Loading...
R2017-082 2017-04-24RESOLUTION NO. R2017-82 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City Manager or his designee to enter into Master Services Agreement, Task No. 3, with Ardurra Group LLC, in an amount not to exceed $1,587,764.00, for Owner's Representative Services associated with the Surface Water Plant Program. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 2. That certain Task Order No. 3, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a Task Order No. 3. PASSED, APPROVED and ADOPTED this the 24th day of April, A.D., 2017. ATTEST: APPROVED AS TO FORM: DARR%.CO ER CITY ATTORNEY TOM REID MAYOR ATTACHMENT A TASK ORDER No. 3 MASTER SERVICE AGREEMENT (MSA), Project Management Services Resolution No. R2017-82 Exhibit "A" Pursuant and subject to the above captioned MSA dated June 27. 2016 between the City of Pearland and Ardurra Group LLC. The City hereby requests that Consultant perform the work described below upon the terms set forth: CITY PROVIDED INFORMATION: Work Site: Surface Water Plant (Project Nos. WA1605. WA17051 Work to Be Performed: Provide Owner's Representative Services for the project listed in attached proposal and Ieyel of effort`Work related to SubTask #3. Water Masterplan Update will be funded from WA1705. Drawings, plans, specifications are not attached: ves Date and Time to Commence: April 24. 2017 Date and Time to Complete: June 30. 2019 Equipment, vehicles, tools, materials, supplies to be furnished or obtained through third parties by the CITY (if any): Costs are outlined in the detailed Scope of Services. Level of Effort and include reproduction costs and mileage. Invoice Mailing Instructions: Invoices will be submitted to Pearland Proiect Manaaer— Andrea Brinkley via Manaae It. the Citv's Proiect Management Information System. Other Requirements or Variance from MSA (if any): N/A CONSULTANT PROVIDED INFORMATION: Compensation: $1,587,764.00 Billing Terms: Hourly Not to Exceed Scope of Work: See Detailed Scone of Services for Task Order No. 3. attached. ACCEPTANCE: The foregoing TASK ORDER is accepted on the terms set forth as indicated by the signatures below. By: Lt / BCONSULTAN du G LLC City of Pea /• • : ice.. T y Jr) relA Printed Name: Jeffrey S. Peters, PE Printed Name: `4 •i Title: Client Accounts Manager Date: April 8, 2017 Title: i L. Ll , . A f/ Date: LI Ardurra 2032 Buffalo Terrace Houston Texas 77019 TBPE Firm 817004 (t) 713.385.5601 www.ardurragroup.com April 7, 2017 Mrs. Andrea Brinkley City of Pearland Asst. Director of Public Works 3501 East Orange St. Pearland, Texas 77581 Subject: Task Order No. 3 - Proposal for Professional Engineering Services Owner's Representation Services for the 10 MGD Surface Water Treatment Plant Dear Mrs. Brinkley: Ardurra Group, LLC (Ardurra) is excited to have the opportunity to submit this proposal to the City of Pearland to provide professional engineering services in conjunction with the subject project. Please find the attached Exhibit 1A -Scope of Services which provides the detailed description of engineering and professional services for continued TWDB support, technical assistance in consultant evaluations, water master plan update, assistance with the basis of design development, pilot plant support, procurement plan, facility personnel assistance, deliverable reviews, standards development assistance, meeting milestone attendance and internal project management services. These services are expected to occur through the completion of the preliminary design phase of each design package. Based on the scope of services included in Exhibit 1A, we propose to complete the work under a maximum not to exceed basis in the amount of $1,587,764.00 as shown in the task breakdown on Table A-1. Also, please find the attached level of effort tabulation and the anticipated completion schedule. We look forward to beginning work on this important project and appreciate the opportunity to serve the City of Pearland. If you have any questions or require additional information, please contact me at 713-385-5601. Sincelely, ittic Jfffrey S. Peters, P.E., BCEE Principal Engineer Ardurra Group, LLC TPBE Firm Registration No. 17004 Attachments TEXAS 1 LOUISIANA I MISSISSIPPI I FLORIDA 1 NEW YORK Task Order No. 3 Detailed Scope of Services April 7, 2017 Scope of Services For Owner's Representative Services For 10 MGD Surface Water Treatment Plant The Engineer will execute tasks necessary to perform Owner's Representative duties and responsibilities for planning and development activities related to the proposed surface water treatment plant (SWTP) for the City of Pearland as defined in this Task Order. The tasks associated with these engineering services is separated into the following services and tasks: 1. Continued TWDB Funding Application Assistance 2. Design Consultant RFQ & Procurement Assistance 3. Water Master Plan Update 4. Basis of Design Development 5. Pilot Plant Support 6. Construction Methodology 7. Planned Facility Personnel Requirements 8. Deliverable Reviews 9. Standards Development 10. Project Management Services 1. TWDB DWSRF FUNDING APPLICATION ASSISTANCE 1.1. Coordinate with the TWDB as necessary to continue the funding application process. 1.2. Preparing, presenting and attending public meetings as may be required by the Texas Water Development Board process to complete the application process. This does NOT include attendance in Austin for meetings with the TWDB. 2. DESIGN CONSULTANT RFQ AND PROCUREMENT ASSISTANCE 2.1. Participate in various Design Consultant workshop and presentation meetings as directed by the Owner. 2.2. Assist City of Pearland in negotiating each of the three PRELIMINARY design packages including assistance with scope and fee review. 4rdu rra https://bcgnola.sharepoint.com/shared documents/projects/00000 pearland/42516.00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-1 Task Order No. 3 Detailed Scope of Services 2.3. Assist the City of Pearland in negotiating each of the three FINAL design packages including assistance with scope and fee review. 3. WATER MASTER PLAN UPDATE The Water Master Plan Update will baseline and calibrate the existing water system and project flows and infrastructure (including the planned surface water treatment plant) for a 10 year planning period as well as ultimate buildout conditions including potential regionalization. 3.1. Review Historic Documents The most recent planning and growth projections will be reviewed prior to a kickoff meeting held with City staff to discuss project startup and gain perspective on the information available and potential information that has changed since the most recent planning documents were completed. Relevant data and reports supplied by the City will be reviewed. 3.1.1. The following data and reports will be reviewed: 3.1.1.1 Most recent water master plans and subsequent updates 3.1.1.2 Customer complaint database and previous reports relating to flow and/or pressure 3.1.1.3 Main break records 3.1.1.4 Most recent City fire flow testing data 3.1.1.5 Operation data including distribution system water quantity and quality, pump station pumping records and plant production (past 2-3 years of records) 3.1.1.6 Pipe type/age in distribution system 3.1.1.7 Existing City GIS system for model compatibility 3.1.1.8 Previous Water Distribution System Model 3.1.1.9 ESRI/GIS data for water infrastructure and base map layers 3.1.1.10 Billing and parcel data 3.1.1.11 Daily water pumping and usage information 3.1.1.12 Number of active connections information Urdu rra ou haps://bcgnola.sharepoint.com/shared documents/projects/00000 pearland/425I6-00 swtp/0I project management, 02 contract/task order 3/final venions'task order 3 attachment a final.docx A-2 Task Order No. 3 Detailed Scope of Services 3.1.1.13 Demand data for large commercial water users 3.1.1.14 Operational data, i.e., historical supervisory control and data acquisition (SCADA) information, pump control logic, hydrant flow tests data, etc. 3.1.1.15 Control logic and associated information for wells, surface water supply, valves, pumps, storage facilities, and chemical dosing systems 3.1.1.16 Available topography and survey data, including any digital elevation model (DEM) data 3.1.1.17 As-builts and construction record drawings and reports for key water infrastructure (plants, pump stations, storage facilities, PRVs etc.) 3.1.2. Deliverables 3.1.2.1 Workshop #1: Project kick-off, inputs for demand data development, established modeling scenarios, summary of workshop #1 included in technical memorandum and decision matrix with identified action items. 3.1.3. City Staff Involvement 3.1.3.1 Provide copies or access to the reports and data sets listed above 3.1.3.2 Participation in Workshop #1 3.2. Demand Allocations and Projections Demand development is one of the key aspects of hydraulic model development. Existing demand will be allocated based on water billing data and existing water production and pumping data. Future demand allocation will be based on City's land use plan or other electronic database provided by the City. An ultimate buildout scenario based on density and land use will be developed with the City. 3.2.1. The following detailed activities are the scope of services for this task: 3.2.1.1 Review and Update Proiections — This activity includes a brief review of the data, assumptions, process and results of the water demand projections from the prior master plans. A meeting will be scheduled with the City to verify existing demands and discuss their plans for future water demands. 3.2.1.2 Development Review — Open, developable land in the service area will be evaluated for development use and a demand estimate will be prepared for %rdu rra https //bcgnola sharepoint com/shared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-3 Task Order No. 3 Detailed Scope of Services these areas. Initially, this information will be combined with the allowable population density based on zoning and the projected uses to establish future and ultimate demands. 3.2.1.3 Redevelopment Review - Review the potential for redevelopment with City Staff and city planning documents. Develop an understanding of the potential redevelopment impacts to the City water demands. 3.2.1.4 Estimate Future Demands - Combine current updated demand data (acquired from billing data), with demand projections for undeveloped and redevelopment areas to determine a best estimate of projected demand for intermediate demand scenarios between existing and build -out conditions. The following scenarios will be evaluated: 3.2.1.4.1 Present (baseline) (2017 — including near-term/CIP improvements) 3.2.1.4.2 Intermediate 10 year (2027) planning period 3.2.1.4.3 Intermediate 10 year (2027) planning period including regionalization 3.2.1.4.4 Ultimate Buildout (2035) 3.2.1.4.5 Ultimate Buildout (2035) including regionalization These projected demands will be prepared as average annual demand throughout the City. Demands will be applied to vacant parcels and parcels identified as viable redevelopment candidates based on the land use. Demand scenarios will include a reasonable/conservative estimate for use in future planning for new developments. A table will be prepared using current demand as a baseline for comparison. Demand values will be distributed as a single demand split to one or more model junctions as described in Task 3.4.1.2. 