R2004-123 08-09-04 FAILED FAILED 8~9~04
Resolution No. R2004-123
RESOLUTION NO. R2004.123
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND,
TEXAS, AWARDING A BID FOR CONSTRUCTION SERVICES
ASSOCIATED WITH THE CORRIGAN AREA DETENTION POND.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS:
Section 1. That the City opened bids for construction services associated with the
Corrigan Area Detention Pond, and such bids have been reviewed and tabulated.
Section 2. That the City Council hereby awards the bid to , in the
amount of $
Section 3. The City Manager or his designee is hereby authorized to execute a
contract for construction services associated with the Corrigan Area Detention Pond.
PASSED, APPROVED and ADOPTED this the gth dayof August ,
A.D., 2004.
ATTEST:
TOM REID
MAYOR
YOUNG LORFING, TRMC
CITY SECRETARY
APPROVED AS TO FORM:
DARRIN M. COKER
CITY ATTORNEY
urn
Engineers ® Planners ® Project Managers
P.O. Box 130089
Houston, Texas 77219-0089
5757 Woodway 77057-1599
Tel: (713) 780-4100
Fax: (713) 780-0838
July 27, 2004 TC&B Project No. 052.511256.0004
Mr. Joe Wertz
Projects Director
City of Pearland
3519 Liberty
Pearland, TX 77581
Re: Mobility and Drainage Bond Program
Corrigan Area Drainage -Contract No.2-Detention Pond Improvements
Dear Mr Wertz:
The City of Pearland Purchasing Office received sealed bids on June 2, 2004 on the above referent
project Bids were received from three contractors. The bids received are shown on the attached
Bid Tabulation.
The low bidder was Triple B Services L L P with a bid of $2,782,970.25. The bid were tabulated
and reviewed. Triple B Services, L.L.P has previously satisfactorily completed projects for the
City of Pearland and in the City of Pearland In negotiations with Triple B Services, L L P it was
determined that the construction cost could be reduced by relocating the proposed pump station to
the southwest corner of the site, changing the configuration of the pump station structure changing
the discharge piping and the intake configuration. The total negotiated reduction in construction
cost of $415,977.80 is reflected in the attached Change Order No.1.
It is our recommendation the project be awarded to the low bidder Triple B Services, L L P in the
amount of $2,782,970.25 and execute Change Order No.1 in the amount of a cost decrease of
$415,977 45.
Sincerely,
Jarfies W. Keller, P.E.
Senior Project Manager
Enc: Bid Tabulation
Change Order No.1
cc: Craig Hester
Rod McCrary
Established in 1946
Engineering Excellence for Over One -Half Century
AN AECOM COMPANY
TurnerCo(Iie0Braden Inc.
Engineers • Planners • Project Managers
Date:
Owner:
November 7,2003
City of Pearland
Contractor: Triple B Services, L.L.P.
Engineer:
Job Name:
Job No.:
Contract:
Turner Collie & Braden Inc.
Corrigan Area Drainage Improvements
Contract 2 - Detention Pond
052.511256.0004
Bid No B2004-058
Construction Change Order
Change Order No. 1
Amount
Amount:
($415,977.80)
Time
Original Contract
Previous Change Orders none
Current Change Order # ;J
Current Contract
$2,782,970.25
$0.00
($415,977.80)
$2,366,992.45
Days
The terms of the Agreement, dated 07/26/04, between Owner and Contractor are amended as follows:
Description of Changes
Relocate Pump Station and eliminate force main and related quanity adjustments
APPROVED BY: OWNER
By:
Company:
Title:
Date:
ACCEI D B144 : CO
By: ktit,
Company: M
Title: Y cKn Gi e• Pace ker
Date: q• Z /• 0ki
300
300
Comp Date
N/A
N/A
n.�► �L I c(evi cars, L `..,?
Fonn Date: 9/11/2001
TurnerCollie651Braden Inc.
F igineers • Planners • Project Managers
Date:
Job Name:
Job No.:
Contract:
November 7,2003
Corrigan Area Drainage Improvements
Contract 2 - Detention Pond
052.511256.0004
Bid No B2004-058
Description of Changes
Construction Change Order
Change Order No. 1
CHANGE
ORDER
TABULATION
ITEM
DESCRIPTION
QUANTITY
UNIT
UNIT
PRICE
NET
CHANGE
13
Haul
and
dispose
excess excavated
material
-5000
CY
$5.10
($25,500.00)
18
18-inch
RCP
-18
LF
$34.85
($627.30)
19
24-inch
RCP
100
LF
$47.50
$4,750.00
20
24-inch
ASCP
-20
LF
$38.00
($760.00)
23
48-inch
RCP
-18
LF
$128.00
($2,304.00)
24
4" x 5" RCB
-7
LF
$200.00
($1,400.00)
25
8' x 8' RCB ( Intake)
80
LF
$468.00
$37,440.00
35
24-inch
RCP SET
1
EA
$900.00
$900.00
40
5
1/2" Channel
Lock
-500
SY
$48.20
($24,100.00)
41
8" Channel
Lock
-800
SY
$68.00
($54,400.00)
42
42-inch
force main
-560
LF
$325.00
($182,000.00)
43
Pump Station Structure
-1
EA
$392,700.00
($392,700.00)
44
Pump Station Piping
-1
EA
$262,500.00
($262,500.00)
43a
Pump Station Structure
1
EA
$385,200.00
$385,200.00
44a
Pump Station
Piping
1
EA
$46,200.00
$46,200.00
48
6" Concrete Pavement with
Lime Subgrade.
