Loading...
R2019-035 2019-02-11 RESOLUTION NO. R2019-35 A Resolution of the City Council of the City of Pearland,Texas,authorizing the City Manager or his designee to enter into a contract amendment with Brown and Gay Engineers (BGE), in the additional amount of $130,140.00 for construction phase services associated with the Hughes Ranch Road Expansion Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and BGE, a copy of which is attached hereto as Exhibit"A"and made a part hereof for all purposes, is hereby amended. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract with BGE, for construction phase services associated with the Hughes Ranch Road Expansion Project. PASSED, APPROVED and ADOPTED this the 11th day of February, A.D., 2019. l>7? �{�fi TOM REID MAYOR ATTEST: _ ix/Yo NG O _3, SE . TARP " • APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY CITY OF PEARLAND PROJECTS DEPARTMENT , z 3519 Liberty Drive, Suite 300 f } � �l` Pearland,TX 77581 t x A. pearlandtx.gov/projects Professional Services Contract Amendment Hughes Ranch Road Date of Issuance: 01/10/2019 Amendment No.: 5 Consultant: BGE, Inc CoP Project No.: TR1201 P.O. No.: 2017-00000261 Finance Approval: rX" '--` Date 02/21/2019 ACCEPTED*: APPROVED: By: Date 01/29/2019 By: / Date 02/18/2019 Consultant Project Manager By: , , �_.._ -- Date 02/20/2019 Owner *Consultant agrees to perform change(s)included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties,the following changes identifies for the contract value and/or contract time shown,are made part of the Design 2 of 2 D4.Revised 7/08 P£ �� PROJECTS OF PEARLAND DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 non. e x > , pearlandtx.gov/projects �sr s4a Professional Services Contract Amendment Hughes Ranch Road Date of Issuance: 01/10/2019 Amendment No.: 5 Consultant: BGE, Inc CoP Project No.: TR1201 P.O. No.: 2017-00000261 Explanation: This change order encompasses the following: This contract amendment is for bid and construction phase services to be provided by BGE. The original 2015 contract was for the design update only. The project is now entering the construction phase and BGE will need to perform basic construction administration services that include responses to questions brought up during the pre-coordination and pre-construction meetings, attending monthly construction progress meetings, reviewing and responding to RFIs,submittals shop drawings, details and change orders. BGE will also be responsible for the issuance of clarifications and interpretations of the contract documents and design, coordination with the materials testing lab, including the review of reports, participation in the substantial and final walk-throughs, and preparation of record drawings. The City will be 100% responsible for all fees associated with professional services(design, bid and construction)for the Hughes Ranch Road project. The Construction Phase services will be billed Hourly Not to Exceed. Description of Work Cost Time 1 Add Item No. 8 Pre-construction $2,240.00 0 Days 2 Add Item No. 9 Public Meetings $7,796.00 0 Days 3 Add Item No. 10 Monthly Site Visits/Progress Meetings $37,352.00 0 Days 4 Add Item No. 11 Preparation of Change Orders $5,056.00 0 Days 5 Add Item No. 12 Review Pay Request $8,208.00 0 Days 6 Add Item No. 13 Review Submittals $ 18,280.00 0 Days 7 Add Item No. 14 Respond to RFIs $ 10,012.00 0 Days 8 Add Item No. 15 Coordinate with Testing Lab $2,048.00 0 Days 9 Add Item No. 16 Attend Initial and Final Walk Throughs $9,160.00 0 Days 10 Add Item No. 17 Prepare Record Drawings $ 13,344.00 0 Days 11 Add Item No. 18 Addenda Preparation $7,240.00 0 Days 12 Add Item No. 19 Bid Tabulation and Recommendation Award $4,404.00 0 Days 13 Add Item No.20 Reimburseables $5,000.00 0 Days Please attach