3.2.2. Deliverables 3.2.2.1 Demand projections Section in the Master Plan Report (intermediate and build -out demands for average day conditions) 3.2.2.2 Demand comparison table (present vs. future) i rdu rra Intpsi/bcgnola.sharepoint corn/shared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final vcrstons/task order 3 attachment a final.docx A-4 Task Order No. 3 Detailed Scope of Services 3.2.3. City Staff Involvement 3.2.3.1 Interactive meetings regarding model inputs and operation 3.2.3.2 Planning meeting to determine expected development and determine demand projections 3.2.3.3 Provide historical billing data 3.2.3.4 Provide operation data for pressures, flows, and tank levels 3.2.3.5 Provide annual WTP production 3.3. Model Improvement The model improvement task includes a comprehensive review of the existing model configuration and operation with modifications provided to reflect changes that have taken place in the system or in the system operations since the last master plan. Changes in the system will be presented for visual review. New data sources will also be incorporated into the revised system. The updated model will be capable of evaluating changes in projected water demands, pressure criteria, and fire flows, and the impacts of improvements to the distribution system. Operational improvements will be made to the model based on new data on operation and on improved model demand distribution, diurnal pattern assignments, physical layout, C -factors, and major facility operations. 3.3.1. Following are the individual activities that are included in this task: 3.3.1.1 Update Svstem/GIS —The first component of this project involves upgrading the hydraulic model to better represent current system conditions. The pipe configuration in the model will be verified through direct comparison to the GIS and the model will be updated to reflect the current state of the distribution system, as detailed in the GIS. This will likely be performed as complete rebuild using current GIS data, merged with the key hydraulic features in the existing model (pumps, tanks, etc.) that are not reflected in the GIS. This also includes conversion from the existing hydraulic model format from H2O Net to Bentley Water Gems in accordance with City requirements for future "real-time" water system monitoring capability. 3.3.1.2 Distribute Demands - A key component of the demand development process involves improvements to the current demand allocation in the City's model. The budget developed for this task approach assumes that 4rdp rra https://bcgnola.sharepomt.condshared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-5 Task Order No. 3 Detailed Scope of Services 4rdu rra the demands from each parcel will be proportionally split, using model tools, to the existing model nodes on either end of the main linking these nodes. This proportional split will be made using geocoded customer billing points. Current water demands will be used for establishing the baseline model. There are three components of a complete demand allocation that will be further developed using available data: 3.3.1.2.1 Average Demands - The annual average demand for every customer will be linked to each parcel. This volume will be developed by taking a year of data from the billing system and assigning it directly to the meter location or parcel via geocoding or another viable method. The demand values will be assigned as described above using tools provided in the modeling software suite. 3.3.1.2.2 Peaking Factors —Use the available operation data and production data to identify the peak and minimum demand periods and associated factors. These factors will be applied universally to all demands to develop maximum and minimum day scenarios. These different demand conditions will be simulated using the scenario management capabilities of the model and by changing the base operating parameters for different alternatives that will then be associated with the appropriate scenarios. Scenarios will be created for average day, minimum day, maximum day, and peak hour demand conditions. All of these scenarios will typically be operated in extended period mode. The peak hour demand condition will be simulated as the highest hour on maximum day, unless the peak hour demand is consistently shown to not occur on maximum day. In this case, the project team and the City will decide on the best course of action to simulate this condition. These scenarios will be created as children of the "Base" model that will simulate actual, best known current conditions. 3.3.1.2.3 Unaccounted -for -water (UFW) — Billing data for an extended period will be compared to operation data to estimate the unaccounted -for -water volume (UFW) will be distributed across the system based on discussions with City staff. Traditionally, UFW demand is simply divided by the number of model nodes and distributed evenly to each node. Performance of this task is necessary for the successful documentation of water loss for https.//bcgnola.sharepoint.com/shared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachmcnt a final.docx A-6 Task Order No. 3 Detailed Scope of Services surra the TWDB as well as implementing corrective action measures through the implementation of the Advanced Metering Infrastructure (AMI) program in increase water accountability which is required by TWDB as a condition of the funding mechanism. 3.3.1.3 Review Diurnal Patterns - Review the diurnal demand patterns for each customer type and update them, if necessary. 3.3.1.4 Verify Facility Operations - Assess the capabilities and limitations of the existing hydraulic model, and identify required system improvements. Pump operations will be reviewed so they reflect current operations at each pumping location. Control valve operation and settings will be verified with operational staff so that these devices are modeled as they are operated. If operational settings change seasonally, these changes will be noted and appropriate scenarios created to model the range of conditions so that maximum day and minimum day demand scenarios are appropriately handled from a control standpoint. Units will be modified as needed for pumps, controls, etc. 3.3.1.5 Scenario Manaeement - Recommendations for how the scenario management capabilities of the model will be used to support a wide range of modeling activities will be developed. This will include recommendations for applying both the scenario management tools and facility sets to achieve the intended operations for different model runs. The recommended and agreed upon scenario tree within the delivered model will be created. The different modeled scenarios will include descriptions on the conditions that each scenario represents. 3.3.1.6 As shown in the future demand development section above, the following scenarios will be evaluated: 3.3.1.6.1 Present (baseline) (2017 — including near-term/CIP improvements) 3.3.1.6.2 Intermediate 10 year (2027) planning period 3.3.1.6.3 Intermediate 10 year (2027) planning period including regionalization 3.3.1.6.4 Ultimate Buildout (2035) 3.3.1.6.5 Ultimate Buildout (2035) including regionalization https://bcgnola.sharepomt.com/shared documents/projects/00000 pearland/42516-00 swtp/nl project management/02 contract/task order 3/final versions/task order 3 attachment a final docx A-7 Task Order No. 3 Detailed Scope of Services The system demand alternatives will also include the following subsets that will be represented by the use of either global factors or different diurnal patterns: ■ Average Day ■ Maximum Day • Peak Hour (may be simulated as part of maximum day if appropriate) ■ Minimum Day The model will be operated in the following different analysis modes: • Extended Period Simulations — Review of tank and reservoir use and capability to maintain desired pressures and other "level -of - service" indicators during the course of expected operations, such as water age. All "normal" runs — average day, maximum day, minimum day — for all scenarios will be made in extended period mode. • Steady State — Adequacy of pumping and conveyance for maintaining system pressure based on TCEQ standards, including 35 psi for average conditions, with a 20 psi minimum at point of delivery. High pressure will also be evaluated. The distribution system components will vary from run to run consistent with the modeled time frame. This will be performed using facility sets instead of, for example, using open/closed status of pipes to change the modeled features from one scenario to another. Facility sets will be based on database queries rolled up into a single query set for each time frame. Model time frames consistent with the different future demand scenarios will be created as follows: ■ Base conditions (existing features only) • CIP facilities (existing, less features to be removed, plus features to be added at specified times in the CIP, for up to three modeled future scenarios) • Ultimate (existing facilities plus all CIP projects, less existing facilities to be removed) �xdrra https://bcgnolasharepomt.com/shared documents/project_c/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final.docz A-8 Task Order No. 3 Detailed Scope of Services ■ Operation Recommendation scenarios Overall Modeling objectives include: 3.3.2. Deliverables 4rdurra ■ Identifying zones of influence for groundwater and surface water • Identifying areas of concern, such as chronically low pressure, high pressure, high water age, high velocity or flow reversals. • Identifying pumping system and transmission system capacity and capability to deliver peak flows. 3.3.2.1 Section in the Master Plan Report reviewing system demands detailing total billed demand, production, and maximum and minimum factors. 3.3.2.2 Section in the Master Plan Report detailing diurnal patterns applied for different customer types and for discrete large customers. 3.3.2.3 Section in the Master Plan Report to summarize distribution system operation scenario assumptions (e.g., pump station, elevated storage tanks, etc.) 3.3.2.4 Deliver up to 10 simulations including detailed output in PDF format. At a minimum this will include the following runs: 3.3.2.4.1 Existing and near-term average day simulations for routine operations (2 runs) 3.3.2.4.2 Existing and near-term maximum day simulations for identifying transmission system issues and verifying the capability to refill system tanks (2 runs) 3.3.2.4.3 Existing and near-term minimum day simulations for calculating travel time on minimum day (2 runs) 3.3.2.4.4 The balance of 4 runs may include runs for buildout scenarios or longer-term scenarios, or additional custom scenarios, as desired by the City httpsJ/bcgnola.sharepoint.com/shared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-9 Task Order No. 3 Detailed Scope of Services 3.3.3. City Staff Involvement 3.3.3.1 Provide necessary GIS and operation data 3.3.3.2 Assist in determining demand locations for large customers 3.3.3.3 Work with Ardurra on verification of facility operations 3.4. Model Verification Backsround on Approach After review of the model configuration has been completed and modifications to model inputs have been performed and confirmed by the City, the hydraulic model will be verified. The verification process depends on data collected from the distribution system that reflects actual operation that will be used to compare model predictions to field conditions and to adjust model parameters if necessary to better reflect field conditions. 3.4.1. Following are the activities that are included in this task: 3.4.1.1 Operational Review - An operational review with City staff will be used to verify that the model results agree with their experience. Operational parameters verified will be high pressures areas, low pressures areas, tank fill and empty rates and pump station operations specifically ability to pump against system head. 3.4.1.2 Adiust Model Parameters — Model C -factors and pump and facility operations will be adjusted to within accepted accuracy to represent the operation of the City water system. 3.4.2. Deliverables ■ Section in the Master Plan Report with model verification results and comparisons to existing operation. 3.4.3. City Staff Involvement ■ Assistance in adjusting model to accurately represent facility and system operation in the model. 3.5. Model Analysis Backsround on Approach The model analysis task includes a complete review of current conditions using the verified distribution system model. These simulations will evaluate the behavior and adequacy of the system under both current and future flow conditions, and subsequently identify potential i%rdu rra https:/ibcgnola.sharepomt.com/shared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final docx A-10 Task Order No. 3 Detailed Scope of Services improvements. Using the verified model, create operation scenarios that utilize the existing system layout. A "brainstorming" session will be held with City staff to develop alternatives after the severity of near-term and build out issues have been established. 