R2018-113 2018-06-25 RESOLUTION NO. R2018-113 A Resolution of the City Council of the City of Pearland,Texas,authorizing the City Manager or his designee to enter into an amended contract with Freese and Nichols, Inc., in the additional amount of $104,263.01, for engineering services associated with the McHard Road Extension Project (Fiber Optics Network); and approving a Supplemental Work Authorization to include a fiber network in the Mchard Road Extension Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract for engineering services associated with the McHard Road Extension Project, a copy of which is attached hereto as Exhibit"A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That a Supplemental Work Authorization to include fiber network improvements in the McHard Road Extension Project is hereby approved. Section 3. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the above referenced documents required for the McHard Road Extension Project. PASSED, APPROVED and ADOPTED this the 25th day of Ju e A.D., 2018. TOID MAYOR ATTEST: .0i 111114, . a-rzte- - :-.:4./ i tr. Yso6 NG LO 1 G, TRAC7 =� _ SEC ARY APPROVED AS TO FORM: 0 ild‘ l... alL• DARRIN M. COKER CITY ATTORNEY Resolution No. 2018-113 CITY OF PEARLAND 0.‘ r`'4.. Exhibit "A" PROJECTS DEPARTMENT • • O 3519 Liberty Drive, Suite 300 Pearland,TX 77581 www.cityofpearland.com/projects Fsr Professional Services Contract Amendment McHard Road Extension from Cullen to Mykawa Date of Issuance: 06/01/2018 Amendment No.: 3 Consultant: Freese&Nichols CoP Project No.: TR1405 P.O.No.: 2017-00000670 Explanation: This change order encompasses the following: Freese and Nichols, Inc.(FNI),has been commissioned to design the fiber optics network throughout the proposed McHard Rd.corridor.The fiber work has been divided into two scopes. Work within the McHard Road Extension project limits and work beyond the limits that connect to existing termini at the Westside Event Center on the west end and at SH 35 on the east end. The design work within the project limits total$51,115.01 which has an 80/20 cost share with TxDOT. The design cost of the work outside of the project limits is$53,148.00;the City is responsible for 100%of this cost. This contract amendment adds the total fiber design cost of$104,263.01 to the FNI contract. Description of Work Cost Time 1. Revise the quantity from 1 to 1.7202915099868304 on Item No. 1 1 $ 104,263.01 0 Days Route Studies/Design Please attach back-up documentation. Cost&Time Change Summary Cost Time Original Contract: $4,415,202.20 0 Days Previous Amendment(s): $0.00 0 Days Contract prior to this Amendment: $4,415,202.20 0 Days Net increase(decrease)from this Amendment: $ 104,263.01 0 Days Revised Contract: $4,519,465.21 0 Days Finance Approval: Date 06/27/2018 ACCEPTED*: APPROVED: By: ''.001,—A26----4. �.— Date 06/26/2018 By: Date 06/15/2018 Consultant Project Manager By: • --- Date 06/27/2018 Owner *Consultant agrees to perform change(s)included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties,the following changes identifies for the contract value and/or contract time shown,are made part of the Design 1 of 1 D4.Revised 7/08 FREESEinnovative approaches 1 ZNICHOLs practical results 11200 Broadway Street,Suite 2320 • Pearland,Texas 77584 • 832-456-4700 • FAX 832-456-4701 www.freese.com July 6, 2017 Updated 4-19-18 I I ! Jennifer Lee, Project Manager City of Pearland 3519 Liberty Drive Pearland,Texas 77581 Re: McHard Road Extension—Contract Amendment-ITS Additional Design Services Dear Jennifer: Per TxDOT's feedback,we are submitting this revised proposal to amendment McHard Road Extension contract to provide additional engineering services for the ITS Design. The scope of this work will be for the design a 4" PVC conduit, Fiber Optic lines, and connectivity to proposed signals and controllers along McHard Road extension from Cullen Blvd. to Mykawa Road. Design will be per TxDOT design criteria. Per TxDOT's comment,we removed the additional budgets,on As-Needed Basis,for the Bld&Award and Construction Admin. Design Support Services. We are proposing to work with our subconsultant, GC Engineering, Inc. to complete this additional services. Fees and detailed scope of work are attached. Here is summary additional fee breakdown: Freese and Nichols, Inc. Design Services $11,377.24 GC Engineering. Inc. Design Services (DBE Sub) $39,737.77 Total $51,115.01 Please contact me if you have any questions or need additional information. Sincerely, Mehran (Ron) Bavarian Project Manager Attachments PRL 14465—contract,ITS WAs Used Contract No.TR1406/CSJ 0912-31-290 ATTACHMENT D D-2 SUPPLEMENTAL WORK AUTHORIZATION NO..1 WORK AUTHORIZATION NO. 2017-00000670 CONTRACT FOR INTELLEGENT TRANSPORTATION SYSTEM (ITS) DESIGN SERVICES THIS SUPPLEMENTAL WORK AUTHORIZATION is made pursuant to the terms and conditions of Article 5 Contract No.TR1405/CSJ 0912-31-290 hereinafter identified as the "Contract," entered Into by and between the City of Pearland, and Freese and Nichols. Inc. (the Engineer). The following terms and conditions of Work Authorization No. 2017-00000670 are hereby amended as follows: 1. Attachment C, Services To Be Provided By The Engineer, is amended to add engineering services for the ITS design. The scope of this work will include the design of a 4"conduit, Fiber Optic lines, and connectivity to the proposed traffic signals and controllers along McHard Rd.from Cullen Blvd. to Mykawa Rd. The design of the ITS will be per TxDOT criteria. 