R2018-058 2018-04-23 RESOLUTION NO. R2018-58
A Resolution of the City Council of the City of Pearland, Texas, renewing a
unit supply contract for Sanitary Sewer Rehabilitation Services to IPR
South Central, LLC, for the period of April 25, 2018 through April 24, 2019;
containing a contingency that any work performed under this contract shall
be subject to appropriation of funding through a future amendment to the
FY 2018 Annual City Budget and/or the appropriation of funding in the FY
2019 Annual City Budget.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the City previously awarded a supply bid for Sanitary Sewer
Rehabilitation Services.
Section 2. That the City Council hereby renews a bid with IPR South Central, LLC, in
the unit price amounts reflected in Exhibit "A" attached hereto.
Section 3. The City Manager or his designee is hereby authorized to execute a
supply contract for Sanitary Sewer Rehabilitation Services.
PASSED, APPROVED and ADOPTED this the 23rd day of April, A.D., 2018.
- , )th'n S
TOM REID
MAYOR
ATTEST:
��.�QF pRLgNp%
Y NG LO ING, T' >� C / ;° A.
ft.\ j\
C T SECT TARY
APPROVED AS TO FORM:
0 41,---:- h. Ctrr--___„
DARRIN M. COKER
CITY ATTORNEY
Resolution No. R2018-58
Bid No. 1017-01 Addendum 3 Exhibit "A"
Title Sanitary Sewer Rehabilitation Annual Service
(PM Construction &
Specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
1 General Conditions 1 $35,218.00 $35,218.00
CCTV inspection and cleaning - Mobilization, per
1.1 Task Order EA 1 $15,000.00
1.2 CIPP- Mobilization, per Task Order EA 1 $2,000.00
1.3 Pipe Bursting - Mobilization, per Task Order EA 1 $3,000.00
Open Cut or Remove and Replace- Mobilization,
1.4 per Task Order EA 1 $3,000.00
Paving Repair/Replace greater than 500 square
1.5 yards- Mobilization, per Task Order EA 1 $100.00
1.6 Bypass setup for 3-inch pump EA 1 $350.00
1.7 Bypass setup for 4-inch pump EA 1 $500.00
1.8 Bypass setup for 6-inch pump EA 1 $2,000.00
1.9 Bypass setup for 8-inch pump EA 1 $3,000.00
1.10 Bypass pumping for each 3-inch pump DAY 1 $250.00
1.11 Bypass pumping for each 4-inch pump DAY 1 $500.00
1.12 Bypass pumping for each 6-inch pump DAY 1 $2,000.00
1.13 Bypass pumping for each 8-inch pump DAY 1 $2,500.00
Approved traffic control plan in conformance with
1.14 Texas MUTCD EA 1 $500.00
Executing traffic control measures, including the
provision of traffic control devices, equipment and
1.15 personnel to protect the Work and public DAY 1 $500.00
1.16 Trench safety systems (all sizes, all depths) LF 1 $18.00
2 Site Work 1 $248,255.35 $248,255.35
Removal of asphaltic pavement& base courses, all
2.1 thicknesses SY 1 $12.00
Removal of concrete pavement, up to 9-inch thick,
and associated base courses, including curb and
2.2 gutter SY 1 $24.00
Removal of concrete pavement, > 9-inch and up to
12-inch thick, and associated base courses,
2.3 including curb and gutter SY 1 $25.00
Removal of concrete sidewalk (4-foot wide of
2.4 equivalent LF area), including reinforcement LF 1 $12.00
2.5 Removal of driveways, including reinforcement SY 1 $24.00
2.6 Removal and disposal of existing manhole EA 1 $750.00
Abandonment of 6-inch and smaller sewer using
2.7 flowable fill/grout LF 1 $9.00
1
(PM Construction &
Specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
Abandonment of 8-inch sewer using flowable
