Loading...
R2005-0017 01-24-05 RESOLUTION NO. R2005-17 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO. 6 ASSOCIATED WITH THE CORRIGAN DITCH BY-PASS CHANNEL. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That Change Order No. 6 associated with the Corrigan Ditch By-Pass Channel, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 6 associated with the Corrigan Ditch By- Pass Channel. PASSED, APPROVED and ADOPTED this the 24'bh day of Januar'y , A.D., 2005. ATTEST: APPROVED AS TO FORM: DAIS, RIN M. COKER CITY ATTORNEY TOM REID MAYOR Turner llie Braden Inc. Engineers - Planners o Project Managers Date: December 17, 2004 Owner: City of Pearland Construction Change Order Change Order No. 6 Contractor: Engineer: NGB Constructors,Inc. Turner Collie & Braden Inc. Amount: ($63,057.27) Job Name: Job No.: Contract: Corrigan Subdivision Drainage Improvements - Corrigan Ditch By-Pass Channel 052.511556.0007 Contract No. 1 Amount Time Days Comp Date Original Contract $2,374,770.00 300 12/4/2004 Previous Change Orders #1-5 $250,852.60 N/A Current Change Order # 6 ($63,057.27) N/A Current Contract $2,562,565.33 300 12/4/2004 The terms of the Agreement, dated 2/9/04, between Owner and Contractor are amended as follows: Description of Changes This Change Order reflects the adjustments for the final quanities installed. Title: Date: FER ACCEPTED BY: CONTRACTOR ~ By: ~ Company: NBG CONSTRUCTORS, INC. Title: VICE PRESIDENT Date: JANUARY 19,2005 ' TumerCollie . Braden Inc. Engineers - Planners - Project Managers Date: December 17, 2004 Construction Change Order Job Name: Corrigan Subdivision Drainage Improvements - Corrigan Ditch By-Pass Channel Change Order No. 6 Job No.: 052.511556.0007 Contract: Contract No. 1 Description of Changes CHANGE ORDER TABULATION ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE NET CHANGE 3 Remove and dispose of Existing Pipe - 101 LF $10.00 ($1,010.00) 6 Remove and Dispose of Asphalt Pavement -2808 SY $1.00 ($2,808.00) 7 Remove and Dispose of Concrete Pvmt -72 SY $2.00! ($144.00) 13 24" Drilled Shaft Footing -72 VF $65.013 ($4,680.00) 14 36" Drilled Shaft Footing -73 VF $140.013 ($10,220.00) 15 Tpye "RR8" Rip Rap -74 SY $42.013 ($3,108.00) 16 Channel Excavation 6000 CY $2.113 $12,600.00 Haul and Stockpile Excavated Material 20 Kirby Site -4000 CY $4.00 ($16,000.00) 22 Load Excavated Material -5600 CY $1.00 ($5,600.00~ Haul and Dispose of Surplus Excavated 23 Material 15600 CY $3.50 $54,600.0£ 27 24-inch RCP Storm Sewer -67 LF $40.00 ($2,680.00 29 42-inch RCP Storm Sewer -37 LF $90.00 ($3,330.00 31 24-inch ASCP Storm Sewer - 10 LF $45.00 ($450.00 34 24" RCP 4:1 Safety End Treatments -2 EA $700.00 ($1,400.00 36 Type "A" Inlet - 1 EA $1,000.00 ($1,000.00) 37 Modified Type "A" Inlet - 1 EA $1,700.00 ($1,700.00) 40 12" Steel Sanitary Sewer -120 LF $62.012 ($7,440.00) Sub Total This Page $5,630.00 Form Date: 9/11/2001 TurnerCollie Braden Inc. Engineers o Planners o Project Managers Date: December 17, 2004 Construction Change Order Job Name: Corrigan Subdivision Drainage Improvements - Corrigan Ditch By-Pass Channel Change Order No. 6 Job No.: 052.511556.0007 Contract: Contract No. 1 Description of Changes 41 Sanitary Sewer Manholes -2 EA $2,100.00 ($4,200.00 42 4" PVC Sanitary Sewer Force Main -210 LF $11.00 ($2,310.00 43 4" Steel Force Main Bridge Crossing -1 EA $4,900.00 ($4,900.00 44 2" Air/Vacuum Release Valve Complete -2 EA $1,300.00 ($2,600.00 49 Trench Safety -52 LF $1.00 ($52.00 52 12" Lime Stablized Sub-Grade -217 SY $4.00 ($868.00 53 Lime -25.03 TON $100.00 ($2,503.00) 54 6" Asphalt Base Course - 130 SY $16.50 ($2,145.00) 55 2" Asphalt Surface Course 380 SY $6.50 $2,470.00 57 4" Traffic Paint Pavement Marking White -314 LF $0.20 ($62.80) 58 4" Traffic Paint Pavement Marking Yellow 130 LF $0.20 $26.00 59 12" Traffic Paint Pavement Marking White -233 LF $1.50 ($349.50) 60 4' Barbed Wire Fence -7117 LF $3.25 ($23,130.25) 61 4' Chain Link Fence -272 LF $6.00 ($1,632.00) 62 6' Chain Link Fence -233 LF $7.5C ($1,747.50) 63 6' Wood Fence 5 LF $15.513 $77.5( 65 Pipe Swing Gate -1 EA $1,000.00 ($1,000.00' 66 Hydromulch Sideslopes and Berm -404 SY $0.18 ($72.72 Sub Total This Page ($44,999.27 Form Date: 9/11/2001 TumerCollie Braden Inc. Engineers - Planners o Project Managers Construction Change Order Date: Job Name: December 17, 2004 Corrigan Subdivision Drainage Improvements - Corrigan Ditch By-Pass Channel Change Order No. 6 Job Name: Corrigan Subdivision Drainage Im[ Description of Changes 67 Reinforced Filter Fabric Barrier -7392 LF $1.50 ($11,088.00) 68 Stablized Construction Exit -6 EA $1,500.00 ($9,000.00) 70 16 FT Chain Link Gate -8 EA $450.00 ($3,600.00) Sub Total This Page ($23,688.00) TOTAL I ($63,057.27) Form Date: 9/11/2001