back-up documentation. Cost&Time Change Summary Cost Time Original Contract: $215,237.00 0 Days Previous Amendment(s): $ 145,198.00 112 Days Contract prior to this Amendment: $360,435.00 112 Days Net increase(decrease)from this Amendment: $ 130,140.00 0 Days Revised Contract: $490,575.00 112 Days Design 1 of 2 D4.Revised 7/08 January 7, 2019 Mr. Skipper Jones Assistant Director of Capital Projects City of Pearland 3519 Liberty Drive Pearland,Texas 77098 RE: Proposal for Basic Construction Phase Services Hughes Ranch Road (CR 403)from Smith Ranch Road to Cullen Blvd. Project Dear Mr. Jones: BGE, Inc. (BGE) is pleased to submit this proposal to the City of Pearland for Basic Construction Phase Services for the Hughes Ranch Road (CR 403) from Smith Ranch Road to Cullen Blvd. Project. This project entails the reconstruction of Hughes Ranch Road from a two-lane open ditch roadway to a four-lane reinforced concrete section with curbs, medians, storm sewer, illumination, sound barrier wall, and mixed use walking paths on the north and south sides of Hughes Ranch Road. A Scope of Services, Exclusions, and Fee Summary are included as part of this proposal. SCOPE OF SERVICES: The scope of this project entails Basic Construction Phase Services for this project. Per the City's request, certain bid phase tasks are also included. A. Basic Construction Administration Services BGE will perform the following tasks on an hourly, not to exceed, basis. BGE received from TxDOT their standard Construction Phase Services tasks (Function Code 309) and incorporated those items within this list: 1. Attend pre-construction meeting. 2. Attend public meetings (2). 3. Attend monthly field meetings and provide periodic site visits during construction (one visit per month for 24 months). For each meeting, BGE will prepare agenda and take Serving. Leading. Solving.'" BGE,Inc. •10777 Westheimer Road,Suite 400•Houston,Texas 77042•281.558.8700 www.bgeinc.com Mr. Skipper Jones January 7,2019 Page 2 meeting minutes. BGE will also document work progress with a site observation two- page report for each site visit. 4. Review change orders prepared by others, as necessary. 5. Assist in review of pay requests. 6. Review the construction submittals, shop drawings, and details. 7. Issue clarifications and interpretations to the Contract Documents as appropriate through the RFI process. 8. Assist in the coordination of laboratory testing, which will be led by the CM/CI consultant (separate contract with City). 9. Attend the initial and final walkthroughs with the contractor. Prepare punch list items. Review corrected punch list items in final walkthrough. 10. BGE will prepare record drawings for the project based on "red lined" drawings and information provided by the Contractor. We will furnish one set of printed "Record Drawings" to Pearland. We will also provide an electronic version of the record drawings for your permanent records. Per the City's request,the following bid phase services are included with this proposal.These items were not included within the original design phase services scope. 11. Preparation of four (4) addenda and providing 5 sets of project manuals. 12. Prepare the bid tabulation and recommendation of award letter. Note that no full or part-time construction observation by BGE is included as part of this proposal. EXCLUSIONS All services not specifically listed herein are excluded from this proposal and our scope of work. Note that the contract duration of construction (730 calendar days) serves as the time basis for this proposal. Construction time in excess of the 730 calendar days would facilitate the need for either a contract supplement to cover the above-listed tasks or for those tasks to be performed on an hourly basis according to the