Loading...
R2005-0104 06-27-05 RESOLUTION NO. R2005-104 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO. 6 ASSOCIATED WITH THE DIXIE FARM ROAD PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That Change Order No. 6 associated with the Dixie Farm Road Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 6 associated with the Dixie Farm Road Project. PASSED, APPROVED and ADOPTED this the 27th day of June A.D., 2005. ATTEST: Y~NG LjZ~'pl~r~(~, TF~C / ~ SE(r~ETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR Freese Nichots, Engineers Environmentat Scientists Architects 201_0 East Broadway FNI 01-262 Peafland, TX 77581-5502 281/485-2404 281/485-4322 fax www.freese.com June 8, 2005 Mr. Joe Wertz Project Director City of Pearland 3519 Liberty Pearland, Texas 77581 Re: Dixie Farm Road Widening - Supplemental #6 Blackhawk Intersection - 2005 APPROVED Dear Joe: Per our coordinations and meetings with City, Harris County, and TxDOT, we prepared this Supplemental #6 for the referenced project to revise TxDOT's Phase 1 PS&E to design a left-turn lane bay, a cross-over, and pavement tie-in and all other related changes to plans and quantities for the connection of Blackhawk Blvd. to Dixie Farm Road. As you know this new roadway has been completed in the past 2 months and is about to be opened. Our proposal also includes a signal warrant study and a signal design for the intersection. It is assumed that no right-turn lane would be warranted. This proposal does not include any potential R.O.W. acquisition (corner clip) surveying. It is assumed that Harris County would undertake that if warranted. Our proposal consists of FNI-LAN fees to design the roadway and drainage related items, a fee from TEDSI Infrastructure Group to design the signal and conduct the signal warrant study, a fee from Wilson Survey Group for gathering survey information on pipelines, and a fee from Cobb, Fendley & Associates on SUE for more accurately locating pipeline(s) with Mr. Joe Wertz Page 2 respect to a possible signal pole in the pipeline easement. Please note that SUE budget is based on 10 hours of pipeline(s) locating with equipment and technicians. All pipelines will be probed first by pipeline companies by conventional method. We will use SUE budget on as-needed basis. Budget does not include SUE for all pipelines. The breakdown for this Supplemental #6 is attached. The total fee is $49,233.11. Attached are two (2) originals of Supplemental #6 for your review and approval. Please forward us one signed copy if this fee proposal meets with your approval. Please call me if you have any question. Sincerely, Mehran (Ron) Bavarian, P. E. Associate Pearland Office Manager MB:plp Encl. T:PRL01262\Wertz.doc Exhibit "A" Resolution 2005-104 FREESE ' NICHOLS Client: City of Pearland CONTRACT CHANGE AUTHORIZATION NO. 6 FNI Project No.: PRL 01-262 Client Contract Ref.: CSJ 0912-31-158 (Brazoria) CSJ 0912-71-744 (Harris) Date: 6-8-05 Project Description: Dixie Farm Road Widening Description of Services Added: Additional services to conduct a traffic warrant study, design a Left-turn Lane bay, a median crossing, and pav't tie-in, a signal and associated drainage, roadway signage & marking, TCP's, etc. on Dixie Farm Road and incorporate these additional into current Phase 1 construction for the Dixie Farm Road Widening. See attached proposals from Project Team & Sub-consultant. Deliverables: Revised Plans, Specifications and Estimate to include Blackhawk Intersection for Phase 1 construction. Compensation shall be adjusted as follows: Add the following fees to total fee: Freese and Nichols, Inc.