R2004-160 10-11-04RESOLUTION NO. R2004-160
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, APPROVING WORK AUTHORIZATION #4 SUPPLEMENT #16
FOR MATERIAL TESTING SERVICES ASSOCIATED WITH THE
PEARLAND MOBILITY AND DRAINAGE BOND PROGRAM (CORRIGAN
DETENTION POND PROJECT).
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That certain contract by and between the City of Pearland and Turner,
Collie and Braden, Inc., ("T C & B) for Program Management of the Pearland Mobility and
Drainage Bond Program was authorized by the City Council on December 10, 2001.
Section 2. That T C & B has developed work authorization #4 Supplement #16,
which is attached hereto as Exhibit "A".
Section 3. That work authorization #4 Supplement #16 for material testing
services associated with the Corrigan Detention Pond Project is hereby approved.
PASSED, APPROVED and ADOPTED this the ].].th
A.D., 2004.
ATTEST:
day of October
TOM REID
MAYOR
YOU~~
CITY ~ECRETA~,Y u' V
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
TurnerCollie __ Braden Inc.
Engineers · Planners · Project Managers
Exhibit "A"
Resolution No. R2004-160
P.O. Box 130089
Houston, Texas 77219-0089
5757 Woodway 77057-1599
Tel: (713) 780-4100
Fax: (713) 780-0838
September 22, 2004
Re:
Pearland Mobility and Drainage Program
Corrigan Drainage
TC&B Job No. 13-11256-004
Mr. Joe Wertz, Jr.
Projects Director
City of Pearland
3519 Liberty Drive
Pearland, Texas 77581
Dear Mr. Wertz:
In accordance with the Program Management Contract approved by the Pearland City Council
on December 10, 2001, Turner Collie & Braden is requesting the following Contract
Supplement for the ongoing Program Work as described below:
Work Authorization No. 4, Supplement No. 16
Corrigan Drainage Improvements - Contract No.2 - Pump Station and Detention Pond
Coostruction Materials Testing
Geotest Engineering, Inc $38,000.00
The total amount of the Contract Supplement is $38,000.00. Copies of the Work Authorization
and the Proposal for the work are attached.
Please return one executed copy of each of the attached Work Authorizations.
Sincerely,
Associate Vice President
Attachments
Established in 1946
Engineering Excellence for Over
AN AECOM COMPANY
One-Half Century
ATTACHMENT D
WORK AUTHORIZATION NO. 4
SUPPLEMENT NO. 16
This Work Authorization is made pursuant to the terms and conditions of the Pearland
Mobility & Drainage Bond Program, hereinafter identified as the "Contract", entered into
by and between the City of Pearland ("City"), and Tumer Collie & Braden Inc.
("Engineer).
PART 1. Work Authorization No. 4, is related to The Corrigan Subdivision Drainage
Improvement Project. The Engineer will perform, Construction Materials Testing
services associated with the construction of Contract No.2 -Pump Station and Detention
Pond.
PART 2. The maximum amount payable for services under this Work Authorization
Supplement No. 16 is $38,000.00. This amount is based on the attached fee proposal
submitted by Geotest Engineering, Inc. dated September 20, 2004
PART 3. Payment to the Engineer for the services established under this Work
Authorization shall be "Reimbursable ".
PART 4. This Work Authorization shall become effective on October 12, 2004 and shall
terminate on November 12, 2005, unless extended by a supplemental work authorization.
PART 5. This Work Authorization does not waive the parties' responsibilities and
obligations provided under the contract.
PART 6. This Work Authorization is hereby accepted and acknowledged below.
ENGINEER
By: 5~..,~~/~/--~ By:
Typed e
CITY OF PEARLAND
Bill £isen
Typed or Printed Name
Title
City Manager
Title
October 11. 2004
D~e
LIST OF EXHIBITS
Exhibit A - Fee Schedule
Turner Collie Braden Inc.
