Loading...
R2019-166 2019-07-08 RESOLUTION NO. R2019-166 A Resolution of the City Council of the City of Pearland,Texas,authorizing the City Manager or his designee to enter into a contract with Alliance Transportation Group, in the amount of $125,581.25, for design services associated with the Pearland Parkway Traffic Signal and Intersection Improvement Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and Alliance Transportation Group, a copy of which is attached hereto as Exhibit"A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute, and the City Secretary to attest, a contract with Alliance Transportation Group for design services associated with the Pearland Parkway Traffic Signal and Intersection Improvement Circle Project. PASSED, APPROVED and ADOPTED this the 8th day of July, A.D., 2019. izt. _ TOM REID • MAYOR ATTEST: ' C��1 41.E /x4-4-4-"A_Ae MARIA RODRIGUEZ INTERIM CITY SECRETARY APPROVED AS TO FORM: 0-/ — DARRIN M. COKER CITY ATTORNEY Resolution No. R2019-166 Exhibit A CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is entered into upon final execution by and between the City of Pearland ("CITY") and Alliance Transportation Group, Inc. (Alliance Texas Engineering Company) ("CONSULTANT"). The CITY engages the CONSULTANT to perform professional services for a project known and described as Pearland Parkway Traffic Improvements ("PROJECT"). (Project#TR1902) SECTION I -SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A. The CONSULTANT shall perform engineering services. See Exhibit A, attached, for a detailed SCOPE OF WORK and PROJECT schedule.The PROJECT schedule shall be submitted in digital and hard copy form in the Microsoft Project for Windows format. B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C. The CONSULTANT acknowledges that the CITY (through its employee handbook)considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D. The CONSULTANT shall submit all final construction documents in both hard copy and electronic format. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software version used shall be compatible to current CITY standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. All Record Drawings electronic files shall be submitted to the CITY in TIF format. E. The CONSULTANT recognizes that all drawings, special provisions, field survey notes,reports,estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. F. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors Design 1 of 7 D2.Revised 04/2019 and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non-owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. The CONSULTANT shall agree to waive its Right to Subrogation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits ("Change in Coverage") except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT,CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT'S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. G. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees,harmless from any claim, loss, damage, suit,and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT,his officers,employees,agents,or subcontractors under this CONTRACT. H. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. Design 2 of 7 D2 Revised 04/2019 SECTION II-PERIOD OF SERVICE This CONTRACT will be binding upon execution and end December 31,2020. SECTION III-CONSULTANT'S COMPENSATION A. The total compensation for the services performed shall not exceed the total noted in Section B. B. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT based upon the following: 1. Basic Services (Lump Sum) $96,955.00 2. Additional Services shall require independent and specific authorization and shall be billed as (Lump Sum): $9,460.00 3. Bid Phase Services (Hourly Not to Exceed) $8,160.00 4. Construction Phase Services (Hourly Not to Exceed) $10,060.00 5. Reimbursable Expenses (Not to Exceed) $946.25 6. Total: $125,581.25 C. The CITY shall make payments to the CONSULTANT within thirty(30)days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. D. CONSULTANT shall invoice for work performed during the preceding thirty day period("Billing Period"). The Billing Period shall run from the 26th day to the 25th day of each consecutive month. Invoices shall be submitted to CITY not more frequently than once every 30 days. CONSULTANT shall be responsible for timely submittal of all invoices and CONSULTANT shall not be entitled to payment for invoices in arrears. All invoices shall reflect most recent single Billing Period only and represent the true,correct and accurate account of work performed during the Billing Period. E. For an agreed contract amount identified as "Lump Sum", Not to Exceed" and "Reimbursable"the CONSULTANT shall not exceed the fixed contractual amount without written authorization in the form of a Contract Amendment. CONSULTANT shall provide 45 days prior notice to the CITY in the event contract fees may exceed the fixed contract amount. CONSULTANT shall be responsible for ensuring that such authorization is complete and executed by all parties performing any work or submitting any invoices for work that exceeds the fixed contract amount under any expense category. Design 3 of 7 D2 Revised 04/2019 F. Allowable Reimbursable Expenses CONSULTANT shall identify and include in the proposal any anticipated Reimbursable Expenses, and shall itemize Reimbursable Expenses by work category. Reimbursable Expenses shall be invoiced AT COST without subsequent markup by the CONSULTANT. All invoices containing a request for Reimbursable Expenses shall include copies of the original expense receipts itemized per the allowable category. Allowable Reimbursable Expenses include: • Hard copy reproductions, copies and/or binding costs • Postage • Mileage, for travel from Consultant's local office (within a 25 mile radius) to meetings at the City or job-site. Mileage shall be charged at the current IRS rates. • Travel expenses, mileage from local office to State or federal regulatory agency office beyond 100 miles. • Lodging expenses,for destinations beyond 100 miles from the Consultant's local office AND when business hours exceed eight hours within one business day OR requires more than one eight hour day. F.2. Disallowed Expenses Disallowed Expenses include travel expenses for professional expertise traveling into the greater Houston area from Consultant offices outside of the greater Houston area. SECTION IV-THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection,review, acceptance or approval of CONSULTANT'S work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub- consultant(s) or in any way affect the CONSULTANT'S status as an independent contractor of the CITY. Design 4 of 7 D2 Revised 04/2019 SECTION V-TERMINATION A. The CITY, at its sole discretion,may terminate this CONTRACT for any reason-- with or without cause--by delivering written notice to CONSULTANT personally or by certified mail at 11500 Metric Blvd., Bldg. M1, Ste. 150,Austin, TX 78758. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes,reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15th day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty(60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or defmitely ascertainable sum,the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F. If the CITY terminates this CONTRACT for cause and/or if the CONSULTANT breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney's fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this CONTRACT. To accomplish this,the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. Design 5 of 7 D2 Revised 04/2019 SECTION VI—ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII—COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person,other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability,and in its discretion,may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission,percentage brokerage fee, gift, or contingent fee that has been paid. SECTION VIII-SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. nit/ el Zoe/ CITY OF P. • • AND,TEXAS DATE • ' - zap