Loading...
R2005-0095 06-06-05RESOLUTION NO. R2005-95 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE KIRBY DRIVE EXTENSION PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That the City opened bids for construction services associated with the Kirby Drive Extension Project, and such bids have been reviewed and tabulated. Section 2. That the City Council hereby awards the bid to Hassell Construction, Inc., in the amount of $7,568,945.50. Section 3. The City Manager or his designee is hereby authorized to execute a contract for construction services associated with the Kirby Drive Extension Project. PASSED, APPROVED and ADOPTED this the 6th dayof June A.D., 2005. MAYOR ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY .Jun 02 05 08:48a TC&]) PldD 713-267-2857 p.2 TCB I AECOM Turner Collie & 5757 Woodway. SLt ~:-~ t01 We,st. Flot.~s(o~% i. :8:~ ?'705%1599 T7';3.780,4'!00 F ?!3780.0838 vvww. tcb. June 2, 2005 Mr. Joe Wertz Projects Director City of Pearland 3519 Liberty Pearland, TX 77581 Subject: City of Pearland Pearland Economic Development Corporation Kirby Drive Extension Dear Mr. Wertz: The City of Pearland Purchasing Office received sealed bids on June 1, 2005 on the above referent project. Bids were received from two contractors. The bids received are shown on the attached Bid Tabulation. The Iow bidder was Hassell Construction Co. Inc., with a bid of $7,568,945.50. The bids were tabulated and reviewed. HasselI Construction Co. Inc. has previously satisfactorily completed projects for the City of Pearland. It is our recommendation the project be awarded to the Iow bidder Hassell Construction Co. Inc in the amount of $7,568,945.50. Sincerely, ~James W. Keller, p.E.~ <'-'~' ~ ~J' Senior Project Manager Eric: Bid Tabulation cc: Fred Welch- PEDC Rod McCrary City of Pearland Kirby Drive Extension Bid Tabulation Engineers Estimate Hassell Construction C.Inc. Beyer Construction,LLP Item# Description Unit Bid Qty. Unit Price Amount Unit Price Amount Unit Price Amount 1 Mobilization(Maximum Bid$350,000) LS 1 350,000.00 $ 350,000.00 350,000.00 $ 350,000.00 350,000.00 $ 350,000.00 2 Project Identification Signs EA 2 750.00 $ 1,500.00 600.00 $ 1,200.00 600.00 $ 1,200.00 3 Site Preparation LS 1 15,000.00 $ 15,000.00 100,000.00 $ 100,000.00 130,000.00 $ 130,000.00 4 Remove and Dispose Existing Concrete Pavement SY 2,000 10.00 $ 20,000.00 6.00 $ 12,000.00 4.75 $ 9,500.00 5 Remove and Dispose Existing Asphalt Pavement SY 1,200 5.00 $ 