R2002-0096 06-10-02RESOLUTION NO. R2002-96 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO ENTER INTO A CONTRACT WITH DUKE ENERGY FIELD SERVICES FOR THE LOWERING OF A GAS TRANSMISSION LINE ASSOCIATED WITH THE EXTENSION OF PEARLAND PARKWAY. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain Contract by and between the City of Pearland and Duke Energy Field Services, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the original of the attached Contract for and on behalf of the City of Pearland. PASSED, APPROVED and ADOPTED this the 10 _ day of_2~~, A.D., 2002. TOM REID MAYOR ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY _Du..k.e Ener. Field Serwces ~ Ne;~ ~nd of E~e~ly Exhibit "A" R2002-96 ~oy 21,2002 City of Pearland Attention: Al Hague 3519 Liberty Pearland, Texas 77581 Re: Letter Agreement concerning lowering of the existing San Jacinto Gas Transmission 16-inch natural gas pipeline as a result of a City of Pearland project called the Pearland Parl<way Extension, from 2700 feet north of Broadway (FM 518) to Beltway 8, in Harris County, Texas. Dear Gentlemen and Ladies: When executed by an authorized person acting on behalf of San Jacinto Gas Transmission Company, ("San Jacinto"), whose address is 7431 FM 762, Richmond, Texas 77469, this letter and the attached exhibits will constitute the entire agreement between San Jacinto and the City of Pearland, whose address is 3519 Liberty, Pearland, Texas 77581 ("The City") concerning their respective rights and obligations regarding the lowering of the captioned natural gas pipeline. San Jacinto and The City collectively shall be identified herein as "the Parties." Whereas, pursuant to the terms of valid and subsisting agreements, San Jacinto presently operates a natural gas pipeline which traverses real property owned by the City; and, Whereas, the City is desirous of maldng certain road improvements on, over and across the pipeline easement area described on Exhibit "A" hereto and in connection therewith; and, Whereas, this proposed road improvement project will necessitate the adjustment or relocation of certain facilities of San Jacinto as shown on the plan and profiles prepared by Walsh/Freese and Nichols Engineers, Project No. 2001-060, City of Pearland, Pearland Pad<way Extension, dated 6/11/01; and, Whereas, the Parties recognize the valuable interest owned by each of them and have heretofore individually expressed a desire to accommodate the interest of the other while pursuing their respective business objectives; and, Whereas, San Jacinto is the operator of the aforesaid existing natural gas pipeline and as the pipeline operator, San Jacinto is solely responsible for compliance with pipeline safety regulations, including specifications for construction, materials and procedures associated with the subject pipeline. Therefore, in consideration of the mutual benefits and obligations described herein, the Parties agree that San Jacinto shall lower the existing natural gas pipeline at the SOLE COST AND EXPENSE OF THE CITY and further specifically AGREE AS FOLLOWS: San Jacinto has, or will initiate a competitive bidding process in order to obtain reasonable bids from qualified contractors for all work and material necessary to lower the subject pipeline and agree to make best efforts to have all work completed as soon as practicable. San Jacinto shall have exclusive authority to select pipeline construction contractors, pipeline construction materials and shall have exclusive authority to make any other decisions regarding the lowering of the subject pipeline. It is specifically understood and agreed that presently, the total cost to The City for the lowering of the subject pipeline is anticipated to be approximately $119,240.00 as itemized and set forth on Exhibit "B" attached hereto and made a part hereof. It is further agreed and understood by the Parties that if the actual cost to The City is anticipated to exceed a total of $131,200, all costs in excess of such amount will have to be expressly agreed upon in writing by the Parties. Upon a breach of this agreement, the non-defaulting Party, in any court of competent jurisdiction, by an action or proceeding at law or in equity, may secure the specific performance of the covenants and agreements herein contained, may be awarded damages for failure of performance, or both. The Parties are aware that the costs identified on Exhibit "B" may not include all costs incurred by San Jacinto or The City in the lowering of the subject natural gas pipeline. By entering into this Relocation Reimbursement Agreement, neither San Jacinto nor The City intend to indicate that this agreement identifies the sum total of all costs to be incurred by The City in lowering said pipeline. However in the spirit of cooperation and good faith, San Jacinto agrees that inasmuch as the attached project cost estimate may differ from the final amount payable to San Jacinto for the lowering of the subject pipeline, actual invoices arising out of the project activities will be determinative of the final amount to be paid in order to satisfy The City's obligations pursuant to this agreement, but not to exceed $131,200 except as provided hereinabove. All amounts payable hereunder to San Jacinto shall be received at the following address payable to the order of San Jacinto Gas Transmission Company, not later than thirty (30) calendar days after the invoice date: Mr. Doug Ross San Jacinto Gas Transmission Company 5718 Westheimer, Suite 2000 Houston, Texas 77057 Landowners agree, to the extent allowed by law, to fully defend, indemnify, reimburse and hold harmless San Jacinto, its affiliates and subsidiaries and their successors and assigns, as well as employees and contractors thereof, from and against any and all claims, of whatsoever nature, including, without limitation, claims for injury or death to persons, damage or destruction of real or personal property or natural resources; or any other demand, loss or expense incident to, or resulting from the lowering of the subject natural gas pipeline. AGREED AND ACCEPTED: THE CITY OF PEARLAND By: Bill Eisen Title: City Manager Date: SAN JACINTO GAS TRANSMISSION COMPANY by ~P' CENTANA INTRASTATE PIPELINE, LLC its Managing General Partner By: ,~ o~--.. -~ j,o~Kuchi~i, Vice P'resident Date: 200 0 100 200 400 SCALE: 1'=200' B.C.O,R. B.C.P.R. FND H.C.C.R. H.C.O.P.R.R.P. H.L.&P. I.P, P.O.C. R.O.W. SO.FT. LEGEND BRAZORIA COUNTY DEED RECORDS BRAZORIA COUNTY PLAT RECORDS FOUND HARRIS COUNTY COURT RECORDS HARRIS COUNTY OFFICIAL PUBLIC RECORDS OF REAL PROPERLY HOUSTON LIGHTING AND POWER IRON PiPE IRON ROD POINT OF BEGINNING POINT OF COMMENCING RiGHT-OF-WAY SOU ARE FEET H.L.&P. TRANSMISSION TOWER POWER POLE FOUND PROPERTY CORNER SET 5/8-INCH IRON ROD WITH CAP STAMPED WALSH SURVEYING BARBED WIRE FENCE OVERHEAD ELECTRICAL wIRE TOP BANK NOT~: 1, DEED RESEARCH WAS PERFORMED BY BERNETTA COOK, ANGLETON, TEXAS AND COURTHOUSE SPECIALISTS, 2. THE BEARINGS SHOWN HEREON ARE BASED ON CITY OF PEARLAND MONUMENTATION, NAD 1983 ADJUSTMENT. 