Loading...
R2017-072 2017-04-10RESOLUTION NO. R2017-72 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City Manager or his designee to enter into a contract with Halff Associates, in the amount of $266,335.00, for professional services associated with the City of Pearland and Brazoria Drainage District No. 4 Joint Master Drainage Plan Project — Phase II. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain contract by and between the City of Pearland and Halff Associates, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a contract with Half Associates, for professional services associated with the City of Pearland and Brazoria Drainage District No. 4 Joint Master Drainage Plan Project — Phase II. PASSED, APPROVED and ADOPTED this the 10'" day of April. A.D., 2017. ATTEST: FING, Y S:' RETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR Resolution No. R2017-72 Exhibit "A" CONTRACT FOR PROFESSIONAL SERVICES THIS CONTRACT is entered into upon final execution by and between the City of Pearland ("CITY") and Halff Associates, Inc. ("CONSULTANT"). The CITY engages the CONSULTANT to perform professional services for a project known and described as City of Pearland & Brazoria Drainage District No. 4 Master Drainage Plan ("PROJECT"). (Project # DR1501) SECTION I - SERVICES OF THE CONSULTANT The CONSULTANT shall perform the following professional services to CITY standards and in accordance with the degree of care and skill that a professional in Texas would exercise under the same or similar circumstances: A. The CONSULTANT shall prepare a Drainage Master Plan. See Exhibit A, attached, for a detailed SCOPE OF WORK and PROJECT schedule. The PROJECT schedule shall be submitted in digital and hard copy form in the Microsoft Project for Windows format. B. The CONSULTANT shall prepare and submit a detailed opinion of estimated cost of the PROJECT. C. The CONSULTANT acknowledges that the CITY (through its employee handbook) considers the following to be misconduct that is grounds for termination of a CITY employee: Any fraud, forgery, misappropriation of funds, receiving payment for services not performed or for hours not worked, mishandling or untruthful reporting of money transactions, destruction of assets, embezzlement, accepting materials of value from vendors, or consultants, and/or collecting reimbursement of expenses made for the benefit of the CITY. The CONSULTANT agrees that it will not, directly or indirectly; encourage a CITY employee to engage in such misconduct. D. The CONSULTANT shall submit all final construction documents in both hard copy and electronic format. Plans shall be AutoCAD compatible and all other documents shall be Microsoft Office compatible. The software version used shall be compatible to current CITY standards. Other support documents, for example, structural calculations, drainage reports and geotechnical reports, shall be submitted in hard copy only. All Record Drawings electronic files shall be submitted to the CITY in TIF format. E. The CONSULTANT recognizes that all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT shall be delivered to the CITY upon request, shall become subject to the Open Records Laws of this State. Design 1 of6 D1. Revised 1/14 F. The CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons, damages to property, or any errors and omissions relating to the performance of any work by the CONSULTANT, its agents, employees or subcontractors under this Agreement, as follows: (1) Workers' Compensation as required by law. (2) Professional Liability Insurance in an amount not less than $1,000,000 in the aggregate. (3) Comprehensive General Liability and Property Damage Insurance with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for each occurrence of damage to or destruction of property. (4) Comprehensive Automobile and Truck Liability Insurance covering owned, hired, and non -owned vehicles, with minimum limits of $1,000,000 for injury or death of any one person, $1,000,000 for each occurrence, and $1,000,000 for property damage. The CONSULTANT shall include the CITY as an additional insured under the policies, with the exception of the Professional Liability Insurance and Workers' Compensation. Certificates of Insurance and endorsements shall be furnished to the CITY before work commences. Each insurance policy shall be endorsed to state that coverage shall not be suspended, voided, canceled, and/or reduced in coverage or in limits ("Change in Coverage") except with prior written consent of the CITY and only after the CITY has been provided with written notice of such Change in Coverage, such notice to be sent to the CITY either by hand delivery to the City Manager or by certified mail, return receipt requested, and received by the City no fewer than thirty (30) days prior to the effective date of such Change in Coverage. Prior to commencing services under this CONTRACT, CONSULTANT shall furnish CITY with Certificates of Insurance, or formal endorsements as required by this CONTRACT, issued by CONSULTANT'S insurer(s), as evidence that policies providing the required coverage, conditions, and limits required by this CONTRACT are in full force and effect. Design 2 of6 DI. Revised 1/14 G. The CONSULTANT shall indemnify and hold the CITY, its officers, agents, and employees, harmless from any claim, loss, damage, suit, and liability of every kind for which CONSULTANT is legally liable, including all expenses of litigation, court costs, and attorney's fees, for injury to or death of any person, for damage to any property, or errors in design, any of which are caused by the negligent act or omission of the CONSULTANT, his officers, employees, agents, or subcontractors under this CONTRACT. H. All parties intend that the CONSULTANT, in performing services pursuant to this CONTRACT, shall act as an independent contractor and shall have control of its own work and the manner in which it is performed. The CONSULTANT is not to be considered an agent or employee of the CITY. SECTION II - PERIOD OF SERVICE This CONTRACT will be binding upon execution and end April 30, 2018. SECTION III - CONSULTANT'S COMPENSATION A. The total compensation for the services performed shall not exceed the total noted in Section B. B. The CITY shall pay the CONSULTANT in installments based upon monthly progress reports and detailed invoices submitted by the CONSULTANT based upon the following: 1. Basic Services (Lump Sum) $266,335.00 2. Additional Services shall require independent and specific authorization and shall be billed as (Lump Sum): 3. Bid Phase Services (Hourly Not to Exceed) 4. Construction Phase Services (Hourly Not to Exceed) 5. Reimbursable Expenses (Not to Exceed) 6. Total: $266,335.00 C. The CITY shall make payments to the CONSULTANT within thirty (30) days after receipt and approval of a detailed invoice. Invoices shall be submitted on a monthly basis. Design 3 of 6 D1. Revised 1/14 SECTION IV - THE CITY'S RESPONSIBILITIES A. The CITY shall designate a project manager during the term of this CONTRACT. The project manager has the authority to administer this CONTRACT and shall monitor compliance with all terms and conditions stated herein. All requests for information from or a decision by the CITY on any aspect of the work shall be directed to the project manager. B. The CITY shall review submittals by the CONSULTANT and provide prompt response to questions and rendering of decisions pertaining thereto, to minimize delay in the progress of the CONSULTANT'S work. The CITY will keep the CONSULTANT advised concerning the progress of the CITY'S review of the work. The CONSULTANT agrees that the CITY'S inspection, review, acceptance or approval of CONSULTANTS work shall not relieve CONSULTANT'S responsibility for errors or omissions of the CONSULTANT or its sub-consultant(s) or in any way affect the CONSULTANT'S status as an independent contractor of the CITY. SECTION V - TERMINATION A. The CITY, at its sole discretion, may terminate this CONTRACT for any reason - - with or without cause -- by delivering written notice to CONSULTANT personally or by certified mail at 14800 St. Mary's Lane, Suite 160, Houston, TX 77079. Immediately after receiving such written notice, the CONSULTANT shall discontinue providing the services under this CONTRACT. B. If this CONTRACT is terminated, CONSULTANT shall deliver to the CITY all drawings, special provisions, field survey notes, reports, estimates and any and all other documents or work product generated by the CONSULTANT under the CONTRACT, entirely or partially completed, together with all unused materials supplied by the CITY on or before the 15th day following termination of the CONTRACT. C. In the event of such termination, the CONSULTANT shall be paid for services performed prior to receipt of the written notice of termination. The CITY shall make final payment within sixty (60) days after the CONSULTANT has delivered to the CITY a detailed invoice for services rendered and the documents or work product generated by the CONSULTANT under the CONTRACT. D. If the remuneration scheduled under this contract is based upon a fixed fee or definitely ascertainable sum, the portion of such sum payable shall be proportionate to the percentage of services completed by the CONSULTANT based upon the scope of work. Design 4of6 DI. Revised l/14 E. In the event this CONTRACT is terminated, the CITY shall have the option of completing the work, or entering into a CONTRACT with another party for the completion of the work. F. If the CITY terminates this CONTRACT for cause and/or if the CONSULTANT breaches any provision of this CONTRACT, then the CITY shall have all rights and remedies in law and/or equity against CONSULTANT. Venue for any action or dispute arising out of or relating to this CONTRACT shall be in Brazoria County, Texas. The laws of the State of Texas shall govern the terms of this CONTRACT. The prevailing party in the action shall be entitled to recover its actual damages with interest, attorney's fees, costs and expenses incurred in connection with the dispute and/or action. CONSULTANT and CITY desire an expeditious means to resolve any disputes that may arise between under this CONTRACT. To accomplish this, the parties agree to mediation as follows: If a dispute arises out of or relates to this CONTRACT, or the breach thereof, and if the dispute cannot be settled through negotiation, then the parties agree first to try in good faith, and before pursuing any legal remedies, to settle the dispute by mediation of a third party who will be selected by agreement of the parties. SECTION VI — ENTIRE AGREEMENT This CONTRACT represents the entire agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations, or contracts, either written or oral. This CONTRACT may be amended only by written instrument signed by both parties. SECTION VII — COVENANT AGAINST CONTINGENT FEES The CONSULTANT affirms that he has not employed or retained any company or person, other than a bona fide employee working for the CONSULTANT to solicit or secure this CONTRACT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of the CONTRACT. For breach or violation of this clause, the CITY may terminate this CONTRACT without liability, and in its discretion, may deduct from the CONTRACT price or consideration, or otherwise recover, the full amount of such fee, commission, percentage brokerage fee, gift, or contingent fee that has been paid. Design 5 of 6 Dl. Revised 1/14 SECTION VIII- SUCCESSORS AND ASSIGNS This CONTRACT shall not be assignable except upon the written consent of the parties hereto. n\_ OF EARLAND, TEXAS .(17 (1 DATE 03 /30/2o17 DATE Design 6 of 6 D1. Revised 1/14 CITY OF PEARLAND & BRAZORIA DRAINAGE DISTRICT NO.4 MASTER DRAINAGE PLAN SCOPE OF WORK — Phase 11 March 17, 2017 Preface Over the last several decades, the City of Pearland (City) and Brazoria Drainage District No. 4 (BDD4) have experienced significant growth and development throughout. The last decade alone has seen a two -fold increase in the area's population. With development comes an increased risk of flooding from streams as well as other sources, which can present hazards to the public and impede growth. In an effort to more effectively plan drainage improvements to bayous and ditches and to consider regulatory measures aimed at minimizing negative development impacts, the City and BDD4 have taken a proactive approach. As such, the City of Pearland and Brazoria Drainage District No. 4 have selected Halff Associates to prepare a drainage master plan update for the combined area. The services and products resulting from the study shall be referred to as the City of Pearland/Brazoria Drainage District No. 4 Master Drainage Plan. The Pearland/Brazoria DD4 Drainage Master Plan is located within the shared boundary of the City and BDD4, which encompasses a combined area of nearly 97 sq. mi. The project is generally bound by Clear Creek to the north and FM 521 to the west. The eastern and southern boundaries are Tess clearly demarcated, with a portion of the City extending into Harris County on the east side of Clear Creek. The Galveston County line serves as the remainder of the eastern boundary. A majority of BDD4 is located north of SH6, with the exception of the area near the Fort Bend County line, which includes portions of Iowa Colony and Manvel. Streams included in