Loading...
R2017-030 2017-02-13RESOLUTION NO. R2017-30 A Resolution of the City Council of the City Of Pearland, Texas, authorizing the City Manager or his designee to enter into an Interlocal Agreement between the City of Pearland, Lower Kirby Pearland Management District, and the Pearland Municipal Management District No. 1 (collectively, the "Districts") for maintenance of improvements associated with the Gateways and Corridor Enhancements Master Plan serving the Districts. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That certain Interlocal Agreement by and between the City of Pearland, Lower Kirby Pearland Management District and the Pearland Municipal Management District No. 1, a copy of which is attached hereto as Exhibit 'A" and made a part hereof for all purposes. is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest an Interlocal Agreement with the City of Pearland, Lower Kirby Pearland Management District and the Pearland Municipal Management District No. 1. PASSED, APPROVED and ADOPTED this the 13'1 day of February, A.D., 2017. ATTEST: PUNG �J FTNG, TY S #' ETARY APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR Resolution No. R2017-30 Exhibit "A" COST SHARING INTERLOCAL AGREEMENT FOR MAINTENANCE OF IMPROVEMENTS This Cost Sharing Agreement for Maintenance of Improvements ("Agreement") is entered into and made effective this 1st day of January, 2017, (the "Effective Date"), by and between PEARLAND MUNICIPAL MANAGEMENT DISTRICT NO. 1, a municipal management district and political subdivision of the State of Texas, ("PMMD1 "), LOWER KIRBY PEARLAND MUNICIPAL MANAGEMENT DISTRICT, a municipal management district and political subdivision of the State of Texas, ("LKPMD") (collectively, the "Districts") and THE CITY OF PEARLAND, TEXAS, a home rule municipality in the State of Texas (the "CITY") (individually, a "Party", and collectively, the "Parties"). RECITALS Whereas, the Districts were created as municipal management districts under Article XVI, Section 59, and Article III, Sections 52 and 52-a, Texas Constitution; and Whereas, the Districts operate under Chapter 375, Texas Local Government Code; and certain provisions of Chapters 49 and 54, Texas Water Code; and Whereas, the both of the Districts are located wholly within the boundaries of the CITY; and Whereas, certain road improvements (including, but not limited to traffic related items, street lighting and streetscape), water and sanitary sewer improvements, and drainage improvements are located within the boundaries of the Districts and are more accurately described and shown on the attached Exhibit A (the "Improvements"); and Whereas, the City plans to make approximately $1.5 Million in Streetscape Improvements to Kirby Drive, including the installation of entry signs for the Districts' surrounding area, in conjunction with the Pearland Economic Development Corporation, which will be maintained by the Districts; and Whereas, the Parties desire to establish the maintenance and cost sharing responsibilities and associated with the Improvements; and 617844_2 AGREEMENT Section 1. Recitals. The recitals set forth above are declared true and correct and are hereby incorporated as part of this Agreement. Section 2. Shared Maintenance Items. The Parties agree that the maintenance costs of certain portions/segments of the Improvements shall be shared by the Districts in accordance with the percentages reflected on Exhibit B. LKPMD and PMMD1 agree and recognize that they have already entered into separate cost sharing agreements for the maintenance of: (i) all regional drainage and park improvements which are part of the duly adopted Master Drainage Plan; and (ii) aesthetic improvements to be constructed by the CITY and Pearland Municipal Management District No.2 (or one of its related entities) along State Highway 288 ("Additional Improvements"). Consequently, the maintenance responsibilities of the Additional Improvements are not affected by this Agreement. Section 3. Streetscape Improvements. Streetscape Improvements are defined as those improvements that are located within (a) the roadway right-of- way ("ROW") or (b) surrounding detention ponds/lift stations ("Public Facilities) and include the following (the "Streetscape Improvements"): • Landscape plantings including trees, shrubs, groundcover, mulch and grass, • Hardscape pavers, • City