R2019-168 2019-07-08 RESOLUTION NO. R2019-168 A Resolution of the City Council of the City of Pearland,Texas,authorizing the City Manager or his designee to enter into a contract with ARKK Engineers, LLC, in the amount of $228,205.00, for design services associated with the Neighborhood Street Reconstruction Project(Linwood Oaks Subdivision). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and ARKK Engineers, LLC, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract with ARKK Engineers, LLC, for design services associated with the Neighborhood Street Reconstruction Project. PASSED, APPROVED and ADOPTED this the 8th day of July, A.D., 2019. 1-2e, I _ot. J� = TOM REID MAYOR ATTEST: (--R4-71i,g MARIA RODRIGU Z INTERIM CITY SECRETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Exhibit A Resolution No. R2019-166 CONTRACT FOR PROFESSIONAL SERVICES, THIS CONTRACT is entered into upon final execution by and between the City of Pearland ("CITY") and ARKK Engineers, LLC ("CONSULTANT"). The CITY engages the CONSULTANT to perform professional services for a project known and described as Street Reconstruction (Linwood Oaks and Orange Circle) and Orange Circle Waterline ("PROJECT"). (Project#TR1901 &WA1907) SECTION I -SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A. The CONSULTANT shall perform engineering services. See Exhibit A, attached, for a detailed SCOPE OF WORK and PROJECT schedule. The PROJECT schedule shall be submitted in digital and hard copy form in the Microsoft Project for Windows format. B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C. The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D. The CONSULTANT shall submit all final construction documents in both hard copy and electronic foiriiat. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software version used shall be compatible to current CITY standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. All Record Drawings electronic files shall be submitted to the CITY in TIF format. E. The CONSULTANT recognizes that all drawings, special provisions, field survey notes,reports,estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. F. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors Design 1 of 7 D2.Revised 04/2019 and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non-owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. The CONSULTANT shall agree to waive its Right to Subrogation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits ("Change in Coverage") except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT,CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT'S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. G. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT,his officers, employees, agents, or subcontractors under this CONTRACT. H. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. Design 2 of 7 D2 Revised 04/2019 SECTION II -PERIOD OF SERVICE This CONTRACT will be binding upon execution and end February 28, 2022. SECTION III- CONSULTANT'S COMPENSATION A. The total compensation for the services perfoiuied shall not exceed the total noted in Section B. B. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT based upon the following: Street Reconstruction (Linwood Oaks and Orange Circle) 1. Basic Services (Lump Sum) $131,075.00 2. Additional Services shall require independent and specific authorization and shall be billed as (Lump Sum): $35,390.00 3. Bid Phase Services (Hourly Not to Exceed) $2,500.00 4. Construction Phase Services (Hourly Not to Exceed) $30,855.00 5. Reimbursable Expenses (Not to Exceed) $750.00 6. Total: $200,570.00 Orange Circle Waterline 7. Basic Services (Lump Sum) $19,950.00 8. Additional Services shall require independent and specific authorization and shall be billed as (Lump Sum): $0.00 9. Bid Phase Services (Hourly Not to Exceed) $1,490.00 10. Construction Phase Services (Hourly Not to Exceed) $5,445.00 11. Reimbursable Expenses (Not to Exceed) $750.00 12. Total: $27,635.00 C. The CITY shall make payments to the CONSULTANT within thirty(30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. Design 3 of 7 D2 Revised 04/2019 D. CONSULTANT shall invoice for work performed during the preceding thirty day period ("Billing Period"). The Billing Period shall run from the 26th day to the 25th day of each consecutive month. Invoices shall be submitted to CITY not more frequently than once every 30 days. CONSULTANT shall be responsible for timely submittal of all invoices and CONSULTANT shall not be entitled to payment for invoices in arrears. All invoices shall reflect most recent single Billing Period only and represent the true, correct and accurate account of work performed during the Billing Period. E. For an agreed contract amount identified as "Lump Sum", Not to Exceed" and "Reimbursable"the CONSULTANT shall not exceed the fixed contractual amount without written authorization in the form of a Contract Amendment. CONSULTANT shall provide 45 days prior notice to the CITY in the event contract fees may exceed the fixed contract amount. CONSULTANT shall be responsible for ensuring that such authorization is complete and executed by all parties performing any work or submitting any invoices for work that exceeds the fixed contract amount under any expense category. F. Allowable Reimbursable Expenses CONSULTANT shall identify and include in the proposal any anticipated Reimbursable Expenses, and shall itemize Reimbursable Expenses by work category. Reimbursable Expenses shall be invoiced AT COST without subsequent markup by the CONSULTANT. All invoices containing a request for Reimbursable Expenses shall include copies of the original expense receipts itemized per the allowable category. Allowable Reimbursable