2.8 fill/grout LF i 1 $10.00
Abandonment of 10-inch sewer using flowable
2.9 fill/grout LF 1 $14.00
Abandonment of 12-inch sewer using flowable
2.10 fill/grout LF 1 $18.00
Abandonment of 15-inch sewer using flowable
2.11 fill/grout LF 1_ $20.00
Abandonment of 18-inch sewer using flowable
2.12 fill/grout LF 1 $26.00
Abandonment of 24-inch sewer using flowable
2.13 fill/grout LF 1. $35.00
2.14 Abandonment of manhole, up to 10-foot deep EA 1 $950.00
2.15 Abandonment of manhole, > 10 to 15 ft deep VF 1 $1,250.00
2.16 Abandonment of manhole, > 15 to 20 ft deep VF 1 $1,650.00
Remove and replace 6-inch sewer, up to 10 ft deep,
2.17 up to 300 LF LF 1 $60.00
Remove and replace 6-inch sewer, up to 10 ft deep,
2.18 301 LF to 700 LF LF 1 $60.00
Remove and replace 6-inch sewer, up to 10 ft deep,
2.19 701 LF & up LF 1 $60.00
Remove and replace 6-inch sewer, > 10 to 15 ft
2.20 deep, up to 300 LF LF 1 $82.00
Remove and replace 6-inch sewer, > 10 to 15 ft
2.21 deep, 301 LF to 700 LF LF 1 $82.00
Remove and replace 6-inch sewer, > 10 to 15 ft
2.22 deep, 701 LF & up LF 1 $82.00
Remove and replace 6-inch sewer, > 15 to 20 ft
2.23 deep, up to 300 LF LF 1 $99.00
Remove and replace 6-inch sewer, > 15 to 20 ft
2.24 deep, 301 LF to 700 LF LF 1 $99.00
Remove and replace 6-inch sewer, > 15 to 20 ft
2.25 deep, 701 LF & up LF 1_ $99.00
Remove and replace 8-inch sewer, up to 10 ft deep,
2.26 up to 300 LF LF 1 $62.00
Remove and replace 8-inch sewer, up to 10 ft deep,
2.27 301 LF to 700 LF LF 1 $62.00
Remove and replace 8-inch sewer, up to 10 ft deep,
2.28 701 LF & up LF 1 $62.00
Remove and replace 8-inch sewer, > 10 to 15 ft
2.29 deep, up to 300 LF LF 1 $84.00
2
(PM Construction &
Specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
Remove and replace 8-inch sewer, > 10 to 15 ft
2.30 deep, 301 LF to 700 LF LF 1 $84.00
Remove and replace 8-inch sewer, > 10 to 15 ft
2.31 deep, 701 LF & up LF 1 $84.00
Remove and replace 8-inch sewer, > 15 to 20 ft
2.32 deep, up to 300 LF LF 1 $99.00
Remove and replace 8-inch sewer, > 15 to 20 ft
2.33 deep, 301 LF to 700 LF LF 1 $99.00
Remove and replace 8-inch sewer, > 15 to 20 ft
2.34 deep, 701 LF & up LF 1 $99.00
Remove and replace 12-inch sewer, up to 10 ft
2.35 deep, up to 300 LF LF 1 $78.00
Remove and replace 12-inch sewer, up to 10 ft
2.36 deep, 301 LF to 700 LF LF 1 $78.00
Remove and replace 12-inch sewer, up to 10 ft
2.37 deep, 701 LF & up LF 1 $78.00
Remove and replace 12-inch sewer, > 10 to 15 ft
2.38 deep, up to 300 LF LF 1 $99.00
Remove and replace 12-inch sewer, > 10 to 15 ft
2.39 deep, 301 LF to 700 LF LF 1 $99.00
Remove and replace 12-inch sewer, > 10 to 15 ft
2.40 deep, 701 LF & up LF 1 $99.00
Remove and replace 12-inch sewer, > 15 to 20 ft
2.41 deep, up to 300 LF LF 1 $115.00
Remove and replace 12-inch sewer, > 15 to 20 ft
2.42 deep, 301 LF to 700 LF LF 1 $115.00
Remove and replace 12-inch sewer, > 15 to 20 ft
2.43 deep, 701 LF & up LF 1 $115.00
Remove and replace 18-inch sewer, up to 10 ft
2.44 deep, up to 300 LF LF 1 $115.00
Remove and replace 18-inch sewer, up to 10 ft
2.45 deep, 301 LF to 700 LF LF 1 $115.00
Remove and replace 18-inch sewer, up to 10 ft
2.46 deep, 701 LF & up LF 1 $115.00
Remove and replace 18-inch sewer, > 10 to 15 ft
2.47 deep, up to 300 LF LF 1 $135.00
Remove and replace 18-inch sewer, > 10 to 15 ft
