eerin.g, Inc.
FIGURE 12.2
0
0
h
L
a q
■■■E
0., d COHESIVE d _
I Wis1111111
P..
H P,= + +
COHESIONLESS MEM
or
SEMI-COHESIONLESS MEM
•
p,
f P' k- P4
TYPICAL SOIL PARAMETERS PERMANANT WALL
°%a , See Table 3 for typical
values of soil parameters
Pm=y.'d K.
K.=1.0 - P. y.'d
K.
K.=1-sin¢. A=(Y•'d+y'(H-d)]R..
P.=y.H=62.4H
P,=0.5q
Where:
y.'=Submerged unit weight of cohesive soil,pct
y'..=Submerged unit weight of cohesionless or semi-cohesionless soil,pcf;
=Internal friction angle of cobesionless or semi-cohesionless soil,degree;
K.=Coefficient of at-rest earth pressure in cohesive soil;
K.=Coefficient of at-rest earth pressure in cohesionless or semi-cohesionless soil;
y. =Unit weight of water,pet
q =Surcharge load at surface,psf;
P. =Lateral pressure,psi;
Py Pk,Pb =At-rest earth pressure,psi;i=1,2;
P, =Horizontal pressure due to surcharge,psf;
P. =Hydrostatic pressure due to groundwater,psi;
H =Height of wall,feet
LATERAL EARTH PRESSURE DIAGRAM
FOR PERMANENT WALL
SUBMERGED COHESIVE SOIL OVER
'`` COHESIONLESS OR SEMI-COHESIONLESS SOIL
Geotest Engineering, Inc.
FIGURE 12.3
•
o (a)DEAD WEIGHT OF STRUCTURE (b)WEIGHT OF SOIL ABOVE BASE (e)SOIL-WALL FRICTION PLUS
O
tn
0 EXTENSION PLUS DEAD WEIGHT DEAD WEIGHT OF STRUCTURE
cJ OF STRUCTURE
O
zak it,
W iy S!. Wf UHL 1AYEa"m"
W. M
. H YW 1 ..t•
i• F W F,
1
W, ,r:
Is
$6 .2itaitgwV44..i4,41e3 a
. i
P. I HUI . 1111111111111 P. Ulna
F F, F.
•
P. = Hyw P. =Hyw. P. = Hyw
•
Fu=AeP Fu=AeP Fu=AbP
. t' = F. Sf +BWp=F° +I_ Fu
a
I s
Predominantly Cohesive Soils, Fr— a q.A.
See Table 3 for typical Predominantly Cohesionless Soils, Fr=p.,A=K tan S.
values of soil parameters
Where: As - area of base,sq.ft.
A. = cylindrical surface area of layer"m",sq.ft.
o,. - undrained cohesion of soil layer"m" psf.
K, = hydrostatic uplift force,lbs.
F, = frictional resistance,lbs.
H = height otburied structure,ft.
K = coefficient of lateral pressure=0.5.
POI average overburden pressure for layer"In,"psf.
p. = hydrostatic uplift pressure,psi.
Sr, s = factor of safety.
W1 = dead weight of concrete structure,lbs.
W2 = weight of backfill above base extension,lbs.
a = cohesion reduction factor=0.5.
S,. = friction angle between soil layer"m"and concrete wall,degrees=0.75 0„
0. = internal angle of friction of soil layer'tn",degrees.
yw = , unit weight of water= 62.4 pcf.
UPLIFT PRESSURE
AND RESISTANCE
Ceotest Engineering, Inc.
FIGURE 13
N
O
Z
O •
•• 0
0
N
0 •
• M a
a
W
Q C
a
n t a
^eo m
> w o
✓ o w r N
lm
4:2 '
2 I i ��. 0
rr � 9
5 N O
y '' >1. N E
10 m I CO
U El-
-_ co
J o
N o
Mw Nig a =
i
Now L aNz°3333 cn
(7 m
x (- o
G o ci
O o • o Q
•a .
ary - M
M M
C a `n
• _ o0
c
C 0
ai O cp 0000a 0 LL
w o 0 c •- N i d
N
CI i3M000 N
2 mCION
eet
:3Co m
a='ONNON
w.
NjZrNMd'
rd
h� OOcoU
mnrm,-NommN
NNm NMp Culbbb
LLNNN NNNNNNN
C I 1 -. o
o 0 0 0 0
W N o a
°`r'
1331 NI NOI1VA313
Geotest Engineering, Inc.
FIGURE 14.1
0
O a
N
O
O
O
Z I
o !
0
CV
T
9
O t
Ce 2 11• Q
N
> n
co 0b
S c•▪ -;- c" v
> N
R o
m 10 m c -
0 _ ��t Er
D y
r 02
N U Q = /
2N N8 r CO SI •ad
i aNz3333 V' U
c -
o � LLnI a
c90 < nm" o
os _
a M
u
• N d n O __ _ N
V }
U- dUoA3S.00No m
a
N>7`C
q•- co n
It
'� Q0,-tvmc
N� VUNU
:71,191Pi%Co m mom
LL -t---- - �
c I I Is o
0 oo
COCN CO v
1333 NI NOI1VA313
Geotest Engineering, Inc.
FIGURE 14.2
O I N
LO
`1O I
V
O
z
0
0 F
o
N
I- v•
0
r
' d
2
�m • a 0.
✓ co CO 0
o n0
NI.
C
�'�
O Tc, O aON3 m 1" 1 IL
U m I e a
ErL
. JJ
Na d
r ! �m aCO I _s
el 1%; c, �
\/ cr 1-triOU
O e
CO •LL QaNN(9N
O
m - co' m N
y0) 2 _ ¢
is.
N 0 o . N
o qgg0000 q
CO
o3V O
=
nryNON
O
�
FZ.-Nane O
we 0en0
u)WSi m m m SS n m m0)
4 .
Sl AG VDN� m.— �.
la O
oO O O O
, r m a
r
—w
1333 NI NOI.LVAJ13
Geotest Engineering, Inc.
FIGURE 14.3
O
N
-4- V
O
Z
.0
0
o
o
N
U
O t
wQ 75
> m _.... . .. _..... _. ._ o _ _... .. . . Cc o
s
N
in
2 1" 6 "
v
" .e
z ` O
in IL C N
V rc `^o Am o h ~
0 6 J N
Ur e4N 03 re
� lia 30
N p a
r
u J 0 713
O
`1z a„ 2
0
co g
U.
4 3 n f N 02 D
w U U
N v N
0.1 CV
Nzfrja (NCV
§Foo
yFZ N
OH
rob 000
9 r��NraN m n moo
d464W - OI.0
it IOL V V N" U L -
r I I di o
CO N W V O
133d NI NOIlVA313
Geotest Engineering, Inc.
FIGURE 14.4
0
O ry
N
N
a
Z
a
0
0
_.. ......... _.. _ o
N
CO
a 9
O 0L
n
0
`meg
v N o co-
m O
L
N
Pt m y
N x v 9
o
to 5L.
11
Ucc
_ � r�'
EI-
o � — ; N WT
VI a m
N U I. r J N
fA ¢ , n 50 teg
Q -1
\' _ oCII a oz333 o m
• O
0 2 - o9o. o
EL c ` �m0
cSLLa@
2 coo
vdcco u
L O co r-
c v u
yU Usn •-•- T
dat
Ca 83€000 co
coo
m06 �
zEo° - n
F No
NFZ rvm cr
woxoo
U
w(4 x0(0000.-tJ
LLOPVPv PpuION
1* yea 00 an- 0e .
I- I I Ii O
coo
N W O O
r r
1333 NI NOIIVA313
Geotest Engineering, Inc.
FIGURE 14.5
0
F- r
0
1'RI N V
O
o
Z
Jo
I
2 o
oN
ci
F D
J
fa
ID o
r ,ram S` r L
ry
N
x � I- Nt. m
vmw
ei
Y a„ CO 'C
CZ 2a \)Ic‘ F O
W m Jr C N
U Er
a O LL T
O.) a -1"' ca
r n 9
N v ro •
m
fnN a i I- c
2 y y,t d N � J
a Ti
C N
O g � III R
NNNQENCO
LL
0C Oy _
NC LL
2 _2_
N NO U�
o § moo21 Co
N_uocoo
`13- fokeu6 r n
~7n O
Do 1.- -,z °
0- 0 2o0
U
mmmntomo Nnn
LLn'1--0: 000 m.qm
I- I it o
m H co a to
1333 NI NOIIVA313
Geotest Engineering, Inc.
FIGURE 14.6
OI N
N
e
a
z
n
0
5n - O
N
O c
LLI L
. g
.i!, c: , co 0
b r L
N
T ry 9
am d
Y �a s mD
0
Nm II
coc
o c t
U aN \ 21-
5 a _.__. . ..._ _ .. _ ___. ._ �. 4 a N LL T
N .
N J
I▪ O N m N
W F c9
i� Uci a�2. 3 0 q
= 0 =vwoo2o
OE C'aodNd
a LL<-
_• m 2 _ a
« o all000 co
0 o• U a
O n2am r.oc. 41
- uo
mFz
- g mAm
ma 00m0
N
wormunco0oc,
cnWmmmmm0000
unauaormt --_
I- I I 4 e o
o WS N COCO O
I'
Itialial
1333 NI NOLLVA313
Geotest Engineering, Inc.
FIGURE 14.7
0
in1I I •'r N
N
V
O
Z I
0
0
oi
a
O o
L
b
I Q E
v ei `
n \
O O-
w r
3
= o O
m CO
Ir-
T- v
CI M IIo
A m c CV
0ErL-
N
K O N T
.. ..__ N 16 03
u J u
U c> p,�z°33�� o m
-co ti 1- U
00 - aa000 cciRoice a
C 0 c— 0 2
O ° vco o m
O
Gm °" n ' LL0 0a
0— f
0a0�
Z
m
d
co
wDa.-,-'-,-
•
-3 ti a VI
F
= t7NON
6 O
coFz nnC
— 7 3
0� I020
y
LL I;11 CO 71 72)lO in'I MM
* RL UD0 - Oi--..
I I _ I O
c. 0
0
CO 0 0 K 'NISI
1333 NI NOI1VA313
Geotest Engineering, Inc.
FIGURE 14.8
I I Cln
N
41.11•00P
O I
Z
a
O
a
, C o
t
iii
N o n
co 0
=o Nco
r a et. \co hal
gn Z >r '
II
U Ez
a
Er-
U J J W
m
Ni
'tz3333 y _'
0 6 u
\. V9 m' i CDU
C• E
CE _Qm0000 `
d o LL¢v�ry NN Q
C 3 W
'0 ' 0
v $co0 o u
▪ o . acoC r a
d▪ U o
i a
N a 0
O eccs! a
to
To 3c0
oui0i 0i
0= ancw0iJ
�Fz
Nmc
a
r 6 30 3 O
0
N '
N
N0p0000--.�
LL at 0100 Of 000000
NNNN
# COO O V a),- m e—.—
r 0
o 0 CO y O
1333 NI NOIIVA313
Geotest Engineering, Inc.
FIGURE 14.9
0
� N
in
31oV
O
z
a
0
0
a - N
a 1 m
U .'
O
aI L
m rn \ !d
_ _.
L
•rm A
m
zd
N.
ty. co
NY E m 0
z
N m >R % 2
e
Ij E iE
aN
•Ow _A .. ___ . . N LLm
(n q J J N
e.i � I
U� w 5 . . F v
U ti a >3�3 ". 0
0'0 — N bA
C o `o 0— Q
a n Eta co o
G 0
O m 0 8 C A
•C 0 ( a
LL
w e U c n N
Q $�Et ,.00a y
CO/gv
76§F.1= ei
o= nrvno
.-
_.. — O
O ad.-on')
3
Nw U
Ug
co
0)ZotI `8imr nm mm
# Aa ua v'- ca= --
r I I - o
0tr. crs co o V 0
(00
"Si
1331 NI NOILVA313
Geotest Engineering, Inc.
FIGURE 14.10
Cr
N
inN
1/411100. p
O
z
a
o I
C
v 0
N
I N
O w O
LC o
a d
._.. 0 o.
=o a
Zit ry 9
N m
Y b p
NG
O mII
U c Cpl
— � 'E i!
O fa
a N a
Uo m1'
8 l <
Name v u a-c7) r 0 C5
C `o U
O o `
C N LLao,-Nm
3
• m 0
S
O m
N o t u-
2 U U I'
N v a
O 'Oc. 3c4 a
NjmCl)a IN CO 0
c4 n
r?a
N o
o
= 3
m0 MO2
N
LLNryNN N NNNN0
at as Oa a - mc
I— I I o
coso N NO p 0
*low
1333 NI NOIlVA313
Geotest Engineering, Inc.
FIGURE 14.11
0
toN
N I
C
Z
a
o
O
v
o
—I $
al
to. . , V g
....
r co N
\ 0]
r \ N
N m v a
S °'. o
A• 6 7r ry c d
U m
. E1-
CO 113:1 c LI- CO
0di-
J «N
co E
O o 2 4
C o LLQa-e4M , c
as «
3
al o pin m
d N
O 3rGmo� co
N=a
-5 001 00• �� M
F=ate O
NFZ N0
3
o w
w
o 0 w
ioor- r-.000000
WmcomMOMO000
# Na-----
m N
r 1 Iz 1 O
0 O O
0 0 co <
1333 NI NOI1VA313
Geotest Engineering, Inc.
FIGURE 14.12
O N
N
O
O
Z
a
0
i
Ieq 0 ihf \ m
3 Elk O
3Q A�� o \ r
r2
UO HN o a
c
wo
C ie_ to
z a o
Sm >n N2
II
d• c CL
0
CN a EF
• N _
y a i r
ra
U c0i v m `"'
m
O o a'c z3333 r N =
00 0 03
c o qa
U r LLctaoomo G
Uo
0 0 4
m 4' aoo
C m m __. m o
O o '9
ti
c a 000 d
o e3��
co
d
N - CR .n
o
0= oozrocool
333
v 3-
0 3
m O N 501_s
yU
(00.77-`r--p-- •
NN NN N N NNNN
ik Nn UD Nr Oi-._.-
C I I ; o
.,p- N 0 0 0
V
14V
1333 NI NOIlVA3l3
Geotest Engineering, Inc.
FIGURE 14.13
co
N
.41 id
a
0
Z
a
0
0
—. . R N
L
H
, a O 6
to o
Ce mN
s m
--- It\
7? n
y ia
M o
z 2
C d
co
N ¢ o N j
N LLm
A d il
'
1.-. W
m 14
(jv at,z3333 0 �j
o N
U N LL<g'
Cmvgcco 0os
O oUa F_ u'
a0 z.
C d
O q �cy
Cac'cn0'-
N
n
oo
mFz'-NMa
3
No 0 unj
LLn8 i°!'m f n`,23.1—
F I I o
o
O ON Ov O
N )y
.1I
1331 NI NOI1VA313
Geotest Engineering, Inc.
FIGURE 14.14
I 0
I N
1 i
O a
40111.0,
< I
O
Z
Jo
0
.-�
L I N
ID
C •
Iry
U O
to
t
N
m
Cr' w
r d
Q
=_Z 1n O p
Q m Jr
C C a
Nto
_ E
m
• N stor DI u
*as, fA a a'CZ°03333 1- u
U' U
U
so°
U N LLag� a
C o -'y Stag
po -__ __ __. ..
O = y ado - N q
d 3 U LL
co T
o fico d
zC .e..- aNmory co
O co
1 -4,,,,,.. li
1:10.1C9
O
3
coo O SURA
NU
yyy
LLOOO�NNNNNNNNNN
* CO.0 Oa d OIL._._,
r I __E; I
O 0
CO C'l Oy 0 0
4/111100
1331 NI NOIIVA913
Geotest Engineering, Inc.
FIGURE 14.15
0
0
N
0
`c1'
O
O
re)
r
121 19
0
0
+
0
N87' 16' 37"E
1,148.29'
115+00
11+25
0
0
i•
0
L17
S89' 00' 04"E
73.65'
N86' 49' 21"E —
293.76'
L6
G B-64
L26
PI STA 138+60.95
5+00
L27
N3' 28' 41"W
1,125.47'
0
0
In
C-4
140+00
LL.
L16
PC STA 122+53.33
120+00
0,4
0
a
0
O
CURVE DATA
A = 16,17'
R = 2000.001
T = 284.10'
L = 564,43'
125+00
N87' 16' 37"E
1,148.29'
N3' 04' 13"W
1,218.67'
0+00
PI STA 140+16.11 McHARD RD
140+00
`- L7
CURVE DMA
A = 16.17'
R = 1965.00'
T = 279.13'
L = 554.55'
145+00
r:13930.5Gfi-73
C6
Alltr
C15
N86' 55' 29"E
2,040.19'
•„ "` 125+00
PT Sir 27+27.37
GB-71
S76' 33' 12"E
250.65'
L28
— PT STA 128+17.75
GB-63
L5
S76' 33' 12"E
250.65'
gitftft,
130+00
fts444_,
ass
L25 130+00 --..
CURVE DATA
A = 16.62'
R = 2000.00'
T = 292,19'
L = 580.28'
PC STA 129+78.02
CURVE DATA
A = 16.62'
R = 2035.00'
T = 297.31'
L = 590.44'
N86' 55' 29"E
2,038.95'
PC STA 130+68.41
155+00
C7
C16
150+00
GB-74
O
O
10
co
W
U
SQ
PT STA 136+48.69
135+00
135+00
PT STA 135+68.46 —
O
O
V)
MATCH LINE
0 50' 100' 200'
SCALE IN FEET
LEGEND
Boring
Boring
w/Piezometer
NOT FOR CONSTRUCTION
MI5 DOCUUENT IS RELEASED FOR 111E
PURPOSE OF INTERN RENEW UNDER 111
AUTHORITY OF UENRA)I BAVARWI P.E.
TEXAS NO:48811 011 DATE:7/6/1016
N IS 110T 10 BE USED FOR CONSTRUCTION.
DIDDNG OR PERUR PURPOSES
FREESE
%NICHOLS
11200 Broadway Street, Suite 2332
Pearland, Texas 77584
Phone — (832) 456-4700
Fox — (832) 456-4701
Freese and Nichols, Inc.
Texas Registered Engineering Arm F-2144
HORIZONTAL ALIGNMENT
DATA
McHARD ROAD
CULLEN BLVD TO MYKAWA RD
SHEET 6 OF 7
Texas Department of Transportation
Air©2016
FED.RO.
D V140.
PROJECT N0.
SHEET
N0.
6
STP 2014 (326) MM
68
0+00
gi;i POSSIBLE HORIZONTAL LIMITS OF COHESIONLESS SOILS
STATE
Dlsr.
COUNTY
TEXAS
12
BRAZORIA
CONT.
SECT.
JOB
HIGHWAY NO.
912
31
290
CS
FIGURE 15.1
Job No. 1140215001
Q
V)
bJ
J
0
2
N86' 55' 2911E
2,040.19'
13+54
CURVE DATA
A = 4.86'
R = 2035.00`
T = 86.29'
L = 172.47'
PC STA 160+55.05
McHARD RD
160+00
`Ir
0
0
+
0
•
5: :'tiioo.00'.GB 76n
T = 84 80'
L = 169.51'
G B-78
•
•
loom 141
L18
165+00
PC STA 164+81.95 —
N82' 04' 0811E
257.40'
L29
L9
L9
GB-66 ems
C-5
•
C17
C8
N82' 04' 0811E
257.40'
— CURVE DATA
A= 5.33•
R = 1965.00'
T = 91.53'
L = 182.92'
C9
C18 — 165+00
PC STA 164+04.63
PT STA 162+24.56
PT STA 161+47,23
N3' 30' 041'W
1,353.98'
0+00
CURVE DMA
A = 5.33'
R = 2000.00'
T = 93.16'
L = 186.18'
PT STA 166+68.13
N87' 24' 0911E
732,99'
PT STA 165+87.55
GB-67
L30 --I
170+00
PI STA 173+20.54
170+00
L1O
N87' 24' 0911E
1, 528.74'
L31
N88' 18' 26"E
285,04'
175+00
175+00
PI STA 176+05.58
N87. 24' 0911E
454.76'
END STA 181+96.87
180+00
GB-68180+00 J
L32
END STA 180+60.34
0 50' 100' 200'
0
181+97
5
SCALE IN FEET
LEGEND
Boring
Boring
w/Piezometer
POSSIBLE HORIZONTAL LIMITS OF COHESIONLESS SOILS
NOT FOR CONSTRUCTION
1H)S DOCUMENT IS RELEASED FOR TIIE
UiPOSE OF NUM RENEW UNDER NE
AUOpRRY OF UENRMI BMW P.E.
E%AS 110:48811 01 OAT@ 7/6/2016
R 5 NOT ID BE USED FOR CONS110CD ,,
8100C10 OR PERUW PURPOSES.
FREESE
NICHOLS
11200 Broadway Street, Suite 2332
Pearlond, Texas 77584
Phone — (832) 456-4700
Fax — (832) 456-4701
Freese and Nichols, Inc.
Texas Registered Engineering Firm F-2144
HORIZONTAL ALIGNMENT
DATA
McHARD ROAD
CULLEN BLVD TO MYKAWA RD
SHEET 7 OF 7
Texas Department of Transportation
02016
FT:O.RO.
D VJJO.
6
srATE
TEXAS
cofT.
PROJECT NO.
STP 2014 (326) MM
SHEET
NO.
69
DIST.
12
SECT.
couNtt
JOB
BRAZORIA
HIGHWAY NO.
CS
912 31
290
FIC;I IRF 1 A 9
1140215001
O
4
0
0
0
E
N
m
0
0
c
0
0
IC
0
14.
0
BWF
0
ADAMO LN
0
0
S
0
0
BWF
t•SPHAt9T '1 •IVE
PROP 2-6'X4' RCB
BWF
BW
OI
0
0
0
0
Id"o'6 -0o L••'0 z DO
lo" cT m c f*i 0 PROP. BACKSLOPE
I o 0 0 m o� INTERCEPTOR STURCTURE
o NZ °
aT' mXoo
(Th.
CZe°W
00
xicz
PROP. 1 ACKSLOPE
INTERCEPTOR STURCTURE
1WGW0
. rvlewvsn�` .�� • • • +••rm®' 'ww v•9nwr •isuwaw wwa"nlinsnesr1
�� vt .�.. ----
wuwigniti
t�anar'r•4• ------
l?S'•1.T7ZDd11R�'at talk NRXHXMCgi
7o 1
POND SUMMARY
• 14 1 •tIv
PROP. BACKSLOPE
INTERCEPTOR STURCTURE
PROP. 195' DE
1. STORM WATER DETENTION REQUIRED — 13.2 AC —FT
2. FLOODPLAIN MITIGATION REQUIRED — 1.0 AC —FT
3. TOTAL POND VOLUME REQUIRED — 14.2 AC —FT
4. TOTAL POND VOLUME PROVIDED — 18.0 AC —FT
5. 100—YR W.S.E. — 47.0 FT
6. OUTFALL STRUCTURE — 1-6'X4' BOX AT EL. 34.70 FT
5ECNON 'A"
PROP. BACKSLOPE
INTERCEPTOR STURCTURE
13AR8WIRE FENCE/TR'E LINE
e.7 11�6 7R f Ra 1111i1if 1C� .FI7vYsdA , . .O
flfr
wwili syw.uw
e.
"w 3a:: • • wwriyl
TIWWWW$ICWarILMAJOLIIIi
11YYwNN W 11•WWIA11••••01allit
IgitMajetaMirtannin
"n^.al
•.•. tiN1IyV•
n Z
00
A
W o
i. in
o_ .n
•
•
•
•
POW ItigrX4:4
PROP. 195' DE
PROP. BACKSLOPE
INTERCEPTOR STURCTURE
BARBWIRE FENCE
PROPERTY LINE
LEGEND
Boring
Boring
w/Piezometer
W•T8 A
PROP. INTERCEPTOR
STURCTURE
POSSIBLE HORIZONTAL LIMITS OF COHESIONLESS SOILS
SCALE IN FEET
\� loe
PROP. 140' DE To„
'FROM CLEAR CREEK 4,
;CENTERLINE (PER BDD4)
•
GC ENGINEERING, INC.
2505 Park Avenue, PearlondTexas 77581
PH: 281-412-7008, FAX: 281-412-4623
TBPE Registration No. F-7889
NOT FOR CONSTRUCTION
DES DOCUVEHT IS RELEASED FOR THE
PURPOSE OF L•RERIU RENEW UHOER THE
AUTHORITY OF A I/AHE /RA RODRIGO, P.L
TUAS HOE 87523 ON DATE: 01/19/2016
IF TS NOT TO DE USED FOR COIHSI UCTION.
BODING OR PEWIT PURPOSES.
FREESE
NICHOLS
11200 Broadway Street, Suite 2332
Pearlond, Texos 77584
Phone — (832) 456-4700
Fax — (832) 456-4701
Freese and Nichols, Inc.
Texas Re•islered En•ineerin• Firm F-2144
McHARD ROAD EXTENSION
DRAINAGE
OVERALL POND LAYOUT
POND CC-1
PRO.£CT NO.
COUNTY
BRAZORIA
SHEET 1 OF 4
SHEET
NO.
FIGI1RF 1R'l
TABLES
Table
Summary of Boring Information 1
Summary of Soil Parameters for LPile Input 2
Nor
Geotechnical Design Parameter Summary—Open-Cut Excavation 3
Geotechnical Design Parameter Summary—Trenchless Installation 4
Summary of Soil Parameters Used for Slope Stability Analyses for
Detention Ponds 5.1 thru 5.4
TABLE 1
SUMMARY OF BORING INFORMATION
BORING NO. STATION OFFSET ELEVATION DEPTH (ft)
(ft)
GB-49 0+84.4 31.6'RT 51.3 35
GB-50 8+10.3 3.9' LT 51.4 25
GB-51 15+24.5 17.3'RT 51.0 25
GB-52 24+10.5 12.9'LT 51.5 25
GB-53 32+61.2 7.4'RT 50.8 35
GB-54 40+80.4 7.4'RT 49.4 25
GB-55 46+50.7 34.2' RT 48.5 25
GB-56 58+00.0 10.0'RT 50.1 35
GB-57 * -- -- -- --
GB-58 78+09.3 9.9'LT 50.0 35
GB-59 * -- -- -- --
GB-60 98+36.9 12.0'LT 50.0 35
GB-61 106+40.0 10.0'LT 48.2 25
GB-62 118+00.8 15.9' 48.9 35
GB-63 128+17.8 7.3'LT 48.1 25
GB-64 139+39.9 10.1'RT 47.3 35
GB-65 * -- -- -- --
GB-66 161+99.9 10.0'RT 48.3 35
*sr GB-67 170+98.7 14.0'RT 46.0 25
GB-68 181+20.2 15.3' RT 44.7 35
GB-69 119+94.0 123.7' RT 47.7 15
GB-70P 123+02.4 134.7'RT 47.2 15
GB-71 126+60.9 145.3'RT 47.0 15
GB-72 142+29.9 130.1' RT 46.2 20
GB-73 146+00.1 130.2'RT 45.4 20
OB-74 * -- -- -- --
GB-75P 157+00.0 130,0'RT 46.1 20
GB-76 159+95.3 163.2'RT 47.1 20
GB-77 160+20.0 550.0'RT 47.1 20
GB-78 158+80.0 400.0'RT 46.8 20
GB-79 18+78.95 431.15' LT 50.5 30
GB-80 20+48.39 671.36' LT 50.0 30
GB-81P 18+98.38 838.88'LT 50.0 30
GB-82 20+17.84 1043.34'LT 50,0 30
GB-83 18+77.42 1166.58'LT 48.5 30
GB-84 19+46.93 1366.82'LT 49.5 30
Note: I. Survey information was provided to us by Freese and Nichols,Inc.
*These borings were not drilled during the preparation of the draft report.
TABLE 2 1 of 1
SUMMARY OF SOIL PARAMETERS FOR LPILE INPUT j
MCNARD ROAD EXTENSION -TRAFFIC SIGNALS V
Submerged Unit Undrained Internal
Elevation(feet) Depth(feet) Lpile Program Friction
Boring Sta.No. Offset Soil Type Weight Cohesion Angle cS0
No. From To From To (pct) (lbs/in3) (psf) (psi) (degree)
GB-49 0+84.4 31.6 Rt 51 48 0 3 Stiff Clay 80 0.03472 1000 6.94444 0.010
48 45 3 6.5 Soft Clay 60 0.03472 320 2.22222 0.015
45 40 6.5 11.5 Soft Clay 58 • 0.03356 760 5.27778 0.011
40 36 11.5 15 Stiff Clay 71 0.04109 1700 11.80556 0.022
36 31 15 20 Soft Clay 71 0.04109 800 5.55556 0.036
31 26 20 25 Stiff Clay 71 0.04109 2500 17.36111 0.024
26 20 25 31.5 Stiff Clay 71 0.04109 2300 15.97222 0.016
20 18 31.5 33 Stiff Clay 71 0.04109 1300 9.02778 0.026
18 15 33 36.5 Stiff Clay 70 0.04051 1800 12.50000 0.007
GB-56 58+00 10.0 Rt 50 49 0 1.5 Stiff Clay 60 0.03472 1000 6.94444 0.010
49 40 1.5 10 Stiff Clay 68 0.03935 1200 8.33333 0.017
40 37 10 13.5 Soft Clay 68 0.03935 600 4.16667 0.010
37 35 13.5 15 Sand 51 0.02951 25
35 24 15 26.5 Stiff Clay 62 0.03588 1400 9.72222 0.008
24 17 26.5 33 Stiff Clay 76 0.04398 2500 17.36111 0.011
17 14 33 36.5 Soft Clay 68 0.03935 600 4.16667 0.024
GB-58 78+09.3 9.9 LI 50 39 0 11 Stiff Clay 65 0.03762 1250 8.68056 0.015
39 37 11 13 Stiff Clay 71 0.04109 1700 11.80556 0.020
37 27 13 23 Stiff Clay 62 0.03588 1300 9.02778 0.005
27 23 23 27 Stiff Clay 66 0.03819 1300 9.02778 0.014
23 20 27 30 Stiff Clay 68 0.03935 1700 11.80556 0.039
20 14 30 36.5 Stiff Clay 82 0.03588 1300 9.02778 0.017
06-60 98+36.9 12.0 LI 50 42 0 8 Soft Clay 65 0.03762 434 3.01389 0.024
42 40 8 10 Stiff Clay 72 0.04167 1500 10.41667 0.017
40 34 10 16.5 Soft Clay 72 0.04167 600 4.16667 0.024
34 29 16.5 21.5 Stiff Clay 70 0.04051 2800 19.44444 0.019
29 23 21.5 27 Stiff Clay 76 0.04398 1000 6.94444 0.027
23 20 27 30 Stiff Clay 69 0.03993 2000 13.88889 0.026
20 17 30 33 Stiff Clay 70 0.04051 2000 13.88889 0.007
17 14 33 36.5 Soft Clay 65 0.03762 800 5.55556 0.036
06-62 118+00.8 15.9 Lt 49 48 0 2.5 Stiff Clay 60 0.03472 1000 6.94444 0.010
46 42 2.5 6.5 Stiff Clay 65 0.03762 1500 10.41667 0.013
42 37 6.5 11.5 Soft Clay 66 0.03819 800 5.55556 0.024
37 34 11.5 15 Stiff Clay 68 0.03935 2000 13.88889 0.011
34 22 15 26.5 Stiff Clay 70 0.04051 1200 8.33333 0.028
22 17 26.5 31.5 Stiff Clay 73 0.04225 2700 18.75000 0.027
17 16 31.5 33 Stiff Clay 65 0.03762 3000 20.83333 0.008
16 12 33 36.5 Soft Clay 70 0.04051 700 4.86111 0.010
GB-64 139+39.9 10.1 Rt 47 44 0 3 Soft Clay 63 0.03646 700 4.86111 0.016
44 41 3 8 Soft Clay 60 0.03472 720 5.00000 0.010
41 36 6 11.5 Stiff Clay 68 0.03935 1450 10.06944 0.022
36 32 11.5 15 Soft Clay 61 0.03530 B00 5.55556 0.012
32 24 15 23 Stiff Clay 60 0.03472 1300 9.02778 0.010
24 20 23 27 Stiff Clay 72 0.04167 1400 9.72222 0.032
20 17 27 30 Stiff Clay 70 0.04051 2400 16.66667 0.028
17 14 30 33 Stiff Clay 69 0.03993 1200 8.33333 0.027_
14 11 33 36.5 Stiff Clay 60 0.03472 2400 16.66667 0.005
181+20.2 15.3 Rt 45 43 0 2 Stiff Clay 65 0.03762 900 6.25000 0.010
43 39 2 6 Stiff Clay 66 0.03819 1120 7.77778 0.020
39 33 6 12 Stiff Clay 68 0.03935 _ 1350 9.37500 0.013
33 27 12 18 Stiff Clay 63 0.03646 1000 6.94444 0.020
27 23 18 22 Stiff Clay 68 0.03935 900 6.25000 0.033
23 18 22 27 Stiff Clay 72 0.04167 2450 17.01389 0.020
18 12 27 33 Stiff Clay 68 0.03935 1500 10.41667 0.023
12 8 33 38.5 Stiff Clay 70 0.04051 3500 24.30556 0.013
Notes: 1.Use groundwater level at ground surface(flood condition)
2.Use Internal defult p-y subgrade modulus k computed by Lpile(input k as 0)
TABLE 3
Ni,.. GEOTECHNICAL DESIGN PARAMETER SUMMARY
OPEN-CUT EXCAVATION
Boring Stratigraphic Range of Wet Submerged Internal
Nos. Unit Depths,ft Unit Unit Undrained Friction
Weight, Weight,y', Cohesion, Angle,4,
y,pcf pcf psf degree
GB-49 Cohesive 0-6 116 54 1,000 --
6-11.5 130 65 2,000 --
11.5-15 133 66 800 --
15-30 128 64 3,200 --
30-35 125 63 1,200 --
GB-50 Cohesive 0-15 120 60 1,000 -
through 15-25 125 63 1.500 --
GB-52
GB-53 Cohesive 0-4 125 63 1,400 --
4-14 130 65 2,000 --
14-15 125 63 1,000 --
15-20 127 64 2,100 --
20-25 126 63 500 --
25-30 125 63 4,000 --
30-35 125 63 2,200 --
GB-54 Cohesive 0-10 124 62 1,000 --
10:15 126 63 400 --
15-20 129 65 2,000 --
**sr 20-25 132 66 2.000 --
GB-55 Cohesive 0-5 125 63 1,500 --
5-10 130 65 2,400 --
10-13 128 64 500 --
Cohesionless 13-16.5 105 43 -- 30
Cohesive 16.5-25 127 63 2,400 --
GB-56 Cohesive 0-13.5 126 63 1,000 --
Cohesionless 13,5-I5 100 38 -- 28
Cohesive 15-30 124 62 2,000 --
30-35 128 64 500 --
GB-58 and Cohesive 0-8 125 63 500 --
GB-60 8-15 130 65 1,500 --
15-35 125 63 1,000 --
GB-61 Cohesive 0-10 125 63 2,000 --
10-25 126 63 1,000 --
GB-62 Cohesive 0-12 130 65 1,500 --
12-25 125 63 2,000 --
25-35 130 65 600 --
GB-63 Cohesive 0-6 125 63 500 --
Cohesionless 6-12 105 43 -- 30
Cohesive 12-25 130 65 1,500 --
GB-64 Cohesive 0-5 126 63 1,500 --
5-10 125 63 2,000 --
10-15 126 63 1,000 --
15-35 132 66 1,500 --
TABLE 3
GEOTECHNICAL DESIGN PARAMETER SUMMARY
OPEN-CUT EXCAVATION
•ad
Boring Stratigraphic Range of Wet Submerged Internal
Nos. Unit Depths,ft Unit Unit Undrained Friction
Weight, Weight,y', Cohesion, Angle,iii,
y,pef pef psf degree
GB-66 Cohesive 0-5 125 63 1,000 --
5-10 120 60 500 --
10-25 125 63 1,600 --
Cohesionless 25-35 106 44 -- 30
GB-67 Cohesive 0-10 125 63 800 --
10-16 130 65 2,000 --
16-25 130 65 1,500 --
GB-68 Cohesive 0-5 130 65 1,000 --
5-15 130 65 2,000 --
15-20 126 63 1,000 --
20-35 130 65 2,000 --
Note:
I. Cohesive soils include clay,sandy clay,and silty clay.
2. Cohesionless soils include silty sand,clayey sand and sandy silt.
TABLE 4
GEOTECHNICAL DESIGN PARAMETER SUMMARY
TRENCHLESS INSTALLATION
O.. (Based on Borings GB-49 through GB-68)
PROPERTY COHESIVE COHESIONLESS SOILS(2)
SOILS(o
Wet Unit Weight,y,pcf 0-6 116 --
6-13 124 105(GB-63 only)
13-16.5 126 100(GB-55 and GB-56 only)
16.5-20 125 --
20-25 128 --
25-35 123 106(GB-66 only)
Submerged Unit Weight,y',pcf 0-6 54 --
6-13 62 43 (GB-63 only)
13-16.5 63 38(GB-55 and GB-56 only)
16.5-20 63 --
20-25 64 --
25-35 62 44(GB-66 only)
Moisture Content(%) 0-6 18 --
6-13 20 19(GB-63 only)
13-16.5 22 20(GB-55 and GB-56 only)
16.5-20 16 --
20-25 22 --
25-35 18 21 (GB-66 only)
UNDRAINED PROPERTIES
Undrained Cohesion,c,,,psf 0-6* 500 --
6-13* 800 --
13-16.5 * 1,000 --
Now 16.5-20* 500 --
20-25* 1,000 --
Angle of Internal Friction,Q,degrees 0-6* -- --
6-13* -- 30(GB-63 only)
13-16.5 * -- 30(GB-55 and GB-56 only)
16.5-20* -- --
20-25* -- --
Elastic Modulus,E,psf 0-6* 150,000 --
6-I3* 240,000 196,000(GB-63 only)
13-16.5 * 400,000 70,000(GB-55 and GB-56 only)
l6.5-20* 150,000 --
20-25* 300,000 --
Coefficient of Lateral Earth pressure at Rest,le..„, 04* 1.2 --
6-13* 1,2 0.5(GB-63 only)
13-16.5* 1.2 0.5(GB-55 and GB-56 only)
16.5-20* 1.2 --
20-25* 1.2 --
Poisson's Ratio,p 0.45 0.3
TABLE 4 (cont'd)
GEOTECHNICAL DESIGN PARAMETER SUMMARY
TRENCHLESS INSTALLATION
(Based on Borings GB-49 through GB-68)
PROPERTY COHESIVE COHESIONLESS SOILS(2) 1/2.100
SOILS(t)
DRAINED PROPERTIES
Drained Cohesion,c',psf 0-6* 0 —
6-13* 0 --
13-16.5 * 0 --
16.5-20* 0 --
20-25* 0 --
Angle of Internal Friction,6',degrees 0-6* 19 —
6-13* 20 30(GB-63 only)
13-16.5 * 26 30(GB-55 and GB-56 only)
16.5-20* 21 --
20-25* 21 --
Elastic Modulus,E,psf 0-6* 90,000 --
6-13* 144,000 196,000(GB-63 only)
13-16.5 * 240,000 70,000(GB-55 and GB-56 only)
16.5-20* 90,000 --
20-25* 180,000 --
Notes: 1.Cohesive soils include Clay,Sandy Clay,and Silty Clay.
2.Cohesionless soils include Silty Sand,Clayey Sand,Silt and Sandy Silt.
* Tunneling zone between depths of 0 and 25 feet(one bore diameter,but not less than 6 feet,above
and below tunnel bore.
o Le
2 = CS N I, -
; {
| ' B .1-2 I `
it ; -
ta
/
3 . � ',Et ; 0 : \
. : )
\ VL ; F-
§ 9o. \_ \ ~ vp }
( $ a % / ` of
_
. 2 i
el
; [ a ! , NN , ,
/ 0L.
leeLal
7 - - ' no
-
0t' ° (
o ! t /0/4
/� ' ' ` )
) Z4o Su ) .
\ § - / , o \ , \\ }
a 77 ° ; C !! 0
Ai
§ § } 12 12) � } /
# , , = 0 , f § , !
2 \ in
_ ) ! ) ] ) t > > 0
4E4 211
4 ! ! :
iifl Hj
.4 .a, ! ! ] f HIJUJUI
\ \
! ! e & aQ� ;la\ {
Ni / N.
} )
NI moeCA . ) ) } ®
k - - -
I §
S. \ : v In \
144 PI ;et
N {
k k
\- - - |
3.
2 . -N 1/40
...
C
\ Cem
7 ! I C «
) 2 a 3 | J : /
, & :
§ fR 7 NN
\
§o \ j \ ! — — /
0 /$ .
\ ( i § /k� I I , |
Cl, \ ` 0 _ . . � !
aIr2 02 .0 01 k _ — - : ! , 77 ]
a co 41
� ` . ! $ ! !
` A. - , ) t ,}\ � t \
k_S ! ! ! § ® / 12
l — — — .4 Z, a ; ) ) {f
. (/] k | C"VV-
o ; ; /\ � ) ) ) ) \ �
}\ « a 0
§ ! $a: ;J=!®
\ ¥ - , G.S )
. _
r----) 1.---) "...--)
TABLE 5.3: SUMMARY OF SOIL PARAMETERS USED
FOR SLOPE STABILITY ANALYSES—DETENTION POND CC-1-SOIL CASE 1
(GB-79,GB-80 and GB-81)
Shear Strength
Elevation Material Wet Density
(ft) Description (pcf) End of Construction Rapid Drawdown Long Term _
Friction
Cohesion Angle Effective Weathered Effective Effective Weathered Effective
(psi)=c,,,, (deg)= -
u c'(psi) 4)' c'w(psi) 4)'w c'(psi) 4)' c'w(psi) clew
+50—.+45 Clay 130 1,500 — 107 22 57 16 107 22 57 16
+45—+37 Sandy Clay 125 500 — 173 27 173 27 173 27 173 27
+37—+30 Silty Sand/ 102 — 29 — 29 — 29 — 29 — 29
Sandy Silt
+30—+20 Clay 125 1,000 — 139 26 139 26 139 26 139 26
Where LL: Average Liquid Limit
PI: Average Plasticity Indices
c,;,,: Unconsolidated-Undrained Cohesion
46: Unconsolidated-Undrained Friction Angle
c': Effective Stress Cohesion
V: Effective Stress Friction Angle
c'w; Weathered Effective Stress Cohesion
4)'w: Weathered Effective Stress Friction Angle
Note: For rapid drawdown and long term conditions,weathered effective stress parameters were used for clay(with PI>20)within 7'zone below top of bank,slope surface,and
bottom of the pond,wherever is applicable within each layer.
---— - TABLE-5.4:_SUMMARY OF SOIL PARAMETERS USED
FOR SLOPE STABILITY ANALYSES—DETENTION POND CC-1-SOIL CASE 2
(GB-82,GB-83 and GB-84)
Shear Strength
Elevation Material Wet Density
(ft) Description Oct) End of Construction Rapid Drawdown Long Term
Friction
Cohesion Angle Effective Weathered Effective Effective Weathered Effective
(pst)=co„ (deg)=
Cm c'(psi) 4)' c'w(Psi) 4)'w c'(psi) 0' c'w(pst) O'w
+50—+45 Clay 125 1,500 — 145 23 83 17 145 23 83 17
+45—+40 Sandy Clay 130 800 — 173 27 173 27 173 27 173 27
+40—+20 Silty Sand 105 — 30 — 30 — 30 — 30 — . 30
Where LL: Average Liquid Limit
PI: Average Plasticity Indices
el.: Unconsolidated-Undrained Cohesion
46: Unconsolidated-Undrained Friction Angle
c': Effective Stress Cohesion
4)': Effective Stress Friction Angle
c' . Weathered Effective Stress Cohesion
4)'w: Weathered Effective Stress Friction Angle
Note: For rapid drawdown and long term conditions,weathered effective stress parameters were used for clay(with PI>20)within 7'zone below top of bank,slope surface,and
bottom of the pond,wherever is applicable within each layer.
G Gi U
APPENDIX A
Figure
Logs of Borings A-1 thru A-37
Symbols and Terms Used on Boring Logs A-38
Piezometer Installation Report A-39 thru A-41
'`.
DRILLING LOG 1ofI
it County Brazoria Hole GB-49 District Houston
WinCore Highway McHard Road Structure Traffic Signals Modification Date 1-6-18
Iletwv Version 3.1 CSJ 0912-31-290 Station 0+84.4 Grnd.Elev. 51.30 ft
Offset 31.6'RT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Ea)v. 0 Penetrometer Strata Description reLateral rDeviator MC LL PI Den. Additional Remarks
losil (psi) (pcft
FILL,clay,medium stiff,dark 28 w/roots and sand seams 0'-1'
gray and gray w/shell fragments 1'-3'
48.3 —4—�1 34 85 54 119
or CLAY,very soft to medium stiff, 35
6 / 2(6)2(6) gray w/ferrous nodules and ferrous
/ stains(CH) gray and yellowish brown 6'-e'
/ 8 11 36 T8 49 120_Jw/calcareous nodules 6'-8'
10
/ 4(6)6(6) 28
39.8 0 CLAY,silty,soft to stiff,brown 0 25 20 41 25 111
and gray w/sand seams,calcareous 18
15 di T(6)8(6) and ferrous nodules and ferrous
stains(CL)
18 10 21 30 14 113 w/sand seams 1r-18'
20 % 24
9(6)12(8) -
/ very stiff 21.5'-23'
0 51 19 47 26 133
/ _ 19
26.3 25 / 9612 6
,/ CLAY,stiff to very stiff,brown
and gray w/sand seams and caicareo s 0 44 • 19 50 24 111
nodules(CH) 21
`t 30 /PP 11 (6)13(6) reddish brown and gray w/sand
19'8 ; CLAY,silty,stiff (CL) a 18 19 33 15 133 seams and calcareous
18.3 nodules 31.6'-33'
PP 10(6)12(6) CLAY,stiff,reddish brown and 25
36 gray w/ferrous nodules and ferrous
14.8 Afal stains(CH)
•
40
45
50
55
Rn
• Remarks:1)Dry auger to 18.0 ft.,wet rotary from 18.0 ft.to 36.0 ft.2)Free water encountered at 18.0 ft.during drilling,water level
measured after 15 mins.is at 8.5 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Adalberto Perez Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-1
0.1000140215301 RaMwey_Slam Svwnr_G849,ft9.CLG
14- DRILLING LOG 1of1
Are,. County Brazoria Hole GB-50 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-7-16
Version 3.1 CSJ 0912-31-290 Station 8+10.3 Grnd.Elev. 61A0 ft kJ
Offset 3.9'LT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 penetrometer Strata Description Lateralress. StressvtDeviator
MC LL PI Den.
