Loading...
HomeMy WebLinkAboutR2018-042 2018-02-26TOM REID MAYOR RESOLUTION NO. R2018-42 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City Manager or his designee to enter into an amended contract with Brown and Gay Engineers, in the additional amount of $67,950.00, for engineering services associated with the Hughes Ranch Road Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract for engineering services associated with the Hughes Ranch Road Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract for engineering services associated with the Hughes Ranch Road Project. PASSED, APPROVED and ADOPTED this the 26th day of February, A.D., 2018. ATTEST: APPROVED AS TO FORM: NG L ING, TRM Y SEC TARY DARRIN M. COKER CITY ATTORNEY `"' I I,,,,1 =ter ..A►, �U� Resolution No. R2018-42 Exhibit "A" !V!, February 14, 2018 Skipper Jones, P.E. City of Pearland 2559 Hillhouse Road Pearland, TX 77584 RE: Hughes Ranch Road, Additional Services Dear Mr. Jones: Enclosed are BGE's proposed scope, schedule and fee for various additional services requested by the City in regard to the Hughes Ranch Road Improvements. The additional services included in this proposal include: • Addition of an eastbound right turn lane at Challenger Elementary School. • Incorporation of an alternative sound wall design into the current plans. • Additional TxDOT reviews resulting from the design changes above, and new interlocal agreement recently executed between the City and TxDOT Schedule for completing these additional services is 112 days. This schedule includes approximately six weeks for advancing the design to 95% (addition of the right turn lane and sound walls), with the remainder reserved for TxDOT 95% and 100% reviews, and time to respond to those TxDOT comments. Our estimated fee for these additional services is $67,950.00. We appreciate the opportunity to be of continued service to the City for this important project. Please contact me if you have questions or need additional information. nathan B. Ho% ard, P.E. r. Projcct Manas Serving. Leading. Solving.'" BGE, Inc. • 10777 Westheimer Road, Suite 400 • Houston, Texas 77042 • 281-558-8700 • www.bgeinc.com City Of Pearland Hughes Ranch Road - Fee Estimate Challenger Elementary Right Turn Lane TASK DESCRIPTION TOTAL Roadway Design S 10,972.00 Drainge Design S 11,758.00 Traffic Control $ 4,680.00 Illumination $ 954.00 Traffic Items $ 5,634.00 SW3P Layouts $ 1,608.00 Landscape and Irrigation Design $ 2,176.00 Quantity Summaries and Cost Estimate S 2.772.00 Project Management & Coordination S 1,722.00 Direct Expenses $ 620.00 TOTAL $ 42,896.00 TASK DESCRIPTION Project Manager Senior Engineer Engineer EIT Senior Designer CADD Technician Clerical TOTALS Rate S 210.00 $ 210.00 $ 156.00 S 108.00 S 146.00 S 108.00 S 86.00 Roadway Design Roadway Plan & Profile 2 8 16 8 34 Typical Sections 1 2 4 4 11 Median Layouts 1 2 8 8 19 Intersection Layouts 1 2 8 11 Design Cross Sections 1 2 8 11 Roadway Design Sub -total_ 6 0 16 44 8 12 0 86 Drainge Design Drainage Area Map 1 1 2 4 Hydraulic Computations 2 4 8 14 Storm Sewer Plan & Profile 2 4 8 15 29 Storm Sewer Lateral Profiles 1 2 2 4 9 Lateral Layout 1 2 2 4 9 Drainage Report 2 4 8 2 16 Drainage Design Sub -total 7 7 22 20 15 8 2 81 Traffic Control 4 8 12 12 36 Illumination 1 2 4 7 Traffic Items Traffic Signal at Bryan Ct 2 4 4 15 25 Signing and Pvmt Marking Layout 1 4 4 8 17 Traffic Items Sub -total 3 4 8 19 0 8 0 42 BGE, Inc. Page 1 of 2 2/14/2018 City Of Pearland Hughes Ranch Road - Fee Estimate Challenger Elementary Right Turn Lane TASK DESCRIPTION Project Manager Senior Engineer Engineer EIT Senior Designer CADD Technician