R2005-0045 02-28-05 RESOLUTION NO. R2005-45 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO. 5 ASSOCIATED WITH THE DIXIE FARM ROAD PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That Change Order No. 5 associated with the Dixie Farm Road Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 5 associated with the Dixie Farm Road Project. PASSED, APPROVED and ADOPTED this the 28th day of February , A.D., 2005. ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR Freese Nichots, Tnc. Engineers Environmental Scientists Architects 2010 East Broadway Pear[and, TX 77581-5502 281/485-2404 281/485-4322 fax www.freese.com February 15, 2005 FNI 01-262 Mr. Joe Wertz Project Director City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Re: Dixie Farm Road Widening Dear Joe: Per your request please find enclosed our Change of Contract No. 5 for the referenced project. The proposed scope of changes is the result of several coordination/progress meetings we have had with the City staff in the past several months and coordination meetings we had with TxDOT representatives. The changes to PS&E include updating topography, sound wall design and workshop, specifications update, surveying, coordinations, signals update, additional geotechnical, environmental and landscape design services. It also included the requested phasing of the referenced project. It is the intent of the City to construct Dixie Farm Road in two (2) phases. Phase 1 is from Beamer Road to approximately 1,500' south of Broadway (FM 518). Phase 2 is from 1,500' south of Broadway (FM 518) to State Highway 35 (SH 35). This change of contract only covers the tasks and efforts needed to undertake the preparation of Phase 1 PS&E. In doing this, the current plans which are at the 90% level would have to be separated, the Phase 1 plans for the limits mentioned above would have to be updated and completed in accordance with the tasks enumerated below and submitted to City and TxDOT for 95% complete review and comments and the eventual completion. The changes and updates for Phase 2 are not included in this change of contract. For the purpose of this change order which TxDOT will participate in funding, the change order for water and sewer design and update are not included. A separate fee is provided for this City-funded design services. Below is a brief summary of major tasks which need to be undertaken to update, redesign, modify, and separate the plans for Phase 1 PS&E: Mr. Joe Wertz Page 2. 1. Freese and Nichols, Inc. - Lockwood, Andrews and Newnam, Inc. mo Topo Update: Since August 2001 which was the time the Project's aerial mapping was flown, topography has changed considerably in some areas, which would affect the roadway and storm sewer designs, traffic control plans, intersection layouts, quantities, and numerous other related items. Some of these changes include roadway widenings for left-turn lanes at McDonald and McGinnis within Phase 1 limits, installation of a number of culverts and drives, widening of comers at FM 518, placement of sidewalks, landscaping and other items. This update would require additional engineering and drafting to update construction plans, quantities, and other related items. Fee for this task is $17,213.33. Bo Phasing: Due to funding, the City requested a phased implementation plan. Phase 1 will be from Beamer Road to 1,500' south of FM 518. Phase 2 will be from 1,500' south of FM 518 to SH 35. For this supplemental, the original plans and quantities will be revised to remove the plans, details, computations, quantities, and all other related items for the segment from 1,500' south of FM 518 to SH 35 out of plan set; modify the design of roadway, storm sewers, drainage area map, traffic control, and other related items, for the transition segment; and revise other appropriate plans, details, quantities, and standards. Fee for this task is $32,397.15. This fee is to supplement what is remaining in the contract to complete the PS&E for Phase 1. Co 2004 Specifications: Study the 2004 specifications and revise necessary plans, details, typical sections, units of measure, pay items, recompute the necessary quantities, and any other component which require change. Fee for this task is $18,818.61. Sub-Consultants Coordiantions: Extra manhours needed to meet, coordinate and provide the necessary information to our sub-consultants to revise their portion of work. Fee for this task is $4,280.73. Eo Sound Wall Workshop: This budget is to assist the City in preparation and conducting a workshop with residents in Dixie Hollow and Dixie Woods subdivisions whose homes are adjacent to Dixie Farm Road which will be affected by the placement of sound walls. Fee for this task is $2,154.94. Sound Wall Design & Details: This budget is to cover the design and preparation of plans and foundations design for the sound walls along Dixie Hollow and Dixie Woods subdivisions. Fee for this task is $15,683.87. The total fee for Items A thru F is $90,548.63. Joe Wertz Page 3. 