3.5.1. Following are the specific activities that are included in this task: 3.5.1.1 Establish Criteria - Develop the criteria for system assessment and modeling. The criteria to be reviewed and established include; allowable pressure ranges, storage requirements, maximum velocities and other factors. The evaluation criteria include the requirements of the TCEQ. Criteria for evaluation of all of the alternatives will be summarized. 3.5.1.2 Identify Immediate Issues — Consider existing system and current demands and determine where the established hydraulic levels of service are not being met with the existing system. Review the deficiencies listed in the previous Master Plan to determine if these items have been addressed. Use this information to document deficiencies and develop potential projects to address them. Prepare list for inclusion in the capital improvement plan under Task 6. 3.5.1.3 Identify Lone Term Issues — Consider ultimate build -out demand with pipe degradation and identify Tong -term issues. Develop potential long term improvements to address the deficiencies in the system, review with City staff, and evaluate these for inclusion in the long term plan. Develop a table with recommended improvements, time frame, and conditions that would trigger initiation. 3.5.1.4 Analyze & Select Alternatives - Develop alternatives for each identified potential improvement. Prepare preliminary costs and pros/cons for the different solutions. Discuss these developed alternatives with City staff and facilitate a session with City staff to apply the evaluation criteria (previously established by the City) for the immediate and long term improvements identified. 3.5.1.5 Identify Capital Proiects - Identify the resulting list of capital improvement projects for use by the City in its planning process. Include preliminary prioritization based on city established process, budget cost and timing for each of the elements of the final plan. Prepare draft CIP data sheets for each project. 1%rdu rra httpsJ/bcgnola.sharepotnt.com/shared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versiorts/task order 3 attachment a final.docx A-11 Task Order No. 3 Detailed Scope of Services 3.5.1.6 Operation Recommendation -Identify facility operation recommendations to operate the City system more efficiently and optimize hydraulic performance. 3.5.2. Deliverables 3.5.2.1 A proposed list of both short term and long term potential improvements 3.5.2.2 Section in the Master Plan Report including the process for development of short term and long term improvement list 3.5.2.3 Section in the Master Plan Report detailing recommended Operation Recommendation Plan. This Section will include facility operation recommendations including pumps, tanks, and valve settings/modifications. 3.5.2.4 Workshop #2: Modeling results workshop to discuss needed improvements in the system 3.5.2.5 Workshop #3: Operation Recommendation Plan scenarios and responses. 3.5.3. City Staff Involvement 3.5.3.1 Provide input during all phases of project development and evaluations 3.5.3.2 Participation in Workshop #2 3.5.3.3 Participation in Workshop #3 3.5.3.4 Assistance with valve identification, model inputs and locational information as needed 3.5.3.5 Review of operation plan 3.5.3.6 Provide City established evaluation and prioritization criteria for CIP projects 3.6. Project Development 3.6.1. The previous tasks will generate a list of potential projects. All of the available documents, reports, data, and model results will have been reviewed and recommendations will be developed under this task. This task will develop the recommended plan for system improvements, and how they will be incorporated into the City's CIP. Ar•durra httpsJibcgnola.sharepoint.cont/shared documents/projects/00000 pearland/42516-00 swtp/Ol project ntanagentent/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-12 Task Order No. 3 Detailed Scope of Services 3.6.1.1 Calculate Proiect Costs - Project costs will be developed for all the identified projects. The number of projects is assumed to be no more than 20 and the cost numbers will be developed based on a unit cost basis. The unit costs for a variety of construction projects will be developed with input from the City staff. Recent construction projects in the City will be used to develop these unit costs. Costs should be loaded with City's implementation costs including design, management, bonding, etc. 3.6.1.2 Prioritize - The Distribution System Master Plan recommendations developed in Workshop #2 will be prioritized. A timeline and budget level cost for the recommended improvements will be developed. Following the development of this draft CIP, facilitate Workshop #4 to review the final recommendations. Results will be provided to the City for input into the CIP. Provide projected priority, projected year of construction and cost. Prepare draft CIP project sheets and use model to prioritize. 3.6.1.3 Prepare Reports — A draft report will be prepared, and submitted to the City staff for review. Following receipt of comments, a final version of the report will be prepared and distributed to the City. 3.6.1.4 Proiect Manaeement — Schedule, lead and prepare minutes for all project meetings and workshops. Routine project meetings will be monthly. 3.6.2. Deliverables 3.6.2.1 Section in the Master Plan Report detailing project costs and the final CIP recommendations 3.6.2.2 Draft report for City review 3.6.2.3 Hydraulic model files in electronic native format. 3.6.2.4 GIS project files bookmarked with key layout data displayed. 3.6.2.5 Electronic copies of all deliverables, such as TMs, minutes, presentations, drawings, final report and so forth, in both original and PDF formats. City should also receive 3 paper copies of final report 3.6.2.6 Workshop #4: Recommendations 3.6.3. City Staff Involvement 3.6.3.1 Provide unit cost information 4rdu rra https.//bcgnola.sharepomt.com/shared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-13 Task Order No. 3 Detailed Scope of Services 3.6.3.2 Participation in the workshop 3.6.3.3 Provide recent Pearland construction costs 3.6.3.4 Provide rate analysis based on initial CIP prioritization. 3.6.3.5 Provide CIP adjustments to schedule based on rate impact. 3.7. Identify options, software, platforms and systems to integrate master plan model (if applicable) to overall system operation, including real time system monitoring including predictive capabilities. This task will identify and document options via Technical Memorandum that will be included in the appendix of the Water Master Plan report. Implementation support to be provided in future task order. 3.8. Staff Training — Engineer will provide two — 4 hour sessions with trained City staff to review the model parameters, scenarios and provide general guidance on how to execute the various model scenarios. These sessions will occur at a designated City location/facility. 3.9. Limitations — The modeling proposed in the above scope does NOT include hydraulic transient or surge modeling/analysis. Hydraulic transient and/or surge modeling analysis is NOT being performed at this preliminary stage. 4. BASIS OF DESIGN DEVELOPMENT FOR SWP 4.1. Regulatory Requirements -Review Technical Memos or other documents generated by each of the Package 1, 2 & 3 consultants that identify and summarize all applicable local, state, and federal regulatory requirements and parameters including references for all aspects of design for all components of project. 4.2. Permitting and Approval Requirements - Review Technical Memos or other documents generated by each of the Package 1, 2 & 3 consultants that identify and summarize all applicable local, state, and federal regulatory permits and approvals and associated processes as they apply to the project. Assist the City with summarizing the key permits required for the project and parties roles and responsible for securing permits and approvals. 4.3. Establish Treated Water Quality Goals — Work with Package 2 consultant in reviewing existing finished water and distribution system water quality goals. Participate in a coordination workshop with stakeholders to discuss the current and future water quality goals. Based on workshop results, assist the City with finalizing the treated water quality goals. .rdu rra httpsJ/bcgnota.sharepoint.comlshared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-14 Task Order No. 3 Detailed Scope of Services 4.4. Basis of Design Criteria and Technical Guidelines — Work with Package 1, 2 & 3 consultants in assisting them to develop Basis of Design Criteria for all project packages for considerations including capacity requirements, service life, operating ranges and conditions, integration with existing water infrastructure, treatment process considerations to achieve treated water quality goals and regulatory requirements, constructability, life cycle cost analysis, and non -monetary factors. Non -monetary factors could include operations and maintenance considerations, safety, schedule considerations, constructability, start-up, commissioning, and acceptance testing. 5. PILOT PLANT SUPPORT 5.1. Authorization of this task shall be contingent on the final process treatment recommendations for achieving stable, reliable, and efficient operation requiring pilot plant studies. Engineer will review of pilot plant protocols developed by Package 2 Consultant and provide written comments, attend meetings, participate in telephone conferences and issue written communication as needed in the form of emails, and memorandums. 5.2. Review of pilot plant data investigating performance challenges identified in the process decision report, performing due diligence of treatment relationships and assisting with the development of treatment process train for treating the range of raw water quality. 5.3. Review pilot test report and provide comments with attention to operating and capital costs of recommendations. 6. CONSTRUCTION/PROCUREMENT METHODOLOGY 6.1. Conduct one workshop with each of the Package 1, 2, & 3 consultants as well as the Owner (total of 4) to review available construction packages, timelines, schedules, risks, and delivery methods. 6.2. Prepare memorandum on options for construction procurement methodology with pros and cons for: 6.2.1. How to break work in logical construction packages 6.2.2. What construction delivery methods are most applicable to each desired package 6.3. Conduct follow-up workshop with Owner & consultants to review findings on construction procurement options. 6.4. Deliverable — Produce a technical memorandum summarizing the findings, recommendations and path forward. 4rdu rra https://begnola sharepoint.com/shared documents/projects/00000 pearland/42516-00 swtp/OI project managentent/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-15 Task Order No. 3 Detailed Scope of Services 7. PLANNED FACILITY PERSONNEL REQUIREMENTS os rt4. v o likaigi 'sr. is° 7.1. Engineer determine the expected requirements for operations staff to perform in-house operations and maintenance for the Pearland Surface Water Plant, including range of expected costs. Specific items to be evaluated and provided are as follows: 7.1.1.Proposed organizational chart 7.1.2.Position titles, duties, experience 7.1.3.Schedule of recommended personnel needs 7.1.4.Industry salaries 7.1.5.Staffing/Shift Options to meet City Goals 7.2. Engineer shall conduct up to four (4) meetings with local governments who operate surface water treatment plants and determine interest and range of proposed cost to operate the Pearland surface water plan. 7.3. Deliverable — Provide a technical memorandum summarizing the findings and recommendations. 