the study are Clear Creek, Hickory Slough, Mary's Creek, Cowart Creek and related ditches and diversions, Chigger Creek, Mustang Bayou, and the West Fork Chocolate Bayou. The specific tasks to be completed for each stream will be detailed in subsequent sections of the scope. The study area lies within fourteen (14) FEMA FIRM panels in three counties; Brazoria, Harris, and Fort Bend. Panels include those in Brazoria (48039C 00101, 0020H, 00301, 00351, 00401, 0045J, O110H), in Harris (48201C 1010L, 1030L, 1035L, 1055L), and in Fort Bend (48157 0305L, 0315L, 0455L). The effective dates vary. Project Purpose The purpose of the Master Drainage Plan is to conduct a two-phase update to the existing drainage master plans for both the City and BDD4. The focus of this effort will be on the bayous and ditches that drain the City and BDD4. The Phase 1 effort included data collection, development of data inventories, review of models and data, field reconnaissance, and recommendations for the Phase II effort. Phase II is intended to establish the baseline conditions modeling and mapping for the major bayous and tributaries and identify the capacity of many of the smaller ditches within the combined jurisdiction. Flood reduction alternatives will be identified and evaluated for the 100 -year Level of Service (LOS) as well as a lesser LOS if the 100 -year is infeasible. Cost -benefit analysis will be conducted and the projects will be evaluated and prioritized in several categories based on their effectiveness, affordability and acceptability. In addition, an implementation plan will be prepared such that the proposed projects can be programmed into the City and BDD4 CIP and the information is accessible digitally. 11 Page While the focus is on bayous and ditches, the information developed during the MDP process will help identify areas where localized flooding may be the result of limited storm sewer or neighborhood ditch capacity. Improvements to receiving ditches recommended through the MDP will provide the outfall capacity to accommodate local drainage improvements. In addition, small area studies may be recommended as part of the MDP effort if it is determined that the ditches are not the source of flooding. Project Scope Task 1: Project Management/ Coordination 1. Attend one (1) project kickoff meeting with staff from both the City and BDD4. The meeting will be coordinated by the Halff Project Manager and is intended to discuss key items such as project schedule, budget, and any specific directives. Halff will provide a preliminary schedule of tasks. 2. Attend up to eight (8) progress meetings throughout Phase II to discuss specific tasks such as data collection, outreach, baseline and future condition modeling, flood mitigation alternatives, project costs, etc. Meeting notes shall be submitted to the City and BDD4 Project Managers within five (5) working days after each meeting. 3. Develop a Project Management Plan (PMP) for the City and BDD4. This is a planning and communication document that will include specific information regarding to the scope and budget, as well as schedule, team resources, discussion of quality control procedures, and a communication plan. PMP shall be completed after the project kickoff meeting. Within the PMP, the project schedule will be provided. Any delays to the project schedule shall be discussed with the City and BDD4 for review and approval. 4. Coordinate project activities with the City and BDD4 as well as internally. This includes phone and email communication. 5. Monthly project status reports shall be provided to the City and BDD4 with the monthly invoices. Separate monthly invoices will be provided for each agency, but the same project status reports will be provided. Progress shall include notes regarding work completed in the preceding billing cycle, work expected to be completed in the next cycle, and any outstanding questions or issues for discussion. Task 2: Outreach 1. Coordinate with City and BDD4 staff and key stakeholders from other departments to refine the short-term and Tong -term vision for primary system drainage improvements within the shared jurisdiction. Align this vision with the mission and goals of both the City and BDD4. a. One (1) combined (City and BDD4) visioning meeting will be conducted. The specific date and location will be determined by the City and BDD4. b. Engineer will assist with the development of necessary exhibits and/or presentation. 2. Conduct public meetings to inform the public about the MDP effort, identify citizen issues, provide public information regarding the current drainage conditions and potential improvement alternatives, and increase public understanding of the MDP planning process. a. A maximum of three (3) public meetings will be attended by the Engineer b. Engineer will assist with the development of necessary exhibits and/or presentation. 3. Attend one (1) City Council Meeting and one (1) BDD4 Board Meeting to present the Master Drainage Plan update findings and recommendations. Prepare a presentation and the requisite exhibits for the meeting. 21 Page Task 3: Additional Data Collection and Inventory Updates 1. New information that has been submitted to the City and BDD4, projects that have been completed within the last year, data on more recent flood events, and other relevant information should be collected and evaluated. In the case of reports and modeling, that information will be incorporated into the data and model inventories developed in Phase I. The data and model inventories will be updated a maximum of two (2) times during the MDP process. Additional updates after the completion of the MDP are considered additional services. 2. Additional field reconnaissance will be done before and/or during the modeling phase of the MOP. Site visits will be documented using the Halff Mobile Applications. Documentation will include the location, feature type, dimensions (if applicable), general condition, and photographs. Data points collected will be added to the existing Field Reconnaissance geodatabase developed during Phase I of the MDP update. Measurements will be taken for bridges/culverts not surveyed. 