Expenses include: • Hard copy reproductions, copies and/or binding costs • Postage • Mileage, for travel from Consultant's local office (within a 25 mile radius) to meetings at the City or job-site. Mileage shall be charged at the current IRS rates. • Travel expenses, mileage from local office to State or federal regulatory agency office beyond 100 miles. • Lodging expenses, for destinations beyond 100 miles from the Consultant's local office AND when business hours exceed eight hours within one business day OR requires more than one eight hour day. F.2. Disallowed Expenses Disallowed Expenses include travel expenses for professional expertise traveling into the greater Houston area from Consultant offices outside of the greater Houston area. Design 4 of 7 D2 Revised 04/2019 SECTION IV- THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub- consultant(s) or in any way affect the CONSULTANT'S status as an independent contractor of the CITY. SECTION V- TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason-- with or without cause--by delivering written notice to CONSULTANT personally or by certified mail at 7322 Southwest Fwy, Suite 1040, Houston, TX 77074. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15th day following termination of the CONTRACT. C. In the event of such temiination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty(60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum,the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. Design 5 of 7 D2 Revised 04/2019 F. If the CITY terminates this CONTRACT for cause and/or if the CONSULTANT breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney's fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this CONTRACT. To accomplish this,the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. SECTION VI—ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII—COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person,other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability,and in its discretion,may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission,percentage brokerage fee, gift, or contingent fee that has been paid. SECTION VIII-SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. ///Aik nit1 t i 2.01i C ?41.1-OF E AND,TEXAS DATE itifiXotk talvAliv 6 - I1 - 2019 CONSULTANT DATE Design 6 of 7 D2 Revised 04/2019 House Bill 891 Verification I, M A w. 61 a' h i (Person name), the undersigned represenAtive (hereafter referred to as d'Representative") of A Mc LtA, (company or business name, hereafter referred to as "Business Entity"), being an adult over the age of eighteen(18)years of age, after being duly sworn by the undersigned notary,,do hereby depose and affirm the following: 1. That Representative is authorized to execute this verification on behalf of Business Entity; 2. That Business Entity does not boycott Israel and will not boycott Israel during the term of any contract that will be entered into between Business Entity and the City of Pearland; and 3. That Representative understands that the term"boycott Israel"isdefined by Texas Government Code Section 2270.001 to mean refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes. t6p6dt, baailktiv: SIGNATURE OF REPRESENTATIVE (SUBSCRIBED AND SWORN TO BEFORE ME, the undersigned authority, on this /7 day of ETD"?e.. , 20/9. girry DAV(D JANSSEN FATTIG ' Notary lDR731233869 �`eYSee G�/`Z •� raj My Commission Expires ore August 3,2021 .� t ;.,.. •, Notary Public Design 7 of-7 D2 Revised 04/2019 FRKKENGINEE - S June 5, 2019 Ms. Mahagony Isabell Project Manager— Engineering & Capital Projects City of Pearland 2559 Hillhouse Pearland,Texas 77584 Re: Proposal for Engineering Services for Linwood Oaks (Briar Circle, Linwood Oaks, and Yupon Circle) & Orange Circle Reconstruction Project Dear Ms. Isabell: As requested, ARKK Engineers, LLC (ARKK) is pleased to submit this proposal for performing engineering services related to reconstruction of streets in Linwood Oaks and on Orange Circle. The street selection was based on a Pavement Condition Assessment Survey performed by the City. This condition assessment survey prioritized streets needing immediate improvements based on the calculated Pavement Condition Index (PCI) value found for the streets. The proposal is based on our understanding of the project as discussed in our previous meetings and conversations. Linwood Oaks —The streets within the Linwood Oaks subdivision designated for improvement are Briar Circle, Linwood Oaks, and Yupon Circle. This project will involve reconstructing these streets with new 6" thick concrete curb & gutter pavement, and also includes the reconstruction of existing storm sewer inlets at Plum Street. No water and wastewater utility improvements are proposed at this time, other than adjustments to meet proposed street finished grade, or minor relocations. The estimated construction cost for performing these improvements is $1,275,000. Orange Circle — Orange Circle is planned to be reconstructed with new 6" concrete curb & gutter pavement, and includes the reconstruction of existing storm water inlets on Orange Circle North and Orange Circle South. This project also includes the replacement of 1000—feet of existing water lines on Orange Circle and approximately 700-feet of water line on Mykawa Road between Orange Street and Orange Circle. The estimated construction cost for performing the paving and drainage improvements is $575,000: the estimated construction cost for performing the water line improvements is $255,000. Page 1 of 9 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 • www.arkkengineers.com • TX Firm No.13872• (713)-400-2755 This proposal addresses the engineering services ARKK Engineers will provide the City during the