R2017-198 2017-11-27 RESOLUTION NO. R2017-198 A Resolution of the City Council of the City of Pearland, Texas, authorizing Arcadis .U. S., Inc. to perform construction management and inspection services, in the amount of $169,720.00 associated with the Hughes Ranch Road Waterline Project(Task Order No. 5). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. The City previously entered into a Master Service Agreement with Cobb Arcadis U. S., Inc. for construction management services. Section 2. That certain Task Order No. 5 of the Master Service Agreement, attached hereto as exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 3. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Task Order No. 5. PASSED, APPROVED and ADOPTED this the 9th day of October, A.D., 2017. TOM REID MAYOR ATTEST: NG IN "14-; s • TY S ETAR APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Resolution No. R2017-198 Exhibit "A" ATTACHMENT A TASK ORDER - No. 5 MASTER SERVICE AGREEMENT (MSA), Construction Management & Inspection Services Pursuant and subject to the above captioned MSA dated May 15, 2017 between the City of Pearland and Arcadis U.S., Inc. CLIENT hereby requests that CONSULTANT performs the work described below upon the terms set forth: CLIENT PROVIDED INFORMATION: Work Site: Hughes Ranch Road Water Line Work to Be Performed: Provide Construction Management Support Services Drawings, plans, specifications are not attached: Date and Time to Commence: September 5, 2017 Date and Time to Complete: March 30, 2018 Equipment, vehicles, tools, materials, supplies to be furnished or obtained through third parties by CLIENT (if any): N/A Invoice Mailing Instructions: Invoices will be submitted through the online prosect management system "Manage -It" Other Requirements or Variance from MSA (if any): N/A CONSULTANT PROVIDED INFORMATION: Compensation: $169,720.00 Billing Terms: Time and Materials Scope of Work: See Attachment C — Construction Management Scope of Services ACCEPTANCE: The foregoing TASK ORDER is accepted on the terms set forth as indicated by the signatures below. CONSULTANT CLIENT ArcadisU.S., Inc. City of Pe By: l By: Printed Name: Wendell L. "Buddy" Barnes Printed Nam Title: Date: Title: Senior Vice President Date: August 9, 2017 M4y Pear" Sohl C 1 ,fl er oar R, /4/7 ATTACHMENT R - Time and Materials Fee Estimate City of Pearland Project CM Service for Hughes Ranch Road Water Line Contract No. Estimated Fee for Construction Management 9169,720.00 and Inspection Services Project Duration: 180 Calendar Days Construction Costs: CM Costs: $169,720.00 CM Costs /Construction Costs: M/WBE Participation: 0.00% Revision Date: 5/1/2017 Time Construction Inspector project Manager 6 Month Raw Salary Rate $40.00 595.00 Sundays & Saturdays 2 Multiplier 2.75 2.00 128 Working Days Regular HRS Billing Rata 9110.00 $190.00 Total Regular Working Hours 173 Overtime HRS Billing Rate 9165.00 $190.00 400 Total Overtime Hours Time 180 Calendar Days 6 Month 26 Weeks 52 Sundays & Saturdays 2 Holidays 0 Rain days 128 Working Days 8 Regular Working Hours/Day 1040 Total Regular Working Hours 173 Average Regular Working Hours/Month 0 Overtime Hours/Week 400 Total Overtime Hours 67 Average Overtime Hours/Month 014 S Description Summary Monthly Breakdown Lebo Costs Project Setup Construction Duration Warranty Period HRs %of Firs $Amount %of Total Aug -17 Sep -17 O01-17 Nov -17 Deo -17 Jar017 Feb -17 Mar -17 1 HRs Water Lina - Conslrunion Manager 1440 98.09% 9158,400.00 93.33% 180 210 210 210 210 210 210 Utility Relocation- Protect Manager 28 1.91% $5,320.00 3.13% 4 4 4 4 4 4 4 Labor Mrs: 1468 100.00% 0 0 104 214 214 214 214 214 214 0 0 0 0 0 0 0 Labor Costs: 9183,720.00 98.46% 90.00 50.00 920,560.00 923,880.00 923,860.00 923,880.00 923,880.00 923,860.00 923,880.00 90.00 00.00 $0.00 90.00 $0.00 90.00 00.00 Reimbursable expenses; vehicle allowance. 