6,000.00 6.00 $ 7,200.00 2.70 $ 3,240.00 6 Roadway Excavation CY 8,600 5.00 $ 43,000.00 3.40 $ 29,240.00 2.40 $ 20,640.00 7 Roadway Fill CY 37,000 6.00 $ 222,000.00 1.60 $ 59,200.00 2.00 $ 74,000.00 8 Clearing AC 5.4 2,500.00 $ 13,500.00 7,000.00 $ 37,800.00 4,800.00 $ 25,920.00 9 24"RCP Storm Sewer LF 900 45.00 $ 40,500.00 60.00 $ 54,000.00 96.00 $ 86,400.00 10 30"RCP Storm Sewer LF 625 55.00 $ 34,375.00 71.00 $ 44,375.00 111.00 $ 69,375.00 11 36"RCP Storm Sewer LF 1,325 85.00 $ 112,625.00 98.00 $ 129,850.00 138.00 $ 182,850.00 12 42"RCP Storm Sewer LF 190 115.00 $ 21,850.00 120.00 $ 22,800.00 163.00 $ 30,970.00 13 48"RCP Storm Sewer LF 1,400 130.00 $ 182,000.00 140.00 $ 196,000.00 183.00 $ 256,200.00 14 60"RCP Storm Sewer LF 2,150 200.00 $ 430,000.00 190.00 $ 408,500.00 250.00 $ 537,500.00 15 24"ACMP Storm Sewer LF 70 40.00 $ 2,800.00 48.00 $ 3,360.00 97.00 $ 6,790.00 16 36"ACMP Storm Sewer LF 200 75.00 $ 15,000.00 67.00 $ 13,400.00 118.00 $ 23,600.00 17 72"ACMP Storm Sewer LF 80 150.00 $ 12,000.00 228.00 $ 18,240.00 250.00 $ 20,000.00 18 8'x 8'RCB Storm Sewer LF 250 500.00 $ 125,000.00 480.00 $ 120,000.00 565.00 $ 141,250.00 19 6'x 5'RCB Storm Sewer LF 80 300.00 $ 24,000.00 390.00 $ 31,200.00 380.00 $ 30,400.00 20 Interceptor Structure EA 6 4,000.00 $ 24,000.00 2,200.00 $ 13,200.00 3,700.00 $ 22,200.00 21 Timber Bents EA 1 500.00 $ 500.00 900.00 $ 900.00 5,100.00 $ 5,100.00 22 Type"C"Inlet EA 27 1,600.00 $ 43,200.00 1,300.00 $ 35,100.00 1,670.00 $ 45,090.00 23 Type"E"Inlet EA 14 1,800.00 $ 25,200.00 1,000.00 $ 14,000.00 1,960.00 $ 27,440.00 24 Retaining Wall Sta 31+12.85 to 32+77.85 SF 3,100 50.00 $ 155,000.00 45.00 $ 139,500.00 56.00 $ 173,600.00 25 C411 Texas Classic Railing on Retaining Wall LF 232 150.00 $ 34,800.00 75.00 $ 17,400.00 93.00 $ 21,576.00 26 Type"C Storm Sewer Manhole 42"and smaller(All Depths) EA 11 1,800.00 $ 19,800.00 1,900.00 $ 20,900.00 1,925.00 $ 21,175.00 27 Type"C"Storm Sewer Manhole 8'Dia EA 4 2,500.00 $ 10,000.00 3,100.00 $ 12,400.00 6,600.00 $ 26,400.00 28 Type"C"Storm Sewer Manhole 11'-6"Dia EA 12 3,500.00 $ 42,000.00 5,300.00 $ 63,600.00 16,600.00 $ 199,200.00 29 Storm Sewer Manhole for RCB EA 2 1,500.00 $ 3,000.00 1,400.00 $ 2,800.00 2,550.00 $ 5,100.00 30 Articulated Riprap SY 1,200 50.00 $ 60,000.00 44.00 $ 52,800.00 66.00 $ 79,200.00 31 5"Concrete Slope Paving SY 50 40.00 $ 2,000.00 50.00 $ 2,500.00 53.00 $ 2,650.00 32 6"PVC Water Line LF 325 25.00 $ 8,125.00 14.00 $ 4,550.00 66.00 $ 21,450.00 33 8"PVC Water