Loading...
R2017-021 2017-02-13RESOLUTION NO. R2017-21 A Resolution of the City Council of the City of Pearland, Texas, authorizing the City manager or his designee to enter into an amended contract with 5Engineering, LLC, in the additional amount of $71,435.00, for engineering services associated with the Mykawa Lift Stations Project. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain amended contract for engineering services associated with the Mykawa Lift Stations Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an amended contract for engineering services associated with the Mykawa Lift Stations Project. PASSED; APPROVED and ADOPTED this the 13th day of February, A.D., 2017. ATTEST: NG Lo"FING, T TY SE " ETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY Gm TOM REID MAYOR `%%1111111/,,/ O : • •. ccs. Date of Issuance: Consultant: Resolution No. R2017-21 Exhibit "A" CITY OF PEARLAND PROJECTS DEPARTMENT 3519 Liberty Drive, Suite 300 Pearland, TX 77581 www.cityofpearland.com/projects Professional Services Contract Amendment Mykawa Lift Station 01/17/2017 SEngineering, LLC Amendment No.: CoP Project No.: P.O. No.: 1 WW1601-Design 2016-00000821 Explanation: This change order encompasses the following: Additional scope required as a result of the preliminary engineering report finding that the lift station at Mykawa & Orange can not be decommissioned without replacing it with another at a nearby location outside of the Mykawa right-of-way. This lift station was originally slated to be abandoned and replaced with a manhole, along with the Shank Lift Station, in advance of the Mykawa Road Expansion. It has now been determined that, due to the length and depth of the new sewer gravity line to be installed along Mykawa, a lift station is still warranted at a new location just north of Town Ditch. Description of Work Cost Time S 35,795.00 120 Days 2 Revise the quantity from 1 to 1.085974 on Item No. 3 3 Design Phase Services Revise the quantity from 1 to 3.75 on Item No. 6 6 Additional Services Please attach back-up documentation. Cost & Time Change Summary Original Contract: Previous Amendment(s): Contract prior to this Amendment: Net increase (decrease) from this Amendment: Revised Contract: S 35,640.00 0 Days Cost Time S 575,590.00 0 Days $ 0.00 0 Days $ 575,590.00 0 Days S 71,435.00 120 Days S 647,025.00 120 Days Finance Approval: Date ACCEPTED*: APPROVED: By: caieeu Date 01/19/2017 By: Date 01/19/2017 Consultant Project Manager By: Date Owner 'Consultant agrees to perform change(s) included in the Contract Amendment for the price and time indicated. The prices for changes included all costs associated with this Contract Amendment. No work is 10 be done until this Amendment is executed. No payment to the Consultant shall be made for work included in the Amendment until this Amendment is executed. Upon execution by all parties, the following changes identifies for the contract value and/or contract time shown, are made part of the Design 1 of 1 D4. Revised 7/08 5engineering 10200 Grogan's Mill Rd #238, The Woodlands, TX 77380 1 832-800-3483 1 Amendment No. 1 Letter_Pearland_Rev 3 January 19, 2017 Susan Johnson Project Manager City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Re: Mykawa Lift Stations Proposal Amendment No. 1 - Revised January 19, 2017 Dear Ms. Johnson: 5engineering, IIc (5e) has prepared Amendment No. 1 to the Mykawa Lift Stations Proposal dated April 19, 2106. The amendment addresses the changes to the project scoped based on the selection of Alternative No. 3 from the Preliminary Engineering Report. The following tasks have been revised in the Level of Effort. BASIC SCOPE OF SERVICES Task Three - Design Phase Services includes preparation of 30%, 60%, 90%, and final construction package submittals and construction cost estimates. The selected alternative includes two lift stations, instead of the previously proposed plan which only had one lift station. The original proposal for Task 3 was in the amount of $416,348.52. The amended fee for performing the above scope of services is $452,143.52, an increase of $35,795.00. The following is a breakdown of the revisions to each component of Task 3: Description/Task Original Fee Revised Fee Amendment Amt. Construction Drawings, Contract Documents, and Technical Specifications $132,980.00 $162,560.52 $29,580.00 Construction Cost Estimates $6,760.00 $6,760.00 No Change. Coordinate with External Regulatory and Permitting