R2005-0065 04-11-05RESOLUTION NO. R2005-65
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, APPROVING THE 2004 ANNUAL REPORT FOR TAX
INCREMENT REINVESTMENT ZONE #2.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the annual report for Tax Increment reinvestment Zone #2 is
hereby approved.
PASSED, APPROVED and ADOPTED this the 11th day of April
A.D., 2005.
TOM REID
MAYOR
ATTEST:
UNG
Y S'TRETARY
APPROVED AS TO FORM:
0.1 Pr. cs---
DARRIN M. COKER
CITY ATTORNEY
REINVESTMENT ZONE NUMBER TWO
CITY OF PEARLAND, TEXAS
Annual Report
Fiscal Year Ending December 31, 2004
liAkUPP‘
SHADOW
CREEK
RANCH
TABLE OF CONTENTS
Pearland City Council .ii
TIRZ Board of Directors iii
Description of the Zone 1
Purpose of the Zone 1
State of the Zone and Plan Implementation in 2004 ..2
Tables
Table A, Taxing Entity Percent Participation 2
Table B, Base Values by Jurisdiction 3
Table C, Revenue by Jurisdiction 3
Table D, Project Plan & Reinvestment Zone Financing Plan Budget 4
Table E, Developer Reimbursements 10
Table F, Estimated Captured Appraised Value by Jurisdiction 12
Table G, Projected Gross Revenue Available for TIRZ Projects 13
Appendices
Exhibit 1,
Exhibit 2,
Exhibit 3,
Exhibit 4,
Exhibit 5,
Exhibit 6,
Exhibit 7,
Zone Boundary Map
Village 1, Phase lA Street Paving/Monument Locations
Village 1, Phase IA Water & Sanitary Sewer Line Locations
Village 1, Phase IA Drainage Locations
Village 1, Phase IB Street Paving Locations
Village 1, Phase 1B Water & Sanitary Sewer Line Locations
Village 1, Phase 1B Drainage Locations
Exhibit 8, Sapphire Bay Drive & Additional Village 1, Phase 1B Street Paving
Locations
Exhibit 9, Sapphire Bay Drive & Additional Village 1, Phase IB
Water & Sanitary Sewer Line Locations 22
Exhibit 10, Sapphire Bay Drive & Additional Village 1, Phase 1B
Drainage Locations 23
Exhibit 11, Additional Village 1 & 2 Street Paving & Park Locations 24
Exhibit 12, Additional Village 1 & 2 Water & Sanitary Sewer
Line Locations 25
Exhibit 13, Additional Village 1 & 2 Drainage Locations 26
Exhibit 14, Village 1 & Village 2, Phase 2 Street Paving & Park Locations 27
Exhibit 15, Village 1 & Village 2, Phase 2 Drainage Locations 28
Exhibit 16, Remaining Village 2, Phase 2 Street Paving & Park Locations 29
Exhibit 17, Remaining Village 2, Phase 2 Water & Sanitary Sewer Line Locations30
Exhibit 18, Remaining Village 2, Phase 2 Drainage Locations 31
14
15
16
17
18
19
20
21
Exhibit 19, Village 3, Phase 1 & 2 Street Paving & Park Locations 32
Exhibit 20, Village 3, Phase 1 & 2 Water & Sanitary Sewer Line Locations 33
Exhibit 21, Village 3, Phase 1 & 2 Drainage Locations 34
Exhibit 22, Village 3, Phase 3 Street Paving & Park Locations 35
Exhibit 23, Village 3, Phase 3 Water & Sanitary Sewer Line Locations 36
Exhibit 24, Village 3, Phase 3 Drainage Locations 37
Exhibit 25, Kingsley Drive, Phase 3 Street Paving & Park Locations 38
Exhibit 26, Kingsley Drive, Phase 3 Water & Sanitary Sewer Line Locations 39
Exhibit 27, Kingsley Drive, Phase 3 Drainage Locations 40
Exhibit 28, Kingsley Drive, Phase 4 Street Paving & Park Locations 41
Exhibit 29, Kingsley Drive, Phase 4 Water & Sanitary Sewer Line Locations 42
Exhibit 30, Kingsley Drive, Phase 4 Drainage Locations .43
Exhibit 31, Village 5 Street Paving & Sanitary 44
Exhibit 32, Village 5 Water & Sanitary Sewer Line Locations 45
Exhibit 33, Village 5 Drainage Locations 46
Exhibit 34, Primary Entry Land Costs 47
Exhibit 35, Fire/Police Station Land Cost Adjustment 48
Exhibit 36, Regional Nature Park Location 49
Exhibit 37, Village 3, Phase 4 Street Paving & Park Locations 50
Exhibit 38, Village 3, Phase 4 Water & Sanitary Sewer Line Locations 51
Exhibit 39, Village 3, Phase 4 Drainage Locations ..52
Exhibit 40, Village 4, Phase 1 & Reflection Bay North Street Paving and Park
Locations .53
Exhibit 41, Village 4, Phase 1 & Reflection Bay North Water & Sanitary Sewer
Line Locations 54
Exhibit 42, Village 4, Phase 1 & Reflection Bay North Drainage Locations 55
Exhibit 43, Traffic Signal at Shadow Creek Parkway and Kingsley
Drive Location 56
Exhibit 44, Parks & Trails Grading & Infrastructure Locations 57
COMPLIANCE
Texas Tax Code Section 311.016:
(a)(1) ...2
(a)(2) 3
(a)(3) 9
(a)(4) 10
(a)(5) 11
in
CITY OF PEARLAND, TEXAS
CITY COUNCIL
2004 Council Members
Mayor Hon. Tom Reid
Mayor Pro -Tem Hon. Woody Owens
Council Member Hon. Richard Tetens
Hon. Larry Marcott
Hon. Kevin Cole
Hon. Charles Viktorin
City Manager William Eisen
Deputy City Manager Alan Mueller
REINVESTMENT ZONE NUMBER TWO
CITY OF PEARLAND, TEXAS
BOARD OF DIRECTORS
Position I
Position 2
Position 3
Position 4
Position 5
Position 6
Position 7
Position 8
Position 9
2004 Board Members
iii
Donna Coleman
State Senator Designee
Gary Davis
State Representative Designee
Nigel Harrison, Chair
City of Pearland Designee
Gary Cook, Vice Chair
City of Pearland Designee
Vacant
City of Pearland Designee
Jo Knight
City of Pearland / Alvin Independent
School District Designee
Mike Pyburn
Alvin Independent School District
Designee
Ron Castillo
Fort Bend County Designee
Larry Loessin
Brazoria County Designee
•
DESCRIPTION OF ZONE
In accordance with the Tax Increment Financing Act (Chapter 311, Tax Code),
Reinvestment Zone Number Two, City of Pearland, Texas (the Zone) was established by
Ordinance 891 of the City Council of the City of Pearland, Texas on December 21, 1998.
The Zone, also known as "Shadow Creek Ranch", consists of 3,467 acres located in
Brazoria County and Fort Bend County, Texas. In addition, the Zone is located in Alvin
I.S.D. (AISD), Fort Bend I.S.D. (FBISD) and a small portion in Pearland I.S.D. (PISD).
The Zone is generally bounded by Clear Creek on the north, State Highway 288 on the
east, County Road 92 (the extension of FM 518 west of S.H. 288) on the south and FM
521 on the west. A map illustrating the boundaries of the Zone follows on page 13 as
Exhibit 1.
PURPOSE OF ZONE
The objective of the Zone is to facilitate quality mixed-use development with a self-
sustaining tax base for the City of Pearland (the City), and the other participating taxing
entities.
The City Council, in adopting the ordinance creating the Zone, found that the
development described in the Project Plan and Reinvestment Zone Financing Plan (the
Project Plan) would not likely occur, to the quality, standards and densities described in
the Project Plan, but for the creation of the Zone.
The City Council further found that improvements in the Zone will significantly enhance
the value of all taxable real property in the Zone and will be of general benefit to the
City. The Zone will pursue its objective by acting as a financing vehicle for regional
public improvements, as described in the Project Plan. The methods of financing and the
!on sources of funding available to the Zone, including the participation levels of the various
participating entities, including the City, Brazoria County, Fort Bend County and Alvin
ISD, are described in the Project Plan.
lac
u
r
■1
1
1
1
1
1
1
1
1
1
STATE OF THE ZONE AND PLAN
IMPLEMENTATION IN 2004
1. The information provided in this section is in accordance with § 311.016 (a)
(1) of the Texas Tax Code, which requires inclusion of the amount and source of
revenue in the tax increment fund established for the zone.
In addition to the City's tax increment revenue, interlocal agreements with Brazoria
County, Fort Bend County and Alvin ISD provide for each taxing unit's participation in
the Zone. The Project Plan also allows for the participation of Brazoria Drainage District
No. 4 and Fort Bend Independent School District, though neither is currently
participating. Current levels of participation are detailed in the Project Plan. A schedule
outlining the varying levels and lengths of participation appears in Table A.
TABLE A
Taxing Entity Zone Years
Percent Participation
City of Pearland
1 - 3
100 %
4-8
100%(a)
9-30
100%(b)
Brazoria County
1 -30
38 %
Fort Bend County
1 - 10
100 %
11-20
75%
21 -30
50 %
Alvin I.S.D.
1 - 30
100 % (c)
(a) 36 % to be repaid as an Administrative Cost, provided never more than $ .255 / $100
(b) 64 % to be repaid as an Administrative Cost, provided never more than $ .44 / $100
(c) 75 % to be used by AISD for constructing educational facilities
The obligations of the participating taxing jurisdictions, as defined in their respective
interlocal agreements, include the timely deposit of tax increment into the City's tax
increment revenue fund. Table B illustrates the growth in appraised value from base year
to tax year 2004 for each participating jurisdiction. Table C illustrates the amount of the
City's incremental revenue, which is due to the increment fund. These amounts are based
upon a 100% collection rate and are in accordance with the Development Agreement
between the City and Shadow Creek Ranch Development Company (the Developer).
2
Each participating taxing unit remained in compliance with its respective interlocal
agreement in 2004.
TABLE B
Base Market Value by Jurisdiction *
Base Taxing Entity
Year
1998 City of Pearland
Brazoria County
Fort Bend County
Alvin ISD
Base 2004 Change
Value Value
7,172, 980 258,290,690 251,117, 710
4,143,160 252,185,610 248,042,450
3,029,820 6,105,080 3,075,260
4,143,160 252,185,610 248,042,450
* The information in this table was provided by the Brazoria and Fort Bend County Appraisal Districts.