2. The maximum amount payable under this Supplemental Work Authorization Is$51,115.01. All other provisions are unchanged and remain in full force and effect. This Supplemental Work Authorization shall become effective on the date of final execution of the parties hereto. All other terms and conditions of Work Authorization No.2017-00000670 not hereby amended are to remain in full force and effect. IN WITNESS WHEREOF,this Supplemental Work Authorization is executed In duplicate counterparts and hereby accepted and acknowledged below. Freese and Nichols,Inc. THE CI • OF Pi ARLAND (Signature) Signatu 1 �rfrosr.L AO") BOldOstia/1 Oinked Name) (Print Socf%att. V a (Date) (Date) Engineering-Engineering SpecOeivANA.doc Page 1 of 1 Attachment D-2 FREESE iRI%IICHOLS , ,'` 11200 Broadway Street,Suite 2320 • Pearland,Texas 77584 • 832-456-4700 • FAX 832-456-4701 www.freese.com April 10,2017 Jennifer Lee Project Manager City of Pea rland 3519 Liberty Drive Pea rland,Texas 77581 RE: McHard Road Fiber Optic Conduit Dear Jennifer, Freese and Nichols, Inc. (FNI) appreciates the opportunity to submit to you our proposal for providing professional engineering services to the City of Pearland for the referenced project. FNI will render professional services In connection with the development of the Project as defined in the Exhibit A—Utilities Scope of Services&Supplemental Services included as Attachment A. FNI proposes to complete the final design effort for a lump sum fee of$39,105 and the bid and construction phases for a fee not-to-exceed $3,798 and $9,045, respectively. Direct expenses not-to-exceed $1,200. The total proposed fee is$53,148. FNI proposes to furnish our services as described herein in accordance with the fee as outlined in Attachment B — Compensation and detailed In Attachment C. For your reference, we also included a preliminary opinion of probable construction cost(OPCC) and proposed project schedule as Attachments D& E,respectively If additional information or clarification is desired, please do not hesitate to contact us. Sincerely, FREESE AND NICHOLS,INC. Mehran (Ron) Bavarian,P. E. Associate—Transportation Group Manager C: Carrie French, P.E., Project Manager Attachments v 9� TEX AS UTILITIES SCOPE OF SERVICES FOR McHard Road Fiber Optics Conduit Westside Event Center to Cullen Boulevard & Mykawa Road to SH 35 Design 1 of 9 D10.Revised 12/11 BASIC SERVICES: The Consultant shall render the following professional engineering services to the OWNER in connection with the construction of the Project. TASK I— PROJECT MANAGEMENT 1. Plan and participate In a PROJECT kick-off meeting with CITY to confirm PROJECT scope, team, lines of communication, and schedule; 2. Plan and participate in up to two (2) project status meetings and two (2) site meetings to facilitate PROJECT coordination, timeliness, and budget compliance. Prepare meeting summary (meeting minutes) and distribute to participants; 3. Develop a PROJECT task schedule; 4, Prepare and provide monthly progress/status reports to the CITY sufficient to support monthly billings. Monthly status reports shall be submitted with monthly invoices; and 5. Contact and coordinate with franchise utility companies to inform them of the'PROJECT, update record Information, coordinate survey and base mapping information, identify possible conflicts, and establish critical issues for design, PROJECT schedule, and construction. Note areas for potential conflict of lines to be resolved during design; • TASK II — DETAILED DESIGN The following shall be provided for the preparation of construction documents: 1. ENGINEER will prepare Plans and Specifications for the PROJECT. The PROJECT Is based on the preparation of plans and specifications for the installation of 4" Fiber Optic conduit along two segments of McHard Road. One segment will be from Smith Ranch Road to east of Cullen Blvd. the other segment will be from west of Mykawa Road to east side of Old Alvin Road; Design 2 of 9 D1O.Revised 12/11 2. Conduit drawings will include plan-only, double stack, at 1-inch equal fifty (50) feet scale horizontally (full size plans); prepare general specifications and quantities for Contractor's installation of as-needed Storm Water Pollution Prevention Systems; and traffic control plan and standard details, as needed; 3. Prepare construction related permits required for the installation of the proposed fiber optic conduit, such as City roadway, TxDOT roads, gas line, pipelines, or power line; 4. Opinion of probable construction costs—ENGINEER will prepare an opinion of probable construction costs for review by the CITY following completion of the conduit alignment route study. This opinion will be updated for the sixty percent (60%), the ninety percent (90%), and the final (100%) quality control review meetings; 5. Quality control review meeting-- ENGINEER will plan and participate in up to two (2) quality control review meetings with CITY personnel. The meetings will be held at approximately the sixty percent (60%) and the ninety percent (90%) project completion stages. ENGINEER will provide three (3) review sets (half-size), and three (3) review sets of specifications a minimum of ten (10) working days before the review meetings. A meeting memorandum will be prepared documenting major revisions and decisions made during each of the meetings. The meeting locations will be at the CITY'S offices. TASK Ill CONSTRUCTION ADVERTISEMENT AND BIDDING The CITY's Purchasing Department shall be responsible for advertising and bidding the PROJECT, including all correspondence, and bid opening meetings. ENGINEER shall provide the following during advertising and bidding: 1. Pre-bid meeting—Assist CITY in conducting a pre-bid conference with the Contractors; Design 3 of 9 D14.Revised 12/11 2. Bidding documents--ENGINEER will provide the CITY with electronic PDF files of the construction plans and the specifications. The CITY shall be responsible for posting the bid documents to the CITY's website for access for potential bidders; 3. Information to bidders—When requested by CITY, ENGINEER shall respond to questions related to the construction bid documents regarding the PROJECT; 4. Addenda—When requested by CITY, ENGINEER shall prepare and deliver to CITY, in PDF format, up to two (2) addenda addressing additions, deletions, modifications, or interpretations to the contract documents; and 5. Prepare contract documents for execution — assist the CITY in preparing construction documents for execution by the successful low bidder. Prepare a Notice of Award for the CITY to issue to the contractor upon award of the contract by the CITY with instructions of executed documents and bonds for conformance with the requirements of construction contract documents. Assist the CITY in reviewing executed documents and bonds for conformance with the requirements of construction contract documents. Assist the CITY in reviewing certificates of insurance for compliance with construction contract documents. Forward documents to the CITY with a recommendation of execution and distribution of documents. Those documents will