design and construction phases, including services such as topographic surveying, geotechnical engineering, plan reproduction, and other services required for the project. During the construction phase, ARKK will perform standard construction administration services, with the City performing (or arranging for) construction management and inspection services. This proposal does not include construction management and inspection services, environmental studies, or materials testing services. We understand that the City will contract directly with a material testing firm during construction. SCOPE OF SERVICES I. Design Phase • Conduct a kickoff meeting with the City. • Employ and coordinate with project sub-consultants, to include geotechnical, surveying, and arborist sub-consultants as needed. • Obtain from the City available water, sanitary sewer, and storm sewer block maps / GIS data, and any as-built/record drawings as part of the data collection efforts. • Obtain information on the existing private utilities (gas, electric, cable, pipelines, etc.) for the street areas. • Perform a site reconnaissance visit to all the streets identified as part of the Project. • Coordinate with other governmental entities which may be impacted by the project. • Prepare base mapping of the street project areas. • Prepare 30% preliminary plan drawings based on the anticipated water, paving, and drainage improvements. These drawings will contain plan and profile drawings of the existing background and proposed facilities in plan view only. • Prepare a 30% design cost estimate. • Upload to the City's Manage-It site the 30% plan drawings and cost estimate to the City for review and comments. Meet with City staff at the 30% Design Phase. • Incorporate 30% comments and proceed with the final engineering design based on input/direction from the City during the 30% Design Meeting and plan review. Page 2 of 9 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 • www.arkkengineers.com • TX Firm No.13872• (713)-400-2755 • Prepare design plans and technical specifications for the proposed paving, drainage and water line improvements for the streets which constitute the Project. These improvements are based on a total construction cost of$2.105 million. • Prepare for and attend project design status meetings with City staff. '• The format of the front-end contract documents will be supplied by the City. • Prepare project-specific construction notes and specifications. Specifications will be prepared in conformance with City standards except when City standard specifications do not address the proposed specific area of work. • The standard Owner detail sheets for water, sewer, storm, paving, and typical cross sections shall be included in the project plans as appropriate. • All geometric design shall be in conformance with the applicable City's standards, except where variances are permitted, applicable Harris County standards, Brazoria County standards, and TMUTCD. • Upload to the City's Manage-It site the 60% plan drawings, cost estimate, and project manual to the City for review and comments. • Submit 60% plan drawings to the private utility companies for review and comments for both bid packages. • Revise the 60% submittal in response to City's and other parties' comments, as appropriate, and incorporate such revisions in the 90% Bidding Documents. • Incorporate comments from the City and the private utility companies into the bid documents. • Upload to the City's Manage-It site 90% plan drawings, cost estimate, and project manual to the City for review and comments. • Revise the 90% submittal in response to City's and other parties' comments, as appropriate, and incorporate such revisions in the 100% Bidding Documents. • Prepare quantity take offs and an opinion of probable construction cost for the proposed improvements at the 60%, 90%, and 100% milestones. • Prepare electronic documents for the City's e-bid online procurement system. Page3of9 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 • www.arkkengineers.com• TX Firm No.13872• (713)-400-2755 • Submit final plans to subcontractor for TDLR plan review in accordance with State regulations (only when required by State law). A. Special Services: • Topographic Survey a. Design Phase survey services will be performed as described in the attached professional surveying services proposal by Ellis Surveying to ARKK Engineers dated May 22, 2019. b. The general scope of work includes topographic surveying for all designated project areas. • Geotechnical Services o Geotechnical Services will be performed per the attached proposal from Geotest Engineering to ARKK Engineers dated May 1, 2019. The proposal provides for 8 borings at 10-foot each,testing, and an engineering report. • Urban Forestry Services o Urban forestry services if determined to be necessary during the design phase will be performed by a sub-consultant. Therefore, a budget for urban forestry services is included in this proposal. • Traffic Control Plans o Prepare Traffic Control Plans for the routing of traffic for all streets within the project areas. This plan will include signs and lane closures to complete the proposed improvements. • Storm Water Pollution Prevention Plan o Prepare a Storm Water Pollution Prevention Plan (SWPPP) in accordance with the Texas National Pollutant Discharge Elimination System (TPDES) General Permit for Storm Water Discharge from construction for all project areas. • TDLR (Texas Department of Licensing and Regulation) Review o TDLR Review: An ADA review shall be provided and plans shall be submitted to the TDLR. The Project will require plans to be reviewed in accordance with Texas Page 4 of 9 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 • www.arkkengineers.com • TX Firm No.13872• (713)-400-2755 Architectural Barriers Project Registration (TABPR) guidelines. ENGINEER will submit the drawings to a State licensed reviewer for review and approval. ENGINEER will prepare the TABPR application and estimate the review fee. ENGINEER will submit the completed application and a set of construction drawings to the reviewer for review and approval. ENGINEER will coordinate with the reviewer to address comments. Once all comments have been cleared, the Project will be registered with the Texas Department of Licensing and Regulations (TDLR). The application fee along with any review fees required by TDLR will be a subcontractor reimbursable fee and therefore, will be billed as such. • Reproduction • o Reproduction of plans, reports, and specifications for review sets submittals to the City, governmental agencies, and utility companies will be included in the cost for reproduction. III. BID PHASE SERVICES • The City of Pearland will advertise the project and will absorb all related advertising costs. ARKK will coordinate with the City and will assist in developing the wording of the advertisement and the electronic Bid Form. • Notify local contractors specializing in work related to this project. • Conduct a pre-bid conference for potential bidders. Prepare meeting agenda and minutes summary. • During the bidding process, provide information to and answer questions from potential bidders concerning the Project's construction documents. • Prepare addendums as necessary. • Review the City's electronic bid tabulation for this project. Check the bids for mathematical errors and/or bid irregularities. • Evaluate the bids and the qualifications of the apparent low bidders and advise the City as to the acceptability of the apparent low bidder. • Prepare of letter of recommendation for award of construction contract. • Attend and participate in City Council meeting to award the construction contract. Page 5 of 9 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 • www.arkkengineers.com • TX Firm No.13872• (713)-400-2755 IV. CONSTRUCTION PHASE SERVICES A. Construction Administration Services • ARKK will perform Construction Administration services as described in this proposal. This proposal does not include construction management and inspection services. • Attend pre-construction meeting to provide information & answer questions. • Review & comment on Contractor's submittals using the City of Pearland's Manage- It system. • Review change orders necessitated by field conditions. • Review and approve contractor's monthly progress pay estimates. • Attend monthly progress meetings for this project. • Visit the site at intervals appropriate to the various stages of construction to observe the progress and quality of executed work and to determine in general if such work is proceeding in accordance with the Contract Documents. • ARKK will not be responsible for the means, methods, techniques, sequences or procedures of construction selected by the Contractor(s) or the safety precautions and programs incident to the work of the Contractor(s). ARKK's effort will be directed toward providing a greater degree of confidence for the City that the completed work of Contractor(s) will conform to the Contract Documents, but ARKK will not be responsible for the failure of Contractor(s) to perform the work in accordance with the Contract Documents. During site visits and on the basis of on- site observations ARKK shall keep the City informed of the progress of the work, shall endeavor to guard the City against defects and deficiencies in such work and may disapprove or reject work failing to conform to the Contract Documents. • Conduct a final inspection of the Project and make a recommendation for Final Payment on the project. • Engineer shall provide one electronic copy of the record drawings on a CD based on the Contractor's provided red line marked up as-built drawings. Page 6 of 9 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 • www.arkkengineers.com • TX Firm No.13872• (713)-400-2755 FEE Design Services (paving and drainage):the lump sum amount of: $119,250.00 Design Services (water line):the lump sum amount of: $19,950.00 Topographic Survey: (Cost plus 10%) not to exceed: $20,690.00 Geotechnical Services: (Cost plus 10%) not to exceed: $8,700.00 Traffic Control Plan: the lump sum amount of: $8,250.00 Storm Water Pollution Prevention Plan:the lump sum amount of: $3,575.00 TDLR Budget Items: Hourly& Cost Plus 10% $2,500.00 Urban Forester Consultation Budget: Hourly& Cost Plus 10% $3,500.00 Reproduction: not to exceed: $1,500.00 Bid Phase Services (paving and drainage): not to exceed amount of: $2,500.00 Bid Phase Services (waterline): not to exceed amount of: $1,490.00 Construction Administration Services (paving and drainage): not-to-exceed amount of: $30,855.00 Construction Administration Services (waterline): not-to-exceed amount of: $5,445.00 Total: $228,205.00 ARKK Engineers, LLC will submit monthly progress invoices for all work completed to invoice date. Hourly charges for office personnel shall be charged based on a raw labor rates times a multiplier of 2.99. Reimbursable expenses and subcontracted Special Services will be charged at cost plus 10%. Mileage will be charged at the current IRS prevailing rate. Additional services beyond those described in the Scope of Services will be invoiced on the basis of direct labor costs times a factor of 2.99 and direct cost plus 10% upon approval from the City. No additional services will be performed or invoiced without prior authorization form the City of Pearland. ARKK Engineers, LLC appreciates the opportunity to submit this proposal and we look forward to continuing our