- Lockwood, Andrews, & Newnam Wilson Survey Group - Misc. Surveying Cobb, Fendley & Assoc. - SUE TEDSI TOTAL $22,321.11 950.00 4,062.00 ,~2_1,900.00_ ('-- $49,233.1_:_~1~ Contract Total as Amended by Change Order No. 1, 2, 3, 4, & 5 Revised Total Contract Lump Sum $2,008,336.91 Lump Sum $2,057,570.02 Schedule shall be adjusted as follows: Not Applicable The above described services shall proceed upon return of this Contract Change Authorization. Services will be billed as they are done. All other provisions, terms, and conditions of the agreement for services which are not expressly amended shall remain in full force and effect, ~ jA contract modification will be submitted. ~'"'~ This Contract Change Authorization will serve as contract modification. FREESE AND NICHOLS, INC.: BY: TITLE: Associate/Pearland Office Manager DATE: June 8, 2005 C I TY OF PEAR L/~~b , BY: ~-~..,o¢'//,--~ ~---~- Bill Ei sen T~TLE~ City Manager DATE~ June 27, 2005 DISTRIBUTION: . PM, GROUP MGR., DISC. LDR ..... OPER. ANAL., CONTRACT ADMIN. 4055 INTERNATIONAL PLAZA, SUITE 200 ~ FORT WORTH, TEXAS 76109-4895 ! TELEPHONE: 817-735-7300 ~ METRO: 817-429-1900 ! FAX: 8i7-735-7491 U;\FORMS\CONTRACT~CONTRACT CHANGE REQUEST.DOC ATTACHMENT FEE SCHEDULE SUMMARY Summary of Fee Schedule for Supplemental #6 for Dixie Farm Road PS&E Contract CSJ No. 0912-31-158 & 0912-71-744 Freese & Nichols, Inc. - Lockwood, Andrews & Newnam, Inc. (Project Team) Wilson Survey Group Cobb, Fendley & Associates TEDSI Infrastructure Group $22,321.11 $950.00 $4,062.00 $21,900.00 Total Cost for Supplemental #6 for Dixie Farm Road PS&E $49,233.11 Page 1 of 1 SUPPLEMENTAL #6 FEE SCHEDULE Freese & Nichols, Inc. ~ Lockwood Andrews & Newnum, Inc. (Project Team) Direct Labor by Function Co~le: Project Project Design Senior Description Principal Mn--get Engineer Engineer Designer CADD Clerical Total A. Revise PS&E for Blackhawk Int'n 1. Coordinations & meetings w/City, TxDOT, HC 1 20 8 3 4 36 2. Coordination w/Pipelines to gather loc. & depths 4 4 4 12 3. Mod. ofRdwy. P/P at Int'n 2 8 S 12 30 4. Mod. of Pav't Making & signage at Int~ 4 6 6 ! 6 5. Mod. of TCP's at Int'n & Typical Sections 4 4 4 16 28 6. Mod. to Horiz, Align. & Rdwy Point Data I 1 2 7. Changes to layout, Index, Typical sections 1 2 3 ~t. Revisions to Rdwy. Quantity Summary shee~ 1 2 4 4 11 ~. Changes to Drainage area map & Hyd. Comp. I 3 8 6 I 8 10. Mod. of]Dram'age P/P & Laterals at Int~n 2 4 14 8 28 11. Changcs to Demol. Sheets & Quantities 1 I 2 12. Changes to SW3P & quantifies at Infn 2 2 4 13. Add Int'n Layout sheet I 2 4 6 13 14. Knvision to othe plans reflecting this Infn 2 2 4 6 14 15, Revise Estimate for Int~ 1 4 5 16. Addressing 95% Comments 4 2 2 2 8 18 Subtotal A 1 42 48 62 6 77 4 240 B. Coordinations with Subs Coordinatios & meetings w/Signal sub, surveyor and SUE consultant on topo, pipelines, & SUE & review work and incorporate into revised plans 6 4 4 4 18 Subtotal B 0 6 4 4 0 4 0 18 Project Project Design Senior Description Principal ]Mnnno~er lt. no=inear Engineer Designer CADD Clerical Total Hours Hours Hours Hours Hours Hours Hours A: Revise PS&E for Blaekhawk Int'a 1 42 48 62 6 77 4 240 D: Coordination w/Sub's 0 6 4 4 0 4 0 ;ubtotal Hours I 48 52 66 6 81 4 258 Rate $50.00 $40.00 $35.00 $27.00 $25.50 $22.00 $16.50 Rate+ Overhead 160.36% $130.18 $104.14 $91.13 $70.30 $66.39 $57.28 $42.96 Rate + Ovrhd ] 60.36%) x Fix Fee 12% $145.80 $116.64 $102.06 $78.73 $74.36 $64.15 $48.11 Total Direet Labor Cost $146 $5v599 $5,307 $57196 $446 $57196 $192 $22~083.11 Freeze & Nichols, Inc. = Lockwood Andrews & Newnam, Inc. Indirect Labor Cost Description Unit Qty,. Cost Total Ex~xa Travel Mile 100 $0.38 $38.00 Extra Printing/l~production L.S. 1 $100.00 $100.00 Extra Deliveries L.S. 1 $100.00 $100.00 Total Indlreet Labor Cost $238.00 Freese & Nichols, Inc. - Lockwood, Andrews & Newnam, Inc.