Agencies $10,125.00 $10,125.00 No Change. Traffic Control Plan and SWP3 $17,100.00 $17,970.00 $870.00 c5-3 5en9ineering Description/Task Original Fee Revised Fee Amendment Amt. Submit Final Construction Documents for City Signature $4,500.00 $4,500.00 No Change. Prepare Bid Set for Distribution $1,500.00 $1,500.00 No Change. Surveying (including 1 boundary survey)* $112,082.40 $108,209.00 -$3,873.40 Geotechnical $74,520.00 $70,466.00 -$4,054.00 Environmental $5,211.12 $6,658.00 $1,446.88 Structural $36,450.00 $45,576.00 $9,126.00 Electrical $15,120.00 $17,820.00 $2,700.00 TOTAL TASK 3 $416,348.52 $452,143.52 $35,795.00 ADDITIONAL SCOPE OF SERVICES (OPTIONAL) Task Six - Additional Services to include boundary surveying for up to fifteen easements. The original proposal for Task 6 was in the amount of $12,960.00 and the amended fee for performing the above scope of services is $48,600.00. The tasks will be invoiced monthly during the project. Payment is expected 30 days of the invoice date. The followingis a breakdown of the revisions to each component of TaSk 6: Description/Task Original Fee Revised Fee Amendment Amt. Boundary Surveying for Easements (up to 3)* $12,960.00 $48,600.00 $35,640.00 TOTAL TASK 6 $12,960.00 $48,600.00 $35,640.00 *This was revised from 3 easements to 15 easements and one easement was removed from surveying in Task 3 for inclusion in Task 6. The total amendment amount increase was $71,435.00 for a total contract amount of $647,025.00. Exclusions: 1. The proposal does not include a sanitary sewer model of the lift station service areas, sub -utility excavation (SUE), or an archeological study if requested by the Texas Archeological Commission. 2. The proposal fee shall be considered in their entirety for the Scope of Services. Should you wish to contract only a portion of the work, we reserve the right to negotiate individual scope items on their own merit. Mykawa Lift Stations Proposal Amendment No. 1 - Revised January 19, 2017 Page 2 5engineering 3. The proposal is valid for 60 days from this date and may be extended upon approval from our office. Please feel free to call at 832-800-3483 (Ext. 102) or email me at liz@5engineering.com with any comments or questions. We look forward to working with you on this endeavor. Sincerely, Elizabeth 0. Parent, P.E. Principal Mykawa Lift Stations Proposal Amendment No. 1 - Revised January 19, 2017 Page 3 EXHIBIT A UTILITIES SCOPE OF SERVICES FOR MYKAWA LIFT STATIONS AMENDMENT NO. 1 5engineering, Ilc De,itm 1 of 5 DIO. Revised 12/11 PROJECT LOCATION: Mykawa-Scott Lift Station (Relocation), Mykawa- Orange Lift Station (Relocation), and Mykawa-Shank Lift Station (Retirement) BASIC SERVICES: The project consists of the preparation of a Preliminary Engineering Report (PER) evaluating the alternatives for the relocation and retirement of the referenced lift stations, recommendations for gravity sanitary sewer route alternatives, sizing of Mykawa-Scott force main, design phase services for selected alternatives, bid phase services, and construction phase services. Amendment No. 1 revises the post PER scope of services based on the following route, which was identified as Alternative No. 3 in the final PER. Mykawa — Scott - Shank The gravity sanitary sewer alternative for the Mykawa-Scott and Mykawa-Shank lift stations is projected in this scope as the following: 1) sanitary sewer line beginning north of H100-00-00 to proposed Mykawa-Scott lift station and 2) the Mykawa-Shank lift station will be replaced by a sanitary sewer line south of H100-00-00 to the proposed Mykawa-Orange lift station. The proposed gravity sanitary sewer lines will be 12 -inches in diameter. Mykawa - Orange The gravity sanitary sewer alternative for the Mykawa-Orange lift station projected in this scope is as follows: 1) replace the existing Mykawa-Orange lift station northeast of the Mykawa-Orange intersection and 2) the proposed 8 -inch force main will begin at the lift station and extend along Mykawa Road to West Orange Street within the right-of-way to discharge at an existing manhole on Hatfield 1050' from the intersection of Orange and Hatfield. I)csign 2 of 5 1)10. Revised 12.11 The proposal does not include a sanitary sewer model of the lift station service areas, sub -utility excavation (SUE), or an archeological study if requested by the Texas Archeological Commission. The Consultant shall render the following professional engineering services to the OWNER