TANT DATE Design 6 of 7 D2 Revised 04/2019 House Bill 89 Verification I, 0416 ` �1 n' (Person name), the undersigned representative (hereafter referred to 4s "Representative") of -{ll4 TYGtnc d7lti lil (company or business name, hereafter referred to as "Business Entity"), being an adult over the age of eighteen (18)years of age, after being duly sworn by the undersigned notary, do hereby depose and affirm the following: 1. That Representative is authorized to execute this verification on behalf of Business Entity; 2. That Business Entity does not boycott Israel and will not boycott Israel during the term of any contract that will be entered into between Business Entity and the City of Pearland; and 3. That Representative understands that the term "boycott Israel" is defined by Texas Government Code Section 2270.001 to mean refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled tern . , but does not include an action made for ordinary business purposes. .4,4t(---- SIGN/ R OF REPRESENTATIVE SUBSCRIBED AND SWORN TO BEFORE ME, the undersigned authority, on this 05 _day of June, , 20 t . 1 U . .t! 1 Ir t► ' Itt 'nI Notary Public MICHELLE R. LEMON Notary Public,State of Texaa ;9 +P Comm. Expires 01.11.2022 Notary ID 131405781 Dcsign 7 of 7 D2 Revised 04/2019 TG ALLIANCE TRANSPORTATION GROUP June 19,2019 Fatema Weekly City of Pearland 2559 Hillhouse Pearland,Texas 77584 Re: Professional Services Fee Proposal Pearland Parkway Traffic Improvements PS&E Dear Ms. Weekly, Alliance Transportation Group Inc. is pleased to submit this proposal for professional engineering services for the subject project. Project Description Final Engineering and Design of the proposed traffic signal improvements at Pearland Parkway& Forest Park Lane/Summit Spring Lane, and for the proposed fiber interconnect from McHard Road/Old Alvin Road to Barry Rose Road. Scope of Services Outlined in detail in Exhibit A(attached). Basis of Estimate Labor total for this effort is$115,175.00 with an ODE total of$10,406.25,for a project total of $125,581.25. Expenses for mileage will be invoiced at a rate of$0.54 per mile. Please see the detailed fee estimate breakdown attached. In closing,we appreciate the opportunity to provide this professional services proposal and look forward to working with the City of Pearland on this project. Please do not hesitate to reach out to us at any time with any questions or concerns. Sincerely, Alliance Transportation Group, Inc. Mark Ingram, P.E., PTOE Director,Traffic Engineering Alliance Transportation Group,Inc. 111500 Metric Blvd.,Bldg.Ml,Ste. 150,Austin,TX 78758 Tel:512.821.2081 I Toll Free:866.576.0597 I Fax:512.821.2085 www.alliance-transportation.com EXHIBIT A 4 i.„ :moo ' �I V O D I x n s E'S T it q 54 TRANSPORTATION SCOPE OF SERVICES FOR Pearland Parkway Traffic Improvements PS&E 2019 Bond Projects Traffic Signal at Pearland Parkway & Forest Park Lane/Summit Spring Lane & Fiber Interconnect from McHard Road/Old Alvin Road to Barry Rose Road Design I of G D8.Revised 2016 BASIC SERVICES: The Consultant shall render the following professional engineering services to the OWNER in connection with the preparation of plans, specifications, and an estimate (PS&E) for the Project. 1. Traffic Engineering Study • Operational Analysis i. Collect and analyze two (2) hour AM and PM peak period turning movement counts at the intersection of Pearland Parkway & Forest Park Lane/Summit Springs Lane. ii. Code Synchro models with existing geometry and existing year peak hour traffic volumes. iii. Develop proposed AM and PM peak hour signal timings. • Crash Analysis i. Obtain and analyze crash records from previous three (3) years. ii. Recommend intersection alternatives to address safety concerns. • Memorandum i. Prepare and submit draft memorandum detailing results of the operational and crash analysis and proposed signal timings for the intersection of Pearland Parkway & Forest Park Lane/Summit Springs Lane. ii. Prepare and submit final memorandum detailing results of the operational and crash