R2004-196 11-29-04 RESOLUTION NO. R2004-196 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO. 4 ASSOCIATED WITH THE CORRIGAN DITCH BY-PASS CHANNEL. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That Change Order No. 4 associated with the Corrigan Ditch By-Pass Channel, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 4 associated with the Corrigan Ditch By- Pass Channel. PASSED, APPROVED and ADOPTED this the 29th day of November , A.D., 2004. ATTEST: SEC, P, ETARY "' APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR TurnerCollie Braden Inc. Engineers ,. Planners o PrOject Managers Date: October 19, 2004 Owner: City of Pearland Exhibit "A" Resolution R2004-196 Construction Change Order Change Order No. 4 Contractor: Engineer: NGB Constructors,Inc. Turner Collie & Braden Inc. Amount: $228,015.60 Job Name: Job No.: Contract: Corrigan Subdivision Drainage Improvements - Corrigan Ditch By-Pass Channel 052.511556.0007 Contract No. 1 Amount Time Days Comp Date Original Contract $2,374,770.00 300 12/4/2004 Previous Change Orders #1-3 $16,089.00 N/A Current Change Order # 4 $228,015.60 N/A Current Contract $2,618,874.60 300 12/4/2004 The terms of the Agreement, dated 2/9/04, between Owner and Contractor are amended as follows: Description of Changes Adjust bid quanities to reflect actual field measurement for amount installed. Additional Concrete Cellular Mattress required by BDD#4 in their approval. APPROVED BY:~ By: ~ _~?~:~/~ ACCEPTED BY: CONTRACTOR Company: City of Pearland Company: Title: City ~anager Title: ~ Date: /J/~¢~ Form Date: 9/11/2001 TurnerCollie Braden Inc. Engineers · Planners o project Managers Construction Change Order Date: October 19, 2004 Job Name: Job No.: Contract: Corrigan Subdivision Drainage Improvements - Corrigan Ditch By-Pass Channel 052.511556.0007 Contract No. 1 Change Order No. 4 Description of Changes CHANGE ORDER TABULATION ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE NET CHANGE 9 Abandon Existing Water Well 1 EA $2,500.00 $2,500.00 24 Concrete Cellular Mat 4735.59 SY $45.0C $213,101.55 26 18" RCP Storm Sewer 11 LF $60.00 $660.0C 28 36" RCP Storm Sewer 5 LF $90.00 $450.0C 30 18" ASC30P Storm Sewer 153 LF $35.00 $5,355.00 37 Modified Type "A" Inlet 1 EA $1,700.00 $1,700.00 COg 3-2 Asphaltic Concere Patching 65.37 Ton $65.00 $4,249.05 TOTAL $228,015.60 gr~rm Dnt~- q/1 1/?fit~l NBG CONSTRUCTORS, General Contractor 9702 Synott Road Houston, Texas 77083 (281)495-0842 Fax (281)495-0962 INC. October 8, 2004 Turner Collie and Braden Inc. 5757 Woodway Houston, Texas 77057 Attention: Mr. James W. Keller, P.E. Reference: City of Pearland Corrigan Subdivision Drainage Improvements Contract No. 1 Job No. 052.511256.0004 Dear Mr. Keller, At this time we respectfully request that the quantities for the items listed below be adjusted by change order to reflect the quantities installed. Item Description Increased Quantity Unit 9 Abandon Existing Water Well 1 EA 26 18" RCP Storm Sewer 11 LF 28 36" RCP Storm Sewer 5 LF 30 18" ASCP Storm Sewer 153 LF 37 Modified Type "A" Inlet 1 EA HMAC 65.37 TON We are in process of quantifying the excavation and haul; we will provide those calculations upon completion. ~~..~erely, ~ David Boehm Vice-President NBG Constructors, Inc. CONSTRUCTORS, General Contractor 9702 Synott Road Houston, Texas 77083 (281)495-0842 Fax (281)495-0962 INC. October 8, 2004 Turner Collie and Braden Inc. 5757 Woodway Houston, Texas 77057 Attention: Mr. James W. Keller, P.E. Reference: City of Pearland Corrigan Subdivision Drainage Improvements Contract No. 1 Job No. 052.511256.0004 Dear Mr. Keller, Attached is our summary of the concrete cellular mattress. All the quantities are field measurements except for Fire Road. The total area is 10,735.59 square yards. At this time we request a change order be initiated for the additional 4,135.59 square yards. If you have questions please call. David Boehm Vice-President NBG Constructors, Inc. CORRIGAN SUBDIVSION CONTRACT #1 CONCRETE CELLULAR MATTRESS SUMMARY STATION/LOCATION QUANTITY MARY'S CREEK 4+00 12+00 20+00 FITE ROAD 25+50 30+00 BURKETT BRIDGE 32+25 39+32 42+64 HATFIELD BRIDGE 45+02 45+53 47+55 52+00 2,366.00 76.70 76.70 119.00 559.11 1,130.00 1,224.O0 565.00 92.88 1,230.00 92.88 613.00 63.33 63.33 1,085.00 1,378.66 TOTAL 10,735.59