R2002-0106 07-08-02 RESOLUTION NO. R2002-106 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AUTHORIZING THE CITY MANAGER OR HIS DESIGNEE TO ENTER INTO A CONTRACT WITH THE MURILLO COMPANY FOR MATERIALS TESTING SERVICES ASSOCIATED WITH THE PEARLAND PARKWAY PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and The Murillo Company, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract with the Murillo Company, for materials testing services associated with the Pearland Parkway project. PASSED, APPROVED and ADOPTED this the A.D., 2002. 8 dayof July TOM REID MAYOR ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Exhibit "A" R2002-'106 CITY OF PEARLAND STANDARD AGREEMENT FOR ENGINEERING SERVICES This Contract (Contract) is made between the City of Pearland, .Texas (hereinafter "City"), and The Murillo Company (hereinafter "Engineer") as follows: 1. Summary of Contract Terms. The following information and referenced documents shall be a part of this Contract: Description of Project: Perform construction materials testing during the construction, for Pearland Parkway. Engineer/Subconsultant(s) Fee Basis of Compensation The Murillo Company $84,916.00 Lump Sum $ Maximum Contract Amount $84,916.00 Lump Sum * All financial obligations created by this agreement are between the City and Engineer, and shall not be construed to be between City and any subconsultant. Delivery of plans, specifications and estimates: Sixty (60) days from completion of construction. Attachments: Scope of Services - Exhibit A 2. Services and Payment. Engineer shall perform services within the Standard of Care of the Engineering profession as follows: A. Engineer will furnish services to the City in accordance with the terms and conditions specified in this Contract. Payment for the services of Engineer shall be due and payable upon submission and approval of a statement for services to City. Statements for services shall not be submitted more frequently than monthly. After consultation with the City, the Engineer shall specify the basis of compensation in the scope of work for the project. The Engineer shall provide adequate detail of the basis of compensation .so that the City can determine the reasonableness of the fees and have the ability to make reasonable progress payments to the Engineer based upon work completed at the payment intervals. The Engineer shall subcontract for all subconsultants, subject to City approval, necessary to complete the scope of work. The subconsultant's fees and administrative mark-up, if any, .s. hall be included in the scope of work. Unless otherwise agreed upon, the method of compensation shall be one of the following methods: 1. Salary Cost Times Multiplier Plus Direct Nonsalary Expense ("Salary") Compensation shall be based on 1) the direct salaries (including benefits) of the Engineer's employees whose time is directly chargeable to the project; 2) an agreed upon multiplier to compensate the Engineer for overhead and profit; and 3) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. The Engineer shall provide a proposal that includes the total fees for the project, which shall not be exceeded without prior City approval. 2. Per Diem ("Per Diem") Compensation shall be based upon 1) an agreed upon lump sum per day for specific services; and 2) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. This method is best suited to expert witness work or other short-term engagements involving intermittent services. 3. Cost Plus Fixed Fee ("Cost Plus") Compensation shall be based upon 1) reimbursement of the actual costs of all services and supplies related to the project and 2) an agreed upon fixed fee (profit). The Engineer shall provide an estimate of the costs to be reimbursed, but actual compensation shall be based upon invoices and supporting documentation provided by the Engineer. 4. Lump Sum ("Lump") Compensation shall be based upon an agreed lump sum payment for completing the entire scope of work. This method is best suited to investigations or studies and for basic services with limited scope and complexity. 5. Percent of Construction ("Percent") Compensation shall be based upon 1) the "Harris County Curve for Engineering Compensation" for basic and construction phase services; and 2) reimbursement for direct nonsalary expenditures and subconsultant contracts as defined in the scope of work for the project. The Engineer shall provide a proposal that includes the estimated construction cost of the project and the total fees for the project. If the actual Iow bid for construction is 20% above or below the estimate, the engineering fees are subject to equitable adjustment by mutual agreement of the Engineer and City. If City fails to make any payment due Engineer for services and expenses within thirty (30) days after receipt and approval of Engineer's statement for services therefore, the amounts due Engineer will be increased at the rate of one percent (1%) per month from said thirtieth (30th) day, and, in addition, Engineer may, after giving seven (7) days' written notice to City, suspend services under this Contract until Engineer has been paid in full, all amounts due for services, expenses, and charges. B. All the Engineer's working drawings, plans, and specifications, if required under this Contract, shall be sufficiently accurate, detailed, and complete so that competitive bids for the work can be obtained and the improvements