2. Sub-Consultants: The fees from our sub-consultants are listed below with their proposals attached: a. Tolunay-Wong Engineers $ 990.00 b. Wilson Survey Group $ 9,100.00 c. Corrigan Consulting $ 7,570.46 d. TEDSI $12,037.41 e. Vernon Henry & Assoc. $ 640.00 Total $ 30,337.87 3. Reimbursable Expenses: An extra budget of $1,990 is proposed for extra printing, mileage, deliveries. The attached spread sheets show the breakdown for each of the above tasks to be done by FNI-LAN. Also attached are sub-consultant's proposals. Please note, all changes are for Phase 1 PS&E only. The total proposed Supplemental (Change of Contract No. 5) is $122,876.50 therefore, the original TxDOT-funded contract amount would increase from current $1,885,460.41 to $2,008,336.91. Finally, we would like to mention that the original FNI-LAN contract fee has been impacted throughout the design by numerous changes. Some of these are: 1) raising of roadway profile from north of Mary's Creek Bypass thus changes to profile, median, widths, sidewalks, etc., 2) due to restricted R.O.W., we had to provide in some segments, retaining walls, 3) as result of potential conflict with waterline, the sidewalks south of Mary's Creek Bypass had to be relocated closer to curb line, 4) monthly meetings with City staff since mid or late 2003 (these meetings have been very helpful in keeping everyone abreast of all components of project being worked on). We hope above requested fees will supplement the current fees to complete the Phase 1 PS&E. As mentioned previously a separate fee budget will be provided for the water and sewer design and updates. Please also note that. A totally separate fee would be required in the future to complete the plans for Phase 2 PS&E. We look forward to begin the above changes in order to complete plans, specifications, and quantities/estimate, for the Phase 1 plan set. Please call me if you have any questions. Sincerely, Mehran (Ron) Bavarian, P. E. Associate Houston Area Office Attachments: February 9, 2005 TEDSI INFRASTRUCTURE GROUP Consulting Engineers 10260 Westheimer, Suite 460, Houston, Texas 77042 Mr. Ron Bavarian, P.E. Houston Area Manager Freese and Nichols, Inc. 2010 East Broadway Pearland, Texas 77581 Re.' Dixie Farm Road Widening - PHASE I From Beamer Road to 1500ft. south of FM 518 "Supplemental" Traffic Engineering Proposal TEDSI Project 21588 Dear Mr. Bavarian: Pursuing a request from The Texas Department of Transportation (TxDOT) in conjunction with the above captioned project, please be advised that we have reviewed our breakdown of' man- hours required to accomplish the traffic engineering services required to perform the revisions to our design plans, as submitted on our Supplemental Proposal dated September 29, 2004, and we kindly submit the following explanation for consideration: These are some of the items that need to be addressed when revising the drawings: · Coordinate project issues and updates with FNI-LAN, TxDOT, City of Pearland and Harris County. · Revise existing conditions at Beamer Road and FM 518 intersections to reflect new geometric improvements and updated information. · Re-check utility information. · Revise/reapply with private utilities for Power Service, name changes, etc. · Update pedestrian pole size (new 15 ft.) and push-button details (now R10-3b) for all signals. · Revise overhead sign details (now clear view font & size) for all signals. · Update proposed conditions to reflect the latest in VIVDS detection and specifications. · Revise signing and striping. · Revise/update General Notes. · Include new/latest Standards. · Revise Index of Drawings. · Revise Basis of Estimates to show new/latest items, codes, quantities, etc. for all signals. · Revise temporary signal layout at Beamer Road and FM 518 to accommodate new geometry. Tel: 713/975-8337 , ~ , Fax: 713/975-7194 Mr. Ron Bavarian, P.E. February 9, 2005 Page 2 · Revise title block information and re-number sheets. · Separate PS&E package and assemble new package for Phase I. · Plot bond copies and re-submit drawings to all agencies (TxDOT, COP and HC) for interim review(s). · Address review comments and respond to agencies comments (received from TxDOT, City of Pearland and Harris County and utilities). We trust that the information provided is sufficient clarification to complete their evaluation of our proposal. However, should you have any questions or need additional information, please let me know. Sincerely, TEDSI INFRASTRUCTURE GROUP Ricardo Rivero Manager of Engineering CC.: File Exhibit "A" Resolution No. 2005-45 CONTRACT CHANGE AUTHORIZATION NO. 5 F REESE ° NICHOLS Client: City of Pearland FNI Project No.: PRL 01-262 Client Contract Ref.: CSJ 0912-31-158 (Brazoria) CSJ 0912-71-744 (Harris) Date: 2-15-05 Project Description: Dixie Farm Road Widening Description of Services Added: Additional services to: A. Update background topo. & revise design and PS&E accordingly; B. Revise current PS&E to prepare Phase 1 (BeaTer Rd. to 1,500' So. of FM 518) only PS&E; C. Revise PS&E due to 2004 Specifications for Phase 1; D. Coordination with Sub-consultants; E. Assistance in sound wall workshop; F. Sound wall design & plans & details. ( Above scope does not include water & sewer design & update. A separate agreement will be made w/City for these tasks) See attached proposals from Project Team & Sub-consultants. Additional Scope of services detailed herein is only for revisions of 90% level PS&E to prepare Phase 1 PS&E(Beamer Rd. to 1,500' South of FM 518) Deliverables: Revised Plans, Specifications and Estimate for Phase 1 construction. Compensation shall be adjusted as follows: Add the following fees to total fee: Freese and Nichols, Inc. - Lockwood, Andrews, & Newnam $92,538.63 Tolunay-Wong $990.00 Wilson Survey Group $9,100.00 Corrigan Consulting $7,570.46 TEDSI $12,037.41 Vernon Henry & Assoc. $640.00 TOTAL $122,876.50 Contract Total as Lump Sum ,~ : ? .