Loading...
R2018-045 2018-03-05RESOLUTION NO. R2018-45 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City Manager or his designee to enter into Master Services Agreement, Task No. 6, with Arcadis U. S., Inc., in an amount of $189,387.74, for construction management and inspection services associated with Fire Station No. 1. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 2. That certain Task Order No. 6, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a Task Order No. 6. PASSED, APPROVED and ADOPTED this the 5ch day of March, A.D., 2018. t` IJY 1 s,41 TOM REID MAYOR ATTEST: % tr 'YO .ems APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Resolution No. R2018-45 Exhibit "A" ARCADIS Exhibit A Ms. Matisia Hollingsworth Senior Project Manager City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Subject: Proposal for Fire Station No. 1 Construction Observation Services Dear Ms. Hollingsworth: As requested by the City of Pearland, Arcadis U.S., Inc. (Arcadis) has prepared this proposal to provide construction observation services for the Fire Station No 1 project. Enclosed please find the following information for your consideration: • Attachment A — Task Order No. 6 • Attachment B — Time and Materials Fee Estimate • Attachment C — Construction Observation Scope of Services for Fire Station No. 1 • Attachment D — Resume for Ronnie Hart — experienced construction management professional qualified to provide inspection and observation for this project. We appreciate the opportunity to provide this proposal and are excited to be able to serve the City of Pearland on this project. If you have any questions or require additional information please contact me. Sincerely, Arcadis U.S., Inc. Wendell L. "Buddy" Barnes, PE, FSAME Senior Vice President Design & Consultancy for natural and built assets Arcadis U.S., Inc. 10205 Westheimer Road Suite 800 Houston Texas 77042 Tel 713 953 4800 Fax 713 977 4620 www.arcadis.com Date: February 14, 2018 Contact: Wendell L. "Buddy" Barnes, PE, FSAME Phone: 713.248.8257 Email: wendell.barnes@ arcadis.com ARCADIS U.S., Inc. TX Engineering License # F-533 Geoscientist License # 50158 Page: 1/1 Printed Name: Wendell L. "Buddy" Barnes, P.E. Title: Senior Vice President Date: February 14, 2018 ATTACHMENT A TASK ORDER - No. 6 MASTER SERVICE AGREEMENT (MSA), Construction Management & Inspection Services Pursuant and subject to the above captioned MSA dated May 22, 2017 between the City of Pearland and Arcadis U.S., Inc. CLIENT hereby requests that CONSULTANT performs the work described below upon the terms set forth: CLIENT PROVIDED INFORMATION: Work Site: Fire Station No. 1 Work to Be Performed: Provide Construction Observation Services Drawings, plans, specifications are not attached: Date and Time to Commence: March 12, 2018 Date and Time to Complete: February 28, 2019 Equipment, vehicles, tools, materials, supplies to be furnished or obtained through third parties by CLIENT (if any): N/A Invoice Mailing Instructions: Invoices will be submitted through the online protect management system "Manage -It" Other Requirements or Variance from MSA (if any): N/A CONSULTANT PROVIDED INFORMATION: Compensation: $ 189,387.74 Billing Terms: Time and Materials Scope of Work: See Attachment C — Construction Observation Scope of Services ACCEPTANCE: The foregoing TASK ORDER is accepted on the terms set forth as indicated by the signatures below. CONSULTANT CLIENT Arcadis .S., Inc. City By: By: Printe�me:, OA J / /M Title: Date: ATTACHMENT B - Time and Materials Fee Estimate City of Pearland Project Construction Observation Services for Fire Station #1 Contract No. Estimated Fee for Construction Management $189,387.74 and Inspection Services Project Duration: 300 Construction Costs: CM Costs: $189,387.74 CM Costs /Construction Costs: M/WBE Participation: 0.00% Revision Data: 2/5.2018 Calendar Days Construction Inspector Project Manager Raw Salary Rate $34.55 $95.00 Multiplier 2.75 2.00 Regular HRs Billing Rate $95.00 $190.00 Overtime HRs Billing Rate $142.50 $190.00 nma 300 Calendar Days 10 Month 43 Weeks 66 Sundays IL Saturdays 2 Holidays 0 Rain days ' 214 Working Days 8 Regular Working Hours/Day 1924 Total Regular Working Hours 174 _ Average Regular Working Hours/Month 0 Overtime Hours/Week 400 Total Overtime Hours 40 Average Overtime Hours/Month % S Description Summary - Monthly Breakdown Labor Costs Project Setup Construction Duration Warranty Period HRs %of Hrs SAmont %ol Total Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 OCF18 Nov-18 Dec-18 Jen-18 Feb-18 HRs Construction Manager 1808 97.94% 5171,567.74 90.59% 43 172 172 172 172 172 172 172 172 172 172 43 Project Manager 38 2.06% 57,220.00 3.81% 4 3 3 3 3 3 3 3 3 3 3 4 Labor Hes: 1844 100.00% 0 0 47 175 175 175 175 175 175 175 175 175 175 47 0 0 Labor Costs: $178,787.74 94.401'. $0.00 $0.00 84,844.95 $16.909.79 $16,909.79 516.909.79 516,909.79 $18,909.79 516.909.79 516.909.79 $16,909.79 516,909.79 $16.909.79 94,844.95 $0.00 S0.00 Reimbursable expanses; vehicle allowance. $10,600.00 5.60% 5300.00 $1,000.00 $1,000.00 51,000.00 $1,000.00 51,000.00 $1,000.00 51,000.00 $1,000.00 51,000.00 $1,000.00 $300.00 50.00 $0.00 e%ol Subconinclor's costs: $0.00 0.00% $0.00 $0.00 $0.00 50.00 $0.00 $0.00 $0.00 50.0D 50.