86,000.00 3.54% 9500.00 9500.00 91,000.00 51,000.00 91,000.00 $1,000.00 91,000.00 90,00 00.00 50.00 50.00 90.00 50.00 50.00 Yo(Su0contraetor'S costs: 90.00 0.0088 50.00 90.00 90.00 50.00 90.00 30.00 90.00 90.00 90.00 90.00 90.00 90.00 30.00 90.00 90.00 $0.00 Total: 0169,720.00 100.00% 50.00 90.00 921,080.00 024,360.00 924,860.00 924,880.00 924,880.00 924,880.00 524,860.00 50.00 $0.00 50.00 90.00 90.00 90.00 $0.00 Totals to Date: $0.00 $0.00 921,060.00 545,420.00 I 970,280.00 985,140.00 9120,000.00 5144,860.00 9189,720.00 51119,720.00 9189,720.00 5169,720.00 5169,720.00 9189,720.00 5169,720.00 9189,720.00 Pape 1 NSR 457 CM Budget Setup 01 -0S -Inds Resolution No. R2017-198 Exhibit "A" ATTACHMENT C CONSTRUCTION MANAGEMENT SCOPE OF SERVICES FOR HUGHES RANCH ROAD WATER LINE CONSTRUCTION BASIC SERVICES: Construction Manager(s) shall render the following professional services to the OWNER in connection with the construction of the Project. Design 1 of 10 D7. Revised 2016 1. Pre -Construction (on specific projects, as requested by the City/Owner) 1.1. Provide constructability review of plans, specifications, contract documents and validity of Engineer of Record's project duration. Identify construction issues, conflicts, deficiencies, review the adequacy and accuracy of the design and independent verification of quantities. 1.2. Attend Pre -Bid Meeting; provide feedback to City's Project Manager as necessary, such as: tracking and recording questions for the Engineer's written response, clarifying the Owner's expectations for the project and the project execution. 1.3. Chair Pre -Construction Meeting 1.3.1. Schedule and conduct the pre -construction meeting; record and disseminate minutes from pre -construction meeting. 1.3.2. Utilize the City's Pro -Trak system: set communications protocol and contract administration procedures, establish progress meeting schedule and submittal schedule. 1.3.3. Provide agenda for meeting: Key milestone dates, pay application procedures, schedule, public notification issues and procedures, utility coordination issues, traffic control, permitting, property owner notification and coordination, temporary facilities, contractor's use of City's Pro -Trak system, etc. 2. Construction Administration and Management Services 2.1. Act as the City's on-site representative administering the contract for construction and providing overall project oversight, maintain record of decisions and changes made. Design 2 of 10 D7. Revised 2016 2.2. Meetings: Schedule and conduct construction progress meetings; record minutes from construction progress meetings and distribute via Pro -Trak to: City Project Manager, Design Engineer and contractor throughout the duration of the project. 2.2.1. Schedule meetings every two weeks, minimum, to review the following: work progress and schedule, outstanding issues, status of submittals and responses shop drawings unforeseen issues and changes to the work. 2.2.2. Coordinate additional meetings as necessary to discuss and resolve problems and provide guidance in a timely manner. 2.2.3. Coordinate/monitor the following: utility relocation activities for compliance, utility installation verification, reporting, record management and as -built drawings. 2.2.4. Attend all utility coordination, construction, and scheduling meetings. 2.2.5. Obtain copy of ROW permit and prints from Public Works in order to monitor progress of utility relocation per permit/plan. 2.3. Manage Construction 2.3.1. All final documentation is required in electronic/digital format, utilizing Pro -Trak as is feasible. 2.3.2. As field problems arise, notify the Design Engineer and City Project Manager of proposed solutions to resolve problems. 2.3.3. Review and update as -built documents regularly with contractor. Design 3 of 10 D7. Revised 2016 2.3.4. Monitor and ensure adherence to approved project baseline schedule. Review contractor's schedule monthly, ensure compliance with City's intended schedule, and provide recommendations as needed to retain and regain schedule if needed. 2.3.5. Recommend alternate project sequencing/scheduling to keep project on schedule. 2.3.6. Prepare monthly summary report of construction activities with outstanding issues outlined for review. Monthly progress information associated with the project will be submitted to the Project Manager for review and approval. 2.3.7. Record weather conditions on jobsite daily. 2.4. Coordinate work of contractor with external agencies and utility companies. Coordinate contractor's operations with regard to other City contracts and construction as well as with property owners for planned service outages, street closures, and access control issues to properties including notifications. 