TABLE C
Cly 4P.Aaad 77RZ Na 2 rag Arsuraut Reuww Paid laMacv 17 Tear (1)
Year 1999 2000 2001 2002 2093 2.01
City ofPeariardRevenue 3 45,111 (2) $ 46,413 (2) S 47,443 (2) $ 67,388 $ 167,897 S 753.905
36% Rebate roCity for AtriuisrrnrrveCosts $ - $ - $ - $ (23.221) $ (60,353) $ (299.311)
lramria County Revel's, S • S - S - S S S 159.854
Alin LSD Reveare (3) S - S S $ 10,969 S 207,479 S 229,941
Other Reverser (4) S S $ S - S 4,130 S 00,981
Pore lewd Corry Revenue S 9 S - S - S - S •
Expnuainam)brZaneAdriristeaaon S - S - S - S - S (118.244) S (154.203)
-4aaadPaul Magma $ 45,111 S 91,524 S 134,9417 f 194143 S 395,112 S 1,166,179
(1) Some: City of Peached, Texas.
(2) Note dist in years 1999 through 2001. revenue was reponcd net of expenditures. From year 2002 Conyers!, gross revenue will be repotted, along with rebates to the City (36%). and
other expenditures.
(3) Nae that Alvin ISD revenue is reported net oldie 75% rebate back to Alvin ISI).
(4) Includes developer supplemental payments. interest earned and other adjustments.
Note: Based upon the 2004 captured appraised value. 4 is estimned that the Brazoria County tax increntea revenue for 2004 will be approximately 8120457.
Note: Based upon the 2004 captured appraised value. it is estimated that the Fon Bend County tax increment revenue for 2004 will be approximately 8270.570 after 75% rebate
2. The information provided in this section is in accordance with § 311.016 (a)
(2) of the Texas Tax Code, which requires inclusion of the amount and purpose of
expenditures from the fund.
The Board of Directors of the Zone has been granted by City Council, in accordance with
Section 311.010 of Texas Tax Code, the power to administer, manage, and operate the
Zone and to implement the Project Plan. The Zone was created for a duration of 30 years,
or until dissolved by the City.
The total cost of the public improvements within the Zone, as outlined in the Project
Plan, amounts to $294,482,034. Of this amount, the City will fund $35,471,061 worth of
improvements, and the Texas Department of Transportation (TXDOT) will fund another
$10,277,050 worth of improvements. The Zone will fund the remaining improvements,
which amounts to a cost of $248,733,923. These costs are detailed in the Project Budget,
which was approved and adopted as part of the Project Plan, a copy of which follows as
Table D.
3
TABLE D
Budget Status as of December 31, 2004
Items
TIRZ Budget as
approved on
August 23, 1999
Previously
Authorized
Projects per LFA
as of Dec. 31,
2004
Remaining
Budget (1999
Dollars)
INFRASTRUCTURE
Streets
Pavement
Sidewalks
Landscaping and Irrigation
Entry Monuments
Water System
Wastewater System
Storm Sewer System
Lakes & Channels
Improvements
Land Cost
Parks & Recreation
Improvements
Land Cost
Major Improvements
Water Plants
Land Cost
W.W.T.P
Lift Station
Traffic Signals
McHard Rd Reimbursables
Miscellaneous
Signal
SH 288 Access Road
Contingencies & Engineering
Contingencies (10 %)
Engineering (15 %)
Subtotal
ZONE ADMINISTRATION/CREATION
TIRZ Administration (1-3 yrs.)
Reimbursable TIRZ Creation Costs
2002 Annual TIRZ Administration ($175,000) (3)
2003 Annual TIRZ Administration ($175,000) (3)
2004 Annual TIRZ Administration ($175,000) (3)
Subtotal
TOTAL
CITY FACILITIES
Library
Improvements
Land Cost
Fire / Police Station
Improvements
Land Cost
Subtotal
EDUCATIONAL FACILITIES
AISD Elementary School
AISD Jr. High School
AISD Fresh/Soph Campus
FBISD Elementary School
FBISD Middle School
Subtotal
GRAND TOTAL
$ 12,610,050 $
$ 1,859,400 $
$ 9,675,350 $
$ 735,320 $
$ 3,026,863 $
$ 6,940,964 $
$ 10,195,776 $
$ 29,121,916 $
$ 4,597,889 $
$ 5,155,524 $
$ 2,383,545 $
$ 20,000 $
$ 340,000 $
$ 300,000 $
$ 600,000 $
$ 150,000 $
$ 100,000 $
$ 1,000,000 $
$ 8,181,116 $
$ 11,274,211 $
$ 108,267,924 $
$ 466,000 $
$ 900,000 $
$ $
$ $
$ $
$ 1,366,000 $
$ 109,633,924 $
$ 2,395,000 $
$ 105,000 $
$ 2,255,000 $
$ 245,000 $
$ 5,000,000 $
10,706,840
1,392,840
7,424,408
735,320 $
3,112,320
6,297,984
8,429,627
$ 1,903,210
$ 466,560
$ 2,250,942
$ (85,457)
$ 642,980
$ 1,766,149
27,916,563 $ 1,205,353
4,296,504 $ 301,385
3,814,323 $ 1,341,201
737,907 $ 1,645,638
340,000
300,000
200,000
$ 20,000
$
$ 400,000
150,000 $
100,000 $
$ 1,000,000
7,092,022
10,004,998
93,051,656
313,079 (2)
882,434
100,940 (4)
121,249 (5)
176,148 (6)
1,195,513
94,247,169
604,286
604,286
$ 41,600,000 $ 1,064,900
$ 21,450,000 $
$ 34,050,000 $ -
$ 11,000,000 $
$ 26,000,000 $
$ 134,100,000 $ 1,064,900
$ 248,733,924 $
$ 1,089,094
$ 1,269,213
$ 15,216,268
$ 152,921
$ 17,566
$ 74,060
$ 53,751
$ (1,148)
$ 170,487
$ 15,386,755
$ 2,395,000
$ 105,000
$ 2,255,000
$ (359,286)
$ 4,395,714
$ 40,535,100
$ 21,450,000
$ 34,050,000
$ 26,000,000
$ 133,035,100
95,916,355 $ 152,817,569
(1) 'LFA' stands for Letter Finance Agreement.
(2) The Board authorized LFA's for the first three years (1999 - 2001) for Zone Administration ($175,000/year per Exhibits G & H,
pages 34-37 of the TIRZ Project Plan and Financing Plan). This figure represents actual expenditures through December 31, 2001,
leaving an authorized, but unexpended balance of $152,921.
(3) Annual TIRZ Administration budget amounts of $175,000 as authorized by Exhibits G & H, Pages 34-37 of the TIRZ Project Plan
and Financing Plan. This line item has no effect on the project budget totals, subtotals or grand total. It is included for illustrative
purposes only.
(4) This figure represents actual expenditures through December 31, 2002, leaving an authorized, but unexpended balance of
$74,060.
(5) This figure represents actual expenditures through December 31, 2003, leaving an authorized, but unexpended balance of
$53,751.
(6) This figure represents actual expenditures through December 31, 2004.
4
Ami
■
■
1
1
1
1
1
1
1
1
1
TIRZ-)handed Projects:
• TIRZ Creation & Organization Letter Financing Agreement was approved by the
Board of Directors in June 2000. Of the authorized budget of $900,000, only
$882,434 was expended;
• 1999 Zone Administration Letter Financing Agreement was approved by the
Board of Directors in June 2000. Of the authorized budget of $175,000, only
$117,877 was expended;
• 2000 Zone Administration Letter Financing Agreement was approved by the
Board of Directors in June 2000. Of the authorized budget of $175,000, only
$98,530 was expended;
• 2001 Zone Administration Letter Financing Agreement was approved by the
Board of Directors in April 2001. Of the authorized budget of $175,000, only
$96,672 was expended;
• 2002 Zone Administration Letter Financing Agreement was approved by the
Board of Directors in November 2001. Of the authorized budget of $175,000,
only $100,940 was expended;
• 2003 Zone Administration Letter Financing Agreement was approved by the
Board of Directors in March 2003. Of the authorized budget of $175,000, only
$121,249 was expended;
• 2004 Zone Administration Letter Financing Agreement was approved by the
Board of Directors in October 2003. Of the authorized budget of $175,000,
$176,148 was expended;
• Primary Entry Monument and Gateway Development Improvements, a $919,150
project initiated in November 1999, was completed on July 17, 2001;
• Village 1, Phase lA Improvements, a $6,524,629 project initiated in February
2000, has provided street and sidewalk paving, landscaping and irrigation, water
and storm sewer systems, lakes and channels, entry monuments for Kirby at FM
2234 and miscellaneous public improvements along FM 2234. By the end of
2002, construction was complete. Specifically, construction of the lakes and
channels was completed on March 1, 2002. Installation of the water and storm
sewer systems and street paving was completed on March 13, 2002. Construction
of the landscaping, irrigation, entry monuments for Kirby at FM 2234 and
miscellaneous public improvements along FM 2234 was completed on May 15,
2002. Maps illustrating the location of these improvements follow on pages 16
through 18 as Exhibits 2, 3 and 4;
5
• Village 1, Phase 1B Improvements, a $10,318,290 project initiated in October
2000, has provided street and sidewalk paving, landscaping and irrigation, water
and storm sewer systems, lakes and channels, entry monuments, interim
wastewater treatment and land costs for the first sections of single-family
development. This project delivered the first four sections of lots (225) to the
development. Construction of the lakes and channels was completed on May 9,
2002. Construction of the interim wastewater treatment plant, Phase 1, was
completed on June 3, 2002. Construction of the water lines, storm and sanitary
sewer systems and paving were completed in 2003. Installation of the
landscaping, sidewalks and irrigation, as well as construction of the parks and
recreation improvements was completed in 2003. Maps illustrating the location
of these improvements follow on pages 19 through 21 as Exhibits 5, 6 and 7;
• Sapphire Bay Drive and Additional Village 1, Phase 1B Improvements, a
$1,967,061project initiated in April 2001, has provided street and sidewalk
paving, landscaping and irrigation, water and wastewater systems, storm sewer
systems, an interim drainage channel, entry monuments at Sapphire Bay Drive
and Kirby Drive and land costs. This project serves four additional sections of
lots (308) within the development. Construction began in November 2001, and
was completed in 2003. This includes construction of the street paving, water and
waste water systems, storm sewer systems and interim drainage channel. Maps
illustrating the location of these improvements follow on pages 22 through 24 as
Exhibits 8, 9 and 10;
• Additional Village 1 and Village 2 Improvements, a $23,412,925 project initiated
in November 2001, will provide street and sidewalk paving, landscaping and
irrigation, water and wastewater systems, storm sewer systems, lakes and
channels, entry monuments, greenbelts and parks for Village 1, Phases 2 and 3, as
well as Village 2, Phase 1. Additionally, this project will provide for construction
of Channels A 128-01-00 and A 128-00-00, a diversion channel, entry monuments
at Shadow Creek Parkway and Trinity Bay, land costs for the Fire/Police Station
and engineering for the Master Drainage Plan and the FEMA Conditional Letter
of Map Revision. Construction began in August 2002 and will be completed in
early 2005. Maps illustrating the location of these improvements follow on pages
25 through 27 as Exhibits 11, 12 and 13;
• Village 1 and Village 2, Phase 2 Improvements, a $3,324,623 project initiated in
August 2002, will provide paving, lake improvements, traffic signalization at the
intersection of Kirby Drive and Shadow Creek Parkway. This cost includes
$1,064,900 in land acquisition costs for an Alvin ISD school site. Construction
began in August 2002, and will be completed in early 2005. Maps illustrating the
location of these improvements follow on pages 28 through 29 as Exhibits 14 and
15;
• Shadow Creek Interim Wastewater Treatment Plant, an approximately $510,000
project which was funded by the TIRZ with the City awarding and managing the
6
■
■
1
1
1
1
1
1
1
1
1
1
1
1
contract, was completed in June 2002. The interim wastewater plant was
removed from service in October 2003;
• Remaining Village 2, Phase 2 Improvements, a $6,887,692 project initiated in
October 2003, will provide street paving, water distribution systems, wastewater
systems, storm water drainage systems, lake and channel systems and park
construction. Construction began in October 2003, with completion expected in
early 2005. Maps illustrating the location of these improvements follow on pages
30 through 32 as Exhibits 16, 17 and 18;
• Village 3, Phase 1 and 2 Improvements, a $7,120,454 project initiated in October
2003, will provide street paving, water distribution systems, wastewater systems,
storm water drainage systems, lake and channel systems and park construction.