(Project Team) Total Suppemental #6Cost t $ 22,321.11 Page I of 1 WILSON SURVEY GROUP, INC. PROFESSIONAL LAND SURVEYORS June 7, 2005 Mr. Mehran Bavarian, P.E. Freese and Nichols, Inc. 2010 East Broadway Peadand, Texas 77581 Re: Additional Services for the Dixie Farm Road Widening Project Dear Mr. Bavarian, This letter is our proposal to provide surveying and mapping services at the intersection of Blackhawk and Dixie Farm Road in Peafland, Texas. This roadway has been constructed subsequent to the completion of the topographic survey update. We understand that we am to locate pipelines that cross Blackhawk in the vicinity of this intersection after the pipeline companies mark them horizontally and vertically. We will also provide you with additional topographic information needed to design the signalization of this intersection. We understand that we will provide you with the electronic field survey data and that you will insert this information into your drawing. This information can be made available within six (6) working days following written authorization to proceed. The cost to provide these services will be $950.00. We understand that the issuance of a Purchase Order Number will serve as our authorization to proceed. Mr. Bavarian, we appreciate this opportunity to be of service. Please feel free to call me if you have any questions. I~iichael D. Wilson, R.P.L.S. President 2006 E. Broadway * Suite 105 * Pearland, Texas 77581 Ph (281) 4115-3991 * Fax (281) 485-3998 E-mail: mdwilson~houston, rr. eom ~3 0 · 0 · ~ 0 May 12, 2005 TEDSI INFRASTRUCTURE GROUP Consulting Engineers 10260 Westheimer · Suite 460 · Houston, Texas 77042 Mr. Ron Bavarian, P.E. Houston Area Manager Freese and Nichols, Inc. 2010 East Broadway Pearland, Texas 77581 Re~ Dixie Farm Road Widening - PHASE I "Supplemental" Traffic Engineering Proposal Traffic Signal Warrant Study and Traffic Signal Design for Dixie Farm Road at Blackhawk Boulevard TEDSI Project 21588 Dear Mr. Bavarian: TEDSI Infrastructure Group (TEDSI) appreciates the oppommity to submit this lump Sum "Supplemental" proposal to Freese and Nichols, Inc. and Lockwood, Andrews & Newnam, Inc., Joint Venture (FNI - LAN) to perform traffic engineering services required in conjunction with the Dixie Farm Road Widening PHASE I, from Beamer Road to Farm to Market Road 518 (FM 518). This proposal is based on our understanding of the Scope of Services as discussed in our recent telephone conversation. The engineering services to be provided by TEDSI consist of conducting a Traffic Signal Warrant Study, for the "future" intersection of Dixie Farm Road at Blackhawk Boulevard, and if warranted, the Traffic Signal Design for this intersection. PROJECT UNDERSTANDING A Traffic Signal Warrant Study will be conducted for the intersection of Dixie Farm Road at Black_hawk Boulevard. The study will be based on the proposed intersection geometry, existing traffic counts and projected volumes for YEAR 2008 completion date. Based on the results of the Traffic Signal Warrant Study conducted for this intersection, if signalization