R2018-041 2018-02-26 RESOLUTION NO. R2018-41 A Resolution of the City Council of the City of Pearland, Texas, approving a change order with Hurtado Construction Company, in the amount of $156,590.72, associated with the Hooper Road Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order associated with the Hooper Road Project, a copy of which is attached hereto as Exhibit"A"and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the change order associated with the Hooper Road Project. PASSED, APPROVED and ADOPTED this the 26th day of February, A.D., 2018. v/vl va,„ TOM REID MAYOR ATTEST: NG ii = IN C 0? Y S" RETA-Y /"\ APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Resolution No. R2018-41 Exhibit "A" Exhibit A CITY OF PEARLAND PROJECTS DEPARTMENT t =R= `.. 3519 Liberty Drive,Suite 300 IIP Pearland,Texas 77581 �' E. '477 www.cityofpearland.com/projects CHANGE ORDER For Hooper Road Reconstruction Date of Issuance: 2/26/2018 Change Order No.: 8 Contractor: Hurtado Construction CoP Project No.: TR1406,WA1504,WW1407 Designer: LJA Engineering P.O.No.: 2016-00000566 Explanation: This change order encompasses the following: • Description of Work Project Closeout Net Change Order Cost Time 1 TR1406 $ 155,686.47 0 Days 2 WA1504 $ 18,599.25 0 Days 3 WW1407 •$ (17,695.00) 0 Days 4 $ - Days 5 $ Days Please attach back-up documentation • Cost&Time Change Summary Cost Time Original Contract: $ 3,634,424.25 365 Days Previous Change Order(s): $ 145,713.54 2 Days Contract prior to this change order: • $ 3,780,137.79 367 Days Net increase(decrease)from this change order $ 156,590.72 0 Days Revised Contract: $ 3,936,728.51 367 Days Finance Approval: Date: RECOMMENDED: RECOMMENDED: By: Date: • By: Date: Design Engineer • Construction Manager ACCEPTED*: APPROVED: By: Date: By: Date: Contractor Owner *Contractor agrees to perform change(s)included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed.No payment to the Contractor(or Consultant)shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order governs.Upon execution by all parties,the following changes identified for the contract value and/or contract time shown,are made part of the contract. Construction I of 1 D19.Revised 7/08 CITY OF PEARLAND PROJECTS DEPARTMENT �-`� q '� 3519 Liberty Drive, Suite 300 'Xi n_� Pearland,TX 77581 ' www.cityofpearland.com/projectsCHANGE ORDER Hooper Road Reconstruction Date of Issuance: 02/22/2018 Change Order No.: 8 Contractor: Hurtado Construction Company CoP Project No.: TR1406 Consultant: LJA Engineering, Inc. P.O. No.: 2016-00000566 Explanation: This change order encompasses the following: Final Net Change Order • Description of Work Cost Time Admin 1 of 7 6.Revised 7/25/08 ,.V - CITY OF PEARLAND rtge 44.