2.48 deep, 301 LF to 700 LF LF 1 $135.00
Remove and replace 18-inch sewer, > 10 to 15 ft
2.49 deep, 701 LF & up LF 1 $135.00
3
(PM Construction &
Specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
Remove and replace 18-inch sewer, > 15 to 20 ft
2.50 deep, up to 300 LF LF 1 $135.00
Remove and replace 18-inch sewer, > 15 to 20 ft
2.51 deep, 301 LF to 700 LF LF 1 $155.00
Remove and replace 18-inch sewer, > 15 to 20 ft
2.52 deep, 701 LF & up LF 1 $155.00
Remove and replace 24-inch sewer, up to 10 ft
2.53 deep, up to 300 LF LF 1 $125.00
Remove and replace 24-inch sewer, up to 10 ft
2.54 _deep, 301 LF to 700 LF LF 1 $125.00
Remove and replace 24-inch sewer, up to 10 ft
2.55 deep, 701 LF & up LF 1 $125.00
Remove and replace 24-inch sewer, > 10 to 15 ft
2.56 deep, up to 300 LF LF 1 $145.00
Remove and replace 24-inch sewer, > 10 to 15 ft
2.57 deep, 301 LF to 700 LF LF 1 $145.00
Remove and replace 24-inch sewer, > 10 to 15 ft
2.58 deep, 701 LF & up LF 1 $145.00
Remove and replace 24-inch sewer, > 15 to 20 ft
2.59 deep, up to 300 LF LF 1 $175.00
Remove and replace 24-inch sewer, > 15 to 20 ft
2.60 deep, 301 LF to 700 LF LF 1 $175.00
Remove and replace 24-inch sewer, > 15 to 20 ft
2.61 _deep, 701 LF & up LF 1 $175.00
2.62 New 6-inch sewer, up to 10 ft deep, up to 300 LF LF 1 $60.00
New 6-inch sewer, up to 10 ft deep, 301 LF to 700
2.63 LF LF 1 $60.00
2.64 New 6-inch sewer, up to 10 ft deep, 701 LF& up LF 1 $60.00
2.65 New 6-inch sewer, > 10 to 15 ft deep, up to 300 LF LF 1 $82.00
New 6-inch sewer, > 10 to 15 ft deep, 301 LF to 700
2.66 LF LF 1 $82.00
2.67 New 6-inch sewer, > 10 to 15 ft deep, 701 LF & up LF 1 $82.00
2.68 New 6-inch sewer, > 15 to 20 ft deep, up to 300 LF LF 1 $99.00
New 6-inch sewer, > 15 to 20 ft deep, 301 LF to 700
2.69 LF LF 1 $99.00
2.70 New 6-inch sewer, > 15 to 20 ft deep, 701 LF & up LF 1 $99.00
2.71 _ New 8-inch sewer, up to 10 ft deep, up to 300 LF LF 1 $62.00 4
(PM Construction &
Specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
New 8-inch sewer, up to 10 ft deep, 301 LF to 700
2.72 LF LF 1 $62.00
2.73 New 8-inch sewer, up to 10 ft deep, 701 LF& up LF 1 $62.00
2.74 New 8-inch sewer, > 10 to 15 ft deep, up to 300 LF LF 1 $84.00
New 8-inch sewer, > 10 to 15 ft deep, 301 LF to 700
2.75 LF LF 1 $84.00
2.76 New 8-inch sewer, > 10 to 15 ft deep, 701 LF & up LF 1 $84.00
2.77 New 8-inch sewer, > 15 to 20 ft deep, up to 300 LF LF 1 $99.00
New 8-inch sewer, > 15 to 20 ft deep, 301 LF to 700
2.78 LF LF 1 $99.00
2.79 New 8-inch sewer, > 15 to 20 ft deep, 701 LF &up LF 1 $99.00
2.80 New 12-inch sewer, up to 10 ft deep, up to 300 LF LF 1 $78.00
New 12-inch sewer, up to 10 ft deep, 301 LF to 700
2.81 LF LF 1 $78.00
2.82 New 12-inch sewer, up to 10 ft deep, 701 LF & up LF 1 $78.00
2.83 New 12-inch sewer, > 10 to 15 ft deep, up to 300 LF LF 1 $99.00
New 12-inch sewer, > 10 to 15 ft deep, 301 LF to
2.84 700 LF LF 1 $99.00
2.85 New 12-inch sewer, > 10 to 15 ft deep, 701 LF &up LF 1 $99.00
2.86 New 12-inch sewer, > 15 to 20 ft deep, up to 300 LF LF 1 $115.00
New 12-inch sewer, > 15 to 20 ft deep, 301 LF to
2.87 700 LF LF 1 $115.00
2.88 New 12-inch sewer, > 15 to 20 ft deep, 701 LF & up LF 1 $115.00
2.89 New 18-inch sewer, up to 10 ft deep, up to 300 LF LF 1 $115.00
New 18-inch sewer, up to 10 ft deep, 301 LF to 700
2.90 LF LF 1 $115.00