(psi)
Additional Remarks
(%) G (psi) (nail IPCfI
FILL,clay,sandy,w/oyster shell, 72
48.9 sand and roots 29 wfsand fragments 2'-2.5'
P CLAY,soft to medium stiff,gray 5 12 29 72 45 118
6 0 3(6)3(6) (CH) gray and yellow 5'-11'
Irv/ferrous nodules and
32 stains 6'-13'
10
10 12 33 75 47 120
/ 5(6)6(6)
39.9 / CLAY,silly,soft to stiff,brown 19 40 22
and gray whantl seams,ferrous 16 24 18 2914-13
15 ! 6(6)716) nodules antl ferrous stains(CL)
di
la
0 25 28 _49_.79__1
32.4 23
20 ! 9(6)11(6) CLAY,stiff to very stiff,reddish 'w/ferrous nodules and ferrous
brown and gray w/calcareous and stains 20'-25'
/ ferrous nodules and ferrous stains 24
(CH) w/calcareous nodules 23'-25'
ed 10(6)11 (6) 0 28 23 58 34 127
25
24.9 I
30
36
40
45
50 T
y'
55 -
G9—
Remarks:1)Dry auger to 22.0 ft.,wet rotary from 22.0 ft.to 25.0 ff.2)Free water encountered at 22.0 ft.during drilling,water level
measured after 15 mins.Is at 15.75 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Adalberto Perez Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-2
CMoba\1140115001\1140$15]1 Roadway_Storm Sewer_GBW,51,52,54.5L5],59,61,6],65,6].CLG
-A- DRILLING LOG 1of1
Aro="' County Brazoria Hole GB-51 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-6-16
ail/ Version 3.1 CSJ 0912-31-290 Station 16+24.5 Grnd.Elev. 51.00 ft
Offset 17.3'RT GW Elev. NIA
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviator Wet Additional Remarks
cmG Penetrometer Press. Stress MC LL PI Den.
lost) (psi) (pd) .
CLAY,soft to very stiff,dark sv -w/grass roots and shell
gray(CH) 3 9 28 80 37 122 fragments 0'-T
il/ gray 3'-6'
/ 28 33
5 ( )2{8 1 very soft 5-6.5'
gray&yellow w/ferrous stains
--,s4 _8_18— 29 67 47 122 '.&ferrous nodules V-10'
10 4(6)6(6) 30 brown and gray 10'-13'
24
clay,sandy 13'-14'
15 8(5)10(6) 15 11 34 65 40 126
w/sand&silt seams 16'-17'
vre°
reddish brown and gray
10 62 6 0 33 24 54 33 111 w/calcareous and ferrous
20 �- (�--_( 1 nodules 113'-22'
_._ 22 brown and gray 22'-25'
Th.."
—0—._.47 21 56 31 133
25 9(6)11(6)
24.5
—w 30
35
i
40
i
45
50
55
SO
Remarks:1)Dry auger to 16.0 ft.,wet rotary from 15.0 ft.to 26.0 ft.2)Free water encountered at 15.0 ft.during drilling,water level
measured atter 16 mins.is at 3.42 ft.
The ground water elevation was not determined during the course of this boring.
Name
Driller:Adalberto Perez Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-3
C:LIoMtl 140215001\1140215001 Raadaay_61wm Sewer Ga50,5152,54,5557,59,61,6355.67..CLG
DRILLING LOG 1 of 1
Ar.. "'" County Brazorla Hole GB-52 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-7-16
Version 3.1 CSJ 0912-31-290 Station 24+10.5 Grnd.Elev. 51.50 ft
Offset 12.9'LT GW Elev. NIA
L Texas Cone Triaxial Test I Properties
Elev. 0 Strata Description Lateral Deviatol Wet Additional Remarks
(T0I MC LL PI Den.
loaf) los!) (pan
50.5 FII L clay sandy gray 19 w/oyster shell,sand,and
CLAY,silty,stiff,gray w/sand 3 18 21 43 27 123 clay mix w/roots 0'-0'
48.5 seams(0I)
CLAY,soft,gray w/calcareous 27 60 37
5 o'S 4(6)4(6) and ferrous nodules and ferrous
stains(CH) brown and gray 6'-8'
24
43.5 CLAY,silty,stiff,brown and 10 76 19 42 25 136 w/calcareous nodules B'-10'
_1 4(6)3(6) ga t`J
41.5 10 _ SILT,very loose,brown w/sand wlsantl&clay seams 11.5'-13'
(ML) 27 %passing 1/200 sieve=71%
38.5 CLAY,silty,brown and gray(CL) 22 37 17
36.5 15 /7(6)8(6)
CLAY,soft to very stiff,reddish
brown w/ferrous stains(CH) 132
w/calcareous nodules 16'-20'
20 31 30 62 38 123 w/slit seams 18'-23'
20 7(6)8(8)
/ 24
w/calcareous nodules 23'-25'
•
25
8(6)9(6) 0 26 23 51 29 127
25.
30
35
40
45
50
J
55—.
60-
I
Remarks:1)Dry auger to 11.5 ft.,wet rotary from 11.5 ft.to 25.0 ft.2)Free water encountered at 10.0 ft.during drilling,water level
measured atter 15 mins.Is at 5.67 ft.
The ground water elevation was not determined during the course of this boring.
11111
Driller:Adalberto Perez Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-4
C:Uobs IA0215001111 W215W1 Ro dw y_Siwm Sewed Ga50,51,5354,55,57,596185,65,67 CLG
DRILLING LOG 1of1
®'"�", • County Brazorla Hole GB-53 District Houston
WlnCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-6-16
1184,0- Version 3.1 CSJ 0912-31-290 Station 32+61.2 Grnd.Elev. 50.80 ft
Offset T.4'RT SW Elev. N/A
Triaxial Test Properties
L Texas Cone Lateral Deviator Wet Additional Remarks
Elev. 0 penetrometer Strata Description Press. Stress MC LL PI Den.
(ft) G
hash (Psi) (pet)
FILL,clay,sandy,gray 11 w/grass roots,shell fragments
48.8 ..... S sand seams 0'-2'
CLAY,sandy,soft to very stiff, 4 21 21 45 26 130
5 /4(6)7(6) brown and gray w/ferrous nodules 1L_ wlcalcareous nodules 4'-5'
(CL)
18
10 ) 5(6)6(6) 0 28 18 36 20 134
25 w/santl seams 13'-13.5'
P. 7(6)9(6) 15 7 32 37 18 126
35.0 15 CLAY,soft to very stiff,reddish
/ brown and gray w/ferrous stains, 24
calcareous nodules and silt seams
ril 816)6(6) (CH) __Cr 30 27 64 40 127 I
30.8 20 / CLAY,silty,soft to medium stiff,
Pa brown w/silt seams(CL) 23 12 73 29 9 128
27S wlcalcareous nodules and
OPP 8 18(6) CLAY,stili,reddish brown and _213ferrous stains 23'-25'
25 16 l 1 gray(CH) I
243 gray and brown 26'-28'
I, CLAY,sandy,very stiff(CL) 0 54 19 47 31 131 wlcalcareous nodules 28'-30'
22'8 OP CLAY,stiff to very stiff,gray
`� 22-.
30 / 16(8)18(6) and brown w/ferrous nodules and reddish brown and gray 30'-35'
/ ferrous stains(CH)
/ 0 32 26 60 38 125
wlcalcareous nodules 33'-35'
36 1918)2016) 27
14.3
40
45
I I
50
•
55
60
Remarks:1)Dry auger to 13.0 ft.,wet rotary from 13.0 ft.to 35.0 ft.2)Free water encountered at 13.0 ft.during drilling,water level
measured after 15 mins.Is at 4.42 ft.
The ground water elevation was not determined during the course of this boring.
...er
Driller:Adalberto Perez Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-5
C Vobs\11402150011114m15001 RosO,vry_Slam Sewer 01349,53.56,58,60,5264,6858.CLG
DRILLING LOG 1of
,a' County Brazoria Hole GB-54 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-29-16
Version 3.1 CSJ 0912-31-290 Station 40+80.4 Grnd.Elev. 49.40 ft SNad
Offset 7.4'RT GW Elev. WA
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviator Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
(PSI) (pep Ince
/ CLAY,sandy,soft to very stiff, 26 w/grass roots 0'-2'
gray and yellow(CL) w/ferrous nodules 2'-10'
/ 4 14--21A2 23 123
w/ca
careo
5
4(6)5(8) 21 stainls 4-10 nodules&ferrous
0 30 191.24 131
19
10Ir
6(6)6(8)
17.9 % CLAY,silty,very soft to soft, 24
/ reddish brown,brown and gray 15 3 27 30_11 190
15 ! 8(6)9(6) wlcalcareous and ferrous nodules
(CL)
32.9 , CLAY,soft to very stiff,reddish 26
PP brown,brown and gray wlcalcareous 0 . 25 28 71 44 129
20 / 9(6)10(6) and ferrous nodules and silt seams
/ (CH)
22
0 44 20 52 30 136
25 0 13(6)13(6)
22.9
30 J
35
40-.
45 —'.
50 —
55—
60 -,
Remarks:1)Dry auger to 16.5 ft.,wet rotary from 16.5 ft.to 25.0ft.2)Free water encountered at 15.0 ft.during drilling,water level
measured after 15 mins.is at 4.33 ft.
1 The ground water elevation was not determined during the course of this boring.
`a/
Driller Jose Munoz Logger:Felipe Gamez Organization:Geotest Engineering,Inc.
FIGURE A-6
C VOENt1402150011114021 W31_Rwdxey_Stam Sewer Ga50.5152.54.55.57,5981 a3,65,87 CLG
11- DRILLING LOG 1of1
"" County Brazoria Hole GB-55 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-29-16
*4100...
Version 3.1 CSJ 0912-31-290 Station 46+50.7 Grnd.Elev. 48.50 ft
Offset 34.2'RT GW Elev. N/A
Texas Cone Triaxial Test Properties
St) Penetrometer Strata Description Lateral D Additional Remarks
a Penetrometer Press. Stress
si
CLAY,sandy,soft to very stiff, 13
8 6 8 6 gray and yellow w/calcareous and
ferrous nodules and ferrous stains '
/
(CL)
•
4 6 5 6
laI
SAND,clayey,loose,brown and •
I 9(6 9 6
- yellow(SC)
��
CLAY,soft to very stiff,reddish /4 passing#200 sieve=87%
brown and gray w/calcareous and slickensided 18'-20'
did.
48 8 11 6 ferrous nodules and ferrous stains _
/ (CH)
5
/ 126298
dli
Slate
Remarks:1)Dry auger to 16.5 ft.,wet rotary from 16.5 ft.to 25.0 ft.2)Free water encountered at 16.0 ft.during drilling,water level
measured after 15 mins.is at 7.58 ft.
The ground water elevation was not determined during the course of this boring.
`a
Driller:Jose Munoz Logger:Felipe Gomez Organization:Geotest Engineering,Inc.
FIGURE A-7
C Vabf l 140715[01111@15001 Rmdway_sMm Sews)GB50,51.52,54.55.57,59.616365.137 CLG
--A DRILLING LOG 1 o 1
��""'" County Brazoria Hole GB-56 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-11-16 }
Version 3.1 CSJ 0912-31-290 Station 58+00.00 Gmd.Elev. 50.10 ft `s/
Offset 10'RT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviator Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
(osll (psi) loon
FILL,clay,gray 71 w/calcareous nodules and
48.6ddir sand seams 0'-2'
CLAY,candy,soft to stiff,gray 4 19 22 47 30 111
w/calcareous and ferrous nodules gray and yellowish brown 4'-10
6 /4(6)518) and ferrous stains(CH) 15
Oddi
w/sand pockets 6.5'-13'
0 24 18 ]5 19 111
10Pr
0
4(8)4(6) 22
brown 11N-13.5'
27 24 9 %passingg 1/20 O200 sieve=]8%
36.6 6(6)](6) SAND,clayey,loose,brown(SC) 22 %passing 5200 sieve=47%
35.1 15 CLAY,soft to stiff,reddish brown
1041
and brown w/sill seams(CH) 27 52 31
w/calcareous and ferrous
I 31 70 45 nodules 18'-25'
20 / 7 16)8(6) I brown and gray 20'-23'
slickenslded 21.5'-23'
40
0 27 24 60 41 124
Pr reddish brown S gray 23'-25'
26 / 24 8(6)10(6)
23.6 ea Y CLAY,sandy,stiff to hard,brown 0 62 16 42 28 138 �1
reddish brown,brown and
30 !/ and gray w/sand seams(CL) 20 i gray 28'-33' ^s/
14(8)15(6)
A 19
17.1
! 1](6)18(6) CLAY,silty,medium graystiff to stiff,en0 7 24 94 1B 130
36 ! reddish brown and w/santl
13.6 seams(CL)
40
45
50 H
55
1
1
-1
ao�i I
Remarks:1)Dry auger to 8.8 ft.,wet rotary from 6.6 ft.to 35.0 N.2)Free water encountered at 5.0 ft.during drilling,water level
measured after 15 mins.Is at 3.0 ft.
The ground water elevation was not determined during the course of this boring.
NaII}
Driller:Adalberto Perez Logger:John A.Gentry/Felipe Garnet Organization:Geotest Engineering,Inc.
FIGURE A-8
C Vobs1140215001n1W215m1 Roadway_SW,m sawsr_Ga49,53,56,5808261.66.68CLG
alf DRILLING LOG 1of1
i"'""" County Brazoria Hole GB-513 District Houston
WinCore Highway Mallard Road Structure Roadway/Storm Sewer Date 1-7.15
*awe Version 3.1 CSJ 0912-31-290 Station 78+09.3 Grnd.Elev. 50.00 ft
Offset 9.9'LT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviato Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den,
(Psi) (psi/ (peg
48.8 PAVEMENT 10 3"Asphalt over
11"Limestone Base w/oysterOP CLA�so dtoa va9ry sUB,Barky 20 shell fragments,sand seams&
8 8 gray(CH) 5 78 21 53 33 130 calcareous nodules 14"-2'
fi 4 O 5 U grays'-0'
/ 24 w/ferrous nodules and ferrous
stains DA
10 32 22 60 37 130 gray and yelloww/calcareous
10 / 6(6)7(8) nodules 8'-10'
38. c/ CLAY,sandy,stiff,grayand brown
Y 13 25 10 32 16 133 %passing S200 nodules 07 seams f(f,1) w/calcareous nodules 13'-18'
CLAY,softyto stiff,reddish
dul brown 24
15 ! 6 8)8(6) and gray w/ferrous nodules and
/ ferrous stains(CH)
31
/ 28
slickensldetl 18'-20'
20
!7(6)8(6) 0 21 28 b8 36 124
'
21
27. % CLAY,sandy,stiff,brown and 0 18 22 45 25 128
25M.115(6)15(6) gray(CL) w/calcareous and ferrous
nodules&sand seams 2M-28'
8
ro, w/sand&silt seams 28'-30'
9 O 12(8)6
30_ 25 70 32 15 131 ye/ferrous stains 30'-33'
20. 30 CLAY,stiff,reddish brown and
/ gray(CH) 76
w/slit seams 3M-35'
35 17 26 51 31 175
35 / 11 (6)12(6)
13.5 ,
40
45
50
55
an
Remarks:1)Dry auger to 21.6 ft.,wet rotary from 21.6 ft.to 35.0 ft.2)Free water encountered at 21.0 ft.during drilling,water level
measured after 15 mins.Is at 12.00 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Adalberto Perez Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-9
CUoln111002150011 4c21WJ1_PoaMrzy_Storm Sewer_G1349,53,6.58,60,62,64 e8,68.CLG
DRILLING LOG 1of1
�`�"" County Brazode Hole GB-60 District Houston
WinCore Highway MCHard Road Structure Roadway/Storm Sewer Date 1-28-16 aj
Version 3.1 CSJ 0912-31-290 Station 98+36.9 Grnd.Elev. 50.00 ft t/
Offset 12'LT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviate Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
IDsil Mei) Inch
PAVEMENT 1.5"Asphalt over 16"Sand,
48.6 18 Gravel and Oyster Shell Mix
FILL,clay,sandy
47. 22 dark gray S gray w/shell
CLAY,sandy,very soft to stiff, 5 13 20 448 130fragments and calcareous
5 / 1(6)3(6) brown and gray w/calcareous and nodules 17.5"-3'
ferrous nodules and ferrous stains w/slit seams 4'-3'
(CL) 21
10 % 7(6)7(6) 10 22 19 49 31 134
–Xf2-
20
15 5(6)4(6) 15 9 21 28 11 114
33.5 CLAY,stiff to very stiff,reddish 30
brown w/calcareous and ferrous 0 39 23 5a 32 113
,✓ 18 p3)17(6) nodules and sand seams(CH)
20 _`-
28.5 f CLAY,sandy,stiff,gray and brown 18
_1 w/sand pockets,ferrous nodules 25 15 17 24 9 138
25 j 18(6)19(6) and ferrous stains(CL)
_;,....4
18
0 32 21 33 14 132 J
20. 30
12(6)13(6)
Cl" CLAY,stiff,reddish brown and
w/slit seams 315'-33'
gray w/ferrous nodules and ferrous 29
_.v1 u
17. / CLAY silty,(CH)
stiff to stiff, 35 12 24 31 12 128
35 j 10(6)10(6) reddish brown and brown w/slily
13.5 sand layer(CL)
-
40
45
50
55 --.I
-1
fin-
Remarks:1)Dry auger to 16.5 ft.,wet rotary from 16.5 ft.to 35.0 ft.2)Free water encountered at 15.0 ft.during drilling,water level
measured after 15 mine.Is at 7.17 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Jose Munoz Logger:John A.Gentry/Felipe Gamez Organization:Geotest Engineering,Inc.
FIGURE A-10
C4obs11140215001%1140215C01_Roadnay_alam Sew GB49.53.5658.60.82.64.06,BB.CLG
DRILLING LOG 1 of 1
Ira County Brazoria Hole GB-61 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-28-16
Nis/ Version 3.1 CSJ 0912-31-290 Station 106+40.0 Grnd.Elev. 48.20 ft
Offset 10'LT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. G Strata Description Lateral Deviator Wet Additional Remarks
Penetrometer Press. Stress MC LL PI Den.
(psi) los') Inc)
/ -5
CLAY,sandy,soft to very stiff, 20 w/gross roots 0'-2'
gray w/silt seams,calcareous w/ferrous nodules 2' '
nodules and ferrous stains(CH) 4 34 17 39 21 135
5 10(6)9(6) 17
41.7 , 8 29 22 68 34 130 •wlcalcareous nodules 6.5'-8'
diir CLAY,very stiff,gray and brown
w/ferrous nodules and ferrous 23
38.2 10 / 5(6)6(6)
stains(CH)
CLAY,sandy,soft to medium stiff, w/silt seams,ferrous nodules
gray and brown(CL) X3_13 21 28 11 127 S ferrous stains 11.5'-13'
35'2 CLAY,stiff,reddish brown and pL w/calcareous nodules 13'-15'
15 % 10(6)11(6) gray w/silt seams,ferrous nodules
/ and ferrous stains(CH)
dm
fa 20 ]0 >d 45 126_
30.2 r CLAY,silty,stiff,reddish brown 124
20 0 10(6)11 (6) w/calcareous nodules(CL)
w/silt seams 21.6'-23'
26.7 .arCLAY,sandy,stiff,gray and brown 23 18 19 12 15 1%
w/calcareous and ferrous nodules 20
25 18(6)19(6) (CL)
21.7 i
*e 30
35
40
46
50
55
so
Remarks:1)Dry auger to 16.5 ft.wet rotary from 16.5 ft.to 25.0 ft.2)Free water encountered at 16.5 ft.during drilling,water level
•
measured after 15 mins.Is at 3.0 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Jose Munoz Logger:Felipe Gamez Organization:Geotest Engineering,Inc.
FIGURE A-11
c umsulaozl50]nt lacisco1 Roaaway_Ste,m Sewer GBW.5152$4,55.57,59.61$36567CLc
DRILLING LOG 1of1
,m"'""` County Brazoria Hole GB-62 District Houston
WinCore Highway MCHard Road Structure Roadway/Storm Sewer Date 1-11-16
Version 3.1 CSJ 0912-31-290 Station 118+00.8 Grnd.Elev. 48.90 ft
Offset 16.9'LT GW Elev. N/A
Triaxial Test Properties
L Texas ConeEleLateral Deviator Wet Additional Remarks
(ft) 0 Penetrometer Strata Description Press. Stress MC LL PI Den.
(ft) G (psi) Iasi) loch
FILL,clay,gray wlcalcareous 19
46.4 nodules and sand seams
J
CLAY,very soft to stiff,gray 4 24 21 56 33 130
w/calcareous nodules and ferrous 24 w/ferrous nodules 4'-5'
5 3(6)4(6) stains(CH) —._.._
424 - 23 w/calcareous nodules 6.5'-8'
CLAY,silty,very soft to stiff,
brown and gray w/silt,ferrous 10 18 73 29 10 132
10 ▪ 3(6)4(6) nodules and ferrous stains(CL)
37.4 -4 P6
CLAY,very stiff,reddish brown -,w/ferrous nodules and ferrous
and gray wlcalcareous nodules 14 28 25 75_4L130 stains 13'-15'
/ 6(6)7(6) (CH)
33.9 16
0" CLAY,sandy,soft to very stiff,
1 reddish brown and gray w/sill 27
seams(CL) 20 28 22 42 22 112
20 6(6)6(6)
w/ferrous nodules and ferrous
19 stains 21.5'-23'
J 0 7L 19 34 16 132 w/calcareous nodules 21.6'-25'
25,J1-' 7(6)10(6)
L wlcalcareous nodules 28.6'-28'
22.4 CLAY,silty,stiff to very stiff, 22
brown w/sand seams(CL) w/silt stone 28'-30'
/
30 % 10(6)20(6) 30 41 73 24 7 115 J
174 _4 reddish brown&gray 31.5'-33' `I
/ CLAY,very stiff(CH) 33 41 76 68 42 127 88amca eou.sjnodules and slit
15.9 -1 CLAY,silty,hard,brown w/sill 75 37 17
36 • 50(5)50(4) stone(CL)
12.4 -/ r
40 -
46--
• 50-
• 55
an -
Remarks:1)Dry auger to 15.0 ft.,wet rotary from 15.0 ft.to 35.0 ft.2)Free water encountered at 13.0 ft.during drilling,water level
measured after 15 mins.is at 10.0 ft.
The ground wafer elevation was not determined during the course of this boring.
Driller:Adalberto Perez Logger:Felipe Gamez Organization:Geotest Engineering,Inc.
FIGURE A-12
GUob:u 110215Wm1402150. 1 Roedwny_SKnn Sever ca 49s3,56,59.W,62.64,Wse.IMO
—A- DRILLING LOG 1ot1
Az_
'"" County Brazorla Hole GB-63 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-27-16
aeser Version 3.1 CSJ 0912-31-290 Station 128+17.8 Grnd.Elev. 48.10 ft
Offset 7.3'LT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviator Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
(Psi) (psi) (Pcf)
aCLAY,sandy,soft to medium stiff, 19 w/grass roots 0'-4'
2 dark gray w/sand seams,ferrous 95 gray 7-3'
nodules and ferrous stains(CL) I w/calcareous nodules 7-6'
5 10 23 44 27 125 gray and yellow 3'-6'
5 4(6)4(6)
42.1 / SAND,silty,slightly compact, 19 %passing 4200 sieve=30%
brown and gray(SM)
10 115(6)18(6)
36.1 , CLAY,stiff to very stiff,reddish 21 w/silt and silty clay
! 108106 brown w/silt seams and calcareous 14 32 31 ,76_.St 124 seams at 13'
15 O O nodules(CH)
/ _ 22
30.1 / CLAY,silty,stiff,brown w/silt _20 16 22 41 24 113
28.1 20 / 6 6 11 6 _and grind tamale(a)
Ira CLAY,sandy,soft to very stiff,
gray and yellow w/calcareous and 17
r ferrous nodules(CL)
0 29 18 27 11 195
25 5(6)6(6)
21.6 de
I
30
35
40
45
50
I 1
55
60 I
Remarks:1)Dry auger to 6.5 ft.,wet rotary from 6.5 ft.to 25.0 ft.2)Free water encountered at 5.33 ft.during drilling,water level
measured after 15 mins.is at 2.0 ft.
The ground water elevation was not determined during the course of this boring.
Near
Driller:Adrian Perales Logger:John A.Gentry Organization;Geotest Engineering,Inc.
C VMs 114021YA1U 140215001_RwAnm y_SipScam 085051$354,55,57,5961,a3,65,fi].CLG FIGURE A-13
-A. DRILLING LOG 1 of 1
County Brazorla Hole GB-84 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-8-16
Version 3.1 CSJ 0912-31-290 Station 139439.9 Grnd.Elev. 47.308
Offset 10.1'RT GW Elev. NIA
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviato Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
(Psi) (psi) lost)
45.9 FILL,clay,sandy,gray and brown fngmantaaots,sand seams
calcareous and
and
shell
CLAY,sandy,dark gray(CL) - ferrous nodules 0'47"
44.3 CLAY,soft,gray and yellowish w/roots 1y"-3'
5 4(6)5(6) brown w/sand seams and ferrous '%passing#200 sieve•81%
•
w/ferrous nodules and ferrous
41.3 CLAY,sandy,soft to very stiff, 20 stains 6'-10'
gray and yellowish brown(CL) w/sand seams 6'-11.5'
0 29 70 43 24 131
10 6(6)8(8) w/ferrous stains 10'-13'
gray and brown w/sill
35.8 CLAY,soft to stiff,reddish brown 16 seams 1110"-13'
and gray w/silt seams,ferrous 15 11 30 52 30 124.
15 7(6)7(6) nodules and ferrous stains(CH)
32
20
T(6)8(6) 0 25 32 70 42 123
w/calcareous nodules 21'-23'
24 brown and gray wlferrous
24.3 nodules 22'-23'
8(6)12(6) CLAY,sandy,stiff to very stiff, 0 21 18 30 14 114
26 gray w/sand seams and calcareous
nodules(CL) gray&yellow 26'-28'
16
gray&brown 28'-30'
12(6)13(6) 0 36 70 34 16 132
17.3 30 CLAY,silty,stiff,brown and
gray w/sand and slit seams and 0 16 21 36 18 112
• 14.3 CLAY,stiff,reddish brown and 23
95 14(6)15(6) gray wlcalcareous nodules(CH)
10.8
40 -
45-1
1
60
y
55
- i
RO
Remarks:1)Dry auger to 13.0 ft.,wet rotary from 13.0 ft.to 35.0 ft.2)Free water encountered at 13.0 ft.during drilling,water level
measured atter 15 mins.is at 5.92 ft.
The ground water elevation was not determined during the course of this boring.
held
Driller:Adalberto Perez Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-14
C UobA1 N021YA11114O215m1Roadway_SlwmSwu_GB49,53,54$5. ,62,6466,58.CLG
..,4- DRILLING LOG 1of1
/St% County Brazorla Hole GB-66 District Houston
WlnCore Highway McHard Road Structure Roadway/Storm Sewer Date 1-8-15
east Version 3.1 CSJ 0912-31-290 Station 161+99.9 Glint.Elev. 48.30 ft
Offset 10'RT GW Elev. N/A
L Texas Cone Triaxial Test I Properties
Elev. 0 Penetrometer Strata Description ress. ,Lateral StresDeviator MC LL PI DpiAdditional Remarks
(ft) G IPSO (pall (pcf)
CLAY,sandy,soft to stiff,dark 19 'w/grass roots 0'-2'
gray w/sand seams(CL) yellowish brown 3 gray
4 19 14 43 25 126 w/calcareous nodules 2'-5'
5 — 5(6)6(6) 18 brown&gray w/ferrous stains
&ferrous nodules 5'-11'
-1 _ 21 i
10 7 19 26 10 129
10 %4(6)6(6)
37.3
CLAY,soft to very stiff,reddish 27
brown and gray w/calcareous and
ferrous nodules and ferrous stains - 29
15 / ]16)6(6) (CH)
0 31 30 78 48 126_
29.3 20 . 5(6)6(6) CLAY,sandy,soft to stiff,gray w/ferrous nodules 20'-23'
-✓ and brown w/ferrous stains and
-/ sand seams(CL) 23 22 22 36 19 134
23.3 26 i 17
10(6)18(6)
SAND,silty,slightly compact
to compact,brown and gray(SM) 21 %passing#200 sieve=31%
`,r 30 ',iji: 26(6)27(6)
• 21
I 35 I�'d 23(6)25(6)
11.8 —
40
•
•
•
45
50 i
55
BD-t
Remarks:1)Dry auger to 10.0 ft.,wet rotary from 10.0 fL to 35.0 ft.2)Free water encountered at 9.0 ft.during drilling,water level
measured after 15 mins.Is at 3.33 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Adalberto Perez Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-15
Cuob:nuo2tsoomt4O2I5 Ol Roadway Sty sw=r_0B495355,58,60,82.5466.58CLG
DRILLING LOG 1 of 1
County Brazorla Hole GB-67 District Houston
WlnCore Highway McHard Road Structure Roadway/Storm Sewer Date 2-1-16
Version 3.1 CSJ 0912.31.290 Station 170+98.7 Grnd.Elev. 46.00 ft
Offset 14'RT GW Elev. N/A
Triaxial Test Properties
L Texas Cone Lateral Deviator Wet
ft) G0 Penetrometer Strata Description Press. Stress MC LL PI Den. Additional Remarks
(
(k) G (PSI) (Pall Mob
•
CLAY,dark gray and gray w/roots 26 w/roots and sand seams 0'-2'
`H
44. CLAY,sandy,stiff,gray and yellow 20
41. 5 ✓ 4(6)4(6) —a dndwan-seams(ferrous nodules 5 20 20 45 26 1)]
CLAY,silty,soft to medium stiff,
gray and brown w/sand seams,tenons 23
nodules and ferrous stains(CL) 10 13 24 37 18 130
10 6(6)11(6)
34.6 w/calcareous and ferrous
CLAY,soft to very stiff,reddish 30 nodules 11.5'-15'
brown and gray(CH) 0 28 32 81 61 175
15— B(6)10(8)
/ 31
w/sand seams and ferrous
_20 24 23 52 30 133 nodules 18'-20'
20 : 7(6)10(6)
24.5 CLAY,silty,stiff to very stiff, - 17
brown and gray w/calcareous nodules 0 15 22 32 14 133
25— 23(6)22(6) and sand pockets(CL)
19.5
no
30
35
90
45
50
55-
80
Remarks:1)Dry auger to 13.0 ft.,wet rotary from 13.0 ft.to 25.0 ft.2)Free water encountered at 12.0 ft.during drilling,water level
measured after 15 mins.is at 4.0 ft
The ground water elevation was not determined during the course of this boring.
Driller:Adrian Perales Logger:Felipe Gamez Organization:Geolest Engineering,Inc.
FIGURE A-16
CUtM111LON500111106215OO1 Roe oy Siorm asxar_GB50,5152,ASiA59,61.C3,65.67 CLG
DRILLING LOG 1 of 1
County Brazoda Hole GB-68 District Houston
WinCore Highway MCHard Road Structure Traffic Signals Modification Date 2.1-18
Neer Version 3.1 CSJ 0912-31-290 Station 181+20.2 Grnd.Elev. 44.70 ft
Offset 16.3'RT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviator Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
WW1 (ssi) (PGO
CLAY,sandy,dark gray w/roots _ 20
42.7 w/sand seams 2'3'
9 CLAY,soft to very stiff,gray 73
7(6)7(6) and brown w/ferrous nodules and
ferrous stains(CH) 5 28 20 63 28 13^
5 /
40 22
O
6(6)7(6)
10 _J0 26 28 52 32 131
/ 36 reddish brown 8 gray 11.5'-15'
Want seams 13'-15'
5 /
8(8)9(6)
15 14 28 51 31 126
wlcaleareou>nodules 18.5.-18'
26
26'7 CLAY,sandy,stiff to very stiff, 20 12 21 41 25 111
20 / 9 6 16-) brown and gray w/calcareous nodule
MI and silt seams(CL)
PP 17
25 113(6)16(6) 0 42 20 38 19 134
20
`e 14 6 15 6 -J1--22 20 28 12 131
30 1 ) 1 >
23 %passing 8200 sieve=69
11.7 OP CLAY,very stiff,reddish brown 0 49 25 64 41 112
35 / 22(6)25(6) w/calcareous nodules(CH)
8.2 ,
40
45
50
55
6n
Remarks:1)Dry auger to 15.0 ft.,wet rotary from 16.0 ft.to 35.0 ft.2)Free water encountered at 15.5 ft.during drilling,water level
measured after 15 mins.is at 6.0 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Adrian Logger:Felipe Gamez Organization:Geotest Engineering,Inc.
FIGURE A-17
CVobs11140215001\1140215001 nondistAlorm Sewer GB49.6aCMG
DRILLING LOG loft
County Brazoria Hole GB-69 District Houston
WlnCore Highway MCHard Road - Structure Detention Pond-O'Day Date 1.27-16
Version 3.1 CSJ 0912-31-290 Station 119+94.0 Gmd.Elev. 47.70 ft ter/
Offset 123.7'RT GW Elev. NM
L Texas Cone Triaxial Test Properties
Elev. 0 Penetrometer Strata Description Lateral Stress Deviator MC LL PI Oen. Additional Remarks
(ff) G loan (Psi) (Pan
CLAY,sandy,stiff to very stiff, 15 w/grass roots 0'-i'
dark gray and gray wlcalcareous 3 28 15 41_2,1_137_
nodules and ferrous stains(CL) gray 3'-5'
5 5(6)10(6) 19 soft 6'-6.6'
w/ferrous nodules 5'-10'
17 38 20 gray and brown 5'-13'
10 23 , 22 110
10 % 11 (6)9(6)
17 32 12
34.7
CLAY,soft,reddish brown and __._ 33
16 91L11(01 _ grayw/ferrous nodules and ferrous
31.2 — stains(CH)
20
25
ad
30
35
40
45
50
55
80
Remarks:1)Dry auger to 15.0 ft.,wet rotary from 15.0 ft.to 15.0 ft.2)Free water first encountered at 13.25 ft.during drilling;
atter 15 mins.at 6.75 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Adrian Perales Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-18
C UobOfl40215m11114a215W1 Gelmem Pond_GUay_G9e91o71 GLG
_ DRILLING LOG 1 of 1
�"""' County Brazoria Hole GB-70p District Houston
WlnCore Highway McHard Road Structure Detention Pond-O'Day Date 1-27-16
'4W" Version 3.1 CSJ 0912-31-290 Station 123+02.4 Grnd.Elev. 47.20 ft
Offset 134.7 RT GW Elev. N/A
L Texas Cone Trlazlal Test Properties
Elev. 0 Strafe Description Lateral Deviator Wet
Press. Stress MC LL PI Den. Additional Remarks
.(g) G Penetrometer
(Psi) (psi) 1pcfl
CLAY,sandy,stiff,dark gray 21 wfgrass roots o'-2'
and gray w/calcareous and ferrous 3 16 20 43 23 122
nodules(CL) w/calcareous nodules 3'-5'
22 42 25
42.2 5 % 4(6)3(6)
_ SAND,silty,very loose,brown
and gray(SM) 20 %passing 4200 sieve•32%
38.2 `' 10 31 23 56 31 121 sllckensided 9'-10'
10-�B(8)9l8) CLAY,soft to very stiff,reddish
brown and gray w/calcareous nodules
and ferrous stains(CH) 2)
131 78 49
15� 5(6)7(6)
30.7
20
25
1V
30
35
40
45
50
55
•
80
Remar s:1)Dry auger to 8.0 ft.,wet rotary from 8.0 ft.to 16.0 ft.2)Free water first encountered at 8.0 ft.during drilling;after
•
15 mins.at 5.17 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Adrian Perales Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-19
C VMzn 140115001n140215WI oxenrm Pond oory_OBCAml ZUG
DRILLING LOG loft
County Brazorla Hole GB-71 District Houston
Wincore Highway McHard Road Structure Detention Pond-O'Day Date 1-27-16 6
Version 3.1 CSJ 0912-31-290 Station 126+60.9 Grnd.Elev. 47.00ft V
Offset 145.3'RT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 penetrometer Strata Description reLateral DeviatorStress MC LL PI Den. Additional Remarks
(ft) G loaf) (psi) (pc0
CLAY,sandy,stiff to very stiff, 23 w/grass roots 0'-2'
dark gray w/calcareous and ferrous 16 41 23 w/sand seams 0'6'
-� nodules and ferrous stains(CL) 6 33 _17 132 gray and yellow 2'-T
5 X10(6)12(6)
8 43 20 /5 25 132 gray&w/san seams sh IV-1 ' ]'-10'
wlsantl seams 6'-10'
22
37. 10 2(B)2(8)
CLAY,very soft to soft,reddish
brown and gray and
and 26
ferrous nodules ferrous stains 131 72 45
15
4(6)6(6) (CH) .__
30.5
20
25
II
30
35
40
45
50-
55 -
60
Remarks:1)Dry auger to 10.0 ft.,wet rotary from 10.0 ft.to 15.0 ft.2)Free water first encountered at 10.0 ft.during drilling;after
15 mine.at 6.75 ft
The ground water elevation was not determined during the course of this boring.
`YI
Driller:Adrian Perales Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-20
C1obM114021sWnn0215W1 oo,ention aond_owy_GB691o71.CLG
DRILLING LOG 1 of 1
ia'-^"` County Brazoria Hole GB-72 District Houston
WlnCore Highway McHard Road Structure Detention Pond-Hatfield Date 1-26-16
"%or Version 3.1 CSJ 0912-31-290 Station 142+29.9 Grnd.Elev. 46.20 ft
Offset 130.1'RT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 Penetrometer Strata Description Lateral Deviatortress MC LL PI WetDeAdditional Remarks
IR) G (psi) (pcf)
/ CLAY,sandy,very soft to medium 21 w/grass roots 0'-2'
tistiff,dark gray w/calcareous gray 2'-4'
/ and ferrous nodules(CL) 4 9 18 38 23 127
5 2(6)2(6) 22 stains 4'andbellow w/ferrouc
40.2 SAND,silty,slightly compact, 18
brown and gray(SM)
10
1116)1118) 17 %passing#200 sieve=15%
14.7 CLAY,soft to very stiff,reddish 26 ----
brown and gray(CH) slickensided,w/ferrous
/4(6)3(6) 15 31 27 79 66 128 very soft 15les 6
15 165'
/ 31
20 0 7(6)7(6) 20 54 37
24.7 •,
25
1v 30
36
•
40
45
50
55
ea
Remarks:1)Dry auger to 5.0 ft.,wet rotary from 5.0 ft.to 20.0 ft.2)Free water first encountered at 4.0 ft.during drilling;after
15 mins.at 2.0 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Adrian Perales Logger:John A.Gentry Organization:Geotest Engineering,inc.
FIGURE A-21
CuoMV140215WIH 14021NA1 Detention P Hatra14_GBR1o]a CLO
DRILLING LOG 1 of 1
County Brazorla Hole GB-73 District Houston
WinCore Highway McHard Road Structure Detention Pond-Hatfield Date 1-26.16
Version 3.1 CSJ 0912-31-290 Station 146+00.1 Grnd.Elev. 45.40 ft
Offset 130.2'RT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviator Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
(pal) (psi) loon
401
CLAY,soft to very stiff,gray _ 23
w/ferrous nodules,ferrous stains gray and brown 2'-5
and sand seams(CH) 2l1 54 31
OFF
6 6(6)6(6) 19
gray and yellowish brown
B 90— 0-51_11 129 I wfsiit and sand seams 6'-10'
6(6)](6) 22
10 /
24 66 43
wlcalcareous nodules 11.6'-18'
/
/ 6(6)](6)
15 33
3B 30 ]4 45 124 sllckensided 18.5'-18'
18
21
20 0 3(6)3(6) very soft 20'-21.5'
23.9
25
30
35
40
45
50
65
an H'
Remarks:1)Dry auger to 13.0 R.,wet rotary from 13.0 ft.to 20.0 ft.2)Hole caved in at 13.0 ft.
The ground water elevation was not determined during the course of this boring. V
Driller:Adrian Perales Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-22
C Woad 11ON5Wn110e215001_DaleMlm Pand_Halred_Ga72107eC10
- DRILLING LOG 1of1
County Brazoria Hole GB-75P District Houston
WinCore Highway MCHard Road Structure Detention Pond-Hatfield Date 1-25.16
'Item/ Version 3.1 CSJ 0912-31-290 Station 167+00.00 Gmd.Elev. 46.10 ft
Offset 130'RT GW Elev. NIA
L Texas Cone Triaxial Test [ Properties
(ft) 0 penetrometer Strata Description Press.Lateral Stress r MC LL PI Den. Additional Remarks
(ft) G
Iasi) Wei) (pcf)
di CLAY,sandy,soft to stiff,gray 25 w/roots 0'-2'
ri and brown w/calcareous and ferrous
nodules and ferrous stains(CL) 4 16 22 41 24 128 %passing#200 sieve=73%
5 di4(6)5(6) 18
5 8 9 18 27 10 127 41
38.1
Ai/
6(6)4(6) SILT,sandy,loose,brown w/sandy _17 1%passing#200 sieve=56%
ip clay seams and calcareous nodules
36.1 �M�� w/silt stone 11.5'-13'
,silty,reddish brown(CL) 26
33.1 CLAYwlferrous stains 1T-15)
% J(6)4(6) CLAY,very soft to very stiff, 28 74 46
15 gray and reddish brown w/calcareous
/ nodules(CH)
36 w/santl seams 18'-20'
20
3(6)3(6)
20 39 31 56 33 132
ii
24.6
25
r►= 30
35
40 i
45
50
55
60
Remarks:1)Dry auger to 10.0 ft.,wet rotary from 10.0 ft.to 20.0 ft.2)Free water first encountered at 10.0 ft.during drilling;after
15 mins.at 6.17 ft.
The ground water elevation was not determined during the course of this boring.
iamr
Driller:Adrian Perales Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-23
C lobs111402l5 111140215001 nelnbon Pond_Halfield Ga]21o79.CLG
A- DRILLING LOG toff
'St. County Brazoria Hole GB-76 District Houston
Wincore Highway MCHard Road Structure Detention Pond-Hatfield Date 1-25-16 j
Version 3.1 CSJ 0912-31-290 Station 169+95.3 Grnd.Elev. 47.10 ft "✓
Offset 163.2'RT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. O Strata Description Lateral Deviator Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
(PSI) (Pall (rich
/ CLAY,sandy,soft to stiff,dark 21 w/roots 0'-2'
p. gWy(CL) gray and brown w/sand seams,
4 19 19 42.28_111_ferrous nodules and ferrous
_- ZS__ stains 2'-6.5'
6 518)5(8) -- _. %passing 4200 sieve=74%
Pp-
40.6 CLAY,silty,soft,gray w/silt ____23 36 to
0 stone and calcareous nodules(CL) 73 w/sandy slit 8'-9'
10 !4(6)6(6)
35.6 , CLAY,very soft to stiff,reddish 27 56 79
brown w/silt seams,calcareous 15 22 32 124
15 / 2(6)3(6) nodules and ferrous stains(CH)
OA 30 77 47
33
20 05(6)3(6)
25.6
25
`ead
30
35
40
45
50 —,
J
55 —.
se— 1
Remarks:1)Dry auger to 13.0 ft.,wet rotary from 13.0 ft.to 20.0 ft.2)Free water first encountered at 13.0 ft.during drilling;after
20 mins.at 10.86 ft.
The ground water elevation was not determined during the course of this boring.
Driller:Adrian Perales Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-24
C:uoh.e A@150fll 14021 Yb. 1 eeIenian eend_H.retl Ger21er&CLG
DRILLING LOG 1 of 1
ice"'^` County Brazoria Hole GB-77 District Houston
WinCore Highway McHard Road Structure Detention Pond-Hatfield Date 1-25-16
kea,/ Version 3.1 CSJ 0912-31-290 Station 160+20.0 Grnd.Elev. 47.10 ft
Offset 560'RT GW Elev. N/A
L Texas Cone Triaxial Test Properties '
Elev. 0 Strata Description Lateral Deviator Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
(psi) (psi) foci
01 CLAY,sandy,dark gray and gray 21 'w/roots 0'-4'
1r1
15.1 CLAY,stiff,gray and yellowish 4 26 20 60 28 130
brown w/d-saw'ous nodules,ferrous %passing 6200 sieve=83%
42.1 5 16 6 7 6 _-LAY,sand sann serve
ray an Cu) u w/sand 4'-5'
CLAY,silty,soft,gray and brown
w/silt and sand seams(CL) 25 49 31
39dCLAY,soft to stiff,reddish brown 27
10 9 516)9(6) w/calcareous nodules and ferrous
/ stains(CH)
13 19 32 89 40 12
5—
slickensided 11.5'-13'
/
! 8(6)9(6)
15 Al
34
/ �fl-26. 31 82 56 120
w/ferrous nodules 18'-20'
/ 7(8)10(6) ______.3.4______
20
25.6
25
Nae/ 30
35
40
45
50 I
55
80
Remarks:1)Dry auger to 16.0 ft.,wet rotary from 16.0 ft.to 20.0 ft.2)Free water first encountered at 16.0 ft.during drilling;after
20 mins.at 14.42 ft.
The ground water elevation was not determined during the course of this boring.
tee-
Driller:Adrian Perales Logger:John A.Gentry Organization:Coolest Engineering,Inc.
FIGURE A-25
CUobsl a4o21axlll 140215X1 Delenaan emd_HaIfield GanIo7B CLO
DRILLING LOG 1of1
��'"'""" County Brazorie Hole GB-76 District Houston
WinCore Highway McHard Road Structure Detention Pond-Hatfield Date 1-25-16 }
Version 3.1 CSJ 0912-31-290 Station 158+80.0 Grnd.Elev. 46.80 ft V
Offset 400'RT GW Elev. N/A
Triaxial Test Properties
L Texas Cone
Elev. 0 Strata Description Lateral Deviator Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
los]) (osi) (peg
/ CLAY,sandy,soft to medium stiff, 22 w/grass roots 0'-4'
A gray and dark gray w/ferrous nodules w/calcareous nodules and
4 13 72 49 79 126 ferrous stains 2'-5'
(CL) 19 w/sand seams 4'-5'
5 j4(6)6(6)
Mil
Prol 17 29 14
37.8 / 20 Iw/sill seam 9'-13'
10 6(6)6(6) _ CLAY,soft to stiff,gray and
brown wderrous nodules and ferrous
/ stains(CH) 13 73 33 74 47 122
reddish brown 13'-16'
4686 32
31.8 15 / CLAY,sandy,soft,brown and gray
Pri w/ferrous nodules and ferrous 19 29 12
stains(CL) 17
20 06(6)5(6)
25.3
25
J
30
35
40
45
50
55
e0
Remarks:1)Dry auger to 10.0 ft.,wet rotary from 10.0 ft.to 20.0 ft.2)Free water first encountered at 10.D ft.during drilling;after
20 mina,at 7.83 ft.
The ground water elevation was not determined during the course of this boring. j
Driller:Adrian Perales Logger:John A.Gentry Organization:Geotest Engineering,Inc.
