Loading...
R2017-093 2017-05-08RESOLUTION NO. R2017-93 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City Manager or his designee to enter into a Letter Financing Agreement with the Pearland Municipal Management District No. 1, and a Reimbursement Agreement with the Pearland Economic Development Corporation associated with the West Conveyance Pond. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain Letter Financing Agreement by and between the City of Pearland and Pearland Municipal Management District No. 1, a copy of which is attached hereto as Exhibit' A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That certain Reimbursement Agreement, by and between the City and the Pearland Economic Development Corporation, a copy of which is attached hereto as Exhibit "B" and made a part hereof for all purposes, is hereby authorized and approved. Section 3. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest the Letter Financing Agreement and Reimbursement Agreement attached hereto. PASSED, APPROVED and ADOPTED this the 8th day of May, A.D., 2017. ATTEST: APROVED AS TO FORM: i6)1AA- 54G2A) )44 DIARRIN M. COKER CITY ATTORNEY TOM REID MAYOR �`i Resolution No. R2017-93 Exhibit "A" PEARLAND MUNICIPAL MANAGEMENT DISTRICT NO. 1 c/o Allen Boone Humphries Robinson LLP 3200 Southwest Freeway, Suite 2600 Houston, Texas 77027 February 8, 2017 Mr. Clay Pearson City Manager City of Pearland, Texas 3519 Liberty Drive Pearland, TX 77581 Re: Financing for land acquisition (other than the Texas Department of Transportation drainage ditch) needed for Master Drainage Plan Dear Mr. Pearson: Pearland Municipal Management District No. 1 (the "District") and THE CITY OF PEARLAND, TEXAS (the "City") entered into a Financing Agreement (the "Agreement") dated February 6, 2014, to provide for the financing and construction of facilities to serve land within the District. The District adopted a Master Drainage Plan on February 6, 2014, updated on October 19, 2016. The District and the City have determined to proceed with the acquisition of the underlying fee interests or easements in properties (other than the TxDOT drainage ditch) needed to implement the Master Drainage Plan (the "Project"). Although the actual costs are difficult to determine, the Parties best estimate of the total cost of the Project is $1,395,692. The Parties expect the properties to be acquired in pieces and in phases. The City will acquire all such properties needed for the Project and make all payments related to the Project on the condition that the District agrees to reimburse the City for all costs to the maximum extent approved by the Texas Commission of Environmental Quality, for the District's 27.7% share of the Project, subject to the terms and conditions of the Agreement. As each parcel is acquired in fee, the City shall fill in the form attached hereto as Exhibit A to document the actual Project costs. [EXECUTION PAGE FOLLOWS] 645034 This agreement was duly authorized at a meeting of the Board of Directors of the District held on the 8th day of February, 2017. Very truly yours, PEARLAND MUNICIPAL MANAGEMENT DISTRICT NO. 1 By: / 4/1) President, Board of/Directors AGREED TO AND ACCEPTED BY THE CITY OF PEARLAND this day of rna-c_� . 2017. 