and Districts vicinity entryway signage, • Irrigation systems, and • Lighting and electrical components. Maintenance of Streetscape Improvements include: • Mowing, edging, and trash removal in medians and shoulders and other future right of ways, • Hardscape weed control, • Mulching, • Weeding, • Irrigation and site inspections, • Irrigation repairs, • Fertilization, • Shrub and tree pruning, • Entryway signage maintenance and repairs, and -2- 617844_2 • Monthly electrical use. Section 4. CITY Responsibilities. The CITY shall be responsible for the maintenance of all roadways (pavement to top of curb), street lights, traffic signal and related improvements, sidewalks, lift stations, and all water, sanitary sewer and storm sewer lines included in the Improvements (the "CITY Improvements"). The CITY shall provide water to the Districts for irrigation and maintenance of Streetscape Improvements located in the road ROW, and all Streetscape Improvements located outside the ROW shall be maintained and irrigated at the Districts' expense. Section 5. LKPMD Responsibilities. LKPMD shall be responsible for all costs associated with the maintenance and replacement of the Streetscape Improvements within its boundaries. Streetscape Improvements specifically include the cost of electricity for City and Lower Kirby vicinity entryway signage and irrigation systems along the roadways within LKPMD boundaries. In addition, LKPMD shall be responsible for all costs associated with the maintenance of Streetscape Improvements installed for public facilities located within its boundaries; however, functional maintenance of the public facilities shall remain the responsibility of the owner of each facility. Subject to an amendment to this Agreement (or a separate agreement between appropriate parties), LKPMD shall be responsible for all public parks located within its boundaries. LKPMD shall be responsible for all public drainage improvements (other than storm sewers in road ROW or abutting easements) located within its boundaries that are not part of the Master Drainage Plan. LKPMD shall own all City and Lower Kirby vicinity signage located within the both of the Districts as well as all Streetscape Improvements located within its boundaries, and shall obtain sufficient property/casualty insurance to protect against any damage or loss to the signage or Streetscape Improvements. LKPMD shall obtain the CITY's approval from the City Manager, or his designee, prior to its removal of any Streetscape Improvements except for removal and replacement of any improvements with like improvements. LKPMD shall not be required to obtain permits from CITY in order to perform work in the ROW in order to perform its maintenance responsibilities. Section 6. PMMD1 Responsibilities. PMMD1 shall be responsible for all costs associated with the maintenance and replacement of the Streetscape Improvements within its boundaries. Streetscape Improvements specifically include the cost of electricity for City and Lower Kirby vicinity entryway signage and irrigation systems along roadways located within PMMD1 boundaries. In addition, PMMD1 shall be responsible for all costs associated with the maintenance of Improvements installed for public facilities located within its boundaries; however, functional maintenance of the public facilities shall remain -3- 617844_2 the responsibility of the owner of each facility. Subject to an amendment to this Agreement (or a separate agreement between appropriate parties), PMMD1 shall be responsible for all public parks within its boundaries. PMMD1 shall be responsible for all public drainage improvements (other than storm sewers in road ROW or abutting easements) located within its boundaries that are not part of the Master Drainage Plan. PMMD1 shall obtain the CITY's approval from the City Manager, or his designee, prior to its removal of any Streetscape Improvements except for removal and replacement of any improvements with like improvements. PMD1 shall not be required to obtain permits from CITY in order to perform work in the ROW in order to perform its maintenance responsibilities. Section 7. Contracting Responsibility. The Parties agree that LKPMD shall contract for all maintenance and replacement responsibilities of the Districts for the Improvements and Streetscape Improvements under this Agreement. The Districts