9/22/2004
EXHIBIT A
FEE SCHEDULE
Pearland Mobility & Drainage Bond Program
Work Authorization No. 4
Supplement No. 16
Summary
,Project
Corrigan Subdivision Drainage Improvements
En.qineerinfl Services
Hydrologic & Hydraulic
McLean Study
Environmental Compliance
404 Permit
Archeological
404 Permit Survey
Topographic Survey
Geotech
ROW Maps & Documents
PS&E
Basic Services
Traffic Control
SWPPP
Construction Administration
Redesign Pump Sta Relocation
ROW Acquisition Assistance
Materials Testing
Contract No. 1
Contract No. 2
Subtotal
Total to Date
LJA Engineering & Surveying
LJA Engineering & Surveying
Quadrant Consultants
Quadrant Consultants
Quadrant Consultants
C.L. Davis
LJA Engineering & Surveying
Tonunay-Wong
LJA Engineering & Surveying
LJA Engineering & Surveying
LJA Engineering & Surveying
LJA Engineering & Surveying
LJA Engineering & Surveying
TCB
LAN
Previous
Authorization
$76 930.00
$15 500.00
$24 462.00
$7 784.89
$1 500.00
$9 9OO.O0
$113 321.50
$22 060.00
$41,863.00
$o.oo
$321,665.OO
$19,300.00
$16,080.00
$20,955.00
$9,6O5.43
$t72,700.00
$35,000.00
$o.0o
$908,626.82
Current
Authorization
$0.00
$o.oo
$o.oo
$o.oo
$o.oo
$o.oo
$o.oo
$o.oo
$o.oo
$o.oo
$o.oo
$o.oo
$o.oo
$o.oo
$0.00
$0.00
$0.00
$38,000.00
$38,000.00
$946,626.82
P:Vt3-11256r~Cordgan Drainage~Work Authorization 4-10.xls Page 1 of 1
GEOT $T ENGINEERING INC
5600 Bintliff Drive Houston, Texas 77036 Telephone: (713) ~
F~: (713) 2~-2977
September 20, 2004
Proposal No.: 04PM274
Mx. Jim Keller, P.E.
Turner Collie & Braden Inc.
5757 Woodway
Houston, Texas 77057
Re:
Corrigan Subdivision Drainage Improvements
Contract No. 2
Dear Mr. Keller:
As requested, please fred enclosed our proposed unit fees to pwvide materials
testing services on the above referenced project This schedule is being used on current
projects with the City of?earlmifl.
It is our undersumding that $38,000.00 has been budgeted for materials testing
services. Additionally, we have been instmcr~l that is a not to exceed mnouat.
We look forward to working with you on thi~ project. If you have any questions,
please contact me at your convemence.
Very truly yours,
GEOTEST ENGINEERING, INC.
Mark D. Wells, P.E.
Vice President
MDW/~
Copi~ SubmlUe. d
Am~c. hm~nts:
(1)
Fee Schedule (CMT 800)
1)C26/l~! ~/04P~74.DOC
GEOTEST ENGINEERING, INC.
5600 6intliff Ddve Houston, Texas 77036 Tel (713) 266-0588 Fax (713) 26,~.2977
CONSTRU(;TION MATERIAL8
TESTING FEE SCHEDULE
CMl' 81)0
PERSONNEL
01 Prindpal, P.E.
02 Senior Engineer. P,E. (t0 years experience]
03 Project Engineer, P,E,
04 Staff Engineer. E.I.T,
05 Proje~ ManN)er
06 Technician NICET IV
06.5 Technician NICET 1V - eT
07 Technician NICET Ill, HMA-IA a~ HM^-II
07,5 Technician NICET III, HMA-IA or HIvlA-II - 03'
08 Technk;ian NICET Il. HMA-1A, ACI I
08,5 Technician NICET II, HMA-1A, ACI I - o*r
11 Technician, Non-CaflJrmd
! t o$ Technician, Non-Certified - eT
lZ Welding Insm~clor (CWl)
