Loading...
R2018-064 2018-04-09 RESOLUTION NO. R2018-64 A Resolution of the City Council of the City of Pearland,Texas,authorizing an amended contract for professional services with Huitt-Zollars, Inc., in the additional amount of $102,290.00, for design services associated with the Orange Street Service Center Renovation Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract for professional services, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract for professional services. PASSED, APPROVED and ADOPTED this the 9th day of April, A.D., 2018. ..)e?W TOM REID MAYOR ATTEST: Q�RLM %V, ,Q Y NGL• /ING, TR1 / Y SEI TARY .. .. APPROVED AS TO FORM: Ca. 64-- - DARRIN M. COKER CITY ATTORNEY rf CITY OF PEARLAND `'% 4Q�, PROJECTS DEPARTMENT ` ° Resolution No. 2018-64 3519 Liberty Drive, Suite 300 ladaleritbal Exhibit "A" Pearland,TX 77581 * www.cityofpearland.com/projects isr sc." Professional Services Contract Amendment Renovation of Orange St. PW Service Ctr. Date of Issuance: 03/21/2018 Amendment No.: 1 Consultant: Huitt-Zollars, Inc. CoP Project No.: FA1404 P.O. No.: 2017-00000264 Explanation: This change order encompasses the following: Redesign of the PW Administration Bldg., including Site Master Planning Phase(site&bldg. programming,floor plans, aerial topo); Construction Documents Phase; and Bid Phase. Description of Work Cost Time 1 Revise the quantity from 1 to 1.31425967186550535 on Item No.2 2 $62,060.00 84 Days Construction Documents Phase 2 Revise the quantity from 9240 to 19880 on Item No. 3 3 Bid &Award $ 10,640.00 42 Days Phase Revise the quantity from 5000 to 10000 on Item No. 6 6 $ 5,000.00 0 Days Reimbursable Expenses 4 Add Item No. 7 Site Master Planning Phase $24,590.00 14 Days Please attach back-up documentation. Cost&Time Change Summary Cost Time Original Contract: $428,670.00 0 Days Previous Amendment(s): $0.00 0 Days Contract prior to this Amendment: $428,670.00 0 Days Net increase(decrease)from this Amendment: $ 102,290.00 140 Days Revised Contract: $530,960.00 140 Days Finance Approval: 27Z , Date 05/01/2018 ACCEPTED*: APPROVED: By: � Date 03/26/2018 By: Date 03/26/2018 Consultant Project Manager By: - Date 05/01/2018 Owner *Consultant agrees to perform change(s)included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. Noworlciskobe done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties,the following changes identifies for the contract value and/or contract time shown,are made part of the Design 1 of 1 D4.Revised 7/08 HUITLZI)LLARS NYRf-ZOLLARS,INC. i 1500 South Dairy Ashford r Suite 200 i Houston,TX 77077-3858 281 496 0066 phone 281 496 0220 fax hunt zolars.com March 15,2018 Mr.Robert Upton,P.E. Director of Engineering and Capital Projects City of Pearland 3519 Liberty Drive Pearland,Texas 77581 Attention: Skipper Jones Reference: Redesign of the New Public Works Administration Building at the Orange Street Service Center,Pearland,Texas Dear Mr. Upton: Huitt-Zollars, Inc. (Huitt-Zollars) appreciates the opportunity to provide our proposal for professional architectural and engineering services to the City of Pearland, Texas(City) for revising and upgrading the construction documents, bidding services and construction administration services for the new Public Works Administration Building at the Orange Street Service Center located at 3501 East Orange Street in Pearland,Texas(Project). Our proposal is based upon the scope of services,compensation, schedule,and the terms and conditions in the City's Standard Engineering Agreement. The scope includes revising the current design of the new Public Works Administration Building to accommodate additional city staff along with associated parking, drainage, and landscaping improvements. It is our understanding that the fee remaining from the initial design of the Public Works Admin Building ($7,180.00) and the remaining construction administration fee ($87,860.00) will be available to us to complete this project. SCOPE OF SERVICES: 1.0 Basic Services 1.1 SITE MASTER PLANNING PHASE-Based on updated building program requirements provided by the City,Huitt-Zollars shall: 1.1.1 Update space plans and site program information. 