include up to three (3) half-size conformed construction plans, three (3) sets of executed construction specifications, and three (3) sets of conformed construction specifications, TASK IV—CONSTRUCTION PHASE GENERAL REPRESENTATION FNI will proceed with the performance of Construction Phase Services as described below. FNI will endeavor to protect the CITY In providing these services. However, it Is understood that FNI does not guarantee the Contractor's performance, nor is FNI responsible for supervision of the Contractor's operations or employees. FNI shall not be responsible for the means, methods, Design 4 of 9 DID.Revised 12/11 techniques, sequences, or procedures of construction selected by the Contractor, or any safety precautions and programs relating in any way to the condition of the premises, the work of the Contractor, or any Subcontractor. FN1 shall not be responsible for the acts or omissions of any person (expect its own employees or agents) at the Project site or otherwise performing any of the work of the Project: 1. Pre-Construction Conference -Assist CITY in conducting a pre-construction conference with the Contractor; 2. Communication - Establish communication procedures with the CITY and the Contractor; 3. Documentation & Submittals - Establish and maintain a project documentation system consistent with the requirements of the construction contract documents. Monitor the processing of Contractor's submittals and provide for filing and retrieval of project documentation. Review Contractor's submittals, Including: a) Requests for Information (up to 10); b) Contract modifications (up to 5): c) Shop drawings (up to 10); d) Schedules (up to 4- monthly); e) Other submittals in accordance with the requirements of the contract documents for the Project. 4. Site Visits - Make one (1) site visit per month for the estimated 5-month construction duration (5 site visits_total) to observe the progress and quality of work and attempt to determine, in general, if the work Is proceeding in accordance with the contract documents. In this effort, FM will endeavor to protect the City against defects and deficiencies in the work of Contractors Design 5of 9 1)10.Revised 12/11 and will report any observed deficiencies to the City. Visits to the site in excess of the specified number are an additional service: 5. Contractor Quality Review - Notify the Contractor of non-conforming work observed on site visits. Review quality related documents provided by the Contractor such as test reports, equipment installation reports, or other documentation required by the contract documents; 6. Contract Document Interpretation - interpret the drawings and specifications for the City and Contractor. Investigations, analyses, and studies requested by the Contractor and approved by the City for substitutions of equipment and/or materials or deviations from the drawings and specifications is an additional service; 7. Change Order Documentation - Establish procedures for administering constructive changes to the construction contracts. Process contract modifications and negotiate with the Contractor on behalf of the CITY to determine the cost and time impacts of these changes. Prepare change order documentation for approved changes for execution by the CITY. Documentation of field orders, where cost to CITY is not impacted, will also be prepared; 8. Substantial Completion - Conduct, in company of CITY's representative, one (1) site visit for review of the Project for Substantial Completion, including conformance with the design concept of the Project and general compliance with the contract documents, Prepare a list of deficiencies to be corrected by the Contractor before recommending the project be Substantially Complete; and 9. Final Completion - Conduct, in company of CITY's representative, one (1) site visit for review of the Project for Final Completion, including conformance with the design concept of the Project and general compliance with the contract documents, Prepare a list of deficiencies to be corrected Design 6 of 9 D10.Revised 12/11 by the Contractor before recommendation of final payment. Assist the CITY in obtaining legal releases, permits, warranties, and spare parts from the Contractor. TASK V— PREPARATION OF RECORD DRAWINGS 1. Examine the Contractor's construction record as-built drawings once a month to determine that the information appears to be recorded in an accurate and timely manner by the Contractor as required In the construction contract documents; and 2. Preparation of Record Drawings -The ENGINEER shall revise the construction drawings In accordance with the information furnished by Contractor(s), reflecting changes made during construction of the PROJECT. ENGINEER shall organize and participate in a record drawings review workshop with CITY personnel prior to finalizing record drawings. The ENGINEER shall provide the CITY with one set of electronic (PDF) record drawings and three (3) half size bond sets of record drawings. ENGINEER shall provide electronic files of the record drawings in formats suitable to the CITY. SPECIAL SERVICES: There are no Special Services included as a part of the PROJECT. ADDITIONAL SERVICES: Additional Services to be performed by FNI, if authorized in writing by OWNER's authorized representative, which are not included in the above described Basic or Special Services, are described as follows: 1. Prepare to serve or serve as an expert witness on behalf of the CITY in connection with any public hearings or legal proceedings; Design 7 of 9 D 10.Revised 12/11 2. Preparation of applications and supporting documents for government grants, loans, or planning advances; 3. GIS mapping services or assistance with these services; 4. Design of siphons, meter stations, and/or a customized odor control system; 5. Condition assessment of existing wastewater pipelines and manholes, including CCTV; 6. Inspection during construction activities; 7. Post construction survey; 8. On-the-Ground flagging of easements; 9. Prepare legal descriptions and plats beyond the number previously stated; 10. Perform geotechnical assessments to determine soil, water table, or trenching characteristics beyond the number previously stated; 11. Furnish construction plans and specifications in excess of those sets