R2004-196 11-29-04 RESOLUTION NO. R2004-196
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, APPROVING CHANGE ORDER NO. 4 ASSOCIATED WITH THE
CORRIGAN DITCH BY-PASS CHANNEL.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That Change Order No. 4 associated with the Corrigan Ditch By-Pass
Channel, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all
purposes, is hereby authorized and approved.
Section 2. That the City Manager or his designee is hereby authorized to execute
and the City Secretary to attest Change Order No. 4 associated with the Corrigan Ditch By-
Pass Channel.
PASSED, APPROVED and ADOPTED this the 29th day of November ,
A.D., 2004.
ATTEST:
SEC, P, ETARY "'
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
TOM REID
MAYOR
TurnerCollie Braden Inc.
Engineers ,. Planners o PrOject Managers
Date: October 19, 2004
Owner: City of Pearland
Exhibit "A"
Resolution R2004-196
Construction Change Order
Change Order No. 4
Contractor:
Engineer:
NGB Constructors,Inc.
Turner Collie & Braden Inc.
Amount: $228,015.60
Job Name:
Job No.:
Contract:
Corrigan Subdivision Drainage Improvements -
Corrigan Ditch By-Pass Channel
052.511556.0007
Contract No. 1
Amount Time
Days Comp Date
Original Contract $2,374,770.00 300 12/4/2004
Previous Change Orders #1-3 $16,089.00 N/A
Current Change Order # 4 $228,015.60 N/A
Current Contract $2,618,874.60 300 12/4/2004
The terms of the Agreement, dated 2/9/04, between Owner and Contractor are amended as follows:
Description of Changes
Adjust bid quanities to reflect actual field measurement for amount installed. Additional Concrete Cellular Mattress required
by BDD#4 in their approval.
APPROVED BY:~
By: ~ _~?~:~/~
ACCEPTED BY: CONTRACTOR
Company: City of Pearland Company:
Title: City ~anager Title: ~
Date: /J/~¢~
Form Date: 9/11/2001
TurnerCollie Braden Inc.
Engineers · Planners o project Managers
Construction Change Order
Date: October 19, 2004
Job Name:
Job No.:
Contract:
Corrigan Subdivision Drainage Improvements -
Corrigan Ditch By-Pass Channel
052.511556.0007
Contract No. 1
Change Order No. 4
Description of Changes
CHANGE ORDER TABULATION
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE NET CHANGE
9 Abandon Existing Water Well 1 EA $2,500.00 $2,500.00
24 Concrete Cellular Mat 4735.59 SY $45.0C $213,101.55
26 18" RCP Storm Sewer 11 LF $60.00 $660.0C
28 36" RCP Storm Sewer 5 LF $90.00 $450.0C
30 18" ASC30P Storm Sewer 153 LF $35.00 $5,355.00
37 Modified Type "A" Inlet 1 EA $1,700.00 $1,700.00
COg 3-2 Asphaltic Concere Patching 65.37 Ton $65.00 $4,249.05
TOTAL $228,015.60
gr~rm Dnt~- q/1 1/?fit~l
NBG
CONSTRUCTORS,
General Contractor
9702 Synott Road
Houston, Texas 77083
(281)495-0842
Fax (281)495-0962
INC.
October 8, 2004
Turner Collie and Braden Inc.
5757 Woodway
Houston, Texas 77057
Attention: Mr. James W. Keller, P.E.
Reference:
City of Pearland
Corrigan Subdivision Drainage Improvements Contract No. 1
Job No. 052.511256.0004
Dear Mr. Keller,
At this time we respectfully request that the quantities for the items listed below
be adjusted by change order to reflect the quantities installed.
Item Description
Increased Quantity Unit
9 Abandon Existing Water Well 1 EA
26 18" RCP Storm Sewer 11 LF
28 36" RCP Storm Sewer 5 LF
30 18" ASCP Storm Sewer 153 LF
37 Modified Type "A" Inlet 1 EA
HMAC
65.37 TON
We are in process of quantifying the excavation and haul; we will provide those
calculations upon completion.
~~..~erely, ~
David Boehm
Vice-President
NBG Constructors, Inc.
CONSTRUCTORS,
General Contractor
9702 Synott Road
Houston, Texas 77083
(281)495-0842
Fax (281)495-0962
INC.
October 8, 2004
Turner Collie and Braden Inc.
5757 Woodway
Houston, Texas 77057
Attention: Mr. James W. Keller, P.E.
Reference:
City of Pearland
Corrigan Subdivision Drainage Improvements Contract No. 1
Job No. 052.511256.0004
Dear Mr. Keller,
Attached is our summary of the concrete cellular mattress. All the quantities are field
measurements except for Fire Road. The total area is 10,735.59 square yards.
At this time we request a change order be initiated for the additional 4,135.59 square
yards.
If you have questions please call.
David Boehm
Vice-President
NBG Constructors, Inc.
CORRIGAN SUBDIVSION CONTRACT #1
CONCRETE CELLULAR MATTRESS SUMMARY
STATION/LOCATION
QUANTITY
MARY'S CREEK
4+00
12+00
20+00
FITE ROAD
25+50
30+00
BURKETT BRIDGE
32+25
39+32
42+64
HATFIELD BRIDGE
45+02
45+53
47+55
52+00
2,366.00
76.70
76.70
119.00
559.11
1,130.00
1,224.O0
565.00
92.88
1,230.00
92.88
613.00
63.33
63.33
1,085.00
1,378.66
TOTAL 10,735.59