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00 50.00 7089i: 5189,387.74 100.00% $0.00 $0.00 55,144.95 517,909.79 517,909.79 $17.909.79 517,909.79 517,909.79 517,909.79 S17,909.79 017,909.79 517,909.79 517,909.79 55,144.95 50.00 $0.00 Totals to Dab: 50.00 $0.00 $5,144.95 523,054.73 540.984.52 558,874.30 $76,784.09 594,693.67 S112.603.66 5130.513.44 $148,42323 $166,333.01 5184,24280 0189.387.74 5189,387.74 $189,397.74 Poo NSR 451 CM Budget Seam 01.05.10.tlr ATTACHMENT C CONSTRUCTION OBSERVATION SCOPE OF SERVICES FOR Fire Station No. 1 Design 1 of 10 D7. Revised 2016 BASIC SERVICES: Construction Manager(s) shall render the following professional services to the OWNER in connection with the construction of the Project. 1. Pre -Construction (on specific projects, as requested by the City/Owner) 1.1. Provide constructability review of plans, specifications, contract documents and validity of Engineer of Record's project duration. Identify construction issues, conflicts, deficiencies, review the adequacy and accuracy of the design and independent verification of quantities. 1.2. Attend Pre -Bid Meeting; provide feedback to City's Project Manager as necessary, such as: tracking and recording questions for the Engineer's written response, clarifying the Owner's expectations for the project and the project execution. 1.3. Chair Pre -Construction Meeting 1.3.1. Schedule and conduct the pre -construction meeting; record and disseminate minutes from pre -construction meeting. 1.3.2. Utilize the City's Pro-Trak system: set communications protocol and contract administration procedures, establish progress meeting schedule and submittal schedule. 1.3.3. Provide agenda for meeting: Key milestone dates, pay application procedures, schedule, public notification issues and procedures, utility coordination issues, traffic control, permitting, property owner notification and coordination, temporary facilities, contractor's use of City's Pro-Trak system, etc. Design 2 of 10 D7. Revised 2016 2. Construction Administration and Management Services 2.1.Act as the City's on -site representative administering the contract for construction and providing overall project oversight, maintain record of decisions and changes made. 2.2. Meetings: Schedule and conduct construction progress meetings; record minutes from construction progress meetings and distribute via Pro-Trak to: City Project Manager, Design Engineer and contractor throughout the duration of the project. 2.2.1. Schedule meetings every two weeks, minimum, to review the following: work progress and schedule, outstanding issues, status of submittals and responses shop drawings unforeseen issues and changes to the work. 2.2.2. Coordinate additional meetings as necessary to discuss and resolve problems and provide guidance in a timely manner. 2.2.3. Coordinate/monitor the following: utility relocation activities for compliance, utility installation verification, reporting, record management and as -built drawings. 2.2.4. Attend all utility coordination, construction, and scheduling meetings. 2.2.5. Obtain copy of ROW permit and prints from Public Works in order to monitor progress of utility relocation per permit/plan. 2.3. Manage Construction 2.3.1. All final documentation is required in electronic/digital format, utilizing Pro-Trak as is feasible. 2.3.2. As field problems arise, notify the Design Engineer and City Project Manager of proposed solutions to resolve problems. Design 3 of 10 D7. Revised 2016 2.3.3. Review and update as -built documents regularly with contractor. 2.3.4. Monitor and ensure adherence to approved project baseline schedule. Review contractor's schedule monthly, ensure compliance with City's intended schedule, and provide recommendations as needed to retain and regain schedule if needed. 2.3.5. Recommend alternate project sequencing/scheduling to keep project on schedule. 2.3.6. Prepare monthly summary report of construction activities with outstanding issues outlined for review. Monthly progress information associated with the project will be submitted to the Project Manager for review and approval. 2.3.7. Record weather conditions on jobsite daily. 