8. PACKAGE 1, 2 & 3 DELIVERABLE REVIEWS Engineer proposes to review each of these documents as prepared by others: 8.1. Pre -Sedimentation Basin Preliminary Engineering Report 8.2. Surface Water Treatment Plant 8.2.1. Process Selection (Membrane or Conventional) Report 8.2.2. Preliminary Engineering Report 8.2.3. Pilot Test Plan 8.2.4. Pilot Test Report 8.2.5. Technical Memorandums 8.3. GST, Pump Station and Pipeline Preliminary Engineering Report 4c.durra https://bcgnola.sharepomt.com/shared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-16 Task Order No. 3 Detailed Scope of Services 9. STANDARDS DEVELOPMENT 9.1. Specifications — Engineer will identify and coordinate specifications that may be used across Package Nos 1, 2 and/or 3 projects for the purposes of establishing uniformity and consistency across these projects. Engineer shall receive preliminary specifications list from each of the three (3) package lead consultants along with their proposed standard specifications for review by Engineer. Engineer will compare to City standard specification (if they exist) and provide recommended changes to be used a standard across all three (3) packages. 9.2. Standard Drawing Details — Engineer identify and coordinate standard details that may be used across Package Nos 1, 2 and/or 3 projects for the purposes of establishing uniformity and consistency across these projects. Engineer shall receive preliminary standard details from each of the three (3) package lead consultants along with their proposed standard details for review by Engineer. Engineer will compare to City standard details (if they exist) and provide recommended changes to be used a standard across all three (3) packages. 10. PROJECT MANAGEMENT SERVICES 10.1. Coordinate with staff and project personnel to complete project tasks and meet project objectives; 10.2. Meetings & workshop attendance with Package 1, 2, and/or 3 in occurrence of executing the work associated this program. 10.3. Engineer will conduct monthly progress meetings pertaining to Engineer's work efforts throughout the project with City staff to review work completed to date, project schedule, and other issues. Engineer will provide appropriate and necessary documentation; 10.4. Coordinate lead/conduct project workshops between the various packages and design elements needed throughout the course of the project and prepare agendas, materials, exhibits or coordinate production of same as necessary to execute required tasks; 10.5. Coordinate, lead/conduct, and/or participate in site visits as necessary in the execution of or required tasks; 10.6. Produce and maintain a Project Management Plan for the surface water program inclusive of the three (3) main design packages; 10.7. Develop and maintain a project schedule with detailed milestones; 10.8. Generate monthly status reports and preparation of invoices to be submitted together for review and approval; 4rdp rra https://bcgnola.sharepomt.com/shared documents/projects/00000 pearland/42516-00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-17 Task Order No. 3 Detailed Scope of Services 10.9. Provide quality control reviews and technical reviews of all evaluations and recommendations, technical memoranda, and reports, and; 10.10. Work with City Project Manager (and other designated City personnel) to coordinate City reviews of work products. Work with internal project team to document and incorporate City comments. 10.11. Meetings with regulatory agencies such as TCEQ for obtaining approvals and exceptions. 10.12. Conduct workshop meetings with the City to determine communication protocols, establish project controls, generally define Engineer's limits of authority. 10.13. Engineer will work with the City to confirm/establish electronic document system/repository for use in the Surface Water Treatment Program for Package 1, 2 and 3, including support and additional service consultants. Selected criteria and/or protocols will try to maintain Protrack/Manage-lt as the official City electronic document repository. 10.14. Define minimum requirements for Quality Program for design of all design packages including quality control and quality assurance procedures to be implemented during the permitting, design, and all subsequent phases of project. 10.15. Participate in water flavor profile analysis and provide assistance to City as needed. 10.16. Attend, lead, and/or participate in undefined conference calls and meetings. 11. LIMITATIONS & CLARIFICATIONS 11.1. Tasks NOT included in this Task Order: 11.1.1. USACE Application for Department of the Army Permit (Form 4345) 11.1.2. Threatened and Endangered Species Habitat Evaluation 11.1.3. Archaeological Pedestrian Survey du rra https://bcgnola.shareepoint com/shared documents/projects/00000 pearland/42516-00 swtp/OI project management/02 contract/task order 3/final versions/task order 3 attachment a final docx A-18 Task Order No. 3 Detailed Scope of Services TABLE A-1 TO AGREEMENT BETWEEN ENGINEER AND OWNER FOR PROFESSIONAL SERVICES FOR CITY OF PEARLAND OWNERS REPRESENTATIVE SERVICES 10 MGD SURFACE WATER TREATMENT PLANT TASK NO. SUMMARY OF SERVICES AND FEES TASK DESCRIPTION LUMP SUM AMOUNT 1 2 Continued TWDB Funding Application Assistance (HNE) $ 40,110 Design Consultant Selection Assistance (HNE) $ 77,126 3 4 Water Master Plan Update (HNE) $ 451,655 Basis of Design Development (HNE) $ 62,235 5 1 Pilot Plant Support (HNE) $ 76,023 6 1 Construction Procurement Methodology (HNE) $ 40,534 7 Planned Facility Personnel Requirements (HNE) $ 39,135 87 I Deliverable Reviews (HNE) $ 81,281 9 ^ Standards Development Assistance (HNE) $ 137,546 10 Project Management Services, Workshops & Meetings (HNE) $ 548,380 Sub -Consultants Mark-up $ 32,738 Total $1,587,764 LS — Lump Sum HNE — Hourly Not to Exceed NTE — Not to Exceed 44•04u rra https://bcgnola.sharepoint.com/shared documents/projects/00000 pearland/42516.00 swtp/01 project management/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-19 Task Order No. 3 Detailed Scope of Services TABLE A-2 TO AGREEMENT BETWEEN ENGINEER AND OWNER FOR PROFESSIONAL SERVICES FOR CITY OF PEARLAND OWNERS REPRESENTATIVE SERVICES 10 MGD SURFACE WATER TREATMENT PLANT HOURLY LABOR RATES LABOR CATEGORY Hourly Rate Principal/Sr. Proj. Manager Sr. Tech Specialist (QA/QC) Engineer 7 Engineer 5/6 Engineer 3/4 Engineer 1/2 $230 $230 $200 $180 $160 $140 Senior Modeler Senior Designer/Drafter Drafter Sr. GIS Technician $150 $135 $110 $135 GIS Technician Administrative/Accounting $90 $90 Ardu rra https://bcgnola.sharepotnicom/shared documents/projects/00000 pearland/42516-00 swtp/OI project management/02 contract/task order 3/final versions/task order 3 attachment a final.docx A-20 Task Order No. 3 Owner's Representative Services For 10 MGD Surface Water Treatment Plant 4 11 52 ''''��"4�� 0.+owny .011 10 NO I 100 I 110 NO 150 115 I 115 20 50 Pips N. l2 9000740 Ws,. 5:0 In Sr►41� 4, 59655 561 1555 (w. 145579 Sw.03 PO4w he MIN 14109 La 440 110001 IMISIAMMIM4 a M 10 w 5:4720 55.5:0 1/100410011011�p3 6779 rlrtrt N3 . 50� 5C� rre...1n SO 50 sr..... Y. ,.. OWN, 50 50 fo.Oa P.P. 50 50 _, ••1L14811/ ••••••111 50 50 Se.rrr.l 4aor. I 50 SO M :4 555.0 54.803 C00.542.2325.153.400,,•1 °.aar.4 * s 1.710 NsweiNe 1012/ 012020 Pair/ SK LarO Pito • Y 120.140 0 10 O 517.100 0 50 0 SO 0 50 0 10 0 50 0 50 01• 155 557640 52.2 /64110 $0122 10 1 5.1 00145•4541.501164•0101,191.6554 ed 001•.00 ...O......OppCa7.rA075n1 730200700and 21.1443 40 119600 50 50 50 50 50 50 50 50 • 00 511.000 156..22 514.141 11 2 344.6••03.4002 4.t. 2207050... ma 92 5012 10 30 50 50 50 2 2 001402mer 12* CIHMO WWI .31 004•0 •re or rer.r f17.o.,50 SO 50 50 50 52 17.400 1201 Ail 59401 PP COOT 04.4.10 M 5:5601 50 SO 50 30 5i No 50 50 S7 SO 4 5 • r 557110 PPP 15LS11 530511 22 0 55 MO 50 SO 50 50 50 50 10 SO SO id 109 5123 1101 1102 2.0 •e 4.....a5.45a•r2r 24 1.5 Assal CPwoo 0045. 110/04164 Mu.• 0 5922* 50 92 514401 50 50 50 SO 50 50 4 9 • 155 141.200 11 110.111 114353 42 Assies CM.* 15441110,10.8 4 ReP5a• 0 sten A 52..10 SO 50 0 5, SO 52 50 50 26 9450 SPA SLP. x•76 POW P100111•21140144 01014•110 MUM 114 225. 0 11 WAS 71 52440 0 10 a 12.360 0 50 0 50 0 SO 0 SO 0 57 • 90 151740 177.121 554.507 10 130/20 So 50 SO 50 90 SO S SPY SNP SI.59 50 8 55)00 50 11 51040 50 SO 12 5440 5.162 51.740 5010.4 10 50 SO 20 50 SO . 5 5510 555 5515 9071 • 57 70 50 8 50.00 10 S"0 SO SO 9 AMC 7450 11 x0 0725 4 50 A S} 50 SO A 000 50 50 32 1 741»1 11 50 5240 • 50 w S7.5 09550 5155 MI5 11471 555.145 51415 121151 50 50 50 50 50 50 • 4 05 SSS 575 5575 • 55240 50 N 52400 4 5540 A 020 A 54050 51 4 54 2 520 11200 1102 514.01 51100 50 50 50 50 500 50 :0 0 :050 OII I_, s 51.100 S0 14 5060 1 51.00 A 54120 A 12030 N 50 515460 5771 113151 517411 52 A 15530 50 0 50 50 50 15 52.410 SSw 54741 K740 I 51.1( 50 14 S150 S0 A M Po 34 I f0 IO 111000 003 511)0 054 MI 50 50 5O 50 S0 S0 50 5410 SIL NY I 55:K M 0 5510 2 52 N 5:.160 SO 0 Mat SNS 940 PP 50 50 50 50 5O SO f0 9 50 ll 11 e10 2 A 701/0 SO A 55 720 A 5900` 50 10 111.420 1541 116.12* 1,4511 • 5540 10 50 50 50 50 40 5140 5511 5106 55.1 Il .5510 52 A 1200 2 N 5004, A $5.40 M 20 111..04 MIL 511111 51144 So 50 50 Sc SO 50 SO 4 7511 12* 1575 55 57.030 52 Si 51.00 50 A 14 IN 14 51.00 50 P 171.750 5701 512444 711420 SO 50 50 54 5O 5O 50 1 520: s0 1w • .1.120 so S4 02.050 SO M A 51,551 2 5740 M MSP. 5551 NON N037 SO 50 50 SO 50 50 SO 4 5,211 SSS 9075 55 50 51750 M 12 55.101 M A 51.741 SO 2 1520 M 5110 5554 10451 NIN 50 0 55 Sm 50 50 50 50 50 57.0 900 9540 57 • 55_•00 0 A 5400 10 A 14.420 A NOM 52 101 1554201 NISI 15495 51410 50 40 50 50 50 50 50 6 51.750 5105 55415 11.273 I 55130 50 22 1140 50 12 5.10 A 1700 10 103 114740 7416 511514 115.5,2 500 20 10 50 50 10 M P 57.710 5101 51.1151 11.473 • 57.730 u A $4150 0 A 5100 A 5.00 SO 201 5141A 142 5110s 01 FM 50 SS 50 50 50 50 2 O 19720 5101 5L11 15.400 4 160 .: A 545¢ 2 A 5:505 A fru 2 1555 2 0250 5715 15719 11505 i ... . '' .. .w " _Ifttt`tttt t Eytt.= _ t Ext t E t t t tftftfttttt`a �[ 1F wA CiN�tb4 Tni 1111Ta 1 1a ;1a� 11111a`a t!II!i111UUIIIII1tU!tqqli4asa .� tt u I"1? i�3F 3���+ji ta 'EW1f4 ti?!ti;x g II hill€i d1 f #!?a3'9 .-1.1 1R11f4Ili t lllg Fq1 FstoaS s 3`65 { I. 'f '=!x 9s�o sr { i 8 i i i§ ad g s 1$ a r 4 9 ? s s € - R 484 „ . o.. , 6,rmsg4g4.8, baa w 8.686544. 8 . tvg _ 8 . C .. C28..R ;t.a.6L 8 € ammo 8 hitt 8 s tie t Exat g q#�5 F r 1 T Cy E&7F a E E E 1i � 1E1ExE110 a E ioEw: l 8 tFA ._"- r$ 8 x n C R4iC B3.Eig X krO- t 2 8-8 -6868C..6 C a=a» r— 5 5 v E x t t x i f i @; 6 x -t 8 tit C@ t t g? t 8 6 5 6 x Y 5 6 Y . t 4 » » 884 »• } w.» C g 1 i [ 0 61666888/1$oM;IMtEam 6tgii6u6ts6C5 5 G Y __ =r o 2 t 5 g 68S 6 5 6 o 6 " s '`e S t�S 6 6 0 Li,6 8 6 0 6 6 6 s 22 22 72 66 8 6 6 xt'`at 38e8�656 i i sit i 6§ .3i. gt 8itit8s86ii 8 siiii§ii 6 i ail 1 8 6 8 8 ti866iii6i6 o » 5» w r .x w , wF 8 i P 66E 8 8 6 8 88 68ita88 e8e 6 La8i6E6 1 8 188 8 8 8 8 8 886888881846 .. • . . C 8 8 888 8 8 8 =8 88 88868o8a888 8 88686868 Is o 8E8 2 8 8 8 8 888888888888 w Y»». 5 8 8 888 6 8 8 8 88 88886856688 8 86666666 6 8 688 8 6 8 8 8 666868686860 6 6 888 8 8 8 66 66888888588 6 66668686 8 8 888 8 8 6 8 8 888888888888 1 l--26 . . . . . C . .. 8 8 668 6 6 6 r688 88665668688 8 88888888 N M a 8 X88 6 5 6 0 8 $1i60i8a0&tdt F � . w . $ a a . . . . w , » 8 8 888 6 8 6 88 8 56 8 885886866 8 88686868 8 8 885 6 8 8 5 8 688888585858 .. » .. . . » 8 V. 5 » z . 2 3 3 bra 6 a x 85, a 68R66868RE 6 888i888g.ai 8 886 6 8__6 8 8 888888888881-- ` R 484 „ . o.. , 6,rmsg4g4.8, baa w 8.686544. 8 . tvg _ 8 . C .. C28..R ;t.a.6L 8 € ammo 8 hitt 8 s tie t Exat g q#�5 F r 1 T Cy E&7F a E E E 1i � 1E1ExE110 a E ioEw: l 8 tFA ._"- r$ 8 x n C R4iC B3.Eig X krO- t 2 8-8 -6868C..6 C a=a» r— 5 5 v E x t t x i f i @; 6 x -t 8 tit C@ t t g? t 8 6 5 6 x Y 5 6 Y . t 11` GGGGGGGGGrZi: CCCCCC_ '` `" VI I •`L' ` ` L{L,• _ Ili gtg ti3iI.--- i,i,$`$ i ,,O=lift f2 = g 44411 I i iii; 3 i o s S p- 7.. i i2 3€ itt9€tit! It ; 3-t1ifi1 Y i 1 a °S r i'!6 1i !fit} i ¢ a S S•3 f ..8Y 888888 }6 fittif688fo$ok8g8 fi kE E888 a 0 8 8 =.r 6 88 . . .. . G C 17 8 8 3. 8 x Y L a a :.88p88 588858555g55518t6 ¶8 _ . 8 8 — .880 58 ¶ g8I 8 g 5 21 2{g a SK .5Y.• KC X F 3;$; 388 .. • Y digLA R8 X888885 5� 9�i� ���3e5 5 A�i�9 § A tAt B t 888885 . 5 588888555I8b588a8 88 88M8'88 d5 88888888835888888 6 ti 3 x.A w t w . 8 8 f kk 88`53 5 g8g 8 k 5 .. 388888 88 88888588888888888 88...388 6 888 5 888 5 8 8 8 ;S A 888888 8 888 8 8 8 8 i 85885 88888886888888888 88.