Construction began in November 2003, with completion expected in mid 2005.
Maps illustrating the location of these improvements follow on pages 33 through
35 as Exhibits 19, 20 and 21;
• Village 3, Phase 3 Improvements, a $7,030,769 project initiated in October 2003,
will provide street paving, water distribution systems, wastewater systems, storm
water drainage systems, lakes and park construction. Construction began in
January 2004, with completion expected in mid 2005. Maps illustrating the
location of these improvements follow on pages 36 through 38 as Exhibits 22, 23
and 24;
• Kingsley Drive, Phase 3 Improvements, a $3,217,602 project initiated in October
2003, will provide street paving, water distribution systems, wastewater systems,
storm water drainage systems, lake and channel systems and park construction.
Construction began in March 2004, with completion expected in mid 2005. Maps
illustrating the location of these improvements follow on pages 39 through 41 as
Exhibits 25, 26 and 27;
• Kingsley Drive, Phase 4 Improvements, a $4,090,267 project initiated in October
2003, will provide street paving, water distribution systems, wastewater systems,
storm water drainage systems, lake and channel systems and park construction.
Construction began in February 2004, with completion expected in early 2006.
Maps illustrating the location of these improvements follow on pages 42 through
44 as Exhibits 28, 29 and 30;
• Village 5 Improvements, a $6,432,314 project initiated in October 2003, will
provide street paving, water distribution systems, wastewater systems, storm
water drainage systems and enhancements to the lakes and channels system.
Construction began in September 2003, with completion expected in early 2006.
Maps illustrating the location of these improvements follow on pages 45 through
47 as Exhibits 31, 32 and 33;
7
AR
LirJ
• Primary Entry Land Costs, an $81,225 project initiated in July 2004, will provide
funding for the land costs associated with the acquisition and construction of the
development's primary entry at Shadow Creek Parkway and 288. A map
illustrating the location of this project follows on Page 48 as Exhibit 34;
• Fire/Police Station Land Cost Adjustment, a project initiated in July 2004, will
adjust the estimate of project costs as found in the Zone's Project Plan and
Reinvestment Zone Financing Plan to reflect $605,000 for the land costs and
$1,895,000 for the improvements. A map illustrating the location of this project
follows on Page 49 as Exhibit 35;
• Regional Nature Park Improvements, a $669,000 project initiated in July 2004,
will provide for a regional nature park along Clear Creek. Construction began in
October 2003, with completion in Late 2004. A map illustrating the location of
this improvement follows on page 50 as Exhibit 36;
• Village 3, Phase 4 Improvements, a $7,213,186 project initiated in July 2004, will
provide street and sidewalk paving, parks, water distribution systems, wastewater
systems, storm water drainage systems, and lakes and channels. Construction
began in April 2004, with completion expected in late 2005. Maps illustrating the
location of these improvements follow on pages 51 through 53 as Exhibits 37, 38
and 39;
• Village 4, Phase 1 and Reflection Bay North Improvements, a $2,948,968 project
initiated in July 2004, will provide street and sidewalk paving, entry monuments,
water distribution systems, wastewater systems, storm water drainage systems and
linear parks. Construction began in October 2004, with completion expected in
late 2005. Maps illustrating the location of these improvements follow on pages
54 through 56 as Exhibits 40, 41 and 42;
• Traffic Signal at Shadow Creek Parkway and Kingsley Drive, a $253,000 project
initiated in July 2004, will provide traffic signalization at the intersection of
Shadow Creek Parkway and Kingsley Drive. Construction is expected to begin in
February 2005, with completion expected in mid 2005. A map illustrating the
location of this improvement follows on page 57 as Exhibit 43;
• Parks and Trails Grading and Infrastructure, an $885,500 project initiated in July
2004, will provide grading for linear parks and trails, as well as storm water
drainage systems. Construction began in November 2005, with completion
expected in early 2005. A map illustrating the location of this improvement
follows on page 58 as Exhibit 44;
• As stated in the 2003 Annual Report, marketing and economic considerations
compelled the Developer to re-examine alternative vehicles for funding internal
infrastructure improvements within the Zone (Public Improvement Districts or
"PIDs" versus Municipal Utility Districts or "MUDs"). Following discussions
8
with the City and representatives of the development and financial communities,
the Developer determined that MUDs, rather than PIDs should be the funding
vehicles of choice. The City Council approved creation of up to six MUDs on
February 12, 2001. In April 2001, the Zone's Board of Directors approved this
change.
City Funded Improvements:
• Construction of Shadow Creek Parkway Sanitary Sewer Improvements — Phase I, a
$1,967,059 project, was completed in November 2001;
• Design of Shadow Creek Parkway Sanitary Sewer Improvements — Phase II, an
approximately $1.5 million project, was completed in December 2002. Construction
was substantially completed by December 2003;
• Construction of Economic Development Agency (EDA) Grant Project No. 2A, a
$536,994 project to build a 20 inch water line (second source) along McHard Road
west of FM 521, was completed in October 2001;
• Construction of EDA Grant Project No. 2B, a $2,160,888 project to build the Shadow
Creek Ranch Water Plant, began in August 2001, was completed in November 2003;
• Construction of the Far Northwest Wastewater Treatment Plant, a $9,021,563 project,
was completed in February 2003.
TXDOT Funded Improvements:
• No TXDOT funded projects were initiated in 2004.
The projections in the Project Plan were based on data prepared in the last quarter of
1998. Delays in the final Project Plan adoption process, approval of the Master Drainage
Plan, marketing and economic considerations, and weather contributed to a delay in the
commencement of major construction activity. As a result, the Developer reported
approximately 691 home sales, 649 home starts and 672 closings in 2004.
3. The information provided in this section is in accordance with $ 311.016 (a)
(3) of the Texas Tax Code, which requires inclusion of the amount of principal and
interest due on outstanding bonded indebtedness.
In accordance with the Development Agreement between the City, the Zone and the
Developer, which was adopted September 13, 1999, the Developer received its first
reimbursement for project costs advanced on behalf of the Zone in 2004.
The Zone's auditor, Null-Lairson, PC, performed an audit of the costs as of September
30, 2004 that are associated with letter financing agreements for Zone Creation, Primary
9
Entry Monumentation, and Public Improvements for Village A - Phase 1A, Village 1 -
Phase 1B, and Sapphire Bay Drive. The Zone Board approved the auditor's
reimbursement report, which included the project costs plus interest as illustrated in the
following Table E:
TABLE E
Anomie App. v.d for Developer Relwl....r b MMAM m' Aelea
Per 15Ls
lsan Fiaeare Ajnewear (LFA) Project Nash LFA Dee LPA Ansa& Arad C. Merest (2) Tea/ IeMe/
Zm,e Creation A Organi;otion NA 06/1900 S 900.000 $ 882,131 f 352.199 S 1.231,933 f 36
Primary Ener Mawawsewaalna d Gateway 99-11-001 1148.99 $ 919.150 (1) $ 919.150 $ 284.813 $ 1.203963 f 201
Village 1. Phare IA 00-01001 02/21/00 S 6,521.629 $ 1.160.628 5 1,009.664 $ 5.110,292 5 912
Village 1. Phase 18 00-10402 1009,00 $ 10.314290 5 (4435,775 $ 1.65(4876 $ 1(4086,651 $ 1.849
Sapphire Bay Darr & Additional Village. Phase IB 0141401 04/2341 $ 1.967461 f 630.249 $ 117.755 5 748.004 5 138
$ 24129,131 $ 14128,236 3 3,41507 $ 1544,1,143
(1) Actual corp exceeded the anrwn of the LFA. Per the governing agreements, reimbarrensew is limited to the amount of the LFA.
(2) Interest as as September 30, 2004.
On October 5, 2004, the Zone, the City and the Development Authority of Pearland
entered into an agreement whereby the Development Authority of Pearland is to issue
bonds and make approved reimbursements from the City's tax increment fund. On
October 5, 2004, the City and Zone Board each approved total reimbursements to the
Developer of $18,443,843. The Developer was reimbursed $11,283,000 from the
proceeds of the sale of bonds by the Development Authority of Pearland. Project Costs
were reimbursed in the order of the Letter Financing Agreements listed above in Table E.
The Zone has no outstanding bond indebtedness. Therefore, no principal or interest
payments were due or made. The initial debt service payment on the Bonds by the
Pearland Development Authority is due in 2005.
4. The information provided in this section is in accordance with § 311.016 (a)
(4) of the Texas Tax Code, which requires inclusion of the tax increment base and
current captured appraised value retained by the zone.