3. Field survey will be collected at bridges and culverts along the major bayous based on the level of detail as discussed in Task 4. Survey will include approximately 40 bridge/culvert structures including the siphon at Rodeo Palms ditch. Task 4: Base Model Update and Hazard Identification 1. Existing Conditions Hydrology: a. Existing hydrologic models provided by the City and BDD4 will be updated. The Clear Creek hydrologic model (includes Hickory Slough, Mary's Creek, Cowart Creek, Chigger Creek) will be revised based on the updated basin delineation provided in Phase I. This update will include revision of TC&R parameters, channel routing, diversions relationship, storage -discharge relationships, and any other parameter as required. These updates will be used for the MDP only. Changes to the Clear Creek model for a FEMA submittal will require coordination with HCFCD and other jurisdictions under a separate contract. b. Existing HEC -1 models for Mustang and Chocolate Bayou will converted into HEC -HMS format. Drainage areas, TC&R parameters, and channel routing will be updated. c. Update storage routing of HEC -HMS models using HEC -RAS models developed in Task 4.b. d. Output flows will be compared against effective or best available flows. 2. Existing Conditions Hydraulics: a. Existing HEC -RAS models for Hickory Slough, Mary's Creek, Cowart Creek, Chigger Creek, and Town Ditch will be updated based on the most current terrain dataset (2008 HGAC LiDAR) and field survey at major bridge/culvert locations. FEMA models will be updated to reflect changes in channel layout, fill placement, new regional detention ponds, and new storm sewer connections. The hydraulic models for Mary's and Hickory Slough will be extended further west to include additional inline storage structures. In some instances unsteady modeling may be utilized to model complex hydraulic situations. b. New HEC -RAS models will be developed for Mustang Bayou, West Fork Chocolate Bayou, and portions of the Cowart Creek system. The Cowart Creek Diversion Ditch will be included in the FEMA Mapping update for Brazoria County. c. Preliminary hydraulic models will be prepared for several streams including Country Place Ditch, CR 383, Mustang Spur, New Corrigan Ditch, Resort Park Ditch, Rodeo Palms Ditch, and Weatherford Ditch. Preliminary models will be developed based on LiDAR information but no survey will be included with the exception of Rodeo Palms Ditch. Survey at the structures and canal siphon along Rodeo Palms Ditch will be included. d. Evaluate existing flood hazards based on updated modeling and mapping. 31 Page Table 1. HEC -RAS Models Ditch ID Stream Length (miles) New Model I Preliminary I Update C107-03-00 Cannon Cannon Ditch Spur Chigger Creek Chigger Creek By -Pass Cold River Ranch Ditch Country Place Ditch Cowart Creek Cowarts Creek (CR 413 Ditch) CR 383 CR 413 Ditch CR383 Dare Ditch Diversion Ditch E103-00-00 East Fork of Chocolate Bayou HickorySlough Hood Ditch Hospital Ditch LeClair Ditch Mary's Creek Mary's Creek Bypass McCu tch e n Moore Rd. Ditch Mustang Bayou Mustang Spur New Corrigan Ditch North Fork Mary's Creek North Fork of Mary's Creek Resort Park Ditch Rodeo Palms Ditch Shadow Creek Ranch South Fork Mary's Creek South Fork of Mary's Creek Town Ditch Villarreal Weatherford Ditch West Fort of Chocolate Bayou 1.2 2.8 7.7 2.5 0.5 2.3 1.1 0.6 1.1 3.7 1.1 0.5 1.1 1.5 0.5 1.5 1.2 3.5 2.5 0.5 3.6 0.4 1.2 1.0 0.9 3.6 1.2 2.6 1.2 4.6 1.1 0.9 1.3 0.2 8.0 1.9 0.5 1.5 9.0 2.4 1.9 Total 142 29.4 1 42.8 41Page 3. Ditch Capacity Analysis a. The remainder of channels with in the study area will be studied based on the Rational Method in order to determine their flow capacity. No hydraulic models will be prepared for these reaches. A total of 91.8 miles will be evaluated by capacity only. Table 2 shows a list of the total mileage of each modeling category by major watershed. i. Calculate Peak Discharges for each ditch using the Rational Method. ii. Evaluate the capacity of each ditch using Manning's Equation (LiDAR topo) iii. Determine an approximate level of service based on the ditch capacity Table 2. Ditch Modeling Summary Ditch ID Stream Length (miles) Capacity Only New Model Preliminary Update Totals Chigger Creek 7.0 1.7 3.8 12.5 Chocolate Bayou 4.7 4.6 0.2 9.6 ClearCreek 34.1 4.8 2.4 41.3 Cowart Creek 18.5 4.0 17.1 39.6 Hickory Slough 13.0 8.0 21.0 1Mary's Creek 11.3 12.5 11.3 35.1 I Mustang Bayou 1.5 7.7 1.1 10.3 West Fork Chocolate Bayou 1.6 2.5 4.7 8.8 Total I 91.8 I 14.2 I 29.4 42.8 178.1 _ _, Task 5: Future Condition Analysis and Hazard Identification Consider a variety of strategies to reduce flooding within the shared jurisdiction of Pearland and BDD4. This effort will consider the expected future growth of the area in the development of these alternatives. Improvement options may include traditional approaches such as conveyance and storage improvements, as well as other strategies such as multi -use facilities and green approaches. Consider one (1) additional level of service, such as the 10 -year or 25 -year where 100 -year capacity projects are financially or physically impractical. Technical memorandums detailing the future condition hydrology approaches and the alternatives to be considered will be provided to the City and BDD4 before the modeling begins. 1. Develop Future Conditions Hydrology a. Determine expected development levels using land use data for the City/BDD4 where available. The use of future land use data and how to estimate areas with no data will be discussed with the City/BDD4. Future thoroughfares may also be considered in the development of the future scenario. b. Update the hydrologic parameters including the loss parameters (% impervious cover) as well as the hydrograph parameters (TC, R). Soil parameters will remain consistent with the existing conditions as they are not expected to change. Storage routing may be updated if needed. c. Update the HEC -HMS models with the updated parameters, execute and troubleshoot the models. The future conditions model will not include any changes to the channels or additional detention. It will be used as a comparison to existing conditions to determine the expected increases in discharges due to future development and to size improvements. 5IPage d. Compare revised results to effective or best available models to determine changes. 