Line LF 100 35.00 $ 3,500.00 16.00 $ 1,600.00 18.25 $ 1,825.00 34 12"PVC Water Line LF 1,450 40.00 $ 58,000.00 30.00 $ 43,500.00 31.00 $ 44,950.00 35 16"PVC Water Line LF 550 6.00 $ 3,300.00 51.00 $ 28,050.00 111.00 $ 61,050.00 36 20"PVC Water Line LF 4,250 80.00 $ 340,000.00 66.00 $ 280,500.00 127.00 $ 539,750.00 37 20"Steel Water Line LF 180 85.00 $ 15,300.00 200.00 $ 36,000.00 225.00 $ 40,500.00 38 6"Gate Valve and Box LF 16 900.00 $ 14,400.00 400.00 $ 6,400.00 540.00 $ 8,640.00 39 8"Gate Valve and Box LF 1 1,000.00 $ 1,000.00 550.00 $ 550.00 750.00 $ 750.00 40 12"Gate Valve and Box LF 4 1,200.00 $ 4,800.00 1,100.00 $ 4,400.00 1,395.00 $ 5,580.00 41 16"Gate Valve&Box EA 7 2,500.00 $ 17,500.00 4,500.00 $ 31,500.00 3,900.00 $ 27,300.00 42 20"Gate Valve&Box EA 9 8,000.00 $ 72,000.00 9,000.00 $ 81,000.00 10,000.00 $ 90,000.00 43 6"Irrigation Sleeve LF 300 8.00 $ 2,400.00 9.00 $ 2,700.00 14.25 $ 4,275.00 44 Fire Hydrant EA 15 1,100.00 $ 16,500.00 2,000.00 $ 30,000.00 1,890.00 $ 28,350.00 45 16"Wet Connection EA 1 2,000.00 $ 2,000.00 4,000.00 $ 4,000.00 2,500.00 $ 2,500.00 46 20"Steel Water Line-Bridge Crossing LS 1 40,000.00 $ 40,000.00 30,000.00 $ 30,000.00 38,000.00 $ 38,000.00 47 6"PVC Sanitary Sewer(All Depths) LF 200 25.00 $ 5,000.00 22.00 $ 4,400.00 108.00 $ 21,600.00 48 8"PVC Sanitary Sewer(All Depths) LF 700 30.00 $ 21,000.00 24.00 $ 16,800.00 140.00 $ 98,000.00 49 12"Sanitary Sewer 12 to 14 FT Depth LF 720 31.00 $ 22,320.00 33.00 $ 23,760.00 87.00 $ 62,640.00 50 12"Sanitary Sewer 14 to 16 FT Depth LF 460 37.00 $ 17,020.00 62.00 $ 28,520.00 91.00 $ 41,860.00 51 12"Sanitary Sewer 10 to 12 FT Depth LF 150 28.00 $ 4,200.00 30.00 $ 4,500.00 85.00 $ 12,750.00 52 18"Sanitary Sewer 16 to 18 FT Depth LF 50 65.00 $ 3,250.00 76.00 $ 3,800.00 120.00 $ 6,000.00 53 21"Sanitary Sewer 16 to 18 FT Depth LF 310 80.00 $ 24,800.00 104.00 $ 32,240.00 175.00 $ 54,250.00 54 24"Sanitary Sewer 18 to 20 FT depth LF 160 120.00 $ 19,200.00 130.00 $ 20,800.00 210.00 $ 33,600.00 55 30"Sanitary Sewer 16 to 18 FT Depth LF 1,400 125.00 $ 175,000.00 167.00 $ 233,800.00 215.00 $ 301,000.00 56 30"Sanitary Sewer 18 to 20 FT Depth LF 1,500 140.00 $ 210,000.00 173.00 $ 259,500.00 215.00 $ 322,500.00 57 36"Sanitary Sewer 18 to 20 FT Depth LF 370 145.00 $ 53,650.00 224.00 $ 82,880.00 340.00 $ 125,800.00 58 Sanitary Sewer Manhole 0-8 ft EA 14 2,000.00 $ 28,000.00 1,300.00 $ 18,200.00 3,200.00 $ 44,800.00 59 Sanitary Sewer Manhole Extra Depth VF 120 200.00 $ 24,000.00 150.00 $ 