*-, 'I ``, PROJECTS DEPARTMENT r : g 3519 Liberty Drive, Suite 300 L , Z, LF�' Pearland,TX 77581 www.cityofpearland.com/projects CHANGE ORDER Hooper Road Reconstruction Date of Issuance: 02/22/2018 Change Order No.: 8 Contractor: Hurtado Construction Company CoP Project No.: TR1406 Consultant: LJA Engineering, Inc. P.O.No.: 2016-00000566 1 Revise the Quantity from 156 to 78 on Bid Item No.1.00, $(780.00) 0 Days "STABILIZED CONSTRUCTION EXIT(INSTALL)" 2 Revise the Quantity from 156 to 78 on Bid Item No.2.00, $(390.00) 0 Days "STABILIZED CONSTRUCTION EXIT(REMOVE)" 3 Revise the Quantity from 1 to 0 on Bid Item No.3.00, "PROVIDE $(8,000.00) 0 Days STORMWATER POLLUTION PROTECTION" 4 Revise the Quantity from 85 to 15 on Bid Item No.6.00, "ROCK $(1,400.00) 0 Days FILTER DAMS" 5 Revise the Quantity from 9387 to 9589 on Bid Item No.7.00, $202.00 0 Days "TRENCH SAFETY SYSTEM" 6 Revise the Quantity from 10427 to 10280.85 on Bid Item No.8.00, $(1,315.35) 0 Days "REMOVING ASPHALTIC CONCRETE PAVEMENT" 7 Revise the Quantity from 1274 to 2900.75 on Bid Item No.9.00, $ 16,267.50 0 Days "REMOVING CONCRETE PAVING" 8 Revise the Quantity from 60 to 0 on Bid Item No.11.00, "MOVE AND $(3,000.00) 0 Days RELOCATE 5'X5' PLANTER BOXES (1500FT)" 9 Revise the Quantity from 100 to 0 on Bid Item No.12.00, "CEMENT $(2,500.00) 0 Days STABILIZED SAND" 10 Revise the Quantity from 16667 to 18542 on Bid Item No.13.00, $24,375.00 0 Days "EXCAVATION" 11 Revise the Quantity from 15496 to 17289.2 on Bid Item No.15.00, $ 10,759.20 0 Days "8"LIME STABILIZED SUBGRADE" 12 Revise the Quantity from 279 to 351.39 on Bid Item No.16.00,"LIME $ 14,333.22 0 Days SLURRY FOR SUBGRADE STABILIZATION" 13 Revise the Quantity from 1265 to 1850 on Bid Item No.17.00, "12" $25,155.00 0 Days PVC WATER MAIN (C-900 DR 18)" 14 Revise the Quantity from 191 to 251 on Bid Item No.18.00, "12"PVC $3,360.00 0 Days WATER MAIN (RESTRAINED JOINTS)" 15 Revise the Quantity from 585 to 0 on Bid Item No.19.00, "8"PVC $(18,456.75) 0 Days WATER MAIN (C-900 DR 18)" 16 Revise the Quantity from 60 to 0 on Bid Item No.20.00, "8" PVC $(3,060.00) 0 Days WATER MAIN (RESTRAINED JOINTS)" Admin 2 of 7 6.Revised 7/25/08 ).:- CITY OF PEARLAND 'IfX PROJECTS DEPARTMENT J�:n �- 3519 Liberty Drive, Suite 300 �- ' Pearland,TX 77581 r ;teras: s www.cityofpearland.com/projects CHANGE ORDER Hooper Road Reconstruction Date of Issuance: 02/22/2018 Change Order No.: 8 Contractor: Hurtado Construction Company CoP Project No.: TR1406 Consultant: LJA Engineering, Inc. P.O. No.: 2016-00000566 17 Revise the Quantity from 6 to 8 on Bid Item No.22.00, "FIRE $8,700.00 0 Days HYDRANT ASSEMBLIES(ALL DEPTHS)" 18 Revise the Quantity from 2 to 3 on Bid Item No.25.00, "SHORT $2,101.00 0 Days SIDE LEAD" 19 Revise the Quantity from 2 to 3 on Bid Item No.26.00, "WET $80.0.00 0 Days CONNECTION TO EXISTING SYSTEM" 20 Revise the Quantity from 232 to 95 on Bid Item No.29.00,"24 IN $(19,180.00) 0. Days PVC SANITARY SEWER" 21 Revise the Quantity from 232 to 95 on Bid Item No.30.00, "24 IN $(685.00) 0 Days PVC SANITARY SEWER(2 FT EXTRA DEPTH)" 22 Revise the Quantity from 9 to 11 on Bid Item No.32.00, "SANITARY $5,070.00 0 Days SEWER SHORT SIDE LEADS" 23 Revise the Quantity from 2 to 0 on Bid Item No.33.00, "8"GATE $(2,900.00) 0 Days VALVE&BOX" 24 Revise the Quantity from 690 to 950 on Bid Item No.39.00, "REFL $260.00 0 Days PAV MRK TY I (Y)4"(BRK)" 25 Revise the Quantity from 1774 to 2164 on Bid Item No.40.00, "REFL $585.00 0 Days PAV MRK TY I (Y)4"(SLD)" 26 Revise the Quantity from 380 to 398 on Bid Item No.42.00, "REFL $54.00 0 Days PAV MRK TY I (W)8"(SLD)" 27 Revise the Quantity from 142 to 134 on Bid Item No.43.00, "REFL $(64.00) 0 Days PAV MRK TY I (W) 12"(SLD)" 28 Revise the Quantity from 43 to 67 on Bid Item No.44.00, "PREFAB $336.00 0 Days PAV MRK TY C(W)24"(SLD)" 29 Revise the Quantity from 1 to 5 on Bid Item No.45.00, "PREFAB $800.00 0 Days PAV MRK TY C(W)(ARROW)" 30 Revise the Quantity from 1 to 5 on Bid Item No.46.00, "PREFAB $800.00 0 Days PAV MRK TY C(W)(WORD)" 31 Revise the Quantity from 1024 to 1044 on Bid Item No.50.00, $ 1,540.00 0 Days "STORM SEWER(24"RCP)C76-CL III" 32 Revise the Quantity from 448 to 398 on Bid Item No.53.00, "STORM $(8,250.00) 0 Days SEWER(36" RCP)C76-CL III" 33 Revise the Quantity from 150 to 0 on Bid Item No.62.00, $(15,150.00) 0 Days "TEMPORARY CULVERT EXTENSION (24"TO 30")" Admin 3 of 7 - 6.Revised 7/25/08 CITY OF PEARLAND ° PROJECTS DEPARTMENT � 3519 Liberty Drive, Suite 300 17 •kUp.,1 Pearland,TX 77581 .7' 115,X; 4. �- www.cityofpearland.com/projects CHANGE ORDER Hooper Road Reconstruction Date of Issuance: 02/22/2018 Change Order No.: 8 Contractor: Hurtado Construction Company CoP Project No.: TR1406 Consultant: LJA Engineering, Inc. P.O. No.: 2016-00000566 34 Revise the Quantity from 60 to 55 on Bid Item No.63.00, "STORM $(1,170.00) 0 Days SEWER(60" RCP)C76-CL III" 35 Revise the Quantity from 26 to 28 on Bid Item No.65.00,"TYPE C $5,400.0.0 0 Days INLET" 36 Revise the Quantity from 1493 to 1529.24 on Bid Item No.68.00, "2" $906.00 0 Days ASPHALTIC CONCRETE PAVEMENT" 37 Revise the Quantity from 646 to 1126.92 on Bid Item No.69.00, "10" $26,450.60 0 Days ASPHALT STABILIZED BASE" 38 Revise the Quantity from 13744 to 14404.2 on Bid Item No.70.00, $51,495.60 0 Days "10"CONCRETE PAVING" 39 Revise the Quantity from 13662 to 13854 on Bid Item No.72.00, "4" $ 192.00 0 Days CONCRETE SIDEWALKS" 40 Revise the Quantity from 1150 to 1874.47 on Bid Item No.73.00, $36,223.50 0 Days "CONCRETE DRIVEWAYS (6 IN THICK)" 41 Revise the Quantity from 240 to 346 on Bid Item No.76.00, $ 1,590.00 0 Days "REMOVING CONCRETE(PAV)" 42 Revise the Quantity from 926 to 802.72 on Bid Item No.81.00,"FL $(4,314.80) 0 Days . BS(CMP IN PLC)(TY E GR 4)(8")" 43 Revise the Quantity from 443 to 464.3 on Bid Item No.86.00, "CONC $2,130.00 0 Days PVMT(CONT REINF-CRCP)(10")" 44 Revise the Quantity from 23 to 0 on Bid Item No.88.00, "ROCK $(1,840.00) 0 Days FILTER DAMS (INSTALL)(TY 1)" 45 Revise the Quantity from 23 to 0 on Bid Item No.89.00, "ROCK $(1,035.00) 0 Days FILTER DAMS (REMOVE)" 46 Revise the Quantity from 2 to 6 on Bid Item No.92.00, "CURB $ 10,000.00 0 Days RAMPS (TY 3)" 47 Revise the Quantity from 460 to 322 on Bid Item No.101.00, "Bore $(6,624.00) 0 Days sanitary line at power poles in lieu of bracing and clearing around poles." 