2.4.1. Verify construction conformance and compliance with TCEQ, NOI and NOT. 2.4.2. Verify construction conformance with permitted activities such as: City of Pearland permits, U.S. Army Corps of Engineers permits, TxDOT roadway permits, and any Railroad agreements. 2.5. Maintain records of all decisions, actions and activities with regard to construction operations via the City's Pro -Trak system (i.e. Change Orders, RFIs and responses, Submittals and responses, Request for Proposals, correspondence, SWPPP inspections.) Design 4 of 10 D7. Revised 2016 3. Construction Inspection Services 3.1. Provide full-time on-site technical observation of Contractor's activities to verify and ensure all work materials, structures, equipment and workmanship comply with the Contract Documents including Addenda, and Change Orders. Verify and ensure that Contractor maintains good construction practices and professional standards prevailing in the local City, County, and State of Texas. Utilize City's Pro-Trak system for all inspection reports. 3.1.1. Notify the City Project Manager if Contractor's work is not in compliance with the Contract Documents or specifications. Notify the City Project Manager and Design Engineer of any failure of the Contractor to take measures to repair and bring work in compliance. 3.1.2. Issue Advisory Notices to Contractor for work that is not in compliance with approved construction documents. 3.1.3. Issue Non-Compliance Reports to Contractor if non- conforming work is not brought into compliance or if plan of action to bring work into compliance is not conducted in timely manner. 3.1.4. Inspect and observe the materials and equipment being incorporated into the work to assure that they are handled, stored and installed in accordance with the Contract Documents and specifications. Report to the City Project Manager regarding these activities. 3.2. Identify record and notify Design Engineer of any problems or failures to meet performance requirements in a timely manner to minimize delay in the progress of the project, make recommendation(s) for appropriate solution to the City Project Manager and Design Engineer. Design 5 of 10 D7. Revised 2016 3.3. Prepare and maintain daily progress log or daily construction reports, photographs, records and track quantities installed that day utilizing the City's Pro -Trak system. 3.4. Ensure contractor reviews and approves daily reports and quantities. 3.5. Verify contractor has obtained necessary permits and is maintaining any Traffic Control, public notification and Storm Water Pollution Prevention Plans, facilities, equipment or arrangements in accordance with contract documents. 3.6. Attend and participate in progress meetings. 3.7. Create contacts for your record for: names, addresses, telephone numbers and email of all contractors, subcontractors, sub consultants and major suppliers of material and equipment; store in City's Pro -Trak system. 3.8. Immediately notify the City Project Manager and Design Engineer in the event of an on-site accident. Record and note conditions, activities and witnesses to the event. 3.9. Maintain Resolution Log and respond to citizen complaints in Pro - Trak system. 3.10. Consult with City Project Manager and Design Engineer in advance of scheduled major work operations, tests, inspections or start of important phases of project. 4. Pay Applications 4.1. Pay applications will be generated by the City's Pro -Trak system based on quantities approved in the daily reports. Review and verify quantities provided by contractor for all work in compliance with contract documents. 4.1.1. Review work conducted daily on daily inspection reports and material installed measurements submitted by contractor; verify work conducted and Design 6 of 10 D7. Revised 2016 bid item quantities via Pro -Trak; meet monthly to review pay estimate and quantities with contractor 4.1.2. Review progress pay application with Design Engineer for approval or revision prior to submittal to City. 4.1.3. Finalize pay application with signatures from Contractor, Engineer and Construction Manager certifying quantities and amounts via Pro -Trak. 4.1.4. Notify City Project Manager when all electronic signatures are completed in the Pro -Trak system for invoice processing. 