Clerical TOTALS SW3P Layouts 2 4 8 14 Landscape and Irrigation Design 2 1 4 8 15 Quantity Summaries and Cost Estimate 2 4 16 22 Project Management & Coordination 4 4 3 11 TOTAL 27 13 67 123 31 48 5 314 OTHER DIRECT EXPENSES No. Unit Unit Price Subtotal Mileage 500 Mile S 0.54 S 270.00 Photocopies B/W (11" x 17") 400 each S 0.25 S 100.00 Mylar (11x17) 100 each S 2.50 S 250.00 TOTAL S 620.00 BGE, Inc. Page 2 of 2 2/14/2018 City Of Pearland Hughes Ranch Road - Fee Estimate Sound Wall Revisions TASK DESCRIPTION Project Manager Senior Engineer Engineer EIT Senior Designer CADD Technician Clerical TOTALS Rate $ 210.00 _ $ 210.00 $ 156.00 $ 108.00 $ 146.00 $ 108.00 $ 86.00 Sound Wall Design Sound Wall Layouts 4 8 4 16 32 Sound Wall Miscellaneous Details 1 4 8 8 8 29 Design Cross Sections 1 8 24 33 Quantity Summaries 2 4 16 8 30 Standards & Specifications 1 4 5 Sound Wall Design SUBTOTAL 5 4 24 56 4 32 4 129 Sound Wall Design LABOR $ 1,050.00 $ 840.00 $ 3,744.00 $ 6,048.00 $ 584.00 $ 3,456.00 $ 344.00 $ 16,066.00 Brown & Gay Engineers, Inc. Page 1 of 1 2/14/2018 City Of Pearland Hughes Ranch Road - Fee Estimate TxDOT Comment Response TASK DESCRIPTION TOTAL Project Management and Coordination $ 8,316.00 Direct Expenses $ 672.00 TOTAL $ 8,988.00 TASK DESCRIPTION Project Manager Senior Engineer Engineer EIT Senior Designer CADD Technician Clerical TOTALS Rate $ 210.00 $ 210.00 $ 156.00 $ 108.00 $ 146.00 $ 108.00 $ 86.00 Project Management and Coordination Respond to TxDOT 90% Comments 2 4 8 2 4 20 Respond to TxDOT 95% Comments 2 4 8 2 4 20 Respond to TxDOT 100% Comments 2 2 4 8 2 4 22 Project Management and Coordination SUBTOTAL 6 2 12 24 6 12 0 62 Project Management and Coordination LABOR $ 1,260.00 $ 420.00 $ 1,872.00 $ 2,592.00 $ 876.00 $ 1,296.00 $ - $ 8,316.00 OTHER DIRECT EXPENSES No. Unit Unit Price Subtotal Mileage 125 Mile $ 0.54 $ 68.00 Photocopies B/W (11" x 17") 2,416 each $ 0.25 $ 604.00 TOTAL $ 672.00 Brown & Gay Engineers, Inc. Page 1 of 1 2/14/2018 Date of Issuance: Consultant: CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpearland.com/projects Professional Services Contract Amendment Hughes Ranch Road 02/13/2018 BGE, Inc Amendment No.: CoP Project No.: P.O. No.: 3 TR1201 2017-00000261 Explanation: This change order encompasses the following: Contract amendment will include Challenger Elementary right turn lane: incorporation of a storage lane includes changes to roadway design, traffic control plan, median, illumination, storm water pollution prevention plan, landscape and irrigation; Soundwall revision update to design; TxDOT comment review and 95% plans submittal for full approval by TxDOT. Description of Work 1 Add Item No. 5 Add right turn lane at Challenger Elementary 2 Add Item No. 6 Complete plan review with TxDOT 3 Add Item No. 7 Additional design services - Revise soundwall specification Please attach back-up documentation. Cost & Time Change Summary Original Contract: Previous Amendment(s): Contract prior to this Amendment: Net increase (decrease) from this Amendment: Revised Contract: Cost Time $ 42,896.00 42 Days $ 8,988.00 28 Days $ 16,066.00 42 Days Cost $ 215,237.00 $ 56,998.00 $ 272,235.00 $ 67,950.00 $ 340,185.00 Time 0 Days 0 Days 0 Days 112 Days 112 Days Finance Approval: Date ACCEPTED*: By: Date 02/16/2018 APPROVED: By: Consultant Project Manager Date By: Date Owner 02/14/2018 'Consultant agrees to perform change(s) included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is to be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes identifies for the contract value and/or contract time shown, are made part of the Design 1 of 1 D4. Revised 7/08