2. Flood Reduction Alternatives Analysis e. Identify flood prone areas using the existing and future conditions modeling and preliminary mapping (RASMapper). f. Identify specific locations and determine appropriate criteria for flood reduction alternatives. This includes determining what types of projects will be evaluated, specific configurations for channels and detention projects, detention service areas, and what types of multi -use projects are preferred. g. Conduct hydrologic and hydraulic modeling of proposed channel improvement alternatives to achieve a 100 -year level of service based on the future conditions modeling completed in Task 5.1. A location map will be developed for each project which includes the extents and information regarding the proposed channel configuration. h. Conduct hydrologic and hydraulic modeling of proposed channel improvement alternatives to achieve one (1) alternative level of service (10 -year, 25 -year, etc.) based on the future conditions modeling completed in Task 5.1. The specific level of service will be discussed with the City/BDD4 prior to modeling the scenario. A location map will be developed for each project which includes the extents and information regarding the proposed channel configuration. i. Conduct hydrologic and hydraulic modeling of proposed regional detention improvement alternatives to achieve a 100 -year level of service based on the future conditions modeling completed in Task 5.1. A location map will be developed for each project which includes the extents and information regarding the proposed detention configuration. j. Consider improvements to small ditches based on the capacity analysis. Recommendations will include basic channel configurations and minimum culvert sizes. 3. Planning Level Concepts a. Develop planning level concepts for the proposed channel improvements, including any channel sections that may include trails. Concept sketches may be used for the public meetings. b. Develop planning level concepts for the proposed detention improvements, including any improvements that may have multiple uses such as parks and recreational uses. Concept sketches may be used for the public meetings. Task 6: Conduct Cost Benefit Analysis 1. Benefit -Cost Analysis — Compare the cost of proposed improvements to the estimated reduction in damages (benefits) on an annualized basis. Specific subtasks include: a. Develop Planning Level cost estimates for selected alternatives that reduce flooding and are considered acceptable by the City/BDD4. During the public meeting, some input may be gathered from the public regarding the acceptability of alternatives as well. b. Flood Damage Analysis — Average annual damage estimates will be evaluated using the HEC -FDA (Flood Damage Assessment) software with USACE depth -damage curves. The tool will be run for each feasible alternative for a defined range of flows. A damage analysis will also be conducted for the existing conditions as a baseline for comparison. Annual Damages will be brought to present value using an acceptable discount rate and 6IPage project life. Flood depths at structures will be based of the calculated WSEL and an assumed finished floor elevation (FFE). Given the number of structures in the project area, the FFE will be estimated from the LiDAR and field observation. If surveyed FFE are available, that data can be incorporated into the analysis. c. Benefit Calculation — Benefits for each alternative will be calculated by subtracting the alternative flood damages from the existing (without project) damages. The difference between the two will be considered the benefit. d. Benefit -Cost ratios will be developed based on the present value basis and will be used to determine the economic viability of each feasible alternative. 2. Other non -monetary benefits will be considered in the recommendation process. These include, improved mobility and emergency access due to reduced roadway flooding, area of floodplain reduced, number of habitable structures, removed from floodplain, etc. These will not be included in the calculation of the benefit -cost ratio. Task 7: Prioritize and Implement Future Projects (Capital Improvement Plan) 1. Evaluate and Prioritize Projects a. Develop prioritization metrics and weighting specific to City of Pearland and BDD4. b. Select projects identified and evaluated in the alternatives analysis task based on acceptability to the public, effectiveness with respect to flood reduction, and cost- effectiveness given current and projected future funding constraints. Consider several categories of projects, including O&M projects, small CIP, large CIP, and reserve, or "opportunity" projects. 2. Consider alternative funding sources, such as utility fees, impact fees, grant opportunities and other mechanisms to help fund recommended projects. 3. Implementation Plan — Develop a planned approach for implementation of recommended projects based on identified constraints. a. Develop project classification and assign a priority score based on the criteria developed in Task 7.1.a. b. Identify project constraints and associated costs including: i. Utility relocation including public utilities as well as pipelines and other private utilities ii. Land acquisition and associated cost iii. Environmental permitting and mitigation, including estimated costs c. Develop fact sheets for prioritized projects. Fact sheets will include information such as project name, project location map, description including design configuration specifics, estimated cost for design and construction, timeframe, and other information. Fact sheets will be linked to a GIS feature. Task 8: Update Drainage Criteria and Policies a. Provide a review and benchmarking of current City drainage criteria and ordinances relative to other local stormwater programs. Policies regarding the submittal process, basic hydrologic methodologies, detention, and other high-level drainage policy will be considered. Specific criteria such as street grading, inlet and pipe sizing, and other detailed items will not be included. 7IPage b. Review City and BDD4 criteria and policies with the intent of improving regulatory practices, and in some cases avoid the pitfalls surrounding communities have experienced. c. Based on internal discussions, the Phase I criteria review, and the benchmarking task, provide recommendations to assist with improvements to create concise, consistent, and up-to-date criteria and policies. This is limited to small adjustments to the criteria. A large-scale update including public input will require additional scope and fee. Task 9. Deliverables The Phase II submittal will include the project deliverables; a detailed narrative discussing the data collection and inventory process, compilation of all the data collected and evaluated, updated digital information, including GIS, H&H models, photos, and recommendations for Phase II. Specific tasks relating to the Phase I Submittal preparation include the following: 1. Master Drainage Plan Report Deliverable a. Prepare a detailed narrative discussion of the procedures and findings of each task b. Prepare Exhibits that provide relevant information including but not limited to drainage areas and hydrologic parameters, hydraulic modeling information such as channel alignments and cross sections, revised flood mapping, proposed improvement alternative locations and dimensions, limits of inundation for improved conditions, etc. c. Relevant figures and tables, including hydrologic and hydraulic calculations and results, meeting notes project decisions. d. Planning -Level cost estimates for recommended flood reduction alternatives. e. Information and exhibits used for the public outreach effort. 