~,i,, ~'~ Amended by Change $1,885,460.41 Order No. 1, 2, 3, & 4 Lump Sum Revised Total Contract $2,008,336.91 Schedule shall be adjusted as follows: Not Applicable The above described services shall proceed upon return of this Contract Change Authorization. Services will be billed as they are done. All other provisions, terms, and conditions of the agreement for services which are not expressly amended shall remain in full force and effect. ,//" A contract modification will be submitted. This Contract Change Authorization will serve as contract modification. FREESE AND NICHOLS, INC.: BY: -~...~~ ~ - TITLE: Associate/Houston Area Manager DATE: February 15, 2005 CITY OF PEAR/~,~~__ BY: Bill [1sen TITLE: City Manager DATE: 2/28/05 4055 INTERNATIONAL PLAZA, SUITE 200 ! FORT WORTH, TEXAS 76109-4895 I TELEPHONE: 817-735-7300 .~ METRO: 817-429-1900 t FAX: 817-735-7491 U:\FORMS\CONTRAC%CONTRACT CHANGE REQUEST.DOC ATTACHMENT FEE SCHEDULE SUMMARY Summary of Fee Schedule for Supplemental #5 for Dixie Farm Road PS&E Contract CSJ No. 0912-31-158 & 0912-71-744 Freese & Nichols, Inc. - Lockwood, Andrews & Newnam, Inc. (Project Team) Tolunay-Wong Engineers, Inc. Wilson Survey Group Corrigan Consulting, Inc. TEDSI Infrastructure Group Vernon G. Henry and Associate, Inc. $92,538.63 $990.00 $9,100.00 $7,570.46 $12,037.41 $640.00 Total Cost for Supplemental #5 for Dixie Farm Road PS&E $122,876.50 Page 1 of I SUPPLEMENTAL #5 FEE SCHEDULE Freese & Nichols, Inc. - Lockwood Andrews & Newnam, Inc. (Project Team) Direct Labor by Function Code: Project Project Design Senior Description Principal Manager Engineer Engineer Designer CADD Clerical Total Hours Hours Hours Hours Hours Hours Hours Hours A. Topographical Update - Phase 1 Only Upon receipt of topo. update field surveying, update all pertinent plans and details, revise design, TCP's, demolition, roadway quantities, detouring, etc. 2 14 41 26 31 103 3 220 Subtotal A 2 14 41 26 31 103 3 220 B. Revision to PS&E to Prepare Phase i(Beamer to 1,500' S. FM 518) PS&E 1. Coordinations & meetings 1 8 8 2 19 2. Mod. ofRdwy. P/P at Transition 2 10 12 10 16 50 3. Mod. of Pav't Making & signage at Trans. 2 8 20 30 4. Mod. of TCP's at Trans. & Typical Sections 3 14 I 0 8 24 59 5. Mod. to Horiz. Align. & Rdwy Point Data 4 2 6 12 6. Changes to Cover, Index, Typical sections 2 4 2 6 14 7. Revisions to Rdwy. Quantity Summary sheets 1 6 8 4 6 25 8. Changes to Drainage area map & Hyd. Comp. 2 8 12 8 30 9. Mod. of Drainage P/P & Laterals at Transition 3 l0 10 6 16 45 10. Changes to Demol. Sheets & Quantities 2 6 8 1. Changes to SW3P & quantities at Transition 1 4 4 6 15 12. Plotting & prep. for 95% Submittal 4 6 6 8 8 2 34 13. Addressing 95% Comments 1 4 12 8 8 24 2 59 Subtotal B 2 30 92 78c~ 46 146 6 400 C. Revisions to PS&E Due to 2004 Spec. Phase 1 Only Coordinations, meetings, review of current 0 vs. new spec.'s, changes to quantities, plans, 2 27 72 36 36 28 15 216 item codes, etc. 0 Subtotal C 2 27 72 36 36 28 15 216 Page I of 2 SUPPLEMENTAL #5 FEE SCHEDULE D. Coordinations with Sub's Coordinatios & meetings to provide necessary updated topo., revised plans to sub's and review work and incorlyorate into revised plans 12 12 8 0 16 48 Subtotal D I} 12 12 8 0 16 0 48 E. Coord. w/City on Sound Wall wrkshop. Assistance in prop. of exhibits, mail outs, and meeting, & coord, w/TxDOT(City will mail out notices) 8 6 8 2 24 Subtotal E 0 8 6 0 0 8 2 24 F. Sound Wall Design, P/P, & Details Design of sound walls along Dixie Hollow & Dixie Woods S/D's and prep. of P/P sheets and founda0on details I 12 40 30 20 96 I 200 Subtotal F I 12 40 30 20 96 I 200 Project Project Design Senior Description Principal Manager Engineer Engineer Designer CADD Clerical Total Hours Hours Hours Hours Hours Hours Hours A: Topo. Update 2 14 41 26 31 103 3 220 B: Revsions to Prepare PS&E for Phase 1 2 30 92 78 46 146 6 400 C: Changes to PS&E due to 2004 Spec. 2 27 72 36 36 28 15 216 D: Coordination w/Sub's 0 12 12 8 0 16 0 48 E: Coord. w/City on Sound Wall Wi:shop. 0 8 6 0 0 8 2 24 F: Sound Wall Design I 12 40 30 20 96 I 200 Subtotal Hours 7 103 263 178 133 397 27 1108 Rate $50.00 $40.00 $35.00 $27.00 $25.50 $22.00 $16.50 Rate+Overhead 160.36% $130.18 $104.14 $91.13 $70.30 $66.39 $57.28 $42.96 Rate + Ovrhd 160.36%) x Fix Fee 12% $145.80 $116.64 $102.06 $78.73 $74.36 $64.15 $48.11 l'otal Direct Labor Cost $1,021 $12,1114 $26,842 $14,014 $9,890 $25,469 $1,299 $90~548.63 Freese & Nichols, Inc. - Lockwood Andrews & Newnam, Inc. Indirect Labor Cost Description Unit Qty. Cost Total Extra Travel Mile 500 $0.38 $190.00 Extra Printing/Reproduction L.S. I $1,500.00 $1,500.00 Extra Deliveries L.S. 1 $300.00 $300.00 Total Indirect Labor Cost $1,990.00 IFreese & Nichols, inc. - Lockwood, Andrews & Newnam, Inc.(Project Team) Total Suppemental #5Cost 92,538.63 I Page 2 of 2 Tolunay-Wong Engineers, Inc. 10710 S. Sam Houston Pkwy W., Suite 100 * Houston, TX 77031 * 713-722-7064 * Fax 713-722-0319 TxDOT c/o Freese and Nichols, Inc. 2010 East Broadway Pearland, Texas 77581-5502 Attn: Mr. Ron Bavarian, P.E. November 12, 2004 TWEI Proposal No: P04-G466 NOV 1 6 200 Freese & Nichols, Inc. PROPOSAL FOR GEOTECHNICAL STUDY PROPOSED SOUND WALL DIXIE FARM ROAD WIDENING PROJECT SH 35 TO BEAMER ROAD PEARLAND, BRAZORIA AND HARRIS COUNTIES, TEXAS Dear Mr. Bavarian: Tolunay-Wong Engineers, Inc. (TWEI), is pleased to submit this proposal to provide additional geotechnical services for the referenced project. The additional work in this project consists of the construction of a Sound Wall for the proposed Dixie Farm Road widening project. Preliminary