645034 EXHIBIT A LAND ACQUISITION PROJECT COSTS 1 Description 1 645034 Amount Paid 1 1 Resolution No. R2017-93 Exhibit "A" PEARLAND MUNICIPAL MANAGEMENT DISTRICT NO. 1 c/o Allen Boone Humphries Robinson LLP 3200 Southwest Freeway, Suite 2600 Houston, Texas 77027 May 2, 2017 Mr. Clay Pearson City Manager City of Pearland, Texas 3519 Liberty Drive Pearland, TX 77581 Re: Financing for design and construction of the West Conveyance Pond Dear Mr. Pearson: Pearland Municipal Management District No. 1 (the "District") and THE CITY OF PEARLAND, TEXAS (the "City") entered into a Financing Agreement (the "Agreement") dated February 6, 2014, to provide for the financing and construction of facilities to serve land within the District. The District adopted a Master Drainage Plan on February 6, 2014, updated on October 19, 2016. The District and the City have determined to proceed with the design and construction of the West Conveyance Pond (the "Project) in accordance with the Agreement. The City will pre -finance payments to the District related to design of the Project in the amount of $66,762.00 as outlined in the proposal from LJA Engineering, Inc., which is attached hereto as Exhibit "A", and construction of the Project in the estimated amount of $260,700.00 as outlined in the preliminary engineer's estimate, which is attached hereto as Exhibit "B", and the District agrees to reimburse the City for the District's 27.7% share of the Project, subject to the terms and conditions of the Agreement. This agreement was duly authorized at a meeting of the Board of Directors of the District held on the 2nd day of May, 2017. Very truly yours, PEARLAND MUNICIPAL MANAGEMENT DISTRICT NO.1 By' LA. .tom J. Pre ent, Board of D'a ec • rs A REED TO AND ACCEPTED BY THE CITY OF PEARLAND this 8th day of . 2017. 656614 EXHIBIT A LJA Engineering, Inc. ,,Je2 L{narpafk_'ive ijocE 713 521,0 Suite 600 Fax 7139535626 Holston texas 77042 v wa llaeng neenng.cern TBPE Nv F 1386 TBPLS 141 101/0501 114 March 8, 2017 PROPOSAL Mr. Ron Dagley - President Lower Kirby Pearland Management District c/o Allen Boone Humphries Robinson LLP Phoenix Tower 3200 Southwest Freeway, Suite 2600 Houston, Texas 77027 Re: West Conveyance Pond Lower Kirby Regional Detention Lower Kirby Pearland Management District City of Pearland, Texas LJA Proposal No. 17-00292 LJA Job No. 2209-1503 Dear Mr. Dagley: LJA Engineering. Inc. (LJA) is pleased to submit this proposal for the following services for the West Conveyance Pond in accordance with the terms and conditions set forth in the Engineering Services Agreement dated February 6, 2014. SCOPE OF SERVICES Phase Description Fee Surveying 205 Design Survey (2.0% of Const. Cost) $ 5,735 208 Control Staking (1.O% of Const. Cost) $ 2,868 Basic Services 401 Design and Construction Administration 1$ 260.700 x 9.6%) $ 27,243 409 Project Representative (3.5% of Const. Cost) $ 10,037 Additional Services 413 Storm Water Pollution Prevention Plan $ 5,000 414 Geotechnical Study $ 8,580 415 Construction Testing Services $ 4,299 Z99 Reimbursable Expenses $ 3,000 TOTAL $ 66,762 The reimbursables budget will be used for the actual expenses Incurred on the project including bid advertisement, printing, mileage, etc. This proposal does not include Right-of- Way/Easement acquisition services or environmental services. 4'u;2ot,Al.Q01:u oNnr Kirby Pwnunn 6tuiapnner 1117 OQ292 W r11 Conveyance Pori Draft f •.trawl e;. Mr. Ron Dagley — President March 8, 2017 Page 2 of 2 We appreciate the opportunity to submit this proposal and look forward to working with you on this project. If you should have any questions or require additional information, please do not hesitate to contact me at 713.953.5096. Sincerely, 62 - James D. Ross, PE Vice President JDR/ew ACCEPTED FOR: LOWER KIRBY PEARLAND MANAGEMENT DISTRICT �,1 By: 6�" �j Name: //say ?