2. Digital Data Deliverable a. Copies of the digital information will be included on CD/DVD with the report, including a pdf copy of the report itself. b. Update the MDP Geodatabase developed in Phase I with modeling and mapping information developed in Phase II. The Geodatabase will include the updated feature classes relating to the model inventory and report/plan inventory developed as part of Phase I as well as additional field data collected. Among other data fields, ownership of features will be identified. Other relevant digital data collected will be organized into the Geodatabase as well. c. Provide all models collected as well as any model updates. The models will be catalogued and include the location, date prepared, and any other information available. The associated GIS features will be included in the Geodatabase. The evaluation will be provided as part of the narrative; but notes will be included in the GIS. 3. Respond to City/BDD4 Comments a. Review comments from the City and BDD4 relating to the hard copy report or digital data delivery. Coordinate with City and BDD4 and attend meetings as needed to discuss. Task 10. Quality Assurance/Quality Control Each task will be subjected to internal QA/QC by a separate water resources team at Halff. Associated documentation will be provided with the Final Phase I Report. Specific tasks relating to the QA/QC process include the following: 81 Page 1. The QA/QC program will include a multi-level approach to ensure that senior members review, comment, and approve the completed work. Quality control check lists shall be created for the data collection, GIS data development, and final report elements of the work. Each checklist shall include milestone review events that describe the items to be reviewed and include documentation of the comments by the reviewer and responses from the Project Manager. All project materials presented to the City and BDD4 as draft or final products will be accompanied by QA/QC certification. QA/QC will be performed for the following specific tasks: a. Existing Conditions Modeling — Includes new modeling (detailed and preliminary) as well as model updates and the capacity analysis to be completed for smaller local ditches. b. Proposed Improvement Modeling — Includes new modeling for the proposed flood improvement alternatives and calculations for small ditch and culvert improvements. c. Phase 11 Report — Including the narrative, exhibits, figures and tables. In addition, cost estimates, GIS information, fact sheets and other information will be reviewed. 2. The ENGINEER shall retain all work products generated and information gathered and used during the course of the project. This includes, but is not limited to, base data as well as intermediate work products. Task 11. Additional Services The following services are NOT included in the Phase 11 MDP contract; however, they may be added at a later date as needed to facilitate updates to the Brazoria County FEMA maps at the discretion of the City and/or BDD4. 1. Floodway Analysis and Remapping a. Update the floodway mapping for Clear Creek on the Brazoria County side of the creek. This does NOT include changes to the encroachment analysis completed for the Clear Creek (A100-00-00) Effective Model, which is managed by Harris County Flood Control District. b. Update the encroachment analysis for Hickory Slough, Mary's Creek, Cowart Creek and other necessary analysis using the modeling developed as part of the Pearland/BDD4 MDP Phase 11. c. Update the floodway mapping for Hickory Slough, Mary's Creek, Cowart Creek and other necessary analysis using the encroachment analysis developed as part of Task 11.1.c above. Wage Project Phases and Tasks' CITY OF PEARLAND & BRAZORIA DRAINAGE DISTRICT NO. 4 MASTER DRAINAGE PLAN LEVEL OF EFFORT ESTIMATE February 9, 2017 oa o. A O• d 0) U0 O q c O g 0 C m C w y �C A C ~ w 0- U C � Q C rn 12 c 0 Administrative Direct Costs 5300.00 $225.00 $200.00 5165 00 5150.00 $105 00 5150.00 $120.00 $80.00 $80.00 Hours Task 1: Project Management & Coordination Project Kickoff Meeting & Minutes (1) Project Update Meetings & Minutes (8) Development of Project Mangement Plan Project Coordination Project Status Reports and Invoicing (8) Subtolal Task 1 2 4 3 16 8 2 32 4 24 8 4 12 Task 2: Community Outreach Internal Visioning Session Preparation of Materials Meeting Attendance Public Meetings (2) Preparation of Materials Meeting Attendance City CouncilBDD4 Board Meeting 8 ,4 23 12 8 8 8 '2 51.645 55.280 53.060 $18,380 53.420 540 $321. 51.685 55.600 53.060 518.380 53,420 14 531.785 5362 S32.150 81.050 51,980 56.420 55.820 53.840 Subtotal Task 2 20 516.170 340 51.950 52.020 56,420 55.900 S3.920 520,210 Task 3: Additional Data Collection and Inventory Updates Data Collection Collect additional reports and modeling data Webmap Updates Historical Rainfall and Stroam Gage Data Field Reconnaissance Field Survey Data subtotal task 3 2 0 8 2 2 4 4 24 56 32 72 16 4 $1,890 $3,710 5750 $10,700 $300.00 560,000.00 20 0 $17,050 ,3111 51.890 53.710 5750 511,000 560.000 577,350 Project Phases and Tasks' CITY OF PEARLAND & BRAZORIA DRAINAGE DISTRICT NO. 4 MASTER DRAINAGE PLAN LEVEL OF EFFORT ESTIMATE February 9, 2017 U g O g c O ro c 2 CI) O • g ▪ c o 16 i R y C.2 N N C Q2w a 8 c cm c g 1.2 0 N co 1, 0 dministrative Task 4: Baseline Conditions Modeling Hydrologic Modeling Update Clear Creek Watershed Model 4 Import/Update Mustang, Chocolate, Chigger Models 8 Update Storage Routing 4 Results Analysis & Comparison 2 Hydaulic Modeling Update Hickory, Marys, Cowart, Town Ditch Models 6 Models for Mustang, Chocolate, Chigger Preliminary Modeling (LiDAR Only) Evaluate Existing Flood Hazards Ditch Capacity Analysis Rational Method Calculations Ditch Capacity Analysis Level of Service Determination JUo1Oral l asK 4 16 16 4 2 2 2 16 24 24 8 40 64 40 16 50 S7.740 512.460 59.060 53.453 57,740 512.480 59,060 S3.450 24 64 64 40 160 128 4 8 16 8 32 16 64 4 8 16 104 168 616 4 8 S9.510 530,000 527,760 54.440 55.010 $9,570 $3,990 59.510 530.000 527,760 $4,440 55,010 S9,570 S3,990 5123,0i0 SO 5123.010 Task 5: Drainage Improvement Alternatives Develop Future Conditions Hydrology Determine Expected Development Levels Update Hydrologic Parameters Updare and Execute HEC -HMS Models Compare Results to Existing and Evaluate Flood Reduction Alternatives Analysis Identify Specific Areas for Improvement Determine Improvement Criteria H&H Modeling for 1% LOS Channel Improvements H&H Modeling for Alt. LOS Channel Improvements H&H Modeling for Regional Detention Small Ditch Improvement Analysis Planning Level Channel Scenarios Planning Level Detention Scenarios ovvrvcm Jabsir. 