In each year subsequent to the base year, the Zone will receive tax increment revenue
based on ad valorem property taxes levied and collected by each participating taxing unit
on the captured appraised value of the Zone. The captured appraised value of the Zone is
the total appraised value of all real property located within the Zone, less the tax
increment base value.
Because the pace of development is unpredictable, and because the Project Plan provides
a best estimate of captured appraised values, the actual captured appraised value in any
future year may not equal the estimates of such value.
As of January 1, 1998, the base year for the Zone, the area encompassed by the Zone was
undeveloped land, with a total appraised (market) value of $7,172,980. On January 1,
2004, the area encompassed by the Zone had a total appraised (market) value of
$258,290,690. As a result, the total captured appraised (market) value on the tax roll as
10
r
r
1
1
of January 1, 2004 was $251,117,710 for the City, as illustrated in Table B. Note that the
total appraised (market) value of $258,290,690 does not include partially constructed
homes in existence as of January 1, 2004. When such partially constructed
improvements are taken into account, the total appraised (market) value has been
estimated to be $287,885,610.
5. The information provided in this section is in accordance with § 311.016 (a)
(5) of the Texas Tax Code, which requires inclusion of the captured appraised value
shared by the municipality and other taxing units, the total amount of tax
increments received, and any additional information necessary to demonstrate
compliance with the tax increment financing plan adopted by the governing body of
the municipality.
As previously stated, the City, Brazoria County, Fort Bend County and Alvin ISD are the
only taxing units currently participating in the Zone. As of December 31, 2004,
development schedules remained unchanged from projections in the Project Plan and the
total captured appraised value in the TIRZ as of January 1, 2004 was $251,117,710. The
total amount of tax increment revenue received is detailed in Table C.
Neither the Captured Appraised Value Projections, nor the Gross Incremental Revenue
Projections as approved have been amended or revised. Copies of each appear as Tables
op G and H; however these may be revised in the future.
ow
at
oso
z
t
(This report was written in accordance with the provisions of Chapter 311.016 of the
Texas Tax Code)
11
r
ME ® ® ® I N ® IMO NM 1
•
-"EL, gra •
Harris County
Harris County , ,
40
40
•
am um •
• • • • • • • • •
MN ftei 1E1 Ilk TA
Brazoria County 1
r _
1
1
1
1
1
1
1
1
• 4r
•
•
r ���1• wINN ONE — WIN — Nil ----- EMI -- NMI MRII. NMN■MI MI MI UM
•
•
INIII
NM
MN — — MI
Page 14
Exhibit 1
A MI MO 11.11 1 L_1 li —11 J = E 11111 1 I 1 I A
Altfti
I I
I i
PASSVIOUSSY
Alrrn0R0'!9 PROPOSED twn7Tm
I
ESI
0 MI I
0 • •
l00.0.V. OTOS ar PAVEMENT
1St USX .rm 2.25'M\91I1,7 SECTIONS
9100.0.W. stn( 1.-17 PAY/94112ft 55" 170113 (Y XNC.
WCATTTM Of 57TOET 374\71.1
LEGEND
71709051/0 FUTURE
I I
1 1
I I
tint 2-'9 rennwiew SECT)O?5 (9'00l4C)
t!d 11097._ /JURE 9T0)F7ONC. Of 0055100 RICHARD TOAD
Yb ROW VIM 472 UTi35 AND A IS mRTIROU M TORN SAM;
. PWM410' P770' MO:'GML`rT
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE ONE
PHASE ONE "A"
IMPROVEMENTS
STRSIGNALS
EETS 'PARKS
PROJECT NO. 00-01-001
Page 15
IJ+Erejn.«inae(E 1.14
2929 Brlaryark Dr Ivo 'hone 7 13. 555. 5200
Sunt* 500 tc. 717.953.5026
Houston. Texas 77042-3703
TOa17IT A! OD -Di -coil nJ4 R? INE -SON !NM, JP. 11. soon
Exhibit 2
® ME M I MIIII M
20. W.L BY CITY
OF PEARL AND
FUTURE WATER PLANT
BY CRY OF PEARLANO
//1
7,
CLEAR
r'.
C.R. 92
PRPlIOLISLY
AVRNR®
POOR:MD
LEGEND
FLTYLO6
WATES L66
SANTMSC SEISES LO.Z
♦ LIFT TATO
■ IN RFDA S NFCJ TRRATMFAT
NCOMPROPC005) SASELOY Walt :ROOM CAV T[T6 916/ar
6 MHO DROOP= AND CC06TRUCTIO m CITY OF MUSD.
Ni' BY C
PEARLANO
REINVESTMENT ZONE NO. 2
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE ONE
PHASE ONE 'A"
IMPROVEMENTS
WATER AND SANITARY
PROJECT NO. 00-01-001
L.S A BvI '� • ig & &n"lt L JA
2929 blorp .* 11.1w Shoo 717.9513700
SuIN SOO Fm 7119510020
1100010'O 71509 TT002-5102
mIIRIT II? 05110111/ 16i- 1541.000 1061,. L 11.2000
Page 16
Exhibit 3
= EN N I I N I M = 1.1111 INN
C.R.92
t1/39RO rnv PPLIPDAD ?AMUR!
N7775W®
LEGEND
C
STORM 3612111
wa7 DATENT'ON AREA
DIS' DSRi7RDN ARTA
d5M7Ul. 115.7,0212.9715S5
REINVESTMENT ZONE NO. 2,
CM OF PEARTAND, TEXAS
SHADOW CREEK RANCH
VILLAGE ONE
PHASE ONE 'A"
IMPROVEMENTS
DRAINAGE
PROJECT NO. 00-01-001
w�Enaileceng & Surrey/4 Inc Lit
2955 SriSlyork Orin Plans 713. 553. 5201
Sults 500 Foe 713. 953. 50A
Roo.,on. 7.001 77052-3707
5001115 I10. 00-01 b0111J XII Pa ION -f000 I017F..lsc 11, 7-000
Page 17
Exhibit 4
108-111N• MA 14 NOS
REINVESTMENT ZONE NO. 2,
CITY OF PEARIAND, TEXAS
SHADOW CREEK RANCH -
PM NMI INN NM INN 1E11 NE 11111 MIN NMI 1E11 11111 Ell NMI NMI 111-- 4NMI
IA llav Irtt. r
• AMR \1111 1 Y: PAVTMI..I SW IV1M
for ttlf qui +lt n,SI*VN'I SICIpIM C 4117.0.
MIN
•
pr ll.l.W {x114 7-75'n1ITLIMI 7R:7V1111 K COW')
MV ILO" - - I lllt1AF VIMNINI. tM dRtTMki WHAM MAD
W AO% enc. 4 171ANs 041l A Wt t.81 IJ()Ilf '11Jgn- Uti'
WNIRT 710:41-1..01
VILLAGE ONE PHASE ONE B
IMPROVEMENTS STREETS, PARRS
/NO thrum* 111-1w A/A 71 M/111
!II» 1110 ht 71 OA,1141
IYsheb Tlrs T1044M
ser m
Page 18
Exhibit 5
111.11 N = N N 1 M N M 11 ® On , r
REINVESTMENT ZONE NO. 2,
CITY OF YEARI AM), TEXAS
SHADOW CREEK RANCH
VILLAGE ONE PHASE ONE N
IMPROVEMENTS WATER AND SANITARY
Vt�_K Brew Mons TIL t•. Ms
I� °00T 77042-370r� ns sa gas
1
i
1
WMT � � nnw 0.sMa
Page 19
Exhibit 6
NE MN N M MN 11111 1 NS N MS E N IIMI
REINVESTMENT ZONE NO 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE ONE PHASE ONE B
IMPROVEMENTS DRAINAGE
L,NWi�rMilRM+wi�Min L
Ir t 1.1MM MIN
/10 Why Fa i 11.. NM MI
r��n Tam MO -1M
_IT r• 1 -bb w.w IMO am mem
Page 20
Exhibit 7
1111 OM 1011 MN 11.1 IIIII ME IIIIIII IIIIII
7
l RAO I tw a.W, .Nr
Rrtnv.airN 2 IS 1AVnnnr A7tltrR4
naao.Mn1 2 7SMN3A0n 321,11045 (7 OONL)
LEGEND
MIN
INN
RD.*.wn+ 3-W447140R 6(.1X* t2' COM"
N7 ROW.- FVIU4 I704T'12 M NOSUHU 1.11:34M ROAD
i3 RO.R Writ 4 QIAN6 ANO A trU24114410tn TURN SAM'
174IRY 1.1021414721
A
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
SAPPITIRE BAY ANT) AI)1)ITIONA1. VILLAGE
ONE PHASE ONE B STP,EEPS AND PARI
LMBM..+a assr.ft Ira 1. 1,1
ifs
Ilinerpirk a -r. 'Pro 7111•LrL
LIN 300 Fat 7111.110.11114
RRa♦Iw 74•444 7100-3110
mon A PE 3f 141.l111 line
4
Page 21
Exhibit 8
11.1 MN NM IME MIN
PPI.IPPNIAID UNITAAT StOlk
ONLMw4YW4l) IO&$, MAIM
PPTAATYIVPll IIATTT Illi
PPOPOSID SN ITAR./ StTPLI
PI.t)Mt*) )ORM MAIN
. PTTPOSED LOT STATION
PYRNM S5T.M TWATMPAT MANY
LEGY-ND
PPOPOQTD TATO! LIPS
CRY NATO" LINT
MA)MKH) WATAR DANT
REINVESTMENT ZONE NO. 2,
CITY OP MARI AM), TEXAS
SHADOW CIC RANCH
S.APPy1RE ItAY INUVE AIl) ADMIT -INA' VN 'ADE
ONE PI USE ONE B WADDL AND SANITARY SEWER
t.wgrai..rr&Waft ria `J.,
����1rP/ItI erM PARI. Di 1113.17101
--TTM_SfID
Fee Tllia 1111
=IMMO las v. ismisim limas
Page 22
Exhibit 9
iii PM — NM MINI — MIN La — 111.11 IIIIN
}
Yy,
Page 23
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CRIEK RANCH
SAJThIRE MY DRIVE AND ADDmONAL
YILIAGk ONE PNASk ONk 0
IMPR(YVEMINT T)RAINA(:0
L11 Iftlirmete Sm.% Ma LA
MS Sults rrv. Plum ilS0N Fhl SUL
w.+.* Arm T -Tl
MINT — ION Mb Nabs= IMPS
Exhibit 10
M I 111111 I = M M IIIE M — k
l ROW MTN ]•S 1MVT),ONT 1&CTk)NY
{OTC :TIT 2 $ 10131011 Qrrt[1N( I- fYly I
p_ +r•
LEGEND
MIN
•
fN s r a. TOT I 'as TMVD 1D T .11(71( 10 fS fTM' +
.r
010R- [VW*, 11Mhvai f)) )XRTTJC VC1N1n Roan
B ROW WITH u.• 1wN7S M 1 * & *Y1MTW110, 1102 I 422
tNTYT * 5.M.24
STREETS AND PARKS
REINVESTMENT ZONE NO. 2,
CITY OF PEARIAND, TEXAS
SHADOW CREEK RANCH
ADDITIONAL VILLAGE 1
AND VILLAGE 2
IMPROVEMENTS
PROJECT NO. 01-11-002
LJAErotsetc tTElmira 1e LJt
»a rIwpr• Or Iry The. 111.113. face
SAN 100 is Tf1.'S3.f00S
Ra.1M Term 17012-1701
DIM*, O 'i OW
Page 24
Exhibit 11
M N I === MN MN I N— I l--- N m
NW. .. IN,
1111•0sLv
ALITMO QD
O
COSTING SANITARY SIMI2
CMTMN, INTFMIN treAM:f
TICATNINT MAA?