work with the City of Pearland. Sincerely, ARKK ENGINEERS, LLC. Madhu Kilambi, P.E. Sr. Project Manager/Principal Page 7 of 9 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 • www.arkkengineers.com • TX Firm No.13872• (713)-400-2755 SCHEDULE • 30% project drawings: 120 days from Notice to Proceed o Deliverables: Preliminary design drawings; plan and profile drawings of the existing background and proposed facilities in plan view; 30% cost estimate; • 60% project drawings, and technical specifications: 210 days from Notice to Proceed o Deliverables: Design drawings; Drainage improvements plan & profile; updated construction cost estimate update; specifications table of contents; any special specifications; • 90% project drawings, and technical specifications: 270 days from Notice to Proceed o Deliverables: Draft plans and specifications of the proposed drainage improvements; Draft contract documents and technical specifications; updated construction cost estimate. • 100% project drawings and technical specifications: 315 days from Notice to Proceed o Deliverables: Bid-ready plans and specifications. Page 8 of 9 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 • www.arkkengineers.com• TX Firm No.13872• (713)-400-2755 RATE SCHEDULE Employee Classification Billing Rate Project Principal $190/hour Senior Construction Manager $190/hour Senior Project Manager $186/hour Project Engineer $135/hour Senior Designer $125/hour CADD Operator $ 90/hour Construction Technician $ 85/hour Reimbursable expenses will be charged at cost plus 10%. Mileage will be charged at the current IRS prevailing rate. Page 9 of 9 7322 Southwest Fwy Suite 1040 • Houston,TX 77074 • www.arkkengineers.com• TX Firm No.13872• (713)-400-2755 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1011 Complete Nos,1-4 and 6 if there are interested parties, OFFICE USE ONLY Complete Nos.1,2,3,5.and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity Sling form,and the city,state and country of the business entity's place Certificate Number: of business. 201.9-506844 ARK<K IEnglneers Houston.TX United States Date Filed: Z Marne of governmental entity or state agency that is a party to the contract tor which the form is 06)1912019 being filed. City of Peariend Date Acknowledged: g Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. Project r TR1901 VNA1907 Consulting Engineering Services Nature of interest Mame of Interested Party City,state,Country(place of business) (chuck applicable) Controlling I Intermediary 5 Check only if there is NO Interested Party. x 6 LIN SWORN DEcLARATION my name Is 1)14-‘-1 A \Al, \.61A and my date of birth is My address is 313 rZNI c Au-CC Wim` , t/b -71534. 4 (street) (city (state} (zip code) (country) I declare under penalty of perjury that the foregoing is true and cured. (� Executed in VIA s County, State. e)t on the (61 day of (3704%.4t- ,20 i p . (month) (year) -41.1-1,-- of authorized agint of contracting business entity (dadarant) Forms provided by Texas Ethics Commission wnuw.etlticsstate.tx.us Version V1.1.39f8039c ARKKENG-01 THASSAN � g CERTIFICATE OF LIABILITY INSURANCE DAT/19/2D/YYYY) =%"' 6/19/2019 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Securance Corporation Agency g PHONE 3100 S Lessner Rd,Ste 560 (A/c,No,Ext):(713)977-6606 FAX 1 (A/C,Ne):(713)785-6722 Houston,TX 77063 aiORIEss:info@securancecorp.com INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Valley Forge Insurance Company INSURED INSURER B:Continental Casualty-CNA ARKK Engineers,LLC INSURER C:Continental Ins Co-CNA James Andrews 7322 S/VV Frwy#1040 INSURER D:Hiscox Insurance Company, Inc. 10200 Houston,TX 77074 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER • POLICY EFF POLICY EXP LIMITS LTR INSD WVD (MMIDD/YYYY).JMMIDD/YYYYI A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $_ 1,000,000 CLAIMS-MADE X OCCUR 5085716164 12/17/2018 12/17/2019 PREMISDAMAGEES RENTEDaoccurrences $ 300,000 S((E MED EXP(Any one person) $ 10,000 PERSONAL&ADV INJURY $ 1,000,000 • GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 X POLICY PRO- JECT LOC PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: $ A AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000,000 (Ea accident) $ ANY AUTO 5085716164 12/17/2018 12/17/2019 BODILY INJURY(Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY(Per accident) $ X AUTOS ONLY X ATOS ONLY PROPERTY accidentDAMAGE $ $ B X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 1'000,000 EXCESS LIAB CLAIMS-MADE 5085716276 12/17/2018 12/17/2019 AGGREGATE $ 1,000,000 DED X RETENTION$ 10,000 $ C WORKERS COMPENSATION X PER AND EMPLOYERS'LIABILITY STATUTE EERH ANY PROPRIETOR/PARTNER/EXECUTIVE Y/N 5085716231 12/17/2018 12/17/2019 E.L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1'000'000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 0- PROFESSIONAL URA130217318 11/14/2018 11/14/2019 LIMIT 2,000,000 D PROFESSIONAL URA130217318 11/14/2018 11/14/2019 AGGREGATE 2,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) SEE ATTACHED ADDENDUM PROJECT:Linwood Oaks(Briar Circle,Linwood Oaks,and Yupon Circle)&Orange Circle Reconstruction CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Cityof Pearland THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 3519 Liberty Drive Pearland,TX 77581 AUTHORIZED REPRESENTATIVE ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID:ARKKENG-01 THASSAN LOC#: 1 CCC Mgr ADDITIONAL REMARKS SCHEDULE Page 1 of 1 AGENCY NAMED INSURED Corporation Agency ARKK Engineers,LLC Securance Cor P g y James Andrews POLICY NUMBER 7322 SIW Frwy#1040 SEE PAGE 1 Houston,TX 77074 CARRIER NAIC CODE SEE PAGE 1 SEE P 1 EFFECTIVE DATE:SEE PAGE 1 ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: ACORD 25 FORM TITLE: Certificate of Liability Insurance _ BLANKET ADDITIONAL INSURED WITH BLANKET WAIVER OF SUBROGATION FOR GENERAL LIABILITY AND AUTO LIABILITY AND FOLLOW FORM UMBRELLA LIABILITY WHERE REQUIRED IN A WRITTEN CONTRACT ACCORDING TO ALL POLICY TERMS, CONDITIONS,AND POLICY PROVISIONS. THE GENERAL LIABILITY AND AUTO LIABILITY COVERAGES INCLUDE PRIMARY AND NON-CONTRIBUTORY WORDING WITH 30 DAYS NOTICE OF CANCELLATION, EXCEPT FOR NON-PAYMENT OF PREMIUM,AND WHERE REQUIRED IN A WRITTEN CONTRACT IN ACCORDANCE TO POLICY PROVISIONS. THE WORKERS COMPENSATION POLICY INCLUDES BLANKET WAIVER OF SUBROGATION AND 30 DAYS NOTICE OF CANCELLATION ACORD 101 (2008/01) ©2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD ITSM-ING4g w ViCit "' LLC,PROFESSIONAL LAND SURVEYORS ARKK Engineers 7322 Southwest Freeway Suite 1040 Houston, Texas 77074 713-400-2755 Attn: Mr. Madhu Kilambi, P.E. Date: May 22, 2019 Re: City of Pearland Linwood Pavement Replacement Project Dear Mr. Kilambi Introduction Thank you for the opportunity to provide this proposal for surveying services for the above referenced project. Based on your email and supplied maps we have identified a scope of work and a lump sum fee for your project. Project Overview Prepare a topographic survey for use in the design of pavement replacement for Briar Ln., Linwood Oaks, Yupon Circle, and Orange Circle in Pearland, Texas. Scope of Work o The survey will extend from right of way to right of way plus an additional 10 feet on each side of the right of way(when accessible) at 50-foot cross section intervals. Shots of sanitary manholes, water valves, and other utilities will be included in the survey. Sanitary and storm sewer invert elevations will be obtained. Existing culvert invert elevation and sized will be acquired. o Survey will be prepared in accordance with ARKK Engineering survey requirements with the exception that Ellis Surveying Services makes no warranty that all of the underground utilities within the project area have been depicted on the survey. Ellis Surveying Services will notify Texas One-Call of the survey date and request that all underground utilities be marked, all marked utility locations will be shown on the survey but the locations should be considered as approximate. o Survey will be tied to State Plane Coordinates (NAD83)Texas South Central Zone Elevation data to be tied to NAVD88 Geoidl2B. o Ellis survey will supply autocad file and point files in ACAD 2020 format and will supply completed and signed "Control Map"of project. Schedule of Fees Registered Professional Land Surveyor $ 150/hr. Survey Field Crew Including Equipment $205/hr. Cad Tech $ 85/hr. • Courthouse Research $ 65.00/hr. Page 1 of 2 Initials Initials 2805 25th Ave.North TEXAS CITY TX.77590 TEL: 409-938-8700 info@ellissurvev.com Texas Firm Reg.No. 100340-00 EJj y 4,-; - LLC,PROFESSIONAL LAND SURVEYORS Fees, Budget&Schedule Project Survey Cost Sub Area Street Length of per Linear Subtotal by Project No Survey Foot Area 1 Orange Street 300 $3.15 $945.00 2 Briar Circle 800 $3.15 $2,520.00 3 Linwood Oaks 1,110 $3.15 $3,496.50 4 Yupon Circle 900 $3.15 $2,835.00 5 Plum Street 1200 $3.15 $3,780.00 6 Orange Circle 1,000 $3.15 $3,150.00 7 Mykawa 660 $3.15 $2,079.00 TOTAL 5,970 $18,805.50 Please sign and return one original copy of this letter to signify your approval and acceptance. We appreciate this opportunity to serve you. Sincerely, Ellis Surveying Services Robert Ellis RPLS Contract accepted this (Day) of 2019. By: Page 2 of 2 Initials Initials 2805 25th Ave.North TEXAS CITY TX.77590 TEL: 409-938-8700 info(a,ellissurvev.co m Texas Firm Reg.No. 100340-00 GEOTEST ENGINEERING, INC. Groteclurtcnl Engineiiry..4 Materials Testing - `. / 5600 sini i Drive Houston,Texas 77036 Telephone:(713) 266.0588 Fax:(713) 266-2977 • • Proposal No. 1140454199 May 1, 2019 Mr. Madhu Kilambi, P.E. ARKK Engineers, Inc. 7322 Southwest Freeway, Suite 1040 Houston, Texas 77074 Re: Proposal for Geotechnical Services City of Pearland's Linwood Oaks Subdivision and Orange Circle Drainage and Paving Project City of Pearland, Texas Dear Mr. Kilambi: In accordance with your request on April 30, 2019, Geotest Engineering, Inc. is pleased to submit this proposal for the referenced project. Based on the provided information, we understand that the project will include paving and drainage improvements along Briar Circle, Linwood Oaks, Yupon Circle and Orange Circle in the City of Pearland, Texas. The proposed improvements include the following: • Construction of storm sewers, up to 30 inches in diameter; • Reconstruction of new concrete curb and gutter streets; • Driveway replacement along project alignment; • Water Line replacement along project alignment. It is our understanding that the maximum invert depth of the proposed storm sewers is approximately 5 feet below existing pavement, and will be installed primarily by open-cut method of construction. Purpose and Scope The purpose of this investigation is to explore subsurface soil and water level conditions for the proposed improvements along various streets in City of Pearland, Texas. The scope of this investigation is based on the information provided to us in your e-mail on April 30, 2019, and will include the following tasks: Mr. Madhu Kilambi, P.E. Proposal No. 1140454199 Page 2 May 1,2019 • Coring the existing pavement along Briar Circle, Linwood Oaks, Yupon Circle and Orange Circle to determine existing pavement thickness, and for boring access; • Drilling and sampling: ■ two (2) soil borings each to a depth of 10 feet along Briar Circle; • two (2) soil borings each to a depth of 10 feet along Linwood Oaks Street; • two (2) soil borings each to a depth of 10 feet along Yupon Circle; • two (2) soil borings each to a depth of 10 feet along