is warranted and approved by TxDOT, a traffic signal design will be provided for this intersection. It is our understanding that FNI-LAN will provide TEDSI all the required electronic files for the "approved" proposed geometry for the intersection and any other pertaining information available to FNI-LAN. Tel: 713/975-8337 · ~ · Fax: 713/975-7194 Mr. Ron Bavarian, P.E. May 12, 2005 Page 2 TEDSI will include with the signal design all the recommended improvements. Since this intersection falls within the jurisdiction of Harris County, the proposed traffic signal design will be in accordance with Harris County Public Infrastructure Department Traffic & Transportation Section (HCPID T&T) guidelines. TEDSI would be required to complete the PS&E for the "Permanent" traffic signal and incorporate the plans with the other signals located in PHASE I (Dixie Farm Road at Beamer Road, Mc Donald, Mc Ginnis and FM 518 intersections). SCHEDULE: The services provided by TEDSI will be in collaboration with and in character, sequence and timing so as to coordinate with the services provided by FNI-LAN. We estimate fifteen to twenty-five (15-25) calendar days to complete the Traffic Signal Warrant Study and, if warranted and approved by TxDOT, it will require thirty 00) calendar days for the Traffic Signal Design, after a written notice to proceed is received from FNI-LAN. These estimates are contingent upon the availability of information to be provided by FNI-LAN and the electronic files. This estimate does not include the time necessary for agency review. SCOPE OF WORK: TASK A - TRAFFIC SIGNAL WARRANT STUDY: TEDSI will obtain all the traffic-data required to conduct the study, such as 24-hour approach counts, operating speeds, etc. Based on the traffic data obtained and information provided by FNI-LAN, TEDSI will determine the projected traffic volumes and conduct a Traffic Signal Warrant Study for the intersection of Dixie Farm Road at Black_hawk Boulevard, in accordance with the guidelines published in the Texas Manual on Uniform Traffic Control Devices (TMUTCD) and TxDOT procedures. Warrants will be based on opening day traffic volumes (2008). TEDSI will submit three (3) draft copies of the study to FNI-LAN for review and comments by all the required agencies. The study will provide recommendations for improvements along with construction cost estimates. After review comments are received, TEDSI will provide five (5) copies of the "final" report. TASK B - TRAFFIC SIGNAL DESIGN: If signalization is warranted and approved by TxDOT, TEDSI will prepare Design Plans and Cost Estimate for the proposed traffic signal installation for the intersection of Dixie Farm Road at Blackhawk Boulevard. The design, drawings and estimates will conform to current Harris County criteria. The drawings will be based on electronic files provided by FNI-LAN, including the updated topographic survey and design changes for the above-mentioned intersection. Mr. Ron Bavarian, P.E. May 12, 2005 Page 3 The traffic signalization will consist of a full vehicle actuated system with a ground-mounted controller/cabinet. Interconnect system is not considered at this time. The traffic signal hems will be suspended from four steel strain poles in a catenary span wire system. The signal will include two (2) standard luminaire arms with HPS luminaires. Pedestrian signal indications with all required call buttons and signing for all approaches will be included as directed by HCPID. It is assumed that the construction