-.58 8 88 58 8 888 8 8 5 - er 0 it 888888_8 55558855555888858 88f=58 5 88 5... -88 5 858 5 8 8 a t 588555 58 85858588888588858 85 885 8. .... _-558 8 558 5 8 5 6 8 a 859881 i5 }555555888a8a8855 �als8,aS81 5 i5 Hit 185 $ 898 9 8 6 8b88Ec tug 8; 11333,,,,T8 6 8d8 8 III 5 r:ra �.. rr r w i AkbB§_ ss�€$'s56B� v8� $ 6A M68" E Egg s A a r_¢a:ailC "avvawvsi?wrrna rn t3 32 'Eft tibE 2 Y Bi "e 11 :a 8 'k �`�tCC8; �% x�"-- f k w 6 X�� 8 2 r rx r x itii iiji iv'sagiss>rx i3 c -g3 LAB i a Y viii `Ae v $v K f ..1-t'::;;;;;; . M e 1 3 1 i A — i A 1 ` i A y 9 1 3""0 esEs aeres" EEEEEEEEE ! w s E EEE E EtUt EeEE.,� tjEEE6>on6A6 / Y c ii$ " spino EMM li 5 Ix4 ;ii f.3i.iiiili € i€a-.:1 = -!I !HOW - Ilii Y a p ill$el4 9illi°_liiii eiifi s 9 4 4 Ti11 -°yi111111111T1: ,bil-lilt/ (1ii$i i Iz 1 VifiltIlig � 5iCf zi p}¢e ti a- 1 1 fc VII E 1 33 gi5 4 e a -II 8gf D i p VII 4 - e [Q Y _ S g Y 1 e g0. . ..[._..� . . G ._T . X. .ti...UG I iinigailsaox2liniisgrniia 'd x o S iii i Fs kMilin n oYSY tliiriht F k a s n n n n nsn n nnnnnnnsnnn n nnnnnsnnnsnn if nsnnnnnnnnnnnnnnnnnnnsnnnnnnnnn aeigki3iieeVIWIWieiieesiM it§i i i i i ee§ i giiiiiAigin n inaiiitiBef nnnnnnnnnnnnnnnnnnnnnnnn=nnnnnn n n n n nsn n nnnnnnnnsnn n nnsnnnsnnnno 2 S F � S nnnnnnnnnsssnsngnnnsnnnnnnnnnsn s n n n nnn n nnnnnnnnnnn n nnnnnnnnns5r - � G nnnnnnnnnnnnnnnnnnnsnnnnnnnnnnn n n n n nnn n nnnnnnnnnnn n nnnsnnnnnnns 9 i -SnnnnnnssIs svnnnnnnnnnsnnnnssrs n n n n nns n nnnnsnnnnnn n nnnnnnnnnnns :Y snnnnnnnnnsnnnnnnnnnnssnnnnnnnn n n n n nnn n nnnnnnsnnnn n nnnnnsnnnnnn izo- S I. ..S..n.'nn -n.n.n.n.n...s... n_ n - n . n n nn n n .6 "' _........ , ICY ` ._._._.. .. - .....-.-.. ................ . . c . x.. K 1Cn1C$knnn'6nn n ne°astttnnnnL.. lY1 .-.... Ce z 5Ee€e_esF egW `ytrn €e�r'= € e _ # aie§e sin n g 5§sseeeegt 5 w P E x I££ E EEeEAAA EA5 n f � g n ��EEEE�EE�� f - \ E 3 gg:6n M pEt a Q :tt' 8 s. 8 6= 8 6E5 s ,.a: cc ill �5 `i111firiiiiiIIIIIII 1g!h1191111111 I i!8 1 7i i i ill" a 5 i 4■ !ll E s r E . p I Y Y 4 p, i i a a - iii Yu 4C.. .888G • 8 . . . L • . •. ar X egg g6gx go58Ss� g o oo�fx o x & g 4x88 =r 08 8888 8888888 8 8 8888 8 8 8 8 8 8 ssss ~ wE to c .88$; b 8. .. . 8 g '^g 8828 r8tP ";;t11 FM tta"&§st 8 $ it t s a 't .g A 8 § ;Iss + „ s 6x8 88888 8888sss 8 8 8 8 8 8 8 8 8 rSU"..p ; 8 e8ts 8888 sg88868 8 s nrsr 8888888 8888 r 888 8888 ssss888 8 8 8888 8 s 8 s 8 8 6 8888 S 688 8888 8 8 8888 8 8 8 8 8 8 8 881S8 rr G N 688 8888 8886868 6 8 8888 x 8 6 8 8 8 8 88ss t 888 8sss rrrrrs8 8 6 -888 8 8 8 s o 8' 8 8888 R� $+3� i . mc . 8 L. .. .. 888; GL�S?+JS C 5 : 8 6 C .Sg io xi�fi-8 g ';viii; k A prE C r so ALgBQi tits $ir CILTik s cK - .5PPtttin- E e n 8 t 3 1 t 8 $ 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Task hz City of Pearland, Texas Owners' Representation Services for the 10 MGD Surface Water Treatment Plant Task Order No. 3 Schedule Task Name bwner's Rep Services Task Order No. 3 Notice to Proceed Task 1 Continued TWOS Funding Assistance Task 2 Design Consultant Selection Assistance Task 3 Water Master Plan Update Project Kickoff Meeting Review Historic Documents Issue Data Needs Letter City Collects and Provides Requested Data Data and Report Review Data Analysis and Modeling Scenarios (WS #1) Demand Allocations and Projections Review Current Demands Review Expected Development Current and Expected Demand Review Meeting Estimate Future Demand Projections Model Improvement Update Water System GIS Distribute Demands Review Diurnal Patterns Verify Facility Operations Operational Philosophy Meeting with City Scenario Management Develop Steady State Simulations Initial Observation Review Meeting Develop EPS Simulations EPS Simulation Review Meeting Model Verification Compare Operational Data with Model Predictions Adjust Model Parameters To Represent Operation of the City System Model Analysis/Master Planning Establish Criteria Identify Immediate Issues Identify Long Term Issues Analyze & Select Alternatives Project 10 MGD SWTP Date Fri 4/7/17 Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary IAarlDuration Start (Finish 2018 2019 ._.I.._I ulI.._leapl ct1NovlD_ 1 Jan feblMarl Aix 'Marl unI Jul l ughe.I ctINovlOec1 Jan IFelMar War l. 1035 days ue 6/28/16 Sun 4/28/19 0 days Mon 5/1/17 Mon 5/1/17 856 days Tue 6/28/16 Wed 10/31/10 280 days Tue 1/31/17 Mon 11/6/17 355 days Mon 5/8/17 Fri 4/27/18 1 day Mon 5/8/17 Mon 5/8/17 29 days Mon 5/15/17 Tue 6/13/17 r'f 0 days Mon 5/15/17 Mon 5/15/17 5/15 14 days Tue 5/16/17 Mon 5/29/17 14 days Tue 5/30/17 Mon 6/12/17 1 day Tue 6/13/17 Tue 6/13/17 36 days Wed 6/14/17 Wed 7/19/17 14 days Wed 6/14/17 Tue 6/27/17 14 days Wed 6/14/17 Tue 6/27/17 1 day Wed 6/28/17 Wed 6/28/17 21 days Thu 6/29/17 Wed 7/19/17 149 days Wed 6/14/17 Thu 11/9/17 . 1 21 days Wed 6/14/17 Tue 7/4/17 21 days Thu 7/20/17 Wed 8/9/17 14 days Wed 6/14/17 Tue 6/27/17 28 days Wed 6/14/17 Tue 7/11/17 1 day Wed 6/28/17 Wed 6/28/17 113 days Thu 7/20/17 Thu 11/9/17 56 days Thu 7/20/17 Wed 9/13/17 1 day Thu 9/14/17 Thu 9/14/17 84 days Thu 8/17/17 Wed 11/8/17 1 day Thu 11/9/17 Thu 11/9/17 42 days Thu 9/28/17 Wed 11/8/17 21 days Thu 9/28/17 Wed 10/18/17 21 days Thu 10/19/17 Wed 11/8/17 107 days Thu 11/9/17 Fri 2/23/18 r� 1 r1 14 days Thu 11/9/17 Wed 11/22/17 21 days Thu 11/23/17 Wed 12/13/17 21 days Thu 11/23/17 Wed 12/13/17 42 days Thu 12/14/17 Wed 1/24/18 "rte Manual Task Duratwnior4y Manual Summary Rollup Manual Summary Page 1 Start only Finish -only External Tasks External Milestone C 3 Deadline Progress Manual Progress 4 D Task Task Name A mode Owners' 36 37 38 39 4 40 4 41 42 43 4 44 45 4 46 4 47 4 48 4 49 4 50 ,r 51 52 ,r 53 54 >r 55 ,r 56 )r 57 58 ,r 59 ,r 60 ,r 61 ,r 62 ,r 63 ,r 64 ,r 65 ,r 66 �r 67 4 68 Project 10 MGD SWTP Date: Fn 4/7/17 Identify Capital Projects Modeling Results Workshop (WS #3) Operation Recommendations Operation Recommendations Plan Scenarios Workshop (WS #4) Project Development/CIP Calculate Project Costs Project Prioritization Workshop (WS #4) Prepare Draft Report Submit Draft Report to City for Review City Review of Draft Report Review and Recommendations Workshop (WS #5) SCADA and Predictive Modeling Tech Memo Water Master Pian Model Training Task 4 Basis of Design Development Task 5 Pilot Plant Support Task 6 Construction Procurement/Methodology Task 7 Planned Facility Personnel Requirements Task 8 Deliverable Reviews P1 Draft Feasibility Technical Memorandum Review P1 Draft PER Review P2 Process Alternatives Evaluation Report Review P2 Bench Scale Testing Protocol Review P2 Pilot Testing Phase 1 Report Review P2 Pilot Testing Phase 2 Report Review P2 Electrical Power Assessment TM Review P2 Site Master Plan Development TM Review P2 SCADA System Architecture TM Review P2 Architectural Standardization TM Review P2 Unit Process Evaluation TM Review P2 Draft PER Review P3 Draft PER Review Task 9 Standards Development Task 10 Project Management Services Task spilt Milestone Summary 4 Project Summary Inactive Task Inactive Milestone Inactive Summary City of Pearland, Texas Representation Services for the 10 MGD Surface Water Treatment Plant Task Order No. 3 Schedule Duration 4 days 1 day 14 days 1 day 72 days 14 days 1 day 42 days 0 days 14 days 1 day 14 days 7 days 84 days 588 days 84 days 56 days 677 days 14 days 28 days 28 days 7 days 14 days 14 days 14 days 14 days 14 days 14 days 14 days 28 days 28 days 84 days 728 days Start u 1/25/18 Thu 2/8/18 Fri 2/9/18 Fri 2/23/18 Thu 2/8/18 Thu 2/8/18 Thu 2/22/18 Fri 2/23/18 Thu 4/5/18 Fri 4/6/18 Fri 4/20/18 Fri 2/23/18 Sat 4/21/18 Mon 5/1/17 Thu 6/15/17 Led2/l/lg ish 01gg 2079 Arm' a_.I..._I ulla.._ISeoIOct'NodDec I2.__IL._.IAorIM_.1..._I dla.aleeola.ct l„_.In__ 1 .__ a_.LMarl Apr I. Thu 2/8/18 Thu 2/22/18 Fri 2/23/18 Fri 4/20/18 Wed 2/21/18 Thu 2/22/18 Thu 4/5/18 Thu 4/5/18 4/S Thu 4/19/18 Fri 4/20/18 Thu 3/8/18 Fri 4/27/18 Sun 7/23/17 Wed 1/23/19 Mon 10/16/17 Sun 1/7/18 Thu 9/14/17 Wed 11/8/17 Mon 5/1/17 Fri 3/8/19 Mon 7/10/17 Sun 7/23/17 Mon 11/27/17 Sun 12/24/17 Thu 8/17/17 Wed 9/13/17 Mon 5/1/17 Sun 5/7/17 Thu 5/3/18 Wed 5/16/18 Thu 10/18/18 Wed 10/31/18 Thu 12/7/17 Wed 12/20/17 Fri 9/29/17 Thu 10/12/17 Thu 11/16/17 Wed 11/29/17 Fri 11/24/17 Thu 12/7/17 Thu 10/26/17 Wed 11/8/17 Thu 6/14/18 Wed 7/11/18 Sat 2/9/19 Fri 3/8/19 Mon 7/24/17 Sun 10/15/17 Mon 5/1/17 Sun 4/28/19 Manual Task Duraoon.ony Manual Summary Roilup Manual Summary Page 2 Start -only Finish -only External Tasks External Milestone r adline Pess Manuel Progress — 4 MI rlr 11 IrKIT Professionals, Inc. Engineers • Planners • Construction Managers Challenging Challenges... April 6, 2017 Mr. Jeffrey S. Peters Client Accounts Manager Ardurra Group 2032 Buffalo Terrace Houston, Texas 70019 Re: City of Pearland, Texas Owner's Representative Services for 10 MGD Surface Water Treatment Plant KIT Professionals, Inc. Proposal for Task Order No. 3 Dear Jeff: KIT Professionals, Inc. (KIT) is pleased to offer our services to the City of Pearland Owner's Representative Services for 10 MGD Surface Water Treatment Plant project. As discussed, we are providing a proposal for engineering services to assist Ardurra Group as a sub -consultant on this critical infrastructure project. Please find attached our detailed scope of work and level of effort for Task Order No. 3. We look forward to providing our services to the City and Ardurra Group. Please contact me at 713-231-4403 or skommineni@kitprofs.com if you have questions or require additional information. Very truly yours, KIT Professionals, Inc. w Sunil Kommineni, PhD, P.E., BCEE KIT Project Manager 2000 W Sam Houston Parkway S, Suite 1400, Houston, Texas 77042 • Tel: 713-783-8700 • Fax: 713-783-8747 www.kitprofs.com Task Order No. 3 KIT's Scope of Services April 6, 2017 KIT Professionals, Inc. Scope of Services For Owner's Representative Services For 10 MGD Surface Water Treatment Plant KIT Professionals, Inc. (KIT) is a sub -consultant to Ardurra Group (Ardurra). As a sub -consultant, KIT will execute tasks necessary to perform Owner's Representative duties and responsibilities for planning and development activities related to the proposed surface water treatment plant (SWTP) for the City of Pearland as defined in this Task Order. The tasks associated with these engineering services are separated into the following services and tasks: 2. Design Consultant RFQ & Procurement Assistance 3. Water Master Plan Update 4. Basis of Design Development 5. Pilot Plant Support 7. Planned Facility Personnel Requirements 8. Deliverable Reviews 9. Standards Development 10. Project Management Services 2. DESIGN CONSULTANT RFQ AND PROCUREMENT ASSISTANCE 2.1. Participate in various Design Consultant workshop and presentation meetings as directed by Ardurra. 2.2. Assist the City of Pearland and Ardurra in negotiating each of the three PRELIMINARY design packages including assistance with scope and fee review. 2.3. Assist the City of Pearland and Ardurra in negotiating each of the three FINAL design packages including assistance with scope and fee review. [1� KR Profasslonsls, Inc. Page 1 Task Order No. 3 KIT's Scope of Services 3. WATER MASTER PLAN UPDATE The Water Master Plan Update will baseline and calibrate the existing water system and project flows and infrastructure (including the planned surface water treatment plant) for a 10 year planning period as well as ultimate buildout conditions including potential regionalization. 3.1. Review Historic Documents The most recent planning and growth projections will be reviewed prior to a kickoff meeting held with City staff to discuss project startup and gain perspective on the information available and potential information that has changed since the most recent planning documents were completed. Relevant data and reports supplied by the City will be reviewed. 