48 Revise the Quantity from 1 to 0 on Bid Item No.105.00, "Remove '$(500.00) 0 Days and Restore Chain Link Fence" 49 Add Item No. 120.00,"Removal and disposal of light poles at N $7,200.00 0 Days Spectrum" Admin - 4 of 7 6.Revised 7/25/08 CITY OF PEARLAND alp PROJECTS DEPARTMENT -•`s• + 3519 Liberty Drive, Suite 300 J ' Pearland,TX 77581 r www.cityofpearland.com/projects CHANGE ORDER Hooper Road Reconstruction Date of Issuance: 02/22/2018 Change Order No.: 8 Contractor: Hurtado Construction Company CoP Project No.: TR1406 Consultant: LJA Engineering, Inc. P.O. No.: 2016-00.000566 50 Add Item No. 121.00,"Furnish and install raised pvmt markers- $ 120.00 0 Days way blue 4x4" Please attach back-up documentation. Cost&Time Change Summary Cost Time Original Contract: $3,634,424.25 365 Days Previous Change Order(s): $ 145,713.54 2 Days Contract prior to this Change Order: $3,780,137.79 367 Days Net increase(decrease)from this Change Order: $ 156,590.72 0 Days Revised Contract: $3,936,728.51 367 Days Finance Approval: �`'' ` Date 02/28/2018 RECOMMENDED: RECOMMENDED: By: �/� �/ 2� Date 02/27/2018 By: Date 02/27/2018 Consultant Construction Manager ACCEPTED*: APPROVED: By: `"_' --Date 02/27/2018 By: Date 02/28/2018 Contractor Owner *Contractor agrees to perform change(s)included in the Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed. No payment to the Contract(or Consultant)shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order governs. Upon execution by all parties,the following changes identifies for the contract value and/or contract time shown,are made part of the contract. Admin 5 of 7 6.Revised 7/25/08 CHANGE ORDER NO.8 ATTACHMENT"A" February 22,2018 PROJECT: Hooper Road Reconstruction PROJECT NO.: TR1406 ORIGINAL CONTRACT REVISED CONTRACT ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL QTY UNIT COST TOTAL NET CHANGE ADJUSTED CONTRACT QUANTITY: CO 105.00 Remove and Restore LS .1 $500.00 $500.00 0 $0.00 -$500.00 Chain Link Fence Pavin 1.00 STABILIZED SY 156 $10.00 $1,560.00 78 $780.00 -$780.00 CONSTRUCTION EXIT (INSTALL) 2.00 STABILIZED ' SY 156 $5.00 $780.00 78 $390.00 • -$390.00 CONSTRUCTION EXIT (REMOVE) 3.00 PROVIDE STORMWATER LS 1 $8,000.00 $8,000.00 0 $0.00 -$8,000.00 POLLUTION PROTECTION 6.00 ROCK FILTER DAMS LF 85 $20.00 $1,700.00 15 $300.00 -$1,400.00 7.00 TRENCH SAFETY LF 9,387 $1.00 $9,387.00 9,589 $9,589.00 $202.00 SYSTEM 8.00 REMOVING ASPHALTIC SY 10,427 $9.00 $93,843.00 10,280.85 $92,527.65 -$1,315.35 CONCRETE PAVEMENT 9.00 REMOVING CONCRETE SY 1,274 $10.00 $12,740.00 2,900.75 $29,007.50 $16,267.50 PAVING 11.00 MOVE AND RELOCATE LF 60 $50.00 $3,000.00 0 $0.00 -$3,000.00 5'X5'PLANTER BOXES (1500FT) 12.00 CEMENT STABILIZED TON 100 $25.00 $2,500.00 0 $0.00 -$2,500.00 • SAND 13.00 EXCAVATION CY 16,667 $13.00 $216,671.00 18,542 $241,046.00 $24,375.00 15.00 8"LIME STABILIZED SY 15,496 $6.00 $92,976.00 17,289.2 $103,735.20 $10,759.20 SUBGRADE 16.00 LIME SLURRY FOR TON 279 $198.00 $55,242.00 351.39 $69,575.22 $14,333.22 SUBGRADE STABILIZATION 39.00 REFL PAV MRK TY I(Y) LF 690 $1.00 $690.00 950 $950.00 $260.00 4"(BRK) 40.00 REEL PAV MRK TY'I(Y) LF 1,774 $1.50 $2,661.00 2,164 $3,246.00 $585.00 4"(SLD) 42.00 REEL PAV MRK TY I(W) LF 380 $3.00 $1,140.00 398 $1,194.00 $54.00 8"(SLD) 43.00 REFL PAV MRK TY I(W) LF 142 $8.00 $1,136.00 134 $1,072.00 -$64.00 12"(SLD) 44.00 PREFAB PAV MRK TY C LF 43 $14.00 $602.00 67 $938.00 $336.00 (W)24"(SLD) 45.00 PREFAB PAV MRK TY C EA 1 $200.00 $200.00 5 $1,000.00 $800.00 (W)(ARROW) 46.00 PREFAB PAV MRK TY C EA 1 $200.00 $200.00 5 $1,000.00 $800.00 (W)(WORD) 50.00 STORM SEWER(24"RCP) LF 1,024 $77.00 $78,848.00 1,044 $80,388.00 $1,540.00 C76-CL III 53.00 STORM SEWER(36"RCP) LF 448 $165.00 $73,920.00 398 $65,670.00 -$8,250.00 C76-CL III 62.00 TEMPORARY CULVERT LF 150 $101.00 $15,150.00 0 $0.00 -$15,150.00 EXTENSION(24"TO 30") - 63.00 STORM SEWER(60"RCP) LF 60' $234.00 $14,040.00 55 $12,870.00 -$1,170.00 C76-CL III • . 