constructed. C. Approval of the Engineer's work by the City shall not release the Engineer, its employees, agents, or consultants, from the responsibility and liability for the accuracy and competency of their designs, working drawings, and specifications, or other documents and services. D. Subject to Article 8 herein or as otherwise agreed, the Engineer shall promptly correct errors in the Engineer's work, including errors discovered after final payment, without receiving additional compensation. E. Prior to execution of this agreement, the Engineer shall have prepared a project schedule identified as an attachment to this agreement. The Project Schedule shall be submitted in digital and paper form, in the Microsoft Project for Windows format. The Project Schedule shall cOntain a complete schedule so that the Engineer's scope of services under this contract can be accomplished within the specified time and contract cost. The Project Schedule will provide specific work sequence and definite review times by the City and the Engineer of the work performed. If the review time should take longer than shown on the project schedule, through no fault of the Engineer, additional contract time may be authorized by the City through a supplemental agreement, if requested by a timely written request from the Engineer and approved by the City. 3. Term and Termination. This Contract term will begin upon execution and end sixty days after issuance of the certification of completion of construction by the Engineer. The City may terminate this Contract at any time during its term by giving written notice to Engineer. The .City shall pay the Engineer for all services rendered to the date of termination. 4. Modifications. City without invalidating the Contract, may order changes within the general scope of the work required by the Contract by altering, adding to and/or deducting from the work to be performed. If any change under this clause causes an increase or decrease in Engineer's cost of, or the time required for, the performance of any part of the Services under the Contract, an equitable adjustment will be made by mutual agreement and the Contract modified in writing accordingly. 5. Subcontracts. If, for any reason, at any time during the progress of providing services, City determines that any subcontractor for Engineer is incompetent 3 or undesirable, City will notify Engineer accordingly and Engineer shall take immediate corrective action, which may include cancellation of such subcontract. Subletting by subcontractors shall be subject to the same regulations. Nothing contained in the Contract shall create any contractual relation between any subcontractor and City. 6. Ownership:of Documents.' All drawings, report data, and other project information developed in the execution Of the services provided under this Contract shall be the property of the City upon payment of Engineer's fees for services. Engineer may retain copies for record purposes. Owner agrees such documents are not intended or represented to be suitable for reuse by City or others. Any reuse by City or by those who obtained said documents from City without written verification or adaptation by Engineer will be at City's sole risk and without liability or legal exposure to Engineer, or to Engineer's independent associates or consultants, and City shall indemnify and hold harmless Engineer and Engineer's independent associates and consultants from all claims, damages, losses, and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle Engineer to further reasonable compensation. Engineer may reuse all drawings, report data, and other project information in the execution of the services provided under this Contract in Engineer's other activities. Any reuse by Engineer will be at Engineer's sole risk and without liability or legal exposure to City, and Engineer shall indemnify and hold harmless City from all claims, damages, losses, and expenses including attorneys' fees arising out of or resulting therefrom. 7. Insurance. A. The Engineer shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the Engineer, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non-owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. B. The Engineer shall include the City as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the City before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. Upon request, certified copies of all insurance policies shall be furnished to the City. 8. Indemnity. Engineer shall indemnify and hold the City, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which Engineer is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the Engineer, his officers, employees, agents, or subcontractors under this Contract. 9. Assignment. Engineer shall not assign this Contract without the prior written consent of the City. 10. Law Governing and Venue. This Contract shall be governed by the law of the State of Texas and no lawsuit shall be prosecuted on this Contract except in a court of competent jurisdiction located in Brazoria County, Texas. 11. Entire Contract. This Contract represents the entire Contract between the City and the Engineer and supersedes all prior negotiations, representations, or contracts, either written or oral. This Contract may be amended only by written instrument signed by both parties. Purchase orders issued under this Agreement shall contain a statement nullifying additional terms and conditions on the reverse side of the purchase order and referencing this Agreement. 