2.4. Coordinate work of contractor with external agencies and utility companies. Coordinate contractor's operations with regard to other City contracts and construction as well as with property owners for planned service outages, street closures, and access control issues to properties including notifications. 2.4.1. Verify construction conformance and compliance with TCEQ, NOI and NOT. 2.4.2. Verify construction conformance with permitted activities such as: City of Pearland permits, U.S. Army Corps of Engineers permits, TxDOT roadway permits, and any Railroad agreements. 2.5. Maintain records of all decisions, actions and activities with regard to construction operations via the City's Pro-Trak system (i.e. Change Orders, RFIs and responses, Submittals and responses, Request for Proposals, correspondence, SWPPP inspections.) Design 4 of 10 D7. Revised 2016 3. Construction Inspection Services 3.1. Provide full-time on -site technical observation of Contractor's activities to verify and ensure all work materials, structures, equipment and workmanship comply with the Contract Documents including Addenda and Change Orders. Verify and ensure that Contractor maintains good construction practices and professional standards prevailing in the local City, County, and State of Texas. Utilize City's Pro-Trak system for all inspection reports. 3.1.1. Notify the City Project Manager if Contractor's work is not in compliance with the Contract Documents or specifications. Notify the City Project Manager and Design Engineer of any failure of the Contractor to take measures to repair and bring work in compliance. 3.1.2. Issue Advisory Notices to Contractor for work that is not in compliance with approved construction documents. 3.1.3. Issue Non -Compliance Reports to Contractor if non- conforming work is not brought into compliance or if plan of action to bring work into compliance is not conducted in timely manner. 3.1.4. Inspect and observe the materials and equipment being incorporated into the work to assure that they are handled, stored and installed in accordance with the Contract Documents and specifications. Report to the City Project Manager regarding these activities. 3.2. Identify record and notify Design Engineer of any problems or failures to meet performance requirements in a timely manner to minimize delay in the progress of the project, make recommendation(s) for appropriate solution to the City Project Manager and Design Engineer. Design 5 of 10 D7. Revised 2016 3.3. Prepare and maintain daily progress log or daily construction reports, photographs, records and track quantities installed that day utilizing the City's Pro-Trak system. 3.4. Ensure contractor reviews and approves daily reports and quantities. 3.5.Verify contractor has obtained necessary permits and is maintaining any Traffic Control, public notification and Storm Water Pollution Prevention Plans, facilities, equipment or arrangements in accordance with contract documents. 3.6.Attend and participate in progress meetings. 3.7. Create contacts for your record for: names, addresses, telephone numbers and email of all contractors, subcontractors, sub consultants and major suppliers of material and equipment; store in City's Pro-Trak system. 3.8. Immediately notify the City Project Manager and Design Engineer in the event of an on -site accident. Record and note conditions, activities and witnesses to the event. 3.9. Maintain Resolution Log and respond to citizen complaints in Pro- Trak system. 3.10. Consult with City Project Manager and Design Engineer in advance of scheduled major work operations, tests, inspections or start of important phases of project. 4. Pay Applications 4.1. Pay applications will be generated by the City's Pro-Trak system based on quantities approved in the daily reports. Review and verify quantities provided by contractor for all work in compliance with contract documents. 4.1.1. Review work conducted daily on daily inspection reports and material installed measurements submitted by contractor; verify work conducted and Design 6 of 10 D7. Revised 2016 bid item quantities via Pro-Trak; meet monthly to review pay estimate and quantities with contractor 4.1.2. Review progress pay application with Design Engineer for approval or revision prior to submittal to City. 4.1.3. Finalize pay application with signatures from Contractor, Engineer and Construction Manager certifying quantities and amounts via Pro-Trak. 4.1.4. Notify City Project Manager when all electronic signatures are completed in the Pro-Trak system for invoice processing. 4.1.5. Track and record requests for rain or other delays with potential to add to Contract Time in Daily Reports in Pro-Trak. 4.1.6. Provide an independent quantity forecast bid items to identify potential quantity over -runs as part of pay estimate review. 