R2018-080 2018-05-21 RESOLUTION NO. R2018-80 A Resolution of the City Council of the City of Pearland,Texas,approving a change order with Pepper Lawson Waterworks L.L.C., in the amount of $131,315.90 from Project Contingency, associated with grit and grease removal from the Reflection Bay Water Reclamation Facility. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain change order associated with the Reflection Bay Water Reclamation Facility, a copy of which is attached hereto as Exhibit"A"and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the change order associated with the Reflection Bay Water Reclamation Facility. PASSED, APPROVED and ADOPTED this the 21st day of May, A.D., 2018. TOM REID MAYOR ATTEST: QV Y G L•Ai NG, , SE T TARY [� APPROVED AS TO FORM: art-- DARRIN M. COKER CITY ATTORNEY Exhibit A CITY OF PEARLAND .. `' Resoltution No. R2018-80 PROJECTS DEPARTMENT Exhibit "A" 3519 Liberty Drive,Suite 300 Pearland,TX 77581 F.f r $«. www.cityofpearland.com/projects CHANGE ORDER Reflection Bay Water Reclamation Facility Expansion Date of Issuance: 04/10/2018 Change Order No.: 16 Contractor: Pepper Lawson Waterworks CoP Project No.: WW1405 Consultant: CDM Smith P.O.No.: 2016-00001153 Explanation: This change order encompasses the following: The expansion project includes the rehabilitation of the Influent Lift Station which required the cleaning and removal of the lift station solids. The original base bid requirement for the project required the contractor to remove the following debris/sludge/grit material from the several structures including the existing Influent Lift Station,and had included an extra work item for additional grit solids removal. The contractor began removal of the contents of the existing lift station and encountered a much different material than expected.After several days of removal operations,the City was notified of this condition.The material was not grit but rather a grease material that would require enhanced removal and disposal techniques including more stringent safety equipment.The City elected to have the contractor continue with the grease removal operations and track the costs on a time and material basis to be assured of actual costs,due to this work effort being necessary and dependent on the Influent Lift Station work progressing on schedule.The changed condition at the existing lift station could have possibly been the result of the extreme flooding in Pearland due to Hurricane Harvey.The excessive amount of grease that was encountered was not anticipated by the City or Design Engineer at the time of design. The final summary of contents removed from the lift station and disposed of at the Republic landfill site: 49,880 Gallons Grease;45.46 Tons of Solids;28 Containers used during the removal operation. Description of Work The result was an overrun the Base and Extra Work bid item amounts by$44,496.36 and$33,000.00 respectively. The removal of the additional influent lift station material additional costs: 12 days of additional 3 man crew time: $63,675.25 Advanced personal protective equipment: $ 3,780.68 Additional waste container box rentals $31,383.70 Additional container cleaning fees $ 10,925.54 Additional disposal fees $44,308.00 Additional laboratory analyses $ 1,768.26 These additional costs total$134,193.76 from which a credit of$21,647.87 for sunk costs in mobilization was deducted bringing the subcontract cost to$101,193.56 As un-scoped work,the contract allows the general contractor to pass on direct costs with the subcontractor's markup plus his direct costs and mark up for overhead and supervision$30,122.34. This is shown on page 2 of PLW's Summary Sheet Exhibit. This brings the total cost for this unknown condition to$131,315.90. Description of Work Cost Time 1 Add Item No.921.0000 16,"CPR 042 Grease Removal at Lift $ 131,315.90 0 Days Station" Please attach back-up documentation. Admin 1 of 3 6.Revised 7/25/08 �r 44CITY OF PEARLAND 0, 7 ;0 PROJECTS DEPARTMENT 3519 Liberty Drive,Suite 300 S. Pearland,TX 77581 ! C A Fs r 10.% www.cityofpearland.com/projects CHANGE ORDER Reflection Bay Water Reclamation Facility Expansion Date of Issuance: 04/10/2018 Change Order No.: 16 Contractor: Pepper Lawson Waterworks CoP Project No.: WW1405 Consultant: CDM Smith P.O.No.: 2016-00001153 Cost&Time Change Summary Cost Time Original Contract: $44,657,000.00 1,001 Days Previous Change Order(s): $71,071.75 0 Days Contract prior to this Change Order: $44,728,071.75 1,001 Days Net increase(decrease)from this Change Order: $ 131,315.90 0 Days Revised Contract: $44,859,387.65 1,001 Days Finance Approval: ��,% �'t�1�j� Date Gila RECOMMENDED: RECOMMENDED: By: ��` Date 05/10/2018 By: Date 05/10/2018 Consultant Construction Manager ACCEPTED*: A• `• E By: �' � , Date 05/10/2018 Date r/gA Contractor Own: *Contractor agrees to perform change(s)included in the Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed. No payment to the Contract(or Consultant)shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order governs. Upon execution by all parties,the following changes identifies for the contract value and/or contract time shown,are made part of the contract. Admin 2 of 3 6.Revised 7/25/08 CHANGE ORDER NO.16 