18,000.00 130.00 $ 15,600.00 60 6"Force Main LF 1,450 25.00 $ 36,250.00 18.00 $ 26,100.00 16.40 $ 23,780.00 61 6"Force Main Bridge Crossing LS 1 10,000.00 $ 10,000.00 18,000.00 $ 18,000.00 15,000.00 $ 15,000.00 62 Trench Safety System LF 21,535 1.00 $ 21,535.00 0.30 $ 6,460.50 0.85 $ 18,304.75 63 8"Lime Stabilized Subgrade SY 41,000 2.50 $ 102,500.00 1.60 $ 65,600.00 1.75 $ 71,750.00 64 Lime(7%) Ton 1,000 120.00 $ 120,000.00 100.00 $ 100,000.00 110.00 $ 110,000.00 65 10"Concrete Pavement SY 38,000 34.00 $ 1,292,000.00 38.00 $ 1,444,000.00 38.50 $ 1,463,000.00 66 6"Monolithic Concrete Curb LF 22,500 2.50 $ 56,250.00 1.40 $ 31,500.00 2.45 $ 55,125.00 67 Dowel 6"Concrete Curb LF 600 3.50 $ 2,100.00 3.00 $ 1,800.00 5.00 $ 3,000.00 68 Asphalt(6"thick) SY 100 35.00 $ 3,500.00 26.00 $ 2,600.00 35.00 $ 3,500.00 69 TPDES Requirements LS 1 5,000.00 $ 5,000.00 6,000.00 $ 6,000.00 1,000.00 $ 1,000.00 70 Stabilized Construction Exit EA 3 500.00 $ 1,500.00 1,400.00 $ 4,200.00 500.00 $ 1,500.00 71 Reinforced Filter Fabric Barrier LF 24,000 1.25 $ 30,000.00 1.20 $ 28,800.00 1.55 $ 37,200.00 72 Inlet Protection Barrier EA 41 60.00 $ 2,460.00 60.00 $ 2,460.00 150.00 $ 6,150.00 73 Hydromulch Seeding SY 120,000 0.30 $ 36,000.00 0.20 $ 24,000.00 0.25 $ 30,000.00 74 Sod Block SF 24,000 3.25 $ 78,000.00 2.60 $ 62,400.00 0.38 $ 9,120.00 75 Thermoplastic Pavement Marking(4") LF 16,000 0.35 $ 5,600.00 0.60 $ 9,600.00 0.40 $ 6,400.00 76 Thermoplastic Pavement Marking(8") LF 1,600 0.50 $ 800.00 1.20 $ 1,920.00 1.10 $ 1,760.00 77 Thermoplastic Pavement Marking(12") LF - 0.75 $ - 4.00 $ - 5.00 $ - 78 Thermoplastic Pavement Marking(24") LF 1,750 2.50 $ 4,375.00 7.00 $ 12,250.00 6.50 $ 11,375.00 79 Thermoplastic Pavement Markings(WORD,White) EA 12 150.00 $ 1,800.00 140.00 $ 1,680.00 146.00 $ 1,752.00 80 Thermoplastic Pavement Markings(ARROW,White) EA 12 150.00 $ 1,800.00 140.00 $ 1,680.00 140.00 $ 1,680.00 81 Raised Reflective Pavement Marking CL B Type II-AA EA 80 4.00 $ 320.00 4.00 $ 320.00 4.00 $ 320.00 82 Raised Reflective Pavement Marking CL B Type II-C-R EA 420 4.00 $ 1,680.00 4.00 $ 1,680.00 4.00 $ 1,680.00 83 Traffic Control&Regulation LS 1 25,000.00 $ 25,000.00 4,000.00 $ 4,000.00 3,400.00 $ 3,400.00 84 Traffic Signs EA 19 250.00 $ 4,750.00 350.00 $ 6,650.00 300.00 $ 5,700.00 85 Traffic Signs(Large) EA 3 1,500.00 $ 4,500.00 2,000.00 $ 6,000.00 1,350.00 $ 4,050.00 86 Not Used LF - $ - - $ - - $ - 87 Not Used EA - $ - - $ - - $ - 88 Not Used EA - $ - - $ - - $ 89 Clear