analysis and proposed signal timings for the intersection of Pearland Parkway & Forest Park Lane/Summit Springs Lane. 2. Traffic Signal Design • Conduct one (1) field visit to evaluate existing conditions and verify topographic survey and underground utility information. Design 2 of 6 D8.Revised 2016 • Develop 60% PS&E to include pole locations, mast arm lengths, signal head types and locations, pedestrian pole locations and pedestrian signal heads. Incorporate 60% review comments in ProTrak. • Participate in one (1) telephone 60% design review meeting. • Develop 90% PS&E to include ground box locations, wiring and conduit tables, cable termination charts, vehicle detection layouts, traffic signal elevations, signing layouts, and pavement markings layouts. Incorporate 90% review comments in ProTrak. Attend TRC meeting (face-to-face). • Participate in one (1) telephone 90% design review meeting. • Develop 100% PS&E, which will be signed & sealed by an engineer licensed to practice in the State of Texas. • Tabulate quantities and prepare engineer's opinion of probable cost. • Prepare specifications and general notes. 3. Fiber Interconnect Design • Conduct one (1) field visit to evaluate existing conditions and document topographic features and underground utility information. • Research utility and existing right-of-way records through the corridor. • Develop 60% PS&E to include preliminary fiber, ground box, and device locations. • Participate in one (1) telephone 60% design review meeting. • Develop 90% PS&E to include device connection details. • Participate in one (1) telephone 90% design review meeting. • Develop 100% PS&E, which will be signed & sealed by an engineer licensed to practice in the State of Texas. • Tabulate quantities and prepare engineer's opinion of probable cost. Design 3 of 6 D8.Revised 2016 • Prepare specifications and general notes. • Attend TRC meeting (face-to-face). • • • 4. Roadway Design • Prepare 90% PS&E to include turn bay extension, intersection curb ramp, stormwater pollution prevention plan (SWPPP/SW3P) and temporary traffic control plan (TCP) layouts. • Participate in one (1) telephone 90% design review meeting. • Develop 100% PS&E, which will be signed & sealed by an engineer licensed to practice in the State of Texas. • Tabulate quantities and prepare engineer's opinion of probable cost. • Prepare specifications and general notes. • Attend TRC meeting (face-to-face). 5. Bid Phase Services • Prepare bid documents necessary for the procurement of a contractor to construct the proposed improvements. • Attend one (1) pre-bid meeting. • Provide Notice to Bidders (NTB) electronically. • Chair pre-bid meeting. • Assist with design of bid proposal. • Prepare Engineer's Recommendation of Award letter. • Attend Council meeting for award of construction contract. • Respond in writing to questions from bidders and prepare addenda as necessary. •• • Produce/transmit five (5) sets of plans and project manuals to construction contractor. • Record all documents and correspondence in the City's ProTrak system. Design 4 of 6 D8.Revised 2016 6. Construction Phase Services • Review shop drawings for up to two (2) submittals. • Respond to two (2) requests for information submitted by the contractor. • Conduct one (1) field visit to perform final construction inspection ahead of traffic signal turn-on. • Attend monthly progress meeting with construction manager, contractor, and COP, as needed. • Review/approve and comment on contractor's submittals, RFIs, contractor proposals, request for change orders, etc. • Conduct Substantial Completion Inspection: i. Review progress of work for substantial completion walk- through. ii. Generate punch list of items for correction. iii. Substantiate items that are completed. • Issue Certificate of Substantial Completion. • Issue Final Completion & Acceptance letter to City recommending acceptance & release of final payment. • Issue As-Builts to COP within 30 days of project completion. • Record all documents and correspondence in the City's ProTrak system. 