FIGURE A-26
Cobsn 1402150011140215001 o.snum
on aond_H. ae C9721000LG
\J
DRILLING LOG 1of1
°"'°° County Brazorla Hole GB-79 District Houston
WinCore Highway McHard Road Structure Detention Pond-Clear Creek Date 04-0146
`' Version 3.1 CSJ 0912-31-290 Station 18+76.95 Grnd.Elev. 50.60 ft
Offset 431.15'LT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0
(g) G Penetrometer Strata Description Lateral Deviator Wet
Press. Stress MC LL PI Den. Additional Remarks
(psi) (psi) (pck
CLAY,stiff,dark gray w/sand 16 w/roots 0'4
seams(CH)
24 64 41 %passing#200 sieve=82%
46.5 6 no/ 3(6)7(6) _-6_20 23________11.1_1
CLAY,sandy,soft to very stiff,
gray and yellowish gray w/calcareous 13
and ferrous nodules and ferrous
10 —./9(6)11(6)
stains(CL) 1e 30 15 35 19 149_%passing#200 sieve=83%
—/ w/sand seams 11.5'-13'
24
37.5 w/sandy clay seams 13.5'-15'
15
7(617(8) SILT,loose,brown w/sand(ML) 19 %passing#200 sieve a 82%
34. CLAY,stiff,reddish brown w/silt 22
seams and calcareous nodules(CH)
20 _26 27 70 43 122 s% 20-285200 sieve:98%
20 — 6(6)9(6) sokft 20'-21.5'
/ 27
22 53 33 %passing#200 sieve=86%
16(6)19f0.)
r
25 _ yellowish gray and
25 _brown 26.5'-30'
lea30 9(6)15(6) 23
n/
19. —
35
40
45
60
55
60
Romer s:1)Dry auger to 15.0 ft.,wet rotary from 15.0 ft.to 30.0 ft.2)Free water first encountered at 16.0 ft.during drilling;after
20 mins.8.66 ft.
The ground water elevation was not determined during the course of this boring.
*sr
Driller:Bo-Van&Sons Logger;Shapoor Golshan Organization:Geotest Engineering,Inc.
FIGURE A-27
cuacsnao215mnn4a2rsoa_onenron Pono_Ciaer Creek ce7910a4 CLO
DRILLING LOG 1of1
County Brazoria Hole GB-80 District Houston
WinCore Highway Mallard Road Structure Detention Pond-Clear Creek Date 03-31-16
Version 3.1 CSJ 0912-31-290 Station 20448.39 Gmd.Elev. 60.00 ft
Offset 671.36'LT GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0Strata Description Lateral Deviator Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
(psi) (Mil (Pcf)
CLAY,sandy,dark gray(CL) iB wlgrass roots 0'-2'
48. CLAY,very stiff,dark gray and 4 30 19--5235 131 %passing#200 sieve=77%
Frown(Cu)
46. 5 6(6)7(6) CLAY,sandy,soft,gray and brown 19
wlcalcareous nodules,ferrous w/ferrous nodules 6.5'-10'
stains and sand seams(CL) 19
% 20 44 2 %passing#200 sieve=76%
10 7(6)7(6)
very sandy clay 11.6'-12.5'
37.5 l 13 9 21 131
SILT,sandy,slightly compact,
- 12(6)14(6) brown(ML) 23
15
22 %passing#200 sieve e'56%
30. 20 7(6)5J )
CLAY,silty,soft to stiff,yellowish w/silt seams 21.5-23'
brown w/sand seams and ferrous 22
stains(CL) 26 11 23 211 12 127 %passing#200 sieve=88%
25 14(6)11 (8)
23.6CLAY,soft,reddish brown w/calcareoi V 0 3B 94 68 41 122—
nodules(CH) 31
30 7(6)12(6)
18.5
35
40
45
50 -
56 -
s0
Remarks:1)Dry auger to 16.0 ft.,wet rotary from 16.0 ft.to 30.0 ft.2)Free water first encountered at 15.0 ft.during drilling;after
20 mins.8.25 ft.
The ground water elevation was not determined during the course of(Ills boring.
Driller:Rusty-Van 8 Sons Logger:Shapoor Goishan Organization:Geotest Engineering,Inc.
c mmsnam+soovaoz scm oaemmo rand CearCreek Ge79M4CLG FIGURE A-28
DRILLING LOG 1of1
County Brazoria Hole GB-81P District Houston
WinCore Highway McHard Road Structure Detention Pond-Clear Creek Date 03-31-16
`' Version 3.1 CSJ 0912-31-290 Station 18«98.38 Grnd.Elev. 50.00 ft
Offset 838.88'LT GW Elev. NIA
L Texas Cone Triaxial Test Properties
Elev. O Strata Description Lateral Deviator Wet Additional Remarks
(ft) G Penetrometer Press. Stress MC LL PI Den.
(Psi) (Psi) (PO
CLAY,sandy,dark gray w/roots 19
48. (rI)
CLAY,soft to stiff,gray and 4 26 722 70 45 127 %passing#200 sieve•79%
dark gray w/sand seams and ferrousP3 gray and yellowish gray 4'-10'
5 -„,..
4(8)5(6) nodules(CH) - -
w/sand stone 6.5'-9'
7w/ferrous stains 6.5'-10'
43. CLAY,sandy,stiff,brown and - _ _ 22
9(6)9(6) gray w/calcareous nodules(CL) 0 25 21 39 20 127 w/slltsseams28-1sieve=85%
40. 10 CLAY,silty,soft,brown and reddish
brown w/sand and silt seams(CL) 24
37, w/calcareous nodules 13'-15'
6 18 8 CLAY,stiff,reddish brown and 34 73 47
14
15 1 1 O gray(CH)
33.5 CLAY,silty,stiff,reddish brown 22 37 19 %passing#200 sieve•979
(CL) _0__, 15 23 131 w/calcareous notlules l0'-2y,'
20 / 12(6)14(6)
28.5 CLAY,stiff,reddish brown w/calcareous 27
_....0 nodules and silt seams(CH) r 6D 35 %passing#200 sieve=98%
25 10(6)16(6)
20
'taw/ 30 11 (6)17(6) 26
18.5
35
40
45
50
55
60
Remarks:1)Dry auger to 16.0 ft.,wet rotary from 16.0 ft.to 30.0 ft.2)Free water first encountered at 16.0 ft.during drilling;after
20 mins.9.17 ft.
The ground water elevation was not determined during the course of this boring.
*Nov
Driller:Bo-Van 8 Sons Logger:Shapoor Golshan Organization:Geotest Engineering,Inc.
FIGURE A-29
CI
c V WAit4021500NUO215o01 Debmi0n Pond_Clear #A
er Creek G .a094. G
4- DRILLING LOG 1of1
" County Brazoria Hole GB-82 District Houston
WlnCore Highway McHard Road Structure Detention Pond-Clear Creek Date 03-30.16
Version 3.1 CSJ 0912-31-290 Station 20+17.84 Grod.Elev. 50.00 ft
Offset 1043.34'LT GW Elev. NIA
Triaxial Test Properties
L Texas Cone Lateral Deviator Wet
0 Penetrometer Strata Description Press. Stress MC LL PI Den. Additional Remarks
(ft)
(„) G (nail Well (oaf)
. CLAY,sandy,soft to very stiff, 20 w/roots 0'-2'
gray w/ferrous nodules and ferrous w/calcareous nodules 0'4.5'
-/ stains(CL) 4 43 12 38 24 137 _%passing#200 sieve a 76%
5 / 3(6)4(6) 18 gray and Yellowish gray 2'-13'
very soft 5'-8.5'
21 w/silt seams 6.6'-13'
0 15 22 29 12 111 %passing#200 sieve=74%
10 6(6)6(6)
22
37. _ SAND,silty,loose,brown(SM) 24 le passing#200 sieve=23%
15 -.':`. 4(6)5(6)
25
20- .r1. 7(6)5(6)
28.5SILT,brown w/santl seams(ML) 24 w/silly clay 22'-23'
27. ��/ CLAY,stiff to very stiff,reddish 0 36 27 65 42 132 %passing#200 sieve=99%
25 12(8)11 (6) brown(CH)
J sided,w/calcareous
nodules_nodules 28.5'-28'
w/silt seams 28'-30'
30 /
11(6)16(6) 24 J
18.5 —
35
40
45
50
55
an
Remarks:1)Dry auger to 17.0 ft.,wet rotary from 17.0 ft.to 30.0 ft.2)Free water first encountered at 17.0 ft.during drilling;after
20 mina.9.0 ft.
The ground water elevation was not determined during the course of this boring. j
Driller:Rusty-Van&Sons Logger:Shapoor Golshan Organization:Geotest Engineering,Inc. `V
FIGURE A-30
C uobe914O215a0n1I 4e25wm pnemmn aond_cIeer CreeL_Gmalo54.CLn
. DRILLING LOG 1 oft
County Brazoda Hole GB-83 District Houston
WinCore Highway McHard Road Structure Detention Pond-Clear Creek Date 0341-16
mar Version 3.1 CSJ 0912-31-290 Station 18+77.42 Grnd.Elev. 48.50 ft
Offset 1166.58'LT GW Elev. NIA
LTexas Cone Triaxial Test Properties
Elev. G Penetrometer Strata Description LateralresDeviator MC LL PI Den. Additional Remarks
(Psi) (psi) loch
CLAY,sandy,dark gray and brown 18 w/tree roots 0'-2'
n
46.5 CLAY,very hartl,dark gray w/sand 4 112 14 51 32 128—%passing#200 sieve=74%
O8(8) seams(CH) 16 51 31 nollowiis4gray ye/calcareous/calcareous
-/ 4 6
43.5 5
CLAY,sandy,medium stiff,brown
and gray wfferrous nodules and 20 -
ferrous stains(CL)
j3(6)4(8) 10 10 20 44 29 119 %passing*200 sieve=64%
38.5 10 SAND,silty,loose,brown w/sandy
clay lumps(SM) 22 %passing*200 sieve=36%
15 - B,6)7(6)
32. _� CLAY,silty,medium stiff,brown 19 F
w/sand seams(CL-ML)
10(6)10(6) 0 12 21 21 5 112 j%passing#200 sieve=85%
28.5 20 CLAY,stiff,reddish brown w/calcareou r
nodules and silt seams(CH) 0 31 28 61 36 125
25–/ 12(6)15(6) - 26 ---gray and brown w/sand seams&
calcareous nodules 26.5'-28'
22. J yellowish brown&gray 27'40'
—,..,v,'
CLAY,silly,stiff(CL) 0 15 22 44 28 125 %passing*200 sieve=88%
20.5 CLAY,stiff,gray and brown w/calcareous 23 50 30
`e 30 / 14(6)16(6) nodules(CH)
17.
35
40
45 ,
50
55
60 I
Remarks:1)Dry auger to 30.0 ft.
The ground water elevation was not determined during the course of this boring.
-fid
Driller:Rusty-Van&Sons Logger:Shapoor Golshan Organization:Geotest Engineering,Inc.
cmome um15mnn402r5csi GeIedron ecnd_CInr geek Gwaow.aa FIGURE A-31
DRILLING LOG 1 of 1
/'"nom^` County Brazarla Hole GB-84 District Houston
WinCore Highway McHard Road Structure Detention Pond-Clear Creek Date 03-30-16 9
Version 3.1 CSJ 0912-31-290 Station 19+46.93 Grnd.Elev. 49.50ft tea/
Offset 1366.82'LT GW Elev. NIA
Triaxial Test Properties I
L Texas Cone
Elev. 0 Strata Description Additional Remarks
(g) G LateraDeviator Wet Penetrometer Press. Stress MC LL PI Den.
(Dsll (nal) (PcFl
CLAY,sandy,dark gray(CL) 22 wares roots 0'-2'
47.5 w/canodules 2'-6'
CLAY,gray and brown w/sand(CH) 24 52 32 %passingssing 02#200 slave=67%
45.5 6(6)t2(6) CLAY,sandy,very stitl,gray 5 45 14 43 26 140 %passing#200 sieve•57%
5 soft 5'-6.5'
and brown w/ferrous nodules and
-/ ferrous stains(CL) 14
10 34 13 23 9 134
39.5 10 i 14(6)12(6) %passing 0200 sieve=53%
SAND,silty,loose to compact, wlsantl clay 11.5'-13'
gray and brown(SM) _F16 23 7 Y
15
'i� 7(6)9(6) 20
21 %passing#200 sieve=12%
20 Isi 21(6)26(6)
21
25 5'' 36(6)32(6)
20
30 : NS
',...: 15(6)19(6)
16.
35
40
45
50
55
60
Remark :1)Dry auger to 17.0 ft.,wet rotary from 17.0 ft.to 30.0 ft.2)Free water first encountered at 17.0 ft.during drilling;after
20 mins.11.0 ft.
The ground water elevation was not determined during the course of this boring.
V
Driller:Rusty-Van&Sons Logger:Shapoor Golshan Organization:Geotest Engineering,Inc.
FIGURE A-32
oom l402rawru em�14021s00l_p . vod_Crear Creek b0
08794.mG
C v
DRILLING LOG 1of1
County Brezoria Hole C-1 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 5-2-16
'PPP' Version 9.1 CSJ 0912-31-290 Station Grnd.Elev. 100.00 ft
Offset GW Elev. N/A
L Texas Cone Thula!Test Properties
Elev. 0 Strata Description Lateral Deviate Wet Additional Remarks
)ft) G Penetrometer Press. Stress MC LL PI Den.
(Psi) (psi) loci)
PAVEMENT
99. 4"Asphalt over 0"Base
CLAY,stiff,gray w/calcareous
nodules(CH)
37 20 %passing 4200 sieve=67%
97. -L
5 —
%s
10 —
15
20—'
Remarks:
The ground water elevation was not determined during the course of this boring.
Osa+
Driller:Jorge Hemandez Logger:Felipe Gamez Organization:Geotest Engineering,Inc.
FIGURE A-33
CUoeonamtsmtrnaoaiw
sadRdwu
ay_Sm sower CII0C5 tc
--A- DRILLING LOG 1of1
County Brazoria Hole C-2 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 5-2-16
Version 3.1 CSJ 091231-290 Station Grnd.Elev. 100.00 ft V
Offset GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviator Wet
Press. Stress MC LL PI Den. Additional Remarks
.(ff) G Penetrometer
(pall (psi) (Pon
PAVEMENT
98.9 3.5"Asphalt over 3.5"Base
00. CLAY,stiff,gray(CH)
over 8"Shell and Sand
19 38 20 1%passing 8200 sieve=70%
97.
5 —
•
1
10—
15
•
30
Remarks:
The ground water elevation was not determined during the course of this boring.
Driller:Jorge Hernandez Logger:Felipe Gamez Organization:Geotest Engineering,Inc.
FIGURE A-34
Ohms'11W3umm1402t5001 Roadway Storm Sewed Cno05CLU
DRILLING LOG '°"
County Brazoria Hole C-3 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 5.2-16
'fee/ Version 3.1 CSJ 0912-31-290 Station Grnd.Elev. 100.00 ft
Offset GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviator Wet Additional Remarks
(R) G Penetrometer Press. Stress MC LL PI Den.
(pelt (Dell (Pal
PAVEMENT
88.3 1
FILL,clay,sandy,hard,gray 2.75"Asphalt over 8"Base
w/calcareous and ferrous nodules 16 3417 ,%passing#200 sieve=71%
98. CLAY,very stiff,gray and yellow
w 19 42 p5 %passing#200 sieve=74%
/calcareous and ferrous nodules
97. 1 Put
5 —
*ewe 10 —
15—
I
Remarks:
The ground water elevation was not determined during the course of this boring.
%so
Driller:Jorge Hernandez Logger:Felipe Gamez Organization:Geotest Engineering,Inc.
FIGURE A-35
C uObSI I w215001 a laozl5COI RwWay 91Crm Sewer cn0C5.CLG
DRILLING LOG 1 of 1
County Srazorle Hole Cd District Houston
WinCore Highway MCHard Road Structure Roadway/Storm Sewer Date 5-2-16
Version 3.1 CSJ 0912-31-290 Station Grnd.Elev. 100.00 ft V
Offset GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. O Penetrometer Strata Description Lateral StresstDeviator
MC LL PI Den.
tAdditional Remarks
lftl G (pail (psi) (Pcf)
PAVEMENT
99.3
CLAY,stiff,gray w/ferrous nodules 6"Asphalt over 3.5"ie=7
(CR) 19 48 27 %passing 8200 slave=78%
7 24 66 32 %passing 8200 sieve=84%
97. —4
5 —
10—
15
90
Remarks:
The ground water elevation was not determined during the course of this boring.
Driller:Jorge Hernandez Logger:Felipe Gamez Organization:Geotest Engineering,Inc. \Y/
FIGURE A-S8
C VCDs\114M1500111140215Wt Ro dway_Smem Sewer C11oC5 CLG
DRILLING LOG 1 oft
County Brazoria Hole C-5 District Houston
WinCore Highway McHard Road Structure Roadway/Storm Sewer Date 5-2-18
%ler Version 3.1 CSJ 0912-31-290 Station Grnd.Elev. 100.00 ft
Offset GW Elev. N/A
L Texas Cone Triaxial Test Properties
Elev. 0 Strata Description Lateral Deviator Wet Additional Remarks
Penetrometer Press. Stress MC LL PI Den.
(PCR (psi) Cacti ,
PAVEMENT
99'3 CLAY,silty,medium stiff,gray 6"Asphalt over 3.5"Base
w/calcareous and ferrous nodules 22 48 37 %passing#200 sieve=79%
98. (CL)
CLAY,stiff,gray and yellow w/calcareou ! 21 50 33 %passing#200 sieve 82%
1 and ferrous nodules(CH)
97.
5 —
*ewe 10—
— I
15— l
— I
9n —'
Remarks:
The ground water elevation was not determined during the course of this boring.
/w/
Driller:Jorge Hernandez Logger:Felipe Gamez Organization:Geotest Engineering,Inc.
FIGURE A-37
CVWa11140215001\1140215001 RoaMny_elam 5exa,_C11oC5 CLG
o SYMBOLS AND TERMS USED ON BORING LOGS
Nod
to
SOIL TYPES •
(SHOWN IN IAO COLUMN)
Val liI VA •
p Fie or Gravel Sand Silt Clay,silty Clay Muck
Debris Clay,sandy Organics '
Peat
TERMS DESCRIBING CONSISTENCY OR CONDITION
COHESIONLESS SOILS:includes(1)clean gravels and sands, (2)silty or clayey gravels and sands,
(3)inorganic and organic silts,and(4)sandy or clayey slit.
TCP Blow/0.3 m(12 in.) Density
Less than 8 Very loose
8 to 20 Loose
20 to 40 Slightly compact
40 to 80 Compact
80 to 51100 Dense
5"/100 to 0"/100 Very dense
COHESIVE SOILS: Includes(1)inorganic and organic clays, (2)gravelly, sandy, or silty days.
UC Ko/cmr(tsf) Consistency TCP Blow/0.3 m (12in) Consistency
Less than 0.25 Very soft 0 to 8 Very soft
0.25 to 0.5 Soft 8 to 20 Soft
0.5 to 1.0 Medium stiff 20 to 40 Stiff
1.0 to 2.0 Stiff 40 to 80 Very stiff
2.0 to 4.0 Very stiff 80 to 51100 Hard
Greater than 4.0 Hard 5"/100 to 0"/100 Very hard
Note SOdrensided and fissured clays may have lower unconfined compressive strengths,bemuse of planes of
weakness or Ratio in the soli.
TERMS CHARACTERIZING SOIL STRUCTURE
Parting:-paper thin In size Seam:-1/8"to 3"thick Layer.-greater than 3"
Slickensided -having inclined planes of weakness that are slick and glossy In
appearance
Fissured -containing shrinkage cracks,frequently filled with fine sand or silt;
usually more less vertical.
Laminated -composed of thin layers varying color and texture:
Interbedded -composed of alternate layers of different soil types.
Calcareous -containing appreciable quantities of calcium carbonate.
Well graded -having wide range In grain sizes and substantial amounts of all
Intermediate particle sizes.
Poorly graded -predominantly of one grain size,or having a range of sizes with some
intermediate sizes missing.
Flocculated -pertaining to cohesive soils that exhibit a loose knit or flakey structure.
Geotest Engineering, Inc. FIGURE A-38
a-
0
PIEZOMETER INSTALLATION REPORT
PROJECT NAME:CITY OF PEARLAND MCHARD ROAD
i� EXTENSION DETENTION POND-O'DAY PIEZOMETER NUMBER: GB-70P
GEOTECHNICAL CONSULTANT DESIGN CONSULTANT
GEOTEST ENGINEERING, INC. FREESE & NICHOLS CITY OF PEARLAND, TEXAS
COMPLETION DATE 01-27-16
DEPTH ELEV.
DRY AUGERED 0 TO 8.0 FT (Fr) (Fr)
WASH BORED 8.0 TO 18.5 FT a
DRIWNG FLUID: WATER 3 FT
0 47.20
DEVELOPMENT DATE: 01-27-16 / /STYPE OF BACKFILL
METHOD OF DEVELOPMENT: / CEMENT-BENTONITE
BAILING A
r RISER
1 FT TYPE PVC CASING
.O. CA
WATER LEVEL READINGS: U
TYPE OF COUPUNG
DATE DEPTH (TOG) ELEVATION 1 4820 THREADED
01-28-16TPE OF SEAL
1.6 451 3 4420 2 R' BENTONITE
02-29-16 3.3 43.85 42.20 2 FT
LTYPE OF FILTER
FILTER SAND
MI
•
"�/ SCREEN
10 FT TYPE SLOT
D. 2•
SLOT SIZE 0.01
15 32.20
TPE OF BOTTOM CAP
15 32.20 0 TT THREADED PVC
5.0" le
(NOT TO SCALE)
REMARKS:
NOTES: DRILLED BY: STARTED: STATION NO: 123+02.4
1. DIMENSIONS NOMINAL UNLESS AP 01-27-16 OFFSET: 134.7' RT
OTHERWISE NOTED LOGGED BY: COMPLETED:
2. TOG = TOP OF GROUND JG 01-27-16 GROUND LEVEL (MSL): 47.20
CHECKED BY: APPROVED BY:
NeiNK MB SHEET _L OF 1
GEOTEST ENGINEERING, INC.
C:\CADFBES\JOBS\1140215001\1140215001 GB-00P.DWG FIGURE A-39
O
O
Ln
PIEZOMETER INSTALLATION REPORT
0
a
PROJECT NAME:CFTY OF PEARLAND MCHARD ROAD V
ci EXTENSION DETENTION POND-O'DAY PIEZOMETER NUMBER: GB-75P
JD
ID GEOTECHNICAL CONSULTANT DESIGN CONSULTANT
GEOTEST ENGINEERING, INC. FREESE & NICHOLS CITY OF PEARLAND, TEXAS
COMPLETION DATE 01-15-16
DEPTH
DRY AUGERED 0 TO 10.0 FT (FT) (FT)(�)
WASH BORED 10.0 TO 21.5 FT a
DRILLING FLUID: WATER 3 FT
0 46_10
DEVELOPMENT DATE: 01-25-16 // /STYPE OF BACKER
METHOD OF DEVELOPMENT: CEMENT-BENTONITE
BAILING RISER
i R TYPE PVC CASING
D. 21.
WATER LEVEL READINGS: OLIO TYPE OF COUPLING
DATE OFPTH (TOG) ELEVATIONTHREADED
I 45.10 ` /
01-26-16 2.5 43.62 R F--TYPE OF SEAL
3 43.10 BENTONITE
02-26-16 2.8 43.3 2 FT
5 41_10 TYPE OF FILTER
FILTER SAND
MI
SYPE SLOT
15 31.10 EEN
10 FT I.a 2.
20 26.10 5 FT 1 SLOT SIZE 0.01
TYPE OF BOTTOM CAP
20 26.10 D R THREADED PVC
5.0" (F—
(NOT TO SCALE)
REMARKS:
NOTES: DRILLED BY: STARTED: STATION NO.: 157+00.00
1. DIMENSIONS NOMINAL UNLESS AP 01-25-16 OFFSET: 130' RT
OTHERWISE NOTED LOGGED BY: COMPLETED:
2. TOG = TOP OF GROUND JG 01-25-16 GROUND LEVEL (MSL): 46.10
CHECKED BY: APPROVED BY: /
NK MB SHEET 1 OF 1
I
GEOTEST ENGINEERING, INC.
C:\CADFILES\JOBS\1140215001\1140215001 GB-75P.DWG FIGURE A-40
O
0
10
PIEZOMETER INSTALLATION REPORT
0
+ PROJECT NAME:CITY OF PEARLAND MCHARD ROAD
EXTENSION DETENTION POND-O'DAY PIEZOMETER NUMBER: GB-81P
GEOTECHNICAL CONSULTANT DESIGN CONSULTANT
GEOTEST ENGINEERING, INC. FREESE & NICHOLS CITY OF PEARLAND, TEXAS
COMPLETION DATE 03-3I-I6
DEPTH ELEV.
DRY AUGERED 0 TO 16.0 FT (FT) (FT)
WASH BORED 16.0 TO 31.5 FT a
DRILLING FLUID: WATER 2'4T Ff
0 50.00
DEVELOPMENT DATE: 03-31-16 wwi r /E-TMPE OF BACKFILL
METHOD OF DEVELOPMENT: CEMENT-BENTONITE
I
BAILING
RISER
0 FTfli TYPE PVC CASING
D. Y
WATER LEVEL READINGS: I—I' TYPE OF COUP NG
DATE PFPTH (TOG) ELEVATION
0 50_00
04-01-16 7.0 43.03 FT TWE OF SEAL
3 47.00 BENTONITE
05-02-16 5.0 45.0 7 FT
10 40.00
TPE OF FlLSER
t!"111.1 FILTERcavoTYPEEN SLOT20 30.00Nor
10 Ff 2.30 �� 10 STAT SIZE 0.01
TYPE OF BOTTOM CW
30 2000 0 FT THREADED PVC
(NOT TO SCALE)
REMARKS:
NOTES: DRILLED BY: STARTED: STATION NO.: 18+98.38
1. DIMENSIONS NOMINAL UNLESS 80 03-31-16 OFFSET: 838.88' LT
OTHERWISE NOTED LOGGED BY: COMPLETED:
2. TOG = TOP OF GROUND SG 03-31-16 GROUND LEVEL (MSL): 50.00
CHECKED BY: APPROVED BY:
Noe NK MB SHEET 1 OF 1
CEOTEST ENGINEERING, INC.
c\CADFlLES\JABS\1140215001\1140215001 GB-61P.DWG FIGURE A-41
Nor-
APPENDIX B
Figure
Summary of Laboratory Test Results B-I thru B-32
Grain Size Distribution Curves B-33 thru B-36
L California Bearing Ratio (CBR) of Laboratory—Compacted Soils B-37a thru B-37f
Dry Density versus Laboratory CBR B-38a and B-38b
Consolidated Undrained Triaxial Compression Test Results B-39 thru B-42
Permeability Test Results B-43 thru B-45
Pinhole Test Results B-46
} ± 6006 ! !
! Z00000000000000
on cE2 ! ) ! B ! § ! 60 § § 04 § ! E
ow° or
C o t ; 0 | | ; § § 0000NN ! § !
o
OD IMP OP
/ t1,10 sit.
gm
6_cal ot'M \P \
- zm
0—i7s 2 ~0 00
` !
/ 0 , , w . C _62 .co tn 15 41 42 Z }
Z Z & , - 0) ID - N / i !
} ) / \ N } \ \ \ \ }
, -. , N N .
4 „ : ; , : : ; _ _ \ - NOI- N
sas
al U
00 o
§ j
( ) . ' ' ' ' _ _ _ _ 00 = 0 = = = O. \
§ ; ; ;
\ 2 rr . . � . — — — — N , §
/ ) © / : : : : : 7 ; ; ; Z § ; ; ; ; \
§ \ 0
§
f 000
! z ! ! ! ! ! ! ! ! ! !
zE }/ ddSSSS - - - -
�J
2 ( 0SS50 ! ! § !
o or
on R
Et , 0NN. .
0
) ; B E §
\ 0 c0oee
!
0 0
/ Anita
�\ . .; ill , . ! _
. . , , \
\ _ _ . y!
Nce \\ \ j \ \ ,
031-
; :0
hi— ! !•
/
0
cn
a N NN00.N — — NNNN
§ / 2 ;
§ / \ ) :
® ! /
_ 0 2 2
2 \ . _ : , 0 : / \ /
§ % , N , l0 . . . . ; 04b
@ m ` _ \
a , , , � . - - NN '\
7 , . N , 000 , oc : : \
/ | 0
W
m
U-
\.r o
fY U
O UO U U U U U U
U U 0
CI yopo nononNrNj �Qa nOOw ON O O C - o �OWpNpZOC N P n vn in p ON N
W
NrCO OO0 0 0 0 0 - -0
N
N m O
W O=
a %Sinn 00. O O
K g°
0 -or c N ° $
`o 0 a o 0 6
S or
in
n3
min 00
V ?N con
0E o oa
din N UO n
T 0 no
a o
03 > „ovi
2
r71 CN e
- o d.' �
W uz ` -°
6'= 9
3 MThEr
Nam 0
U o-, Low
C°n
W LI W5 6 N N N N N
n n
a. - a J I$ 0 m in in Ian-Ja n
o?o a m m o
0
N pW co oi
E-1
wish-.
n N n N n N n N N N N 0
0
0)) 3U Ed
C VZ
ric
w
V2 Ii,T 0 W
K
_ a
44% i
G t-b �r 0 > > > o > > > > > > _ii Iaz
O2 E m 0 0 0 0 0 0 0 0 '�Atnala
Im E, o in ri m ri n W 6 n 0i J
0
a. CO m ad f N _ - ?I6iI"a0
O E- g`" m Li 115 00 0 o o o n cc
O - n io ro n vi ry 7UU0j
a U F N 006¢Z
M III II II II
M 6 - N in < n N N m P O
in
_ ..
Now Oz 7 w
CO w
U
FIGURE B-3
Li
w
1/2041101
L. N N
z - s s o s N s a s s s
0 0 0 V 0 0 0 0
ce
y l an nao n nNN
VoEMOO - 6 O .` -
OWOaam
O OC 0 0 0 9 N . nn
4 u 6 OO 6 6 c- .-
O O -
NN
O »M O
• OJ N
goo ua
C• 0--
SFMY O00 o a
ni
U
Oi. U O
U ; N-V
AVN OO
oq
O € o LLzw .g
mo O` O VS~ bN
N00
zo
4\ N 7U
r 0
03 UO
`0 •-• z . e n
az K oo cx
W D1 -0._n
r
3 3
az z u n N n 0
Nco
rn N ��NH
',Si
rc
UOF b, LLU N 0
in N NwII II II II
O OJ ✓p QJdO. Q- d < 0 < b N 0d
Ozp O- o
0
cLI
EQIq N N N N NN
0
.]
z0
N
K
U
? & n
W V nA 0 w
F- 2 - K a
>4 a w w
41
r 0 0 o 00in a N o o 7 0 J LLD2-1
0
0• U
2 E 9 0 0 0 0 0 0 0 0 0 0 �wA
CO F w m YI b - i- - 0 N N N W0r6-1
a
c•' CO a u m - zN0 0
N F 0 0 0 0 n om o 0 o b o ytrci0
>-, O d ri , , Ed- m N N �uml-:
U in¢nz
a uu1lln
5 2N It 0 0 CO N b P 0 3-
N 0
J
z cid
i mi
0 Nm 0
0
FIGURE B-4
CC
Ipppppp ! /
lnottuctuouctuuctooco
owo !ce / SSS - - § ! f ! § § § § §
! § E ! § § : ! § l 6666 ! §
01
\ —•
c •
\/
o 0
/ \ . , ! 0 , . {
101 CI 0 t -J \ \ — a0 \ \ —;
CC ) u , , , . eq . to0 tit_at
o ! : ; ; ! ;
0CO E
4.4
H / LICI
a 0 0 0 0 0 0
0 0 0 0 0
. . . . CV „1-3 \ \
\ 000. , : , , , : , , , , , •)§ ; ; ; ;� , . � L/ a b
to Z 242
0-0
0 II Ii A\\ 6 0 q \ 0 Inc \ \\ \ \ \ \ \� } \ \
0
'eller § / Li
0
RI
of /
/ / / i «
o
! 00000000000
oz, °E oo ! - - 00 _ _ § §
! § |/ § ! § § - 66 - — §
w -PRI 302 °`-‘•- °
\ `\ = S ;
in 00
/ \ 62 _ , , .1§.
\
B r t . N N a } § !
) \ \ \ 0 N
\ 0
WWII oz EL - - - - -
30 W
W ti
( \
E:
E
a , w
» \` j§ § l : : : 0 = == -
RR ORR 000000
- =\ � - - - NNN \! K , , . �! � , \_( mao\
[ � : : : : : : § ; 0 \( Z
§ ,. N , . . , . . 0, , : °a
§, 1 /
§ a. � r
! ; ; ; 0 vc 11 in 0
(\ 666 -: 06 ! § !
C o § !v666 .- . , , . . 0
cn in
C
/ S-P Poi }/ \ \ \ \
—
4 \ Z " !
TO I-
, �� , , � ~ , , \
o / t -J N- co NN N \ )
) ) CC j \ j j \ / ; \ /II 11 0
: z » •
!!
0
\ : : _ : ; _ , : ; : ; \
cc Li z/
EP ® 0 Lpl
\
l000 = = 0 . 00 , w b
o 3
\ / , � ] _ , � � . . . . , . (N
0 1r . 6pi . COxi \
at
7 , } , , , 0 . . o . — \
Er
Li
fi / i / / / ) ƒ / / i
! 0000C)0 000000 ± !
/ § ! ! !
\ § § ! § § ddU
} § !/ § B § ! ! § ! ! § § § !in \
W J411 Cow
/ ci-
=
w no
0 00o-ZO ~ >
/ \0 0 -
<6r7 0
�` . , m � � ; ; CO , °\
Bu t . N I . . . , CO . !
) \ } - N \ N0 00 4 \ OH H}
OZa - - - - -
o
to wz
§ / \
Wco
=e ,k j\ 0
. , , , , , , in : , , , _ 0 \§) r 0
'N(( � _ - - � � . . . . � N \
� : : = : : -N ;-\ ; ; ;\ . N , . � . � . . : . N . . 0§ , a
0 x
DOC/ CO ( Nod
!
| V 10 0
. , lr „
z = = : = : : = = = = : a0 , ,
- - o --U \ - - -6In § 66
tei
0»
IA 10;v
! § § .-.-0 lrl , l : ; 0
/ Son \\ \ 6 6 \ \
en 00
/ \ CO ! >
/ 0 A - CCwL /
zz LI / . N0 N \ N 2y g
N0 ct ti
\ \
§ _ , , ; N CO ; N a §
oz a § N : N > / ;
en0
: : ; ; , l = : „ _ l : ; : §
GI 1.3
§ y w
F. : 0 o.
oo 000n or? or=
Er .ix CC o
,o =a = , = = = = = = = = = = = \ \
3
§ / e � , . � . . . . NNN , , . , L\
N. § i N e-en trD
-
j ; 2 , , , , : 7 ; ; ; Z § § / ; \ ;/
*re 0 , \ )
!
f 8888 / 8833 z 'S
rl ; ; � :
! ! ! ! UUUUUUUUUUU
et o
Iti0lL2dIt2 0015tE0
6666. - - rc 6
! } !/ ! ! § ! ! ! ! § § § § ! E
0in
- -cc 000 t 0 C4
.
/ 0 \ ! N ! !
En oo
/ \ u o et, ! :cc zo 06 >
Ili 4 \ ` . P-
.- N .Q66 a' /
CA , , . . ‘'S ,
\ / \ a Cl , _ ; _ a : !
o 0 « , ! _ , , N : ; E
oz a : - - CO CO ! :
o
§ \
C/1 0 1c3
C4 n
J E
� tn 42
=
`
, \
IX � , , , 0 , , , , , , , , \ \ \
! 2 ,0. � i ; o � . . . . , . � ; ; # 4ta
CD0b
\ § A 0 ! ` ! ® : 7 § ; § : ; ; ; ; ;M 03-
=\
gz \ §
BI
a
Y G G p
NI/ 0 IS VI VI N VI N N
S s s 6 6 6 s
U V U V UV V U U U U
K i
nf0 to o co 0 0 0 n 6 inni
p .6 .6 .6 .6 o d - o •- domNmmZ
Q Noc 0 N 0 0 N N h N N 'l 8l
Q O gu 6 6 6 O -
_ 1 6'-''
o N
N m. I
OJ ` n m
Nig
9 Senn= on 3.0 OO OO OO -0
-
K xQv
9 n--re -
13 a_m - 6 6 6
O 6 NN
01
2
U3
7at tn 00
9 NUJCE
145:nOQ Ky04OO
OUZ lel
OT N 000
0
o 3 <
v zn •
�p
VK QON
Z am
E.. m 'ES
= r
y✓ z z m a N n - a o _ -
a
m
wWw m - N
II II II IIo Mi- -1
aaaa n N N n n visa
oza _ o m
o
N0c
Fry
,-1l Q2v N N N N n N N 0
O
7N ;� __ G
CO
F : o
pa
FNO w
• C — wi
10 41 0
o 2 ra o o a o a o a ammmm
a a o as
Marc
V
za
w W a 0 n � mo
aw
m
o
N a N m 6 vry zo
iq6F u L0A-
i^ rc
2 w a3 v ]NUWpj
O F N 0 O N O N O N O W p
N 6 N 4 b 0 - ^ iC N N- N Zd me.x
U mail
H H I O n
i6 - N n a N n n m m - omom.
- - Omoaz
CO
Nihon U2
Ed b
0
U ',
FIGURE B-11
RA
op
40 in N Vi t/1 Vi Vi VI (71 N
Zw 0 0 0 0 0 0 CO 0 0 0 0 U 0 0 00
w 1 W CO b CO N r I 'b'1 N N n n `1 n
�P b
OW7 NP" 6 6 6 6 O o - - 6 - - 6 6 N
uam 0
a
nh e nN nNryni3n
C & Nu- o - 6 - 6 6 - - 6 - - 6 6 N d
• oS
C N
O0 %. m
o 61
S N
-o glEn 0a. d o _ N N..
¢
9 ~o1 &°0 0 0 EI- 0
o . U by o
o 3
Hyl 00
� E Zn o o
a tet -
L `o 0 onF
ON N U3 N
o.T N 7U
0 O
o ; O 2
To ^ zc' p
(JOC K ndiN
W it
• 0 vE9
ET
< Z
Q = n
z z o a n - * N _ N _- -
N N b
%
p
U 0 oY 0 0 0 NJdp
W W K LL - N N II IL II
o K N. n
a a a d n N N •
n N b n In�nn
02a 0 0 0 0 - - o
0
N Oz n
F R'�WK - N N N N N N N N - - ry N N0
N ;U le
2: z
E-1
1 Ls
O
F ti n0
NI ° ¢ -1
'- 4
aYa
O W a 0 0 0 0 0 0 0 0 0 W SJ
F¢ % 12% 000000000000000 RAW,
m_,
o =U o 0 0 0 0 0 0 RAW,-a
E 0 0 0 0 0 0
zee
F wco eV N a vi ad o n - vi ry N n N n M n Lu
j ‘0°P71
c., b m poono
o cry v i-tn
O F 00 0 0 n 0 N O N 0 N 0 N N O _ ow
>T Fuji
O N < b 0 - n - 0 N N N N n n ocjO x
4 U ¢11z
1111111111
'S' Z6 - N n < N b 1� CO m o - N n V N OmVOx
JNG62
V)
0 O
1Z-6 g W
oz 1 0
00 -J
FIGURE B-12
w
O V
411ar" L'oN N N m N
0 0 0 N 0 0 0 0 0 0
xt,
'"' r N m NmO
^ n O
0E2 d dOdm I
0..m
�' a
c '_" R R d"n
C v d d d
-
o N
a, N
m o
0= `c d- n
W NO
0O 00.
a P—
cc
-0o - n
OL 0 cwO
0
I 0-
0 ;
m d z
y' 00
• za On O
O`• O 0 0ZW m-
in
ln 0
a� N DO
1-
a_ O 0
O 3 V
a Nr -
,..0 RG'
a. n o
o
bce 62 now c m
W =ao
'Er
M m 3 o j'
z z Nor ec 'a N t N - - _
co c., m� m '0030-.
w 05
o a N- - MIIAll
GJ •-
CL a a _pa n ^ a.
N 0-1CCzXM1
oz. _o m Cl 0
cm
m
W r m
f n NnN N
oa <2.-.2
m
W
Li
" a
w
F.• 2 - m
• W
w a
of ` N 0 0 0 m m 0 o m o o •_ s�
U 0 j� gK
O 2 E
� N o 0 0 0 0 0 0N 0N 0N almpm W n00i00dn 0 y
^ w m ceq.?) m
mn
FgoO LWOO O N O N O O I.mtW d ri ri N J>, - N NQ :
F 0a2
$ A II R P II
a = �- N n a m m n m m .- ON6n2
N
O in
*101••• ZOw
m� o W
Vz
FIGURE B-13
RI
ccw
o S 8 o o
o $ 8 S u
m o U UUp o u o 0 o U u u 0 o u
yIE P° 11 n N n N 00 '. N RARRN
ozm Nem .- d d - - 6 . - - - - - .. - N
Za
a `o oC n
to
0
N o N •- 0 0 N n 0
O o v 000 - - ooNN NNNoN
ma'-'
.
w o
w 1:'
a 3o= 00- OO •`
pgll
.0 roF 6oC n o
o U NY% O
0• 3 N
FVI 00 m
9 ZN 0 o m ill N
L {�
O £ .5 2K Sl - S NS OO
ON N UM mN
d N H 00
` 0 0
O 3 ac
p
9 _ Up
0 ;j
UK K Yw�ly e u
w LLm o am
S 2 Q of c
z i U. u N N MI a d - 41Xmil
rc N m 0 0t
` mo
o o m�N m a
0 0=0- '
EJJ Li yC°5 d - N ,- IIIIIIM
o o
0 6 QJ 'j Y 4q N 0 II fN at ✓1 Oder
Om
0 re
Ww `N N N N N N n n n N =1 -0loa N N .
ao 0
Ll
UI 3U G
60. Z •-• z
%e- 0
0.W U N; 0
F ti a a -wl
w N W nn
o N g o U U U U 00000 00 0 0 o uw S�
F Z.b2 r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 an N2K
ow W E n N o 0 0 o o 0 o o ow
Id 0 n vi m ry n 'dogzmma
I F N N �o� m
o f OV N O 0 O N o N 0 N 0 uI pmo
,_ 0 o - „ m m6a t35 a - - a m N N N N In I ga"u I
M n y H H II
0 6 z n a N m n m rn o - ry n a N m 0mom x
mmamm
(0
o
z z
omz I
oo -J
FIGURE B-14
!
| / / 0 / / / « i
F000000ll0000
ozm |rc / ! § E § E . r.-o6
co ( ! 46666 11 , 44
In
/ , \ \ \
/ \ �`0 0 _ at 0
° "
) ) O.
j N / \ /11 II II
ox tnz la - ! -
o
\ < _ ! ! ; l = , : „ _ ; ; §
en Li
� / . , , , : , : , _ : , , . ./ } \
§ CO� . � _ LLi) . N , . . .
y _ |
CO in /! _
§ 6 4 _ b) � . . . _ . . N .�
*ter { / 0
!
ti.` / | ! !
0
O. 00000000902
00000 LiUL1000
aS 56- - - S S
c o § \ .
, , _ 6 . . . 6 . 6
in
C
ALTS L
N g 1M
E !\ |
U ®/ \ j
/ \ / 0 ; a m = t
!eu -s on a o , .
j \)) j \ }G.
\
O 0 ! In ! !
) < ; : ; . � . ; _ � ;
6. / 0
&
§CC § Ej
\ � -
` „ 0 : : , : , , , ,0 0 0 ay
A3
§ . . o _ T/ e / . - - NNN |
tv i o.
\ . ,.5 , 0=00 1
in CCI'l
PC 0 \ f
z
Lu
F.
L. \ \ { 0041
! ! ! ! 000VUC000000
re c
ccooc
! In
( ! § : : ! ! ® ; : rmw ! §
co
) _ : 0 [ § !R
§\ 2
in C
cc
t ! 4 ! \
o co
▪ 0 11 C
/ } , �\ ; ; Eo
! _ ,cow \
• LiLI ce \ / CI
In 0 VI } \ \
/r 0 0! • ! !:
o
CO cc z
8 LI
co 6
EP 43 I.0 \ cn
^ co `
�0 r44� 00000 = 0 0 , , , 0 , a \
o E
\ w , 0 000R 00000000000
� , � � L)
/ ) � � / : ; : : , : § ; ; Z ! § § ; ; ;\
\ 0 04 . 0 , y0 . , . VI0 . 0 e
\low { \ )
m
P a a
L.o
gC C C C g C C Ned
r0 0 0 SIU 0 0 SI U
VWw &P„ N N N a) 0b N
Ouz
O O Iy o ICV G C
G
o= _„.4.a ci n
w ¢NSI 0. O 6
0.
a %c
K to
O V N e`i
O N
3P 2
0
mol ?N
DO - U.~ *gm
d• C N 20DO
O 0
Al
oC a 8 O
4-.._ in 'Q
WO in
v
az -
L m d3,,T
3 3
z z V. a l 0
NT __
a
¢ iF
U U mr m N dd
ceE d - N 11111111
m• m Q J j Y mmNJd d
,_
KO m— -
OV
n
m N
C V 2
F F\ O
co U �s m w
2
ww
o 2 a M 0 0 0 0 0 0 44 W�
Ov
2 En o 0 0 0 0 uws
co W 3 ri vi ro 6 r o „o1zzg J
F w .. CO
SIM;
g-1
o h z noPO mM
O F VI 0 m O NCmwo
w2M
N w 0O N n m CO 420=1 x
U vlauz
'W' BOHOH
5 26 - N n 4 m 0 N Omo41X
Do<02
N
2
c76 S wIWO
al w
u
FIGURE B-18
W
/ ƒ\ C -
§ G/ # 0
ddo
- .
-
! ( 0 § 0 - ! ! §
en
w
N.
gcc
} n» .
0
} ` •
/ az c \TC, ; " ;
B 2 Q „ , gg!
) ) C \ N j N N }
0 0
0
§ 4 ; : , : _ _ � §
F LU
0
» § § j
- 'g rs . : _ � ' = = =a 0 0 0 0 0 0 0 \
\ \ hi .6 CO .0- 10 0
wZcICW
-
CC \ � 0 0000) 00CS 01 mi co cpi - vi j 00.001- ce\
7 . , � /
, , , „
§
\ / / / / i
! 00 0 0 0
owo I/ § B ) ! ! !
0.06
§ \ -
o
s\
-
MP 2
/ oo
\ ` : .zo {
zz
ii. cow
�{, 01ce Nalid
ce ) \ } } / }
: !
0
cc
\ \ WiTe '4 : _ ; N / , /
§ 2 CZ.
` 0 :
. 00000 0 5 /
/10°W1
c§\ �2
� b
E\ = , \ §la
1602
7 , . IN , . o . , °/
§ R 0
§
1-
<
; ; ! ( \
! 335 ; ; 0000
Ce r
o
aam
§ ! ! !
o w-
o o
oaVncc
/ Ita-gfowmn0tc3.