1.1.2 Prepare tentative building floor plans and site master plan. 1.1.3 Meet with key City staff to finalize the building floor plans and site master plan. 1.1.4 Obtain aerial topography of the Orange Street Public Works complex using drone technology. 1.2 CONSTRUCTION DOCUMENTS PHASE - Based on City-approved building program information,Huitt-Zollars shall: 1.2.1 Revise and prepare construction documents(plans and specifications)that set forth in detail the requirements for the construction of the project. The drawings and specifications shall establish in detail the quality levels of material and construction of the Project. 1.2.2 Inform the City of any adjustments to previous opinions of probable construction cost indicated by changes in requirements or general market conditions. 1.2.3 Submit approved construction documents to Texas Department of Licensing and Regulation (TDLR) for ADA Accessibility Review. Huitt-Zollars will review comments received from ADA review and modify drawings as necessary. 1.2.4 Submit five (5) hard copy half size plan sets and upload plans through Protrak online for review by the City. 1.2.5 Upon completion of City review, meet with City to review and revise plans. Huitt- March 15,2018 Mr.Robert Upton,P.E. Orange Street Service Center Zollars shall respond to City's comments in Protrak, if necessary, to finalize Conceptual Plans. 1.2.6 Furnish to the City three (3) hard copies and a compact disk with electronic copy of approved plans,specifications and project manual and upload on Protrak. 1.3 BIDDING PHASE-After acceptance by City of the Final Design Construction Documents and the most recent opinion of probable Construction Cost,Huitt-Zollars shall: 1.3.1 Attend pre-Bid conference. 1.3.2 Issue Addenda as appropriate to clarify,correct,or change the Bidding documents. 1.3.3 Consult with City as to the acceptability of Contractor, subcontractors, suppliers and other individual and entities proposed for the Project. 1.3.4 Attend the Bid opening and assist City in evaluating Bids or proposals and in assembling and awarding contracts for the Project. 1.4 CONSTRUCTION ADMINISTRATION PHASE—Upon award of a Construction contract, Huitt- Zollars shall: 1.4.1 Attend Pre-Construction and construction progress meetings. 1.4.2 Review and process submittals,shop drawings,and Requests for Information. 1.4.3 Review Construction Materials Testing(CMT)reports. CMT shall be performed by others under separate contract with the City. 1.4.4 Review applications for payment. 1.4.5 Coordinate with Construction Manager on all Requests for Change Proposals and Change Orders. 1.4.6 Advise the City on questions from the Construction Contractor. 1.4.7 During construction,Huitt-Zollars shall visit the site monthly in conjunction with the construction meetings in order to observe the progress and quality of the work completed by the Contractor. Such visits and observation are not intended to be an exhaustive check or a detailed inspection of the Contractor's work but rather are to allow Huitt-Zollars to become generally familiar with the work in progress and to determine,in general,if the work is proceeding in accordance with the construction documents. 1.4.8 Based on these visits,Huitt-Zollars shall provide a site visit report to keep the City informed about the progress of the work and shall advise the City about any observed deficiencies in the Work. 1.4.9 Huitt-Zollars shall not supervise,direct or have control over the Contractor's work nor have any responsibility for the construction means,methods,techniques,sequences or procedures selected by the Contractor nor for the Contractor's safety precautions or programs in connection with the Work.These rights and responsibilities are solely those of the Contractor in accordance with the Contract Documents. 1.4.10 Conduct Substantial Completion Inspection,coordinate with City to create punch list, substantiate that items noted are completed,and issue Substantial Completion Certificate. 1.4.11 Provide support services as needed during the project close out process. 