12. Conflicts in Contract Documents. The above provisions shall govern over any conflicting provision contained in any referenced contract document specified above. 13. Dispute Resolution Procedures. The Engineer and City desire an expeditious means to resolve any disputes that may arise between them regarding this Contract. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this Contract, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before bringing any legal action, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. EXECUTED and EFFECTIVE as of the 8 day of Ju] y ,20 CITY OF PEARLAND By: ~ Printed Name: Bi 11 Ei sen Title: City Manager ENGINEER PrintFe~rn6~ Title: C~,~ STATE OF TEXAS COUNTY OF Brazoria _/~ ,BEF0J~E ME, the undersigned Notary Public, on this day personally appeared ~ /~' ..4;.¢.,-~ , known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. ¢,g..IVEN UNDER MY HAND , A.D., 20__~,2--_. ..,,,,,,,.,% ~ ~"~"' O' 1 STATE OF TEXAS , § COUNTY OF Brazoria AND SEAL OF OFFICE THIS c"//-¢,.DAY OF N~RY p~y~u B'LiC~iN'~~N D F~~OR THE STATE OF TEXAS Printed Name: Robin E,. Pitcock My Commission Expires: 05106106 ~ z BEFORF_¢ ME~. the undersigned Notary Public, on this day personally apPeared ~ ~~/"~_/"Z,L¢'. Z,¢-.,¢~ , known to me to be the person whose name is subscribed to the foregblng instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. ~L,~IVEN. UNDER MY HAND AND :I.,L.~I; ., A.D., 20 ~9 ,-9-'. SEAL OF OFFICE NOTARY PUBLIC IN AND FOR THE STATE OF TEXAS Pdnted Name: Robin E. Pitcock My Commission Expires: 05/03/06 THiS /(¢ ~/~'~DAY OF 6 The Murillo Company 10325 LANDSBURY . (281) 933-9702 · HOUSTON, TX 77099 www. rnurillocompany.corn . info@rnurillocompany.com June 24,2002 City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Attn: Gene Simeon RE: Materials Testing Service Pearland Parkway (Northbound Lanes) 2,700 North of Broadway (FM 518) to Beltway 8 Sta. 31 + 00-Sta. 88 + 00 and Sta. 116 + 00 - Sta. 186 + 00 B2001-060 We are pleased to submit this proposal for performing construction materials testing during the construction for the above referenced project. This proposal outlines our understanding of the project, proposed scope of work, project fees and project schedule. SCOPE OF WORK It is our understanding that construction materials testing and inspection services will include the following services On site testing will consisted of the following: 1. Soil technician: a. Sample onsite material (ASTM D-75) for atterberg limits (ASTM D-4318) and moisture/density relationship curves (ASTM D-698) b. Perform Field Density Tests (ASTM D-2922) c. Perform Gradations on Lime-Soil Mixture and Depth Check (ASTM C-136) 2. Concrete Technician · a. Inspect Cast-In-Place Concrete (ASTM C-31/C31M-98) b. Perform following tests on concrete 1. Slump of concrete ASTM-C143 2. Unit weight of concrete ASTM-C~138 3. Air content (Volumetric Method) ASTM C-173 4. Making and curing test specimens (6x12 inch cylinders) ASTM C192 5. Temperature of concrete ASTM C1064 The Murillo Company 10325 LANDSBURY , (281) g33-9702 · HOUSTON. TX 77099 www.murillocompany.com , info@rnurillocornpany.com Off Site Testing will consists of the following: 1. Laboratory a. Atterberg Limits ASTM D-4318 b. Moisture/Density Relationship Curve ASTM-F698 c. Compressive Strength of Concrete (6x12 inch cylinders) ASTM C-39 This budgetary estimate is based upon information provided. Every effort was made to prepare a budgetary estimate that would accurately reflect the intended construction sequence. Overtime at 1 ¼ times the normal rates will be charged for hours worked in excess of eight (8) hours per day Monday thru Friday, all day Saturday, Sunday or Holidays. All hourly work will be charged on a portal to portal basis from our laboratory. A one (1) day notice is required for scheduling all field assignments. Our laboratory is meets the requirements of ASTM E-339-71, Recommended Practice for Inspection and Testing Agencies for Concrete and Steel as used in construction. Thank you for this opportunity to prepare this budgetary estimate for you. Your selection of our firm to provide the services for this project will be appreciated. Very Truly Yours, CMT Manager attachment: cost proposal The Murillo Company 10325 LANDS'BL~RY · (281) 933-9702, HOUSTON, TX 77099 www, murillocompany,com · info@muritlocompany.com On-Site Testing CONSTRUCTION MATERIALS TESTING COST ESTIMATE PROPOSAL PROJECT NAME: Pearland Parkway (Northbound Lanes) 2,700 North of Broadway (FM 518) to Beltway 8 Sta. 31 + 00-Sra. 88 + 00 and Sta. 116 + 00 - Sra. 186 + 00 B2001-060 Description of Services SOils Testing Quantity Unit Fee Unit Total 06.Soils technician, min. 4 hrs. 1200 1013. Nuclear Density Equipment Rental 150 1006.Moisture/density relationship, ASTM D-698 6 1001.Atterberg Limits, ASTM D418 12 1008. OMD Lime or Cement Stabilized Sand, ASTM D-698 4 12. Vehicle charge 156 28.00 Hour $33,600.00 35.00 Day $5,250.00 105.00 Each $630.00 28.00 Each $336.00 115.00 Each $460.00 30.00 Day $4,680,00 Sub Total $44,956.00 Concrete Inspection and Testing 06. Concrete technician, min. 4 hrs. 960 201. Mix design review 6 203. Concrete cylinders (ASTM C-39). 960 12. Vehicle charge 120 28.00 Hour $26,880.00 100.00 Each $600.00 9.25 Each $8,880.00 30.00 Day $3600.00 Sub Total $39,960.00 TOTAL ESTIMATE: $84,916.00