0 .
Mo z
go "to
00
av ` `/ \ coo 0 \, m °:
G !uo _p n , i.
, -,, C , - - - (
on ; f
0
/ \ 30 ; � � \ \ \ ^ � \ 0
xioj
§ \ . , : : . In : „ : m\
\ ; , _opOgggo 000
� . . _ . . . . , Wb
` 0 � � 6 � . . � \
\ � C - (N . , '0 \ Nona no<]
l / )
/
! ! ! ! ! ! ! ! ! !
yUouZwJwI2o.J 2 B § ( ; : rnn :
aawo § nonNononer
C !, . S , . , . . . .
o
, .
§\ \
/ / : :
o - � _�`21 tn 0 \
w az
` dw
0 \ L \ / / } } /
) ) a \ \ N N }
o . 0 ;
0
E-• a ; ; , NN ; : : ; 0
43 ti
§ y 0
- r! ! :
= q V : 4
\ \ . , D , : , , , , : { \
! § , N . N � . . . . N
` ! \ 0 . m
g , N . 6M _ _ . .0 ° q ° 0 0 ° 00 {
\ � 62 - (N 400 / / \ . DO<\
0 \ \
/
4000, / / / / ƒ / 1
F ! ! ! ! ! ± ! ! !
cc r
dddd § § § :
w
! § 2666 dd-
o
N 43
to
\ Li—
ga
sum uo.
° \ \ \
.2° o, )
Et at
< = ` \ o 03 0
` , : c {
15 Lai 0- ) COr \ } N\ \ }I
1714-. r 0 f
coa
: : l , / � : . , /
; 2 8 = Li
- -
00:ou<
w § . L §
al
[ - _ _ , , . _ „ : \
La
\ / , . . 6 _ . - N
ooga
@ � 6 `a 0 � . . � o ODa
0 D.
\
RI
} | / / « &
lZZ ± Z ± ! ! ! !
E§ i922 \ 666666 .--
; § !/ ! § ! § § ! : : §
20D 00.
P-mto 'Se LI 000 \ N
/ ®z .
= oo
zin .c
ne
( 02 ® !
c2- il 15
/ \ \� Co ! N _ co tu \
.
) \ \ 0. : : : "f
ce E £ « . .N
.�.
! ;
w ter
§ o
irt \ \ ) ix
f 4
. _ 0 , : 0 , 0 , : tj \
cc CO
/\ e , . , . o
e \ f
i � = : : : ; ; ; z\\ = 7/
_ / \ . \
Li
I-
Li
itlible 0 C%
Lij s s
Z 0 0 0 0 0 0 0 0 0
0 L
Yalu 00 R m N. N in o
0 Z M
NSv 6 OO OO O 6 - -
14
• p u[� O O n 00 0 m n n 0
O O N
C
O a
Oj rypJ N m 0
9 S V01J 00- OO OO f
K %�v
O.N
a9 0mp- gc01MI 'tO O O
20 NN'v
F• O 00
0 z0F
C C z 000
0 00.
00° n zo m
ao w OO
O 0 41
0
o�
0• _ Uo o
N 2
H
U0 & aOV1
Z '9
W 7 °'EEc
CP
a
*re 0 n N n a0 in Tigeir
U U mr
W -, W5 0. N .. N N Ilpllp
0- QJ U N a 0 0N
NJdd
02n co m
0
WF
.�fl QON N N N N N n n n In o
y 3U [
aU i
z o
G] U No
o
F Z -
x a
Gm
{G 4 La
O 61 n O 0 0 0 0 0 ono ww j
!
/ / / / / / /
! 333 \ ! ! ! ! 3
ozm =ell 6d -— ] | §
ammo }
m w
cc Lt/▪ gulp uo.
\ 5 \ \
M 00
-60
gm
- o / \
0v V
< = E. , . N N x
/ / 0 . N j r. / c-5014
! 410001
0 11 11
) ) tjp IV \ ; ; (. N
EMAZ
: ;
m mz
` -
0
2 \ 0 ,
�• ` ` \ j
0 0 0 0 0
§ ) . _ , 00 , 00 0\
§ } , _ , , o � . . . . N
` § ice_fl ` , . . . _ k
) � 0 N ) 4In \ \ \10 / °06°00° 1
0 / ( *41
/
! ( !/ § § § ! ! ! § § § § ! !
\ \£a •
/ \
oo
zwunth 1-2C
/ \ � 13
C
/ 0 ` \ / \ \cc °\
\ / a -J } N 11 II II\wo 22-2\
§ n ;
CI , _ _ : ; : N: ; N. : 00
\ \ w / :§ ;
00 CL
1-1
+ ) - = = = 0 0„ =0 0 0 00 = _ , , , : !w 4
\ § 64. \
] : , „ � � . . . . , , . � , ! ,
0 ° a0 00000 . . J
(71
) � 0 NI4U) \ N Ci0 - N \ \
R
ow / \ / / / / ( \
E000000 § x0000
ozmaE° . . . . ! § § §
o.ape
\ ! . . .el l � . 4. , . .
al
ES
01 -an I 0ED \a \ \
0tri
co
0 00-123 Oa
Lo. In IA
00 .5 12 124j 2 0c La \ . . f
08
E . _ \ ,
id m
\ \ 0 \ / / \ 22 0
\
) } 00 \ j } j . }
V70]; 0
02 a - ; 0 :
0
§ < 1 : = : : ; ; , . _ ; - 0
ta
m /Ego _
• n. ` .
§ � 1 = : oom = cn0000 J
\ ) / \ j / / \ � , � „ 2
/ O. . | w � w ® „ r , 4 ; „ b
ca• § , � tot Ez§
. . . . . IN , N , /
7 , . p . . , . , _ o : _ , /
0
|� | §
!
; 0 !| ; ! I
! oo00000000000
- e0 ul 666 6
Ow e
o } \
/ -07i o gm= Sr-
me-
ge I—OW F1171 0!
Me z
u 00
lel m
o
/ \ az E` \ \ N \ \ }
F• & & . n 0 / j \ !
) \ N \ / \ inn
} }
E\ ; ; §
30 w
Et / .— . . 00
tIO N N
9
. 0000 „ 0 , 'now %
( ! \
\ / � o ] _ . . � - - - - NN , � , b
pOD
bw \ » 6 ° 1200 --
§ § . . . . . � , , , )Q
7 , . N . . . z , = „ : , _ 0/
!
f / / / / / | \ \ Nod
F000000 ; ; ! ! ! !
2 - N 6o001, 0 6 -
ozm
owo " •
Cf \ � . . .
x on vi m elSo 00.
`g Cr
/ �
W
ti zwP, r6c in 01
Iti
/ \ Lcz tip 4N ^ as a \
G n t . 4 N I !
) ) Ctj \ - } N (
cetrol o N
n !
\ / 30 : , l ; � ; / / n , 1 ; /
F
'11;
/
\ ! . : „ _ : J N . 0 J J J \
Cl)§ 222g 4 � . . . NNN , cb
[ @ ! © °
§ / : = : : : r ; ; 2 ; ; ; "\
0 \ . } 111110
} C „\ 0000000
0000
IH IC
fwomam
§ ! | E 6 -
! } ) ! ! § § 6 .2
m-19gg00fa \ \
U 00
` . \ ` \\\ \/ F� \ �
\ } \ \ \ II a ii(no
\ ) \ _ \-
EC t , .. 4 0,0.0.
N
; 0M N
\ \ em
30 \ _ ! ; , /ao
00 \ ; ; ; � :no \
Eo 0 Y Ce
(Lj j
( \ _ _ : , , . _ : „0 0 : .\
\ \ , r , . . _ . . . , . � ; ; ceR8\
4.
o 0 � � / _ N , _ 0 : 166 , . 6 , mwo
924814
� �
) , . � . . � . � m . - - - \
/ / / / i \ -
! ! ! ! ! ! (2888 ;
E§ / 6 . . § §
v . . .
oz m o § \
/ gm
on 4
\ N
- 00
rcio
\ {
/ 0 \ \ ` . \
s 2
) ) r \ \ } jj }
a :
En / C
m . . . C
! \ au
' = 0 0 0 l ; : an » \
oA! /
§ § _ N . 0 � . - - - NN I@
0. S. \ 0 z
no � . O , . . . NN _\
7 , . � . . � . y . . 4-
0 | \
IH013M A 213S2:1tl00 1N303d
0
0 0 0 0 0 0 0 0 0 0
o N n a i!I to n co m
Vr o 0
N Q
N
0
C
Z
n >
o s
0
0 o
0
a
.„..),
, Ll
/ a >
o c CC
o
eq- ji�-/ E
/P�a
� _ mo U
oW o N Z
0 o U
F z
et noo m
Z M U 3rnn Cr
In ujro
IV — lj all Z 0 30 myH If)
W
iliN
o N - •00
z o� T000 W
E
0 z sj VIUVIN N
- p N
.t 0 z
i 0000 Q
�t Mro I l 0
0 in ' 0
NVINN
�10 M1
PPP i'„- W
CP
ao 0 m ON
MZ IIII
orlon.- o ¢ NNU1N
4 N
tel
W
Q —
z 0 NIP CO 10
CC
12 t111411.11
o N��r COO nil
D7010)Q)
m 0000
rc'!
u N o, o
is
E 0 A
00 0 0 0 0 0 0 0 0 0
No,.. 0 m co N co co a n N
IHUI3M AB enNli 1N3DN3d
Ceotest Engineering, Inc.
FIGURE 8-33
11-1013M A9 63S8V00 1N302Qd
0
o o 0 0 0 0 0 0 0 0
O N N) a i() (0 N co O1
o 0No Id
o 0
N p
N
O
a
O
z
.0 )-
o
0
O
0 O
a
US
U1
__
W
Cr
0
ID
o U$ _
_ — N Z
re
Co 0w Z0
w o 0v F
tr. en 4 3 a ja D
rc oo m
i N no G_ d
I< >;3 F-
_ Z Illz p .. Oo (n
w 0
VI N
O � ) O a V V -
E oT 4 z 4 000 W
to 9 p,.I in VI VIU IN
Yi II K A
A ✓� O
z
Oo
IT- O N
m- W I I I 0
o 0 NNN
1010
u NM
(0 WN a
apaI-I-
MZ I I 1
scD
z *t - O ((Wan
u-
w w
pMar Z 000
o
mom
m 000
f0 8 ]]j
O f
Z
W
taU
J
o O 0 0 0 0 0 0 0 0 0 .$
0 01 cc N co N a M N V
II-1013M A8 el3N13 1N3083d
Ceotest Engineering, Inc.
FIGURE B-34
11-1013M A8 a3SWO3 1N33J3d
0
0 0 0 0 0 0 0 0 0 0
o a N V) V t() 1.0 n m 0)
0
0 0
N 6
N
0
a
0
Z ID
0
o g 0
O
reaO p
F 6
O
VI 0
E
o U
coIn W
o EC
/ / o 55
o
n p � as o
-- _ ___ -c_ w Z 003
— w 0 I--
I` H s . - s d 333 m
oire M 0000
0 (r
z Z wp >.� /-
- L e. .mm U7
Id II/ Q
Z ID N
o o n - N a V0C
Z M C W
IC a 00
N 9 = o Z Uj NVI fA NJ
- p U)
z,
s` h 0
z_
Z o0o Q
m ww K00 CD
CO NII
e ,p NN
cc
a cd cd
o RO <NN
Z 1 I I
mnue- O Q CO VIN
(A
0-),-
W z
Q — pva.- 0 ONN
K Z hhh
O Lj ' K0 0)Ol U)
01 m 000
il
0 0 • o !
Z
E
0 0 0 0 0 0 0 0 0 0 0
"le 0 0 0 0 to VI O n N
D-1013/A A8 S3NId 1N3383d
Geotest Engineering, Inc.
FIGURE B-35
1H013M A9 H]SHV00 1N30a3d
0
o o 0 0 0 0 0 0 0 0
o ry n a 0 0 N 00 0) j
0 o V
0 0
N a
04O
a
0
z
a >-
0 5
U
0_
o ED
6
N
N
W
>
0
0'
N_
/N U
•
D--
ul Z
ce O
W z
w O
V 4 333 D
ce
0 0 0 CO
CO o
U -0 Li C
Z W tn T T
-- `� 0 CCC
N
W W NNm 0
o n� N4 4
Q N LO
N E A oW Z t/i UINN
Z U N
vi Zz
o
I NOJN Q
m_ 2t i
Li In un to 0
0 rn orn
LI w
ce_
d0 N N
2 I I I
If: ,y. 0 N to rn to
In
W
La
wYd� U' 0004
CC
Z • r•-•C003
O N �r OZ 000
m 000
El
apI{j
N N. 0 • m
,
W
0
O O 0 0 0 0 0 0 0 0 0
o T m N to n a n w
IH0I3M AS 213NI3 1N33213d
Geotest Engineering, Inc. --
FIGURE B-36
`'" CALIFORNIA BEARING RATIO (CBR) OF LABORATORY-COMPACTED SOILS
ASTM D1883
Project: McHard Road Job No.: 1140215001
Sample Location: Composite sample from borings No. GB-49, 51, 54, 55, 58, 62, 64, 67, 68
Sample Description: Dark gray Clay(CH)
Liquid Limit: 57 Plastic Limit: 22 Plasticity Index: 35
Method of Compaction: ® ASTM D698
0 ASTM D1557
Blows per layer: 10
` we Sample Condition: ® soaked ❑ unsoaked
Dry Density before soaking 88.2 pcf
Dry Density after soaking 86.3 pcf
Moisture Content:
Before compaction 18.6 %
After compaction 18.5 %
Top 1-in layer after soaking 26.4 %
Average after soaking 25.0%
Swell 2.18 %
Bearing Ratio 0.30 % (® soaked 0 unsoaked)
Surcharge 10 lbs
ti.
Geotest Engineering, Inc.
FIGURE B-37a
CALIFORNIA BEARING RATIO (CBR) OF LABORATORY-COMPACTED SOILS
smile
ASTM D1883
Project: McHard Road Job No.: 1140215001
Sample Location: Composite sample from borings No. GB-49, 51, 54, 55, 58, 62, 64, 67, 68
Sample Description: Dark gray Clay(CH)
Liquid Limit: 57 Plastic Limit: 22 Plasticity Index: 35
Method of Compaction: E ASTM D698
❑ ASTM D15S7
Blows per layer: 25
Sample Condition: E soaked 0 unsoaked }
Dry Density before soaking 102.5 pcf `✓
Dry Density after soaking 101.3 pcf
Moisture Content:
Before compaction 18.2 %
After compaction 18.1 %
Top 1-in layer after soaking 23.7 %
Average after soaking 21.4 %
Swell 1.11 %
Bearing Ratio 2.52 % (E soaked 0 unsoaked)
Surcharge 10 lbs
Geolest Engineering, Inc.
FIGURE B-37b
CALIFORNIA BEARING RATIO (CBR) OF LABORATORY-COMPACTED SOILS
ASTM D1883
Project: McHard Road Job No.: 1140215001
Sample Location: Composite sample from borings No. GB-49, 51, 54, 55, 58, 62, 64, 67, 68
Sample Description: Dark gray Clay(CH)
Liquid Limit: 57 Plastic Limit: 22 Plasticity Index: 35
Method of Compaction: ® ASTM D698
❑ ASTM D1557
Blows per layer: 56
.` Sample Condition: ® soaked D unsoaked
Dry Density before soaking 107.4 ocf
Dry Density after soaking 106.1 pcf
Moisture Content:
Before compaction 18.5 %
After compaction 18.5 %
Top 1-in layer after soaking 23.2 %
Average after soaking 19.7 %
Swell 1.18 %
Bearing Ratio 3.93 % (0 soaked ❑ unsoaked)
Surcharge 10 lbs
O.
Geotest Engineering, Inc.
FIGURE B-37c
CALIFORNIA BEARING RATIO (CBR) OF LABORATORY-COMPACTED SOILS
ASTM D1883
Project: McHard Road Job No.: 1140215001
Sample Location: Composite sample from borings No. GB-53, 54, 55, 56, 60, 61, 63, 66
Sample Description: Yellowish brown and gray Sandy Clay(CL)
Liquid Limit: 38 Plastic Limit: 15 Plasticity Index: 23
Method of Compaction: ® ASTM D698
0 ASTM D1557
Blows per layer: 10
Sample Condition: ® soaked 0 unsoaked
Dry Density before soaking 94.1 pcf
Dry Density after soaking 93.1 pcf
Moisture Content:
Before compaction 16.5 %
After compaction 16.7 %
Top I-in layer after soaking 25.4 %
Average after soaking 22.8 %
Swell 1.35 %
Bearing Ratio 0.83 % (® soaked 0 unsoaked)
Surcharge 10 lbs
Nuaid
Geotest Engineering, Inc.
FIGURE B-37d
CALIFORNIA BEARING RATIO (CBR) OF LABORATORY-COMPACTED SOILS
ASTM D1883
Project: McHard Road Job No.: 1140215001
Sample Location: Composite sample from borings No. GB-53, 54, 55, 56, 60, 61, 63, 66
Sample Description: Yellowish brown and gray Sandy Clay(CL)
Liquid Limit: 38 Plastic Limit: 15 Plasticity Index: 23
Method of Compaction: ® ASTM D698
o ASTM D1557
Blows per layer: 25
Sample Condition: Z soaked 0 unsoaked
Nrir
Dry Density before soaking 108.4 pcf
Dry Density after soaking 108.1 pcf
Moisture Content:
Before compaction 16.8 %
After compaction 16.7 %
Top 1-in layer after soaking 18.3 %
Average after soaking 17.1 %
Swell 0.283 %
Bearing Ratio 4.64 % (® soaked ❑ unsoaked)
Surcharge 10 lbs
- Geotest Engineering, Inc.
FIGURE B-37e
CALIFORNIA BEARING RATIO (CBR) OF LABORATORY-COMPACTED SOILS V
ASTM D1883
Project: McHard Road Job No.: 1140215001
Sample Location: Composite sample from borings No. GB-53, 54, 55, 56, 60, 61, 63, 66
Sample Description: Yellowish brown and gray Sandy Clay(CL)
Liquid Limit: 38 Plastic Limit: 15 Plasticity Index: 23
Method of Compaction: ® ASTM D698
❑ ASTM D1557
Blows per layer: 56
Sample Condition: ® soaked 0 unsoaked sed
Dry Density before soaking 112.2 pcf
Dry Density after soaking 111.8 pcf
Moisture Content:
Before compaction 16.2 %
After compaction 16.4 %
Top 1-in layer after soaking 17.1 %
Average after soaking 16.8 %
Swell 0.284 %
Bearing Ratio 5.77 % (® soaked 0 unsoaked)
Surcharge 10 lbs
V
Geotest Engineering, Inc.
FIGURE B-37f
Project: McHard Road
Sample Location: Composite sample from borongs No.GB-49, GB-51 ,
GB-54, GB-55, GB-58, GB-62, GB-64, GB-67 and GB-68
O
Sample Description: Dark gray Clay (CH)
.16
z
$ Liquid Limit: 57 Plastic Limit: 22 Plasticity Index: 35
Dry Density (pcf): 101
5.00r __.-- ------. _.. ——---,
4.00
56 blows/layer
3.00
Now r-
w 1i 25 blows/layer
CBR =2.2 i.
2.00 ---I_
co
to
1.00
10 blows/layer i
0.00..
-1.00 I
80.0 85.0 90 0 95.0 100.0 105.0 110.0
DRY DENSITY AS MOLDED.PCF
DRY DENSITY VERSUS CBR
(ASTM D 1883)
Geotest Engineering, Inc.
FIGURE B-38a
Project: McHard Road
E ' Sample Location: Composite sample from borings GB-53, GB-54, GB-55,
GB-56, GB-60, GB-61, GB-63, and GB-66
N
Sample Description: Yellowish brown and gray Sandy Clay (CL)
i
z°
$ Liquid Limit: 38 Plastic Limit: 15 Plasticity Index: 23
Dry Density (pcf): 108
6.00
• 56 blows/layer
• I
I I
I I f
5001
CBR =4.5 25 blows/layer
r I
4.00 --
� I
w I I
O 300
° •
- I
m I f
0 I
I _
zoo . . I
•
•
100_
10 blows/layer I •
0.00
90.0 95.0 100.0 105-0 110.0 115.0 120.0
DRY DENSITY AS MOLDED,PCF j
V
DRY DENSITY VERSUS CBR
(ASTM D 1883)
Geotest Engineering, Inc.
FIGURE B-38b
5.7 Total Effective I.-� ' I- 1
C, ksf 0.608 0 173 1 l /
- ' - // •
•
P.deg __..._20.0 272 ',., //JI -
% : Tan(e) 036 051
1 _ /
- I II II I//
N 38 _ I 4
I
N LI ` 1 1 I / I .
I _ I I .iy \. ' II 11 F
1 i
t I ' -1 I \ 111
9 {I -r -- x . 31-- -H -_ 1 I -\-,1 (
I
c4T11: 11:
171
l_
L/ +J- / Ti'f -1 4 \_--
1 '
_-I , . A�{
0 1.9 3.8 5.7 7.6 9.5 11.4
Total Normal Stress,ksf
Effective Normal Stress, ksf ---
15 . .I I I 1 -I .`i. -I- Sample No. 1 2 3
. . . Water Content, 16.4 16.5 16.7
125 L I 11i-- I Dry Density, pcf 114.8 115.3 114.1
L 1 I I I la. Saturation, 96.3 98.1 96.0
jc Void Ratio 0.4571 0.4509 0.4661
L co m 10 11 11 l' Diameter,in. 1.47 1.49 1.49
_1.+ 1- -P. { rte.�L_ 3 Height,in. 2.98 2.95 2.96
El - t• • -r- Water Content, 19.1 17.3 17.6
rn 7 5 I I I 1 _ _i _J- 1 N Dry Density, pcf 110.7 114.2 113.7
o I __ L - e Saturation, 100.0 100.0 100.0
_ I, ' 1 ~ Void Ratio 0.5114 0.4648 0.4714
o
0 5 1 p Diameter,in. 1.50 1.50 1.50
1 I ! _ _ - Height,in. 2.96 2.92 2.92
a _ Strain rate, in./min. 0.01 0.01 0.01
2.5
ire
Back Pressure,ksf 6.91 6.91 6.19
1III L ' 1-:- _: Cell Pressure, ksf 8.06 9.22 10.80
0 I ' ' Fail.Stress,ksf 3.38 4.12 6.60
0 10 20 30 40 Total Pore Pr.,ksf 6.55 6.41 7.20
Axial Strain,% Ult. Stress, ksf 3.38 4.12 6.60
Total Pore Pr.,ksf 6.55 6.41 7.20
Type of Test: di Failure, ksf 4.89 6.93 10.20
a
CU with Pore Pressures s Failure, ksf 1.51 2.81 3.60
Sample Type: UNDISTURBED Client: Freese and Nichols
Description: Yellowish brown and gray sandy
clay Project: McHarad Road,City of Pearland,Texas
LL=38 PL= 18 Pl= 20
Specific Gravity= 2.68 Source of Sample: GB-69 Depth: 6.5'-8'
Remarks: ASTM D4767 Method B, Moisture Sample Number: S-4
i.+ ASTM D2216, LL and PL ASTM D4318, Proj. No.: 1140215001 Date: 03/17/2016
Imitial Water Content from Trimming, Specific TRIAXIAL SHEAR TEST REPORT
Gravity ASTM °854 GEOTEST ENGINEERING, INC.
FIGURE B-39
m1 I I 10 2 'I
I 8 I I 8
07TH , m ❑ _ - -
p0
0% 20% 40% 0% 20% 40%
10-3 10 4
1I 8 j[A— __ I_____ 1____.—_ I 8 -- _ I _.. .__
I l �� I I
y 6/ m I I
_—.-- 6
m N I m
N
N d y N N y
n_ c Y 0_ 0 y
y
o O 4 _. _. !i__ -�. N O 4 .__.__.I I.
O
Na. _ O N
mp 3 ❑
0 2 - 11 ___-__ o 2 _ _. _ _. �_—_—______
p ISI I 0
0% 20% 40% 0% 20% 40%
9 Peak Strength I I '.
Total Effective I I
a= 0.571ksf 0.154ksfI _. - - __.—
a= 18.9 deg 24.6 deg
tan a= 0.34 0.46
I
p�
Y
0'
0 2 4 6 8 10 12
p,ksf
Stress Paths: Total Effective— — — *Si
Client: Freese and Nichols
Project: McHarad Road.City of Pearland,Texas
Source of Sample: GB-69 Depth: 6.5'-8' Sample Number: S-4
Project No.: 1140215001 GEOTEST ENGINEERING, INC.
FIGURE B-39a
9 Total Effective
4.deg 14.$ 622.0 1 � 1
C, ksf 0.548i
.y„ Tan(4) 0.26 040 - I I
s
h I_I i f J_ I 1 1 I . 'I ; r
+ 1 tT I- 1 � ' t , -
I . r. .� - i-
11 j: � - _.--- -,11,111111:' I .
_rte 1�'j- , __ �'i nr t - N i I I - kk I `_ i _.-
er_.� i 1 I T t I .
_L 1
0 3 6 9 12 15 18
Total Normal Stress,ksf
Effective Normal Stress, ksf ---
9 u. I__ 1 '- , -- Sample No. 1 2 3
5 1 t Water Content, 26.0 33.3 33.2
; i+ Dry Density, pcf 98.0 88.0 88.1
- .. Saturation, 96.1 97.1 97.0
_ I_ = Void Ratio 0.7396 0.9377 0.9354
`, 6 f v"id^ I 3 Diameter, in. 1.49 1.50 1.51
iiII. 1 t I I I- Height,in. 3.01 298 2.97
a 1 '-
{_-_ - r P Water Content, 26.2 26.7 27.9
co '5 4 L,_ 2 .. Dry Density,pcf 99.3 98.6 96.8
- - -- II F Saturation, 100.0 100.0 100.0
> - 17 - < Void Ratio 03170 0.7306 03612
0 3 1� _ I 1 Diameter, in. 1.49 1.43 1.45
+ I - i Height, in. 2.99 2.95 2.92
Strain rate in./min. 0.01 0.01 0.01
1:5 t1 _ Back Pressure,ksf 6.91 6.91 6.91
, .T I C _ Cell Pressure, ksf 9.07 11.23 15.55
0 I -F- - I Fail.Stress, ksf 2.79 4.55 7.28
0 10 20 30 40 Total Pore Pr., ksf 7.14 7.75 9.79
Axial Strain, % Ult. Stress,ksf 2.79 4.55 7.28
Total Pore Pr., ksf 7.14 7.75 9.79
Type of Test: o, Failure,ksf 4.72 8.04 13.04
CU with Pore Pressures Er, Failure, ksf 1.93 3.48 5.76
Sample Type: UNDISTURBED Client: Freese and Nichols
Description: Redish brown clay
Project: McHarad Road,City of Pearland,Texas
LL= 74 PL=27 PI= 47
Specific Gravity=2.73205 Source of Sample: GB-75 Depth: 13'-15'
Remarks: ASTM D4767 Method B,Moisture Sample Number: S-7
\r ASTM D2216,LL and PL ASTM D4318, Proj. No.: 1140215001 Date: 03/20/2016
'initial Water Content from Trimming.Specific TRIAXIAL SHEAR TEST REPORT
Gravity ASTM D854 GEOTEST ENGINEERING, INC.
FIGURE B-40
12.51 12.5 2 '
I 10 . . I 10 _
I I I
a
to to
or to
Ell __ NVy
ay a 'o I
0 0 5 - _.__` _.__-. m o 5 -.. _� _.. _. _.
o 16 o o I
Tu ___ % 40%
40%
0% 20% 0% 20
0 2.5 -r _ 0 2.5 I
p 0
12.53 I 12.5 4
E w 7.5 — - , _ 2 CO7.5-. I _I- _f_- L_.
N ` N -N a) _..
a N x a N x
u o 5 . _-- -__. ____. - o 5 _ J_
`om _. _—_- om
a -> a '5
0 0
0% 20% 40% 0% 20% 40%
6 Peak Strength ^ice'
Total Effective
a= 0.530 ksf 0.158 ksf 1---. - : _. _f_! / _-i.
a= 14.3 deg 20.3 deg 1 ii�
tan a= 0.28 0.37
in / Il ,
O -I
1.11-11--#411
r \,
f
I \
0 3 6 9 12 15 18
p,ksf
Stress Paths: Total Effective- - -
Client: Freese and Nichols
Project: McHarad Road,City of Pearland,Texas
Source of Sample: G13-75 Depth: 13'-I5' Sample Number: S-7
Project No.: 1140215001 GEOTEST ENGINEERING, INC.
FIGURE B-40a
3
Total Effective - -- -- - -
C, ksf 0.589 0.145
Q,deg 15.0 23.5 - - .-• .
`e Tan(+) 027 0.43
2
x
I ._ -.I it I.: I - I-
I . .
_ _ il._ .
m - 1 I I . _
in
d I i 1\ I
J- 1- �-.-t 1I ' � \r-- I I \ r11 IN I t t
0-V'- I 11 . 11 -Y I I I'
0 1 2 3 4 5 6
Total Normal Stress,ksf
Effective Normal Stress,ksf ---
6 i I_ i-_ I Sample No, 1 2 3
-I I Water Content, 22.4 23.0 22.2
1-171
5 J _ Dry Density, pcf 102.6 101.2 100.6
_ _LI { 1 - -- 1 Saturation, 93.0 92.2 87.7
r14-1-- H, , 'E Void Ratio 0.6560 0.6780 0.6876
'� - 4 1 - -i 1 _ 1_ Diameter,in. 1.47 1.48 1.51
m I t ._ I I i.._ f 1 1 Height,in. 3.00 3.01 3.00
L I-4 L {. - .1"-: ill - 2 Water Content, 24.7 24.2 23.4
3
rn 3 i .. Dry Density, pcf 101.6 102.4 103.7
ts
;41 _1 4 -1 I F Saturation, 100.0 100.0 100.0
> I - - 1 -- I • Void Ratio 0,6711 0.6579 0.6371
/21• 2 - 4 Diameter, in. 1.48 1.48 1.49
-I _ _._A { - Height,in. 2.98 2,98 2.96
Strain rate,in./min. 0.01 0.01 0.01
1 I 1 _ - _. Back Pressure, ksf 5.616 6.192 6.192
-- - _- Cell Pressure,ksf 6.192 7.344 8.496
Fail. Stress,ksf 1.906 2.533 3.120
0 to 20 30 40 Total Pore Pr., ksf 5.069 5.659 6.480
Axial Strain, % Ult.Stress, ksf 1.906 2.533 3,120
Total Pore Pr., ksf 5.069 5.659 6.480
a
Type of Test: , Failure, ksf 3.030 4.217 5.136
CU with Pore Pressures a, Failure, ksf 1.123 1.685 2.016
Sample Type: UNDISTURBED Client: Freese and Nichols
Description: Gray Clay
Project: McHarad Road,City of Pearland,Texas
LL= 64 PL=23 PI=41
Specific Gravity=2.72073 Source of Sample: GB-79 Depth: 2'-4'
Remarks: ASTM D4767 Method B, Moisture Sample Number: S-2
'ir ASTM D2216,LL and PL ASTM D4318, Proj. No.: 1140215001 Date: 05/17/2016
Imitial Water Content from Trimming,Specific TRIAXIAL SHEAR TEST REPORT
Gravity ASTM D854 GEOTEST ENGINEERING, INC.
FIGURE B-41
10 1 I 10 2
6 I 6 I V
I I
w a m `m
dN -_ 1 aye
o m o m
To
Fp 1 Fp
0% 20% 40% 0% 20% 40%
103 10 4 I,,
I 6 _ 1 6
I I
E a vs6 _- . .. _ w 6 _ I
6:al E ILt5 o_ 0m
d 8 4- ___- _._. - $2 `0 4 _ _I
Q.• 5 1 0 > I
6 p p
IP) _ m
F 2 o 2 Vj
II F
0 1 0
0% 20% 40% 0% 20% 40%
3Peak Strength
Total Effective
a= 0.566ksf 0.124 Ice -- - 'I ----
a= 14.5 deg 21.8 deg I
tan a= 0.26 0.40
2 I _. _ __ ___-
-i
y
y-- i
/ v,
f
0 0.8 1.6 2.4 3.2 4 4,8
p,ksf
Stress Paths: Total Effective - - —
Client: Freese and Nichols J
Project: McHarad Road,City of Remind,Texas
Source of Sample: GB-79 Depth: 2'-4' Sample Number: 5-2
Project No.: 1140215001 GEOTEST ENGINEERING, INC.
FIGURE B-41a
9 Total _ Effective / - H -I ..
C, ksf 0.391 - 0,139 ` I ' I j,.-
- -
e,deg 20.9 26.0 . . I I .. mt'
(m) _ _.
•
`►r Tan 0.38 0 49 I
..I
w 8 - 1 1 -I I I
I - I II ' I .���/ _ I
1 F_ 1
1
d 1I -II ilii �11� I_- I
c 4 iI _ i 1 I Js �- r I _ . _..
co.c .....T_ Y -"It, Ts T.3 _Li I
J
• _1:2-11121--,
c'� ft {t I- { t I III t I
11 �,� 11 ( L �1I- I `1 1 �� - t �
o C,- h 11 'II I I I I I I
0 3 6 9 12 15 18
Total Normal Stress,ksf
Effective Normal Stress, ksf ---
15 - .. 11 I _ Sample No. 1 2 3
T' I- t I 1 ` - Water Content, 18,0 182 18.1
1 `
125 � Dry Density, pcf 109.6 109.3 109.4
... I _ T�'i 1 1_11. 3 m Saturation, 91.8 91.9 91.7
_ c Void Ratio 0.5270 0,5306 0.5289
N.. 10 f 1 I Diameter,in. 1.54 1.50 1.51
IJ - ' [ 1 Height,in. 3.01 3.00 3.00
El Water Content, 21.1 21.4 18.5
y 7 5J 1 j .. Dry Density,pcf 106.9 106.3 111.8
o v Saturation, 100.0 100.0 100.0
G 1 - - - -- ~cr- Void Ratio 0.5653 0.5742 0.4965
p 5 I- TI2 - Diameter,in. 1.56 1.53 1.50
a- '-" -- Height, in, 2.99 2.98 2.96
_ 1 Strain rate, in./min. 0.01 0.01 0.01
2.5 { _ • Back Pressure, ksf 5.47 547 6.19
I_ T t 1 Cell Pressure,ksf 6.91 8.35 11.95
0 _ -
I - 1 _..- {- Fail. Stress,ksf 2.75 4.32 7.55
o 10 20 30 40 Total Pore Pr., ksf 5.40 5.90 7.37
Axial Strain,% Ult. Stress, ksf 2.75 4.32 7.55
Total Pore Pr., ksf 5.40 5.90 7.37
Type of Test d1 Failure, ksf 4.27 6.77 12.13
CU with Pore Pressures a, Failure, ksf 1.51 2.45 4.58
Sample Type: UNDISTURBED Client: Freese and Nichols
Description: Grayish brown sandy clay
Project: McHarad Road,City of Pearl and,Texas
LL=44 PL= 19 PI=25
Specific Gravity=2.68 Source of Sample: 013-80 Depth: 8'-10'
Remarks: ASTM D4767 Method B, Moisture Sample Number: S-5
Nor ASTM D2216, LL and PL ASTM D4318, Proj. No.: 1140215001 Date: 05/11/2016
Irnitial Water Content from Trimming, Specific TRIAXIAL SHEAR TEST REPORT
Gravity ASTM D854 GEOTEST ENGINEERING, INC.
FIGURES-42
151 I15 2
I 12 I - i 12 _
I
in N W 'r N N y
` d 0 z
N
m o 6 _
i Y
Ta 0
r_.-------- I
0% 20% 40% 0% 20% 40%
15 3 I ' 15 4
I
12 - i _. i _. ____ I 12 - F--_. il.
N
v m y 0 `I� o in
y d `n
x 2 x
oo TO
0 0 ISI
0% 20% 40% 0% 20% 40%
9Peak Strength ''. '..
Total Effective
a= 0.365 ksf 0.125 ksf ---- - - -- — - ---
a= 19.7 deg 23.6 deg 1 i'mo
tan a= 036 0.44 !.
6 - _ --
i --
I
° —
ch
' /i
l
I /
0 3 6 9 12 15 16
p,ksf
Stress Paths: Total Effective— — —
Client: Freese and Nichols
Project: McHarad Road,City of Peadand.Texas
Source of Sample: GB-80 Depth: 8'-10' Sample Number: S-5
Project No.: 1140215001 GEOTEST ENGINEERING, INC.
FIGURE B-42a
ye- -1@ d
°1 4
aao a
H = >ti W
N 0 0 a rr W
I' • a O N o b b b b 'o eD
r...r a v
p u m>< >< x > >< LO
V V N Ln N O O O h
N d N
o E a N v`
2 .J 0 T
o a d =
▪ CO E
Y .0
T t
o N t+) N COU
N 'R o co a n ^'0 0 0 0 '0 o
v co M o ov C
o E E a `o
x x x x x
C N ^ UO n 0 Q V N O) CO W 0
FC) d 6 0. O. L V _jO f N N N O O O d
co S o d o N -� d J 7
QN N CO {p N
`v = a
a •_V d N a) N 0 N T �� S
J - F - 7 Y
^. a a` 0. U O d
Q L T d co 0 0d 0
Q S. = U d H N C_
I- d m OC V E co O O) O) H Q
Wit ii m a v) u) o o M
F I
r
zMmr
O N (o ? (D N o W E r Cl ca r m
0 A W O O 0 E N CO O O) m
•••••V F N` r 0 CO N N
r
q coco
i:. L N V) O O
m 0 U U O) VV 6 o a C
J U N m m y dy C ti
C L J N_ _ 0 d A :a O 0 0 0 0
d ° d (n J co
6V NNNNN
E
M N a 3 E ~
0
Q o 1-
LU
W Z a
5 v
d c d
L. a CO d a 0 0 0 0 O
W E m a d m 0 0 0 0 m
O.. m 6- IR CO N CO d E Wr � t- P r-
In o
CO R R N Qs cn CO N N SO W F
0
K p)
I tO▪ O O U OI `O-' CI- d N N N N ON 0
2 CO a o i- L .E E m .c c° o 0) n i+) r) v 0
00 o) d y 0 o La
m 0 0 Zr Zr 0 C
o m d m z' Q > U c W
V 0) a d > N 3 0 0
O 'it EC a`o a E A O
s O a dN CO V L!) d
10...- a m m CO 0 0 I
$ !
.at- \ aa. ) / \ _ : : _ _ �
\ . o
0 = L „ ! ! 1-1 E2 2
■ _ (4 3 o , 0Li? r
I—
••-• 3 3 \ 2 03 = :-...-,-
=
01
3 = `
co
o : _ L.
E
co 0
00
7 � T/ / _ <
w =
in N
/ wi (0co„ N r r � ® ; 0 en 0 in
_ _ ,t‘i _42 w
_ N 0ri
vt co , corri cn
§ { i \ \ f / K 5
\ \ I ( # )
03
( ! \ / ~ * \ a ) 3
, < a § ) ! 3 . 4 Nnco. Nnco. ,
re■ )\
ILI 0. \ \ /ik ta
,\
co
o
CC 6
1203 co E21 & } 2 £ up 0 CD CO CD C
. ,0 03: : { f \ f ! \ 4.-
.o — .La_< ° ) 3 CO CO 3 3
13
\ { \ _ N CO , : 0
to I— *
N
O d m
O co y w
N J 1 4'
1'0
O W a n nm
v c a O O 'O 'o 9 a o o LL
�i = a 0 to X x x x x x
V C) N COOCO CO coNr N-
tO N
J N (p N N h
Na, d L
o E c
Z 'E a )..
o 0. m =
-, co) I-
Y .2 Y
›. t T
V m 5
o O N 0 CO
a N ' o O o 0 o a
r co co in U civ — —5 a
a d X X X X X G
a 0 CO O N N
C C y y a0 a ry U N co N co co U
FO a 2 �- 6 L m V a r v co N CO 0 N 2
co 2 a a a a ¢ 0-03 3 a a a
Q U to to CaA
To a = v
4 = m d d o ? x Y x
I- t a a` a s c) o a
Q L T N co O y N N
Ci 6 S U m ~ y C L _ a
I— 0 e C . E O) N f0 N r a
LUI-
)-
R' r co m
sm. O )" m Cl N N x a CO CO IO co 0
R r
Q co r cO C N O
IZ U .. .. .. .. .. .. .. . t N- r r N- r
m m u u 0 mE d - c c
4
cf) E
J Er
3 m `a a a CC o g a
o
2 I' m U m u v v v v v
J a r > a CO
m 0.of N N N N N
Ea Q Co a a >> > I-
Ijf 6 cm
2 Z L
m
a _
W E Ifid a 0 O O O 0
d Iv i L N 0 V ,.) a E L% N r r Nr ,ro
a ^ a Nco'co o „ W f V
O N N
di
a J .. .. Q V ^ ^ CO CO CO CO (0 C
RI Co 0 E p) —. tic —° a a o 0 0 0 0 •y
u 00 _ E a N N N N N a
2 a r v m .0 E a L p co co c- in v C
T)
'>E m 0
m a
0m w o 2 > U c o 0 0 0 C
a ¢ o0 -I O mFmCa yca N > a 125
d
UJ
o >. E To 0
2 a iv 0 0 aN CO V V) 0
O. m V) 03 a I- 0
\as \
u5 0
o
\ \$ » oo
! {H. / (
c,
= 2\ ) § , \ §MZ )
« 5 , , ; : , , , ! ;
\ ° \ } 6Z
§ \ _ :
( ° \
\ _ \>
_ :
\ _
z n ~ \! ! } \ : 6. co
® \\
•
0 1J
} ) ` \ 0 - i
\ 01 o Qs n \ \ 0 } - t \ \\ • 0
\ \
Naar
APPENDIX C
Figure
WinCore Soil Strength Analysis—Drilled Shaft Design C-1 thru C-7
WinCore Soil Strength Analysis—Piling Design C-8 thru C-14
j SOIL STRENGTH ANALYSIS
WinCore
'erslon 3.1 County Brazoria Hole GB-49 District Houston
\r/ Highway McHard Road Structure Traffic Signals Modification Date 1-6-16
Control 0912-31-290 Station 0.34.E Grnd.Elev. 51.30 ft
Offset 31.6'RT GW Elev. N/A
TAT Values Preferentially Used Soli reduction factor of 0.7 applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (T/F)
1 51.3 48.3 0.00 0 0.0 0.00 0.00
2 48.3 39.8 0.09 792 0.0 0.14 1.18
3 39.8 26.3 0.21 1849 0.0 0.32 5.55
4 26.3 19.8 0.32 3528 0.0 0.62 9.56
5 19.8 18.3 0.00 1296 0.0 0.23 9.90
6 18.3 14.8 0.31 0 0.0 0.31 11.13
fir.