7. Project Management • Conduct project setup; prepare and execute required subconsultant agreements. • Coordinate, conduct, and document a project kickoff meeting with City staff and any other relevant stakeholders; discuss the project overview, design criteria, communication plan, team member responsibilities, and project schedule. Design 5 of 6 D8. Revised 2016 • Provide management and coordination for all activities included in the contract, including preparing a design schedule and providing monthly updates, developing monthly invoices and progress reports, maintaining the project file and records, subconsultant coordination, and coordination with the City. Design 6 of 6 D8.Revised 2016 MBco• • WBEIDBE SBE I HUB ENGINEERING CERTIFIED . SURVEYING h, O B B • 13L FT B G H • G tl E N E K PROPOSAL FOR LAND SURVEYING SERVICES April 23, 2019 Matthew Gaal, E.I.T. Alliance Transportation Group, Inc. 11500 Metric Boulevard, Bldg M-1,Ste 150 Austin,TX 78758 Ref: Pearland Parkway at Forest Park Lane Topographic Survey Dear Mr. Gaal: MBCO Engineering, LLC. (MBCO) is pleased to submit this proposal for professional surveying services to Alliance Transportation Group, Inc. (ATG)for the topography of the intersection of Pearland Parkway and Forest Park Lane/Summit Spring Lane. Topographic Survey MBCO will perform a topographic survey that meets The Manual of Practice for Land Surveying in the State of Texas for a Category 6, Condition 2 topographic survey. The horizontal datum will be based on the Texas State Plane Coordinate System, Zone 4204, South Central Zone with elevation tie to Pearland Monumentation. The extents of the topographic survey will be: • Along Pearland Pkwy north of the intersection for 400 feet. • Along Pearland Pkwy south of the intersection for 400 feet. • Along Forest Park Lane west of the intersection for 250 feet. • Along Summit Spring Lane east of the intersection for 250 feet. Topographic survey will extend from ROW to ROW throughout the project limits, as shown on the attached exhibit. Existing Right of Way will be located and shown meeting Category la,Condition 2 standards of the Manual of Practice for Land Surveying in the State of Texas. Natural and structural features that will be gathered in the field are as follows: • Back of Curb and Gutter located along the concrete roadway • Centerline of roadway • Natural ground within the median and within the ROW of the roadways at a maximum 50' grid • Lane Lines and Pedestrian Crossings • All above ground features within the Right of Way (fire hydrants, power and traffic poles, signal boxes, man holes,water valves, etc.) • Traffic Signal Sensors within the roadway 1505 Highway 6 South,Suite 180• Houston,TX 77077 • www.mbcoengineerinR.com TBPE Firm Registration No.F-16850 ITBPLS Firm Registration No. 10194112 .MBCO WBE I DBE SBE I HUB ENGINEERING CERTIFIED & SURVEYING NI O g R • R L E T R G N • C fl E N E K • Sanitary and Storm Systems within the project corridor and one junction (i.e. man hole or inlet) outside of project corridor • All trees within the Right of Way within the project corridor MBCO will perform a Level B SUE concerning all underground utilities in the project corridor. MBCO will deliver a CAD file in 2016 .dwg format containing a DTM surface model along with a CSV fill of all points. MBCO will also produce topographic sheets showing the topographic survey, roadway Right of Way,and adjoining land owners on 22x34 paper size. MBCO will also provide a signed and sealed copy of the survey as a stand alone deliverable. Topographic Survey $8,600.00 SCHEDULE: MBCO is requesting 30 calendar days to complete the above said work once the Notice to Proceed has been given. We appreciate the opportunity to submit this proposal and look forward to working with you. 1505 Highway 6 South,Suite 180• Houston,TX 77077 •www.mbcoengineering.com TBPE Firm Registration No. F-16850 1TBPLS Firm Registration No. 10194112 IMBco: WBEIDBE SBE I HUB ENGINEERING CERTIFIED SURVEYING M o s s • E l L T •.i c rq • c rl v