previously stated; 12. Complete redrawing of construction plan sheets, if required as a result of changes made in the scope of the construction contract after submission of final plans to the CITY; 13. Observe on-site conditions to evaluate exposed conditions, dewatering techniques, or changed conditions; 14. Land acquisition services, included but not limited to preparing appraisals, title research, negotiations, etc.; 15. Prepare any environmental permits (USACE, EPA, THC USFWD, etc.); 16. Separating the project into two or more sets of construction documents; Design B of 9 D10.Revised 12/11 17. Preparation of a pre-construction notification (PCN) or an individual Section 404 permit application; 18. Preparation of a mitigation plan for impacts to waters of the U.S. or other natural resources; 19. Conducting an archeological survey; 20. Floodplain mapping, development of floodway models, and/or preparation of a LOMAR or CLOMAR; 21. Conducting a formal habitat evaluation (e.g., HEP/VVHAP) along the proposed pipeline alignments; 22. Conducting a condition assessment (e.g., TXRAM) on waters of the U.S. potentially Impacted by the proposed project; 23. Presence/absence surveys for federally listed threatened/endangered species; 24. Conducting a tree survey by a licensed arborist for the purpose of complying with any federal, state or local permitting requirements; 25. Providing construction control staking prior to advertising/bidding of the PROJECT; 26. Appearance before any regulatory agency, other than the City; 27. Application for General Land Office Easement; 28. Consultation with the U.S. Fish and Wildlife Service under Section 7 of the Endangered Species Act; and 29. Provide any other services otherwise excluded in this AGREEMENT but customarily furnished in accordance with generally accepted engineering practices. Design 9 of 9 DID.Revised 12111 ATTACHMENT A-SUPPLEMENTAL SCOPE OF SERVICES ARTICLE I BASIC SERVICES: Freese and Nichols, Inc. (FNI) shall render the following professional services in connection with the development of the Project described as: McHard Road Fiber Optic Conduit—Smith Ranch Road to Cullen Blvd.&Mykawa Road to Old Alvin Road. A. DESIGN PHASE SERVICES Upon authorization from the CITY, FNI shall render the following services: I. Data Collection Use City's GIS mapping files,McHard Road Water Transmission Line plans, McHard Road RR overpass and other available maps to create the basic plan-only layout of McHard Road corridor between Smith Ranch Road to Cullen Blvd.and Mykawa Road to Old Alvin Road,for the purpose of design. 2. Conduct design related site visits. 3. Study McHard Road Railroad overpass bridge plans for the fiber optic conduit attachment to bridge structure at Hickory Slough crossing. 4. Prepare construction plans for the 4"Fiber Optic conduit within the project limits including cover sheet,general notes,summary quantities tables,general typical sections,small-scale project layout sheet,1"=50'scale double stack,plan-only,conduit layout sheets showing open cut,cased,uncased, and aerial installation of fiber optic conduit,with associated details and standards. 5. Conduct limited utility and pipeline coordination to depict general locations of crossings. 6. Submit three (3) half-size 60%-complete plan sets to CITY for review and comments. Attend a meeting to discuss review comments. FNI will provide a response to CITY's comments in writing. 7. Upon receipt of 60%-complete comments,continue further development of construction plans and details to 90%Ievel. 8. Assemble TxDOT's standard one-lane closure and work zone barricade traffic control plans and details for the Project. 9. Prepare Technical Specifications and Contract Document for the Project. 10. Provide general approximate quantities for SW3P system for as-needed basis for the contractor to use for Stormwater pollution prevention. 11. Prepare bid quantities and cost estimate and updates. 12. Submit three(3)half-size 90%-complete plan sets, technical specifications and contract documents to the CITY for review and comments. Attend meeting to discuss comments.FNI will provide a response to CITY's comments in writing. 13. Assist CITY in acquiring permits from TxDOT for Conduit crossings at FM 865(Cullen Blvd.) and SH 35. 1 14. Assist CITY in approval of plans from pipelines, 15. Upon final approval by the CITY,FNI will provide CITY three(3)sets of"Final"plans and construction documents. In addition,FNI will provide the CITY with pdf copies of the plans and specifications on a CD. 16. Prepare quantities for contractor on as-needed Stormwater Pollution Prevention Plans and Details for the Project. 17. Assemble TxDOT's standard one-lane closure traffic control plans and details for the purpose of construction traffic control. 18. Adhere to Exhibit A, "Utilities Scope of Services for McHard Road Fiber Optic Conduit." B. BID PHASE SERVICES Upon authorization from the CITY,FNI will proceed with the performance of services in this phase as indicated in Exhibit A, "Utilities Scope of Services for McHard Road Fiber Optic Conduit." C. CONSTRUCTION PHASE SERVICES Upon completion of the bid phase services,FNI will proceed with the performance of construction phase services as described Exhibit A, "Utilities Scope of Services for McHard Road Fiber Optic Conduit." FNI will endeavor to protect CITY in providing these services however,it is understood that FNI does not guarantee the Contractor's performance, nor is FNI responsible for supervision of the Contractor's operation and employees. FNI shall not be responsible for the means,methods,techniques,sequences or procedures of construction selected by the Contractor,or any safety precautions and programs relating in any way to the condition of the premises,the work of the Contractor or any Subcontractor. FNI shall not be responsible for the acts or omissions of any person(except its own employees or agents)at the Project site or otherwise performing any of the work of the Project. E. SPECIAL SERVICES 1. No Special Services are included in this Scope of Services. ARTICLE II ADDITIONAL SERVICES: Services that are not specifically listed in above Supplemental Scope of Services or Attachments shall be considered as Additional Services to be performed by FNI,if authorized by CITY and will be paid