4.1.5. Track and record requests for rain or other delays with potential to add to Contract Time in Daily Reports in Pro -Trak. 4.1.6. Provide an independent quantity forecast bid items to identify potential quantity over -runs as part of pay estimate review. 4.2. Upon completion of the work, prepare a final progress payment including a balancing change order zeroing out all unused quantities utilizing Pro -Trak. Identify and add additional quantities and make any approved changes to the Contract Time. 4.2.1. Review and coordinate with Design Engineer to provide Engineer's recommendation for Substantial Completion or Final Acceptance. (See Close-out Section) Design 7 of 10 D7. Revised 2016 5. Document Control 5.1. Utilize the City's Pro -Trak system to: receive, route, track and log all Contractor communications, Submittals, Change Orders, RFIs, Pay Applications and Citizen Complaint/Resolution Log; communicate with Contractor the status of submittal reviews; review submittal and RFI log in Pro -Trak to ensure timely responses; notify City Project Manager, Contractor and Design Engineer of time critical issues. 5.1.1. Respond to RFIs when such response does not require the Engineer's opinion or expertise or direction from City. 5.1.2. Assemble and maintain notes, comments, sketches and supportive data relative to the Project to facilitate the revision of drawings to conform to the final as -built conditions. Review Contractor's record keeping periodically to ensure completeness, timeliness and progress. 6. Change Orders 6.1. Prepare and issue request for proposals in a timely manner via Pro - Trak. Review RFP and contractor proposal for additional work with City Project Manager and Design Engineer for approval. Ensure the status of RFP and Responses from Contractor, City and Design Engineer are logged and tracked in the Pro -Trak system. 6.2. Provide recommendation on technical matters as an advocate for the City. Evaluate Contractor's response/proposal for merit, cost, time, accuracy and price practicality. Negotiate with Contractor on City's behalf if required. 6.3. Prepare Change Order and documentation including signatures of Contractor, Engineer and Construction Manager for delivery to City. Design 8 of 10 D7. Revised 2016 7. Testing Laboratory and Results 7.1. Coordinate testing laboratory activities with Contractor's activities. Review test reports for compliance with Contract Documents. Log, track and retain test reports in Pro -Trak. Review results with Contractor. Monitor any corrective action and re -testing for compliance. Maintain compliance with City's specifications 7.1.1. Review lab test reports and log any failures. 7.1.2. Review Invoicing from Laboratory to daily activities. 8. Project Completion and Close out 8.1.A. Provide list of deliverables for substantial completion walk through/inspection. Schedule and conduct project walk through upon receipt of Contractor's notification of substantial completion. Include City Project Manager, Design Engineer and others as directed. Prepare a list of non -conforming work based on visual inspections via Pro -Trak. Record and monitor contractor's corrective efforts and schedule. Schedule final completion inspection for any remaining corrections. B. Coordinate and obtain Design Engineer's signature and seal on Substantial Completion certificate and Final Completion and Acceptance certificate via Pro -Trak. 8.2. Review and compile any Operation and Maintenance documents required from the Contractor — forward to Engineer for review. Ensure Contractor's closeout documents are uploaded to Pro -Trak. Review for completeness and accuracy, including; affidavits of final payment, final pay estimates, as built records, redlines and drawings. Once received, notify the Design Engineer and City Project Manager when completed. Design 9 of 10 D7. Revised 2016 8.2.1. Upon completion of close out items, provide recommendation for City's Substantial Completion/Final Acceptance certificate. 8.2.2. Provide indexed project files, redline plans and as - built or record drawings to City via Pro -Trak. 8.3. Conduct Project Close -Out Meeting. 8.4. Prepare and recommend final payment application. (Prepare job record logs transmittals, and correspondence reports in an organized file for delivery to City.) 8.5. Consult with City on any potential Warranty items requiring repair or replacement. 