Orange Circle; The number and depth of borings is as suggested by ARKK Engineers, Inc. • Grouting all boreholes using non-shrink cement bentonite grout after completion of drilling and water level measurements. The use of cement bentonite grout will eliminate the potential problems and safety hazards associated with surface settlements that might occur if boreholes are backfilled with soil cuttings. • Performing appropriate laboratory tests on selected representative soil samples to develop the engineering properties of the soil. • Perform engineering analyses to develop geotechnical recommendations for pavement thickness including subgrade stabilization for the pavement construction, bedding and backfill and water level control for proposed utilities installation, • Prepare a geotechnical investigation report including field and laboratory data and geotechnical recommendations. It is our understanding that your surveyors will tie-in our borings after completion of the drilling. Mr. Madhu Kilambi, P.E. Proposal No. 1140454199 Page 3 May 1,2019 Project Schedule We should be able to start the fieldwork within one (1) week after receiving your written authorization or one (1) week after receiving lane closure permits (if any), whichever is later. It is estimated that the fieldwork will be completed in about one (1) week barring bad weather. The laboratory tests will be completed in about two (2) weeks. A geotechnical report, which will include field and laboratory data and geotechnical recommendations, will be submitted in about eight (8) weeks after receiving your notice-to-proceed. Cost Based on the scope of work outlined above, the cost of the field investigation, laboratory testing, engineering analyses and geotechnical report will be a lump sum amount of$7,909.00. The cost breakdown given in Attachment No. 1 is for additional information only. The invoices will be billed on Lump Sum basis based on percent completion. This cost is based on the assumption that the site is accessible to a truck mounted drilling rig and no site clearance will be required. We appreciate the opportunity to propose on this project. We hope that this proposal meets your approval. If you have any questions, please call us at (713) 266- 0588. Sincerely, GEOTEST ENGINEERING, INC. TBPE Registration No. F-410 Krishna M. Pradeep, E.I.T. Graduate Engineer { r klyr r.^..r x v Naresh Kolli, P.E. Project Manager NK\kmp Copies Submitted: (1-PDF) Enclosure: Attachment No. 1 -Cost Breakdown PC3 8\Geotechnical\Proposals\40454199.D OC Geotechnical Investigation Geotest Engineering,Inc. Linwood Oaks Subdivision&Orange Circle Proposal No. 1140454199 Paving and Drainage Project City of Pearland,Texas ATTACHMENT NO.1 COST BREAKDOWN Quantity Unit Unit Cost Amount Field Investigation Mob and Demob of Truck Mounted Drilling Rig 1 LS $340.00 $340.00 Drilling and Continous Sampling(0'-20') 80.0 ft. $19.00 $1,520.00 Grouting of Completed Bore Holes 80.0 ft. $6.00 $480.00 Utility Clerance for Boring Locations,Marking borings and Field Coordination 5.0 hr. $65.00 $325.00 Concrete Coring(4"Dia up to 6"Thickness) 8.0 ea. $90.00 $720.00 Vehicle Charge 5.0 hr. $10.00 $50.00 Traffic Control Cost for Minor Street 1.0 day $600.00 $600.00 • Subtotal $4,035.00 Laboratory Testing Liquid and Plastic Limits 8 ea. $60.00 $480.00 Moisture Content Only 32 ea. $9.00 $288.00 Percent Passing No.200 Sieve 8 ea. $46.00 $368.00 Unconsolidated Undrained Triaxial Compression 8 ea. $61.00 $488.00 Subtotal $1,624.00 Engineering Services Principal or Sr.Consultant 1 hrs. $210.00 $210.00 Sr.Engineer 4 hrs. $150.00 $600.00 Project Engineer 12 hrs. $105.00 $1,260.00 Support Personnel,Word Processing 3 hrs. $60.00 $180.00 Subtotal $2,250.00 Total $7,909.00 PC38\Geoteclviical\Pr000sals\40454199.xls\Cost Breakdown Linwood Oaks Subdivision and Orange Circle Paving Improvements CITY OF Pearland MANHOUR ESTIMATE DATE: 5/9/2019 Sr.Project Project Senior CADD Construction Principal Mgr. Engineer Designer Operator Technician TOTAL TOTAL HOURS COST SHT NO. DESCRIPTION $190 $186 $135 $125 $90 $85 DESIGN PHASE-BASIC SERVICES 1 Project Kickoff Meeting 3 3 6 $963 2 Project Progress Meeting 1 3 3 6 $963 3 Project Progress Meeting 2 3 3 6 $963 4 Project Progress Meeting 3 3 3 6 $963 5 Project Progress Meeting 4 3 3 6 $963 6 Project Progress Meeting 5 4 4 8 $1,284 7 Project Progress Meeting 6 4 48 $1,284 Review existing utility maps,master planning documents,GIS 8 database,and available As-Built drawings provided by the City. 1 4 4 9 $1,226 Perform site visits to identify surface features such as landscaping, utility markers,pipeline markers,structures,and other apparent 9 items that may impact the design and construction of the project. 4 4 8 16 $2,284 Research and gather existing private utility data on the project such as existing phone,cable,electric,and gas utility information,and 10 pipeline crossings. 2 8 10 $1,270 11 Evaluate potential drainage improvement alternatives 2 8 10 $1,452 12 Prepare Drainage Calculations 16 16 $2,976 13 Provide estimated construction costs-30%Level 4 16 20 $2,904 14 Provide estimated construction costs-60%Level 4 16 20 $2,904 15 Provide estimated construction costs-90%Level 4 16 20 $2,904 16 Provide estimated construction costs-100%Level 4 16 16 36 $4,904 Update private utility information(gas,electric,cable,pipelines,etc.) for the project area during the final design phase and plot on plan 17 sheets 1 8 16 25 $2,626 Coordinate with the geotechnical engineering subcontractor and 18 authorize the geotechnical investigation 1 1 $135 19 Prepare Project Specifications-Front End Contracts 8 16 24 $3,648 20 Prepare Project Specifications-Technical Specifications 8 16 24 $3,648 Coordinate and submit plan drawings to private utility