R2004-173 10-25-04 RESOLUTION NO. R2004-'173 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING CHANGE ORDER NO. 3 WITH FREESE AND NICHOLS, INC. FOR ENGINEERING DESIGN SERVICES ASSOCIATED WITH THE DIXIE FARM ROAD SANITARY SEWER PROJECT. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That change order No. 3 with Freese and Nichols, Inc. for engineering services associated with the Dixie Farm Road Sanitary Sewer Project, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest Change Order No. 3 for engineering services associated with the Dixie Farm Road Sanitary Sewer Project. PASSED, APPROVED and ADOPTED this the 25th day of October , A.D., 2004. ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR Exhibit "A" Resolution R2004-175 FREESE° NICHOLS CONTRACT CHANGE AUTHORIZATION NO. 3 Client: City of Pearland FNI Project No.: PRL 03-292 Client Contract Ref.: Date: 10-6-04 Project Description: Dixie Farm Road Sanitary Sewer Improvements Description of Services Added: Additional design and const, phase eng. services to incl. a 6 MGD lift station, changes to force main, additional gravity sewers, change to a gravity sewer at FM 518, revision to plans, quantities and spec's, etc. Deliverables: Additional plans & revised plans & quantities Compensation shall be adjusted as follows: Increase Basic design Lump Sum Fee by $40,000 Increase Basic Const. Phase Lump Sum Fee by $13,000 Provide Extra engineering services during const, at a NTE fee of $16,610 ~ ~;~ '~!~ Design Phase=S57,000 ~ ~r~.=:;~? ........ ~.~;.~ ~.~ .....~:~,~ ~ .... Su~eying = $7,150 . ...,.~ , TxDOT Coord.= $1,500 .. ,¢~;~: ;~,¢;: :.:~ ;~,.~; Misc. Reimb. =$4,000 *~,,,.~,;~ TOTAL = $105,290 ::~¢,:¢¢ ~-;~,~' ;¢; ,;~:~; ~, ~ ~;:, Design Phase=S97,000 :. ~ Su~eying = $7,150 :,~? :~:: ~;, ~ ~ *~':' .::'~;': TxDOT Coord.=$1,500 ....... SW3P =$8,000 ,~;;;~;~.?~, ;,;:¢ Misc. Reimb. =$4,000 Schedule shall be adjusted as follows: None The above described services shall proceed upon return of this Contract Change Authorization. Services will be billed as they are done. Ail other provisions, terms, and conditions of the agreement for services which are not expressly amended shall remain in full force and effect. A contract modification will be submitted. This Contract Change Authorization will serve as contract modification. FREESE AND NICHOLS, INC.: BY: ~~'..---,.--~~ TITLE: Associate/Houston Area Manager DATE: October 6, 2004 CITYBy: OF PEARL~,.~.~__~, 4055 INTERNATIONAL PLAZA, SUITE 200 [ FORT WORTH, TEXAS 76109-4895 t TELEPHONE: 817-735-7300 t METRO: 817-429-1900 [ FAX: 817-735-7491 U:\FORMS\CONTRACT~CONTRACT CHANGE REQUEST.DOC Lump Sum Fee Increase to Basic Design Dixie Farm Road Sanitary Sewer Improvements Extra Engineering Services for Additional Design* City of Pearland 1 Principle of Firm Hr. $165.00 0.00 $0.00' 2 Office Manager/Project Manager Hr. $155.00 60.00 $9,300.00 3 Sr. Project Manager Hr. $145.00 0.00 $0.00 4 Project Manager Hr. $105.00 0.00 $0.00 5 Project Engineer Hr. $100.00 130.00 $13,000.00 6 Design Engineer Hr. $75.00 30.00 $2,250.00 7 Sr. CAD Technician Hr. $60.00 180.00 $10,800.00 8 CAD Technician Hr. $50.00 80.00 $4,000.00 9 Clerical Hr. $65.00 10.00 $650.00 10 Sub-Consultant Cost Plus 10% $0.00 1.10 $0.00 11 Computer Time Hr. $10.00 0.00 $0.00 12 Reimbursables(Misc.) Cost Plus 10% $0.00 1.10 $0.00 TOTAL LUMP SUM INCREASE $40,000.00 * Additional design include: Complete design of a 6 MGD lift station including details, electrical, & SCADA, upsizing 12" FM to 16" FM, changing the 4" FM at FM 518 to 12" gravity includ, bore under FM 518, adding 8" and 12" gravity sewer crossings at FM 518 and Westfield, revising current plans to reflect new additions, revising quantities, revising spec's. and other related changes. Above estimate includes an $8,000 credit for