project details were provided by you during our telephone conversation on September 11, 2004. The proposed Sound Wall will be constructed in three areas. Site No. 1, in the vicinity of Boring CB-9, Site No. 2, in the vicinity of Boring CB-10, and Site No. 3, in the vicinity of Boring CB-21. The proposed three sites are anticipated to be no deeper than about 15-ft. The proposed Sound Wall is about 8 feet high and should be designed to withstand 125 miles per hour wind force. TWEI prepared a geotechnical report for this project on November 30, 2002. Scope of Services Our scope of services covered in this proposal will consist of the preparation of the final geotechnical engineering report for this project which will include TWEI geotecl-mical design recommendations for the proposed Sound Wall. Field Exploration. There will be no additional field wok for the proposed Sound Wall. Borings CB-9, CB-10, and CB-21 from TWEI project No. 02-071 submitted on November 30, 2002 will be utilized for the proposed Sound Wall foundations. Engineering Report. We will interface with the FNI design team during the course of the study to discuss the geotechnical information for the proposed Sound Wall. We will prepare a final engineering report that will present our findings and provide you with geotechnical design and construction recommendations for this project, including the geotechnical design recommendations for the proposed Sound Wall. The lateral load analyses for the drilled shafts will be analyzed using the p-y method in which the soil is modeled as a series of non-linear springs. This procedure with appropriate computer codes (i.e., LPILE by Ensoft, Inc.) has the advantage that the major factors influencing soil resistance are inherently included in the semi-empirical p-y design criteria. We will utilize the computer code software "LPILE Mr. Ron Bavarian, P.E. TWEI Proposal No.: P04-G466 November 12, 2004 4.0m" by Ensoft, Inc. to analyze the single foundation resistance to lateral loads. This LPILE 4.0m program runs under the Microsoft® Windows operating systems. Budget Our estimated cost for the above-described services is $990 and will not be exceeded without your prior written authorization for the proposed Sound Wall including issuing the Dixie Farm Road Widening final geotechnical report. Schedule We can complete the analyses and issue our final geotechnical report within 10 days after receiving authorizations to proceed and loading conditions for the proposed Sound Wall. We can furnish you with verbal preliminary information upon completion of the analyses. Closing Remarks Again, we would like to express our appreciation for the opportunity to submit this proposal and look forward to serving you on this project. Sincerely, TOLUNAY-WONG ENGINEERS, INC. Fouad Hammoud, P.E. Accepted by: Name: Date: G:lGeotechnicallProposals120041PO4-G4661P04 G466.pro. doc THE WILSON SURVEY GROUP, INC. PROFESSIONAL LAND SURVEYORS November 9, 2004 Mr. Mehran Bavarian, P.E. Freese-Nichols, Inc. 2010 Broadway Pearland, Texas 77581 Re: City of Pearland: Dixie Farm Road Project - Phase One Update Topographic Survey Dear Mr. Bavarian, This letter is our proposal to provide surveying and mapping services to update the topographic survey information on the Dixie Farm Road-Phase One Project in Pearland, Texas. The project commences at the Mary's Creek Bypass and extends to Beamer Road. The existing topographic information is based on aerial photography prepared in August, 2001. There have been numerous changes in the features such as turning lanes, ddves, utilities constructed and/or relocated, drainage courses altered, etc. The project route will be visually inspected and any changes in the topographic and planimetric features will be horizontally and vertically located. This will include, but not be limited to: changes in pavement, changes in back of curb locations, additions or deletion of utility structures and/or poles, and changes to drainage channels. These changes will be limited to the area within the proposed right-of-way lines and 25-feet outside of the proposed right-of-way lines. We will supply a digital file containing all of the changes· Freese-Nichols can then modify their design drawings accordingly. 2-Man Survey Crew 40 hours @ $95.00/hr. = $ 3,800.00 Survey Technician/CAD 64 hours (~ $65.00/hr. = $ 4,160.00 R.P.L.S. 12 hours @ $85.00/hr. = $1,020.00 Expenses $. 120.00 TOTAL SURVEY COST $ 9,100.00 The cost to provide these services will be $9,100.00 including all labor, materials and expenses. The Wilson Survey Group, Inc. will not be responsible for locating changes beyond thirty (30) days after written authorization to proceed is given. Mr. Bavarian, thank for this opportunity to be of service. We understand that the issuance of a Freese-Nichols Purchase Order will serve as our notice to proceed. Please feel free to contact me if you have any questions or if I can be of further service. Yo)~rs truly, , · ael O. Wilson, R.P.L.S. President 2006 E. Broadway · Suite 105 · Pearland, Texas 77581 Ph (281) 485-3991 · Fax (281) 485-3998 E-mail: mdwilson~houston.rr.com CORRIGAN CONSULTING, ~NC. 12000 Aerospace Ave., Suite 450 Houston, Texas 77034 (281) 922-4766 · Fax (281) 922-4767 September 24, 2004 Mr. Mehran Bavarian Freese & Nichols, Inc. 2010 East Broadway Pearland, Texas 77581 Re-' Statement of Continuous Activity Wetland Delineation and NWP Request Dixie Farm Road Widening Project Pearland, Texas CCI Proposal Number: 04PR-1089 Dear Mr. Bavarian: As requested, Corrigan Consulting, Inc. (CCI) has prepared and submitted the Statement of Continuous Activity for submittal to the Texas Department o'f Transportation (TxDOT) Houston District for the Dixie Farm Road project. In reviewing our file information, we determined that the U.S. Army Corps of Engineers (USACE) Nationwide Permit (NWP) 14, Linear Transportation Crossings, (Permit No. D-11737) for the project expired in 2002. The permit provided authorization for the construction activities at three bridge crossings: Cowart Creek and Mary's Creek in Brazoria County, and Mud Gully in Harris County, Texas. The authorization was based on the provision that no work would be done at the Clear Creek crossing and that Mary's Creek Bypass, a m~'m-made ditch, was determined to be non- j urisdictionai. Frccse & Nichols, Inc. has requested CCI to conduct a wetlands delineation and obtain the enviromnental permits in order to meet the USACE and TxDOT requirements. The scope of services and estimated cost is detailed below. Item 1: Statement of Continuous Activity Based on verbal authorization, CCI has already prepared and submitted thc Statement of Continuous Activity. Thc Statement included a stunmary of the 2003 supplemental traffic noise study and the status of right of way acquisitions, utility adjustments, PS&E and other routine project activities. Based on a conversation with Mr. Jim Roscher of TxDOT Houston District, he has received the Statement and has forwarded it to the FItWA. Item 2: Project Coordination and Review As mentioned above, the NWP 14 for the Dixie Farm Road project (Permit No. D-11737), authorized by the USACE on November 17, 2000, expired in March 2002. In 2002, the USACE reissued new NWPs and General Conditions, including a modified NWP 14. CORRIGAN CONSULTING, ~NC. According to thc USACE, a new NWP 14 for the project can be obtained by resubmitting a report with a current wetland delineation and supporting attachments. Thc USACE will then conduct a wetland delineation verification prior to authorizing the NWP 14. CCI will review our previous pro. ject files and determine if all the attachments previously submitted for the NWP can be utilized in the new submittal. CCI will coordinate with Freese & Nichols, Inc. to review the Typical Bridge Crossing diagram and quantity of fill material used in the previous submittal and verify that there have not been any significant changes since the last NWP application. We will also coordinate with Freese & Nichols to obtain and reviewed current construction plans, including maps and bridge cross-sections, to verify that the new NWP 14 provisions and General Conditions will apply to the project. For the purpose of this proposal, it is assumed that the NWP 14 will be applicable and the only impacts will be thc road crossings at Cowart Creek, Mary's Creek, and Mud Gully. tfthe new NWP i4 conditions cannot be met, we will coordinate with Freese & Nichols, and prepare a revised scope of work if necessary. Item 3: Wetland Survey and Delineation We would conduct a field survey of the project area in order to assess the proposed impacts and perform a wetland delineation and survey the ordinary high water tree at bridge crossings. We will verify that conditions along the roadway meet NWP 14 criteria. We will delineate any wetlands within the right-of-way at the bridge crossings using the routine field method from the 1987 "Corp of Engineers Wetland Delineation Manual" (Technical Report Y-87-1). Any wetland areas will be staked by CC!. In order to qualify for NWP 14, the discharge to non-tidal waters may not cause the loss of greater that 55-acre of waters of the U.S. To re-confirm the total acreage of impact, a survey of the location and dimension of the wetland boundaries and ordinary high water marks of Cowart Creck, Mary's Creek and Mud Gully by a registered land surveyor will be required. Wilson Survey Group will be responsible for completing the surveying and providing a map with the surveyed wetlands and waters. Item 4: Wetlands Report and NWP 14 Request Upon receipt of the new surveyed maps, CCi will verify that the impacts to waters of the U.S. are less than ½-acre, as required fbr the NWP 14. We will also verify that the impacts are less than 0.10 acre, as previously reported. In the event that impacts are greater thm~ 0.10 acres, the NWP may still be applicable, but a Pre-Construction Notice will also be required fbr the project. In this event, CCI will immediately coordinate with Freese & Nichols to submit a revised scope of work for including additional information in the submittal to thc USACE. Assuming that the impacts are less than 0.10 acre, CCI will prepare the wetlands report and request fbr a NWP 14, including the following ite~ns: · Snmmary of the project area vegetation, soils and hydrology; 12000 Aerospace Ave., Suite 450 · Houston, Texas 77034 · (281) 922-4766 CORRIGAN CONSULTING, · Description of any wetlands and impacts to waters of the U.S. at bridge crossings; A wTitten statement explaining how avoidance and minhnization of losses of waters were achieved; · New wetland data sheets and photographs; · New smweyors drawings with delineated wetlands m~d ordinary high water lines; · Typical bridge cross-section; and · Maps showing project boundaries on a USGS Topographic Quadrangle, USFWS National Wetland Inventory Map, FEMA Map, and a NRCS Soil Survey Map. For the purpose of this proposal, we are assuming that the previous maps wili not require