Creek Bridge LS 1 1,450,000.00 $ 1,450,000.00 1,000,000.00 $ 1,000,000.00 998,000.00 $ 998,000.00 90 18-inch Drilled Shafts VF 280 65.00 $ 18,200.00 45.00 $ 12,600.00 46.00 $ 12,880.00 91 36-inch Drilled Shafts VF 1,200 150.00 $ 180,000.00 125.00 $ 150,000.00 102.00 $ 122,400.00 92 48-inch Drilled Shafts VF 910 200.00 $ 182,000.00 300.00 $ 273,000.00 300.00 $ 273,000.00 93 Precast Pannel Fence 8'Tall LF 416 70.00 $ 29,120.00 55.00 $ 22,880.00 56.00 $ 23,296.00 94 Precast Pannel Fence with wrought iron 8'Tall LF 10 100.00 $ 1,000.00 75.00 $ 750.00 72.00 $ 720.00 95 Concrete Headwall EA 2 1,000.00 $ 2,000.00 5,600.00 $ 11,200.00 3,600.00 $ 7,200.00 96 Lift Station LS 1 550,000.00 $ 550,000.00 400,000.00 $ 400,000.00 413,000.00 $ 413,000.00 97 Rolling Gate EA 1 2,500.00 $ 2,500.00 1,000.00 $ 1,000.00 1,035.00 $ 1,035.00 98 24-inch Safert End Treatment 6:1 Slope EA 4 900.00 $ 3,600.00 1,600.00 $ 6,400.00 1,025.00 $ 4,100.00 99 2-inch Tap EA 1 500.00 $ 500.00 16,000.00 $ 16,000.00 8,700.00 $ 8,700.00 100 Conveyance Ditch/Swale Excavation CY 40,000 3.50 $ 140,000.00 2.70 $ 108,000.00 2.45 $ 98,000.00 101 TxDOT Ditch Excavation CY 9,000 4.00 $ 36,000.00 6.50 $ 58,500.00 4.00 $ 36,000.00 102 East Detention Pond/Swale Excavation CY 30,000 3.50 $ 105,000.00 2.70 $ 81,000.00 2.45 $ 73,500.00 103 South Detention Pond/Swale Excavation CY 15,500 3.50 $ 54,250.00 2.80 $ 43,400.00 2.70 $ 41,850.00 104 Clear Creek Shelf Excavation CY 3,500 4.00 $ 14,000.00 7.00 $ 24,500.00 6.00 $ 21,000.00 105 21"Sanitary Sewer 14 to 16 FT Depth LF 60 135.00 $ 8,100.00 100.00 $ 6,000.00 165.00 $ 9,900.00 106 36"Sanitary Sewer 20 to 22 FT Depth LF 250 150.00 $ 37,500.00 236.00 $ 59,000.00 375.00 $ 93,750.00 107 Sanitary Sewer Manhole 5 Ft Dia.,0-8 Feet Complete EA 2 2,500.00 $ 5,000.00 1,400.00 $ 2,800.00 5,000.00 $ 10,000.00 108 Sanitary Sewer Manhole 5 Ft Dia.,Extra Depth Complete VF 25 250.00 $ 6,250.00 170.00 $ 4,250.00 255.00 $ 6,375.00 109 6-Inch Conctete Driveway Pavement SY 400 30.00 $ 12,000.00 31.00 $ 12,400.00 40.00 $ 16,000.00 110 2-Inch Asphalt Pavement SY 250 15.00 $ 3,750.00 9.00 $ 2,250.00 11.00 $ 2,750.00 111 Kidder Morgan Concrete Slab LS 1 26,000.00 $ 26,000.00 30,000.00 $ 30,000.00 7,350.00 $ 7,350.00 112 4-FT Barbed Wire Fence LF 4,500 2.00 $ 9,000.00 2.20 $ 9,900.00 3.50 $ 15,750.00 113 4-FT Chain Link Fence LF 1,500 10.00 $ 15,000.00 12.00 $ 18,000.00 12.90 $ 19,350.00 Total $ 8,035,405.00 $ 7,568,945.50 $ 8,886,338.75 6/2/2005 Turner Collie&Braden,Inc. 1