DCKT,NC WATTA LW
tfSTD . l•TY SATTt Lr,
LEGSND
FICIOIND
•
wtm NlT 4MiAv1 •tete
PROM IVT WATT,.
Nt/Mnv, wATTI MANT
fY.Trilt tkMtTAUT liflR
• II:r1fM IRT ITATIM:
---- FVIIIAl WATF2 IDC
FVTT.O IFATt. MMR
m
N
N
WATER AND SANITARY SEWER
REINVESTMENT ZONE NO. 2,
CITY OF PEARIAND, TEXAS
SHADOW CREEK RANCH
ADDITIONAL VILLAGE 1
AND VILLAGE 2
IMPROVEMENTS
PROJECT NO. 01-11-002
WA Ergpeortg&> LJ�
Tm rises. ylA. Prom 111 Thi WOO
Sul to 1100 /01 TS 3. I. l021
mu.TT TFIp. 71042-3T63
ELM' III T
Page 25
Exhibit 12
'ROW vN%
ERT UETTNT+UN k *
c24.414`1R 601110VvulxTI
wT2101 �..�
DRAINAGE
REINVESTMENT ZONE NO. 2.
CITY OF PEARTAND,TEXAS
SHADOW CPJ±K RANCH
ADDITIONAL VILLAGE 1
AND VILLAGE 2
IMPROVEMENTS
PROJECT NO. 01-11-002
2121 Fo. 713. PM 520C
•6O
lot w1 ECO Ta .13.13. SW<
TSra ..0.2-IT33
2i1t11. r 1— - '/.-Ir 1004
Page 26
Exhibit 13
hifi
R R
,x111110 pun V, ....11410..1.
_ nr 1!.116 61111 I W_M1 13!-I106f5
_Mal/ 6 all 2 .• rA\!Mlr1; 41'. I011 I' CO,
1610 AS.
LEGEND
•
ter 4115; orn l :.21V0T1061. 01.711(06 It CMR-,
50 ROW - 11 111.11£ wmtra C Or [)ISTD:; 1404A501. ROAD
x411. 6r111 60IA60 AMD A 11 (01a1161O(rW ,1,111,1 NM!
TM.2211; 51C1.1161
03
STREETS AND PARKS
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILIAGE 1 AND VILLAGE 2
PHASE 2 IMPROVEMENTS
PROJECT NO. 02-08-001
L11A G' Saknwina Inc. IA
3321 Orlarpv4 Orlvw P1gr19 ?r3. 3.5100
Suite 600 Fox 1r3.951.7026
Rwrtpn Twos )?012-3203
ib1161, go [J0610 IYID
Page 27
Exhibit 14
N I IIIIII M I MN 1111111 N NE E N 1 11111 1 E IMO
raw- ow1
IVVIo' Y
I.FGEND
F6fl6111Q1 rrItTlfilT
1161066 %R6'N
dipRT 2lT{Ifl1W M 1
f 16v26r2 /Y6rriT V e.1't
DRAINAGE
cc
N
Vl
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE 1 AND VILLAGE 2
PHASE 2 IMPROVEMENTS
PROJECT NO. 02-08-001
LJA ErcineaI+p & 8urefict tr. `,14
212' OF WOO' R Or 1.1. A,m
lre iI1153. 3200
e 600 Fax 711.953.00h
MOWton. 70606 T2062-1207
O0116IT O
Page 28
Exhibit 15
EN MN NM N I NM M NM En N 11111 1 EN I E MN EN E MS
EO ROW WTTM 20' PAVEMENT
SO' ROW WIM 2.2S PAVEMENT SECTIONS
?OD ROW WTI 2.25 PAVEMENT SECTIONS IT CONC 1
PARK AREA
MEND
tar ROW WIT112. 25' PAVEMENT 8ECTLONS IS' CONC.1
MO ROW - FUTURE wroetipoc OF EXISTDAS MCMARI) ROAD
tee ROW WmTM•. IT LANES ANO A 1t CONTINUOUS 'TURN LME
LICYUOA Nt
SCALE r •1SDOFEET
STREETS AND PARKS
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
REMAINING VILLAGE 2
PHASE 2 IMPROVEMENTS
PROJECT NO. 03-10-001
LJA 6 glowed / i 1LLFveyM/e Ise. 1A
Ihsral
o• mason mum*
OaaRt l0
X• 11M1L-
Page 29
Exhibit 16
i 11111 MIN® iii NM i• MN N IVAI f• 11111 MI --
1
PREVIOUSLY
AUTHORIZED
EXIS SANITARY SEWER
EMS. INTERNI SEWAGE
TREATMENT PLANT
EXIS WATER LINE
EXIS. WATER PLANT
LEAENO
PROP. SANITARY SEWER
PROP. WATER LINE
MIRE
Ci,
FUTURE SANITARY SEWER
FUTURE LIFT STATION
FUTURE WATER LINE
..1
SCALE T= 790 FEET
WATER AND SANITARY SEWER
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
REMAINING VILLAGE 2
PHASE 2 IMPROVEMENTS
PROJECT NO. 03-10-001
WA EnONIN.dng & Surveying, Ina 111
XMONavolits• rum e Amo
➢01ao
0/148(" 10
1 Ian
Page 30
Exhibit 17
E M r NE r EN 1 MN E MN M 11111 LA -11 L i
1 L_ 1
-MilirdAavs- camel a
,A•m*
• 44404,
474r1P
moii
710 r. °Wu*
--APP
CLEAR
N
FL R
a �A^I \'-* f#4111 IL*N Atli/ IFIF II11 Wkilat 61 ''I? ir. y4i4kfrit-- .1111 UMW II i ar 11.
rPir•vmg
MGM
PylousLY
as QReP PgQ?Q$ D FIZTURE
0 0 0
C:1 ® o
c
STORM SEWER
WET OETEN?TON AREA
DRY DETENTION AREA
CHARNEL VROYEMENTS
SCALE. 1' 9WfEET
DRAINAGE
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
REMAINING VILLAGE 2
PHASE 2 IMPROVEMENTS
PROJECT NO. 03-10-001
& surveying, hoe. ,14
Oil St OIL
Page 31
Exhibit 18
NMI — — — — — iI M — — ! f• i• iI i1 i• — — —
rik.•
4 j!r,,, ,
/4j
1
'woe
4 11.4
,..„ r♦
/ •
Atm& .
SO' ROW VATH 2e PAVEMENT
INN
SP ROW WPM 2.25' PAVEMENT SECTIONS
100' ROW WITH 2.25' PAVEMENT SECTIONS (>• CONC.I
PARK AREA
LEGEND
IOD ROW VAN 2.2S PI W EEd@R SECTIONS Ir CONC.,
IW ROW - FUTURE WIDENING OF COSTING MCHARD ROAD
700' ROW WITH 4- 1r LANEs AND A 14* CONTINUOUS TURN LANE
MOA JMFNT
SCALE I-•IWOf (ET
STREETS AND PARKS
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE 3
PHASE 1 AND PHASE 2
IMPROVEMENTS
PROJECT NO. 03-10-002
LJA Engineer* Z Surveying, Ino. IA
'r. r . .ozr
r.Iin _n
-o
AM IC
Page 32
Exhibit 19
N — — M M — l i♦ M = M — — —
PREMOUSLY
AUTHORIZED
EXIS. SANITARY SEWER
EXIS INTERRISEWAGE
TREATMENT PLANT
EXIS WATER LINE
EUS. WATER PLANT
eeOFoRED
LEGEND
PROP SANITARY SEWER
PROP. WATER LINE
Forum
- FUTURE SANITARY SEWER
Ej: FUTURE LIFT STATION
FUTURE WATER LIN:
1
SCALE • 500 FT TT
WATER AND SANITARY SEWER
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE 3
PHASE 1 AND PHASE 2
IMPROVEMENTS
PROJECT NO. 03-10-002
LJA EngineorIng & 6nrveyIng, Inc. IA
mWeer Miatkill
W M mem
4.1.11m 1110.14f
Mein
I- I MY
Page 33
Exhibit 20
11111 NMI NE 11111iiiii• EN M EN N 11111 Ell NM INN 1 EN 11111 iiia
LEGEND
EEMOGISLY
NITHORIEED PROPOSED fUT11$E
0
STORM SEWER
WE- DETENTION AREA
DRY DETENTON AREA
°IMPEL IMPROVEMENTS
SCALE T• SCOFE[T
DRAINAGE
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE 3
PHASE 1 AND PHASE 2
IMPROVEMENTS
PROJECT NO. 03-10-002
LJAIbugInsecIng & Surveing,l.c. IA
Sown mwee.