modification, other that the title blocks. CCI will submit a copy of the Draft Report for review by Freese & Nichols. Any comyncnts will be incorporated and the Report will be submitted to the USACE. Item 5: USACE Coordination After submitting the application for N WP 14, CCI will coordinate with the U SACE to schedule the fietd verification. CCI will accompany the USACE personnel to orient them to the site and answer any questions. We will then coordinate with the USACE throughout the permitting process to ensure that a timely response is obtained. Currently, the time required by the USACE to complete an authorization to proceed under a NWP is approximately 45 days. UPon receipt of the NWP from the USACE, CCI will forward the docmnentation to Freese & Nichols. The new permit will be effective until March 2007. Schedule and Cost We arc prepared to begin work on this project within one week of receiving a signed Authorization and Agreemcnt Fom~ fi-om Freese & Nichols, Inc. Based on our experience, this project can be completed according to thc following schedule. Item Description Schedule 1 Statement of Continuous Activity completed 2 Project Coordination and Review 2 weeks (includes l xveek for obtaining maps from client) Wetland Survey and Delineation (includes 3 weeks for surveying and maps) Wetland Report & NWP Request (includes 1 week for client review) USACE Coordination 4 5 Total Time Required 4weeks 2 ~veeks 6 weeks 14 weeks 12000 Aerospace Ave., Suite 450 · Houston, Texas 77034 · (281) 922-4766 -- CORRIGAN CONSULTING, The estimated cost to complete this work is detailed in Attachment A. Monthly invoices will be submitted based on time and materials, but will not exceed the estimated total without prior authorization. Remittance will be due within 30 days of the date on the invoice. We appreciate the opportunity to provide our envirolmaental permitting services. If you have any questions, please feel free to call me, or Ms. Kathy Williams, at (281 ) 922-4766 Sincerely, Gall A. Corrigan President KLW/GAC/mh Attachment PSCCI l)oct,menLs\Proposals\2004 Proposals\ 1076-1100\O4PR- 1089 Freese & Nichols - Dixie Farm Road NWP 14W)FR NWP Proposal 09-24-04.doc 12000 Aerospace Ave,, Suite 450 · Houston, Texas 77034 ,. (281) 922-4766 Estimated Cost Statement of Continuous Activity Wetlands Delineation and NWP Request Dixie Farm Road Widening Project Item and Description Unit Cost Number Total Item 1: Statement of Continuous ActiviD~ Project Biologist $81.31/hour Principal $161.84/hour Word Processing $40.46/hour Item 2: Project Coordination and Review Prqjcct Biologist $81.3 l/hour Program Manager $110.38/hour Item 3: Wetland Survey and Delineation Field Biologist Project Biologist Program Manager Mileage Supplies (stakes, film, & devel) Registered Land Surveyor $62.24/hour $81.3 !/hour $110.38/hour $0.375/mile $50.00/day N/A ltem4: Wetland Report and NWP Request Project Biologist $81.31/hour Program Manager $110.38/hour Word Processing $40.46/hour Copies/Deliveries $15/copy Item 5: USACE Coordination Field Biologist Project Biologist Program Manager Word Processing Copies/Deliveries $62.24/hour $8 [ .3 l/hour $110.3 8/hour $40.46/hour $15/copy 12 hours 2 hours 2 hours Subtotal 16 hours 2 hours Subtotal 8 hours 8 hours 1 hour 20 mi les 1 day N/A Subtotal 24 hours 2 hours 4 hours 3 copies Subtotal 4 hours 6 hours 1 hours 2 hours 3 copies Subtotal $ 975.72 323.68 80.92 $1,380.32 $ 1,300.96 220.76 $1,521.70 $ 497.92 650.48 110.38 7.50 50.00 0.00 $1316.28 $ 1~951.44 220.76 161.84 45.00 $ 2,379.04 $ 248.96 487,86 110.38 80.92 45.00 $ 973.12 Total Estimated Cost $ 7,570.46 CORRIGAN CONSUL TING, ~NC. ~ PROJECT AUTHORIZATION AND AGREEMENT Chent: Project: Location CCI Proposal No.: Freese and Nichols, Inc. Statement of Continuous Activity & Wetland Delineation & NWP Request Dixie Farm Road Widening Prqject Pearland, Texas 04PR-1089 This agreemem provides authorization for Corrigan Consulting, Inc. to provide enviromnental consulting services for the completion of a Statement of Continuous Activity and Wetland Delineation and NWP Request fbr the Dixie Farm Road Widening Project, according to the proposal dated September 24, 2004. Remittance will be due to Corrigma Consulting, Inc., 12000 Aerospace Ave., Suite 450, Houston, Texas, within 30 days of each invoice date. For: By: Name: Tide: Corrigzu~ Consulting. Inc. Gall A. Corrigan President Telephone: Date: Authorized and Agreed: (281 ) 922-4766 By: Name: Title: Telephone: Date: Address: CORRIGAN CONSULTING,/NC. ~ September 29, 2004 TEDSI INFRASTRUCTURE GROUP Consulting Engineers 10260 Westheirner, Suite 460 · Houston, Texas 77042 Mr. Ron Bavarian, P.E. Houston Area Manager Freese and Nichols, Inc. 2010 East Broadway Pearland, Texas 77581 Re' Dixie Farm Road Widening - PHASE I From Beamer Road to 1500ft. south of FM 518 "Supplemental" Traffic Engineering Proposal TEDSI Project 21588 SEP ,q 0 200 Freese & Nichols, Inc. Dear Mr. Bavarian: TEDSI Infrastructure Group (TEDSI) appreciates the opportunity to submit this lump Sum "Supplemental" proposal to Freese and Nichols, Inc. and Lockwood, Andrews & Newnam, Inc., Joint Venture (FNI - LAN) to perform traffic engineering services required in conjunction with the Dixie Farm Road Widening PHASE I, from Beamer Road to Farm to Market Road 518 (FM 518). This proposal is based on our understanding of the Scope of Services as stated in your E-Mail dated September 21, 2004, and our recent telephone conversations. The traffic engineering services includes