4.2. Upon completion of the work, prepare a final progress payment including a balancing change order zeroing out all unused quantities utilizing Pro-Trak. Identify and add additional quantities and make any approved changes to the Contract Time. 4.2.1. Review and coordinate with Design Engineer to provide Engineer's recommendation for Substantial Completion or Final Acceptance. (See Close-out Section) Design 7 of 10 D7. Revised 2016 5. Document Control 5.1. Utilize the City's Pro-Trak system to: receive, route, track and log all Contractor communications, Submittals, Change Orders, RFIs, Pay Applications and Citizen Complaint/Resolution Log; communicate with Contractor the status of submittal reviews; review submittal and RFI log in Pro-Trak to ensure timely responses; notify City Project Manager, Contractor and Design Engineer of time critical issues. 5.1.1. Respond to RFIs when such response does not require the Engineer's opinion or expertise or direction from City. 5.1.2. Assemble and maintain notes, comments, sketches and supportive data relative to the Project to facilitate the revision of drawings to conform to the final as -built conditions. Review Contractor's record keeping periodically to ensure completeness, timeliness and progress. 6. Change Orders 6.1. Prepare and issue request for proposals in a timely manner via Pro- Trak. Review RFP and contractor proposal for additional work with City Project Manager and Design Engineer for approval. Ensure the status of RFP and Responses from Contractor, City and Design Engineer are logged and tracked in the Pro-Trak system. 6.2. Provide recommendation on technical matters as an advocate for the City. Evaluate Contractor's response/proposal for merit, cost, time, accuracy and price practicality. Negotiate with Contractor on City's behalf if required. 6.3. Prepare Change Order and documentation including signatures of Contractor, Engineer and Construction Manager for delivery to City. Design 8 of 10 D7. Revised 2016 7. Testing Laboratory and Results 7.1. Coordinate testing laboratory activities with Contractor's activities. Review test reports for compliance with Contract Documents. Log, track and retain test reports in Pro-Trak. Review results with Contractor. Monitor any corrective action and re -testing for compliance. Maintain compliance with City's specifications 7.1.1. Review lab test reports and log any failures. 7.1.2. Review Invoicing from Laboratory to daily activities. 8. Project Completion and Close out 8.1. A. Provide list of deliverables for substantial completion walk through/inspection. Schedule and conduct project walk through upon receipt of Contractor's notification of substantial completion. Include City Project Manager, Design Engineer and others as directed. Prepare a list of non -conforming work based on visual inspections via Pro-Trak. Record and monitor contractor's corrective efforts and schedule. Schedule final completion inspection for any remaining corrections. B. Coordinate and obtain Design Engineer's signature and seal on Substantial Completion certificate and Final Completion and Acceptance certificate via Pro-Trak. 8.2. Review and compile any Operation and Maintenance documents required from the Contractor — forward to Engineer for review. Ensure Contractor's closeout documents are uploaded to Pro-Trak. Review for completeness and accuracy, including; affidavits of final payment, final pay estimates, as built records, redlines and drawings. Once received, notify the Design Engineer and City Project Manager when completed. 8.2.1. Upon completion of close out items, provide recommendation for City's Substantial Completion/Final Acceptance certificate. Design 9 of 10 D7. Revised 2016 8.2.2. Provide indexed project files, redline plans and as - built or record drawings to City via Pro-Trak. 8.3. Conduct Project Close -Out Meeting. 8.4. Prepare and recommend final payment application. (Prepare job record logs transmittals, and correspondence reports in an organized file for delivery to City.) 8.5. Consult with City on any potential Warranty items requiring repair or replacement. 9. Warranty Period 9.1. Schedule, arrange and coordinate a One Year Walk-through of the project to review status of the work 30 days prior to expiration of the One Year Maintenance period. 9.2. Provide staff to conduct and participate in the warranty inspections. 9.3. Prepare list of non -conforming work for presentation to the City Project Manager, Design Engineer and Contractor via Pro-Trak. 9.4. Oversee repairs for non -conforming work with Contractor. 