1.4.12 Obtain and review close-out submittal from the contractor for completeness before transmitting to the City which include but are not limited to: a. Contractor's red lines and as-built notes b. Warranty information c. Material Safety Data Sheet(MSDS) d. Operating Manuals e. Start up and testing reports f. Building commissioning report(if required in construction documents) Page 2 of 4 March 15,2018 Mr.Robert Upton,P.E. Orange Street Service Center 2.0 Additional Services 2.1 Because the effort required for some items of work varies considerably from project to project,and because some items of work are sometimes provided separately by the City,these items of work are not included in the basic services fees and are authorized and charged separately. Such additional services may include: 2.1.1 FF&E design and procurement services. 2.1.2 Utility Site Survey 2.1.3 Construction Staking and Re-staking 2.1.4 Environmental Investigations 2.1.5 Making revisions in drawings, specifications or other documents when such revisions are inconsistent with written approvals or instructions previously given, are required by enactment or revision of codes, laws or regulations subsequent to the preparation of such documents or are due to other causes not solely within the control of Huitt-Zollars 2.1.6 Any changes to and/or out-of-scope work not included or specifically noted in the Basic Services COMPENSATION: 1.0 Fee Budget 1.1 Our estimated additional fee budget for the Basic Services is as follows: Site Master Planning Phase $ 24,590 (Lump Sum) Construction Documents Phase $ 62,060 (Lump Sum) Bidding Phase $ 10,640 (Hourly Not To Exceed) Total Additional Fee $ 97,290 2.0 Reimbursable Expenses Additional reimbursable expenses shall include fees associated with TDLR ADA Accessibility Submittal, Review and Inspection; and reproduction and outside service fees. Expenses shall be compensated based upon the attached Hourly Rate Sheet and are estimated to be$5,000. 3.0 Total Estimated Budget Our total estimated additional budget for this project is$ 102,290. 4.0 Additional Services Additional Services, mutually agreed upon and authorized separately by the City in writing, shall be completed on a lump sum basis or an hourly not-to-exceed basis per the attached Hourly Rate Sheet. 5.0 Invoicing Invoices will be submitted monthly. Lump sum tasks shall be invoiced based upon percentage of work completed. Hourly tasks shall be invoiced based on hours worked per the attached Hourly Rate Sheet. SCHEDULE: We anticipate the following project schedule: Programming Phase 2 weeks Construction Documents 10 weeks City Review of CD 2 weeks Bidding 4 weeks Construction Phase 12 Months Page 3 of 4 March 15,2018 Mr.Robert Upton,P.E. Orange Street Service Center AUTHORIZATION: Should this proposal meet with your approval and acceptance, please return a City Agreement for our signature. We will schedule the above services as soon as we receive your written authorization. If you have any questions,please call. Sincerely, HUITT-ZOLLARS,INC. Gregory R.Wine,P.E.,LEED AP Senior Vice President Attachments: Hourly Rate Sheet The Texas Board of Architectural Examiners has jurisdiction over complaints regarding the professional practices of persons registered as architects in Texas. TBAE is located in the Hobby Building, 333 Guadalupe, Suite 2-305,Austin,TX 78701. Telephone no. 512-305-9000. Page 4 of 4 HUIThZOLRRS Houston 2018 HOURLY RATE SHEET Engineering/Architecture Interior Design Principal-In-Charge $ 245.00 Sr. Interior Designer $ 110.00 Design Principal $ 210.00 Interior Designer $ 95.00 Sr. Project Manager $ 210.00 Interior Designer Intern $ 75.00 QA Manager $ 190.00 Project Manager $ 185.00 Survey Sr. Civil Engineer $ 180.00 Survey Manager $ 160.00 Sr. Structural Engineer $ 190.00 Sr. Project Surveyor $ 150.00 Sr. Mechanical Engineer $ 180.00 Project Surveyor $ 125.00 Sr. Electrical Engineer $ 185.00 Surveyor Intern $ 120.00 Civil Engineer $ 175.00 Survey Technician $ 105.00 Structural Engineer $ 170.00 Mechanical Engineer $ 150.00 Survey Crews Electrical Engineer $ 160.00 1-Person Survey Crew $ 95.00 Plumbing Engineer $ 150.00 2-Person Survey Crew $ 140.00 Engineer Intern $ 120.00 3-Person Survey Crew $ 170.00 Sr. Architect $ 185.00 Architect $ 150.00 Construction Architect Intern 1 $ 90.00 Construction Manager $ 175.00 Architect Intern 2 $ 110.00 Resident Engineer $ 165.00 Architect Intern 3 $ 140.00 Sr. Project Representative $ 125.00 Sr. Landscape Architect $ 165.00 Resident Project Representative $ 95.00 Landscape