2 2 2 2 4 8 4 16 32 2 4 16 6 12 32 8 4 4 4 4 4 8 8 16 12 80 200 16 12 80 200 12 6 12 40 120 12 2 8 16 40 46 u ( 8 24 8 24 128 ( 11 668 16 48 $2,270 $7,510 $2,610 $6,600 62,580 $5,700 $36,980 $37,860 $22,890 $8,370 $4,080 $4,080 5141.530 SO S2.270 S7,510 S2.610 S6.600 52.580 55.700 S36.980 S37.860 522,890 $8.370 54,080 54,080 $141.530 CITY OF PEARLAND & BRAZORIA DRAINAGE DISTRICT NO. 4 MASTER DRAINAGE PLAN LEVEL OF EFFORT ESTIMATE February 9, 2017 Project Phases and Tasks' Principle -In - Charge Senior Project Manager U Q a c O i Senior Professional Engineer Professional Engineer a, c .c ccn e 1— w Landscape Architect 0 C7 8 m to 5 0 Administrative Effort Subtota Direct Costs Project Total Task 6: Benefit Cost Analysis Benelt-Cost Analysis Develop Planning Level Cost Estimate 4 16 32 40 512,540 512,540 Flood Damage Assessment 2 4 8 16 80 2 3 $14.500 514,500 Calculation of Benefits 2 2 4 12 24 56.030 56,030 Benefit -Cost Ratios 2 8 51.395 51.395 Identify Non -Monetary Benefits 2 4 8 16 53.990 $3,990 Subtotal Task 6 4 13 0 34 68 168 0 2 6 0 $38.455 50 538.455 Task 7: Prioritize and Implement Projects (CIP) Evaluate and Prioritize Projects Develop Prioritization Criteria 2 4 4 4 52,760 52,760 Select Projects for Project Categories 2 4 8 8 16 55.700 55,700 Condor Alternative Funding Sources 4 4 4 53.780 53,780 Develop Implementation Plan Develop Project Classification and Priority 2 8 8 24 56.240 56,240 Identify Project Constraints and Costs 2 4 2 o ' T 55.700 55,700 Develop Project Fact Sheets and GIS Information 1 4 4 6 s ' 8 56,980 56,980 Subtotal Task 7 13 28 0 36 32 76 0 8 16 0 531.160 50 531,160 Task 8. Update Drainage Criteria/Policy Review and Augment City Benchmarking 2 4 5975 5975 Review Criteria and Policies 2 4 8 51.995 51,995 Make Recommendations for Updates .- 2 2 4 4 S2.400 52.400 Subtotal Task 8 2 4 0 6 8 16 0 0 0 0 55.370 Sr 85,370 CITY OF PEARLAND & BRAZORIA DRAINAGE DISTRICT NO. 4 MASTER DRAINAGE PLAN LEVEL OF EFFORT ESTIMATE February 9, 2017 Project Phases and Tasks' Principle -In - Charge Senior Protect Manager a G Q W Sc Senior Professional Engineer Professional Engineer Engineer in Training Landscape Architect (/) (1 `o c °' N 3 C5 `o c 4 Administrative O rn = o W Direct Costs Project Total Task 9: MDP Phase II Submittal Master Drainage Plan Report Deliverable Narrative Development 16 8 8 32 S9.480 S9,480 Exhibit Propralion 4 8 16 16 4 40 $9,860 59,860 Tables 8 Figures Preparation 4 16 32 66.660 56.660 Cost Estimate Exhibits 4 12 'F 54.380 64.380 Community Outreach Information 1 2 6 51,395 51.395 Digital Submittal Prepare PDF copy of report 1 4 4 $965 S965 Finalize Goodatabase 4 4. 8 $2.00S 62.005 Compile Calculations. Models. Etc. 1 4 6 $1.665 61.665 Respond to Comments and Update Report 6 8 16 32 ''2 $10.080 510.080 Subtotal Task 9 40 14 44 116 I i ti 'w 4 646.490 50 S46.490 task 10: Quality Assurance/Quality Control Existing Conditions Modeling OA/QC 4 12 8 4 $5.220 65.220 Proposed Conditions Modeling QA/OC 4 12 16 8 4 $5.220 65,220 Phase II MDP Report and GIS QA/OC r. 4 12 8 4 16 66.500 66,500 Sub:_'.: .•' 0 12 36 48 24 2 2 12 16 0 $16,940 50 616.940 >ROJJECT TOTALS 25 310 40 417 596 1783 52 90 168 18 5436.800 $60.860 5532,670 NAN-HOUR PERCENTAGES 1 0.79 8.9.0 1 1% 11.9`%, 17.0% 51.04,, 1.5% 2.6% 4.8% 0 54, ID Task Name 1 )ask 1- Project Management 2 BDD4 Project Authorization 3 Pearland Project Authorization 4 Project Kickoff Meeting 5 Internal Project Planning 6 Project Management 7 /ask 2 - Community Outreach 8 Internal Visioning 9 Public Meeting No. 1 10 Public Meeting No. 2 11 Pearland City Council Presentation 12 BDD4 Board Presentation 13 task 3 - Additonal Data Collection 14 Data Collection 15 Collect Additional Reports/Data 16 Webmap Updates 17 Historical Rainfall and Gage Data 18 Field Investigation 19 Channel/Structure Survey 20 Survey Needs Identification 21 Set Control 22 Field Survey Structures 23 `ask 4 - Baseline Conditions Modeling 24 Hydrologic Model Update 25 Update Clear Creek HEC -HMS Model 26 Convert HEC -1 Models to HEC -HMS 27 Revise Drainage Areas 28 Update Loss and UH Parameters 29 Update Storage Routing 30 Evaluate Results and Comparison 31 Hydraulic Model Updates 40 days 32 Develop Preliminary Models 20 days 33 Update RAS Models (Hickory, Mary's, Etc 20 days Duration (Start days 4ue 4/4/17 0 days Tue 4/4/17 0 days Mon 4/10/17 0 days Mon 4/17/17 10 days Mon 4/17/17 265 days Mon 4/17/17 200 days Mon 5/1/17 5 days Mon 5/1/17 0 days Fri 9/1/17 0 days Fri 1/5/18 0 days Fri 2/2/18 0 days Fri 2/2/18 35 days Mon 5/1/17 25 days Mon 5/1/17 5 days Mon 5/1/17 S days Mon S/8/17 20 days Mon 5/8/17 10 days Mon S/1/17 35 days Mon 5/1/17 5 days Mon 5/1/17 10 days Mon 5/8/17 20 days Mon 5/22/17 85 days Mon 5/8/17 60 days Mon 5/8/17 10 days Mon 5/8/17 5 days Mon 5/8/17 5 days Mon 5/15/17 10 days Mon 5/22/17 10 days Mon 7/3/17 10 days Mon 7/17/17 Mon 6/5/17 Mon 6/5/17 Mon 6/5/17 Project. Pearland_B0D4_MDP Ph Date: Fri 3/24/17 Task Split Milestone Summary • ti•1=11p (Finish Fri 4/20/18 Tue 4/4/17 Mon 4/10/17 Mon 4/17/17 Fri 4/28/17 Fri 4/20/18 Fri 2/2/18 Fri 5/5/17 Fri 9/1/17 Fri 1/5/18 Fri 2/2/18 Fri 2/2/18 Fri 6/16/17 Fri 6/2/17 Fri 5/5/17 Fri 5/12/17 Fri 6/2/17 Fri 5/12/17 Fri 6/16/17 Fri 5/5/17 Fri 5/19/17 Fri 6/16/17 Fri 9/1/17 Fri 7/28/17 Fri 5/19/17 Fri 5/12/17 Fri 5/19/17 Fri 6/2/17 Fri 7/14/17 Fri 7/28/17 Fri 7/28/17 Fri 6/30/17 Fri 6/30/17 CIty of Pearland/8razoria Drainage District No. 4 Master Drainage Plan Update - Phase II Qtr 2,2017 Mar Apr 1 L 8004 Project Authorization 110 . Pearland Project Authorization 4/17 Project Kickoff Meeting Ion Project Summary r External Tasks External Milestone G Inactive Task Qtr 3, 2017 May 1 Jun I Jul I Aua ■ Qtr 4, 2017 I Seo Oct 1 9/1 ♦ Publ c Meeting No. 1 Task 3 - Addkonal Data C..ection Data Collection Channel 'Structure Survey Halff Survey Halff Sury I Qtr 1,2018 Nov 1 Dec Jan Qtr 2, 2018 Feb 1 Mar Aar i 1 v Iun ask 1F Ottititt Manage i..sk 2 - Community Outreach 1/5 t Public Meeting No. 2 2/2 t Pearland City Council Presentation 2/2 .BDD4 Board Presentation Task 4 - Baseline Conditions Modeling Hydrologic Node' Update 4 Hydraulic lei del Updates Imigml Hig=gigj Inactive Milestone Inactive Summary Manual Task Duration -only Page 1 Manual Summary Rollup . Manual Summary Start -only Finish -only C Deadline Progress Manual Progress ID ask Name City of Pearland/Brazoria Drainage District No. 4 Master Drainage Plan Update - Phase 11 Duration Start Finish I Qtr 2, 201' Mar Aor 34 Models for Mustang, Chigger, Chocolate b days 35 Evaluate Existing