3. ALL SET RODS wERE SET wiTH A CAP STAMPED WALSH SURVEYING, INC, 4. SEPARATE METES AND BOUNDS DESCRIPTIONS HAVE BEEN PREPARED IN CONNECTION WITH THIS PLAT. R INATES SHOWN HEREON ARE BASED ON THE TEXAS STATE , SURFACE COORDINATES. xCT 4 THIS SURVEY SUBSTANTIALLY COMPLIES WITH THE CURRENT TEXAS SOCIETY OF PROFESSIONAL SURVEYORS STANDARDS AND SPECIFICATIONS FOR '3'07' ;'"~ SURVEY LIN~ MICHAEL D. WILSON R.P.L.S. TEXAS REGISTRATION NO. 4821 ~/g/001 UPDATED TO SHOW REVISE0 R.O.W. ~ ~/4/O0/ UPOATEO TO SHOW TRACTS 7 AND 8 ~POAT£O TO REMOVE TRACTS 7 AND 8 WALSH SURVEYING INC. PROFESSIONAL LAND SURVEYORS 2006 E. BROADWAY pFARLAND, TEXAS (281) 485-3991 FAX (281) 485-3998 CITY OF PEARLAND PLAT TO SHOW PROPOSED RIGHT-OF-WAY FOR PEARLAND PARKWAY BRAZORIA COUNTY, TEXAS Exhibit A ;AD FILE 00-~68B DW1,I O,M.W. M.O.W. APDDM.D.W. SCALE 1'= 200' JOB NO. 00-168 yH~T[O G~S : VOLU~,~[ , ,.. ,+ac-,~ 60 · _aTt 0'3') wiDE p!PELINE EASEMENT U.',dTEC GAS PIPE LINE COMPANY ~OLUME 7166, PAGE 444 H.C.O.P.R,R.P, / FND I" IR. 150' W~OE EASEMENT HOUSION LIGHTING ANO PowER COllOP AN Y vOLUME 2589, PACE .32 H.C.O.P.R,R.P. BELTWAY SEE DETAIL N 02'18'54" W 424.08' N 87'4.1'06' E 5.00' SURVEY LINE TRACT 5 1.985 ACRES 86,463 SQ.FT. REMAINDER 55.0,5 ACRES S,DN['~ S McCLENDON, III, TRUSTEE CLERK'S FILE# H073440 H,C.O.P.R.R.P, SEE DETAIL 'B"~ N 06'52'47" E 107.57' P,O.B. TRACTS ,'5 AND 5 P.O.C. TRACT 4 FENCE POST FN0 AT CORNER ~0.5905 ACRES COUNTY OF HARRIS CLERK'S FILE# K342424 H.C.O P.R.R.P. 4.9139 ACRES HARRIS COUNTY FLOOD CONTROL DISTRICT "~ CLERK'S FILE~ K342426 H.C.O,P.R,R.P. CLEAR CREEK 8 ~ ~ ~ i=~ ~ N %6'5f4Y E ...-.--- '-'--' ~ f 6.428 ACRES / ......... ,.------ / N~ '-'-" CL 24" PIPELINE EASEMENT J HouSTON LIGHTING A U UNITED TEXAS POWER COMPANY P,O,B. TRACT 6 TRANSMISSION COMPANY FND. 1" I.R. CLERK'S FILE# N071422 VOLUME 2604, PAGE 592 3,1,54,797.75 H,C.O.P.R.R.P. H.C.O.P,R.R.P. 1,3.784,410.41 60' CITY OF PEARLANO CLERK'S FILE B.C.D.R. 60' WIDE R.O.W. COUNTY OF HARRIS CLERK'S FILE/~ 0911628 H.C.O.P.R.R.P. REMAINDER 81.8804 ACRES F. RUSSELL KENDALL. TRUSTEL CLERK'S FILE# D911627 H.C.O.R.R.R.P. 02'18'54" W 105.20' S 12'25'01' E 106,73 TRACT 4 ~.023 ACRES 985 SQ.FT. .O,B, TRACT 4 SET 5/8' t.R. S 87'18'07" W 150.00' ; SURVEY LINE 291.8760 ACRES ~.,._2,,,..,~<~''''~' COUNTY OF HARRIS -- ;URVEY LINE /X,. ~ 6,0541ACRES AND ~. ~- 8.3177 ACRES ~ACT 3 HARRIS COUNTY FLOOD 928 ACRES ~ CONTROL DiSTRiCT 127,542 SQ,~, / CLERK'S FILE~ R254525/ . _ 2so,5~L/ COUNTY HARRIS BRAZORIA COUNTY N 87~ 12.~ BELTWAY 8 (300' R.O.W.) 21.09' TOWER 09109 TOWER 1 o097 --~ - N 86'59'45' E 80.00' N 86'59'43' E S 42'20'25' W 21.34' TRACT 6 209 ACRES-- 86'5g W 60.00' P.O.B, TRACT 6 FNO. 1' I.R. X= 3,154,797.75 Y= 13,784,¢10.¢1 DETAIL 'A' SCALE: 1"=50' S 8l F RELO: Lower approx. 150' of 1 pipe from a current depth of 3' to a new depth of 17'. NO SIZE 2 100x200 0 0 1 1 800 FT 800 FT 0 FT 0 0 FT OFT 0 FT 600 FT 0 FT 0 0 DAYS 12 DAYS 3 DAYS 0 0 0 0 0 0 0 0 8X12 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 The new depth will place the line 4' below planned road and drainage construction. DESCRIPTION PIPELINE R O W ROW ACQUISITION ENVIRONMENTAL SURVEY ENGINEERING PIPELINE CONSTRUCTION PIPE ONLY; 16",.344 wall x52 w/pcrete PIPE SIZE MAIN LINE VALVE DRAINAGE DITCH CROSSING CANAL CROSSING SLICK BORE DIRECTIONAL BORE CASED CROSSINGS PIPE HAULING COMPANY LABOR ( Const. Inspection) INSPECTION ( Third Party ) X-RAY SITE PURCHASE METER STATION CONSTRUCTION COMPANY LABOR ( Meter Station ) INSPECTION METERING EQUIPMENT E G M SCADA EQUIPMENT GAS ANALYSIS EQUIPMENT ELECTRICAL BUILDING ELECTRICAL MATERIALS AND LABOR VALVES SIZE VALVES SIZE VALVES SIZE CHECK VALVES CONTROL VALVES PRESSURE VESSELS FILTER SEPARATOR FITTINGS MISCELLANEOUS MATERIALS ATMOSPHERIC TANK ENVIRONMENTAL INSTRUMENT BUILDING SITE WORK PAINTING SUB TOTAL OMISSIONS GRAND TOTAL Prepaired By COUNTY STATE AFE # LINE # LINE SIZE UNITS COST $ 3,000.OO $ $ $ 3,000.00 $ 2,000.00 $ 18:00 $ 24.00 $ $ $ - $ - $ - $ .80.00 $ - $ $ 400,00 $ 1,000,00 $ $ $ $ $ $ $ $ - $ - $ - $ - $ $ $ $ $ 2,000.00 $ $ $ $ $ $ 0.1 HARRIS TEXAS SAN JAC 16 E X T, COST $ 6,000.00- $ $ 3,000.00 $ 2,000.00 $ 14,400.00 $ 19,200.00 $ $ $ $ $ $ 48,000.00 $ - $ - $ $ 4,800.00 $ 3,000.00~ $ $ $ $ $ $ $ $ $ $ - $ - $ - $ - $ $ $ $ 8,000.00 $ $ $ $ $ $ $ 108,400.00 $ 10,840.00 $ 119,240.00 - Exhibit B