R2005-0008 01-10-05 RESOLUTION NO. R2005-8
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, RATIFYING AN EMERGENCY EXPENDITURE FOR REPAIRS TO
THE ALICE STREET WATER WELL.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. Pursuant to Chapter 252 of the Local Government Code the City is
exempt from the statutory bid requirements if a procurement is necessary to prevent
unforeseen damage to public machinery, equipment or other property.
Section 2. That the City incurred costs of $63,692.23 for the unanticipated
rehabilitation of the
Alice Street water well.
Section 3. The City Council hereby ratifies the aforementioned expenditure as an
emergency procurement in accordance with Section 252.022(3) of the Local Government
Code.
PASSED, APPROVED and ADOPTED thisthe 10th dayof January ,
A.D.,2005.
ATTEST:
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
TOM REID
MAYOR
FROM ,ODAY DRILLING
FAX NO. :2814850962
Dec. 11 2004 OI:O1PM P2
O'DAY DRILLING COMPANV, INC.
2357 GARDEN ROAD
PEARLAND, TX 7758 l
(281) 485-1330
1-800-856-6329
FAX (281) 485-0962
Decomberl0,20(~
City of Pearland
Attn: Bobby Whisenant
3519 Liberty Dr.
Pearland, TX 7758
Phone#281.692.6895
Fax#281.692.0903
RE: Alice Street Well
The following price includds all work that has been completed thru
Dec~mber 8, 2004 and all work that needs to be completed to put the
Alice Street Well back in operation.
Work Already Completed:
11/5/04 Pulled Water Samples to Test Chlorides
5.5 Hr. (~ $110.00/Hr.
11/8/04 Pulled Pump 240 Ft. 8" x 2 ½" x 1 ¼"
9 Hr. ~ $210.00/lit.
11/9/04 Finished Pulling Pump Set 400 Ft.
3 Hr. (~ $210.00/lit. ·
11/9/04 Bail Oil 150 Gallons 2.5 Hr. ~ 210.00/lit.
Dispo,,ml of Oil 150 Gallons (~ $2.50/Ea.
Haul Pump, Tube, & Shaft 5 Hr. ~ $105.00/Hr.
Di~ssemble Pump 3 Hr. (~ $65.00/Hr.
Wash Column, Shaft, & Tubo & Pull Shafts
8 Hr. ~ $45.00/Hr.
11/12/04 Run Camera Survey
Total to Pull & Inspect
$ 605.00
1,890.00
630.00
525.00
375.00
525.00
195.00
360.00
1,500.00
$ 6,605.OO
11116104
11/I 7/04
11/18/04
Build 10" Scmteher
2 Itr. Labor @), $210.00/Iir.
Haul 1060 Ft. of 4" Working String ~.~ $1.00/Ft.
6 Hr. Labor (¢ $210.00/Hr.
Haul 2" Tubing 320 Ft. C~ $.50/Ft.
4 1.tr. Labor (9 $210.00/Hr.
Run '1" Jet & Pull Sample 6 Hr. (~ $210.00/IIr.
$ 200.00
420.00
1,060.00
1,260.00
160.00
840.00
1,260.00
K.~oo ~
D~c. 11 2004 01:01P~ PS
FROM ;ODAY DRILLING
FAX NO. ;2814850962
Page 2
Alice Street Well
11/l 8/04
11/18/04
1 1 l18/04
I l/l 9/04
1 1/17/04
I 1/22104
11/22/04 Thru
Pull 4" & Jet Approx. 700 Ft. 6 Hr. (3 $210.00/Hr.
Pull 4" & Jet Approx. 640 Ft. 6 fir. ~ $210.00/Hr.
Pull 4" & 1" 6 Hr. ~ $210.00/Hr.
Run Packer 10 Hr. (~ $210.00/Hr.
Rental Pump, Wire, Starter
15 Extra Days (.~ $30.O0/Ea.
Run Pump to 280 Ft. 4 Hr. ~ $210.00/Hr.
12/6/04
Pull Pump to Next Screen For Samples
26 Hr. (hi $2 lO.O0/H.r.
Build Packer
2 Hr. @ $210.00/m.
Air Compressor
Pzun Camera Survey
Total Well Rehabilation
1,260.00
1,260.00
1,260.00
2,100.00
300.00
450.00
840.00
5,460.00
12oo.oo
420.00
250.00
1,59o.oo
$28,105.110
New 12MI00 4 Stage Pump
Newl 2 Joints of 8" x 20 Ft. Column Pipe ~ $748.00/Ea
New 2 ¼, ()il Tubes 8 ~ $90.00/Ea.
New 1 ¼" x 20 Ft. Shafts (Shafts Have Already Been Turned)
20 ~ $232.00/Ea.
80 Line Shaft Beatings 2 %" x 1 ~A" (9_3 $45.00/Ea.
Head Shaft Stainless Steel
405 Ft. of Stainless Steel Air Line C~ $2.00/Ft.
40 Stainless Steel Bands ~ $8.00/Ea.
8'x 2 ¼" Spiders 19 (~ $24.00/Ea.
Separate & Clean Oil 'lubes & Reas.~mble 2 Man Crew
16 Hr @ $65.00/Hr.
Aqua Lube, Chlorine, & Sealant
Set Pump 16 Hr. ~ $210.00/Hr.
Start Up Pump 2 Hr. (~ $85.00/Iir.
Total for Pump Repair & Labor to Replace
$ 4,458.00
8,976.00'
720.00
4,640.00
3,60O.00
347.23
810.00
320.00
456.00
1,040.00
85.00
3,360.00'
170.00/
$28,982 23¢
TOTAL PUMP & WELL REPAIR
Accepted By:
Printed Nan~:
$63,692,23