R2001-0042 04-26-01 RESOLUTION NO. R2001-42 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING A CHANGE ORDER WITH PATE & PATE ENTERPRISES, INC. FOR CONSTRUCTION SERVICES ASSOCIATED WITH THE MAGNOLIA/HARKEY SANITARY SEWER IMPROVEMENT PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order by and between the City of Pearland and Pate & Pate Enterprises, Inc., a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute a change order with Pate & Pate Enterprises, Inc. for construction services associated with the Magnolia/Harkey Sanitary Sewer Improvement Project. PASSED, APPROVED and ADOPTED this the 26 dayof March , A.D., 2001. TOM REID MAYOR ATTEST: Z '// (.~y SFt~ETARY f,/ V APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY CHANGE ORDER FOR MAGNOLIA/HARKEY SANITARY SEWER TRUNK LINE PEARLAND, TEXAS Date of Issuance: February 15, 2001 Date Amended: March 8, 2001 Owner: City of Pearland Contractor: Pate & Pate Enterprises, Inc. Engineer: Carter & Burgess, Inc. Change Order Number: 2-AMENDED Owner's Project Number: B00-052 Contractor's Project Number: 2786 Engineer's Project Number: 99-3064-030 Explanation of this Change Order: This change order is being issued to authorize the following items: 1) Offset of the sewer line by 2 feet due to a utility conflict between stations 167+70 and 187+ 10. 2) Payment of additional cement stabilized sand and additional asphalt road removal and replacement due to unsatisfactory soil conditions. 3) Additional improvements on parcel # 3 that were authorized by City staff. 4) The boring of a stub-out at Sharondale Drive due to utility conflicts. 5) Time extensions associated with the above changes. 6) Reductions in sodding quantities to only include private property and not City ROW. A contract close out change order will be issued at a later date to adjust line item quantities to match the final as built quantities. 1) Sewer Line Offset A SWBT buried cable was found to be installed at the same location as the proposed sewer line. The sewer line offset was adjusted from 8.0 feet west of the center line of the future ROW to 6.0 feet west of the center line of the future ROW between station 167+70 to station 187+10. No change in cost or quantities is associated with this offset. 2a) Additional Cement Stabilized Sand During the excavation for the 36" sewer line from Station 167+70 to Station 185+90, the contractor encountered different soil conditions than were anticipated. The geotechnical report stated that the excavation could be made vertically and shored with bracing or trench boxes. The soil located under Harkey Road was unstable and did not support the vertical trench through the use of a trench box. This required the contractor to over excavate and replace the material with cement-stabilized sand (CSS). To potentially avoid unstable soil conditions, after they were discovered, the relocation of the sewer line to the west of the original alignment would have been required. This alignment would have placed the sewer line closer to a water line and approximately in the center of an existing ditch which would have lead to additional utility conflicts, the replacement of several driveways and culverts and caused interference with the future boulevard section planned for Harkey Road. This additional work would have resulted in additional cost and time delays for the City of G:\1999-\99-3064.030\CONSTR ADMIN\CO2-AMENDED.DOC Magnolia / Harkey Sanitary Sewer Change Order No. 2 - Amended Page 1 of 3 Pearland. Offsetting the sewer line to the west would not have guaranteed that unstable material would be avoided. As a result, the adjusted alignment under Harkey road was maintained. These soil conditions resulted in 2116 cubic yards of additional CSS being installed by the contractor. Calculations showing the bid amount of CSS and delivery tickets for the actual installed-amount are attached. The unit cost for the removal of unsatisfactory soil and the installation of additional CSS is set at $23.95 per cubic yard. This results in a total cost of $50,678.20. 2b) Additional Asphalt In addition to the poor soil conditions under the road, the base and sub-base material was inadequate in certain places. The geotechnical report indicated a 3 inch thick asphalt pavement with between 12 and 33 inches of base material. In several locations along Harkey Road the base material was less than indicated, which resulted in the failure of the asphalt pavement during construction. The Engineer, Inspector and Contractor reviewed the condition of the road and determined the appropriate limits of replacement. The replacement of additional asphalt is between Stations 167+18 and 187+39. This results in an increase in asphalt restoration (line item 10) by 2,950 square yards and the removal of 960 CY of excess asphalt and sub-grade material. The removal of asphalt and sub- grade material shall be at a lump sum cost of $7,680.00. The replacement of the base material and the asphalt surface shall be at the bid price of $26.70 per square yard. This results in a cost of $78,765.00. 