the Final Design Service only. The Contract Phase and Construction Phase are not included with this proposal. PROJECT UNDERSTANDING Due to project funding, the Texas Department of Transportation (TxDOT) and the City of Pearland (COP) have decided to separate the original project (from Beamer Road to SH 35) into two (2) Phases. TxDOT and COP would like to proceed with the completion of the design of PHASE I (from Beamer Road to 1500 ft. south of FM 518). In addition, since the original plans were designed under the "old" specifications, standards and guidelines, it will be required to update the design plans to the new 2004 Specifications, Standards and Guidelines. TEDSI would be required to complete the PS&E for all the "Permanent" and "Temporary" traffic signals located in PHASE I (Dixie Farm Road at Beamer Road, Mc Donald, Mc Ginnis and FM 518 intersections). Tel: 713/975-8337 , i , Fax: 713/975-7194 Mr. Ron Bavarian, P.E. September 29, 2004 Page 2 The revised drawings will be based on electronic files provided by FNI - and/or LAN, including the updated topographic survey and design changes for the above-mentioned intersections. The revisions would be for PHASE I only and will require the updating of the basis of estimate, overhead signs, warning signs, push buttons, power service requirements, video camera detection layouts, modification of stop bars, pedestrian poles and all the required coordination with FNI - LAN, TxDOT, COP and with Harris County. SCHEDULE TEDSI shall perform the services in collaboration with, character, sequence and timing so that it will coordinate with services provided by FNI - LAN under the Prime Agreement. We estimate twenty-one calendar days (21) for the completion of the Design Modifications for PHASE I, from the date on which an executed supplemental contract and written notice to proceed is received from FNI - LAN. The completion of work is contingent upon the availability of required information from FNI - LAN and does not include the time necessary for agency review. COMPENSATION The work as defined in the Scope of Services will be performed at a Lump Sum Fee $12,037.41. The cost proposal includes all the necessary direct expenses estimated to complete these tasks as specified in the Scope of Services. Any work not specifically stated in the Scope of Services will be considered as additional work and will be subject to negotiation. Thank you for the opportunity to provide this supplemental proposal to Freese and Nichols, Inc. - Lockwood, Andrews & Newnam, Inc., Joint Venture. We trust that the information provided is sufficient for you to evaluate this proposal. Should you have any questions or need additional information, please advise. Sincerely, TEDSI INFRASTRUCTURE GROUP Ricardo Rivero ~ Manager of Engineering Enclosures: Fee Schedule/Budget CC.: File LU C: 0 0 N ..c: 0 {D C~ LL CI 0 Lq SUPPLEMENT #1 TO CONTRACT FOR LANDSCAPE ARCHITECTURAL SERVICES BETWEEN VERNON G. HENRY AND ASSOCIATES, INC. (CONSULTANT) AND WEI-LAN, JOINT VENTURE (CLIENT) DATED AUGUST 15, 2000 I. GENERAL All items in this addendum shall be considered additional to those of the basic contract unless noted otherwise herein. II. PROJECT DESCRIPTION The project as stated in the basic contract to which this is a supplement is the Dixie Farm Road Widening from State Highway 35 to the Pearland city limit. For the purposes of this addendum, the project is to be modified to include only the Phase 1 portion which extends south from the City of Pearland city limit to a point 1500 feet south of FM 518. III. ADDITIONAL SCOPE OF SERVICES The construction drawings most recently submitted (90% completion) and commented upon by TxDOT encompass the original project limits but are to be revised to include only the Phase 1 area. In addition, the drawings and specifications will be modified as necessary to conform to the new TxDOT 2004 standard specifications. IV. FEES The lump sum fee required to perform the Additional Scope of Services will be $640.00. ACCEPTED THIS 4th DA mon G. Henry~A~C~ President ~'~~ ,~2004 FOR VERNON G. HENRY AND ASSOCIATES, INC. ~r~ Mary i~ He,y, AiC~-d Vice President As indicated by my signature below, I certify that I am authorized to execute this contract on behalf of WEI-LAN, JOINT VENTURE. BY: Signature Typed Name Date Mary Lou Henry, FAICP, Executive Vice President 1800 West Loop South, Suite 1750, Houston, Texas 77027 Start Winter, AICP, Vice President (713) 627-8666 Fax: (713) 627-7666 Freese Nichots Inc. Engineers Environmental Scientists Architects 2010 East Broadway Pear[and, TX 77581-5502 281/485-2404 281/485-4322 fax www.freese.com February 15, 2005 FNI 01-262 Mr. Joe Wertz Project Director City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Re: Dixie Farm Road Widening Dear Joe: Per your request please find enclosed our Change of Contract No. 5 for the referenced project. The proposed scope of changes is the result of several coordination/progress meetings we have had with the City staff in the past several months and coordination meetings we had with TxDOT representatives. The changes to PS&E include updating topography, sound wall design and workshop, specifications update, surveying, coordinations, signals update, additional geotechnical, environmental and landscape design services. It also included the requested phasing of the referenced project. It is the intent of the City to construct Dixie Farm Road in two (2) phases. Phase 1 is from Beamer Road to approximately 1,500' south of Broadway (FM 518). Phase 2 is from 1,500' south of Broadway (FM 518) to State Highway 35 (SH 35). This change of contract only covers the tasks and efforts needed to undertake the preparation of Phase 1 PS&E. In doing this, the current plans which are at the 90% level would have to be separated, the Phase 1 plans for the limits mentioned above would have to be updated and completed in accordance with the tasks enumerated below and submitted to City and TxDOT for 95% complete review and comments and the eventual completion. The changes and updates for Phase 2 are not included in this change of contract. For the purpose of this change order which TxDOT will participate in funding, the change order for water and sewer design and update are not included. A separate fee is provided for this City-funded design services. Below is a brief summary of major tasks which need to be undertaken to update, redesign, modify, and separate the plans for Phase 1 PS&E: Joe Wertz Page 3. 2. Sub-Consultants: The fees from our sub-consultants are listed below with their proposals attached: a. Tolunay-Wong Engineers $ 990.00 b. Wilson Survey Group $ 9,100.00 c. Corrigan Consulting $ 7,570.46 d. TEDSI $12,037.41 e. Vernon Henry & Assoc. $ 640.00 Total $ 30,337.87 3. Reimbursable Expenses: An extra budget of $1,990 is proposed for extra printing, mileage, deliveries. The attached spread sheets show the breakdown for each of the above tasks to be done by FNI~LAN. Also attached are sub-consultant's proposals. Please note, all changes are for Phase 1 PS&E only. The total proposed Supplemental (Change of Contract No. 5) is $122,876.50 therefore, the original TxDOT-funded contract amount would increase from current $1,885,460.41 to $2,008,336.91. Finally, we would like to mention that the original FNI-LAN contract fee has been impacted throughout the design by numerous changes. Some of these are: 1) raising of roadway profile from north of Mary's Creek Bypass thus changes to profile, median, widths, sidewalks, etc., 2) due to restricted R.O.W., we had to provide in some segments, retaining walls, 3) as result of potential conflict with waterline, the sidewalks south of Mary's Creek Bypass had to be relocated closer to curb line, 4) monthly meetings with City staff since mid or late 2003 (these meetings have been very helpful in keeping everyone abreast of all components of project being worked on). We hope above requested fees will supplement the current fees to complete the Phase 1 PS&E. As mentioned previously a separate fee budget will be provided for the water and sewer design and updates. Please also note that. A totally separate fee would be required in the future to complete the plans for Phase 2 PS&E. We look forward to begin the above changes in order to complete plans, specifications, and quantities/estimate, for the Phase 1 plan set. Please call me if you have any questions. Sincerely, Mehran (Ron) Bavarian, P. E. Associate Houston Area Office Attachments: February 9, 2005 TEDSI INFRASTRUCTURE GROUP Consulting Engineers 10260 Westheimer, Suite 460, Houston, Texas 77042 Mr. Ron Bavarian, P.E. Houston Area Manager Freese and Nichols, Inc. 2010 East Broadway Pearland, Texas 77581 Re: Dixie Farm Road Widening - PHASE I From Beamer Road to 1500ft. south of FM 518 "Supplemental" Traffic Engineering Proposal TEDSI Project 21588 Dear Mr. Bavarian: Pursuing a request from The Texas Department of Transportation (TxDOT) in conjunction with the above captioned project, please be advised that we have reviewed our breakdown of man- hours required to accomplish the traffic engineering services required to perform the revisions to our design plans, as submitted on our Supplemental Proposal dated September 29, 2004, and we kindly submit the following explanation for consideration: These are some of the items that need to be addressed when revising the drawings: · Coordinate project issues and updates with FNI-LAN, TxDOT, City of Pearland and Harris County. · Revise existing conditions at Beamer Road and FM 518 intersections to reflect new geometric improvements and updated information. · Re-check utility information. · Revise/reapply with private utilities for Power Service, name changes, etc. · Update pedestrian pole size (new 15 ft.) and push-button details (now R10-3b) for all signals. · Revise overhead sign details (now clear view font & size) for all signals. · Update proposed conditions to reflect the latest in VIVDS detection and specifications. · Revise signing and striping. · Revise/update General Notes. · Include new/latest Standards. · Revise Index of Drawings. · Revise Basis of Estimates to show new/latest items, codes, quantities, etc. for all signals. · Revise temporary signal layout at Beamer Road and FM 518 to accommodate new geometry. o Tel: 713/975-8337 , ~ , Fax: 713/975-7194 Mr. Ron Bavarian, P.E. February 9, 2005 Page 2 · Revise title block information and re-number sheets. · Separate PS&E package and assemble new package for Phase I. · Plot bond copies and re-submit drawings to all agencies (TxDOT, COP and HC) for interim review(s). · Address review comments and respond to agencies comments (received from TxDOT, City of Pearland and Harris County and utilities). We trust that the information provided is sufficient clarification to complete their evaluation of our proposal. However, should you have any questions or need additional information, please let me know. Sincerely, TEDSI INFRASTRUCTURE GROUP Ricardo Rivero Manager of Engineering CC.: File