Nik or
FIGURE C-1
S IGeo1ean.cal JooeVn Jortsool.ow of Peenxm Meharo Road Epansiarvwlncore Dasig6VI4E9l500�Fozavay_swm 5s'ra Tzll'.c 6ignals_GF49.56 5866061 64fie CIG
j SOIL STRENGTH ANALYSIS
WlnCore County Brazoria Hole GB-56 District Houston
Version 3.1
Highway McHard Road Structure Roadway/Storm Sewer Dale 1-11-16
Control 0912-31-290 Station 59+00.00 Grnd.Elev. 50.10 It
Offset 10'RT GW Elev. N/A
TAT Values Preferentially Used Soil reduction factor of 0.7 applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (T/F)
1 50.1 48.6 0.00 0 0.0 0.00 0.00
2 48.6 35.1 0.12 672 22.6 0.16 2.27
3 35.1 23.6 0.21 1944 0.0 0.34 6.19
4 23.6 21.1 0.00 4464 0.0 0.78 8.14
5 21.1 17.1 0.34 0 0.0 0.34 9.49
6 17.1 15.1 0.00 504 0.0 0.09 9.67
7 15.1 13.6 0.41 0 0.0 0.41 10.49
"a
FIGURE C-2
S.GecleMmeal Jo05..l l'D l5661.C1y of Ceeele•b IdcHard Road ElnareionW,CO.e Oesign.II4021506�1ReaINay SrormSe.' , T2'ae 5im:au GB49.56.58.60.62.64.68 CLO
j SOIL STRENGTH ANALYSIS
WinCore County Brazoria Hole GB-58 District Houston
'ersiersion 3.1
*we Highway McHard Road Structure Hoa0way/Storm Sewer Date 1-7-15
Control 0912-31-290 Station 78+09.3 Grnd.Elev. 50.00 ft
Offset 9.9'LT GW Elev. NM
TAT Values Preferentially Used Soil reduction factor of 0.7 applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (T/F)
1 50 48.6 0.00 0 0.0 0.00 0.00
2 48.8 39 0.15 1288 16.6 0.25 2.56
3 39 37 0.00 1800 0.0 0.32 3.19
4 37 27 0.20 1512 0.0 0.26 5.83
5 27 20 0.35 1161 6.0 0.24 7.51
6 20 13.5 0.31 1224 0.0 0.21 9.01
'Oa sr
1.+.e
FIGURE C-3
S GeoleChnical.16153'1140215001-Ply of Pioilaoo Y¢Hard Hoaa 6pan5,o5 V.66Cw5 D6565.1140715001_Ra655ay Scrn Save 5566 c SigreIs 6619.56.5850.6266 68 Cie
SOIL STRENGTH ANALYSIS
WinCore
Version 3.1 County Brazoria Hole GB-60 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-28-16
Control 0912-31-290 Station 98+36.9 Grnd.Elev. 50.00 ft
Offset 12'LT GW Elev. N/A
TAT Values Preferentially Used Soil reduction factor of 0.7 applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (TIE)
1 50 48.5 0.00 0 0.0 0.00 0.00
2 48.5 33.5 0.11 700 8.3 0.14 2.13
3 33.5 28.5 0.49 2808 0.0 0.49 4.59
4 28.5 20 0.43 1692 0.0 0.30 7.10
5 20 17 0.35 0 0.0 0.35 8.15
6 17 13.5 0.23 864 0.0 0.15 8.76
FIGURE C-4
S'Goole:MGM Jo059ID02150011Ary of Pea rlo od Me Hard Road Eva nsron dV mCore BE9on',1140216001 Roadway_Storm Se,er_i21Lc Sign aLCGB49.56.5860.6204 60CLG
j SOIL STRENGTH ANALYSIS
WinCore
Version 3.1 County Brazorla Hole GB-62 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-11-16
Now
Control 0912-31-290 Station 118.00.8 Grnd.Elev. 48.90 ft
Offset 15.9'LT GW Elev. NIA
TAT Values Preferentially Used Soil reduction factor of 0.7 applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (T/F)
1 48.9 46.4 0.00 0 0.0 0.00 0.00
2 46.4 43.9 0.00 1728 0.0 0.30 0.76
3 43.9 42.4 0.10 0 0.0 0.10 0.90
4 42.4 38.9 0.00 1296 0.0 0.23 1.70
5 38.9 37.4 0.08 0 0.0 0.08 1.82
6 37.4 33.9 0.00 2016 0.0 0.35 3.05
7 33.9 32.4 0.15 0 0.0 0.15 3.28
8 32.4 28.9 0.00 2016 0.0 0.35 4.52
9 28.9 27.4 0.14 0 0.0 0.14 4.73
10 27.4 23.9 0.00 2088 0.0 0.37 6.01
11 23.9 22.4 0.20 0 0.0 0.20 6.30
12 22.4 17.4 0.44 2952 0.0 0.52 8.89
13 17.4 15.9 0.00 2952 0.0 0.52 9.66
New 14 15.9 12.4 0.88 0 0.0 0.88 13.16
"'tor
FIGURE C-5
s>osm464444Wobss.14021500-Coy Ed Pwile-o rncMoN Foao EWanJOPwlncne oe49^114o2i5001 fiom,.ry_s1oim scwk Traffic signal_GB49 66 se 60626468CLc
Aft SOIL STRENGTH ANALYSIS
WinCore
Version 3.1 County Brazoria Hole GB-64 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Dale 1-8-18
Control 0912-31-290 Station 139+39.9 Grnd.Elev. 47.30 ft
Offset 10.1'RT GW Elev. WA
TAT Values Preferentially Used Soil reduction factor of 0.7 applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (T/F)
1 47.3 45.9 0.00 0 0.0 0.00 0.00
2 45.9 44.3 0.00 648 0.0 0.11 0.17
3 44.3 41.3 0.13 0 0.0 0.13 0.55
4 41.3 37.3 0.00 2088 0.0 0.37 2.01
5 37.3 35.8 0.16 0 0.0 0.16 2.25
6 35.8 24.3 0.20 1368 0.0 0.24 5.01
7 24.3 17.3 0.23 2052 0.0 0.36 7.52
8 17.3 14.3 0.29 1152 0.0 0.20 8.13
9 14.3 10.8 0.42 0 0.0 0.42 9.81
V
FIGURE C-6
5'.6eoiecencaVOR=414021500Liry or Fear and M:rvaro Road 6panson Nand ore nesl9evI14021500i_ROadWay Sro,m Sw.er_nalae 5.gozs 004956 58.60.62 64
SOIL STRENGTH ANALYSIS
WinCore
Version 3.1 County Brazoria Hole GB-68 District Houston
Highway McHard Road Structure Traffic Signals Modification Date 2-1-16
`i Control 0912-31-290 Station 181+20.2 Grnd.Elev. 44.70 ft
Offset 15.3'RT GW Elev. N/A
TAT Values Preferentially Used Soil reduction factor of 0.7 applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (TIE)
1 44.7 42.7 0.00 0 0.0 0.00 0.00
2 42.7 26.7 0.21 1632 0.0 029 4.57
3 26.7 11.7 0.31 1824 0.0 0.32 9.36
4 11.7 8.2 0.66 3526 0.0 0.62 11.83
`r
FIGURE C-7
S562.5lectInicai Jobs‘1140215001 Lily IN Pearlan6 612HaN Poaa EXpanSoOr WrCom eea!0n.1140215001.noaJ ay Slmm Sm'n!Lollic Signalz_613J956 56.6062 6+66 CIG
It . SOIL STRENGTH ANALYSIS
W lnCoCounty Brazoria Hole GB-09 District Houston
Version 3.1
Highway MCHartl Road Structure Traffic Signals Modification Date 1-6-16 NsId
Control 0912-31-290 Station 0.86.4 Grnd.Elev. 51.30 ft
Offset 31.6'RT GW Elev. N/A
TAT Values Preferentially Used Skin Friction Limit=1.25 tsf No soil reduction factor applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (T/F)
1 51.3 48.3 0.00 0 0.0 0.00 0.00
2 48.3 39.8 0.13 792 0.0 0.20 1.68
3 39.8 26.3 0.30 1849 0.0 0.46 7.92
4 26.3 19.8 0.45 3528 0.0 0.88 13.66
5 19.8 18.3 0.00 1296 0.0 0.32 14.14
6 18.3 14.8 0.44 0 0.0 0.44 15.90
Nod
V
FIGURE C-8
S VG o¢ciwoal Joesv+40215001-Ciy of oeanaw McHx N Fool Expa none V✓Ircpre Design 140215001_Roadway_.5icm sewer T alio S,00A;G849 56 58 606264.68 Cle
Si: SOIL STRENGTH ANALYSIS
WinCore CountyBrazoria Hole GB-56
Version 3.1 District Houston
NewHighway McHard Road Structure Roadway/Storm Sewer Date 1.11-16
Control 0912-31-290 Station 56+00.00 Grnd.Elev. 50.10 ft
Offset 10'RT GW Elev. N/A
TAT Values Preferentially Used Skin Friction Limit=1.25 Mt No soil reduction factor applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (T/F)
1 50.1 48.6 0.00 0 0.0 0.00 0.00
2 48.6 35.1 0.17 672 22.6 0.23 3.25
3 35.1 23.6 0.31 1944 0.0 0.49 8.84
4 23.6 21.1 0.00 4464 0.0 1.12 11.63
5 21.1 17.1 0.48 0 0.0 0.48 13.56
6 17.1 15.1 0.00 504 0.0 0.13 13.81
7 15.1 13.6 0.58 0 0.0 0.58 14.98
Nasoo
FIGURE C-9
5'GeccteMmeal JCP54 i 40215001014 of Peanand McHard Road E peneio6WnCwe Ges!p .11n0215M1dPwemM_Me"m5ev.er_Lalhe9gra6 66444 5556666264 66 CRC
j SOIL STRENGTH ANALYSIS
WlnCore County Brazorla Hole GB-50 District Houston
Version 3.1 3
Highway McHard Road Structure Roadway/Storm Sewer Date 1-7-15 `tom
Control 0912-31-290 Station 78+09.3 Grnd.Elev. 50.00 ft
Offset 9.9'LT GW Elev. NM
TAT Values Preferentially Used Skin Friction Limit=1.25 tst No soil reduction factor applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (T/F)
1 50 48.8 0.00 0 0.0 0.00 0.00
2 48.8 39 0.22 1288 16.6 0.36 3.65
3 39 37 0.00 1800 0.0 0.45 4.55
4 37 27 0.29 1512 0.0 0.38 8.33
5 27 20 0.50 1161 6.0 0.34 10.72
6 20 13.5 0.44 1224 0.0 0.31 12.86
V
FIGURE C-10
SVienchire al Jo0s 114021500'Cit 01 pearland MCHam goad E ns.onW.c Cme ees,gm 140215001_9 mEray_So'm Set r Trali a Sr gnalc 6E49 56 58 60626,168.OLG
j, SOIL STRENGTH ANALYSIS
WlnCore
Version 3.1 County Brazoria Hole GB-60 District Houston
‘` Highway McHard Road Structure Roadway/Storm Sewer Dale 1-28-16
Control 0912-31-290 Station 98+36.9 Grnd.Elev. 50.00 ft
Offset 12'LT GW Elev. N/A
TAT Values Preferentially Used Skin Friction Limit=1.25 tsf No soli reduction factor applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (TX)
1 50 48.5 0.00 0 0.0 0.00 0.00
2 48.5 33.5 0.15 700 8.3 0.20 3.04
3 33.5 28.5 0.70 2808 0.0 0.70 6.55
4 28.5 20 0.62 1692 0.0 0.42 10.15
5 20 17 0.50 0 0.0 0.50 11.65
6 17 13.5 0.33 864 0.0 0.22 12.51
`Iter
Ilia or
FIGURE C-11
5 aLeolee hoar Jobs'914Q215001 Cry of Pearian0 Mc Hard Road Expo mb n'Pnnore De=ign'I140T500T_Ppad ay_Sionn Sewer Tales Sig noise B4956.5860 62 64262 GLG
j SOIL STRENGTH ANALYSIS
WinCore
Version 3.1 County Brazoria Hole GB-62 District Houston
Highway McHard Road Structure Roadway/Storm Sewer Date 1-11-16 N
ed
Control 0912-31-290 Station 118+00.8 Grnd.Elev. 48.90 ft
Offset 15.9'LT GW Elev. WA
TAT Values Preferentially Used Skin Friction Limit=1.25 tsf No soil reduction factor applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (T/F)
1 48.9 46.4 0.00 0 0.0 0.00 0.00
2 46.4 43.9 0.00 1728 0.0 0.43 1.08
3 43.9 42.4 0.14 0 0.0 0.14 1.29
4 42.4 38.9 0.00 1296 0.0 0.32 2.42
5 38.9 37.4 0.12 0 0.0 0.12 2.60
6 37.4 33.9 0.00 2016 0.0 0.50 4.36
7 33.9 32.4 0.22 0 0.0 0.22 4.69
8 32.4 28.9 0.00 2016 0.0 0.50 6.45
9 28.9 27.4 0.20 0 0.0 0.20 6.75
10 27.4 23.9 0.00 2088 0.0 0.52 8.58
11 23.9 22.4 0.28 0 0.0 0.28 9.00
12 22.4 17.4 0.63 2952 0.0 0.74 12.69
13 17.4 15.9 0.00 2952 0.0 0.74 13.80
14 15.9 12.4 1.25 0 0.0 1.25 18.80
V
FIGURE C-12
51Gea ee 'cel Joos.1140215001-City of Peerland McHard Pond Flven acn'.W,nCore Descni/40215001 Roadco y_Smrm Sewer_La H6 S,gnaG2G B49.565860.626468 CLG
SOIL STRENGTH ANALYSIS
WinCore
'erslon 3.1 County Brazoria Hole GB-64 District Houston
`S Highway McHard Road Structure Roadway/Storm Sewer Date 1-8-16
Control 0912-31-290 Station 139+39.9 Grnd.Elev. 47.30+
Offset 10.1'RT GW EIev. N/A
TAT Values Preferentially Used Skin Friction Limit=1.25 tst No soil reduction factor applied
Strata EIev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PS9 (TSF) (T/F)
1 47.3 45.9 0.00 0 0.0 0.00 0.00
2 45.9 44.3 0.00 648 0.0 0.16 0.24
3 44.3 41.3 0.18 0 0.0 0.18 0.78
4 41.3 37.3 0.00 2088 0.0 0.52 2.87
5 37.3 35.8 0.23 0 0.0 0.23 3.22
6 35.8 24.3 0.29 1368 0.0 0.34 7.15
7 24.3 17.3 0.33 2052 0.0 0.51 10.75
8 17.3 14.3 0.42 1152 0.0 0.29 11.61
9 14.3 10.8 0.60 0 0.0 0.60 14.01
FIGURE C-13
5)Gegwhncal Jo0a11140215001.Gry or Peanana*Hard Road 6pan5!onAWrr9se nesgn'.114@I5001_Roedresy_Sorn Se.er_Trallic S9n&s_GB49 5658bn.6264 68CIG
iiI-
La SOIL STRENGTH ANALYSIS
WlnGare CountyBrazoria Hole GB-60 3.1 60 District Houston
Highway McHard Road Structure Traffic Signals Modification Date 2-1-16
Control 0912-31-290 Station 181+20.2 Grnd.Elev. 44.70 ft
Offset 15.3'RT GW Elev. N/A
TAT Values Preferentially Used Skin Friction Limit=1.25 tsf No soil reduction factor applied
Strata Elev. TCP Unit TAT TAT Phi TAT Unit Accumulative
No. (Feet) Friction Cohesion Degrees Friction Friction
From To (PSF) (TSF) (T/F)
1 44.7 42.7 0.00 0 0.0 0.00 0.00
2 42.7 26.7 0.29 1632 0.0 0.41 6.53
3 26.7 11.7 0.44 1824 0.0 0.46 13.37
4 11.7 8.2 0.94 3528 0.0 0.88 16.90
V
FIGURE C-14
s:G erne&i eel Joao 1140215001 Loy of Pea rleno M-Ha re Hoax Expansinode/-nCaa Des vne1402215001_Poa O'oal_Slorm Sewer_T rail c Sign al a_GB49 Se 56 60 62 64OS CLG
tame
-.
APPENDIX D
Borings from Previous Study
LOG OF BORING NO. GB-1
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland. Texas
LOCATION : N 13777864, E 3115623 COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 52.21 FT. DATE : 12-12-12
SAMPLER : Shelby Tube/Split Spoon
0o o N UNDRNNED SEAR STRENGTH,
H
w trc S 2 ?N N K O RAND PENETROMETER
U. DRY AUGER 0.0 TO 15.0 FT. a n"' ,r, = ii
mO 6 • UNCONFINED COMPRESSION
p WET ROTARY -- TO -- FT. e'; f<r -a £r II L UNCONSOLIDATED-UNDRAINED
°O w =6 g- _ r y TRIAXIAL COMPRESSON
Ps-) :-
aN a 0 a 8 A iORVFNE
DESCRIPTION OF MATERIAL
si
0.5 1.0 1.5 2.0 2.5
- 52.2
Stiff dark gray FAT CLAY
(CH) w/ferrous nodules 31
Citi
—w/grass roots 0'-2'
II
—stiff to very stiff 32 OL
w/colcoreous nodules and
sand seams 4'-6 136 97 31 75 28 47 ft
- 46.2
=
Medium stiff to stiff brown
and) gray SANDY LEAN CLAY se 22 34 19 Is p 0
CN (CL
—w/calcareous nodules 6'-8'
—medium stiff 8'-10' 21 /0
s_
INI
40.2- -\1 Very stiff reddish brown
FAT CLAY (CH)
`' - 37.2 1 \ 99 27 66 25 41 QN
26
2
36
3
DEPTH TO WATER IN BORING
B: FREE WATER 1st ENCOUNTERED AT 15.0 F. DURING DRILLING; AFTER 15.0 MINI. AT 11.2 F.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
— Geotest Engineering, Inc.
LOG OF BORING NO. GB-2
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texos
LOCATION : N 13777924, E 3116379 COMPLETION DEPTH : 15.0 FT.
See Plon of Borings (Figure 2)
SURFACE ELEVATION : 54.87 FT. DATE : 12-12-12
SAMPLER : Shelby Tube/Split Spoon og K UNORAINEa SHEAR STRENGTH,
�rc -n 0 ?M N K w 0 HAND PENETROMETER
DRY AUGER : 0.0 TO 15.0 FT. za 7 ‘71
o _I w 6a Ln 3q Z 3 z • UNCONFINED COMPRESSION
s s WET ROTARY -- TO -- FT. do W 0 C UNCONSOLIDATED-UNDRAINED
an -, vo o -- Fa - 1RM%IAL COMPRESSION
W a DESCRIPTION OF MATERIAL n$ o g 6 n TDRdANE
- 54.9r ✓� 0.5 1.0 1.5 2.0 2.5
\ Medium stiff to stiff dark
gray FAT CLAY (CH)
21 GA
\ w/ferrous nodules
.
-w/gross roots, calcareous
nodules and shell
85 26 61 24 37 5
fragments 0'-2'
-stiff 2,_8,
-slickensided w/calcareous 21
nodules bow'
-y6 _10 brOWn and gray 69 96 27 63 24 39 ON o
-w/silt
seams 8'-15'
4 J3 n A
4 I.II.\ -stiff reddish brown 13'-15'
- 39.9 1 M 24 n
2e
2
3.
35 Arid
DEPTH TO WATER IN BORING :
?: FREE WATER 1st ENCOUNTERED AT 15.0 FT. DURING DRILLING: AFTER 15.0 MIN. AT 11.2 FT.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
— Geotest Engineering, Inc.
LOG OF BORING NO. GB-3 (GB-3P)
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13777928, E 3116954 COMPLETION DEPTH : 40.0 FT.
Nee
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 53.86 FT. DATE : 12-12-12
08 UNDRAJNED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon -o z ,., Li H rc TSF
Ci &p 6 Op. n' i.•, 0 HAND PENETROMETER
w DRY AUGER : 0.0 TO 29.0 FT. za - C . . e
0 " 3 r 3 • UNCONFINED COMPRESSION
i i WET ROTARY : 29.0 TO 40.0 FT. o ca sW a _
a rc w D <z a tr-S 8 nr-n Zy9 TRAxIA• 50CouPRESSION�INED
DESCRIPTION OF MATERIAL G et o o ,i � 6 ] A TORYANE
- 53.9 T 91E4 0.5 1.0 1.5 20 2.5
Hard gray FAT CLAY (CH)
-w/grass roots 0'-4'
-very stiff to hard 2'-4' 20
-very stiff 4'-8' 20 0 A
-w/calcareous nodules and
ferrous stains 4'-10' 32 s
-slickensided 6'-8'
T_ 45.9 .` e6 101 25 82 29 53 O • A
Very stiff to hard groy and
yellowish brown LEAN CLAY 16 A nh
(CL) w/sand
-medium stiff to stiff
s reddish brown and gray
New'
k w/sill seams 13'-15' 77 21 10
38.9 Ni Very stiff reddish brown
FAT CLAY (CH) w/calcareous
and ferrous nodules 24 0
-slickensided 19'-21' 21
- 32.9 r % ]] 111 20 56 22 34 •60
=
• Gray SANDY LEAN CLAY (CL)
w/ferrous stains
-stiff 21'-23' 60 17 24 16 e a0
MkAh
-stiff to very stiff w/sand 21 50 17
seams 25'-27'
-stiff to hard 27' 29' 62 ns IS 31 16 15 p 0
- 24.9 Mt% 19 A 0
T ' Dense gray SILTY SAND (SM)
• I
� 51 42
Ell y
I
- 18.9 ' 32 21
`e
DEPTH TO WATER IN BORING
a: FREE WATER Isl ENCOUNTERED AT 29.0 FT. DURING DRILLING; AFTER 15.0 MINI. AT 13.7 Ft
T: WATER DEPTH AT 7.9 FT., HOLE OPEN TO 40.0 FT. ON 01-16-13. Continued on Figure A-30
Geotest Engineering, Inc.
LOG OF BORING NO. GB-3 (GB-3P) Cont'd
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Peorland, Texas
LOCATION : N 13777928, E 3116954 COMPLETION OEPTH : 40.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 53.86 FT. DATE : 12-12-12
UNPAIRED SHEAR STRENGTH,
SAMPLER Shelby Tube/Split Spoon �K$ eP w
ER H TSF
DRY AUGER 0.0 TO 29.0 FT. f5 G
- H N t w O HAND PENETROMETER
6 0 6 n 3 - • UNCONFINED COMPRESSION
o 9 WET ROTARY : 29.0 TO 40.0 FT. `LL 3 - UNCONSOLIDATED-UNORNNEO
tet2
w n r, u
g �g, TRIAXNL COMPRESSION
�i o 0 nn 0
L o m DESCRIPTION OF MATERIAL dN i a n TORVANE
18.91 35 .. '^0 up
0.5 1.0 1.5 2.0 2.5
Dense gray SILTY SAND (SM)
Imo'....'
;.:: ;r -brown 38.5'-40'
- 13.9— 40 . X 3 20
NOTE :
See Piezometer GB-3P for
water level measurements.
- 45-
Wolf
- 50-
- 55-
- 60-
- 65-
- 70-
DEPTH TO WATER IN BORING
: FREE WATER 1st ENCOUNTERED AT 29.0 FT. DURING GRILLING; AFTER 15.0 MIN. AT 13.7 FT.
T: WATER DEPTH AT 7.9 FT., HOLE OPEN TO 40.0 FT. ON 01-16-13.
Geotest Engineering, Inc.
• LOG OF BORING NO. GB-4 (GB-4P)
PROJECT : McHord Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13777953, E 3117674 COMPLETION DEPTH : 40.0 FT.
See Plan of Barings (Figure 2)
SURFACE ELEVATION : 54.01 FT. DATE : 12-12-12
Qo H UNDRAINED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon reo u TSF
w u: N o 'RN H N w O HAND PENETROMETER
DRY AUGER 0.0 i0 21.0 FT, a a- G
'. o 'J' 2.� 3 8E: e j & • UNCONFINED COMPRESSION
o WET ROTARY : 21.0 TO 40.0 FT. -o Z�
N a 6000 W,NN z _ 0 0 u . UNCON50LIWTEO-UNOWJNED
Hrt.Q am - �y9 LRAXNL COMPRESSION
,,, DESCRIPTION OF MATERIAL �� & C. a A TORVANE
- 54.0— WO 6-� 0.5 1.0 1.5 2.0 2.5
Very stiff yellowish brown
and groy FAT CLAY (CH) 31 00
w/ferrous nodules
-stiff 2'-4'
et
-stiff to very stiff brown, 30
_ slickensided 4'-6'
93 81 38 101 35 66
-reddish brown w/calcareous
r nodules 6'-8'
46.0 15 25
Stiff reddish brown LEAN
S ` CLAY (CL) w/sand and silt
- 1r seams 22 A
-medium stiff to stiff
13'-15'
'``
- 1 t -very stiff 15'-17' 79 106 22 30 15 Is t O
i -
36.0 si,, a
Very stiff reddish brown 22 AO
s FAT CLAY (CH) w/calcareous
_ 2Enodules
33.0 30 OD
Medium stiff to stiff
j reddish brown and gray
t LEAN CLAY (CL) w/sand 20 A 0
-stiff to very stiff
w/calcareous nodules 75 n1 18 32 16 16 h O
- 29.0— 2 S l 23'-25' r
Very stiff reddish brown
FAT CLAY (CH) w/calcareous 24 LO
nodules and ferrous stains
-stiff to very stiff 27'-29'
27 O A
- 3EL
99 25 62 24 38 /V'
kai -stiff 33'-35'
- 19.0— 351 16 nA
DEPTH TO WATER IN BORING
s: FREE WATER 1st ENCOUNTERED AT 21.0 FT. DURING DRILLING: AFTER 15.0 MIN. AT 19.6 FT.
€: WATER DEPTH AT 7.2 FT., HOLE OPEN TO 40.0 FT. ON 01-16-13. Continued on Figure A-4a
Geotest Engineering, Inc.
LOG OF BORING NO. GB-4 (GB-4P) Cont'd
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13777953, E 3117674 COMPLETION DEPTH : 40.0 FT.
See Plan of Borings (Figure 2) Wad
SURFACE ELEVATION : 54.01 FT. DATE : 12-12-12
op a UNDRAINED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon ✓ rc
Bp 04 U N N R d 0 HAND PENETROMETER
W DRY AUGER 0.0 TO 21.0 FT. n n
o V Syw F 3 • UNCONFINED COMPRESSION
N 0 2 5
a WET ROTARY 21.0 TD 40.0 FT, ,,e- w^ ?a ,4 o UNCONSOUDATED-UNDRAINED
PhhF u TRIAXIAL COMPRESSION
as ] TORVANE
DESCRIPTION OF MATERIAL aN n� a 3
- 19.0+ 3 0.5 I.0 1.5 20 2.5
Very stiff reddish brown
FAT CLAY (CH) w/calcareous
nodules and ferrous stains
21 An
- 14.0— 40 \
NOTE :
See Piezometer GB-4P for
water level measurements.
- 45-
V
- 50-
-
o-- 55-
- 60-
-
o-- 65-
o-
DEPTH TO WATER IN BORING
V: FREE WATER 1st ENCOUNTERED AT 21.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 19.6 FT.
WATER DEPTH AT 7.2 FT., HOLE OPEN TO 40.0 FT. ON 01-16-13.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-5
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texas
`� LOCATION : N 13778025, E 3118346 COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 56.06 FT. DATE : 10-30-12
ei-
UNDIMMED SHEAR STRENGTH.
SAMPLER Shelby Tube/Split Spoon 0� u a n TSF
G ORY AUGER : 0.0 TO 15.0 FT. t� 0� U Ng X K = O NANO PENETROMETER
LL O i m ; O q Z. UNCONFINED COMPRESSION
o i WET ROTARY -- TO -- FT. dy $ z u
W a SZ W UNCONSOCOMPRESSION NNEO
yg o0 pa - - �u9 it
COMPRESSION
L i w0
DESCRIPTION OF MATERIAL .: ug a gu ] — TORVANE
- 56.1— WO 1-2 a 0.5 1.0 1.5 2.0 2.5
FILL: very stiff to hard
dark gray fat clay w/gross
54.1 roots, gravel and sand 16 n 0
\ seams I
\ Very stiff dark gray FAT 25 0 a
CLAY (CH) w/ferrous
- 5,\ nodules
-gray 4'-T 90 98 34 89 v 58 OL.
\ -stiff 4.-8'
-gray and brown w/calcareous
- 48.1 . nodules 6I-8' r 38
Stiff to very stiff brown
1 \ and gray LEAN CLAY (CL) 71 114 19 3e 12 21 A ID
- w/sand and ferrous nodules
-w/calcareous nodules
4V 13'-15'
- 41.1— 15 \ 26 n
- 20-
- 25-
- 30-
,fie - 35-
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Geotest Engineering, Inc.
LOG OF BORING NO. GB-6
PROJECT : McHord Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Peorland, Texas
LOCATION : N 13778124, E 3118889COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 54.10 FT. DATE : 10-30-12
AB UNDRAINED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon Fa a w N TSF
L 1 ¢ -� U Tr
N u, w O HAND PENETROMETER
w g DRY AUGER 0.0 TO 15.0 FT. za a. 3 0 . s i 2. • urvcoNFwEO COMPRESSION
�P WET ROTARY : -- TO -- FT. oT W$Pt zn Pw p UNC0rv50UDATE0-uNDRA NED
Q a �^ 6 0U P qui by — TRIAXIAL COMPRESSION
-i DESCRIPTION or MATERIAL zm a� 0 ° 0.- ] A IORVANE
- 54.1— 0 -w z 0.5 1.0 1.5 2.0 2.5
FILL: hard dark gray fat
cloy w/gross roots and
52.1 \ l gravel r 1e
V Very stiff gray FAT CLAY
(CH) w/ferrous nodules 91 30 89 31 58 O [1
—stiff 4'-9'
- 5-\ —gray and yellowish brown
5`-8' 39
—w/calcoreous nodules 6'-9'
\ 34 ifiii
45.1
- Stiff brown and gray LEAN
CLAY (CL) w/sand, 76 105 20 a 18 25 r, C
�
to
calcoreous and ferrous
\ nodules and silt seams )
- 39.1_ 1 22 /A7 `�
- 20-
-
o-_ 25-
- 30-
- 35-
held
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILUNG.
Geo test Engineering, Inc.
LOG OF BORING NO. GB-7
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Peorlond, Texas
`e LOCATION : N 13778373, E 3119447 COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 54.77 FT. DATE : 10-30-12
O Te UNDRAINED SHEAR STRENGIX,
SAMPLER : Shelby Tube/Split Spoon go (N i.a TSF
a X
w �, ORY AUGER : 0.0 TO 15.0 FT. a ns, - IN wr t w O RANO PENETROMETER
'� o °J - p✓ - ? rX
3 0 UNCONFINED COMPRESSION
o 5 i WET ROTARY -- TO -- FT, n3 i _ia u mt., U • UNCONSOUDATED_UNDR.NNLD
iQET. w^ = go o .qR %u TRIAXIAL COMPRESSION
W DESCRIPTION OF MATERIAL 2 . wX a si C 6 a A mamANE
54.8 u: 0.5 LO T5 2.0 2.5
r r I FILL: hard dark gray and
�
�4 gray fat clay w/grass 25 n0
- 52.8roots and sand seoms
. tt r
Very stiff groy FAT CLAY
(CH) w/ferrous nodules 30 po
I\ —stiff to very stiff 4'-6'
\ —w/calcareous nodules 4'-8'
\ —stiff gray and brown 91 34 50 21 29
slickensided 6'-8'
- 46.8 % 86 35 M®
Stiff to very stiff groy
and yellowish brown LEAN
71 20 41 17 24 A n
CLAY (CL) w/sand
—soft to stiff brown and
lite. 131-15'
gray very sandy cloy
13'-15' 20 A(l
- 39.8 1
2.
2
3.
3
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Geo test Engineering, Inc.
LOG OF BORING NO. GB-8
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778584, E 3120116 COMPLETION DEPTH : 15.0 FT. 3
See Plan of Borings (Figure 2) V
SURFACE ELEVATION : 54.37 FT. DATE : 10-30-12
o0 0 Li UNORMNEO SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon Li w
16 TSF
LT ^4o F N n o 0 HAND PENETROMETER
o oar AUGER a.o To 15.0 FT. is 1�- RoZ , J z • UNCONFINED COMPRESSION
o i WET ROTARY -- TO -- FT. 1n o
63 i fi J V E UNCONSOLIDAIED-VNORNNED
SSION
F.: A 0, w- 76 ¢a 0 F iT - TRIAXIAL COMPRESSION
El • ¢o. TORVANE
a DESCRIPTION OF MATERIAL G a o ti
w 0.5 1.0 1.5 2.0 2.5
- 54.4— 0
FILL: very stiff to hard
4. brown and gray lean clay 12 A 0
52.4 w/gross roots, and sand
Iseams I
Hard dark gray and brown 90 28 56 31 55 d
—\\ FAT CLAY (CH) w/calcareous
and ferrous nodules
\ —very stiff gray 4'-6' 30 0
\ —stiff to very stiff gray
and brown slickensided
- 46.4C 1 6'-8' 93 es 34 85 30 55 OA
r
\� n
Stiff to very stiff brown
- 1 and gray LEAN CLAY (CL) 22 A
�\ w/calcareous and ferrous
\\ nodules, ferrous stains
and sandf
seams
s_
—soft to stiff very sandy
clay 13'-15' J
- 39.4— 15 \ 23 A t7
- 20-
- 25-
- 30-
- 35- J
DEPTH TO WATER IN BORING
V: FREE WATER 1st ENCOUNTERED AT 15.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 12.5 FT.
HOLE OPEN TO 15.0 FT. AT END Of DRILLING.
— Geotest Engineering, Inc.
LOG OF BORING NO. GB-9 (GB-9P)
PROJECT : Mallard Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13778585, E 3120817 COMPLETION DEPTH : 15.0 FT.
Noose See Plan of Borings (Figure 2)
SURFACE ELEVATION : 53.95 FT. DATE : 10-31-12
po u N UNDIMMED SHEAR STRENGTH.
SAMPLER : Shelby Tube/Split Spoon r w TSF
2 = N
El DRY AUGER : 0.0 TO 15.0 FT. 146 a nN - r w 0 HAND PENETROMETER
'i m 3 - ' S a 3 S UNCANFINEO COMPRESSION
n WET ROTARY : -- TO -- FT. d; za sw u UNCONSOLIDATED-UNDRAPED
o Tn co - u
th
Fir mo coz oe �a _ %% - UNCOLL COMPRESSION
o DESCRIPTION OF MATERIAL iG a� go
6 u 0 tORvaNE
- 54.0 0.5 1.0 1.5 2.0 2.5
F j_4 FILL: dork groy fat clay
- 53.0 " fraw/grossgments roots,and shell
sand seams 34
Stiff dark gray FAT CLAY
(CH) SIJ 37 93 32 61
-gray and brown 4'-8'
-w/ferrous nodules 4'-13'
ah
-stiff to very stiff Se
6/calcareous nodules
6'-13' 92 29
z Silk -brown and gray 8'-13'
21
;' —w/sand and silt seams
41.0 12'-15' r
Stiff to very stiff brown
'tir - 39.0 I and gray LEAN CLAY (CL) 82 Ie 36 19 n A n
w/sond, calcareous nodules
I-
and ferrous stoins
NOTE :
See Piezometer GB-9P for
water level measurements.
20
2
34
3
DEPTH TO WATER IN BORING
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
T: WATER DEPTH AT 8.1 FT, HOLE OPEN TO 15.0 FT. ON 01-16-13.
— - Geotest Engineering, Inc.
LOG OF BORING NO. GB-10
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Peorland. Texas
LOCATION : N 13778591, E 3121551 COMPLETION DEPTH : 15.0 FT. 3
See Plan of Borings (Figure 2) heed
SURFACE ELEVATION : 58.54 FT. GATE : 10-30-12
SAMPLER Shelby Tube/Split Spoon gee00
u x N UNDRAINED SHEAR STRENGTH,
M DRY AUGER : O.O TO 15.0 FT. W6 3.Cs u NN u 0 RANO PENETROMETER
'� L. a' _. n a. 3 E3f 5 5 z 0 UNCONFINED COMPRESSION
WET ROTARY : -- TO -- FT. '—u '6 5
Z t o6 zN n o o u L . UNCONSOLIDATED-UNDRNNED
trlQ TRIAXIAL COMPRESSION
6 Nm d .. F
0 DESCRIPTION OF MATERIAL Ay�' ai o -a j 6 5 TORVANE
- 58.5 W•
FP • 0.5 1.0 1.5 2.0 2.5
Stiff dark gray and gray
FAT CLAY (CH) w/ferrous
nodules 27
—w/grass roots 0'-2'
35 OA
M95 36 98 34 64 m
—gray and yellowish brown
.\ 8 -9.
—medium stiff to stiff 38
slickensided 8'-10'
\ —w/calcareous nodules 8'-15'
I —gray and brown 9'-11' 54 37 I ��
•
—stiff to very stiff reddish
brown and gray 11'-15'
21 AC) '•1/
- 43.5 1
2•
2
35
•
35 ,vili
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING,
Geotest Engineering, Inc.
LOG OF BORING NO. G8-11
PROJECT : McHord Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pear-land, Texas
`�. LOCATION : N 13778618, E 3121993 COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 60.96 FT. DATE : 10-30-12
4S u N UNORAINED SHEAR STRENGTH.
SAMPLER Shelby Tobe/Split Spoon r w TSG
G
rix z u lK N n
w m DRY AUGER : D.D TO 15.0 FT, a s - o HAND PENETROMETER
'� 0 "� W 3LL o J a 3 . UNCONFINED COMPRESSION
o WET ROTARY -- TO -- FT. n� �N j yr 0 u UNCONSouDATEo-UNDRAINED
>� 00, d ✓y� mm TRIAXIAL COMPRESSION
W o DESCRIPTION OF MATERIAL cAr ug oa o g 6 A TORVANE
- 61.0 •t L 0.5 1.0 1.5 2.0 2.5
r I FILL: very stiff dork gray
I 4 and gray fat cloy w/gross 1e
ON
roots and calcareous
58.0 Mt nodules
- Very stiff dark gray FAT 93 28 BO 29 51 OA
1CLAY (CH) w/ferrous
nodules
-stiff to very stiff 4'-6' 34 OA
.\ -medium stiff to stiff,
slickensided 6'-8'
-grey 2ndd yellowish brown 82 37
F -sti6'-12'
8'-10' 35 pQ
ff
I -w/calcareous nodules 8'-15'
-brown and gray 12'-15'
-w/sand and silt seams
`fir 161
13'-15'
- 46.0 1 19 /0
2t
2
3.
*s 35
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT, AT END OF DRILLING,
Ceotest Engineering, Inc.
LOG OF BORING NO. G8-12
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13778682, E 3122614 COMPLETION DEPTH : 15.0 FT. 3
See Plan of Borings (Figure 2) V
SURFACE ELEVATION : 53.12 FT. GATE : 10-30-12
zz5 0 N UNDRAINED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoonw u
Id tc % I11 0 HAND PENETROMETER
G 81 DRY AUGER : 0.0 TO 15.0 FT. k. 77 0lw t
O = z 6'A Zw i-
n, g . UNCONFINED COMPRESSION
p . Di A WET ROTARY -- TO -- FT. aN Ca yz0 L , UNCONSOUDATED-UNDRAINED
Q C.
df, a %F TRIF%LLL COMPRESSION
W o DESCRIPTION OF MATERIAL CG 62 o - - n A TOR>ANE
re
0.5 1.0 1.5 2.0 2.5
- 53.1— S
4 FILL; hard dark gray and
4 gray fat clay w/gross Rz o0
- 51.1 r 1 roots r
\ Very stiff dark gray FAT
CLAY (CH) w/ferrous 91 24 80 29 51 e
nodules
- 5'\ —stiff to very stiff gray
\� and yellowish brown 4'-6' 31
—medium stiff to stiff,
slickensided 6'-8' 8> 36 • a
\ —gray and brown 6'-12'
—w/calcareous nodules 7'-12'
19 rh
1pl\
40.1
Very stiff brown and gray
LEAN CLAY (CL) w/sand, 81 19 48 70 28 An
`�
- 38,1— 15 calcareous and ferrous
nodules
- 2o-
- 25-
- 30-
- 35-
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-13
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13778717, E 3123314 COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 53.27 FT. DATE : 10-30-12
SAMPLER : Shelby Tube/Split Spoon foo y� K UNPINNED SEAR STRENGTH.
D •
M` HG u =K K K 0 HAND PENETROMETER
EA DRY AUGER : 0.0 TO 15.0 FT. Lt G w
im m a 3 Ot- = C • UNCONFINED COMPRESSION
yr WET ROTARY -- TO -- FT. u� $ kV- sF o u G
pa s �U o • UNCONSOLIDATED-UNORNNED
a p 2 rg % TRIAXIAL COMPRESSION
W r, DESCRIPTION OF MATERIAL am tX a o n ] A TORVANE
w Kpg 0.5 LO 1.5 2.0 2.5
- 53.3
j. FILL: very stiff to hord
reddish brown and dark 22
- 51.3 -��n gray fot clay w/grass - 4 0
rootsin 1 and skng seams
Very stiff dark groy FAT 95 29 89 31 58 e
CLAY (CH) w/ferrous
nodules
-gray
4'-6'
3'
29
Ca
-stiff lc4Teo
-w/colcnd boo nodules 5'-15'
-gray and brawn 6'-15' 3e
86 37 •A
I
New, - 38,3 11461
24 nC7
2•
2
3•
%me 3
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Geotest Engineering, Inc.
LOG OF BORING NO. G8-14
PROJECT : McHard Water Transmission Line & Road Extension PROJECT NO. 1140185901
City of Peerless, Texas
LOCATION : N 13778748, E 3123913 COMPLETION DEPTH : 15.0 FT. }
See Pion of Borings (Figure 2) •V
SURFACE ELEVATION : 52.83 FT. DATE : 10-30-12
21-
SAMPLER Shelby Tube/Split Spoon oa K UUNO0.NNEO STSF
HEAR STRENGTH,
La Kilt et DRY AUGER : 0.0 TO 15.0 FT. tIf N u ?K K K o 0 HAND PENETROMETER
" w m = Wa ¢ 3 0,.: J 3 3 6 UNCONFlNEO COMPRESSION
L.- FW
z A WET ROTARY : -- TO -- FT. l; ig z J C • UNCONSOLIOATEO-UNORAMEO
QOO w o o F TRIA%PA COMPRESSION
p Liz 0. A TORVANE
DESCRIPTION OF MATERIAL e. a 0 D V 3
-
52.8+ WD 0.5 1.0 1.5 2.0 2.5
FILL: very stiff to hard
dark gray and brown fat 27 O
50.a clay w/grass roots and
gravel
Very stiff dark gray FAT 31 a
CLAY (CH) w/ferrous
- 5- nodules
—stiff 4'-8' 92 37 99 34 64
\ —gray and brown 4'-13'
—w/calcareous nodules 7'-13'
—stiff to very stiff, 35
slickensided 8'-10'
- 1 0 91 33 • An
- 39.8-11\\
Stiff to very stiff brown
and and gray LEAN CLAY 80 20 45 20 25 A n
- 37.8— 15 (CL) w/sond, calcoreous rI
and ferrous nodules and
silt seams
- 20-
-
o-- 25-
- 30-
- 35 79409
-
DEPTH TO WATER IN BORING
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Ceotest Engineering, lnc.
LOG OF BORING NO. GB-15
PROJECT : McHord Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778821, E 3124421 COMPLETION DEPTH : 15.0 FT.
lee' See Plan of Borings (Figure 2)
SURFACE ELEVATION : 51.56 FT. DATE : 10-30-12
UNDRAINED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon F“. i : w N TSF
={< N N w 0 HAND PENETROMETER
C o
DRY AUGER : 0.0 TO 15.0 FT. za nN 3 G . i -
LI J z • UNC°NBNEO COMPRESSION
p a 5 F WET ROTARY -- TO -- FT. �N zn 46 u Z • UNCONSOUOATED-UNDRNNED
j o o - u TRIAXIAL COMPRESSION
° . re =`-' y
w DESCRIPTION OF MATERIAL o g a - A TORVA'E
51.6— r ✓+� o. 0.5 1.0 1.5 2.0 2.5
- j FILL: hard dark gray and
4 gray fat clay w/gross
•; roots and calcareous 20
4 nodules
-141
91 24 76 28 48
- 47.6 \ Very stiff gray FAT CLAY
(CH) w/ferrous nodules
-stiff slickensided 6'-8' 30 OA
-gray and brown 7'-13'
—w/calcareous nodules 8'-15' 92 89 31 80 29 51
31
-brown and gray w/sand seams
13'-15'
'\I/ 86 26 63 24 39 ,m
- 36.6— 15-
S"
- 20-
- 25_
- 30-
-
o-- 35-
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO, G8-16
PROJECT : McHard Water Transmission Line & Road Extension PROJECT NO. : 1140155901
City of Pearlond, Texas
LOCATION : N 13778742, E 3124865 COMPLETION DEPTH : 2.0 FT. V
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 49.00 FT. DATE : 11-01-12
�N r
SAMPLER : Shelby Tube/Split Spoon 22 u _ UNDRAINED SHEAR STRENGTH,
TSF
nG rN K N O HAND PENETROMETER
a
o g DRY AUGER : 0.0 TO 2.0 FT. Cul 3 _ t —
/ UNCONFINED COMPRESSION
8 i WET ROTARY -- TO -- FT. ug Wo so._ G C •
UNCONS0UDATEO-UNDRNNEO
W m p= V Q g ~F� — TRIVIAL COMPRESSION
G DESCRIPTION OF MATERIAL w W. 0i n 0. a A TORVANE
0.5 1.0 1.5 2.0 2.5
.A'N 12.25" Concrete mr
48.0
47.0 FILL: dark gray leon clay
NOTE :
Hit obstruction at 2 feet
- 5- and boring was offset to
GB-16A,
- lo-
Need
- 15-
- 20-
-
o-- 25-
- 30-
- 35-
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 2.0 FT. AT END OF DRILLING.
Geotest Engineering, /nc.
LOG OF BORING NO. GB-16A (GB-16AP)
PROJECT : Mchlard Woter Tronsmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
,`� LOCATION : N 13778742, E 3124865 COMPLETION DEPTH : 40.0 FT.
See Plan of Bonn (Figure 2)
SURFACE ELEVATION : 49.00 F. DATE : 11-01-12
wi-
UNDRAINED SHEAR STRENGTH.
SAMPLER : Shelby Tube/Split Spoon oe o .2 w K x TSF
DRY AUGER 0.0 TO 40.0 FT. Le N 5 nM N- - w 0 HAND PENETROMETER
L4:I Lai- p W d 3 - e3 2 3 - RNaONEINE° COMPRESSION
a y 5 3 WET ROTARY : -- TO -- FT. w6 tN id C UNCONSOLIo rEO-UNORAINEO
0 1 16 w
Q m o U - TRNXIAL COMPRESSION
e, o DESCRIPTION OF MATERIAL N a� i j A TORYMNE
- 49.0 4 �� 0.5 1.0 1.5 2.0 2.5
r- FILL: hard dark gray and
gray fat clay w/colcareous 21
,1 1 and ferrous nodules and
••i grass roots
••• 91 25 75 28 47 2
Ill•• I
- 43.0r
39Stiffgrayand yellowishbrownFATCY (CH)w/calcareous and ferrous93 J4 el z9 52nodules
-very stiff 8'-10' 23 40-w/silt seams 8'-14'
-reddish brown and gray
`e - 35.0 13-14
\ Stiff reddish brown and e4 111 20 31 Ii u rLCt
I gray LEAN CLAY (CL) w/sond
- 32.0 FVery stiff reddish brown 25
sAT CLAY (CH) w/ferrous
stains
II
-w/sand seams 120' 25 W
' -slickensided 18odul
-w/c-2areous nodules
211-27'
98 92 32 91 32 59 a
29
-stiff to very stiff 26 30
slickensided 27'-29'
�\ -g and reddish brown99 xs • q'0
w/ferrous nodules ow''-31'
.� 22 LO
-very stiff to hard 33'-40'
26 /0
14.0 3
,`e
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
is WATER DEPTH AT 11.1 FT., HOLE OPEN TO 40.0 FT. ON 01-16-13. Continued on Figure A-16Ao
Geotest Engineering, Inc.
LOG OF BORING NO. GB-16A (GB-16AP) Cont'd
PROJECT : Hord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Peorlond, Texas
LOCATION : N 13778742, E 3124865 COMPLETION DEPTH : 40.0 FT. j
See Plan of Borings (Figure 2) i•w/
SURFACE ELEVATION : 49.00 FT. DATE : 11-01-12
r SAMPLER : Shelby Tube/Split Spoon °o o u w x UNDWJNED SHEARFSTRENGTH.
u. (,"j '� DRY AUGER : 0.0 TO 40.0 FT. �a ¢ NH H ,_ o O RAND PENETROMETER
o .. 3 s $ 9 3 • UNCONFINED COMPRESSION
s 5 WET ROTARY : -- TO -- FT. to
i A p ry 9 yJ r^- UNCONSOUDATED-UNDRAINED
a o m pZ =U ] r — TRMMAL COMPRESSOR
(J, DESCRIPTION OF MATERIAL 0 - a a - j 6 A TORVMff
- 14.0— 3 U,
0.5 1.0 1.5 2.0 2.5
Very stiff reddish brown
FAT CLAY (CH) w/ferrous
stains
-w/colcoreous nodules
38'-40'
- 9.0- 40 24 An
NOTE :
See Piezometer GB-16AP
for water level
measurements.
- 45- I
- 50- `"}
- 55-
- 60-
--
o-- 65-
o- .ad
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
#: WATER DEPTH AT 11.1 PT.. HOLE OPEN TO 40.0 FT. ON 01-16-13.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-17
PROJECT : McHard Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texas
`e LOCATION : N 13778839, E 3125610 COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 53.52 FT. DATE : 10-31-12
goo K UNORNNED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon c0 a TSF
w g� -N u ?K K K ie 0 HAND PENETROMETER
DRY AUGER 0.0 TO 15.0 F.T. za n
O N 3 zw e J g • UNCONFINED COMPRESSION
i WET ROTARY : -- TO -- FT. w , '- UNCON50uMTEO-UNDRAINED
19. i• f uS go- w. 2.6 �U o ty le: • TRWXNL COMPRESSION
DESCRIPTION OF MATERIAL 2m 12 0 0-0e _ 0 0. § 0 TORVANE
- 53.5 0 �� mr O.5 1.0 1.5 1.0 2.5
V# FILL: hard dark gray and
rz
gy fat cloy w/grass9
51.5roots, shell fragments and- r calcareous nodules
Very stiff dark groy FAT 93 24 78 28 50
CLAY (CH) w/calcareous and
ferrous nodules
very stiff s' 25
11c -stiff to very stiff,
slickensided 6'-8' 85 a5 •AO
-brown and gray 8'-13'
22
A l
\I —w/sand seams 11'-13'
- 40.5
Medium stiff brown and groy
Troop, \ LEAN CLAY (CL) w/sand and
- 38.5 1 calcareous nodules 72 20 31 15 16 m
20
2
3E
%we 3
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Geotest Engineering, Inc.