in connection with the construction of the Project. Amendment No. 1 revises the following professional engineering services. Design Phase Services 1. Prepare Construction Plans and Specifications as follows: i. Submit for review construction plans at 30% consisting of Plan & Profile Topographic Survey with parcel data based on agreed alternatives from PER and overall for new submersible lift stations at Mykawa-Scott and Mykawa-Orange. The new submersible lift station will include a generator quick connect and manual transfer switch. The plans will be prepared as 24"x36" drawings per City guidelines. The plans will not include odor control or an on- site generator. ii. Submit for review detailed construction plans at 60% & 90% (along with specifications form at 60% - include bid form & completed "front end documents" at 90%) for gravity alternative for Mykawa-Shank, force main alternative for Mykawa-Scott and Mykawa-Orange, and new submersible lift stations at Mykawa- Scott and Mykawa-Orange. The design and technical specifications will be prepared for utilization by the City as "City Standards". The front end documents will be provided by the City for revision and inclusion at the 90% submittal. iii. Submit 60% & 90% plans to Utility companies and coordinate work for relocation or service changes, if required. 2. Prepare two lift station design reports for submittal at the 90% phase. 3. Prepare Construction Cost Estimates at the 30%, 60%, and 90% submittals. Design 3 of 5 D10. Revised 12/11 4. Coordinate with external regulatory and permitting agencies, including but not limited to TCEQ, TXDOT, Brazoria DD #4, USACE (US Army Corp of Engineers), Burlington Northern and Santa Fe Railway (BNSF), various pipeline companies, and coordination with the Mykawa Road widening design consultant. 5. Provide Traffic Control plan and SWP3 plans and specifications, if required. 6. Submit plans for City Engineer's signature. 7. Prepare bid sets for distribution via the City's e -bid system. 8. Survey proposal for selected routes is attached, including topographic survey and preparation of easement documents for an estimate of fifteen (15) parcels. 9. Geotechnical data proposal is attached with a map of proposed boring locations and depths. 10. Environmental proposal is attached for a Phase I Environmental Site Assessment for the future Mykawa-Scott and Mykawa-Orange lift station sites which are estimated to be 70'x70'. 11. Structural proposal is attached for lift station design, bid phase services, and construction phase services. The structural engineering services include: structural engineering/design for abandonment of lift stations that may have roadway constructed over them, structural engineering/design of a new lift station for the Preliminary Engineering Report Phase (Including preliminary structural drawings to show necessary plan, section, and details structural specifications required for a new lift station based on Division 03, coordination during the design phase, responses to City's comments on City software, review of construction submittals, responses to RFIs and RFPs and change orders related to the structural engineering scope of work, and finalize structural design and production of construction drawings. 12. Electrical proposal is attached for lift station design, bid phase services, and construction phase services. The electrical engineering services include, assistance in creating a lift station design standard and/or technical specifications for electrical work, attendance at one (1) coordination Deaun 4 ut 5 1)10. Ren.ed 121 1 meeting, preparation of construction drawings and technical specifications, assistance with the Preliminary Engineering Report (including sizing the electrical service, selecting the voltage for the service, and including a manual transfer switch with a generator quick connect for emergency power via a city -owned or rented portable generator), and assistance during the procurement phase, and construction phase. Additional Services 1. Survey proposal for selected routes is attached, including preparation of easement documents for an estimate of fifteen (15) parcels. Definition: 1) As-Builts "redlines": Contractor's record of field changes to the work in line, grade & elevation 2) Record Drawings: Engineer's incorporation of contractor's As-Builts Design 5 of5 DIO. Revised 12/11 8 i 4 g0 EAA ss'nN Es 88 88 8888 N$ibi81 ( 81808 R8 1 88 8$888 �slsl�I�i I$I�I�I�I$ 8