3.1.1. The following data and reports will be reviewed: 3.1.1.1 Most recent water master plans and subsequent updates 3.1.1.2 Customer complaint database and previous reports relating to flow and/or pressure 3.1.1.3 Main break records 3.1.1.4 Most recent City fire flow testing data 3.1.1.5 Operation data including distribution system water quantity and quality, pump station pumping records and plant production (past 2-3 years of records) 3.1.1.6 Pipe type/age in distribution system 3.1.1.7 Existing City GIS system for model compatibility 3.1.1.8 Previous Water Distribution System Model 3.1.1.9 ESRI/GIS data for water infrastructure and base map layers 3.1.1.10 Billing and parcel data 3.1.1.11 Daily water pumping and usage information 3.1.1.12 Number of active connections information 3.1.1.13 Demand data for large commercial water users [M KIT Professionals. Inc. Page 2 Task Order No. 3 KIT's Scope of Services 3.1.1.14 Operational data, i.e., historical supervisory control and data acquisition (SCADA) information, pump control logic, hydrant flow tests data, etc. 3.1.1.15 Control logic and associated information for wells, surface water supply, valves, pumps, storage facilities, and chemical dosing systems 3.1.1.16 Available topography and survey data, including any digital elevation model (DEM) data 3.1.1.17 As -built and construction record drawings and reports for key water infrastructure (plants, pump stations, storage facilities, PRVs etc.) 3.1.2. Deliverables 3.1.2.1 Workshop #1: Project kick-off, inputs for demand data development, established modeling scenarios, summary of workshop #1 included in technical memorandum and decision matrix with identified action items. City Staff Involvement • Provide copies or access to the reports and data sets listed above • Participation in Workshop #1 3.2. Demand Allocations and Projections Demand development is one of the key aspects of hydraulic model development. Existing demand will be allocated based on water billing data and existing water production and pumping data. Future demand allocation will be based on City's land use plan or other electronic database provided by the City. An ultimate buildout scenario based on density and land use will be developed with the City. 3.2.1. The following detailed activities are the scope of services for this task: 3.2.1.1 Review and Update Proiections — This activity includes a brief review of the data, assumptions, process and results of the water demand projections from the prior master plans. A meeting will be scheduled with the City to verify existing demands and discuss their plans for future water demands. 3.2.1.2 Development Review — Open, developable land in the service area will be evaluated for development use and a demand estimate will be prepared for these areas. Initially, this information will be combined with the allowable KR KR Professionals. Inc. Page 3 Task Order No. 3 KIT's Scope of Services population density based on zoning and the projected uses to establish future and ultimate demands. 3.2.1.3 Redevelopment Review - Review the potential for redevelopment with City Staff and city planning documents. Develop an understanding of the potential redevelopment impacts to the City water demands. 3.2.1.4 Estimate Future Demands - Combine current updated demand data (acquired from billing data), with demand projections for undeveloped and redevelopment areas to determine a best estimate of projected demand for intermediate demand scenarios between existing and build -out conditions. The following scenarios will be evaluated: 3.2.1.4.1 Present (baseline) (2017 — including near-term/CIP improvements) 3.2.1.4.2 Intermediate 10 year (2027) planning period 3.2.1.4.3 Intermediate 10 year (2027) planning period including regionalization 3.2.1.4.4 Ultimate Buildout (2035) 3.2.1.4.5 Ultimate Buildout (2035) including regionalization These projected demands will be prepared as average annual demand throughout the City. Demands will be applied to vacant parcels and parcels identified as viable redevelopment candidates based on the land use. Demand scenarios will include a reasonable/conservative estimate for use in future planning for new developments. A table will be prepared using current demand as a baseline for comparison. Demand values will be distributed as a single demand split to one or more model junctions as described in Task 3.4.1.2. 3.2.2. Deliverables 3.2.2.1 Demand projections Section in the Master Plan Report (intermediate and build -out demands for average day conditions) 3.2.2.2 Demand comparison table (present vs. future) CI" KIT Professionals, Ine. Page 4 Task Order No. 3 KIT's Scope of Services City Staff Involvement • Interactive meetings regarding model inputs and operation • Planning meeting to determine expected development and determine demand projections • Provide historical billing data • Provide operation data for pressures, flows, and tank levels • Provide annual WTP production 3.3. Model Improvement The model improvement task includes a comprehensive review of the existing model configuration and operation with modifications provided to reflect changes that have taken place in the system or in the system operations since the last master plan. Changes in the system will be presented for visual review. New data sources will also be incorporated into the revised system. The updated model will be capable of evaluating changes in projected water demands, pressure criteria, and fire flows, and the impacts of improvements to the distribution system. Operational improvements will be made to the model based on new data on operation and on improved model demand distribution, diurnal pattern assignments, physical layout, C -factors, and major facility operations. 3.3.1. Following are the individual activities that are included in this task: 3.3.1.1 Update Svstem/GIS —The first component of this project involves upgrading the hydraulic model to better represent current system conditions. The pipe configuration in the model will be verified through direct comparison to the GIS and the model will be updated to reflect the current state of the distribution system, as detailed in the GIS. This will likely be performed as complete rebuild using current GIS data, merged with the key hydraulic features in the existing model (pumps, tanks, etc.) that are not reflected in the GIS. This also includes conversion from the existing hydraulic model format from H2O Net to Bentley Water Gems in accordance with City requirements for future "real-time" water system monitoring capability. 3.3.1.2 Distribute Demands - A key component of the demand development process involves improvements to the current demand allocation in the City's model. The budget developed for this task approach assumes that [1P KIT Professionals, Inc. Page 5 Task Order No. 3 KIT's Scope of Services [1, KIT Professionals. Inc. the demands from each parcel will be proportionally split, using model tools, to the existing model nodes on either end of the main linking these nodes. This proportional split will be made using geocoded customer billing points. Current water demands will be used for establishing the baseline model. There are three components of a complete demand allocation that will be further developed using available data: 3.3.1.2.1 Averaee Demands - The annual average demand for every customer will be linked to each parcel. This volume will be developed by taking a year of data from the billing system and assigning it directly to the meter location or parcel via geocoding or another viable method. The demand values will be assigned as described above using tools provided in the modeling software suite. 3.3.1.2.2 Peaking Factors —Use the available operation data and production data to identify the peak and minimum demand periods and associated factors. These factors will be applied universally to all demands to develop maximum and minimum day scenarios. These different demand conditions will be simulated using the scenario management capabilities of the model and by changing the base operating parameters for different alternatives that will then be associated with the appropriate scenarios. Scenarios will be created for average day, minimum day, maximum day, and peak hour demand conditions. All of these scenarios will typically be operated in extended period mode. The peak hour demand condition will be simulated as the highest hour on maximum day, unless the peak hour demand is consistently shown to not occur on maximum day. In this case, the project team and the City will decide on the best course of action to simulate this condition. These scenarios will be created as children of the "Base" model that will simulate actual, best known current conditions. 3.3.1.2.3 Unaccounted -for -water (UFW)— Billing data for an extended period will be compared to operation data to estimate the unaccounted -for -water volume (UFW) will be distributed across the system based on discussions with City staff. Traditionally, UFW demand is simply divided by the number of model nodes and distributed evenly to each node. Performance of this task is necessary for the successful documentation of water loss for Page 6 Task Order No. 3 KIT's Scope of Services [1, KIT Professionals, Inc. the TWDB as well as implementing corrective action measures through the implementation of the Advanced Metering Infrastructure (AMI) program in increase water accountability which is required by TWDB as a condition of the funding mechanism. 3.3.1.3 Review Diurnal Patterns - Review the diurnal demand patterns for each customer type and update them, if necessary. 3.3.1.4 Verify Facility Operations - Assess the capabilities and limitations of the existing hydraulic model, and identify required system improvements. Pump operations will be reviewed so they reflect current operations at each pumping location. Control valve operation and settings will be verified with operational staff so that these devices are modeled as they are operated. If operational settings change seasonally, these changes will be noted and appropriate scenarios created to model the range of conditions so that maximum day and minimum day demand scenarios are appropriately handled from a control standpoint. Units will be modified as needed for pumps, controls, etc. 3.3.1.5 Scenario Manasement - Recommendations for how the scenario management capabilities of the model will be used to support a wide range of modeling activities will be developed. This will include recommendations for applying both the scenario management tools and facility sets to achieve the intended operations for different model runs. The recommended and agreed upon scenario tree within the delivered model will be created. The different modeled scenarios will include descriptions on the conditions that each scenario represents. As shown in the future demand development section above, the following scenarios will be evaluated: • Present (baseline) (2017 — including near-term/CIP improvements) • Intermediate 10 year (2027) planning period • Intermediate 10 year (2027) planning period including regionalization • Ultimate Buildout (2035) • Ultimate Buildout (2035) including regionalization The system demand alternatives will also include the following subsets that will be represented by the use of either global factors or different diurnal patterns: Page 7 Task Order No. 3 KIT's Scope of Services • Average Day • Maximum Day • Peak Hour (may be simulated as part of maximum day if appropriate) • Minimum Day The model will be operated in the following different analysis modes: • Extended Period Simulations — Review of tank and reservoir use and capability to maintain desired pressures and other "level -of - service" indicators during the course of expected operations, such as water age. All "normal" runs — average day, maximum day, minimum day — for all scenarios will be made in extended period mode. • Steady State — Adequacy of pumping and conveyance for maintaining system pressure based on TCEQ standards, including 35 psi for average conditions, with a 20 psi minimum at point of delivery. High pressure will also be evaluated. The distribution system components will vary from run to run consistent with the modeled time frame. This will be performed using facility sets instead of, for example, using open/closed status of pipes to change the modeled features from one scenario to another. Facility sets will be based on database queries rolled up into a single query set for each time frame. Model time frames consistent with the different future demand scenarios will be created as follows: • Base conditions (existing features only) • CIP facilities (existing, less features to be removed, plus features to be added at specified times in the CIP, for up to three modeled future scenarios) • Ultimate (existing facilities plus all CIP projects, Tess existing facilities to be removed) • Operation Recommendation scenarios Overall Modeling objectives include: (1, KR Professionals, Inc. Page 8 Task Order No. 3 KIT's Scope of Services • Identifying zones of influence for groundwater and surface water • Identifying areas of concern, such as chronically low pressure, high pressure, high water age, high velocity or flow reversals. • Identifying pumping system and transmission system capacity and capability to deliver peak flows. 