LOG OF BORING NO. GB-18
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778919, E 3126305 COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 53.34 FT. DATE : 10-31-12
oo N UNDRAINED SHEM STRENGTH,
SAMPLER : Shelby Tube/Split Spoon G. 18 12 w TSF
G gp h s s N w w O HMO PENETROMETER
W .4 W DRY AUGER : 0.0 TO 15.0 FT. id LL W3 Oq; _ s x UNCONFINED COMPRESSION
z L' s % WET ROTARY : -- TO — FT. I 8 tb 50
I Zu V UNCONSOUOATEO-UNDRAINED
Yn z, c F TRIAXLLL CONPRESSIDN
a o a c.b
u w DESCRIPDON OF MATERIAL u� C 3 a a TORVANE
- 53.3- 0 fl 0.5 1.0 1.5 2.0 2.5
FILL: hard dark gray and
reddish brown fat clay 16
w/gross roots, shell
50.3 fragments, wood and sand
l seams 21
-
s-(\\�I Very stiff dark gray FAT
CLAY (CH)
-gray 4'-8' 91 26 78 28 50 a—w/ferrous nodules 6'-8'
\ —w/calcareous nodules 7'-8'
45.3 ! 28
Stiff to very stiff brown
ch, DLEAN L)
- 1, n,�, wSAN/calcoreousY nCLAYodules(Csa 11s 15 26 Is 11
\
-reddish brown w/ferrous
stains and silt seoms
13'-15' 21 A n V
- 38.3- 15 " '
- 20-
-
o-- 25-
- 30-
- 35- `r1/
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 R. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-19
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Peorland, Texas
LOCATION : N 13778952, E 3126961 COMPLETION DEPTH : 15.0 FT.
`Fr See Plan of Borings (Figure 2)
SURFACE ELEVATION : 52.28 FT. DATE : 10-31-12
0o H UNDRANED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon o a o w K TSF
us DRY AUGER : 0.0 TO 15.0 FT. wp w trj NK K w O HANG PENETROMETER
" w m L. wa au) -t 5 . 2 • UNCONFINED COMPRESSION
o LL 4 s WET ROTARY -- TO -- FT. uN^ it ja 4 UNCONSOUDATED-
UNDRUNED
ts d / S^ -I w pga r' G F TRIAXIAL COMPRESSION
Pi o DESCRIPTION OF MATERIAL - uZ o / j n n A TORVANE
- 52.3— 0 teW 0.5 1.0 1.5 2.0 2.5
FILL: hard dark gray and
- 50.3graroot
fat cloy w/grass r
\ tT
\ Hard dork gray FAT CLAY
(CH) w/ferrous nodules 19 a
—gray 41-6,
- 5-\ —w/calcareous nodules 4'-15'
—gray and yellowish brown 91 21 va 27 n pp
6 —B
to
—very stiff reddish brown 22
and gray 8'-15'
1_ lDe 21 /d O
Naar - 37.3— lY 27 AO
IN
- 20-
-
o-- 25-
- 30-
- 35-
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Geotest Engineering, Inc.
LOG OF BORING NO. GB-20
PROJECT : McHord Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778912, E 3127585 COMPLETION DEPTH : 15.0 FT.
Ned
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 52.89 FT. DATE : 11-01-12
?..-
SAMPLER
K UNDRUNEO SHEM STRENGTH,
SAMPLER Shelby Tube/Split Spoon �o i wTSF
Ip -• ' �N N R w O HAND PENETROMETER
tu LL o DRY AUGER 0.0 TO 15.0 FT. iv 6• ,I s g _ - S 2 ip UNCONFINED COMPRESSION
a ' pp WET ROTARY : -- TO -- FT, d'£ �S jx Sw 3 UNCONSOVOATEO-UNORNNED
w t F I 00 ¢u et.
ci u • TRL IN. C0MPRESSWN
0 . RS � g a n 0 TORVM&
DESCRIPTION OF MATERIAL o ]
6P n 0.5 1.0 1.5 20 2.5
- 52.9 • ". .' 10.375" Concrete
- 52.0
IiiiReddish brown FAT CLAY (CH) 30
w/sand seoms
-w/yo us nodules 2'-4'
-very2'-8' 95 28 53 22 31 AO
4 stiff
-gray 4'_8'
s 40
-
-stiff to very stiff 8'-10' 29 nO
-w/colccrecus nodules 8'-15'
91 29 En A
i\i -w/silt seoms 13'-15'37.9 1 92 24 53 22 31 On
20
2
3.
3
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF GRILLING.
Geo test Engineering, Inc.
LOG OF BORING NO. GB-21 .
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778860, E 3128327 COMPLETION DEPTH : 30.0 FT.
"4..e? See Pion of Borings (Figure 2)
SURFACE ELEVATION : 50.97 FT. DATE : 12-13-12
SAMPLER Shelby Tube/Split Spoon oo vw. N UNDRAINED SHEAR STRENGTH,
Li eN: 0 ?N r`' a w O HAND PENETROMETER
L. DRY AUGER 0.0 TO 18.0 FT, za 6N s F J
N WET ROTARY 18.0 TO 30.0 FT. -w a
UNCONFINED COMPRESSION
a t ;AN zn . Z UNCONSOLIDATED-UNDRAINED
i vq a = 0 o H cm TRMJOAL COMPRESSION
m p= y
�„Li w
0 DESCRIPTION OF MATERIAL z'aG a o laif] 0 e] 6 A TORVMIE
51.0- 0 mr 0.5 LO 1.5 20 25
In FILL: stiff dork gray fat
� cloy27
1 -w/grass roots 0'-2'
41.4 -very stiff 2'-4'
•
•1 a a
elt —gray w/ferrous nodules and
•• sand seoms 4'-6'
-
45.0 s� 90 90 28 99 31 58 lea
\ Stiff yellowish gray FAT
CLAY (CH) w/colcoreous 33 Oa
nodules and ferrous stains
-very stiff 8'-13'
0.\ 21 P9
— —very stiff to hard 13'-20'
—reddish brown 13'-25'
15,%\\.% 19 A n
4 \
-Th97 105 23 66 25 41 •• An
��-\ -very stiff 23'-25'
25\\
19 /0
—)I -very stiff to hard gray and
brown 28'-30'
23 A n
- 21.0- 30
- 35-
DEPTH TO WATER IN BORING
?: FREE WATER 1st ENCOUNTERED AT 17.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 16.0 FT.
HOLE OPEN TO 30.0 FT. AT END OF DRILLING.
— Ceotest Engineering, Inc.
LOG OF BORING NO. GB-22
PROJECT : McHard Water Tronsmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13778892, E 3129254 COMPLETION DEPTH : 15.0 FT. ,d
See Pion of Borings (Figure 2) `el/
SURFACE ELEVATION : 50.71 FT. DATE : 12-13-12
po U R UNDRAINED SHEAR STRENGTH.
SAMPLER : Shelby Tube/Split Spoon Fw 2 z w x TSF
w DRY AUGER : 0.0 TO 15.0 FT. ow col u HN H 1- = O HANG PENETROMETER
m °� �� i4 g ? 4 UNCONFINED COMPRESSION
N s WET ROTARY : -- TO -- FT. $
qw Za UNCONSOUDATED-UNDRAINED
o �, 03 w p 0 r U TRIA%ML COMPRESSION
9 o DESCRIPTION OF MATERIAL r: rc2 Dw 3 n 0 TDRVANE
47-be n 0.5 L0 1.5 2.0 2.5
4110 50.7— 0
FILL: stiff dark gray fat
�• cloy w/silt seams 29 2
a —w/gross roots 0'-2'
I
a1 96 24 A0
—groy w/ferrous nodules
•It 4'-8'
44.7 _4 29
\ Stiff gray FAT CLAY (CH)
—slickensided w/silt seams
8'd8' 88 94 29 70 26 44 ED
—medium stiff to stiff
w/ferrous stains and as
- lo-k. ferrous nodules 8'-10'
03
—yellowish brown and groy
\ 10-13
37.7
nic Stiff reddish brown and
groy LEAN CLAY (CL) 84 22 43 20 23 O J
- 35.7— 1 w/sond, calcareous and -
ferrous nodules
- 20-
-
o-- 25-
- 3o-
- 35 vNS
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
— Ceotest Engineering, Inc.
LOG OF BORING NO. GB-23
PROJECT : McHard Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13778956, E 3130140 COMPLETION DEPTH : 30.0 FT.
9r' See Plan of Borings (Figure 2)
SURFACE ELEVATION : 50.07 FF. DATE : 12-13-12
06 UNDRAINED SMEAR STRENGTH.
SAMPLER : Shelby Tube/Split Spoon - v w TSF
�p eq u ¢ N IG
DRY AUGER : 0.0 TO 15.0 FT. u 6N - Gk t o 0 HAND PENETROMETER
' O i n 3 p F 5 - • UNCONFINED COMPRESSION
I WET ROTARY : 15.0 TO 30.0 FT. oln i . 20 s r
4 5, a 2n UNCONSOLIDATED-UNDRAINED
W o rA vl o Td Q go 5 ,) u - TRIAXIAL COMPRESSION
cL DESCRIPTION OF MATERIAL L. 6 o TORVANE
- 50.1- 0 - GWK' a ¢ 0.5 1.0 1.5 2.0 2.5
Hard dark gray LEAN CLAY
(CL) w/sand
107 20 AO
-w/grass roots 0'-2'
-yellowish brown and gray
2'-10' 16 nO
-very stiff 4'-6'
-w/calcareous nodules and
ferrousstoins
19 ei O\ -very stiff to hard 6t_8'
-stiff to very stiff 8'-10' 14 0
110 19 40 18 22 ,A n
4
,` Medium densebrown and gray
SILTY SAND (SM) n 16 21
15 -w/lean clay seams 14.5'-18'
31.6-
1-.., Loose brown and gray CLAYEY
- 30.1- 20 1. SAND (SC) 9 32 I9 21 13 8
Very stiff reddish brown
and gray FAT CLAY (CH)
w/calcareous nodules
2__ 94 108 20 51 21 30 an
i h-vsey ssiff to ard w/sandsr t 28'-30'
ha19 nO
- 20.1- 30
- 36-
`e
DEPTH TO WATER IN BORING
g: FREE WATER 1st ENCOUNTERED AT 14.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 12.8 FT.
HOLE OPEN TO 30.0 FT. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-24 (GB-24P)
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texos
LOCATION : N 13779002, E 3131080 COMPLETION DEPTH : 15.0 FT. 3
See Pion of Borings (Figure 2) ter/
SURFACE ELEVATION : 49.81 FT. DATE : 12-13-12
K UNORAINED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon gp . K K TSE
_ ?K w 0 HAND PENETROMETER
0 01 DRY AUGER : 0.0 TO 15.0 FT. ii u H r c
3 ,: 3 ? UNCONFINED COMPRESSION
p LLCi3 WET ROTARY : -- TO -- FT. in
o WN zv u UNCONSOLIDATED-UNDRNXED
fi e" 5 ] _ • TRIA%NL COMPRESSpN
UO r pu A G. iaftVANE
DESCRIPTION OF MATERIAL ON u� a
o0.5 1.0 1.5 2.0 2.5
- 49.8} r
\ Very stiff to hard dark
gray LEAN CLAY (CL) w/sond 12 A 0
-w/gross roots 0'-2'
-w/calcoreous nodules 2'-4'
-hard 2'-6' 19 14 nO
_ \ -gray 4,-6,
-w/ferrous nodules 4'-B'
-very stiff yellowish brown 12 a0
and gray
-w/calcareous nodules 6'-10' e4 110 19 49 19 30 A DO
-stiff reddish brown, yellow
and gray 8'-10'
- 39.8- 14 \ 22 AC)
Loose brown and gray SANDY
SILT (ML)
sz
7 55 23
NOTE :
See Piezometer GB-24P for
water level measurements.
- 20-
- 25-
- 30-
- 35-
0-- 35- V
DEPTH TO WATER IN BORING :
V: FREE WATER 1st ENCOUNTERED AT 15.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 12.0 FT.
: WATER DEPTH AT 4.1 FT., HOLE OPEN TO 15.0 FT. ON 01-16-13.
Geotest Engineering, Inc.
LOG OF BORING NO. GB-25
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13779100, E 3131968 COMPLETION DEPTH : 15.0 FT.
,`
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 49.17 FT. DATE : 12-13-12
�Oo a n. UNORAINED SHEAR STRENGTH.
SAMPLER : Shelby Tube/Split Spoon c0 LuTSF
w I¢ -N a rp. te K `yf 0 RAND PENETROMETER
L. w m j DRY AUGER : 0.0 TO 15.0 FT. * a 3 y F UNCONFINED COMPRESSION
o x s WET ROTARY : -- TO -- FT, oo zn =a 3 w Y _
�,, a w 'wqu o t9 op 4. TRIAXIAL COMPRESSIONRA�NEO
W p m p2 0 O a % A TORVANE
DESCRIPTION OF MATERIAL
- 49.2— w0 oi- vPM 1 0.5 1.0 1.5 2O 2.5
Medium stiff dark gray LEAN
CLAY (CL) w/sand
26
19
—w/grass roots 0'-2'
—medium stiff to stiff 2'-4'
\ —w/calcareous nodules 2'-8' Mas 23
—yellowish brown and gray
_ \ 2 -10
\ —stiff to very stiff 4'—6' 71 106 21 49 21 25 W O
—w/ferrous nodules 6'-8'
\ —very stiff 6'—10'
\ 20 ES 0
39.2-- 10 20 A n
Loose yellowish brown and
gray SILTY SAND (SM) 8 40 16
w/clay seams
]5.7-
-(.rt.•.
*o,. \ Brownand gray LEAN CLAY
(CL) w/sift seams and silt to 21
- 34.2— 1.. ` \ loyers r
- 20-
-
o-- 25-
- 30-
- 35-
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-26
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13779141, E 3132799 COMPLETION DEPTH : 15.0 FT. ♦
See Plon of Borings (Figure 2) V
SURFACE ELEVATION : 48.33 FT. DATE : 12-13-12
oo
N UNDRAINED SHEAR STRENGTH,
11 SAMPLER : Shelby Tube/Split Spoon po u 12 w 'Sr
W ,$,$ Li u Npt N Ll O HAND PENETROMETER
k. v, DRY AUGER : 0.0 TO 15.0 FT. E,w a t
t` 2 g - 2a 3 p J 3 - 0 UNCONFINED COMPRESSION
g o WET ROTARY ; -- TO -- FT, n3 o to yW- u
�8 2 d UNCONSOLIDATED-UNDRAINED
t aEi p • - a r •
TRIMIAL COMPRESSION •
6 - "3
DESCRIPTION OF MATERIAL
L A TORVANE
a co,End
Ar 0.5 1.0 1.5 2.0 2.5
- 48.3— 0
Very stiff to hard dark
gray LEAN CLAY (CL) w/sond
16 a 0
-w/grass roots 0'-2'
-hard 2'-4'
-w/ferrous nodules 2'-10' 14 AO
-hard 6'-8' 119 15 A 0
3.6
•
-very stiff brown and gray 76 119 w 47 21 26 AO
8'-10'
A \ 17n C)
35.3 \\
Brown LEAN CLAY (CL) w/sand
seams a so 23
- 33.3- 15 —
- 20-
- 25-
- 30-
35-
Ned
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
— Geotest Engineering, Inc.
LOG OF BORING NO. GB-27
PROJECT : McHard Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778953, E 3133674 COMPLETION DEPTH : 15.0 FT.
'✓ See Plan of Borings (Figure 2)
SURFACE ELEVATION : 49.84 FT. DATE : 12-14-12
SAMPLER Shelby Tube/Split Spoon oo N UNDRAINED SHEAR STRENGTH,
T. ZW V j N
wDRY AUGER : 0.0 TO 15.0 FT. IN H - N K IS o O Hw0 PENETROMETER
6 WET ROTARY -- TO -- FT. o 6o sz J UNCONFINED COMPRESSION
a 5• R, V 0 E at TRIA%IALOCOMPRESSIONRAINEa
u4 E Gn
wDESCRIPTION OF MATERIAL ma• i 0 aU a E ] 0 TORVANE
- 49.8 pi
nC nz 0.5 1.0 1.5 2.0 2.5
Stiff to very stiff dark
groy LEAN CLAY (CL)
-w/gross roots 0'-2' 19
.\ -very stiff to hard 2'-4'
-w/ferrous nodules 2'-6' 108 18 A 0
l -w/calcoreous nodules 2'-10'
-gray 4.-10'
ai
-w/ferrous nodules 6'-10' 17
19
90 109 20 44 20 24 A nM
I
- 36.8
ts Stiff to very stiff reddish
�a brown FAT CLAY (CH) w/silt
- 34.8 15 , seams and calcareous - 25 /x O
nodules
26
2
3,
3
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-28
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13778867, E 3134194 COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 49.40 FT. DATE : 12-14-12
SAMPLER : Shelby Tube/Split Spoon oo = X UNOFAINEO SHEAR STRENGTH,
l+ N IR LS 0 NAND PENETROMETER
ISE
w DRY AUGER 0.0 TO 15.0 Fi. w 7En w DN - s o
'0 d p'r' p • 0 UNCONFINED COMPRESSION
o s s WET ROTARY : -- TO -- FT. om in to sui U uNCON50U0aE0-UNORAMEO
Q Si r -I o U 5 Q � TRIMIAL COMPRESSION
rd �z o z'o 4 n _ UMANE
d o DESCRIPTION OF MATERIAL a. n 6
,n� 0.5 1.0 1.5 2.0 2.5
- 49.4
Very stiff to hard gray
LEAN CLAY (CL) w/sand and
13 A 0
ferrous nodules
-w/gross roots 0'-2'
-yellowish brown and gray 114 Is A 0
w/calcareous nodules 4'-8'
17 A 0
a n n O
Stiff to very stiff reddish
brown and gray FAT CLAY 93 102 25 63 24 39 AS• \I w/soon seamsand
colcareous nodules
-very stiff 13'-15'
24 /0
- 34.4 1 illik —
2•
25
3.
3
Pled
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-29
PROJECT : McHord Woter Tronsmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
`r LOCATION : N 13778770, E 3135111 COMPLETION DEPTH : 15.0 FT.
See Ron of Borings (Figure 2)
SURFACE ELEVATION : 48.21 FT. DATE : 12-14-12
K UNDRAINED SHEAR STRENGTH.
SAMPLER : Shelby Tube/Split Spoon F� i U K TSF
L gm N ?K K IA O NAND PENETROMETER
,� W o DRY AUGER 0.0 TO 15.0 FT. is aN 3u 3 5 J z 0 UNCONFINED COMPRESSION
p - 3 WET ROTARY : -- TO -- FT. cod �w - u_ UNCONSOIIOATEO-UNDRAINED
q p a 6 �O 9 MI �u IRIA%W. COMPRESSION
J? ih1 DESCRIPTION OF MATERIAL en a9 o o• a 3 A TORVANE
0.5 1.0 1.5 2.0 2.5
48.2- • N Stiff to very stiff dark 'PP
\ gray FAT CLAY (CH)
ZO
-w/grass roots 0'-2' 29
\ -very stiff to hard 2'-4'
-gray w/calcareous and 20 A 0
ferrous nodules 2'-8'
-very stiff 4'-8
80 106 22 66 25 41 ar
23 AO
- 40.2
Medium stiff to stiff
reddish brown SANDY LEAN
- 1 \ CLAY (CL) w/sift layers 59 le 28 17 n OA
35.2
.1•• . Reddish brown SILTY SAND
�, - 3 .z (SM
) r 97 15 66 25 41
S'-7- 33.2- 1' \ I Reddish brown FAT CLAY (CH) r
w/sond seams
- 20-
- 25-
- 30-
35
DEPTH TO WATER IN BORING :
9: FREE WATER ENCOUNTERED AT 15.0 FT. DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Geotest Engineering, Inc.
LOG OF BORING NO. GB-30
PROJECT : McHard Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778925, E 3136036 COMPLETION DEPTH : 15.0 FT. f
See Plan of Borings (Figure 2) V
SURFACE ELEVATION : 48.66 V . DATE : 12-14-12
SAMPLER : Shelby Tube/Split Spoon
4a u et UNDRAINED TEM STRENGTH,
H
W Sap
AX
u = 0 14 w 0 NANO PENETROMETER
DRY AUGER 0.0 TO 15.0 FT. is a"' 3 Oi F s x 8 UNCONFINED COMPRESSION
� 0
O U. $ a WET ROTARY : -- TO -- FT. 4; i '-j Sw u UNCONSOLIDATED-UNDRAPED
ao w^ = ¢i -mm U - TRIAAUL COMPRESSION
La DESCRIPTION OF MATERIAL e rci o ou a a y A TORVANE
g 6 0.5 L0 1.5 2.0 2.5
IA I-
8.7 a \
t \ Stiff to very stiff dark
gray FAT CLAY (CH) 24 0 0
w/ferrous stains
I -w/gross roots 0'-6,
-hard 2'-4' ns 15
-very stiff 4'-6'
-stiff to very stiff 6'-8' 18 Oa
.\ -w/colcareous nodules 6'-10'
-very stiff gray and brown 78 IDs 22 54 22 32 0 it
8'-10'
20 A (I
A \I -very stiff reddish brown
slickensided w/colcareous
�i
nodules 13'-15' 100 30 67 25 42 /0
- 33.7 1 —
20
2
3A
35V
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-31
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
Re, See
: N 13778919, E 3136868 COMPLETION DEPTH : 15.0 FT.
See Plon of Borings (Figure 2)
SURFACE ELEVATION : 49.84 FT. DATE : 12-14-12
07SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon ao UNDRAINED e 0 M TSF
W u4 44ii ?a N d Q HAND PENETROMETER
DRY AUGER 0.0 TO 15.0 Fi, i w H
LL LL O w pP' LL
ca. . S UNCONFINED COMPRESSION
al S WET ROTARY : -- TO -- FT. YLn i u VNCONSOUDATEO-UNOWVNEO
C. (A om -a gaga o F 4
9 - TRN%NL COMPRESSION
`j9 DESCRIPTION OF MATERIAL 8Nm s9 o Du o ] 6 TORVnn'E
0.5 1.0 1.5 2.0 2.5
- 49.8- 0
Medium stiff to stiff gray
LEAN CLAY (CL) w/sond and 17 p 0
47.8 • 1 gross roots r
Stiff dark gray FAT CLAY
(CH) w/sond, colcoreous 23 m
nodules and ferrous stains
- s\ -stiff to very stiff 4'-6' ILO- 43.8 72 105 21 52 23 29 O
KNStiff to hard gray and
reddish brown SANDY FAT s9 17 56 22 ]+ A 0
Wit'?,t CLAY (CH) w/sond and
: calcareous and ferrous
nodules
18 A 0
- 10 -stiff to very stiff 8'-10'
s_
36.8
35.8
1•, Reddish own SILTY SAND
-) ( r
l. \ 99 23 59 2] 36 (7
- 34.8-
Reddish brown FAT CLAY (CH)
w/sond seams
- 20-
-
o-- 25-
- 30-
War - 35-
DEPTH TO WATER IN BORING :
V: FREE WATER 1st ENCOUNTERED AT 13.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 11.0 FT.
HOLE OPEN TO 15.0 Ft. AT END OF GRILLING.
Geotest Engineering, Inc.
LOG OF BORING NO. GB-32
PROJECT : McHord Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION t N 13778857, E 3137670 COMPLETION DEPTH : 15.0 FT. j
See Plan of Borings (Figure 2) *Sr
SURFACE ELEVATION : 48.22 FT. DATE : 12-14-12
'- UNORAINED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon oo0 .ie, z w M H TSE
w DRY AUGER : 0.0 TO 15.0 FT. n `-' NN x w 0 HAND PENETROMETER
" o N Zu n - 45 i ] - • UNCONFINED COMPRESSION
p WET ROTARY -- TO -- FL ! " WS in y UNCONSOuOATED-UNORAINED
Q om o = R8 - ` Y TRIAXIAL COMPRESSION
u 0 �,_ ci o iORVUVE
DESCRIPTION OF MATERIAL
-w 0.5 1.0 1.5 2.0 2.5
- 48.2— 0
Stiff dark gray FAT CLAY
(CH) w/sand and ferrous n
01
stoins
-w/gross roots 0'-2'
-very stiff to hard 112 18 A 0
- u nodules 2'-8'
-very stiff 41-6'
-
-stiff 24 m
w/ferroustovery nodules 6'-8'
71 110 21 59 24 35 WD
39.2
\ Stiff to very f gray 73 19 32 Is is A O
1D� and brownn LEAN CLAY (CL)
w/sond
35.2
Very stiff reddish brown 1
FAT CLAY (CH) w/colcoreous 29 ^O
- 33.2— 15 \ 1 nodules and ferrous stains
- 20-
- 25-
- 30-
- 35-
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING ORILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-33
PROJECT : McHord Woter Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texos
LOCATION : N 13778810, E 3138348 COMPLETION DEPTH : 15.0 FT.
"rex See Plan of Borings (Figure 2)
SURFACE ELEVATION : 48.55 FT. DATE : 12-14-12
zl-
UNORAINED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon 08 u w N N TSF
,w o t J ,h. DRY AUGER : 0.0 TO 15.0 FT. nd nN 93 93 if H C 0 HAND PENETROMETER
a u3 '� - J J w 4, UNCONFINED COMPRESSION
i s 3 WET ROTARY -- TO -- FT.
n° Wg 3Y c' UNCONSOIIWTERMaRA'NEO
s? r/i 00j §. 0 F Si • iRIRIIIPL COMPRESSION
W o DESCRIPTION OF MATERIAL G,. ,L o 1.7
n , n a TONVANE
- 48.5 Cf 0.5 1.0 1.5 2.0 2.5
I ' Very stiff gray SANDY LEAN
CLAY (CL) 22 p
- —w/grass roots 0'-6'
-4 —w/calcareous and ferrous
nodules 2'-8' 111 19 AO
EL —stiff to very stiff 4'-8'
4 19 A O
40.5 .k 66 120 17 47 26 21 40
Stiff gray and brown LEAN
CLAY (CL) w/sand, 80 23 46 20 26 ((1
calcareous and ferrous
nodules
- 35.5
IN Stiff reddish brown FAT
'919•1? CLAY (CH) w/calcareous 32 a
- 33.5 1 ` nodules and ferrous stoins _r
2•
2
3.
3
—w
DEPTH TO WATER IN BORING
n: FREE WATER 1st ENCOUNTERED AT 13.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 11.8 FT.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
— Geotest Engineering, Inc.
LOG OF BORING NO. GB-34
PROJECT : McHard Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Peorland, Texos
LOCATION : N 13778839, E 3139079 COMPLETION DEPTH : 15.0 FT.
Nod
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 47.79 FT. DATE : 12-17-12
o0 a N UNDRAINED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon a H TSF
bi 5 H w 0 HAND PENETROMETER
w DRY AUGER : 0.0 TO 15.0 FT. iF GH c
" O .a 2 - ' z 0 UNCONFINED COMPRESSION
w w y J
F i WET ROTARY -- TO -- FT, ao a to op. o Z ■
WH za y UNCONSOLIDATED-UNDRAINED
TRIAXIAL COMPRESSION
0 a = a 0 TORVANE
wDESCRIPTION OF MATERIAL m o. o a.
a.
0.5 1.0 1.5 2.0 2.5
47.8— 0
Stiff gray LEAN CLAY (CL)
w/sand IS
o0
-w/gross roots 0'-2'
-medium stiff to stiff 2'-4'
-w/ferrous nodules 2'-10' T1
iD
-stiff to very stiff 4'-6'
_ L -yellowish brown and gray
.'\ 4'-13' 19 o O
-w/colcoreous nodules 6'-10'
74 109 19 49 21 28 AN
1r 23
34.8
Very stiff reddish brown j
FAT CLAY (CH) `.I
- 32.8— 15 99 31 69 26 43 96
- 20-
- 25-
- 30-
-
o-- 35-
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
— Ceo test Engineering, Inc.
LOG OF BORING NO. GB-35 (GB-35P)
PROJECT ; McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778972, E 3140045 COMPLETION DEPTH : 15.0 FT.
V+ See Plan of Borings (Figure 2)
SURFACE ELEVATION : 48.12 FT, DATE : 12-17-12
=18N UNORAINEO SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon aE 2 V a x TSF
"I DRY AUGER : D.0 TO 10.0 FT. ED rG, - 2w w O HAND PENETROMETER
Lw, 8 8 p i Z 8 Z • UNCONFINED COMPRESSION
o • s u WET ROTARY : 10.0 TO 15.0 FT. n Wo `-u 3 o Z UNCONSOLIDATED-UNDRAINED
an do 0 P u - TRIAXIAL COMPRESSION
< am , - �Vy
,‘P=
o DESCRIPTION OF MATERIAL w n o iU ei L ] O TORVANE
mr 0.5 1.0 1.5 2.0 2.5
- 48.1 •
-t` Stiffyto very f
,�' SANDY brownLNand groy 117 16 AO
SANDY LEAN CLAY (CL)
- w/sand seams
.� –w/gross roots 0'-2' 17 A O
i �� –w/calcareous nodules 2'-6'
�k –soft to medium stiff very 1s O
yam, sandy 6'–B'
4 21
-stiff w/ferrous stains and
ferrous nodules 8'-10'
,.. 61 105 19 32 17 15 IIn
- 35.1 rib
I Stiff to very stiff reddish
V brown LEAN CLAY (CL)
100 27 42 21 21 70
- 33.1 1 —
NOTE
See Piezometer GB-35P for
water level measurements.
2•
2
3r
35
Wee
DEPTH TO WATER IN BORING :
FREE WATER Ist ENCOUNTERED AT 10.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 7.8 FT.
T: WATER DEPTH AT 4.3 FT., HOLE OPEN TO 15.0 FT. ON 01-16-13.
Geotest Engineering, Inc.
LOG OF BORING NO. GB-36
PROJECT : McHard Water Transmission line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13779131, E 3140412 COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2) void
SURFACE ELEVATION : 47.89 FT. DATE : 12-17-12
og W % UNDRAINED SHEARSSTRENGTH.
SAMPLER : Shelby Tube/Split Spoono
W ,4� v, ~ St, I` . w O HAND PENETROMETER
DRY AUGER : 0.0 TO 15.0 FT. Za �- u G
` w 0 - 3 Oi �- N 0 UNCONFINEO COMPRESSION
p i WET ROTARY -- TO -- R. ; in ja v� 3 0 C UNCONSOLIDATED-UNORAINED
o71
m ea 0 R %F% TRIAXIAL COMPRESSION
ea w ° DESCRIPTION OF MATERIAL . ug o j So g a 6 0 TORVANE
Hd 0.5 1.0 1.5 2.0 2.5
- 47.9
It Very stiff gray LEAN CLAY
(CL) w/sond and ferrous 17 a 0
nodules
—w/gross roots U-2'
—w/calcareous nodules 2'-6' 1s n 0
—yellowish brown and gray
F 4 _B'
74 115 18 44 20 24 Qy
IR o O
3
II 9.9 Medium stiff yellowish
brown and gray SANDY LEAN
14 S CLAY (CL) w/sand layers 62 21 zs IS 7 pp
- 34.4 k
_r
,Nr, Reddish brown LEAN CLAY
- 32.9 1 \A (CO 13 92 30 49 21 28
2•
2
34
35
Neadi
DEPTH TO WATER IN BORING
s: FREE WATER 1st ENCOUNTERED AT 13.0 FT. DURING DRILLING: AFTER 15.0 MIN. AT 8.5 FT.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-37
PROJECT : McHord Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION': N 13779002, E 3141120 COMPLETION DEPTH : 15.0 FT.
N► See Plan of Borings (Figure 2)
SURFACE ELEVATION : 47.49 FT. DATE : 12-17-12
UNDRAINED SHEAR STRENGTH.
SAMPLER : Shelby Tube/Split Spoon -o i . w H H TSF
4uLL _ JN N OH
AND PENEIROMEIER
,"'. DRY AUGER 0.0 TO 15.0 FT. id G ' o
•
` y ku w 5 ! • UNCONFINED COMPRESSION
3 WET ROTARY -- TO -- FT, o Wal j 5 Q C a UNCONSOUDATEO-UNDRAINED
Q t�lo. 6 go F. TRIAXIAL COMPRESSION
W p o eq Du 0 3 Q. 3 A TORVANE
DESCRIPTION OF MATERIAL 2m
47.5— 0 Gr n<co . 2 0.5 1.0 1.5 2.0 2.5
- Stiff gray LEAN CLAY (CL)
w/sond 24 eCD
-w/gross roots 0'-2'
-very stiff w/ferrous
nodules 2'-8' 17 n 0
-yellowish brown and gray
\\�� -w/colcoreous nodules 4'-8' 71 107 Is 49 20 29 AD
-medium stiff very sandy Is x' 0
8-10
-
ta� PO
20
-medium stiff to stiff
reddish brown and gray
``air \ 13'-15' 71 22 34 17 17
- 32.5— 15
- 20-
- 25-
-
0-- 25-
- 30-
- 35-
'44414
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
— Ceo test Engineering, Inc.
LOG OF BORING NO. GB-38
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778948, E 3142012 COMPLETION DEPTH : 15.0 FT.
See Pion of Borings (Figure 2)
SURFACE ELEVATION : 46.36 FT. DATE : 12-17-12
SAMPLER : Shelby Tube/Split Spoon Pg i : w N UNDRWNED SHEARFSTRENGTH,
T., I g% —� = NN 11 K w O NAND PENETROMETER
L w M DRY AUGER 0.0 TO 10.0 FT, i
p z4 sin W Sw e Ii - • UNCONFINED COMPRESSION
I WET ROTARY : 10.0 TO 15.0 FT.
•06
$n =a o Tq uNCDNsouwTEO-UNDRAINED
- `- II TRIAXIAL COMPRESSION
W . o DESCRIPTION OF MATERIAL 0 . i2 o 2- g 2 12 0 TORVANE
46.4 �^ 0.5 1.0 1.5 2.0 2.5
4 \ Very stiff to hard gray
LEAN CLAY (CL) w/sond 13 A 0
-w/gross roots 0'-2'
I -w/calcareous and ferrous 113 13 A 0
nodules 4'-8'
4 .\ -very stiff w/ferrous 14 a 0
nodules 6'-8'
- - 38.4
74 110 18 48 19 29 O
.% Medium stiff to stiff gray
�, and reddish brown SANDY 62 15 3s 17 1s A n
- 36.4 14 "i . LEAN CLAY (CL)
'1 Medium dense to dense gray 15 9 21
' FINE SAND (SP-SM) w/silt
PSI
- 31.4 1 " _ 40 22 '
24
2
3.
3
"WS
i
DEPTH TO WATER IN BORING :
8; FREE WATER 1st ENCOUNTERED AT 10.0 Ff. DURING DRILLING; AFTER 15.0 MIN. AT 7.8 FT.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
— Geotest Engineering, Inc.
LOG OF BORING NO. GB-39
PROJECT : McHord Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778908, E 3142568 COMPLETION DEPTH : 15.0 FT.
Ilisor See Plon of Borings (Figure 2)
SURFACE ELEVATION : 46.14 FT. DATE : 12-17-12
SAMPLER : Shelby Tube/Split Spoon og g UNDRAINED STHSEAR STRENGTH,
LJ gbLL ' U ?M N' N w O HAND PENETROMETER
2i DRY AUGER : 0.0 TO 15.0 FT. '"n n 3 si - ? o
" z 0 UNCONFINED COMPRESSION
o i WET ROTARY -- TO -- R. nen 8 E:u w r
5, 26 UNCONSOLIDATED-SNORAINEO
Tt- 1¢~ o qj m• TRIAXIAL COMPRESSION
DESCRIPTION OF MATERIAL ON li z o zci a a n v A TORVANE
46.1 •
or. 0.5 1.0 1.5 2.0 2.5
F % Very stiff to hord gray
LEAN CLAY (CL) w/sond 12 A 0
—w/gross roots 0'-2'
-hard 2'-4'
—W/calcareous nodules 2'-8' 112 I1 0
-yellowish brown and groy
w/ferrous nodules 4'-8'
-stiff to very stiff 6'-8' 13
IE
- 38.1 \ 28 111 18 46 20 26 Si
Medium stiff to stiff
yellowish brown and groy Bz 22 44 20 24 n('1
LEAN CLAY (CL) w/sand
seams
- 32.1 -\
`EI✓ n Stiff reddish brown FAT 26 n
- 31.1 1 CLAY (CH) w/silt seams r
29
2
30
3
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Geo test Engineering, Inc.
LOG OF BORING NO. GB-40
PROJECT : McHard Woter Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13778954, E 3143424 COMPLETION DEPTH : 30.0 FT.
See Plan of Borings (Figure 2) head
SURFACE ELEVATION : 45.54 FT, DATE : 12-17-12
N UNORMNEO SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon 9S z e TSF
U v4 y� -�" tai ?p. K - L1 LA HAND PENETROMETER
DRY AUGER 0.0 TO 15.0 FE. Gv ,Il'� . U 0 -J W 6 icj 172� B n - • UNCONFINED COMPRESSION
o WET ROTARY 15.0 TO 30.0 FT. oo W$ i� W 0 u UNCONSOLIDATED-UNDRAINED
Q 9 r F% TRIAXIAL COMPRESSION
a DESCRIPTION OF MATERIAL im Eg a o 8 a. ] a TORVANE
a
45.5 EL
0.5 LO L5 1.0 2.5
F % Medium stiff to stiff dark
gray LEAN CLAY (CL) w/sand
—very stiff to hard 2'-8' 22 OA
. —gray 4'-6' los Is A 0
i\ —w/ferrous stains and 16 A 0
ferrous nodules 6'-8'
—stiff to very stiff 8'-10'
83 114 n 49 20 29 p •0
—w/silt seoms 8'-13'
71 AC)
- 32.5
Medium stiff to stiff
reddish brown LEAN CLAY
\ (CL) w/sand and silt seams 85 se 25 31 20 n
- 2].5 kod
Stiff to very stiff gray
and reddish brown FAT CLAY sa too 26 59 23 36
in
iQ
(CH) w/sond seams
22.5
Stiff to very stiff
yellowish brown and gray
I% SANDY LEAN CLAY (CL) '° '] 36 is 20 A n
Mk"
Very dense reddish brown
155 3. I SILTY SAND (SM) _ 55 22 19
35 y
DEPTH TO WATER IN BORING : V/
HOLE WAS BACKFILLED IMMEDIATELY AFTER COMPLETION OF DRILLING,
MEASUREMENT OF WATER LEVEL COULD NOT BE OBTAINED.
Geotest Engineering, Inc.
LOG OF BORING NO. GB-41
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland, Texas
_ LOCATION : N 13778938, E 3144193 COMPLETION DEPTH : 15.0 FT.
See Plon of Borings (Figure 2)
SURFACE ELEVATION : 47.55 FT. DATE : 12-17-12
E.: UNDRAINED SHEAR STRENGTH,
SAMPLER : Shelby Tube/Split Spoon F8 na rc Tsr
Le W b, m ORY AUGER : 0.0 TO 15.0 FT. Ga di '^ n � o 0 HAND PENETROMETER
p�^ 3 0',.t S _- 0 UNCONFINED COMPRESSION
WET ROTARY -- TO -- FT, a3 io zn zF -•
y U - UNCONSaCDAPE(-UNDRAINED
w^ ' 3 2 P u ■ TRIAX1AL COMPRESSION
aaa . ad 8 - nn
DESCRIPTION OF MATERIAL n uz o e5 A TOR?NE
g
- 47.5— 0
0.5 1.0 1.5 2.0 2.5
Medium stiff to stiff gray
LEAN CLAY (CL) w/sand
-w/grass roots 0'-2' 18 0A
-stiff w/calcareous nodules
2'-4' 20
-yellowish brown and gray
w/ferrous nodules 2'-11'
"\\ -very stiff to hard 4'-8' 17 p O
-stiff 8'-10' 18 A 0
79 103 22 37 17 20
34.5
Very stiff reddish brown
'fin FAT FAT CLAY (CH) w/calcoreous
3zs— 1 1 nodules 25 /0
- 20-
-
o-- 25-
- 30-
`, - 35-
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Geotest Engineering, Inc.
LOG OF BORING NO. GB-42
PROJECT : McHard Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearland, Texas
LOCATION : N 13779044, E 3144737 COMPLETION DEPTH : 15.0 FT. }
See Pon of Borings (Figure 2) DATE 12-18-12 W/
SURFACE ELEVATION : 46.87 FT.
ag u N UNNAMED SHEAR STRENGTH,
SAMPLER Shelby Tube/Split Spoon iTSF I
re_
-� DN X N o 0 HAND PENETROMETER
W DRY AUGER : 0.0 TO 15.0 Ff. Oa t
U. ir, 4 a a� a5 5 3 - • UNCONFINED COMPRESSION
o cl I WET ROTARY -- TO -- FT, a :$ zn- ¢F u UNCONSOUDATED-UNDRAINED
<p - ._9 TRIAXIAL COMPRESSION
'4 o DESCRIPTION OF MATERIAL = WA o6 Do g a ] 0 TORVANE
- 46.9— O \
�8 n 0.5 1.0 1.5 2.0 2.5
Very stiff to hard dark
gray LEAN CLAY (CL) w/sand 13 A O
-w/grass roots 0'-2'
-gray 2.-4'
-w/ferrous nodules 2'-8' IIs 15 A O
-yellowish brown and gray
- 5- w/calcareous nodules 4'-8'
17 A O
-very stiff 6'-8'
79 110 19 43 20 23 .60•
-stiff to very stiff reddish
brown and groy 8'-10'
- 1 Ie A n I
33.9
Stiff to very stiff reddish
brown FAT CLAY (CH) w/silt 25 /O
31.9— 1 and sand seams and -
calcareous and ferrous
nodules
- 20- '
- 25-
- 30-
- 35- `S
DEPTH TO WATER IN BORING
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
— Ceotest Engineering, Inc.
LOG OF BORING NO. GB-43
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13779131, E 3145542 COMPLETION DEPTH : 15.0 FT.
*s See Plan of Borings (Figure 2)
SURFACE ELEVATION : 45.77 FT. DATE : 12-18-12
UNDRAINED SHEAR STRENGTH.
SAMPLER : Shelby Tube/Split Spoon qLL o w u TSE
w DRY AUGER : 0.0 TO 15O FT. a aN U HK t o 0 HAND PENETROMETER
p V 5 3 - • UNCONFINED COMPRESSION
o LL 3, WET ROTARY -- TO --„trz R, a'(' - u UNCONSOLIDATED-UNDRAINEO
a 3 oa COE a P • TRIAXIAL COMPRESSION
CU a DESCRIPTION OF MATERIAL
cit o a g Q A TORVN4E
45.8— 0 ,AFL-12 0.5 1.0 1.5 2.0 2.5
. `i Very stiff to hard dark
gray SANDY LEAN CLAY (CL) 13
w/sond seams n 0
—w/gross roots 01-2'
—w/colcareous and ferrous 123 14
D 0
_ nodules 4'-8'
—hard 6'-8' 13 A 0
-yellowish brown and gray
70 118 15 49 19 30 C5 •
-very stiff 8'-10'
- t0 24 nn
32.8
Very stiff reddish brown
tar FAT CLAY (CH), 29
- 30.8— 15 slickensided w/calcareous -
Inodules
- 2o-
- 25-
•
- 3o-
�r - 35-
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OE DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. G8-44
PROJECT : McHard Water Transmission Uric & Road Extension PROJECT NO. : 1140185901
City of Peorland, Texas
LOCATION : N 13779185, E 3146238 COMPLETION DEPTH : 15.0 FT.
See Plan of Borings (Figure 2)
SURFACE ELEVATION : 45.32 FT. DATE : 12-18-12
zk-
SAMPLER : Shelby Tube/Split Spoon -0 u N UNDRAINED S SEAR STRENGTH.
a4p N 0 �N R ce 1. LI O HAND PENETROMETER
Li
W DRY AUGER 0.0 TO 15.0 FT, iW a 3
" 0 'a. w Sw a 3 • UNCONFINED COMPRESSION
o € WET ROTARY : -- TO -- FT. uLR qN j K • uxC0Ns0u0nTED-uNosnwc0
& GG so o y • TRIAXNI COMPRESSION
o am fr'd �y9 �9
L DESCRIPTION OF MATERIAL z�. aR o Ba o n ]0. 0 TORVANE
Gr 0.5 1.0 1.5 20 2.5
- 45.3 I „iii
Stiff dork gray LEAN CLAY
w/
(CL) sand 20 en
\ -w/grass roots 0'-2'
I -very stiff 2'-6'
-yellowish brown and gray 107 20 m
i w/calcoreous and ferrous
nodules 2'-10'
-very stiff to hard 6'-8' 18 p p
.\ -very stiff B'-10' I8 A 0
84 105 19 40 19 21 N n
Ir I 32.3-
Stiff to very stiff reddish
brown FAT CLAY (CH)
- 30.3 1 ` w/calcareous nodules and -
2B (M Mad
sand seoms
2•
2
30
3 J
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
— Geotest Engineering, Inc.
LOG OF BORING NO. GB-45 (GB-45P)
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13779382, E 3146955 COMPLETION DEPTH : 40.0 FT.
Nen See Plan of Borings (Figure 2)
SURFACE ELEVATION : 43.78 FT. DATE : 10-31-12
ea UNDRAINED SHEAR STRENGTH.
SAMPLER : Shelby Tube/Split Spoon c13 a - ,., x N TS,
W DRY AUGER 0.0 TO 27.0 FT. i6 Y�ig. ' NN N - t. 0 HAND PENETROMETER
to m 'n 3 pi ' z • uNCONFINED COMPRESSION
g 4 WET ROTARY 27.0 TO 40.0 FT. n� .8 i gm 3 1",.?