� Title --"5/ Date 3���5/Z0/7 OAPROPOSAL12017Yna.r Kirby P..do d wriprnonn17-00242 W. Cmnv.y.nc. Pond DWI P,vgc doc EXHIBIT B UA Engineering, Inc PRELIMINARY ENGINEER'S ESTIMATE FOR: WEST CONVEYANCE PONT) CITY OF PFARLAND, TEXAS ESTIMATE BY: HARRIS COUNTY ANC ESTIMATE DATE: 1/18/2017 LIA JOB NO. 2209.0000 UNIT TOTAL rrEM DESCRIPTION UNIT QTY COST COST EXCAVATION ITEMS 1 EXCAVATION, HAULING, PI ACEMEN . AND COMPACTION CY 14,560 $ 5.00 $ 72,800 OF DIRT, AS INDICATED ON PLANS 2 MOBILIZATION LS 1 40,000.00 40,000 3 CLEARING AND GRUBBING AC 3.1 8,775.00 27,203 4 24" COMP STORM SEWER I.F 200 270.00 54,000 5 TRENCH SAFETY LF 200 6.00 1,200 6 BROADCAST SEEDING OF POND MATIN. BERMS AC 1.0 600.00 600 7 HYDROMULCH SEEDING OF POND SIDE SLOPES AC 3.1 1,200.00 3,720 SUBTOTAL EXCAVATION ITEMS $ 199,500 MIS('EILANEOUS ITEMS 1 SEEDING OF FILL AREAS AC 2.0 $ 600.00 $ 1,200 2 POND DEWATERING (GROUNDWATER CONTROL) LF 1,753 25.00 43,825 3 INSTALL. AND MAINTAIN FILTER FABRIC FENCE LF 3,700 1.00 3,700 4 STABILIZED CONIRIICIION EXrr EA 1 1,200.00 1,200 5 STORM WATER POLLUTION PREVENTION COMPI)ANCE EA 1 1,000.00 1,000 6 TYPE 2 ROCK FILTER DAM EA 1 2,000.00 2,000 7 COFFER DAM LS 1 8,250.00 8,250 SUBTOTAL MISCELLANEOUS ITEMS S 61,200 DETENTION ESTIMATE SUMMARY SUI3TOTAI. EXCAVATION POND $ 199,500 SUBTOTAL MISCELLANEOUS ITEMS 61,200 TOTAL CONSTRUCTION AMOUNT S 260,700 Page 1 of l Resolution No. R2017-93 Exhibit "B" REIMBURSEMENT AGREEMENT LOWER KIRBY: WEST CONVEYANCE POND This Agreement is entered into this th day of , 2017, by and between the CITY OF PEARLAND, TEXAS (hereinafter "City"), and the Pearland Economic Development Corporation (hereinafter "PEDC"). WHEREAS, the PEDC is a Type B economic development corporation, created pursuant to Chapter 505 of the Texas Local Government Code, as amended; and WHEREAS, the City and Lower Kirby Pearland Management District ("LKPMD") and Pearland Municipal Management District No. 1 ("PMMD#1") have approved a Master Drainage Plan ("Plan") for the area located within the boundaries of LKPMD and PMMD#1. WHEREAS, the LKPMD, PMMD#1, City and PEDC desire to make drainage improvements for a West Conveyance pond to be located between Kirby Drive and the Main detention pond, and between Fruge Road and Clear Creek, as shown in "Exhibit A" attached hereto, in accordance with the Plan (hereinafter "Improvements"); and WHEREAS, the Improvements represent an infrastructure project located within the boundaries of the LKPMD; and WHEREAS, the City and PEDC desire to acquire the fee simple title property interest in the property in order to make the Improvements (hereinafter "Acquisition"); and WHEREAS, the LKPMD will design and construct the Improvements on behalf of PMMD#1; and WHEREAS, Section 501.103 of the Texas Local Government Code (hereinafter "Code"), in pertinent part, defines the term "project" to mean "expenditures that are found by the board of directors to be required or suitable for infrastructure necessary to promote or develop new or expanded business enterprises, limited to: (1) streets and roads, rail spurs, water and sewer utilities, electric utilities, or gas utilities, drainage, site improvements, and related improvements; (2) telecommunications and Internet improvements ..."; and WHEREAS, the PEDC desires to fund PMMD#1's portion of the Acquisition, and engineering and construction of the Improvements and related expenses; and WHEREAS, the City is entitled to receive eligible reimbursements from PMMD#1 for the costs associated with PMMD#1's portion of the Acquisition, engineering, and construction of the Improvements; and 1 WHEREAS, PEDC approved funding for the Acquisition, engineering and construction of PMMD#1's portion of the Improvements at its March 30, 2017 Board of Directors' meeting; and WHEREAS, City and PEDC desire an agreement to set forth their respective responsibilities with regard to the Acquisition and reimbursement of said costs. WITNESSETH: NOW THEREFORE, in consideration of the foregoing premises and other good and valuable consideration the receipt and sufficiency of which is hereby acknowledged, it is hereby agreed as follows: 1. The City shall contract for all professional services necessary to provide documentation to acquire the fee interest in the Acquisition. 