13 Willcling Inspe~-tor {A~,oclate C,W.I.)
13.5 Welding Inr~pector (A~eoaate C.W.I,) · eT
t4 NDT Inspector (ASNT Level II)
14.5 NDT Inspector (^$NT Level Il) - eT
15 NDT Inspector (A-~NT Level II1)
15.5 NDT Inspe¢tOt (ASNT Level Iit) - eT
16 NDT Inspector Level II wi AsSt. (2 man crew)
17 Support Pcr~onnol (Drafting or Word Processing)
18 Vehicle Charge
'ID Treffic Control
MA TERIAI.$ TESTING
fO0 Cot, crete Aggregates:
101 Screen or Sieve Analysis (A~TM C-136)
102 Speoirm Gravity (A.~TM C-1Z7 er C-128)
103 Unit Waigllt {^~I'M C-29)
104 A~ien (ASTM C-t27 or C-128)
105 Fkner thaa 200 mesh (ASTM C-117)
106 Organic Impmitbe (AS'TM G~0)
107 Seratch Hardness (AS?M C-851)
108 LA Abrasion Tests (ASTM C-131 or C.535)
109 Cie~y I. umpe (A~I'M C-142)
110 Light Weight Piec, e~ (ASTM C-123)
111 Send Equivalent (A~STM C-2419)
1'12 Sodium ~utfate Soundness. 5 cycles (ASTM
113 Sodium Sulfate 8oundne~ ~ additiofleJ Cycles
114 pslmgrapi.Jc Examinatiorl of Congreto Aogregalee (A~TM C~295)
201 Mix Design Review ($tatlaticalAnely~b)
202 Trl#, Batch Tesl~ (incl. Test Costs ASTM C-lg2)
203 Cylinder Te~t (ASTM C-39)
204 Beem Teat (ASTM C-78, C-203)
205 Concrete Coring (4' Dia., up to 6' Thickne~)
206 Measuring Thickness o/Concrete Cores (ASTIVl C-174)
207 Additiemd Thickness (8" tO t2')
208 Additional Thi=kness (over t2')
209 Concrete Caring. Minimum Charge
210 i:¥epamlioo of Core, Cepplngan~Test(ASTMC-42)
Page 1 of 4
$143.00
$105.00
$82.00
$65,00
$58.00
$53.0O
$79.5O
$48,00
$72,00
$a3.oo
$~:4.50
$32,00
$72,00
~48.00
$'72,00
S78.00
S31.00
Cost +10%
$28.00
$33.0O
S31.00
$1
~*~40,00 '
~7.00
S260,00
ay
/'Hr
/ Hr
I Hr
I Hr
/Hr
I Hr
/i'V
I Hr
I H~
I Hr
I Hr
I Hr
I Hr
I Hr
/Hr
/Hr
IH[
I Hr
I Hr
I Hr
/Hr
I Hr
I Hr
les
lea
lea
/Es
lea
lea
l~s
lee
lea
lee
tee
lee
$I 15.00 lea
$200,00 Iea
$13.00 IFa
$20.00 I,Fa
$72.00 I Ee
Se,SO lea
$6.75 I In
$12.00 I In
$275.00 ILS
$57.00 /es
CO 39~d ~)NI~33NIE~q3 £$3J.O~FD LLG~gg~£TL OP:OT POOC/T~/60
GEOTEST ENGINEERING, INC.
5600 Bintliff Drive Houston, Texas 77036 Tel (713) 266-0588 Fax (713) 266-2977
CONSTRUCTION MATERIALS
TESTING FEE SCHEDULE
GMT 600
Page 2 of 4
211 Cement Compressive Stmrmgth, one age (ASTIVl C-109) $104.00
212 Cement Compressive Sb'ength, ek~o eges (^$TM c-1n9) $127.00
213 MortarlGroui Comp. ,gtrength Cubes (AST~ C-10g)
214 Me, tar/Grout Comp. Sirenglh Cubes 3" x 6' (^STM C-495) $17.00
215 Mc~arlGrout Comp. Strenglh (AETM C-1019}
216 Structural C~n9 By Quo';ation
2t7 Wlml$or Probes (ASTM C-603)
218 Bar Linear Shrinkage $235.00
219 Unit Wright of Lighlwejght CylinOers $25.(10
220 Sf~it Tensile Strength Including preparation (ASTM C-496}
221 petrographic Examinabon of Iflatdened Concrete (ASTM C-R56) By Quotation
222 Concrem Shrinkage TeSt (ASTM C-157, C-4g0) $125.00
lsat
I Sm
I Ea
lea
/ Ea
I Set
I
I Ea
301 Cemixessive ~trength (ASTM C-67) $24.00 I Ea
302 Ab~rplien- f;ve hour boiling (ASTM C-67) $E2,00 1E.~
303 Absorption - 24 hou¢ boiling (ASTM C-67) $~,3.00 1 E~
400 Re~nf(~cing
401 Ten~ion Tests (elam #1t and under) $36.00 I Ea
402 Ter~si~ Tests (mze~ over #11) $48,00 I Ea
403 Bend Tes~s (size #6 end ureter) $29.00 I Ee
404 6em~ Tests (sizes ~ver #6) S35.00 I Ea
405 Oek;rmabon Examination $?.1.00 I Eu
406 Belt Tenrdle Test (ASTM A-325) $42.00 I Ea
500 Weidee ~ee~imm~:
501 Welded Coupons (A,~I'M A-370) ~est -10%
600 ~'enskm Tests (ASTM A.3?O):
601 Without use of Extensometer $38.00 I Ea
602 With use of Extensomemr (with Curves) $67,00 I Ea
603 Steel SCrand Ca~e $94.00 I Ea
700 Nondestructive
701 Radiographic Films (ASTM E-142) . Cost ~. 10%
702 Ra~ogral~ic So~'ce, Iridium (ASTM E-1114) 3i91
703 Radiographic $0urca, Cob~ 60 $104.00
704 Ul~e~eni= Equipment (AW8 D1.1)
IE.~
lea
lea
P0 39~ E~NI~33NIE~q3 IS3103~J LLG~gg~ETL OP:GT
GEOTEST ENGINEERING, INC.