2.91 New 18-inch sewer, up to 10 ft deep, 701 LF & up LF 1 $115.00
2.92 New 18-inch sewer, > 10 to 15 ft deep, up to 300 LF LF 1 $135.00 5
(PM Construction &
Specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
New 18-inch sewer, > 10 to 15 ft deep, 301 LF to
2.93 700 LF LF 1 $135.00
2.94 New 18-inch sewer, > 10 to 15 ft deep, 701 LF & up LF 1 $135.00
2.95 New 18-inch sewer, > 15 to 20 ft deep, up to 300 LF LF 1 $135.00
New 18-inch sewer, > 15 to 20 ft deep, 301 LF to
2.96 700 LF LF 1 $155.00
2.97 New 18-inch sewer, > 15 to 20 ft deep, 701 LF &up LF 1 $155.00
2.98 New 24-inch sewer, up to 10 ft deep, up to 300 LF LF 1 $125.00
New 24-inch sewer, up to 10 ft deep, 301 LF to 700
2.99 LF LF 1 $125.00
2.100 New 24-inch sewer, up to 10 ft deep, 701 LF & up LF 1 $125.00
2.101 New 24-inch sewer, > 10 to 15 ft deep, up to 300 LF LF 1 $145.00
New 24-inch sewer, > 10 to 15 ft deep, 301 LF to
2.102 700 LF LF 1 $145.00
2.103 New 24-inch sewer, > 10 to 15 ft deep, 701 LF & up LF 1 $145.00
2.104 New 24-inch sewer, > 15 to 20 ft deep, up to 300 LF LF 1 $175.00
New 24-inch sewer, > 15 to 20 ft deep, 301 LF to
2.105 700 LF LF 1 $175.00
2.106 New 24-inch sewer, > 15 to 20 ft deep, 701 LF & up LF 1 $175.00
Remote reconnection of service connections along
2.107 cured-in-place rehabilitated sewer lines EA 1 $50.00
Reconnection (open cut)of sanitary sewer service
lines without stacks and located within 5 feet of
2.108 sewer main centerline EA 1 $675.00
Reconnection (open cut)of sanitary sewer service
lines with stacks and located within 5 feet of sewer
2.109 main centerline EA 1 $850.00
Reconnection (open cut)of sanitary sewer service
lines located more than 5 feet laterally from the
2.110 sewer main centerline LF 1 $850.00
2.111 Abandoned service connection EA 1 $225.00
6
(PM Construction &
Specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
Installation of new/replacement 4-ft dia. manholes
less than or equal to 10-ft in depth, including
2.112 removal of existing manhole EA 1 $4,400.00
Installation of new/replacement 4-ft dia. Manholes,
from 10 to 15 ft depth, including removal of existing
2.113 manhole EA 1 $12,750.00
Installation of new/replacement 4-ft dia. Manholes,
from 15 to 20 ft depth, including removal of existing
2.114 manhole VF 1 $17,500.00
Installation of new/replacement 5-ft dia. manholes
less than or equal to 10-ft in depth, including
2.115 removal of existing manhole EA 1 $6,800.00
Installation of new/replacement 5-ft dia. Manholes,
from 10 to 15 ft depth, including removal of existing
2.116 manhole EA 1 $15,000.00
Installation of new/replacement 5-ft dia. Manholes,
from 15 to 20 ft depth, including removal of existing
2.117 manhole VF 1 $17,400.00
Installation of new/replacement 6-ft dia. manholes
less than or equal to 10-ft in depth, including
2.118 removal of existing manhole EA 1 $11,000.00
Installation of new/replacement 6-ft dia. Manholes,
from 10 to 15 ft depth, including removal of existing
2.119 manhole EA 1 $18,000.00
Installation of new/replacement 6-ft dia. Manholes,
from 15 to 20 ft depth, including removal of existing
2.120 manhole VF 1 $24,500.00
Installation of new/replacement standard manhole
2.121 drop EA 1 $1,650.00
Installation of new/replacement extra depth
2.122 manhole drop VF 1 $110.00
Point repair, up to 24-inch diameter, up to 10 ft
2.123 deep, up to 6 ft length EA 1 $5,800.00