0.0111110-
Page
io
Page 34
Exhibit 21
1-A It—I1 MIN INN INN MI 111111 11•11 NM 11111 EMI UN 111E1 EN NE
EB ROM WITN 2rPAVEAENT
08 ROW MRN 2.25 PAVEMENT SECTIONS
108 ROM WTTN 2.25 PAVEMENT SECTIONS (1' CONC
PARK AREA
LEGO P
10C ROW WRN 2 - 28 PAVEMENT SECTIONS (S CONC1
1E8 ROW - FUTURE WIDENING Of EXISTVIG MCWRG ROAD
100 ROW WITN a .17 LANES AND A 14' CONTINUOUS TURN LANE
MONUMENT
.1
SOME r • 1900 FEET
STREETS AND PARKS
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE 3
PHASE 3 IMPROVEMENTS
PROJECT NO. 03-10-003
*4*
Enelmeting a Surveying, hie. IA
SOD= On 1.0.140
604•R NO
JOa1Q ' Oa1{
Page 35
Exhibit 22
N I IIIIIIiii -- MN— N— 111111 M M M INIII
NoNforry
FR, imt/
illorpt*In..:1
Atinettilin irat
u.nrn.iLY
EMS. SANITARY SEWER
DOS *ITEM SEWAGE
TREATMENT PLANT
EMS WATER LNE
GO EMS. WATER PLANT
ERIGED
LEGEND
PROP SANITARY SEWER
PROP WATER LWE
FlaURE
FUTURE SAVTARY SEWER
g FUTURE LMT STATION
FUTURE WATER LINE
SCALL ,'•,lW.EET
WATER AND SANITARY SEWER
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND. TEXAS
SHADOW CREEK RANCH
VILLAGE 3
PHASE 3 IMPROVEMENTS
PROJECT NO. 03-10-003
LJA ItAgineedR. s airvivilleg, bee- IA
fatala /a .6 alto
LOW! MO
'-P [o+n
Page 36
Exhibit 23
ice■ NM — — — I — — — MIN ii• MIN MN — — —
, ii.,, .
i---,ro-Amik.......!..-....,,,
# ft&.1maraws,tvilh-
i,(4.4,A.Akani ... _ . . . 6 iim 1 • i
Jr:4V I 1--- - Wal- vil ri 1 iWifl
fil vAtt4: .,,c, ail
0. —
Ali Volifto, "Arabi
Apt ornifv4Aviiiii
altilbialli 11111:
LEGEND
esEYKIVALY
AUmc$IZED DOSED FIUME
C:1 ED CI
Cl
STORM SEWER
WET DETENTION AREA
ORY DETENTION AREA
CHANNEL IMPROVEMENTS
DRAINAGE
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE 3
PHASE 3 IMPROVEMENTS
PROJECT NO. 03-10-003
LJA Englna.iln f Ear ..,, Inc.
Waft.. oar
OMI! NO.
Page 37
Exhibit 24
h — —111111 IIS NM IN N Mil M = I I♦ —
Q W ROW WTM 2E PAVEMENT
- IG ROW WTI 2 - 25' PAVEMENT SECTIONS
_ NG RDW IMTN 2.2S PAVEMENT SECTIONS (T CONC.X
Q PARR AREA
LEGEND
_ ID0 ROW WITH 1.25' PAVEMENT SECTIONS (T CONC.)
_ 1 0' ROW . FUTURE VAOEN ING OF EXISTING MCNARD ROAD
- 100' ROW WITT • • 17 LANES AND A 11' CONT1HIp{S TURN LANE
BALE ''• 1300FEET
STREETS AND PARKS
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
KINGSLEY DRIVE
PHASE 3 IMPROVEMENTS
PROJECT NO. 03-10-004
E.M► Ongla .Fm, i ..F..,i_Y, inc. I/4
Page 38
Exhibit 25
INN — iiia — ® I i♦ N I M NIII N NM M NIN 1 I.
e 11 Va ‘
ti* fhb
'IOW MUM
PREYKIUSLY
SECHORZED
EXIS SANITARY SEWER
EMS INTERIM SEWAGE
TREATMENT PLANT
EMS WATER LME
%' (XIS WATCH PLANT
PROPOSED
4ES'TEND
PROP SANITARY SEWER
PROP WATER LME
ARE
FUTURE SANITARY SEWER
[{i FUTURE LWT STATION
FUTURE WATER LME
J
SONEI••'SOO FEET
WATER AND SANITARY SEWER
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
KINGSLEY DRIVE
PHASE 3 IMPROVEMENTS
PROJECT NO. 03-10-004
WA tng1...Fdng & Surveying, Mn.. 1A
mop. um Almon
\.r•�40 ' MB VI
Page 39
Exhibit 26
MI — — — iIMMII MI MN I I 1 MNI WA NMI —
EAR
sw.
giv•ir(
LEGEND
rnEviOIJELY
AUTHORIZED Pft4P4SEQ MIRE
STORM SEWER
OWET DETENTION AREA
II DRY DETENTION AREA
- Q CHANNEL NWROVELEMS
1
SCALE 1.• SOD SRt
DRAINAGE
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
KINGSLEY DRIVE
PHASE 3 IMPROVEMENTS
PROJECT NO. 03-10-004
WA Engineering & Surveying, Inc. Li
Rev 1.110i•
Mises r. teas
OMIT,
Page 40
Exhibit 27
N MI MI N — M i♦ N — = — — MN i= iI — — -
OD ROW WITH 2E PAVEMENT
MIN
!D ROW WITH 2.2$ PAVEMENT SECTIONS
INN
10S ROW MAIM 2.29 PAVEMENT SECTIONS (T CONC.)
MRK AREA
_ 100' ROM WITH 2.23 PAVEMENT SECTIONS (S. CONC.)
_ 1E0' ROW . FUTURE WIDENING OP EXISTING MCN ARD RDW
_ 100 ROW MRN 4.12' LANES AND A 12' CONTINuot6 TURN LANE
C MONUMENT
1
GLACE r. S IU
STREETS AND PARKS
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
KINGSLEY DRIVE
PHASE 4 IMPROVEMENTS
PROJECT NO. 03-10-005
LOA Raglitatering A Survey's*, lite. 1A
N0!
Page 41
Exhibit 28
M I N I I I N IIIIII i• M M M L 1
i
i F i l 1
PREYIQU!
AUTHORIZEC
PROPPED
EGENp
EXIS. SANITARY SEWER DROP. SANITARY SEWER
EXIS PETERM SEWAGE
TREATMENT PUNT
EXIS. WATER LINE
EXIS. WATER PLANT
PROP WATERLINE
FUTURE
FUTURE SANITARYSEWER
FUTURE LMT STATION
FUTURE WATSA LPN
.1
SCALE. r. WO FEET
WATER AND SANITARY SEWER
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
KINGSLEY DRIVE
PHASE 4 IMPROVEMENTS
PROJECT NO. 03-10-005
UA ERQIRMFfIp aSumAleg,ra
w �
Ou.► M
Page 42
Exhibit 29
MI MINI MIN IIIIII IIIIII =I MIMI NMI NMI IIIII MIN Mill MO MIMI MI =I IIIIII
LES
FREYIQuSLY
91ED3OBIZED EINPOSED RJTURE
M
O 1=J
STORM SEWER
WET DETENTION AREA
ORY DETENTION AREA
O CHANNEL D.PROVEEEMS
DRAINAGE
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
KINGSLEY DRIVE
PHASE 4 IMPROVEMENTS
PROJECT NO. 03-10-005
LJA EgLeeeEMip & 3wve tit., lea. IA
WIN MIMS{
E1041 W MONO
Page 43
Exhibit 30
i■� -- En N N MN I EN — I I — 1 MS MINI MI N—
i�
IIC ROW WRH 2S PAVEMENT.
80 ROW WITH 2.25 PAYMENT SECTIONS
100 ROW WITH 2.2S PAVEMENT SECTIONS IT COICA
PARK AREA
MIN
100' ROW WITH 2. n' PAVEMENT SECTIONS (C CONC
180 ROM - FUTURE W10EINNG OF EXISTING MGWtD ROAD
IOC ROW MPRH 4 . '? LANES ANO A 14' CON1Tl/0US TURN LAME
MONUMENT
40A&L 500
STREETS AND PARKS
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND. TEXAS
SHADOW CREEK RANCH
VILLAGE 5
IMPROVEMENTS
PROJECT NO. 03-10-006
{JA IR IlN* • jfIC.
rr .. mrM I
rwr afu
1sNVIIro
aro
Page 44
Exhibit 31
INN — MN ® ® NE 1 1 NM i♦ N iii N EN
P ,01411.1 Aille. s Mil -
/4 iti, ‘1101 Pl.\*M1
441,4fr , II I
Il
ME
irtilligkill
FSEIKVSLY
AV IORVEQ
EX$. SANITARY SEWER
EXIS, INTERS* SEWAGE
TREATMENT PLANT
EMS. WATER LINE
EMS. WATER PLANT
SER
tEGE NEN
PROP. SANITARY SEWER
PROP. WATER LINE
MEE
FUTURE SANITARY SEWER
OV FUTURE UFT STATION
FUTURE WATER LINE
SCALE 1' • 1000 FEET
WATER AND SANITARY SEWER
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE 5
LMPROVEMENTS
PROJECT NO. 03-10-006
WA Engineering a tag, tee. IA
01•.17 PO'
� fl OFTF
Page 45
Exhibit 32
INN 1 N MS I l N NE NE MI NM 1 NM I I M INN
• "a!" ILL ,-Imiliiilk
Aguipli.sw----iii __.1101 , A lim
/(,-„4i\i,Liminti fp ITip
Orr 7111111141 ileti IF!
,Aiii ft-*$ '14,,. trillti.
,,,,J kvi koyeric ,
limiroitt.o 44.11.
__ .
Bismigioemo ,
FlIMASNALY
AUI HOR¢EP mom= FuruRE
STORM SEWER
WET DETENTION AREA
DRY DETENTION AREA
CNANEL WROYEMENTS
SCALE r. 600 FEET
DRAINAGE
REINVESTMENT ZONE NO. 2,
CITY OF PEARLAND, TEXAS
SHADOW CREEK RANCH
VILLAGE 5
IMPROVEMENTS
PROJECT NO. 03-10-006
UA Engk,..d.O i Surveying, lee. LA
Page 46
Exhibit 33
I 11111 E 11111 1M1 N ME I 111111 I 1 I 111111 MI NM MN
Ir
i " I
fi
LEGEND
♦ MINN WRY IOMJYEPG
KALE
1
-,,Cert:*
REINVES FMENT ZONE NO. 2.
CITY OF PEARLAND. TEXAS
SHADOW CREEK RANCH
PRIMARY ENTRY MONUMENT
LAND COST
PROJECT NO. 04-07-001
uw lisil.wb a ermine, kn. ill
Page 47 Exhibit 34
UM NM I IIIII MN = = = = I i• N = MI = 1 1 1
POUCE676 STATION LOCATION
IEGENO
1
SCALL .c.