deletion of design of Forest Lane 12" gravity sewer. Lump Sum Fee to Basic Const. Services Dixie Farm Road Sanitary Sewer Improvements Additional Basic Engineering Services During Construction Phase* City of Pearland 1 Principle of Firm Hr. $165.00 0.00 $0.00 2 Office Manager/Project Manager Hr. $155.00 48.00 $7,440.00 3 Sr. Project Manager Hr. $145.00 0.00 $0.00 4 Project Manager Hr. $105.00 0.00 $0.00 5 Project Engineer Hr. $100.00 36.00 $3,600.00 6 Design Engineer Hr. $75.00 12.00. $900.00 7 Sr. CAD Technician Hr. $60.00 9.00 $540.00 8 CAD Technician Hr. $50.00 0.00 $0.00 9 Clerical Hr. $65.00 8.00 $520.00 10 Sub-Consultant Cost Plus 10% $0.00 1.10 $0.00 11 Computer Time Hr. $10.00 0.00 $0.00 12 Reimbursables(Misc.) Cost Plus 10% $0.00 1.10 $0.00 TOTAL LUMP SUM INCREASE $13,000.00 * Additional basic engineering fee is due to increase in scope and considerable increase in const, cost(original estimate $2,365,000, updated estimate including all additions $3,765,000) Estimated Fee Budget for Extra Const. Phase Service Dixie Farm Road Sanitary Sewer Improvements Extra Engineering Services During Construction Phase* City of Pearland Principle of Firm Hr. $165.00 0.00 $0.00 Office Manager/Project Manager Hr. $155.00 90.00 $13,950.00 Sr. Project Manager Hr. $145.00 0.00 $0.00 Project Manager Hr. $105.00 0.00 $0.00 Project Engineer Hr. $100.00 24.00 $2,400.00 Design Engineer Hr. $75.00 0.00 $0.00~ Sr. CAD Technician Hr. $60.00 0.00 $0.00 CAD Technician Hr. $50.00 0.00 $0.00 Clerical Hr. $65.00 4.00 $260.00 Sub-Consultant Cost Plus 10% $0.00 1.10 $0.00 Computer Time Hr. $10.00 0.00 $0.00 Reimbursables(Misc.) Cost Plus 10% $0.00 1.10 $0.00 TOTAL NOT TO EXCEED $16,610.00 * Extra egineering services during construction phase to include monthly progress meetings, field and office meetings with Contractor and City. Freese NichoLs, Engineers Environmental Scientists Architects 2010 East Broadway PearLand, TX 77581-5502 281/485-2404 281/485-4322 fax www.freese.com October 6, 2004 FNI 03-292 Mr. Joe Wertz Project Director City of Pearland 3519 Liberty Drive Pearland, Texas 77581 Re: Dixie Farm Road Sanitary Sewer Improvements Dear Joe: Please find enclosed two (2) original copies of Contract Change Authorization No. 3 for the referenced project. The fee increase is for three tasks. First is a $40,000 increase in design fee for the complete redesign of lift station to build a 6 MGD station including electrical and SCADA, upsizing the 12" FM to 16" FM, changing the 4" FM at FM 518 to 12" gravity back to lift station including a bore under FM 518, additional 12" and 8" gravity sewer crossings at FM 518 and Westfield, revisions to existing plans, quantities, specifications and other related items. The above figure includes an $8,000 reduction in fee for not designing the Forest Lane 12" gravity sewer, however, We spent some time investigating it so a small amount ($711) was not credited. The survey budget from Forest Lane topographical survey will be used to survey and prepare the parcel taking description for the above lift station site. Second, due to considerable construction cost increase and increase in construction scope, the basic construction phase services is proposed to be increased by a lump sum of $13,000. Third, per your request, we provided a not-to-exceed budget of $16,610 for extra engineering services during construction phase for progress meetings and additional office and field meetings with City and/or Contractor. Joe Wertz October 6, 2004 Attached is a copy of latest estimate for the project. We appreciate your review and approval of this Change of Contract. Upon execution, please forward one copy to us. Please call me if you have any question. Sincerely, Mehran (Ron) Bavarian, P.E. Associate Houston Area Manager MB:lw Enclosure: PRL03292Wertz3 .ltr