-150
SY
$52.50
($7,875.00)
51
8" Lime
Stablized
Subgrade
75
SY
$2.60
$195.00
52
Lime
2
Ton
$163.00
$326.00
Sub
this
Sheet
($479,155.30)
Total
Form Date: 9/11/2001
TurnerCollieC5Braden Inc.
Engineers • Planners • Project Managers
Date: November 7,2003
Job Name:
Job No.:
Corrigan Area Drainage Improvements
Contiact 2 - Detention Pond
052.511256.0004
Contract: Bid No. B2004-058
Description of Changes
Construction Change Order
Change Order No. 1
CHANGE
ORDER
TABULATION
ITEM
DESCRIPTION
QUANTITY
UNIT
UNIT
PRICE
NET
CHANGE
53
6" Flex
Base Course
75
SY
$8.00
$600.00
54
2"
Hot Mix
Asphalt
Conctete Pavement
75
SY
$14.50
$1,087.50
61
Bollards
-46
EA
$260.00
($11,960.00)
70
5" slope
pacing
1300
SY
$56.50
$73,450.00
LF
LF
LF
LF
LF
LF
LF
EA
EA
EA
LF
LF
SY
LS
Sub
this Sheet
$63,177.50
Total
($415,977.80)
TOTAL
Form Date: 9/11/2001
CORRIGAN SUBDIVISION DRAINAGE IMPROVEMENTS CONTRACT NO. 2
CORRIGAN DETENTION POND & PUMP STATION
MOBILITY AND DRAINAGE BOND PROGRAM
BID TABULATION
U
4
0
0
N
0
a".
a
Bids Received June 2, 2004
0.
a
EA.
di
0
0
0
0
69
0
N
e)
0
ci
0
N
0
0
0
N
0
0
ui
0
0
0
0
N
0
Cr
0
O
Cr
t9
0
0
co
0
0
ci
0
O
0
0
N
0
ci
0
N
69
0
ci
N
01 69
0 0
O 0
66
O N
co
e)
e)
0
0
0
0
0
N
0
O0)
to
69
0
ci
rn
co-
69
01
0
0
e)
0
0
on
0
ci
0
on
oo
010
0;0
IA VS
69
LO O
EFS {oi
a
0
0
69
0
0
01
0
CO
0
M
to
0
ci
0
ui
10
o
O
0
e)
0
69
0
N
0
0
0
0
(
0 0
0 0
on• f0
01
0
m
O
0
0
0
oio
0'0
0 CO
F-
69
0
N
(9
69
0
0I0
0
0
O
t..
010
Oi0
N'O6916
0 0
CD 6
O'
EeCO
l
0
69
0
ci
o{o
O 't
6 69
o
ci
a0)
(9 69
0 0
O 10
0!O
69
or
19
co
10
69
0
69
t9
69;
O
0
co
e>
CD
(V
e3
b
0
0
69
0
0
e)
a
0
u)
69
0
N
69 69
0 0
0 v• 0)
69
e)
V
N
DISPOSE OF EXIST ASP
0
VI
DISPOSE OF EXISTING CONCRETE SPILLWAY
b
DISPOSE EXISTING CONCRETE SID
e)
0
0
N
0
69
0
0
on
0
(V
132,500.00 j $
69
in
e)
0
ci
0
69
n
N
0
el
0
69
N
0
CO
0
!�
a
a O
0
0
ci
0
ci
010
OliN
trS
8
69i
o0
69{0
;VI
0
N
N
ter 69
(Ir
co
0
N
t9
0
0
vi 611
0 0io
o o K
69
0 0 0
0 0
N V vCD
M
U
z
U
W
a0.
co
U
U
N
0
0
N
0
0 0 0
o ola-
o (O, u)
O M O
aaa
0
ci
0
0
0
0
o
co
0
0
tri
a
0
ci
0
0
69
0
co
69
M
12.000.00 i $
69
0
69
CD
CO
U
0
0
o
M
N
t9
0
0.
ci
U
U
w
0
w
O
O
0
0co
VI
15.000.00 j $
69
rn
0
N
0
ci
0
te
0
N
N
00
tri
to
0
3
COOD
CO
en
N
A
69ve
0
on
0
h
N
0'0
Nt-
EA
e)
a
69
0
0
0
N
69
0
M
010
oio
o ;o
o:o
Oil
01 EA
NIM
O WS
0 0
0 0
CS 6
N N
N
69 69
O
V
Vi
0 0
Eri
h
0
N
aIa
0on
0
0
0
u0i
n
o; o
0v 0
olo
0 0
09
0 0Io
OD Cr
0 0
a• l
0
N 6
69 69
0
tri
0
CO
0
0
tri
0o 0 0
00003
0
ci
0
0
0
a
o10
0 0
o co
0
0
000
091e
0
N
0
co
0
0
69
0
N
69: 691 t91t9
(9
CO f9 e9
0 0 0
W o o
co
H.