3.3.2. Deliverables 3.3.2.1 Section in the Master Plan Report reviewing system demands detailing total billed demand, production, and maximum and minimum factors. 3.3.2.2 Section in the Master Plan Report detailing diurnal patterns applied for different customer types and for discrete Targe customers. 3.3.2.3 Section in the Master Plan Report to summarize distribution system operation scenario assumptions (e.g., pump station, elevated storage tanks, etc.) 3.3.2.4 Deliver up to 10 simulations including detailed output in PDF format. At a minimum this will include the following runs: 3.3.2.4.1 Existing and near-term average day simulations for routine operations (2 runs) 3.3.2.4.2 Existing and near-term maximum day simulations for identifying transmission system issues and verifying the capability to refill system tanks (2 runs) 3.3.2.4.3 Existing and near-term minimum day simulations for calculating travel time on minimum day (2 runs) 3.3.2.4.4 The balance of 4 runs may include runs for buildout scenarios or longer-term scenarios, or additional custom scenarios, as desired by the City City Staff Involvement • Provide necessary GIS and operation data • Assist in determining demand locations for large customers [1� KIT Professionals, Inc. Page 9 Task Order No. 3 KIT's Scope of Services • Work with Ardurra on verification of facility operations 3.4. Model Verification Backeround on Aooroach After review of the model configuration has been completed and modifications to model inputs have been performed and confirmed by the City, the hydraulic model will be verified. The verification process depends on data collected from the distribution system that reflects actual operation that will be used to compare model predictions to field conditions and to adjust model parameters if necessary to better reflect field conditions. 3.4.1. Following are the activities that are included in this task: 3.4.1.1 Operational Review - An operational review with City staff will be used to verify that the model results agree with their experience. Operational parameters verified will be high pressures areas, low pressures areas, tank fill and empty rates and pump station operations specifically ability to pump against system head. 3.4.1.2 Adiust Model Parameters — Model C -factors and pump and facility operations will be adjusted to within accepted accuracy to represent the operation of the City water system. 3.4.2. Deliverables 3.4.2.1 Section in the Master Plan Report with model verification results and comparisons to existing operation. City Staff Involvement • Assistance in adjusting model to accurately represent facility and system operation in the model. 3.5. Model Analysis Background on Approach The model analysis task includes a complete review of current conditions using the verified distribution system model. These simulations will evaluate the behavior and adequacy of the system under both current and future flow conditions, and subsequently identify potential improvements. Using the verified model, create operation scenarios that utilize the existing system layout. [1T KIT Professionals, Inc. Page 10 Task Order No. 3 KIT's Scope of Services A "brainstorming" session will be held with City staff to develop alternatives after the severity of near-term and build out issues have been established. 3.5.1. Following are the specific activities that are included in this task: 3.5.1.1 Establish Criteria - Develop the criteria for system assessment and modeling. The criteria to be reviewed and established include; allowable pressure ranges, storage requirements, maximum velocities and other factors. The evaluation criteria include the requirements of the TCEQ. Criteria for evaluation of all of the alternatives will be summarized. 3.5.1.2 Identify Immediate Issues — Consider existing system and current demands and determine where the established hydraulic levels of service are not being met with the existing system. Review the deficiencies listed in the previous Master Plan to determine if these items have been addressed. Use this information to document deficiencies and develop potential projects to address them. Prepare list for inclusion in the capital improvement plan under Task 6. 3.5.1.3 Identify Lone Term Issues — Consider ultimate build -out demand with pipe degradation and identify long-term issues. Develop potential long term improvements to address the deficiencies in the system, review with City staff, and evaluate these for inclusion in the long term plan. Develop a table with recommended improvements, time frame, and conditions that would trigger initiation. 3.5.1.4 Analyze & Select Alternatives - Develop alternatives for each identified potential improvement. Prepare preliminary costs and pros/cons for the different solutions. Discuss these developed alternatives with City staff and facilitate a session with City staff to apply the evaluation criteria (previously established by the City) for the immediate and long term improvements identified. 3.5.1.5 Identify Capital Proiects - Identify the resulting list of capital improvement projects for use by the City in its planning process. Include preliminary prioritization based on city established process, budget cost and timing for each of the elements of the final plan. Prepare draft CIP data sheets for each project. 3.5.1.6 Operation Recommendation -Identify facility operation recommendations to operate the City system more efficiently and optimize hydraulic performance. [1P KIT Probssbnsls, Inc. Page 11 Task Order No. 3 KIT's Scope of Services 3.5.2. Deliverables 3.5.2.1 A proposed list of both short term and long term potential improvements 3.5.2.2 Section in the Master Plan Report including the process for development of short term and long term improvement list 3.5.2.3 Section in the Master Plan Report detailing recommended Operation Recommendation Plan. This Section will include facility operation recommendations including pumps, tanks, and valve settings/modifications. 3.5.2.4 Workshop #2: Modeling results workshop to discuss needed improvements in the system 3.5.2.5 Workshop #3: Operation Recommendation Plan scenarios and responses. City Staff Involvement • Provide input during all phases of project development and evaluations • Participation in Workshop #2 • Participation in Workshop #3 • Assistance with valve identification, model inputs and locational information as needed • Review of operation plan • Provide City established evaluation and prioritization criteria for CIP projects 3.6. Project Development 3.6.1. The previous tasks will generate a list of potential projects. All of the available documents, reports, data, and model results will have been reviewed and recommendations will be developed under this task. This task will develop the recommended plan for system improvements, and how they will be incorporated into the City's CIP. 3.6.1.1 Calculate Proiect Costs - Project costs will be developed for all the identified projects. The number of projects is assumed to be no more than 20 and the cost numbers will be developed based on a unit cost basis. The unit costs for a variety of construction projects will be developed with input from the City KIT Professionals, Inc. Page 12 Task Order No. 3 KIT's Scope of Services staff. Recent construction projects in the City will be used to develop these unit costs. Costs should be loaded with City's implementation costs including design, management, bonding, etc. 3.6.1.2 Prioritize - The Distribution System Master Plan recommendations developed in Workshop #2 will be prioritized. A timeline and budget level cost for the recommended improvements will be developed. Following the development of this draft CIP, facilitate Workshop #4 to review the final recommendations. Results will be provided to the City for input into the CIP. Provide projected priority, projected year of construction and cost. Prepare draft CIP project sheets and use model to prioritize. 3.6.1.3 Prepare Reports — A draft report will be prepared, and submitted to the City staff for review. Following receipt of comments, a final version of the report will be prepared and distributed to the City. 3.6.1.4 Proiect Manaeement — Schedule, lead and prepare minutes for all project meetings and workshops. Routine project meetings will be monthly. 3.6.2. Deliverables 3.6.2.1 Section in the Master Plan Report detailing project costs and the final CIP recommendations 3.6.2.2 Draft report for City review 3.6.2.3 Hydraulic model files in electronic native format. 3.6.2.4 GIS project files bookmarked with key layout data displayed. 3.6.2.5 Electronic copies of all deliverables, such as TMs, minutes, presentations, drawings, final report and so forth, in both original and PDF formats. City should also receive 3 paper copies of final report 3.6.2.6 Workshop #4: Recommendations City Staff Involvement • Provide unit cost information • Participation in the workshop • Provide recent Pearland construction costs [1" KR Professionals, Inc. Page 13 Task Order No. 3 KIT's Scope of Services • Provide rate analysis based on initial CIP prioritization. • Provide CIP adjustments to schedule based on rate impact. 3.7. Identify options, software, platforms and systems to integrate master plan model (if applicable) to overall system operation, including real time system monitoring including predictive capabilities. This task will identify and document options via Technical Memorandum that will be included in the appendix of the Water Master Plan report. Implementation support to be provided in future task order. 3.8. Staff Training — Ardurra/KIT will provide two — 4 hour sessions with trained City staff to review the model parameters, scenarios and provide general guidance on how to execute the various model scenarios. These sessions will occur at a designated City location/facility. Limitations —The modeling proposed in the above scope does NOT include hydraulic transient or surge modeling/analysis. Hydraulic transient and/or surge modeling analysis is NOT being performed at this preliminary stage. 4. BASIS OF DESIGN DEVELOPMENT FOR SWTP 4.1. Regulatory Requirements -Review Technical Memos or other documents generated by each of the Package 1, 2 & 3 consultants that identify and summarize all applicable local, state, and federal regulatory requirements and parameters including references for all aspects of design for all components of project. 4.2. Permitting and Approval Requirements - Review Technical Memos or other documents generated by each of the Package 1, 2 & 3 consultants that identify and summarize all applicable local, state, and federal regulatory permits and approvals and associated processes as they apply to the project. Assist the City with summarizing the key permits required for the project and parties roles and responsible for securing permits and approvals. 4.3. Establish Treated Water Quality Goals — Work with Package 2 consultant in reviewing existing finished water and distribution system water quality goals. Participate in a coordination workshop with stakeholders to discuss the current and future water quality goals. Based on workshop results, assist the City with finalizing the treated water quality goals. 