R2004-067 05-10-04 RESOLUTION NO. R2004-67 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS, APPROVING A CHANGE ORDER ASSOCIATED WITH THE REPLACEMENT OF THE ALICE STREET WATER PLANT GROUND STORAGE TANKS. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PEARLAND, TEXAS: Section 1. That a change order associated with the replacement of the Alice Street Water Plant ground storage tanks, a copy of which is attached hereto as Exhibit "A" and made a part hereof for all purposes, is hereby authorized and approved. Section 2. That the City Manager or his designee is hereby authorized to execute and the City Secretary to attest a change order associated with the replacement of the Alice Street Water Plant ground storage tanks. PASSED, APPROVED and ADOPTED this the [0th day of Nay , A.D., 2004. ATTEST: APPROVED AS TO FORM: DARRIN M. COKER CITY ATTORNEY TOM REID MAYOR Exhibit "A" Resolution No. R2004-67 CHANGE ORDER OWNER ........... ~ ................................................................................................... OWNER's Contract No ....... ~.~.. ' You are directed to make the following changes in the Contract Documents. Description: ~ ~L_ L.e_k-~_w- a 3~ Zc~' ~ t-P 4 ¢ Reason for Change Order: Ct. ~ ~ ~ k_-~-X' ~ t~ o ~ ~ K ~ Attachments: (List documents supposing change) CHANGE IN CONTACT PRICE: CHANGE IN CON--CT TI~S: ' Original Contract Price Odginal Contract Times $ ~ Z ~f 000 - SubstantialCompletion: Ready for final payment: days or Net ch~ges from previous Change Ordem No., to No ~ Net change from previous Cb~ge days Contract Price prior to this Change Order Net Increase (decre~c) of this Chanse Order Contract Price wi~ all approved Change O~ers Contract Tim~ with ~1 approved Change Ordem $ 5[~ ~O. Substantial Completion: l~ , ~ Ready for final payment: da~ or dates EJCDC No. 191~-B (1~0 Edition) ~epared by th~ Ensine~B ~oint Contact Documents Committee and endorsed by The Associated 6¢neral Contractors of America. Contract Times prior to this Change Order S ubstantial Completion: [ r~q:> Ready for fin~ ~ymnt: da~ or dat~ Net lncre~e (~sO of this Change O~r 3o / . - Co n t rac t~z ( ~,u tho~ig~a~l~) Date: LI'I&.O H ' DUNHAM ENGINEERING /,1 Water Tank Consultants �IT 13141 Hill Rd. • College Station,TX 77845 • (979)690-6555 • Mobile(979)820-1648 •FAX (979)690-7034 ( www.DunhamEngineering.com March 24, 2004 Advance Tank and Construction Company Pell City, Alabama Via fax#205-884-2040 Attn: Terry Hyatt Ref.: City of Pearland, Texas Water Storage Tanks @ Alice Road Water Plant Construction Project You are directed to make the following changes to the ref. project: • Add 4' air gap to each tank's water compartment by increasing the overall shell height from 24' to 28'. You are authorized to use 3/16"thick A36 steel plate for the upper 4' of the wall that will not be in contact with water. • Increase overflow pipe diameter for each tank from 8" to 16"— �` °� 1 P�7P of Par row m 23' . No change to fill pipe elevation. • Increase height of each tank's interior ladder by 4'. No change to exterior ladder. • Increase diameter of interconnect pipe between the two tanks from 12"to 24". • Add a 24" diameter blind flange to the lower wall of each tank for future discharge pipe connection. Locate bottom of flange approx. 1' above grade. Locate on the east side of the tank as determined by Engineer. • Add a 24" diameter blind flange to the roof of each tank for future fill pipe connection. Locate outer edge of flange approx. 