companies for 21 review andcomments @30%,60%,&100% 2 8 1 11 $1,360 Assist the City in obtaining and/or securing approvals required by all 22 governmental authorities(DD4) 2 4 6 $872 DESIGN DRAWINGS-BASIC SERVICES _ _ _ _ _ _ 23 Cover Sheet/Vicinity Map 1 1 2 4 8 $931 24 General Notes 2 6 2 2 12 $1,612 25 Overall Layout Sheet 1 1 2 4 8 15 $1,676 26 Overall Layout Sheet 2 1 2 4 8 15 $1,676 27 Survey Control Sheet 1 2 4 6 $630 28 Survey Control Sheet 2 2 4 6 $630 29 Drainage Area Map 1 1 10 12 16 39 $4,476 30 Drainage Area Map 2 1 4 4 8 17 $1,946 31 Drainage Calculations Sheet 2 4 8 8 22 $2,632 32 Typical Roadway Sections 2 4 8 8 22 $2,632 33 Plan&Profile Briar Circle 1 of 3 1 8 16 18 43 $4,886 34 Plan&Profile Briar Circle 2 of 3 1 8 16 18 43 $4,886 35 Plan&Profile Briar Circle 3 of 3 1 8 16 18 43 $4,886 36 Plan&Profile W Lynnwood Oaks 1 of 3 1 8 16 18 43 $4,886 37 Plan&Profile W Lynnwood Oaks 2 of 3 1 8 16 18 43 $4,886 38 Plan&Profile W Lynnwood Oaks 3 of 3 1 8 16 18 43 $4,886 39 Plan&Profile Yupon 1 of 3 1 8 16 18 43 $4,886 40 Plan&Profile Yupon 2 of 3 1 8 16 18 43 $4,886 41 Plan&Profile Yupon 3 of 3 1 8 16 18 43 $4,886 42 Plan&Profile Orange Circle 1 of 3 includes water lines 1 16 20 28 65 $7,366 43 Plan&Profile Orange Circle 2 of 3 includes water lines 1 16 20 28 65 $7,366 44 Plan&Profile Orange Circle 3 of 3 includes water lines 1 16 20 28 65 $7,366 45 Water Details 1-Standard 0 0 11 $90 46 Water Details 2-Special/Custom 1 2 6 12 21 $2,286 47 Paving&Drainage Details 1-Standard 0 0 1 1 $90 48 Paving&Drainage Details 2-Standard 0 0 1 1 $90 49 Paving&Drainage Details 3-Special/Custom 1 4 4 12 21 $2,306 50 Paving&Drainage Details 4-Special/Custom 1 4 4 12 21 $2,306 51 Paving&Drainage Details S-Special/Custom 1 4 4 12 21 $2,306 52 Paving&Drainage Details 6-Special/Custom 1 4 4 12 21 $2,306 DESIGN PHASE BASIC SERVICES TOTALS 0 109 315 326 396 0 1146 $139,189 DESIGN DRAWINGS-SPECIAL SERVICES-TRAFFIC CONTROL 53 Traffic Control Plan Notes and Layout 1 2 4 8 14 $1,592 54 Phase 1 Traffic Control Plan 4 8 12 $1,744 55 Phase 2 Traffic Control Plan 4 8 12 $1,744 56 Traffic Control Details 1 2 4 8 14 $1,592 57 Traffic Control Details 2 2 4 8 14 $1,592 DESIGN PHASE SPECIAL SERVICES TOTALS-TRAFFIC CONTROL 0 14 0 28 24 0 66 $8,264 DESIGN DRAWINGS-SPECIAL SERVICES-SWPPP 58 Stormwater Pollution Prevention Plan-Sheet 1 2 4 8 14 $1,632 59 Stormwater Pollution Prevention Plan-Sheet 2 2 4 8 14 $1,632 60 Stormwater Pollution Prevention Plan-Details 1 2 3 $315 DESIGN PHASE SPECIAL SERVICES TOTALS-SWPPP 0 4 9 0 18 0 31 $3,579 I Linwood Oaks Subdivision and Orange Circle Paving Improvements CITY OF Pearland MANHOUR ESTIMATE DATE: 5/9/2019 Sr.Project Project Senior CADD Construction Total BID PHASE Principal Mgr. Engineer Designer Operator Technician Hours Total Cost 61 Notify local contractors specializing in similar work on the project 2 2 $170 Conduct a pre-bid conference for potential bidders.Prepare meeting 62 agenda and minutes summary 2 4 6 $912 Provide information to and answer questions from potential bidders 63 concerning the Project's construction documents 4 4 $540 64 Prepare addendums as necessary 22 $270 Prepare bid tabulation for this project.Check the bids for 65 mathematical errors and/or bid irregularities 2 13 $355 Evaluate the bids and the qualifications of the apparent low bidders 66 and advise the City as to the acceptability of the apparent low bidder 2 4 6 $912 Prepare of letter of recommendation for award of construction 67 contract 1 23 $456 Attend and participate in City Council meeting to award the 68 construction contract 22 $372 BID PHASE TOTALS 0 7 18 0 0 3 28 $3,987 1 Sr.Project Project Senior CADD Construction Total CONSTRUCTION PHASE-BASIC SERVICES Mgr. Engineer Designer Operator Technician Hours Total Cost 69 Assist with preparation of Pre-Construction Meeting Agenda 4 4 4 12 $1,624 70 Attend and assist with Pre-Construction Conference 44 $744 71 Review Preconstruction Meeting Minutes 2 2 $372 72 Pro-Trak System setup 0 $0 73 Attend Progress Meetings Monthly-8 meetings 32 8 40 $7,032 74 Submittal Review&Response 16 8 32 56 $6,776 75 RFI Follow-up&Response 16 8 • 8 32 $4,736 76 Field Meetings-3 Meetings 12 4 16 $2,772 77 Utility Coordination Meetings-2 Meetings 8 S $1,488 78 Monitor Construction Schedule 4 4 $744 79 Review Pay Estimates 8 6 14 $1,998 80 Document Control and Input Information in Pro-Trak 0 $0 81 Change Order Follow-up Support 6 8 14 $1,796 82 Preliminary Walk through 6 6 12 $1,926 83 Document Preliminary Punch List Items 2 2 4 $542 84 Substantial Walk Through 2 4 6 $712 85 Document Substantial Walk Through Punch List Items 2 24 $542 86 Final Walkthrough 3 3 $558 87 Review Final Pay Estimate 2 4 6 $712 88 Review Close-out Package 2 2 $372 89 Warranty Walkthrough 4 1 5 $829 CONSTRUCTION PHASE BASIC SERVICE TOTALS 0 135 38 0 0 71 244 $36,275 D - . x n m D „ r' ='' , in gz 3 w' . w' ;3 w' m 3. ' ° a V A \ O £ O £ o N \ O A 7 Og. O O 9 0 5 O j o - 0 0 3 - (°~ a n w n w o n o ° m - m ,� m o ° w w 0 0 0 0 0 0 ' 0 O 0 7/1/2019 7/8/2019 ^� .7/15/2019 "' 7/22/2019 4. 17 7/29/2019 = .8/5/2019 m 8/12/2019 �+ 8/19/2019 m 6/26/2019 9/2/2019 0 9/9/2019 .' 9/16/2019 ti 9/23/2019 w 2 9/30/2019 c 10/7/2019 (N m j 10/14/2019 m m *Vt O 10/21/2019 C 10/28/2019 61 m m 11/4/2019 r- � 11/11/2019 o O 11/18/2019 0 0 11/25/2019 ti O 12/2/2019 w DT. cn 12/9/2019 a . 12/16/2019 m O 12/23/2019 m O 0 12/30/2019 C) 1/6/2020 m m 1/13/2020 8 (55 ") *V a 1/20/2020 m 1/27/2020 a Ir 2/3/2020 ti 2/10/2020 w 2/17/2020 a 2/24/2020 m 3/2/2020 m 3/9/2020 :1 e 3/16/2020 a 3/23/2020 e 3/30/2020 a 4/6/2020 r 4/13/2020 a 4/20/2020 a 4/27/2020 a 5/4/2020 a 5/11/2020 a 5/18/2020 a \[ 5/25/2020 a 6/1/2020 a 6/8/2020 0 6/15/2020 a 6/22/2020 n+ 6/29/2020 w V 7/6/2020 a je 7/13/2020 m 7/20/2020