5600 BIn~liff Drive Houston, Texas 77036 Tel (713) 266~$88 Fax (,~t3) 266-2977
CONSTRUCTION MATERIALS
TE~TING FEE SCHEDULE
CMl' 8OO
Asphalt Consrete MIX Design
Page 3 of 4
801 Mix Design Review $16CLO0 I Ea
802 Trial Batr..h Test (up to 5 points) $1,20(k00 /-Es
803 ' Additional Cuwe Points for l'r~al Baich Te~t, per paint $17:t.00 I Ea
504 Extraction & Gradation Test (T£X 210F) $141).OO I Es
80,5 Sl)eoifi; Gravity (ASTM C.2041 er TS× D01F) $53.00 I Es
806 HVEEM or Marshall Stability (TEX 208F or ASTM D1559) $70.00 I Set
801 I~u~k Density- tab Molded (TEX-20?F) $3~,00 I Set
807.5 Bulk Density - Core (TEX.207F) $35,00 / Ea
808 Molding Specimens (;3 per set) (TEX 205F) $48.00 I Set
~09 Penelradon (A3TM D-5) $63.00 I Ea
810 Oucfllity(ASTMD-113) $85,00 lea
811 Viscosi~/{ASTM 0-2170) $70,00 I E~
812 Asphall Coring (4' Dis., up to 6" Thickness) $88.o0 I Ea
813 Asphalt Coring Minimum Charge $2~,0.00 IL$
814 Additiorml thV.,kne~ greater than 6" ~:6.00 1 In
81,5 Abson Recovery (TF_X 211F) $2z,0,00 I Ea
817 Mexlmum Theoretical Specific G~avi[y (TEX 227) $67.00 I Ea
815 HOt Mixed ln-Pla(;e Asph~l Design $1,e~J0.00 I Ea
819 Apparent Specili; (3rav#y (TEX-202F) $50,00 1 Ea
820 Moisture Su,sceptibilily Test (TEX $~1-C) $3~,50.00 I EB
821 PMA Exfraction/Graddtinn (ASTM 0-2172) $200,00 I Ea
822 pMA Ex~raotlon/Gradutlon by IgnllJon (ASTM D,.6307) $11).4.00 I E;
gO0 Build-up Rtmf and R~of Fill:
901 CuL'ting Out Roof Sample EvalualJ~nl Analy~l~ (ASTM D-2928)
902 D~ Density Test and 28 day C,~mpre~lve Tests
903 LeboraoTy Prepm~o~
$259.00 I Ea
$53.00 ~ Ea
APl~i¢abie Technictam Rate
1000 ~oils Teats:
1002
1003
1005
1006
t007
1008
1019
1011
1012
1013
10t4
1015
1016
1011
1018
1019
10t9,5
1021
1022
1023
10~4
Liquid and Pis~i; Llrnbs (ASTM D-4318)
Moisture Content Only (ASTM D-2216)
,~ieve An~ysis (ASTM C).-422)
Parr, el'Jr Passing #2O0 Sieve (ASTM D-1120)
Specific Gravity (A~rlVl D-854 and D-204)
OMC) S~andard Compaoik~ (A~TM D-698)
aMD Id~dified compaction (ASTM D-1557)
OM~) Lime or Content Sf, al~li~ Soil (ASTM D-698 or O-1557)
Cnlifomia Bearing Ratio (ASTM IP-tSa~J)
Percent Solids - Lime Slur~' (ASTM 0-2216)
Lime Series - 4 Point
Cement Content (A~TM D-SO0)
Nuclear Dem~¥ Equipment Ran(al
Cement ~ CompmssNe S~rength (ASTM D-1633)
Maximum and Minimum Density (Sand) (ASTM D.4254)
Dansily and Moislum of Soil Sample (ASTM D-2216,0.2937)