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND. TEXAS
SHADOW CREEK RANCH
POLICE/FIRE STATION
LAND COST ADJUSTMENT
PROJECT NO. 04-07-002
WA engineering $ surveying, ave. 111
Page 48
Exhibit 35
NM I — iii — i0 MI iii N — MIN MEI — — NM MIMI i= INN
IM111cuW1
J
IC L 1. • HIV R11
PARKS
REINVESTMENT ZONE NO. 2.
CITY OF PEARL AND. TEXAS
SHADOW CREEK RANCH
REGIONAL NATURE PARK
PROJECT NO. 04-07-003
w► e.grl..en, a Se n"ra, Ye. LA
Page 49
Exhibit 36
111M1 11111 NE MINI EN MI N EN 1 N E MIN MN M M 11111 INN
romormorsr I
h car
• S0• ROW WITH 2T PAVEMENT
• SP ROW WON 2.2'- PAVEEUTSECTONS
_ IOP ROW WITH 2- 25 PAVEMENT SECTIONS tCONCt
• PARKMWUNDSCAPING
LEMIQ
_ 100' ROW WTI 2.25 PAVEMENT SECTIONS 1r CONCH
• 15P ROW • FUTURE NIDEMNG OF EXISTING MOIARO ROM
▪ I RGW.Arni .17 IMPS ANO A M' CONTINUOUS TURN LIE
♦ MOMMENT 0 TRAFFIC SIGNAL
i
SCALE 1 • 1Rb FEET
STREF.TS AND PARKS
REINVESTMENT ZONE NO. 2.
CITY OF PEARI.AND. TEXAS
SHADOW CREEK RANCH
VILLAGE 3 PHASE 4
IMPROVEMENTS
PROJECT NO. 04-07-004
LJA [Ngs .. ang s Unwire, he. 114
Gown.. 001.0 an.
Page 50
Exhibit 37
1 1 1 MIN MIMI =I ® Mil r IIIIII 111111 IMO Mil NM ILA1 L i
PREV/OMLY
A1.7,10RIZED
!JOS SANITARY SEWER
EXIS VIATFR U NF
Ems IN^ERV/ SFVMOP
TREATMENT POAN'
LEDEND
WOR SAMI ARv EEV.ER
PROP 'vArER LINE
PROP l:•' :AMR
FJTURE SANTTARI SNIEP
FUTURE'WATER :INE
,W.[ 1 . .STEST
WATER AND SANITARY SEWER
REINVESTMENT ZONE NO. 2.
CITY OF PE.ARLAND. TEXAS
SHADOW CREEK RANCH
VILLAGE 3 PHASE 4
IMPROVEMENTS
PROJECT NO. 04-07-004
W*
lik*Hisrlos • funiglibm Ino. IA
Page 51
Exhibit 38
11111 11111 MN NM MN 111111 '11 PRI tim11
PREVIOUS! IOUS! Y
AUTHORIZED [Q
0 0
-
amas
bowl
STORM SEW &
viET OcrE'TOn AREA
DRY DETENTION AREA
CPWDIEL WPROVEMENTS
KA:[ Lec MET
DRAINAGE
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND. TEXAS
SHADOW CREEK RANCH
VILLAGE 3 PHASE 4
IMPROVEMENTS
PROJECT NO. 04-07-004
IJAA {{ Bring d. urver_M�y
Page 52
Exhibit 39
UN 11111 11111 1111M 111111 MN MS 11111 111111 111111 1E1 111111 MIN 11111 111111
•
•
is
1
•
ISMIC
PI' ROW WITH 25 PAVEMENT
IC ROW WITH 2.2S PAVEMENT SECTIONS
100 ROW WTN 2.25 PAVEMENT SECTIONS IT CONE 1
PMKMEMANOSCAPINO
•
t 2 ROW WITH 2.25 PAVEMENT SECTIONS R'CONc.,
167 ROW . KNEE WIDENING OF EJEST1NOMC1 ARO ROAD
100 ROW WITH I .12LAMES AND A NT CONTNUOU6 WON UNE
MONUMENT
TRAIPSE SIONA/
1
*CAI .. INCOWET
STREETS AND PARKS
REINVESTRIENI ZONE NO. 2.
CITY OF PEARLAND. TEXAS
SHADOW CREEK RANCH
VILLAGE 4 PHASE 1 AND
REFLECTION BAY NORTH
PROJECT NO. 04-07-005
1..1N MgN'.«Nq 8 SNMMyIng, Mad%
Page 53
Exhibit 40
1 1 1 1I 1E11 IIIII 1111 INN MIN OM MIN 11111 11111 .11111
AUTHORIZED
-- as SANITARY SEWER
£ iS MACER aac
E%!S NTERSI SNAGS
IREATRENT PUNT
FJOS LIR STRIION
PROPOSED
FUTURE
PROP SANITARY SENER -- !Uitm E SAHRARY$E.ER
PROP MATER ONE - FUTURE"ATER LRE
WATER AND SANITARY SEWER
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND. TEXAS
SHADOW CREEK RANCH
VILLAGE 4 PHASE I AND
REFLECTION BAY NORTH
PROJECT NO. 04-07-005
LJA Enpinwdfwg i Eurwyl ,
ta.H l ury
Page 54
Exhibit 41
NE — 11M1 1-- IM1 M 1 I EN MN N MI iii M an I NM
IRMO
PREMOLISLY
AUf/q nD MEM 8031%
ETDMI REWVER
VIET DETENTION AREA
ODNY DETENTION
GTMM EL YTN OWNIENT$
EMI •'- =KIT
DRAINAGE
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND. TEXAS
SHADOW CREEK RANCH
VILLAGE 4 PHASE 1 AND
REFLECTION BAY NORTH
PROJECT NO. 04-07-005
EJA • e_._ , )Tec. 114
NSW AO .0
Page 55
Exhibit 42
LJAlR➢binERO '
® ® 1111 — — — — i NE — — — — — I 1 — — NS
1
1 PT ROVI VRm 35PAVEMENT
S'J' ROW WITH 2-^P PAVEMENT SECTIONS
- :NS ROW WON 3. b' MVEMEM 0tC11ON3 I, COM )
PARR ARRA
- IC? ROW VATN;. ;S PAVEMENT SECTIONS Ir CONE)
ISE POW FUTURE VADENINO Of ENS'1NG MCHARD ROAD
_ )x rOV: VATNA :;'WIN MO NI.CONTINU01.0 TUM LAN!
• MONtMENT TRAMS SIGNAL
STREETS AND PARKS
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND. TEXAS
SHADOW CREEK RANCH
TRAFFIC SIGNAL AT
SI IADOW CREEK PARKWAY
AND KINGSLEY DRIVE
PROJECT NO. 04-07-006
As+PI NC pN
Page 56
Exhibit 43
1W111 MI NMI 11•11 1E1 SIM 1E11 INN 11111 INN MN MN 111111 Inn NM
PpEND
• BO' ROW %OH 211.PAVp1ENT
• SN ROW MRTN 2.2 PAVEMENT S(CTIONO
- +op ROW WRN 2.24 Pm/00W SECTORS CO CORGI
• PARK AREA
_ XV ROW aMTM: .S PAVEMENT SECTIONS it CONG,
150 POW • FVTURE VROERWG Of EA.S'wG MCNARO ROTO
_ t 07 007 VATNa '?,ANC ANO*• .'CONTNUCVS it/P4 UNE
j MORt.ENT -MOM S1GNAL
1
SC. - 1545 RI?
STREETS AND PARKS
REINVESTMENT ZONE NO. 2.
CITY OF PEARLAND. TEXAS
SHADOW CREEK RANCH
TRAFFIC SIGNAL AT
SIIADOW CREEK PARKWAY
AND KINGSLEY DRIVE
PROJECT NO. 04-07-006
LJA Eaginaorlog i SJvvybb
Cu.*, Ra pw
Page 57 Exhibit 44
Memo
To: Mayor and Council Members
Bill Eisen
l'o tin aLcoz`ing
From: Alan Mueller
Date: 5/5/2005
Re: TIRZ # 2 Annual Report
Attached are pages 12 and 13 for the TIRZ#2 Annual Report, which were
inadvertently omitted from the copy that was provided to you by Knudsen &
Assoicates.
3 ECIEGWE
MAY 1 0 2005
CITY OF PEARLAND
CITY SECRETARY'S OFFICE
ci
TABLE°F'
ESTIMATED CAPTURED APPRAISED.VALUE BY JURISDICTION
ASSUMING NO APPRECIATION
CITY ACTUAL CITY CITY ACTUAL CITY BRAZORIA ACTUAL BRAZORIA ACTUAL BRAZORIA F7 BEND ACTUAL FT BEND ACTUAL FT BEND ALVIN ISD ACTUAL ALVIN ISO ACTUAL ALVIN ISD
TAX TAXABLE TAXABLE CAPTURED CAPTURED TAX TAXABLE BRAZORIA CAPTURED CAPTURED TAX TAXABLE FT BEND CAPTURED CAPTURED TAX TAXABLE ALVIN ISD CAPTURED CAPTURED
YEAR VALUE VALUE APPRAISED VALUE APPRAISED VALUE YEAR VALUE TAXABLE VALUE APPRAISED VALUE APPRAISED VALUE YEAR VALUE TAXABLE VALUE APPRAISED VALUE APPRAISED VALUE YEAR VALUE TAXABLE VALUE APPRAISED VALUE APPRAISED VALUE
1998 $ 7,172880 $ 7.172980 BASE YEAR BASE YEAR 1998 $ 4,143,160 $ 4,143,160 BASE YEAR BASE YEAR 1998 $ 3,029,820 $ 3,029,820 BASE YEAR BASE YEAR 1998 $ 4,148160 $ 4,143.160 BASE YEAR BASE YEAR
1999 7,172080 14,024830 0 6,847,1350 1999 4,143,160 10,076,560 0 6,933,400 1999 3,029,820 3,820,260 0 790,440 1999 4,143,160 10,078.560 0 5,933,400
2000 7,172980 16,304,860 0 7,131,B80 2000 4,143,180 10,383,B2D 0 6,220,760 2000 3,029,820 3,793,300 0 763.480 2000 4,143,160 10,363,920 0 6,220,760
2001 41.153,030 19,240,440 33,980,050 12,057,460 2001 31.008,310 15,081,700 26,865,160 10,938,540 2001 3,029,820 4,158,740 0 1.128,920 2001 35,152200 10,938,540 31.009,040 6,785,380
2002 187,966,938 22,566,490 180.793,958 16,393,510 2002 154,326,533 18,628,790 150,183,373 14,485,630 2002 3,02.3,820 3,937,700 0 907,880 2602 172,607,428 15,081,700 168,464,266 10,938,540
2003 361.063,994 75,904,290 353,881,014 68,731,310 2003 297,322058 87,814,240 293,178,898 63,671,080 2003 6,707,345 3,946,893 3,677.525 917.070 2003 330,636,568 19628,790 326,493,406 14,485,630
-2004 550,913,255 258,290,690 543,740,275 251,117,710 2004 432,721,507 252.185.610 428,578,347 248,042,450 2004 33,815,024 6.108660 30,785,204 3,075,260 2004 480,582.919 252,185,610 476,439,759 248,042,450 c7
2005 745,709,617 738,536,637 2005 550,455,344 548312,184 2005 83,751,924 80,722104 2005 608,977,109 604,833,949
2006 939,339,603 932,166,623 2008 659,483,818 655,340,658 2006 141,411,603 138.391,983 2006 727,129,002 7229134842
2007 1,133,445,170 1.126,272,190 2007 805,377,033 801.233,873 2007 160,643,781 157,613,961 2007 887,957,659 883,814,499 .