Point repair, up to 24-inch diameter, > 10 to 15 ft
2.124 deep, up to 9 ft length EA 1 $8,500.00
Point repair, up to 24-inch diameter, > 15 to 20 ft
2.125 deep, up to 12 ft length EA 1 $12,900.00
Extra unit length for point repairs, up to 24-inch
2.126 diameter, up to 10 ft deep LF 1 $120.00
Extra unit length for point repairs, up to 24-inch
2.127 diameter, > 10 to 15 ft deep LF 1 $140.00
7
(PM Construction &
specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
Extra unit length for point repairs, up to 24-inch
2.128 diameter, > 15 to 20 ft deep LF 1 $165.00
2.129 Obstruction removal by excavation, up to 10 ft deep EA 1 $1,300.00
Obstruction removal by excavation, > 10 to 15 ft
2.130 deep EA 1 $1,600.00
Obstruction removal by excavation, > 15 to 20 ft
2.131 deep EA 1 $3,150.00
2.132 Remote obstruction removal EA 1 $300.00
Furnish and install cementitious lining with epoxy
2.133 coating or epoxy lining in manhole VF 1 $310.00
Adjustment of manhole frame and cover using a
watertight manhole frame and cover(? 1 vertical
2.134 foot) EA 1 $825.00
Adjustment of existing manhole frame and cover(?
2.135 1 vertical foot) EA 1 $500.00
Extra vertical foot adjustment for new or existing
2.136 manhole frame and cover adjustment VF 1 $140.00
2.137 Installation of new manhole insert dish EA 1 $240.00
2.138 Installation of frame-to-manhole seals EA 1 $800.00
Rehabilitate 6-inch sewer using CIPP, up to 20 ft
2.139 deep, up to 300 LF LF 1 $26.00
Rehabilitate 6-inch sewer using CIPP, up to 20 ft
2.140 deep, 301 LF to 700 LF LF 1 $25.00
Rehabilitate 6-inch sewer using CIPP, up to 20 ft
2.141 deep, 701 LF & up LF 1 $24.00
Rehabilitate 8-inch sewer using CIPP, up to 20 ft
2.142 deep, up to 300 LF LF 1 $27.00
Rehabilitate 8-inch sewer using CIPP, up to 20 ft
2.143 deep, 301 LF to 700 LF LF 1 $26.00
Rehabilitate 8-inch sewer using CIPP, up to 20 ft
2.144 deep, 701 LF & up LF 1 $25.00
Rehabilitate 10-inch sewer using CIPP, up to 20 ft
2.145 deep, up to 300 LF LF 1 $33.00
Rehabilitate 10-inch sewer using CIPP, up to 20 ft
2.146 deep, 301 LF to 700 LF LF 1 $32.00
Rehabilitate 10-inch sewer using CIPP, up to 20 ft
2.147 deep, 701 LF & up LF 1 $31.00
Rehabilitate 12-inch sewer using CIPP, up to 20 ft
2.148 deep, up to 300 LF LF 1 $40.00
8
(PM Construction &
Specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
Rehabilitate 12-inch sewer using CIPP, up to 20 ft
2.149 deep, 301 LF to 700 LF LF 1 $39.00
Rehabilitate 12-inch sewer using CIPP, up to 20 ft
2.150 deep, 701 LF & up LF 1 $38.00
Rehabilitate 18-inch sewer using CIPP, up to 20 ft
2.151 deep, up to 300 LF LF 1 $64.00
Rehabilitate 18-inch sewer using CIPP, up to 20 ft
2.152 deep, 301 LF to 700 LF LF 1 $62.00
Rehabilitate 18-inch sewer using CIPP, up to 20 ft
2.153 deep, 701 LF & up LF 1 $60.00
Rehabilitate 24-inch sewer using CIPP, up to 20 ft
2.154 deep, up to 300 LF LF 1 $110.00
Rehabilitate 24-inch sewer using CIPP, up to 20 ft
2.155 deep, 301 LF to 700 LF LF 1 $100.00
Rehabilitate 24-inch sewer using CIPP, up to 20 ft
2.156 deep, 701 LF & up LF 1 $95.00
2.157 Rehabilitate sewer service laterals using CIPP LF 1 $1,500.00
Line cleaning and TV inspection of sewers, less
2.158 than or equal to 18 inches LF 1 $3.00
Line cleaning and TV inspection of sewers, greater
2.159 than 18 inches LF 1 $3.75
