R2005-0017 01-24-05 RESOLUTION NO. R2005-17
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, APPROVING CHANGE ORDER NO. 6 ASSOCIATED WITH THE
CORRIGAN DITCH BY-PASS CHANNEL.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That Change Order No. 6 associated with the Corrigan Ditch By-Pass
Channel, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all
purposes, is hereby authorized and approved.
Section 2. That the City Manager or his designee is hereby authorized to execute
and the City Secretary to attest Change Order No. 6 associated with the Corrigan Ditch By-
Pass Channel.
PASSED, APPROVED and ADOPTED this the 24'bh day of Januar'y ,
A.D., 2005.
ATTEST:
APPROVED AS TO FORM:
DAIS, RIN M. COKER
CITY ATTORNEY
TOM REID
MAYOR
Turner llie Braden Inc.
Engineers - Planners o Project Managers
Date: December 17, 2004
Owner: City of Pearland
Construction Change Order
Change Order No. 6
Contractor:
Engineer:
NGB Constructors,Inc.
Turner Collie & Braden Inc.
Amount: ($63,057.27)
Job Name:
Job No.:
Contract:
Corrigan Subdivision Drainage Improvements -
Corrigan Ditch By-Pass Channel
052.511556.0007
Contract No. 1
Amount Time
Days Comp Date
Original Contract $2,374,770.00 300 12/4/2004
Previous Change Orders #1-5 $250,852.60 N/A
Current Change Order # 6 ($63,057.27) N/A
Current Contract $2,562,565.33 300 12/4/2004
The terms of the Agreement, dated 2/9/04, between Owner and Contractor are amended as follows:
Description of Changes
This Change Order reflects the adjustments for the final quanities installed.
Title:
Date:
FER ACCEPTED BY: CONTRACTOR
~ By: ~
Company: NBG CONSTRUCTORS, INC.
Title: VICE PRESIDENT
Date:
JANUARY 19,2005
' TumerCollie . Braden Inc.
Engineers - Planners - Project Managers
Date:
December 17, 2004
Construction Change Order
Job Name: Corrigan Subdivision Drainage Improvements -
Corrigan Ditch By-Pass Channel Change Order No. 6
Job No.: 052.511556.0007
Contract: Contract No. 1
Description of Changes
CHANGE ORDER TABULATION
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE NET CHANGE
3 Remove and dispose of Existing Pipe - 101 LF $10.00 ($1,010.00)
6 Remove and Dispose of Asphalt Pavement -2808 SY $1.00 ($2,808.00)
7 Remove and Dispose of Concrete Pvmt -72 SY $2.00! ($144.00)
13 24" Drilled Shaft Footing -72 VF $65.013 ($4,680.00)
14 36" Drilled Shaft Footing -73 VF $140.013 ($10,220.00)
15 Tpye "RR8" Rip Rap -74 SY $42.013 ($3,108.00)
16 Channel Excavation 6000 CY $2.113 $12,600.00
Haul and Stockpile Excavated Material
20 Kirby Site -4000 CY $4.00 ($16,000.00)
22 Load Excavated Material -5600 CY $1.00 ($5,600.00~
Haul and Dispose of Surplus Excavated
23 Material 15600 CY $3.50 $54,600.0£
27 24-inch RCP Storm Sewer -67 LF $40.00 ($2,680.00
29 42-inch RCP Storm Sewer -37 LF $90.00 ($3,330.00
31 24-inch ASCP Storm Sewer - 10 LF $45.00 ($450.00
34 24" RCP 4:1 Safety End Treatments -2 EA $700.00 ($1,400.00
36 Type "A" Inlet - 1 EA $1,000.00 ($1,000.00)
37 Modified Type "A" Inlet - 1 EA $1,700.00 ($1,700.00)
40 12" Steel Sanitary Sewer -120 LF $62.012 ($7,440.00)
Sub Total This Page $5,630.00
Form Date: 9/11/2001
TurnerCollie Braden Inc.
Engineers o Planners o Project Managers
Date: December 17, 2004
Construction Change Order
Job Name: Corrigan Subdivision Drainage Improvements -
Corrigan Ditch By-Pass Channel Change Order No. 6
Job No.: 052.511556.0007
Contract: Contract No. 1
Description of Changes
41 Sanitary Sewer Manholes -2 EA $2,100.00 ($4,200.00
42 4" PVC Sanitary Sewer Force Main -210 LF $11.00 ($2,310.00
43 4" Steel Force Main Bridge Crossing -1 EA $4,900.00 ($4,900.00
44 2" Air/Vacuum Release Valve Complete -2 EA $1,300.00 ($2,600.00
49 Trench Safety -52 LF $1.00 ($52.00
52 12" Lime Stablized Sub-Grade -217 SY $4.00 ($868.00
53 Lime -25.03 TON $100.00 ($2,503.00)
54 6" Asphalt Base Course - 130 SY $16.50 ($2,145.00)
55 2" Asphalt Surface Course 380 SY $6.50 $2,470.00
57 4" Traffic Paint Pavement Marking White -314 LF $0.20 ($62.80)
58 4" Traffic Paint Pavement Marking Yellow 130 LF $0.20 $26.00
59 12" Traffic Paint Pavement Marking White -233 LF $1.50 ($349.50)
60 4' Barbed Wire Fence -7117 LF $3.25 ($23,130.25)
61 4' Chain Link Fence -272 LF $6.00 ($1,632.00)
62 6' Chain Link Fence -233 LF $7.5C ($1,747.50)
63 6' Wood Fence 5 LF $15.513 $77.5(
65 Pipe Swing Gate -1 EA $1,000.00 ($1,000.00'
66 Hydromulch Sideslopes and Berm -404 SY $0.18 ($72.72
Sub Total This Page ($44,999.27
Form Date: 9/11/2001
TumerCollie Braden Inc.
Engineers - Planners o Project Managers
Construction Change Order
Date:
Job Name:
December 17, 2004
Corrigan Subdivision Drainage Improvements -
Corrigan Ditch By-Pass Channel
Change Order No. 6
Job Name: Corrigan Subdivision Drainage Im[
Description of Changes
67 Reinforced Filter Fabric Barrier -7392 LF $1.50 ($11,088.00)
68 Stablized Construction Exit -6 EA $1,500.00 ($9,000.00)
70 16 FT Chain Link Gate -8 EA $450.00 ($3,600.00)
Sub Total This Page ($23,688.00)
TOTAL I ($63,057.27)
Form Date: 9/11/2001