9. Warranty Period 9.1. Schedule, arrange and coordinate a One Year Walk-through of the project to review status of the work 30 days prior to expiration of the One Year Maintenance period. 9.2. Provide staff to conduct and participate in the warranty inspections. 9.3. Prepare list of non conforming work for presentation to the City Project Manager, Design Engineer and Contractor via Pro -Trak. 9.4. Oversee repairs for non conforming work with Contractor. 9.5. Submit final report on completed warranty repairs via Pro -Trak. Design 10 of 10 D7. Revised 2016 Resolution No. R2017-198 Exhibit "A" ATTACHMENT A TASK ORDER - No. 5 MASTER SERVICE AGREEMENT (MSA), Construction Management & Inspection Services Pursuant and subject to the above captioned MSA dated May 15, 2017 between the City of Pearland and Arcadis U.S., Inc. CLIENT hereby requests that CONSULTANT performs the work described below upon the terms set forth: CLIENT PROVIDED INFORMATION: Work Site: Hughes Ranch Road Water Line Work to Be Performed: Provide Construction Management Support Services Drawings, plans, specifications are not attached: Date and Time to Commence: September 5, 2017 Date and Time to Complete: March 30, 2018 Equipment, vehicles, tools, materials, supplies to be furnished or obtained through third parties by CLIENT (if any): N/A Invoice Mailing Instructions: Invoices will be submitted through the online prosect management system "Manage -It" Other Requirements or Variance from MSA (if any): N/A CONSULTANT PROVIDED INFORMATION: Compensation: $169,720.00 Billing Terms: Time and Materials Scope of Work: See Attachment C — Construction Management Scope of Services ACCEPTANCE: The foregoing TASK ORDER is accepted on the terms set forth as indicated by the signatures below. CONSULTANT Arcadis IJ.S., Inc. By: Printed Name: Wendell L. "Buddy" Barnes Title: Senior Vice President Date: August 9, 2017 CLIENT City of Pe By: Printe. Name: Title: Date: /o- rz-17 ATTACHMENTS - Time and Materials Fee Estimate City of Pearland Project CM Service for Hughes Ranch Road Water Line Contract No. Estimated Fee for Construction Management 1169,720.00 end Inspection Services Project Duration: 160 Calendar Days Construction Costs: CM Costs: 5169,720.00 CM Costs /Construction Coats: M/WBE Participation: 0.00% Revision Date: 5/1/2017 Time Construction Inspector Project Manager 6 Month Raw Salary Rate 840.00 195.00 Sundays&Saturdays 2 Multiplier 2.75 2.00 128 Working Days Regular HRs Billing Rata 8110.00 8190.00 Total Regular Working Hours 173 Overtime HRs Billing Rab 8165.00 8190.00 400 Total Overtime Hours Time 180 Calendar Days 6 Month 26 Weeks 52 Sundays&Saturdays 2 Holidays 0 Rain days 128 Working Days 8 Regular Working Hours/Day 1040 Total Regular Working Hours 173 Average Regular Working Hours/Month 0 Overtime Hours/Week 400 Total Overtime Hours 67 Average Overtime Hours/Month M S Description Summary Monthly Breakdown Lebo Costs Project Setup Construction Duration Warranty Period HRs %of Hrs. $ Amount % of Total Aug -17 Sep -17 Oot-17 Nov -17 Dec -17 Jan -17 Feb -17 Mar -17 / HRs Water Line - Constmction Manager 1440 08.09% 0150,400.00 93.33% 180 210 210 210 210 210 210 Uglily Relocation- Project Manager 28 1.91% $5,320.00 3.13% 4 4 4 4 4 4 4 Labor 610: 1468 100.00% 0 0 184 214 214 214 214 214 214 0 0 0 0 0 0 0 Labor Costs: 4163,720.00 96.46% $0.00 $0.00 020,560.00 823,860.00 823,860.00 523,860.00 023,860.00 823,860.00 823.860.00 $0.00 $0.00 $0.00 $0.00 $0.00 00.00 50.00 Reimbursable espenses; vehicle allowance. 46.000.00 3.54% 5500.00 5500.00 51,000.00 $1,000.00 51,000.00 81,000.00 91,000.00 40.00 00.00 90.00 10.00 $0.00 90.00 00.00 8% of Subcontractor's costs: $0.00 0.00% 50.00 50.00 00.00 80.00 $0.00 $0.00 00.00 80.00 $0.00 90.00 50.00 00.00 $0.00 50.00 00.00 $0.00 Total: 5169,720.00 100.00% $0.00 $0.00 021,060.00 $24,360.00 024.660.00 824,860.00 024.860.00 $24,880.00 024,860.00 00.00 50.00 50.00 90.00 $0.00 00.00 00.00 Totals to Date: 80.00 50.00 $21,060.00 645420.00 070,280 00 985,140.00 0120,000.00 0144,860.00 5169,720.00 8168,720.00 0169,720.00 0160,720.00 5168,720.00 8168,720.00 8168,720.00 8169,720.00 Page 1 71514 457 CM Budget Setup 01-05-10.a4