Cleaning and visual inspection of 6-ft dia. manholes
2.160 less than or equal to 10-ft in depth EA 1 $950.00
Extra vertical depth for cleaning and visual
inspection of 6-ft dia. manholes greater than 10-ft in
2.161 depth VF 1 $100.00
Heavy cleaning of sewers, less than or equal to 18
2.162 inches LF 1 $6.00
2.163 Heavy cleaning of sewers, greater than 18 inches LF 1 $11.00
Replace 6-inch sewer using pipebursting, up to 300
2.164 LF LF 1 $35.00
Replace 6-inch sewer using pipebursting, 301 LF to
2.165 700 LF LF 1 $33.00
Replace 6-inch sewer using pipebursting, 701 LF &
2.166 up LF 1 $31.00
Replace 8-inch sewer using pipebursting, up to 300
2.167 LF LF 1 $36.00
Replace 8-inch sewer using pipebursting, 301 LF to
2.168 700 LF LF 1 $34.00
9
(PM Construction &
Specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
Replace 8-inch sewer using pipebursting, 701 LF &
2.169 up LF 1 $32.00
Replace 12-inch sewer using pipebursting, up to
2.170 300 LF LF 1 $52.00
Replace 12-inch sewer using pipebursting, 301 LF
2.171 to 700 LF LF 1 $48.00
Replace 12-inch sewer using pipebursting, 701 LF&
2.172 up LF 1 $46.00
Replace 18-inch sewer using pipebursting, up to
2.173 300 LF LF 1 $97.00
Replace 18-inch sewer using pipebursting, 301 LF
2.174 to 700 LF LF 1 $92.00
Replace 18-inch sewer using pipebursting, 701 LF&
2.175 up LF 1 $87.00
Replace 24-inch sewer using pipebursting, up to
2.176 300 LF LF 1 $192.00
Replace 24-inch sewer using pipebursting, 301 LF
2.177 to 700 LF LF 1 $182.00
Replace 24-inch sewer using pipebursting, 701 LF &
2.178 up LF 1 $172.00
2.179 Base course for pavement SY 1 $18.00
2.180 Placement of asphalt paving SY 1 $28.00
Concrete pavement (6-inch thick), including
2.181 reinforcement and subgrade SY 1 $50.00
Concrete pavement(7-inch thick), including
2.182 reinforcement and subgrade SY 1 $51.00
Concrete pavement(8-inch thick), including
2.183 reinforcement and subgrade SY 1 $52.00
Concrete pavement(9-inch thick), including
2.184 reinforcement and subgrade SY 1 $53.00
Concrete pavement(10-inch thick), including
2.185 reinforcement and subgrade SY 1 $54.00
Concrete pavement (11-inch thick), including
2.186 reinforcement and subgrade SY 1 $56.00
Concrete pavement (12-inch thick), including
2.187 reinforcement and subgrade SY 1 $60.00
2.188 Concrete curb and gutter LF 1 $18.00
2.189 Concrete headers LF 1 $18.00
Concrete sidewalks (4'-0"wide or equivalent LF
2.190 area), including reinforcement and sub base SF 1 $7.00
10
(PM Construction &
Specification Responses Rehab, LLC)
Line Description UOM QTY Unit Extended
Concrete driveways, including removal of existing
driveway, driveway curbs, select fill subgrade and
2.191 reinforcement SY 1 $65.00
Hydromulch seeding of disturbed land, up to 1000
2.192 SY SY 1 $1.00
Hydromulch seeding of disturbed land, 1001 SY to
2.193 5000 SY SY 1 $0.95
Hydromulch seeding of disturbed land, 5001 SY&
2.194 _up SY 1 $0.90
2.195 Sodding of disturbed land, up to 1000 SY SY 1 $5.50
2.196 Sodding of disturbed land, 1001 SY to 5000 SY SY 1 $5.25
2.197 _Sodding of disturbed land, 5001 SY& up SY 1 $5.00
Miscellaneous utility relocations as directed by the
2.198 City LS 1 $20,000.00
2.199 Miscellaneous landscaping as directed by the City LS 1 $20,000.00
Provide all bonds and insurance as required by the
2.200 contract LS 1 $20,000.00
Total $283,473.35
11