fd Y. K COMPENSATION: The estimated cost of the above described services is$8,600.00 and will be billed at the end of each month on a percent complete basis for each task listed in the attached Level of Effort Spreadsheet. This cost proposal is valid for 30 days and may be re-evaluated after such time to account for any changes with the project scope, environmental factors and/or the general rate schedule. Thank you for the opportunity and we appreciate doing business with you. Sincerely, David P. Brister Survey Department Manager (W) 281-760-1656 (C) 713-203-9417 If this proposal is acceptable, please sign and return a copy. 1505 Highway 6 South,Suite 180• Houston,TX 77077 • www.mbcoengineering.com TBPE Firm Registration No. F-16850 ITBPLS Firm Registration No. 10194112 MBCO, WBE I DBE SBE HUB ENGINEERING CERTIFIED & SURVEYING M o F F • [1 1. F: T f3 C: 11 • L. (l F N i- K Acceptance: If this proposal meets with your approval, please so indicate your acceptance by executing it in the space provided below and return two originals.Your written acceptance of this proposal will consummate the Agreement which can be terminated by either party upon receipt of written notice. Upon termination, all fees currently earned under the terms of this Agreement will be due and promptly paid. Alliance Transportation Group, Inc. "OWNER" BY: DATE: NAME: TITLE: ADDRESS: 11500 Metric Blvd, Bldg M-1,Ste 150 Austin,TX 78758 MBCO ENGINEERING, LLC. "ENGINEER" BY: DATE: NAME: Bonnie Moss TITLE: President ADDRESS: 1505 Highway 6 South,Ste 180 Houston,TX 77077 1505 Highway 6 South,Suite 180• Houston,TX 77077 •www.mbcoengineering.com TBPE Firm Registration No.F-16850 ITBPLS Firm Registration No. 10194112 MBC4 WBEIDBE SBE I HUB ENGINEERING CERTIFIED & SURVEYING MOSS • [It r T rIc ,, c i, ?F r; . , EXHIBIT OF THE SURVEY LIMITS < e l. I•'•• ' ..._. . •/7".. ,,. r • '.4.a i '''''' \ r. .,r 0d A 1505 Highway 6 South,Suite 180• Houston,TX 77077 • www.mbcoengineering.com TBPE Firm Registration No. F-16850 ITBPLS Firm Registration No. 10194112 Project Estimate for Scope of Services-Alliance Transportation Group City of Pearland-Pearland Parkway Traffic Improvements Method of Payment:Lump Sum Senior Project Project Senior Engineer in Adminstrative Clerical CATEGORY pnncipel Manager/ Engineer Engineer Engineer Training Controller Support Support LABOR TOTAL Director TOTALS FEE RATE $280.00 $260.00 $225.00 $205.00 $165.00 $120.00 $190.00 $105.00 $75.00 Hours Cost Task 1 Traffic Engineering Study 0 0 0 0 18 54 0 0 $ 72 Operational Analysis Process Data 1 2 3 $405.00 Create AM and PM Peak Flour Synchro Models 2 4 6 $810.00 Develop Proposed AM and PM Peak Hour Signal Timings 1 4 5 $645.00 Crash Analysis Gather Crash Data 4 8 12 $1,620.00 $9,450.00 Analyze Crash Data 2 12 14 $1,770.00 Determine Recommended Intersection Alternatives 2 4 6 $810.00 Memorandum Create DraftMemo 4 12 16 $2,100.00 Create Final Memo 2 _ 8 10 $1,290.00 Task 2 Traffic Signal Design 1 1 10 17 54 94 0 0 0 177 Utility&ROW Research:Survey Coordination 2 2 4 $570.00 Coordination with Electrical Utility 2 2 4 $570.00 Prepare Intersection Layouts 1 2 8 12 23 $3,395.00 Prepare Traffic Signal Layouts 1 2 12 16 31 $4,535.00 Prepare Traffic Signal Phasing Diagrams and Cable Charts 1 2 8 12 23 $3,395.00 Prepare Traffic Signal Elevation Layouts 1 2 4 16 23 $3,215.00 $26,460.00 Prepare Signing Layouts 1 2 4 8 15 $2,255.00 Prepare Pavement Marking Layouts 1 2 4 6 13 $2,015.00 Specifications 8 General Notes 1 1 2 4 8 $1,240.00 Tabulate Quantities 1 1 2 4 8 $1,240.00 Prepare Cost Estimate 1 1 2 4 8 $1,240.00 QA/QC 1 1 1 2 4 8 17 $2,795.00 Task 3 Fiber Interconnect Design 1 1 15 21 54 172 0 0 0 264 Utility&ROW Research 4 4 16 40 64 59.160.00 Prepare Fiber Interconnect Layouts 4 8 16 72 100 $13,820.00' Prepare Communication Network Diagrams 1 1 2 8 12 $1,720.00 Prepare Splice and Device Connection Details 1 1 2 8 12 $1.720.00 $37,770.00 Specifications&General Notes 1 1 2 4 8 $1,240.00 Tabulate Quantities 1 1 4 16 22 $3,010.00 Prepare Cost Estimate 1 1 4 8 14 $2,050.00 QA/QC 