65.00 TYPE C INLET EA 26 $2,700.00 $70,200.00 28 $75,600.00 $5,400.00 68.00 2"ASPHALTIC CONCRETE SY 1,493 $25.00 $37,325.00 1,529.24 $38,231.00 $906.00 PAVEMENT 69.00 10"ASPHALT SY 646 $55.00 $35,530.00 1,126.92 $61,980.60 $26,450.60 STABILIZED BASE 70.00 10"CONCRETE PAVING SY 13,744 $78.00 $1,072,032.00 14,404.2 $1,123,527.60 $51,495.60 Admin 6 of 7 6.Revised 7/25/08 CHANGE ORDER NO.8 ATTACHMENT"A" February 22,2018 PROJECT: Hooper Road Reconstruction PROJECT NO.: TR1406 ORIGINAL CONTRACT REVISED CONTRACT ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL QTY UNIT COST TOTAL NET CHANGE 73.00 CONCRETE DRIVEWAYS SY 1,150 $50.00 $57,500.00 1,874.47 $93,723.50 $36,223.50 (6 IN THICK) 76.00 REMOVING CONCRETE SY 240 $15.00 $3,600.00 346 $5,190.00 $1,590.00 (PAV) 81.00 FL BS(CMP IN PLC)(TY E SY 926 $35.00 $32,410.00 802.72 $28,095.20 -$4,314.80 GR 4)(8") 86.00 CONC PVMT(CONT SY 443 $100.00 $44,300.00 464.3 $46,430.00 $2,130.00 REINF-CRCP)(10") 88.00 ROCK FILTER DAMS LF 23 $80.00 $1,840.00 0 $0.00 -$1,840.00 (INSTALL)(TY 1) 89.00 ROCK FILTER DAMS LF 23 $45.00 $1,035.00 0 $0.00 -$1,035.00 (REMOVE) 92.00 CURB RAMPS(TY 3) EA 2 $2,500.00 $5,000.00 6 $15,000.00 $10,000.00 Sanitary 29.00 24 IN PVC SANITARY LF 232 $140.00 $32,480.00 95 $13,300.00 -$19,180.00 SEWER 30.00 24 IN PVC SANITARY LF 232 $5.00 $1,160.00 95 $475.00 -$685.00 SEWER(2 FT EXTRA DEPTH) 32.00 SANITARY SEWER EA 9 $2,535.00 $22,815.00 11 $27,885.00 $5,070.00 SHORT SIDE LEADS 33.00 8"GATE VALVE&BOX EA 2 $1,450.00 $2,900.00 0 $0.00 -$2,900.00 Water 17.00 12"PVC WATER MAIN LF 1,265 $43.00 $54,395.00 1,850 $79,550.00 $25,155.00 (C-900 DR 18) 18.00 12"PVC WATER MAIN LF 191 $56.00 $10,696.00 251 $14,056.00 $3,360.00 (RESTRAINED JOINTS) 19.00 8"PVC WATER MAIN LF 585 $31.55 $18,456.75 _ 0 $0.00 -$18,456.75 (C-900 DR 18) 20.00 8"PVC WATER MAIN LF 60 $51.00 $3,060.00 0 $0.00 -$3,060.00 (RESTRAINED JOINTS) 22.00 FIRE HYDRANT EA, 6 $4,350.00 $26,100.00 8 $34,800.00 $8,700.00 ASSEMBLIES(ALL DEPTHS) 25.00 SHORT SIDE LEAD EA 2 $2,101.00 $4,202.00 3 $6,303.00 $2,101.00 26.00 WET CONNECTION TO EA 2 $800.00 $1,600.00 3 $2,400.00 $800.00 EXISTING SYSTEM Water/Sanitary 72.00 4"CONCRETE SF 13,662 $1.00 $13,662.00 13,854 $13,854.00 $192.00 SIDEWALKS 101.00 Bore sanitary line at LF 460 $48.00 $22,080.00 322 $15,456.00 -$6,624.00 power poles in lieu of bracing and clearing around poles. ADD ITEM(S)TO CONTRACT: Paving 120.00 Removal and disposal of EA 2 $3,600.00 $7,200.00 $7,200.00 light poles at N Spectrum 121.00 Furnish and install raised EA 15 $8.00 $120.00 $120.00 pvmt markers-way blue 4x4 NET TOTAL CHANGE ORDER#8: $156,590.72 ORIGINAL CONTRACT AMOUNT: $3,780,137.79 CHANGE ORDER#8: $156,590.72 REVISED CONTRACT AMOUNT: $3,936,728.51 Admin 7 of 7 6.Revised 7/25/08