of the traffic signal will be bid and constructed with the proposed roadway construction of Dixie Farm Road. It is our understanding that the proposed ultimate intersection geometry will be constructed prior to the construction of the traffic signal and as such, construction of "temporary traffic signal" during construction shall not be required. COMPENSATION: TASK A - TRAFFIC SIGNAL WARRANT STUDY: The total Lump Sum Fee for providing the services described above is set at $5,900.00 (please see attached break-down cost). The amount shown includes all necessary direct expenses estimated for this project. This fee includes all labor and non-labor reimbursable expenses required to complete the effort as specified above. TASK B - TRAFFIC SIGNAL DESIGN: The work as described above for the Signal Design will be performed at a Basic Fee of $16,000.00 (please see attached break-down cost). The amount shown includes all necessary direct expenses estimated for this project. This fee includes all labor and non-labor reimbursable expenses required to complete the effort as specified above. Any work not specifically stated above will be considered as additional work and will be subject to negotiation. Thank you for the oppommity to provide this supplemental proposal to FNI-LAN. We look forward to working with you on this project. Should you have any questions or require additional information, please let me know. Sincerely, TEDSI INFRASTRUCTUR~ GROUP Ricardo Rivero Manager of Engineering Enclosures: As noted CC.: File TRAFFIC DATA COLLECTION AND TRAFFIC WARRANT STUDY DIXIE FARM ROAD AT BLACKHAWK BOULEVARD Total Man-Hours Salary Rate Payroll OH G&A OH Labor Cost LABOR TMH SR X Y (TMH)(SR)[1 + CLASSIFICATION (X.Y)] SIGNAL WARRANT PER INTERSECTION Engineer Manager 3 $ 48.00 50% 114% $ 380.16 Project Engineer 8 $ 50.00 50% 114% $ 1,056.00 Engineering Designer 50 $ 26.25 50% 114% $ 3,465.00 Sub-Total Labor 63 $ 4,901.16 Fixed Fee (12%) $ 588.14 TOTAL PER $ 5,489.30 INTERSECTION TOTAL LABOR + FIXED FEE FOR ONE (1) INTERSECTION Xl= $5,489.30 NON-LABOR Units Rate Non-Labor CLASSIFICATION Cost FOR ONE (1) INTERSECTION .24 Hour Traffic Counts 2 $150.00 $ 300.00 Mileage 180 $ 0.40 $ 72.00 Reproduction, Photographs, LS At Cost $ 50.00 Delivery Total Non-Labor $422.00 $422.00 GRAND TOTAL $5,911.30 TEDSI INFRASTRUCTURE GROUP DIXIE FARM ROAD - 05/12/05 TRAFFIC SIGNAL DESIGN - PERMANENT SIGNALS DIXIE FARM ROAD AT BLACKHAWK BOULEVARD Total Man-Hours Salary Rate Payroll OH G&A OH Labor Cost LABOR TMH SR X Y (TMH)(SR)[1 + CLASSIFICATION (X*Y)] TRAFFIC SIGNAL DESIGN PERMANENT SIGNAL Engineer Manager 11 $ 48.00 50% 114% $ 1,393.92 Project Engineer 29 $ 50.00 50% 114% $ 3,828.00 Engineering Designer 48 $ 26.25 50% 114% $ 3,326.40 CADD Technician 96 $ 21.50 50% 114% $ 5,448.96 Clerical 4 $ 18.75 50% 114% $ 198.00 Sub-Total Labor 188 $14,195.28 Fixed Fee (12%) $ 1,703.43 TOTALPER INTERSECTION TOTAL LABOR + FIXED FEE FOR ONE (1) PERMANENT SIGNAL $15,898.71 Xl= $15,898.71 NON-LABOR Units Rate NON-LABOR CLASSIFICATION FOR COST ONE ('1) PERMANENT SIGNAL Mileage 120 $ 0.40 $ 48.00 Reproduction LS At Cost $ 100.00 Total Non-Labor $148.00 $148.00 GRAND TOTAL $16,046.71 TEDSI INFRASTRUCTURE GROUP DIXIE FARM ROAD - 05/12/05 Texas Department of Transportation P.O. BOX 1386 · HOUSTON, TEXAS 77251-1386 · (713) 802-5000 July 6, 2005 CONTACT: CONSULTANT Brazoria County CSJ 0912-31-158 CR: Dixie Farm Road from 1500 ft. S. of FM 518 to Harris/Brazoria Co. Line Harris County CSJ 0912-71-744 CS: Dixie Farm Rd. from