2008 1,379,348,607 1372,175,627 2008 1,014,395,884 1,010,252724 2008 170.890,396 167,860,576 2008 1,111,286,486 1,107,143,328
2009 1,558295292 1,551,122312 2009- 1,156,294,978 1.162151,818 2009 181,137,011 178,107,191 2009 1,267,807,111 1,263,663,951
2010 1,734,190,348 1,727,017,368 2010 1,282,821,406 1,278.678,248 2010 204,441,999 201,412179 2010 1.406,048,759 1,401,905,599
2011' 1,865,781,102 1,858,608,122 2011 1,342.836,685 1,338,693,625 2011 258,840,641 265,810,821 '2011 1,467,275,433 1,463,132,273
2012 1.925.907.602 1,918,73,1,6= 2012 1,402963,185 1,398,620,025 2012 258,840,641 258810,821 2012 1,527,401,933 1,523,2513,773
2013 1,944,107,602 1,936,934,622 2013 1,418,147,185 1,414,004,025 2013 261,856,641 258.826,821 2013 1,542,585,933 1,538,442,773
2014 1,960,591,602 1,953,418,622 2014 1,418,147.185 1,414,034,025 2014- 278,340,641 275,310,821 2014 1,542,585,933 1,538,442773
2015 1.968591,602 1,953,418.622 2015 1,418,147.185 1,414,004,025 2015 278,348841 278310,821 2015. 1,542.585,933 1,638,442773
2016 1,960.691,602 1,053,418.622 2016 1,418,147,185 1.414,004,025 2018 278,340,641 275,310,821 2016 1,542,585,933 1,538,442773
2017' 1,960691,602 1,953,418,622 2017 1,418,147,185 1.414,004,026 2017 278,340,641 275,310,821 2017 1,542685,933 1,539,442773
2018 1,960691,602 1,053,418,622 2018 1.418,147,185 1.414,004,025 2018 278,340,641 275,310,821 2018 1,542,585,933 1,538,442773
2019 1,960,691,602 1,953,418,622 2019 1,418,147,185 1,414,034,025 2019 278,340,641 275,310,821 -2019 1,542585.933 1,538,442773
2020 1,960,591,602 1,953,418,622 2020 1,418,147.185 1.414,004,025 2020 278,340,641 275,310,821 2020 1,542585,933 1,538,442.773
2021 1,960,591,602 1653,418,622 2021 1.418,147,185 1.414.004,025 2021 278,340,641 275,310,821 2021 1,542,585,933 1638,442,773
2022- 1,960,591,602 1,953,418,622 2022 1,418,147,185 1,414,004,025 2022 278,340,641 275,310,821 2022 1,542,595,933 1,538,442773
2023 1,960,591,602 1,953,418,622 2023 1,418,147,185 1.414,004,025 2023 278,340,641 275,310,821 2023 1,542585,933 1,538,442.773
2024- 1,960,591,602 1.953,418,622 2024 1,418,147,165 1,414004,025 2024 278.340,641 275,310,821 2024 1,542585,933 1,538,442,773
2025 1,960,591,602 1,953,418,622 2025 1,418,147,185 1,414,004,025 2025 278,340,641 275,310.821 2025 1,542685,933 1,638,442,773
2026 1668591,602 1,953,418,622 2026 1,418,147,185 1,414,004,025 2026 278,340,641 275,310,821 2026 1,542685,933 1,538,442,773
2027 1,960,591,602 1,953,418,622 2027 1,418,147,185 1,414,004,025 2027 278,340,641 275,310,821 2227 1,542,585,933 1,538,442,773
2028 1,960,591,602 1.953,418,622 2028 .1,418,147,185 1.414,604025 2028 278,340,641 275,310,821 2028 1,642,585,933 1.538,442,773
TOTAL 01,960,591,602 $ 1,953,418,622 TOTAL $1,418,147,185 $ 1,414,004025 _ TOTAL $ 278,340,641 $ 275,310,821 TOTAL.$ 1,542685,933 $ 1,538,442,773
PER AC $ 550,433' $ 588,273 PER AC $ 638,080 $. 534,514 PER AC $ 441,811 $ 437,001 PER AC $ 484,550 $ 463,303
This table was taken Iron,the Psr ect Plan&Rebrvesbned Zeno Financing Ran as adeplee en August 23,1999.Actual values provided by the Braroria Central Appraisal District and the Fort Bed County Appraisal District Please role that ehoud Brazorla Drainage Distant No.4 ene/or the Fort Bend County Independent Scheel District elect to partkpete N the future,
that information w01 be included In Suture Reports.
Page 12 Table F
ti
TABLE"G"
PROJECTED GROSS REVENUE AVAILABLE,FOR TIRZ PROJECTS
ASSUMING NO APPRECIATION
PEARLAND(1) PEARLAND BRAZORIA(2) BRAZORIA FT BEND(3) FT BEND ALVIN ISD(4) ALVIN ISD TIRZ TIRZ ANNUAL ANNUAL
INCREMENTAL INCREMENTAL INCREMENTAL INCREMENTAL INCREMENTAL INCREMENTAL INCREMENTAL INCREMENTAL ADMIN ADMIN INCREMENTAL INCREMENTAL
YEAR REV @$0.695 REVENUE(ACTUAL) REV @ 0.3575 REVENUE(ACTUAL) REV @ 0.6241 REVENUE(ACTUAL) REV @ 1.5743 REVENUE(ACTUAL) EXPENSE EXPENSE(ACTUAL) REVENUE REVENUE(ACTUAL)
1998 $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ -
1999 0 45,111 0 0 0 0 0 0 (175,000) (117,877) 0 (72,766)
2000 0 46,413 0 0 0 0 0 0 (175,000) (98,530) 0 (52,117)
2001 •0 47,433 0 0 0 0 0 0 (175,000) (96,672) 0 (49,239)
2002 212,545 67;388 32,847 0 0 0 439,358 10,969 (175,000) (100,940) 509,750 (22,583)
2003 1,130,866 167,897 183,622 0 0 0 2,386,920 207,479 (175,000) (121,249) 3,526,408 254,127
2004 2,213,588 753,905 358,455 159,854 20,656 0 4,625,987 229,941 (175,000) (176,148) 7,043,687 967,552
2005 3,401,095 524,001 172,917 6,750,532 (175,000) 10,673,546 0 r'
2006 4,619,547 667,949 453,408 8,569,711 (175,000) 14,135,614 0
2007 5,830,702 801,252 777,278 10,243,755 (175,000) 17,477,988 0
2008 7,044,833 979,629 885,302 12,522,502 (175,000) 21,257,265 0 c
2009 8,582,959 1,235,185 942,856 15,686,782 (175,000) 26,272,782 0
2010 9,702,270 1,408,678 750,308 17,904,475 (175,000) 29,590,732 0
2011 10,802,494 1,563,376 848,484 19,863,180 (175,000) 32,902,534 0
2012 11,625,594 1,636,754 1,077,648 20,730,682 (175,000) 34,895,678 0
2013 12,001,685 1,710,267 1,077,648 21,582,597 (175,000) 36,197,197 0
2014 12,115,526 1,728,832 1,090,353 21,797,734 (100,000) 36,632,445 0
2015 12,218,633 1,728,832 1,159,795 21,797,734 (100,000) 36,804,995 0
2016 12,218,633 1,728,832. 1,159,795 21,797,734 (100,000) 36,804,995 0
2017 12,218,633 1,728,832 1,159,795 21,797,734 (100,000) 36,804,995 0
2018 12,218,633 1,728,832 1,159,795 21,797,734 (100,000) 36,804,995 0
2019 12,218,633 1,728,832 1,159,795 21,797,734 (100,000) 36,804,995 0
2020 12,218,633 1,728,832 773,197 21,797,734 (100,000) 36,418,396 0
2021 12,218,633 1,728,832 773,197 21,797,734 (60,000) 36,458,396 0
2022 12,218,633 1,728,832 773,197 21,797,734 (60,000) 36,458,396 0
2023 12,218,633 1,728,832 773,197 21,797,734 (60,000) 36,458,396 0
2024 12,218,633 1,728,832 773,197 21,797,734 (60,000) 36,458,396 0
2025 12,218,633 1,728,832 773,197 21,797,734 (60,000) 36,458,396 0
2026 12,218,633 1,728,832 773,197 21,797,734 (60,000) 36,458,396 0
2027 12,218,633 1,728,832 773,197 21,797,734 (60,000) 36,458,396 0
2028 12,218,633 1,728,832 773,197 21,797,734 (60,000) 36,458,396 0
TOTAL $ 260,344,572 $ 1,128,147 $ 37,034,495 $ 159,854 $ 20,854,603 $ - $ 468,272,493 $ 448,389 $ (3,805,000) $ (711,416) $ 784,437,554 $ 1,024,974
(1) City of Pearland receives Administration Fees over the life of the Zone based on fees of 0%years 1-3;36%years 4-8;and 84%years 9-30,
(2) Brazoria County Zone participation of 38%for the life of the Zone.
(3) Ft Bend County Zone participation at 100%years 1-10;75%years 11-20;and 50%years 21-30.
(4) Alvin:ISD Zone participation at100%for the life of the Zone,with 25%for non-educational facilities and 75%for educational facilities.
Assumes 90%collection rate.
The takedown schedule Is based on market study.Any changes in the takedown over the course of the Zone will not require a Plan amendment.
The tax rates above are•1998 tax rates,which may change from year to year.
This table was taken from the Project Plan&Reinvestment Zone Financing Plan as adopted on August 23,1999.
Page 13
Table G