9.5. Submit final report on completed warranty repairs via Pro-Trak. Design 10 of 10 D7. Revised 2016 ATTACHMENT D ARCJADIS Ior natural and built assets RONNIE HART Construction Manager EDUCATION BS Construction Management University of Houston 2014 AS Liberal Arts Alvin Community College 2002 YEARS OF EXPERIENCE Total - 5 CERTIFICATIONS OSHA — 30 and 10 hour cards First Aid/CPR/AED — American Red Cross Mr. Hart brings five years of construction management experience on large multi -faceted projects. Project Experience Houston Texans Soccer Club New Facility Houston, TX Construction Management Consultant. Organize construction plan; Solicited sub -contractor Bids. In process of awarding Bids to sub- contractors. Reviewed drawings; Set up meetings and document notes to distribute to team. La Porte ISD High School Rebuild Tellepsen Builders, TX Project Engineer for a $100 Million project. Responsibilities included: • Assisted the Safety department with jobsite inspections. • Inspected Sub contractor workmanship. • Wrote Change Orders for subcontractors. • Responsible for submitting RFIs and Submittals to the architect for approval. • Onsite inspections to process monthly pay applications • Assisted Superintendents with scheduling material deliveries. • Scheduled weekly Sub meetings and distributed the information out to all parties. • Completed - Second Baptist Church Cinco Ranch- $39Million, Centennial Gardens- $22Million Phillips 66 World Headquarters WS Bellows Construction Corporation, TX Project Engineer for a $117 Million project. Responsibilities included: • Helped develop and maintain site specific safety guidelines. • Assisted on site QA/QC department with daily inspections of concrete pours. • Maintained communication between subcontractors on installation coordination. • Performed material take offs for PM • Assisted Superintendents with scheduling material deliveries. 1 PERSONNEL RESUME - Ronnie Hart Project Experience Continued Houston Rapid Transit - Joint Venture for METRO Light Rail Expansion Project Houston, TX Engineering Intern for a $1.2 Billion project. Responsibilities included: • Environmental Engineer responsibilities: Weekly inspections of the Project; Produce weekly Storm Water Pollution Prevention Plans; Create contingency plans in the event of any issues and notify the proper authorities in a timely manner. • Assist our Safety department in preparing presentations geared toward our field personnel regarding on the job hazards. • Field Engineer responsibilities: Assist project Superintendent with implementation of daily/weekly work plan; order materials for production crew; preform job cost analysis. • Office Engineer responsibilities: Track monthly/weekly work quantities and process Sub and Vendor invoices as well creating modifications to their contracts; Write RFIs and submit them to our Design group and insert redlines into our "as built" plans; Take meeting minutes and distribute daily information to our field crews; Ensure all survey equipment is calibrated and accurate. SERVPRO of Napa County (Fire and water damage remediation company) Production Manager. Responsibilities included: • Responsible for logistics and scheduling of daily job assignments for production crews. • Organized daily/ weekly safety meetings with continuing education class room time. • Handled all customer service and quality control issues. SERVPRO of Missouri City (Fire and water damage remediation company) Supervisor. Responsibilities included: • Implemented a safety/ work plan to performed mold remediation on Shell offshore platforms in Gulf of Mexico. • Residential restoration project lead. 2 House Bill 89 Verification I, Wendell L. Barnes. (Person name), the undersigned representative (hereafter referred to as "Representative") of Arcadis U.S., Inc. (company or business name, hereafter referred to as "Business Entity"), being an adult over the age of eighteen (18) years of age, after being duly sworn by the undersigned notary, do hereby depose and affirm the following: 1. That Representative is authorized to execute this verification on behalf of Business Entity; 2. That Business Entity does not boycott Israel and will not boycott Israel during the term of any contract that will be entered into between Business Entity and the City of Pearland; and 3. That Representative understands that the term "boycott Israel" is defined by Texas Govemment Code Section 2270.001 to mean refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli -controlled territory, but does not include an action made for ordinary business purposes. SIGNATURE OF RIPRESENTATIVE SUBSCRIBED AND SWORN TO BEFORE ME, the undersigned authority, on this 22 day of February, 2018. /2 Rider /2tfie, fi7(iutiLe Notary Public ifyi Ube tria.ni frnaiiev�;ch_ ;ow VN c. • ��y MICHELLE MANGOGNA MARKOVICH •11 Notary Public, State of Texas � My Commission Expires 74:4.1''�` July 30, 2019 i