ATTACHMENT"A" April 10,2018 PROJECT: Reflection Bay Water Reclamation Facility Expansion PROJECT NO.: WW1405 ORIGINAL CONTRACT REVISED CONTRACT ITEM DESCRIPTION UNIT QTY UNIT COST TOTAL QTY UNIT COST TOTAL NET CHANGE ADD ITEM(S)TO CONTRACT: 921.00C CPR 042 Grease Removal LS 131,315.9 $1.00 $131,315.90 $131,315.90 O 16 at Lift Station NET TOTAL CHANGE ORDER#16: $131,315.90 ORIGINAL CONTRACT AMOUNT: $44,728,071.75 CHANGE ORDER#16: $131,315.90 REVISED CONTRACT AMOUNT: $44,859,387.65 Admin 3 of 3 6.Revised 7/25/08 v, Memo ARDURRA To: Andrea Brinkley From: Stan Conley Date: May 8, 2018 Re: Change Order# 16 Overview Grease Removal at Lift Existing Lift Station CPR # 042 A. The original base bid requirement for the project was for the contractor to remove the following debris/sludge/grit material from the following existing structures: 1. Existing Lift Station 10 tons 2. Existing SBR 115 tons 3. Existing ASHT 30 tons Total of 155 tons for the entire project. B. An extra debris/sludge/grit removal item #32 was also part of the contract. Total 60 tons. The contractor began removal of the contents of the existing lift station and encountered a much different material than expected. After several days of removal operations, the City was notified of this condition. The material was not grit but rather a grease material that would require enhanced removal and disposal techniques including more stringent safety equipment. The City elected to have the contractor continue with the grease removal operations and track the costs. The changed condition at the existing lift station could have possibly been the result of the extreme flooding in Pearland due to Hurricane Harvey. The excessive amount of grease that was encountered was not anticipated by the City or Design Engineer at the time of design. The brief summary of contents removed from the lift station and disposed of at the Republic landfill site: • 49,880 Gallons Grease • 45.46 Tons of Solids and • Total of 28 Containers used during this operation This changed condition dictated that the removal & disposal operation was to be accomplished on a T&M basis versus the originally planned base bid lump sum approach. Subcontractor Cost Summary • Grease Removal & Disposal Turnkey Operation $155, 841.43 • Original Base Bid Negotiated Credit $21,647.87 • Extra Grit Removal Bid Item $33,000.00 PLW Extra Supervision Labor $ 5,928.00 PLW Standard Insurance, Burden, OH & Fee $ 24,194.34 Total Change Order 16 $131,315.90 wciterworks April 10, 2018 Stan Conley Senior Construction Manager Ardurra Group,LLC 2032 Buffalo Terrace Houston,Texas 77019 RE: City of Pearland Reflection Bay Water Reclamation Facility PLW Project No. 1500103/P2A CPR No. 042—Grit and Grease Removal Beyond Base Bid Dear Mr. Conley, Per the City of Pearland's request,Pepper Lawson Waterworks submits the following Change Proposal Request to remove the additional Grit and Grease in the Lift Station by the Owner. Please note,should any additional costs be incurred as a result of this Work due to clarifications,changes or unknown scope,PLW will seek reimbursement.Please see the attached Contractor Breakout and Subcontractor Proposals for your consideration. This will result in an additional $131,315.90 to the lump sum contract. Should you have any questions or comments,please feel free to contact me at 713-301-8637,or kdrown@pepperlawson.com. Sincerely, hrti Katy Drown Pepper Lawson Waterworks 3701 Kirby Drive, Suite 1133 aliouston, TX 77098 P. (713) 521 -0174 R. (713) 521 -0386 www.plwaterworks.com City Of Pearland : Reflection Bay Water Reclamation Facility 2 MGD to 6 MGD Expansion and Rehabilitation Project 4/2/2018 Pepper Lawson Waterworks- Job#1500103/P2A Project#: WW1405 CPR#042-Additional Grit and Grease Removal in the Lift Station LABOR NON-TAXED EQUIPMENT SUBCONTRACTOR MATERIAL ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QTY UNIT COST COST COST COST COST COST COST COST 1 PLW Personnel Project Manager 8 HRS $ 98.00 $ 784.00 Project Engineer 4 HRS $ 76.00 $ 304.00 Project Superintendent 40 HRS $ 121.00 $ 4,840.00 Allwaste Additional Removal 2 (Base Bid vs Additional Time Breakout Provided w/Backup) Labor 1 LS $ 63,675.25 $ 63,675.25 PPE 1 LS $ 3,780.68 $ 3,780.68 Box Rental 1 LS $ 31,383.70 $ 31,383.70 Washout 1 LS $ 10,925.54 10,925.54 Disposal 1 LS $ 44,308.00 $ 44,308.00 Second Sample of Grit 1 LS $ 1,768.26 $ 1,768.26 Credit from Base Bid Work 1 LS $ (21,647.87) $ (21,647.87) Line Item Site 32.1,Additional Grit and 3 Grease Removal 60 TONS $ (550.00) $ (33,000.00) SUMMARY 1 2 4 5 A DIRECT COST SUBTOTAL 5,928.00 0.00 0.00 101,193.56 B LABOR BURDEN 3,260.40 N/A N/A N/A C TAX @ 8.25% N/A N/A N/A N/A D SUBTOTAL 2(A+B+C) 9,188.40 0.00 0.00 101,193.56 E SMALL TOOLS @ 5%(.05xD) 459.42 N/A N/A N/A F SUBTOTAL(D+E) 9,647.82 0.00 0.00 101,193.56 G EQUIPMENT BURDEN @ 50%(.50xF) N/A N/A 0.00 N/A H SUBTOTAL(F+G) 9,647.82 0.00 0.00 101,193.56 I O&P Subs @ 5% • N/A N/A N/A 5,059.68 J SUBTOTAL 3(H) 9,647.82 0.00 0.00 106,253.24 K OH&P 10% 964.78 0.00 0.00 10,625.32 L SUBTOTAL 4(J+K) 10,612.60 0.00 0.00 116,878.56 M BONDS AND INSURANCE(3%) 318.38 0.00 0.00 3,506.36 N SUBTOTAL(L+M) 10,930.98 0.00 0.00 120,384.92 TOTAL BASE BID(J1+J2+J3+J4+J5) $131,315.90