4.4. Basis of Design Criteria and Technical Guidelines — Work with Package 1, 2 & 3 consultants in assisting them to develop Basis of Design Criteria for all project packages for considerations including capacity requirements, service life, operating ranges and [1P KIT Professionals, Inc. Page 14 Task Order No. 3 KIT's Scope of Services conditions, integration with existing water infrastructure, treatment process considerations to achieve treated water quality goals and regulatory requirements, constructability, life cycle cost analysis, and non -monetary factors. Non -monetary factors could include operations and maintenance considerations, safety, schedule considerations, constructability, start-up, commissioning, and acceptance testing. 5. PILOT PLANT SUPPORT 5.1. (a -c). Authorization of this task shall be contingent on the final process treatment recommendations for achieving stable, reliable, and efficient operation requiring pilot plant studies. KIT will assist Ardurra with review of pilot plant protocols developed by Package 2 Consultant and provide written comments, attend meetings, participate in telephone conferences and issue written communication as needed in the form of emails, and memorandums. 5.2. Review of pilot plant data investigating performance challenges identified in the process decision report, performing due diligence of treatment relationships and assisting with the development of treatment process train for treating the range of raw water quality. 5.3. Review pilot test report and provide comments with attention to operating and capital costs of recommendations. 7. PLANNED FACILITY PERSONNEL REQUIREMENTS 7.1. KIT will assist Ardurra with determining the expected requirements for operations staff to perform in-house operations and maintenance for the Pearland Surface Water Plant, including range of expected costs. Specific items to be evaluated and provided are as follows: 7.1.1. Proposed organizational chart 7.1.2. Position titles, duties, experience 7.1.3. Schedule of recommended personnel needs 7.1.4. Industry salaries 7.1.5. Staffing/Shift Options to meet City Goals 7.2. KIT will assist Ardurra with conducting up to four (4) meetings with local governments who operate surface water treatment plants and determine interest and range of proposed cost to operate the Pearland surface water plan. (1, KIT Professionals, Inc. Page 15 Task Order No. 3 KIT's Scope of Services 7.3. Deliverable — Provide a technical memorandum summarizing the findings and recommendations. 8. PACKAGE 1, 2 & 3 DELIVERABLE REVIEWS KIT will assist Ardurra with reviewing each of these documents as prepared by others: 8.1. Pre -Sedimentation Basin Preliminary Engineering Report 8.2. Surface Water Treatment Plant 8.2.1. Process Selection (Membrane or Conventional) Report 8.2.2. Preliminary Engineering Report 8.2.3. Pilot Test Plan 8.2.4. Pilot Test Report 8.3. GST, Pump Station and Pipeline Preliminary Engineering Report 9. STANDARDS DEVELOPMENT 9.1. Specifications — KIT will assist Ardurra with identifying and coordinating specifications that may be used across Package Nos 1, 2 and/or 3 projects for the purposes of establishing uniformity and consistency across these projects. Ardurra/KIT shall receive preliminary specifications list from each of the three (3) package lead consultants along with their proposed standard specifications for review by Ardurra. Ardurra/KIT will compare to City standard specification (if they exist) and provide recommended changes to be used as standard across all three (3) packages. 9.2. Standard Drawing Details — KIT will assist Ardurra with identifying and coordinating standard details that may be used across Package Nos 1, 2 and/or 3 projects for the purposes of establishing uniformity and consistency across these projects. Ardurra/KIT shall receive preliminary standard details from each of the three (3) package lead consultants along with their proposed standard details for review by Ardurra. Ardurra/KIT will compare to City standard details (if they exist) and provide recommended changes to be used as standard across all three (3) packages. 10. PROJECT MANAGEMENT SERVICES 10.2. Meetings & workshop attendance with Package 1, 2, and/or 3 in occurrence of executing the work associated this program. [19 KIT Profssslonals, Inc. Page 16 Task Order No. 3 KIT's Scope of Services 10.4. Assist with project workshops between the various packages and design elements needed throughout the course of the project and prepare agendas, materials, exhibits or coordinate production of same as necessary to execute required tasks; 10.15. Participate in water flavor profile analysis and provide assistance to City as needed 10.16. Attend, lead, and/or participate in undefined, as -needed, conference calls and meetings. LIMITATIONS & CLARIFICATIONS Tasks NOT included in this Task Order: • USACE Application for Department of the Army Permit (Form 4345) • Threatened and Endangered Species Habitat Evaluation • Archaeological Pedestrian Survey [1" Kii Prof.ssionals, Inc. Page 17 Task Order No. 3 KIT's Scope of Services KIT'S SUMMARY OF SERVICES AND FEE ESTIMATE FOR CITY OF PEARLAND OWNERS REPRESENTATIVE SERVICES 10 MGD SURFACE WATER TREATMENT PLANT TASK NO. TASK DESCRIPTION KIT FEE ESTIMATE 1 Continued TWDB Funding Application Assistance (HNE) - 2 Design Consultant Selection Assistance (HNE) $ 18,529 3 Water Master Plan Update (HNE) $ 354,294 4 Basis of Design Development (HNE) $ 28,726 5 Pilot Plant Support (HNE) 1 $ 43,375 6 Construction Procurement Methodology (HNE) - 7 Planned Facility Personnel Requirements (HNE) $ 24,571 8 Deliverable Reviews (HNE) $ 38,075 9 Standards Development Assistance (HNE) $ 18,232 10 Project Management Services, Workshops & Meetings (HNE) $ 89,952 Total I $ 615,754 HNE — Hourly Not to Exceed Proi:uKRssionals, Inc. Page 18 Task Order No. 3 KIT's Scope of Services KIT'S HOURLY LABOR RATES FOR CITY OF PEARLAND OWNERS REPRESENTATIVE SERVICES 10 MGD SURFACE WATER TREATMENT PLANT LABOR CATEGORY Hourly Rate Principal/Sr. Proj. Manager Sr. Tech Specialist (QA/QC) Engineer 7 Engineer 5/6 $230 $230 $200 $180 Engineer 3/4 $160 Engineer 1/2 $140 Senior Modeler $150 Senior Designer/Drafter $135 Drafter $110 Sr. GIS Technician GIS Technician Adm inistrative/Accounting [1" KR Professionals. Inc. $135 $90 $90 Page 19 Task Order No. 3 KIT's Scope of Services KIT PROFESSIONALS, INC. TASK ORDER NO. 3 DETAILED LEVEL OF EFFORT AND FEE ESTIMATE Page 20 C C q.. FEEEE FFFEE 1 11111141H 1 } tit,fp 3 Elgl, { , !Iii, 997 t?!H1Iij1 = 99833 EE E : Ettttgg E F $= q 4 tt 'sg3t $ 3 8ap 9 . 2 i Q 8 i? g ? 3 it 3; i & F C G E EEEEEE" EE EE �kr ij� a 8 " 13 .L1 t;t tPt 1 °� Lf ] 9 9 $_ S i i i F Pii $ f I `$ f' SS 9 9 ;` R ,-._,...i Q 1 i 4 - : d a( Y hilly pr Y ar £ 1 i = i A ; 8 a .. . . . .r k.r . r. . . .....r . .. f Y4 t �S g 1�!! 7e '! If $ h tal I;E£t S 8E dtt i t8a8R8tt 0 E t . . . r .r . 6. S ta$tt z . $$ i s L t.. :ti,, t Min ii$$ E £z a$ ooi4s$$ $ i e t a 6 E $$5aa t t a x r g'4 t = gg gg :t t _—, 844th titdi rr TT gg t t t8 8 8 thitt t t t t t t t 44444 § t tt t �. t£ t yy :4 a 7a� Y EBwttE 2ttE yy b Eo t t t$$t£t l E i t t t$ Shit t t t t a tt o ppp sa s _y t 444th 4444 s tt t t 444th t t t t t t t 44444 t t ,nn t f . 95 .. ... k t. r . ..4tt, Y L Y t t t k 4 44.444 . 1 a a�d, s tttsst tris A g @ i iiiiii &#& . U. . i&$$ ii&U i A S a s tt t sa r -� ttatit tttt t tt t t 444th t t t t t t t ttttg 1 t t t t tt t r Y Y. .. ..t..t 4 4 4 4 Y t Yt t4 . zy ! sr t t ttsttt tttt a t$ W o H9•a`o$S # 5 z a `s t o tats; 4t . s a a tt t it t& :a�t attz4 .iii to ii ist"&a$ b P G & i$a9$ t E i. t s tt t Ff s$€ • V as :a s i Baaaa6 tats; at t o taaaag i a a R i a t tt t ` a alma a-tta a !k L a 4L444k tart 4 rY Y t CYaaaa t 8 Y 0444 a6a£� $ tau :at x 4 k URN E e 4 i € N iiitei r i i 5 1 ep M g 1 6 e a fas 111 i $$ i t a g HMI EM I O' i i ii"f3i ; I! l: r i llin 4 l a i $ lE, 1 g€ f l fl g .? E££cg@. t"?_8 z E? d 5 aile5 S i L i t££ tilii Y -£ e o Ar i 1 ilia ax o aesxl 1 ifiel MIMI WW1 MT rMr PH! !Hire' ink. 11 I Yt a ESs5 a a X xsxxs s s $ 11111 to Y . . . .. ssssssss 11 sssss 6i11 1 e1eel a g;y1w 11 E1ss 1 s s 11111 1111 s 1 s 11111 1111 1 . a 11111 1 1111 1 1 s 11111 ssssssss ss lssss YY CC t E. YY Z. C 1 as =1 ds 1. Y ISI. .... a 1s Asn _ € E`g 1" 11111111 11 11111 11 111/1111 11 11111 11 11111111 11 11111 1s ssss 1 1 s ssssssss17S1ss ss 11111 11 1111 s 1 1 11111 1 1 1 tt t .. E EE 1i 11 s EE f9 0 1 .. s 11 s 11 11 s 1 111 1111 1 Ems 11 11111 1s 11 1 �=1 s 1111 1 11 1 s 44 5 6 6 sri tsslsst 11 18111 -1 s1s 1 EY 1 . . . a ... .:..t... .. ..... r F.1 pp r e i eQ�sie€ "C"¢ easel ?A F s e ggE i gE gifiiiEE E&6F1 81 b ttYt Y s t1 11 1 e JI. s it 1 EE 11 a Y SS 1 5 5 8 e I "fprsYr e $ECTr` 8 If si $e 11 t tQ 1 F GAII Gupta & Associates, Inc. constitirg ng 7322 Southwest Freeway, Suite 410, Houston, Texas 77074, Tel: 713-636-2936 Office, 713-636-2987 Fax April 7, 2017 Jeffrey S. Peters, P.E., BCEE Principal Engineer Ardurra Group 2032 Buffalo Terrace Houston, Texas 77019 Reference: City of Pearland Surface Water Plant Project Dear Mr. Peters Gupta & Associates, Inc. is excited to for the opportunity to submit this proposal to the City of Pearland to provide professional engineering services in conjunction with the reference project. Please find the attached proposal which provides the detailed description of engineering and professional services for continued standards development assistance to Ardurra team. Based on the scope of services attached, we propose to complete the work under a maximum not to exceed basis in the amount of $36,800.00 as shown in the task breakdown. Also, please find the attached level of effort tabulation. We look forward to beginning work on this important project and appreciate the opportunity to serve the City of Pearland. If you have any questions or require additional information, please contact me at 713-636-2936 or email me hforouzan@gaiconsulting.com. Sincerely, E'z\-c- Hoss Forouzan, P.E. Senior Vice President City of Pearland Surface Water Plant project A. Scope of Service Standard Development 1. Specifications — Engineer will identify and coordinate specifications that may be used across Package Nos 1, 2 and/or 3 projects for the purposes of establishing uniformity and consistency across these projects. Engineer shall receive preliminary specifications list from each of the three (3) package lead consultants along with their proposed standard specifications for review by Engineer. Engineer will compare to City standard specification (if they exist) and provide recommended changes to be used a standard across all three (3) packages. 2. Standard Drawing Details — Engineer identify and coordinate standard details that may be used across Package Nos 1, 2 and/or 3 projects for the purposes of establishing uniformity and consistency across these projects. Engineer shall receive preliminary standard details from each of the three (3) package lead consultants along with their proposed standard details for review by Engineer. Engineer will compare to City standard details (if they exist) and provide recommended changes to be used a standard across all three (3) packages. B. Deliveries 1. GAI will deliver the required design specifications and drawings comments per schedule and tasks assigned. 2. GAI will attend meetings and conference calls as required to discuss comments as necessary. C. Engineering Fees GAI staff will perform the hours of services required for each item listed within the Level of effort outlined per listed rates and 3 multipliers. 1. Resources Title Name Project Manager Hoss Forouzan 2IPage City of Pearland Surface Water Plant project Electrical Designer Instrumentation Engineer Weihua Zheng Hung Duong 2. Estimated Level of effort hours per resources listed 1 Item Task Review specifications, provide Task 1 comments, make recommendations, and revised as needed. Task 2 Review drawings provide comments and make recommendations. (Subtotal Hours (Subtotal Fees Hours 1 Rates 80 80 160 Total $230.00 $18,400.00 $230.00 $18,400.00 $36,800.00 3. Total Fees The total fees per above level of efforts for listed resources and hours required to complete tasks will be estimated at $36,800.00 Thank you for the opportunity and we are looking forward to work with your team soon. Sincerely, Floss Forouzan, P.E. Senior Vice President 3IPage