for as stated in the Compensation Attachment. ARTICLE III TIME OF COMPLETION: FNI is authorized to commence work on the Project upon execution of this AGREEMENT and agrees to complete the services in accordance with the following schedule: 1. Design Phase: Upon authorization by the CITY,FNI shall proceed with performance of professional services defined as Design Phase, to submit Final plans and construction documents within 90 2 calendar days after date of authorization. Approval period by the CITY and other agencies have not be accounted for. 2. Bid&Construction Phases: Upon authorization by the CITY,FNI shall proceed with performance of professional services defined Bid and Construction Phases until completion of the Project. If FNI's services are delayed through no fault of FM,FNI shall be entitled to adjust contract schedule consistent with the number of days of delay. These delays may include but are not limited to delays in CITY or regulatory reviews,delays on the flow of information to be provided to FNI,governmental approvals,etc. ARTICLE IV RESPONSIBILITIES OF CITY: CITY shall perform the following in a timely manner so as not to delay the services of FNI: A. Designate a person to act as CITY's representative with respect to the services to be rendered. Such person shall have contract authority to transmit instructions, receive information,interpret and define CITY's policies and decisions with respect to FNI's services for the Project. B. Provide all criteria and full information as to CITY's requirements for the Project, including design objectives and constraints,space,capacity and performance requirements,flexibility and expandability, and any budgetary limitations;and furnish copies of all design and construction standards which CITY will require to he included in the drawings and specifications. C. Assist FNI by placing at FNI's disposal all available information pertinent to the Project including previous reports and any other data relative to design or construction of the Project. D. Arrange for access to and make all provisions for FNI to enter upon public and private property as required for FNI to perform services. B. Attend the pre-bid conference,bid opening,preconstruction conferences,construction progress and other job related meetings and substantial completion inspections and final payment inspections. F. Give prompt written notice to FNI whenever CITY observes or otherwise becomes aware of any development that affects the scope or timing of FNI's services,or any defect or nonconformance of the work of any Contractor. ARTICLE V DESIGNATED REPRESENTATIVES: FNI and CITY designate the following representatives: CITY's Designated Representative - (Jennifer Lee, Project Manager, City of Pearland, 3519 Liberty Drive, Pearland,Texas 77581,281-652-1760). PNI's Group Manager-(Ron Bavarian,P.E., 11200 Broadway Street,Suite 2320,Pearland,Texas 77584,713- 600-4722) FNI's Project Manager-(Carrie French,P.E.,11200 Broadway Street,Suite 2320,Pearland,Texas 77584,832- 456-4738) PNI's Accounting Representative-(Kristina Isaac, 10497 Town and Country Way, Suite 600,Houston,Texas 77024,713-600-6860) 3 RATE SHEET ATTACHMENT B-COMPENSATION Compensation to FNI for the Basic Services described in Exhibit A&Attachment A-Supplemental Services for the Design Phase Services shall be the lump sum of Thirty-Nine Thousand One Hundred-Five Dollars ($39,105). Compensation to FNI for Services described in Exhibit A and Attachment A - Supplemental Services for Bid and Construction Phase Services, on As-Needed Basis, shall be computed on the basis of the Schedule of Charges, but shall not exceed Three Thousand Seven Hundred Ninety- Eight Dollars ($3,798) for Bid Phase and Nine Thousand Forty-Five Dollars ($9,045) for Construction Phase. Direct Expenses shall not exceed One Thousand Two Hundred Dollars ($1,200). Therefore, total Compensation to FNI shall not exceed Fifty- Three Thousand One Hundred Forty-Eight Dollars ($53,148). If FNI sees the Scope of Services changing so that Additional Schedule of Charges: Position Rate Professional - 1 107 Professional -2 130 Professional-3 146 Professional-4 169 Professional-5 197 Professional-6 225 Construction Manager- 1 85 Construction Manager-2 111 Construction Manager-3 131 Construction Manager-4 164 CAD Technician/Designer- 1 91 CAD Technician/Designer-2 117 CAD Technician/Designer-3 145 Corporate Project Support- 1 87 Corporate Project Support-2 105 Corporate Project Support-3 139 Intern/Coop 53 Rates for In-House Services Travel Bulk Printing and Reproduction Standard IRS Rates B&W Color Small Format(per copy) $0.10 $0.25 Large Format(per sq.ft.) Bond $0.25 $0.75 Glossy/Mylar $0.75 $1.25 Vinyl/Adhesive $1.50 $2.00 Mounting (per sq.ft.) $2.00 Binding(per binding) $0.25 OTHER DIRECT EXPENSES: Other direct expenses are reimbursed at actual cost times a multiplier of 1.10. They include outside printing and reproduction expense, communication expense, travel, transportation and subsistence away from the FNI office and other miscellaneous expenses directly related to the work, including costs of laboratory analysis, test, and other work required to be done by independent persons other than staff members. For Resident Representative services performed by non-FNI employees and CAD services performed In-house by non-FNI employees where FNI provides workspace and equipment to perform such services, these services will be billed at cost times a multiplier of 2.0. This markup approximates the cost to FNI if an FNI employee was performing the same or similar services. These rates will be adjusted annually in February. 1022015 Freese and Nicho s,Inc. ) ATTACHMENT C-City of Pearland Project Foe Summary McHard Rd ITS:Westside Event Center to Cullen&Mykawa to west of SH 35 Basic $ 53,148_ 4/7/2017(Updated 6-4-18) Special $ Detailed Cost Breakdown Total Project $ 53,148 Basic Services Phase Teak Employee ,tick w,w.... ,,,IL r.rch i Pick l.,• kora,n...•w Rich Hem 1 wawa i...,: Total Labor Total Expense r ----- - - - - •— .- t L - - - - - Total Hours Total Sub Effort Total Effort Project Rob' OMPu ( sray... i CAD OC Effort Effort -- -- --_----- Hourly Bill Rata $22500 +$146.00 $197.00 1 $117.00 $225.00 $139.00 - -- 1 Project Management $ S $ - S - 1 Pr:•:e&Attend Kickoff Meeting 1 • 2 - 3 $ 517 $ 22 5 - S 539 2 Status M:,. e 2&Site Visits 2) 8 =MO 6 S _ 1,188 $ 65 $ - $ 1,233 3 t. :.,Project Schedule • 2 -- 2 $ _ 292 $ $ ----- - $ 292 4 Mord*Progress Reports jjj>_ 3 $ 438 $ - $ $ 438 5 --Admin 8 . 