Architect $ 130.00 Landscape Architect Intern $ 95.00 Administrative Sr. Planner $ 205.00 Sr. Project Support $ 95.00 Planner $ 120.00 Project Support $ 70.00 Planner Intern $ 80.00 Sr. Designer $ 150.00 Reimbursable Expenses Designer $ 125.00 Consultants Cost + 10% Sr. CADD Technician $ 130.00 Other Direct Costs Cost + 10% CADD Technician $ 90.00 Mileage IRS Standard Business Mileage Rate HUI1TZOLIARS PROJECT BUDGET WORKSHEET- Houston 2015 Contract Mod Client: City of Pearland Date: 3/20/2018 Project Name: Additional Design of Admin Building Project Number: I -. Contract No.: Project Template: Project No.: Labor Code Schedule: HO10 Phase Number RMB Phase Description Revise CDs Bid Admin Bldg Site Programming and Reimbursable Drone Survey Expenses Task Number HZ LABOR BUDGET New Admin Bldg Task Description &Site wont Phase/rask Manager Lump Sum or Hourly LS LS LS Column Total Column Total Column Total Column Total Cobde Labor Classification Hourly Rate $ 62,060.00 $ 10,640.00 $ 24,590.00 1$ 5,000.00 TOTAL HOURS TOTAL BUDGET PIC Principal-In-Charge $ 225.00 0 16 2 18 $ 4,050.00 SPM Sr.Project Manager $ 180.00 8 0 16 24 $ 4,320.00 PMX Project Manager $ 170.00 0 0i 0 0 $ - QAM QNQC Manager $ 180.00 0 OB 0 0 $ - SCE Sr.Civil Engineer $ 175.00 0 0 0 0 $ - CEX Civil Engineer $ 170.00 16 8 16 40 $ 6,800.00 EIT Engineer Intern $ 115.00 160 2 0 162 $ 18,630.00 SSE Sr.Structural Engineer $ 175.00 0 0 0 0 $ - STE Structural Engineer $ 165.00 16 2 0 18 $ 2,970.00 SME Sr.Mechanical Engineer $ 175.00 0 0 0 0 $ - MEX Mechanical Engineer $ 165.00 12 2 0 14 $ 2,310.00 SEE Sr.Electrical Engineer $ 175.00 0 0 0 0 $ - EEX Electrical Engineer $ 165.00 12 2 0 14 $ 2,310.00 PEX Plumbing Engineer $ 165.00 12 16 0 28 $ 4,620.00 SAX Sr.Architect $ 175.00 40 0 0 40 $ 7,000.00 AXX Architect $ 145.00 0 8 16 24 $ 3,480.00 AIX Architect Intern $ 115.00 120 0 16 136 $ 15,640.00 CTX CADD Technician $ 90.00 100 0 0 100 $ 9,000.00 SMX Survey Manager $ 155.00 0 0 4 4 $ 620.00 SPS Sr.Project Surveyor $ 130.00 0 0 0 0 $ - PSX Project Surveyor $ 120.00 0 0 8 8 $ 960.00 SIX Surveyor Intern $ 115.00 0 0 40 40 $ 4,600.00 STX Survey Technician $ 90.00 0 0 40 40 $ 3,600.00 SC1 1-Person Survey Crew $ 90.00 0 0 0 0 $ - SQ 2-Person Survey Crew $ 135.00 0 0 32 32 $ 4,320.00 SM2 2-Person Survey Member $ - 0 0, 32 32 $ - RPR Resident Project Representative $ 95.00 0 4 0 4 $ 380.00 PSS Senior Project Support $ 85.00 0 0 0 0 $ - PRO Project Support $ 70.00 16 4 4 24 $ 1,680.00 Total Manhours per 512 64 226 802 Ptese/Task HZ Labor per Phase/Task $ 62,060.00 $ 10,640.00 $ 24,590.00 HZ Labor $ 97,290.00 Direct Expenses(Distribute among Phases/Tasks as applicable) $ - $ - $ . Direct Expenses $ Direct Consultants(Distribute among Phases/Tasks as applicable) $ - $ - $ - Direct Consultants $ - RMB Expenses $ 5,000.00 RMB Expenses $ 5,000.00 RMB Consultants(Distribute among Phases/Tasks as applicable) $ - $ - $ - RMB Consultants $ Total Fee per Phase/Task 5 62,060.00 $ 10,640.00 $ 24,590.00 $ 5,000.00 CONTRACT SUM $ 102,290.00 Orange Sheet Admin Bldg.PROJECT_WORKBOOK_HOUSTON 2015 Version 4.x15/CM PROJECT BUDGET-HZ House Bill 89 Verification I, C. Y4N - (Person name), the undersigned representati (hereafter referred to as "Representative") of l S TT -21aid iS, - iv(C_ . (company or business name, hereafter referred to as "Business Entity"), being an adult over the age of eighteen (18)years of age, after being duly sworn by the undersigned notary, do hereby depose and affirm the following: 1. That Representative is authorized to execute this verification on behalf of Business Entity; 2. That Business Entity does not boycott Israel and will not boycott Israel during the term of any contract that will be entered into between Business Entity and the City of Pearland; and 3. That Representative understands that the term "boycott Israel" is defined by Texas Government Code Section 2270.001 to mean refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes. f )'1.1 SIGNATUR OF REPRESENTATIVE ��,� SUBSCRIBED AND SWORN TO BEFORE ME, the undersigned authority, on this day of khc L , 20 I I . —\--.0^A ki4-1`6\ \-\-ekl rapo4 c\o,---) Notary Public - - — - - 1 4"'.,�.�'i1 TONI LYNN HOLLINGSWORTH 4 JL- Notary ib r 12145305 0 I My Commission Expire %Tr too November 10.2020 e