2. The City will acquire, on behalf of the LKPMD and PMMD#1, the parcel needed for the Improvements. 3. The City shall acquire the parcel as identified in Exhibit "B" attached hereto. The total estimated cost of the Acquisition and Improvements is $1,000,000, as shown in Exhibit "C". PEDC shall fund the actual cost (estimated to be $277,000) of PMMD#1's 27.7% share of the Acquisition, engineering and construction expenses for the Improvements ("PEDC Participation Amount"), which shall be paid to City in installments or a lump sum amount. The timing and amount of the payment shall be determined at sole discretion of the City, but in no event shall the total payments exceed the actual cost of the Acquisitions. 4. This Agreement shall be contingent upon the City and PMMD#1 entering into a Financing Agreement whereby City agrees to pre -finance PMMD#1's portion of the Acquisition, engineering and construction expenses for the Improvements in return for PMMD#1's agreement to reimburse said expenses ("Reimbursable Fund Payment"). Within 90 days following City's receipt of a Reimbursable Fund Payment from PMMD#1 that is attributable to the Acquisition, engineering or construction, City shall make payment to PEDC, in an amount equal to the Reimbursable Fund Payment, as reimbursement for the PEDC Participation Amount. 5. The initial term of this Agreement shall be for a period of eighteen (18) months, commencing on the $' th day of , 2017, and may be renewed as needed until the Improvements are substantial complete. 6. This Agreement may only be amended, modified, or supplemented by written agreement and signed by both parties. 8. No assignment by a party hereto of any rights under or interests in this agreement will be binding on another party hereto without the written consent of the party 2 sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. 9. Nothing herein is intended to supersede or waive any City ordinance or regulation pertaining to such construction. 10. Whenever possible, each provision of this Agreement shall be interpreted in such manner as to be effective and valid under applicable law, but if any provision of this Agreement is prohibitive or invalid under applicable law, such provision shall be ineffective to the extent of such provision or invalidity, without invalidating the remainder of such provision or the remaining provisions of this Agreement. 11. This Agreement shall be construed and enforced in accordance with and governed by the laws of the State of Texas. 12. To accomplish execution of this Agreement, it may be executed in multiple counterparts. 13. The Parties agree that any suit arising out of or related to this Agreement shall be filed in Brazoria County Texas. 14. All notices which are required or may be given pursuant to this Agreement shall be in writing and shall be sufficient if delivered personally or by first class mail, postage prepaid, return receipt requested, or by a nationally recognized courier, to the parties and their attorneys at the addresses set out below or such other addresses as the parties or their attorneys may hereafter notify one another: If to City: If to PEDC: City of Pearland Attn: Clay Pearson, City Manager 3519 Liberty Drive Pearland, TX 77581 Pearland Economic Development Corporation Attn: Chairman 3519 Liberty Drive, Suite 300 Pearland, TX 77581 Notice delivered in accordance with the terms hereof shall be effective upon receipt. 3 In witness whereof, the parties have hereunto set their hands and signatures on the date first above mentioned. ATTEST: 'IL ....AIL?). #1/ ng Log Secr: ary PEARLAND ECONOMIC DEVELOPMENT CORPORATION a Texas non-profit corpor ion By: Rushi Patel Chair CITY OF PEARLAND, a Texas mur}icipal 'ojoration By: Clay I arso City Manag-r 4