2' from edge of roof. Locate on the east side of the tank as determined by Engineer. • Install three additional 12" diameter vents on the roof of each tank. Locations to be determined by Engineer. Please provide pricing information and construction duration changes. We will prepare the change order for signatures and mail a copy to you. Please call with any questions. Sincerely, tik‘ immy D. Dunham, P.E. 03/30/04 09.17 FAX 205 884 2040 ADVANCE TANK ll 001/003 P.D. Box 1149 8762 Dry Creek Road TANK AND CONSTRUCTION CO ' Pell City, AL 35125 To: Mr. Jimmy Dunham Company: Dunham Engineering Address: 13141 Hill Road College Station, TX 77845 Phone: (979) 690-6555 Fax: (979)690-7034 From: Erich Ott, Senior Sales Executive Company: Advance Tank and Construction Co. Phone: (205) 338-4483 Fax: (205) 884-2040 Date: March 30, 2004 Pages including this page: 3 REFERENCE: Tank A-600,000 Gallon Storage Tank Tank B-425,000 Gallon Storage Tank City of Pearland, TX ATCC#: 6603 03/30/04 09:17 FAX 205 884 2040 ADVANCE TANK 0 002/003 ® .11 v E TANKARD CONSTRUCTION co. March 30, 2004 Mr. Jimmy D. Dunham, P.E. Dunham Engineering 13141 Hill Road College Station, TX 77845 REFERENCE:Water Storage Tanks City of Pearland, TX AT&C#6603 Dear Mr. Dunham: Per your request dated March 24, 2004 for the additional changes on the water storage tanks located at Alice Road: Tank#1—55'Dia.X 24'High Cone Roof Tank: Add 4' air gap using 3/16" T Plate - $ 6,483.00 Increase overflow pipe size from 8"to 16"— $ 3,109.00 Increase height of interior ladder(1)—I $ 370.00 Increase dia. of interconnect pipe from 12"dia. X 24"dia. - $17,500.004" Add a 24"shell nozzle with steel plate blind flange for future use.- $ 1,672.00re;13 . 3 Add 24" dia. roof nozzle with steel plate blind flange for future use $ 1,672.00 Install (3) additional 12" roof vents- $ 3,031.00 LP'" , t Extra painting- $ 5,500.00 4.00 , ,,.) o- Tank#2—66'Dia. X 24'High Cone Roof Tank: Add 4' air gap using 3/16"T Plate- $ 7,945.00 Increase overflow pipe size from 8" to 16" - $ 3,109.00 �� Increase height of interior ladder- $ 370.00 3 Increase dia. of interconnect pipe from 12"dia.X 24"dia. - $11,500.004' � J 2 if Add a 24" shell nozzle with steel plate blind flange for future use- $ 1,672.00 Pa. Add 24"dia. roof nozzle with steel plate blind flange for future use$ 1,672.00 Install (3)additional 12" roof vents- $ 3,031.00 p I ��Extra painting - $ 6,457.00 (,Q,Xmi Engineering- $ 1,800.00 Extra Shipping Cost- $ 4,000.00 Subtotal- $80,893.00 Overhead& Profit 10%- $ 8,093.00 4 io TOTAL COST $88,986:66 gy,2/0 Office(205)338-4483 8762 Dry Creek Road,RO. Box 1149 Pelt City,Alabama 35125 Fax(205)884.2040 03/30/04 09:18 FAX 205 884 2040 ADVANCE TANK 0 003/003 Please issue the appropriate change order so we can proceed. We will notify you of the extra time needed at a later date when we can get a handle on the deliveries. If you have any questions, please do not hesitate to contact me. Very truly yours, ADVANCE TANK AND CONSTRUCTION CO_ Erich Ott Senior Sales Executive EO_jf TANK AND CONSTRUCTION CO April 5, 2004 Mr. Jimmy D. Dunham, P.E. Dunham Engineering 13141 Hill Road College Station, TX 77845 REFERENCE:Water Storage Tanks City of Pearland, TX AT&C# 6603 Dear Jimmy: Per our previous discussion of using a 24" M&H valve in lieu of the one you specified, there will be a $3,300.00 deduct. Also, I -have made an error and forgot to add the modifications needed for the center columns -due to raising the tanks. This will increase our change order request by $1,024.00 for both tanks. Original change order request dated 3/3/04 - $88,986.00 - Add — Extend center columns - $ 1,024.00 - Sub Total - $90,010.00 Deduct— Use M&H 24" valve in lieu of valve specified - ($ 3,300.00) Total - $86,710.00 Please issue the-appropriate change order so we can proceed. If you have any questions; please do not hesitate to contact me. - - - - - Very truly yours, ADVANCE TANK AND CONSTRUCTION CO. Erich-Ott - -_- -- _ S.enior-Sales=Executive-:._-.. EO;:jf, Office (205)338-4483 8762 Dry Creek Road, P.O. Box 1149 Pell City,Alabama 35125 Fax(205) 884-2040