2 • 6 • 4 -- 12 $ 1,882 $ 22 $ • $ 1.904 2 EIMIDeteNed...., .— j $ $ - $ 1 Plan and Specs Preparation =M $ - $ $ :.section I 16 - 24.... $ 3,040 $ - $ - S 3,040 i -- $ - Gecover sliest,notes,tables, 4'Conduit s:-• &• :.Plan-a Double Stack Sheets _ 0 52 8 • BO 141 $ 18,753 $ 540 S - $ 19,293 Study McHard RR Bridge Plans for Conduit Attachment 00 • 5 $ 809 $ $ $ 809 Pr:.8 Assemble ITS and: ••:Attachment Details 111.1111.11111111EMMIIIIIIIIKIMIMMEMIll . 14 $ t $ $ - S 2,350 11♦ Assemble TxDOTs Ore-Lane Closure&Work Zona 2 2 4 $ 528 $ - $ - $ 526 - Approximate Quarttiulee-Orily for SW3P 3 , F 3 .,$ 438.4.8 - $ $ 430 Tads :- 8 Centred Manud 8 8 $ 1.168 S 170 $ S 1,338 © LkTIIed ;. &•.. Coord 10 • 6 18 S 2,396 S $ - S 2,396 Q Bid Quantities&Construction Cost Estimates 1 8 9 $ 1,393 $ $ $ 1393" ILIN Assist City In Acquiring TxDOT Parent for Work With TxDOT ROW 1 5 f_ ♦ s $ 955 $ - $ - $ 955 MMI Quail Control Reviews& -: 2 5 11.1111.111111111111111.:= 111.111.11111111111 15 $ 2,980 $ - $ - $ 2,980 3 a BAss�e in BldDocs& 2 ��_ - 2 $ 292 $ - $ - $ 292 MM Pre-Bid 14,_. • 3 _—�— 3 $ 438 $ - $ $ 438 ® Respond es toBidde Questions 4 4 $ 344 $ $ 584 ��Assl In issuance o Addenda 14 4 101.544 $ 1,344 :•:a Conformed Construction Contract Dace 3 8 9 $ 1.140 $ 125 $ $ 1,265 4 , :Construction Phase General Rap(As-Needed jjjjjjj>fijjjjjjjjjjjjjjjjjjMMIMM—! $ - S - $ - $ 1 Pre-Construction Conference IIIIIIIIIIMIIIEOIIIIIIIIMMIIIIIIMIIMIMMMIMIIIIMIIIIIIMIIIMMINI 3 $ 438 $ •_$ $ 438 2 I Coordination w/Contractor 0_--IIIIIIMMIIIIIIIIIIII_ 4 $ 584 S S - $ 564 4 Site ViWsitsField M Reviews ��� 15 $ 2,190 $ 87 $ $ 2.277 4 Site Ia&Fiertetlrga,As-Requested 5 Asslstarce In RFFs 1 Oj—IMMIE—� 5 $ 809 $ $ - $ 809 6 Assistance In •,Order Documentation 0_— jjjjjjjjjjjjjjjjjjjjjjj) 4 $ 584 $ - $ • $ 58, 7 Substantial Completion W eIktrolgh I 8 4 , 6 $ 876 $ • $ - $ 876 • 8 Final C. •.,• wa9dfxrrt h 6 8 $ 876 s 22 $ - $ 898 x $ 22 S $ 22 5 _. . '• of Record Drawl •s $ _ - $ • $ - $ -1• Review red Brie as-bunts 2 _ 2 $ 292 $ - $ - S 292 2 Prepare Record Drawings 2 WEE 10 S 1,228 $ 125 $ - $ 1,353 3 Record Drawings Workshop .-_—._---- , 3 3 5 438 $ - $ - $ 438 - Total Basic Services Hours 10 INI $ -. 4 _ 366 $ 51,948 $ 1,200 $ $ 53,1$9 I $ Total Basic Services Labor Effort S 2,280 $ 30.076 $ 2,798 $ 14,809 $ 1,8001 i O$ -, $ -18 - Lg Format-Lg Format-Lg Format-I Lg Format- nom Usk Expenses Tech Charge Mises B&W Color Binding Bond- Glossy/Myl VinyVAdhes Band- Total Exp (sheet) (sheet) (each) BSW(sq. or-B&W ive-B&W Color(sq. Effort IL) (sq.ft.) (sq.ft.) ft.) 1 >Project Management $ - 1 Prepare 8 Attend Kickoff Meeting _ 40 $ 22 --•2 Status Meetings(21 8 Silo Visits 121 120 $ 65 3 Develop Project Schedule ( t $ 4 Monthly Progress Reports —~ 1 $ -- 5 Project Admix&Invoicing --_i 40 , $ 22 2 Detailed Design •. i $ 1 Plans and Specs Preparation • I $ General Sheets(cover sheet,notes,tables,typical sections) $ 4'Conduit Design&Prep Plan-Only Double Stack Sheets -__ - • 400 2.000 $ 540 Study McHard RR Bridge Plans for Conduit Attachment $ Prep 8 Assennbie ITS and Bridge Attachment Details .- ....._ $ - Assemble rxDOT's One-lane Closure&Work Zone $ - Approxknate Ousnetles-Only for SW3P $ - Tech Specifications&Contract Mantel 1,700 l $ 170 3 Limited Utility&Pipelines Coord $ _ 4 Bid Quantities&Construction Cost Estimates $ - 5 Assist City in Acquiring TxDOT Permit for Work With TaDOT ROW j $ 1 of 2 M:Peadand-ITS-McHard CoeldonCey Segmerne-4-tx Updated Prnposeuttecrsnant C-McHard Rd Fee Spreadsheet 8/5/2018 • Freese and Nichols,Inc. ATTACHMENT C -City of Pentland Project Fee Summery McHard Rd ITS:Westside Event Center to Cullen&Mykawa to west of SH 35 Basic ;$ 53,148 4/7/2017(Updated 6-4-18) $ - Detailed Cost Breakdown Total Project i$ 53,148 6 Quality Control Reviews d Meetings $ 3 I Bid Phase(As-Needed) _-_— i _ - ..... �_- S• _- 1 Assistance M Bid Does&Upload - --__.. -_.. _. . f • .. 2 Pre-Bid Meeting ._._�__ —`- s 3 Respond to Bidders'Questions ---.— f . 4 Assist in Issuance of Addenda f - 5 Prepare Conformed Construction Contract Dos - --- I -. 500 $ 125 4 Construction Phase General ReoAs_Needed) - $ - 1 Pre-Construction Conference • f 2 ;Coordination w/Contractor f • 3 Submittals Reviews 1 - --,- S - 4 Site Visits&Field Meetings,As-Requested _ 1801 _ $ 87 5 Assistance in RFI's f 8 Assistance in Change Order Documentation • _ f 7 Substantial Completion WalktM)ugh _ , f - 8 1Flnal Completion Wetktlrotgh - _._-_--- / 40 , i $ 22 22 5 'Preparation of Record Drawings f 0 1 _--- -- -� $ 1 'Review red line as-bulbs -. -_ f 2 Prepare raw Rd Dings - - I 500 f 125 3 jRecord Drawi gs Workshop i 1 f II - -- f -- -- - —. — _ f •• . f - Total Basic Services Items - 440 2,100 - - 3,0 - - - Total Basic Services Expenses EHort�,-� -'�S f 210 $ - $ ----$--- 00 750 T -.r $ - 5 - $ 1,200 • 2 01 2 M+Pearlard.ITS•McNard CondaSCty Segned16-4-18 Updated ProposMWaaclment C•McHard Rd Fee Spreadsheet 615/2010 rll-IACINENrru CQ\CL[UAL OPCCIx E i1CH,UtD WOAD wick Of'11C3 rmFREESE?NICHOLS ,'11\L'\ , i I'I:.'11\I'lI . .`\•l Rik IIS'\l . 'I \I'I:JI 0,'lli, ESrJMATOA CHECKED&Y ACCOUNT NO MBNA NA ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL McHard Rd.Fiber Optics-Smith Ranch to Culleb E Myhawa to Old Alvin Rd. 1 Mobilization 1 LS $18,800 $18,800 2 4'HOPE Conduit In Open Trench with Ground Boxes,Markers,Tie-Ins,etc, 14,000 LF $33 $462,000 3 4"Conduit In 6"Steel Casing,Bored Under Cullen&SH 35 200 LF $150 $30,000 4 4'Steel Conduit attached to Bridge 1,000 LF $75 $75,000 5 4'Steel Conduit Bored Under Streets 300 LF $60 $18,000 6 Trete Control 1 $15,000 $15,000 T SW3P,.As•Needad 1 L5 55,000 $5,000 8 Site Pra.&Restoration 1 LS $20,000 $20,000 SUBTOTAL S643,500 CONTINGENCY I2S°o) 5151,000 TOTAL OPINION OF PROBABLE CONSTRUCTION COST 5804.800 Attachment D.McHard Rd RS OPCC•Cly Page 1 of 1 I8 =_=• ;In 71 Z 1141 4 P ii < a U u li u. - 1 Sn "F p $;II 3gtiai a C H z" �3 AI IE 81 5! 0 ;ii " I Li ;II I/ ;; rr !_TILT .... RP ii n g 0 lv 3E _, it 1 ; 1i Y t C ` • i 1 1 s r { gf iagi i. ii. I gi i li I MI �rrii' H Hl H i r ridM: 'GCEngineering,Ina Mefferd Road Extension front GCE 1 NI rf 4 Cullen alvd to Mykawa Road \, _/ CITY OF PEARLAND MCHARD ROAD EXTENSION FROM CULLEN BLVD.