rate schedule attached. The multiple for this hourly work can be negotiated. Any scope items not specifically listed that the City would like to add can be performed on an hourly basis. Change order preparation and coordination with the testing lab will be led by the CM/CI consultant which is under a separate contract with the City of Pearland. Mr. Skipper Jones January 7,2019 Page 3 FEE SUMMARY Fees will be invoiced on a monthly basis accompanied by LOE supporting documentation. The hourly fees (unless otherwise noted) associated with each project phase are as follows: Basic Construction Phase Tasks Amount 1. Precon meeting $ 2,240 2. Public meetings (2) $ 7,796 3. Monthly site visits/ progress meetings (24) $ 37,352 4. Prepare change orders $ 5,056 5. Assist in the review of pay requests $ 8,208 6. Review construction submittals $ 18,280 7. Issue clarifications through RFI's $ 10,012 8. Coordinate with testing lab $ 2,048 9. Initial and final walkthroughs $ 9,160 10. Prepare record drawings $ 13,344 11. Addenda preparation (4) $ 7,240 12. Bid tab and letter of recommendation to award $ 4,404 Reimburseables (Mileage, Deliveries, Supplies, etc.) $ 5,000 Total Proposal Fee: $130,140 The following supporting documents are attached for your review: 1. Manhour Estimate 2. Rate Schedule Please call should you have any questions. We look forward to working with the City of Pearland on this assignment. Sincerely, BGE, Inc. f.2.71 (?„...g.L...._ Todd Calvin, P.E. Municipal Practice Leader Attachments CITY OF PEARLAND HUGHES RANCH ROAD PROJECT-CONSTRUCTION PHASE SERVICES _ MANHOUR ESTIMATE _ _ BGE,INC. DATE: 1/7/2019 INIAL SUBIUTAL Project Mgr. Sr Engineer Engineer EIT Sr.Designer CADD Technician Clerical HOURS FEE NO. DESCRIPTION $210.00 $210.00 $156.00 $108.00 $146.00 $108.00 $86.00 BASIC CONSTRUCTION PHASE SERVICES 1 Pre-Construction Meeting 4 4 4 4 16 $2,240 2 Public Meetings(2) 2 16 I6 8 12 8 62 $7,796 3 Monthly Site Visits/Progress Meetings (24) 24 48 216 17 305 $37,352 4 Prepare Change Orders 2 12 24 2 40 $5,056 5 Assist in Review of Contractor Pay Requests 8 12 24 24 68 $8,208 6 Review Submittals 8 40 80 20 148 $18,280 7 Respond to RFI's 6 24 40 8 78 $10,012 8 Coordinate with testing lab 1 5 9 1 16 $2,048 9 Attend initial and final walkthroughs 12 16 32 8 68 $9,160 10 Prepare record drawings 8 8 24 24 40 104 $13,344 11 Addenda Preparation-4 8 8 24 20 60 $7,240_ 12 Bid Tabulation and Recommendation of Award 6 8 8 12 34 $4,404 BASIC CONSTRUCTION PHASE SERVICES TOTALS 89 0 201 501 32 52 124 999 $125,140 REIMBURSEABLES(MILEAGE,DELIVERIES,SUPPLIES,ETC.) $5,000 I _ TOTAL PROPOSAL FEE $130,140 1 [/7/25193 as nv1 BROWN &GAY ENGINEERS, INC. 2018 BILLING RATES The Engineering fee for hourly services,shall be determined by using a multiplier of 2.5 as the Overhead and Profit Factor,multiplied by Direct Personnel Expense of 1.3. Employee Title Category Billing Rate Range Engineer I, II $80 - $113 Engineer III, IV $99 - $164 Engineer V,VI $122 - $312 Engineer VII $208 - $369 CAD Technician I, II, III $47 - $128 Designer I,II, III $93 - $256 Mgmt of CAD/Design/Construction $175 - $197 Platting Services $66 - $212 GIS Services $55 - $200 Scheduler I, 11. 111 $107 - $213 Construction Tech I, II, Ill $68 - $236 Inspector I, II, Ill $56 - $164 Chief of Inspectors $124 - $185 Environmental Services $46 - $254 Survey Crew-Unit Rate' $160 Survey Technician I,II,Senior $74 - $126 Project Surveyor I, II,Chief of Parties $105 - $164 Surveying Manager, Director $163 - $205 Admin Asst I, II, Ill, Recordkeeper $43 - $131 'Survey Crew is billed at an hourly'Unit'rate. The unit rate includes imputed costs for survey equipment,GPS,vehicles,and materials such as stakes,flagging and iron rods and personnel. I:\Account\DATAIRATE SHEETSI2018 RATE SHEET Dec-2017