3) Parcel # 3 Improvements Additional improvements were performed on Parcel 3. The 8" sanitary sewer was extended 85 LF to the east at the City of Pearland's request. This work included removing and replacing 118 LF of 18" RCP and two (2) storm water inlets. The additional length of 8" sanitary sewer will be incorporated into the quantity adjustment change order. The removal and replacement of the 18" RCP shall be paid at a unit price of $39.50/LF. The removal and replacement of the storm water inlet shall be paid at a unit price $200.00/EA. 4) Stub-out at Sharondale At Sharondale Drive, existing utility conflicts made the installation of the proposed 8" sanitary sewer stub out impractical by open-cut methods. Therefore, trench-less installation was used to install the 35 LF of 8" sanitary sewer stub-out at Sharondale Drive for a lump sum of $2,500.00. 5) Time Extension The contractor has requested 30 days of additional time to complete the project due to the increased amount of excavation and backfill required and for the other additional work. These additional 30 days shall extend the time for substantial and final completion; however, the time for the early completion bonus expired on January 17, 2001 and shall not be extended. G:\1999-\99-3064.030\CONSTR ADMIN\CO2-AMENDED.DOC Magnolia / Harkey Sanitary Sewer Change Order No. 2 - Amended Page 2 of 3 6) Sodding Ad/ustments The areas identified on the plans to be sodded that are located within City ROW will be hydromulched and not sodded. Quantity adjustments will be incorporated into the quantity adjustment change order. Contract Amount: Original Contract Price: Previous Change Order(s): Contract price prior to this change order $1,222,504.40 $11,8OO.OO $1,234,304.40 Net increase (decrease) from additional items in this change order · Additional cement-stabilized sand [$23.95/CY * 2116 CY] · Additional asphalt surface [$26.70/SY * 2950 SY] · Additional asphalt removal [Lump Sum of $7,680.00] · Remove and replace 18" RCP [$39.50/LF * 118 LF] · Remove and replace storm water inlet [$200:00/EA * 2 EA] · Add 35 LF of trench-less 8" sanitary sewer [Lump Sum] $50,678.20 $78,765.00 $7,680.O0 $4,661.00 $4O0.00 $2,5OO.OO Total increase (decrease) included in this change order $144,684.20 Contract price with all change orders to date (including this change order): $1,378,988.60 Contract Time: Original Contract Time (substantial completion/final completion): Previous change in time: Contract time prior to this change order: 150/180 days 4/4 days 154/184 days Net increase (decrease) from this change order · Additional time to complete additional work 30/30 days 30/30 days Contract time with all change orders to date (including this change order): 184/214 days RECOMMENDED: By: ~"'//-z,-t...~ ~~- Engineer Date: ~~ ACCEPTED: APPROVED: ¢//Contractor Owner Date: .~/~/,~z.-/,¢/ Date: G:\I999-\99-3064.030\CONSTR ADMIN\CO2-AMENDED.DOC Magnolia / Harkey Sanitary Sewer Change Order No. 2 - Amended Page 3 of 3 Magnolia I Harkey Extra Cement Stabilized Sand Calculations C$S Invoices Provided by Pate & Pate 'Total Invoice # of Invoice Date Weight (Tons) )eliveries Number 1/02/2000 19 1 6180280 1102/2000 57 3 6180281 1/09/2000 165 9 6180879 1/09/2000 19 1 6180878 1/10/2000 389 21 6181073 1/10/2000 110 6 6181074 1/11/2000 483 27 6181222 1114/2000 132 7 6181479 1/14/2000 493 29 6181480 1/1512000 362 22 6181701 1/15/2000 586 32 6181700 i 1121/2000 111 7 6182110 11/22/2000 358 21 6182337 11/22/2000 188 10 6182336 11/27/2000 435 6 6182548 11/28/2000 76 4 6182807 11/28/2000 276 17 6182808 11/29/2000 106 6 6183012 11/30/2000 18 1 6183225 11/30/2000 822 49 6183227 12/01/2000 618 38 6183455 12/02/2000 547 12 6183604 12/04/2000 160 10 6183749 12/05/2000 305 19 6183978 12/06/2000 60 4 6184149 12/07/2000 354 21 6184318 12/08/2000 435 27 6184544 12/09/2000 14 1 6184679 12111/2000 183 10 6184846 12/11/2000 501 30 6184847 12/12/2000 633 39 6185049 12/14/2000 18 1 6185223 12/15/2000 405 14 6185408 12/16/2000 325 19 6185499 12/18/2000 98 6 6185646 12/19/2000 171 10 6185855 12/20/2000 56 3 6186088 12/20/2000 204 12 6186089 01/03/2001 38 2 6187088 01/03/2001 109 6 6187089 01/04/2001 242 14 6187281 01/05/2001 349 19 6187487 01/05/2001 265 16 6187488 01/06/2001 342 20 6187632 01/08/2001 392 23 6187812 01/08/2001 202 11 6187811 01/09/2001 467 26 6188027 01/10/2001 150 8 6188205 01/12/2001 702 39 6188455 01/13/2000 430 25 6188572 01/15/2000 592 32 6188726 01/23/2001 346 19 6189270 01123/2001 53 3 6189271 01126/2001 318 28 6189979 01/27/2001 38 2 6190110 Total 15,327 848 07J15/2001 G:\1999-\99-3064.030\CONSTR ADMIN\sand,xls CSS invoices Magnolia / Harkey Extra Cement Stabilized Sand Calculations -'stimated Cement Stabilized Sand (CSS) Required from Station 167+17.8 to End of Project ------'--- CSS for Manhole CSS for Line Segment Manhole Station (Tons) Preceding MH (Tons) i 67 + 17.8 74 : ~: ~::;~ ::i .i i~' ~.'-'~ ~'~'!~ ~"-~:' !ti :i~~-~- ~:~'i~ -, ~ 167+70.8 77 276 170+82.6 77' 1,965 171+94.4 76 658 175+21.7 73 2,006 i79+02.3 69 2,248 179+62.3 69 296 182+82.0 66 1,80C 185+84.3 67 1,677 Bore Pit (20'x8'x18.3') 108 Stub Out @ 170+82.6 46 Stub Out @ 175+21.7 43_ 'Stub Out @ 179+62.3 41 45 Stub Out @ 185+84.3 T_.~..~_.~~otal 648 11,209 Total CSS Installed (Contractor's Invoices) Total CSS BID (Carter & Burgess, Inc. Calculations) Extra CSS used Extra CSS used (1.64 Tons / CY conversion Factor) 15,327 Tons 11,857 Tons 3,470 Tons 2,116 Cubic Yards Sum of Estimated CSS 02/12/2001 g:\1999-\993064.030\CONSTR ADMIN\sand.xls