(FM 865)TO MYKAWA ROAD Additional Services for Design and Preparation of Construction Plans for 4"Fiber Optic Design Work Description I I The proposed additional work is comprised of installing 4" Fiber Optic Conduit, cables, ground boxes, etc. along the approximately 3.5-mile section of McHard Road between Cullen Blvd. (FM-865)and Mykawa Road. GCE will render the following professional services in connection with the development of the proposed project. The Conduit design and construction documents will be prepared in general accordance with TxDOT standards and criteria. 1. 4"Fiber Optic Design GCE will utilize the project topographic survey and mainly the Illumination Plans prepared by Freese and Nichols, Inc. (FNI) for the project limits to prepare fiber optic conduit drawings. Fiber Optic Design includes: • Standard Fiber Optic Conduit • Standard fiber optic lines and drop cables • Underground Construction (4"Conduit) • Communication ground box spacing(-1,000 ft.) • Type I communication ground boxes used at slack locations • Type II communication ground boxes used at splice locations • 120 feet of slack at each communication ground box • Labeling of all communication ground boxes and splice enclosures • Connectivity to the signals and controllers 2. Preparation of construction plans Utilizing the Illumination Plans described in the previous task, GCE will prepare Fiber Optic design plans for the project. Construction plans will include the fiber optic design elements indicated above as well as the following: • Specifications • Standard sheets and details PROJECT COST The work described in the above scope tasks will be performed on a cost plus basis with a not-to- exceed cost of$39,737.77. M.•IPraJectttC- 0727A - COP Mefferd Rood Final D stp%Scope and Rudgett2017 Amendment No. 11180419 Proposa11180419 C-07274 Whorl Road Amendment No.1-F bre OpNe Propoael doc Freese and Nichols Inc./City ofPearland, Texas Apri119,2018 Page 1 of I MCHARD ROAD EXTENSION FROM CULLEN BLVD. (FM 865)TO MYKAWA ROAD CITY OF PEARLAND Fiber Optic Design Budget Senior TOTAL TOTAL Pm. Dertgn Project Project CAD Directect TOTAL TASK Manager er Engineer Technician Clerical MAN DIRECT Rases LABOR& _ HOURS LABOR EXPENSES Rate $195.00 $165.87 $135.60 596.30 $42.00 Task 1:Fiber Optic Design Commie Utility Information 2 2 4 8 $1,106.93 $1,106.93 Fiber Optic Conduit Design,Details,Standards,Coordination,& r J Meetings(17 design sherd,17 detags&notes) 13 30 40 40 I23 316,786.96 $16,786.96 • Conduit Design, 15 32+ 40- 44_ 0 131 SI7,893.89 50.00 $17,893.89 Task 2:Preparation of Construction Plans Qu,antitics&ate 2 2 16 10 30 53,854 33 53,85433 Coordination with Prime 2 3` 5 5 15 31,775.60 31,775.60 Daft and Foal Submittals 4 24 30 36 44 $12,295.57 3200.00 $12,495.57 Rask Maaagemmt,Admin.&Billing 2 6 4 12 81,553.19 $1,553.19 QC/QA 6 6 w 12 S7,i65-19 $2,165.19 Preparation of Construction Plans-Subtotal 16 41 51 46 9 163, $2I,643.88 5200.00 $21,843.88 Man Boars Snb-Total 31 73 91 90 9 294 y TOTAL POR TRE PROJECT S6,045.00 $12,108.17 $12,339.60 $8,667.00 $378.00 $39,537.77 $200.00 $39,737.77 • • M:1ProjactajC-0727A-COP McHard Road Fi tai Deslgn%Scope and Budgett2017Amendment No.11180419 ProposaA180419 McHard RaadAmondrnent No.1.xls 4/192018 Page 1 of! Two segments of fiber I outside of the McHard .-- .- - Road Extension project am, SMI HOUSTON TOLLwAY,BEL AYE limits. �7— _ / 1 1 1 N.--'SAM HDUSTOu----IEELTWAYE—"' -�� �� f"^/ •1 Iter. --_•.....�.--__. 'II __ RO[KSIOE, WILL GE, n'l ,' BR"oKaiDF no Future Firs ` „J/011 \ . \`• I \,. 4-, 41 ,r44610.141111111051KCAM1 V \./ MI HARD RD I FM 223a • Fuwn' Ill ' ��� iii . �� snug a t � 21" 5S1By��1 �ry `, � 9YIIPn1,.AO. '''11...l',111-:: UGH5RA^MRO _ •111111111 inFlie 3JJJ � �: t4:4 SUZi Salaryo �; ■ �' do-RI `, GENe�9 Fiber segment within Smill .: ��wea,. �[3 r the McHardRoad r� DR°'°.�', •� � �� artlimi («rt:. FM 9filca'a.: ilt� a projectlimrts, + d �� Dawe SUlbnl SmYAF a • q. FM a,lene�(I� � �� Aamin Ltrery L!I-� AA/.s, FY. Mallon CVO o AJ 3. III 4 •I na ComnxnNy ../ is 1 „Ira aa ii �! I S a ® Q litgli M:� la-r l5 /MArta in SI. E ® CJ r;• •R�DR '' ; Y L ISI _. (11114Et ISHIT $ _ •• P�—� SWRaIS c� �_ I.S Comde >\� �2 GNp CO \ O it 1 "y:3�� BAILEY HU 'r Naiabrium IJ if of,'e C ----t_- o !( - i j w _-._._I FYe Slallon 0 I -- %/ :., r 1,--- Ii • .1,Ft CF LA r 4, „s HA i ! -•_.___� 4.,,...--,...sa '-__`—�' f si \ r-..... - ,}a i r•1W N 4. 1 - `” ,• , CITY OF PEARLAND Imw ! ,__.. a [.A , gq J 1-t 1 JO p r i'• C IOWA C LO-''.1 i 1 Fiber Optics D' `'- •• •'-'' ;• - IS e•10•Curterd Rowlandwain Trealmev Fant clyLna, /: �CwreM MOOT ® ...Sans ET,'Peoria.,LTJ M1„ rp.. I row,.s,.naaone Pr II /' '\ qecI Fuwre Roaea to/ Is' ,...•vM. n r.. If \, ��ProaaeE CIP li,r:.1.'1.71`1=147=!,...., rl iIWiiirii .. -- ._ -_—. __. Design 1 of 1 D6. Revised 6/16 CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, Texas 77581 pearlandtx.gov/projects Professional Services Contract Amendment For McHard Road Expansion Date of Issuance: 05.10.23 Amendment No: 09 Consultant: Freese and Nichols, Inc. CoP Project No: TR1405 PO#: 2017-00000670 Explanation: This Amendment encompasses the following: The preparation and submission of a Letter of Map Revision (LOMR) to revise the flood maps along Hickory Slough to the Federal Emergency Management Agency (FEMA) because of the construction of the McHard Road Expansion project. Description of Work Cost Time 1. Review the as-built geometry, perform H & H analysis, prepare exhibits and forms, prepare and submit the LOMR report to FEMA, coordination and responses to FEMA request $ 45,760.00 Days 2. $ Days 3. $ Days Please attach back-up documentation Cost & Time Change Summary: Cost Time Original Contract: $ 4,415,202.20 Days Previous Amendment(s): $ 22,267.37 Days Contract prior to this Amendment: $ 4,437,469.57 Days Net increase (decrease) from this Amendment: $ 45,760.00 Days Revised Contract: $ 4,483,229.57 Days Finance Approval: ____________________ Date: Finance Director ACCEPTED*: APPROVED: By: _____________________ Date: By: _________________________ Date: Consultant Owner *Consultant agrees to perform change(s) included in this Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the A mendment until this Amendment is executed. Upon execution by all parties, the following changes identified for the Contract Value and/or Contract Time shown, are made p art of the Contract. 