Flood Hazards 36 Ditch Capacity Analysis 37 Rational Method Calculations 38 Ditch Capacity Analysis 39 Level of Service Determination 40 Data and Model Update QA/QC (Task 9) 41 Respond to QA/QC Comments 42 Submit Existing Conditions Memorandum 43 /ask 5 - Drainage Improvement Altematives 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 Future Conditions Hydrology Determine Expected Development Update Hydrologic Parameters Update HEC -HMS Models Future Conditions Storage Routing Compare Results to Existing Flood Reduction Alternatives Identity Areas for Improvement Determine Improvement Criteria H&H Modeling for 1% LO5 (Channels) H&H Modeling for Alt. LOS (Channels) H&H Modeling for Regional Detention Small Ditch Improvement Analysis Planning Level Concepts Planning Level Channel Scenarios Planning Level Detention Scenarios Review Planning Level Scenarios Alternatives Analysis QA/QC Respond to QA/QC Comments Submit Alternatives Analysis Memo 64 /ask 6: Benefit Cost Analysis 65 Develop Planning Level Cost Estimates 66 Flood Damage Assessment Project. Pearland_BDD4_MDP Ph Date: Fri 3/24/17 Task Split Milestone Summary on 6/5/17 ri 6/30/17 10 days Mon 7/17/17 Fri 7/28/17 45 days Mon 5/8/17 Fri 7/7/17 15 days Mon 5/8/17 Fri 5/26/17 15 days Mon 5/29/17 Fri 6/16/17 15 days Mon 6/19/17 Fri 7/7/17 10 days Mon 7/31/17 Fri 8/11/17 15 days Mon 8/14/17 Fri 9/1/17 0 days Fri 9/1/17 Fri 9/1/17 90 days Mon 9/4/17 Fri 1/5/18 65 days Mon 9/4/17 Fri 12/1/17 10 days Mon 9/4/17 Fri 9/15/17 5 days Mon 9/18/17 Fri 9/22/17 10 days Mon 9/25/17 Fri 10/6/17 10 days Mon 11/6/17 Fri 11/17/17 10 days Mon 11/20/17 Fri 12/1/17 S0 days Mon 9/4/17 Fri 11/10/17 10 days Mon 9/4/17 Fri 9/15/17 5 days Mon 9/18/17 Fri 9/22/17 10 days Mon 9/25/17 Fri 10/6/17 10 days Mon 10/9/17 Fri 10/20/17 10 days Mon 10/23/17 Fri 11/3/17 5 days Mon 11/6/17 Fri 11/10/17 35 days Mon 10/2/17 Fri 11/17/17 15 days Mon 10/2/17 Fri 10/20/17 15 days Mon 10/16/17 Fri 11/3/17 10 days Mon 11/6/17 Fri 11/17/17 10 days Mon 12/4/17 Fri 12/15/17 15 days Mon 12/18/17 Fri 1/5/18 0 days Fri 1/5/18 Fri 1/5/18 90 days Mon 7/31/17 Fri 12/1/17 30 days Mon 10/9/17 Fri 11/17/17 30 days Mon 7/31/17 Fri 9/8/17 Pay IQtr 3,201' • Ditch :apacltyAtrrsls Qtr 4, 2017 I Qtr 1, 2018 I Qtr 2, 2018 Are l Sep Oct 1 Nov 1 Dec Jan 1 Feb 1 Mar Aor 1 May 1 Jun Halff ten/QC 9/1 Existing Conditions Memorandum Task 5 - Drainage Improvement Alternatives Future Conditions Hydrology action AkematMs ping Level Concepts Project Summary 1 1 Inactive Milestone Manual Summary Rollup .— External Tasks ..._z: - Inactive Summary Manual Summary • External Milestone 6, Manual Task Start -only 111, Inactive Task Duration -only uMeliMM Finish -only Page 2 Half, QA/QC 1/S . Subrrilt Alternatives Analysis Mama Task 6: Benefit Cost Analysis C 3 Deadline Progress Manual Progress a ID Task Name Duration Start Finish days 67 Calculation of Benefits on 11/20/1' Fri 11/24/17 68 Benefit -Cost Ratios 5 days Mon 11/27/17 Fri 12/1/17 69 Identify Non -Monetary Benefits 10 days Mon 11/20/17 Fri 12/1/17 70 /ask 7: Prioritize and Implement Projects 45 days Mon 12/4/17 Fri 2/2/18 I 71 Evaluate and Prioritize Projects 30 days Mon 12/4/17 Fri 1/12/18 72 Develop Prioritization Criteria 10 days Mon 12/4/17 Fri 12/15/17 73 Select Projects 10 days Mon 12/18/17 Fri 12/29/17 74 Consider Alternative Funding 10 days Mon 1/1/18 Fri 1/12/18 75 Develop Implementation Plan 25 days Mon 1/1/18 Fri 2/2/18 76 Develop Project Classification 10 clays Mon 1/1/18 Fri 1/12/18 77 Identify Project Constraints and Costs 5 days Mon 1/15/18 Fri 1/19/18 78 Develop Project Fact Sheets 10 days Mon 1/22/18 Fri 2/2/18 '.-Task 8: Update Drainage Criteria/Policy 80 days Mon 5/8/17 Fri 8/25/17 80 Review and Augment City Benchmarking 20 days Mon 5/8/17 Fri 6/2/17 81 Review Criteria and Policies 30 days Mon 6/5/17 Fri 7/14/17 82 Make Recommendations for Updates 30 days Mon 7/17/17 Fri 8/25/17 83 Task 9: MDP Phase II Submittal 165 days Mon 9/4/17 Fri 4/20/18 84 MDP Report Deliverable 110 days Mon 9/4/17 Fri 2/2/18 85 Narrative Development 110 days Mon 9/4/17 Fri 2/2/18 86 Exhibit Preparation 110 days Mon 9/4/17 Fri 2/2/18 87 Tables and Figure Preparation 110 days Mon 9/4/17 Fri 2/2/18 88 Cost Estimate Exhibits 55 days Mon 11/20/17 Fri 2/2/18 89 Community Outreach Information 110 days Mon 9/4/17 Fri 2/2/18 90 Digital Data Submittal 30 days Mon 2/5/18 Fri 3/16/18 91 Prepare PDF copy of report 5 days Mon 2/5/18 Fri 2/9/18 92 Finalize Geodatabase 5 days Mon 2/12/18 Fri 2/16/18 93 Compile Calculations, Models, Etc. 5 days Mon 2/12/18 Fri 2/16/18 94 Deliverable QA/QC 10 days Mon 2/19/18 Fri 3/2/18 95 Respond to QA/QC Comments 10 days Mon 3/5/18 Fri 3/16/18 96 Submit Draft Report 0 days Fri 3/16/18 Fri 3/16/18 97 Pearland/BDD4 Review 15 days Mon 3/19/18 Fri 4/6/18 98 Respond to Comments and Update Report 10 days Mon 4/9/18 Fri 4/20/18 99 Submit Final Report 0 days Fri 4/20/18 Fri 4/20/18 Project: Pearland_BDD4_MDP_Ph Date. Fri 3/24/17 Task Split Milestone Summary City of Pearland/Brazoria Drainage District No 4 Master Drainage Plan Update - Phase II Qtr 2, 2017 I Qtr 3, 2017 Aor Mav 1 Jun Jul 1 Aue Qtr 4, 2017 Qtr 1, 2018 Seo Oct 1 Nov 1 Dec Jan 1 Feb 1 Mar 111, Leis. Evaluate and Prioritize Projects Qtr 2, 2018 Aor 1 May Jiro _ Task 7: Prioritize and Implement Projects , T isk 8: Update Drainage Criteria/Polley Project Summary u i Inactive Milestone Manual Summary Rollup External Tasks Inactive Summary 1 Manual Summary • External Milestone • Manual Task Start -only 1111 Inactive Task Duration -only 11111110111111111111111118 Finish -only Page 3 1 Develop Implementation Plan I tint) 3 MDP Report Deliverable Task 9: MDP Phase II St Digital Dais Submittal Half( QA/QC 3/16 Submit Draft Report Pearland/BDD4 4/20 irSubmIt Final Report Deadline Progress Manual Progress i HARRIS COUNTY SHADOW CREEK•PKWY PEARLAND CITY OMIT FORT BEND COUNTY C• w1C, OAch GALVESTON COUNTY LEGEND =Pearland/BDD4 MDP Area Brazona DD4 Pearland Pearland ETJ -111111 Alvin Brookside Village Iowa Colony Manvel PROJECT AREA Soo,ces EsnritERE\OaQrn e. USGS. Inlermap. mcremeq{jjCoy.. NRCAN. Esn Japan, METI, Esn China (Hong Kong). Esn (Thailand), Mapmylnea. OpenSlreetMap cnnlnb fors, and tile` ls^ CITY OF PEARLAND BRAZORIA DD4 MASTER DRAINAGE PLAN PROJECT LOCATION MAP February 2017 0 3,500 7,000 14,000 eet 1 inch = 7,000 feet Notes. 1) Aerial imagery for Pearland. TX and surrounding ares provided by Landiscor 2014. 2) Project area includes the City of Pearland and Brazoria DD4 Portions of other cities including Brookside Village, Manvel, Iowa Colony, and Alvin are also located within the project area as well. :C: HALFF HALF ASSOCIATES. INC. 14600 SAINT MARY'S LN. SUITE 160 HOUSTON. TX 77079-2943 WWW.HALFF.COM