Un;o~ned Compro~ive (ASTM D-2166)
Unconsolidated Undrained (A~TM D..2650)
Consolidatlon - Increment (ASTM D-2435)
Conrroiidalion - additional Increment
pH at' Soil (AOTM D-4972)
Optimum Lime Content pH M~hod
Sieve Analysis - Base Malarial (ASTM C-136)
Compre~r, ive Stranglh - Bi~e Malarial {TEX-120E)
$45.00 I Ea
$6.00 lea
~42,00 I Ea
~3~.00 lea
$I~.0o /
$160,00 / Ea
$~65.00 lea
$; 58.00 lea
$32,OO I Ea
$t78.00 I
$230.00 I Ea
S52,00 I Ea
$155,00 / Te~t
:;19.00 I Ea
$33.00 I Ea
$48.00 I
$265.00 I
$38.00 I
$173.00 IE~
.~/O.OO
GEOTEST ENGINEERING, INc.
5600 Bintliff Drive Houston. Texas 77036 Tet (7t3) 266-0588 Fax (713) 266..2977
CONSTRUCTION MATERIALS
TESTING FEE SCHEDULE
CMT 800
Page 4 of 4
1025 Soil Shrinkage Feeler (ASTM D-427 ) ~6.,~ I Es
$2t5.'~ I ~
1 026 O~ D~te~n~l Swal Coh~ive ~ (ASTM D~943) By Qu~n
1027 T~axial T~a~ $170.~ I ~{
1028 Pe~eeblii~ C~d~ He~ (AS~ D-24~) $210.~ I Te~t
10~ P~h~e Test ~8.~ / Ea
10~ Crumb Test (ASTM 0~7) $1~,~ I ~
1031 Double Hydromet~ (~TM D~I) $75.~ I ~
1032 Free 5weR (FHA) ~2,~ I ~
1033 So~ Suct~n - Filer Pe~r Mat~
1101 Intermittent 3.1nch Dismeter (0-50FT) $13.50 IFt
$1 !~.00 1Ft
1102 Intermittent 3-inch Diameter (51FT-I.OOFT) $15,00
1103 Con[inuous 3-Inch Diameter (0-20FT} $!;.00 IFt
1104 Boring over 1.00 FT A~Jitinnel Surcharge $7.00 / Ft
1105 W.~h Boring $;}.00 IFt
1106 Auger Boring
1107 Undisturbed or Split Spoon Sample In Wa=h or Aucjer Borir~s $~;).00 I Ea
1108 Gmu~ing of Completed Bore Holes 94.00 ! Ft
1109 Boring Not Ac, Ge~sible by Truck Mounted Equipment, Surchal~je $5.00 IFt
11 tO MImmum Chsi'ge (to be used when charges ere
les~ e~an 9575)
1111 Idobili;MJon/Oemobiib~tion $250,00 I Projec{
t112 Piezemster Inst~ilation ByQuotalJon
1113 ?HDConePenetrsliDnTest $;~.00 lea
$1~,00 ILS
1114 ATV Mol~#zation Surcharge
1115 Polleble Rig Drilting (Crew el' W~oi $1:~2.00 /Hr
$1;~5.00 I Hr
1116 Stand by(Crew of two) Cost +10%
1117 Matel~l~
13o0 Reimburi~bls Expenses
130t Reimbursable Expenses InckJding Outside Tea, ting, Equipment
Cost *10%
Remarks
Ove)Yime rate of 1.5 times the hourly rate Is appliGabte or any hours worked before 8:00 a.m. or elter &'O0
p.m. Monday ~hrough Fr~ley, w~l any huur~ worked on Saturday. Sunday or holidey or over 8 hours per
day.
A minimum of 4 hours will be charged .f the epp~cebM rate for all tachnl;iarufnspecior se(vices.