BrazoriaJHarris Co. to Beamer Rd. Mr. Joe Wertz, Projects Director City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Dear Mr. Wertz: We recently received Supplemental Agreement Number 6 to the contract for the subject project, between the City of Pearland and Freese and Nichols, Inc. (FN). The supplemental agreement provides for additional work for the consultant to prepare the plans for a new signalized intersection at a new Brazoria and Harris County roadway. This will change the amount payable under the contract from $2,008,336.91 to $2,057,570.02. We have reviewed this supplemental agreement and have determined that it adequately describes the work to be performed and that it is for a fair and reasonable price. Please let this letter serve as our official concurrence to Supplemental Agreement Number 6. We request that you proceed to execute this supplemental agreement with FN at your earliest convenience. JUL -8 CITY OF PEARLAND r;~O~J EC'TC~ DEPARTMENT A P PR,.jVE;_~ __ An Equal Opportunity Employer Mr. Joe Wertz July 6, 2005 Page 2 Please provide us with a fully executed copy of this supplemental agreement with FN. No payments can be made for work performed under the supplemental agreement until we receive this copy. Please comact Mr. Mark D. Patterson, P.E., at (713) 802-5506, should you have any questions or need additional information. Sincerely, Elvia R. Cardinal, P.E. Director of Consultant Contract Administration Houston District MDP:ha cc: Mr. Mark D. Patterson, P.E~. ~ Ms. Jennifer Phan, City of Pearland EXHIBIT e• FREESE-NICHOLS CONTRACT CHANGE AUTHORIZATION NO. 6 Client: City of Pearland FNI Project No.: PRL 01-262 Client Contract Ref.: CSJ 0912-31-158 (Brazoria) CSJ 0912-71-744 (Harris) Date: 6-8-05 Project Description: Dixie Farm Road Widening Description of Services Added: Additional services to conduct a traffic warrant study, design a Left-turn Lane bay, a median crossing, and pav't tie-in, a signal and associated drainage, roadway signage& marking, TCP's, etc. on Dixie Farm Road and incorporate these additional into current Phase 1 construction for the Dixie Farm Road Widening. See attached proposals from Project Team &Sub-consultant. Deliverables: Revised Plans, Specifications and Estimate to include Blackhawk Intersection for Phase 1 construction. Compensation shall be adjusted as follows: Add the following fees to total fee: Freese and Nichols, Inc.—Lockwood, Andrews, & Newnam $22,321.11 Wilson Survey Group—Misc. Surveying 950.00 Cobb, Fendley&Assoc. -SUE 4,062.00 TEDSI $21,900.00 TOTAL $49,233.11 Contract Total as Lump Sum Amended by Change $2,008,336.91 Order No. 1, 2, 3,4, 8,5 Lump Sum Revised Total Contract $2,057,570.02 Schedule shall be adjusted as follows: Not Applicable The above described services shall proceed upon return of this Contract Change Authorization. Services will be billed as they are done.All other provisions,terms,and conditions of the agreement for services which are not expressly amended shall remain in full force and effect. ❑ A contract modification will be submitted. This Contract Change Authorization will serve as contract modification. FREESE AND NICHOLS, INC.: CITY OF PEARLAND: BY: BY: TITLE: Associate/Pearland Office Manager TITLE: DATE: June 8, 2005 DATE: DISTRIBUTION: PM, GROUP MGR., DISC.LDR., OPER.ANAL., CONTRACT ADMIN. 4055 INTERNATIONAL PLAZA,SUITE 200 ! FORT WORTH,TEXAS 76109-4895 ! TELEPHONE:817-735-7300 ! METRO:817-429-1900 ! FAX:817-735-7491 U:IFORMSICONTRACTTCONTRACT CHANGE REQUEST.DOC