1 1 2 4 8 16 32 $5,050.00 Task 4 Roadway.Design 1 _ 1 12 2 26 _ 56 0 0 0 98 Prepare Curb Ramp Improvements Layouts 2 4 8 14 $2,070.00 Prepare Tum-Lane Improvements Layouts 24 12 18 $2,550.00 SWPPP 2 4 8 14 $2,070.00 TCP 24 8 14 52,070.00 $14660.00 Specifications&General Notes 1 2 4 7 $1,035.00 Tabulate Quantities 1 2 4 7 , $1,035.00 Prepare Cost Estimate 1 2 4 7 $1,035.00 QA/QC 1 1 1 2 4 B 17 $2,795.00 Task 5 Bid Phase Services 0 12 0 12 4 16 0 0 0 44 Prepare Bid Documents 4 4 4 12 24 $3,960.00 $0.160.00 Attend Pre-Bid Meetings 8 8 4 20 $4,200.00 Task 6 Construction Phase Services 0 0 4 4 36 20 0 0 0 64 Review Shop Drawings 2 2 12 4 20 $3,320.00 Respond to Requests for Information(RFIs) 2 2 12 4 20 $3,320.00 $10,060.00 Construction Inspection&Signal Turn-On 12 12 24 $3,420.00 Task 7 Project Management 4 4 44 12 8 2 12 2 1 52 Project Initiation&Coordination 2 2 4 4 8 8 2 30 $5,290.00 $0,610.00 Project Control and Reporting 2 2 4 2 10 2 22 $3,320.00 Total Hours 7 19 45 60 204 420 2 12 2 771 Total Cost $1,960.00 $4,940.00 $10,125.00 $12,300.00 533,660.00 $50,400.00 $380.00 $1,260.00 $150.00 Labor Total 6115,175.00 Total Labor o $115,175.00 ODE Total 6'0.406.25 Project Total$125,581.25 PROJECT ESTIMATE FOR SCOPE OF SERVICES-Alliance Transportation Group City of Pearland-Pearland Parkway Traffic ImprovementsMethod of Payment:Lump Sum LABOR TOTAL TOTALS FEE UNIT Rate Count Subtotal Hours Cost Other Direct Expenses Turning Movement Counts-AM/PM Peak Hour each $ 350.000 1 $ 350.00 $350.00 MECO Engineering&Surveying-Topographic Survey each $8,600.000 1 $ 8,600.00 $8,600.00 Subconsultant(Surveyor)markup each 10.00% 1 $ 860.00 $860.00 Mileage each $ 0.575 750 $ 431.25 $431.25 $10,406.25 Overnight Mail-Oversized Boz each $ 3.00 40 $ 120.00 $120.00 Photo Copies B/w(11017) each $ 0.20 200 $ 40.00 $40.00 Photo Copes B/W(8.5x11) each $ 0.10 50 $ 5.00 $5.00 Total Cost $10,406.25 Total ODE_ $10,406.25 • Task Name Duration r Start Finish (Predecessors 6g May 2019 hme 2419 July 2019 August 2019 September 201 October 2011 I November 201'December 2019 January 2020 February2020 March 2020 April 2020 May 2020 lune� July 2020 Au9u ` _.(17(2227.2 7 121722271'.611I16�21261 61116212631110152021304 9 14.192429 4 9 14192424j 3.i 8 131823'28 3 8 13182328 2 7 12172227 1 6 11162126 2 7 12172227 1 6 11162126 1 6 12101260212631;j. 116212631.51 530 S 10152025304,9 1 Notice to Proceed 3 days Wed Fri 5/17/19 I 1 Issued;Project 5/15/19 Initiation 2 Traffic Data 10 days Mon Fri 5/31/19 1 L Collection 5/20/19 3 Draft Traffic 15 days Mon 6/3/19 Fri 6/21/19 2 Engineering Study • 4 Submit Draft Traffic 0 days Fri 6/21/19 Fri 6/21/19 3 476/21 Engineering Study 5 City Review of Draft 10 days Mon Fri 7/5/19 4 Traffic Engineering 6/24/19 Study 6 Final Traffic 10 days Mon 7/8/19 Fri 7/19/19 5 L. Engineering Study '.. _ I 7 Submit Final Traffic 0 days Fri 7/19/19 Fri 7/19/19 6 ♦'7/111 Engineering Study 8 ;Topographic Survey 20 days Mon Fri 6/14/19 1 5/20/19 9 Field Investigation; 10 days Mon Fri 6/28/19 8 Utility&ROW 6/17/19 Research I 10 Develop 60%PS&E 25 days Mon 7/1/19 Fri 8/2/19 9 r 11 Submit 60%PS&E 0 days Fri 8/2/19 Fri 8/2/19 10 t 12 I City Review of 60% 10 days Mon 8/5/19 Fri 8/16/19 11 PS&E • 13 Develop 90%PS&E 25 days Mon 8/19/19 Fri 9/20/19 12 SII 14 Submit 90%PS&E 0 days Fri 9/20/19 Fri 9/20/19 13 '. 09/20 15 City Review of 90% 10 days Mon Fri 10/4/19 14 IONE, PS&E 9/23/19 16 Develop 100%PS&E 15 days Mon 10/7/19Fri 10/25/19 15 �. 17 Submit 100%PS&E 0 days Fri 10/25/19 Fri 10/25/19 16 ♦ 10/25 18 Bid Phase Services 70 days Mon 10/28/1 Fri 1/31/20 17 • 19 Construction Phase 130 days Mon 2/3/20 Fri 7/31/20 18 T Services 20 Project Management 318 days Wed Fri 7/31/20 5/15/19 • • Task Project Summary "" Manual Task 1111111111MINIMIll Start-only C Deadline 6 Project:Schedule DRAFT Split .......wu.. Inactive Task Duration-only Finish-only 1 Progress Date:Fri 5/10/19 Milestone ♦ Inactive Milestone Manual Summary Rdlup External Tasks Manual Progress Summary r"."" -I Inactive Summary Manual Summary i I External Milestone Page 1 —_----