5/15/2023 11200 Broadway Street, Suite 2320 Pearland, Texas 77584 832-456-4700 FAX 832-456-4701 www.freese.com May 1, 2023 Jennifer Lee, Project Manager City of Pearland 2016 Old Alvin Road Pearland, Texas 77581 Re: McHard Road Extension – LOMR Contract Amendment Dear Jennifer: Per your email request on January 19, 2023, GC Engineering has prepared the attached Amendment to prepare a Letter of Map Revision (LOMR) to revise the flood maps along Hickory Slough, per the approved Conditional Letter of Map Revision (CLOMR) for the project. The attached proposal from GC Engineering documents these additional efforts. Below is a general explanation of major additional efforts incurred: 1. FC 161 – Prepare Letter of Map revision (CLOMR). The cost of item 1 is a lump sum fee of $45,760.00. If you have any questions, please contact me at 713-600-6878. Sincerely, James “JB” Ferguson, PE Project Manager GC Engineering, Inc. McHard Road Extension from Cullen Blvd. to Mykawa Road _____________________________________________________________________________________________ Freese and Nichols Inc. / City of Pearland, Texas April 05, 2023 Page 1 of 2 CITY OF PEARLAND MCHARD ROAD EXTENSION FROM CULLEN BLVD. (FM 865) TO MYKAWA ROAD AMENDMENT No. 9 Additional Services for the Submission of Letter of Map Revision Report Project Description Based on the communication with the Freese and Nichols Inc. (Client) and City of Pearland (COP), GC Engineering, Inc. (GCE) was directed to prepare Letter of Map Revision (LOMR) to revise the flood maps along Hickory Slough, per the approved Conditional Letter of Map Revision (CLOMR) for the project. The proposed additional work comprised of submitting the LOMR to Federal Emergency Management Agency’s (FEMA). The proposed additional work consists as the following: 1. LOMR Report Submission GCE will prepare a LOMR Report for the project consistent with the requirements of FEMA. The report will include required forms, exhibits, and other supporting data as follows: •Incorporate the As-built geometry of McHard Road cross-sections, Hickory Slough Pond, and Hickory Slough cross-sections within the limits of the CLOMR study. •Compare the results of revised HEC-RAS models with the effective HEC-RAS models developed prior to construction of the project. •Prepare Form 1, entitled "Overview and Concurrence Form" obtained from http://www .fema.gov/media-library/assets/documents/1343. •If as-built conditions differ from the proposed plans, prepare the following forms: I.Form 2, entitled "Riverine Hydrology and Hydraulics Form", Hydraulic analyses for as-built conditions of the base flood, the 10-percent, 2-percent, and 0.2- percent-annual-chance floods, and the regulatory floodway. II.Form 3, entitled "Riverine Structures Form". •Submit a certified topographic work map showing the revised and effective base and 0.2- percent-annual-chance floodplain and floodway boundaries. •Submit an annotated copy of the FIRM, at the scale of the effective FIRM. •Submit as-built plans, certified by a registered Professional Engineer, of proposed project elements. •Prepare a LOMR Report which will include the following: GC Engineering, Inc. McHard Road Extension from Cullen Blvd. to Mykawa Road _____________________________________________________________________________________________ Freese and Nichols Inc. / City of Pearland, Texas April 05, 2023 Page 2 of 2 o Narrative on project and submittal. o Completed application forms. o Hydraulic Computations along with digital files of HCE-RAS models used. o Certified topographic map with floodplain and floodway (if applicable) delineations. o Annotated DHS-FEMA FIRM and/or FBFM to reflect changes due to project. o Items required to satisfy any DHS-FEMA NFIP regulatory requirements. o Review fee payment. 2.Agency Coordination GCE will provide services regarding coordination with FEMA during the FEMA review process. It is anticipated that there will be one (1) request for clarification/modification of the analyses by FEMA. In addition, GCE will coordinate with the local regulatory agencies throughout the review process. PROJECT COST The work described in the above scope tasks will be performed at a lump sum cost of $45,760.00. ASSUMPTIONS 1.The Client shall provide As-built plans for the project area including the As-built topographic survey for McHard Road, Hickory Slough, Hickory Slough storm water detention pond, and associated hydraulic structures. 2.The Client shall directly pay any regulatory or review fees by FEMA and/or any other regulatory agency for the project. 3.Additional coordination efforts resulted beyond those included in this scope of services shall be provided at the following hourly rates upon receiving prior authorization from the Client: Principal $ 240.00 Project Manager $ 190.00 Project Engineer $ 165.00 CAD Technician $ 90.00 Clerical $ 55.00 M:\Projects\C - 0727A - COP McHard Road Final Design\Scope and Budget\Amendment No.4\230405 to FNI\230405 C-0727A McHard Road Amendment No. 1-LOMR Proposal.doc TASK Principal Project Manager Project Engineer CAD Technician Clerical TOTAL MAN HOURS TOTAL DIRECT LABOR Direct Expenses Subs TOTAL LABOR & EXPENSES Rate 240.00$ 190.00$ 165.00$ 90.00$ 55.00$ LOMR Report Submission Incorporate the As-built geometry 4 36 40 $6,700.00 $6,700.00 Perform H&H Analysis 4 12 74 4 94 $15,810.00 $15,810.00 Prepare Exhibits and Forms 4 6 32 42 $4,630.00 $4,630.00 Prepare LOMR Report and Submit 1 6 48 24 79 $10,620.00 $200.00 $10,820.00 Coordinate with FEMA and local FP Administrator 1 8 4 13 $2,420.00 $2,420.00 Prepare up to four (4) responses to Requests for Information/Modification 4 28 32 $5,380.00 $5,380.00 LOMR Report Submission Man Hours Sub-Total 6 38 196 36 24 300 TOTAL FOR LOMR REPORT SUBMISSION $1,440.00 $7,220.00 $32,340.00 $3,240.00 $1,320.00 $45,560.00 $200.00 $0.00 $45,760.00 Professional Engineering Services MCHARD ROAD EXTENSION FROM CULLEN BLVD. (FM 865) TO MYKAWA ROAD CITY OF PEARLAND, PEARLAND TX AMENDMENT 9 M:\Projects\C - 0727A - COP McHard Road Final Design\Scope and Budget\Amendment No.4\230405 to FNI\230405 C-0727A McHard Road Amendment No. 1-LOMR 4/5/2023 Page 1 of 1