b
CO
CO 0
0 N
azb
n w
0
N
U
a
O
0
N
N
CO
gminiviviEgvim
co
0
Elo
0
0
0
N
0
0
0
0
0
ci
0
0
fa
(V
oio
0; 0
0
Nt
V
69
0
N
N
0
0
d9
0
co
69
0
M
O
te to
0 0
0 0
00
N (`CO 0)
c-1
69 69
O
O
0
EA
(Nn
0
0
e)
0
0
69
0
0
t9
0
0
e)
7
u3
N
N
N
8'x8' RCB. STO
N
2
0col
a
N
N
0
0
m
t9
0
0
N
ci
cd
69
69 69
o
ri
0
Cr
EA
en
ci
69
ci
69
CD
491
-41
el
os
olo
cni
co
69
ci
01
Cr
CP
00
69
ci
to
cni
ci
to o
CFI
0
0
69
CI
69
ci
U3 CO
co
en
co
69
ci
69
Ci Cr
1.0
CD met
69
69 69
ci
to
to
ut
tic
01 tA
ci
Cr
01
ci
co
69
co
ci
69 69
to
Eri
ci
co
trl
ci
co
69
ci
cn
co
co
03
00
4.1
0
Ci
0
CO
ci
tr
CA-
Ci
0
o
te
611 Cr
N 69
0
0
el
69
ci
on
ci
cNE-
ci
ci
te
16
CD 0
ci
el
co
te
ci
01 E/1
tt
en co
O
Cel
to
to
ci
tr
co i
CO
ci
tf
69
CD
Itt
6 69
69
cni
co
tri
69
to
co
co
cci
tr
o
o
EA
cr
0
69
el
ci
el
EFS
ci
ci
co
co
(19
on
ci
CO 61
ni
to
69
EA
to • 0
o
OLE FOR 42'
OLE FOR 48" STO
tri
0
co
a.
18"RCP 6:1 S
24"RCP 6:1S
COI
30" RCP 6:1 SAF
VI
136" RCP 6:1 S
48" DUCTILE IRON PIPE FL
48" DUCK BILL C
CO
to
LOCK CON
ci
CO
69
0
0
Ci
0
at
CO
cp
01
CD
cr
cn
di-
o iq
o
to 1
43 ':.PUMP STATION VAULT
ci
co
on
to
69
0
oi
69
Cr
0
oc
01
co
69
En
ci
ci
69
ci
ci
CA
ci
0
TRE
CA
Cti
JO
69
ci
tr
ci
tr
LO
69
Ul
Or
EFS
ci
ci
0 co
93
ci
co
61
co
ci
69
ci
to
ci
69
CO
69
CO
co
to
to
cl
0
Ci
69
En
69
69
ci
co
LO
CI
44
Hp
69
69
o
4;4 El
in 110
DUCTILE IRO
110
Tr
cop
0.
co
En
69
69
co
cti
69
ci
ai
69
01
69
Eri
Ce
0
Cr
LO
69
CP
co
CA
CD
Ci
fA
01
It
Cr Cr
011.0
le le
Or
69
fie
ci CD
101
ot
e 69
con
co • opt
co ai
69
o
69 EA
01 0
0 • VI
CD
to
tri
69
69
03
0
CS
at
61
to
CS
0
tiS
CI
CO
(71
01 o
tri
to co
co! • to
69 1
co
to
cti
CO 0
Op • N
CO !CO
tOI
co N
co
tri
0 N-
CO 03
ci
te
to
to
ci
01 VS
CD 0
Cr Cr
69
• t• ri
o
co co
tri to
co
EA 69
CI
ci
Itc
69
0
0
Cr
69
0
Ci
CO
CA
to
ci
fel
0
LO
CI
ul
co
0
01
VI
po
If; 09
0
ci
o
Crl
69 EA
CD
cad
0
CO • 0
o
ct
4.4
.71
el
0
0
0
VD
VI
or oc)
691
te
o
0
ci
tr
CD
ci
co
ci
oi
69
CI
tr
69
0
to
on
co
ci
Ern
CO
co
o co
to
EFS
69 69
cp
Eri
co
03 69
Eri
CA
ci
69 69
69
VI
69 e
00
0
44
prit
VI
ci
co
01
CA
ci
co
01
of
69
0
el
0
rwrol
cip
o.
En
6
01
co
69
tri
tri
en
0
Cr
Ul
03
co
ci
ci
co CO
el 69
ci
o
el CO
e 69
o
0
ci
co
o
ci
to
ci
ci
co
09 69
to
05
EFS
Cr
61)
ci
ci
CI 0
69 69
tO
69
Ul
-EL CO
6 PEP
1109
0
0
LO
44
6 VD
tO VD
0
cO
CO
10
EA
mt
ot
LO
CO
$ 2,854,266.00
$ 2,782,970.25
$ 1,689,120.00 j