further agree that the maintenance obligations of the Districts shall meet the minimum standards of the City's Roadway Maintenance Policy as it may be amended from time to time. The Districts agree that, although a District may only be responsible for a portion of costs of certain Streetscape Improvements, it must timely pay to the contracting District it's pro rata cost share of the maintenance obligations described herein. The Districts further agree that the contracting District will invoice the other District for its' pro rata shares. Payments of invoices shall be made within 45 days of receipt, and interest calculated at the rate of 1% (one percent) per month shall be added to the principal amount of any late payment. The District responsible for maintenance may take appropriate legal action to collect late payments and seek to impose court costs and legal fees on the delinquent Party. Section 8. Term and Amendment. This Agreement shall be effective when signed by the last party whose signing makes the agreement fully executed. This agreement is perpetual and shall remain in effect for as long as the Districts exist. No modification hereof or subsequent agreement relative to the subject matter hereof shall be binding on either party unless reduced to writing and signed by the parties. Section 9. Entire Agreement and Law. This Agreement is the entire Agreement between the Districts related to cost sharing of the Improvements and Streetscape Improvements and no modification of this Agreement shall be binding on any Party unless reduced to writing and signed by all of the Parties. This Agreement shall be governed by the laws of the State of Texas. Section 10. Not Assignable. This Agreement shall not be assignable. .4. 617844_2 IN WITNESS WHEREOF, the parties hereto have executed this Agreement in multiple copies, each of equal dignity, as of the date and year set forth on the first page. A FI EST: By: PEARLAND MUNICIPAL MANAGEMENT DISTRICT No. 1 By: President, Board of 4 rectors Secretary, Board of Directors (SEAL) A I'I'EST: By: 3 Sei i yam•,.. 441410,,tINiNl* LOWER KIRBY PEARLAND MANAGEMEN DISTR CT By: Preside cretary, Board of Directors (SEAL) ATTEST: By: 617844_2 rectors CITY OF RL By: D, TEXAS ity'Nlanager -5- "11111%0�'`` Exhibit A Map of Improvements -6- 617844_2 Exhibit A LOWER KIRBY PEARLAND MUNICIPAL MANAGEMENT DISTRICT DECEMBER. 2016 ROW MAINTENANCE 945.8 ACRES LOWER KIRBY PEARLAND MGMT DIST QPEARLAND MUNICIPAL MGMT DIST 1 _ DETENTION AND LIFT STATIONS (EXISTING AND FUTURE) IMPROVED ROADS (ASPHALT) - IMPROVED ROADS (CURB AND GUTTER) - UNIMPROVED ROADS FUTURE 1 Inch = 700 feet AERIAL PHOTOGRAPH DAIS: NEARMAP 2016 Exhibit B Cost Shares and Responsibility -7- 617844_2 Exhibit B LKPMD & PMMD#1 ROW & Streetscape Maintenance Itemized List 12/14/2016 ROW Segment ROW Description Annual Estimate` % Share Maintenance Funding Responsibility Improved Roads Curb & Gutter D Kirby Drive (1mile) $ 98,000 100% LKPMD S North Spectrum Existing (.25 mile) $ 9,000 100% LKPMD F North Spectrum Extension (.25 mile) $ 9,000 100% LKPMD Improved Roads Asphalt 0 Hooper Road (.75 mile) $ 15,570 100% LKPMD N Fruge West of Kirby (.25 mile) $ 5,190 100% LKPMD E Riley Road (.75 mile) $ 27,000 100% LKPMD Unimproved Roads Future H Promenade (.25 mile) $ 24,500 50% LKPMD H Promenade (.25 mile) $ 24,500 50% PMMD#1 I Promenade (.25 mile) $ 9,000 25% LKPMD I Promenade (.25 mile) $ 9,000 75% PMMD#1 K Promenade (.3 mile) $ 10,800 100% LKPMD A South Spectrum from Promenade to 288 (.3 mile) $ 29,400 50% LKPMD A South Spectrum from Promenade to 288 (.3 mile) $ 29,400 50% PMMD#1 B South Spectrum from Promenade to Central Detention (.25 mile) $ 9,000 10% LKPMD B South Spectrum from Promenade to Central Detention (.25 mile) $ 9,000 90% PMMD#1 C South Spectrum from Central Detention to Kirby (.25 mile) $ 9,000 100% LKPMD M Fruge East of Kirby (.25 mile) $ 5,190 100% LKPMD L Fruge East of South Detention (.3 mile) $ 6,228 100% LKPMD P Del Pappa Street (.75 mile) $ 15,570 100% LKPMD R New Road to Almeda (1 mile) $ 36,000 100% LKPMD Q Labrador (.75 mile) $ 15,570 100% LKPMD Detention Ponds & Lift Stations J Kirby Drive Detention Pond $ 9,600 100% LKPMD T Hooper Road Detention Pond $ 6,000 100% LKPMD Other ROW & Future Parks/Trails All annual estimates are based on 24 visits except for detention ponds and lift stations, which are based on monthly visits. 1