Z UNCONs000ATED-UMORAIrvEO
a u' a2 3" '� P, o %% u • TRIAXNL COMPRESSION
j 0 DESCRIPTION OF MATERIAL •
trt aG u� o to j a a D rONVANE
- 43.8 0.5 1.0 1.5 2.0 2.5
4
N. Hard dark gray FAT CLAY
(CH) w/sand, calcareous
and ferrous nodules 13CD
-w/grass roots 0'-2'
-gray 2'-4'
78 15 54 20 34
X -very stiff 4'-6'
eiV
-stiff to very stiff gray 17
and brown 6'-8'
- 35.8 \
` 24 A0
M• edium stiff to stiff
reddish brown and gray
• \ LEAN CLAY (CL) 95 101 26 44 19 25 t7f
\
w/colcareous and ferrous
nodules and silt seams
2
- 30.8 I V• ery stiff reddish brown
,,� '
FAT CLAY (CH) and 30 An
silt seams and calcareous
c
nodules
1. -reddish brown and gray
1T-19'
-w/ferrous stains 19'-21' 83 23 56 22 34a
- 22.8 ` 24
- S• tiff gray and brown SANDY
LEAN CLAY (CL) w/ferrous
nodules and ferrous stainskl 69 110 19 40 19 21 p If
and sand seams
-very stiff to hard w/cloy 22
- 18.8 seams 23'6"-24'6" n
41411 -w/colcareous nodules
23 -25 96 22 52 21 31 A
18.8 . ■ Very stiff reddish brown
k w/sand gray FATsiCLAYltseams(CH)and
v z� and and
calcareous nodules
' -w/ferrous nodules and
A ferrous stains 25'-27' 20
I
' Medium dense brown and gray
- 108 SILTY SAND (SM)
IS -• brown lean clay 30.5'-31' r
Stiff to very stiff brown 97 23 26 19 9 An
- 8.8 35 k and gray LEAN CLAY (CL)
DEPTH TO WATER IN BORING :
V: FREE WATER 1st ENCOUNTERED AT 27.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 12.6 FT.
7: WATER DEPTH AT 4.5 FT., HOLE OPEN TO 40.0 FT. ON 01-18-13. Continued on Figure A-45o
Geotest Engineering, Inc.
LOG OF BORING NO. GB-45 (GB-45P) Cont'd
PROJECT : McHard Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Pearlond, Texas
LOCATION : N 13779382, E 3146955 COMPLETION DEPTH : 40.0 FT.
See Pon of Borings (Figure 2) Nod
SURFACE ELEVATION : 43.78 FT. DATE : 10-31-12
SAMPLER Shelby Tube/Split Spoon 98 = w g UNDRAINED SHEAR STRENGTH.
F+ �LL -� N M X w O NAND PENEIROMEIER
p.dyj DRY AUGER : 0.0 TO 27.0 FT. is �n 3 2
0 n oto j ] j 0 UNCONFINED 60MPRESS!ON
o g L- WET ROTARY : 27.0 TO 40.0 FT, n tom$ �� u UNCONSOLIDnreO-UNDRAINED
P i: a7aa o LI
- TRWML COMPRESSION
d o DESCRIPTION OF MATERIAL Pb. Fig o zu , n u 0 TORVANE
- 8.8 35 IS n 0.5 1.0 1.5 2.0 2.5
78 s Stiff to very stiff brown 4
-` and gray LEAN CLAY (CL) r
- Soft to very stiff brown 67 110 19 30 16 14 0 A 0
L\! (Cd) gray SANDY LEAN CLAY
I p -stiff to very stiff 38'-40' 17 A n
- 3.84- 46 ^oQ
I
_ 4 }
V
- 5•
- 5
- 6•
- 6
mai
DEPTH TO WATER IN BORING '
F: FREE WATER 1st ENCOUNTERED AT 27.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 12.6 FT.
T: WATER DEPTH AT 4.5 FT., HOLE OPEN TO 40.0 FT. ON 01-16-13.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-46
PROJECT : McHard Water Transmission Line & Road Extension PROJECT NO. : 1140185901
City of Peorlond, Texas
LOCATION : N 13779388, E 3147259 COMPLETION DEPTH : 15.0 FT.
`r See Pion of Borings (Figure 2)
SURFACE ELEVATION : 46.35 FT. DATE : 10-31-12
SAMPLER : Shelby Tube/Split Spoon 20 zw . w K
UNNAMED SHEAR STRENGTH.
w
re: �` tt w O RANO PENETROMETER
LL W DRY AUGER : 0.0 TO 15.0 FT. iW aN uM ,- i
O LL - - WET ROTARY : --TO -- FT, nEn io i,5j - • UNCONFINED COMPRESSION
p • b i� y Z UNCONS0UDATEO-UNORMNEO
g dp 9 IP 0 • TRIAXIAL COMPRESSION
6 DESCRIPTION OF MATERIAL it ai o g o a 0 TORVANE
o.
46.3 r rn� 0.5 1.0 1.5 2.0 2.5
\ Very stiff to hard dark
gray LEAN CLAY (CL)
- 44.3 w/sand, calcareous and - 13 A 0
Nil ferrous nodules and gross
roots
17 GIS
Very stiff to hard gray FAT
111 CLAY (CH) w/sond seams
-stiff to very stiff 4'-6' aT loo 22 55 22 33Ilr
111 -w/ ns nodules
-w/ferrous nodules 4'-la
'
-very stiff 6'-15'
21 m
ii
101 22 FN •
`r - 31.3 1 6111125
2.
2
34
3
`r
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT END OF DRILLING.
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-47 (GB-47P)
PROJECT : McHard Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Pearland. Texos
LOCATION : N 13779638, E 3147948 COMPLETION DEPTH : 40.0 FT. j
See Plan o/ Borings (Figure 2) 'U
SURFACE ELEVATION : 47.14 FT. DATE : 11-01-12
SAMPLER Shelby Tube/Split Spoon ao R UNDRAINED SHEAR STRENGTH,
�p 1 0 N
La '61.
I( O HPNO PENEIROMEiER
o0 0, DRY AUGER : 0.0 TO 21.0 FT. tit' aTh 3 N t s
w 3 • UNCONFINED COMPREss10N
o U. 0 J WET ROTARY : 21.0 TO 40.0 FT. uo o to sw C UNCONsou0niE0-UNDRA NEO
am 3" D g 0 E U • IRA%14 COMPRESSION
a DESCRIPTION OF MATERIAL o gFa A TaavbNE
G� u z 0.5 1.0 1.5 2.0 2.5
- 47.1— 0
Hard dark gray LEAN CLAY
(CL) w/sond, calcareous
and ferrous nodules 11 0
-w/gross roots 0'-2'
-gray and yellowish brown 15
2,-6'
_ \\ -very stiff 4'-6'
41.1 "\ 73 15 44 20 24 p O
Y Very stiff gray and
yellowish brown FAT CLAY
23
93
(CH) w/sand, ferrous
stains and ferrous nodules
\ -stiff to very stiff 8'-10'
0�
>s 97 23 el 29 52 /O
\ -reddish brown 11'-17'
V
4-15-\
30 "Si
30.1
Very stiff reddish brown
and gray LEAN CLAY (CO
W/silt seams e3 104 20 42 20 22 AO
27.1 2 RN -fat cloy 19'-20'
- 261 ^Reddish brown SANDY SILT 23 p
:�qk l (ML) r
vy Very stiff to hard gray and lz O
yellowish brown SANDY LEAN
CLAY (CL) w/sond and silt
seams and ferrous stains 65 112 Ie 34 7 '7 a 0-w/ferrous nodules 23'-27'
-very stiff 27-29' 12 6 0
18.1 21 2) 0
1.
Very stiff reddish brown
3' FAT CLAY (CH) w/sand and
silt seams and calcareous 97 07 28 64 25 39
nodules
-hard brown and gray 33'-40'
- 12.1 3 15 49 y
V
DEPTH TO WATER IN BORING :
F: FREE WATER 1st ENCOUNTERED AT 20.0 FT. DURING DRILLING; AFTER 15.0 MIN. AT 12.3 FT.
7.: WATER DEPTH AT 6.8 FT.. HOLE OPEN TO 40.0 FT. ON 01-16-13. Continued on Figure A-46a
Ceotest Engineering, Inc.
LOG OF BORING NO. GB-47 (GB-47P) Cont'd
PROJECT : McHord Water Tronsmission Line & Read Extension PROJECT NO. : 1140185901
City of Pearland, Texos
LOCATION : N 13779638, E 3147948 COMPLETION DEPTH : 40.0 FT.
See Plon of Borings (Figure 2)
SURFACE ELEVATION : 47.14 FT. DATE : 11-01-12
SAMPLER Shelby Tube/Split Spoon
pi., ,2 p UNORNNED SHEAR STRENGTH,
TF
g yN .50 N K w 0 HAND PENETROMETER
'o in DRY AUGER : 0.0 TO 21.0 FT. u , y F J 0
4 Z� j - • UNCONFINED COMPRESSION
WET ROTARY 21.0 TO 40.0 FT. i� �$ vi µ a u
$ UNCONSOLIDATED-ONONMNW
am w gu 9 nn- _ TRN%ML COMPRESSION
w
DESCRIPTION OF MATERIALG n� o g n A TORVANE
Ate
- 12.1— 35 ��- 0.5 1.0 1.5 2.0 2.5
V— Hard reddish FAT CLAY (CH)
w/sand and silt seams and
calcareous nodules
—w/ferrous nodules and
ferrous stoins 38'-40'
- 7.1— 40 17 n
- 45-
%Yr - 50-
- 55-
- 60-
- 65-
I
- 70-
I
DEPTH TO WATER 114 BORING :
: FREE WATER 1st ENCOUNTERED AT 20.0 FT. DURING DRILLING: AFTER 15.0 MIN. AT 12.3 FT.
T: WATER DEPTH AT 6.8 FT.. HOLE OPEN TO 40.0 FT. ON 01-16-13.
Geotest Engineering, Inc.
LOG OF BORING NO. GB-48
PROJECT : McHord Water Transmission Line & Rood Extension PROJECT NO. : 1140185901
City of Peorland, Texas
LOCATION : N 13779758, E 3148838 COMPLETION DEPTH : 15.0 FT. �p
See Pion of Borings (Figure 2) V
SURFACE ELEVATION : 45.11 FT, DATE : 11-01-12
00 N UNDRAINED SHEAR STRENGTH,
iu-
SAMPLER : Shelby Tube/Split Spoon o z K w N TSF
' w DRY AUGER 0.0 TO I$,D F. tM 6W9 �N= ceb. ,_ p• O HAND PENETR°MEIER
Q s s WET ROTARY : -- TO -- FT, nil o � air
Iir s • uNCONFlxED COMPRESSION
2, 6" za J UNCONSOLIDATED-UN°RAINED
< ItQ am 9 IPyJ 1RIAXIAL CDAI PRESSION
it
DESCRIPTION OF MATERIAL �'a` ug o 1u 4 n n D TORJANE
45.1— WO GC 0.5 1.0 1.5 20 u
\ Hord dark gray FAT CLAY
(CH) w/ferrous nodules
—w/gross roots 0'-2' 20ta
—very stiff 2'-4'
—w/calcareous nodules 2'-10' ag 20 65 25 40
—stiff to very stiff gray 6
and brown 4'-6'
—very stiff 6'-8' J1
—reddish brown 6'-15'
• —stiff 8'-10' 21
1 \— 96 100 24 51 21 30 a
\ —very stiff w/sand seams
Ne
12'-15' 29 p
- 30.1— 15 �0
20-
- 25-
- 30.
35
DEPTH TO WATER IN BORING :
NO GROUNDWATER ENCOUNTERED DURING DRILLING.
HOLE OPEN TO 15.0 FT. AT ENO OF DRILLING.
Geotest Engineering, Inc.
vie
APPENDIX E
it
Phase I Geologic Fault Study
PHASE I GEOLOGIC FAULT ASSESSMENT
PROPOSED MCHARD ROAD EXTENSION
CULLEN BLVD. TO MYKAWA ROAD
PEARLAND, BRAZORIA COUNTY, TEXAS
SUBMITTED TO:
Cilloro ( pi-,,,e,
•
,Texas ei; `i, 7J
Department 9rr.. 69°
of Transportation
PREPARED FOR:
FREESE
9 °NICHOLS
SUBMITTED BY:
Houston 6120 S.Dairy Ashford Rd.
Austin Houston.TX 77072-1010
281 933 7388 Ph
Dallas
281 933 7293 Fax
ASSOCIATES San Antonio WW..Rri.Mm
,V, MAY 19,2017
Houston 6120 S.Dairy Ashford Rd.
Austin Houston,TX 77072-1010
*tie 281.933.7388 Ph
Dallas 281.9337293 fax
ASSOCIATES San Antonio www.hvj.com
May 19,2017
Mr. Naresh Kolli, PE
Project Engineer
GEOTEST ENGINEERING,INC.
5600 Bintliff Drive
Houston,Texas 77036
Re: Phase I Geologic Fault Assessment Report
McHard Road Extension
From Cullen Blvd. to Mykawa Road
Owner: City of Pearland/TXDOT
HVJ Report No. HE1610124
Dear Mr. Kolli:
Presented herein is our Phase I Geologic Fault Assessment final report for the above captioned
project. The study was performed in general accordance with the City of Houston, Department of
Public Works & Engineering Infrastructure Design Manual Chapter 11 and our proposal number
HE1610124 dated May 31,2016 and a Houston Geological Society fault assessment guidance
t♦.. document
This report presents HVJ Associates' understanding of the project's scope,the methodology we
employed in executing the work, and the conclusions we reached subject to the limitations discussed
in Section 8 of this report.
It has been a pleasure to work with you on this project,and we appreciate the opportunity to be of
service. Please notify us if there are questions or comments or if we may be of further assistance.
Sincerely,
HVJ ASSOCIATES, INC.
fate
,. �� Flnr- = -- 014.
Texas Firm Registration No.F-000646 sMNWP-—OZimi.y5£
Tonzia
���p�A1/4.1.fsENsEI
Edward Hawkinson, PG Sharmi Vedantam, PE
Project Geologist Project Manager
EH/MH/NL/SV
Copies Submitted: 4 final & 1 electronic
The following lists the pages which complete this report:
• Main Text-16 pages • Appendix B-30 pages
• Plates-8 pages • Appendix C-7 pages
�, • Appendix A-7 pages
TABLE OF CONTENTS
Nu ape
EXECUTIVE SUMMARY
1. INTRODUCTION 1
1.1 Project Objective 1
1.2 Project Scope 1
1.3 Basis of Report 1
1.4 Qualifications of Licensed Geologist 2
2. PROJECT AREA DESCRIPTION 2
3. BACKGROUND 2
3.1 Geologic Setting 2
3.2 Nature of Faulting 3
3.3 Indications of Faulting 3
3.4 literature Review 4
4. FAULT ASSESSMENT 4
4.1 Review of Aerial Photographs 4
4.2 Review of Topographic Maps 5
5. RECONNAISSANCE 5
5.1 Objectives 5
5.2 Field Reconnaissance 5
%or 6. RECOMMENDATIONS 5
7. SUMMARY OF FINDINGS/CONCLUSIONS 7
7.1 Findings 7
7.2 Conclusions 8
8. LIMITATIONS 8
9. REFERENCES 9
PLATES y
SITE VICINITY MAP 1 "�
PROJECT ALIGNMENT MAP 2
PROJECT AREA FAULT PATTERN MAP 3
PROJECT AREA FAULT 41A LOCATION MAPS 4
PROJECT AREA FAULT 40A HAZARD ZONE MAP 5A
PROJECT AREA FAULT 41A HAZARD ZONE MAP 5B
FIELD INDICATIONS OF POSSIBLE FAULTING MAP 6
APPENDIX
SITE PHOTOGRAPHS A
AERIAL PHOTOGRAPHS B
TOPOGRAPHIC MAPS C
err EXECUTIVE SUMMARY
HVJ Associates, Inc. has completed a Phase I Geologic Fault Assessment for the proposed McHard
Road Extension from Cullen Blvd. to Mykawa Road. The project will include installation of storm
sewer, new pavement, traffic signals and asphalt widening at major intersections (referred to as the
Subject Project Alignment in this report) in Pearland,Texas (see Plates 1 and 2- Site Vicinity and
Project Location Map for the Subject Project Alignment).
Our services included a review of available published and unpublished literature on faulting in the
area and a site reconnaissance. The Subject Project Alignment is approximately 3.44 miles long and
is partially developed with commercial and single-family residential structures. Access to the Subject
Project Alignment was limited by fencing from private properties. The available information for this
project and the on-site reconnaissance conducted during June 2016 are summarized below:
• The project area appears to be near an area south of Houston with well documented fault
systems with surface expressions. Two faults have been identified in the geologic literature
near the Subject Project Alignment near the intersection of Woody Road and between Stone
Road and Max Road. These down to the northwest, southwest to northeast trending
Geologic Faults are radial to the Mykawa Oil Field salt dome area that have been identified
by the United States Geological Survey (USGS).
• Geologic Fault 40A is mapped crossing several streets north of the Subject Project
Alignment; extends to the southwest to the area just north of the Subject Project Alignment
and possibly crosses the Subject Project Alignment.
• Geologic Fault 41A may cross the Subject Project Alignment near the intersection of Woody
%or Road.
• Analysis of the 1944, 1975 and 1996 vertical aerial photographs revealed faint linear features
or lineament which may be indicative of the documented geologic faults crossing near the
west end and east end of the Subject Project Alignment. Development in the project area
makes resolution of this feature difficult in later photographs.
• Examination of current and historical topographic maps revealed no topographic features
and/or stream and drainage patterns that could be related to faulting.
• Cracked paving was observed along Woody Road near the Subject Project Alignment and
two scraps were observed on both side of Max Road near the intersection of Martin Lane,
northeast from the Subject Project Alignment near the west end. The observed cracked
paving and scarps are probably related to the documented Fault 40A and Fault 41A in the
area and could impact the Subject Project Alignment. No obvious building damage
indicating recent fault movement was observed during the field reconnaissance near the
location of Geologic Faults 40A and 41A.
Based on the information obtained in this study, the potential for active surface faulting in the
Subject Project Alignment should be considered high. Geologic Fault 40A is mapped terminating
near the Subject Project Alignment on the west end and three aerial photographs showed it crosses
the Subject Project Alignment. This fault was not observed crossing the Subject Project Alignment
in the field. Geologic Fault 41A which is mapped near the east end of the Subject Project
Alignment near the intersection of Woody Road was observed on one aerial photograph and in the
field. We estimate that the faults extend under the Subject Project Alignment area at an angle of
approximately 75° (from the horizontal). This dip is typical for faults in the Houston Metropolitan
area and is a rough estimate based on invasive fault studies conducted by HVJ Associates in the
general project area and from other sources. No faults other than the fault mentioned above were •vri{
observed and/or documented in the literature on or near the Subject Project Alignment.
Faults are not always associated with lineaments. Thus in the absence of definitely recognizable
fault scarps or fault-related damage,they may not be identifiable by visual inspection alone.
Additionally,vegetative cover and uneven topography can obscure the presence of a fault, especially
if it is slow moving or currently inactive. Predicting future fault activity cannot be done with
certainty due to the number of variables involved. Dormant or very slow moving faults can be,
respectively,reactivated or accelerated due to a number of reasons, including groundwater
withdrawals and petroleum production.
Based on available information, we cannot rule out fault activity impacting the Subject Project
Alignment. We recommend that fault protective measures be designed based on a 50 year Design
• Criteria Movement of 11 inches vertically within a hazard band extending 300 feet from either side
of the faults. Near the west end of the Subject Project Alignment,the portion of the project
potentially affected is from about Station 43+00 to Station 49+00 along the Subject Project
Alignment between Stone Road and Max Road. Geologic Fault 40A is estimated to cross the
Subject Project Alignment at about Station 46+00. Near the east end of the Subject Project
Alignment, the portions of the project potentially affected are from about Station 156+60 to Station
162+60 along the Subject Project Alignment near Woody Road and about Station 6+10 to Station
10+10 along Woody Road. Geologic Fault 41A is estimated to cross the Subject Project Alignment
at about Station 159+60. These hazard bands might be reduced or eliminated if Phase II Geologic
Fault Assessment study is conducted.
We recommend that, during construction planning, consideration be given to the proximity of the
fault to the project arca. Construction should take into account of the potential for fault movement.
It should be noted that movement rates are not consistent along the fault and that the rate goes to
zero at either end. Pavement crossing the fault locations will experience horizontal and vertical
movements. These movements will cause cracking and accelerated deterioration of the pavement
structure due to water infiltration. To the extent possible, the area of pavement within the fault
hazard zones of influence should be minimized. Where pavements must cross the fault, the
pavement section recommended for heavy truck loads should be used near the fault trace.
Maintenance budgets should include allowance for replacement of slabs near the fault much more
frequently than similar pavements away from the fault. Subsurface utilities crossing the faults will
experience vertical and horizontal movements. These movements will cause cracking of pipes and
change the invert grades in the vicinity of the faults with time. Drainage in the vicinity of the faults
will be impacted by fault movement. Over time the site grades will change near the fault to create
an apparent depression that will not drain properly.
Two design approaches can be taken for design of buried utilities crossing a fault line. Limited
measures to protect the utility can be taken and the utility can be designed to be easily serviced when
a break occurs. As an alternative,the section of the utility that is located within the fault zone can
be designed to accommodate the projected fault movement without damage. We recommend this
approach due to the relatively high impact of a break,unless a Phase II Geologic Fault Assessment
study is performed along the alignment to confirm that the faults are not present.
One approach to solving the deflection issues is to use jointed pipe within the fault zone that is
capable of sustaining the rotation and extension that may occur. We recommend that valves be
installed in the pipe near but outside the fault zone in order that the portion of the line within the
fault zone can be easily isolated for repair in the event of a break.
This executive summary does not fully summarize our findings and opinions. Those findings and
opinions are related through the full report only.
1. INTRODUCTIO
v
1.1 Project Objective
HVJ Associates, Inc. was contracted by GEOTEST Engineering, Inc. (GEOTEST) to perform a
Phase 1 Geologic Fault Assessment for the proposed McHard Road from Cullen Blvd. to Mykawa
Road. The project will include installation of storm sewer, new pavement, traffic signals and asphalt
widening at major intersections (referred to as the Subject Project Alignment in this report) in
Houston,Texas. Published geologic studies have identified two active geologic faults trending
through the Subject Project Alignment. These faults are radial to the Mykawa Oil Field Salt Dome
and cross the Subject Project Alignment area near its west and east ends. Access to the project area
was limited by fencing from private properties. The objective of this study was to identify active
faulting along the Subject Project Alignment based on available data and a site reconnaissance and
to determine if faulting hazards exist that could affect planned development.
1.2 Project Scope
The scope of services for this study were performed in general accordance to City of Houston,
Depatunent of Public Works &Engineering Infrastructure Design Manual Chapter 11
"Geotechnical and Environmental Requirements" Section 11.09 Fault Assessment. The following
tasks were performed:
1. A search was conducted of available published and unpublished literature on geologic
faulting to point out areas of known fault activity and assist in locating direct site-specific
evidence. Literature reviewed included publications of the U.S. Geological Survey,
Texas Bureau of Economic Geology, Gulf Coast Association of Geological Societies,
and the Houston Geological Society.
%se 2. A review of the results of previous fault studies,performed by HVJ Associates,in
adjacent areas was conducted and relevant information from those studies was
considered for this study.
3. A review of a series of black and white and colored vertical aerial photographs and both
recent and historic U.S.G.S. topographic maps was conducted to identify features that
may indicate the presence of faulting.
4. A physical site and area reconnaissance was performed to identify and locate features
that indicate the presence of faulting. All evidence derived from the literature,photo
and map reviews was evaluated in the field and used to locate the position of the ground
profiles.
5. This report was prepared summarizing our findings, conclusions and recommendations.
1.3 Basis of Report
Although this study has been a reasonably thorough attempt to identify faulting in the vicinity of
and on the Subject Project Alignment, there is a possibility that existing faults may have escaped
detection due to the inherent limitations of this or similar studies or the inaccuracy of published and
unpublished data. If faults are present, the surface evidence may not be well developed or may be
obscured by erosion, soil and vegetation cover, and/or new construction.
HVJ Associates reserves the right to alter our conclusions and recommendations based on our
review of any information obtained after the date of this report. The data obtained during the
course of this Assessment and this report is for the sole and exclusive use of GEOTEST. HVJ
Associates, Inc. will hold all project data,papers,correspondences and reports pertaining to this
study confidential to the extent allowed by law.
1
Our professional services have been performed using that degree of care and skill ordinarily
exercised,under similar conditions,by geotechnical consultants practicing in this or similar localities.
No warranty,express or implied, is made as to the professional information included in this report.
1.4 Qualifications of Licensed Geologist
The primary investigator for this study is Mr. Edward Hawkinson. Mr. Hawkinson holds BS and
MS degrees in geology from The Ohio State University and the University of Cincinnati,
respectively. Mr. Edward Hawkinson also holds an MBA from the University of Cincinnati. Mr.
Hawkinson is a registered professional geologist in Arkansas,Tennessee and Texas (License
Number 45). His career encompasses a period exceeding 30 years involving both Phase I and II
Geologic Fault Studies, environmental site assessments, hydrogeology,water resource evaluations,
NEPA environmental assessments and energy exploration.
2. PROJECT AREA DESCRIPTION
The Subject Project Alignment is approximately 3.44 miles long and is partially developed with
mixed residential and commercial area in Pearland,Texas. There are residential structures
along/near the Subject Project Alignment.
3. BACKGROUND
3.1 Geologic Setting
A review of the Bureau of Economic Geology 1992 Geologic Atlas of Texas, Houston Sheet
indicates that the uppermost geologic formation underlying the Subject Project Alignment is the
Pleistocene Beaumont Formation (map symbol Qb). This formation was deposited on land near sea
level in flat river deltas and in inter-delta regions. Soil deposition occurred in fresh water streams
and in flood plains (as back-water marsh and natural levees). The courses of major streams and -+✓
deltaic tributaries changed frequently during the period of deposition,generating within the
Beaumont clay a complex stratification of sand,silt and clay deposits. Frequently, stream courses
were diverted significant distances from a given point in a backwater marsh, and the water overlying
the soil would evaporate since it was cut off from a drainage path. Such water,which would be
highly alkaline,would precipitate large nodules of calcium carbonate (calcareous nodules)
throughout the surface of evaporation. With the coming of the Second Wisconsin Ice Age, the
nearby sea withdrew,leaving the formation several hundred feet above sea level and permitting the
soil to desiccate. The process of desiccation compressed the clays in the formation such that they
became significantly overconsolidated to a large depth. In addition to pre-consolidating the soil, the
process of desiccation, together with the later rewetting,produced a network of fissures and
slickensides that are now closed but which represent potential planes of weakness in the soil. The
formation weathers to a fairly flat and featureless surface except for numerous rounded shallow
depressions and pimple mounds.
Two down to the northwest, southwest to northeast trending geologic faults transect the Subject
Project Alignment near its west and east ends. These faults are radial to the Mykawa Oil Field salt
dome which is located approximately 1 mi. north from the east end of the Subject Project
Alignment. In their"Map Showing Surface Faults in the Southeast Houston Metropolitan Area,
Texas" (1978) prepared in conjunction with NASA, E.R. Verbeek and U.S. Clanton label these
faults as Geologic Faults 40A and 41A mapped near the west and east ends of the Subject Project
Alignment, respectively. Geologic Fault 40A terminates near the Subject Project Alignment on the
west end and Geologic Fault 41A crosses the Subject Project Alignment near Woody Road (See
Plate 4-Project Area Fault Location Map).
2
V 3.2 Nature of Faulting
In the Gulf Coast region of Texas over 200 faults are known or suspected to be active with an
aggregate length of approximately 370 miles. Many of these faults are located in the Greater
Houston-Galveston area subsidence bowl. Although the existence of most of these faults have been
reported in the literature, only 100,with an aggregate length of approximately 140 miles have been
mapped at scales suitable for general use. These faults extend offshore several hundred miles and
inland north of the Conroe area. Evidence of fault activity includes laterally persistent abrupt
changes in the elevation of the ground surface (scarps) where the slope of the land on either side of
the fault scarp is similar. Fault scarps can produce linear features (lineaments) on aerial photographs
and topographic maps,linear patterns of vegetation that are primarily due to the ponding of water
on the downthrown side of the fault, and damage to pavement and other structures. Evidence of
active faulting in undeveloped areas may be obscured due to dense vegetation cover such as woods
and underbrush.
Many faults are classified as growth (down-to-the-coast) faults wherein the dip angle of the fault
near the ground surface is very high,averaging 75 degrees. These faults may have been active for a
long period of time. As their name implies,growth faults are active during sedimentation,and
consequently, subsurface features include increased thickness of geologic units on the downthrown
side and increased displacement of these units with depth adjacent to the fault. Another type of
fault found along the Gulf Coast is often associated with growth faults. This faults generally parallel
growth faults and have a fault-plane dip that is up-to-the coast. Because of their opposite dip and
close association with growth faults, these faults are known as antithetic faults. Growth faults and
their antithetic faults have a strike or orientation that generally parallels the coast. Movement rates of
growth and antithetic faults are slow and generally range from 0.1 in. to slightly more than 1.0 in. per
year. Horizontal movements are extensional and depend upon the dip of the fault,generally being
about one-fourth to one-half the vertical movement. This surface movements generally occur in a
\r band of significant width which is likely to be different for each fault and to vary along the length of
a particular fault. Band widths of 30 to 50 ft. are common,but wider or narrower bands are also
found. In general, fault movement rates may be episodic for a specific fault and an extended period
of time may pass between movement periods. Fault movement and fault reactivation has been
attributed to fluid withdrawals from pumping of groundwater and oil and gas production, however
the predominant affect of this fluid pumping has been local and regional ground subsidence. Fault
movement and subsidence rates are documented in Houston where older structures or roadways can
display damage.
Other types of faults found along the Gulf Coast are those associated with salt domes. Faults
immediate to or overlying salt domes may have surface expressions that tend to be shorter in length
and may form either an irregular radial or offset pattern around the salt dome. Away from the dome
tangential faults may be present. Unlike growth faults, the orientation of dome-related faults does
not follow a general orientation, that is, they can have strikes that are randomly oriented. Many
faults mapped in the subsurface are inactive and do not extend to the surface.
3.3 Indications of Faulting
Evidence of faulting at the surface is not always readily identifiable and can also be falsely inferred.
Topographic features such as escarpments associated with river terraces may resemble a fault scarp.
However,in many cases these features cannot be traced laterally for any substantial distance, or the
relative direction of movement observed might change significantly which would indicate the feature
is not related to active faulting. Normal deterioration on existing buildings and other structures may
produce damage that may resemble damage associated with active faulting. Other sources of linears
that can erroneously suggest faulting include clearings made for seismic surveys during oil
exploration, fence lines, stratigraphic contacts, or drainage patterns. In most cases, the observed
linears on aerial photographs are related to changes in vegetation, while on topographic maps they
are related to changes in slope and/or drainage patterns.
3
Though the existence of river terraces and other linear natural topographic features does not
necessarily indicate the presence of a fault, there are times wherein fault scalps are coincidentwith
and are the progenitors of these features. Additionally, there are instances where the fault may be
offset from such a topographic feature yet nevertheless is the cause of its existence and the control
on its orientation.
In undeveloped terrains covered by dense forest and underbrush and possessing varied topographic
relief, the visual, onsite identification of fault scarps can be difficult. Lineaments that could be
associated with faulting are likely to be masked by the heavy overgrowth. In such environments,
several lines of boreholes across the study area may be needed to supplement the aerial
photograph/topographic map analysis and field reconnaissance. Electric log data obtained from
these boreholes can provide an idea of subsurface conditions and the likelihood of fault existence.
3.4 Literature Review
We reviewed available literature on faults in the area which include USGS publications, university
research papers and professional society publications. Although faults exist, seismic activity is not a
concern based on the site's location in Seismic Zone 0 of the Uniform Building Code.
Many of the faults in the Texas Gulf Coast region are considered growth (down-to-the-coast) faults
in which the dip angle of the fault near the ground surface averages 75 degrees. Since growth faults
are active during sedimentation, subsurface features include increased thickness of geologic units on
the downthrown side, and increasing displacement of these units with depth adjacent to the fault.
Movement rates of these faults range from less than 0.1 to over 1.0 inches per year. Plate 3 shows
the regional trend of some of these faults based on our literature review.
United States Geological Survey Open File Report 78-797 "Map Showing Surface Faults in the
Southeast Houston Metropolitan Area,Texas"by E.R. Verbeek and U.S. Clanton (1978) shows 8.161
southwest to northeast trending down to the northwest Geologic Faults 40A and 41A. These faults
are radial to the old Mykawa Oil Field. The U.S.G.S. map which shows Geologic Fault 40A
terminating near the Subject Project Alignment and Geologic Fault 41A crossing the Subject Project
Alignment. See Plate 4-Project Area Fault Location Map.
The most current research for the Subject Project Alignment area was found in a paper by Khan et
al, "Case History a Geophysical Investigation of the Active Hockley Fault System near Houston,
Texas, GEOPHYSICS,Vol. 78, No. 4(July-August 2013). Using geophysical data, they examined
the fault systems in the Houston Metropolitan Area with emphasis on the Hockley Fault System in
northwest Harris County. They used airborne LiDAR to identify fault scarps and identified several
new faults and assemble an updated map for the faults in Houston and surrounding areas. They
used two different LiDAR data sets (from 2001 to 2008) to develop their area fault map.
4. FAULT ASSESSMENT
4.1 Review of Aerial Photographs
For the Subject Project Alignment,we obtained a series of aerial photographs for the years 1930,
1944, 1953, 1965, 1975, 1977, 1989, 1996,2004 and 2014 taken under various conditions including
some taken prior to substantial disturbance or covering the natural ground surface (these aerial
photographs are provided in Appendix B). Based on this review,we found two possible faults
crossing the Subject Project Alignment. The 1944, 1975 and 1996 aerial photographs show some
linear shading which may be indicative of the mapped Geologic Fault 40A near the west end of the
of the Subject Project Alignment. The 1944 aerial photograph shows some linear shading which
may be indicative of the mapped Geologic Fault 41A near the east end of the Subject Project
Alignment. No other possible fault(s) were observed on the earlier 1930 aerial photographs due to Ned
4
its poor quality or on the 1953 and later aerial photographs due to modifications of the landscape
Nger
and other factors.
In viewing aerial photographs, features that may indicate the presence of a fault,include tonal
variations in vegetation, areas of standing water and lineations associated with drainage patterns.
This features by themselves do not prove that a fault is present, but allow for more effective
topographic map review and field reconnaissance.
4.2 Review of Topographic Maps
HVJ Associates reviewed the 1929 and later Pearland area topographic maps for the project area.
Because of project area terrain with relatively low relief and five-foot contour intervals, no obvious
lineaments or other features indicative of geologic faulting were observed on these maps.
5. RECONNAISSANCE
5.1 Objectives
A field reconnaissance was performed during June 2016 on foot and by automobile to observe the
subject areas and to observe areas identified through literature research and on topographic maps
for evidence of faulting.
5.2 Field Reconnaissance
During the course of the field reconnaissance, paved roads adjacent to and within the study area
were examined for road surface flexures and/or cracks that would be indicative of faulting. Cracked
paving and two scarps potentially related to Geologic Fault 40A were observed along Rov Road,
Green Hill Road and along Max Road near the Subject Project Alignment. Cracked paving
potentially related to Geologic Fault 41A was observed along Woody Road near the Subject Project
's e Alignment. No obvious building damage indicating recent fault movement was observed during this
reconnaissance. A series of site photos showing the fault locations and descriptions of what we
observed along the Subject Project Alignment and the surrounding local streets is provided in
Appendix A. Plate 6 shows the data we collected during our field reconnaissance.
A sag zone is a depressional feature on the downthrown side of a fault which can cause drainage
problems near a fault. While sag zones are a common feature associated with active faults, no
evidence of a sag zone was observed during our field reconnaissance at the fault locations.
It should be noted that a common complication in many fault studies is that much of the evidence
normally used to map surface traces of faults in the Gulf Coast have been destroyed in developed
areas. Only the most active and damaging faults or faults whose scarps are of substantial height are
likely to be noticed during mapping of developed areas. Mapping of faults is most difficult in areas
with recent development; however,in older developed areas the fault can be located quite accurately
at many points where it has damaged buildings, road and other manmade structures. The trace of
the Geologic Fault 40A near the west end and Fault 41A near the east end along the Subject Project
Alignment has been obscured by landscape modifications along and near the Subject Project
Alignment area.
6. RECOMMENDATIONS
Since two faults which are well documented in the geologic literature, by field observation and by
aerial photographs may cross on or near the Subject Project Alignment area,we recommend fault
protective measures are required for a buried utility. These measures are determined based on the
size of the utility, the method of installation, and the fault activity. While there is some uncertainty
lit or of whether Geologic Fault 40A or Geologic Fault 41A actually crosses the Subject Project
Alignment,we recommend that the proposed utilities in particular be designed with protective
5
measures unless additional study is done to confirm that faulting is not present. We recommend xed
that fault protective measures be designed based on a 50 year Design Criteria Movement of 11
inches vertically within a hazard zone extending 300 feet from either side of Geologic Fault 40A and
Geologic Fault 41A. Near the west end of the Subject Project Alignment, the portion of the project
potentially affected is from about Station 43+00 to Station 49+00 along the Subject Project
Alignment between Stone Road and Max Road. Geologic Fault 40A is estimated to cross the
Subject Project Alignment at about Station 46+00 (see Plate 5A). Near the east end of the Subject
Project Alignment, the portions of the project potentially affected are from about Station 156+60 to
Station 162+60 along the Subject Project Alignment near Woody Road and about Station 6+10 to
Station 10+10 along Woody Road. Geologic Fault 41A is estimated to cross the Subject Project
Alignment at about Station 159+60 (see Plate 5B).
We recommend that,during construction planning, consideration be given to the proximity of the
fault to the project area. Construction should take into account of the potential for fault movement.
It should be noted that movement rates are not consistent along the fault and that the rate goes to
zero at either end. Pavement crossing the fault locations will experience horizontal and vertical
movements. These movements will cause cracking and accelerated deterioration of the pavement
structure due to water infiltration. To the extent possible, the area of pavement within the fault
hazard zones of influence should be minimized. Where pavements must cross the fault, the
pavement section recommended for heavy truck loads should be used near the fault trace.
Maintenance budgets should include allowance for replacement of slabs near the fault much more
frequently than similar pavements away from the fault. Subsurface utilities crossing the faults will
experience vertical and horizontal movements. These movements will cause cracking of pipes and
change the invert grades in the vicinity of the faults with time. Drainage in the vicinity of the faults
will be impacted by fault movement. Over time the site grades will change near the fault to create
an apparent depression that will not drain properly.
Two design approaches can be taken for design of buried utilities crossing a fault line. Limited
measures to protect the utility can be taken and the utility can be designed to be easily serviced when
a break occurs. As an alternative, the section of the utility that is located within the fault zone can
be designed to accommodate the projected fault movement without damage. We recommend this
approach due to the relatively high impact of a break,unless a Phase II Geologic Fault
Assessment is performed along the Subject Project Alignment to confirm that the fault is not
present.
The utility design at the fault crossing needs to address the following fault-related design issues in
addition to the normal utility design issues:
1. Vertical loads due to the fault displacement,
2. Lateral loads due to the fault offset,
3. Loss of support beneath a portion of the utility due to fault displacement,
4. Tension stress in the utility due to fault extension, and
5. Rotation and extension at the utility pipe joints due to fault displacement.
One approach to solving the deflection issues is to use jointed pipe within the fault zone that is
capable of sustaining the rotation and extension that may occur. These design issues and our related
recommendations are discussed in the following paragraphs. We recommend that valves be
installed in the pipe near but outside the fault zone in order that the portion of the line within the
fault zone can be easily isolated for repair in the event of a break.
Vertical Load. The fault is projected to produce up to about 11 inches of vertical offset over a fifty-
year period. This vertical loading will deform the pipe and needs to be accommodated without J
damage to the pipe.
6
,�, Lateral Load. The fault is projected to produce up to about four inches of lateral movement over a
fifty-year period. To the extent that the pipe centerline does not cross perpendicular to the fault
lateral loads can be generated. These lateral loads will deform the pipe and need to be
accommodated without damage to the pipe.
Loss of Support. The pipe will tend to "bridge" and lose contact with the underlying soil for some
distance on the downthrown side of the fault. The pipe must be designed to accommodate this loss
of support without damage.
Tension Stress. The fault is projected to produce about 4 inches of horizontal extension along the
alignment over a fifty-year period. The soil structure friction will produce tension stresses in the
pipe because of the extension which need to be resisted by the pipe without damage. This tension
may also have a tendency to disengage joints between pipe sections located within the fault area.
Backfill and Bedding. Rigid backfill and bedding materials, such as cement stabilized sand, should
not be used within the fault hazard zone identified in this report. Rigid materials can cause stress
concentrations leading to highly localized failure of the pipe, and they may make access to the pipe
for repair more difficult. Crushed rock with sand backfill is preferred.
Within the hazard zone,we recommend that the trench be lined with a geotextile filter installed per
the manufacturer's recommendations. This lining will serve to prevent infiltration of natural soil
into the backfill and will prevent sediment inflow into the pipe in case of breakage or joint distress.
Alignment. We recommend that no sensitive structures be installed within the hazard zone.
Sensitive structures include manholes,valves, access manways and similar facilities.
Nur
7. SUMMARY OF FINDINGS/CONCLUSIONS
Based on our site reconnaissance and review of available information obtained for this project, our
findings and conclusions are summarized below:
7.1 Findings
The Subject Project Alignments appear to be in an area of Houston with well documented fault
systems with surface expressions. Two main active surface faults are present along the Subject
Project Alignment. These faults are down to the northwest, southwest to northeast trending fault
identified by the United States Geological Survey (USGS) which is radial to the Mykawa Oil Field
salt dome area. Geologic Fault 40A is mapped crossing Max Road and Roy Road and terminates in
a wooded area near the Subject Project Alignment. Its approximate location is depicted on Plates 3,
4 and 6. During site reconnaissance, an obvious expression of Geologic Fault 40A in the form of
cracked paving and two scarps were observed at/near Max Road, Green Hill Road and Roy Road,
northeast of the Subject Project Alignment. Geologic Fault 41 A is mapped crossing the Subject
Project Alignment near Woody Road. Its approximate location is depicted on Plates 3,4, and 6.
During site reconnaissance, an obvious surface expression of this fault was observed along Woody
Road near the Subject Project Alignment.
The 1944, 1975 and 1996 aerial photographs show some faint linear shading which may be
indicative of the mapped Geologic Faults 40A near the west end of the Subject Project Alignment.
The 1944 aerial photograph shows some faint linear shading which may be indicative of the mapped
Geologic Faults 41A near the east end of the Subject Project Alignment. No other possible fault(s)
were observed on the earlier 1930 aerial photograph due to poor photograph quality and on the
1953 and later aerial photographs due to modifications of the landscape and other factors.
Examination of the 1929 historical topographic map and later topographic maps for the project area
7
showed no alignment or linear features that could be interpreted as fault related. This is due in part ,%•010
to the project area terrain with relatively low relief and five-foot contour intervals.
7.2 Conclusions
Based on the information obtained in this study, the potential for active surface faulting along the
Subject Project Alignment should be considered high. Geologic Fault 40A terminates near the
Subject Project Alignment on the west end. The location of this fault is documented in the geologic
literature, on three aerial photographs and by field reconnaissance. It should be noted that we
observed no indications that this fault crossing the proposed McHard Road,however, since it is
mapped terminating near the proposed McHard Road we recommend a hazard zone for this
location. We conclude that Geologic Fault 40A may cross the proposed McHard Road near the
west end of the Subject Project Alignment. Geologic Fault 41A is documented in the geologic
literature crossing the Subject Project Alignment near Woody Road and was observed in the field
and on one aerial photograph. We estimate that these faults extend under the Subject Project
Alignment at an angle of approximately 75° (from the horizontal). This dip is typical for faults in
the Houston Metropolitan area and is a rough estimate based on invasive fault studies conducted by
HVJ Associates in the general project area and from other sources. We conclude that fault hazard
zones are appropriate for two locations along the Subject Project Alignment and one location along
Woody Road. The portions of the project potentially affected are from about Station 43+00 to
Station 49+00, from about Station 156+60 to Station 162+60 along the Subject Project Alignment
and from Station 6+10 to Station 10+10 along Woody Road. The need for these hazard zones
might be reduced or eliminated if a Phase II Geologic Fault Assessment is conducted. No faults
other than these two faults mentioned above were observed and/or documented in the literature on
or near the Subject Project Alignment.
Faults are not always associated with lineaments. Thus in the absence of definitely recognizable
fault scarps or fault-related damage, they may not be identifiable by visual inspection alone.
Additionally,vegetative cover and uneven topography can obscure the presence of a fault, especially
if it is slow moving or currently inactive. Predicting future fault activity cannot be done with
certainty due to the number of variables involved. Dormant or very slow moving faults can be,
respectively, reactivated or accelerated due to a number of reasons,including groundwater
withdrawals and petroleum production.
8. LIMITATIONS
The conditions and recommendations contained in this report are based on our review of available
documents and field geologic mapping techniques. Shallow soil conditions, cultural activities, new
construction, slow movement rates, and repair of existing fault damage may obscure fault-related
features.
This report is an instrument of service of HVJ Associates, Inc. The report was prepared for and is
intended for the exclusive use of GEO 1 EST,the City of Pearland and TXDOT. The report's
contents may not be relied upon by any other party without the express written permission of HVJ
Associates and GEOTEST.
The report's findings are based on conditions that existed on the dates of HVJ Associates site visit(s)
and should not be relied upon to precisely represent conditions at any other time. All conclusions
are qualified by the fact that no excavations or borings were made and no geophysical surveys or
logging was conducted. Conclusions about site conditions under no circumstances comprise a
xarranty that conditions in all areas within the site and study area (and below existing grade) are of
the same quality that HVJ Associates has inferred from observable site conditions.
8
•
HVJ Associates' findings and conclusions must be considered probabilities based on professional
%se judgment applied to the limited data HVJ Associates was able to gather during the course of this
fault study.
9. REFERENCES
The following references were used to compile this report:
• Approximate Land-Surface Subsidence in the Houston-Galveston Region,Texas, 1906-78,
1943-78,and 1973-78, Open File Report 80-338, US Geological Survey,March 1980.
• Bureau of Economic Geology, 1992, Geologic Map of Texas: University of Texas at Austin,
Virgil E. Barnes,project supervisor, Hartmann, B. M., and D. F. Scranton, cartography,scale
1:500,000.
• Clanton. U.S. and Amsburv,D. L., 1976,Active Faults in Southeast Harris County, Texas:
Environmental Geology,v. 1,no. 3.
• Coplin, L.S., and Galloway, D.L., 1999, Houston-Galveston,Texas: Managing coastal
subsidence, in D. L. Galloway,D. R.Jones, and S. E. Ingebritsen,eds., Land Subsidence in the
United States: U.S. Geological Survey Circular 1182, 35-48.
• Engelkemeir, R., and S. D. Khan,2007,Near-surface geophysical studies of Houston Faults:
The Leading Edge,26, 1004-1008.
• Engelkemeir,R., and S. D. Khan,2008,LiDAR Mapping of Faults in Houston,Texas,USA:
"tor Geosphere,4, 170-182.
• Khan, Stewart, Otoum, Chang,2013, Case History a Geophysical Investigation of the Active
Hockley Fault System near Houston, Texas, GEOPHYSICS,Vol. 78,No. 4 (July-August
2013); P. B177—B185, 7 FIGS.
• Kreitler, C.W., 1976, Lineations and Faults in the Texas Coastal Zone, Report of Investigations
No. 85,Bureau of Economic Geology, the University of Texas.
• Kreitler, C.W., 1978, Faulting and Land Subsidence from Groundwater and Hydrocarbon
Production, Houston-Galveston,Texas. Bureau of Economic Geology,Univ. of Texas at
Austin,Research Note 8.
• Mastroianni,J.J, 1991, Study of Active Fault Movement, Houston,Texas and Vicinity.
Unpublished M.S.Thesis,University of Houston.
• Pratt,W.E., and D.W.Johnson, 1926,Local Subsidence of the Goose Creek Oil Field,Journal
of Geology, 34, 577-590.
• Roberts, G., and A. Michetti,2004, Spatial and Temporal Variations in Growth Rates along
Active Normal Fault Systems: An example from the Lazio-Abruzzo Appenines, central Italy:
Journal of Structural Geology, 26, 339-376.
• Saribudak,M.,2011,Geophysical mapping of the Hockley Growth Fault in Northwest Houston,
USA, and Recent Surface Observations:The Leading Edge, 30, 172-180.
9
• Shaw, S., and J. Lanning-Rush, 2005, Principal faults in the Houston,Texas,Metropolitan Area:
Nod
U. S. Geological Survey Scientific Investigations Map 2874.
• Sheets,M. M., 1971, Active Surface Faulting in the Houston area,Texas: Houston Geological
Society Bulletin, 13,24-33.
• Sheets, M. M., 1979, Oil Fields, Subsidence and Surface Faulting in the Houston Area: Houston
Geological Society Guidebook,24.
• Shelton,J., 1984, Listric Normal Faults: An Illustrated Summary: AAPG Bulletin, 68, 801-815.
• Soil Survey of Harris County Texas,Soil Conservation Service,US Department of Agriculture,
1972.
• United States Geological Survey (various scales), 1995 and earlier.
• Verbeek,E. R., 1979, Surface Faults in the Gulf Coastal Plain between Victoria and Beaumont,
Texas:Tectonophysics, 52, 373-375.
• Verbeek, Ratzlaff and Clanton, 1979,U.S. Geological Survey Miscellaneous Field Studies, Map
MF-1136,Faults, Houston Metropolitan Area,Texas.
• Verbeek and Clanton, 1981, Historically Active Faults in the Houston Metropolitan Area,Texas,
in Houston Area Environmental Geology: Surface Faulting, Ground Subsidence, Hazard
Liability, Houston Geological Society.
Nod
10
PLATES
< I = I 1 I , = I
m °
W To
r a r_ oC z X
Q 0.3
—
.c 0. o
a w ro
CC c v
a ° •
pp 0.n`x....o o 2 ccb z
,
`- 7 Z ere nw.n ob�""U 4:_ — `! �\s- _`. G =55 (J
c _ ,_ g •• < u m Z_
54,
G
• =nn 7r vi
o jaa a. o C� 1
t p=N N < 1: Q d '7
ID g i ; _
— _0 1,,,.....„_,--::-\__ U G -
te$ C_
s
i a, ;1 •o w —
+° iu
: P o
3: ! '
i < t
C 'L 0
,.•..-..rte'' ua+vn-,� I C3 -
•
a , N F Z
i.iyY •g •
' V e, hb
W .1:: It > .•'
,r, n
.a r,•.....:o,. S. C-c e a c d
c t 1 Fmeftz
p :y vg
R r Q.,a.� ^ .�, I...Yi. `:7.
�— 1 as Gr q..Y x.4e r5.,.. al ..�C C F2
c:..':'otci- -
�^i c Fa
C2
c
- �.a E‘71;
i i i .1 }t _C„ Z
y {C,
? s G
,,•%,,,, r° i ilii a 1 I ; Coe F�
— /` —
0 5
r'° .n w.n Ea 6 4• it S
U i s ..
.v.a-+rs. T.
L Ea T i
.----F / 1 ri 0- e i i T.
........ ¢ • .M:1'.1 .'
�. `•
r•--,1N
z
-� a .w• x .•
i
i .--• •
i
C L
4 6
< I _ I -1 2 1 w 1 = I_ 1
G L- ET LI '17
SCALE: NTS
6120 S. Dairy Ashford Road
Houston, Texas 77072-1010
281.933.7388 Ph
281.933.7293 Fax
DATE: 6/22/2016
APPROVED BY:
EH
PREPARED BY:
NL
PROJECT ALIGNMENT MAP
Geologic Fault Assessment— McHard Extension
From Cullen Blvd to Mykawa
PROJECT NO.: DRAWING NO.:
HE1610124
PLATE 2
0 5 KM ;t
S. HOUSTON FIELD
:'- .: 1 N
WILLIAM P_f—if'
AIRPORT (\
d
Ai/\\ _ /
ft 1
ELLINGTON `, ---,
A. F. B,
CLEAR LAKE
MYKAWA
FIEF �' —'- \ „,.... j FIELD
_.,,,,._ VI
c====7\ \
1`'f'-'''''^ '\WEBSTER FIELD
APPROXIMATE PROJLC:1 AREA
,, NASA-
,�: ,� ' 1 S C
EXPLANATION
Fauns,associated with FAULT
Hastings salt dome
3 OIL FIELD
11
Note:Modified after Verbeek and Clanton(1978)
Drawn: NL
Checked: EH Plate 3
Project Area Fault Pattern Map
Geologic Fault Study-McHard Road Extension
,s s oC 1.{T i s Date: June 2016 From Cullen Blvd.to Mykawa
Pearland,Texas
Rcrnrr No. HE1610124 Scale: NTS
= r,
.. „_----- oti-Vgl .
\,'1
. p.t
f ti ate. ! _
.y
C6 -
iilior}may.....
y`{
D - ' N.../ 4 s. _ _ 1 '-
) \„
{
7 -; a }.Ys''
A
'."...<'....N. \i\?
3 ••
1
t i
D A t
113
.a-
, _ .. y
-0, 11110
U—upthrown side of fault
D—downthrown side of fault
Note:solid line where position is certain based on field
and other evidence. Dashed where exact position is
uncertain due to modification of the landscape.
After. Map Showing Surface Faults in the Southeastern
Houston Metropolitan Area,Texas,Verbeek and Clanton
1978
Drawn: NL ✓r
Checked: EH Plate 4
Project Area Fault Locations Map
A TQC i AT F? Dare: June 201 G McHard Road Geologic Fault Assessment Project
Houston,Harris County,Texas
Report No. HE1610124 Scale: NTS
L12
N87' 00' 41 "E
1 ,976.47'
40+00
PC STA 44+63.12
PC STA 434-82.78
5+00
1
40+00
1
McHard RD
Fault hazard zone extends 300 feet on I
either side of the Fault 40A location.
45+00
C1
45+00
CURVE DATA
A = 1 3.25'
R = 1965.00'
T = 228.18*
L = 454.33'
C10
CURVF DATA
= 1 3.25'
R = 2000.00*
T = 232.25'
L = 462.42'
e or
C STA 48+37.11
't
50+00
CC STA 49+25.54
CURVE DATA
A = 24.34'
R = 965.00'
T = 208.08'
L = 409.88'
\ \\,.
\ .N
50+00
C11
C2
PRC STA 52+46.99
CURVE DATA
p = 24.34'
R = 1000.00'
T = 215.63'
L = 424.75'
PRC STA 53+50.29
55+00
%%44%4%a 1K*T
55+00
C12
CURVE DATA
A = 37.59'
R = 1035.00'
T = 352.20.
L = 678.96'
ASSUUAI IS
1 0+00
CURVF DATA
A = 37.59'
R = 1000.00'
T = 340.29'
L = 656.00'
C3
0
0
i0
0
+
6120 S. Dairy Ashford Road
Houston, Texas 77072-1010
281.933.7388 Ph
281.933.7293 Fax
0
CC
x
DATE 6/22/2016
APPROVED BY:
EH
PREPARED BY:
NL
FAULT 40A HAZARD ZONE MAP
Geologic Fault Assessment — McHard Road Extension
From Cullen Blvd. to Mykawa
SCALE: NTS
PROJECT NO.:
HE1610124
DRAWING NO.:
PLATE 5A
N86' 55' 29"E
2,038.95'
150+00
155+00
APPROX. FAULT 41A LOCATION
Fault hazard zone extends 300 feet on
either side of the Fault 41A location.
N86' 55' 29"E
2,040.19'
McHAR RD
.:......................
160+00
159+74.76
160+00
CURVE DATA
0 = 4,86'
R = 200! 00
Tme:— 8 i0'
69.51'
i
Li 8
165+00
PC STA 164+81.95
N82` 04' 08"E
257.40'
L29
C17
C8
9
N.82' 0408"E
257.40'
= 5.33'
R = 1965.00'
T = 91.53'
L = 182.92'
C9
C 18 165+00
PC STA 164+04.63
PT STA 162+24,56
PT STA 161 +47.23
N3' 30' 04"W
1,353 98'
0+00
6120 S. Dairy Ashford Road
Houston, Texas 77072-1010
281.933.7388 Ph
281.933.7293 Fax
DATE: 8/30/2016
APPROVED BY:
EH
PREPARED BY:
NL
FAULT 41A HAZARD ZONE MAP
Geologic Fault Assessment — McHaid Road Extension
From Cullen Blvd. to Mykawa
SCALE: NTS
PROJECT NO.:
HE1610124
DRAWING NO.:
PLATE 5B
=ughes&} anchrIR
ff&Stonef
vMer atn .
azoefa
Google
2016 Google
ea%th
NOTES: See Appendix A for site photos and descriptions.
t • 1 O
II ge`;Gr%ve
a-S
ro"mtaI
SCALE: NTS
ASSUCIAT IS
6120 S. Dairy Ashford Road
Houston, Texas 77072-1010
281.933.7388 Ph
281.933.7293 Fax
DATE 6/22/2016
APPROVED BY:
EH
PREPARED BY:
NL
FIELD INDICATIONS OF FAULTING
Geologic Fault Assessment — McHard Road Extension
From Cullen Blvd. to Mykawa
PROJECT NO.: DRAWING NO.:
HE1610124
PLATE 6
kid
APPENDIX A
SITE PHOTOGRAPHS
}.ate-;4, -.tt r y� µ, - `., {4
, y --torLt k 1.• 4 • K rf •;.,,.-, 4 b -+.
two
Photo 1. View of cracked pavement crossing Suburban Garden Road and new asphalt pavement.
i
460) i. _ .,
r
f
Photo 2. View of cracked pavement leading to the driveway at 2126 Kelly Drive.
to
GEOTEST ENGINEERING,INC.
Phase I Fault Assessment—McHard Road Extension from Cullen Blvd.to Mykawa Road
HVJ Associates Project No.HE1610124
. _ . •._a. .. ..�. T;a...
r
•
•
_
Photo 3. View of cracked driveway pavement at 2105 Kelly Drive.
4
Al
Photo 4. View of cracked pavement in front of 1904 Orchard Frost Drive.
GEOTEST ENGINEERING,INC.
Phase I Fault Assessment—Mc Hard Road Extension from Cullen Blvd.to Mykawa Road
HVJ Associates Project No. HEI610124
; ►- ..
a r,". :1
•
CO • • .. . •
5-
� ` --
Photo S. View of multiple cracked pavement crossing Woods-Road near the Subject Project Alignment.
r:: -A.{ -. 'sa
1.
ti r ;41 `('w pyo /, 1 e -? ;w:4r ; _,�{
„RAP
jor
M1} 6`}I • ate—.
' '
..._ht ^ 'e,.A.�. .- ..-- .Yi- .. `a
iteLti'.s',4-4 tet. >...41 14,- .v, .t `,r;4 i�a• ,. ....,,, ,i,.:-.1.44-16
Photo 6. View from Woody Road looking west along the proposed Subject Project Alignment.
GEOTEST ENGINEERING,INC.
Phase I Fault Assessment—McHard Road Extension from Cullen Blvd.to Mykawa Road
HVJ Associates Project No. HEI610124
!dw
$,,,.
% '' f -
4414111V. '''..•-•:. P '
l' .4
IS• f y s( •
,
§ O
-- ! - — mii!'4 __
.T►... ..-N '.QIP
•
Photo 7. View from Woody Road looking east along the proposed Subject Project Alignment.
•
___
,_
_ ,
[ J
rv.
l�'j%e
.- u ,6 ''.iye Nom- 5a
-
Photo 8. View looking north from Wood Road and the proposed Subject Project Alignment.
i%iiii)
GEOTEST ENGINEERING,INC.
Phase I Fault Assessment—McHard Road Extension from Cullen Blvd.to 1ykawa Road
HVJ Associates Project No. HE1610124
1164
§174 zi
ginompoit
•
Photo 9. View of cracked pavement crossing Roy Road;County Road 105.
•
Photo 10. View of possible fault scarp near Green Hill Road cul-de-sac.
1111100
GEOTEST ENGINEERING,INC.
Phase I Fault Assessment—N1cHard Road Extension from Cullen Blvd.to Mykawa Road
HVJ Associates Project No. HEI610124
Ij ' �r •s
-'ISN ' I ' ,-• .. +•u,
' , • 44107 Fes .0.
•
watansiimelP4- 1417' pg,
1G
�t .-� mss':� � ,�♦
Photo 11. View of possible fault scarp adjacent to Max Road/County Road 108.
—
•
7{ _
Photo 12. \ of cracked pavement crossing Max Road/County Road 108.
GEOTEST ENGINEERING,INC.
Phase I Fault Assessment—McHard Road Extension from Cullen Blvd.to Mykawa Road
HVJ Associates Project No.HE1610124
411104
APPENDIX B
4110 AERIAL PHOTOGRAPHS
it
= -. J ,----:,.. .2
{{j ***
.14-:-
-1- ---1::*1".. 1:-.4-7-c.. . il. :11:-.:17.c.:-
tio
,'it , ..,„,4 ..
'''r''' ..fir , ,• + 1 1
y
r b , t• �--° �•
Z Mb- 7 ) r
d 4,14 Via.
':T.4
i
f �
S BJ CT PROJECT ALIGNMENi3s • 3 I E T Ji
•�'
•.
- .-
J
4 , 1 L 1 2�IIcHARD ROAD - •s: ^
•
t -. 1 - a A_.,_. r� t f /•!..'. R, •. ^:
e,... a t i ._ ` 1 y $ r �
r-lit' '_ ,c. . "Itye .' „...... 4---.. ,__,.... ,[,- .,...., t
• f
i� CC
=4 - :,, 1 : .;
1!
I
t ["1-- 1-H4 -- +
- - ..i• . I
2014 WEST AREA HISTORICAL AERIAL PHOTO X
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
iliow MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
\ - "
, ..
l
is .
1
..�' ,►
Ar-
III
1� _ ' t
} 1
4✓
IN
14
41
ra
-,21-4
--_!-:"� :1 _ f.,`,.
•
1
SUBJECT tRO ECT ALIGNMENT _ ,.
1 . McID ROAD -
iflr 1 • 1 :-f !. ;
•
,
pi S
1 �J
3 ',---i-"r.,74,4`..! i
i y
I i
_ (, _
1
i 'i •
l
i+coat ere2004 WEST AREA HISTORICAL AIR PHOTO X
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
••T• _ - 4
•
•
kill ._ jj ' , r ! i
L — t L i J
\
} S ..'-.T -_ •,-
- r. -. ' 'y ,. t• _T• -- - rte.. -
•
- - Lia.••1y` ,.t'� "+er, 1A{ -• `' .? $- ti
1 \ elf __ ..3 r `'. •,
i 1' ,,. '-,,.i..Jr.;',:;, -A -POSSIBLE FAT:I_TTRACE
,'
F s'i'el ,fir ...� m. -,e - -
diAPP
yz'� a, .1;----1•1:-.;,,,a . €� ,ii' .g 'J -
is moi : . 1
p,t a. y �..�,
_ •i A4cHARD l �'Te°"rc?- 1 '-'ti "t -J
` �• -fr `4 r•
kid -,I v_ \i JI C'I' PRO ECT :11.I(i\�I`j.c
i.i.r:,.. . , ,
t — r d .y ; Qt,n:
•
.-1
♦ 4 ^i -
—i— y S�� rr•• _-�_,...-_r , - - ,
- s� .' ..-. ~_ _ .. .. _ TY Air
• j
14. '1.:.% ke&y 'arr4�
1996 WEST AREA HISTORICAL AIR PHOTO X
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
. 'RICHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
t.' 'e'` ',•:',.,1-.5.:•• y 1 :'. •1 ♦ ! 1•--';.'•-
1
'7,1s ♦ ..__...ml+ �_ .. .... . __.♦a 'i. :,Vv1 :.-..c•' yifo.,s• tom'.. :_4.
y - Ss ,....4 L, -% Fv.i)•'.. t :r' uutS [ r r
A Y % Ar)4
�3 *--.„,,,,":',.-...;:• ,,u."1'.?.:',.. •
_ jai Y. I
•
_, 101/ Y ...- . ,,
r
SUBJI.((f Plt()JF.CT .ALICr\\T:\T •
iltli.pF
\ • -:-.. .4,...--:* .— -
A'le'lIA,RL) ROAD •_
t
..,r,...4.-. ) 4
iy
i Is
` �.
v rr
_te _
,J,.
•
•
11
, 7�t ,
} ALF �yz
1989 WEST AREA HISTORICAL AIR PHOTO d
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS *
..r
(SCALE ADJUSTED)
}
' ` I ill.1
_ S S. Q=I 6_1.
s - _ tix. . 1 ,,,,_.$• _ .
. ,t Z.
ti . yy}iii
•
i ,,
c' A • ' Via.' I'''''•- y, :i.'; 10' ,4 -cri
• it .. •
-. tet. .. • 4 I '. ,! Wit. '
•
1t ;:x
•c . ..Y w:
•. wp
' 4 . ir -17,,,i I.e.f . 7.. . .- ,- . .. • — .
,T.i.i.... . .
„ ,
., , , ,;..,.,,,...... :::40or,,-.- '-. - - - • , -iif'' 1.!....-AtX:-
•
iviis.At
; .4 -4:81: ../tlak—,.11.-^.. ... .1 -".. . • . ,.-- ' ' --. 7-.t I
, ••may -r _
1 PfJ,BJECT I fJ'r-1-. HENT - • : .
rsf } G d
11410J** . ••• . -.'' 1'' ''''' •—
w ;
a
tom.. a -
1975 WEST AREA HISTORICAL AIR PHOTO v,
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT 1)9'
'Jew' PEARLAND, BRAZORIA COUNTY,TEXAS
,
(SCALE ADJUSTED)
i
/.ti
•
ti b.. A ` 4 • -r
,. '. .. } •cel
R
.._t,.._ .a'VBJ!CT1)ROJECTALIGNMENT S lac
116.1•
•
4
4;
• - - - - -- -=-1-,skyv',,, . .•. .- - . .v....-- . ... ,
, ...„.-,
I
.`', _..
%,\
_ _ -
.�. ,fix >, a�. y�.. ,:
r-'...w. .a,�yroiesr -- '. -
•
,
yy
is .d Z,'�i t. .,
yy • a� 5,. -
T ,11p . �y_ ' f _ r
,
fir.
'.' __Y -
41
T—).:11 . ,--''.104'a - ' . - •
il
1965 WEST AREA HISTORICAL AIR PHOTO N
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT 1)
PEARLAND, BRAZORIA COUNTY,TEXAS I,
(SCALE ADJUSTED)
j
•
•
SUBJECT P •JECT ALIGNMENT
r•
► McHA_RD ROAD {
4i/0
•
. 1
1953 WEST AREA HISTORICAL AIR PHOTO V
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
'RICHARD ROAD EXTENSION PROJECT
""°' PE.ARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
'‘'.4."A‘ a'.'1' .t .; a
rK
,..4.
r "'' , 4 _ s, , , ,{ w*Vy = A..' ' — . •'' \ K ... 1 It ;'t }
,_, •,it , -,- • • .,‘ 4.• Olp '-'. •-- _ '...- •._, , --_"..
4
. .
_ A , , , .' ' .. t,0,;:,":..... ...\, •4, .'
rk
.4,..N3.ti
i. rra' . . Ete Gly.-. ,vet.,
, �' jalEA WITI1 POSSIBLE FAULT TRACE `
s SUBJECT PROJECT ALIGNMENT *"�
r Ay bt y. . .+♦
,I ` - MZ}iARf R()ATl — T� 1'
I
$4 ► i ` • ‘11111100
•
• ° 1
• .,
•tY t h. 1a ,.
.� •
•
Vet. . e Y•
�
1. r_.
t
a t/ r
•
—t a
., o.J
1944 WEST AREA HISTORICAL AIR PHOTO d`r
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS * .. w
--
(SCALE ADJUSTED)
rr ACI," .................,* „,,.. $ .
°b
L
41 e«
yam.- • A
{"
i n:.
n _
rc •
43 A t
'CA
• SUBJECT PROJECT ALIGNMENT
ki*
\ .
y
L NfcHARD ROAD • ,4-4 ;w
_,..' r
r
.
w F
t: %
k
♦ e
sr
1930 VEST AREA HISTORICAL AIR PHOTO cJ V
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
iiiiiwe MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED) 1
. ".4%.: i. ,e- • .- ,._.-- .---- -- ›../..,„ ...I
• ^' • Il
t e t
�' ' 1,_.y
-
' - IP , f- -T-t- -.- '-' - 4.I ili . f_.:L.W.- ..
r . { r
€ T � - may: 'w r_________I
•�-�_ - -`. SUBJECT PRIDJECT ALIGNMENT _ • !
. - - I •s. !'fit«_
_L—s-,_,_._� .-- ; - ^
1,..•
. te'• ._...
1.
,4111. "1./Li
• - {
r •
A p's• i� �J t 1 1
i
2.
•
-1 1. , , .: -7I11")._.1..
t, ••••4- . ---`
f l SI
C
;t
' 'er `‘.. ' ; '..a ;7,--- /. -Z ail - • '''.2" . t' f
' ,t'•;S .rte Via " t__ �"' :.-4
. j..
r C F+ . •1:111
.�.,
2014 CENTRAL AREA HISTORICAL AIR PHOTO u,
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS * -qourf'
(SCALE ADJUSTED)
,_ _ „a_ __
i , - _ 1 I
N,. — . _.
-
• H' .
,..<
,r r T
-'SUBJECT PROOECT ALIGNMENT :
ess".... ,;:,?i4j111-1- .
1 <\ - le
r_
2
. I / •
as a 4r' `.
t
MEM
_ . 1 ' D ,rwr4
is. .. : .
.. ... 1 , .1 . 1 .......-.4.411-461tr tirjr-sstios.q.- _
iii ,
L^ ••
. •..-: 'a '
I
7 -
r x'
• N-- 1
_ 6 +cca V
"Ilp�
� '
2004 CENTRAL AREA HISTORICAL AIR PHOTO J\11'
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
*le
•
y mayy►► , ...! ( ; ! (•~ i°a.� ; — • �.
" � s} kil '1,4;13,0,,, T_ 4 !.. . { 1 SFr
+ .:
is s !r
1. f .. f„i
rir-
tis ` 1
� • 1
T-' �.," , . -t•5 of ,`SY{ /y/r,�[T w# ` q .y T c`r,4 4' ty. , r; ,
•
ARI. �� '()ASIS a �¢ ,+ •• •b-1..s ,t ' _ .Sl.ittp.
- --fli.r._.111\ .. ,,. ' ., ''.-, .; -
I
SUIi�1:CT ' G ALIGNMENT SAL—le,
VT •
i . 4 Iy 4.
• n •1J _,- - - - _ - • !
` ` t • . '3. .. -.,..,,,___L-,,„ .,` ut �.-�
.
0
ili .. .
.111•111—._ „, _ . 111 JJJ.. {.L�1.11�,,.�
• _A _ ;•
•
7.T. ,*”" 41 .% . ' ''* ' t_ qjligliffi, 2 Cririff ••,B.',..'
•
�.� _ ewe,urs_
jY ,1• "tittea ` 1. •• ^" S'".,� ''' r
1996 CENTRAL AREA HISTORICAL AIR PHOTO `i
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
i t
(SCALE ADJUSTED)
•
i c.
' 7 , •� ..
pj 4
r -r,;
„i' R .r
1 I r---- SUI3JECT PROJEC 3v1MENTiso
IIP
\ .
I-- i
160 • A.
a. .1 ` i t° is •f' _ .I% _t [
� [ I 'r R„ a
_ .4.1,. _
31 l
.� t t
f
ji i
fit,' .,4 ``t +
-
... + _. „ '.1 4.8 amort
y C'_ — 7r
T• g
1989 CENTRAL AREA HISTORICAL AIR PHOTO di
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT 1. "
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED) I
1
- ::: ,,,,,,,,x-
,
A +'S' ._ �„'x'^
3 [e
M
I " r
4
1
— - - I - _ _— ^
•
ria.. t._-r..- '-4.:. -. s_
SUBJECT PROJE =_ALIG "MENT _ t
R
4
!J 1 F
i ' t- ^ '''' - -
E
1
R - j
f r r 1
t
---I
a.•
;rte
r.. _r o
1977 CENTRAL AREA HISTORICAL AIR PHOTO X
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT i
MCHARD ROAD EXTENSION PROJECT
PEARLAND,BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
'TAP
. a`•
r ., ...3R r a�»a .1� `_ Y "4` r-
41104 - . ; .
�� rc . pl i
'It. i1.- • 'I-"�, ' Fait
Y, _ t -*I' 4 +
.�.._ i. - *. ' ; . "moi...— t �.
. Y. +rte- .�.w--..� ' f�
- , ) Y :fir. _ -; _
. 1"
•
AREA ,POSSIB FAL I,T T• 1 .: 4 ,.a .' ' ,t • '
\ii §UBJECOPEf•ti i -,:
' y ,,_... .
f'F
•
A- -, - , _
41110 — - — ' ' - -- •:-.. '-'".... -PE' -,... -:r.,- <
..1 -: '.ate 4-• -.- aQ' - _ -.a vt
yr. - ._. s- ..
;R .,,,,i.,,„. s
t •
....:
'n -r ,- f '3l`•yam. ,..1r+F. ja..
-....•si 'k 7
.
< r
{
#
-.3•
1975 CENTRAL AREA HISTORICAL AIR PHOTO v,
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT 1L
PEARLAND, BRAZORIA COUNTY,TEXAS 1
(SCALE ADJUSTED)
'- 1.•,A57-
-1• ,
' t
Nod
fit
,.' i PI '' i :
..,.•• 1 ' ••'ilk i
:.V.
- • 1
NO
4. .. •
.. __
. .
....._.11 -4 . ..
I.
.-....,4-. -
.. .
; . .. .
. ,
•
4 . - . # " ......r-
"
i (;
i .
. 401
,,,,•••-•!..---sr--
........ 1111, •.. .
...."/VI
'`.. SUBJECIIIIIIDJE
1 . •
. 4:4
.. ...
. 4.•: j:
... . 7 1
- 10 ' . , ..•-: --r-- ,
,..
I '
, -I*
,-
t'••::: Y
. . „ .n..
.4-
24. : .44.6 '0•40.1:iik
4 . ,
,..
a 1-'1# ° • . -
7*.iimmik,.• _,_,
: ,
. . --------- -
. _
, , ....
-
" . - ''.7:4-- •`-' `.,' -, • • .,,
. '', "4. ••• ,1* . . ' ' • . . - _ -
, •.
. .
1.- .
(
.. ...- 1' . 1 .
.47 a`lif ",...4'
1111
Ita•-•• -.
y • . •
1965 CENTRAL AREA HISTORICAL AIR PHOTO X
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
4
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS -gate'
(SCALE ADJUSTED)
.41 '.
/.�
M:s
ti
SUBJECT PROJECT ALIGNMENTC
...,Ix :.
L
t
:( ._.;, .- ------- . .t
i
•1
f
i :. �
1953 CENTRAL AREA HISTORICAL AIR PHOTO
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
4
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
,
'' ,-,1' Noire
4.
.I
F'
e.
• ., - SUBJECT PROJECT ALIGNMENT
,j
\ ie.
if
AREA%t it l H POSSIBLE FAULT TRA
•t
' i .n ,two+
1 T,
1
,..4, r. f )•-r,.4 t „.:-'5,
4 a
•
I i
1< S. •
Ji' z s
+
` i
-"'—f
,
.=t'... ._ i' ...N4. j.L•' ' r. ' - _ I
1944 CENTRAL AREA HISTORICAL AIR PHOTO X
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLA_ND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
•,-, z . --4. ,. ,•-- 1-,-. , . ..r.,,,,, ,...t,.....
. . ........., ,. .., ,,„ „....,, ,,,
. ,,,,, ,,, , :
..... , , ,,,,..„., ,,
.... ,....,, .,
. , :.24 ,,
'ria ^
s'wg
,A.?
2
r
.. : -... -
f ..i:
14111.1100. ,,,
T •-
a
•
1930 CENTRAL AREA HISTORICAL AIR PHOTO J\.°
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED) ..'i
1
•
rte' 5 :,} �� 1 . j 1 = -, '
..
inr
.* 4
f L.,
E.
Y'..!'.. ' / Y J_ '1 tis ".. .
- A _* = �x
Imo( - 1.� •• .- r-- FL
-
' L „: 1. I` St BJECT 'ROJEg ALIGN., ' I
. i
. :'� t i X`� a� _
4.
,1111rzAW '
t _ fri r�� 1.. s
1 1�
-' ...
li
I 47
'-z''• , us- slim; i 4 I
: f ,
+
-4---•_.r...-_." L.:, tllkl 7fi,N I...1' 1.1. 1.1.41114•!111.1 I . '`
C Ay
e.
2014 EAST AREA HISTORICAL AIR PHOTO V
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
Ala
INF
r l �^ w
. + .�. . '' 1 i •
■
--, ,, , t--.,. `-i
• :`.
,. . ,
• ,, ,if — ..
SUBJECT PROJECT ALIGNMENT •
.
` � a --
414 ..
�_•, _ '
v
' „„4.—Qtell'"_:---- —er
�/J •0.1000001110000010—10....e• ,
i 1.iM.r.
11111 • _—
e
.. iiia - 7 4''''''t.:. fr 4 �_•
r
•
r
",
Ats.I Ili
.. .... L !iJ L_.
VI
�' 1 .
2004 EAST AREA HISTORICAL AIR PHOTO u,
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT 1 e
111111. PEARLAND, BRAZORIA COUNTY,TEXAS
,
(SCALE ADJUSTED)
Y•fV • yam..e}: •.. ` •.ap t i' .1 s \ -.jy� ,
•.•i[S•G�•1r. *� ..s Its•�. y. - ',lad:- •I _ iiY`.•w r t. k..i,,;.,,,,'. • A t 1' t: C� �,-w ,; ,:_j ,;! !i i?...,..:.),;a '!".7......` ,' _S' r �, y ••'' g. it
,it
___.o`er ----- "'"40—"r ,i _ r ,r �p!'r .� s ' '•�' Pi'• ;_,•f•..
-. •• ,LI
= 1 Y >
r i aa '!'--,,A....*�aj1� _
" t; -.'4:i'<-7:3 it,„:,..,--....._.----,_---t - --.
T ►" .. � 'SUB 1?C7` PRO.1}'C'I'".r.IGN R1 F, � I a
_ - 1+ - *. - .. 1 `� _^ Jim
:1!„.. _ ,•h may, ,.►.,,»r T
'. . . = t*. -
,
. semg � •,w . - y s., ° ii.
1.
,/.� �..
F.' .
,.
:= L--- .
Pg1"""71-1'1.-- ..-.—•
01.1111T----) ..
�' -C , 1._ ��. „-II-'�y �.(j t :1 `. .w '-44•\ r� 04'7:e►
• 'MI .Y F.. ' ;r!' .a. III! 'Dui*. U IM ' _ ' .-,I y.` l . ,. 1-1'.1 .
1996 EAST AREA HISTORICAL AIR PHOTO X
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS `mow(SCALE ADJUSTED)
a, t' t w .• j , tom,~ 1, j-
s...- 3` :.-m4j +lye --- -.... "'1 <
(..: 2.; -i
3 jrs �'°
' -
--!_ t
i, , , 1 � __
,,..'!„.,2"_:%-. - erg
it r 1 I rM
z
SUBJECT PROJECLALIGNM 'T"'
1,1 II
1 ;
'. .- NI' ' . \
110 f
. . _ ;... ,
,_,„, .
_.
. ., f .,_ .
t " ,
_ --ventelor.„....,...„_,... ,
. .-...,-,.---. .., --., .....,- ._ .
1 -i,-..-,,-: ...: :__.- . • . -
.. --.t- ; -,..-:-.- ",: ....:, .. vii....1. _ • ,--..
4. . _ .
•
i < G.aea
____ .. _ ....,
wt
r
1011.1.... , -
t v
#le' t m .
P
•
` a� �._ •
l+ .1� 'I ' y t•E _ .Y '� ',
110111 ft
f
x w .. x 1-;_ _ '1._`—4. * 3 17-0 ►I1
i.
�4 Y 3
I i(tii�iiltit WU ;w. c ! e ,
I.
1989 EAST AREA HISTORICAL AIR PHOTO
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
Illiir PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
- ' •,.. ,.. • P-
-
- ..
--- .9-!-• i t '..lt - 111
.. ..
?..-"
..,-
....
. . . -..
.
(
444.•-- r-- ,
v. ..
..,_ ,
i---1.
..a.!'•- --"" ( 4-- - ••
I-
' r.--•• 9#3
fr.! 4 • ....
..
.
1..... \r -it-. . L.
. • '' -
'-v--rT ,,
-'„ ,... ..,
' • t....,. '
1-...• '.
1 al
..
-1, ,
. .
. ... ,.
,
.1.... --.44,ill t.., 1...,*..41.....,. .....„ .. ,
' ' &
,- li ,--•-- -1:--1
. t r---;-, '' ' - '2
. . .„
- • ., /
... --- ..
••• S ; L -,T PROIE, ATIGNME 1 -
• 4_
,
, '•:.,. ......11, ' ..,. ir
- i r.
I
- ._...-. -
' ' .•-1 ' . ....,.
, r --- - • ,2),-,...-
, = ...
__,..
- ... _
- .
14.
A f ,
,...
, ---___ .•
.. ....,
.,.. ,
.. '
. •
. '. .
1977 EAST AREA HISTORICAL AIR PHOTO X
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND,BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
1
H. & 'S
40 . ..
IFfi... ...' _- • ip,
- �.. ,1 a•.: ""'T-- - _ a.-
t six � ' fi 1• ..
. 9 _ lir ' .* Jr.
_ �
M
a ) r'-i. J 9: . .r; c. if-
r,�1 rr 1 , of I ,A
— • 1 . ' - ' er,(' r., ., 4�c.} %' t` ,. ..41.. r fI. ..., .
,,,_ tc' ' f 7P 1 r r 1e.,..- ! i �•+ ) r '� ?!!tit:-- e
F'f.`�'1 ' aA C "1 i M1, (� t la
r PI',.F+
,tom, ""ter, t t, .r r __ �•.
- 4 !EF 4' ,
ROJE. ' ENT ';'..4.. - ' • .
.
t� .' i .F' C;�_a .+l' °-.. ..
` k .. L r _
lit'- "-.."'' '. --r'::. . • . Y.'..... "::, ..:4. ..t•;'et', ,, , ,..r.10 : ...'..
iii' - _ �. i, "yam rS
IL4
_ — _ 'sem 'r - ftI'1'[_ -
,.:.
411
�
._ f r _
y,, FI , ,,1,
•' ,�.�� ,:'' ,rte...'. _ ' 'A
1975 EAST AREA HISTORICAL AIR PHOTO v,
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
\\
..•
_, I — -y
t
. 111
a
Y
1 r - T d
t - y.- . -_
• �.{_t.....'.3.. 1. 1
C.
iri., r _ �' `
.,„.„.
, ,
, ,
. ,
'' r _ : � rp
,...._
, , 4 ..t-.7-; .- -—r-t-7---"- 1' . 1,,,10/ ".
- .SUBJECT PROJECT A1.IGNMEIsT,- '
- ••— .. .a#',, fN. .- \-11.
-
JI'. -- . :
��
ir
7.7
r .
_ ,
a
-- t —■
•
T
..: ,
1965 EAST AREA HISTORICAL AIR PHOTO
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
t
a
r> ` %' -
'
G
• i
I.
��* SUBJEC1 PROJECT ALIGNMENT
J \
r",.:......;:.,.a.,�aw.r:.p T�,y;.<.»..o,�o�rm. . awdaava �y,.i a�•,:,....�.�:,��.. r',aR„ .o..•m a. '•SJ'
tet.f
. •
-
-- 8
1953 EAST AREA HISTORICAL AIR PHOTO X
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
I
1
I
sic
i .' .
.A 4 . _ r`.
• , . t
V y
,
I: -`
r-' ; : ,
A ir ! /
�. • - I
3 I '/
Mil
AREA WITH POSSIBLE FAULT TRACE .-„d.
' '''41i0/4 . • , / -”
•'
r
. -- \ .
�-- SUBJECT PRdJEC 1 ALIGNMEN _
4 ;• —
. a
, • ;:.a •
s ,--,+
.
C' r
4
‘ .
.... . ...,. .,
-,, . ..
• , ,,,, ..• , , ...,.•
. •...„._ . . • „,_,,...
1944 EAST AREA HISTORICAL AIR PHOTO X
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT
PEARLAND, BRAZORIA COUNTY,TEXAS
(SCALE ADJUSTED)
...„.•
:t• '
. -. . i-• ,- 4.^.. ' -
%. 4" -
.4 • ; .,•'
4
1 ';r ' . ,;,‘ ',•••*-* -
„....t,, - ;,-:44514,,,,,,i 4, a'• ' .' '4.tt - , 1. ' '-'
sa
...1'
a
:
,-P
SUB-jECT PROJE ' • G le,.i;
- ,
- .
, . .
til0 I :
,
....
, .
.,,
., .
,A'4* •' ' '1.,.. ,..„-..
— , t
-
4 4'4" .
,..ts•
, .. ....- .
44 '
4.,, i iii
,,Aiwytiir :1,-. ,-t• .
..
. ,
..-- .
-, -
. _.
. -
,.. . .
. .
.k..... _. .. ._
, .
1930 EAST AREA HISTORICAL AIR PHOTO
GEOTEST ENGINEERING PHASE I GEOLOGIC FAULT ASSESSMENT
MCHARD ROAD EXTENSION PROJECT 11f
PEARLAND, BRAZORIA COUNTY,TEXAS
A 1
(SCALE ADJUSTED)
;
APPENDIX C
TOPOGAPHIC MAPS
,.,. *--
et
t. �••� f•{ `'/+ / rel 0li �r'/ \
3 .,rf
.....% )). -LllIllk._...h'' . , 44 1 .... t.\
ei 4. •0/
7 �`,� v I� 4 j!/ x a
4 �.___`...� .- ---`' i is t :Y'� ./....,4,�jY ' c
(. 60 Y, ,I • 1 . r a
. I I: Y, p'
PI i •
j� iI !gy `f ` '\ t• .:14"�� b
s 4 t. 'tel'' 04
( / "* Li4,
\re N '. \ i r�. tnV
Pt
N ir rrV. 4----_-
} V TS!-___"- O
r
%
44 ti
j/
) CI a
�. `-=-�.;' I stir a „--,-•
Ir-"-- E. o °c
0,1
,, •-cm Figec ° ! • �i =�'`i :i� ;"•'�0!. , i iil p.
1X 1
I•
1 p •y C tl t / i { . R n
N ,1% A '4,:..' 1 + It( 4
p i ( r 11
_J �. II a'� 'I i : e • I --
, J r u t a'
�E Y • 11IIu .
IV• r >{
• � °I
4...i."•:.;,•4:p.,..• m'1.`—.4i 7 11
W v
Y
. o` N t, 1. ti
• .1 a. o e r %t—._.-...i. *'s. fi II f s Q n
Li
,t—
• s 1 1, -✓"\-
! o
ri
a ��� �.. .
fi.).,r ,: 1.� J��. . _ tl
1 N
v
o
i / (
IN,,N, I 1 i''' \ • -1--. 4: .....--
i 0 \,..,.• - 1 - ..r
oANi_ ,•' .... • a 1 {
\\ ` N.\
1 ' �� / \ �\ V x
ti
• 1
i 1 h61-
I ` ` }}
•I
C.
• e; 1 , 6 7 tC.'
,, z •
L 1 1 i i;
1
; ,, a =
—_^ /) 3N'�.did t
_—I C I ^ A z
— a i
1 1 •
n i 1 x
/ , • 1 1 oars :s>a�+ "y�� __-�� ++
�. i lam. ; .— �• ••• N 1 :4
f
l I;
\ .:.:.•••••••-•.••-••••••- ••• ‘01 , '
SAN , /. e• a
•
• _ `•1•
. . : \ t. ••
•
U
x. } ...d ••Jsi • , '� 4 w
• 1.' ' !o• Z Z
--••-•••••••)c.Z E: 1,i • i. v0• 0
P
=Mg.
• 1
11 ! _- a -- -- --- I 11 x
•/ 1 •
`t 1 •
,_ ii
._ .
•
t o o . 1l
•
II
V V • _ 'n v
!(��• ` 1;1 • a p. I„� 7 "3a 3 2
• P
HI 1�' 4
C1 n
•
r • fn _ _ ..sssnq -amr==vtee• ._i c -..
c u ;
V
; • 111 J
ll •
ti w
i
., p
Cil 3: '''..:' ' • i ct
@ fri.. ,,,,, . • , 1 ,
_... .. ,..::1
(....:
1,--- c
. I 1 . _. .....
_ _
11
...„ • ,
. ) V a
it
y • ,
kV .....„;............-•,,....,-7- . F
' , 1 1 ' • i11
rte, /�, 1
•
1
a —
. •i•• , *
' 9
.. ...... .
, ,
•_,..
_,_:.., ......•
;. ?
4,
ti\ -I . :
P.
.,
. trhUir.14 IN'.- ..
m 4:- :F- l -� _� —_ \\�— - — ::::::::.-::::::::.
r .N _. _.._....._.._..
•
> _� xC±oPn• z' - -------, ;.',c._ avod V X
•
111 :l•
e. .j — —\---- < c.'
I -- - zz
• zl j-- sem'.- . :
.....-\:--:'
� •�..; • � aJ
'\ OE
. • ` \ < z
! !, b ' Mod � O3NIYH_ ., Ha\ . •• • • \- oc
•
.. old , i lat\
i.
----
00
,-a• A •3 -- F'.. g •1
1 r
.1 .. ,..0,., , ._
• . . , it •.. .
, 1. . • .•_•....,.
. .
• " „_.__r__. . ,
• , • •• • • 1:
. • „ .
. • • . : : '
• • ... .: .
mil
• . . : . .
• • . ,.....
.,,4
•
•• • . • .
.. \ ...: v.., ..,
. . _
\ • •• ,,tt ___ _ . . ._•.__I.... `�
/ ..
..
m : 1 0
1 E"-•-• i
•1
t •
I- •
� \ h I ,�y o • .- ! -__ 0 7
r.
'• \ • . I (.1) . \14 I• I I •• .
• ..• . --• 1 -- ,X AYE XTYV
c: V cs 7-I,
''Th .. =-.:�/.%=-fi .=-:Ifes — + _
I • 11 \1 ,r I
. T .,,,...... { 1 , 1 _
. ! ,8 1• • ,V
y
1
/� r ` • \S r. Vii...- i , -. J
11
• ter- , f • • t a-• 4 W I ,11 • •• —
j
S iiill
_ ��•4 —i '_ 2
a
Vi"'''• "al. . I *
MUM
'T ��=, O 77. \ q- 1111111 - C'
f I} � o ' - orad 1• : r `\moi.`` ^
i1
..
, 1 ../- 1 ; V•
• I 's i . ams -
I 1
.,
- t 'aXGa - r• - Aac
I MINI
y
�; ,d e I---- c , —
.. I 111 ;<2
7a1 -- �. I uI� `
— — C
•
c \ /' ' 1all • O 414
I n i. x
s t � o
y�
- a �:� M or0u —Arov — J C
•
. ._______,
-t ...,„•
et .O ..... I. :
1 ,
. ,,t,
_ .
. . I E.
6
'n
•
la
I I •, II, L 'rT
: 4 • . 0• • . •Pil •.,• V• • • • IfF6117; k N3OWV§- 1
:1..
, i I . ._ _L; \ ;I ' i 999
-7711
/ •,,• 43 '\ i at. °, I mob_ ISE •,Aon• o
' g-i y� . .{ a 4=4 : - I• 0;C : � • ; Z• i1 7 -.
• -A.. i' �1 • 1 t & 1 I B.
•
t,. A ' 'I:, - • 1 t L v R r
I F u
•
0 1\ •11
1 \' 1; r, i
1 1 i II 2 _-.. —.-
yam, ---' 1 • /
--'--.
-- • .. 1 — --
'ti (/
N
•
G •`, Yam ` •\ -- — . fr.-. -
1 v` A\ \t ..% ,
•
,: .....;.7 *-4,.-
• 3 a _� k • I
,,• � , I I' •� , i' n
'►
_,.... ___. •
SRP - -•.,. , • i/ - , , Pli :
4
• : rilli '
® --krill
. _-•-• ....:•• :,.: • „.„...„,
1 i 1 �, s�
- i.S. Imo-*' _ I �' l .1.-,:
',-_:,,- *
Y , ,} \OcS
( / i.''.. •
DOOM 3 _f - 1 r o �-.r� •
3AV miIr—Psnr�A_—,��-
n
LI
d _� ` 3 ti 1S 8x030'
max.
4 •--„'.u'. r.�' 1 ' • p ? • 0478 M077U1•.
N /� �x R,s i,T DR
7
f
_ N' Q
E"^ ? a1Nb '
11°
• ` oJ' — 'V , �` 4 0. z o
w { m a oa 076H H __ ca' • O
1`', ^!1 .. 08 83x13 • _ o N7 S-17Vi i�+me a. ~ C a
Z S O ;. i 1 \cai a'. 0 -- c p
(' p '� .La.i a0 k :J
1:6 Ki
t _via 1 0 i a , i,Lc [= � 19 l a a-.1 . .I
..,
O
� ..z.,,..6-,
: 80 3M1 r70/w'f" _. co -..,Com- ),.. { : a
X C'
ori o , ¢ Y 2
I1 a0 S1773 o `U ^ } W ._ ` 5
4._ c Q, as 4n3a� o
1\ J`' 08 N36".!•• r8!Rens °l_ ._ --
CO
- —os z ` `%
i L__
o• +1 iT. dND
�. rzW. 0tlAo - — Z111116
_ x woz
k.
An
3 O M.
til
yal ji,fr 0/1xrw vh — =\ini ..%,' i 'F4 —
•
y0 Y OOde,vns
• 3
•� ��a OU 3N01S t SMOw w11rH
! NM i '''*,, liz5 t' :' .
! -'--t—
CV
r1 m �OC . z. o' o
/0 ° t`O•
-N7 O vv. _. - 08 337 - --- ,_
1)
,02,yi gf:(c\? p.,,',,'
5
` ^0
1 ¼LLu 1
•
` ___.... ' -- __. 047E n.7.
OS 0478.N377n0- C _ \ , ,
A ~ t
cc e f..
,,, ,:i.- 1
`�
�r --'jo83snoN7VH V
0-